Long Ridge plant authorization increase to 505 MW
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
Long Ridge is currently authorized to sell 485 MW, expected to increase to the full 505 MW nameplate in 2H 2026.
Source (primary)
MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation (IR page (ir.mara.com), ir_presentation)
View cached copy (2026-11-10)Live source ↗Archive.org ↗
Quote: “Currently authorized to sell 485 MW; expected to increase to full 505 MW nameplate in 2H 2026.”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
A footnote to the deck's transaction overview slide states both the current 485 MW authorization and the expected increase to 505 MW in 2H 2026.
Confirmed in the source:
- Long Ridge is currently authorized to sell 485 MW
- That authorization is expected to increase to the full 505 MW nameplate in 2H 2026
What we did: Read our cached copy of IR page (ir.mara.com) (https://d1io3yog0oux5.cloudfront.net/_8c69f4357a699e228a85d68890478b48/marathondh/db/417/7572/pdf/Project+Leopard+Deck+V2.pdf) in full (19,483 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA to Accelerate its Digital Infrastructure Strategy with Acquisition of Long Ridge Energy & Power (“Long Ridge”) Presentation
Quote: “Currently authorized to sell 485 MW; expected to increase to full 505 MW nameplate in 2H 2026.”