Kentucky power capacity expansion
Company: Riot - Project: Kentucky Facility
The claim, verbatim
Riot plans a 32 MW expansion at Commerce and a 30 MW expansion at Blue Steel, growing total Kentucky power capacity from 65 MW to 127 MW. It says the expansion remains on track.
Source (primary)
riot 8-K exhibit (riot-20250731xex99d2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-09)Live source ↗
Quote: “32 MW expansion at Commerce and 30 MW expansion at Blue Steel, growing total Kentucky power capacity from 65 MW to 127 MW”
How we checked this
Checked on October 13, 2026. The cited source supports every part of this claim.
The capex table describes both expansions and the 65 MW to 127 MW increase, and the hash rate slide states the Kentucky expansion remains on track.
Confirmed in the source:
- Riot plans a 32 MW expansion at Commerce
- Riot plans a 30 MW expansion at Blue Steel
- The expansions grow total Kentucky power capacity from 65 MW to 127 MW
- Riot says the Kentucky expansion remains on track
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1167419/000155837025009894/riot-20250731xex99d2.htm) in full (33,303 characters, retrieved October 9, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms riot 8-K exhibit (riot-20250731xex99d2.htm)
Quote: “32 MW expansion at Commerce and 30 MW expansion at Blue Steel, growing total Kentucky power capacity from 65 MW to 127 MW”
