Long Ridge CCGT facility capacity
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
The acquisition includes a 505 megawatt combined-cycle gas turbine (CCGT) facility
Source (primary)
MARA Stock Jumps On $1.5 Billion Long Ridge Deal In Latest Shift Beyond Bitcoin Mining - Stocktwits (-, news_article)
View cached copy (2026-08-31)Live source ↗Archive.org ↗
Quote: “The acquisition includes a 505-megawatt combined-cycle gas turbine (CCGT) facility”
How we checked this
Additional evidence
confirms MARA Stock Jumps On $1.5 Billion Long Ridge Deal In Latest Shift Beyond Bitcoin Mining - Stocktwits
Quote: “The acquisition includes a 505-megawatt combined-cycle gas turbine (CCGT) facility”
