Long Ridge site total potential capacity over 1 GW
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
Combined with existing Bitcoin mining at the site, Long Ridge will give MARA over 1 GW of total potential capacity on over 1,600 contiguous acres.
Source (primary)
marathon-digital 8-K exhibit (q326shareholderletter.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-10)Live source ↗
Quote: “Together with our existing Bitcoin mining operations at the site, we will have over 1 GW of total potential capacity.”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
The letter states the over 1 GW potential capacity when combined with existing mining operations and the over 1,600 contiguous acres.
Confirmed in the source:
- MARA has existing Bitcoin mining operations at the Long Ridge site
- Together with those mining operations, Long Ridge will give MARA over 1 GW of total potential capacity
- Long Ridge provides over 1,600 contiguous acres
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1507605/000150760526000026/q326shareholderletter.htm) in full (43,591 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms marathon-digital 8-K exhibit (q326shareholderletter.htm)
Quote: “Together with our existing Bitcoin mining operations at the site, we will have over 1 GW of total potential capacity.”