Long Ridge capacity expansion path
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
MARA has multiple paths to expand capacity at the Long Ridge site to up to 600 gross MW through grid expansions and on-site power generation
Source (primary)
marathon-digital 8-K exhibit (d54802dex991.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-08)Live source ↗
Quote: “MARA also has multiple paths to expand capacity at the site to up to 600 gross MW over time through a combination of grid expansions and on-site power generation”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms marathon-digital 8-K exhibit (d54802dex991.htm)
Quote: “MARA also has multiple paths to expand capacity at the site to up to 600 gross MW over time through a combination of grid expansions and on-site power generation”