Applied Digital's 106 MW Jamestown, ND crypto-mining hosting facility (JMS01) was operating at full capacity as of August 31, 2026, per the Q1 FY2027 earnings release and 10-Q. The July 2026 10-K describes the hosting business as a legacy line serving a single crypto customer with about 1.5 years remaining on its contract, and the Jamestown energy services commitment had about 0.4 years left as of August 31, 2026. A separate 9 MW HPC/cloud data center in Jamestown is mentioned in investor timelines, but it is not counted here because no passage ties it to this facility's capacity.
106 MW in service
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Jamestown blockchain hosting facility (JMS01) | 106 | operational | 2026-08-31 | As of August 31, 2026, the Company’s 106 MW facility in Jamestown, ND, and 180 MW facility in Ellendale, ND, were operating at full capacity. 2026-10-07 View cached copy (2026-10-08)Live source ↗Archive.org ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: October 7, 2026).
Capacity
What has actually been delivered, against what has been promised. Each figure links to the statement it came from.
| Stage | Capacity | As of | Source |
|---|---|---|---|
| Energized power flowing today | 106 MW | 2026-10-15 | Jamestown facility capacity |
| Contracted a customer is on the hook | 309.6 MW | 2023-05-16 | Marathon Digital Holdings hosting contract |
| Under construction | 100 MW | 2026-10-06 | Jamestown ND facility capacity |
| Permitted | -- | ||
| Interconnect approved utility has agreed to deliver | -- | ||
| Interconnect requested in a queue, nothing approved | -- | ||
| Announced a press-release figure | 106 MW | 2026-09-17 | Jamestown facility capacity |
Who has claimed this site
Capacity commitments in the order they were announced. A commitment that ended shows why.
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-10-19
2671 Highway 20 SE, Jamestown, ND → 47.02959, -98.67909 (street) - Located from a published address 2026-10-19
2671 Highway 20 SE, Jamestown, ND → 47.02959, -98.67909 (street) - OpenStreetMap features nearby 2026-10-19
0 named match(es)
- 2026-10-13 vs 2026-10-01: structural change (radar signal shift) — Sentinel-1 backscatter decreased over the 11-day interval, with VV down 3.2 dB and VH down 1.2 dB, consistent with a structural change such as reduced double-bounce or surface-scattering returns at the site.
- 2026-10-01 vs 2026-09-12: structural change (radar signal shift) — Sentinel-1 backscatter increased by +4.0 dB in VV and +2.9 dB in VH over the 18-day interval, consistent with new or altered structural elements visible at the site.
- 2026-10-01 vs 2026-09-21: clearing or grading visible — Over the 10-day interval between Sentinel-2 scenes, NDVI decreased by 0.172 while NDBI increased by 0.166, a pattern consistent with vegetation removal and exposed soil or graded surfaces at the site.
- 2026-10-06 vs 2026-10-01: structural change (radar signal shift) — Sentinel-1 backscatter decreased in both VH (−4.58 dB) and VV (−4.18 dB) over the 5-day interval, consistent with a reduction in structural or surface scattering at the site.
- 2025-06-17 vs 2025-06-01: vegetation recovery visible
Satellite imagery on this page is drawn from the Google Earth satellite basemap, USDA NAIP aerial photography (~1 m/pixel), ESA Sentinel-2 multispectral (10 m, with per-date cloud masks), NASA / USGS Landsat 8/9 (30 m, plus surface temperature), ESA Sentinel-1 radar (all-weather, night), NASA ECOSTRESS thermal (~70 m), and NASA Black Marble night lights (500 m, daily). Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.