Kentucky Facility

Project of Riot

Kind
mining
State/region
KY
Country
US
Status
partially operational as of August 14, 2026

Where it stands

Riot's Kentucky Facility comprises the two Block Mining sites in Kentucky. It reported approximately 192 MW of developed capacity as of June 30, 2026, up from 162 MW at March 31, 2026. Riot is targeting about 232 MW total through the rest of 2026, and August 2026 reporting cites ongoing expansion at the Kentucky facilities. The 2025 10-K is internally inconsistent: one passage gives 137 MW, while its year-end table gives 192 MW. Because of this, the capacity trajectory is somewhat uncertain, and the 232 MW figure is a target rather than confirmed construction.

192 MW in service · 232 MW planned

PhaseMWStatusDateSource
Developed capacity (two Kentucky sites)192operational2026-06-30The Kentucky Facility currently provides approximately 192 MW of developed capacity.
2026-08-09 View cached copy (2026-08-30)Live source ↗
Expansion to ~232 MW total (target through remainder of 2026)232under constructionWe are targeting the Kentucky Facility to reach a total capacity of approximately 232 MW through the remainder of 2026, with additional expansion anticipated.
2026-03-01 View cached copy (2026-08-31)Live source ↗

Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: August 14, 2026).

Capacity

What has actually been delivered, against what has been promised. Each figure links to the statement it came from.

StageCapacityAs ofSource
Energized power flowing today137 MW2026-03-01Kentucky Facility developed capacity
Contracted a customer is on the hook--
Under construction--
Permitted--
Interconnect approved utility has agreed to deliver--
Interconnect requested in a queue, nothing approved--
Announced a press-release figure300 MW2026-04-29Kentucky power capacity

Claims about this project

2025-04-30 - verified
Kentucky hash rate 6.5 EH/s by YE2025. Promised by 2025-12-31.
2025-04-30 - verified
Kentucky power expansion to 120 MW 120.0 MW. Promised by 2025-12-31.
2025-07-30 - stated
2025-12-30 - verified
Block Mining current and targeted capacity 160.0 MW. Promised by 2025-12-31.
2025-12-30 - verified
Block Mining 160 MW targeting timeline 160.0 MW. Promised by 2025-12-31.
2026-03-01 - stated
Kentucky Facility capacity expansion target 232.0 MW. Promised by 2026-12-31.
2026-04-29 - stated