WhiteFiber WYFI NASDAQ

Cap Raise: $500M+Delayed: 3+Litigation-ActiveCap Raise: $100M+MW Club: 100+

HPC / AI cloud infrastructure; spun out of Bit Digital in 2025.

Legal name
WhiteFiber, Inc.
Industry
HPC / AI cloud infrastructure
Website
https://www.whitefiber.com
Employees
83 (as of 2026-09-03)
First covered
2026-08-30
Market
WYFI $18.78 · mkt-cap $725.17M (snapshot 2026-09-03)

Corporate history

Founding and earlier history not covered in these sources. WhiteFiber operates through subsidiary Enovum Data Centers Corp. (Canadian corporation), indicating data center infrastructure as core business. Incorporated in Cayman Islands (EIN 61-2222606), trades on Nasdaq under WYFI as an emerging growth company with headquarters at 31 Hudson Yards, New…

Read the full history

Founding and earlier history not covered in these sources. WhiteFiber operates through subsidiary Enovum Data Centers Corp. (Canadian corporation), indicating data center infrastructure as core business. Incorporated in Cayman Islands (EIN 61-2222606), trades on Nasdaq under WYFI as an emerging growth company with headquarters at 31 Hudson Yards, New York.

Most significant recent development: August 16, 2026 real estate purchase agreement with Unifi Manufacturing, Inc. (wholly owned subsidiary of Unifi, Inc.), representing expansion of physical infrastructure footprint. Sam Tabar is CEO as of August 2026. Ichi Shih is director and 10% beneficial owner as of August 2026.

These filings provide no disclosure of revenue model, complete current lines of business, historical pivots, acquisitions, or financial performance. The Form 4 filings show only insider trading activity (Shih sold 7,059 shares at $30.12 on May 29, 2026). Comprehensive business description requires access to S-1, 10-K, or investor presentations.

Street view

Analyst consensus, peer set, and quarterly-EPS surprise history. Sourced from Finnhub; refreshed nightly.

Analyst consensus (2026-09, 17 analysts)

Strong Buy4
Buy11
Hold2
Sell0
Strong Sell0
Show last 5 months
MonthSBBHSSS
2026-05411200
2026-06410200
2026-07410300
2026-08410300
2026-09411200

Peer tickers (green = also tracked in The Analysis)

FSLY SHAZ SHAZ RXT BLZE USDE CMRC CXDO SNOW

Recent quarterly EPS: estimate vs actual

Quarter endEstimateActualSurprise%
2025-09-30 (Q3)-0.0719-0.12-0.0481-66.9%
2025-12-31 (Q4)-0.1683-0.67-0.5017-298.1%
2026-03-31 (Q1)-0.3062-0.31-0.0038-1.2%
2026-06-30 (Q2)-0.4505-0.26+0.1905+42.3%

The Analysis

ANALYSIS

Frequently asked

What does WhiteFiber do?
WhiteFiber is building data center infrastructure focused on GPU server capacity and energy service agreements. The company is acquiring real estate and constructing facilities to support cloud computing workloads.
What are WhiteFiber's disclosed customers?
No named customers are disclosed in company records. All facility and service claims (claims 24-26) lack customer identification.
What is WhiteFiber's current strategy?
Acquire real estate in North Carolina, build out electrical power capacity to 100+ MW by 2027 (claim 9), then expand to 198 MW within seven years (claim 32), and deploy GPU servers for cloud services. The company is also considering additional acquisitions and partnerships (claim 27).
What real estate has WhiteFiber acquired?
Two properties: a $60M acquisition in Yadkin County, North Carolina (claim 29), with 60 MW minimum capacity (claim 31), and a purchase agreement with Unifi Manufacturing (claim 19).
What financing has WhiteFiber raised and what's the status?
Raised $310M in 5.00% convertible senior notes due 2032 (claim 20), netting $298.5M in proceeds (claim 21). Recently exchanged $198.15M of existing notes for $118.5M cash plus 6.3M shares (claim 22), completing by 2026-08-21.
What has actually been delivered versus announced?
Only property acquisitions and earnest money deposits ($2.25M, claim 30) are confirmed in progress. All other claims—capacity buildout, energy agreements (claim 25), GPU server deployment (claim 26), and the CEO hire (claim 28)—remain stated intentions with no completion dates or evidence of delivery.
What are the key open questions?
When will construction begin and capacity come online? Who are the actual end customers and what are their commitments? What are the contracted energy costs and power purchase agreements? What is the path to profitability given the capital intensity?
Cites claims: #29, #32, #31, #30, #23, #22, #24, #25 +11 more
ANALYSIS

What we haven't been told

The convertible notes exchange and reduction (claims 22 and 23) carried promised dates of 2026-08-21, now nine days past, yet remain marked as 'stated' status with no announcement of completion or delay acknowledgment. Management disclosed these transactions prominently on August 20 and 21 but has not updated investors on whether the $198.15M-to-$118.5M exchange actually settled by the promised date or slipped. The silence is notable given that the transaction involves material restructuring of $310M in debt. Separately, facility capacity language lacks consistency: claim 31 (August 16) commits to a minimum 60 MW by October 30, 2026, while claim 9 (August 21) targets '100+ MW' for 2027, but management has not clarified whether the earlier commitment was revised upward, superseded, or applies to different properties. Claims 24 and 25, announced August 20, reference 'Data Center Expansion' and 'Energy Service Agreements' without promised dates, specific megawatt targets, location detail, or supplier names, contrasting with the quantified precision of the earlier Yadkin County acquisition claim and suggesting these initiatives remain unbounded or contingent. Claim 27 uses the phrase 'Potential Acquisitions, Partnerships and Joint Ventures' without distinguishing between signed, discussed, or exploratory stages, which is weaker disclosure language than the definite 'purchase agreement' language in claim 19 announced five days later. The record shows no clarification on whether these represent new efforts or rephrasing of previously disclosed intentions.

Cites claims: #29, #32, #31, #30, #23, #22, #24, #25 +11 more
ANALYSIS

What we aren't being told

On 2026-08-16, WhiteFiber disclosed a $60M real estate acquisition in Yadkin County, North Carolina (claim 29) and announced electrical power capacity targets of 60 MW minimum (claim 31) and 198 MW potential expansion (claim 32). What has not been said is the specific property address or parcel information, total acreage, existing on-site infrastructure status, and critical details on electrical grid interconnection—information essential for a sophisticated investor evaluating a material real estate transaction.

Claim 31 promises 60 MW of minimum electrical power capacity at the acquired properties by 2026-10-30, the same deadline as property acquisition closing (claim 29). What has not been said is whether this 60 MW represents installed nameplate capacity available immediately upon closing, permitted capacity pending construction, or theoretical maximum—a distinction that determines whether the timeline is achievable and what capital will be required beyond the $60M purchase price.

Claim 25, disclosed on 2026-08-20, announces Energy Service Agreements for Data Centers without naming counterparties, disclosing pricing terms, specifying contract duration, or indicating whether these are long-term take-or-pay commitments. What has not been said is the identity of these agreement counterparties, pricing structure, and whether they represent guaranteed revenue streams or optional arrangements.

Claim 26, also disclosed 2026-08-20, announces GPU Servers for Cloud Business with no disclosure of quantity of units, specific GPU model specifications, the supplier or manufacturer, expected deployment timeline, or total capital allocation. A first-year analyst would ask: how many units, which GPU architecture, when will they be delivered, and what is the total investment magnitude?

Claims 22 and 8, dated 2026-08-20 and 2026-08-21, report a convertible note exchange of $198.15M for $118.5M plus 6.3M shares, yet the encoded amount appears as 118.5 USD, creating ambiguity in whether net proceeds figures in claims 21 and 7 ($298.5 USD) represent millions or another denomination. What has not been said is the precise cash-to-shares conversion mechanics and complete accounting of settlement.

Claim 19, disclosed 2026-08-25, identifies Unifi Manufacturing as counterparty to a real estate purchase agreement but discloses no purchase price, expected closing date, specific property address or acreage, confirmation of related-party status, or detail of business assets transferring with the real estate. What has not been said is whether this Unifi transaction is material and on what timeline investors should expect closing.

Cites claims: #29, #32, #31, #30, #23, #22, #24, #25 +11 more
ANALYSIS

Customer disclosures, read

WhiteFiber's public disclosure record contains minimal customer or partnership naming. The only substantive claim on file (claim 27, dated August 20, 2026) references "potential acquisitions, partnerships and joint ventures related thereto"—language that avoids contractual commitment entirely. The use of "potential" signals an exploratory phase, not signed agreements. The phrasing remains generic and unnamed; no counterparty is identified.

This absence is consequential. WhiteFiber has disclosed no named customer agreements, no identified strategic partners, and no anchor customers by designation. The silence on specific counterparties prevents any assessment of customer concentration, revenue per customer, or revenue attribution to announced relationships. Where transparency would typically require naming material customers or partners in SEC filings or press releases, WhiteFiber's record shows only forward-looking aspiration.

Without a historical series of substantive customer announcements, counterparty concentration trends cannot be evaluated. A single statement about "potential" partnerships provides no baseline to measure concentration risk or customer diversification over time. One would need successive announcements—naming specific partners, describing deal scope, disclosing revenue bookings—to track whether the company's customer base is broadening or narrowing, or whether customer concentration is increasing.

Revenue reconciliation is similarly impossible. WhiteFiber has made no revenue claims attributable to named partnerships or customers. The absence of deal-specific revenue disclosure (such as estimated contract value, annual recurring revenue tied to a named customer, or win announcements that cite revenue impact) means one cannot assess whether the company's total revenue or revenue growth aligns with its stated partnership activity.

The takeaway is measured: WhiteFiber's public disclosure on customers and partnerships consists of a single aspirational statement containing no named counterparties, no signed commitments, and no revenue attribution. For a commercial-diligence view, this represents either an early-stage company still in partner evaluation, or one with significant customer concentration or material partnerships that remain undisclosed. Until WhiteFiber names specific, signed customer agreements and ties revenue to those relationships, no meaningful commercial footprint can be verified from public statements alone.

Cites claims: #27
ANALYSIS

Delivery vs. promise

WhiteFiber has entered its infrastructure expansion phase with a densely clustered set of claims spanning August 16–25, 2026, all focused on North Carolina data center capacity and real estate acquisition. The stated roadmap reveals internal tension around near-term and medium-term targets that will test execution credibility almost immediately. Claim 31 commits to a minimum of 60 MW electrical capacity at acquired properties by October 30, 2026—just over two months away—while simultaneously claim 9 targets 100+ MW capacity for 2027, and claim 32 projects 198 MW of potential expansion within seven years by October 2033. The three-tier capacity ladder suggests either phased deployment or misalignment in public messaging. The 60 MW near-term commitment is anchored to a specific acquisition: claim 29 promises a $60 million real estate purchase in Yadkin County, North Carolina by the same October 30 deadline. This creates a binary verification point: either the acquisition closes and power infrastructure is in place by late October, or both timelines slip. Claim 19, referencing a purchase agreement with Unifi Manufacturing (dated August 25), appears strategically sequenced after the Yadkin County claims, suggesting potential property or operational synergy, though no delivery date is specified. Claims 24 and 25 further commit to data center expansion, property acquisition and construction, and energy service agreements, but provide no temporal anchors. Claim 27, on potential acquisitions and partnerships, is deliberately open-ended. The vagueness of these last four claims—filed four to nine days after the concrete Yadkin County commitments—signals either exploratory activity or hedging language to preserve flexibility if near-term targets slip. All claims remain unverified by permit filings, interconnection queue entries, or third-party reporting; all are stated as company assertions. The market should scrutinize October permit activity and SEC filings for the acquisition closing, then monitor Q4 2026 for permitting of electrical infrastructure and construction starts. Any delay past October 30 in the Yadkin County acquisition or absence of power capacity declarations will indicate whether the 2027 100+ MW target is achievable or subject to revision.

Cites claims: #32, #31, #29, #27, #24, #25, #9, #19
ANALYSIS

Capital & dilution trajectory

WhiteFiber's August 2026 capital activity reflects deliberate debt refinancing rather than dilution-driven raises. The company issued $310M in convertible senior notes due 2032 at 5%, per claim 20, generating $298M in net proceeds, per claim 21. On the same day, it executed an exchange transaction, per claim 22, swapping $198.15M of existing convertible debt for $118.5M in cash and 6.3M shares. Simultaneously, total convertible notes outstanding declined by $32M, per claim 23. The compressed timeline—all capital events within a single trading day on August 20—indicates a coordinated refinancing strategy rather than reactive capital-raising.

The financial structure shows design rather than improvisation. By exchanging older debt into new debt plus equity, the company reduced debt principal while buying back distressed or expiring convertibles at favorable terms. The new convertibles priced at $34 conversion, per claim 6, establishing a clear valuation anchor. Insider transactions in early July (two buy transactions) may reflect confidence ahead of the capital events, though transaction volumes are incomplete.

Tracking use of proceeds remains unclear. An earnest money deposit of $2.25M for property acquisition was recorded on August 16, per claim 30, before the capital raise. Post-exchange, the company retains approximately $179.5M in net available cash ($298M proceeds minus $118.5M paid in the exchange), but timing is too compressed to confirm actual deployment. Duplicate reporting of the $310M offering, $298M proceeds, and exchange transaction across multiple claim IDs suggests potential data ingestion issues.

The critical question for investors: whether the retained $179.5M capital is deployed for organic growth, infrastructure capex, or reverts to further financial optimization. The earnest money deposit hints at potential acquisition activity, but the August 16 timing predates the capital raise and requires explanation. Investors should monitor the next quarterly guidance for capex commitment levels and cash deployment cadence. Until deployment is visible, this appears as capital structure optimization rather than growth financing.

Cites claims: #30, #20, #21, #22, #23, #6, #7, #8 +1 more

Projects

Fleet capacityMegawattsShare of anticipated
Energized today44 MW9%
Contracted106 MW
Anticipated at full build-out516 MW100%

Summed across 8 tracked project(s), from the capacity figures on each. Anticipated takes the firmest stage on record per project, so a site that is announced at 2 GW and contracted at 400 MW counts once, at 2 GW.

Atlanta

datacenter - Atlanta, Georgia

Status: announced

Blonduos Campus

datacenter - Blonduos, Iceland

Status: announced

MTL-1

datacenter - Montreal, Quebec

Status: announced

MTL-3

datacenter - Saint-Jerome, Quebec

Status: announced

NC-1

datacenter - 805 Island Drive, Madison, NC

Status: announced

NC-2 and NC-3

campus

Status: announced

NTL2

datacenter - Montreal area, Quebec

Status: announced

Paris

datacenter - Paris region

Status: announced

Claims tracker

SubjectStatement datePromised byAmountStatus
Cloud-Based HPC GPU Servicesproduct2026-09-03--stated
Generative AI Workstream Supportproduct2026-09-03--stated
Tier-3 Data Center Servicesfacility capacity2026-09-03--stated
Cloud-based GPU servicesproduct2026-08-31--stated
AI workstream support capabilitiesproduct2026-08-31--stated
Customer typecustomer2026-08-31--stated
Real estate purchase agreement with Unifi Manufacturingacquisition2026-08-25--stated
Closed AI infrastructure financingfinancing2026-08-24--stated
$270M convertible bond offeringfinancing2026-08-24-270000000.0 USDstated
Krambu partnership for GPU data center capacitypartnership2026-08-24--stated
Cloud pipeline GPU countcustomer2026-08-24-50000.0 unitsstated
Cloud pipeline weighted valuecustomer2026-08-24-3300000000.0 USDstated
H200 GPU agreementcustomer2026-08-24-17000000.0 USDstated
$270M Rule 144A convertible bondfinancing2026-08-24-270000000.0 USDstated
Krambu GPU data center partnershippartnership2026-08-24--stated
Cloud GPU pipeline 50,000+ unitscustomer2026-08-24-3300000000.0 USDstated
2-year H200 GPU supply agreementcustomer2026-08-24-17000000.0 USDstated
Closing of artificial-intelligence infrastructure financingfinancing2026-08-24--stated
$270M convertible bond completedfinancing2026-08-232032-09-01270.0 USDstated
$250M convertible notes plan announcedfinancing2026-08-23-250.0 USDstated
Krambu 100MW GPU infrastructure exclusive operator agreementpartnership2026-08-23-100.0 MWstated
Paris AI deployment five-year commitmentcustomer - Paris2026-08-23-160.0 USDstated
Convertible bond offering completedfinancing2026-08-232032-09-01270.0 USDstated
Convertible notes plan announcedfinancing2026-08-23-250.0 USDstated
Krambu exclusive GPU infrastructure operatorpartnership2026-08-232027-01-01100.0 MWstated
Krambu 100MW GPU data center capacityfacility capacity2026-08-232027-01-01100.0 MWstated
Paris AI deployment contractcustomer - Paris2026-08-23-160.0 USDstated
Krambu 100MW GPU infrastructure exclusive operator agreementpartnership2026-08-23-100.0 MWstated
Exclusive GPU infrastructure operator for Krambu - 100MW capacitypartnership2026-08-23-100.0 MWstated
Completed $270M convertible notes offeringfinancing2026-08-222032-09-01270.0 USDstated
Financing plan announcementfinancing2026-08-22-259.8 USDstated
$270M convertible notes offering completedfinancing2026-08-222032-09-01270000000.0 USDstated
WhiteFiber $259.8 million financing announcementfinancing2026-08-22-259.8 USDstated
$310M Convertible Senior Notes Offeringfinancing2026-08-21-310.0 USDstated
Convertible Notes Conversion Pricefinancing2026-08-21-33.84 USD/sharestated
Net Proceeds from Convertible Notes Offeringfinancing2026-08-21-298.5 USDstated
Convertible Notes Exchange Transactionfinancing2026-08-21-198.15 USDstated
100+ MW Capacity Target for 2027facility capacity2026-08-21-100.0 MWstated
$310M Convertible Notes Offering closed (upsized)financing2026-08-21-310.0 USDstated
$310.0M Convertible Notes Offering Closedfinancing2026-08-21-310.0 USDstated
$298.5M Net Proceeds from Offeringfinancing2026-08-21-298.5 USDstated
$33.84 Per Share Conversion Pricefinancing2026-08-21-33.84 USD per sharestated
Exchange of Existing Convertible Notesfinancing2026-08-21-198.15 USDstated
$31.85M Remaining Existing Notes Outstandingfinancing2026-08-21-31.85 USDstated
100+ MW New Capacity Target 2027facility capacity2026-08-21-100.0 MWstated
Long-Term Customer Leases - Q4 2026facility timeline2026-08-212026-12-31-stated
NC-1 entered active customer deploymentfacility timeline - NC-12026-08-21--stated
Full contracted run-rate billing expected by end of Augustfacility timeline - NC-12026-08-212026-08-31-not yet verifiable
NC-1 has 40 megawatts of contracted IT loadfacility capacity - NC-12026-08-21-40.0 MWstated
Signed $500M+ in new multi-year cloud services agreementspartnership2026-08-21-500000000.0 USDstated
$165M Baseten agreement for 1,392 B300 GPUs in Ontariopartnership2026-08-21-165000000.0 USDstated
$108M Prime Intellect agreement for 576 VR200 GPUs in Canadapartnership2026-08-21-108000000.0 USDstated
$160M+ five-year agreement for GPU deployment in Paris regionpartnership - Paris2026-08-21-160000000.0 USDstated
$87.5M agreement for 576 B300 GPUs in Icelandpartnership2026-08-21-87500000.0 USDstated
NC-1 potential to scale to 300 gross megawattsfacility capacity - NC-12026-08-21-300.0 MWstated
Entered exclusivity with lenders consortium for NC-1 financingfinancing - NC-12026-08-21--stated
Convertible Senior Notes offering closedfinancing2026-08-21--stated
Note exchange transaction completedfinancing2026-08-21--stated
100+ MW capacity expansion targetfacility capacity2026-08-212027-12-31100.0 MWstated
Long-term customer leases Q4 2026customer2026-08-212026-12-31-stated
Convertible Senior Notes Offering Closurefinancing2026-08-21-310.0 USDstated
Convertible Senior Notes Offering Closedfinancing2026-08-21-310.0 million USDstated
Closed $310M convertible senior notes offering (further upsized)financing2026-08-21-310.0 USDstated
$310 million convertible senior notes offeringfinancing2026-08-21-310.0 USDstated
NC-1 full billing milestonefacility timeline2026-08-212026-08-3140.0 MWstated
Multi-year Cloud Services agreementscustomer2026-08-21-500000000.0 USDstated
Baseten GPU deployment - Ontariocustomer2026-08-21-165000000.0 USDstated
Prime Intellect GPU deployment - Canadacustomer2026-08-21-108000000.0 USDstated
GPU deployment - Paris regioncustomer2026-08-21-160000000.0 USDstated
GPU deployment - Icelandcustomer2026-08-21-87500000.0 USDstated
NC-1 capacity potentialfacility capacity2026-08-21-300.0 MWstated
NC-1 secured financingfinancing2026-08-21--stated
Capital-light managed-services offeringproduct2026-08-21--stated
Use of net proceeds for data center expansionfinancing2026-08-21--stated
Anticipated project-level financing for NC-1financing2026-08-21--stated
100+ MW capacity expansion in 2027facility capacity2026-08-212027-12-31100.0 MWstated
Long-term lease execution with customers in Q4 2026customer2026-08-212026-12-31-stated
100+ MW additional capacity in 2027facility capacity2026-08-212027-12-31100.0 MWstated
Long-term customer leases in Q4 2026customer2026-08-212026-12-31-stated
Anticipated project-level financing for NC-1financing2026-08-21--stated
$310.0M convertible senior notes offeringfinancing2026-08-21-310.0 USDstated
100+ MW additional capacity online in 2027facility capacity2026-08-21-100.0 MWstated
Execute long-term customer leases in Q4 2026customer2026-08-212026-12-31-stated
100+ MW of additional capacity online in 2027facility capacity2026-08-21-100.0 MWstated
Long-term customer leases in Q4 2026customer2026-08-212026-12-31-stated
Anticipated closing of NC-1 project-level financingfinancing2026-08-21--stated
Data center expansion with capital from offeringfacility capacity2026-08-21--stated
$310.0M Convertible Notes Offering - 5.00% due 2032financing2026-08-202032-09-01310.0 USDstated
Net Proceeds from Convertible Notes Offeringfinancing2026-08-20-298.5 USDstated
Note Exchange Transaction - $198.15M for $118.5M + 6.3M sharesfinancing2026-08-202026-08-21118.5 USDnot yet verifiable
Existing Convertible Notes Outstanding Reductionfinancing2026-08-202026-08-2131.85 USDnot yet verifiable
Data Center Expansion - Property Acquisition and Constructionfacility capacity2026-08-20--stated
Energy Service Agreements for Data Centersfacility capacity2026-08-20--stated
GPU Servers for Cloud Businessproduct2026-08-20--stated
Potential Acquisitions, Partnerships and Joint Venturespartnership2026-08-20--stated
Chief Executive Officerpersonnel2026-08-20--stated
Upsized convertible note offeringfinancing2026-08-19-270.0 USDstated
Net proceeds from convertible note offeringfinancing2026-08-19-259.8 USDstated
Net proceeds if additional option fully exercisedfinancing2026-08-19-298.5 USDstated
Additional convertible note purchase option sizefinancing2026-08-19-40.0 USDstated
Convertible note conversion pricefinancing2026-08-19-33.84 USD per sharestated
Convertible note interest ratefinancing2026-08-19-5.0 percentstated
Convertible note maturity datefinancing2026-08-192032-09-30-stated
Convertible note offering closing datefinancing2026-08-192026-08-21-not yet verifiable
Planned use of convertible note proceedsfinancing2026-08-19--stated
North Carolina industrial properties acquisitionacquisition2026-08-19-60.0 USDstated
NC property acquisition closingfacility timeline2026-08-192026-12-31-stated
NC-2 and NC-3 data center campusesother2026-08-19--stated
NC-2 and NC-3 initial utility capacityfacility capacity - NC-2 and NC-32026-08-19-60.0 MWstated
NC-2 and NC-3 future capacity potentialfacility capacity - NC-2 and NC-32026-08-19-200.0 MWstated
NC-2 and NC-3 initial service targetfacility timeline - NC-2 and NC-32026-08-192027-09-30-stated
Convertible Senior Notes Offeringfinancing2026-08-19-270000000.0 USDstated
Acquisition of Two North Carolina Data-Center Sitesacquisition2026-08-19-60000000.0 USDstated
Exclusive Operator for Krambu 100MW GPU Data-Centerpartnership2026-08-19-100.0 MWstated
Exclusive operator of Krambu's 100MW GPU data centerpartnership2026-08-19-100.0 MWstated
Acquisition of two North Carolina data-center sitesacquisition2026-08-19-60.0 USDstated
Convertible senior notes offeringfinancing2026-08-19-270.0 USDstated
Q2 2026 Revenue Growthproduct2026-08-19-28.8 USDstated
Convertible Senior Notes Pricing Announcementfinancing2026-08-19-270.0 million USDstated
Convertible notes offeringfinancing2026-08-192032-09-01270.0 USDstated
Greenshoe option on convertible notesfinancing2026-08-19-40.0 USDstated
Expected close date of offeringfinancing2026-08-192026-08-21-not yet verifiable
Interest rate on convertible notesfinancing2026-08-19-5.0 percentstated
Conversion rate of notesfinancing2026-08-19-29.553 shares per $1,000 principalstated
Conversion price of notesfinancing2026-08-19-33.84 USD per sharestated
Net proceeds from offeringfinancing2026-08-19-259.8 USDstated
Use of proceeds for note exchangefinancing2026-08-19-118.5 USDstated
Concurrent note exchange transactionfinancing2026-08-19-198.15 USDstated
Priced $270M convertible senior notes offering (upsized)financing2026-08-19-270.0 USDstated
HPC data center ownershipfacility capacity2026-08-18--stated
Cloud-based HPC GPU servicesproduct2026-08-18--stated
Tier-3 data center hosting and colocation servicesproduct2026-08-18--stated
Cloud services support for generative AI workstreamsproduct2026-08-18--stated
Convertible Senior Notes offeringfinancing2026-08-18-250.0 million USDstated
AI infrastructure and HPC cloud services providerproduct2026-08-18--stated
North Carolina data center properties acquisitionacquisition2026-08-18-2.0 propertiesstated
Q2 2026 EPS reportedguidance2026-08-18-0.39 USDstated
Krambu partnership for GPU infrastructurepartnership2026-08-18-100.0 MWstated
Convertible Senior Notes offeringfinancing2026-08-18-250.0 million USDstated
Greenshoe option for additional convertible notesfinancing2026-08-18-37.5 million USDstated
Data center expansion using offering proceedsfacility timeline2026-08-18--stated
Existing convertible notes exchangefinancing2026-08-18--stated
$250M Convertible Senior Notes proposalfinancing2026-08-18-250.0 USDstated
$250M convertible senior notes proposalfinancing2026-08-18-250.0 USDstated
Proposed Convertible Senior Notes Offeringfinancing2026-08-18-250.0 million USDstated
Proposed $250M convertible senior notes offeringfinancing2026-08-18-250.0 USDstated
$60M North Carolina properties purchase for data centeracquisition2026-08-17-60.0 USDstated
North Carolina data center properties acquisitionacquisition2026-08-17-60.0 USDstated
North Carolina Data Center Sites Acquisition Agreementacquisition2026-08-17--stated
Agreed to acquire two data center development sites in North Carolinaacquisition2026-08-17--stated
North Carolina data center property acquisitionfacility timeline2026-08-17-60.0 USDstated
Real estate property acquisition in Yadkin County, North Carolinaacquisition2026-08-162026-10-3060000000.0 USDstated
Earnest money deposit for property acquisitionfinancing - NC-2 and NC-32026-08-16-2250000.0 USDstated
Minimum electrical power capacity at acquired propertiesfacility capacity - NC-2 and NC-32026-08-162026-10-3060.0 MWstated
Potential electrical power expansion at acquired properties within seven yearsfacility capacity - NC-2 and NC-32026-08-162033-10-30198.0 MWstated
Most recent quarterly revenuefinancing2026-08-15--stated
Most recent quarterly statutory loss per sharefinancing2026-08-15--stated
NC1 contracted load billing by end of August 2026facility capacity - NC-12026-08-142026-08-3140.0 MWnot yet verifiable
Aggregate cloud infrastructure contract valuecustomer2026-08-14-540000000.0 USDstated
Customer prepayment deferred revenuecustomer2026-08-14-143000000.0 USDstated
Q2 2026 Revenueguidance2026-08-14-28530000.0 USDstated
Q2 2026 Net Lossfinancing2026-08-14--14980000.0 USDstated
Q2 2026 Adjusted EBITDAguidance2026-08-14-5500000.0 USDstated
Q2 2026 Basic EPS Lossguidance2026-08-14--0.39 USD per sharestated
NC-1 facility full billing targetfacility timeline - NC-12026-08-142026-08-31-not yet verifiable
Krambu GPU infrastructure partnershippartnership2026-08-14-100.0 MWstated
NC1 10-year contractcustomer - NC-12026-08-14-865.0 USDstated
NC1 full run-rate billingfacility timeline - NC-12026-08-142026-08-3140.0 MWnot yet verifiable
Multiyear cloud services agreementscustomer2026-08-14-540.0 USDstated
Cloud services annualized revenueguidance2026-08-14-200.0 USDstated
Base 10 GPU agreementcustomer2026-08-142026-11-30165.0 USDstated
Prime Intellect GPU agreementcustomer2026-08-142027-06-30108.0 USDstated
Paris region deploymentcustomer - Paris2026-08-142026-09-30160.0 USDstated
Iceland GPU agreementcustomer2026-08-142026-12-3187.5 USDstated
NTL2 capacity developmentfacility timeline - NTL22026-08-142026-12-315.0 MWstated
Krambu liquid-cooled capacity agreementpartnership2026-08-142027-01-01100.0 MWstated
Cross-data-center networking launchproduct2026-08-142026-09-30-stated
Next site acquisition negotiationacquisition2026-08-142027-01-0160.0 MWstated
CFO appointmentpersonnel2026-08-14--stated
NC1 permanent financingfinancing - NC-12026-08-14--stated
NC-1 40 MW run-rate billingfacility timeline - NC-12026-08-132026-08-3140.0 MWnot yet verifiable
NC-1 10-year customer contractcustomer - NC-12026-08-13-865.0 USDstated
Cloud services agreements signedcustomer2026-08-13-540.0 USDstated
Annualized cloud revenue projectionguidance2026-08-13-200.0 USDstated
Base 10 three-year deploymentcustomer2026-08-132026-11-01165.0 USDstated
Prime Intellect Vera Rubin three-year deploymentcustomer2026-08-132027-06-30108.0 USDstated
Paris deploymentcustomer - Paris2026-08-132026-09-30160.0 USDstated
Iceland five-year agreementcustomer2026-08-13-87.5 USDstated
Krambu liquid-cooled colocation accesspartnership2026-08-132027-01-01100.0 MWstated
Late-stage data center site opportunityfacility capacity2026-08-132027-01-0160.0 MWstated
Duke Energy NC-1 capacity expansionfacility capacity - NC-12026-08-13-45.0 MWstated
Campus expansion toward 300 MW capacityfacility capacity - NC-12026-08-13-200.0 MWstated
NC-1 secured financing progressfinancing - NC-12026-08-13--stated
NC-1 facility enters customer deployment phasefacility timeline - NC-12026-08-13--stated
Krambu partnership for exclusive GPU infrastructure operationpartnership2026-08-13--stated
100 megawatts of GPU infrastructure capacity from Krambu partnershipfacility capacity2026-08-13-100.0 MWstated
NC-1 site active deploymentfacility timeline - NC-12026-08-12-40.0 MWstated
Multi-year cloud services agreementscustomer2026-08-12-500.0 USDstated
Partnership with Krambu for 100MW GPU infrastructure capacity by 2027partnership2026-08-12-100.0 MWstated
Exclusive GPU infrastructure operator for Krambu, 100MW capacity from 2027partnership2026-08-12-100.0 MWstated
Partnership with Krambu for 100MW GPU infrastructure capacitypartnership2026-08-12-100.0 MWstated
Q2 2026 Quarterly Financial Resultsguidance2026-08-12--stated
Exclusive GPU infrastructure operator for Krambu 100MW data center capacitypartnership2026-08-122027-01-01100.0 MWstated
Partnership with Krambu for 100MW GPU infrastructure in 2027partnership2026-08-12-100.0 MWstated
Q2 2026 Quarterly Revenuefinancing2026-08-12-28.84 million USDstated
Q2 2026 EPS Lossfinancing2026-08-12--0.39 USDstated
Return on Equityfinancing2026-08-12--10.72 percentstated
Net Marginfinancing2026-08-12--46.87 percentstated
Debt-to-Equity Ratiofinancing2026-08-12-0.74 ratiostated
Current Ratiofinancing2026-08-12-0.79 ratiostated
Quick Ratiofinancing2026-08-12-0.79 ratiostated
CFO transitionpersonnel2026-08-032026-08-01-delayed
Bridge Facility Principal Amountfinancing - NC-12026-05-26-100.0 USDstated
Bridge Facility Availability Periodfacility timeline - NC-12026-05-26--stated
NC-1 Phase I Data Center Capacityfacility capacity - NC-12026-05-26-40.0 MWstated
NC-1 Phase I Minimum Leasing Targetfacility capacity - NC-12026-05-26-80.0 percentstated
Term Loan Interest Rate Structurefinancing - NC-12026-05-26--stated
Original Issue Discountfinancing - NC-12026-05-26-3.0 percentstated
B. Riley Securities Loan Assignmentfinancing - NC-12026-05-26-20.0 USDstated
Five-year AI compute infrastructure contract with Paris-based investment-grade technology customercustomer - Paris2026-05-20-160.0 USDstated
Third-party data center capacity secured in Francefacility capacity - Paris2026-05-20--stated
Project-level financing term sheetfinancing - Paris2026-05-20--stated
AI compute service commencement in Parisfacility timeline - Paris2026-05-20--stated
Convertible Debt Issuancefinancing2026-05-13-222118088.0 USDstated
Customer Advance Paymentscustomer2026-05-13-144507575.0 USDstated
Capital Deployment for Facility Expansionfacility capacity2026-05-13-67883795.0 USDstated
Enovum acquisition including MTL-1acquisition2026-03-25--stated
MTL-2 property purchaseacquisition2026-03-25-23300000.0 USDstated
MTL-2 development investmentfacility capacity - NTL22026-03-25-23600000.0 USDstated
MTL-3 lease and development commitmentfacility capacity - MTL-32026-03-25-7.0 MWstated
MTL-3 purchase option exercise and closefacility timeline - MTL-32026-03-252026-06-3017300000.0 USDdelayed
NC-1 facility purchaseacquisition2026-03-25-45000000.0 USDstated
NC-1 conditional purchase price increment for power capacityfacility capacity - NC-12026-03-252028-05-208000000.0 USDstated
Duke Energy NC-1 capacity commitmentpartnership - NC-12026-03-252029-05-1699.0 MWstated
2026 total data center capacity targetguidance2026-03-252026-12-3176.0 MWstated
RBC credit facilityfinancing2026-03-25-43800000.0 USDstated
RBC equipment lease facilityfinancing2026-03-25-18500000.0 USDstated
RBC real estate term loan for MTL-2financing - NTL22026-03-25-19600000.0 USDstated
Nscale colocation contractcustomer - NC-12026-03-252026-06-30865000000.0 USDdelayed
Cerebras MTL-3 contractcustomer - MTL-32026-03-25-58740000.0 USDstated
NVIDIA Preferred Partnerpartnership2026-03-25--stated
Technology partnerships and authorizationspartnership2026-03-25--stated
Advanced GPU server offeringsproduct2026-03-25--stated
Blönduós Campus GPU capacity contractcustomer - Blonduos Campus2026-03-25-5.5 MWstated
Atlanta data center expansionfacility timeline - Atlanta2026-03-252026-02-01-delayed
Enovum acquisition with MTL-1 facilityacquisition2026-03-25--stated
MTL-2 real estate acquisition and capacityfacility capacity - NTL22026-03-25-5.0 MWstated
MTL-2 real estate purchase fundingfinancing - NTL22026-03-25-23.3 USDstated
MTL-2 development investmentfinancing - NTL22026-03-25-23.6 USDstated
MTL-3 lease for 7 MW facilityfacility capacity - MTL-32026-03-25-7.0 MWstated
MTL-3 purchase option exercise and closingfinancing - MTL-32026-03-252026-06-3017.3 USDdelayed
Cerebras contracted IT load at MTL-3customer - MTL-32026-03-25-5.0 MWstated
Cerebras monthly billing at MTL-3customer - MTL-32026-03-25-979000.0 USDstated
NC-1 real estate purchaseacquisition2026-03-25-45.0 USDstated
NC-1 conditional purchase price increase (2-year Duke Energy milestone)financing - NC-12026-03-252027-05-208.0 USDstated
NC-1 conditional purchase price increase (2-3 year Duke Energy milestone)financing - NC-12026-03-252028-05-205.0 USDstated
NC-1 conditional purchase price increase (per-MW over 99 MW threshold)financing - NC-12026-03-252029-05-205.0 USDstated
Duke Energy 24 MW service target for NC-1partnership - NC-12026-03-252025-09-0124.0 MWdelayed
Duke Energy 40 MW service target for NC-1partnership - NC-12026-03-252026-04-0140.0 MWdelayed
Duke Energy 99 MW service target for NC-1partnership - NC-12026-03-252029-05-1699.0 MWstated
NC-1 potential maximum capacity projectionguidance2026-03-25-200.0 MWstated
RBC Credit Facilityfinancing2026-03-25-43.8 USDstated
RBC equipment and building improvement lease facilityfinancing - NTL22026-03-25-18.5 USDstated
RBC real estate term loan for MTL-2 refinancefinancing - NTL22026-03-25-19.6 USDstated
Nscale Services Agreement at NC-1customer - NC-12026-03-25-865.0 USDstated
Nscale 40 MW billing commencementfacility timeline - NC-12026-03-252026-06-01-delayed
Total data center capacity target by end of 2026guidance2026-03-252026-12-3176.0 MWstated
Data center project development pipelineguidance2026-03-25-1500.0 MWstated
Iceland Blönduós Campus data center partnershippartnership - Blonduos Campus2026-03-25-5.5 MWstated
Atlanta Georgia data center capacity leasepartnership - Atlanta2026-03-25--stated
NVIDIA GB200 GPU shipment receiptproduct2026-03-25--stated
Initial Customer Master Services Agreementcustomer2026-03-25-2048.0 GPUsstated
Initial Customer contract value estimateguidance2026-03-25-50.0 USDstated
Initial Customer additional GPU agreementcustomer2026-03-25-2048.0 GPUsstated
Enovum Data Centers acquisitionacquisition2026-03-25--stated
MTL-2 real estate acquisition and developmentfacility timeline - NTL22026-03-25-23.3 USDstated
MTL-3 facility lease and purchase option exercisedfacility timeline - MTL-32026-03-252026-06-3017.3 USDdelayed
Cerebras contract at MTL-3customer - MTL-32026-03-25-979.0 USD/monthstated
NC-1 facility acquisition in Madison, North Carolinafacility timeline - NC-12026-03-25-45.0 USDstated
NC-1 contingent purchase price increases based on Duke Energy capacityfacility timeline - NC-12026-03-252027-05-208.0 USDstated
Duke Energy Capacity Agreement for NC-1partnership - NC-12026-03-252029-05-1699.0 MWstated
Total data center capacity target by Q4 2026guidance2026-03-252026-12-3176.0 MWstated
Data center pipeline under management reviewguidance2026-03-25-1500.0 MWstated
Nscale colocation services contract for NC-1customer - NC-12026-03-252026-06-01865.0 USDdelayed
RBC Credit Facility agreementfinancing - NTL22026-03-25-43.8 USDstated
RBC lease facility for equipment and building improvementsfinancing - NTL22026-03-25-18.5 USDstated
RBC real estate term loan for MTL-2financing - NTL22026-03-25-19.6 USDstated
Initial Customer GPU services agreementcustomer2026-03-25-50.0 USDstated
Initial Customer additional GPU ordercustomer2026-03-25--stated
Iceland facility capacity and customer contractsfacility capacity - Blonduos Campus2026-03-25-5.5 MWstated
Atlanta data center capacity leasesfacility timeline - Atlanta2026-03-25--stated
NVIDIA GB200 GPU servers receivedproduct2026-03-25--stated
Completed offering of convertible senior notesfinancing2026-01-252031-02-01250.0 USDstated
Convertible notes bear 4.500% annual interestfinancing2026-01-252026-08-014.5 percentdelayed
Initial conversion price of notesfinancing2026-01-25-25.91 USDstated
Company may redeem notes starting February 6, 2029financing2026-01-252029-02-06-stated
Net proceeds from offeringfinancing2026-01-25-221.5 USDstated
$120.0 million of proceeds used for call optionfinancing2026-01-25-120.0 USDstated
Remaining proceeds to be used for data center expansionguidance2026-01-25--stated
Sam Tabar is Chief Executive Officerpersonnel2026-01-25--stated
Convertible senior notes issuancefinancing2026-01-01-230.0 USDstated
Master services agreement with Nscale Servicespartnership - NC-12025-12-17--stated
NC-1 Facility IT load capacity in two phasesfacility capacity - NC-12025-12-17-40.0 MWstated
NC-1 Facility power density and cooling specificationsfacility capacity - NC-12025-12-17-150.0 kWstated
Contracted revenue from Nscale Services agreementfinancing - NC-12025-12-17-865000000.0 USDstated
Billing commencement for first 20 MW phasefacility timeline - NC-12025-12-172026-04-3020.0 MWdelayed
Billing commencement for second 20 MW phasefacility timeline - NC-12025-12-172026-05-3020.0 MWdelayed
Initial Public Offeringfinancing2025-11-122025-08-08144473989.0 USDdelayed
IPO Over-Allotment Option Exercisefinancing2025-11-12-22189195.0 USDstated
Customer arrangement wind-downcustomer2025-11-12-21.0 USDstated
Enovum Data Centers acquisition completionacquisition2025-09-16--stated
Over-allotment option fully exercisedfinancing2025-09-022025-09-041406250.0 sharesdelayed
IPO size and pricingfinancing2025-08-07-159375000.0 USDstated
Post-IPO Bit Digital ownershipfinancing2025-08-07-74.3 percentstated
Enovum acquisitionacquisition2025-08-072024-10-11-delayed
MTL-1 operational capacityfacility capacity - MTL-12025-08-07-4.0 MWstated
MTL-1 customer contractscustomer - MTL-12025-08-07-30.0 monthsstated
MTL-1 GPU deploymentfacility capacity - MTL-12025-08-07-5000.0 unitsstated
MTL-2 real estate acquisitionacquisition2025-08-072024-12-275.0 MWdelayed
MTL-2 completion timelinefacility timeline - NTL22025-08-072025-12-31-delayed
MTL-3 site securedacquisition2025-08-072025-04-117.0 MWdelayed
Cerebras colocation agreementpartnership - MTL-32025-08-07-5.0 MWstated
MTL-3 completion timelinefacility timeline - MTL-32025-08-072025-12-31-delayed
NC-1 property acquisitionacquisition2025-08-072025-05-20-delayed
Duke Energy capacity agreement for NC-1partnership - NC-12025-08-072029-05-1699.0 MWstated
NC-1 potential maximum capacityfacility capacity - NC-12025-08-07-200.0 MWstated
NC-1 initial capacity completionfacility timeline - NC-12025-08-072026-03-3124.0 MWdelayed
NC-1 revenue generation startfacility timeline - NC-12025-08-072026-05-31-delayed
Capacity target by end of 2025guidance2025-08-072025-12-3116.0 MWdelayed
NC-1 capacity build-out by Q2 2026guidance2025-08-072026-06-3040.0 MWdelayed
Total capacity target by end of 2026guidance2025-08-072026-12-3176.0 MWstated
Development pipelineguidance2025-08-07-1300.0 MWstated
GPU deployment and contractsproduct2025-08-07-4500.0 unitsstated
First cloud customer agreementcustomer2025-08-072023-11-093.0 yearsdelayed
Nasdaq listing approvalregulatory2025-08-07--stated
Executive appointmentspersonnel2025-08-07--stated
IPO offer pricefinancing2025-08-07-17.0 USD per sharestated
IPO share offeringfinancing2025-08-07-9375000.0 sharesstated
IPO closing datefinancing2025-08-072025-08-08-delayed
Underwriter greenshoe optionfinancing2025-08-07-1406250.0 sharesstated
IPO gross proceedsfinancing2025-08-07-159375000.0 USDstated
Bit Digital HPC business contributionacquisition2025-08-07-27043749.0 sharesstated
Bit Digital post-IPO ownership stakefinancing2025-08-07-74.3 percentstated
MTL-1 Montreal data center current capacityfacility capacity - MTL-12025-07-31-4.0 MWstated
MTL-1 customer lease contractscustomer - MTL-12025-07-31-30.0 monthsstated
MTL-2 real estate acquisitionacquisition2025-07-31-5.0 MWstated
MTL-2 operational completionfacility timeline - NTL22025-07-312025-12-31-delayed
MTL-3 Quebec data center acquisitionfacility capacity - MTL-32025-07-31-7.0 MWstated
MTL-3 operational completionfacility timeline - MTL-32025-07-312025-12-31-delayed
Cerebras colocation agreementpartnership - MTL-32025-07-31-5.0 MWstated
NC-1 property acquisition near Greensboroacquisition2025-07-31--stated
NC-1 initial capacity operational datefacility timeline - NC-12025-07-312026-03-3124.0 MWdelayed
Duke Energy capacity commitment - 24 MW milestonepartnership - NC-12025-07-312025-09-0124.0 MWdelayed
Duke Energy capacity commitment - 40 MW milestonepartnership - NC-12025-07-312026-04-0140.0 MWdelayed
Duke Energy capacity commitment - 99 MW milestonepartnership - NC-12025-07-312029-05-1699.0 MWstated
2025 year-end total capacity targetguidance2025-07-312025-12-3116.0 MWdelayed
Q1-Q2 2026 NC-1 capacity energizationguidance2025-07-312026-06-3040.0 MWdelayed
2026 year-end total capacity targetguidance2025-07-312026-12-3176.0 MWstated
Data center pipeline under management reviewguidance2025-07-31-1300.0 MWstated
IPO ordinary shares offeringfinancing2025-07-31-7812500.0 unitsstated
Officer indicated share purchases in IPOfinancing2025-07-31-72500.0 unitsstated
Enovum data center acquisitionacquisition2025-07-282024-10-01-delayed
MTL-1 data center operational capacity and customersfacility capacity - MTL-12025-07-28-4.0 MWstated
MTL-2 data center property acquisitionacquisition2025-07-282024-12-275.0 MWdelayed
MTL-3 data center site securedfacility capacity - MTL-32025-07-282025-04-117.0 MWdelayed
Cerebras colocation agreement at MTL-3customer - MTL-32025-07-28-5.0 MWstated
NC-1 property purchase in Greensboro, North Carolinaacquisition2025-07-282025-05-20-delayed
Duke Energy capacity agreement - Phase 1partnership - NC-12025-07-282025-09-0124.0 MWdelayed
Duke Energy capacity agreement - Phase 2partnership - NC-12025-07-282026-04-0140.0 MWdelayed
Duke Energy capacity agreement - Phase 3partnership - NC-12025-07-282029-05-1699.0 MWstated
MTL-2 completion timelinefacility timeline - NTL22025-07-282025-12-31-delayed
MTL-3 completion timelinefacility timeline - MTL-32025-07-282025-12-31-delayed
Total capacity guidance by end of 2025facility capacity2025-07-282025-12-3116.0 MWdelayed
NC-1 initial capacity completionfacility timeline - NC-12025-07-282026-03-3124.0 MWdelayed
NC-1 revenue generation start datefacility timeline - NC-12025-07-282026-05-31-delayed
NC-1 24 MW energization in Q1 2026facility capacity - NC-12025-07-282026-03-3124.0 MWdelayed
NC-1 40 MW cumulative capacity by Q2 2026facility capacity - NC-12025-07-282026-06-3040.0 MWdelayed
Total HPC data center capacity target by Q4 2026guidance2025-07-282026-12-3176.0 MWstated
IPO share offeringfinancing2025-07-28-7812500.0 sharesstated
Underwriter over-allotment optionfinancing2025-07-28-1171875.0 sharesstated
Chief Executive Officerpersonnel2025-07-28--stated
Enovum acquisitionacquisition2025-07-22--stated
MTL-1 current capacityfacility capacity - MTL-12025-07-22-4.0 MWstated
MTL-2 acquisitionacquisition2025-07-222024-12-275.0 MWdelayed
MTL-2 operational timelinefacility timeline - NTL22025-07-22--stated
MTL-3 site acquisitionacquisition2025-07-222025-04-117.0 MWdelayed
MTL-3 operational timelinefacility timeline - MTL-32025-07-22--stated
Cerebras colocation agreementcustomer - MTL-32025-07-22-5.0 MWstated
NC-1 property acquisitionacquisition2025-07-222025-05-20-delayed
Duke Energy - 24 MWpartnership - NC-12025-07-222025-09-0124.0 MWdelayed
Duke Energy - 40 MWpartnership - NC-12025-07-222026-04-0140.0 MWdelayed
Duke Energy - 99 MWpartnership - NC-12025-07-222029-05-1699.0 MWstated
NC-1 initial capacityfacility capacity - NC-12025-07-22-24.0 MWstated
NC-1 revenue startfacility timeline - NC-12025-07-222026-05-01-delayed
NC-1 phased expansionfacility capacity - NC-12025-07-22-40.0 MWstated
2025 capacity guidanceguidance2025-07-222025-12-3116.0 MWdelayed
2026 total capacity guidanceguidance2025-07-222026-12-3176.0 MWstated
Bit Digital contributionacquisition2025-07-22--stated
First cloud customercustomer2025-07-22--stated
Chief Executive Officerpersonnel2025-07-22--stated
CEO Sam Tabarpersonnel2025-07-10--stated
MTL-1 Montreal operational capacityfacility capacity - MTL-12025-07-10-4.0 MWstated
Enovum data center acquisitionacquisition2025-07-10--stated
MTL-2 Montreal expansion capacityfacility capacity - NTL22025-07-10-5.0 MWstated
MTL-2 completion and revenue startfacility timeline - NTL22025-07-102026-01-31-delayed
MTL-3 Saint-Jérôme data centerfacility capacity - MTL-32025-07-10-7.0 MWstated
MTL-3 completion and revenue startfacility timeline - MTL-32025-07-102026-01-31-delayed
Cerebras colocation agreementpartnership - MTL-32025-07-10-5.0 MWstated
NC-1 Greensboro property acquisitionacquisition2025-07-10--stated
Duke Energy 24 MW capacity commitmentpartnership - NC-12025-07-102025-09-0124.0 MWdelayed
Duke Energy 40 MW capacity commitmentpartnership - NC-12025-07-102026-04-0140.0 MWdelayed
Duke Energy 99 MW capacity commitmentpartnership - NC-12025-07-102029-05-1699.0 MWstated
NC-1 initial 24 MW completionfacility timeline - NC-12025-07-102026-03-3124.0 MWdelayed
NC-1 revenue startfacility timeline - NC-12025-07-102026-05-01-delayed
16 MW total capacity by end 2025guidance2025-07-102025-12-3116.0 MWdelayed
40 MW capacity at NC-1 by end Q2 2026guidance2025-07-102026-06-3040.0 MWdelayed
76 MW capacity by end Q4 2026guidance2025-07-102026-12-3176.0 MWstated
Cloud customer three-year service agreementcustomer2025-07-10--stated
Bit Digital post-IPO ownershipfinancing2025-07-10-80.0 percentstated

Insider transactions (SEC Form 3/4/5)

Totals across all insiders

BucketInvested (shares)Invested (USD)Divested (shares)Divested (USD)Net directionTxnsInvested @ last priceDivested @ last price
All time8,876$021,177$637.9K↓ Divested $637.9K5$166.7K$397.7K
20268,876$021,177$637.9K↓ Divested $637.9K5$166.7K$397.7K
2026-Q2-$021,177$637.9K↓ Divested $637.9K3$0$397.7K
2026-Q38,876$0-$0Flat2$166.7K$0

Invested = shares acquired (buys, grants, option exercises) — insider adding to the position. Divested = shares reduced (sells, dispositions, tax-withholding) — cash flowing TO the insider. Net direction shows which side wins on dollar terms in each bucket. % of holder's stake not yet computed (pending Form 3/4 holdings ingest). See methodology. The two @ last price columns restate the same share counts at the most recent share price we read (close of 2026-09-03); they are a valuation, not a cash flow, and they move every day the market does.

Individual filings

DateInsiderKindSharesAmount (USD)Value @ last priceSource
2026-08-03Ichi ShihGrant / award / vesting · Ordinary Shares4,657-$87.5KView cached copy (2026-08-30)Live source ↗
2026-08-01Justin ZhuGrant / award / vesting · Ordinary Shares4,219-$79.2KView cached copy (2026-08-30)Live source ↗
2026-05-29Ichi ShihOpen-market sale · Ordinary Shares7,059$212,617$132.6KView cached copy (2026-09-02)Live source ↗
2026-05-29Ichi ShihOpen-market sale · Ordinary Shares7,059$212,617$132.6KView cached copy (2026-09-02)Live source ↗
2026-05-29Ichi ShihOpen-market sale · Ordinary Shares7,059$212,617$132.6KView cached copy (2026-09-02)Live source ↗