Long Ridge
Project of Marathon Digital
Capacity
What has actually been delivered, against what has been promised. Each figure links to the statement it came from.
| Stage | Capacity | As of | Source |
|---|---|---|---|
| Energized power flowing today | 505 MW | 2026-09-01 | Long Ridge CCGT power plant |
| Contracted a customer is on the hook | -- | ||
| Under construction | -- | ||
| Permitted | -- | ||
| Interconnect approved utility has agreed to deliver | -- | ||
| Interconnect requested in a queue, nothing approved | -- | ||
| Announced a press-release figure | 1,000 MW | 2026-04-30 | Long Ridge development campus capacity |
Claims about this project
2026-04-29 - delayed
2026-04-29 - stated
2026-04-29 - stated
2026-04-29 - stated
Barclays bridge term loan facility 785.0 million USD.
2026-04-30 - stated
Long Ridge CCGT facility capacity 505.0 MW.
2026-04-30 - stated
Long Ridge development campus capacity 1000.0 MW.
2026-04-30 - stated
2026-04-30 - stated
2026-04-30 - stated
Long Ridge acquisition debt assumption 785000000.0 USD.
2026-04-30 - stated
Increase in owned capacity from Long Ridge acquisition 65.0 percent.
2026-06-24 - stated
2026-09-01 - stated
Long Ridge hedged cash flows 76.0 percent.
2026-09-01 - stated
Long Ridge CCGT power plant 505.0 MW.
2026-09-01 - stated
Long Ridge MW authorization increase 505.0 MW.
2026-09-01 - stated
Long Ridge owned land 1600.0 acres.
2026-09-01 - stated
Long Ridge capacity factor 89.0 percent.
2026-09-01 - stated
Long Ridge operating cost 15.0 USD/MWh.
2026-09-01 - stated
Long Ridge gas reserves 856.0 TBtu.
2026-09-01 - stated
Long Ridge gas production 100000.0 MMBtu/day.
2026-09-01 - stated
Long Ridge energy sales hedges 38.8 USD/MWh.
2026-09-01 - stated
2026-09-01 - stated
Long Ridge heat rate 6400.0 Btu/kWh.