Corsicana Facility 400 MW immersion-cooled
Company: Riot - Project: Corsicana
The claim, verbatim
The complaint asserts the Corsicana Facility has approximately 400 MW of immersion-cooled Bitcoin mining infrastructure, completed or substantially deployed by year-end 2024, with the site designed to scale to about 1 GW.
Source (primary)
Green Revolution Cooling Inc v. Riot Platforms Inc — Entry #1 (RECAP, court_filing)
View cached copy (2026-10-16)Live source ↗
Quote: “the Corsicana Facilityconsisting of approximately 400 MW of immersion cooled Bitcoin mining infrastructurewas completed or substantially deployed by year end 2024, and that the site is designed to scale to approximately 1 gigawatt of total capacity”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
Paragraph 25 makes all three points, presenting them as representations Riot made on its website and in press releases.
Confirmed in the source:
- The complaint states that the Corsicana Facility consists of approximately 400 MW of immersion-cooled Bitcoin mining infrastructure
- The complaint states this infrastructure was completed or substantially deployed by year-end 2024
- The complaint states the Corsicana site is designed to scale to approximately 1 gigawatt of total capacity
What we did: Read our cached copy of RECAP (https://archive.org/download/gov.uscourts.txnd.420903/gov.uscourts.txnd.420903.1.0.pdf) in full (45,534 characters, retrieved October 16, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Green Revolution Cooling Inc v. Riot Platforms Inc — Entry #1
Quote: “the Corsicana Facilityconsisting of approximately 400 MW of immersion cooled Bitcoin mining infrastructurewas completed or substantially deployed by year end 2024, and that the site is designed to scale to approximately 1 gigawatt of total capacity”