Expansion potential for AI and Critical IT loads
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
MARA has line of sight to up to 600 gross MW of AI and Critical IT load capacity through grid expansions and on-site power generation
Source (primary)
MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “Line of Sight to up to 600 Gross MW of AI and Critical IT Loads”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document states MARA has multiple paths to expand to up to 600 gross MW through grid expansions and on-site power generation.
Confirmed in the source:
- MARA has line of sight to up to 600 gross MW of AI and Critical IT loads
- The 600 gross MW would come through grid expansions and on-site power generation
What we did: Read our cached copy of the publisher (https://www.mara.com/posts/mara-agreement-to-acquire-long-ridge-energy-power) in full (17,741 characters, retrieved September 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings
Quote: “Line of Sight to up to 600 Gross MW of AI and Critical IT Loads”
