Bitcoin mining operator; primary sites at Rockdale and Corsicana, Texas.
Corporate history
Riot is a vertically integrated digital infrastructure company operating three business segments: Bitcoin Mining, Data Center, and Engineering. The company owns and manages 1,292 MW of developed power capacity across three large-scale facilities—Rockdale (Texas, 700 MW), Corsicana (Texas, 400 MW, targeting 1 GW at full build-out), and Kentucky (192 MW). As…
Read the full history
Riot is a vertically integrated digital infrastructure company operating three business segments: Bitcoin Mining, Data Center, and Engineering. The company owns and manages 1,292 MW of developed power capacity across three large-scale facilities—Rockdale (Texas, 700 MW), Corsicana (Texas, 400 MW, targeting 1 GW at full build-out), and Kentucky (192 MW). As of June 30, 2026, Riot had deployed 44.4 EH/s of bitcoin mining hash rate and held 11,380 bitcoin ($666 million), of which 5,821 were pledged as collateral for a $200 million credit facility.
The company pivoted from pure-play bitcoin mining to monetizing excess power capacity through third-party data center leasing in 2025. In December 2024, Riot completed the E4A Solutions acquisition to vertically integrate engineering capabilities. In January 2026, Riot secured a ten-year lease with AMD for 25 MW of IT load capacity at Rockdale Facility; AMD exercised an additional 25 MW expansion in April 2026 and holds conditional first-priority rights for up to 100 MW more (total potential: 200 MW). In August 2026, Riot announced a 20-year Tenant Lease for 191 MW at Rockdale, with delivery phases in December 2027 and June 2028, funded by a $573 million Morgan Stanley credit facility.
For the six months ended June 30, 2026, Bitcoin Mining generated $225.6 million in revenue (down from $283.7 million in H1 2025) on 3,060 bitcoin mined at an average price of $73,736 per bitcoin. The cost to mine one bitcoin (excluding depreciation) was $47,369, with power costs as the dominant marginal input. Data Center revenue was $56.4 million, derived from the AMD leasing activity and tenant fit-out services. Engineering revenue was $59.5 million from custom product design and manufacturing, including services to the data center and industrial/governmental customers. The company also captured $31.1 million in power curtailment credits in H1 2026 by participating in ERCOT's demand response and ancillary services programs, which reduced effective mining costs by leveraging spread between fixed-price PPAs and spot market electricity prices.
Riot employs a selective Bitcoin Treasury Strategy, selling or leveraging portions of holdings opportunistically above predetermined price thresholds. The company has executed a Master Agreement with MicroBT for 50.9 EH/s of miners (valued at ~$795 million) for delivery through end of 2026, primarily destined for Corsicana. Three additional annual options to purchase miners on equal or more favorable terms are available under the agreement. Competition intensified in 2025-2026 as global network hash rate doubled; Riot's 15.3% hash rate growth from end of 2025 to June 2026 offset competitive pressure but required continued capital investment in electrical supply and distribution infrastructure.
Analyst consensus, peer set, and quarterly-EPS surprise history. Sourced from Finnhub; refreshed nightly.
Summed across 3 tracked project(s), from the capacity figures on each. Anticipated takes the firmest stage on record per project, so a site that is announced at 2 GW and contracted at 400 MW counts once, at 2 GW.
| Subject | Statement date | Promised by | Amount | Status |
| Term loan facility for Rockdale data centerfinancing | 2026-09-04 | - | 573.0 USD | stated |
| Rockdale lease capacity and termfacility capacity - Rockdale | 2026-09-01 | - | 191.0 MW | stated |
| Expected revenue from Rockdale leaseguidance | 2026-09-01 | - | 9.1 USD billion | stated |
| Q2 liquidity and bitcoin holdingsfinancing | 2026-09-01 | - | 1.2 USD billion | stated |
| Bitcoin pledged as collateralfinancing | 2026-09-01 | - | 5821.0 BTC | stated |
| Q2 2026 revenueproduct | 2026-09-01 | - | 174.2 USD million | stated |
| Rockdale data center term loanfinancing - Rockdale | 2026-09-01 | - | 573.0 USD | stated |
| Rockdale data center capacityfacility capacity - Rockdale | 2026-09-01 | - | 191.0 MW | stated |
| Rockdale campus 191 MW data center leasefacility capacity - Rockdale | 2026-09-01 | - | 9100000000.0 USD | stated |
| $573M term loan for Rockdale data centerfinancing - Rockdale | 2026-09-01 | - | 573.0 USD | stated |
| Rockdale data center capacityfacility capacity - Rockdale | 2026-09-01 | - | 191.0 MW | stated |
| 2029 revenue guidanceguidance | 2026-09-01 | 2029-12-31 | 1200.0 USD | stated |
| 2029 earnings guidanceguidance | 2026-09-01 | 2029-12-31 | 148.2 USD | stated |
| Data center at Corsicanafacility timeline - Corsicana | 2026-08-31 | - | - | stated |
| Data center at Rockdalefacility timeline - Rockdale | 2026-08-31 | - | - | stated |
| 191MW data center leasecustomer - Rockdale | 2026-08-31 | - | 9100.0 USD | stated |
| AMD expansion rights at Rockdalefacility capacity - Rockdale | 2026-08-31 | - | 150.0 MW | stated |
| Corsicana 1GW campus LOIcustomer - Corsicana | 2026-08-31 | - | 1000.0 USD | stated |
| Anthropic project financing structurefinancing - Rockdale | 2026-08-31 | - | - | stated |
| $180M term loan from AMD refinancingfinancing - Rockdale | 2026-08-31 | - | 180.0 USD | stated |
| $573M interim facility from Morgan Stanleyfinancing - Rockdale | 2026-08-31 | - | 573.0 USD | stated |
| Anthropic project capex requirementsfinancing - Rockdale | 2026-08-31 | - | 2150.0 USD | stated |
| Net operating income margin targetsguidance | 2026-08-31 | - | 85.0 percent | stated |
| Morgan Stanley interim financing for Rockdale developmentfinancing - Rockdale | 2026-08-29 | - | 573.0 USD | stated |
| AMD data center lease at Rockdale (50 MW)customer - Rockdale | 2026-08-29 | - | 50.0 MW | stated |
| Total leased data center capacity at Rockdale campusfacility capacity - Rockdale | 2026-08-29 | - | 241.0 MW | stated |
| Base-term contracted revenue from Anthropic and AMD leases combinedguidance | 2026-08-29 | - | 9800.0 USD | stated |
| 20-year lease for 191 MW data center capacity at Rockdalefacility capacity - Rockdale | 2026-08-29 | 2028-06-30 | 191.0 MW | stated |
| Net operating income guidance for Rockdale facilityguidance | 2026-08-29 | 2048-06-30 | 7300000000.0 USD | stated |
| Bitcoin holdingsfinancing | 2026-08-25 | - | 19000.0 BTC | stated |
| Cash balancefinancing | 2026-08-25 | - | 330.0 USD | stated |
| Secured facility for Rockdale data centerfinancing - Rockdale | 2026-08-25 | - | 573.0 USD | stated |
| Bitcoin mining operationsfacility capacity | 2026-08-25 | - | - | stated |
| Available power capacityfacility capacity | 2026-08-25 | - | 2.0 GW | stated |
| Contracted critical IT capacity at Rockdale campusfacility capacity - Rockdale | 2026-08-25 | - | 241.0 MW | stated |
| Long-term contracted revenue from Rockdale capacitycustomer - Rockdale | 2026-08-25 | - | 9.8 USD billion | stated |
| Rockdale contracted capacity and revenuecustomer - Rockdale | 2026-08-25 | - | 9800000000.0 USD | stated |
| Morgan Stanley interim financing for Rockdalefinancing - Rockdale | 2026-08-24 | - | 573.0 USD | stated |
| Morgan Stanley facility maturity datefinancing - Rockdale | 2026-08-24 | 2026-12-31 | - | stated |
| 20-year data center lease at Rockdale with AI labpartnership - Rockdale | 2026-08-24 | - | 191.0 MW | stated |
| First phase Rockdale capacity deliveryfacility capacity - Rockdale | 2026-08-24 | 2027-12-31 | 96.0 MW | stated |
| Second phase Rockdale capacity deliveryfacility capacity - Rockdale | 2026-08-24 | 2028-06-30 | 95.0 MW | stated |
| 20-year lease revenue projectionguidance | 2026-08-24 | 2048-06-30 | 9100.0 USD | stated |
| Lease value with potential five-year extensionsguidance | 2026-08-24 | - | 16100.0 USD | stated |
| Rockdale project estimated costguidance | 2026-08-24 | - | - | stated |
| Expected debt financing for Rockdale projectguidance | 2026-08-24 | - | - | stated |
| Morgan Stanley facility borrowing ratefinancing - Rockdale | 2026-08-24 | - | - | stated |
| Morgan Stanley delayed-draw facility for Rockdale data centerfinancing - Rockdale | 2026-08-24 | 2026-12-31 | 573000000.0 USD | stated |
| Anthropic 20-year lease at Rockdale for 191 MWcustomer - Rockdale | 2026-08-24 | 2048-06-30 | 9100000000.0 USD | stated |
| Rockdale data center capacity delivery schedulefacility timeline - Rockdale | 2026-08-24 | 2028-06-30 | - | stated |
| Coinbase $200M loan with BTC collateralfinancing | 2026-08-22 | - | 200.0 USD | stated |
| Additional BTC pledged February 2026financing | 2026-08-22 | - | 1825.0 BTC | stated |
| April refinancing BTC releasefinancing | 2026-08-22 | - | 1544.0 BTC | stated |
| Pledged BTC balance June 30 2026financing | 2026-08-22 | - | 5821.0 BTC | stated |
| Total BTC holdings June 30 2026financing | 2026-08-22 | - | 11380.0 BTC | stated |
| Q2 2026 mining revenueproduct | 2026-08-22 | - | 113.7 USD | stated |
| Q2 2026 data center revenueproduct | 2026-08-22 | - | 23.2 USD | stated |
| 191 MW facility lease for AI customerfacility capacity - Rockdale | 2026-08-22 | - | 191.0 MW | stated |
| Equipment financing facility $573Mfinancing | 2026-08-22 | - | 573.0 USD | stated |
| $200M credit facility with Coinbasefinancing | 2026-08-22 | - | 200000000.0 USD | stated |
| Initial BTC collateral pledge to Coinbasefinancing | 2026-08-22 | - | 3977.0 BTC | stated |
| Additional BTC collateral deposit to Coinbasefinancing | 2026-08-22 | - | 1825.0 BTC | stated |
| Coinbase credit facilityfinancing | 2026-08-22 | - | 200.0 USD | stated |
| Initial collateral pledge to Coinbasefinancing | 2026-08-22 | - | 3977.0 BTC | stated |
| Additional collateral depositfinancing | 2026-08-22 | - | 1825.0 BTC | stated |
| Total pledged collateralfinancing | 2026-08-22 | - | 5800.0 BTC | stated |
| $200M loan with Coinbasefinancing | 2026-08-22 | - | 200.0 USD | stated |
| Initial BTC collateral at start of 2026financing | 2026-08-22 | - | 3977.0 BTC | stated |
| Additional BTC collateral added in Februaryfinancing | 2026-08-22 | - | 1825.0 BTC | stated |
| BTC collateral released in April refinancingfinancing | 2026-08-22 | - | 1544.0 BTC | stated |
| BTC collateral balance as of June 30, 2026financing | 2026-08-22 | - | 5821.0 BTC | stated |
| Potential BTC collateral recoveryfinancing | 2026-08-22 | - | - | stated |
| AMD capacity expansion at Rockdale data centerfacility capacity | 2026-08-22 | - | 50.0 MW | stated |
| Coinbase loan with BTC collateralfinancing | 2026-08-22 | - | 200.0 USD | stated |
| 20-year AI data center lease - 191 MWfacility capacity | 2026-08-22 | - | 191.0 MW | stated |
| Equipment and project financing facilityfinancing | 2026-08-22 | - | 573.0 USD | stated |
| $573M credit facilityfinancing | 2026-08-21 | - | 573.0 USD | stated |
| Rockdale data center capacityfacility capacity - Rockdale | 2026-08-21 | - | 191.0 MW | stated |
| Anthropic 20-year data center capacity agreementpartnership - Rockdale | 2026-08-21 | - | 191.0 MW | stated |
| Anthropic first phase deployment (96 MW)facility timeline - Rockdale | 2026-08-21 | 2027-12-31 | 96.0 MW | stated |
| Anthropic full deployment (191 MW)facility timeline - Rockdale | 2026-08-21 | 2028-06-30 | 191.0 MW | stated |
| Anthropic agreement revenue projection (base case)guidance | 2026-08-21 | - | 9.1 USD | stated |
| Anthropic agreement revenue projection (with extensions)guidance | 2026-08-21 | - | 16.1 USD | stated |
| Anthropic agreement NOI projection (total)guidance | 2026-08-21 | - | - | stated |
| Anthropic agreement NOI projection (annual)guidance | 2026-08-21 | - | - | stated |
| AMD first 25 MW deployment completionfacility capacity | 2026-08-21 | - | 25.0 MW | stated |
| AMD data center capacity expansion to 50 MWcustomer | 2026-08-21 | - | 50.0 MW | stated |
| AMD 10 MW phase deploymentfacility timeline | 2026-08-21 | 2026-11-30 | 10.0 MW | stated |
| AMD 15 MW phase deploymentfacility timeline | 2026-08-21 | 2027-05-31 | 15.0 MW | stated |
| Morgan Stanley interim financing facilityfinancing - Rockdale | 2026-08-21 | - | 573.0 USD | stated |
| Terrestrial Energy MOU for small nuclear reactorspartnership | 2026-08-21 | - | - | stated |
| Terrestrial Energy nuclear capacity planfacility capacity | 2026-08-21 | - | - | stated |
| Bitcoin sales in first half 2026financing | 2026-08-21 | - | 730000000.0 USD | stated |
| Q1 2026 Bitcoin salesfinancing | 2026-08-21 | - | 289500000.0 USD | stated |
| Bitcoin holdings at end of Q1 2026financing | 2026-08-21 | - | 15679.0 BTC | stated |
| Q1 2026 data-center revenueproduct | 2026-08-21 | - | 33200000.0 USD | stated |
| AMD contracted capacitycustomer | 2026-08-21 | - | 50.0 MW | stated |
| Anthropic 20-year data center capacity agreementpartnership - Rockdale | 2026-08-21 | - | 191.0 MW | stated |
| Anthropic project first phase deliveryfacility timeline - Rockdale | 2026-08-21 | 2027-12-31 | 96.0 MW | stated |
| Anthropic project full capacity deliveryfacility timeline - Rockdale | 2026-08-21 | 2028-06-30 | 191.0 MW | stated |
| Anthropic deal revenue projectionguidance | 2026-08-21 | - | 9.1 billion USD | stated |
| Anthropic deal net operating income projectionguidance | 2026-08-21 | - | 7.3 billion USD | stated |
| Morgan Stanley interim financing facilityfinancing - Rockdale | 2026-08-21 | - | 573.0 million USD | stated |
| AMD expanded data center capacitycustomer | 2026-08-21 | - | 50.0 MW | stated |
| AMD 10 MW phase deliveryfacility timeline | 2026-08-21 | 2026-11-30 | 10.0 MW | stated |
| AMD 15 MW phase deliveryfacility timeline | 2026-08-21 | 2027-05-31 | 15.0 MW | stated |
| Terrestrial Energy memorandum of understandingpartnership | 2026-08-21 | - | 4.0 GW | stated |
| 20-year data-center capacity agreement with Anthropicpartnership | 2026-08-21 | - | 191.0 MW | stated |
| Anthropic first phase delivery (96 MW by December 2027)facility timeline | 2026-08-21 | 2027-12-31 | 96.0 MW | stated |
| Anthropic full delivery (191 MW by June 2028)facility timeline | 2026-08-21 | 2028-06-30 | 191.0 MW | stated |
| Anthropic contract expected net operating incomeguidance | 2026-08-21 | - | 7300.0 USD | stated |
| AMD 10 MW phase delivery (November 2026)facility timeline | 2026-08-21 | 2026-11-30 | 10.0 MW | stated |
| AMD 15 MW phase delivery (May 2027)facility timeline | 2026-08-21 | 2027-05-31 | 15.0 MW | stated |
| Morgan Stanley interim financing facility for Anthropic projectfinancing | 2026-08-21 | - | 573.0 USD | stated |
| Memorandum of understanding with Terrestrial Energy for nuclear power explorationpartnership | 2026-08-21 | - | 4.0 GW | stated |
| Anthropic data center power supply agreementcustomer | 2026-08-21 | - | 191.0 MW | stated |
| Anthropic capacity delivery milestonesfacility timeline | 2026-08-21 | 2028-06-30 | 191.0 MW | stated |
| Expected annual net operating income from Anthropic contractguidance | 2026-08-21 | - | 388.0 USD | stated |
| AMD contracted capacityfacility capacity | 2026-08-21 | - | 50.0 MW | stated |
| AMD capacity delivery schedulefacility timeline | 2026-08-21 | 2027-05-31 | 25.0 MW | stated |
| Morgan Stanley interim financing facilityfinancing | 2026-08-21 | - | 573.0 USD | stated |
| Terrestrial Energy nuclear reactor MOUpartnership | 2026-08-21 | - | 4000.0 MW | stated |
| $573 million credit facility for data center expansionfinancing | 2026-08-21 | - | 573.0 USD | stated |
| 191 MW Rockdale data centerfacility capacity | 2026-08-21 | - | 191.0 MW | stated |
| Contracted data-center capacity with AMDfacility capacity | 2026-08-21 | - | 50.0 MW | stated |
| Anthropic AI data center partnershippartnership - Rockdale | 2026-08-20 | - | 9.1 billion USD | stated |
| 20-year colocation agreement durationfacility timeline - Rockdale | 2026-08-20 | - | 20.0 years | stated |
| Data center annual recurring revenuefacility capacity | 2026-08-20 | - | 457.0 million USD | stated |
| Data center projected annual net operating incomefacility capacity | 2026-08-20 | - | 365.0 million USD | stated |
| Morgan Stanley interim financing securedfinancing | 2026-08-20 | - | 573.0 million USD | stated |
| Data center capital expenditure requiredfacility capacity | 2026-08-20 | - | 2.1 billion USD | stated |
| Additional secured financing requiredfinancing | 2026-08-20 | - | 3.7 billion USD | stated |
| Bitcoin holdings as of June 30, 2026product | 2026-08-20 | - | 11380.0 BTC | stated |
| Peak Bitcoin holdingsproduct | 2026-08-20 | - | 19368.0 BTC | stated |
| Bitcoin mining revenue decline in Q2 2026product | 2026-08-20 | - | 19.0 percent | stated |
| Anthropic 20-year data center leasecustomer | 2026-08-20 | - | 9.1 USD | stated |
| Anthropic lease extension optioncustomer | 2026-08-20 | - | 16.1 USD | stated |
| Frontier AI lab data center lease at Rockdale campusfacility capacity - Rockdale | 2026-08-19 | 2048-06-30 | 191.0 MW | stated |
| AI lab lease initial contract revenuefinancing - Rockdale | 2026-08-19 | - | 9.1 billion USD | stated |
| AI lab lease potential value with extensionsfinancing - Rockdale | 2026-08-19 | - | 16.1 billion USD | stated |
| Initial AI data center deployment at Rockdalefacility timeline - Rockdale | 2026-08-19 | 2027-12-31 | 96.0 MW | stated |
| Full AI data center deployment at Rockdalefacility timeline - Rockdale | 2026-08-19 | 2028-06-30 | 191.0 MW | stated |
| AMD data center lease at Rockdale campuscustomer - Rockdale | 2026-08-19 | - | - | stated |
| Total contracted capacity at Rockdale campusfacility capacity - Rockdale | 2026-08-19 | - | 241.0 MW | stated |
| Total contracted revenue from Rockdale leasesfinancing - Rockdale | 2026-08-19 | - | 9.8 billion USD | stated |
| AMD Phase 2 completionfacility capacity - Rockdale | 2026-08-19 | - | 25.0 MW | stated |
| AMD Phase 3 scheduled deliveryfacility timeline - Rockdale | 2026-08-19 | 2026-11-30 | 10.0 MW | stated |
| AMD Phase 4 scheduled deliveryfacility timeline - Rockdale | 2026-08-19 | 2027-05-31 | 15.0 MW | stated |
| Combined contracted data center revenueguidance | 2026-08-19 | - | 9800000000.0 USD | stated |
| Q2 2026 Bitcoin salesfinancing | 2026-08-19 | - | 4300.0 BTC | stated |
| Bitcoin holdings start of Q2 2026financing | 2026-08-19 | - | 15680.0 BTC | stated |
| Bitcoin holdings June 30, 2026financing | 2026-08-19 | - | 11380.0 BTC | stated |
| Pledged Bitcoin collateralfinancing | 2026-08-19 | - | 5821.0 BTC | stated |
| Q1 2026 Bitcoin sales proceedsfinancing | 2026-08-19 | - | 289.5 USD | stated |
| H1 2026 Bitcoin salesfinancing | 2026-08-19 | - | 9665.0 BTC | stated |
| Cash on handfinancing | 2026-08-19 | - | 548.9 USD | stated |
| Restricted cashfinancing | 2026-08-19 | - | 77.5 USD | stated |
| Total liquid assetsfinancing | 2026-08-19 | - | 1.2 USD | stated |
| Q2 2026 Bitcoin mining productionproduct | 2026-08-19 | - | 1587.0 BTC | stated |
| Q2 2026 average mining cost per coinproduct | 2026-08-19 | - | 49912.0 USD | stated |
| Q2 2026 quarterly revenueproduct | 2026-08-19 | - | 174.2 USD | stated |
| Q2 2026 year-over-year revenue growthproduct | 2026-08-19 | - | 14.0 percent | stated |
| Q1 2026 deployed hashratefacility capacity | 2026-08-19 | - | 42.5 EH/s | stated |
| Year-over-year hashrate growthfacility capacity | 2026-08-19 | - | 26.0 percent | stated |
| Anthropic data center leasepartnership - Rockdale | 2026-08-19 | - | 191.0 MW | stated |
| Anthropic lease revenue projectionguidance | 2026-08-19 | 2048-12-31 | 9.1 USD | stated |
| Investments in other companiespartnership | 2026-08-18 | - | - | stated |
| Bitcoin Mining segment strategyproduct | 2026-08-18 | - | - | stated |
| Engineering segment products and capabilitiesproduct | 2026-08-18 | - | - | stated |
| Q2 2026 Bitcoin salesfinancing | 2026-08-18 | - | 4300.0 BTC | stated |
| H1 2026 total Bitcoin salesfinancing | 2026-08-18 | - | 9665.0 BTC | stated |
| Bitcoin treasury (Q1 end 2026)financing | 2026-08-18 | - | 15680.0 BTC | stated |
| Bitcoin treasury (Q2 end 2026)financing | 2026-08-18 | - | 11380.0 BTC | stated |
| Bitcoin pledged as collateralfinancing | 2026-08-18 | - | 5821.0 BTC | stated |
| Q1 2026 Bitcoin sales proceedsfinancing | 2026-08-18 | - | 289.5 USD | stated |
| Q2 2026 Bitcoin productionproduct | 2026-08-18 | - | 1587.0 BTC | stated |
| Q2 2026 quarterly revenuefinancing | 2026-08-18 | - | 174.2 USD | stated |
| Cash on hand (Q2 2026)financing | 2026-08-18 | - | 548.9 USD | stated |
| Total liquid assets (Q2 2026)financing | 2026-08-18 | - | 1.2 USD | stated |
| Deployed hashrate (Q1 2026)facility capacity | 2026-08-18 | - | 42.5 EH/s | stated |
| Anthropic computing capacity leasecustomer - Rockdale | 2026-08-18 | - | 191.0 MW | stated |
| Anthropic lease revenue projectionguidance | 2026-08-18 | 2048-12-31 | 9.1 USD | stated |
| Anthropic data center lease agreementcustomer - Rockdale | 2026-08-18 | - | 9100000000.0 USD | stated |
| Q2 2026 total revenuefinancing | 2026-08-18 | - | 174200000.0 USD | stated |
| Q2 2026 data center operations revenuefinancing | 2026-08-18 | - | 23200000.0 USD | stated |
| Available power capacityfacility capacity | 2026-08-18 | - | 2.0 GW | stated |
| Contracted critical IT capacity at Rockdale campusfacility capacity - Rockdale | 2026-08-18 | - | 241.0 MW | stated |
| Long-term contracted revenue from Rockdaleguidance | 2026-08-18 | - | 9.8 billion USD | stated |
| Compliance with Texas data center standardsregulatory | 2026-08-18 | - | - | stated |
| Terrestrial Energy molten salt nuclear partnershippartnership | 2026-08-17 | - | - | stated |
| Target nuclear power capacityfacility capacity | 2026-08-17 | - | 4.0 GW | stated |
| Nuclear data center deployment timelinefacility timeline | 2026-08-17 | - | - | stated |
| IMSR reactor specificationsproduct | 2026-08-17 | - | - | stated |
| Riot's operational role in partnershippartnership | 2026-08-17 | - | - | stated |
| Exploring facility sitespartnership | 2026-08-17 | - | - | stated |
| Current Bitcoin holdingsfinancing | 2026-08-17 | - | - | stated |
| Bitcoin sales in Q1 2026financing | 2026-08-17 | - | - | stated |
| Bitcoin holdings restricted as collateralfinancing | 2026-08-17 | - | - | stated |
| 20-year data centre lease at Rockdale, Texaspartnership - Rockdale | 2026-08-17 | 2048-06-30 | - | stated |
| Rockdale data centre capacity under contractfacility capacity - Rockdale | 2026-08-17 | - | 191.0 MW | stated |
| Data centre deal revenue projection through June 2048guidance | 2026-08-17 | 2048-06-30 | 9.1 billion USD | stated |
| Data centre deal potential value with extension optionsguidance | 2026-08-17 | - | 16.1 billion USD | stated |
| AMD - 10-year $311M lease (25 MW initial)partnership - Rockdale | 2026-08-17 | - | 311.0 M USD | stated |
| AMD - $1B potential with 200 MW capacitypartnership - Rockdale | 2026-08-17 | - | 1000.0 M USD | stated |
| AMD - 50 MW contracted after first expansionfacility capacity - Rockdale | 2026-08-17 | - | 50.0 MW | stated |
| Rockdale - 241 MW under signed leasesfacility capacity - Rockdale | 2026-08-17 | - | 241.0 MW | stated |
| Rockdale - 700 MW existing power capacityfacility capacity - Rockdale | 2026-08-17 | - | 700.0 MW | stated |
| Q1 2026 total revenueproduct | 2026-08-17 | - | 167.2 M USD | stated |
| Q1 2026 data center revenueproduct | 2026-08-17 | - | 33.2 M USD | stated |
| Q2 2026 total revenueproduct | 2026-08-17 | - | 174.2 M USD | stated |
| Q2 2026 data center revenueproduct | 2026-08-17 | - | 23.2 M USD | stated |
| Q1 2026 Bitcoin productionproduct | 2026-08-17 | - | 1473.0 BTC | stated |
| Q1 2026 Bitcoin mining revenueproduct | 2026-08-17 | - | 111.9 M USD | stated |
| Q1 2026 Bitcoin soldproduct | 2026-08-17 | - | 3778.0 BTC | stated |
| Q1 2026 average mining cost per BTCproduct | 2026-08-17 | - | 44629.0 USD | stated |
| Anthropic AI compute services dealpartnership - Rockdale | 2026-08-16 | - | 9100000000.0 USD | stated |
| AMD compute capacity leasepartnership - Rockdale | 2026-08-16 | - | 25.0 MW | stated |
| Q2 2026 data center division revenueguidance | 2026-08-16 | - | 23000000.0 USD | stated |
| Q2 2026 total company revenueguidance | 2026-08-16 | - | 174000000.0 USD | stated |
| Fully approved compute capacityfacility capacity | 2026-08-16 | - | 1.7 GW | stated |
| Anthropic AI compute contractpartnership - Rockdale | 2026-08-16 | - | 9000000000.0 USD | stated |
| Rockdale facility capacity for Anthropicfacility capacity - Rockdale | 2026-08-16 | - | 191.0 MW | stated |
| Rockdale contracted data-center revenuefinancing - Rockdale | 2026-08-16 | - | 9800000000.0 USD | stated |
| $9B AI compute deal with Anthropicpartnership - Rockdale | 2026-08-16 | - | 9000000000.0 USD | stated |
| Anthropic compute services dealcustomer - Rockdale | 2026-08-16 | - | 9.0 USD | stated |
| Data center expansion loanfinancing | 2026-08-15 | - | - | stated |
| $573M credit facility for data center equipment and project expensesfinancing - Rockdale | 2026-08-13 | - | 573.0 USD | stated |
| 191 MW critical IT data center at Rockdale Facilityfacility capacity - Rockdale | 2026-08-13 | - | 191.0 MW | stated |
| Bitcoin sale for AI data center expansionfinancing | 2026-08-13 | - | 4300.0 BTC | stated |
| Q2 mining revenue declineproduct | 2026-08-13 | - | 19.3 percent | stated |
| Cost to mine one Bitcoinproduct | 2026-08-13 | - | 49912.0 USD | stated |
| Q2 mining revenueproduct | 2026-08-13 | - | 113.7 USD millions | stated |
| Liquid assetsfinancing | 2026-08-13 | - | 1.2 USD billions | stated |
| Cash balancefinancing | 2026-08-13 | - | 548.9 USD millions | stated |
| Bitcoin holdingsfinancing | 2026-08-13 | - | 11380.0 BTC | stated |
| AMD AI capacity deliveredfacility capacity - Rockdale | 2026-08-13 | - | - | stated |
| 20-year AI lab lease agreementpartnership - Rockdale | 2026-08-13 | - | 9.1 USD billions | stated |
| Anthropic 20-year data center lease, Rockdalepartnership - Rockdale | 2026-08-13 | 2048-06-30 | 9.1 USD | stated |
| Anthropic data center initial 96 MW deploymentfacility capacity - Rockdale | 2026-08-13 | 2027-12-31 | 96.0 MW | stated |
| Anthropic data center full 191 MW deploymentfacility capacity - Rockdale | 2026-08-13 | 2028-06-30 | 191.0 MW | stated |
| AMD contracted capacity expansionpartnership - Rockdale | 2026-08-13 | - | 50.0 MW | stated |
| Rockdale campus total power capacityfacility capacity - Rockdale | 2026-08-13 | - | 700.0 MW | stated |
| Corsicana campus total power capacityfacility capacity - Corsicana | 2026-08-13 | - | 1000.0 MW | stated |
| Corsicana LOI for 756 MW IT capacityfacility capacity - Corsicana | 2026-08-13 | - | 756.0 MW | stated |
| Morgan Stanley interim financing facilityfinancing | 2026-08-13 | - | 573.0 USD | stated |
| Term loan on AMD facility cash flowsfinancing - Rockdale | 2026-08-13 | - | 180.0 USD | stated |
| Anthropic lease average annual revenueguidance | 2026-08-13 | - | 457.0 USD | stated |
| Anthropic CapEx estimate (low)guidance | 2026-08-13 | 2028-06-30 | 2.1 USD | stated |
| Anthropic CapEx estimate (high)guidance | 2026-08-13 | 2028-06-30 | 2.3 USD | stated |
| Anthropic cumulative NOI (low)guidance | 2026-08-13 | 2048-06-30 | 7.3 USD | stated |
| Anthropic cumulative NOI (high)guidance | 2026-08-13 | 2048-06-30 | 8.2 USD | stated |
| Anthropic lease potential value with extensionsguidance | 2026-08-13 | 2058-06-30 | 16.1 USD | stated |
| Morgan Stanley interim financingfinancing | 2026-08-12 | - | 573.0 USD millions | stated |
| Rockdale campus leased capacityfacility capacity - Rockdale | 2026-08-12 | - | 191.0 MW | stated |
| Rockdale first phase deliveryfacility timeline - Rockdale | 2026-08-12 | - | 96.0 MW | stated |
| Rockdale full capacity deliveryfacility timeline - Rockdale | 2026-08-12 | - | 191.0 MW | stated |
| Frontier AI lab 20-year lease revenuecustomer - Rockdale | 2026-08-12 | - | 9100.0 USD millions | stated |
| Extended lease potential cumulative revenueguidance | 2026-08-12 | - | 16100.0 USD millions | stated |
| Rockdale facility NOI projectionsguidance | 2026-08-12 | - | - | stated |
| Rockdale infrastructure tier specificationfacility capacity - Rockdale | 2026-08-12 | - | - | stated |
| Total AI company leased capacityfacility capacity - Rockdale | 2026-08-12 | - | 241.0 MW | stated |
| Total contracted revenue from two AI companiescustomer - Rockdale | 2026-08-12 | - | 9800.0 USD millions | stated |
| AMD data center deploymentcustomer - Rockdale | 2026-08-12 | - | - | stated |
| Q2 2026 data center segment revenuecustomer | 2026-08-12 | - | 23.2 USD millions | stated |
| Anthropic 20-year compute agreementpartnership - Rockdale | 2026-08-11 | - | 9000000000.0 USD | stated |
| Anthropic agreement revenue generationguidance | 2026-08-11 | - | 9100000000.0 USD | stated |
| Long-term AI data center leasefacility timeline | 2026-08-11 | - | - | stated |
| 20-year AI data-center lease at Rockdalecustomer - Rockdale | 2026-08-10 | - | 9.1 USD | stated |
| Q2 2026 quarterly revenueguidance | 2026-08-10 | - | 174.2 USD | stated |
| Q2 2026 data-center revenueguidance | 2026-08-10 | - | 23.2 USD | stated |
| Completed initial 25 MW delivery for AMDfacility capacity - Rockdale | 2026-08-10 | - | 25.0 MW | stated |
| Second 25 MW AMD expansion under constructionfacility capacity - Rockdale | 2026-08-10 | - | 25.0 MW | stated |
| AMD lease expected revenuefinancing - Rockdale | 2026-08-10 | - | 311.0 USD | stated |
| Q2 2026 total revenuefinancing | 2026-08-10 | - | 174.2 Million USD | stated |
| Q2 2026 data center business revenuefinancing | 2026-08-10 | - | 23.2 Million USD | stated |
| Q2 2026 liquid assetsfinancing | 2026-08-10 | - | 1.2 Billion USD | stated |
| 20-year Anthropic lease at Rockdale, Texaspartnership - Rockdale | 2026-08-10 | - | 191.0 MW | stated |
| Total contracted capacity from Anthropic and AMDfacility capacity - Rockdale | 2026-08-10 | - | 241.0 MW | stated |
| Long-term contracted revenue from Anthropic and AMDfinancing - Rockdale | 2026-08-10 | - | 9.8 Billion USD | stated |
| Anthropic - 191 MW data center lease (20-year)customer - Rockdale | 2026-08-10 | - | - | stated |
| Anthropic - First 96 MW deliveryfacility timeline - Rockdale | 2026-08-10 | 2027-12-31 | 96.0 MW | stated |
| Anthropic - Second 95 MW deliveryfacility timeline - Rockdale | 2026-08-10 | 2028-06-30 | 95.0 MW | stated |
| Anthropic - $9.1B base term revenue projectionfinancing - Rockdale | 2026-08-10 | 2048-06-30 | 9100.0 M USD | stated |
| Anthropic - $7.3-8.2B NOI projectionguidance | 2026-08-10 | 2048-06-30 | - | stated |
| Anthropic - $16.1B with extension optionsfinancing - Rockdale | 2026-08-10 | - | 16100.0 M USD | stated |
| $573M term loan for Anthropic projectfinancing - Rockdale | 2026-08-10 | - | 573.0 M USD | stated |
| Anthropic data center lease at Rockdale (20-year, 191 MW)customer - Rockdale | 2026-08-10 | 2048-06-30 | 191.0 MW | stated |
| Anthropic lease delivery schedule at Rockdalefacility timeline - Rockdale | 2026-08-10 | 2027-12-31 | 96.0 MW | stated |
| Expected contract revenue from Anthropic lease through 2048guidance | 2026-08-10 | 2048-06-30 | 9100.0 USD | stated |
| Estimated cumulative net operating income from Anthropic leaseguidance | 2026-08-10 | 2048-06-30 | 7300.0 USD | stated |
| Potential revenue if Anthropic exercises two 5-year lease extensionsguidance | 2026-08-10 | - | 16100.0 USD | stated |
| AMD contracted capacity at Rockdalepartnership - Rockdale | 2026-05-01 | - | 50.0 MW | stated |
| Data center segment revenue Q1 2026financing | 2026-05-01 | - | 33.2 USD | stated |
| Adjusted loss per share Q1 2026financing | 2026-05-01 | - | 1.88 USD | stated |
| Total revenue Q1 2026financing | 2026-05-01 | - | 167.2 USD | stated |
| Bitcoin mining revenue Q1 2026financing | 2026-05-01 | - | 111.9 USD | stated |
| Bitcoin mined Q1 2026product | 2026-05-01 | - | 1473.0 BTC | stated |
| Average Bitcoin mining cost Q1 2026product | 2026-05-01 | - | 44629.0 USD | stated |
| Bitcoin holdings end of Q1 2026financing | 2026-05-01 | - | 15679.0 BTC | stated |
| Cash holdings end of Q1 2026financing | 2026-05-01 | - | 282.5 USD | stated |
| Coinbase revolving credit facilityfinancing | 2026-04-29 | - | 200000000.0 USD | stated |
| Rhodium Settlement - Rockdale assets and power capacityacquisition | 2026-04-29 | - | 125.0 MW | stated |
| Rockdale Facility land acquisitionacquisition | 2026-04-29 | - | 200.0 acres | stated |
| AMD Lease - initial contracted capacitycustomer - Rockdale | 2026-04-29 | - | 25.0 MW | stated |
| AMD Lease expansion optioncustomer - Rockdale | 2026-04-29 | - | 75.0 MW | stated |
| AMD Lease right of first refusalcustomer - Rockdale | 2026-04-29 | - | 100.0 MW | stated |
| AMD Lease renewal termscustomer - Rockdale | 2026-04-29 | - | - | stated |
| AMD Lease amendment - expanded contracted capacitycustomer - Rockdale | 2026-04-29 | - | 50.0 MW | stated |
| Corsicana Facility Phase I Bitcoin build-outfacility capacity - Corsicana | 2026-04-29 | - | 400.0 MW | stated |
| New independent directorspersonnel | 2026-04-29 | - | 3.0 directors | stated |
| Lance D'Ambrosio director nomineepersonnel | 2026-04-29 | - | - | stated |
| Michael Turner director nomineepersonnel | 2026-04-29 | - | - | stated |
| Deloitte & Touche LLP auditor appointmentregulatory | 2026-04-29 | 2026-12-31 | - | stated |
| Seventh Amendment to 2019 Equity Incentive Plan share increasefinancing | 2026-04-29 | - | - | stated |
| Second Amended and Restated Credit Agreement with Coinbase Credit, Inc.financing | 2026-04-26 | - | 200.0 USD millions | stated |
| Rockdale Facility developed capacityfacility capacity - Rockdale | 2026-03-01 | - | 700.0 MW | stated |
| Corsicana Facility current developed capacityfacility capacity - Corsicana | 2026-03-01 | - | 400.0 MW | stated |
| Corsicana Facility target developed capacityfacility capacity - Corsicana | 2026-03-01 | - | 1.0 GW | stated |
| Kentucky Facility current developed capacityfacility capacity - Kentucky Facility | 2026-03-01 | - | 137.0 MW | stated |
| Kentucky Facility capacity expansion targetfacility timeline - Kentucky Facility | 2026-03-01 | 2026-12-31 | 232.0 MW | stated |
| Block Mining acquisitionacquisition | 2026-03-01 | - | - | stated |
| Rockdale land fee simple acquisitionacquisition | 2026-03-01 | - | - | stated |
| AMD long-term data center leasecustomer - Rockdale | 2026-03-01 | - | 25.0 MW | stated |
| MicroBT long-term master purchase and sales agreementpartnership | 2026-03-01 | - | - | stated |
| MicroBT purchase orders executed for minerspartnership | 2026-03-01 | - | 779.5 USD (millions) | stated |
| MicroBT miners expected deliveryfacility timeline | 2026-03-01 | 2026-06-30 | - | delayed |
| MicroBT future purchase options through December 2027partnership | 2026-03-01 | 2027-12-31 | - | stated |
| Rockdale Facility developed capacityfacility capacity - Rockdale | 2026-03-01 | - | 700.0 MW | stated |
| Corsicana Facility current developed capacityfacility capacity - Corsicana | 2026-03-01 | - | 400.0 MW | stated |
| Corsicana Facility total developed capacity upon completionfacility capacity - Corsicana | 2026-03-01 | - | 1000.0 MW | stated |
| Kentucky Facility developed capacityfacility capacity - Kentucky Facility | 2026-03-01 | - | 137.0 MW | stated |
| Kentucky Facility capacity expansion targetfacility timeline - Kentucky Facility | 2026-03-01 | 2026-12-31 | 232.0 MW | stated |
| AMD data center lease at Rockdale Facilitycustomer - Rockdale | 2026-03-01 | - | 25.0 MW | stated |
| Block Mining, Inc. acquisitionacquisition | 2026-03-01 | - | - | stated |
| Rockdale Facility land acquisitionacquisition | 2026-03-01 | - | - | stated |
| MicroBT miners delivery scheduleguidance | 2026-03-01 | 2026-06-30 | - | delayed |
| Rockdale Facility available capacityfacility capacity - Rockdale | 2026-03-01 | - | 700.0 MW | stated |
| Corsicana Facility planned total capacityfacility capacity - Corsicana | 2026-03-01 | - | 1000.0 MW | stated |
| Kentucky Facility expansion targetfacility capacity - Kentucky Facility | 2026-03-01 | 2026-12-31 | 232.0 MW | stated |
| AMD data center lease at Rockdalecustomer - Rockdale | 2026-03-01 | - | 25.0 MW | stated |
| Rockdale Facility land acquisitionacquisition | 2026-03-01 | - | - | stated |
| MicroBT miner deliveriesproduct | 2026-03-01 | 2026-06-30 | 49.2 EH/s | delayed |
| Block Mining acquisition in Kentuckyacquisition | 2026-03-01 | - | - | stated |
| Corsicana Facility total capacity targetfacility capacity - Corsicana | 2026-03-01 | - | 1000.0 MW | stated |
| Kentucky Facility capacity expansion targetfacility capacity - Kentucky Facility | 2026-03-01 | 2026-12-31 | 232.0 MW | stated |
| AMD data center lease agreementcustomer - Rockdale | 2026-03-01 | - | 25.0 MW | stated |
| MicroBT miners delivery schedulepartnership | 2026-03-01 | 2026-06-30 | 49.2 EH/s | delayed |
| Rockdale facility land acquisitionacquisition | 2026-01-15 | - | - | stated |
| AMD 10-year capacity lease at Rockdalepartnership - Rockdale | 2026-01-15 | - | 25.0 MW | stated |
| Colin Yee transition bonus to Senior Advisorpersonnel | 2026-01-04 | 2026-03-13 | 83333.33 USD | delayed |
| Colin Yee CFO departurepersonnel | 2026-01-01 | 2026-03-01 | - | delayed |
| Jason Chung appointed as Chief Financial Officerpersonnel | 2026-01-01 | 2026-03-01 | - | delayed |
| Colin Yee Senior Advisor RSU awardpersonnel | 2026-01-01 | 2028-01-01 | 2000000.0 USD | stated |
| Colin Yee Senior Advisor base feepersonnel | 2026-01-01 | - | 500000.0 USD | stated |
| Jason Les CEO base salary increasepersonnel | 2026-01-01 | 2026-01-01 | 900000.0 USD | delayed |
| Benjamin Yi Executive Chairman base salary increasepersonnel | 2026-01-01 | 2026-01-01 | 900000.0 USD | delayed |
| Jason Les and Benjamin Yi AIP target increasepersonnel | 2026-01-01 | 2026-01-01 | 125.0 percent | delayed |
| Jason Chung CFO base salary increasepersonnel | 2026-01-01 | 2026-01-01 | 550000.0 USD | delayed |
| Stephen Howell COO base salary increasepersonnel | 2026-01-01 | 2026-01-01 | 500000.0 USD | delayed |
| Executive employment agreements extended through January 10, 2031personnel | 2026-01-01 | 2031-01-10 | - | stated |
| Bitcoin Yield metric eliminated from 2026 AIPguidance | 2026-01-01 | - | - | stated |
| Data center revenue metric introduction upon securing tenantguidance | 2026-01-01 | - | 15.0 percent | stated |
| Data Center NOI metric introduction upon securing tenantguidance | 2026-01-01 | - | 15.0 percent | stated |
| Adjusted EBITDA metric weighting reduced in 2026 AIPguidance | 2026-01-01 | - | 25.0 percent | stated |
| LTIP measurement period methodology changeguidance | 2026-01-01 | - | - | stated |
| LTIP TSR cap on performance awardsguidance | 2026-01-01 | - | 100.0 percent | stated |
| At-the-market offering agreement for up to $500 million in common stockfinancing | 2025-12-30 | - | 500000000.0 USD | stated |
| Equity offering authorizationfinancing | 2025-12-30 | - | 500000000.0 USD | stated |
| Sales agent commissionfinancing | 2025-12-30 | - | 1.0 percent | stated |
| Rockdale Facility developed capacityfacility capacity - Rockdale | 2025-12-30 | - | 700.0 MW | stated |
| Corsicana Facility total expected capacityfacility capacity - Corsicana | 2025-12-30 | - | 1000.0 MW | stated |
| Corsicana first phase 400 MW completionfacility capacity - Corsicana | 2025-12-30 | 2024-12-31 | 400.0 MW | delayed |
| Corsicana remaining power capacity for data center developmentfacility capacity - Corsicana | 2025-12-30 | - | 600.0 MW | stated |
| Block Mining current and targeted capacityfacility capacity - Kentucky Facility | 2025-12-30 | 2025-12-31 | 160.0 MW | delayed |
| Block Mining 160 MW targeting timelinefacility timeline - Kentucky Facility | 2025-12-30 | 2025-12-31 | 160.0 MW | delayed |
| MicroBT miner delivery and deployment timelinefacility timeline | 2025-12-30 | 2026-06-30 | - | delayed |
| Block Mining acquisitionacquisition | 2025-12-30 | 2024-07-31 | 113600000.0 USD | delayed |
| Block Mining contingent purchase priceacquisition | 2025-12-30 | 2025-12-31 | 32500000.0 USD | delayed |
| E4A Solutions acquisitionacquisition | 2025-12-30 | 2024-12-31 | - | delayed |
| MicroBT long-term master supply agreementpartnership | 2025-12-30 | 2023-06-23 | - | delayed |
| MicroBT seven purchase orders executedpartnership | 2025-12-30 | - | 779500000.0 USD | stated |
| MicroBT additional annual purchase optionspartnership | 2025-12-30 | 2027-12-31 | - | stated |
| Sales Agents for equity offeringpartnership | 2025-12-30 | - | - | stated |
| Anticipated total self-mining hash rate capacityguidance | 2025-12-30 | - | 50.0 EH/s | stated |
| Scalable data center platform launch at Corsicanaguidance | 2025-12-30 | - | 600.0 MW | stated |
| Jaime Leverton elected directorpersonnel | 2025-06-16 | - | - | stated |
| Douglas Mouton elected directorpersonnel | 2025-06-16 | - | - | stated |
| Deloitte & Touche appointed as independent auditorregulatory | 2025-06-16 | 2025-12-31 | - | delayed |
| Annual advisory votes on executive compensationregulatory | 2025-06-16 | - | - | stated |
| Board declassification approvedregulatory | 2025-06-16 | - | - | stated |
| Amended credit facility with Coinbase Creditfinancing | 2025-05-22 | - | 200.0 USD | stated |
| Credit facility availability periodfinancing | 2025-05-22 | 2025-07-22 | - | delayed |
| Permitted borrowings under credit facilityfinancing | 2025-05-22 | - | 4.0 borrowings | stated |
| Loan maturity datefinancing | 2025-05-22 | 2026-04-21 | - | delayed |
| Loan maturity extension optionfinancing | 2025-05-22 | - | 364.0 days | stated |
| Upsize fee on credit facilityfinancing | 2025-05-22 | - | 1.0 USD | stated |
| Acquisition of Rhodium Encore LLC assetsacquisition | 2025-04-30 | - | 185.0 USD | stated |
| 125 MW power capacity acquisition at Rockdale facilityfacility capacity - Rockdale | 2025-04-30 | - | 125.0 MW | stated |
| Board expansion and director appointmentspersonnel | 2025-02-12 | - | - | stated |
| Director retirementspersonnel | 2025-02-12 | - | - | stated |
| Director annual cash retainerpersonnel | 2025-02-12 | - | 100000.0 USD | stated |
| Director initial restricted stock grantpersonnel | 2025-02-12 | - | 24000.0 shares | stated |
| Corsicana Facility power capacity evaluation for AI/HPCfacility capacity - Corsicana | 2025-02-12 | - | - | stated |
| Corsicana Facility remaining power capacityfacility capacity - Corsicana | 2025-01-20 | - | 600.0 MW | stated |
| Phase II Bitcoin mining expansion haltedproduct | 2025-01-20 | - | - | stated |
| Coinbase Prime Broker Agreementpartnership | 2024-12-19 | - | - | stated |
| Coinbase custody of digital assetspartnership | 2024-12-19 | - | - | stated |
| Prospectus supplement for share resaleregulatory | 2024-12-19 | - | 180000.0 shares | stated |
| 2030 Convertible Notes Offering Closedfinancing | 2024-12-15 | - | 594.4 USD | stated |
| Bitcoin Acquisitionacquisition | 2024-12-15 | - | 667.0 BTC | stated |
| Bitcoin purchaseacquisition | 2024-12-12 | - | - | stated |
| Funding for Bitcoin acquisitionfinancing | 2024-12-12 | - | - | stated |
| 0.75% convertible senior notes offeringfinancing | 2024-12-10 | 2030-01-15 | 525000000.0 USD | stated |
| Bitcoin acquisition using convertible notes proceedsacquisition | 2024-12-10 | - | - | stated |
| Convertible senior notes offering pricedfinancing | 2024-12-09 | 2024-12-11 | 525.0 USD | delayed |
| Overallotment option for convertible notesfinancing | 2024-12-09 | - | 75.0 USD | stated |
| Convertible notes offeringfinancing | 2024-12-08 | - | 500000000.0 USD | stated |
| Jason Les Chief Executive Officerpersonnel | 2024-11-25 | - | - | stated |
| Benjamin Yi Executive Chairmanpersonnel | 2024-11-25 | - | - | stated |
| William Jackman EVP General Counselpersonnel | 2024-11-25 | - | - | stated |
| Jason Chung EVP Head of Corporate Development & Strategypersonnel | 2024-11-25 | - | - | stated |
| Executive employment term 36 months with auto-renewalpersonnel | 2024-11-25 | - | - | stated |
| Settlement agreement with Bitfarmspartnership | 2024-09-22 | - | - | stated |
| Voting commitment at Bitfarms special meetingpartnership | 2024-09-22 | - | - | stated |
| Director replacement nomination rightspartnership | 2024-09-22 | - | - | stated |
| Board member voting commitmentpartnership | 2024-09-22 | - | - | stated |
| Standstill provisions and restrictionspartnership | 2024-09-22 | - | - | stated |
| Beneficial ownership thresholdacquisition | 2024-09-22 | - | 7.5 percent | stated |
| Agreement term expirationpartnership | 2024-09-22 | 2026-06-01 | - | delayed |
| Purchase rights conditionacquisition | 2024-09-22 | - | 15.0 percent | stated |
| Riot owns 19.9% stake in Bitfarms Ltdacquisition | 2024-09-22 | - | - | stated |
| Riot and Bitfarms enter settlement agreementpartnership | 2024-09-22 | 2024-09-23 | - | withdrawn |
| Riot obtains director nomination rightpartnership | 2024-09-22 | - | - | stated |
| Riot has conditional share purchase rights at Bitfarmsacquisition | 2024-09-22 | - | - | stated |
| Riot acquires 19.9% stake in Bitfarms Ltd.acquisition | 2024-09-04 | - | 90110912.0 shares | stated |
| Riot finances Bitfarms acquisition from working capitalfinancing | 2024-09-04 | - | 202180487.0 USD | stated |
| Riot acquired significant stake in Bitfarms Ltdacquisition | 2024-08-20 | - | - | stated |
| Acquisition of Bitfarms common shares stakeacquisition | 2024-06-23 | - | - | stated |
| Ontario Capital Markets Tribunal application to cease-trade Bitfarms poison pillregulatory | 2024-06-23 | - | - | stated |
| Withdrawn acquisition proposal for Bitfarmsacquisition | 2024-06-23 | - | - | stated |
| Ownership stake in Bitfarmsacquisition | 2024-06-23 | - | 14.9 percent | stated |
| Requisitioned special shareholders meeting to reconstitute Bitfarms boardacquisition | 2024-06-23 | - | - | stated |
| Application to Ontario tribunal to cease-trade Bitfarms shareholder rights planregulatory | 2024-06-23 | - | - | stated |
| 15M shares reserved under Sixth Amendment to 2019 Equity Planfinancing | 2024-06-17 | - | 15000000.0 shares | stated |
| Authorized Common Stock increased from 340M to 680M sharesfinancing | 2024-06-17 | - | 680000000.0 shares | stated |
| Five executive employment agreements amended with revised severance provisionspersonnel | 2024-06-17 | - | - | stated |
| New indemnification agreements with directors and officers adoptedpersonnel | 2024-06-17 | - | - | stated |
| Riot acquires 14% stake in Bitfarms Ltd.acquisition | 2024-06-12 | - | - | stated |
| Bitfarms acquisition financed with working capitalfinancing | 2024-06-12 | - | - | stated |
| Corsicana Facility land holdingsfacility capacity - Corsicana | 2024-06-12 | - | - | stated |
| Riot's equity stake in Bitfarms Ltd.acquisition | 2024-06-11 | - | 53793440.0 units | stated |
| Riot's total investment in Bitfarms sharesfinancing | 2024-06-11 | - | 111090522.0 USD | stated |
| Chief Operating Officer Appointmentpersonnel | 2024-06-05 | - | - | stated |
| COO Annual Base Salarypersonnel | 2024-06-05 | - | 400000.0 USD | stated |
| COO Annual Incentive Plan Targetpersonnel | 2024-06-05 | - | 100.0 percent | stated |
| COO Long-Term Incentive Awardpersonnel | 2024-06-05 | - | 373927.0 shares | stated |
| Bitfarms stake acquisitionacquisition | 2024-06-04 | - | - | stated |
| Riot acquired Bitfarms shares for approximately $90 millionacquisition | 2024-06-03 | - | 89972452.0 USD | stated |
| Riot owns 11.3% of Bitfarmsacquisition | 2024-06-03 | - | 44866115.0 units | stated |
| Colin Yee is Chief Financial Officerpersonnel | 2024-06-03 | - | - | stated |
| William Jackman is EVP, General Counsel and Secretarypersonnel | 2024-06-03 | - | - | stated |
| Emergency information collection (Form EIA-862) discontinuedregulatory | 2024-03-01 | - | - | verified |
| Obligation to respond to Form EIA-862 eliminatedregulatory | 2024-03-01 | - | - | verified |
| Future cryptocurrency mining data collection to use notice-and-comment proceduresregulatory | 2024-03-01 | - | - | verified |
| Future cryptocurrency mining survey to follow normal clearance proceduresregulatory | 2024-03-01 | - | - | verified |
| Form EIA-862 emergency collection discontinuedregulatory | 2024-03-01 | - | - | verified |
| Future crypto mining data collection to use standard notice-and-comment proceduresregulatory | 2024-03-01 | - | - | verified |
| EIA to destroy Form EIA-862 emergency collection dataregulatory | 2024-03-01 | - | - | verified |
| Emergency authorization for cryptocurrency mining survey discontinuedregulatory | 2024-02-26 | - | - | verified |
| Court granted temporary restraining order preventing survey enforcementregulatory | 2024-02-23 | - | - | verified |
| Plaintiffs allege emergency cryptocurrency mining survey violated statutory requirementsregulatory | 2024-02-22 | - | - | stated |
As reported in the company's DEF 14A Summary Compensation Table (SEC Reg S-K Item 402(c)). Stock and option awards are grant-date fair values — what the award was worth on the day it was granted, not cash received and not what it is worth now. Every row here reconciles: its columns add up to the total the filing printed.
Every docket has its full metadata cached locally so we don't send visitors through a login wall. Click a case number to see our cached docket page.