Corsicana
Project of Riot
Where it stands
Riot's Corsicana Facility in Navarro County, TX currently provides about 400 MW of developed capacity for Bitcoin Mining, and on completion is expected to offer about 1 GW for high-density compute. Construction of the data center campus is continuing, and the full site (about 756 MW of critical IT capacity) is covered by a nonbinding letter of intent with a single tenant, not an executed lease. As of early October 2026, reporting still describes the site as uncontracted. No passage gives an MW figure for the capacity now under construction.
400 MW in service · 1,000 MW planned
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Bitcoin Mining capacity | 400 | operational | 2026-06-30 | The Corsicana Facility is currently equipped to provide up to approximately 400 MW of developed capacity for Bitcoin Mining 2026-08-09 View cached copy (2026-08-30)Live source ↗ |
| AI/HPC data center campus buildout | under construction | continuing construction at its Corsicana campus, which executives said could support both single- and multi-tenant AI and hyperscaler customers 2026-08-15 View cached copy (2026-08-31)Live source ↗ | ||
| Full campus under LOI (critical IT) | 756 | planned | Riot also has significant optionality at Corsicana, where 1 GW of approved power supports a potential 756 MW of critical IT capacity. 2026-09-28 View cached copy (2026-09-29)Live source ↗Archive.org ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: October 6, 2026).
Capacity
What has actually been delivered, against what has been promised. Each figure links to the statement it came from.
| Stage | Capacity | As of | Source |
|---|---|---|---|
| Energized power flowing today | 400 MW | 2026-06-03 | Corsicana substation energized April 2024 |
| Contracted a customer is on the hook | -- | ||
| Under construction | 1,000 MW | 2025-04-30 | Corsicana substation completion bringing 1.0 GW online |
| Permitted | -- | ||
| Interconnect approved utility has agreed to deliver | 1,000 MW | 2025-04-30 | Corsicana 1 GW secured power |
| Interconnect requested in a queue, nothing approved | -- | ||
| Announced a press-release figure | 1,300 MW | 2026-08-09 | Corsicana Campus Development LOI |
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-10-19
6980 FM 709, Corsicana, TX 75110 → 31.96453, -96.51119 (street) - Rejected facts that point elsewhere 2026-10-19
4 fact(s) rejected
1501 S. Mopac Expressway (225.1 km away); 11525 Stonehollow Drive (208.2 km away); 2721 Charles Martin Hall Rd, Rockdale, Texas 76567 (163.6 km away); 2721 Charles Martin Hall Rd, Thorndale, TX 76567 (163.6 km away) - Located from a published address 2026-10-19
Riot Corsicana → 31.96927, -96.51340 (footprint), 0.6 km from seed - Located from a published address 2026-10-19
6980 FM 709 S, Corsicana, Texas 78759 → 31.96453, -96.51119 (street), 0.0 km from seed - Located from a published address 2026-10-19
6980 FM 709, Corsicana, TX 75110 → 31.96453, -96.51119 (street) - OpenStreetMap features nearby 2026-10-19
1 named match(es)
- 2026-05-24 vs 2026-04-21: vegetation recovery visible
Satellite imagery on this page is drawn from the Google Earth satellite basemap, USDA NAIP aerial photography (~1 m/pixel), ESA Sentinel-2 multispectral (10 m, with per-date cloud masks), NASA / USGS Landsat 8/9 (30 m, plus surface temperature), ESA Sentinel-1 radar (all-weather, night), NASA ECOSTRESS thermal (~70 m), and NASA Black Marble night lights (500 m, daily). Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.