Long Ridge uprate to 505 MW in 1H 2027
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
Long Ridge is authorized to sell 485 MW, with plans to increase rated capacity to 505 MW in the first half of 2027.
Source (primary)
MARA Holdings Q3 Call: Aims to Secure Two AI/HPC Leases by Year-End, Reduces Total Debt by 37% - KuCoin (-, news_article)
View cached copy (2026-11-10)Live source ↗Archive.org ↗
Quote: “The plant is currently authorized to sell 485 MW of power, with plans to increase its rated capacity to 505 MW in the first half of 2027”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
The article states both the current 485 MW sales authorization and the planned increase to 505 MW in the first half of 2027.
Confirmed in the source:
- The Long Ridge plant is authorized to sell 485 MW of power
- There are plans to increase the plant's rated capacity to 505 MW in the first half of 2027
What we did: Read our cached copy of the publisher (https://www.kucoin.com/news/flash/mara-holdings-q3-call-aims-to-sign-two-ai-hpc-leases-by-year-end-cuts-total-debt-by-37) in full (15,540 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Holdings Q3 Call: Aims to Secure Two AI/HPC Leases by Year-End, Reduces Total Debt by 37% - KuCoin
Quote: “The plant is currently authorized to sell 485 MW of power, with plans to increase its rated capacity to 505 MW in the first half of 2027”