jain.com

Sandersville

Project of CleanSpark

Kind
datacenter
Location
1210 S Harris Street, Sandersville, GA 31082
County
Washington County
State/region
GA
Country
US
Status
under construction as of October 17, 2026

Where it stands

CleanSpark's Sandersville, Georgia data center is under construction. It has 175 MW of critical IT load (nearly 250 MW gross) leased for 20 years to a Meta subsidiary, and the first data hall is targeted for Q4 2027. CleanSpark closed $2.276 billion of senior secured notes on Sept. 25, 2026, and says the project is fully funded through completion. An older-looking passage (P40) says CleanSpark added 50 MW of capacity to a Sandersville bitcoin-mining facility. That appears to be the existing mining site, and the passages do not tie it to this HPC lease project, so it is not counted here. Whether the given street address is the mining site or the new campus is unclear.

175 MW under construction · 175 MW planned

PhaseMWStatusDateSource
Sandersville data center (Meta-subsidiary lease, first data hall)175under construction2027-12-31The project includes 175 megawatts of critical IT capacity, with deliveries expected to begin in the fourth quarter of 2027.
2026-10-09 View cached copy (2026-10-10)Live source ↗Archive.org ↗

Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: October 17, 2026).

Capacity

What has actually been delivered, against what has been promised. Each figure links to the statement it came from.

StageCapacityAs ofSource
Energized power flowing today250 MW2026-09-18Sandersville site power capacity
Contracted a customer is on the hook175 MW IT load2026-10-17Sandersville leased critical IT load
Under construction175 MW2026-09-28Georgia data center 175 MW
Permitted--
Interconnect approved utility has agreed to deliver--
Interconnect requested in a queue, nothing approved--
Announced a press-release figure250 MW2026-10-12Sandersville gross capacity

Who has claimed this site

Capacity commitments in the order they were announced. A commitment that ended shows why.

2026-07-13
Undisclosed counterparty (one or more) - tenant · 20-year term source
Probably Anviran, LLC (66 days apart) our guess
Our inference, not a disclosure. Anviran LLC announced 175 MW at Sandersville on 2026-09-17, and this site disclosed an unnamed commitment of 175 MW on 2026-07-13 -- the same capacity 66 day(s) apart. The likeliest reading is one deal described twice, so the capacity is counted once and attributed to neither. It could still be a second undisclosed party; if a source names one, this becomes a fact and the capacity returns.
2026-07-14
Meta - anchor tenant · 175 MW · 20-year term source
replaced on 2026-09-17 inferred
Anviran LLC committed 175.00 MW on 2026-09-17, taking live commitments at this site to 350 MW against a best-known capacity of 250 MW. No termination was announced for Meta; the site cannot carry both, so we record the earlier commitment as replaced.
2026-09-16
Meta - guarantor · 175 MW · 20-year term source
2026-09-17
Anviran, LLC - tenant · 175 MW · 20-year term source
2026-09-18
Verna - tenant source
2026-09-18
Anvolan LLC - tenant · 20-year term source

Claims about this project

2022-09-08 - stated
2022-09-08 - stated
2022-09-08 - stated
2022-09-08 - stated
2022-09-08 - stated
2022-10-10 - outcome unconfirmed
Power utilization target for acquired property 150.0 MW. Promised by 2023-04-08.
2022-10-10 - outcome unconfirmed
Seller-financed promissory note for property 6.5 USD. Promised by 2022-12-17.
2022-10-10 - outcome unconfirmed
Earn-out shares conditional on facility availability 1100890.0 shares. Promised by 2023-04-21.
2022-10-10 - outcome unconfirmed
2022-10-10 - outcome unconfirmed
Earn-out cash conditional on power utilization 2.0 USD. Promised by 2023-04-08.
2022-10-10 - stated
2022-10-10 - stated
2023-08-08 - stated
2023-11-30 - outcome unconfirmed
Sandersville 150 MW expansion completion 150.0 MW. Promised by 2024-02-28.
2023-11-30 - stated
2023-11-30 - outcome unconfirmed
Sandersville facility expansion 150.0 MW. Promised by 2024-02-28.
2023-11-30 - stated
2023-11-30 - delayed
Sandersville expansion timeline 150.0 MW. Promised by 2024-03-31.
2023-11-30 - outcome unconfirmed
Sandersville expansion hashrate addition 6.0 EH/s. Promised by 2024-02-28.
2024-02-07 - stated
2026-05-11 - stated
2026-07-01 - stated
2026-07-10 - stated
2026-07-10 - stated
Sandersville lease deliveries start. Promised by 2027-12-31.
2026-07-10 - verified
2026-07-13 - stated
2026-07-13 - stated
2026-07-14 - stated
2026-07-14 - stated
Sandersville Deliveries Commence. Promised by 2027-10-01.
2026-07-14 - stated
2026-07-14 - stated
2026-07-14 - stated
Expected lease revenue 6600.0 million USD.
2026-07-14 - stated
Average annual lease NOI 330.0 million USD.
2026-07-14 - stated
2026-07-14 - stated
2026-07-14 - verified
2026-07-14 - stated
2026-07-14 - stated
2026-08-05 - stated
2026-08-06 - verified
2026-08-06 - stated
2026-08-06 - stated
2026-08-06 - stated
2026-08-15 - stated
2026-08-15 - stated
2026-08-15 - stated
2026-08-17 - stated
2026-08-17 - stated
2026-08-20 - stated
2026-08-20 - stated
2026-08-21 - stated
2026-08-21 - stated
Sandersville 20-Year Lease 6.6 USD billions.
2026-08-21 - stated
2026-08-21 - stated
2026-08-24 - stated
2026-08-24 - stated
2026-08-24 - stated
2026-08-25 - stated
2026-09-03 - stated
20-year Sandersville lease deal 6.6 Billion. Promised by 2027-10-01.
2026-09-03 - stated
20-year Sandersville, GA triple-net infrastructure lease 6600000000.0 USD. Promised by 2027-10-01.
2026-09-03 - stated
Sandersville, GA campus lease revenue generation begins Q4 2027 6600000000.0 USD. Promised by 2027-10-01.
2026-09-03 - stated
2026-09-03 - stated
2026-09-03 - stated
2026-09-03 - stated
Sandersville lease IT load capacity 175.0 MW. Promised by 2027-10-01.
2026-09-03 - stated
Sandersville 20-year lease $6.6B revenue 6600.0 USD. Promised by 2027-10-01.
2026-09-03 - stated
Sandersville investment-grade tech tenant 175 MW 175.0 MW. Promised by 2027-10-01.
2026-09-04 - stated
AI infrastructure revenue start date. Promised by 2027-10-01.
2026-09-04 - stated
2026-09-04 - stated
2026-09-04 - stated
2026-09-04 - stated
2026-09-04 - stated
2026-09-04 - stated
2026-09-08 - stated
2026-09-08 - stated
2026-09-08 - stated
2026-09-08 - verified
2026-09-08 - stated
2026-09-08 - verified
2026-09-08 - stated
2026-09-08 - stated
2026-09-08 - stated
2026-09-09 - stated
2026-09-09 - stated
2026-09-09 - stated
Sandersville critical IT loads capacity 175.0 MW. Promised by 2027-10-01.
2026-09-09 - stated
2026-09-09 - stated
Sandersville infrastructure 175.0 MW. Promised by 2027-10-01.
2026-09-16 - stated
2026-09-16 - stated
Sandersville Rent Commencement. Promised by 2027-11-30.
2026-09-16 - stated
Sandersville Construction Completion. Promised by 2028-03-31.
2026-09-16 - stated
2026-09-16 - stated
2026-09-16 - stated
2026-09-16 - stated
2026-09-17 - stated
Data center revenue commencement. Promised by 2027-11-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Sandersville capacity availability. Promised by 2027-10-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Sandersville construction completion. Promised by 2028-03-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
$2.227B senior secured notes 2227.0 million USD.
2026-09-17 - stated
Initial rent commencement Q4 2027. Promised by 2027-10-01.
2026-09-17 - stated
First network hall rent generation. Promised by 2027-11-30.
2026-09-17 - stated
Construction completion. Promised by 2028-03-31.
2026-09-17 - stated
2026-09-17 - stated
Sandersville full buildout. Promised by 2028-03-01.
2026-09-17 - stated
2026-09-17 - stated
Sandersville data center online date. Promised by 2027-12-31.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Senior secured notes offering 2227000000.0 USD. Promised by 2031-12-31.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Sandersville rent commencement. Promised by 2027-11-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Sandersville facility full build-out. Promised by 2028-03-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Sandersville 175 MW critical IT capacity 175.0 MW. Promised by 2028-03-31.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Meta lease revenue commencement. Promised by 2027-11-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
Sandersville AI facility lease with Meta 6.6 USD. Promised by 2027-11-01.
2026-09-17 - stated
2026-09-17 - stated
2026-09-17 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - verified
$2.276B Senior Secured Notes Due 2031 2276.0 USD. Promised by 2026-09-25.
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
Sandersville construction timeline. Promised by 2028-03-31.
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - stated
2026-09-18 - verified
2026-09-18 - stated
2026-09-18 - stated
2026-09-19 - stated
20-year Sandersville lease 6600000000.0 USD.
2026-09-20 - stated
2026-09-21 - stated
Sandersville rent commencement date. Promised by 2027-11-30.
2026-09-21 - stated
2026-09-21 - stated
2026-09-21 - stated
2026-09-21 - stated
2026-09-21 - stated
2026-09-21 - stated
2026-09-21 - stated
2026-09-22 - verified
2026-09-23 - stated
2026-09-23 - stated
2026-09-24 - stated
$2.24B 7.875% senior secured notes due 2031 2241860000.0 USD. Promised by 2031-12-31.
2026-09-24 - stated
2026-09-25 - stated
2026-09-25 - verified
2026-09-25 - stated
2026-09-25 - stated
2026-09-25 - stated
USD 2.276B 7.875% senior secured notes due 2031 2276000000.0 USD. Promised by 2031-12-31.
2026-09-26 - stated
2026-09-26 - stated
2026-09-27 - stated
Sandersville Georgia data center lease 6600000000.0 USD. Promised by 2027-10-01.
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-27 - stated
2026-09-28 - stated
2026-09-28 - stated
2026-09-28 - stated
2026-10-05 - stated
2026-10-05 - stated
2026-10-05 - stated
2026-10-07 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
2026-10-09 - stated
Sandersville deliveries begin Q4 2027. Promised by 2027-12-31.
2026-10-09 - stated
2026-10-09 - stated
2026-10-10 - stated
2026-10-10 - stated
2026-10-10 - stated
2026-10-10 - stated
2026-10-10 - stated
2026-10-10 - stated
2026-10-10 - stated
Meta lease at Sandersville 6600000000.0 USD.
2026-10-11 - stated
2026-10-11 - stated
2026-10-11 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-12 - stated
2026-10-15 - stated
2026-10-15 - stated
2026-10-17 - stated
2026-10-17 - stated
2026-10-17 - stated
2026-10-17 - stated

Site intelligence

Analytical estimate. Each site below is located from public records (filings, releases, news, OpenStreetMap) and checked against free satellite imagery; "How we located this site" lists every step and the score it earned. The conclusion is computed from night-time lights, surface heat and year-over-year change, with the dates it rests on. These are hypotheses under active tracking, not legal parcels or an official endorsement.
1210 S HARRIS ST, SANDERSVILLE, GA, 31082
Candidate
Washington County, GA
32.9617, -82.8092
Approximate address 1106 S Harris St, Sandersville, GA 31082, USA Reverse-geocoded from the candidate centroid; not a permit-confirmed parcel address.
Conclusion so far Operating: the site is lit at night like a running facility. · confidence 75%
Running: night-time lights at the site ran 9.08x the surrounding area (11 of 11 clear nights, 2026-06-24 to 2026-09-17); surface temperature +0.9 K against its surroundings (12 pass(es), 2026-07-19 to 2026-10-16). Based on 43 clear observation(s) from 2026-06-21 to 2026-10-19.
What would change this: Lights going dark over several clear nights.
Latest clear imagery: ECOSTRESS thermal 2026-10-16 · Sentinel-2 2026-10-12 · radar 2026-09-30 · Google 2026-09-29 · night lights 2026-09-17 · Landsat 2026-09-13 · NAIP 2023-10-07
Newest clear images189 clear image date(s)
Thermal view of cleanspark-sandersville, 2026-10-16 (ECOSTRESS thermal)
2026-10-16ECOSTRESS thermal · 70 m/pixel
Thermal view of cleanspark-sandersville, 2026-10-13 (ECOSTRESS thermal)
2026-10-13ECOSTRESS thermal · 70 m/pixel
Visual view of cleanspark-sandersville, 2026-10-12 (Sentinel-2)
2026-10-12Sentinel-2 · 10 m/pixel
Thermal view of cleanspark-sandersville, 2026-10-12 (ECOSTRESS thermal)
2026-10-12ECOSTRESS thermal · 70 m/pixel
How we located this site
35/100 (candidate): street location 25 + 1 independent source family 10
  1. Starting point (the project's stated locality) 2026-10-19
    1210 S Harris Street, Sandersville, GA 31082 → 32.96170, -82.80919 (street)
  2. Rejected facts that point elsewhere 2026-10-19
    2 fact(s) rejected
    197 Dixie Wood Road, Washington, Georgia 30673 (82.8 km away); 5295 Brook Hollow Parkway, Norcross, Georgia 30071 (166.7 km away)
  3. Located from a published address 2026-10-19
    1210 S Harris Street, Sandersville, GA 31082 → 32.96170, -82.80919 (street)
  4. Other possible locations 2026-10-19
    1 other location cluster(s) kept as non-public candidates
  5. OpenStreetMap features nearby 2026-10-19
    0 named match(es)
Recent changes
  • 2023-08-20 vs 2023-07-27: vegetation recovery visible
  • 2023-06-25 vs 2023-06-09: vegetation recovery visible
  • 2023-12-18 vs 2023-11-24: vegetation recovery visible

Satellite imagery on this page is drawn from the Google Earth satellite basemap, USDA NAIP aerial photography (~1 m/pixel), ESA Sentinel-2 multispectral (10 m, with per-date cloud masks), NASA / USGS Landsat 8/9 (30 m, plus surface temperature), ESA Sentinel-1 radar (all-weather, night), NASA ECOSTRESS thermal (~70 m), and NASA Black Marble night lights (500 m, daily). Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.