Status
operational as of August 3, 2026

Where it stands

Cipher's wholly owned 207 MW Odessa Facility has been fully built out since September 2023. As of the Q2 2026 filings it remains energized at 207 gross MW and is mining bitcoin under a fixed-price Luminant PPA that runs until at least July 2027. Cipher is in discussions for an HPC hosting lease at the site, but no conversion has been contracted or started.

207 MW in service

PhaseMWStatusDateSource
Odessa Facility (bitcoin mining)207operational2023-09-01We began bitcoin mining operations on this site in November 2022 and completed the build out of the site in September 2023.
2026-02-23 View cached copy (2026-08-31)Live source ↗

Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: August 3, 2026).

Capacity

What has actually been delivered, against what has been promised. Each figure links to the statement it came from.

StageCapacityAs ofSource
Energized power flowing today207 MW2026-08-03Odessa site 207 MW capacity with fixed-price PPA
Contracted a customer is on the hook207 MW2023-03-13Luminant power capacity to Odessa
Under construction--
Permitted--
Interconnect approved utility has agreed to deliver--
Interconnect requested in a queue, nothing approved--
Announced a press-release figure--

Claims about this project

2022-08-31 - stated
2022-08-31 - verified
Luminant cash payment for PPA modification 5.056 USD. Promised by 2022-09-10.
2022-09-01 - stated
2022-09-01 - verified
Luminant payment for schedule modification 5056006.56 USD. Promised by 2022-09-10.
2022-09-01 - verified
2023-03-13 - stated
2023-03-13 - verified
Odessa Facility Q1 2023 miner deployment 47000.0 miners. Promised by 2023-03-31.
2023-03-13 - verified
Odessa expansion to Q1 2023 47000.0 miners. Promised by 2023-03-31.
2023-03-13 - stated
Luminant power capacity to Odessa 207.0 MW. Promised by 2027-12-31.
2023-03-13 - stated
2023-03-13 - stated
2023-03-13 - stated
2023-03-13 - stated
2023-03-13 - verified
Odessa Facility Q1 2023 hashrate capability 4.7 EH/s. Promised by 2023-03-31.
2023-03-13 - verified
Odessa Facility 2023 miner expansion plan 10800.0 units. Promised by 2023-12-31.
2023-03-13 - verified
Odessa Facility capacity fill by end of 2023 10800.0 miners. Promised by 2023-12-31.
2023-03-13 - verified
Odessa Q1 2023 capacity target 4.7 EH/s. Promised by 2023-03-31.
2023-03-13 - stated
2023-05-03 - stated
2023-05-31 - stated
2023-08-03 - stated
2023-08-28 - stated
Odessa Facility lease term duration. Promised by 2027-07-31.
2023-08-28 - stated
2025-02-24 - stated
2025-02-24 - stated
2025-02-24 - stated
Luminant power cost 2.7 c/kWh. Promised by 2027-07-31.
2025-02-24 - stated
Luminant power purchase agreement 2.7 c/kWh. Promised by 2027-07-31.
2025-02-24 - stated
2025-02-24 - stated
Luminant power supply agreement through July 2027 2.7 c/kWh. Promised by 2027-07-31.
2025-05-19 - stated
2025-05-19 - stated
2025-05-21 - stated
2025-05-21 - stated
2026-02-23 - stated
2026-02-23 - stated
2026-02-23 - stated
2026-02-23 - stated
2026-02-23 - stated
Luminant power supply agreement 2.8 c/kWh. Promised by 2027-07-31.
2026-08-03 - stated

Site intelligence

Analytical estimate. Each site below is located from public records (filings, releases, news, OpenStreetMap) and checked against free satellite imagery; "How we located this site" lists every step and the score it earned. The conclusion is computed from night-time lights, surface heat and year-over-year change, with the dates it rests on. These are hypotheses under active tracking, not legal parcels or an official endorsement.
Odessa, Texas, TX
Weak
Ector County, TX
31.8386, -102.3274
Approximate address 204 N Grant Ave, Odessa, TX 79761, USA Reverse-geocoded from the candidate centroid; not a permit-confirmed parcel address.
Conclusion so far We have not located the site yet. · confidence 30%
Undetermined: we have not yet located the actual site, only the town or county it is in, so imagery cannot say whether anything is running.
What would change this: A published address, parcel, coordinates or permit for the site itself.
Latest clear imagery: Google 2026-09-29
Newest clear images4 clear image date(s)
Visual view of cipher-mining-odessa-facility, 2026-09-29 (Google Earth (wide view))
2026-09-29Google Earth (wide view) · 9.5 m/pixel
Visual view of cipher-mining-odessa-facility, 2026-09-29 (Google Earth (close view))
2026-09-29Google Earth (close view) · 0.3 m/pixel
Visual view of cipher-mining-odessa-facility, 2026-09-06 (Google Earth (wide view))
2026-09-06Google Earth (wide view) · 9.5 m/pixel
Visual view of cipher-mining-odessa-facility, 2026-09-06 (Google Earth (close view))
2026-09-06Google Earth (close view) · 0.3 m/pixel
Grid interconnection Anchored to 345kV substation () within 4 mi.
How we located this site
5/100 (weak): locality location 5
  1. Initial geocode 2026-09-05
    Odessa, Texas, TX → town/county centre, 4 km box -- not the site
  2. Nearest substation (earlier method) 2026-09-05
    re-centred on the nearest high-voltage substation (superseded method)
  3. Starting point (the project's stated locality) 2026-10-19
    Odessa, Texas → 31.84568, -102.36764 (locality)
  4. No site-level evidence yet 2026-10-19
    no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site
  5. OpenStreetMap features nearby 2026-10-19
    0 named match(es)