Long Ridge AI and critical IT load capacity
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
Long Ridge site will provide ability to scale to 600 gross MW of AI and critical IT load over time
Source (primary)
marathon-digital 8-K exhibit (q126shareholderletter.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-07)Live source ↗
Quote: “The site gives us over 1 GW of total potential capacity and the ability to scale to 600 gross MW of AI and critical IT load over time”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document explicitly states the site can scale to 600 gross MW of AI and critical IT load over time.
Confirmed in the source:
- The Long Ridge site provides the ability to scale to 600 gross MW of AI and critical IT load over time
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1507605/000150760526000014/q126shareholderletter.htm) in full (39,768 characters, retrieved September 7, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms marathon-digital 8-K exhibit (q126shareholderletter.htm)
Quote: “The site gives us over 1 GW of total potential capacity and the ability to scale to 600 gross MW of AI and critical IT load over time”