Hannibal campus total power capacity expansion

Company: Marathon Digital - Project: Long Ridge

Subject kind
facility capacity
Statement date
2026-04-29
Promised by
2030-12-31
Promised amount
1105.0 MW
Current status
stated

The claim, verbatim

Hannibal campus planned to reach 1,105 MW total capacity (505 MW Long Ridge + 200 MW existing MARA + 200 MW expanded grid + 200 MW expanded generation), with active permits for expansion.

Source (primary)

MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation (IR page (ir.mara.com), ir_presentation)
View cached copy (2026-11-10)Live source ↗Archive.org ↗

Quote: “+1 GW of Potential Power Capacity, with 600 Gross MW of Critical IT Load / AI Through 2030”

How we checked this

Checked on November 11, 2026. The cited source supports part of this claim, but not all of it.

The deck supports the 1,105 MW total, its components and the active permits. However, it labels this capacity as potential and does not say the campus is planned to reach that level.

Confirmed in the source:

We could not confirm this from the cited source:

That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.

What we did: Read our cached copy of IR page (ir.mara.com) (https://d1io3yog0oux5.cloudfront.net/_8c69f4357a699e228a85d68890478b48/marathondh/db/417/7572/pdf/Project+Leopard+Deck+V2.pdf) in full (19,483 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation

Quote: “+1 GW of Potential Power Capacity, with 600 Gross MW of Critical IT Load / AI Through 2030”

View cached copy (2026-11-10)Live source ↗Archive.org ↗