Block Mining current and targeted capacity
Company: Riot - Project: Kentucky Facility
What the later record shows
Delivered late · happened March 31, 2026
Capacity rose from the stated 95 MW to about 137 MW by the 10-K filing (March 2026), still below 160 MW. It reached 162 MW by March 31, 2026 per the Q1 10-Q and about 192 MW by August 2026. A 10-K table showing 192 MW at year-end 2025 conflicts with the 10-K narrative.
“The Kentucky Facility currently provides 137 MW of developed capacity.”
2026-03-01 · Riot 10-K filed 2026-03-02 View cached copy (2026-08-31)Live source ↗
“The Kentucky Facility currently provides 162 MW of developed capacity.”
2026-04-29 · Riot 10-Q filed 2026-04-30 View cached copy (2026-08-31)Live source ↗
“The Kentucky Facility currently provides approximately 192 MW of developed capacity.”
2026-08-09 · Riot 10-Q filed 2026-08-10 View cached copy (2026-08-30)Live source ↗
Checked October 9, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
The Block Mining acquisition added 60 MW of developed capacity which has been expanded to approximately 95 MW of operational capacity, with targeting to reach approximately 160 MW during the remainder of 2025
Source (primary)
Riot 424B5 filed 2025-12-31 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Block Mining Acquisition added 60 MW of developed capacity for self-mining, which we have currently expanded to approximately 95 MW of operational capacity, and we are targeting to reach a total of approximately 160 MW during the remainder of 2025”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The filing states each of these figures directly. A later section of the same filing gives the 160 MW target as the first quarter of 2026.
Confirmed in the source:
- The Block Mining acquisition added 60 MW of developed capacity
- Block Mining capacity has been expanded to approximately 95 MW of operational capacity
- The Company is targeting approximately 160 MW during the remainder of 2025
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1167419/000110465925125315/riot-20251230x424b5.htm) in full (151,163 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Riot 424B5 filed 2025-12-31
Quote: “The Block Mining Acquisition added 60 MW of developed capacity for self-mining, which we have currently expanded to approximately 95 MW of operational capacity, and we are targeting to reach a total of approximately 160 MW during the remainder of 2025”
confirms Riot 10-Q filed 2026-08-10
Quote: “The Kentucky Facility currently provides approximately 192 MW of developed capacity.”
confirms Riot 10-K filed 2026-03-02
Quote: “The Kentucky Facility currently provides 137 MW of developed capacity.”
confirms Riot 10-Q filed 2026-04-30
Quote: “The Kentucky Facility currently provides 162 MW of developed capacity.”