Jamestown GPU Hosting Building
Company: Applied Digital - Project: Jamestown
The claim, verbatim
Constructed separate GPU building in 2023 in Jamestown with capacity of 9 MW
Source (primary)
Applied Digital 424B5 filed 2024-06-17 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “In 2023, we constructed a separate and unique building, designed and purpose-built for GPUs, which is separate from our crypto hosting buildings, next to the Company's currently operating 100-MW hosting facility in Jamestown, North Dakota, with a total capacity of 9 MW.”
How we checked this
Checked on September 18, 2026. The cited source supports every part of this claim.
The filing states that a separate GPU building with 9 MW of capacity was built in 2023 next to the Jamestown facility.
Confirmed in the source:
- In 2023 Applied Digital constructed a separate building purpose-built for GPUs
- The GPU building is in Jamestown, North Dakota
- The GPU building has a total capacity of 9 MW
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000114487924000167/a06142024ciminitialwarrant.htm) in full (130,571 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 424B5 filed 2024-06-17
Quote: “In 2023, we constructed a separate and unique building, designed and purpose-built for GPUs, which is separate from our crypto hosting buildings, next to the Company's currently operating 100-MW hosting facility in Jamestown, North Dakota, with a total capacity of 9 MW.”