Future expansion capacity at Long Ridge for AI and Critical IT loads
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
MARA has multiple paths to expand capacity at Long Ridge to up to 600 gross MW of AI and Critical IT loads over time
Source (primary)
MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “MARA also has multiple paths to expand capacity at the site to up to 600 gross MW over time through a combination of grid expansions and on-site power generation”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states multiple paths to expand to up to 600 gross MW and describes that figure as AI and Critical IT loads in its highlights.
Confirmed in the source:
- MARA has multiple paths to expand capacity at the site to up to 600 gross MW over time
- This expansion capacity relates to AI and Critical IT loads
What we did: Read our cached copy of the publisher (https://www.mara.com/posts/mara-agreement-to-acquire-long-ridge-energy-power) in full (17,741 characters, retrieved September 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings
Quote: “MARA also has multiple paths to expand capacity at the site to up to 600 gross MW over time through a combination of grid expansions and on-site power generation”