Kentucky power expansion to 120 MW
Company: Riot - Project: Kentucky Facility
What the later record shows
Delivered on time · happened December 31, 2025
The 10-K reports Kentucky developed power capacity of 192 MW at December 31, 2025, up from 60 MW. That exceeds the 120 MW target by year-end 2025. The Q2 materials had raised the plan to 127 MW.
“growing total Kentucky power capacity from 65 MW to 127 MW”
2025-07-30 · riot 8-K exhibit (riot-20250731xex99d2.htm) View cached copy (2026-10-09)Live source ↗
“Corsicana Facility 400 400 Kentucky Facility 192 60 Total power capacity”
2026-03-01 · Riot 10-K filed 2026-03-02 View cached copy (2026-08-31)Live source ↗
Checked October 16, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
Riot plans 30 MW expansions at both Commerce and Blue Steel in Kentucky, growing total Kentucky power capacity from 60 MW to 120 MW, with $21.6M of infrastructure capex forecast for Q2-Q4 2025.
Source (primary)
riot 8-K exhibit (riot-20250428xex99d2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-16)Live source ↗
Quote: “growing total Kentucky power capacity from 60MW to 120MW”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The capex table shows $21.6 million forecast for Kentucky infrastructure in Q2-Q4 2025, covering 30 MW expansions at Commerce and Blue Steel that take Kentucky from 60 MW to 120 MW.
Confirmed in the source:
- Riot plans a 30 MW expansion at Commerce in Kentucky
- Riot plans a 30 MW expansion at Blue Steel in Kentucky
- Total Kentucky power capacity will grow from 60 MW to 120 MW
- Kentucky infrastructure capex forecast for Q2-Q4 2025 is $21.6 million
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1167419/000155837025006115/riot-20250428xex99d2.htm) in full (33,776 characters, retrieved October 16, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms riot 8-K exhibit (riot-20250428xex99d2.htm)
Quote: “growing total Kentucky power capacity from 60MW to 120MW”
confirms Riot 10-K filed 2026-03-02
Quote: “Corsicana Facility 400 400 Kentucky Facility 192 60 Total power capacity”
confirms riot 8-K exhibit (riot-20250731xex99d2.htm)
Quote: “growing total Kentucky power capacity from 65 MW to 127 MW”