Odessa bitcoin mining facility specifications
Company: Cipher Mining - Project: Odessa Facility
The claim, verbatim
Odessa facility operates 207 MW total capacity with 17.2 J/TH fleet efficiency and 2.8¢/kWh power cost
Source (primary)
cipher-mining 8-K exhibit (cipherdigital_businessup.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-13)Live source ↗
Quote: “207 MW Total Capacity... ~17.2 J/TH Fleet Efficiency... ~¢2.8 /kWh Power Cost”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The Odessa site snapshot lists 207 MW total capacity, ~17.2 J/TH fleet efficiency, and ~2.8¢/kWh power cost.
Confirmed in the source:
- Odessa has 207 MW total capacity
- Odessa fleet efficiency ~17.2 J/TH
- Odessa power cost ~2.8¢/kWh
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000007/cipherdigital_businessup.htm) in full (25,132 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (cipherdigital_businessup.htm)
Quote: “207 MW Total Capacity... ~17.2 J/TH Fleet Efficiency... ~¢2.8 /kWh Power Cost”