MARA's current capacity at Hannibal site
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
MARA currently has 200 MW of existing capacity at the Hannibal site
Source (primary)
MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “200 MW of existing MARA Capacity”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document references 200 MW of existing MARA capacity at the co-located Hannibal site.
Confirmed in the source:
- MARA currently has 200 MW of existing capacity at the Hannibal/Long Ridge site
What we did: Read our cached copy of the publisher (https://www.mara.com/posts/mara-agreement-to-acquire-long-ridge-energy-power) in full (17,741 characters, retrieved September 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings
Quote: “200 MW of existing MARA Capacity”
