Future expansion capacity at Long Ridge for AI and Critical IT loads
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
MARA has multiple paths to expand capacity at Long Ridge to up to 600 gross MW of AI and Critical IT loads over time
Source (primary)
MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “MARA also has multiple paths to expand capacity at the site to up to 600 gross MW over time through a combination of grid expansions and on-site power generation”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings
Quote: “MARA also has multiple paths to expand capacity at the site to up to 600 gross MW over time through a combination of grid expansions and on-site power generation”
