Hannibal campus Critical IT / AI load through 2030
Company: Marathon Digital
The claim, verbatim
Up to 600 gross MW of Critical IT load / AI at the Hannibal campus through 2030.
Source (primary)
MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation (IR page (ir.mara.com), ir_presentation)
View cached copy (2026-11-11)Live source ↗Archive.org ↗
Quote: “600 Gross MW of Critical IT Load / AI Through 2030”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation
Quote: “600 Gross MW of Critical IT Load / AI Through 2030”