Long Ridge CCGT nameplate power capacity
Company: Marathon Digital - Project: Long Ridge
The claim, verbatim
Long Ridge Energy includes a 505 MW nameplate combined-cycle gas power plant
Source (primary)
MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings (-, news_article)
View cached copy (2026-09-10)Live source ↗Archive.org ↗
Quote: “505 MW nameplate combined-cycle gas power plant (the "Long Ridge CCGT")”
How we checked this
Checked on September 20, 2026. The cited source supports every part of this claim.
The document describes a 505 MW nameplate combined-cycle gas power plant (Long Ridge CCGT).
Confirmed in the source:
- Long Ridge Energy includes a 505 MW nameplate combined-cycle gas power plant
What we did: Read our cached copy of the publisher (https://www.mara.com/posts/mara-agreement-to-acquire-long-ridge-energy-power) in full (17,741 characters, retrieved September 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Advances Its Optimized Digital Infrastructure Strategy with Agreement to Acquire Long Ridge Energy & Power - MARA Holdings
Quote: “505 MW nameplate combined-cycle gas power plant (the "Long Ridge CCGT")”
