Odessa Facility Q1 2023 hashrate capability
Company: Cipher Mining - Project: Odessa Facility
What the later record shows
Delivered; the record does not say when
Odessa was later capable of about 6.4 EH/s (February 2024), above the 4.7 EH/s target. No passage gives the hashrate at March 31, 2023.
“As of February 29, 2024, the Odessa Facility is capable of producing approximately 6.4 EH/s through the operation of approximately 60,000 miners.”
2024-03-04 · Cipher Mining 10-K filed 2024-03-05 View cached copy (2026-08-31)Live source ↗
Checked October 10, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
By end of Q1 2023, Odessa Facility capable of generating approximately 4.7 EH/s
Source (primary)
Cipher Mining 10-K filed 2023-03-14 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “By the end of the first quarter 2023, we anticipate operating approximately 47,000 miners, capable of generating approximately 4.7 EH/s.”
How we checked this
Checked on October 11, 2026. The cited source supports part of this claim, but not all of it.
The 4.7 EH/s figure comes from the 10-K, but the filing gives it as an anticipated outcome, not a stated fact.
Confirmed in the source:
- Cipher anticipated that its Odessa miners would be capable of approximately 4.7 EH/s by the end of Q1 2023
We could not confirm this from the cited source:
- That the Odessa Facility would definitely be capable of 4.7 EH/s by end of Q1 2023 (the filing presents this only as an anticipation)
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000095017023007793/cifr-20221231.htm) in full (564,500 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Cipher Mining 10-K filed 2023-03-14
Quote: “By the end of the first quarter 2023, we anticipate operating approximately 47,000 miners, capable of generating approximately 4.7 EH/s.”
confirms Cipher Mining 10-K filed 2024-03-05
Quote: “As of February 29, 2024, the Odessa Facility is capable of producing approximately 6.4 EH/s through the operation of approximately 60,000 miners.”