Odessa bitcoin mining facility capacity
Company: Cipher Mining - Project: Odessa Facility
The claim, verbatim
Odessa data center is a wholly-owned 207 MW facility in Odessa, Texas
Source (primary)
Cipher Mining 10-K filed 2026-02-24 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “Our Odessa data center (the "Odessa Facility") is our wholly-owned 207 MW facility located in Odessa, Texas.”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
The Bitcoin Mining Operations section describes the Odessa Facility in exactly these terms.
Confirmed in the source:
- The Odessa data center is wholly owned by Cipher
- The Odessa Facility has 207 MW of capacity
- The Odessa Facility is located in Odessa, Texas
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm) in full (477,779 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Cipher Mining 10-K filed 2026-02-24
Quote: “Our Odessa data center (the "Odessa Facility") is our wholly-owned 207 MW facility located in Odessa, Texas.”