Odessa Facility hashrate capacity
Company: Cipher Mining - Project: Odessa Facility
The claim, verbatim
As of April 30, 2025, the Odessa Facility had a hashrate capacity of 11.3 EH/s
Source (primary)
Cipher Mining 424B5 filed 2025-05-20 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “As of April 30, 2025, the hashrate capacity of the Odessa Facility was 11.3 EH/s”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The prospectus supplement states that as of April 30, 2025, the Odessa Facility's hashrate capacity was 11.3 EH/s.
Confirmed in the source:
- As of April 30, 2025, the Odessa Facility had a hashrate capacity of 11.3 EH/s
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000119312525123231/d920705d424b5.htm) in full (436,841 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Cipher Mining 424B5 filed 2025-05-20
Quote: “As of April 30, 2025, the hashrate capacity of the Odessa Facility was 11.3 EH/s”
confirms Cipher Mining 424B5 filed 2025-05-20
Quote: “As of April 30, 2025, the hashrate capacity of the Odessa Facility was 11.3 EH/s.”
