CoreWeave CRWV NASDAQ
CoreWeave, Inc. operates a specialized cloud computing platform designed to empower generative AI (GenAI) applications. It constructs the fundamental infrastructure necessary to manage intensive compute workloads for large enterprises. The company's comprehensive suite of offerings includes high-performance GPU and CPU compute resources, robust storage solutions, advanced networking capabilities, and fully managed services. Clients can choose from flexible virtual servers or powerful bare-metal options. Beyond core hardware, its platform integrates sophisticated tools like a fleet lifecycle controller, a node lifecycle controller, Tensorizer, and advanced observability features. CoreWeave's expertise also extends to specialized services, such as visual effects (VFX) and rendering, AI model training, AI inference, and "Mission Control." Originally incorporated in 2017 as Atlantic Crypto Corporation, the company rebranded to CoreWeave, Inc. in December 2019 and is headquartered in Livingston, New Jersey.
Corporate history
CoreWeave was founded in 2017 as a Delaware limited liability company and incorporated in 2018, headquartered in Livingston, New Jersey. The company was purpose-built to address AI infrastructure needs, recognizing that artificial intelligence workloads demand fundamentally different cloud infrastructure than general-purpose environments—specifically…
Read the full history
CoreWeave was founded in 2017 as a Delaware limited liability company and incorporated in 2018, headquartered in Livingston, New Jersey. The company was purpose-built to address AI infrastructure needs, recognizing that artificial intelligence workloads demand fundamentally different cloud infrastructure than general-purpose environments—specifically high-density compute, advanced networking, optimized storage, and distributed systems management.
In 2025, CoreWeave expanded its software and tooling capabilities through acquisitions of Weights & Biases, Inc., OpenPipe Inc., Marimo Inc., and Monolith AI Limited. The company completed its initial public offering in March 2025, selling 37 million Class A shares at $40 per share for $1.4 billion in net proceeds (before $31 million in offering costs). In April 2025, underwriters exercised an over-allotment option for 2 million additional shares, raising $68 million. The same month the company entered a commercial agreement with a strategic customer, issuing 9 million shares valued at $350 million.
CoreWeave's business combines three integrated components: proprietary software (including Mission Control orchestration and Slurm on Kubernetes for workload scheduling), purpose-built infrastructure (GPU-dense compute with advanced networking and optimized storage), and managed cloud services. The CoreWeave Cloud Platform enables customers to execute the full AI lifecycle—training, inference, data movement, iteration, and agentic workflows—and serves AI research labs, developers, and enterprises building and deploying large language models at scale.
The company generates revenue from cloud services sold to AI researchers and enterprises. R&D spending increased significantly post-IPO: $70 million in Q1 2025 to $104 million in Q1 2026; $80 million in Q2 2025 to $117 million in Q2 2026. Earlier company history and customer concentration details are not covered in these filings.
Street view
Analyst consensus, peer set, and quarterly-EPS surprise history. Sourced from Finnhub; refreshed nightly.
Analyst consensus (2026-10, 50 analysts)
Show last 6 months
| Month | SB | B | H | S | SS |
|---|---|---|---|---|---|
| 2026-05 | 10 | 18 | 12 | 1 | 1 |
| 2026-06 | 10 | 17 | 13 | 1 | 1 |
| 2026-07 | 10 | 19 | 13 | 1 | 1 |
| 2026-08 | 10 | 21 | 12 | 1 | 1 |
| 2026-09 | 10 | 22 | 12 | 1 | 1 |
| 2026-10 | 11 | 26 | 11 | 1 | 1 |
Peer tickers (green = also tracked in The Analysis)
Recent quarterly EPS: estimate vs actual
| Quarter end | Estimate | Actual | Surprise | % |
|---|---|---|---|---|
| 2025-09-30 (Q3) | -0.376 | -0.08 | +0.2960 | +78.7% |
| 2025-12-31 (Q4) | -0.5036 | -0.56 | -0.0564 | -11.2% |
| 2026-03-31 (Q1) | -0.9157 | -1.12 | -0.2043 | -22.3% |
| 2026-06-30 (Q2) | -1.2303 | -1.03 | +0.2003 | +16.3% |
The Analysis
Frequently asked
What we haven't been told
The supplied record stops at the end of May 2025, and the final line is cut off mid-entry. Every observation below therefore describes silence within that window, not silence through today. Almost every claim sits at status stated. The one automated delay flag in the ledger, on the 27 May 2025 notes closing (claim 11919), was a false alarm: claim 29421 confirms the $2.0B notes closed on schedule, and the flag was cleared to verified on 11 October 2026.
The OpenAI contract is recorded at two values with no reconciliation between them. On 10 March 2025 it was disclosed as an $11.9 billion infrastructure contract (claim 19820). By 13 May 2025 the same relationship appeared as an $11.2 billion revenue backlog (claim 4969). The $700 million gap may simply reflect revenue already recognized, or a difference between contract value and backlog. Nothing in the record says which, and no statement explains why the headline number changed between quarters.
The 5 May 2025 credit facility amendment extended the revolver's maturity to 2 May 2028 (claim 5012). It also attached a contingent springing maturity date of 30 December 2026 (claim 11926). That date is now about ten weeks away. The record never describes what condition would trigger it, whether that condition has been met or waived, or how the springing date interacts with the $2.0 billion of 9.250% notes due 1 June 2030 (claims 29435, 29422). Its last appearance in the ledger is the original May 2025 disclosure.
The May 2025 capacity figures were never followed up within the record: 1.6 GW of contracted power (claim 4973) and roughly 420 MW active across 33 data centers (claims 4972, 29785), with more than 250,000 GPUs online (claim 29786). The same is true of the projected $8.9 billion of secured debt to service contracts (claim 29783) and the DDTL 3.0 facility of up to $2.6 billion (claim 11922). The ledger records the DDTL 3.0 amount as 2600.0 USD, an apparent unit error. No later disclosure in the record gives progress on energizing the contracted power, drawing the debt, or how much of the 1.6 GW has converted to active capacity.
The IBM partnership to supply compute capacity for Granite models (claim 4971) appears exactly once, on 13 May 2025. It has no stated value, no term, and no later reference. The record does not show whether it was ever expanded, completed, or quietly dropped.
What we aren't being told
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then put the OpenAI revenue backlog at $11.2 billion on 2025-05-13, cited as claim #4969; what has not been said is why the two figures differ by $700 million. Is the gap revenue already recognized, a contract amendment, or a difference in how the deal is measured, and over what term and delivery schedule is the remainder recognized?
The company disclosed total revenue backlog of $25.9 billion from committed contracts on 2025-05-13, cited as claim #4970, alongside the named OpenAI backlog in claim #4969; what has not been said is who holds the remaining roughly $14.7 billion. How many counterparties make up that balance, what share comes from the largest unnamed customer, and how much of it is take-or-pay versus cancellable?
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power on 2025-05-13 and 2025-05-18, cited as claims #4972, #29785 and #4973; what has not been said is where the roughly 1.2 GW of contracted but inactive capacity sits. Which sites, utilities and interconnection queues are involved, what energization dates are expected, and how many of the more than 250,000 GPUs in claim #29786 are GB200 versus earlier generations?
The company disclosed a revolving credit facility extension to 2028-05-02 with a contingent springing maturity of 2026-12-30 on 2025-05-05, cited as claims #5012 and #11926; what has not been said is what condition triggers the springing date, now about ten weeks away. Did the 9.250% notes due 2030 in claims #29421 and #29435 satisfy it, or does refinancing risk remain open? Relatedly, the DDTL 3.0 facility in claim #11922 is recorded as 'up to $2.6 billion' with a stored value of 2600.0 USD, so how much has actually been drawn, and on what schedule?
The company disclosed a senior notes offering of $1.5 billion on 2025-05-18, cited as claims #29774 and #29777, which priced two days later as an upsized $2.0 billion at 9.250%, cited as claim #29433; what has not been said is how the extra $500 million and the coupon compare with the initial guidance. Beyond the $450 million revolver repayment in claim #29778, how is the rest of the proceeds allocated? And over what period and on what borrowing rate does the $8.9 billion of projected secured debt in claim #29783 get raised against the $5.17 billion run-rate Adjusted EBITDA in claim #29784, a figure whose measurement basis was not defined?
The company disclosed insider stock sales of $29.1 million by the CFO on 2025-05-20 and $217 million by the CDO on 2025-05-31, cited as claims #19831 and #19832, within about two months of the $40 IPO in claim #11616; what has not been said is whether these sales ran under Rule 10b5-1 plans, when any such plans were adopted, and how the sales compare with each executive's total equity holdings and compensation.
Customer disclosures, read
CoreWeave's record holds a small set of contractually documented commitments, plus a much longer layer of partnership and logo language. The signed agreements are order forms under existing master services agreements. OpenAI's is documented in an initial $11.9 billion deal (claim 19820), a $4 billion expansion (25573), a September 2025 order form (4296) and an up-to $6.5 billion addition, which management says brings total commitments to up to $22.4 billion (20198). Meta's runs through an up-to $14.2 billion order form ending December 2031 (4282, 17655) and a March 31, 2026 order form of about $21 billion through 2032 (2123, 10340, 9317). NVIDIA has a capacity order form (4352) valued at $6.3 billion (20209), and Jane Street has committed about $6 billion (10304). Anthropic's multi-year agreement is named but carries no value (10731). Everything else is softer. That includes the NVIDIA 'collaboration framework' and the 5 GW ambition (3892, 17596, 27948), whose software clause only says the parties will 'work towards' inclusion (17598). It also includes the IBM, CrowdStrike, Core Scientific and Aston Martin partnerships (4971, 11768, 20313, 25576), Genesis Mission membership (11778), and rotating 'partner of choice' logo lists that give no dollar amounts (25575, 11767, 9320). Two counterparties stay anonymous: a 'new hyperscaler customer' (25574) and the 'leading AI enterprise' behind DDTL 4.0 (11224). DDTL 3.0's 'customer contract' (4595) is separately identified as OpenAI (26687). Concentration has shifted but not dissipated. In March 2025, OpenAI's $11.9 billion was close to half of a $25.9 billion backlog (4970). By December 2025, OpenAI's up-to $22.4 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion together equal roughly 70% of $60.7 billion in RPO (3555). NVIDIA is both supplier and customer. The 2026 Meta and Jane Street deals broaden the base only modestly. The arithmetic reconciles only loosely. The OpenAI headline of $11.9 billion compares with $11.2 billion credited to backlog (4969). The $25.9 billion 'backlog' includes amounts beyond the $14.7 billion of RPO that depend on delivery conditions (4970), so backlog figures are not directly comparable with the later RPO series (3572, 3555). The roughly $30.6 billion rise from the $30.1 billion June backlog (25586) to December RPO sits close to the roughly $27 billion of named second-half deals. However, those figures are 'up to' ceilings, revenue recognized in the period should have reduced the balance, and the comparison mixes two definitions. The residual is therefore unexplained rather than confirmed. Whether Meta's $21 billion adds to the $14.2 billion or partly replaces it is also not stated explicitly.
Capital & dilution trajectory
CoreWeave's record is overwhelmingly a debt story. Direct equity has come in a few discrete blocks: the $1.5B IPO (claim #19821), netting roughly $1.4B (claim #4967), the $68M over-allotment (claim #29782), and two strategic placements, Nvidia's $2B (claim #31930) and Jane Street's $1B (claim #10305). Common-share dilution from primary issuance has therefore been episodic rather than continuous. The more consequential dilution channel is the convertible program. The December 2025 convertible appears at $2.25B base (claim #18733), and its total with the purchasers' option is cited as $2.5875B (claim #3980). The April 2026 proposal of $3.0B due 2032 (claim #10325) roughly doubles the convertible stack within four months. Capped calls, cited at $295.7M (claim #18738) and $340M (claim #3986), blunt the dilution but do not remove it. Those figures require reconciliation.
The mix reads as a deliberate layering strategy rather than patching, though its cost is not static. Asset-level delayed-draw facilities have scaled from $2.6B (claim #26685) to $8.5B (claim #11218), and the latter carries investment-grade ratings (claim #11219). That is a structurally cheaper channel. At the corporate level, unsecured coupons moved from 9.250% (claim #29433) to 9.000% (claim #26755) and then to 9.750% (claim #23816), so corporate funding costs have not declined as the company has scaled. Several offerings were upsized at pricing, which indicates demand was available.
The stated use of proceeds tracks partially. Note proceeds were directed to repaying the revolver, about $450M (claim #29778), and the 2024 term loan was retired in full at $1B (claim #29779). Both are consistent with announcements. A sizable portion of the December convertible's net proceeds went to capped calls (claim #18743), which is a capital-structure purpose rather than build-out. Net-proceeds figures for that deal also differ across disclosures: $2.5422B (claim #3981) versus $2.2106B (claim #18737).
The items that most require explanation are the covenant changes. These include the postponed debt service coverage ratio testing (claim #3912), the amended minimum liquidity covenant (claim #3911), and the deferred contract realization ratio testing (claim #3913), the latter two not yet verifiable. A reader should watch whether those tests resume on schedule. They should also watch whether projected secured-debt needs, $8.9B (claim #29783) and $8.8B (claim #26760), keep migrating into the investment-grade DDTL channel or back onto high-coupon unsecured paper. No insider transactions appear in this record, and the record itself is truncated, so conclusions on insider behavior cannot be drawn.
Delivery vs. promise
CoreWeave's capacity story is one of steadily rising headline numbers, with contracted power growing faster than delivered power. Active power moved from roughly 420 MW (4972, 29785) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (11769, 3569) and past 1 GW by May 2026 (9321). That is real, compounding delivery against a 2023 base of 70 MW (3551). Contracted power, however, climbed from 1.6 GW (4973) through 2.2 (25578), 2.9 (20200), 3.1 (3554) and 3.5 GW (9323) to 4.2 GW (26367). The gap between what is signed and what is energized has widened from about 1.2 GW to more than 3 GW. The long-range target has also escalated: the 5+ GW Nvidia AI-factory goal (31932, 27948, 9329) was followed within months by an 8 GW active-power target for 2030 (9322). Reaching 8 GW from roughly 1 GW would require about four times the roughly 490 MW added in calendar 2025, every year from now to 2030.
On dates, the clearest revision is Core Scientific. Close was guided for Q4 2025 (28334), and 4517 implied October 2025, but the deal was terminated on 2025-10-30 (19825, 4166). That removed the 1.3 GW of owned power (28335) and the 1 GW+ expansion option (28336) that had underpinned the scale narrative, leaving only a continuing partnership (20313). Claim 4731 still carries a not_yet_verifiable status despite the termination. Data-center performance was characterized as isolated (19827) a month before installation delays at OpenAI-linked sites and weather and design delays at Core Scientific were acknowledged (19828, 19829). That sequence suggests a pattern of late disclosure rather than outright concealment.
The record contains no independent corroboration: no permits, no interconnection queue positions, and no site-level reporting for Kenilworth (25583), Lancaster (20201), Indonesia (26366) or the other announced campuses. All of these remain at announced status, with no capacity or cost fields populated. The announced pace is therefore supported only by company disclosure. The final August 2026 entry (27051) is truncated and cannot be assessed.
Over the next 90 days, the key test is Kenilworth's initial-phase delivery, promised within 2026 (25584). It is the nearest dated, site-specific commitment, and whether it lands or slips quietly will be telling. The Q3 2026 report should show whether active power growth is accelerating toward the 8 GW trajectory or whether contracted capacity keeps outrunning energization. Filings or utility records for Lancaster and Kenilworth would be the first independent signal that the pipeline is physically progressing.
Frequently asked
What we haven't been told
CoreWeave's most notable unannounced shift involves the Core Scientific merger. The company promised a closing date of April 7, 2026 (claims 4731, 4738), then quietly moved it to October 1, 2025 (claim 4517), before terminating the entire agreement on October 30, 2025 (claim 4166). No public statement appears to have disclosed the reasoning—whether regulatory obstacles, financing challenges, or strategic recalculation—leaving shareholders without explanation for why a major acquisition narrative simply ended.
The near-term financing calendar has experienced systematic silent slippage. A notes offering expected to close on July 25, 2025 (claim 4699) was marked delayed without apparent announcement, and senior notes interest payments promised for February 1, 2026 (claim 4659) have also drifted into delayed status. These are not distant-future commitments, but near-term financial events that the market would typically need to understand.
A delayed draw term loan facility commitment with a stated termination date of July 31, 2026 (claim 4593) has similarly transitioned to delayed status. CoreWeave issued a $3 billion DDTL in October 2025 (claim 4277) but has not explained publicly why the commitment termination date—a key covenant boundary—has shifted.
Across all three areas, management's silence is the pattern. The claims show automated system transitions from 'stated' to 'delayed' or dates that have clearly slipped, yet no corresponding earnings call discussion, 8-K filing detail, or investor update explaining the gap between what was promised and current reality.
What we aren't being told
CoreWeave disclosed an OpenAI "strategic deal revenue backlog" of $11.2 billion on May 13, 2025 (claim 4969), but then announced "OpenAI committed revenue" of $6.5 billion on September 24, 2025 (claim 4297). The company has not explained whether these describe the same contract, why the figure declined by 43% in five months, or whether the difference reflects scope reduction, renegotiation, or definitional changes (claims 4969, 4297, 4296).
The Meta capacity commitment disclosed September 29, 2025 includes $14.2 billion of contracted obligation through December 2031, plus an undefined "capacity expansion option through 2032" (claims 4282, 4283). The company has not disclosed the strike price, capacity subject to option, conditions triggering exercisability, or valuation of this option—leaving investors unable to assess potential future commitments or equity dilution risk.
CoreWeave announced "1.6 GW contracted power capacity" on May 13, 2025 (claim 4973), but did not clarify whether this represents power CoreWeave must purchase from utilities or power CoreWeave must supply to customers—a directional ambiguity that makes capital intensity and margin assessment impossible. The "420.0 MW active compute power capacity added" (claim 4972) similarly lacks temporal and geographic specificity: added since when, and at which facility or facilities.
On July 30, 2025, CoreWeave disclosed a "Material customer contract for GPU infrastructure" (claim 4595) identified only by generic description rather than customer name, contract value, or GPU specifications. This is far vaguer than the explicit naming and dollar figures provided for OpenAI ($6.5B–$11.2B) and Meta ($14.2B), raising questions about why a material contract lacks material disclosures.
CoreWeave announced an IBM partnership for "Granite compute capacity" on May 13, 2025 (claim 4971), but disclosed zero financial terms, capacity volumes, revenue splits, geographic deployment, or timeline—despite this being material enough to announce to capital markets.
On July 30, 2025, CoreWeave set a minimum debt service coverage ratio of 1.40x "beginning April 2027" (claim 4596) as a financial covenant. As of today (September 5, 2026), CoreWeave is already six months into this compliance period, yet the company has not disclosed current covenant ratios, proximity to breach, or consequences of non-compliance—material to creditors and equity investors assessing default risk.
Customer disclosures, read
CoreWeave's disclosed customer base has crystallized significantly from early 2025 through mid-2026, though the distinction between signed contracts and strategic frameworks remains material. In May 2025, CoreWeave announced an $11.2 billion 'strategic deal' with OpenAI (claim 4969) alongside an IBM 'partnership' for Granite compute capacity (claim 4971)—both characterized with partnership language rather than order-form specificity. By September 2025, however, the company filed signed order forms: OpenAI under an MSA dated April 10, 2023 (claim 4296), and NVIDIA under an existing MSA from April 2023 (claim 4352). Meta's commitment evolved from an initial $14.2 billion pledge through December 2031 (claim 282) to a materially expanded $21 billion agreement through 2032 (claim 7628), both documented as order forms under an MSA from December 2023. NVIDIA, notably, framed a subsequent engagement as a 'collaboration framework' (claim 3892) rather than a customer contract—a distinction worth noting given NVIDIA's dual role as infrastructure supplier and partnership counterparty.
The customer roster has consolidated around named entities. Microsoft and OpenAI have been consistently identified as 'biggest' or 'major' clients (claims 648, 618, 1100), alongside Meta. Mid-2026 announcements brought Hudson River Trading (multibillion-dollar multiyear agreement, claims 7602–7604), Jane Street ($6 billion capacity commitment, claim 7611), Anthropic (multi-year compute deal, claim 7630), and Backblaze (five-year, $335 million storage agreement, claim 7448). Applied Digital's Polaris Forge engagement represents approximately $11 billion in prospective lease revenue (claim 371). Early disclosures included unnamed 'other amo[unts]' (claim 4970), suggesting material counterparties remain unidentified.
Revenue backlog growth from December 2024's $15.1 billion RPO (claim 3572) to June 2026's $104.2 billion backlog (claim 1302) suggests arithmetical coherence only if announced deals are genuine. Named commitments—Meta $21 billion, Jane Street $6 billion, Applied Digital ~$11 billion, Backblaze $335 million—total approximately $38 billion, yet Hudson River Trading's 'multibillion-dollar' deal lacks a specific figure. The weighted-average five-year contract duration (claim 3555) and $25 billion in commitments signed through early Q3 2026 (claim 3011) support disclosed backlog scale, though the lack of granular attribution for over $25 billion of 2026 commitments remains a material gap for forensic analysis.
Delivery vs. promise
CoreWeave's capacity narrative has shifted notably in scope and direction over eighteen months. The company began mid-2025 announcing 1.6 GW of contracted power and 420 MW active (claim 4973, 4972), but by August 2026 revised this to 4.2 GW contracted and 1.5–1.8 GW active (claims 1456, 1489). The underlying trajectory—70 MW at end-2023 (claim 3551) through 850 MW at end-2025 (claim 3553)—is sharp and consistent. However, the 2030 capacity goal enlarged significantly: from "5+ gigawatts" (claim 3893, January 2026) to "8 gigawatts" (claims 7629, 6738, August 2026), a 60 percent increase in stated ambition in less than eight months.
Promised delivery dates have been fragile. The Core Scientific merger, due April 2026 (claim 4731), was terminated entirely in October 2025 (claim 4166). Three acquisitions announced March 2026—OpenPipe, Monolith, and Marimo (claims 3588, 3589, 3577)—all carried promised closes in late 2025, yet showed as delayed at the same reporting date. Weights & Biases appears three times across a year (claims 4974, 3562, 3586) before a $1 billion figure surfaced in August 2026 (claim 4516) with no promised close date stated.
For infrastructure itself, timelines remain sparse. The Indonesia facility announcement (August 2026, claim 3013) promises 360 MW deployment by end-2028 (claim 155)—a specific, multi-year commitment. The year-end-2026 active capacity target shifted upward within days: 1.7 GW (August 20, claim 7652) to 1.8 GW (August 24, claims 1489, 6737), a minor revision without flagging.
No independent corroboration appears in these claims: no filed permits, grid interconnection queue positions, or third-party assessments. Large partnerships announced in August 2026 (Anthropic, Hudson River Trading, OpenAI contract reported at $22.4 billion, Backblaze at $335 million) suggest demand-side confidence, yet the M&A stumbles and capacity revisions indicate internal execution constraints.
Watch over 90 days for: year-end 2026 active capacity reaching 1.8 GW, closure of the three delayed acquisitions, any revision to 2030 or 2028 Indonesia timelines, and public disclosures of grid interconnection or real-estate filings that lock schedule.
View earlier analyses (1038 superseded)
Every analysis block we've ever published for this company is preserved here as an append-only ledger. Each row is a prior take on the same topic (same computation_key) that was replaced by the current block above.
capital_arc
Capital & dilution trajectory
2026-10-19CoreWeave's record describes a company that used its public listing less as a source of equity and more as the entry point to the debt markets. The IPO raised $1.5 billion at $40 (claim #19821), with net proceeds of $1.4 billion (claim #4967). Since then, nearly all of the capital has come from secured delayed-draw facilities and high-yield notes. The DDTL sequence grows from $2.6 billion (claim #26685) to $3.0 billion (claim #4277) to $8.5 billion (claim #11218). The company's own aggregate figures, more than $25 billion over 18 months (claim #26689) and $28 billion in commitments over twelve months (claim #11221), show how small the IPO is within the total.
The mix looks deliberate rather than improvised. Contract-backed GPU spending goes into secured DDTLs, which earned A3/A(low) ratings on the latest structure (claim #11219). Unsecured notes and strategic equity fill the gaps around them. That equity comes from Nvidia at $2 billion (claim #17594), Jane Street at $1 billion (claim #10305) and a customer issuance of $350 million (claim #4514).
The unsecured layer is getting more expensive. Coupons went from 9.250% (claim #29433) to 9.000% (claim #26755) and then to 9.750% (claim #23816). Dilution is coming more through convertibles than through direct issuance. The December 2025 convertible was $2.25 billion (claim #18733), partly offset by a $295.7 million capped call (claim #18738). A proposed $3.0 billion convertible due 2032 followed in April 2026 (claim #10325). Earlier claims put that deal at $2.6 billion (claim #11765), so the sizing was revised and requires explanation.
The record does not show where the money was actually spent, only stated intentions. One stated use repeats. Both the 2030 and 2031 note offerings name a $450 million revolver repayment (claims #29778 and #26759), even though $444 million of additional revolver borrowing appears in between (claim #29780). That suggests the revolver is being cycled rather than retired.
The item that most deserves follow-up is the January 2026 covenant amendments. These postponed debt-service-coverage testing (claim #3912) and contract-realization testing (claim #3913), and adjusted minimum liquidity (claim #3911). A reader should watch for several things: when that testing resumes; whether draws on DDTL 4.0 track the Meta commitment of $21 billion (claim #2124) and the OpenAI commitment of $6.5 billion (claim #4297); whether the next unsecured coupon prices above 9.75%; and how the convertibles are settled. No insider transactions are on record, so that dimension cannot be assessed.
Capital & dilution trajectory
2026-10-19CoreWeave's record shows a company financed mainly through debt, with equity used sparingly. After the $40 IPO (claim #11616) and $1.4B of net proceeds (claim #4967), new equity came mostly from strategic holders rather than public follow-ons: a $350M customer share issuance (claim #4514), NVIDIA's $2B Class A purchase (claim #17594), and Jane Street's $1B investment (claim #10305). Dilution from straight equity has been modest relative to the balance sheet. The more meaningful future dilution sits in the convertibles: the December 2025 issue, recorded at $2.25B (claim #18733), and the proposed $3.0B 2032 convert with a $450M option (claim #10325, #10326). The figures recorded for the first convert do not agree with each other, at $2B (claim #18739), $2.25B and $2,587.5M (claim #3980), and net proceeds of $2,210.6M versus $2,542.2M (claims #18737, #3981). These require reconciliation, most likely to option exercise. The $295.7M capped call (claim #18738) shows the company actively managing that overhang. The mix looks deliberate. Each senior note deal was upsized, from $1.5B to $2.0B at 9.250% (claims #29777, #29433) and to $1.75B at 9.000% (claims #26755, #4698), while asset-level delayed-draw facilities grew from $2.6B at SOFR+4% (claim #26686) to $8.5B (claim #11218) with A3/A(low) ratings (claim #11219). That progression suggests contract-backed borrowing is meant to replace high-coupon unsecured paper. The April 2026 notes at 9.750% (claim #23816) show that the unsecured cost of capital has not yet come down. On use of proceeds, the 2024 term loan repayment (claim #29779) is documented. The $450M revolver paydown, however, is cited for both the May and July 2025 note deals (claims #29778, #26759), which requires explanation. The postponed debt service coverage ratio testing (claim #3912), along with a contract realization postponement and a liquidity amendment that are not yet verifiable (claims #3913, #3911), indicate that some covenant timelines have been revised. Readers should watch whether DDTL 4.0 draws track the Meta commitment (claim #2124), whether coverage testing resumes on its revised schedule, and how the Series C put obligation (claim #4276) is resolved. No insider transactions appear in the record provided, and the claim list is truncated, so no conclusions are drawn on insider selling.
Capital & dilution trajectory
2026-10-18CoreWeave's record describes a company that has financed almost entirely through debt since listing, with equity arriving mainly from strategic counterparties rather than from the public market. After an IPO of $1.5B gross (claim #19821), or $1.4B net (claim #4967), the company issued high-yield notes at roughly two-month intervals, and each deal was upsized at pricing. The 2030 notes went from $1.5B proposed (claim #29777) to $2.0B priced at 9.250% (claim #29433). The 2031 notes went from $1.5B (claim #26765) to $1.75B at 9.000% (claim #26755). A later 2031 tranche of $2.75B carried 9.750% (claim #23816), so unsecured borrowing costs have not come down over the period. Direct dilution has come from convertibles and strategic placements: the December convertible of $2.25B base (claim #18733), the proposed $3.0B 2032 convertible (claim #10325), NVIDIA's $2B purchase of Class A stock (claim #17594), and Jane Street's $1B (claim #10305). The record contains no insider transactions, so nothing can be said about insider selling.
The overall mix follows a consistent pattern. Asset-level delayed-draw facilities fund contracted GPU deployments, culminating in the $8.5B DDTL 4.0 with A3/A(low) ratings (claims #11218, #11219), while unsecured and convertible paper sits at the holding company. That reads as a deliberate structure rather than patchwork. However, the January 2026 postponement of debt-service-coverage and contract-realization testing, together with the amendment to the minimum liquidity covenant (claims #3912, #3913, #3911), suggests the underlying contracts have not been converting to cash as the original terms assumed. That gap requires explanation.
The stated uses of proceeds are hard to trace through the record. A $450M revolver paydown appears in both the May and July note offerings (claims #29778, #26759), and the filings do not show whether these were separate repayments or the revolver was drawn again in between. The December convertible's figures are also internally inconsistent. Net proceeds appear as $2,210.6M (claim #18737) and as $2,542.2M (claim #3981), and capped-call costs appear as $295.7M (claim #18738) and as $340M (claim #3986). The likely explanation is pre- versus post-option figures, but the disclosures do not reconcile them.
Readers should next watch for three things: when deferred covenant testing resumes, how much of the 2032 convertible is upsized, and whether revenue is collected on the Meta commitment of $21B (claim #2124) and the OpenAI commitment of $6.5B (claim #4297). These contracts are what ultimately service a stack of more than $25B raised in 18 months (claim #26689).
Capital & dilution trajectory
2026-10-17CoreWeave's record shows a company that has funded itself mostly with debt rather than common equity, and it has done so at an accelerating pace. The IPO raised $1.5B gross (claim 19821) and $1.4B net (claim 4967). Later equity came in large single-counterparty blocks rather than broad issuance: NVIDIA's $2B (claim 17594), Jane Street's $1B (claim 10305) and a $350M strategic customer issuance (claim 4514). Direct dilution from common stock is therefore modest relative to total capital raised. The larger dilution question sits in the convertibles. The December 2025 deal grew from a $2.25B base (claim 18733) to $2.5875B (claim 3980), with a $340M capped call (claim 3986) bought to soften conversion dilution. An April 2026 proposal of $3.0B plus a $450M option (claims 10325, 10326) followed within four months.
The mix looks deliberate rather than patched together. Contract-backed delayed-draw facilities fund GPU capex against named commitments: DDTL 3.0 at $2.6B (claim 26685) and DDTL 4.0 at $8.5B (claim 11218), the latter carrying A3/A(low) ratings (claim 11219). Unsecured high-yield and convertible paper cover corporate needs. Two features complicate that reading. First, corporate coupons have drifted upward, from 9.250% (claim 29433) to 9.000% (claim 26755) to 9.750% (claim 23816). Second, the stated totals compound quickly, from $17.2B (claim 4968) to over $25B in 18 months (claim 26689) to $28B in twelve months (claim 11221).
On use of proceeds, both the 2030 and 2031 notes cite repaying the revolver, at $450M each (claims 29778, 26759). An additional $444M RCF borrowing appears alongside (claim 29780). This pattern suggests the revolver is being cycled as a bridge rather than retired, and that warrants explanation. Several aggregates in the record are recorded at inconsistent scales or conflict across claims, for example the $2.6B versus $3.0B convertible figures (claims 11765, 10325). Exact reconciliation therefore requires the primary filings.
A sophisticated reader should watch the covenant posture first. Debt service coverage and contract realization testing were postponed, and the minimum liquidity covenant was amended (claims 3912, 3913, 3911). Whether those tests resume on schedule or are revised again will say more than any new issuance. Beyond that, the reader should track how much of the $21B Meta commitment (claim 2124) and the $6.5B OpenAI commitment (claim 4297) converts into DDTL draws, and whether the next unsecured coupon prints above 9.75%. The record contains no insider transactions, so no read on insider behavior is possible from this data.
Capital & dilution trajectory
2026-10-17CoreWeave's record shows a company that went public mostly to open the capital markets, not to fund itself with equity. The IPO raised $1.4B net (claim #4967), and within two months the company was back in the market with debt. Holdco unsecured notes came in quick succession: $2.0B at 9.250% due 2030 (claim #29433), $1.75B at 9.000% due 2031 (claim #26755), and $2.75B at 9.750% due 2031 (claim #23816). Asset-level delayed-draw facilities grew alongside them, from $2.6B (claim #26685) to $3.0B (claim #4277) to $8.5B (claim #11218). The company's own cumulative figures rise from $17.2B (claim #4968) to over $25B in 18 months (claim #26689) to $28B in twelve months (claim #11221).
The mix looks deliberate rather than improvised, but it has split in two. The asset-level structure now carries A3/A(low) ratings (claim #11219), while the holdco unsecured coupon has not compressed and the latest print is the highest. Equity has come in as strategic placements rather than broad offerings: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). It has been paired with convertibles: $2.59B including the option (claim #3980), then a proposed $3.0B due 2032 (claim #10325). Capped calls (claim #3986) limit near-term dilution from the converts but do not remove it. The record contains no insider transactions, so nothing can be said about insider selling.
Proceeds are hard to trace. Use-of-proceeds claims exist (claims #29776, #26766), but the record only shows debt repayment. Two separate note deals each repaid the revolver by $450M (claims #29778, #26759), while additional revolver borrowing of $444M is recorded (claim #29780). This looks like recycling short-term debt, and it requires explanation alongside the stated capex purpose (claim #2138).
The January 2026 covenant amendments deserve close attention. Debt service coverage testing was postponed (claim #3912), and the minimum-liquidity and contract-realization changes are not yet verifiable (claims #3911, #3913). Readers should watch when those tests resume, whether the cost of new holdco notes moves toward the investment-grade asset-level debt, and how the convertibles' conversion terms (claim #3984) compare with the share price. The record also has duplicates, mixed units, and a truncated final entry (claim #9316), which limits precision.
Capital & dilution trajectory
2026-10-17CoreWeave's record describes a company that has financed itself overwhelmingly through debt since listing, with equity used sparingly and mostly placed with strategic counterparties. After the $1.5B IPO (claim 19821), common-stock dilution has come mainly from negotiated placements: the $350M strategic customer issuance (claim 4514), NVIDIA's $2B investment (claim 17594) and Jane Street's $1B (claim 10305). The convertibles carry dilution forward rather than avoiding it. The December 2025 convertible was sized at $2.25B at announcement (claim 18733) and $2,587.5M at completion (claim 3980), consistent with the full $337.5M option (claim 18735). Capped calls partly offset the conversion exposure. The proposed $3.0B 2032 convertible (claim 10325) would roughly double that latent share overhang within four months. The record contains no insider transactions, so nothing can be said about management selling against this backdrop.
The mix reads as a deliberate two-track structure rather than patching. Contract-backed delayed-draw facilities have grown from $2.6B (claim 26685) to $8.5B (claim 2137), the latter carrying investment-grade ratings (claim 11219). Unsecured senior notes are layered alongside them. The cost of the unsecured track has not improved. The 9.000% 2031 notes (claim 26755) were followed by 9.750% 2031 notes (claim 23816). Several offerings were upsized from their announced size, for example from $1.5B to $2.0B (claims 11921, 29433). This suggests demand is available, though at a price that has moved up rather than down.
Use of proceeds tracks deployment in the instances the record allows us to check. The 2024 term loan was repaid in full (claim 29779), and revolver paydowns were disclosed. The identical $450M revolver repayment appears in both the 2030 and 2031 note offerings (claims 29778, 26759), and that repetition requires explanation. Capped-call allocations differ between filings, at $295.7M (claim 18738) versus $340M (claim 3986), and those figures have not been reconciled.
A careful reader should watch the covenant amendments. Debt service coverage testing was postponed (claim 3912), the minimum liquidity covenant was amended (claim 3911), and the contract realization test is not yet verifiable (claim 3913). Whether these tests resume on schedule matters more than any single new facility. Two further items bear on that. Projected secured debt needed to service contracts was $8.9B in May 2025 (claim 29783), and draws against the DDTL 4.0 facility should be read against the Meta and OpenAI commitments (claims 2124, 4297). The final claim on record (claim 9316) is truncated and may duplicate the January NVIDIA investment.
Capital & dilution trajectory
2026-10-17CoreWeave's record shows a company that has financed itself mostly through debt since listing, with equity arriving in occasional large blocks. After the $1.5B IPO (claim #19821, net $1.4B per claim #4967), common-equity dilution came mainly through strategic placements rather than marketed follow-ons: the $350M strategic customer issuance (claim #4514), NVIDIA's $2B purchase (claim #17594), and Jane Street's $1B (claim #10305). The dilution that matters more over time is contingent. It sits in two convertible offerings roughly four months apart: December 2025, sized at $2.25B base and $2,587.5M with the option (claims #18733, #3980), and a proposed $3.0B due 2032 in April 2026 (claim #10325), which a parallel claim records as $2.6B (claim #11765). That discrepancy requires explanation. Capped calls offset some of the exposure, but the recorded cost differs, at $295.7M (claim #18738) versus $340M (claim #3986).
The debt mix looks more like a layered strategy than ad hoc patching. Contract-backed delayed-draw facilities scale steadily, from DDTL 3.0 at $2.6B (claim #26685) to DDTL 4.0 at $8.5B with A3/A(low) ratings (claims #11218, #11219). Unsecured notes fill the gaps between them. Their pricing has not improved: 9.250% (claim #29433), 9.000% (claim #26755), then 9.750% on the 2031 notes (claim #23816). The secured channel is getting cheaper and larger while the unsecured channel is not. The company's own aggregate figures, $17.2B raised (claim #4968), over $25B in 18 months (claim #26689), and $28B committed in twelve months (claim #11221), show the scale of that reliance.
On deployment, stated uses are partly circular. Two separate notes offerings each name a $450M revolver repayment (claims #29778, #26759), and the 2024 term loan was refinanced in full (claim #29779). New unsecured debt is therefore retiring prior borrowings as well as funding capex. That is not unusual, but it is worth tracking. The January 2026 amendments postponing debt-service-coverage and contract-realization testing and revising the minimum liquidity covenant (claims #3912, #3913, #3911) show that covenant terms were renegotiated within months of issuance.
The record contains no insider transactions, so nothing can be said about insider selling. A sophisticated reader should watch four things: when deferred covenant tests resume, whether the April convertible size is reconciled, the status of the Series C put repurchase obligation (claim #4276), and whether unsecured coupons stay near 9-10% as maturities cluster in 2030-2032. The final claim in this dataset is truncated, so later events may be missing.
Capital & dilution trajectory
2026-10-17CoreWeave's record after the listing is dominated by debt, not equity. The IPO raised $1.5B gross at $40, per claims #19821 and #11616, with net proceeds of $1.4B per claim #4967. Since then, direct equity dilution has come mainly from strategic placements: NVIDIA's $2B purchase of Class A stock (claim #17594) and Jane Street's $1B investment (claim #10305). The larger potential dilution sits in the convertibles. The December 2025 issue grew from $2.25B to $2.5875B (claims #18733 and #3980) and references roughly 30.0M underlying shares (claim #3984). A proposed $3.0B convertible due 2032 followed in April 2026 (claim #10325). Capped calls of about $340M (claim #3986) reduce but do not remove the overhang. The record contains no insider transactions, so that dimension cannot be assessed here.
The mix does show a structure. Contract-backed delayed-draw facilities fund GPU deployment, and the progression runs from DDTL 3.0 at SOFR+4% (claim #26686) to the $8.5B DDTL 4.0 carrying A3/A(low) ratings (claim #11219). Unsecured notes and convertibles sit at the corporate level above them. The unsecured layer is the part that requires explanation. Coupons moved from 9.250% (claim #29433) to 9.000% (claim #26755) and then to 9.750% on the April 2026 notes (claim #23816), so corporate-level borrowing costs have risen even as asset-level financing earned investment-grade treatment. Several offerings were upsized shortly after announcement, which reads as demand-led sizing rather than fixed planning.
On use of proceeds, the May and July 2025 notes both earmarked $450M to repay the revolver (claims #29778 and #26759). The revolver was drawn again in between (claim #29780), which suggests note proceeds are partly refinancing a facility that keeps being redrawn. In January 2026, debt service coverage ratio testing was postponed (claim #3912) and the minimum liquidity covenant was amended (claim #3911). Both changes sit uneasily beside the volume of new commitments, stated at $28B over twelve months (claim #11221).
A careful reader should watch for several things next: whether postponed covenant tests resume on schedule, whether the coupons on unsecured debt stabilize, how much of the convertible stack ends up settled in shares, and whether projected contract-secured debt needs, last stated at $8.8B (claim #26760), keep growing faster than disclosed revenue commitments. The supplied record is truncated after claim #9315, so later events are not reflected here.
Capital & dilution trajectory
2026-10-16CoreWeave's record is mostly a debt story, not a dilution story. Common equity enters at only a few points: the $1.5B IPO at $40 (claims #19821, #11616), netting $1.4B (claim #4967); a $2B NVIDIA purchase of Class A stock (claim #17594); and a $1B Jane Street investment (claim #10305). Dilution beyond that depends on two convertibles: the December 2025 offering, upsized from $2B (claim #18739) to $2.25B (claim #18733), and the proposed $3.0B 2032 notes (claim #10325). Both include capped calls, $295.7M per claim #18738, which suggests management is trying to limit conversion dilution rather than ignoring it.
The mix follows a coherent pattern, though each step has cost more. Unsecured coupons rose from 9.25% on the upsized $2.0B 2030 notes (claim #29433) to 9.0% on the 2031 notes (claim #26755) and then to 9.75% on the $2.75B 2031 notes (claim #23816). Over the same period, asset-level financing grew from the $2.6B DDTL 3.0 at SOFR+4% (claim #26686) to the $8.5B DDTL 4.0 (claim #11218), which carries A3/A(low) ratings at the facility level (claim #11219). The structure separates contract-backed secured debt from expensive corporate paper, and the company's own figures of $25B raised in 18 months (claim #26689) and $28B in 12 months (claim #11221) show the pace accelerating.
The record confirms some stated uses of proceeds. The 2024 term loan was repaid in full (claim #29779). Revolver paydowns of $450M appear after both the May and July note deals (claims #29778, #26759), which points to the revolver being drawn and refinanced repeatedly. Deployment of the remaining proceeds into capex is not documented here. The December convertible figures also need reconciling: net proceeds appear as $2.21B (claim #18737) and $2.54B (claim #3981), and the capped call as $295.7M and $340M (claim #3986). This likely reflects exercise of the purchasers' option, but the record does not say so.
The January 2026 amendments require explanation. They postponed debt-service-coverage and contract-realization ratio testing (claims #3912, #3913) and revised the minimum liquidity covenant (claim #3911). A sophisticated reader should watch for when that testing resumes, how much of DDTL 4.0's $7.5B initial capacity (claim #11220) is actually drawn, and whether coupons keep rising. No insider transactions are present in this record, and the claim list is truncated after May 2026, so later events are not covered here.
Capital & dilution trajectory
2026-10-16CoreWeave's record is overwhelmingly a debt story, and the reader should weigh it that way. Common equity dilution is concentrated in a few events: the IPO at $40 (claim #11616) with $1.5B gross (claim #19821) and about $1.4B net (claim #4967), a $350M strategic customer issuance (claim #4514), and two later private placements, NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). Equity has not been the main funding channel. Most capital has come through senior notes, delayed-draw term loans and, since December 2025, convertibles. The convertibles are where dilution now builds. The December deal grew from $2B proposed (claim #18739) to $2.5875B (claim #3980), partly offset by capped calls of $295.7M (claim #18738) or $340M (claim #3986); those two figures differ and require reconciliation. A further $3.0B convertible due 2032 was proposed in April 2026 (claim #10325).
The mix looks deliberate rather than patched together. Asset-level DDTL facilities finance specific customer contracts (claim #2138), culminating in the $8.5B DDTL 4.0 with A3/A(low) ratings (claims #11218, #11219). Unsecured notes and convertibles sit at the parent level. The cost of that unsecured layer has not fallen. Coupons ran 9.25% on the 2030 notes (claim #29433), 9.0% on the 2031 notes (claim #26755) and 9.75% on the April 2026 notes (claim #23816). Repeated upsizing, from $1.5B to $2.0B (claims #29774, #29433) and from $1.5B to $1.75B (claims #26765, #26755), shows strong demand but not cheaper money.
The stated uses of proceeds can be partly traced. The $1B repayment of the 2024 term loan (claim #29779) and the $450M revolver paydowns (claims #29778, #26759) are disclosed. Most other use-of-proceeds claims are generic, and the record has no deployment data against them.
Three items warrant attention. First, the January 2026 postponement of debt-service-coverage and contract-realization ratio testing, together with an amended minimum-liquidity covenant (claims #3912, #3913, #3911), requires explanation, given that the March 2026 facility carries its own coverage covenant (claim #2141). Second, the cumulative raise claims rise from $17.2B (claim #4968) to over $25B (claim #26689) to $28B in twelve months (claim #11221). They use different windows and cannot be compared directly. Third, conversion of the 2025 and 2026 convertibles is the main path to future share dilution.
The record contains no insider transactions, and it is cut off in May 2026, so these conclusions cover only that window.
Capital & dilution trajectory
2026-10-16CoreWeave's record is dominated by debt rather than common equity, so dilution has accumulated slowly and mostly through equity-linked paper. After the $1.5B IPO (claim #19821), which netted roughly $1.4B (claim #4967), new shares came mainly from strategic placements: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). The more consequential dilution sits in the convertibles. The December 2025 issue grew from $2.25B (claim #18733) to $2.5875B (claim #3980), with conversion terms referencing roughly 30.0M shares (claim #3984). A further $3.0B convertible due 2032 followed in April 2026 (claim #10325). That is two large equity-linked issues within about four months.
The mix reads as a deliberate structure more than patchwork. Contract-backed delayed-draw facilities fund GPU capex tied to specific customers (claim #2138). DDTL 4.0 at $8.5B carries A3/A(low) ratings (claims #11218, #11219). Unsecured notes and converts sit above that layer. The terms, however, have not improved with scale. Coupons went from 9.250% (claim #29433) to 9.000% (claim #26755) and then up to 9.750% on the April 2026 notes (claim #23816). The January 2026 covenant changes also require explanation: debt service coverage testing was postponed (claim #3912), and amendments to contract realization testing and minimum liquidity were recorded (claims #3913, #3911). Both sit alongside an investment-grade rating at the facility level.
Use of proceeds can be traced in places. Both 2025 note offerings earmarked $450M to repay the revolver (claims #29778, #26759), and the 2024 term loan was repaid in full (claim #29779). Revolver repayment appearing twice in two months suggests the revolver works as a bridge that is drawn and then refinanced. The capped call allocation is stated as $295.7M (claim #18738) and also as $340M (claim #3986), which likely reflects the base deal versus the upsized deal. The July 2025 claims on convertible-note conversion and a $270 termination fee (claims #4737, #4739) are no longer discussed in later records.
The disclosed record contains no insider transactions, so that dimension cannot be assessed. Unit conventions vary across claims, and several events appear in duplicate.
Going forward, the most informative items are the following. First, whether covenant testing resumes on the revised schedule. Second, whether the April 2026 $1B notes closed as expected (claim #9699). Third, whether claim #9316 records a second NVIDIA investment or restates the first. Fourth, how much of the 2031–2032 maturity wall is ultimately settled in shares rather than cash.
Capital & dilution trajectory
2026-10-16CoreWeave's record describes a company that has financed itself mostly through debt, with equity held in reserve. After the $1.5B IPO at $40 per share (claim #19821, #15974), the issuer turned almost immediately to high-yield unsecured paper. Those issues ran from the 9.250% notes due 2030, upsized from $1.5B to $2.0B (claims #29774, #29433), through the 9.000% notes due 2031, upsized to $1.75B (claim #26755), to a 9.750% $2.75B tranche (claim #23816). Each of the first two offerings was upsized between announcement and pricing, which points to strong demand rather than difficulty placing the paper. Coupons have not compressed, however, and the most recent tranche on record carries the highest rate. Direct equity dilution has come mainly through strategic placements: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). Potential dilution sits in the convertibles: the December issue, whose size is reported as $2.0B, $2.25B and $2.5875B across claims #18739, #18733 and #3980, and a proposed $3.0B 2032 convert (claim #10325). Capped calls offset part of that exposure (claim #18738).
The mix reads as deliberate rather than improvised. Secured delayed-draw facilities tied to customer contracts scaled from DDTL 3.0 at $2.6B (claim #26685) to DDTL 4.0 at $8.5B with A3/A(low) ratings (claims #11218, #11219). Those facilities sit against backlog such as the OpenAI and Meta commitments (claims #4297, #2124). Unsecured notes and converts fund the parent. Use of proceeds is traceable in the early period, since notes were applied to the revolver and term loan as stated (claims #29778, #29779). For later issues the record carries only 'intended use' language, and actual deployment cannot yet be confirmed.
The items that most require explanation are the covenant changes dated January 2026. Debt-service-coverage and contract-realization testing were postponed, and the minimum liquidity covenant was amended (claims #3911, #3912, #3913). Readers should watch whether that testing resumes on schedule and how DDTL draws track contracted revenue. They should also watch the share count once the converts approach their conversion terms (claim #3984) and whether coupons on new unsecured paper ease. No insider transactions appear in the record provided, and the claim list ends mid-entry, so this read covers only the disclosed portion.
Capital & dilution trajectory
2026-10-16CoreWeave's record is overwhelmingly a debt story, with equity used sparingly. After the IPO at $40 (claim 11601) raising $1.5B gross (claim 19821) and roughly $1.4B net (claim 4967), the company did not return to straight common equity markets. It instead layered high-yield notes, delayed-draw term loans and convertibles. The only subsequent primary equity came from strategic counterparties: NVIDIA's $2B (claim 17594) and Jane Street's $1B (claim 10305). Whether the May 2026 NVIDIA entry (claim 9316) is a second tranche or a restatement of the January investment is not clear from the record and requires explanation. Dilution so far has therefore been modest and concentrated, with the larger latent source being the convertibles: the December 2025 issue at $2.25B base (claim 18733), $2,587.5M with the option (claim 3980), and a proposed $3.0B 2032 convertible (claim 10325). The capped calls (claim 18738) partly offset that overhang.
The mix reads as coherent in its architecture but increasingly heavy in its pace. Stated capital raised moved from $17.2B (claim 4968) to over $25B in 18 months (claim 26689) and then $28B in commitments over 12 months (claim 11221). Unsecured coupons have not compressed. The 2030 notes priced at 9.250% (claim 29433), the 2031 notes at 9.000% (claim 26755), and a later 2031 series at 9.750% (claim 23816). Against that, the $8.5B DDTL 4.0 (claim 11218) carried A3/A(low) ratings at the facility level (claim 11219). That suggests contract-backed secured financing is becoming the cheaper channel. Repeated upsizing, $1.5B to $2.0B (claims 29774, 29433) and $1.5B to $1.75B (claims 26758, 26755), indicates demand rather than strain.
On use of proceeds, the record shows the refinancing legs clearly: a $450M revolver paydown (claim 29778) and the full repayment of the 2024 Term Loan (claim 29779). It does not show actual capex deployment against the projected $8.9B of secured debt for contracts (claim 29783), so that link cannot be confirmed here. The record contains no insider transaction data.
The January 2026 postponement of debt service coverage ratio testing (claim 3912) and contract realization ratio testing (claim 3913) requires explanation. It sits awkwardly beside the rapid issuance that followed. Readers should watch whether those tests resume on schedule. They should also watch how the conflicting April 2026 sizes are reconciled: $3.0B versus $2.6B for the convertible (claims 10325, 10327), and $1.25B versus $1B for the notes (claims 2125, 9697). Finally, watch whether the coupon trend on unsecured paper stabilizes.
Capital & dilution trajectory
2026-10-15CoreWeave's record shows a company that has rarely gone more than six weeks without a capital event since its listing. The direct equity component has stayed modest relative to the whole. The IPO raised $1.5B at $40 (per claims #19821 and #11616), followed by a $68M over-allotment (claim #29782) and a $350M strategic customer issuance (claim #4514). The heavier equity layers came later: NVIDIA's $2B Class A investment (claim #17594) and Jane Street's $1B (claim #10305). Dilution from these is steady rather than abrupt. The more consequential overhang sits in the convertibles. A $2.25B base offering grew to roughly $2.59B with the option (claims #18733 and #3980). A further $3.0B convertible due 2032 was proposed in April 2026 (claim #10325), though claim #10327 records that offering at $2,600, a discrepancy that requires explanation.
The mix reads as a deliberate layering strategy rather than patching. Asset-level delayed-draw facilities fund contract capex, culminating in the $8.5B DDTL 4.0 with A3/A(low) ratings (claims #11218 and #11219). Above them sits corporate high-yield and convertible paper. The corporate tier has a cost trajectory worth noting. Coupons moved from 9.250% on the 2030 notes (claim #29433) to 9.000% on the 2031s (claim #26755), then to 9.750% on a further 2031 tranche (claim #23816). Both 2025 note deals were upsized from their announced sizes (claims #29777 versus #29433, and #26758 versus #26755). Upsizing suggests demand, though it also enlarged the fixed-charge base.
On deployment, the disclosed uses largely track. The 2024 Term Loan was repaid in full at $1B (claim #29779), and revolver paydowns of $450M were stated for both the May and July note deals (claims #29778 and #26759). The capped call allocation, however, appears as both $295.7M (claim #18738) and $340M (claim #3986), likely reflecting pre- and post-option sizing. The April 2026 senior notes are recorded as $1.25B (claim #2125), $1B completed (claim #2056), and $2.75B (claim #23816), which is not reconciled in the record.
The item a careful reader should weigh most is the January 2026 amendment. It postponed debt service coverage and contract realization ratio testing and revised a minimum liquidity covenant (claims #3911 through #3913), and the latter two remain not yet verifiable. Readers should watch for when that testing resumes. They should also watch how drawn DDTL balances compare with the backing commitments, such as Meta's $21B (claim #2124) and OpenAI's $6.5B (claim #4297). The record contains no insider transactions, so no read on insider positioning is possible.
Capital & dilution trajectory
2026-10-15CoreWeave's record since its March 2025 listing shows a company that has relied mainly on debt rather than on share issuance. The equity it has taken in comes from a small number of large blocks: the IPO at $40 (claim 11601), which raised about $1.4B net (claim 4967), NVIDIA's $2B Class A purchase (claim 17594), and Jane Street's $1B investment (claim 10305). A further NVIDIA $2B entry in May 2026 (claim 9316) needs to be explained. It is unclear whether it is a second tranche or a restatement of the January investment. Most dilution risk instead sits in the convertibles: roughly $2.59B issued in December 2025 (claim 3980) and a proposed $3.0B due 2032 (claim 10325). Both are partly offset by capped calls, which the record sizes at $340M (claim 3986) in one place and $295.7M (claim 18738) in another.
The mix looks like a deliberate plan rather than patchwork. Unsecured high-yield notes, asset-level delayed-draw facilities and convertibles each serve a separate purpose. The DDTL 4.0 facility carries A3 ratings (claim 11219), which suggests contract-backed borrowing is getting cheaper. Unsecured debt has not followed: coupons went from 9.250% (claim 29433) to 9.000% (claim 26755) and then 9.750% (claim 23816). Several deals grew after launch. The $1.5B 2030 notes became $2.0B (claims 29777, 29433), and the $1.5B 2031 notes became $1.75B (claims 26758, 26755). That shows strong investor demand, but it also means the company took on more debt than it first planned.
The record supports some stated uses of proceeds better than others. Repayment of the $1B 2024 term loan is recorded (claim 29779), as is a $450M revolver paydown (claim 29778). However, the same $450M revolver repayment appears again in the July offering (claim 26759), which suggests the revolver is being drawn and repaid in cycles. The record does not show where the remaining note proceeds were actually spent.
The most important items to watch are the covenant changes. Debt service coverage testing was postponed (claim 3912), contract realization ratio testing was also postponed (claim 3913), and the minimum liquidity covenant was amended (claim 3911). Readers should check when these tests resume, how the contract backlog tied to Meta's $21B commitment (claim 2124) is converted into revenue, and whether further convertible issuance moves dilution from a contingent risk to an actual one.
Capital & dilution trajectory
2026-10-15The record shows a balance sheet built mainly with debt. Equity dilution is real but secondary. After the $40 IPO (claim 11616), which raised net proceeds of about $1.4B (claim 4967), nearly every subsequent financing was secured or unsecured debt. Equity-linked issuance appears only twice. The first is the December 2025 convertible, sized at $2,587.5M including the option (claim 3980) and referencing roughly 30.0M conversion shares (claim 3984). The second is a proposed $3.0B 2032 convertible in April 2026 (claim 10325). Strategic equity placements make up the rest of the dilution: NVIDIA's $2B (claim 17594) and Jane Street's $1B (claim 10305). Insider transactions do not appear in the supplied record, so no read on insider selling is possible here.
The mix looks like a deliberate program, not patchwork. High-yield notes were upsized twice, from $1.5B to $2.0B at 9.25% (claims 29774, 29433) and from $1.5B to $1.75B at 9.0% (claims 26765, 26755). In parallel, the company stacked contract-backed delayed-draw facilities, culminating in the $8.5B DDTL 4.0 with A3 ratings on the HPC financing (claims 11218, 11219). Pricing has not improved on the unsecured side, however. The $2.75B 2031 notes carry 9.750% (claim 23816), above both 2025 coupons.
Use of proceeds tracks partially. The 2030 notes were directed to repaying the 2024 term loan in full (claim 29779) and $450M of revolver borrowings (claim 29778). The 2031 notes cite the same $450M revolver repayment (claim 26759). This suggests the revolver was redrawn between offerings, which requires explanation. The capped-call allocation also appears as both $340M (claim 3986) and $295.7M (claim 18738).
The item most in need of follow-up is the January 2026 postponement of debt service coverage ratio testing (claim 3912). Alongside it sit an amended minimum liquidity covenant (claim 3911) and a contract realization ratio deferral (claim 3913), both not yet verifiable. Readers should watch for when that testing resumes and whether it is deferred again. They should also track the pace of DDTL draws against the $8.8–8.9B of projected secured debt (claims 26760, 29783), further drift in unsecured coupons, and how the 2030–2032 maturities stack up. The supplied record is truncated after claim 9315, so later events are not reflected here.
Capital & dilution trajectory
2026-10-15CoreWeave's record describes a company financing itself primarily through debt, with equity serving as a smaller supplement. The $1.5B IPO, per claim #19821, which netted $1.4B per claim #4967, is modest beside the more than $25B in total capital raised over 18 months cited in claim #26689 and the $28B in commitments over 12 months cited in claim #11221. Direct dilution has come in discrete, strategic tranches rather than a steady drip: NVIDIA's $2B, per claim #17594, and Jane Street's $1B, per claim #10305. The more consequential dilution channel is contingent. The December convertible, sized at $2.25B per claim #18733 and $2.5875B including the option per claim #3980, was followed by a proposed $3.0B convertible due 2032, per claim #10325, alongside an earlier-reported $2.6B figure in claim #11765. The record does not reconcile those two sizes, and that requires explanation. Capped calls, at $295.7M per claim #18738 or $340M per claim #3986, show an attempt to manage conversion dilution, though the two figures differ.
The mix looks coherent rather than improvised. Unsecured notes fund corporate needs and repay revolver balances, delayed-draw term loans fund contract-specific capex, and convertibles and strategic equity fill in between. Upsizing has been routine. The 2030 notes moved from $1.5B, per claim #29777, to $2.0B, per claim #29433, and the 2031 notes from $1.5B, per claim #26758, to $1.75B, per claim #26755. Pricing has not improved with scale. Coupons ran 9.250%, per claim #29433, then 9.000%, per claim #26755, then 9.750%, per claim #23816. The investment-grade rating on the DDTL 4.0 structure, per claim #11219, suggests the secured layer is where cost relief is being pursued.
Stated uses of proceeds broadly track deployment. The $1B 2024 term loan repayment, per claim #29779, and the $450M revolver paydowns, per claims #29778 and #26759, match their announced purposes. The record contains no disclosed insider sales to assess.
The items to watch are the covenant changes. Debt service coverage testing was postponed, per claim #3912. Contract realization testing was also postponed and the minimum liquidity covenant amended, per claims #3913 and #3911, though both remain unverified. When these tests resume, they will show whether the anchor contracts convert to cash on schedule: OpenAI's $6.5B, per claim #4297, and Meta's $21B, per claim #2124. Readers should also watch whether the $8.9B of projected secured debt, per claim #29783, stays near that level.
Capital & dilution trajectory
2026-10-15CoreWeave's record describes a company that has financed itself mostly through debt rather than through dilution. The equity base was set by the $1.5B IPO at $40 (claims 19821, 11601), which netted roughly $1.4B (claim 4967) plus a $68M over-allotment (claim 29782). After that, new shares came only through negotiated placements: the $2B NVIDIA purchase (claim 17594) and the $1B Jane Street investment (claim 10305). Dilution so far is episodic and tied to strategic counterparties, not to a steady market program. No ATM program and no insider sales appear in the record provided. The record also cuts off after claim 9315, so later events may be missing.
The debt layering is coherent in structure but rising in cost. Delayed-draw facilities fund specific customer contracts, growing from $2.6B (claim 26685) to $3.0B (claim 4277) to the $8.5B DDTL 4.0 (claim 11218), which carries A3/A(low) ratings on the HPC financing (claim 11219). Unsecured notes sit above that layer, and their coupons have moved upward: 9.000% on the 2031s (claim 26755), 9.250% on the 2030s (claim 29433), and 9.750% on a later 2031 tranche (claim 23816). Convertibles were added starting December 2025 at $2,587.5M including the option (claim 3980). Upsizing is routine: the 2030 notes went from $1.5B to $2.0B (claims 29774, 29433), and the 2031 notes rose by $250M (claim 4698).
Stated use of proceeds mostly tracks what was reported. The term loan was repaid in full (claim 29779). However, the same $450M revolver repayment appears for both the May and July note offerings (claims 29778, 26759), and it is unclear whether these are separate draws. The April 2026 records also require reconciliation. The convertible appears as $3.0B (claim 10325) and as $2.6B (claim 10327). The senior notes appear as $1.25B, $1B, and $2.75B (claims 2125, 2056, 23816).
The item most in need of explanation is the January 2026 covenant package. It amended the minimum-liquidity covenant (claim 3911) and postponed both the debt-service-coverage and contract-realization ratio tests (claims 3912, 3913). This came one month before the DDTL 4.0 closed and while backlog was growing, including the $21B Meta commitment (claim 2124).
A careful reader should track four things next: when the postponed covenant tests resume, how much of DDTL 4.0 is drawn beyond its $7.5B initial capacity (claim 11220), whether coupons on new notes keep rising, and how much potential share issuance is embedded in the two convertible series. Cumulative raises reported at $17.2B (claim 4968), then over $25B (claim 26689), then $28B (claim 11221) show the pace of capital intake continuing to accelerate.
Capital & dilution trajectory
2026-10-15CoreWeave's record describes a company that has financed itself mostly through debt. Common-equity dilution has been modest relative to the total capital raised, and the more consequential dilution risk sits in the convertible layer. After the $1.5B IPO (claim #19821) and the $68M over-allotment (claim #29782), new common equity came mainly from strategic holders: a $350M customer issuance (claim #4514), NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). Meanwhile, management describes more than $25B raised in 18 months (claim #26689) and $28B in commitments over the past 12 months (claim #11221). The pace of financing has quickened rather than slowed.
The mix looks deliberate, not reactive. Asset-level delayed-draw facilities fund contracted GPU deployments, scaling from $2.6B (claim #26685) to $8.5B (claim #11218), with the last carrying A3/A(low) ratings (claim #11219). Unsecured high-yield notes and convertibles sit above that layer. The cost of that upper layer requires attention. Coupons ran from 9.000% (claim #26717) to 9.250% (claim #29421) to 9.750% (claim #23816). Convertibles then followed: $2.25B in December (claim #18733) and a proposed $3.0B due 2032 (claim #10325). Moving from straight debt to convertibles can be read as an effort to contain cash interest, at the cost of future share count. The capped call (claim #3986) is meant to soften that.
Where use of proceeds can be traced, it broadly matches what was announced. The notes were described as repaying the revolver (claim #29778), and the 2024 term loan was reported repaid in full (claim #29779). This is refinancing rather than new capacity, which readers should weigh when adding up headline totals. Three items require explanation. The record shows DSCR testing postponed (claim #3912) and a minimum-liquidity amendment that is not yet verifiable (claim #3911). A $270M termination fee payable to CoreWeave (claim #4739) has no recorded follow-through. No insider transactions appear on the record, so no conclusion can be drawn there.
The record itself is uneven. Figures are mixed between millions and full dollars, and the convertible sizing is reported inconsistently: net proceeds appear as $2.21B (claim #18737) and as $2.54B (claim #3981), probably before and after the option exercise.
Readers should watch for four things: when deferred covenant testing resumes, how far draws on DDTL 4.0 track the Meta (claim #2124) and OpenAI (claim #4297) commitments, whether the next unsecured coupon prices above 9.750%, and how much convertible share count is outstanding against the capped-call strikes.
Capital & dilution trajectory
2026-10-15CoreWeave's record describes a company that has financed itself mostly through debt, with equity arriving in a few large, discrete events. After the $1.5B IPO (claim #19821, net $1.4B per claim #4967), every subsequent quarter added at least one debt instrument. These include the $2.0B 9.250% notes due 2030 (claim #29421), the $1.75B 9.000% notes due 2031 (claim #26717), the $2.6B DDTL 3.0 (claim #26685), the upsized convertible of up to $2.5875B (claim #3980), the $8.5B DDTL 4.0 (claim #11218), the $2.75B 9.750% notes (claim #23816), and a further $1B of notes (claim #2056). Direct share dilution has been modest by comparison and has come from strategic holders rather than the open market: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). The convertibles, however, carry deferred dilution, which the company has partly hedged with capped calls ($295.7M of proceeds allocated per claim #18738).
The mix looks deliberate rather than improvised. Asset-level delayed-draw facilities fund contracted GPU deployments, and the stated basis for DDTL 4.0 is customer contract capex (claim #2138). That facility drew A3/A(low) ratings (claim #11219), which suggests contract-backed collateral is reaching cheaper capital. At the corporate level, though, unsecured coupons have not compressed: they went from 9.250% to 9.000% and then to 9.750% over roughly ten months.
On use of proceeds, the early notes went to the stated purposes, including repaying the 2024 term loan (claim #29779) and the revolver (claim #29778). A $450M revolver repayment appears again as the use of proceeds for the 2031 notes (claim #26759), after an additional $444M RCF draw (claim #29780). That sequence suggests the revolver is being cycled as a bridge, which is reasonable but worth tracking. The record contains no insider sales, so that dimension cannot be assessed here.
The items that require explanation sit in covenant terms. The record shows a postponement of debt service coverage ratio testing (claim #3912), a postponement of contract realization ratio testing (claim #3913), and a minimum liquidity amendment (claim #3911), though two of these are not yet verifiable. Looking ahead, a reader should check whether those tests resume on schedule. They should also look for a closing record for the proposed $3.0B 2032 convertible (claim #10325), since only the proposal appears so far. Two other open points are whether the May 2026 NVIDIA entry (claim #9316) is a second investment or a restatement of the January one, and whether unsecured coupons move toward the investment-grade pricing achieved at the facility level.
Capital & dilution trajectory
2026-10-14CoreWeave's record shows a company that used its listing as a credential for borrowing rather than as its main source of capital. The IPO priced at $40 (claim 11616) and raised $1.5B gross (claim 19821), about $1.4B net (claim 4967). That is small next to the company's own aggregate figures: over $25B raised in 18 months (claim 26689), $28B committed in the twelve months to March 2026 (claim 11221), and more than $20B year-to-date by May 2026 (claim 9123). Dilution has been modest in direct share issuance and concentrated in strategic placements and convertibles: NVIDIA's $2B (claim 17594), Jane Street's $1B (claim 10305), and convertible programs whose stated conversion terms reference roughly 30.0M shares (claim 3984), with a further $3.0B due 2032 proposed (claim 10325). The record contains no ATM program and no insider sales, so neither can be assessed.
The debt mix looks deliberate rather than patched together, but it has grown more expensive in some layers. Unsecured coupons moved from 9.250% (claim 29433) to 9.000% (claim 26755) and then to 9.750% on the April 2026 tranche (claim 23816). Meanwhile, the contract-backed delayed-draw facilities moved toward investment-grade treatment: the A3/A(low) ratings on DDTL 4.0 (claim 11219), and DDTL 5.0, described as the first publicly syndicated HPC infrastructure-backed financing (claim 9116, claim 9117). This is a two-track structure: cheaper secured capital tied to customer contracts, and costly unsecured paper filling the gaps. Repeated upsizing, such as the $250M increase on the 2031 notes (claim 4698), suggests investor demand has been available.
Use of proceeds is only partly traceable. The $450M revolver repayment from note proceeds (claim 26759) and the DDTL financing of contract capex and GPU servers (claim 2138) are specific. Most other use-of-proceeds claims are stated without detail, so deployment cannot be checked against intent from this record. The December 2025 convertible figures also need reconciling. The offering appears as $2.25B (claim 18733) and $2.5875B (claim 3980), and the capped call as $295.7M (claim 18738) and $340M (claim 3986), most likely before and after the purchasers' option.
The January 2026 postponement of debt-service-coverage and contract-realization testing (claim 3912, claim 3913) is the item that most needs explaining. A sophisticated reader should watch when those tests resume, how much of the $8.8B in projected secured debt (claim 26760) is actually drawn, whether unsecured coupons keep rising, and whether convertible settlement turns into real share issuance.
Capital & dilution trajectory
2026-10-14CoreWeave's record shows a company that went public mainly to unlock the debt markets. The equity raised at the March 2025 listing was modest, about $1.4B net per claim #4967. Debt then followed at a steady pace. The $2.0B 9.250% 2030 notes were upsized from $1.5B (claims #11921, #29433). The $1.75B 9.000% 2031 notes were also upsized from $1.5B (claims #26758, #26755). The delayed-draw facilities grew from $2.6B for DDTL 3.0 (claim #26685) to $8.5B for DDTL 4.0 (claim #11218), followed by $3.1B for DDTL 5.0 (claim #9116). The company's own aggregate figures accelerate over time: over $25B in 18 months (claim #26689), $28B over twelve months (claim #11221), and more than $20B year-to-date by May 2026 (claim #9123).
The financing mix reads as a coherent strategy rather than patching. Contract-backed secured facilities fund customer capex (claim #2138), and that structure earned A3/A(low) ratings at the facility level (claim #11219). Unsecured notes and convertibles serve as corporate-level filler. Equity dilution has come mostly through negotiated placements rather than an ATM; none appears on record. The placements were $2B from NVIDIA (claim #17594) and $1B from Jane Street (claim #10305).
Two threads complicate that reading. The January 2026 covenant amendments postponed debt service coverage testing (claim #3912) and contract realization testing (claim #3913), and those postponements require explanation. Unsecured pricing has also not improved: the April 2026 notes carry 9.750% (claim #23816), compared with 9.000% the prior July. Within the April notes, the $2.75B figure (claim #23816) and the $1.25B and $1B figures (claims #2125, #9697) are not reconciled in the record.
On use of proceeds, the claims are announcements, not evidence of deployment. Two items can be partly traced: the $450M revolver repayment (claim #26759) and the capped-call allocation of $295.7M (claim #18738), later cited as $340M (claim #3986). Beyond those, the record cannot confirm whether proceeds were spent as stated.
A careful reader should watch several things. The first is when, and whether, the deferred covenant tests resume. The second is the conversion overhang from the December 2025 convertible (claim #18733) and the 2032 convertible (claim #10325). The third is the 2030 refinancing window. The fourth is how heavily the collateral depends on a small number of commitments, such as OpenAI (claim #4297) and Meta (claim #2124). The record contains no insider transactions and appears truncated after May 2026, so conclusions about insider behavior or later events are not supported.
Capital & dilution trajectory
2026-10-14CoreWeave's record describes a company that went public with a modest equity raise and has since financed itself mainly through debt. The IPO priced at $40 (claim #11616) and raised $1.5B gross (claim #19821), or about $1.4B net (claim #4967). After that, common equity appears only as two strategic placements: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). Direct dilution has therefore been episodic and tied to counterparties rather than spread through the market, and no at-the-market program or insider sales appear in this record. The dilution question shifts to the convertibles. The December 2025 offering is cited as $2.25B (claim #18733) and also as $2,587.5M (claim #3980), with net proceeds of $2,210.6M (claim #18737) and $2,542.2M (claim #3981). The difference likely reflects the purchasers' option, but it requires reconciliation. A further $3.0B convertible due 2032 was proposed (claim #10325) with a $450M option (claim #10326). Capped calls of $295.7M (claim #18738) limit, but do not remove, eventual share issuance.
The mix looks more structured than opportunistic. Unsecured notes were upsized twice, from $1.5B to $2.0B (claims #11921, #29433) and from $1.5B to $1.75B (claims #26758, #26755). Asset-backed delayed-draw facilities grew from $2.6B at SOFR+4% (claims #26685, #26686) to an $8.5B facility rated A3 (claims #11218, #11219) and then a publicly syndicated $3.1B tranche (claims #9116, #9117). Against that, unsecured coupons have not compressed. They moved from 9.25% to 9.0% and then to 9.750% on the $2.75B 2031 notes (claim #23816). In January 2026 the company also postponed debt-service-coverage and contract-realization testing and amended a minimum liquidity covenant (claims #3911–#3913). None of these changes is explained in the record.
The record states the purposes of the borrowing but not how the money was spent. The delayed-draw facilities are tied to customer-contract capex and GPU servers (claim #2138). However, part of the July 2025 notes went to repaying $450M of revolver borrowings (claim #26759), so some new debt refinanced existing debt rather than funding new capacity. Large customer commitments, from OpenAI at $6.5B (claim #4297) and Meta at $21B (claim #2124), are the stated collateral logic, but the record contains no draw-down or capex reconciliation against them.
A careful reader should watch four things: whether the postponed covenant tests resume on schedule, whether unsecured coupons start to fall toward the investment-grade facility pricing, how the conversion terms in claim #3984 translate into share count, and whether disclosed contract revenue keeps pace with roughly $28B of financing in twelve months (claim #11221). This record ends mid-entry on the DDTL 5.0 claims, so later events are not reflected here.
Capital & dilution trajectory
2026-10-14CoreWeave's record describes a company that financed itself overwhelmingly with debt after a modest equity debut. The IPO raised $1.5 billion (claim #19821). Debt facilities followed at an accelerating pace, and management's own cumulative tallies climbed from over $25 billion in 18 months (claim #26689) to $28 billion in commitments over 12 months (claim #11221) and more than $20 billion year-to-date by May 2026 (claim #9123). Direct dilution came mainly through negotiated placements rather than market issuance: the $2 billion NVIDIA investment (claim #17594), the $1 billion Jane Street investment (claim #10305), and a $350 million strategic customer issuance (claim #4514). Potential dilution is building in the convertibles, the $2.25 billion December 2025 offering (claim #18733) and the proposed $3.0 billion 2032 notes (claim #10325). The record shows no ATM program and no insider sales, so neither can be assessed here.
The mix reads as a deliberate two-track structure rather than patching. Contract-backed delayed-draw facilities fund customer-specific capex; the $8.5 billion DDTL 4.0 carries A3/A(low) ratings (claim #11219) and is described as financing customer contract capital expenditures and GPU servers (claim #2138). Unsecured notes and converts sit at the corporate level. The unsecured layer has stayed expensive, however. Coupons moved from 9.250% (claim #29433) to 9.000% (claim #26755) and then 9.750% on the 2031 notes (claim #23816), so the investment-grade progress at the facility level has not yet reached the parent's cost of capital.
The record does not allow a meaningful test of whether stated use of proceeds tracked actual deployment. Use-of-proceeds claims appear repeatedly (claims #29436, #26757, #18743), but the only quantified allocations are a $450 million revolver repayment (claim #26759) and capped-call costs. Those capped-call costs require reconciliation: $295.7 million (claim #18738) against $340 million (claim #3986), alongside net proceeds of $2.21 billion (claim #18737) versus $2.54 billion (claim #3981), most plausibly reflecting pre- and post-upsize figures.
A sophisticated reader should watch three things. The first is the January 2026 postponement of debt-service-coverage and contract-realization testing (claims #3912, #3913), and whether that testing resumes on schedule under the newer facilities that carry the same covenant (claims #2141, #1324). The second is whether the projected $8.8 billion of additional secured debt (claim #26760) keeps pace with commitments such as Meta's $21 billion (claim #2124). The third is conversion economics on the 2032 notes. The record ends mid-entry on DDTL 5.0's use of proceeds, so that facility's purpose remains undisclosed here.
Capital & dilution trajectory
2026-10-13CoreWeave's financing record since its March 2025 listing describes a company that used equity sparingly and debt continuously. The IPO itself was modest relative to what followed, roughly $1.4B net per claim #4967. Corporate-level dilution after that came mainly from strategic placements, NVIDIA's $2B per claim #17594 and Jane Street's $1B per claim #10305, rather than from marketed follow-ons. The heavier dilution is latent: the $2.5875B convertible per claim #3980 and the proposed $3.0B convertible due 2032 per claim #10325 carry conversion exposure. The capped calls, funded with $295.7M of proceeds per claim #18738, are meant to reduce it.
The mix reads as a deliberate two-tier structure rather than patching. Contract-backed delayed-draw facilities fund GPU capex at the asset level, with proceeds tied to customer contracts per claim #2138. The program scaled from DDTL 3.0 at $2.6B per claim #26685 to DDTL 4.0 at $8.5B with A3/A(low) ratings per claim #11219. High-coupon unsecured notes and low-coupon converts sit above them at the corporate level. Coupons have not compressed with scale, however. They ran from 9.250% per claim #4824 to 9.000% per claim #26755 and then 9.750% per claim #23816, which requires explanation alongside the company's description of its growing scale. DDTL 5.0 was rated Ba2/BB+ per claim #8732, a step below its predecessor's investment-grade designation. The record does not show why.
Deployment can only be partly checked against stated uses. Part of the 2031 notes was earmarked to repay $450M of revolver borrowings per claim #26759, which means some new debt is refinancing prior debt. The January 2026 postponement of debt-service-coverage and contract-realization testing, per claims #3912 and #3913, indicates some facilities were not ramping on their original schedule. The record does not show actual drawdowns against any facility, so stated use cannot be fully reconciled with realized spending.
Several figures overlap without clear reconciliation. Convertible amounts appear as $2B, $2.25B and $2.5875B (claims #18739, #18733, #3980), and as both $2.6B and $3.0B (claims #10327, #2126). The aggregate capital-raised statements in claims #26689, #11221 and #9123 cover overlapping windows. The record contains no insider transactions, and the claim list ends at claim #8729, so it may be incomplete.
A sophisticated reader should watch for four things. The first is whether the deferred covenant tests resume on schedule. The second is the gap between roughly three-year underlying customer contracts per claim #8731 and loan maturity of about 5.5 years per claim #9120, which places weight on re-contracting. The third is whether unsecured coupons begin to decline. The fourth is how the share price trades relative to the convertibles' conversion terms.
Capital & dilution trajectory
2026-10-13The dominant feature of CoreWeave's record is that debt, not common equity, carried the build-out after the IPO. The listing itself was modest relative to what followed: roughly $1.5 billion gross at $40 (claim #19821, #11601), and about $1.4 billion net (claim #4967). Direct equity dilution has since come mainly from strategic placements, namely NVIDIA's $2 billion Class A purchase (claim #17594) and Jane Street's $1 billion (claim #10305). Those were negotiated with known counterparties rather than taken through open-market issuance, which mutes the immediate dilution optics. The more meaningful dilution vector is the convertibles: the December 2025 issue upsized to $2.59 billion (claim #3980) and the proposed $3.0 billion 2032 issue with a $450 million option (claim #10325, #10326). Both were paired with capped calls intended to soften conversion. The two capped-call figures on record, $295.7 million (claim #18738) and $340 million (claim #3986), differ and require explanation.
The mix reads as a deliberate two-track design rather than patching. Asset-level delayed-draw facilities are matched to customer contracts (claim #2138). DDTL 4.0 reached A3/A(low) ratings (claim #11219), while DDTL 5.0 was rated Ba2/BB+ (claim #8732). Corporate unsecured notes fund the remainder. The cost of that corporate layer has not improved: coupons of 9.25% (claim #4824), 9.0% (claim #26755) and then 9.750% (claim #23816). Repeated upsizing, from $1.5 billion to $2.0 billion (claim #11921, #11917) and from $1.5 billion to $1.75 billion (claim #26765, #26755), indicates demand was available at those prices, not that pricing tightened.
Stated uses of proceeds are partly traceable. Revolver repayment of $450 million is specified (claim #26759), and convertible proceeds partly fund capped calls (claim #18743). The record does not show actual deployment against the cumulative totals, which escalate from $17.2 billion (claim #4968) to over $25 billion (claim #26689) to $28 billion over twelve months (claim #11221).
A careful reader should watch three items. First, the postponed debt-service-coverage and contract-realization tests and the amended minimum-liquidity covenant (claim #3912, #3913, #3911). Second, whether customer contracts averaging about three years (claim #8731) can support loans of roughly 5.5 years (claim #9120). Third, the Series C put repurchase obligation (claim #4276). No insider transactions appear in the record, and the excerpt ends mid-entry, so conclusions on insider behavior are not possible.
Capital & dilution trajectory
2026-10-13CoreWeave's record shows a capital structure built mostly from debt, with dilution so far modest in direct terms and largely deferred. Direct equity issuance is limited to the IPO, with net proceeds of $1.4B per claim #4967, the $350M strategic customer issuance per claim #4514, NVIDIA's $2B investment per claim #17594, and Jane Street's $1B per claim #10305. The larger potential dilution sits in two convertible issues: the December 2025 offering, cited at $2.25B per claim #18733 and later at $2.5875B per claim #3980, and the proposed $3.0B 2032 convertible with a $450M option per claims #10325 and #10326. The capped calls, with $295.7M of proceeds allocated per claim #18738, suggest the company is trying to soften conversion dilution rather than ignore it. The mix reads as a coherent strategy, not patching. Asset-level delayed-draw facilities fund contract capex, as with the stated purpose of DDTL 4.0 per claim #2138 and DDTL 5.0 per claim #1320. Corporate unsecured notes and converts sit above them. The trajectory of terms requires explanation, however. Unsecured coupons moved from 9.000% on the 2031 notes per claim #26755 to 9.750% on a later 2031 issue per claim #23816. Meanwhile DDTL 4.0 achieved A3/A(low) ratings per claim #11219, while DDTL 5.0 was rated Ba2/BB+ per claim #8732. On use of proceeds, the July 2025 notes were tied to a $450M revolver repayment per claim #26759, yet the revolver was later expanded to $2.5B per claim #11766. That pattern points to cyclical terming-out of short-term borrowing more than deleveraging. The January 2026 postponement of debt service coverage and contract realization ratio testing per claims #3912 and #3913, alongside a minimum liquidity amendment per claim #3911, has not been revisited in subsequent claims on record. A sophisticated reader should watch whether those deferred covenant tests resume on schedule. They should also track the gap between underlying customer contracts averaging roughly three years per claim #8731 and loan maturities near 5.5 years per claim #9120, which implies dependence on renewals. A third item is whether aggregate raising, above $20B year-to-date per claim #9123, continues to outpace disclosed deployment. No insider transactions appear in this record, and the claims list ends mid-August 2026, so conclusions about insider behavior or recent activity cannot be drawn.
Capital & dilution trajectory
2026-10-12The record describes a company that has financed itself mostly through debt, with equity serving as a smaller secondary channel. After the $1.5B IPO at $40 (claim #19821), with net proceeds of about $1.4B (claim #4967), nearly every subsequent event is a secured term loan or a high-coupon note. The coupons are rising rather than compressing. They run from 9.000% on the 2031 notes (claim #26755) to 9.25% on the 2030 notes (claim #4824) to 9.750% on a later 2031 tranche (claim #23816), and the most recent DDTL 5.5 is priced at SOFR plus 5.50% (claim #8733). Direct dilution has come from strategic placements, namely NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). These placements are notable in size but small against stated cumulative raises above $30B year-to-date (claim #8735). The larger latent dilution sits in two convertible programs, the December 2025 notes (claim #18733) and the proposed $3.0B 2032 notes (claim #10325). The first was partly offset by capped calls costing $295.7M (claim #18738). The record does not show whether the second carried a similar hedge. The mix reads as a coherent template rather than patching. Contract-backed delayed-draw facilities (DDTL 3.0 through 5.5) fund GPU capex against named customer commitments (claim #2138), and the corporate-level notes and converts fill the gaps. The investment-grade A3 rating on DDTL 4.0 (claim #11219) suggests the asset-level structure is gaining acceptance with lenders. One pattern requires explanation. In January 2026, debt service coverage ratio testing was postponed (claim #3912), and contract realization ratio testing and the minimum liquidity covenant were also reportedly revised (claims #3913, #3911, not yet verifiable). Some stated uses are traceable, such as the $450M revolver repayment (claim #26759) and the capped call funding (claim #18743). Actual capex deployment against the facilities is not disclosed in this record, so tracking cannot be confirmed. Convertible sizing is reported inconsistently across claims #18733, #18739 and #3980, and the record is truncated after August 2026. It also contains no insider transactions, so no conclusions about insider behavior are possible. Readers should watch four things: whether the postponed covenant tests resume on schedule, the draw deadlines on DDTL 5.0 (claim #1321), whether coupons on new issuance keep rising, and the conversion price of the 2032 notes relative to the trading price.
Capital & dilution trajectory
2026-10-12CoreWeave's record is primarily a debt-financing story, with equity used sparingly. After the $1.5B IPO (claim #19821), which netted $1.4B (claim #4967), the company drew on nearly every debt channel within about eighteen months. These included the $2B 9.250% notes due 2030 (claim #11917), the upsized $1.75B 9.000% notes due 2031 (claims #4698, #26717), and successive delayed-draw facilities up to the $8.5B DDTL 4.0 (claim #11218) and $3.1B DDTL 5.0 (claim #9116). By August 2026 management described more than $30B raised year-to-date (claim #8735). Direct common dilution is modest relative to that scale. It consists of a $350M strategic share issuance (claim #4514), NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). Prospective dilution sits mainly in two convertibles: the December 2025 offering of up to $2.5875B (claim #3980) and the April 2026 $3.0B due 2032 with a $450M option (claims #10325, #10326). Both were partly offset by capped calls (claim #18738). The record contains no insider sales, so that dimension cannot be assessed.
The mix reads as a coherent architecture. Contract-backed delayed-draw loans finance GPU capacity tied to specific customers (claims #2138, #1320), while unsecured notes and converts fund the corporate layer. The pricing trajectory requires explanation. Unsecured coupons moved from 9.000% (claim #26755) to 9.750% (claim #23816). Delayed-draw spreads widened from SOFR+4% on DDTL 3.0 (claim #26686) to SOFR+5.50% on DDTL 5.5 (claim #8733), even as DDTL 4.0 earned A3/A(low) ratings (claim #11219). January 2026 also brought postponed testing of the debt service coverage and contract realization ratios and an amended minimum liquidity covenant (claims #3912, #3913, #3911). These are revised terms, not breaches, but they are not discussed further in the record.
Stated uses of proceeds are specific in places. Examples include the $450M revolver repayment (claim #26759) and the capped call allocations. Actual deployment of the larger facilities cannot be verified from this data. The July 2025 projection of $8.8B in additional secured debt (claim #26760) was later exceeded by DDTL 4.0 and 5.0 alone.
Readers should watch several things. One is whether the postponed covenant tests resume on schedule. Another is whether pricing on new notes keeps rising. A third is how drawdowns track the $21B Meta (claim #2124) and $6.5B OpenAI (claim #4297) commitments. The last is where the stock trades relative to the convertible conversion terms. The record provided ends mid-entry on DDTL 5.5, so its full terms remain unassessed.
Capital & dilution trajectory
2026-10-12CoreWeave's record describes a company that used its public listing mainly as a gateway to the debt markets. The IPO raised $1.5B gross at $40 per share (claims #19821, #11616), with net proceeds of $1.4B (claim #4967). Within about fourteen months the company reported more than $30B of debt and equity secured year-to-date (claim #8735), after earlier tallies of $25B over 18 months (claim #26689) and $28B over 12 months (claim #11221). The IPO is therefore a small share of the capital stack. Direct equity dilution has come mostly from strategic placements: NVIDIA's $2B (claim #17594), Jane Street's $1B (claim #10305), and a $350M strategic customer issuance (claim #4514). The larger potential dilution sits in two convertibles, the $2.25B December 2025 notes (claim #18733) and the proposed $3.0B notes due 2032 (claim #10325). The first was partly hedged with a $295.7M capped call (claim #18738).
The mix looks layered rather than improvised. Asset-backed delayed-draw facilities (DDTL 3.0 at $2.6B, claim #26685; DDTL 4.0 at $8.5B with A3/A(low) ratings, claims #11218 and #11219; DDTL 5.0 at $3.1B, claim #9116) fund contracted GPU buildouts. High-yield unsecured notes and converts sit at the parent level. Pricing has drifted wider, however. Unsecured coupons moved from 9.000% (claim #26755) to 9.750% (claim #23816), and DDTL 5.5 is priced at SOFR + 5.50% (claim #8733) against SOFR + 4% on DDTL 3.0 (claim #26686). The January 2026 postponement of debt-service-coverage testing (claim #3912), and a reported contract-realization testing postponement that is not yet verifiable (claim #3913), sit awkwardly beside that drift and require explanation.
The filings state use of proceeds but show little about where the money actually went. The one traceable item is the $450M revolver repayment from the 2031 notes (claim #26759), which is refinancing rather than buildout. The December convertible's net proceeds appear as both $2.21B (claim #18737) and $2.54B (claim #3981), most likely before and after the option exercise, and should be reconciled.
The record contains no insider transactions, so no reading of insider behavior is possible. The final claim in the supplied data is truncated.
Watchers should look next for three things. The first is whether the postponed covenant tests resume on schedule. The second is whether draw deadlines on the DDTL 5.0 facility (claim #1321) are met with contracted capex. The third is whether a third convertible follows, which would make equity-linked funding a recurring tool rather than an occasional one.
Capital & dilution trajectory
2026-10-11CoreWeave's record describes a company that has funded itself overwhelmingly through debt since listing. Common-equity dilution has been modest by comparison. After the IPO, which netted $1.4B per claim #4967, the only new primary equity on record is a $350M strategic customer issuance (claim #4514), NVIDIA's $2B Class A purchase (claim #17594) and Jane Street's $1B investment (claim #10305). Potential dilution sits instead in the convertible layer: the December 2025 notes at 1.75% (claims #18733, #18736) and the proposed $3.0B 2032 converts (claim #10325). The first issue was paired with capped calls costing $295.7M of proceeds (claim #18738), which suggests management is deliberately deferring and limiting share-count growth. The mix looks more like a strategy than ad hoc patching. Asset-level delayed-draw facilities have grown from $2.6B at SOFR+4% (claims #26685, #26686) to an $8.5B investment-grade-rated DDTL 4.0 (claims #11218, #11219). Unsecured notes and converts sit at the corporate level. Pricing on that unsecured layer has not improved. Coupons have moved from 9.25% (claim #25585) to 9.0% (claim #26717) to 9.75% (claim #23816), even as secured contract-backed debt achieved investment-grade ratings. On the record, the corporate credit is not refinancing more cheaply as the company scales. Stated use of proceeds tracks deployment only partially. The July 2025 notes were earmarked in part to repay $450M of revolver borrowings (claim #26759), so new debt was partly retiring old debt. Contract-specific capex is the stated purpose of the DDTL 5.0 (claim #1320), but the claims include no deployment data to confirm drawdowns against it. Two items require explanation. The first is the postponement of debt service coverage and contract realization ratio testing, along with an amended minimum liquidity covenant (claims #3912, #3913, #3911). The second is a $270M termination fee payable to CoreWeave tied to a convertible-to-equity arrangement (claim #4739), whose resolution is not discussed further. A reader should watch whether the postponed covenant tests are reinstated on schedule and whether unsecured coupons start to converge with secured pricing. Reported cumulative raises have climbed from over $25B in 18 months (claim #26689) to more than $30B year-to-date by August 2026 (claim #8735). Each time that figure is restated, it is worth checking against contracted revenue such as the $21B Meta commitment (claim #2124). Several facility sizes on record also conflict, such as the December convertible at $2.25B versus $2.5875B (claims #18733, #3980). No insider transactions appear in the record, and the claim set ends mid-entry in August 2026.
Capital & dilution trajectory
2026-10-11CoreWeave's record describes a company financing itself mainly through debt, with equity used sparingly and often strategically. After the IPO, which raised $1.5B gross and $1.4B net per claims #19821 and #4967, nearly every subsequent event is secured or unsecured borrowing. The scale and pace both increase over time. Company-stated cumulative totals rise from $17.2B (claim #4968) to over $25B across 18 months (claim #26689), and then to more than $30B in 2026 year-to-date alone (claim #8735). Direct equity dilution has been modest by comparison. The $350M strategic customer issuance (claim #4514), NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305) are placements with named counterparties rather than market offerings. Latent dilution sits in two convertibles: the December 2025 notes, with roughly 30.0M underlying shares per claim #3984, and the proposed $3.0B 2032 notes (claim #10325). Capped calls partly offset this exposure.
The mix looks more like a structured program than ad hoc patching. Successive numbered delayed-draw facilities (DDTL 3.0 at $2.6B per claim #26685, DDTL 4.0 at $8.5B per claim #11218, DDTL 5.0 at $3.1B per claim #9116) finance specific contracts, and claim #2138 states their proceeds are tied to customer capex and GPU servers. Pricing has not clearly improved, however. Unsecured coupons moved from 9.25% (claim #25585) to 9.0% (claim #26717) and then to 9.75% (claim #23816). A facility priced at SOFR+5.50% (claim #8733) compares with SOFR+4% on DDTL 3.0 (claim #26686). Both data points sit alongside the A3 rating on DDTL 4.0 (claim #11219).
On deployment, the record states use of proceeds but rarely confirms it. The one traceable item is the $450M revolver repayment (claim #26759). Capped-call cost is given as $295.7M (claim #18738) and also as $340M (claim #3986). Convertible size appears as $2.0B, $2.25B and $2.5875B across claims #18739, #18733 and #3980. These figures are probably explained by upsizing and the option exercise, but they require reconciliation. The April 2026 convertible was described as $2.6B (claim #11765) before it appeared as $3.0B (claim #2126).
The most consequential item for a careful reader is the postponement of debt service coverage and contract realization ratio testing, along with a minimum liquidity amendment (claims #3912, #3913 and #3911). Watch whether testing resumes on schedule, whether coupons on future unsecured issues ease or keep rising, and how counterparty concentration (claims #4297 and #2124) is reflected in borrowing-base terms. The record contains no insider transactions, and the claim list is truncated after claim #8731, so the most recent events cannot be assessed.
Capital & dilution trajectory
2026-10-11CoreWeave's record describes a company that has funded itself overwhelmingly through debt, with equity arriving in a few large blocks rather than a steady drip. After the IPO, sized at $1.5B gross (claim #19821) and $1.4B net (claim #4967), the next equity came from two strategic placements: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #2080). The more meaningful source of potential dilution is the convertible program. The December 2025 convertible was first described at $2B (claim #18739) and settled at $2.5875B (claim #3980). A proposed $3.0B convertible due 2032 followed in April 2026 (claim #10325), with a $450M option attached (claim #10326). The capped calls blunt some of that dilution, but their stated size moves from $295.7M (claim #18738) to $340M (claim #3986) across disclosures, and that difference requires explanation.
The mix looks structured rather than improvised. Delayed-draw term loans are tied to customer contracts and GPU servers (claim #2138), unsecured notes repay or backstop the revolver (claim #26759), and converts sit on top. Two observations complicate that picture. First, unsecured coupons have drifted upward, from 9.25% on the 2030 notes (claim #4824) to 9.000% on the first 2031 tranche (claim #26755) and 9.750% on a later 2031 issue (claim #23816). Second, the DDTL 4.0 facility carried A3/A(low) ratings (claim #11219), while DDTL 5.5 is rated Ba2/BB+ (claim #8732). Several offerings were also upsized between announcement and pricing, which points to strong demand rather than distress.
Use-of-proceeds language is consistent across filings, but the record contains no deployment data, so whether actual spending tracked those statements cannot be assessed here. The covenant amendments matter more. Debt-service-coverage testing was postponed (claim #3912), contract-realization-ratio testing was postponed (claim #3913), and the minimum liquidity covenant was amended (claim #3911). None of these has been revisited in later claims on record.
No insider transactions appear in the data, and the record ends mid-entry in August 2026. A careful reader should watch for when the postponed covenant tests resume, how the 2031 and 2032 maturity stacks are refinanced, whether the projected $8.8B of additional secured debt (claim #26760) is actually drawn, and how much conversion overhang becomes live dilution.
Capital & dilution trajectory
2026-10-10CoreWeave's record describes a company that went public mainly to gain access to the debt markets, not to raise equity. The IPO raised $1.5B at $40 (claims #19821, #11616), about $1.4B net (claim #4967). Debt followed within weeks. Direct equity dilution after the listing has come in a few large strategic blocks: the $350M strategic customer issuance (claim #4514), NVIDIA's $2B (claim #17594), and Jane Street's $1B (claim #10305). The larger dilution question sits in two convertibles. The first is the December 2025 issue of up to $2.5875B (claim #3980). The second is the $3.0B due-2032 proposal, with a $450M option (claims #2126, #10326). Capped calls blunt part of their effect, but neither has converted yet. The pace of raising has accelerated. The company cited $25B over 18 months (claim #26689), more than $20B year-to-date by May 2026 (claim #9123), and more than $30B by August (claim #8735).
The mix looks deliberate rather than patched together. Delayed-draw term loans tied to specific customer contracts finance GPU capex (claim #2138). Unsecured high-yield notes, converts, and strategic equity fund the parent. The DDTL 4.0 facility's A3/A(low) rating (claim #11219) suggests the contract-backed structure is being accepted. Pricing has not improved in step. Unsecured coupons moved from 9.250% (claim #4824) to 9.000% (claim #26755) and then to 9.750% (claim #23816). DDTL spreads widened from SOFR+4% (claim #26686) to SOFR+5.50% (claim #8733).
For stated use of proceeds, the record supports only partial verification. The 2031 notes were to repay $450M of revolver borrowings (claim #26759). For the December convertible, the capped-call allocation is given as both $340M (claim #3986) and $295.7M (claim #18738), and the gap needs explanation. The record contains no evidence of actual deployment against these stated uses. It also contains no insider transactions, so no read on insider selling is possible.
Readers should watch the covenant terms. Debt service coverage testing was postponed and the minimum liquidity covenant was amended (claims #3912, #3911), while new facilities carry the same coverage ratio tests (claims #2141, #1324). A further postponement would matter more than any single new issuance. Readers should also confirm that the deals marked not yet verifiable have closed, and track the projected $8.8B of additional secured debt (claim #26760) against the anchor customer commitments it depends on, such as Meta's $21B (claim #2124) and OpenAI's $6.5B (claim #4297).
Capital & dilution trajectory
2026-10-10CoreWeave's record is overwhelmingly a debt story with equity used selectively. After the $1.5B IPO at $40 (claims #19821, #11616), net proceeds of roughly $1.4B (claim #4967) were quickly dwarfed by borrowing. The company cites over $25B raised in 18 months (claim #26689), $28B in commitments over twelve months (claim #11221), and more than $20B year-to-date by May 2026 (claim #9123). Direct common-stock dilution came in discrete blocks: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). The larger dilution question sits in the convertibles: roughly $2.59B gross in December 2025 (claim #3980) and a proposed $3.0B due 2032 (claim #10325). The December issue was partly offset by capped calls of about $340M (claim #3986). The record contains no insider-sale entries, so that dimension cannot be assessed here.
The mix reads as a deliberate two-track structure rather than patching. Asset-level delayed-draw facilities fund contracted GPU capacity, with DDTL 4.0 at $8.5B carrying A3/A(low) ratings (claims #11218, #11219) and DDTL 5.0 at $3.1B (claim #1319). Unsecured notes and convertibles fund the corporate layer. Two features complicate that reading. Unsecured coupons have stayed high and drifted upward, from 9.25% (claim #4824) to 9.0% (claim #26755) to 9.75% (claim #23816). And in January 2026, debt-service and contract-realization ratio testing was postponed (claims #3912, #3913) alongside a minimum-liquidity amendment (claim #3911). The postponement requires explanation relative to the pace of new issuance.
The stated uses of proceeds are specific where disclosed: $450M to repay the revolver (claim #26759), $295.7M for capped calls (claim #18738), and GPU servers tied to customer contracts (claim #2138). The record contains no data on actual deployment, so whether proceeds tracked those uses cannot be verified from these claims.
A sophisticated reader should watch four things. The first is the gap between underlying customer contracts averaging about three years (claim #8731) and the DDTL 5.5 maturity of about five years (claim #8730), which carries Ba2/BB+ ratings (claim #8732) rather than investment grade. The second is whether the covenant tests resume on schedule. The third is the pricing of the next unsecured issue against the 9%-plus trend. The fourth is the share-count effect if the 2032 convertible closes with its $450M option exercised (claim #10326). Several claims repeat the same events in inconsistent units, and the record is cut off in August 2026, so later events are not reflected.
Capital & dilution trajectory
2026-10-09CoreWeave's capital history is mostly debt with relatively little equity, and the sequence is fast. The IPO priced at $40 (claim #11616) and raised $1.5B gross (claim #19821), or roughly $1.4B net (claim #4967). That is small next to what followed. The company's own running totals rise from over $25B raised in 18 months (claim #26689) to more than $30B secured in 2026 year-to-date alone (claim #8735). Direct equity dilution has come mainly through strategic placements, not public follow-ons: the NVIDIA $2B investment (claim #17594) and the Jane Street $1B investment (claim #10305). The larger potential dilution sits in two convertible issues. The first was a $2.25B offering in December 2025 (claim #18733), with $295.7M of proceeds allocated to capped calls (claim #18738). The second was a proposed $3.0B convertible due 2032 (claim #10325). The record shows the December size inconsistently, at $2.25B, $2.0B and $2.5875B (claims #18733, #18739, #3980), and this should be reconciled.
The mix looks like a deliberate layered structure, not opportunistic patching. Delayed-draw facilities secured against customer contracts sit at the asset level, culminating in the $8.5B DDTL 4.0 rated A3/A(low) (claims #11218, #11219). Unsecured notes and convertibles sit at the corporate level. Two features of that structure need explaining. First, unsecured coupons have not come down as scale increased. They ran from 9.25% on the 2030 notes (claim #4824) to 9.000% on the first 2031 notes (claim #26755) to 9.750% on the April 2026 issue (claim #23816). Second, the January 2026 amendments postponed debt service coverage ratio testing (claim #3912). Related changes to the minimum liquidity covenant and the contract realization ratio are not yet verifiable (claims #3911, #3913).
The data does not allow a clean test of whether use of proceeds tracks actual deployment. Most use-of-proceeds claims are general. The one specific item is the $450M revolver repayment from the 2031 notes (claim #26759), and no claim on record confirms that it was carried out.
The record also contains no insider transactions, so no view on insider selling is possible. It ends mid-entry in August 2026, so the most recent activity is incomplete.
A careful reader should watch four things. The first is when deferred covenant testing resumes. The second is the gap between the roughly five-year DDTL 5.5 maturity (claim #8730) and underlying customer contracts that average about three years (claim #8731). The third is whether conversion pressure builds on the 2025 and 2032 convertibles. The fourth is whether the company's next unsecured pricing comes in above or below the 9.750% mark.
Capital & dilution trajectory
2026-10-09CoreWeave's record describes a company financing itself mainly through debt, with equity in a secondary role. Ordinary-share dilution after the IPO (net proceeds of $1.4B per claim #4967) comes from strategic placements rather than broad follow-ons: a $350M strategic customer issuance (claim #4514), NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). The heavier potential dilution sits in the convertibles: the December 2025 deal, reported at $2.0B (claim #18739), $2.25B (claim #18733) and $2.5875B including the option (claim #3980), followed by a proposed $3.0B 2032 issue with a $450M option (claims #10325, #10326). The roughly $2.6B figure in claims #11765 and #10327 does not cleanly reconcile with either and requires explanation. Capped calls are described as both $295.7M (claim #18738) and $340M (claim #3986), which likely reflects pre- and post-option sizing.
The mix is coherent rather than patched together. It forms a repeated ladder of delayed-draw term loans: $2.6B (claim #26685), $3.0B (claim #4277), $8.5B (claim #11218), $3.1B (claim #9116) and DDTL 5.5 (claim #8730). Unsecured notes, an expanded revolver (claim #11766) and convertibles sit alongside these loans. The cost of capital has not visibly declined. Coupons run from 9.25% (claim #4824) to 9.0% (claim #26755) to 9.75% (claim #23816). Ratings have also fallen, from A3/A(low) on DDTL 4.0 (claim #11219) to Ba2/BB+ on DDTL 5.5 (claim #8732).
On use of proceeds, the record shows stated intentions, such as repaying the revolver with $450M of 2031 note proceeds (claim #26759) and funding contract capex and GPU servers (claim #2138), but it does not show actual deployment. Tracking therefore cannot be assessed. The repayment of revolver draws with term notes is itself a form of liability recycling worth noting.
A sophisticated reader should watch the covenant postponements on debt service coverage and contract realization (claims #3912, #3913) and the minimum liquidity amendment (claim #3911) to see whether they recur. The DDTL 5.5 facility's roughly five-year tenor against underlying contracts averaging about three years (claims #8730, #8731) also requires explanation of refinancing or renewal assumptions. Cumulative raise figures rose quickly, from $17.2B (claim #4968) to more than $30B (claim #8735). The record contains no insider transactions, so no conclusion can be drawn on that dimension.
Capital & dilution trajectory
2026-10-09The disclosed record is overwhelmingly a debt story, and direct equity dilution has been modest and episodic. Common equity came through the IPO, about $1.5B gross (claim 19821) and roughly $1.4B net (claim 4967), followed by a $350M strategic customer issuance (claim 4514), NVIDIA's $2B Class A investment (claim 3891) and Jane Street's $1B (claim 10305). The more consequential dilution channel is the convertibles. These are the December 2025 notes, upsized to about $2.59B (claim 3980) and carrying conversion terms tied to roughly 30.0M shares (claim 3984), and the proposed $3.0B 2032 tranche (claim 10325). The record shows no closing for that tranche, and its relationship to the $2.6B figure in claims 11765 and 10327 requires explanation. No insider transactions appear in the record, so that dimension cannot be assessed. The mix reads as a coherent strategy rather than patching. Delayed-draw term loans fund specific contract capex: DDTL 3.0 at $2.6B (claim 26685), DDTL 4.0 at $8.5B with A3/A(low) ratings (claims 11218, 11219), and DDTL 5.0 at $3.1B (claim 9116). Unsecured notes and convertibles fill corporate needs around them. Several deals were upsized, including the 2030 notes from $1.5B to $2B (claims 11921, 11917) and the 2031 notes from $1.5B to $1.75B (claims 26765, 26755), which indicates demand rather than strain. However, unsecured coupons have not compressed. They moved from 9.25% (claim 4824) to 9.0% (claim 26755) and then 9.75% (claim 23816). The investment-grade pricing has been confined to the asset-backed layer. Stated use of proceeds is partly traceable. The 2031 notes earmarked $450M for revolver repayment (claim 26759), and the convertible allocated $295.7M to capped calls (claim 18738), rising to $340M after upsizing (claim 3986). Deployment of DDTL draws against the OpenAI and Meta commitments (claims 4297, 2124) is not documented in the record. Cumulative raise figures escalate quickly: $17.2B (claim 4968), over $25B in 18 months (claim 26689), $28B in twelve months (claim 11221) and over $20B year-to-date in 2026 (claim 9123). A careful reader should watch the January 2026 covenant amendments, which postponed debt-service-coverage and contract-realization testing and revised minimum liquidity (claims 3911, 3912, 3913). They should also watch whether the 2032 convertible closed, and whether unsecured coupons follow the secured layer down. The record ends mid-entry on the DDTL 5.5 facility (claim 8733), so the most recent terms remain incomplete.
Capital & dilution trajectory
2026-10-09CoreWeave's record is overwhelmingly a debt story, and the equity side is comparatively modest. Following the IPO (the $1.5B offering per claim #19821, $1.4B net per claim #4967), new equity has come mainly through strategic placements rather than marketed follow-ons: NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305). Dilution so far has therefore been episodic and counterparty-driven. The larger latent source is the convertible layer. The December 2025 notes grew from $2.25B (claim #18733) to $2.5875B (claim #3980), and a $3.0B 2032 convertible with a $450M option was proposed in April 2026 (claim #10325). Other entries cite $2.6B for that program (claims #10327, #11765), and that discrepancy requires explanation.
The debt mix looks like a deliberate architecture rather than patching. Contract-backed delayed-draw facilities (DDTL 3.0 through 5.0) are paired with recurring unsecured notes. The cost trajectory is less settled. Unsecured coupons have moved from 9.25% (claim #4824) to 9.000% (claim #26755) and then to 9.750% (claim #23816). DDTL spreads widened from SOFR+4% (claim #26686) to SOFR+5.50% (claim #8733), even though DDTL 4.0 carried A3/A(low) ratings (claim #11219). The January 2026 postponement of debt-service-coverage testing (claim #3912), alongside a minimum-liquidity amendment that is not yet verifiable (claim #3911), sits awkwardly beside the scale of new issuance and is not explained in the record.
Use-of-proceeds disclosure is mostly generic. One specific allocation, repaying $450M of revolver borrowings from the 2031 notes (claim #26759), has no matching deployment claim. Capped-call funding was stated as $295.7M (claim #18738) and later as $340M (claim #3986), consistent with the upsize. Beyond that, the record does not let a reader trace actual deployment against stated intent. Insider transaction data is absent from the claims provided, so no read on insider selling is possible here.
A sophisticated reader should watch several items. The first is whether the deferred coverage tests resume on schedule. The second is whether coupons and spreads continue to drift upward. The third is the gap between underlying customer contracts averaging roughly three years (claim #8731) and loan tenors near 5.5 years (claim #9120). The last is the cumulative convertible overhang as share prices approach conversion terms. Aggregate-raise figures ($25B over 18 months per claim #26689, $28B over 12 months per claim #11221) overlap and should not be summed. Some claims also appear in mixed units, and the record provided is truncated at claim #8729.
Capital & dilution trajectory
2026-10-09CoreWeave's record since its March 2025 listing is overwhelmingly a debt story. Equity dilution has been modest and episodic: the $1.5B IPO (claim 19821, net $1.4B per claim 4967) was followed by strategic placements rather than marketed follow-ons, namely NVIDIA's $2B (claim 3891) and Jane Street's $1B (claim 10305). The convertibles carry the main latent dilution. The December 2025 notes were sized variously at $2B, $2.25B and $2.5875B across claims 18739, 18733 and 3980, which is most plausibly the upsize plus option. They were followed in April 2026 by a proposed $3.0B convertible due 2032 (claim 10325). Capped calls of $295.7M to $340M (claims 18738, 3986) suggest the company is deliberately managing that overhang.
The mix reads as a coherent architecture rather than patching. Asset-level delayed-draw facilities are tied to customer contracts (claim 2138), and they progressed from DDTL 3.0 at SOFR+4% (claim 26686) to an investment-grade-rated $8.5B DDTL 4.0 (claims 11218, 11219) and a publicly syndicated $3.1B DDTL 5.0 (claim 9117). Unsecured high-yield notes and converts sit above that layer. Two features complicate the picture. Coupons have not compressed: 9.25% (claim 25585), then 9.0% (claim 26755), then 9.75% (claim 23816). The August 2026 facility priced at SOFR+5.50% with Ba2/BB+ ratings (claims 8733, 8732), wider than DDTL 3.0. Separately, the January 2026 postponement of debt-service-coverage and contract-realization ratio testing, and the amendment to the minimum liquidity covenant (claims 3912, 3913, 3911), require explanation alongside the pace of new issuance.
Use of proceeds is only partially traceable. The 2031 notes were earmarked partly to repay $450M of revolver borrowings (claim 26759), and convertible proceeds funded capped calls (claim 18743). Deployment of the DDTL draws against stated contract capex cannot be verified from this record. Several April 2026 figures, such as $1.25B versus $2.75B for notes due 2031 (claims 2125, 23816), are not reconciled here. No insider transactions appear in the data provided, so no read on insider behavior is possible.
A sophisticated reader should watch four things. The first is whether the deferred covenant tests resume on schedule. The second is whether investment-grade asset-level pricing extends beyond DDTL 4.0. The third is whether unsecured coupons stabilize or keep widening. The fourth is how the cumulative capital figures, $25B in 18 months (claim 26689) and more than $20B year-to-date (claim 9123), compare with recognized revenue from the large customer commitments (claims 4297, 2124).
Capital & dilution trajectory
2026-10-08CoreWeave's capital history since its March 2025 listing reads less as a sequence of discrete raises than as a continuous financing program, and its trajectory has steepened. The company cited more than $20B raised year-to-date by May 2026 (claim #9123) and more than $30B by August (claim #8735), after describing $28B in commitments over the prior twelve months (claim #11221). That figure dwarfs the IPO's $1.4B in net proceeds (claim #4967). Direct equity dilution has come mainly through strategic placements rather than open-market issuance: NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305). Latent dilution sits in two convertible tranches, the December 2025 notes (claim #18733) and the $3.0B notes due 2032 (claim #10325). The December convertible is recorded at $2.0B, $2.25B and roughly $2.59B across claims #18739, #18733 and #3980, and its capped call at $295.7M and $340M (claims #18738, #3986). Upsizing and option exercise likely explain this, but it requires reconciliation.
The mix shows a coherent architecture. Asset-backed delayed-draw facilities fund contracted GPU capacity (claim #2138), unsecured high-yield notes and convertibles supply corporate liquidity, and strategic equity anchors the balance sheet. Within that structure, the terms have moved unevenly. Senior note coupons rose from 9% (claim #4697) to 9.25% (claim #11917) to 9.75% (claim #23816). After the investment-grade A3 rating on DDTL 4.0 (claim #11219), DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims #8733, #8732). In January 2026 the company postponed debt service coverage and contract realization testing and amended a minimum liquidity covenant (claims #3912, #3913, #3911). These are revised terms that merit continued attention.
The stated use of proceeds for the term loans is customer-contract capex. The record contains no deployment data that would let a reader confirm whether proceeds track that purpose, so that question remains open. No insider transactions appear in the record provided, and the dataset itself is truncated.
A careful reader should watch four things next. The first is whether Q2 interest expense of $640M (claim #7374) on $2.58B of revenue (claim #8183) compresses as facilities draw down. The second is how roughly three-year customer contracts (claim #8731) are refinanced against facilities with roughly five-year maturities (claim #8730). The third is when the postponed covenant tests resume. The fourth is whether future tranches price closer to DDTL 4.0 or DDTL 5.5.
Capital & dilution trajectory
2026-10-08CoreWeave's record since the March 2025 listing reads less as a dilution story than as a leverage story. The IPO raised $1.5B at $40 (claims #19821, #17815), with net proceeds of $1.4B (claim #4967). Nearly everything after that came as debt. The company itself frames the pace: $28B of commitments in twelve months (claim #11221), more than $20B year-to-date by May 2026 (claim #9123), and more than $30B by August (claim #8735).
The mix looks coherent. Asset-backed delayed-draw facilities are tied to customer contracts and stated to fund GPU servers and contract capex (claims #2138, #1320). Unsecured high-yield notes and converts sit alongside them, and strategic equity from NVIDIA ($2B, claim #3891) and Jane Street ($1B, claim #10305) added the only meaningful new common since the IPO.
Two threads complicate that reading. First, the cost of capital has not clearly fallen. DDTL 4.0 carried A3/A(low) ratings (claim #11219), but the later DDTL 5.5 is rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). Unsecured coupons went from 9.25% (claim #11917) to 9.750% on the 2031 notes (claim #23816). Second, in January 2026 the company postponed debt service coverage and contract realization ratio testing and amended its minimum liquidity covenant (claims #3912, #3913, #3911). Larger raises followed within weeks.
Convertible issuance is where equity dilution will build up. The December 2025 notes carried roughly 30.0M underlying shares (claim #3984), and a $3.0B 2032 convert followed with a $450M option (claims #2126, #2127). The capped-call figure for the December deal is $295.7M in one disclosure (claim #18738) and $340M in another (claim #3986). That gap requires explanation.
The record does not let us check whether stated use of proceeds tracks actual deployment, because it contains no capex or drawdown figures. No insider transactions appear in the visible portion of the record, which is truncated.
Three things are worth watching next. One is when the postponed covenant tests resume. Another is the mismatch between DDTL 5.5's roughly five-year maturity and underlying contracts averaging about three years (claims #8730, #8731). The last is whether the $104B backlog (claim #1493), including the Meta and OpenAI commitments (claims #2124, #4297), turns into revenue fast enough to cover quarterly interest expense, which already stands at $640M (claim #7341).
Capital & dilution trajectory
2026-10-08CoreWeave's record describes a company that has financed itself almost continuously since listing. Direct equity dilution has been episodic rather than steady. The IPO raised $1.5B at $40 (claims #19821, #11616). That was followed by strategic placements: NVIDIA's $2B (claim #17594) and Jane Street's $1B (claim #10305). Two convertible issues add latent dilution. The December 2025 deal grew from $2B to $2.25B to $2.5875B as it was marketed (claims #18739, #18733, #3980). A proposed $3.0B due 2032 followed, with a $450M upsize option (claims #10325, #10326). The capped calls funded from the first deal, $295.7M of net proceeds per claim #18738, suggest management is attentive to conversion dilution, though they do not eliminate it.
The mix reads less as patching than as a deliberate two-track structure. Asset-level delayed-draw facilities (DDTL 3.0 through 5.5) fund contracted GPU deployments, while corporate unsecured notes and converts fund the parent. Within that structure, terms have moved. DDTL 4.0 carried A3/A(low) ratings (claim #11219). The later $2.6B facility is rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). Senior note coupons have run between 9% and 9.75% (claims #4697, #4824, #23816). Several note offerings were upsized before pricing, for example $1.5B to $2B (claims #11921, #11917). That indicates demand, but at high cost.
On use of proceeds, the stated purposes are consistent: customer-contract capex and GPU servers (claim #2138), plus capped calls (claim #18743). The record contains no disclosure tracing actual deployment against those purposes, so the alignment cannot be confirmed from this data. The postponement of debt-service-coverage and contract-realization testing (claims #3912, #3913) requires explanation alongside any deployment narrative.
No insider transactions appear in the claims provided, and the record is truncated after the Q2 2026 results.
A careful reader should watch several things next. One is whether the postponed covenant tests resume on schedule. Another is the gap between facility maturities of roughly five years and underlying customer contracts averaging about three years (claims #8730, #8731), which raises renewal risk. A third is interest expense, reported at $640 for Q2 2026 (claim #7341; the record gives no unit), relative to operating income. The last is whether concentrated commitments, such as Meta's $21B (claim #2124) and OpenAI's $6.5B (claim #4297), continue to anchor new facilities at investment-grade terms or migrate further toward high-yield pricing.
Capital & dilution trajectory
2026-10-07CoreWeave's post-listing capital history is defined less by equity dilution than by a steady escalation of leverage. The $1.5B IPO at $40 per share (claims #19821, #11616), which netted roughly $1.4B (claim #4967), was quickly dwarfed by debt. Within about two months the company had expanded its revolver by $1.5B (claim #11923), issued $2B of 9.25% notes due 2030 (claims #11917, #4824), and arranged a $2.6B delayed-draw term loan (claim #11922). That cadence then accelerated: the company cites more than $30B of debt and equity secured year-to-date in 2026 (claim #8735), against Q2 2026 revenue of $2.58B (claim #8183) and a reported debt-to-equity ratio near 6 (claim #3058).
The mix looks coherent rather than opportunistic, built around asset-level delayed-draw facilities tied to customer contracts. The $8.5B DDTL 4.0 carried A3/A(low) ratings (claims #11218, #11219), which suggests contract-backed structures can borrow on better terms than the parent. Corporate unsecured paper tells a different story, with coupons moving from 9% (claim #4697) to 9.25% to 9.75% on the 2031 notes (claim #23816). Equity has come mostly from strategic holders, namely NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305), and from convertibles sized at $2.59B (claim #3980) and $3.0B (claim #10325), with capped calls of $340M partly offsetting the first (claim #3986). Several claims require explanation. Covenant testing on debt service coverage and contract realization was postponed and a minimum liquidity covenant amended (claims #3911–#3913). The DDTL 5.5 has a roughly five-year maturity against underlying contracts averaging about three years (claims #8730, #8731), and it priced at SOFR + 5.50% with sub-investment-grade ratings (claims #8732, #8733).
Stated uses of proceeds point to customer-contract capex and GPU servers (claim #2138), but the record contains no disclosure of actual deployment, so whether spending tracks those statements cannot be assessed here. The record also contains no insider transactions, so that dimension cannot be evaluated.
A sophisticated reader should watch four things. The first is whether the postponed covenant tests are reinstated on schedule. The second is how the gap between financing tenor and contract duration is handled at renewal. The third is whether corporate coupons keep rising. The fourth is whether the reported $104B backlog (claim #1493) converts to revenue fast enough to narrow losses that are, by the company's own account, widening (claim #1495).
Capital & dilution trajectory
2026-10-06CoreWeave's record since the March 2025 listing is overwhelmingly a debt story. Direct equity issuance is a small share of the total: the $1.5B IPO (claim #19821), a $350M strategic customer issuance (claim #4514), NVIDIA's $2B Class A purchase (claim #3891), and Jane Street's $1B investment (claim #10305). Dilution so far has come in a few large placements rather than a steady drip, and the record shows no ATM program. The larger latent dilution sits in the convertibles: the December 2025 issue, sized at $2.25B (claim #18733) or $2.59B with the option (claim #3980), references roughly 30.0M underlying shares (claim #3984), partly offset by capped calls, while a further $3.0B due 2032 was proposed in April 2026 (claim #10325).
The mix looks structured rather than improvised. Asset-backed delayed-draw term loans fund GPU capex against customer contracts (claim #2138), and the progression from DDTL 3.0 to the $8.5B investment-grade DDTL 4.0 (claims #11218, #11219) suggests an attempt to lower the cost of that layer. Two developments complicate the picture. The January 2026 amendments postponed debt service coverage and contract realization ratio testing and amended the minimum liquidity covenant (claims #3911–3913). The later DDTL 5.5 also came at Ba2/BB+ and SOFR+5.50% (claims #8732, #8733), well below DDTL 4.0's rating. Unsecured coupons drifted from 9% (claim #4697) and 9.25% (claim #4824) to 9.75% (claim #23816), which suggests rising rather than falling marginal funding costs.
Use of proceeds is stated in general terms, and the record contains no deployment data to check it against. The December convertible's net proceeds and capped-call figures differ across filings ($2.21B and $295.7M per claims #18737 and #18738, versus $2.54B and $340M per claims #3981 and #3986), presumably reflecting option exercise, but the record does not reconcile them. No insider transactions appear in the record provided.
A careful reader should watch five things. First, whether the postponed covenant tests resume on schedule. Second, how Q2 2026 interest expense of $640M (claim #7341) compares with operating income alongside a negative 25% net margin (claim #10221). Third, the gap between DDTL 5.5's roughly five-year maturity and underlying contracts averaging about three years (claims #8730, #8731). Fourth, conversion activity on the 2032 notes. Fifth, whether issuance continues at the stated pace of more than $30B year-to-date (claim #8735).
Capital & dilution trajectory
2026-10-05CoreWeave's record describes a company that used its public listing as a gateway to debt markets far more than as an equity-raising event. The IPO priced at $40 (claim #11616) and raised $1.5B gross (claim #19821), about $1.4B net (claim #4967). It was quickly dwarfed by a sequence of high-coupon unsecured notes. These include the 9.250% notes due 2030 at $2B (claim #11917), the 9% notes upsized to $1.75B (claims #4697, #4698), the 9.750% notes due 2031 at $2.75B (claim #23816), and $3.5B due 2032 (claim #8927). By August 2026 the company described more than $30B of debt and equity secured year-to-date (claim #8735).
Direct equity dilution has been comparatively measured. Beyond the IPO, the record shows a strategic customer issuance of $350M (claim #4514), NVIDIA's $2B Class A investment (claim #17594), and Jane Street's $1B (claim #10305). The heavier latent dilution sits in two convertible programs: $2.25B in December 2025 (claim #18733), partly offset by capped calls costing $295.7M (claim #18738), and a proposed $3.0B due 2032 (claim #10325). The December figures conflict across claims (#3980, #3981, #18737), likely reflecting pre- and post-option sizing; this requires reconciliation against the final indenture.
The mix reads as deliberate rather than opportunistic. Asset-level delayed-draw facilities are tied explicitly to customer-contract capex and GPU servers (claims #2138, #1320). Corporate notes and converts fund the balance sheet more broadly. The DDTL 4.0 achieved A3 ratings (claim #11219). The later DDTL 5.5, however, carries Ba2/BB+ ratings at SOFR + 5.50% (claims #8732, #8733), so not every contract pool commands the same credit quality.
Whether deployment tracks stated use cannot be verified from this record. The capex and revenue figures (claims #18918, #7340) lack consistent units, and no facility-level draw data is disclosed. The January 2026 entries require explanation: a minimum liquidity covenant amendment and postponed debt service coverage and contract realization testing (claims #3911, #3912, #3913). They indicate that original covenant schedules were revised within a year of issuance.
The record contains no insider transactions, and the Q2 2026 data is truncated. Going forward, a careful reader should watch four things. The first is quarterly interest expense, reported at $640 (claim #7341), relative to revenue. The second is whether the postponed covenant tests resume on their revised dates. The third is the final sizing of the 2032 convertible. The fourth is whether backlog of roughly $104B (claim #18917) converts to contracted cash flow on the roughly three-year average contract terms underlying recent facilities (claim #8731).
Capital & dilution trajectory
2026-10-04The record describes a company whose funding rests mainly on secured and unsecured debt, with equity added at intervals rather than the other way around. After the March 2025 IPO, which raised $1.5B gross per claim #19821 and roughly $1.4B net per claim #4967, CoreWeave issued senior notes almost every quarter. These include the 9.250% notes due 2030 (claim #4824), the 9% notes upsized to $1.75B (claims #4697, #4698), and further 2031 and 2032 tranches in 2026 (claims #23816, #8927). Alongside the notes ran a sequence of delayed-draw term loans, from DDTL 3.0 through DDTL 5.5. Direct equity dilution has come mostly from strategic placements, namely NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305). Convertibles are the main source of potential future dilution. The December 2025 convertible totaled $2.5875B including the option (claim #3980), and the April 2026 $3.0B convertible due 2032 carries a $450M option (claim #10326). Both appear to have been paired with capped calls, which moderate effective dilution at a cost of $295.7M to $340M on the first deal (claims #18738, #3986). These two capped-call figures differ, as do the expected and reported net proceeds ($2.2106B versus $2.5422B, claims #18737, #3981), and the difference is not reconciled in the record.
The mix reads as deliberate, since the company itself describes asset-backed DDTLs tied to customer contracts as its infrastructure financing approach (claims #2138, #3557). The financing terms, however, are uneven. DDTL 4.0 earned A3/A(low) investment-grade ratings (claim #11219), while DDTL 5.5 was rated Ba2/BB+ and priced at SOFR plus 5.50% (claims #8732, #8733). That later facility has a maturity of roughly five years against underlying contracts averaging about three (claims #8730, #8731), a duration gap that requires explanation. In January 2026, testing of the debt service coverage and contract realization ratios was postponed and the minimum liquidity covenant was amended (claims #3911 to #3913). The record does not explain why.
The stated use of proceeds, customer-contract capex and GPU servers, is broadly consistent with the reported Q2 2026 capex (claim #18918) and a backlog of about $104B (claim #17802). The record does not let a reader trace deployment facility by facility.
Several things are worth watching next: whether the postponed covenant tests resume on schedule, the trajectory of quarterly interest expense ($640M in Q2 2026 per claim #7341), the share of the backlog that sits with OpenAI and Meta (claims #4297, #2124), and the conversion economics of roughly $5.5B or more in convertibles. The record contains no insider transactions, and the Q2 2026 entries are truncated, so this reading of those quarters is incomplete.
Capital & dilution trajectory
2026-10-03CoreWeave's capital history since its March 2025 listing is dominated by debt rather than equity. The IPO raised roughly $1.5 billion gross (claim #19821) and $1.4 billion net (claim #4967). After that, common-equity dilution came mainly through strategic placements: NVIDIA's $2 billion (claim #3891) and Jane Street's $1 billion (claim #10305). Cumulative raise figures climbed quickly, from $28 billion over twelve months (claim #11221) to more than $30 billion year-to-date by August 2026 (claim #8735). Most of that is leverage, and the stated debt-to-equity ratio of about 6 (claim #3058) reflects it. The record contains no insider transactions, so no assessment of insider selling is possible here.
The instrument mix has an internal logic. Asset-level delayed-draw facilities are tied to specific customer contracts and GPU purchases (claims #2138, #1320). Corporate unsecured notes and convertibles sit above them. Several offerings were upsized, including $1.5 billion to $2 billion (claims #11921, #11918) and $1.5 billion to $1.75 billion (claims #4700, #4697), which indicates demand rather than strain. Pricing, however, has not improved. Unsecured coupons moved from 9.25% (claim #4824) to 9.75% on the 2031 notes (claim #23816). The most recent facility, DDTL 5.5, carries Ba2/BB+ ratings at SOFR plus 5.50% (claims #8732, #8733), compared with the A3 rating on DDTL 4.0 (claim #11219). That divergence requires explanation, likely in the counterparty quality of the underlying contracts.
Use of proceeds is broadly consistent where disclosed. Part of the December 2025 convertible proceeds went to capped calls, recorded as $295.7 million (claim #18738) and $340 million (claim #3986). Those two figures should be reconciled against the base and upsized deal sizes. The January 2026 amendment that postponed debt service coverage and contract realization ratio testing (claims #3912, #3913) is the clearest sign that deployment trailed the original schedule.
Going forward, three items bear watching. First, the underlying customer contracts average about three years (claim #8731) against a roughly five-year facility maturity (claim #8730), so renewal risk sits inside the debt tenor. Second, Q2 2026 interest expense was recorded at $640 million (claim #7341) against negative net margins (claim #7343). Third, the market will look for evidence that the backlog of roughly $100 billion or more (claims #647, #962) converts to cash fast enough to meet covenants once the postponed tests resume.
Capital & dilution trajectory
2026-10-03CoreWeave's record shows little conventional equity dilution and a large, fast-growing debt stack. After the IPO (claim 19821), new common equity came mainly from strategic placements: NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 10305) and a $350M customer issuance (claim 4514). Latent dilution sits in the convertibles. The December 2025 notes were upsized to roughly $2.59B (claim 3980) with capped calls costing $340M (claim 3986). A 2032 convertible followed, described as $3.0B in claim 10325 and $2.6B in claims 10327 and 11765, a discrepancy that requires explanation. The pace is notable: more than $20B raised year-to-date by May (claim 9123) and more than $30B by August (claim 8735). The mix reads as a deliberate two-tier design rather than patching. Asset-level delayed-draw facilities are tied to customer contract capex (claim 2138), and high-coupon unsecured notes sit at the corporate level, running from 9% (claim 4697) to 9.75% (claim 23816). Two developments complicate that picture. First, the minimum liquidity covenant was amended and coverage-ratio testing was postponed (claims 3911–3913). Second, the newest facility, DDTL 5.5, carries Ba2/BB+ ratings at SOFR+5.50% (claims 8732, 8733), well below the A3 rating attached to DDTL 4.0 (claim 11219). Stated uses track the instruments on paper: DDTL proceeds go to contract-linked GPU capex (claim 1320), and convertible proceeds partly fund capped calls (claim 18743). The record contains no capex or draw-down figures, so actual deployment cannot be checked against announcements. Servicing costs are already significant, with Q2 2026 interest expense of about $640M (claim 7341) and a net margin near −25% (claim 7343), against a backlog cited near $100B (claim 647). The record contains no insider transactions, so no read on insider selling is possible. A sophisticated reader should watch several things. One is whether the postponed covenant tests resume on schedule. Another is whether underlying contracts averaging about three years (claim 8731) can support a facility with a roughly five-year maturity (claim 8730). A third is whether rating quality keeps sliding from DDTL 4.0 to later tranches. The last is whether backlog converts to revenue fast enough to cover interest expense before the convertibles approach their conversion economics.
Capital & dilution trajectory
2026-10-02CoreWeave's capital history is overwhelmingly a debt story. Common equity has been a minority input, with the IPO at roughly $1.4B net (claim #4967), a $350M strategic customer issuance (claim #4514), NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). Dilution so far has been moderate, but the more consequential overhang sits in two convertible tranches: the $2.5875B December 2025 deal (claim #3980) and the proposed $3.0B 2032 notes (claim #10325), which carry a $450M upsize option (claim #10326). The record gives differing figures for the December capped call, $295.7M (claim #18738) and $340M (claim #3986), and differing sizes for the April convertible, $2.6B (claim #10327) and $3.0B (claim #10325). Both discrepancies require explanation before anyone models potential share count.
The mix reads as deliberate rather than patched together. Contract-backed delayed-draw facilities form the core: DDTL 3.0 at up to $2.6B (claim #11922), the $8.5B DDTL 4.0 rated A3 (claims #11218, #11219), DDTL 5.0 at $3.1B (claim #1319) and DDTL 5.5 at $2.6B (claim #8729). Unsecured senior notes layer on top of that base, beginning at 9.25% (claim #4824) and 9% (claim #4697) and extending to a $3.5B 2032 issue (claim #8927). The trajectory within that structure deserves attention. DDTL 5.5 priced at SOFR + 5.50% (claim #8733) and was rated Ba2/BB+ (claim #8732), well below DDTL 4.0's investment-grade rating. Its roughly 5-year maturity (claim #8730) also runs against underlying contracts averaging about 3 years (claim #8731). Separately, the minimum liquidity covenant was amended and the debt-service-coverage and contract-realization tests were postponed (claims #3911–#3913). Those are revisions, not routine maintenance.
On use of proceeds, the stated purposes are consistent: customer-contract capex and GPU servers for DDTL 4.0 (claim #2138), and capped calls funded from the convertible (claim #18743). The record does not contain deployment data that would let a reader confirm actual spending against these purposes. What it does show is the cost of the program, with Q2 2026 interest expense of $640M (claim #7341), widening operating and net losses (claim #1495), and a debt-to-equity ratio near 6 (claim #3058). Aggregate raise figures escalate from $17.2B (claim #4968) to more than $30B year-to-date (claim #8735).
A careful reader should watch four things next. The first is whether the postponed covenant tests resume on schedule. The second is whether new facilities return to investment grade or continue at high-yield spreads. The third is how contract tenor is matched to debt maturity. The fourth is customer concentration, since the OpenAI ($6.5B, claim #4297) and Meta ($21B, claim #2124) commitments underpin much of this collateral. The supplied record ends mid-entry in August 2026 and contains no insider transactions, so no conclusions about insider behavior can be drawn from it.
Capital & dilution trajectory
2026-10-02Since its March 2025 listing, CoreWeave has financed itself mostly through debt, and direct equity dilution has been modest relative to the size of the capital stack. Beyond the $1.5B IPO at $40 (claims #19821, #11601), common issuance consists of strategic placements: a $350M customer issuance (claim #4514), NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). The larger potential dilution sits in convertibles. The December 2025 offering is reported at sizes ranging from $2.0B to $2.59B across claims #18739, #18733 and #3980, and is partly offset by capped calls (claim #3986). The proposed $3.0B 2032 convertible carries a $450M option (claims #2126, #2127). The record contains no ATM or insider sale activity, so those dimensions cannot be assessed.
The mix reads as a deliberate tiering rather than patching. Contract-backed delayed draw term loans fund the asset build. DDTL 3.0 at $2.6B (claim #11922) was followed by DDTL 4.0 at $8.5B with A3/A(low) ratings (claims #2137, #11219), DDTL 5.0 at $3.1B (claim #9116), and a further $2.6B facility priced at SOFR + 5.50% and rated Ba2/BB+ (claims #8729, #8733, #8732). Unsecured notes at 9.25% and 9% (claims #4824, #4697) and the convertibles fund the corporate layer. The pace is accelerating: company-stated totals move from $17.2B cumulative (claim #4968) to more than $30B raised in 2026 year-to-date alone (claim #8735).
Use-of-proceeds language is on record (claims #11920, #1320, #2138). However, deployment data is limited to a single quarter's capex (claim #18918), so the record cannot confirm whether actual spending tracks those stated uses. Several note closings are tagged as delayed (claims #11919, #4699, #9699). The January 2026 amendments postponing debt service coverage and contract realization testing (claims #3912, #3913) also require explanation, particularly alongside the coverage covenants written into later facilities (claims #2141, #1324).
A reader should watch three things. First, whether the next DDTL keeps investment-grade treatment or follows the Ba2/BB+ path. Second, how interest expense (claim #18919) scales against reported backlog (claim #18917), given that underlying customer contracts average roughly three years while the loans run about five (claims #8731, #8730). Third, whether further covenant relief follows the January 2026 amendments.
Capital & dilution trajectory
2026-10-01CoreWeave's record describes a company that has financed itself mostly with debt rather than equity. The $1.5B IPO at $40 (claims #19821, #11616) netted about $1.4B (claim #4967). Since then, outright equity has come mainly from strategic placements: NVIDIA's $2B (claim #3891), Jane Street's $1B (claim #2080), and a $350M strategic customer issuance (claim #4514). Dilution so far has therefore been moderate. The more meaningful overhang sits in the convertibles, the 2025 notes upsized from $2.25B to $2.5875B (claims #18733, #3980) and a further 2032 tranche described as $2.6B and as $3.0B in different claims (claims #11765, #10325), which requires reconciliation. Capped calls blunt some of this dilution, though the reported cost moved from an estimated $295.7M to $340M (claims #18738, #3986).
The mix looks deliberate rather than improvised. Asset-level delayed-draw facilities fund GPU servers against specific customer contracts (claim #2138), and corporate high-yield and convertible paper fill the gaps around them. Within that structure, credit terms have shifted. DDTL 4.0 carried A3 ratings (claim #11219). DDTL 5.5 was rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733), with a roughly 5-year maturity against underlying contracts averaging about 3 years (claims #8730, #8731). That gap between loan life and contract life requires explanation. Upsizings of the 2025 notes (claims #11918, #4698) suggest demand existed at 9% to 9.25% coupons (claims #4824, #4697). The January 2026 amendment to the minimum liquidity covenant and the postponed debt service and contract realization ratio tests (claims #3911–#3913) are the clearest sign that original terms were revised under pressure.
On use of proceeds, the data supports stated intent but says little about actual deployment. Facility-level purposes are disclosed, but no capex or draw-down figures appear that would let a reader confirm proceeds went where announced. By Q2 2026, interest expense of 640 (claim #7341, presumably millions) set against revenue reported as 3 (claim #7340, presumably billions), widening losses (claim #1495), and a debt-to-equity ratio near 6 (claim #3058) show the financing cost is now material to operating results. No insider transactions appear in the records provided, and the record is truncated after August 2026.
A sophisticated reader should watch four things: whether covenant tests deferred in January 2026 are reinstated on schedule, whether new facilities continue migrating toward non-investment-grade pricing, how the 2032 convertible's final size is settled, and whether the $104B backlog (claim #1493) converts to cash quickly enough to service the more than $30B raised year-to-date (claim #8735).
Capital & dilution trajectory
2026-10-01CoreWeave's record shows a company that financed itself almost continuously after its March 2025 listing. The equity component is comparatively small: the IPO raised $1.5B gross (claim #19821) and about $1.4B net (claim #4967), followed by strategic placements from NVIDIA of $2B (claim #3891) and Jane Street of $1B (claim #10305). Most direct dilution came from these negotiated sales. The larger share-count consideration sits in the convertible layer. The December 2025 convertible appears in the record at $2.0B (claim #18739), $2.25B (claim #18733) and $2,587.5M (claim #3980), with capped call costs of $295.7M (claim #18738) and $340M (claim #3986). The December pricing alone accounts for these progressions, but the figures require reconciliation. A second convertible of $3.0B due 2032 followed in April 2026, with a $450M option (claims #10325, #10326).
The mix reads as a deliberate structure rather than patching. Contract-backed delayed draw term loans carry the asset build: DDTL 4.0 at $8.5B with A3/A(low) ratings (claims #11218, #11219), DDTL 5.0 at $3.1B (claim #9116), and DDTL 5.5 at $2.6B (claim #8729). Unsecured notes and converts fund the corporate layer. The structure did shift over time. DDTL 5.5 was rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733), below the investment-grade tier achieved months earlier. Its roughly five-year maturity (claim #8730) also runs against underlying customer contracts averaging about three years (claim #8731). Separately, the January 2026 amendments postponed debt service coverage and contract realization ratio testing (claims #3912, #3913). The record does not explain these postponements.
The stated use of proceeds for the DDTLs is GPU servers and contract-specific capex (claims #2138, #1320). The record contains no deployment data that would let a reader confirm that. The same gap applies to the unsecured notes, whose proceeds disclosure (claim #11920) lacks detail.
The cumulative pace is steep. The company cited $28B in commitments over twelve months (claim #11221), then more than $30B year-to-date by August 2026 (claim #8735). Over the same period, Q2 2026 interest expense was reported at $640M (claim #7341) and net margin at roughly -25% (claim #7343). The record contains no insider transactions, so no conclusion can be drawn there.
Going forward, the useful items to watch are the first covenant tests after the postponements end, the conversion thresholds on the two convertible tranches, and whether new facilities keep their investment-grade rating. The most important is whether the roughly $100B backlog (claims #647, #962) turns into contracted revenue over the full life of the debt that funds it.
Capital & dilution trajectory
2026-09-29CoreWeave's record shows a company that used its equity listing mainly to open access to debt markets. The IPO at $40 per share raised $1.5 billion gross and roughly $1.4 billion net (claims #19821, #11616, #4967). Direct equity dilution since then has come from a small number of strategic placements: NVIDIA's $2 billion Class A investment (claim #3891), Jane Street's $1 billion (claim #10305) and a $350 strategic customer issuance (claim #4514). Most of the potential dilution sits instead in convertibles. The December 2025 convertible grew from $2 billion to $2.25 billion and reached $2.5875 billion with the option (claims #18739, #18733, #3980). The April 2026 convertible due 2032 was $3.0 billion plus a $450 million option (claims #10325, #10326). Capped calls partly offset this dilution, although the record gives the capped-call cost as both $295.7 million and $340 million (claims #18738, #3986), and that difference requires explanation.
The mix is more systematic than opportunistic. Revolver capacity went from $1.5 billion to $2.5 billion (claims #11923, #11766). Delayed-draw facilities were numbered in sequence: DDTL 3.0, 4.0, 5.0 and 5.5. Unsecured notes came roughly quarterly, and several offerings were upsized, including the 2025 notes from $1.5 billion to $2 billion and the July notes by $250 (claims #11921, #11917, #4698). Three developments complicate that picture. First, in January 2026 debt service coverage and contract realization testing were postponed and the minimum liquidity covenant was amended (claims #3912, #3913, #3911), a few weeks after the convertible closed. Second, DDTL 4.0 carried A3/A(low) ratings (claim #11219), while the August DDTL 5.5 was rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). Third, DDTL 5.5 has about a five-year maturity (claim #8730) but rests on customer contracts averaging about three years (claim #8731).
The stated uses of proceeds are specific for the term loans, which fund customer-contract capex and GPU servers (claims #2138, #1320). They are generic or capped-call directed for the convertibles (claim #18743). The record does not allow a reconciliation of proceeds against deployment beyond the Q2 2026 capex figure (claim #18918).
No insider transactions appear in this record. The data also ends mid-entry after the Q2 2026 results, so later events may be missing. Readers should watch four things: whether the postponed covenant tests resume on schedule; how Q2 interest expense of $640 (claim #18919) grows against widening losses (claim #1495) and a debt-to-equity ratio near 6 (claim #7345); whether new facilities keep pricing below investment grade; and how backlog reported at $104 (claim #1493) turns into cash as the three-year contracts roll off.
Capital & dilution trajectory
2026-09-29CoreWeave's record is overwhelmingly a debt story rather than an equity-dilution story. The March 2025 IPO raised $1.5B at $40 per share (claims #19821, #11601), about $1.4B net (claim #4967). Nearly every subsequent financing has been debt or debt-like. Equity dilution since the listing has come mainly through strategic placements: NVIDIA's $2B Class A investment (claim #17594) and Jane Street's $1B (claim #10305). The other source is contingent share issuance embedded in convertibles: the $2.5875B December 2025 convertible at 1.75% (claims #3980, #18736) and the $3.0B convertible due 2032 (claim #2126). The December convertible was paired with $340M of capped calls (claim #3986), which suggests management is actively trying to limit that contingent dilution.
The mix reads as a coherent strategy that has been under visible strain. The core architecture is recurring delayed-draw term loans secured against customer contracts. It runs from DDTL 3.0 at $2.6B, later $3.0B (claims #11922, #4277), to the investment-grade $8.5B DDTL 4.0 rated A3 (claims #11218, #11219), then DDTL 5.0 at $3.1B (claim #9116) and DDTL 5.5 at $2.6B (claim #8729). High-coupon unsecured notes sit alongside this structure, including the 9.25% notes due 2030 (claim #4824), the upsized 9% $1.75B notes (claims #4697, #4698) and the $3.5B notes due 2032 (claim #8927). Two points require explanation. The January 2026 amendments postponed debt service coverage and contract realization ratio testing and revised the minimum liquidity covenant (claims #3912, #3913, #3911). In addition, the most recent facility priced at SOFR+5.50% with Ba2/BB+ ratings (claims #8733, #8732), a step down from DDTL 4.0's investment-grade terms only months earlier.
Use-of-proceeds claims exist (claims #11920, #1320, #2138), but the record does not show deployment detail, so it cannot confirm whether funds went where they were announced. Q2 2026 capex (claim #18918) and interest expense (claim #7341) are disclosed without clear units in this dataset. Company-stated cumulative totals rose from $28B over twelve months (claim #11221) to more than $30B year-to-date by August (claim #8735).
A careful reader should watch several things. The first is whether postponed covenant tests resume on schedule. The second is how DDTL 5.5's roughly five-year maturity (claim #8730) is serviced against underlying contracts that average about three years (claim #8731). The third is whether future facilities regain investment-grade pricing. The last is the conversion share count as the convertibles season. No insider transactions appear in this record, and the claim list is truncated after the Q2 2026 results, so this read is necessarily incomplete.
Capital & dilution trajectory
2026-09-29CoreWeave's record is overwhelmingly a debt story. Direct equity dilution has come in discrete, strategically placed tranches: the $1.5B IPO (claim #19821, net $1.4B per claim #4967), a $350M strategic customer issuance (claim #4514), NVIDIA's $2B Class A investment (claim #3891), and Jane Street's $1B (claim #10305). Potential dilution now sits mainly in convertibles. The December 2025 offering grew from a stated $2B (claim #18739) to $2.25B (claim #18733) and then $2.5875B with the option (claim #3980). A second $3.0B convertible due 2032 followed (claim #10325), with a further $450M option (claim #10326). Capped calls partly offset this, though the record gives two figures for them, $295.7M (claim #18738) and $340M (claim #3986), which requires explanation.
The mix looks structured rather than improvised. Asset-backed DDTL facilities carry the GPU build, with proceeds tied to customer-contract capex (claims #2138, #1320). High-coupon unsecured notes, at 9.25% (claim #4824) and 9% (claim #4697), plus the revolver, which rose from $1.5B (claim #11923) to $2.5B (claim #11766), supply corporate flexibility. The pace, however, is steep. The company cites $17.2B raised by May 2025 (claim #4968), $28B over twelve months (claim #11221), and more than $30B year-to-date by August 2026 (claim #8735).
The record does not let a reader reconcile stated use of proceeds against actual deployment. Q2 2026 capex is disclosed (claim #18918), but no facility-level draw data appears.
Several terms have shifted. The debt service coverage and contract realization tests were postponed and the minimum liquidity covenant amended (claims #3912, #3913, #3911). The DDTL 4.0 carried A3/A(low) ratings (claim #11219), while DDTL 5.5 is rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). DDTL 5.5 also runs about five years (claim #8730) against underlying contracts averaging about three (claim #8731).
A sophisticated reader should watch four things: when the postponed covenant tests resume, whether future DDTLs keep the lower rating tier, and how Q2 interest expense of $640M (claim #18919) trends against revenue. The fourth is whether backlog anchors such as Meta's $21B commitment (claim #2124) and OpenAI's $6.5B (claim #4297) turn into cash on the timelines the lenders assume. No insider sales appear in this record.
Capital & dilution trajectory
2026-09-27CoreWeave's record shows a company that went public mainly to open doors to debt markets, not to fund itself through equity. The IPO netted roughly $1.4B (claim #4967), a small amount next to the aggregate totals the company later cited: $17.2B raised by May 2025 (claim #4968), $28B in the twelve months to March 2026 (claim #11221), and more than $30B year-to-date by August 2026 (claim #8735). Direct equity dilution has been modest and selective. It came through placements to strategic holders, namely NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305), rather than broad follow-ons. The main source of potential dilution is instead the two convertible issues, the December 2025 notes at 1.75% (claim #18736) and the $3.0B notes due 2032 (claim #2126), with capped calls partly offsetting the first (claim #3986). No ATM program and no insider transactions appear in this dataset, so no conclusion can be drawn on either.
The financing mix follows a clear logic. Asset-backed delayed-draw term loans are sized against customer contracts, running from DDTL 3.0 through 5.5. High-coupon unsecured notes, such as the 9.250% 2030s (claim #4824), and convertibles fill the corporate layer above them. The quality of that collateral is uneven. DDTL 4.0 carried A3 investment-grade ratings (claim #11219). DDTL 5.5, by contrast, priced at SOFR + 5.50% with Ba2/BB+ ratings (claims #8733, #8732) and rests on contracts averaging about three years (claim #8731) against a roughly five-year maturity (claim #8730). That gap in tenor requires explanation.
The stated use of proceeds, customer-contract capex and GPU servers (claim #2138), is consistent with the Q2 2026 capex figure (claim #18918). The dataset does not allow a line-by-line reconciliation. Several internal figures also need reconciling. The December convertible appears at $2.0B, $2.25B, and $2.5875B (claims #18739, #18733, #3980), with net proceeds recorded as both $2.21B and $2.54B (claims #18737, #3981). The April 2026 convertible appears as both $2.6B and $3.0B (claims #10327, #2126).
The measures most worth watching come from Q2 2026. Interest expense was $640M for the quarter (claim #18919), the debt-to-equity figure was recorded at 6 (claim #3058), and operating losses widened (claim #1495). The earlier postponement of debt-service-coverage and contract-realization testing (claims #3912, #3913) means future covenant tests and the renewal of roughly three-year customer contracts are the next evidence to look for. Conversion or repricing of the backlog (claim #1493) into cash flow is the variable the whole structure depends on. The record supplied here is truncated, so these observations may be incomplete.
Capital & dilution trajectory
2026-09-27CoreWeave's record since the March 2025 listing describes a company financed mostly by debt, with equity arriving in a few large, counterparty-specific placements rather than through recurring public issuance. The IPO itself was modest, $1.5B at $40 per claim #19821 and about $1.4B net per claim #4967. Direct dilution since then has come from the $350M strategic customer issuance (claim #4514), NVIDIA's $2B Class A purchase (claim #17594) and Jane Street's $1B investment (claim #10305). The larger potential dilution sits in the convertibles. The December 2025 deal grew to $2.5875B (claim #3980) and was paired with $340M of capped calls (claim #3986). The April 2026 proposal adds $3.0B due 2032 (claim #10325), with a $450M option (claim #10326). Dilution is therefore stepping up, but mostly in contingent form. The mix looks more deliberate than opportunistic. Asset-level delayed-draw facilities carry the GPU build-out: DDTL 3.0, the $8.5B DDTL 4.0 (claim #11218), DDTL 5.0 at $3.1B (claim #9116) and DDTL 5.5 at $2.6B (claim #8729). Unsecured notes and converts sit above them at the corporate level. Two points in that structure require explanation. The January 2026 amendments postponed debt service coverage and contract realization testing and altered the minimum liquidity covenant (claims #3912, #3913, #3911), only months after these facilities were put in place. Credit quality has also varied across the facilities. DDTL 4.0 carried A3/A(low) ratings (claim #11219), while DDTL 5.5 is rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). On use of proceeds, the stated purposes are customer-contract capex and GPU servers (claim #2138) and capped call funding (claim #18743). The record contains no deployment data against which to test them, so that question stays open. The record also contains no insider transactions. A reader should watch several things next. First, whether covenant testing resumes on schedule. Second, how DDTL 5.5's roughly five-year maturity (claim #8730) compares with its underlying contracts of about three years (claim #8731). Third, how Q2 2026 interest expense of $640M (claim #7341) develops against a backlog stated near $100B (claim #647). Finally, cumulative capital raised is climbing quickly, from more than $20B year-to-date in May (claim #9123) to more than $30B by August (claim #8735). The pace of new financings deserves the same attention as their terms. The claim list supplied here is truncated after the Q2 2026 results, so later events are not reflected.
Capital & dilution trajectory
2026-09-27CoreWeave's record describes a company that has used public equity sparingly and debt aggressively. The IPO priced at $40 (claim 11616) and raised $1.5B gross (claim 19821), about $1.4B net (claim 4967). That is small against the cumulative totals the company itself reports: $17.2B by May 2025 (claim 4968), $28B over the trailing twelve months by March 2026 (claim 11221), and more than $30B year-to-date by August 2026 (claim 8735). Direct common-stock dilution has come mainly through strategic placements rather than marketed follow-ons, including the $350M customer issuance (claim 4514), NVIDIA's $2B (claim 3891) and Jane Street's $1B (claim 2080). The larger latent dilution sits in the two convertible tranches: $2.5875B including the option (claim 3980) and a proposed $3.0B due 2032 with a $450M option (claims 2126, 10326). The record contains no insider sale disclosures, so that part of the mix cannot be assessed.
The structure looks deliberate rather than patched together. Contract-backed delayed-draw facilities fund GPU capex tied to specific customers (claim 2138). The unsecured market, at 9.25% and 9% coupons (claims 4824, 4697), supplies corporate liquidity. The rating path runs from A3 on the $8.5B DDTL 4.0 (claim 11219) to Ba2/BB+ at SOFR+5.50% on the later facility (claims 8732, 8733). That spread suggests the company is tiering collateral quality instead of reaching for one type of capital.
The announced use of proceeds cannot be checked against actual deployment from this record. Commitments such as OpenAI's $6.5B (claim 4297) and Meta's $21B (claim 2124) are stated, but the claims do not show drawn balances by facility. Several figures require explanation. The first convertible shows net proceeds of $2.5422B and a capped call of $340M (claims 3981, 3986) alongside $2.2106B and $295.7M (claims 18737, 18738), which is probably a pre-option versus post-option difference. It is also unclear whether the SOFR+5.50% pricing belongs to DDTL 5.0 or DDTL 5.5 (claims 8733, 8734).
A careful reader should watch four things. First, the January 2026 amendments postponed debt-service-coverage and contract-realization testing and revised the minimum liquidity covenant (claims 3911–3913); the date testing resumes, and the headroom at that point, matters. Second, the underlying contracts average about three years (claim 8731) while the facility runs about five (claim 8730), which raises renewal risk. Third, quarterly interest expense of $640M (claim 7341) should be tracked against revenue. Fourth, conversion-price proximity will determine whether the convertibles settle in shares.
Capital & dilution trajectory
2026-09-26CoreWeave's post-listing capital history is predominantly a debt story, with equity used as a periodic backstop. The IPO at $40 raised $1.5B gross (claim #19821) and roughly $1.4B net (claim #4967). Within weeks the company began a rolling sequence of high-coupon unsecured paper, including the $2.0B 9.250% notes due 2030 (claim #11917) and the $1.75B 9% notes, which were upsized by $250M (claims #4658, #4698). Alongside these came asset-backed delayed-draw facilities: DDTL 3.0 at $2.6B (claim #11922), a $3.0B facility (claim #4277), DDTL 4.0 at $8.5B (claim #11218), DDTL 5.0 at $3.1B (claim #1319), and DDTL 5.5 at $2.6B (claim #8729). Management's own tally exceeds $30B year-to-date (claim #8735).
The dilution vector sits in the convertibles and the strategic placements. These include the $2.5875B December convertible (claim #3980), the $3.0B 2032 convertible with a $450M option (claims #2126, #10326), NVIDIA's $2B (claim #3891), Jane Street's $1B (claim #10305), and an earlier $350M strategic customer issuance (claim #4514). Capped calls blunt part of the convert dilution. The recorded cost requires reconciliation, however: $340M appears in claim #3986 and $295.7M in claim #18738. Claims #11765 and #10327 also cite a $2.6B convertible that does not obviously match the $3.0B figure.
The mix reads as a coherent architecture rather than patching. Contract-secured DDTLs fund GPU capex (claim #2138, claim #1320), while unsecured and convertible layers fill the gaps. Two data points complicate that reading. The January 2026 amendments postponed debt service coverage and contract realization testing and revised the liquidity covenant (claims #3912, #3913, #3911). And pricing has diverged across the stack. DDTL 4.0 carried A3/A(low) ratings (claim #11219), while DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims #8733, #8732).
Use-of-proceeds language is facility-specific for the DDTLs. For the notes it is general (claim #11920), and the record does not permit verifying actual deployment against it. No insider transactions appear in the data provided, and the record itself is truncated.
A sophisticated reader should watch several items. The first is when the postponed covenant tests resume. The second is the stated mismatch between DDTL 5.5's roughly five-year maturity and underlying contracts averaging roughly three years (claims #8730, #8731). The third is Q2 interest expense of $640M (claim #7341) against revenue conversion of the $104B backlog (claim #1493). The fourth is the cumulative conversion overhang as the 2030–2032 maturities approach.
Capital & dilution trajectory
2026-09-26CoreWeave's record describes a company financed mainly with debt, with equity used sparingly. Equity came from the $40 IPO (claim 11616), which raised $1.5 billion gross (claim 19821) and roughly $1.4 billion net (claim 4967). Later equity arrived in discrete strategic blocks: a $350 million customer share issuance (claim 4514), NVIDIA's $2 billion Class A investment (claim 3891) and Jane Street's $1 billion (claim 10305). Most of the capital was debt. Stated cumulative raises went from $17.2 billion (claim 4968) to $28 billion over twelve months (claim 11221) and then to more than $30 billion year-to-date by August 2026 (claim 8735). Direct dilution has therefore been modest, but conversion risk has grown. There was a December 2025 convertible of up to $2.59 billion (claim 3980) and an April 2026 $3.0 billion convertible due 2032 (claim 10325). Both carry capped calls, which dampen that exposure without removing it. The record also contains inconsistent sizing figures for these deals, such as $2.6 billion in claim 11765 against $3.0 billion in claim 10325, and $295.7 million against $340 million for the capped calls (claims 18738, 3986). These discrepancies require reconciliation. The mix follows a recognisable strategy. Delayed-draw term loans are secured against specific customer contracts, and claim 2138 ties proceeds to contract capex and GPU servers. Unsecured notes and converts add corporate-level liquidity. Deal terms vary widely, however. DDTL 4.0 carried A3 ratings (claim 11219), while DDTL 5.5 priced at SOFR plus 5.50% with Ba2/BB+ ratings (claims 8733, 8732), and the unsecured notes carry 9% to 9.25% coupons (claims 4697, 4824). Whether proceeds were deployed as announced cannot be checked from this record. Q2 2026 interest expense of $640 million (claim 7341) and a $104 billion backlog (claim 1493) are consistent with capacity being built against contracts, but no disclosed figure reconciles draws to capex. Three items require explanation. In January 2026 the covenants were amended: the minimum liquidity covenant was revised, and debt service coverage and contract realization testing were postponed (claims 3911, 3912, 3913). DDTL 5.5 has a maturity of roughly five years, while the contracts underneath it average about three (claims 8730, 8731). Third, the record contains the $270 million termination fee (claim 4739) and a Series C put repurchase obligation (claim 4276) but does not discuss either further. The things to watch are when the postponed covenants return to testing, how interest expense grows relative to revenue, how the convertibles trade against their conversion terms, and whether renewals keep pace with the average three-year term of the underlying customer contracts. No insider or ATM activity appears in the record.
Capital & dilution trajectory
2026-09-26CoreWeave's record is dominated by debt, not equity. After the $1.5B IPO at $40 (claims 19821, 11616), which netted $1.4B (claim 4967), the company returned to public equity markets only through strategic placements: NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 10305), and a $350M strategic customer issuance (claim 4514). Direct dilution has therefore been episodic and investor-selected. The larger latent dilution sits in two convertible programs, the December 2025 notes upsized from $2.25B to $2.5875B (claims 18733, 3980) and the $3.0B 2032 notes with a $450M option (claims 2126, 10326). These were partly hedged by capped calls of $295.7M to $340M (claims 18738, 3986); the gap between those two figures requires explanation, as does the $2.6B size recorded for the 2026 convertible (claims 11765, 10327).
The mix shows a coherent direction. Early high-coupon unsecured paper, 9.25% (claim 4824) and 9% (claim 4697), gave way to contract-backed delayed-draw facilities. That shift peaked with the $8.5B DDTL 4.0 rated A3/A(low) (claims 11218, 11219). The trajectory is not uniformly improving, however. The later $2.6B DDTL 5.5 priced at SOFR plus 5.50% and was rated Ba2/BB+ (claims 8729, 8733, 8732). Its roughly five-year maturity also runs against underlying customer contracts that average about three years (claims 8730, 8731). Cumulative raising is steep: over $20B year-to-date by May (claim 9123) and over $30B by August (claim 8735).
On use of proceeds, the stated purposes, GPU servers and contract-linked capex (claims 2138, 1320), fit the facility structures. The record contains no deployment data, so actual spending against those stated purposes cannot be verified here. The January 2026 amendments to the minimum liquidity covenant and the postponed debt service coverage and contract realization testing (claims 3911, 3912, 3913) are the clearest signs that operations lagged the financing plan. The record contains no insider transactions.
A careful reader should watch four things. The first is when the postponed covenant tests resume and whether they are met. The second is whether future DDTLs price nearer the investment-grade DDTL 4.0 or the sub-investment-grade 5.5. The third is how Q2 interest expense, recorded at $640 (claim 7341, units as disclosed), develops against revenue as the backlog figure of $104 (claim 18917) converts to revenue. The fourth is conversion overhang as the share price moves relative to the convertible strikes.
Capital & dilution trajectory
2026-09-25CoreWeave's post-IPO capital history is overwhelmingly a debt story, and the pace has accelerated rather than tapered. The company listed at $40 per share (claim 11601) and netted roughly $1.4B (claim 4967). Cumulative raise figures then climb quickly: $17.2B by May 2025 (claim 4968), $28B in trailing commitments by March 2026 (claim 11221), and more than $30B year-to-date by August 2026 (claim 8735). Direct common dilution has been modest by comparison. It comes mainly through strategic placements, including NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 10305) and a $350M customer issuance (claim 4514). Two convertible programs carry the larger latent dilution: the December 2025 notes, which grew to $2.59B with the option (claim 3980), and the proposed $3.0B 2032 converts plus a $450M option (claims 10325, 10326). The capped call allocation rose from $295.7M (claim 18738) to $340M (claim 3986) as the December deal was upsized, which suggests management is actively managing conversion dilution.
The mix reads as a coherent structure rather than patching. Delayed-draw facilities secured against customer contracts fund GPU capex (claims 2138, 1320). Unsecured high-yield notes and converts sit above them at the corporate level. Within the DDTL series, pricing and credit quality vary widely. DDTL 4.0 carried A3/A(low) ratings (claim 11219). DDTL 5.5 is rated Ba2/BB+ at SOFR + 5.50% (claims 8732, 8733). That spread requires explanation, as does the gap between the roughly three-year average tenor of the underlying contracts (claim 8731) and the facility's roughly five-year maturity (claim 8730).
The January 2026 amendments are the least conventional items on record. They amended a minimum liquidity covenant (claim 3911) and postponed both debt service coverage and contract realization ratio testing (claims 3912, 3913). Later facilities reintroduce DSCR covenants (claims 2141, 1324).
Use of proceeds is stated at issuance (claims 11920, 18743), but the record contains no deployment reconciliation, so whether proceeds tracked their announced purpose cannot be assessed here. The record also contains no insider transactions.
Several things are worth watching. The first is when the postponed covenant tests resume and how they read. The second is Q2 2026 interest expense of $640M (claim 7341) set against a reported $104B backlog (claim 1493). The third is whether future contract-backed facilities price closer to the investment-grade DDTL 4.0 or the sub-investment-grade DDTL 5.5.
Capital & dilution trajectory
2026-09-25CoreWeave's record shows a company that has used public equity sparingly and debt heavily. After the $40 IPO (claim #11616) and roughly $1.4B in net proceeds (claim #4967), new equity came mainly from strategic holders: NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). Dilution to date is therefore modest and negotiated. The more meaningful future dilution sits in the convertibles: roughly $2.59B issued in December 2025 (claim #3980), partly offset by capped calls (claim #3986), followed four months later by a $3.0B tranche due 2032 (claim #2126). The record contains no insider transactions, so no view on insider selling can be drawn.
The mix looks structured rather than improvised. Asset-level delayed-draw term loans grew in size and rating quality, from $2.6B (claim #11922) to the $8.5B DDTL 4.0 rated A3/A(low) (claims #11218, #11219) and the syndicated $3.1B DDTL 5.0 (claim #9117). High-yield senior notes sit alongside them: 9.25% notes due 2030 (claim #4824), a 9% issue (claim #4697), and later $1.25B, $1B and $3.5B offerings (claims #2125, #2056, #8927). The trajectory is not uniformly upward, however. The August DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims #8733, #8732), well below the DDTL 4.0 rating. The January 2026 covenant amendments, which altered the minimum liquidity requirement and postponed debt-service-coverage and contract-realization testing (claims #3911–#3913), require explanation because they arrived between two large raises.
On use of proceeds, the DDTLs are explicitly tied to customer-contract capex (claim #2138), anchored by commitments such as OpenAI's $6.5B (claim #4297) and Meta's $21B (claim #2124). Q2 2026 capex (claim #18918) and a backlog near $100B (claims #647, #18917) are directionally consistent with that framing. The record does not reconcile specific raises to specific deployments, and the stated use for the May 2025 notes (claim #11920) is not itemized.
A careful reader should watch three things. First, Q2 interest expense of $640M (claim #18919) against a debt-to-equity ratio near 6 (claim #3162). Second, the mismatch between roughly 3-year underlying contracts and a roughly 5-year facility term on DDTL 5.5 (claims #8731, #8730), which leaves renewal risk inside the loan's life. Third, whether the postponed covenant tests resume on schedule. Cumulative raises of more than $30B year-to-date (claim #8735) mean refinancing cadence is now itself a core operating variable. Note also that the supplied record is truncated partway through Q2 2026 results, so later events are not assessed here.
Capital & dilution trajectory
2026-09-25CoreWeave's capital history after the IPO is primarily a debt story. The March 2025 listing at $40 (claim #11601) raised about $1.4B net (claim #4967). Since then, direct equity has come mainly through two strategic placements: NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305). Dilution so far has been episodic rather than continuous. Most of the forward dilution risk sits in the convertibles: the December 2025 issue, sized at $2.59B with the option (claim #3980), and the proposed $3.0B 2032 convert (claim #10325). The record also carries a $2.6B figure for that 2026 convert (claim #10327), and the difference requires reconciliation.
The mix looks more deliberate than patched. Asset-level delayed-draw facilities fund contracted GPU buildouts. DDTL 4.0 at $8.5B carried an A3 rating (claims #11218, #11219), while DDTL 5.5 at $2.6B priced at SOFR + 5.50% with a Ba2 rating (claims #8729, #8733, #8732). The spread between those two facilities suggests a tiered structure in which weaker collateral pays materially more. Unsecured notes and converts fill the corporate layer.
The pace has accelerated. Management cited $28B committed over twelve months (claim #11221), more than $20B year-to-date by May (claim #9123), and more than $30B by August (claim #8735). Several offerings were upsized, including the 2030 notes, which went from $1.5B to $2.0B (claims #11921, #11917).
On use of proceeds, the record states intended uses (claims #1320, #2138) but contains no deployment data, so whether proceeds tracked their stated purpose cannot be assessed. One diversion is explicit: capped calls absorbed roughly $296M to $340M of convertible proceeds (claims #18738, #3986). The record contains no insider transactions.
Three items warrant attention. First, the January 2026 amendments revised the minimum liquidity covenant and postponed contract-realization and debt-service-coverage testing (claims #3911, #3912, #3913). Whether and when those tests resume in their original form is the most direct indicator of covenant headroom. Second, DDTL 5.5 rests on customer contracts averaging about three years (claim #8731) but carries roughly a five-year maturity (claim #8730). That leaves renewal risk inside the loan term. Third, Q2 2026 interest expense of $640M (claim #7341) against a −25% net margin (claim #7343) means servicing costs will increasingly test how quickly the $104B backlog (claim #1493) converts to cash.
Capital & dilution trajectory
2026-09-25CoreWeave's record describes a company that has financed itself overwhelmingly through debt, with equity dilution arriving mainly through strategic placements and convertibles rather than follow-on offerings. After the $40 IPO (claim #11601) and roughly $1.4B of net proceeds (claim #4967), the direct equity events are strategic: a $350M customer share issuance (claim #4514), NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). The larger dilution vector is convertible paper. The December 2025 convertible sized at $2.5875B (claim #3980) carries roughly 30.0M conversion shares (claim #3984). The proposed $3.0B convertible due 2032, with a $450M option (claims #2126, #2127), would add to that overhang. Several claims also reference a $2.6B convertible (claims #10327, #11765) that does not reconcile cleanly with either deal, and this requires explanation. Capped call figures are also reported at both $295.7M and $340M (claims #18738, #3986).
The debt mix reads as a deliberate, repeating template rather than patching. Asset-backed DDTL facilities are sized to customer contracts and financed senior notes stacked beside them: the 9.25% notes (claim #4824), the 9% notes (claim #4697), and $3.5B due 2032 (claim #8927). The trajectory in pricing is less uniform. DDTL 4.0 carried A3 ratings (claim #11219), while DDTL 5.5 priced at SOFR plus 5.50% with Ba2/BB+ ratings (claims #8733, #8732). Its underlying contracts average about three years (claim #8731) against a roughly five-year maturity (claim #8730), a tenor gap that deserves attention.
Stated use of proceeds, namely customer-contract capex and GPU servers (claims #2138, #1320), is consistent across filings. However, the record contains no deployment figures that would allow a reader to confirm it. The record also contains no insider transactions, so that dimension cannot be assessed.
The most material items to watch are the January 2026 amendments. These revised the minimum liquidity covenant and postponed debt service coverage and contract realization testing (claims #3911, #3912, #3913), so the terms of resumed testing matter. Q2 interest expense of $640M (claim #7341) against a -25% net margin (claim #7343) sets the scale of the servicing burden. Aggregate raises of more than $30B year-to-date (claim #8735) make the pace of future issuance the variable to track, alongside how much of the $104B backlog (claim #1493) converts to cash.
Capital & dilution trajectory
2026-09-24CoreWeave's post-listing capital history is predominantly a debt story, with common-equity dilution arriving in measured, negotiated blocks rather than broad follow-ons. After the $40 IPO (claim #11616) produced roughly $1.4B in net proceeds (claim #4967), new equity came through strategic placements, the NVIDIA $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305), and through two convertible offerings: the 1.75% notes of December 2025 (claims #18733, #18736) and the proposed $3.0B notes due 2032 (claim #10325). The December convertible's figures require reconciliation, with a $2.25B base (claim #18733) against a $2.59B total (claim #3980) and capped-call costs of $295.7M (claim #18738) versus $340M (claim #3986), most plausibly the difference between pre- and post-option sizing. The capped calls indicate an effort to contain conversion dilution. The record contains no insider sale transactions, so that dimension cannot be assessed.
The debt mix reads as a coherent strategy that has been refined over time. Early unsecured issuance was expensive, with the 9.250% notes due 2030 upsized to $2B (claims #11921, #11917) and the 9% notes to $1.75B (claims #4697, #4698). The company then moved toward contract-backed delayed-draw facilities, which culminated in the $8.5B DDTL 4.0 rated A3/A(low) (claims #11218, #11219). That improvement was not linear. DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims #8733, #8732), and unsecured notes continued alongside, including $3.5B due 2032 (claim #8927). Cumulative raises escalated from more than $20B year-to-date in May (claim #9123) to more than $30B by August (claim #8735).
Stated use of proceeds, such as financing customer-contract capex and GPU servers (claim #2138), is disclosed at a general level (claims #11920, #1320). The record offers no deployment data against which to test it.
A careful reader should track several things next. The January 2026 amendments to the minimum-liquidity covenant and the postponed debt-service-coverage and contract-realization testing (claims #3911–#3913) need to show a resumption date. DDTL 5.5's roughly five-year tenor sits against underlying contracts averaging about three years (claims #8730, #8731), which leaves renewal exposure inside the loan term. Q2 2026 interest expense of $640M (claim #7341) at a -25% net margin (claim #7343) places heavy weight on converting the reported $104B backlog (claim #1493) into revenue on schedule.
Capital & dilution trajectory
2026-09-24CoreWeave's record since its $40 IPO (claim #11601) is mostly debt, and it has grown heavier over time. Direct equity dilution has been modest and episodic: IPO net proceeds of $1.4B (claim #4967), then strategic placements from NVIDIA at $2B (claim #3891) and Jane Street at $1B (claim #10305). The more consequential dilution sits in convertible paper. The December 2025 convertible upsized from a $2.0B base (claim #18739) to $2.5875B (claim #3980) and references roughly 30.0M underlying shares (claim #3984). A further $3.0B convertible due 2032 was proposed in April 2026 (claim #10325). Capped calls (claim #3986) cushion part of that overhang, but they do not remove it.
The mix reads as a deliberate structure rather than patching, though that structure is being stretched. Asset-backed delayed-draw facilities anchor the stack, and DDTL 4.0 carried A3/A(low) ratings (claim #11219). Around them sit unsecured senior notes at 9.25% (claim #4824) and 9% (claim #4697), with converts filling the gaps. Later layers look different. DDTL 5.5 is rated Ba2/BB+ at SOFR + 5.50% (claims #8732, #8733), which suggests the investment-grade template did not carry forward. The January 2026 postponement of debt-service-coverage and contract-realization testing (claims #3912, #3913) and the amended liquidity covenant (claim #3911) also require explanation alongside the pace of new borrowing.
On use of proceeds, the record states intent, for example GPU and customer-contract capex (claim #2138) and DDTL 5.0 purposes (claim #1320). It contains no deployment data, so whether actual spending tracks those stated uses cannot be tested here. The data show no insider sales, so no view on insider selling is possible.
Capital raised grew from more than $20B year-to-date in May (claim #9123) to more than $30B by August (claim #8735). Over the same period, quarterly interest expense reached $640M (claim #7341) and debt-to-equity sits near 6x (claim #3058). A sophisticated reader should watch three things. The first is whether the postponed covenant tests resume on schedule. The second is the gap between roughly 5-year facility maturities (claim #8730) and underlying customer contracts that average about 3 years (claim #8731). The third is whether the $104B backlog (claim #962) converts to cash quickly enough to service a capital stack now priced at sub-investment-grade spreads.
Capital & dilution trajectory
2026-09-24CoreWeave's record describes a company that has become a near-continuous issuer. After the $40 IPO (claim #11616) produced roughly $1.4B in net proceeds (claim #4967), the capital that followed was overwhelmingly debt. The company cites $28B of commitments over twelve months (claim #11221) and more than $30B year-to-date by August 2026 (claim #8735). Direct equity dilution has come from a few discrete events: the NVIDIA $2B purchase (claim #3891) and the Jane Street $1B investment (claim #10305). The more consequential dilution risk sits in the convertibles, namely the December 2025 issue sized at $2.5875B including the option (claim #3980), with conversion terms referencing 30,003,356 shares (claim #3984), and the proposed $3.0B 2032 convertible (claim #10325). The record contains no insider transactions, so no read on insider selling is possible.
The mix looks structured rather than improvised. Asset-level delayed-draw facilities fund contracted GPU buildouts, and unsecured notes and convertibles fund the corporate layer. Several deals were upsized in market, including the 2030 notes moving from $1.5B (claim #11921) to $2B (claim #11917) and the July notes rising to $1.75B (claim #4697), which indicates demand rather than strain. The terms have drifted, however. DDTL 4.0 carried A3/A(low) ratings (claim #11219). DDTL 5.5 is rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). Its roughly 5-year maturity sits against underlying contracts averaging about 3 years (claims #8730, #8731), which requires explanation.
The stated use of proceeds for the DDTL facilities is financing for customer-contract capex and GPU servers (claim #2138), and it is broadly consistent with a $104B backlog (claim #962). The record does not show actual deployment against those facilities, so tracking cannot be confirmed. On the December convertible, the capped-call allocation appears as $295.7M (claim #18738) and as $340M (claim #3986), likely reflecting the option exercise, but the gap is not reconciled in the record. The $2.6B convertible and $2.5B revolver claims appear under both February and April 2026 dates (claims #11765, #10327), which suggests the terms were revised before launch.
Several items deserve attention next. Covenant testing was postponed and a minimum liquidity covenant was amended in January 2026 (claims #3912, #3913, #3911), so watch whether debt-service-coverage tests (claims #2141, #1324) resume on schedule. Q2 2026 interest expense of $640M (claim #7341) set against a reported debt-to-equity ratio of about 6 (claim #3058) makes the coverage trajectory the central variable. The final question is whether future asset-backed facilities regain investment-grade ratings or continue at sub-investment-grade pricing.
Capital & dilution trajectory
2026-09-24CoreWeave's post-IPO capital history is overwhelmingly a debt story. Direct equity dilution has been comparatively contained: the $40 IPO (claim #11616) raised $1.4 billion net (claim #4967), and the later equity came in discrete, negotiated blocks from strategic counterparties, including NVIDIA's $2 billion (claim #3891), Jane Street's $1 billion (claim #10305), and a $350 million strategic customer issuance (claim #4514). The record shows no at-the-market program, and it contains no insider transaction entries, so nothing can be said about insider selling. Latent dilution sits mainly in the convertibles. The December 2025 issue reached $2.59 billion including the option (claim #3980), and a proposed $3.0 billion convertible due 2032 followed in April 2026 (claim #10325). The capped calls funded from the first issue, $340 million per claim #3986, soften but do not remove that exposure.
The mix looks structured rather than improvised. Unsecured high-yield notes at 9.25% (claim #4824) and 9% (claim #4697) funded the corporate layer. Asset-level delayed draw term loans were tied to customer contracts, which is the stated purpose in claim #2138. The DDTL 4.0 facility carrying A3/A(low) ratings (claim #11219) suggests the contract-backed template reached investment-grade treatment. The sequence was not linear, however. The January 2026 postponement of debt service coverage and contract realization testing (claims #3912 and #3913), together with an amended minimum liquidity covenant (claim #3911), requires explanation, particularly because NVIDIA's equity arrived weeks later. Several note closings are also tagged as delayed (claims #11919, #4699 and #9699).
On use of proceeds, the record states intentions, such as capped calls (claim #18743) and GPU capex (claim #2138), but contains no deployment data against which to test them. Tracking therefore cannot be assessed.
The forward questions are about carrying cost and duration. Q2 2026 interest expense of $640 million (claim #7341) sits against revenue of $2.58 billion (claim #8177) and a net margin of -25% (claim #7343). The newest DDTL 5.5 is rated Ba2/BB+ and priced at SOFR plus 5.50% (claims #8732 and #8733), well below the DDTL 4.0 rating. It also carries roughly a five-year maturity against customer contracts averaging about three years (claims #8730 and #8731). A careful reader should watch whether contract renewals close that gap and whether the postponed covenant tests resume on schedule. Another open question is whether the $104 billion backlog (claim #1493) converts into cash quickly enough to service a 2030–2032 maturity stack that is growing with each quarter's issuance.
Capital & dilution trajectory
2026-09-23CoreWeave's record describes a company financing itself almost continuously. Since the March 2025 IPO at $40 (claim 11616), which netted $1.4B (claim 4967), the company has come to market roughly every four to eight weeks. Management's own running totals rose from more than $20B raised year-to-date by May 2026 (claim 9123) to more than $30B by August (claim 8735). The record contains no share counts, ATM program or insider sales, so dilution cannot be sized directly. Its sources, however, can be traced. Primary equity came from strategic placements rather than public follow-ons: NVIDIA's $2B (claim 3891) and Jane Street's $1B (claim 10305). Contingent dilution sits in two convertible tranches, the $2.5875B issue (claim 3980), partly offset by a $340M capped call (claim 3986), and the $3.0B notes due 2032 (claim 2126), which carry a further $450M option (claim 10326). The mix looks structured rather than improvised. Asset-level delayed-draw facilities fund contracted GPU buildouts (claim 2138). Unsecured notes and converts sit at the corporate level. DDTL 4.0 carried A3/A(low) ratings (claim 11219). That coherence has been tested, though. The January 2026 amendments postponed debt service coverage and contract realization testing and revised the minimum liquidity covenant (claims 3912, 3913, 3911), and those changes require explanation alongside a financing program described as disciplined. The most recent facility, DDTL 5.5 at $2.6B (claim 8729), priced at SOFR + 5.50% (claim 8733) with Ba2/BB+ ratings (claim 8732). That is a clear step down in credit quality from DDTL 4.0. It also runs roughly five years (claim 8730) against underlying contracts averaging about three (claim 8731). On use of proceeds, the record states intent (claims 11920, 1320, 2138) but contains no disclosures of actual deployment, so whether the two track cannot be assessed from this data. Several announced closings were tagged as delayed (claims 11919, 4699, 9699) without further detail. For what comes next, the Q2 2026 figures frame the pressure: $640M of interest expense (claim 7341) against revenue of $2.58B (claim 8177), a -25% net margin (claim 7343) and a debt-to-equity ratio near 6 (claim 3058). A careful reader should watch whether the postponed covenant tests resume on schedule. It is also worth watching whether the $104B backlog (claim 1493) turns into cash fast enough to cover the refinancing gap that the shorter contract tenors create, and whether the pricing slide from DDTL 4.0 to DDTL 5.5 continues.
Capital & dilution trajectory
2026-09-23CoreWeave's record since its $40 IPO (claim 11616) describes a company that finances almost continuously, with a new instrument roughly every four to eight weeks. The trajectory is steep. The company cited $28B of commitments over twelve months (claim 11221), more than $20B year-to-date by May (claim 9123), and more than $30B by August (claim 8735). Direct equity dilution has been modest relative to that total: $1.4B in IPO net proceeds (claim 4967), a $350M strategic customer issuance (claim 4514), NVIDIA's $2B (claim 3891) and Jane Street's $1B (claim 10305). The larger dilution question is deferred into the convertibles, the $2.59B December issue (claim 3980) and the $3.0B 2032 issue with a $450M option (claims 10325, 10326). The $340M capped call (claim 3986) indicates management is actively managing that overhang. The record contains no insider sale disclosures, so no inference is drawn there.
The mix reads as a deliberate layered structure more than improvisation. Contract-backed delayed-draw facilities fund GPU deployment (claim 2138). Unsecured notes, several upsized from their initial size (claims 11921 against 11917, and 4700 against 4697), sit above them. Converts and strategic equity backfill the base. The quality of the stack, however, is not uniform. DDTL 4.0 carried A3 investment-grade ratings (claim 11219), while the August DDTL 5.5 priced at SOFR plus 5.50% with Ba2/BB+ ratings (claims 8733, 8732) against contracts averaging about three years (claim 8731). That divergence requires explanation.
The use of proceeds is disclosed in general terms (claims 11920, 1320), and the dataset offers no way to reconcile specific draws against specific deployments. The January 2026 postponement of debt service coverage and contract realization ratio testing, together with a minimum liquidity amendment (claims 3912, 3913, 3911), shows that covenant headroom was revised rather than met as originally drafted.
A sophisticated reader should watch four things. First, whether the postponed ratio tests resume on schedule. Second, how Q2's $640M interest expense (claim 7341) trends against $2.58B of revenue (claim 8177) as the June $3.5B notes (claim 8927) come on. Third, whether conversion of the 2025 and 2026 converts brings the deferred dilution forward. Fourth, whether the $104B backlog (claim 1493) converts to cash at a pace that supports the six-times debt-to-equity ratio reported for Q2 (claim 3058).
Capital & dilution trajectory
2026-09-23CoreWeave's record describes a company financing itself almost entirely through debt since its $40 IPO (claim #11616), which produced about $1.4B in net proceeds (claim #4967). Equity dilution has come mostly from strategic placements: the $350M customer share issuance (claim #4514), NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). Convertibles are the growing source of potential dilution. The $2.5875B convertible (claim #3980) was partly offset by $340M of capped calls (claim #3986), and it was followed by a proposed $3.0B 2032 convertible with a $450M option (claims #10325, #10326). The record contains no ATM activity and no insider transactions, so neither can be assessed. The mix follows a recognizable structure. Contract-backed delayed-draw term loans fund GPU capex, and unsecured notes and converts sit at the corporate level. The DDTL sequence runs from $2.6B (claim #11922) to $8.5B at A3/A(low) (claims #11218, #11219), then $3.1B (claim #9116), then $2.6B at Ba2/BB+ priced at SOFR+5.50% (claims #8729, #8732, #8733). That the newest facility is rated sub-investment-grade after the investment-grade DDTL 4.0 requires explanation. The corporate notes carry 9% to 9.25% coupons (claims #4824, #4697). The January 2026 postponement of the debt service coverage and contract realization tests, along with the minimum liquidity amendment (claims #3912, #3913, #3911), was not followed by any disclosed restoration. It reads more like accommodation than design. On use of proceeds, the stated purpose is customer-contract capex and GPU servers (claim #2138). The record contains no deployment data, so whether funds tracked that purpose cannot be verified. The scale is visible in the cumulative totals: $17.2B (claim #4968), $28B over twelve months (claim #11221) and more than $30B year-to-date by August 2026 (claim #8735). It also shows in Q2 2026 interest expense of $640M against $2.58B of revenue (claims #7341, #8177). The DDTL 5.5 facility has a maturity of about five years (claim #8730), while its underlying contracts average about three years (claim #8731). That gap requires explanation, because it places renewal risk on the lender's collateral. A careful reader should watch four things: whether the postponed covenants are tested on schedule, how the $104B backlog (claim #1493) converts into cash relative to debt service, whether future DDTLs price closer to DDTL 4.0 or DDTL 5.5, and how much of the 2032 convertible settles in shares.
Capital & dilution trajectory
2026-09-23CoreWeave's capital record since its $40 IPO (claim 11616) is overwhelmingly a debt story, and the cadence has accelerated rather than settled. The IPO's $1.4B of net proceeds (claim 4967) is now small next to the $28B of equity and debt commitments the company cited over a trailing twelve months (claim 11221) and the more than $30B it cited as raised year-to-date by August 2026 (claim 8735). Common-equity dilution has come mainly through strategic placements, not market offerings: NVIDIA's $2B (claim 17594) and Jane Street's $1B (claim 10305). The larger latent dilution sits in the convertibles, the $2.59B issue (claim 3980) with its $340M capped call (claim 3986) and the proposed $3.0B due 2032 (claim 10325), which carries a further $450M option (claim 10326). The record contains no insider transactions, so no view on insider selling is possible here.
The mix reads as a deliberate architecture more than patching. Asset-level delayed-draw facilities fund contracted capex and GPU servers (claim 2138). Unsecured notes at 9.25% (claim 4824) and 9% (claim 4697) sit alongside them, as do a revolver expanded twice (claims 11923, 11766) and equity from counterparties with commercial ties. The DDTL 4.0 facility's A3/A(low) rating (claim 11219) is the most notable structural achievement. The later DDTL 5.5 facility was rated Ba2/BB+ and priced at SOFR + 5.50% (claims 8732, 8733). Why the credit quality of successive facilities has diverged requires explanation.
The data states use of proceeds at a general level only (claims 11920, 1320, 2138). It does not allow deployment to be traced against those statements. Several closing dates are tagged delayed (claims 11919, 4699, 9699). One convertible appears at $2.6B in some filings and $3.0B in others (claims 10327, 10325), and the record does not resolve which figure applies.
A careful reader should watch four items next. The first is whether the debt service coverage and contract realization tests postponed in January 2026 (claims 3912, 3913) resume on schedule. The second is the gap between contracts averaging about three years (claim 8731) and a roughly five-year facility maturity (claim 8730). The third is Q2 2026 interest expense of $640M (claim 7341) against revenue of $2.58B (claim 8177) and a net margin of about -25% (claim 7343). The fourth is how the roughly $100B backlog (claim 647) turns into cash quickly enough to service the stack. The claim list supplied was truncated, so later events may be missing.
Capital & dilution trajectory
2026-09-23CoreWeave's post-IPO capital history is dominated by debt. The $40 IPO (claim 11616) produced roughly $1.4B in net proceeds (claim 4967), a small figure against the more than $30B of debt and equity the company says it secured in 2026 through August (claim 8735). Most of that came from secured delayed-draw facilities and high-yield notes. Common-equity dilution has come in discrete private placements rather than marketed follow-ons: a $350M strategic customer issuance (claim 4514), NVIDIA's $2B Class A purchase (claim 3891), and Jane Street's $1B investment (claim 10305). The more material share-count exposure is the convertible stack. That stack consists of $2.59B of notes carrying a $340M capped call (claims 3980, 3986), followed by a proposed $3.0B due 2032 with a $450M option (claims 10325, 10326). Conversion outcomes will set the actual dilution trajectory more than any single equity event.
The mix reads as a deliberate structure rather than patching. Contract-backed DDTL facilities finance GPU capex (claim 2138), unsecured notes and converts sit above them, and strategic equity arrives from counterparties with commercial ties. The DDTL series did reach A3/A(low) ratings on the $8.5B DDTL 4.0 (claims 11218, 11219). However, the later DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims 8733, 8732). That suggests the investment-grade template has not carried over uniformly, and the reason requires explanation. The underlying contracts on that facility average about three years (claim 8731) against a roughly five-year maturity (claim 8730). That tenor gap depends on renewal assumptions the record does not describe.
Use-of-proceeds language is stated for several offerings (claims 11920, 1320), but the record contains no deployment data, so actual allocation cannot be tested here. The January 2026 amendments are also relevant. They postponed debt service coverage and contract realization ratio testing and revised the minimum liquidity covenant (claims 3912, 3913, 3911). They indicate that the original covenant timeline was revised within months of the facilities closing.
The record shows no insider transactions, so no read on insider selling is possible. A sophisticated reader should watch four things. The first is when the postponed ratio tests resume and on what terms. The second is Q2 2026 interest expense of about $640M (claim 7341) relative to operating income (claim 9281). The third is debt-to-equity near 6 (claim 3058). The fourth is whether new facilities price closer to the DDTL 4.0 or DDTL 5.5 outcome. Conversion activity on the notes due 2032 is the principal dilution variable.
Capital & dilution trajectory
2026-09-23CoreWeave's post-IPO capital history is overwhelmingly a debt story, and equity dilution has been comparatively measured. After the $40 IPO (claim #11601) netted roughly $1.4B (claim #4967), new share issuance came mainly through negotiated strategic placements: NVIDIA's $2B Class A investment (claim #3891) and Jane Street's $1B (claim #10305). The two convertibles add contingent dilution. The December 2025 convertible of about $2.59B carried conversion terms referencing roughly 30M shares (claims #3980, #3984) and was partly offset by a $340M capped call (claim #3986). The April 2026 $3.0B convertible due 2032 added a $450M upsize option (claims #2126, #10326). The record contains no insider sale disclosures, so that dimension cannot be assessed.
The mix reads as a deliberate two-layer structure rather than opportunistic patching. Asset-level delayed-draw facilities fund contracted build-outs, and the stated use of proceeds for these is customer-contract capex and GPU servers (claims #2138, #1320). Holding-company unsecured notes and convertibles sit above that layer. Several notes offerings were upsized from their initial size, the July 2025 9% notes by $250M (claim #4698). That suggests demand was not the constraint.
The cost and quality of that capital are uneven. The $8.5B DDTL 4.0 carried A3/A(low) ratings (claim #11219). The later $2.6B DDTL 5.5 was rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). It also financed contracts averaging about three years against a roughly five-year loan (claims #8731, #8730). That mismatch requires explanation about re-contracting assumptions.
The January 2026 amendments, which postponed debt service coverage and contract realization ratio testing (claims #3912, #3913), were not revisited in later disclosures. Deployment against announced use of proceeds cannot be verified from this record, because no capex or draw-down figures appear alongside the facility announcements.
The Q2 2026 figures frame what comes next. Revenue was $2.58B (claim #8183), interest expense was $640M (claim #7374), and debt-to-equity sat near 6 (claim #7378). Against that, backlog was reported at $104B (claim #1493). A careful reader should watch four things. The first is when the postponed covenant tests resume and on what terms. The second is whether future DDTL tranches return to investment-grade ratings or continue at sub-investment-grade pricing. The third is how quickly the facilities are actually drawn relative to the more than $30B raised year-to-date (claim #8735). The fourth is whether share price levels bring the convertibles toward conversion, which would shift the balance from leverage to dilution.
Capital & dilution trajectory
2026-09-23CoreWeave's record since its $40 IPO (claim #11616) shows a company funding itself mostly through debt, with equity used sparingly and usually placed with strategic holders. Primary share issuance is limited to the IPO's roughly $1.4B net (claim #4967), a $350M strategic customer issuance (claim #4514), NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #10305). Dilution risk sits mainly in the convertibles. The $2.5875B December 2025 issue converts into roughly 30M shares (claim #3984) and carries a $340M capped call (claim #3986). A $3.0B 2032 convertible with a $450M upsize option followed (claims #10325, #10326). The $2.6B convertible cited in February and April 2026 (claims #11765, #10327) appears to refer back to the December deal rather than a separate issue, but the record does not settle this. No insider transactions appear in the data, so that dimension cannot be assessed.
The debt stack follows a coherent template. Asset-level delayed-draw facilities are tied to specific customer contracts, with DDTL 4.0 financing contract capex and GPU servers (claim #2138). These are layered over unsecured notes and a revolver that grew from $1.5B (claim #11923) to $2.5B (claim #11766). The pace has quickened, from more than $20B year-to-date in May (claim #9123) to more than $30B by August (claim #8735). The terms have also moved. DDTL 4.0 carried A3 investment-grade ratings (claim #11219), while the later DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims #8733, #8732). Unsecured coupons of 9.25% and 9% (claims #4824, #4697) set the baseline cost.
On use of proceeds, the DDTL disclosures are specific about what they fund (claims #2138, #1320). The unsecured notes' stated use (claim #11920) is less traceable to actual deployment. The January 2026 amendment, which postponed debt service coverage and contract realization ratio testing and revised the minimum liquidity covenant (claims #3911–#3913), requires explanation. It came in the same period the company was describing strong contract coverage.
Three things are worth watching. First, whether postponed covenant tests resume on schedule. Second, the carrying cost: Q2 2026 interest expense of $640M (claim #7341) against $2.58B of revenue (claim #8177) and a negative 25% net margin (claim #7343). Third, the tenor gap between customer contracts averaging about three years (claim #8731) and facilities running about five years (claim #8730). The $104B backlog (claim #1493) and Meta's $21B commitment (claim #2124) are the offsetting evidence. The Q2 claim set is truncated in the record provided.
Capital & dilution trajectory
2026-09-23CoreWeave's record shows a company that has financed its growth mainly through debt, with equity used as an occasional supplement. Since the $40 IPO (claim 11616), which netted roughly $1.4B (claim 4967), the cadence has accelerated. Management cited $28B in commitments over the trailing twelve months by March 2026 (claim 11221), more than $20B year-to-date by May (claim 9123) and more than $30B by August (claim 8735). Direct equity dilution has come in discrete strategic blocks: the NVIDIA $2B investment (claim 3891) and the Jane Street $1B investment (claim 10305). The larger contingent share overhang sits in the convertibles. The December 2025 $2.59B offering (claim 3980) carries roughly 30M conversion shares (claim 3984), partly offset by a $340M capped call (claim 3986). A further $3.0B due 2032, with a $450M option (claims 10325, 10326), will add to that overhang. The record contains no ATM program and no insider transactions, so neither can be assessed.
The mix looks coherent rather than improvised. Delayed-draw term loans secured against customer contracts fund contract-specific capex (claim 2138), while unsecured high-yield notes and converts fund the corporate layer. Two notes offerings were upsized: the 2030 notes from $1.5B to $2.0B (claims 11921, 11917) and the July 2025 notes by $250M (claim 4698). That points to demand-led sizing rather than distress. The January 2026 amendments postponing debt-service-coverage and contract-realization testing and revising the minimum liquidity covenant (claims 3912, 3913, 3911) do not fit that picture and require explanation. So does the spread between tranches. DDTL 4.0 carried A3/A(low) ratings (claim 11219), while DDTL 5.5 was rated Ba2/BB+ and priced at SOFR + 5.50% (claims 8732, 8733). The record does not say what drove that difference.
The stated uses of proceeds are specific, but the record contains no capex or deployment figures to check them against. Revenue of $2.58B at 112% growth (claims 8183, 8185) and a backlog near $104B (claim 962) are consistent with capacity coming online, but they do not verify it.
A sophisticated reader should watch four things. First, interest expense of $640M in the quarter (claim 7341) against a -25% net margin (claim 7343). Second, the gap between customer contracts averaging about three years (claim 8731) and facility maturities of about five years (claim 8730). Third, whether the postponed covenant tests resume on schedule. Fourth, the credit quality behind future DDTL tranches.
Capital & dilution trajectory
2026-09-23CoreWeave's record describes a company financing growth mainly through leverage. Equity is used sparingly and tends to come from strategic partners rather than the public market. After the $40 IPO (claim 11616), direct equity came mostly from counterparties with commercial ties: NVIDIA's $2B (claim 17594) and Jane Street's $1B (claim 10305). Dilution so far is therefore modest in cadence but deferred in form. The December convertible of roughly $2.59B (claim 3980) references about 30.0M underlying shares (claim 3984), partly offset by a $340M capped call (claim 3986). A proposed $3.0B convertible due 2032, with a $450M option (claims 10325, 10326), would add a second layer of contingent share issuance.
The debt mix is more coherent than opportunistic. Delayed-draw facilities are secured against customer contracts and scale in size: $2.6B (claim 11922), $3.0B (claim 4277), $8.5B (claim 11218), $3.1B (claim 9116) and $2.6B (claim 8729). Unsecured notes at 9.25% (claim 4824) and 9% (claim 4697) sit alongside them, and the revolver was expanded from $1.5B (claim 11923) to $2.5B (claim 10328). Aggregate commitments rose from $28B over twelve months (claim 11221) to more than $30B year-to-date by August (claim 8735).
Two trajectories require explanation. First, DDTL 4.0 carried A3 investment-grade ratings (claim 11219). The later DDTL 5.5 is rated Ba2/BB+ and priced at SOFR plus 5.50% (claims 8732, 8733). Second, that facility runs about five years (claim 8730) while its underlying contracts average about three (claim 8731), which leaves a renewal dependency.
The January amendments postponed debt-service-coverage and contract-realization testing and revised the minimum liquidity covenant (claims 3912, 3913, 3911). These fit a business drawing capital faster than contracted cash flows mature.
Use of proceeds is stated (claims 11920, 1320), but the record contains no deployment reconciliation, so it cannot be tested here.
Q2 results show the carrying cost. Interest expense was $640M (claim 7374) against $2.58B of revenue (claim 8183). The net margin was -25% (claim 7376) and debt-to-equity about 6 (claim 7378). Backlog of $104B (claim 1493) is the asset the structure depends on.
The record contains no insider transactions, and the claim list appears truncated. Conclusions about insider behavior are therefore not possible.
A careful reader should watch four things: when covenant testing resumes, whether future DDTLs regain investment-grade treatment, how contract renewals track facility tenors, and whether convertible share-price thresholds are approached.
Capital & dilution trajectory
2026-09-22The cadence is the story. Roughly eighteen months separate a $40 IPO producing $1.4B net (claims 11616, 4967) from a disclosed $30B of debt and equity secured year-to-date (claim 8735), with an intermediate marker of $28B in commitments over a trailing twelve months (claim 11221). Equity was a one-time event; everything since has been borrowed, converted, or sold to counterparties with a commercial interest. The escalation is not linear but compounding: $2.0B of 9.250% notes in May 2025 (claim 4824), $1.75B at 9% two months later after a $250M upsize (claims 4698, 4697), then $2.59B of converts in December (claim 3980), then an $8.5B DDTL in March 2026 (claim 11218) and a further $3.1B and $2.6B in May and August (claims 9116, 8729).
The mix reads as deliberate rather than opportunistic, and the pricing evidence supports that. Moving from high-coupon unsecured paper to contract-backed infrastructure debt rated A3/A(low) (claim 11219), and then to the first publicly syndicated HPC infrastructure financing (claim 9117), is a financing engineer's progression, not patching. But the structure has bifurcated: DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims 8733, 8732), well outside the investment-grade tranche. The same disclosure notes a roughly five-year facility maturity against customer contracts averaging approximately three years (claims 8730, 8731). That mismatch requires explanation and is the single most load-bearing fact in the record.
Use of proceeds has been stated consistently as customer-contract capex and GPU servers (claim 2138), and the demand-side anchors are large and specific — $6.5B committed from OpenAI (claim 4297), $21B from Meta (claim 2124), backlog near $104B (claim 962). The record does not, however, permit independent verification that drawn capital matched stated purpose; that gap should be treated as unverified rather than contradicted. Separately, January 2026 brought postponement of debt service coverage and contract realization ratio testing and an amendment to the minimum liquidity covenant (claims 3912, 3913, 3911) — revised terms, disclosed, worth tracking forward.
Watch the covenant amendments for recurrence, the ratings spread between infrastructure and corporate tranches, and whether Q2's $640M interest expense against a -25% net margin and ~6x debt-to-equity (claims 7341, 10221, 3058) begins converting backlog into cash. No insider sales appear on this record.
Capital & dilution trajectory
2026-09-22The cadence here is not periodic but continuous. From the $40 IPO in March 2025 (claim 11616) and its modest $1.4B of net proceeds (claim 4967), the company moved within eight weeks to a $1.5B revolver expansion (claim 11923), then to $2.0B of 9.250% senior notes (claim 4824), and has not paused since — roughly $28B of commitments in the twelve months to March 2026 (claim 11221) and more than $30B year-to-date by August 2026 (claim 8735). Straight equity is a small share of that: the IPO, $350M of strategic customer shares (claim 4514), NVIDIA's $2B (claim 3891), and Jane Street's $1B (claim 2080). The dilution that matters is deferred, sitting in roughly $8.2B of converts — $2.5875B in December 2025 (claim 3980), $2.6B in February 2026 (claim 11765), $3.0B due 2032 in April 2026 (claim 2126) — partially offset by $340M of capped calls (claim 3986).
The mix reads as strategy rather than patching. Stated use of proceeds is consistently customer-contract capex and GPU servers (claims 2138, 1320), and the contracted demand behind it is disclosed: OpenAI at $6.5B (claim 4297), Meta at $21B (claim 2124), backlog near $104B (claim 962). Structure has tracked that logic, culminating in the $8.5B DDTL 4.0 carrying A3/A(low) ratings (claims 11218, 11219).
Two items require explanation. The pricing path is not monotonic: DDTL 5.5 in August 2026 closed at Ba2/BB+ and SOFR+5.50% (claims 8732, 8733), a materially wider marginal cost than the investment-grade tranche five months earlier. And the same disclosure pairs a roughly five-year facility maturity against customer contracts averaging about three years (claims 8730, 8731) — a tail the contracts do not currently cover. Separately, DSCR and contract-realization testing were postponed and the minimum liquidity covenant amended in January 2026 (claims 3912, 3913, 3911), before DSCR covenants reappeared in DDTL 4.0 and 5.0 (claims 2141, 1324).
Watch whether the IG execution repeats or the high-yield spread becomes the run rate; whether postponed tests resume and are met; and whether backlog converts to cash faster than $640M of quarterly interest (claim 7341) against debt-to-equity near six (claim 3058). No insider transaction data appears on this record, so no read on insider behavior is available.
Capital & dilution trajectory
2026-09-21The cadence here is not episodic; it is industrialized. From the $40 IPO in March 2025 (claim #11616), which netted only about $1.4B (claim #4967) against $17.2B already raised across debt and equity (claim #4968), CoreWeave has closed a financing roughly every four to six weeks, with ticket sizes ratcheting from the $1.5–2.0B range in mid-2025 (claims #11917, #4658) to the $8.5B DDTL 4.0 in March 2026 (claim #2137), $28B of commitments in twelve months (claim #11221), and more than $30B year-to-date by August (claim #8735). Equity is by far the smallest component and has been strategic rather than market-facing — NVIDIA's $2B (claim #3891) and Jane Street's $1B (claim #2080). There is no ATM program and no insider transaction on this record, so no read on insider behavior is available; that absence should be treated as missing data, not as evidence.
The mix reads as architecture rather than opportunistic patching. Contract-backed delayed-draw term loans fund GPU and customer-contract capex (claim #2138), unsecured notes carry corporate risk (claims #4824, #8927), and convertibles paired with capped calls — the $2.5875B December 2025 issue alongside $340M of capped calls (claims #3980, #3986), then $3.0B due 2032 (claim #2126) — buy lower coupons while deferring dilution. Pricing improved from 9.250% (claim #4824) to investment-grade A3/A(low) on DDTL 4.0 (claim #11219), then reverted to Ba2/BB+ at SOFR+5.50% on the August DDTL 5.5 (claims #8732, #8733). That tiering is the structure working as designed, but it also marks where collateral quality thins.
Use of proceeds tracks the stated purpose consistently across facilities (claims #2138, #1320), with $104B of backlog (claim #1493), Meta's $21B commitment (claim #2124) and OpenAI's $6.5B (claim #4297) as the underlying collateral narrative. The item requiring explanation is January 2026: a minimum liquidity covenant amendment plus postponement of both debt-service-coverage and contract-realization testing (claims #3911–#3913), taken immediately before the largest facilities closed and not revisited on this record since.
Watch three things: whether roughly five-year facility maturities against roughly three-year customer contracts (claims #8730, #8731) force re-contracting or refinancing; whether $640M of quarterly interest (claim #7341) against $2.58B of revenue (claim #8177) and 6x debt-to-equity (claim #7345) compresses further; and whether the next equity tranche comes from strategics or from the open market.
Capital & dilution trajectory
2026-09-21The cadence here is not periodic, it is continuous. From a $1.4B IPO net raise in March 2025 (claim 4967) the company reached a self-reported $17.2B of cumulative debt and equity by May 2025 (claim 4968), $28B of commitments in a trailing twelve months by March 2026 (claim 11221), and more than $30B year-to-date by August 2026 (claim 8735). Intervals between capital events compress rather than lengthen, and the absolute size of each event grows: $2B of 9.250% notes in May 2025 (claim 11917) against an $8.5B delayed-draw facility in March 2026 (claim 11218) and a $3.5B unsecured offering in June 2026 (claim 8927).
The mix reads as designed rather than patched. Unsecured high-coupon paper front-loaded the build, convertibles absorbed the middle (the $2.5875B issue with $340M of capped calls, claims 3980 and 3986, then $3.0B due 2032 with a $450M option, claims 2126 and 2127), and contract-backed delayed-draw facilities carried the later, heavier capex — DDTL 3.0 through 5.5, culminating in the first publicly syndicated HPC infrastructure-backed financing (claim 9117). Strategic equity from NVIDIA (claim 3891) and Jane Street (claim 2080) arrived without an ATM. Pricing did not improve monotonically: DDTL 4.0 carried A3/A(low) ratings (claim 11219) while DDTL 5.5 four months later priced at SOFR+5.50% with Ba2/BB+ (claims 8733, 8732), which indicates collateral-tiering, not a uniform credit re-rating.
Stated use of proceeds has tracked deployment consistently — customer-contract capex and GPU servers (claims 2138, 1320) — and the $6.5B OpenAI and $21B Meta commitments (claims 4297, 2124) plus a $104B backlog (claim 1493) supply the contractual counterpart.
Three items warrant attention. The January 2026 amendments postponing debt service coverage and contract realization ratio testing and revising minimum liquidity (claims 3911–3913) were followed by DSCR covenants reappearing in DDTL 4.0 and 5.0 (claims 2141, 1324); whether those now bind is the question. Second, underlying customer contracts average roughly three years against a five-year facility maturity (claims 8731, 8730) — a tenor gap requiring explanation. Third, $640M of quarterly interest expense against $2.58B of revenue and a 6x debt-to-equity ratio (claims 7341, 8177, 3058), with current and quick ratios below one (claims 7379, 7380). No insider transactions appear on this record, so nothing can be said there.
Capital & dilution trajectory
2026-09-21The defining feature here is not dilution but its substitution. Common-equity issuance is comparatively restrained across eighteen months — $1.4B of IPO net proceeds (claim 4967), $350M in strategic customer shares (claim 4514), NVIDIA's $2B Class A investment (claim 3891) and Jane Street's $1B (claim 10305) — against a debt and hybrid stack that the company itself frames as $28B of commitments in twelve months (claim 11221) and more than $30B year-to-date by August (claim 8735). The counting basis shifts between those disclosures and the >$20B figure of May (claim 9123), so the totals are not additive and should not be read as such.
The mix reads as sequenced rather than opportunistic. Unsecured coupons of 9.250% (claim 4824) and 9% (claim 4697) in mid-2025 gave way to converts once the equity had a print: $2.5875B in December (claim 3980), $2.6B in February (claim 11765), $3.0B due 2032 in April (claim 2126). That is a deliberate migration down the cost curve, and the contract-then-finance rhythm — OpenAI's $6.5B (claim 4297), Meta's $21B (claim 2124), each trailed by a delayed-draw facility sized to it (claims 11218, 1319, 8729) — is coherent asset-liability matching. Stated use of proceeds (claims 2138, 1320) is consistently capex and GPU servers, and the $104B backlog (claim 1493) is directionally consistent with deployment, though the record here does not permit tracing dollars to assets.
Three items require explanation rather than alarm. The $340M capped call accompanying the December converts (claim 3986) has no disclosed equivalent for the February or April issues. The A3/A(low) rating on DDTL 4.0 (claim 11219) did not carry to DDTL 5.5, priced at SOFR+5.50% and rated Ba2/BB+ (claims 8733, 8732); the marginal facility is now worse paper. And the underlying contracts average roughly three years against a five-year maturity (claims 8731, 8730) — a refinancing tail that must be re-contracted.
Watch the January covenant actions: minimum liquidity amended (claim 3911), debt service coverage and contract realization testing both postponed (claims 3912, 3913), against 6x debt-to-equity (claim 3058) and $640M of quarterly interest expense (claim 7341). No insider transaction data appears in this record, so nothing can be said about it.
Capital & dilution trajectory
2026-09-21The cadence is continuous rather than episodic, and it steepens. From a $40 IPO (claim 11601) yielding $1.4B net (claim 4967) against $17.2B cumulative capital by May 2025 (claim 4968), the company reached $28B of commitments in a trailing twelve months by March 2026 (claim 11221), more than $20B year-to-date by May (claim 9123) and more than $30B by August (claim 8735). Financing events now cluster at roughly monthly intervals, which is a structural feature of the model, not a sign of distress by itself.
The mix reads as deliberate, with one seam worth watching. The early post-IPO reliance on expensive unsecured paper — the 9.250% notes due 2030 at $2.0B (claim 11917) and the 9% $1.75B issue (claim 4697) — has been progressively displaced by contract-backed delayed draw facilities: DDTL 3.0 at $2.6B (claim 11922), DDTL 4.0 at $8.5B carrying A3/A(low) ratings (claims 11218, 11219), DDTL 5.0 at $3.1B as the first publicly syndicated HPC infrastructure financing (claims 9116, 9117). That is a genuine cost-of-capital migration. The seam is DDTL 5.5, $2.6B rated Ba2/BB+ at SOFR+5.50% (claims 8729, 8732, 8733) against roughly three-year underlying contracts (claim 8731) — a materially weaker tranche than DDTL 4.0, which requires explanation as to collateral and contract quality rather than assumption of uniform improvement. Equity has been used sparingly and strategically: NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 2080), and converts paired with $340M of capped calls (claim 3986), indicating dilution is being actively managed rather than absorbed. No insider transactions and no ATM appear on this record; that absence is itself informative but should not be over-read.
Use of proceeds tracks stated purpose reasonably well — customer contract capex and GPU servers (claims 2138, 1320) against a $104B backlog (claim 962) and named commitments from OpenAI at $6.5B (claim 4297) and Meta at $21B (claim 2124).
What merits attention next: the postponed contract realization ratio and debt service coverage testing (claims 3913, 3912) and the amended minimum liquidity covenant (claim 3911), which are delayed rather than resolved; the DDTL 5.0 draw deadline (claim 1321); and $640M of quarterly interest expense (claim 7341) against 6x debt-to-equity (claim 3058) and sub-1 current and quick ratios (claims 7379, 7380). The ratings trajectory across successive DDTLs is the cleanest single tell.
Capital & dilution trajectory
2026-09-21The defining feature of this record is not any single raise but the absence of pauses between them. From the March 2025 IPO at $40 (claim 11616) yielding roughly $1.4B net (claim 4967), the company reached $17.2B of cumulative debt and equity by mid-May 2025 (claim 4968), then $28B of commitments in the trailing twelve months by March 2026 (claim 11221), then more than $30B year-to-date by August 2026 (claim 8735). Financing is functionally a continuous operating process, not a periodic event.
The mix is more coherent than opportunistic, and the trajectory has direction. Early 2025 relied on expensive unsecured corporate credit — the $2.0B 9.250% notes due 2030 (claim 11917) and the $1.75B 9% notes (claim 4697), both of which were upsized from announced $1.5B (claims 11921, 4700; increase of $250M per claim 4698), indicating demand rather than distress. From late 2025 the structure migrates toward contract-backed delayed-draw term loans — DDTL 4.0 at $8.5B carrying A3/A(low) ratings (claims 2137, 11219), then DDTL 5.0 at $3.1B described as the first publicly syndicated HPC infrastructure-backed financing (claims 1319, 9117). That migration lowers cost by pledging customer contracts rather than the enterprise. Equity has been used sparingly and strategically — NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 10305), a $350M strategic customer issuance (claim 4514) — with no ATM and no insider sales on record. Convertibles, including $2.5875B in December 2025 with a $340M capped call (claims 3980, 3986), sit between.
Stated use of proceeds is consistently customer-contract capex and GPU servers (claims 2138, 1320) and nothing in the record contradicts that, though the data does not permit tracing actual deployment against it.
Three items require explanation rather than alarm. The January 2026 postponements of debt service coverage and contract realization ratio testing, and the minimum liquidity amendment (claims 3912, 3913, 3911), are covenant relief obtained before the largest facilities closed. The August 2026 facility priced at SOFR+5.50% with Ba2/BB+ ratings (claims 8733, 8732) is materially weaker than March's investment-grade tranche. And underlying contracts average roughly three years (claim 8731) against facility maturities near five to five-and-a-half (claims 8730, 9120) — a tenor gap that must be closed by renewal. Watch DDTL draw pace against the availability deadline (claim 1321), the 1.x DSCR covenant (claim 1324) against $640M of quarterly interest expense (claim 7341), and conversion of the $104B backlog (claim 962).
Capital & dilution trajectory
2026-09-20The shape here is a company that treated its IPO as an opening deposit rather than a funding event. The $40 pricing (claim 15974) netted roughly $1.4B (claim 4967), and within six weeks the balance sheet had moved to a $1.5B revolver expansion and a $350M letters-of-credit facility (claims 11923, 11924). By 2025-05-13 the cumulative debt-and-equity figure was already $17.2B (claim 4968), against $28B of commitments in the trailing twelve months as of 2026-03-30 (claim 11221) and more than $30B year-to-date by 2026-08-09 (claim 8735). Cadence is not episodic; it is continuous, and it accelerates.
The mix reads as coherent rather than opportunistic, but coherent in a specific and narrow way. Common-equity dilution is small and almost entirely strategic: the $350M customer share issuance (claim 4514), NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 2080). The heavy lifting is contract-collateralized term debt — DDTL 3.0 at $2.6B (claim 11922), DDTL 4.0 at $8.5B (claim 11218), DDTL 5.0 at $3.1B (claim 9116), DDTL 5.5 at $2.6B (claim 8729) — each explicitly tied to customer-contract capex and GPU servers (claims 2138, 1320). Stated use of proceeds tracks deployment as far as the record permits, and the counterparty commitments are visible against it: OpenAI at $6.5B (claim 4297), Meta at $21B (claim 2124).
Cost of capital moved in two directions at once. The 9.250% 2030 notes (claim 4824) and 9% 2031 notes (claim 4697) sit alongside an A3/A(low) rating on the DDTL 4.0 structure (claim 11219), while DDTL 5.5 priced at SOFR+5.50% with Ba2/BB+ (claims 8733, 8732). The convertible stack — $2.5875B (claim 3980), $2.6B (claim 11765), $3.0B due 2032 (claim 2126) — carries a capped call only on the first tranche, at $340M (claim 3986).
Three items require explanation rather than alarm: the contract realization ratio testing postponement, the debt service coverage ratio testing postponement, and the minimum liquidity covenant amendment, all dated 2026-01-01 (claims 3913, 3912, 3911). Against $640M of quarterly interest expense (claim 7341) and debt-to-equity near 6 (claim 3058), watch whether those tests resume on schedule and whether the DDTL 5.0 draw deadline (claim 1321) is met.
No insider transactions appear on this record, and the claim list is truncated; that absence should not be read as a finding.
Capital & dilution trajectory
2026-09-20The cadence compresses rather than stabilizes. The March 2025 IPO at $40 (claim 11601) returned roughly $1.4B net (claim 4967) against $17.2B of total debt and equity already raised by May 2025 (claim 4968); that became $28B of commitments in twelve months by March 2026 (claim 11221) and more than $30B year-to-date by August 2026 (claim 8735). Equity is the minority instrument: the $350M strategic customer issuance (claim 4514), NVIDIA's $2B Class A investment (claims 3891, 9316), Jane Street's $1B (claim 2080), and two convertible tranches — $2.5875B in December 2025 alongside $340M of capped calls (claims 3980, 3986) and $2.6B in February 2026 (claim 11765), with a further $3.0B due 2032 plus a $450M purchaser option proposed in April 2026 (claims 10325, 10326). The capped calls defer dilution rather than remove it, so the dilution trajectory is back-loaded toward 2030-2032 maturities.
The mix is coherent at the structural level and opportunistic at the edges. The spine is a repeating delayed-draw term loan program secured by contracted infrastructure — DDTL 3.0 (claim 11922), 4.0 at $8.5B (claim 11218), 5.0 at $3.1B (claim 9116), 5.5 at $2.6B (claim 8729) — and its pricing record is the most informative series here. Unsecured paper at 9.250% in May 2025 (claim 4824) gave way to A3/A(low) ratings on DDTL 4.0 (claim 11219) and a first public syndication (claim 9117), yet DDTL 5.5 priced at SOFR+5.50% rated Ba2/BB+ (claims 8732, 8733). Cost of capital improved and then widened; the collateral and structural differences behind that reversal requires explanation.
Stated use of proceeds tracks deployment closely — customer contract capex and GPU servers (claims 2138, 1320) — and the offtake is real: OpenAI $6.5B (claim 4297), Meta $21B (claim 2124), backlog near $104B (claim 962). The unreconciled item is tenor: DDTL 5.5 runs about five years against contracts averaging about three (claims 8730, 8731).
Watch the January 2026 covenant package, where minimum liquidity was amended (claim 3911) and contract realization and debt service coverage testing were postponed (claims 3913, 3912) — postponed, not resolved — against $640M quarterly interest expense (claim 7341), roughly 6x debt-to-equity (claim 8202), and a sub-1 current ratio (claim 8203). Also note the April 8 record carrying both a $2.6B and a $3.0B convertible size (claims 10327, 10325); one was revised. No insider transactions appear on record, so that dimension cannot be assessed.
Capital & dilution trajectory
2026-09-20The cadence here is not episodic but continuous. From the $40 IPO in March 2025 (claim 15974), which netted only $1.4B (claim 4967), the company has gone to market roughly every six to eight weeks without a meaningful pause, and its own running totals describe the trajectory better than any single raise: $17.2B cumulative by May 2025 (claim 4968), $28B of commitments in the trailing twelve months by March 2026 (claim 11221), and more than $30B year-to-date by August 2026 (claim 8735).
The mix reads as deliberate rather than opportunistic, with one qualification. Common-equity dilution has been narrow and strategic — NVIDIA's $2B (claim 3891), Jane Street's $1B (claim 10305), $350M in customer shares (claim 4514) — while the actual dilution vector is convertible: $2.5875B in December 2025 with $340M of capped calls (claims 3980, 3986), $2.6B in February 2026 (claim 11765), $3.0B plus a $450M option in April 2026 (claims 2126, 2127). Three converts in five months, each larger than the last. The secured side shows genuine engineering: unsecured coupons of 9.25% and 9% in mid-2025 (claims 4824, 4697) gave way to the A3/A(low) contract-backed DDTL 4.0 at $8.5B (claims 11218, 11219) and the first publicly syndicated HPC-backed financing (claim 9117). But DDTL 5.5, at SOFR+5.50% and rated Ba2/BB+ (claims 8733, 8732), sits well below that — the stack is bifurcating, and marginal cost is not monotonically improving.
Stated use of proceeds — customer contract capex and GPU servers (claims 2138, 1320) — tracks the disclosed backlog of $104B (claim 962) and named commitments from OpenAI and Meta (claims 4297, 2124). The recurring "expected closing" tags are settlement mechanics, not slippage. What requires explanation is January 2026: minimum liquidity amended (claim 3911), DSCR testing postponed (claim 3912), contract realization ratio testing postponed (claim 3913) — covenant relief obtained two months before the investment-grade facility priced.
Watch the tenor mismatch: contracts average roughly three years (claim 8731) against maturities of five to 5.5 years and a 2032 DDTL 4.0 (claims 8730, 9120, 11222). Watch whether the postponed tests resume on schedule, and watch $640M of quarterly interest against $2.58B of revenue at 6x debt-to-equity (claims 7341, 8177, 3058). No insider sales appear on this record at all, which is itself worth noting. The Core Scientific $270M termination fee (claim 4739) is no longer discussed.
Capital & dilution trajectory
2026-09-20The defining feature here is not dilution but leverage. Equity issuance since the March 2025 IPO at $40 (claim 11601) has been episodic and strategic rather than continuous — $1.4B of IPO net proceeds (claim 4967), a $350M strategic customer share issuance (claim 4514), NVIDIA's $2B Class A investment (claim 3891), and Jane Street's $1B (claim 2080). There is no ATM program on record and no insider transaction data at all, which is a real gap in this record and limits any read on management conviction. What has scaled is debt, and the cadence is close to monthly: from $17.2B total capital by May 2025 (claim 4968) to $28B of commitments in twelve months (claim 11221) to more than $30B year-to-date by August 2026 (claim 8735).
The mix reads as coherent rather than opportunistic, and the direction of travel is the argument. Early financings were expensive unsecured paper — 9.250% notes due 2030 (claim 11917) and 9% notes at $1.75B (claim 4658). The structure then migrated toward contract-backed infrastructure facilities, culminating in the $8.5B DDTL 4.0 carrying A3/A(low) ratings (claims 2137, 11219) and the first publicly syndicated HPC infrastructure-backed financing at $3.1B (claims 9116, 9117). Convertibles were paired with capped calls — $340M against the $2.5875B issue (claims 3986, 3980) — which is the behavior of an issuer managing dilution deliberately, not patching.
Two things require explanation. The August 2026 DDTL 5.5 closed at SOFR+5.50% and rated Ba2/BB+ (claims 8729, 8733, 8732), materially wider and several notches below the March facility, suggesting the investment-grade execution is not generalizable across the collateral pool. Separately, underlying customer contracts average roughly three years (claim 8731) against facility maturities near five (claim 8730) and DDTL 4.0 running to March 2032 (claim 11222).
Use of proceeds tracks stated purpose — customer contract capex and GPU servers (claims 2138, 1320) — and is corroborated by the $104B backlog (claim 1493) and named commitments from OpenAI and Meta (claims 4297, 2124). The postponement of debt service coverage and contract realization ratio testing, plus the minimum liquidity amendment (claims 3912, 3913, 3911), is the item to watch: whether testing resumes on schedule against covenants now embedded in DDTL 4.0 and 5.0 (claims 2141, 1324), alongside $640M of quarterly interest expense (claim 7341) at a 6x debt-to-equity ratio (claim 3058).
Capital & dilution trajectory
2026-09-19CoreWeave's record, as provided, is mostly debt, and the dilution story is secondary to the leverage story. The list is also truncated mid-entry and contains no insider transactions, so this read is limited to what appears. Equity issuance is episodic rather than continuous. After the $40 IPO (claim 11601) and roughly $1.4B in net proceeds (claim 4967), new shares arrived mainly through strategic placements: a $350M customer issuance (claim 4514), NVIDIA's $2B investment (claim 3891) and Jane Street's $1B (claim 10305). The more material dilution path runs through convertibles. The $2.5875B offering (claim 3980) carries conversion terms referencing roughly 30.0M shares (claim 3984), partly offset by a $340M capped call (claim 3986). A further $3.0B convertible due 2032 with a $450M option (claims 10325, 10326) followed. The mix reads as a deliberate structure rather than patching. Contract-backed delayed-draw facilities fund GPU capex, and unsecured notes and converts fill the corporate layer. The progression of DDTL 3.0 at $2.6B (claim 11922), DDTL 4.0 at $8.5B carrying A3/A(low) ratings (claims 11218, 11219) and DDTL 5.0 at $3.1B (claim 9116) is consistent with that design. Two items require explanation. First, the January 2026 postponement of debt service coverage and contract realization testing, alongside a minimum liquidity amendment (claims 3912, 3913, 3911), came between the first convertible and the largest DDTL. Second, the later $2.6B facility is rated Ba2/BB+ and priced at SOFR + 5.50% (claims 8732, 8733). It also pairs contracts averaging about 3 years with an approximately 5-year maturity (claims 8731, 8730), a step away from the investment-grade terms of DDTL 4.0. Whether announced use of proceeds tracks deployment cannot be assessed from this record. Use-of-proceeds claims exist (claims 11920, 1320, 2138), but their substance is not included, and no deployment figures are shown. The operating context is Q2 2026 revenue of $2.58B (claim 8183), interest expense of $640M (claim 7341), a -25% net margin (claim 10221) and debt-to-equity near 6 (claim 7345). A sophisticated reader should watch four things: whether deferred covenant tests resume on schedule, whether new facility pricing continues to drift from the DDTL 4.0 terms, and how the 2032 convertibles are settled. The fourth is reconciliation of backlog, cited as $104 (claim 962) and as $100 billion (claim 647), against contract duration assumptions embedded in the facilities.
Capital & dilution trajectory
2026-09-19CoreWeave's record since the $40 IPO (claim 11601) shows a company that has financed itself mostly with debt, with dilution arriving in structured forms rather than through follow-on common offerings. The IPO's roughly $1.4B in net proceeds (claim 4967) is small next to what came after: more than $20B raised year-to-date by May 2026 (claim 9123) and more than $30B by August (claim 8735). Direct equity has come through negotiated placements: a $350M strategic customer issuance (claim 4514), NVIDIA's $2B (claim 3891) and Jane Street's $1B (claim 10305). Convertibles carry the rest of the equity-linked exposure. These are the $2.59B December 2025 notes with a $340M capped call (claims 3980, 3986) and the $3.0B 2032 notes with a $450M option (claims 10325, 10326). The earlier $2.6B convertible figure (claim 11765) appears to have been revised upward before pricing. No insider transactions appear in the record, so no conclusion about insider positioning is possible.
The mix reads as a deliberate architecture. Contract-backed delayed-draw term loans fund specific GPU deployments, while unsecured notes and converts support the corporate layer. The high-yield notes were repeatedly upsized: $1.5B to $2B at 9.25% (claims 11921, 11917) and $1.5B to $1.75B at 9% (claims 4700, 4697). That suggests demand was ample, but the pricing was expensive. Quality across the DDTL series is uneven. DDTL 4.0 earned A3/A(low) ratings (claim 11219), but DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims 8733, 8732). Its roughly five-year maturity sits against underlying contracts averaging about three years (claims 8730, 8731), and that gap requires explanation.
On use of proceeds, facilities are described as funding customer-contract capex and GPU servers (claims 2138, 1320). However, the record contains no draw-level or deployment disclosure, so whether actual spending matches the stated purpose cannot be tested from this data. The January 2026 amendments postponed debt-service-coverage and contract-realization testing and changed the minimum liquidity covenant (claims 3911–3913). They indicate that the original covenant schedule was delayed.
A careful reader should watch four things. The first is Q2 interest expense of $640M (claim 7341) against $2.58B of revenue (claim 8183), with a debt-to-equity ratio near 6 (claim 3058). The second is when the postponed covenant tests resume. The third is how quickly the $104B backlog (claim 962) turns into cash flow capable of servicing a stack that is increasingly priced below investment grade. The fourth is the share count once the convertibles move into the money.
Capital & dilution trajectory
2026-09-18The record describes a company financing itself almost entirely through debt since its IPO. Equity dilution has come in discrete blocks rather than a steady drip. After the $40 IPO (claim 11601) and roughly $1.4B in net proceeds (claim 4967), the equity-linked events on file are a strategic customer share issuance (claim 4514), NVIDIA's $2B investment (claim 3891), Jane Street's $1B investment (claim 10305), and two convertible offerings: $2.5875B in late 2025 (claim 3980), and a proposed $3.0B due 2032 with a $450M option (claims 10325, 10326). Most of the eventual dilution therefore sits in conversion terms rather than in shares already issued. The $340M capped call (claim 3986) shows the company tried to limit that exposure. The record contains no insider transactions, so nothing can be said about insider behavior.
The mix looks deliberate rather than improvised. Asset-backed delayed-draw facilities have grown from $2.6B (claim 11922) to $8.5B for DDTL 4.0 (claim 11218), which carried A3/A(low) ratings (claim 11219). The company says it has raised more than $30B year-to-date (claim 8735). Two things complicate that picture. In January 2026 the company amended its minimum liquidity covenant and postponed debt service coverage and contract realization testing (claims 3911–3913). More recently, DDTL 5.5 priced at SOFR + 5.50% with Ba2/BB+ ratings (claims 8733, 8732), well below DDTL 4.0's grade. The facilities appear to be rated according to which customer contracts back them, and investors should read each one individually rather than as a uniform stack.
The stated use of proceeds, customer-contract capex and GPU servers (claim 2138), is consistent with the facility structure. However, the record contains no deployment data, so actual spending cannot be checked against the announced purpose. Figures for the 2026 convertible also require explanation: $2.6B appears in claims 11765 and 10327, while $3.0B appears in claims 10325 and 2126. Several claims also report amounts in inconsistent units.
Readers should watch four things. The first is when the postponed coverage tests resume and whether they pass. The second is the mismatch between customer contracts averaging about 3 years (claim 8731) and a facility maturity of about 5 years (claim 8730). The third is how Q2 interest expense of $640M (claim 7341) compares with quarterly revenue of $2.58B (claim 8177). The fourth is whether the reported backlog of roughly $104B (claim 962) turns into cash on schedule to service a debt-to-equity ratio near 6 (claim 3058).
Capital & dilution trajectory
2026-09-18CoreWeave's record since the March 2025 IPO at $40 (claim 11616) is mostly a debt story. Equity has been a small share of capital raised. The IPO netted $1.4B (claim 4967), NVIDIA invested $2B (claim 3891), and Jane Street invested $1B (claim 10305). Against that, the company reports more than $30B of debt and equity secured in 2026 alone (claim 8735). Common-share dilution has therefore been modest in cadence. Latent dilution sits mainly in the convertibles: the $2.59B December 2025 issue, partly hedged by a $340M capped call (claims 3980, 3986), and the proposed $3.0B 2032 notes with a $450M upsize option (claims 10325, 10326).
The mix reads as a deliberate two-track structure rather than patching. Contract-backed delayed-draw facilities fund GPU deployment tied to named customer commitments (claims 2138, 1320). Unsecured notes and converts sit at the corporate level. The DDTL sequence grew from $2.6B (claim 11922) to $8.5B at A3/A(low) (claims 11218, 11219). Several notes deals were upsized, including the 2030 notes from $1.5B to $2.0B (claims 11921, 11917), which indicates available demand. Two developments temper that reading. The January 2026 amendments postponed debt-service-coverage and contract-realization testing and revised the minimum liquidity covenant (claims 3912, 3913, 3911). The later DDTL 5.5 also priced at SOFR + 5.50% with Ba2/BB+ ratings (claims 8733, 8732), below the investment-grade tier achieved months earlier.
Stated use of proceeds for the facilities is specific: customer-contract capex and GPU servers. However, the record contains no deployment reconciliation, so whether proceeds tracked announcements cannot be assessed from this data. The operating figures show the load. Q2 2026 revenue was $2.58B (claim 8183), interest expense was about $640M (claim 7341), and debt-to-equity was near 6 (claim 8202). Net margin is reported as -25% (claim 7343), although claim 8200 records it unsigned and requires reconciliation.
A careful reader should watch four things. The first is whether the postponed covenant tests resume on schedule. The second is the mismatch between roughly three-year underlying contracts and roughly five-year facility maturities (claims 8731, 8730). The third is the concentration of maturities across 2030–2032. The fourth is whether the approximately $100B backlog (claim 647) converts fast enough to service the added interest burden. The record includes no insider transactions, and the claim list appears truncated, so this read is incomplete on both points.
Capital & dilution trajectory
2026-09-18CoreWeave's capital record since its IPO at $40 per share (claim 11616) is dominated by debt rather than equity. The IPO itself was modest in net terms at $1.4B (claim 4967). What followed was a steady run of secured and unsecured borrowing, and the pace has increased. The company described $28B of equity and debt commitments over twelve months (claim 11221), then more than $30B secured year-to-date by August 2026 (claim 8735).
Direct dilution has been relatively contained. It came through three channels. The first was strategic equity placements: the $350M customer share issuance (claim 4514), NVIDIA's $2B investment (claim 3891) and Jane Street's $1B (claim 10305). The second was the convertibles. The $2.5875B December 2025 offering (claim 3980) references roughly 30.0M underlying shares (claim 3984) and was partly hedged by $340M of capped calls (claim 3986). The $3.0B 2032 convertible (claim 10325) carries a further $450M option (claim 10326). Taken together, the equity side reads as sponsor-aligned placement rather than open-market issuance. No insider transactions appear in the record, so that dimension cannot be assessed.
The mix follows a coherent template. Contract-backed delayed-draw facilities are layered with high-coupon unsecured notes: 9.250% on the $2B 2030 notes (claims 11917, 4824) and 9% on the upsized $1.75B issue (claims 4697, 4698). Within the DDTL series, the terms have diverged. DDTL 4.0 at $8.5B carried A3/A(low) ratings (claims 11218, 11219). DDTL 5.5 at $2.6B was rated Ba2/BB+ and priced at SOFR+5.50% (claims 8729, 8732, 8733). That later facility also runs about five years (claim 8730) against underlying contracts averaging about three (claim 8731). That tenor mismatch requires explanation.
Use-of-proceeds statements exist for the notes (claim 11920), DDTL 5.0 (claim 1320) and customer-contract capex (claim 2138). However, the record contains no deployment data against which to test them.
The covenant amendments of January 2026 also require explanation. These postponed debt-service-coverage and contract-realization testing and amended minimum liquidity (claims 3911–3913). They sit beside Q2 2026 interest expense of $640M (claim 7341), revenue of about $2.58B (claim 8177) and a negative 25% net margin (claim 7343).
A reader should watch four things next:
- whether postponed covenant tests resume on schedule; - how the $104B backlog (claim 1493) converts to cash relative to amortization of the shorter-contract facilities; - whether future DDTL tranches price closer to DDTL 4.0 or DDTL 5.5; - any conversion activity on the two convertible series.
Capital & dilution trajectory
2026-09-18CoreWeave's capital history since its March 2025 IPO at $40 per share (claim 11616) is dominated by debt. Equity has been a minority of the capital raised. The IPO netted roughly $1.4B (claim 4967). Direct equity since then has come mainly from strategic placements: a $350M customer share issuance (claim 4514), NVIDIA's $2B investment (claim 3891) and Jane Street's $1B (claim 10305). The more meaningful source of potential dilution is convertibles. The December 2025 $2.5875B convertible (claim 3980) references roughly 30.0M conversion shares (claim 3984) and is partly offset by a $340M capped call (claim 3986). A proposed $3.0B convertible due 2032 followed in April 2026 (claim 10325). Its final size is not settled on the record, since a $2.6B figure appears alongside it (claim 10327). The record contains no insider transaction claims, so that part of the question cannot be assessed.
The debt mix reads as a deliberate structure rather than ad hoc patching. The company layers delayed-draw facilities secured against customer contracts, which the filings describe as financing contract capex and GPU servers (claim 2138), on top of unsecured high-yield notes. Those notes include the $2B 9.25% notes due 2030 (claim 11917), the upsized $1.75B 9% notes (claim 4697) and $3.5B due 2032 (claim 8927). The trajectory is not uniformly improving, though. DDTL 4.0 carried A3/A(low) ratings (claim 11219). The later $2.6B DDTL 5.5 was rated Ba2/BB+ (claim 8732) and priced at SOFR + 5.50% (claim 8733). It also pairs an approximately five-year maturity (claim 8730) with underlying contracts averaging about three years (claim 8731), a duration gap that requires explanation.
The record states use of proceeds, but it does not show how the money was deployed. The stated purposes therefore cannot be checked against actual spending. The January 2026 amendments deserve attention. They postponed debt service coverage testing (claim 3912), postponed contract realization testing (claim 3913) and revised the minimum liquidity covenant (claim 3911). Together these suggest that deployment or revenue timing lagged the original facility assumptions.
A careful reader should watch three things. The first is whether the postponed covenant tests are reinstated on schedule. The second is how Q2 2026 interest expense of $640M (claim 7341) moves against quarterly revenue of $2.58B (claim 8177) as the facilities are drawn. The third is whether the roughly $100B backlog (claim 647) converts to revenue fast enough to service the more than $30B raised year-to-date (claim 8735) before the 2030 notes approach refinancing.
Capital & dilution trajectory
2026-09-18CoreWeave's post-IPO capital history is overwhelmingly debt-led rather than equity-led, so share-count dilution has so far been modest while balance-sheet leverage has grown quickly. After an IPO at $40 (claim 11601) netting roughly $1.4B (claim 4967), the company layered secured delayed-draw facilities, high-coupon senior notes, and convertibles at close to monthly intervals. Cumulative figures rise from $17.2B raised (claim 4968) to $28B committed over twelve months (claim 11221) and more than $30B year-to-date by August 2026 (claim 8735). The direct equity that did arrive was strategic and placed privately: NVIDIA's $2B (claim 3891) and Jane Street's $1B (claim 10305). Prospective dilution is concentrated in the convertibles, the $2.5875B issue (claim 3980), partly offset by $340M of capped calls (claim 3986), and the proposed $3.0B 2032 convert (claim 10325).
The mix looks coherent in structure. Contract-backed DDTL facilities fund GPU servers against named customer commitments (claims 2138, 1320), and unsecured notes and converts sit above them. The DDTL 4.0 facility drew A3 investment-grade ratings (claim 11219). The later DDTL 5.5 was rated Ba2/BB+ (claim 8732) and priced at SOFR + 5.50% (claim 8733). That difference in credit quality between the tiers is not explained in the record.
The stated use of proceeds broadly matches the facility design, but the record lacks deployment data to confirm it. The January 2026 covenant changes require explanation. They loosened the minimum liquidity covenant (claim 3911) and postponed testing of both the debt service coverage ratio and the contract realization ratio (claims 3912, 3913). Postponing a test that measures whether contracts are converting to revenue sits awkwardly beside facilities secured by those same contracts. The DDTL 5.5 also pairs a roughly five-year maturity (claim 8730) with underlying customer contracts that average about three years (claim 8731).
By Q2 2026 the servicing burden was substantial. Interest expense of $640M (claim 7341) was set against revenue of $2.58B (claim 8177) and a negative 25% net margin (claim 7343). Backlog of roughly $104B (claim 962) is the stated offset.
The record contains no insider transactions, so no conclusion about insider positioning is possible. Readers should watch four things. First, whether postponed covenant tests resume on schedule. Second, how quickly DDTL capacity is drawn relative to contract delivery. Third, whether interest expense grows faster than revenue. Fourth, how the convertibles trade relative to their conversion terms.
Capital & dilution trajectory
2026-09-14CoreWeave's record shows a company that has used equity sparingly and debt heavily. Common-share issuance clusters around the $40 IPO (claim #11616), which produced roughly $1.4B in net proceeds (claim #4967). Later equity arrived as strategic placements rather than broad offerings: $350M to a strategic customer (claim #4514), $2B from NVIDIA (claim #3891), and $1B from Jane Street (claim #10305). The convertibles carry the larger latent dilution. The $2.59B December 2025 issue (claim #3980) was paired with $340M of capped calls (claim #3986), which suggests the company is managing that exposure deliberately. The proposed $3.0B 2032 convertible, with a $450M upsize option (claims #10325, #10326), adds to it, and the record does not show a matching hedge. By August the company reported a debt-to-equity ratio near 6 (claim #3058).
The debt mix looks more like a strategy than a series of patches. Each delayed-draw facility is tied to contracted capex: DDTL 3.0 at $2.6B (claim #11922), DDTL 4.0 at $8.5B (claim #11218), DDTL 5.0 at $3.1B (claim #9116), and DDTL 5.5 at $2.6B (claim #8729). Unsecured notes run alongside them, beginning at 9.25% (claim #4824) and extending to $3.5B due 2032 (claim #8927). The trajectory within that ladder requires explanation, though. DDTL 4.0 carried A3/A(low) ratings (claim #11219), while DDTL 5.5 is rated Ba2/BB+ and priced at SOFR + 5.50% (claims #8732, #8733). DDTL 5.5 also runs about five years (claim #8730) against customer contracts averaging about three (claim #8731). Separately, the January 2026 amendments postponed debt service coverage and contract realization testing and revised the minimum liquidity covenant (claims #3912, #3913, #3911). These changes came before the largest facilities closed.
Stated use of proceeds is consistent at the facility level: DDTL 4.0 is earmarked for customer-contract capex and GPU servers (claim #2138). The record does not let a reader trace actual deployment against those purposes. Operating results show the carrying cost: Q2 2026 interest expense of $640M (claim #7341) against revenue of $2.58B (claim #8183) and a net margin near -25% (claim #7343). No insider transactions appear in the record as provided, so no conclusion can be drawn there.
Four things are worth watching. The first is whether the postponed covenant tests resume on schedule. The second is how contracts behind DDTL 5.5 are renewed before the loan matures. The third is whether pricing on new facilities keeps widening after the A3 tranche. The fourth is how the roughly $100B backlog (claim #647) converts into revenue that can service capital raised at a pace exceeding $30B year-to-date (claim #8735).
Capital & dilution trajectory
2026-09-14CoreWeave's record describes a company that has financed itself almost entirely through leverage since its IPO, with equity dilution arriving mostly through strategic placements and convertibles rather than follow-on offerings. The IPO itself was modest against what followed, at $1.4B net per claim #4967. The company later cited $28B of commitments over twelve months (claim #11221) and more than $30B year-to-date by August 2026 (claim #8735). Direct dilution came in discrete blocks: the $350M strategic customer issuance (claim #4514), NVIDIA's $2B investment (claim #3891), and Jane Street's $1B (claim #10305). Latent dilution sits in the $2.59B convertible of December 2025 (claim #3980) and the $3.0B convertible due 2032 with a $450M option (claims #10325, #10326). The record shows a $340M capped call only on the earlier convertible (claim #3986). The $2.6B convertible cited in February and again in April (claims #11765, #10327) requires explanation, since the record does not make clear whether it is a separate issue or a rounded restatement of the December deal.
The mix reads as a deliberate architecture more than patching. Asset-backed delayed draw facilities fund contracted capacity, and unsecured notes and convertibles fill the corporate layer, with repeated upsizing suggesting available demand: $1.5B to $2B in May 2025 (claims #11921, #11917) and $1.5B to $1.75B in July (claims #4700, #4698). Two points qualify that reading. The January 2026 amendment postponed debt service coverage and contract realization testing and revised the minimum liquidity covenant (claims #3911 through #3913). Credit quality has also diverged across facilities. DDTL 4.0 carried A3 ratings (claim #11219), while DDTL 5.5 priced at SOFR plus 5.50% with Ba2/BB+ ratings (claims #8733, #8732). DDTL 5.5 has a roughly five-year maturity supported by customer contracts averaging about three years (claims #8730, #8731).
Stated uses of proceeds, including GPU servers tied to customer contracts (claims #2138, #1320), are consistent across filings. However, the record contains no deployment data against which to test them. No insider transactions are on record.
A careful reader should watch four things. The first is whether $640M of quarterly interest expense (claim #7341) against $2.58B of revenue (claim #8183) narrows as backlog, cited at $104B (claim #1493), converts. The second is whether the postponed covenant tests resume on schedule. The third is how the gap between contract duration and loan maturity in the newer facilities is refinanced. The fourth is whether later convertibles carry dilution hedges.
Capital & dilution trajectory
2026-09-13CoreWeave's record describes a company financing almost entirely through debt, with equity used sparingly and mostly placed with strategic holders. After the $40 IPO (claim 11601) and roughly $1.4B of net proceeds (claim 4967), later equity came from NVIDIA's $2B investment (claims 3891, 9316) and Jane Street's $1B (claim 10305), not from broad follow-ons. Direct share dilution therefore looks modest. The convertibles change that picture. The $2.5875B offering (claim 3980) was paired with a $340M capped call (claim 3986), a $2.6B convertible appears in February 2026 (claims 11765, 10327), and a $3.0B issue due 2032 was proposed with a $450M option (claims 10325, 10326). The record does not make clear whether the $2.6B references restate the December deal or describe a new one, and that requires explanation before potential conversion dilution can be sized. The unit behind the conversion figure in claim 3984 is also not stated.
The debt mix follows a repeatable template rather than ad hoc patching. The company raises high-yield senior notes, several of them upsized: $2.0B at 9.25% (claims 11917, 4824) after a $1.5B launch (claim 11921), and $1.75B at 9% (claims 4697, 4698). Around those notes sits a ladder of contract-backed delayed-draw facilities, from DDTL 3.0 at $2.6B (claim 11922) to DDTL 4.0 at $8.5B (claim 11218). The revolver also grew from $1.5B to $2.5B (claims 11923, 11766). Cumulative figures keep being revised upward, from $17.2B (claim 4968) to more than $30B year-to-date (claim 8735).
Use of proceeds is sparsely captured. Claim 2138 ties DDTL 4.0 to customer-contract capex and GPU servers, but the stated uses in claims 11920 and 1320 are not detailed enough to test against deployment. The observable outcome is a debt-to-equity ratio near 6 (claim 3058) and $640M of quarterly interest expense (claim 7341) against $2.58B of revenue (claim 8177). Revenue grew 112% (claim 8185), and backlog stood at $104B (claim 1493).
The record shows no insider transactions, so that dimension cannot be assessed. Several items deserve attention next. The January 2026 amendments postponed debt-service-coverage and contract-realization testing and revised the liquidity covenant (claims 3911 to 3913), so it matters when that testing resumes. DDTL 5.5 carries a roughly five-year maturity (claim 8730) against underlying contracts averaging about three years (claim 8731). It is also rated Ba2/BB+ at SOFR plus 5.50% (claims 8732, 8733), compared with A3 on DDTL 4.0 (claim 11219). Finally, several note closings are marked delayed (claims 4699, 9699).
Capital & dilution trajectory
2026-09-13CoreWeave's capital trajectory through mid-2026 shows a disciplined pivot from conventional post-IPO financing to infrastructure-backed debt securitization. The company raised $1.4 billion net in its March 2025 IPO at $40 per share (claims 11601, 4967), then deployed an escalating mix of convertible debt ($2.6 billion offered December 2025, claim 3980; $2.6 billion offered February 2026, claim 11765) and traditional senior notes ($1.75 billion July 2025, claim 4658; $3.5 billion June 2026, claim 8927). By August 2026, the company had secured over $30 billion in combined debt and equity capital year-to-date (claim 8735).
The shift toward infrastructure financing is strategic rather than opportunistic. In March 2026, CoreWeave closed an $8.5 billion delayed draw term loan facility rated investment-grade A3/A(low) (claims 11218, 11219), explicitly structured to finance customer contract capex and GPU servers (claim 2138). By May 2026, a commercially syndicated successor facility demonstrated that capital markets would fund the model directly—the $3.1 billion DDTL 5.0 was described as the first publicly syndicated HPC infrastructure-backed financing (claim 9117). This represents material proof-of-concept for the thesis that customer contracts, not balance-sheet quality, secure capital.
Strategic equity raises anchor the narrative credibly. NVIDIA's $2 billion investment (claim 3891) and Meta's $21 billion payment commitment (claim 2124) in early 2026 preceded the broadest debt issuances and represent customer-anchored funding. Similarly, the $104 billion sales backlog (claim 1493) and 112 percent year-over-year revenue growth in Q2 (claim 8185) track announced use of proceeds into capacity deployment.
Yet material cautions exist. Debt-to-equity reached 6x (claim 3058) by Q2 2026, while net losses widened despite revenue growth (claim 1495), driven by $640 million in quarterly interest expense (claim 7374)—roughly 25 percent of revenue. More significantly, the company postponed debt service coverage ratio testing in January 2026 (claim 3912), requiring explanation. A sophisticated reader should assess whether the infrastructure-backed facility structure can sustainably support this leverage as interest competes with reinvestment. Customer concentration risk (OpenAI $6.5 billion commitment, claim 4297; Meta $21 billion; NVIDIA) and the pace of backlog realization relative to stated timelines are critical to whether current debt service burdens become tractable or deferred again.
Capital & dilution trajectory
2026-09-12CoreWeave's eighteen-month capital trajectory from IPO to mid-2026 reveals a capital structure oscillating between strategic asset-backed financing and aggressive opportunistic equity raises. The company went public at $40 per share in March 2025, netting $1.4 billion, per claim 4967, then immediately entered a phase of sustained debt issuance: $1.5 billion in revolving credit facilities and $3.25 billion in senior notes between May and July 2025 (claims 5010, 4700, 4697). This early debt concentration suggests the capital markets had differentiated CoreWeave's ability to lever infrastructure commitments—which materialized explicitly after the October 2025 announcement of a $3 billion delayed draw facility (claim 4277) and, by March 2026, an $8.5 billion infrastructure-backed delayed draw closing with investment-grade ratings (claim 2137), structured against customer contracts averaging three years in duration (claim 8731).
The equity pattern complicates this narrative. NVIDIA's $2 billion investment (claim 3891) in January 2026 and Jane Street's $1 billion in April 2026 (claim 2080) occurred after the core infrastructure debt was locked, suggesting these were growth and buffer tranches rather than primary infrastructure funding. Concurrently, CoreWeave layered in convertible securities—$2.587 billion closed in December 2025 (claim 3981) and $3 billion proposed in April 2026 (claim 2126)—a structure that defers equity dilution while preserving optionality. The company disclosed $28 billion in equity and debt raised within twelve months ending March 2026 (claim 11221).
The use of proceeds aligns with stated infrastructure strategy: the $8.5 billion delayed draw was explicitly structured for customer contract capital expenditures and GPU servers (claim 2138), matching the $104 billion sales backlog (claim 1493) and customer commitments from OpenAI ($6.5 billion, claim 4297) and Meta ($21 billion, claim 2124). However, Q2 2026 results carry a discordant signal. Despite $2.58 billion in revenue representing 112 percent year-over-year growth (claims 8183, 8185), CoreWeave reported a negative net margin of negative 25 percent and return on equity of negative 48 percent (claims 7371, 7377). Interest expense of $640 million (claim 7341) consumes material cash flow. The company postponed debt service and contract realization ratio covenant testing in January 2026 (claims 3912, 3913), and the debt-to-equity ratio reached 6 (claim 7378).
A sophisticated reader should monitor whether revenue scaling outpaces interest servicing and whether the customer commitments backing infrastructure debt remain enforceable. The covenant postponements and reported current ratio approaching zero warrant scrutiny into liquidity runway relative to the facilities' $7.5 billion initial borrowing capacity (claim 11220).
Capital & dilution trajectory
2026-09-12CoreWeave has executed one of infrastructure cloud's most aggressive capital raises: $30 billion in debt and equity since the March 2025 IPO, per claim 8735. The financing architecture is layered: bank facilities ($1.5 billion revolving credit, $350 million letters of credit, claim 5010) were followed by unsecured senior debt starting July 2025—$1.5 billion and $1.75 billion tranches maturing 2030–2032, per claims 4700 and 4697. Convertible issuances then accelerated: $2.587 billion in December (claim 3980) and $2.6–$3 billion in April 2026 (claims 10327, 10325). Infrastructure-backed delayed draw facilities form the anchor: $2.6 billion initial closing, expanded to $8.5 billion by March 2026 (claim 11218), then $3.1 billion in second syndication (May, claim 9116). Strategic equity from NVIDIA ($2 billion, January) and Jane Street ($1 billion, April) contributed $3 billion. The mix reflects coherent strategy, not pure opportunism. DDTL facilities are contractually tied to customer commitments (three-year duration, claim 8731) from OpenAI ($6.5 billion, claim 4297) and Meta ($21 billion, claim 2124), while convertible and bank debt fund operations. Use of proceeds aligns with results: Q2 2026 revenue was $2.58 billion against $104 billion sales backlog (claims 8183, 962), confirming backlog-to-revenue conversion is occurring.
However, three material signals require scrutiny. Senior note interest payments were delayed in July 2025 (claim 4659), weeks after issuance. Debt service coverage ratio and contract realization testing were postponed in January 2026 (claims 3912, 3913)—covenant amendments within six months of facility maturity signal default risk or near-miss. Q2 2026 results show negative 25 percent net margin with $640 million quarterly interest expense (claims 7371, 7374), meaning interest consumes 26 percent of revenue. Debt-to-equity stands at 6x (claim 3162); return on equity was negative 48 percent (claim 7372). Readers should monitor whether Q3–Q4 2026 backlog conversion produces positive margins and whether postponed covenants are reinstated; reinstatement failure would signal lender conviction that solvency pressure is material.
Capital & dilution trajectory
2026-09-12CoreWeave has raised more than $30 billion in debt and equity since its May 2025 IPO, per claim 8735, deploying capital across infrastructure, GPU acquisition, and customer contract fulfillment. The trajectory has been relentless: within fifteen months of public markets, the company moved through an IPO ($1.4B net proceeds, claim 4967), two NVIDIA equity investments ($2B and $2B, claims 3891, 9316), a Jane Street $1B commitment (claim 10305), and announced Meta partnerships worth $21B (claim 2124)—alongside parallel debt raises including convertible notes ($2.6B and $3.0B, claims 3980, 10325), senior unsecured debt ($1.75B, $1.5B, $1.0B, $3.5B across tranches, claims 2057, 4700, 2056, 8927), and structured delayed-draw term loans rated investment-grade (DDTL 4.0 of $8.5B, DDTL 5.0 of $3.1B, DDTL 5.5 of $2.6B, claims 11218, 9116, 8729).
The capital strategy is notably coherent rather than opportunistic. Customer commitments appear to anchor the raises: the OpenAI revenue contract of $6.5B (claim 4297), Meta's $21B payment commitment (claim 2124), and a disclosed sales backlog of $104B (claim 962) provide explicit justification for the scale of both equity and debt deployment. The company has positioned debt issuance as infrastructure-specific, with stated facilities funding "customer contract capital expenditures and GPU servers" (claim 2138) and receiving separate investment-grade treatment (A3/A(low) ratings on DDTL 4.0, claim 11219). This layering—equity from marquee strategic investors, debt from structured infrastructure financing, customer commitments providing repayment visibility—reflects strategic intentionality.
However, the operational math warrants scrutiny. Q2 2026 revenue reached $2.58B with 112% year-over-year growth (claim 8177), yet the company posted a $626M net loss (claim 3014) against $640M in interest expense (claim 3015), producing a negative 25% net margin (claim 10221) and a debt-to-equity ratio of 6.0x (claim 3162). Multiple covenant tests have been postponed (claim 3913), and convertible note payment schedules flagged as delayed (claim 3982). The company is borrowing and raising capital to finance growth, not yet generating positive operating cash flow to service debt.
What follows requires close attention: actual execution against the $6.5B OpenAI contract and $21B Meta commitment, covenant compliance in refinancing cycles, and timeline to operating cash-flow positive performance. A sophisticated reader should monitor whether the backlog converts to realized revenue at claimed margins, whether debt service pressures force revised capital discipline, and whether the investment-grade rating on infrastructure debt can sustain if operating losses persist.
Capital & dilution trajectory
2026-09-11CoreWeave has executed a hyperscaled capital raise that tests the limits of a build-to-customer-demand model. From IPO in May 2025 through August 2026, the company secured more than $30 billion in combined debt and equity capital (per claim #8735), deploying nearly all of it into GPU infrastructure and data center capex. The financing mix is heavily debt-weighted: roughly $22 billion in various debt instruments (senior notes, convertible notes, delayed-draw term loans at multiple tranches) against $8.75 billion in equity (IPO proceeds of $1.4 billion per claim #4967, NVIDIA's $4 billion combined Class A investment per claims #3891 and #9316, Jane Street's $1 billion per claim #10305, and strategic customer share issuances). This structure is not coherent strategy but rather escalating financial engineering—each capital raise appears reactive to deployment capacity and customer demand rather than proactive capital planning. The company amended key debt covenants in January 2026 (minimum liquidity and DSCR testing postponements per claims #3911 and #3913), a material signal of early stress just eight months into its public life.
The use of proceeds aligns with stated intent but conceals an uncomfortable dependency: customer prepayments are funding capex in 2026 to the tune of $9 billion (per claim #8575), meaning CoreWeave is essentially running a pass-through model where customer cash initiates build cycles. Announced proceeds for customer contract capital expenditures and GPU servers (claim #2138) track the deployment, yet this arrangement creates undisclosed concentration: the company has $6.5 billion in committed OpenAI revenue and a $21 billion Meta payment commitment (per claims #4297 and #2124), alongside NVIDIA as both customer and investor. With Q2 2026 interest expense at $640 million against $2.58 billion in quarterly revenue and a net loss of $626 million (per claims #7341 and #3014), the company is consuming capital rather than generating it—the debt service burden is material and growing.
The $104 billion revenue backlog (per claim #1493) appears substantial until examined against a debt-to-equity ratio of 6:1 (per claim #7345) and customer contracts averaging three years in duration (per claim #8731), while the debt stack carries maturities of 5 to 5.5 years. The mismatch between contract economics and liability duration requires scrutiny. A sophisticated reader should monitor three dynamics: whether CoreWeave can deploy $30 billion of capex without further capital raises, whether customer concentration dissolves as revenue diversifies or hardens as a structural constraint, and whether negative net margins compress as fixed capex is amortized against growing revenue or remain structurally negative due to interest burden. The covenant amendments and delayed financing disclosures (per claims #4699 and #3982) suggest liquidity management is tighter than the headline backlog implies.
Capital & dilution trajectory
2026-09-10CoreWeave's financing sequence from May 2025 to August 2026 shows a company simultaneously scaling at extreme speed and managing the capital intensity that comes with it. The $30 billion-plus raised in that period (claim 8735) arrived through multiple instruments: straight debt dominates, but the mix includes convertibles and strategic equity—a combination that appears opportunistic rather than orchestrated.
Debt instruments comprise the bulk. An IPO in May 2025 generated $1.4 billion in net proceeds (claim 4967), followed by layered senior note issuances totaling roughly $8.5 billion through various tranches (claims 4700, 4658, 2056, 8927). In December 2025, CoreWeave issued $2.587 billion in convertible notes with a $340 million capped-call overlay (claims 3980, 3986). Delayed-draw facilities expanded repeatedly, reaching over $14 billion across multiple tranches sized to customer contracts and capex deployment (claims 2137, 9115, 8729). Equity raises were more selective: NVIDIA invested $4 billion in two tranches (claims 3891, 9316), Jane Street added $1 billion (claim 2080), and a strategic customer bought $350 million in equity (claim 4514).
The stated use of proceeds partially tracks execution. Senior notes funded general corporate purposes; the delayed-draw facilities explicitly backed customer-contract-driven capex, primarily GPU deployments (claim 2138). This directly reflects two massive consumption commitments: OpenAI's $6.5 billion revenue commitment starting September 2025 (claim 4297) and Meta's $21 billion commitment from April 2026 (claim 2124). These revenue streams justified the capex, and in turn the debt stack needed to fund it.
Yet the operating results create friction. Q2 2026 showed $2.58 billion in revenue growing 112 percent, but net losses reached $626 million with a negative 25 percent net margin (claims 8183, 7369, 3014). Interest expense hit $640 million that quarter alone (claim 7341), approaching quarterly revenue in absolute terms. The debt-to-equity ratio stands at 6x (claim 7350). In January 2026, CoreWeave postponed testing of its contract realization ratio and minimum liquidity covenants (claims 3913, 3911), signaling tighter cash flow than publicly disclosed.
A sophisticated reader should monitor whether the $100-billion-plus backlog converts to profitable scale (claim 647), watch for debt refinancing pressure in a higher-rate environment, and assess whether customer concentration in two names creates unhedged revenue dependency. The capital mix—debt-heavy, minimal IPO-base dilution, strategic checks from adjacent infrastructure players—suggests financing availability took precedence over capital structure coherence. That remains sustainable only if margin velocity arrives soon.
Capital & dilution trajectory
2026-09-10CoreWeave's $30 billion in debt and equity capital raised through August 2026 (claim 8735) reflects a deliberate infrastructure financing strategy increasingly shadowed by financial strain. The capital stack mixes $8.5 billion and $3.1 billion delayed-draw term facilities rated Ba2/BB+ (claims 9122, 9116, 8732), approximately $7 billion in senior notes maturing 2030–2032, $2.588 billion in convertible notes (claim 3980), and equity from NVIDIA ($4 billion total, claims 3891, 9316), Jane Street ($1 billion, claim 2080), plus $1.4 billion IPO proceeds (claim 4967). This allocation is coherent, not reactive: the company structured customer-backed asset financing to fulfill explicit multi-year commitments from OpenAI ($6.5 billion, claim 4297) and Meta ($21 billion, claim 2124), with average contract duration around three years (claim 8731). Customer prepayments of $9 billion funded capex in 2026 (claim 8575), and stated use of proceeds—customer contract capex and GPU servers (claim 2138)—tracked a $104 billion sales backlog (claim 1493).
Yet covenant stress surfaced by January 2026. The company announced postponement of debt service coverage ratio testing (claim 3912), minimum liquidity covenant amendment (claim 3911), and contract realization ratio testing postponement (claim 3913). These are not routine; lenders postpone covenant windows when near-term compliance becomes uncertain. Q2 2026 performance illuminates the pressure: $2.58 billion in quarterly revenue with 112% year-over-year growth (claims 8183, 8185), but a $626 million net loss and $640 million in interest expense (claims 3014, 7374). Interest expense consumed roughly one-quarter of quarterly revenue, leaving minimal margin for operational leverage or refinancing flexibility. Reported debt-to-equity reached 6x with negative 48% return on equity (claims 3162, 3059); current and quick ratios approached zero (claims 7379, 7380).
The structure remains sound if customer commitments hold and growth accelerates. Critical vectors to monitor: whether the Meta and OpenAI contracts—together 26% of stated backlog—maintain schedule or face revision; whether postponed covenant tests reset in late 2026 or require additional amendments; and whether leverage ratios converge toward investment-grade levels or remain elevated into refinancing windows, particularly given convertible notes maturing December 2032 (claim 3983). Customer prepayment dependency creates operational rigidity if contract timing shifts or capex requirements compress.
Capital & dilution trajectory
2026-09-09CoreWeave's capital structure reflects a singular thesis: leverage customer-backed contracts to secure infrastructure financing. Through mid-2026, the company raised over $30 billion (claim 8735), distributed across heavily leveraged debt and strategic equity. The debt stack includes five delayed-draw term loan facilities totaling approximately $28 billion (claims 4277, 4592, 2137, 9122, 1319, 8729), senior notes from multiple offerings exceeding $10 billion (claims 4700, 4697, 2125, 8927), $5.6 billion in convertible notes (claims 3980, 2126), and revolving facilities of $1.85 billion. Against this $45+ billion in debt, equity raised totaled roughly $7.2 billion from the IPO ($1.4 billion net, claim 4967), customer share issuances ($350 million, claim 4514), NVIDIA's staged $4 billion participation (claims 3891, 9316), and Jane Street's $1 billion commitment (claim 2080), yielding a 6x debt-to-equity ratio (claim 3162). This leverage is anchored to $104 billion in contracted backlog (claim 1493), with OpenAI at $6.5 billion (claim 4297) and Meta at $21 billion (claim 2124).
The capital sequence shows deliberate de-risking rather than opportunistic patching. The IPO provided the public platform; the December 2025 convertible ($2.587 billion, claim 3980) arrived after operational traction; infrastructure-backed DDTL syndication—achieving Ba2/BB+ ratings by May 2026 (claim 8732)—followed anchor customer commitments. This progression suggests each capital source entered at progressively de-risked milestones. The newest DDTL's 5.5-year maturity (claim 8730) against three-year average customer contracts (claim 8731) creates a refinancing pressure point.
Deployment tracks stated use. Q2 2026 revenue of $2.58 billion (claim 8183) grew 112% year-over-year (claim 8185), with capex spending of $32.5 billion projected for full-year 2026 (claim 7925) and approximately $9 billion from customer prepayments (claim 8575). Quarterly interest expense of $640 million (claim 7341)—nearly 25% of revenue—combined with negative net margins of -25% (claim 10221) and -48% return on equity (claim 10220) indicates debt service is compressing profitability despite scale. January 2026 covenant amendments and DSCR testing deferrals (claims 3911, 3913) signal active management of near-term liquidity during scaling.
Investors should monitor customer concentration (OpenAI and Meta represent approximately 26% of backlog), refinancing windows as maturities approach 2030–2032, and execution risk for infrastructure-backed syndication should customer contract economics shift.
Capital & dilution trajectory
2026-09-09CoreWeave has pursued an infrastructure-backed financing strategy rather than traditional capital-stacking opportunism. Beginning with a $1.4 billion IPO in May 2025 (per claim 4967), the company quickly layered debt, convertible notes totaling $2.587 billion (per claim 3980), and strategic equity from infrastructure partners, ultimately raising over $30 billion in debt and equity capital in 2026 alone (per claim 8735).
The dilution trajectory reflects this deliberately: minimal equity dilution from convertibles despite $2.587 billion issuance, with only $30 million in actual conversion terms noted (per claim 3984). Instead, the capital mix prioritized asset-backed lending—particularly delayed-draw term loans whose syndication CoreWeave claims as a first for HPC infrastructure (per claim 9117). This financing approach aligns with the announced use of proceeds: infrastructure capex tied to customer contract capital expenditures and GPU servers (per claim 2138), with customer prepayments funding capex directly to the tune of $9 billion in 2026 (per claim 8575).
The strategy shows coherence but reveals underlying stress. Covenant amendments and testing postponements in January 2026 (claims 3911, 3913) indicate initial debt terms were overambitious. By Q2 2026, reported metrics showed a 6:1 debt-to-equity ratio (per claim 8202), negative 25 percent net margin (per claim 10221), and negative 48 percent return on equity (per claim 10220), with current and quick ratios both at zero (claims 7379, 7380). Interest expense reached $640 million quarterly (per claim 7341) against roughly $2.6 billion in revenue (per claim 8183).
This structure only functions if the $104 billion sales backlog (per claim 962) delivers revenues at acceptable margins and if customer prepayment flows sustain capex execution amid capital guidance of $32.5 billion to $37 billion (claims 7925, 7890). Revenue growth of 112 percent year-over-year (per claim 8185) supports visibility, but widening operating and net losses (per claim 1495) require explanation. A sophisticated reader should monitor: whether prepayment revenue recognizes at margins sufficient to service 5-year debt maturities (per claim 9120); covenant compliance trajectories given near-zero working capital; and actual capex deployment relative to announced guidance. The company has wagered on execution risk rather than capital risk, shifting dilution burden to leverage.
Capital & dilution trajectory
2026-09-09CoreWeave has raised over $30 billion in debt and equity since May 2025 (claim 8735), executing a capital structure that is architecturally coherent but operationally strained. The dilution story breaks cleanly into phases: IPO proceeds of $1.4 billion in May (claim 4967), followed by strategic equity raises—$350 million from customers (claim 4514), $2 billion from NVIDIA in January 2026 (claim 3891), and $1 billion from Jane Street in April (claim 2080)—that anchor the shareholder base rather than fragment it. Equity dilution from insiders is absent from the record. The debt mix tells a deliberate story. Early senior notes in 2025 at 9–9.25% give way to convertible securities starting December 2025, with $2.59 billion in net proceeds (claim 3981) and $3 billion more in April 2026 (claim 2126), reducing near-term dilution by pushing conversion decisions to equity holders. Overlaying this are delayed draw term loans—$8.5 billion in March (claim 2137) and $3.1 billion in May (claim 1319)—priced at customer contract cash flows rather than corporate credit. The newest tranche, $2.6 billion in August, carries secured DDTL status and Ba2 / BB+ ratings (claim 8732), marking a shift to asset-backed lending as unsecured capacity compressed. The use of proceeds aligns with backlog. Sales backlog of $104 billion (claim 962) is funded partly by $21 billion Meta commitment and $6.5 billion OpenAI commitment (claims 2124, 4297), and partly by customer prepayments that directly finance capex—$9 billion in 2026 alone (claim 8575). Full-year capex guidance of $32.5 to $37 billion (claims 7890, 7925) is aggressive but proportional to contracted revenue. However, operating reality requires close watching. Q2 net loss of $626 million against $2.58 billion revenue (claims 3014, 8183) and interest expense of $640 million (claim 7374) create a debt-to-equity ratio of 6x (claim 7378) and negative return on equity of 48 percent (claim 7372). January 2026 covenant amendments for debt service coverage and minimum liquidity testing (claims 3912, 3911) signal the capital plan runs close to covenant thresholds, dependent on customer cash realization. The convertible maturity and earliest redemption dates (claim 3985) approach, creating refinancing timing risk. What matters next: whether customer prepayments and contract realization sustain draw-down on the $8.5 billion and $3.1 billion DDTLs, and whether interest expense ($640 million quarterly) compresses as debt cost reduction materializes (claim 8547). The backlog is substantial; execution risk is the constraint.
Capital & dilution trajectory
2026-09-09CoreWeave has orchestrated a capital structure that appears deliberately engineered rather than opportunistically assembled. From IPO in May 2025 through August 2026, the company raised over $30 billion, per claim 8735. The mix reveals coherence: customer prepayments and direct commitments (Meta's $21 billion payment commitment, per claim 2124; OpenAI's $6.5 billion committed revenue, per claim 4297) anchor infrastructure-backed delayed draw term loans ($8.5 billion facility rated Ba2/BB+, per claims 9122 and 8732). Convertible offerings ($2.587 billion in December 2025, per claim 3980; $3 billion in April 2026, per claim 2126) provide capital at lower coupon than senior debt. Senior notes proliferated across 2025-2026 (9.250%, 9%, multiple tranches totaling several billion), with pricing tightening as credit ratings improved. Strategic equity investors—NVIDIA ($2 billion, per claim 3891), Jane Street ($1 billion, per claim 2080)—arrived as both capital partners and implicitly de-risking customer concentration. This is not a company patching funding gaps; it is matching customer contract duration to infrastructure financing tenor.
The stated use of proceeds tracks actual deployment closely enough. Customer contract capital expenditures and GPU servers, per claim 2138, consumed $9 billion in Q2 2026 capex (claim 1524) and are guided to $32.5 billion for full-year 2026 (claim 7925). Customer prepayments of $9 billion are funding capex (claim 8575). A $104 billion sales backlog (claim 1824) suggests capex intensity will persist for years.
One structural signal warrants attention: in January 2026, the company amended its minimum liquidity covenant (delayed status, claim 3911) and postponed debt service coverage ratio testing (claim 3912). These revisions occurred after the December 2025 convertible offering and substantial prior capital raises, suggesting early covenant pressure despite capital abundance. The company is simultaneously unprofitable—Q2 2026 net loss of $626 million on $2.58 billion revenue (claims 3014, 8183)—with quarterly interest expense of $640 million (claim 7374), consuming 25 percent of revenue. Debt stands at six times equity (claim 7378), and total liabilities of $72 billion dwarf equity of $5 billion (claims 637, 638).
A sophisticated reader should monitor whether further covenant amendments occur and track the path to operating cash flow generation. The $104 billion backlog is valuable only if customer contracts renew and do not shift to competitors or in-house solutions. Convertible dilution and strategic investor behavior—whether NVIDIA and Meta remain committed capital partners or become sellers—will signal confidence in the infrastructure thesis holding.
Capital & dilution trajectory
2026-09-09CoreWeave executed an aggressive but strategically coherent capital plan post-IPO in May 2025, raising more than $30 billion through coordinated debt and equity issuance, per claim 8735. The financing mix included $1.4 billion in IPO proceeds (claim 4967), convertible notes totaling $2.5 billion (December 2025, claim 3981) and $3 billion (April 2026, claim 2126), senior notes in four tranches ($1.75B, $1.5B, $1B, $3.5B per claims 4658, 4700, 2056, 8927), and infrastructure-backed term loans ($3.1 billion DDTL 5.0 facility, claim 9116). This was not opportunistic patching but customer-led infrastructure financing: Meta committed $21 billion (claim 2124) and OpenAI $6.5 billion (claim 4297), with the stated capex guidance of $32.5–$37 billion for 2026 (claims 7925, 7890) closely tracking capital raised.
Yet performance reveals structural stress. Q2 2026 generated $2.58 billion in revenue, up 112 percent year-over-year (claim 8177), but posted a net loss of $626 million (claim 3014). Interest expense ran $640 million (claim 7341)—approximately 25 percent of revenue. The debt-to-equity ratio stands at 6x (claim 3162). The $104 billion sales backlog (claim 1493) is substantial but should be read alongside covenant amendments in early 2026 postponing debt service coverage and minimum liquidity testing (claims 3912, 3911), which suggests lenders anticipated the cash-burn profile.
CoreWeave operates on an infrastructure-as-deployed model, with customer prepayments funding capex ($9 billion in prepayments, per claim 8575). This is not a conventional balance sheet, but a customer-financed build-to-utilization structure. A sophisticated reader should track capex execution velocity, customer concentration risk (a handful of mega-customers underwriting the entire facility), refinancing calendars for debt maturing through 2030–2032, and the trajectory of net losses as capex moderates and infrastructure utilization ramps. The company bet heavily on customer lock-in and utilization economics to sustain the leverage. Whether that thesis holds will determine whether this financing strategy was prescient or over-levered.
Capital & dilution trajectory
2026-09-08CoreWeave has executed a remarkable but structurally strained capital raise: $30 billion-plus in 2026 alone, per claim 8735, deployed against a $104 billion customer backlog (claim 647). The financing cascade reveals a company with demand it cannot ignore but insufficient self-generated cash to meet it. IPO proceeds of $1.4 billion (claim 4967) in May 2025 proved a placeholder; the real work began in early 2026 when customer commitments—$21 billion from Meta (claim 2124), $6.5 billion from OpenAI (claim 4297), $2 billion from NVIDIA equity (claim 3891)—made the capital structure existential. The mix suggests not opportunism but rather necessity-driven coherence: convertible debt, infrastructure-backed delayed draw term loans (the first publicly syndicated model, per claim 9117), and customer equity stakes all serve a single function—funding GPU deployments against contracted revenue. The company is deployed capital-intensive but revenue-rich if illiquid: Q2 2026 revenue of $2.58 billion (claim 8183) grew 112 percent year-over-year (claim 8185), yet the net loss widened to $626 million (claim 3014) and interest expense alone consumed $640 million (claim 7374). The trajectory is unsustainable without improvement. Debt-to-equity of 6x (claim 7378) mirrors capital-structure debt of roughly $30 billion (claim 1525) against equity of $5 billion (claim 638), a ratio justified only by the visibility of customer contracts with three-year terms (claim 8731). Covenant amendments in January 2026—postponing debt service coverage ratio and contract realization ratio testing (claims 3912, 3913)—flagged early stress; the company appears to have negotiated relief rather than default. Watch whether capex guidance of $32.5 billion to $37 billion (claims 7890, 7925) holds as interest costs escalate and customer prepayments (cited as $9 billion in 2026, claim 8575) prove insufficient ballast. The question is not whether demand exists but whether customer concentration and negative unit economics—losing money on billion-dollar quarterly revenues—can reverse before liquidity pressure forces a restructuring.
Capital & dilution trajectory
2026-09-08CoreWeave's sixteen-month capital trajectory reveals a deliberate infrastructure-financing model rather than opportunistic patching. From May 2025 onward, the company secured anchor customer commitments—OpenAI $6.5 billion (claim 4297) and Meta $21 billion (claim 2124)—then systematically raised debt and convertibles against those contracts. By August 2026, CoreWeave had secured over $30 billion in total capital (claim 8735), weighted heavily toward debt: senior notes ($1.5B, $1.75B, $1.75B, $3.5B per claims 4700, 4697, 4658, 8927), convertible notes ($2.587B per claim 3980), and delayed-draw term loans ($2.6B, $3.0B, $8.5B, $3.1B, $2.6B per claims 4592, 4277, 2137, 9116, 8729). Equity came primarily from strategic investors—NVIDIA twice at $2 billion each (claims 3891, 9316) and Jane Street $1 billion (claim 2080)—not public dilution. The IPO (May 2025, $1.4B net proceeds per claim 4967) was modest relative to total capital raised. This is coherent strategy, not patch-work: customer contract → syndicated debt financing → strategic equity validation.
However, announced capex deployment tracks poorly against operating reality. CoreWeave stated it would finance customer infrastructure and GPU servers (claim 2138), and reported Q2 2026 capex of $9 billion with full-year guidance of $37 billion (claims 1524, 7890), supported by $9 billion in customer prepayments (claim 8575). Yet the $104 billion sales backlog (claim 962) sits alongside devastating unit economics: Q2 2026 net loss of $626 million despite $2.58 billion revenue (claims 3014, 8183), negative net margin of negative 25 percent (claim 7371), return on equity of negative 48 percent (claim 7344), and negative free cash flow of $6 billion (claim 948). Quarterly interest expense of $640 million (claim 7341) consumes nearly a quarter of revenue. The company is unprofitable at scale.
A sophisticated reader should monitor three vulnerabilities. First, whether operating leverage emerges as utilization rises—currently, CoreWeave loses money on growth. Second, debt covenant compliance; early 2026 required amendments (claims 3912, 3911) suggesting tightness. Third, the $36 billion in future debt principal payments (claim 623) against negative free cash flow creates refinancing risk. The model works only if customer contracts accelerate and operating margins normalize sharply. Otherwise, this is capital-intensive growth funded by financial engineering atop structurally unprofitable operations.
Capital & dilution trajectory
2026-09-07CoreWeave's financing arc from May 2025 through mid-2026 shows strategic coherence rather than reactive patching, though with emerging structural strain. The company raised approximately $30 billion in debt and equity over twelve months (claim 8735), following an IPO that netted $1.4 billion (claim 4967). The capital stack evolved deliberately: after public debut, the company layered multiple debt instruments—senior notes of $1.5 billion and $1.75 billion (claims 4700, 4697)—alongside a $2.59 billion convertible offering (claim 3980), structured as long-duration instruments maturing 2030–2032. This reflects not opportunistic funding gaps but staged capital deployment matched to customer contract cycles. Strategic equity arrived late and concentrated: NVIDIA's $2 billion (claim 3891) in January 2026 and Jane Street's $1 billion (claim 2080) in April, suggesting partnerships rather than generic venture capital.
The deployment thesis is infrastructure-backed and customer-anchored. CoreWeave described the $2.6 billion delayed-draw term loan closed in August 2026 as the first publicly syndicated HPC infrastructure-backed financing (claim 9117), with an $8.5 billion facility similarly positioned (claim 9122). Use of proceeds tracked stated purpose: customer contract capital expenditures and GPU servers (claim 2138), with $9 billion in capex during Q2 2026 alone (claim 1524) and full-year guidance near $32.5 billion (claim 7925). Customer prepayments are funding capex directly, per disclosure (claim 8575). This alignment between capital raised and capital deployed is precise.
Structural stress emerged early. Covenant amendments and testing postponements in January 2026 (claims 3911, 3913) occurred well before debt maturity, signaling tightness within six months of IPO. Q2 2026 results show net loss of $626 million (claim 3014) despite $2.58 billion in quarterly revenue (claim 8183), free cash flow negative $6 billion (claim 1233), and debt-to-equity of approximately 6x (claim 8202). Interest expense of $640 million quarterly (claim 7374) is material but appears sustainable given a $104 billion sales backlog (claim 1493). The negative returns on equity and negative margins reflect a company in aggressive capex mode, not operational distress.
What requires watching: customer concentration. OpenAI's $6.5 billion commitment (claim 4297) and Meta's $21 billion (claim 2124) may represent the majority of that backlog. Should either customer defer, curtail, or renegotiate, the capex trajectory and debt service capacity shift materially. Refinancing needs cluster around 2030–2032, requiring the business to have moved to positive operating cash flow by then. The debt maturity ladder and rising interest burden leave limited margin for revenue disappointment.
Capital & dilution trajectory
2026-09-07CoreWeave raised over $30 billion from May 2025 through August 2026 (claim 8735), but the composition reveals a shift from balanced IPO positioning to heavy leverage in under eighteen months. The May 2025 public offering yielded $1.4 billion in net proceeds (claim 4967) alongside revolving credit expansion of $1.5 billion (claim 5010) and initial senior debt of $1.5–$1.75 billion (claims 4700, 4697). By late 2025, convertibles became dominant—$2.59 billion in December 2025 (claim 3980) and $3 billion in April 2026 (claim 2126)—while strategic equity checks from NVIDIA ($2 billion, claim 3891) and Jane Street ($1 billion, claim 2080) totaled $4.4 billion. Cumulative debt substantially outpaced equity: delayed-draw term loans reached $14.1 billion (claims 2137, 9116, 8729), supplemented by $8+ billion in senior notes (claims 8927, 2056, 2057). This is not opportunistic layering but rather a deliberate infrastructure-finance model. The May 2026 DDTL was explicitly the "first publicly syndicated HPC infrastructure-backed financing" (claim 9117), collateralized by customer contracts averaging three years (claim 8731), where prepayments fund capex and contracted cash flows service debt.
Use of proceeds tracks deployment precisely. Capital was designated for customer-contracted GPU infrastructure (claim 2138); Q2 capex of $9 billion against full-year guidance of $32.5–$37 billion (claims 1524, 7925) aligns with $9 billion in customer prepayments (claim 8575). Yet operational metrics reveal structural tension. Q2 2026 revenue of $2.58 billion (claim 8183) supported interest expense of $640 million (claim 7374)—one-quarter of revenue—against negative 25 percent net margins (claim 7376), negative $6 billion free cash flow (claim 1233), and 6:1 debt-to-equity (claim 7378). Current and quick ratios near zero (claim 7380) provide no liquidity cushion. The Meta commitment of $21 billion (claim 2124) concentrates customer risk in a single counterparty. Covenant amendments in January 2026 (claims 3912, 3913, 3911) and a May debt service coverage ratio of exactly 1.0 (claim 1324) signal limited headroom. Watch whether customer prepayments sustain at disclosed levels, whether Meta deploys the $21 billion on schedule, whether quarterly interest expense exceeds $640 million, and whether the company requires further covenant relief before reaching operating leverage.
Capital & dilution trajectory
2026-09-07CoreWeave's capital strategy reflects the specific capital intensity of AI infrastructure: after a $1.4B May 2025 IPO, the company rapidly assembled over $30B in debt and equity financing through mid-2026, per claims 4967 and 8735. The composition tells a story of operational pressure meeting market opportunity. The company began with traditional senior notes ($5B+ aggregated across May-August 2025, claims 4824, 4700, 4697), moved to convertible securities ($2.6B in December 2025, per claim 3981), then shifted to equity checkpoints—$2B from NVIDIA, $1B from Jane Street—paired with customer revenue commitments that function as financing (Meta's $21B through April 2026, per claim 2124). This is not opportunistic patching but a choreographed de-risking: each capital layer narrows as collateral or customer certainty improves. Yet the financing sequence masks a structural tension. Q2 2026 interest expense ran $640M quarterly (claim 7341), annualizing to $2.56B, against quarterly revenue of $2.58B (claim 8183). The debt-to-equity ratio sits at 6x (claim 8202), and Q2 free cash flow was -$6B (claim 1233), even as capex guidance expanded to $32.5B-$37B for full-year 2026 (claim 7925). The postponement of debt-service-coverage-ratio testing in early 2026 (claim 3912) signals that the company did not yet meet existing covenants on drawn debt. Use of proceeds tracks to capex—$9B deployed in Q2 alone (claim 621)—but customer prepayments fund $9B of that (claim 8575), meaning debt capital is not yet self-sustaining. What changed mid-2026 is the repricing of risk. The $3.1B term loan closing in May 2026 was investment-grade rated (claim 8732), marking the first syndicated HPC infrastructure-backed securitization (claim 9117). This suggests lenders now view cash flow collateral as bankable; it also implies CoreWeave believes it can absorb additional maturity through 2031-2032 without new equity. A reader should track whether customer prepayments sustain as capex tapers, whether the next covenant test triggers renegotiation, and whether guidance revisions signal margin pressure from infrastructure oversupply.
Capital & dilution trajectory
2026-09-06CoreWeave's post-IPO capital strategy reveals coherent structure underneath apparent frenzy. The company raised $1.4 billion in net IPO proceeds (claim 4967) in May 2025, then immediately stacked debt: senior notes of $1.5 billion (claim 4700) and $1.75 billion (claim 4697), escalated by $250 million (claim 4698), a $2.542 billion convertible net proceeds (claim 3981), and a $340 million capped call (claim 3986). Three tranches of delayed-draw facilities followed, totaling approximately $14.6 billion (claims 4277, 2137, 1319), capped by a $3.5 billion senior notes offering (claim 8927). By August 2026, CoreWeave had assembled more than $30 billion in debt and equity year-to-date (claim 8735). Rather than diluting shareholders post-IPO, the company locked strategic equity stakes: NVIDIA's $2 billion investment (claim 3891) and Jane Street's $1 billion (claim 2080). The capital mix—predominantly debt, minimal secondary equity dilution, strategic stakes from hyperscalers—reflects disciplined structuring, not opportunistic patching.
The announced use of proceeds tracks deployment closely. Two anchoring customer contracts frame the strategy: OpenAI's $6.5 billion committed revenue (claim 4297) and Meta's $21 billion payment commitment (claim 2124). The $8.5 billion delayed-draw facility explicitly targets customer contract capital expenditures and GPU servers (claim 2138). Q2 2026 capital spending reached $9 billion (claim 1524), supported by $9 billion in customer prepayments funding capex for the full year (claim 8575). The $104 billion sales backlog (claim 1493) justifies the capex trajectory.
However, the capital raise masks an acute profitability challenge. Q2 net loss was $626 million on $2.58 billion revenue (claims 1480, 8183), while quarterly interest expense reached $640 million (claim 1482)—a burn rate where financing costs consume 25 percent of quarterly revenue. Debt-to-equity ratios between 6 and 9 times (claims 7350, 1484) underscore the leverage. More revealing: January 2026 amendments to minimum liquidity covenants and postponements of debt-service-coverage testing (claims 3911, 3912) signaled lender concern immediately after the capital raise. The critical watch is whether customer prepayments scale faster than interest accruals, or whether covenant pressures resurface.
Capital & dilution trajectory
2026-09-06CoreWeave has executed a capital-intensive financing strategy calibrated to fund $37B in 2026 capex (claim 7890), raising more than $30B in debt and equity year-to-date (claim 8735). The sequencing is deliberate: IPO provided public currency with $1.4B net proceeds (claim 4967), followed by layers of subordinated equity—$2.59B in convertible notes (claim 3981) with a $340M capped call (claim 3986) to limit dilution, strategic investments from NVIDIA ($2B, claim 3891) and Jane Street ($1B, claim 2080)—then senior unsecured debt ($7B+ across five offerings through Q2 2026). This is not opportunistic patching but a coherent structure aligned to funding infrastructure capex for customer contracts averaging three years (claim 8731).
The capital stack shows discipline. Convertibles arrived after the IPO established pricing and public currency. Strategic equity from partners suggests customer alignment over equity-market opportunism. Senior debt arrived once revenue trajectory was visible: Q2 2026 generated $2.6B revenue on 112% year-over-year growth (claim 8185) against a $104B backlog (claim 1493). Deployment appears to track stated use: customer prepayments are funding $9B of capex in 2026 (claim 8575), with debt facilities explicitly targeting customer-contract capital expenditures and GPU servers (claim 2138). Yet the math requires scrutiny. Capex guidance of $37B against $30B+ raised and $9B in customer prepayments leaves a gap—suggesting either upcoming tranches or guidance revision.
The balance sheet carries execution risk. Quarterly interest expense of $640M (claim 1482) consumes 25% of quarterly revenue ($2.6B, claim 1479), while the company posted a $626M net loss and $6B negative free cash flow in Q2 2026 (claims 1480, 948). Debt-to-equity reaches 9:1 (claim 1484). This leverage is serviceable only if capex converts to revenue as promised and near-term profitability emerges. Covenant management has required amendment: minimum liquidity covenants were adjusted in January 2026 (claim 3911), and debt service coverage and contract realization testing were postponed (claims 3912, 3913), signaling cash tightness despite capital abundance. Customer concentration is pronounced—OpenAI ($6.5B committed, claim 4297) and Meta ($21B, claim 2124) dominate the backlog. A sophisticated reader should monitor whether capex guidance holds or resets, whether interest coverage improves as revenue scales into profitability, whether customer concentration narrows through diversification, and whether the refinancing cadence required as debt matures remains feasible in a tightening capital market.
Capital & dilution trajectory
2026-09-06CoreWeave's capital structure reflects a coherent, if capital-intensive, strategy matched to a high-backlog business model. The company raised over $30 billion in debt and equity year-to-date through August 2026, per claim 8735, anchored by two megadeals: a $21 billion payment commitment from Meta (claim 2124) and a $6.5 billion revenue commitment from OpenAI (claim 4297). These commitments front-load customer relationships, enabling the company to securitize capex through contractual visibility. Delayed draw term loan facilities—$8.5B via claim 2137, $3.1B via claim 1319, and $2.6B via claim 8729—are structured on approximately 3-year maturities matching customer contract duration (claim 8731), suggesting infrastructure financing designed to synchronize debt service with cash inflows. The capital stack itself—$30 billion in long-term debt against $5 billion in equity, creating a 6:1 debt-to-equity ratio (claim 1484)—is extreme but defensible if backlog converts and prepayments sustain (claim 8575 cites $9 billion in customer prepayments funding capex in 2026).
The covenant amendments in January 2026 (claim 3911 on minimum liquidity, claim 3913 on contract realization ratio testing) signal early stress. Q2 results expose the core tension: $2.58 billion in revenue with 112% year-over-year growth (claim 8183), yet a $626 million net loss (claim 1480) and negative free cash flow of $6 million (claim 1233). Interest expense alone ran $640 million in Q2 (claim 1482), consuming the operating profit margin and forcing dependence on continuing customer prepayments and undrawn debt capacity to fund the $32.5 billion to $37 billion capex budget. Equity raises came from NVIDIA ($2B via claim 3891) and Jane Street ($1B via claim 2080), reinforcing a customer-as-shareholder dynamic rather than traditional venture or public market demand. The convertible offering in December 2025 ($2.587B issued, net proceeds $2.542B per claims 3980 and 3981) was further dilution masked as debt.
A sophisticated reader should monitor three vectors: first, whether the $104 billion sales backlog (claim 1824) converts on guidance and whether customer prepayments remain durable; second, refinancing risk as delayed draw facilities and $3.5 billion in convertible notes due 2032 (claim 2126) approach maturity; and third, whether positive free cash flow materializes at scale, which remains absent despite explosive revenue growth. The company has optimized for capex velocity and customer acquisition rather than unit profitability—a sustainable pattern only if customer commitments hold and refinancing remains available at current spreads (SOFR + 5.50% per claim 8733).
Capital & dilution trajectory
2026-09-06CoreWeave's eighteen-month capital raise—exceeding $30 billion through August 2026, per claim 8735—reflects a customer-driven financing strategy rather than a pre-planned capital structure. The company progressed from IPO in May 2025 (claim 4967: $1.4B net proceeds) through a layered funding model: senior debt issued across multiple tranches between May and July 2025, a $2.587B convertible offering in December (claim 3980), strategic equity from NVIDIA at $2 billion in January 2026 (claim 3891), and Jane Street's $1 billion commitment in April (claim 2080). The most revealing component is the shift toward customer-linked infrastructure financing—$8.5 billion (claim 2137), $3.1 billion (claim 1319), and a final $2.6 billion DDTL facility closed in August (claim 8729)—each sized to specific customer commitments (Meta's $21 billion payment commitment per claim 2124; OpenAI's $6.5 billion revenue commitment per claim 4297). This structure indicates not opportunistic patching but rather a deliberate model in which debt duration and size match customer contract tenors.
However, deployment appears constrained relative to raised capital. CoreWeave guided 2026 capex at $32.5 billion to $37 billion (claims 7925, 7890), yet Q2 2026 showed only $9 billion in actual capital spending (claim 1229) with negative $6 billion free cash flow (claim 1233)—suggesting a widening gap between committed capital and deployed capital. Q2 net loss reached $626 million against $2.58 billion revenue (claims 3014, 8183), driven by $640 million interest expense alone (claim 3015), implying annual debt service exceeding $2.5 billion on a quarterly revenue run rate of $10.3 billion. The 6:1 debt-to-equity ratio (claim 8202) reflects a capital structure designed for infrastructure, not profitability.
The covenant amendments in January 2026 merit attention: postponements of debt service coverage ratio testing and contract realization ratio testing (claims 3912, 3913) arrived before the Meta and subsequent financings were publicly announced, signaling early pressure on leverage metrics. Whether capex accelerates to justify the raised capital, or whether the company faces revised deployment timelines and covenant renegotiations, remains the critical watch. The negative net margin of 25 percent (claim 8179) despite 112 percent year-over-year growth (claim 8185) indicates the capital productivity question is structural, not temporary.
Capital & dilution trajectory
2026-09-06CoreWeave's post-IPO capital strategy reveals less a coherent playbook than a company forced to layer financing instruments in real time around customer demands. The company raised $1.4 billion in net IPO proceeds in May 2025 (claim 4967), but immediately began issuing debt at scale—approximately $5 billion in senior notes across May through July (claims 4824, 4700, 4697, 4658). By December, it added a $2.587 billion convertible offering (claim 3980) with a $340 million capped call (claim 3986), followed by strategic equity from NVIDIA ($2 billion, claim 3891) and Jane Street ($1 billion, claim 2080). This sequencing is not opportunistic patching; it is customer-anchored infrastructure financing.
The Meta commitment of $21 billion in April 2026 (claim 2124) rewired the capital structure entirely. The $8.5 billion delayed-draw term loan facility (claim 2137) is explicitly tied to "customer contract capital expenditures and GPU servers." An additional $3 billion convertible (claim 2126) and $1.25 billion senior notes (claim 2125) followed within days. Customer prepayments of $9 billion are disclosed as funding capex in 2026 (claim 8575), and full-year capital expenditure guidance runs $32.5 to $37 billion (claims 7925, 7890). Use of proceeds tracks deployment: capital raises are synchronized with customer purchase commitments and capex execution.
The structural vulnerability is profitability. Q2 2026 revenue was $2.575 billion (claim 1479) against a net loss of $626 million (claim 1480) and interest expense of $640 million (claim 1482). Net margin is negative 25 percent (claim 8179). Total debt stands at $35 billion (claim 1798) against stockholders' equity of $5 billion (claim 1515), producing a debt-to-equity ratio of 9 (claim 1484). Free cash flow burn in that single quarter reached $5.74 billion (claim 1486).
A revenue backlog of $104 billion (claim 1513) and 115 percent trailing-twelve-month growth (claim 1815) confirm demand is genuine. But the company is currently incurring $1 of net loss for every $4 of revenue while servicing $35 billion in debt. Covenant postponements in January 2026 (claims 3911, 3913) signal early stress on debt metrics. The central question is execution velocity: whether capex deployment converts backlog into positive operating leverage before debt-service capacity becomes unsustainable. Customer concentration risk—Meta's scale within the backlog—remains unrevealed but material.
Capital & dilution trajectory
2026-09-05CoreWeave's capital structure from May 2025 through mid-2026 reveals a deliberately debt-heavy strategy anchored to customer commitments rather than traditional equity dilution. The company raised approximately $2.6B in net convertible proceeds (claim 3981) and layered multiple tranches of senior notes—9.25%, 9%, and $1.25B due 2031 (claims 4824, 4697, 2125)—alongside three distinct delayed-draw term loan facilities totaling $8.5B by March 2026 (claim 2137). This debt-first approach was offset by three rounds of strategic equity: the IPO at $1.4B net (claim 4967), a $2B NVIDIA investment (claim 3891), and $1B from Jane Street (claim 2080). The pattern is coherent: debt services the capex, equity provides validation from tier-one technology buyers. Two December 2025 amendments—minimum liquidity covenant relaxation and postponement of debt service coverage testing (claims 3911, 3912)—signal early working-capital pressure despite the fundraising pace. The announced use of proceeds (GPU infrastructure for OpenAI at $6.5B committed revenue and Meta at $21B committed, per claims 4297, 2124) maps directionally to actual deployment: Q2 2026 capex reached $9B with full-year 2026 guidance of $32.5–$37B (claims 1524, 7890), funded partly through $9B in customer prepayments (claim 8575). However, the cash dynamics are troubling. Q2 2026 free cash flow was negative $6B despite $2.58B in quarterly revenue and 112% YoY growth (claims 948, 8183, 8185), while net interest expense consumed $640M per quarter (claim 7374). The debt-to-equity ratio reached 6–9x by Q2 (claims 1484, 3162), and absolute debt stands near $35B (claim 1798), creating a serviceability question if customer prepayments slow or capital deployment timelines slip. The weighted-average cost of borrowing fell approximately 300 basis points late in the period (claim 1803), suggesting earlier tranches carried higher rates—a potential lock-in cost if refinancing needs accelerate. A sophisticated reader should track whether the $104B sales backlog (claim 1524) sustains prepayment velocity and whether operating margins inflect positive as capex moderates; the current structure assumes backlog-to-cash conversion remains resilient and capex per dollar of revenue continues to decline.
Capital & dilution trajectory
2026-09-05CoreWeave's capital trajectory traces a company building infrastructure at scale through a layered strategy that became increasingly leveraged, then structurally stressed within months. The IPO in May 2025 raised $1,400M in net proceeds (per claim 4967), accompanied immediately by $1,500M in revolving credit expansion and senior notes issuance, establishing a debt-forward posture from the start. Through mid-2025, the company stacked convertible notes ($2,587M gross offering by December, per claim 3980, yielding $2,542M net per claim 3981) and serial tranches of senior notes at rising rates, while customer-specific secured financings—an $8.5B delayed-draw term loan tied to Meta infrastructure (per claim 7563) and $3.1B facilities (per claim 1319)—became the dominant funding source. By August 2026, total debt reached $35B (per claim 1798), against equity of roughly $5B, implying a debt-to-equity ratio near 7:1. The equity mix shifted notably: initial IPO and over-allotment represented roughly $1.5B, but NVIDIA's $2B strategic investment (January 2026, per claim 3891) and Jane Street's $1B (April 2026, per claim 2080) arrived after covenant amendments on debt-service coverage and contract realization ratios were already postponed (January 2026, per claims 3912-3913), signaling capital structure stress less than eight months after IPO. The stated use of proceeds—customer-facing capex, particularly Meta's infrastructure—does map to actual quarterly deployments of $9.4B in capital expenditures (Q2 2026, per claim 1801), but the deployment model contains a critical tension: CoreWeave reported Q2 2026 revenue of $2,580M (per claim 8183) against a net loss of $626M and interest expense of $640M (per claims 1480, 1482), implying negative net margins and operating margins barely positive. The $104B sales backlog (per claim 1513) and OpenAI's $6.5B committed revenue (claim 4297) suggest committed capacity, but the company burned $5.7B in free cash in a single quarter (per claim 1486) while posting negative return on equity of -48% (per claim 8178). A reader should track whether debt service coverage covenant tests in 2026-2027 hold or trigger further amendments, whether capex-to-revenue conversion actually yields profitability, and whether the cost of debt (weighted-average borrowing cost, per claim 1803) continues falling enough to ease the burden of $35B in principal across a rising-rate environment. The current model funds growth through customer commitments, not cash generation; it requires either revenue-to-profitability transition or continued equity infusions to sustain.
Capital & dilution trajectory
2026-09-05CoreWeave's capital structure reveals methodical debt layering matched to customer-specific infrastructure deployments, not opportunistic patching, but execution risk is rising. The company IPO'd in May 2025 with $1.4B net proceeds (claim 4967) embedded within $17.2B total capital raised (claim 4968), then scaled debt aggressively: senior notes at 9.25% and 9% (claims 4824, 4697), a $2.59B convertible offering (claim 3980) with $340M capped-call hedges (claim 3986) to limit dilution, and sequential delayed-draw facilities of $2.6B, $8.5B, and $3.1B (claims 4592, 2137, 1319) tracked against customer commitments from OpenAI ($6.5B, claim 4297) and Meta ($21B, claim 2124). By Q2 2026, total debt reached $35B (claim 1798) against $5B equity (claim 1515), a 7:1 ratio sustainable only if backlog converts to revenue.
The $104B sales backlog (claim 1513) supports this thesis. Revenue grew 112% to $2.58B in Q2 (claims 8183, 1815), demonstrating traction. But cash generation is deeply negative: the company burned $5.74B free cash flow (claim 1486) in Q2 because capex of $9.4B (claim 1801) and interest expense of $640M (claim 1799)—25% of quarterly revenue—overwhelmed operations. Full-year 2026 capex guidance of $32.5–37B (claims 7925, 7890) implies the trajectory will worsen before improving. Critically, the company is unprofitable: Q2 net loss was $626M (claim 1480) on a -25% net margin (claim 7343).
Covenant erosion signals tightening. In January 2026, CoreWeave postponed debt service coverage ratio testing (claim 3912) and required a liquidity covenant amendment (claim 3911)—standard tells that cash flow fell short of lender expectations. The postponements bought time to demonstrate backlog-to-revenue conversion but signal lenders are monitoring closely. The path forward is binary: if the company deploys its $32.5–37B capex efficiently and converts backlog into cash-generative revenue by 2027, it can begin deleveraging before maturities arrive (senior notes due 2030 onward, per claim 4824). If backlog realization stalls or capex exceeds plan, the company faces refinancing pressure on $35B outstanding at higher rates given negative earnings. Customer fulfillment by Meta and OpenAI and quarterly FCF-to-capex trending are the metrics to watch; any material slowdown would force capital markets activity or equity dilution at reduced valuations.
Capital & dilution trajectory
2026-09-05CoreWeave has executed a high-leverage capital strategy since its May 2025 IPO that exhibits internal coherence around a customer-financed infrastructure model but carries material execution risk. Total gross capital raised through September 2026 exceeds $30 billion: equity of $4.8 billion including the IPO (claim 4967), NVIDIA $2 billion (claim 3891), and Jane Street $1 billion (claim 2080); senior debt of approximately $8.5 billion across multiple issuances; convertibles of $5.6 billion (claims 3980, 2126); and undrawn delayed-draw term facilities totaling $15 billion (claims 4592, 2137, 1319). The dilution trajectory moved immediately post-IPO rather than preserving capital: within months, the company layered convertibles and facilities against announced customer commitments—Meta's $21 billion capital commitment (claim 2124) and OpenAI's $6.5 billion (claim 4297)—suggesting these large customers effectively collateralize the deeper leverage tiers.
The capital mix reflects discipline rather than opportunism. Strategic equity from semiconductor and trading firms, senior debt positioning, and convertibles with capped-call hedges ($340 million per claim 3986) show intentional structure design. Use of proceeds tracks coherently to deployment: the announced capex guidance of $32.5-37 billion for 2026 (claim 7925) aligns with serving the $104 billion sales backlog (claim 1513), and Q2 capital spending of $9.4 billion (claim 1801) is proportionate to $2,575 million in quarterly revenue (claim 1479).
Yet deployment has not produced the margin inflection the capital structure requires. Q2 2026 reported a $626 million net loss (claim 3014) with $640 million in interest expense (claim 1482)—financing costs now approximate reported operations. Debt-to-equity reaches 9x (claim 1484), and free cash flow reflected $5.7 billion burn in the quarter (claim 1486). A covenant amendment was postponed in January 2026 (claim 3913), only nine months after the IPO, indicating initial financial models assumed faster operating margin recovery than materialized.
Readers should monitor whether operating margins inflect positive as capex moderates in late 2026, validating the leverage thesis. Refinancing risk on the 2029-2032 maturity wall requires attention if profitability remains delayed. Customer concentration—Meta may represent substantial backlog fraction—warrants scrutiny. If interest burden grows faster than revenue margin expansion, financial flexibility to maintain capex pace through demand cycles may constrain.
Capital & dilution trajectory
2026-09-05CoreWeave's capital trajectory from its May 2025 IPO ($1.4 billion net proceeds, claim 4967) through Q2 2026 shows a company financing infrastructure deployment faster than it generates operating cash flow. In 16 months, it raised roughly $17 billion cumulatively through a sequence that appears opportunistic: traditional bank facilities first ($1.5 billion revolver, claim 5010), senior notes as the IPO window closed (claim 4697: $1.75 billion in July 2025), convertibles later ($2.587 billion in December, claim 3980; $3 billion in April 2026, claim 2126), and equity when available (NVIDIA $2 billion, claim 3891; Jane Street $1 billion, claim 2080). The pattern—equity when signalable, debt when abundant—is orderly but reveals capital constraints shaped choices more than strategy.
Use of proceeds aligns to specific customer needs. The $8.5 billion delayed-draw facility targets customer capex and GPU servers (claim 2138); Meta's $21 billion payment commitment (claim 2124) and OpenAI's $6.5 billion revenue commitment (claim 4297) appear to anchor deployment. Q2 2026 capex of $9.4 billion (claim 1801) reflects this model. But financial results expose the tension. Q2 revenue of $2.575 billion (claim 1479) produced a $626 million net loss (claim 1480) with $640 million in interest expense (claim 1799)—debt service consumed the entire quarter's operating income. Free cash flow was negative $5.74 billion (claim 1486). Total debt reached $35 billion (claim 1798) against $8 billion trailing-twelve-month revenue (claim 6223) and a $2 billion TTM net loss (claim 6224), yielding debt-to-equity of 9x (claim 1484).
Covenant amendments in January 2026 signal strain: minimum liquidity thresholds loosened and debt service coverage and contract realization testing postponed (claims 3911, 3912, 3913). Yet lenders continued funding and weighted-average borrowing costs fell 300 basis points (claim 1803). Debt concentrates $15 billion due after 2030 (claim 6194).
A sophisticated reader should focus on whether operating cash flow inflects before 2030. The company bets on customer volume ramping and driving down cost-per-unit (the $104 billion sales backlog per claim 1824 is suggestive but unaudited). If customer commitments slip or unit economics remain poor, refinancing becomes acute. The question is not whether CoreWeave can raise capital—markets have repeatedly acquiesced—but whether deployed infrastructure can achieve the operating margins necessary to service $35 billion debt from $8 billion annual revenue.
Capital & dilution trajectory
2026-09-05CoreWeave's capital structure reveals a company building real infrastructure amid fragile financial engineering. From IPO completion in November 2025 through Q2 2026, the company raised approximately $35 billion in total debt and equity, but the mix betrays opportunism over coherent strategy. Debt dominates: senior notes totaling $5.5 billion (per claims 2125, 2056, 2057), convertibles of $2.587 billion (claim 3980) and $3 billion (claim 2126), plus delayed-draw term facilities now standing at $20.2 billion arranged across five successive facilities (claims 4592, 4277, 2137, 1319). Equity infusions were selective—NVIDIA's $2 billion (claim 3891) in January 2026 and Jane Street's $1 billion (claim 2080) in April came after public market stress, not before it. By Q2 2026, debt reached $35 billion against $5 billion equity (claims 1798, 638), a 7:1 leverage ratio (claim 1484 reports 9:1). This is not strategic sizing; it is layering.
The announced deployment tracks reality, but the arithmetic is brutal. CoreWeave reported $2.575 billion Q2 revenue (claim 1479) against $9.4 billion capex (claim 1801), a debt-fueled infrastructure build targeting announced mega-customer commitments: Meta's $21 billion (claim 2124) and OpenAI's $6.5 billion (claim 4297). The $104 billion backlog (claim 1513) appears genuine. However, Q2 free cash flow burned $5.7 billion (claim 1486) even as interest expense topped $640 million (claim 1482)—a quarterly cash drain exceeding quarterly revenue by 2.2x. Interest expense guidance jumped to $860 million in Q3 (claim 2965), a 34 percent increase on new debt layers. More concerning: in January 2026, just six weeks after closing a $2.587 billion convertible offering, CoreWeave postponed debt service coverage ratio testing and amended minimum liquidity covenants (claims 3912, 3911). A notice of delayed interest payment appeared simultaneously (claim 4659). These are not routine administrative moves.
A sophisticated reader should track whether CoreWeave can scale revenue to approach serviceability. At current burn, the company needs annual revenue approaching $12–15 billion to service debt sustainably; trailing twelve-month revenue stands at $8 billion (claim 6223). The backlog is material, but conversion risk and GPU market cyclicality matter enormously. Both NVIDIA and Meta are strategic investors and demand drivers—if either customer cycles or deploys in-house, CoreWeave's capex thesis collapses. Watch covenant amendment frequency and the weighted-average interest rate (they reduced it by 300 basis points per claim 1803, suggesting active refinancing), both signals of liquidity pressure beneath guidance.
Capital & dilution trajectory
2026-09-05CoreWeave's dilution trajectory reflects a deliberate sequencing: an IPO raising $1.4 billion in May 2025 (claim 4967), followed by a $2.587 billion convertible offering in December 2025 (claim 3980) and strategic equity injections from NVIDIA ($2 billion, claim 3891) and Jane Street ($1 billion, claim 2080). Total dilutive equity across the period reached roughly $4.8 billion against an estimated $35 billion in total debt raised (claim 1798), suggesting measured shareholder dilution relative to total capital deployed.
The capital mix demonstrates coherence rather than opportunistic patching. CoreWeave layered senior notes—$1.5 billion and $1.75 billion in July 2025 (claims 4700, 4697)—alongside multiple delayed draw facilities ($8.5 billion, $3.1 billion, and others spanning 2025-2026, per claims 2137, 1319). A July 2025 attempt to increase an offering by $250 million was delayed (claim 4699), indicating market receptivity had limits, yet the December convertible offering succeeded at scale. The $340 million capped call transaction (claim 3986) reflects embedded option value pricing.
Use of proceeds tracks deployment. CoreWeave stated delayed draw facilities would fund customer contract capital expenditures and GPU servers (claim 2138); Q2 2026 capital spending of $9.4 billion (claim 1801) and full-year guidance of $32.5 billion to $37 billion (claim 7925) align with committed customer infrastructure. The OpenAI $6.5 billion revenue commitment (claim 4297) and Meta $21 billion payment commitment (claim 2124) appear to underpin the debt strategy, providing visibility for debt service.
Strain points require scrutiny. Debt-to-equity reached 7x by Q2 2026 (claim 1484), with $35 billion in total debt against $5 billion equity (claims 1798, 1515). Interest expense of $640 million quarterly (claim 1482) consumes roughly 320 basis points of trailing revenue (~$8 billion, claim 1510). More acutely, Q2 free cash flow was negative $5.74 billion (claim 1486) despite a $104 billion backlog (claim 1513), indicating CapEx outpaces cash generation. Debt covenant amendments in January 2026 (claims 3912, 3911) suggest the initial structure assumed faster cash conversion.
A sophisticated reader should monitor whether the $104 billion backlog converts to revenue quickly enough to sustain debt service and $32-37 billion annual CapEx. The $300 basis point reduction in weighted average borrowing cost (claim 1803) hints at refinancing optionality, but persistent negative free cash flow may necessitate equity dilution or asset sales if revenue growth falters.
Capital & dilution trajectory
2026-09-05CoreWeave's capital raising since May 2025 reflects crisis-driven financing rather than strategic architecture. The company raised approximately $35 billion in debt (per claim 1514) against $5 billion in equity through the IPO and strategic investors, establishing a 7:1 leverage ratio. The debt mix itself fragments across four tiers: revolving facilities ($1.85 billion, per claims 5010, 5011), term loans ($17.2 billion across four facilities per claims 4592, 4277, 2137, 1319), senior notes ($7-8 billion per claims 4824, 4700, 4697, 2125, 2057, 2056), and convertible notes ($5.6 billion per claims 3980, 2126, 3133). The sheer number of separate facilities—three DDTL tranches in nine months (July 2025 through May 2026)—suggests capital needs escalated beyond initial underwriting. The announced use of proceeds aligns narrowly with observed deployment: claim 2138 specifies financing for customer contract capital expenditures and GPU servers, and Q2 2026 capex of $9.4 billion (claim 1801) with H1 total capex of $16 billion (claim 3038) tracks the infrastructure-as-a-service model. Yet the operational tension is acute. Q2 2026 revenue reached $2.575 billion (claim 1479) against a $104 billion sales backlog (claim 1513), generating a $626 million net loss (claim 1480) while interest expense alone hit $640 million (claim 1482). The weighted-average cost of borrowing declined approximately 300 basis points (claim 1803), indicating refinancing activity, but covenant amendments in January 2026 (claims 3911, 3913) reveal the original facility terms became unworkable almost immediately—DSCR and contract realization ratio testing were postponed and liquidity covenants amended. The inflection points warrant attention: the OpenAI commitment of $6.5 billion (claim 4297) and Meta commitment of $21 billion (claim 2124) preceded the largest debt tranches, suggesting customer contracts drive facility sizes rather than operating performance. Two strategic equity checks—NVIDIA's $2 billion (claim 3891) and Jane Street's $1 billion (claim 2080)—followed these commitments, implying management accepted dilution only after securing customer capital certainty. The free cash flow burn of $5.74 billion in Q2 2026 alone (claim 1486) creates a path dependency: sustained backlog realization is not optional but required to service $2.5+ billion in annualized interest expense. A sophisticated reader should monitor whether management can hold covenant thresholds through 2027 without further amendment, track the cash conversion cycle on the $104 billion backlog, and assess whether customer concentration risk (two contracts representing a substantial backlog portion) creates refinancing hazard if either contract delays or downsizes.
Capital & dilution trajectory
2026-09-05CoreWeave's capital pattern through 2026 reveals a financing structure that has shifted repeatedly in response to unanticipated capital intensity. The company IPO'd in May 2025 with $1.4 billion in net proceeds (claim 4967), paired with $1.5 billion in revolving credit expansion (claim 5010), but within months pivoted toward debt financing and convertible securities. By December 2025, just seven months after going public, CoreWeave issued $2.587 billion in convertible senior notes (claim 3980) and required a minimum liquidity covenant amendment (claim 3911). This January 2026 amendment—triggered mere weeks after the IPO—indicates the capital structure was inadequate for the company's actual deployment requirements.
The deployment story clarifies the pressure. CoreWeave reported $9.4 billion in capital expenditures during Q2 2026 alone (claim 1801), and raised full-year capex guidance to $35 billion (claim 2963). Against trailing twelve-month revenue of only $8 billion (claim 1510), this capex cadence is extreme. The company's negative free cash flow of $5.74 billion in Q2 2026 (claim 1486) and negative trailing net income of $2 billion (claim 1511) show no organic funding source for this build-out. Strategic equity became necessary: NVIDIA invested $2 billion in January 2026 (claim 3891), and Jane Street committed $1 billion in April 2026 (claim 2080). These mid-year injections suggest the May IPO and subsequent debt raises had not provided adequate cushion.
The debt stack by Q2 2026 stood at $35 billion (claim 1798) against stockholders' equity of $5 billion (claim 1515), yielding a 7:1 debt-to-equity ratio (claim 1484). Interest expense climbed to $640 million in Q2 (claim 1482), with Q3 guidance to $860 million (claim 2965), compressing an already-negative operating margin. The company's quick and current ratios both registered near zero (claims 7380, 7379), signaling minimal liquid cushion despite $104 billion in announced sales backlog (claim 1513). A debt maturity of $6 billion looms in 2027 (claim 3041).
This financing arc does not reflect premeditated strategy but rather reactive capital raising to fund infrastructure commitments—particularly the OpenAI $6.5 billion revenue contract (claim 4297) and Meta $21 billion infrastructure commitment (claim 2124). The August 2026 convertible offering ($3 billion with optional $450 million expansion, claims 3133, 3134) followed by Q3 interest expense guidance implies management expects further covenant pressure. Sophisticated investors should monitor whether backlog-to-revenue conversion accelerates sharply or whether the company must undertake additional dilutive capital raises to manage the 2027 debt maturity and sustain current capex guidance.
Capital & dilution trajectory
2026-09-02CoreWeave's 2026 financing pattern reflects a methodical execution of a capital-intensive GPU infrastructure strategy backed by concrete customer commitments, but reveals strain in converting that backlog into near-term profitability. Between March and May, the company secured approximately $20 billion in capital: $11.6 billion in delayed draw term loan facilities ($8.5 billion in March, per claim 2137, and $3.1 billion in May, per claim 1319), $4 billion in senior notes, convertible notes totaling $3.45 billion with a portion due 2032 (claims 2126, 2127), and a $1 billion equity stake from Jane Street (claim 2080). This mix reflects a deliberate preference for leveraged growth over equity dilution. The $21 billion Meta payment commitment announced in April (claim 2124) provides a credible anchor for the capital intensity, and the May DDTL facility explicitly ties deployment to customer contract capex and GPU servers (claim 1320), signaling financial discipline around use of proceeds.
The capital deployment aligns with the financing narrative. Q2 2026 capex reached $9.4 billion (claim 1801), consistent with a business scaling GPU server delivery to major customers. The $104 billion sales backlog (claim 1513) towers over $2.6 billion quarterly revenue (claim 1479), suggesting infrastructure investment targets tangible demand rather than speculative buildout.
The subsurface dynamics demand skepticism. Q2 net loss reached $626 million (claim 1480) while operating and net losses widened (claim 1495) despite revenue growth. Free cash flow burned $5.74 billion that quarter (claim 1486), implying the company consumes cash faster than customer payments can offset. Interest expense of $640 million quarterly (claim 1799) on $35 billion total debt (claim 1798) creates a debt-to-equity ratio of 9x (claim 1484), while the debt service coverage ratio covenant stands at exactly $1 (claim 2141)—the minimal sustainable threshold. The company did secure a 300-basis-point reduction in its weighted-average borrowing rate (claim 1803), easing pressure, but such concessions typically depend on lender confidence in an imminent path to profitability that these numbers have not yet demonstrated.
The question for sophisticated investors: does Q2 mark the trough of negative FCF and losses, or the beginning of sustained cash burn? The 40x backlog-to-revenue ratio cannot persist indefinitely without profitability momentum. Watch for evidence that revenue acceleration outpaces capex growth and cash burn narrows materially in coming quarters.
customer_arc
Customer disclosures, read
2026-10-19CoreWeave's record splits cleanly into three tiers, and only the top one carries contractual weight. The signed agreements are the order forms executed under existing Master Services Agreements: OpenAI (4296, building on 19820), NVIDIA (4352), and Meta (4282, 2123). These are filed contracts with dollar ceilings. OpenAI's tranches of $11.9 billion, $4 billion and $6.5 billion (19820, 25573, 20198) sum exactly to the stated $22.4 billion total. Meta's initial $14.2 billion (4282) was followed by a roughly $21 billion expansion through 2032 (10340, 2123, 9317). Even here, the language is "up to" and "initially committed," so these are ceilings rather than floors. The $11.2 billion backlog contribution attributed to OpenAI (4969), against the $11.9 billion headline (19820), suggests some of the headline value had not converted to booked backlog. Jane Street's roughly $6 billion (10304) and the Anthropic multi-year agreement (10731) are named and described as commitments, but the Anthropic deal carries no disclosed value, and neither appears here as a filed order form.
The second tier is unnamed. The "new hyperscaler customer" (25574) and the "leading AI enterprise" financed by DDTL 4.0 (11224) are never identified. The DDTL 3.0 customer (4595) is resolved to OpenAI only through a separate disclosure (26687). The third tier is relationship language. The January 2026 NVIDIA expansion is explicitly a "collaboration framework" (3892) that includes testing and validation work (17598) and a 5 GW aspiration (27948), distinct from the $6.3 billion capacity order (20209). IBM (4971), CrowdStrike (11768), Core Scientific (20313), Genesis Mission (11778) and the Aston Martin sponsorship (25576) carry no economics. The logo lists (25575, 11767, 9320) name counterparties without contract terms.
Concentration has shifted rather than eased. In early 2025, OpenAI alone was 43% to 46% of the $25.9 billion backlog (4970). By the end of 2026's first quarter, Meta's cumulative ceiling of about $35 billion exceeds OpenAI's $22.4 billion. NVIDIA is both supplier and customer, which adds circularity risk.
The arithmetic roughly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555). Named 2025 additions from OpenAI, Meta and NVIDIA total about $42.9 billion, which implies roughly $3 billion plus revenue burn-off from the hyperscaler and smaller logos. That residual is plausible but unverified, because the "up to" ceilings may overstate what is booked. Meta's $21 billion, Jane Street and Anthropic all postdate the $60.7 billion figure and should surface in 2026 RPO.
Customer disclosures, read
2026-10-19CoreWeave's record separates cleanly into contracts executed under master services agreements and a larger body of partnership and logo language. The signed tier is narrow. OpenAI is documented through an order form under an existing MSA (4296), with announced tranches of $11.9 billion (19820), $4 billion (25573) and up to $6.5 billion (20198), summing to the stated $22.4 billion (20198). Meta's order forms are filed for up to $14.2 billion through 2031 (4282, 2123) and a further roughly $21 billion through 2032 (10340, 17654). NVIDIA's September 2025 order form (4352) corresponds to the $6.3 billion arrangement (20209). Jane Street's roughly $6 billion commitment (10304) is named and quantified. The Anthropic agreement (10731) is named but carries no value. By contrast, NVIDIA's January 2026 'collaboration framework' toward more than 5 GW by 2030 (3892, 17596, 27948) is a framework, not contracted revenue. The IBM (4971), CrowdStrike (11768, 10330), Aston Martin (25576), Genesis Mission (11778) and Core Scientific (20313) items are partnership or participation language. The 'partner of choice' logo lists (25575, 11767, 10338, 9320) disclose no terms. Two counterparties remain unidentified: a 'new hyperscaler customer' (25574) and the 'leading AI enterprise' behind DDTL 4.0 (11224). The DDTL 3.0 'customer contract' (4595) is resolved as OpenAI by 26687.
Concentration has shifted rather than diluted. At March 2025, OpenAI's tranche was roughly 45 percent of the $25.9 billion backlog (4970). By December 2025, OpenAI's $22.4 billion and Meta's $14.2 billion together approximate 60 percent of $60.7 billion in RPO (3555). Meta's 2026 expansion lifts its headline total to about $35 billion, likely making it the largest single counterparty. Jane Street is the only sizable new non-hyperscaler name.
The arithmetic broadly reconciles, with caveats. Year-end 2024 RPO of $15.1 billion (3572) plus the 2025 named deals ($22.4B, $14.2B and $6.3B, about $42.9 billion) yields roughly $58 billion, near the reported $60.7 billion. That fit holds only if the 'up to' ceilings count at full value and burn-down is offset by unnamed wins. The first OpenAI tranche is cited at $11.9 billion (19820) but only $11.2 billion of backlog was added (4969), an unexplained $0.7 billion gap. RPO also fell to $14.7 billion in Q1 2025 (4970), implying that OpenAI value initially sat in conditional, non-RPO backlog. No post-2025 RPO figure is on record to test the 2026 Meta and Jane Street additions.
Customer disclosures, read
2026-10-18CoreWeave's signed contracts are concentrated in a few order forms filed under existing master services agreements. These are with OpenAI (claim 4296), Meta (claims 4282 and 2123) and NVIDIA (claim 4352). The disclosed values are binding, though the Meta and OpenAI figures are framed as "up to" amounts (claims 4282, 20198), which makes them ceilings rather than floors. OpenAI's tranches of $11.9 billion, $4 billion and $6.5 billion (claims 19820, 25573, 20198) add up to the stated $22.4 billion total. The earlier backlog description of the first tranche as $11.2 billion (claim 4969) is $0.7 billion short of the headline and is not explained. Jane Street's roughly $6 billion commitment (claim 10304) is named and sized. Anthropic's "multi-year agreement" (claim 10731) is named but unpriced and appears only through secondary reporting.
Much of the remaining record uses softer language. The NVIDIA 5 GW arrangement is explicitly a "collaboration framework" (claims 3892, 27948). The IBM, CrowdStrike, Core Scientific and Aston Martin items (claims 4971, 11768, 20313, 25576) are partnerships with no disclosed economics. Genesis Mission (claim 11778) is programme participation. The logo lists (claims 25575, 11767, 9320) carry no contract values. Two material counterparties remain unidentified: the "new hyperscaler customer" (claim 25574) and the "leading AI enterprise" financed by DDTL 4.0 (claim 11224). The counterparty behind DDTL 3.0 was later identified as OpenAI (claims 26687, 4595).
Concentration has broadened at the top but not in depth. In March 2025, backlog was $25.9 billion against RPO of $14.7 billion (claim 4970). The $11.2 billion gap equals the OpenAI addition, so OpenAI was effectively the entire non-RPO backlog. By late 2025, Meta, OpenAI and NVIDIA together accounted for roughly $42.9 billion of announced commitments. Meta's further $21 billion order through 2032 (claims 2123, 10340) lifts its cumulative headline to about $35 billion, overtaking OpenAI. NVIDIA's role as supplier, collaborator and $6.3 billion customer (claim 20209) is a circularity that investors should weigh.
The arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3560), a $45.6 billion net increase. Named 2025 deals total $42.9 billion. Revenue recognised during the year also drew the balance down, so unnamed bookings, plausibly including the hyperscaler, likely contributed several billion dollars that are not attributed to any counterparty. Several records also carry unit artifacts that should not be read literally, such as "$21,000" in claim 10729 and "$61" in claim 3555.
Customer disclosures, read
2026-10-18CoreWeave's record has few soft MOU-style announcements, but a lot of repetition, and the figures for the signed contracts need careful handling. The executed agreements are order forms under existing master services agreements. These are OpenAI (19820, then 4296), Meta (4282, then 2123 for the March 31, 2026 order form) and NVIDIA (4352). Jane Street's roughly $6 billion commitment (10304) and the Anthropic multi-year agreement (9318) are also described as signed. Anthropic's has no disclosed value. Several items carry partnership language without disclosed economics: IBM (4971), CrowdStrike (11768, repeated as 10330), Aston Martin (25576), Core Scientific (20313) and the Genesis Mission (11778). The January 2026 NVIDIA expansion is explicitly a collaboration framework (3892, 17596, 27948) aimed at more than 5 GW by 2030, so it should not be read as contracted revenue. Exemplar Cloud status (10332, 9324) is a designation, not a contract. Some disclosures leave the counterparty unnamed. One is a hyperscaler, described as signed and expanded (25574). Another is a 'leading AI enterprise' whose contract backs DDTL 4.0 (11224). DDTL 3.0 at first referred only to 'a customer contract' (4595) but was later tied to OpenAI (26687). The logo lists (25575, 11767, 9320) name customers but give no dollar amounts.
Concentration is severe and growing. OpenAI commitments of $11.9 billion, plus $4 billion, plus $6.5 billion sum exactly to the stated $22.4 billion (20198). One mismatch remains: the first quarter booked the original OpenAI deal as $11.2 billion of backlog (4969), not $11.9 billion. Meta's initial commitment was up to $14.2 billion (4282). The later $21 billion order form is called a 'new' commitment (9317), which implies a cumulative Meta exposure near $35 billion. That figure is unconfirmed, because coverage repeats the same deal (10729, 10694, 10340, 17654).
On the arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of $45.6 billion before netting out recognized revenue. The 2025 OpenAI, Meta and NVIDIA deals total about $42.9 billion. That leaves the unnamed hyperscaler and smaller logos to explain the remainder plus whatever revenue was recognized in the year. OpenAI and Meta alone account for roughly 60 percent of year-end RPO, and about 70 percent once NVIDIA is added. NVIDIA is also a supplier and an investor. Many figures are stated as 'up to' ceilings, which is hard to square with RPO's committed-only definition. The roughly $27 billion of 2026 signings (Meta and Jane Street) has not yet appeared in any reported RPO.
Customer disclosures, read
2026-10-17CoreWeave's dollar-denominated commitments sit almost entirely with a few named counterparties under signed order forms. The firmest are the OpenAI order form of September 2025 (claim 4296, sized at up to about $6.5 billion in claim 20198), the Meta order form committing up to about $14.2 billion through December 2031 (claims 4282, 17655), the March 31, 2026 Meta order form of about $21 billion through 2032 (claims 2123, 10340, 9317), and the NVIDIA capacity order form (claim 4352, described as $6.3 billion in claim 20209). The original $11.9 billion OpenAI agreement (claim 19820) and the $4 billion expansion (claim 25573) are described as executed agreements. The Anthropic deal is called signed (claim 9318) but carries no value. The roughly $6 billion Jane Street commitment (claims 10304, 10730) is quantified but rests on press-release language rather than a filed order form.
A second tier uses softer language. The January 2026 NVIDIA arrangement is a 'collaboration framework' toward more than 5 GW by 2030, with testing and validation aims, and carries no stated payment obligation (claims 3892, 17596, 27948, 17598). The same applies to the IBM partnership (claim 4971), CrowdStrike 'global partnership' (claims 11768, 10330), Aston Martin sponsorship (claim 25576), Genesis Mission participation (claim 11778) and Core Scientific collaboration (claim 20313). The logo lists in claims 25575, 11767, 10338 and 9320 give no values. Three counterparties are not identified at all: the 'new hyperscaler customer' (claim 25574), the DDTL 3.0 'customer contract' (claim 4595), which claim 26687 separately ties to OpenAI, and the 'leading AI enterprise' financed by DDTL 4.0 (claim 11224).
Concentration has moved but not eased. OpenAI's $11.2 billion was roughly 43 percent of the $25.9 billion backlog in March 2025 (claims 4969, 4970). By December 2025, OpenAI's $22.4 billion plus Meta's $14.2 billion equal about 60 percent of $60.7 billion RPO (claim 3555), and about 71 percent with NVIDIA included. Meta's March 2026 addition makes Meta, not OpenAI, the largest exposure.
The arithmetic broadly reconciles, with caveats. The OpenAI figures sum correctly ($11.9B + $4B + $6.5B = $22.4B), but the initial deal was booked as $11.2 billion against a $11.9 billion headline. RPO also fell from $15.1 billion to $14.7 billion in Q1 2025 (claims 3572, 4970), which suggests the OpenAI deal first appeared in delivery-contingent backlog. The $30.6 billion rise from June 2025 backlog (claim 25586) to December RPO roughly matches about $27 billion of named deals. However, this compares backlog with RPO, and the 'up to' wording means these figures are ceilings rather than floors.
Customer disclosures, read
2026-10-17CoreWeave's record separates cleanly into dollarized order forms and softer relationship language. The signed customer agreements are the OpenAI contracts under a master services agreement: $11.9 billion initially (claim 19820), a $4 billion expansion (25573) and a September 2025 order form (4296) of up to $6.5 billion, which brings OpenAI to up to $22.4 billion (20198). That arithmetic adds up exactly, although the first quarterly print booked only $11.2 billion of the initial deal into backlog (4969). Meta signed an order form worth up to $14.2 billion through 2031 (4282) and a roughly $21 billion order form on March 31, 2026 (2123, 10340, 9317). NVIDIA's $6.3 billion capacity order form (4352, 20209) is also signed, though it reads more like a backstop for unused capacity than end demand. Jane Street committed about $6 billion (10304). The Anthropic agreement is described as signed and multi-year (9318), but no value was disclosed. Everything else is framework or partnership language with no committed dollars attached. That includes IBM (4971), Aston Martin (25576), Core Scientific (20313), CrowdStrike (11768, 10330), the Genesis Mission (11778), the January 2026 NVIDIA collaboration framework and its 5 GW ambition (3892, 17596, 27948), Exemplar Cloud status (10332), and the logo lists (25575, 11767, 10338). Several counterparties go unnamed. The record mentions a 'new hyperscaler customer' (25574) and a 'leading AI enterprise' whose contract DDTL 4.0 financed (11224). DDTL 3.0's 'customer contract' (4595) is identifiable only because a separate disclosure ties it to OpenAI (26687). Concentration has deepened. OpenAI, Meta and NVIDIA together account for about $42.9 billion of commitments disclosed through 2025, roughly 70% of the $60.7 billion of RPO at year-end (3555). The 2026 additions skew further toward Meta. On reconciliation, RPO actually dipped from $15.1 billion (3572) to $14.7 billion by March 2025 even as headline backlog reached $25.9 billion (4970). That gap reflects non-RPO amounts that depend on delivery conditions. Taking the $15.1 billion opening RPO and adding the three named 2025 deals gives about $58 billion before any revenue burn-down. That broadly squares with $60.7 billion, provided unnamed customers contributed a few billion more. The record does not include revenue recognized during 2025, so the bridge cannot be closed precisely. Readers should also be aware that the Meta expansion is triple-counted across press coverage (10694, 10729, 17654), and one of those entries is dated before the March signing.
Customer disclosures, read
2026-10-17CoreWeave's signed book rests on three named counterparties. OpenAI has executed order forms under a master services agreement: $11.9 billion (19820), a $4 billion expansion (25573) and a further order form of up to roughly $6.5 billion (4296, 20198). Those three sum to the stated $22.4 billion, so that tranche reconciles. The first leg, however, entered backlog at $11.2 billion rather than $11.9 billion (4969). Meta holds an executed order form of up to $14.2 billion through 2031 (4282). A March 2026 order form adds about $21 billion through 2032 (2123, 10340, 9317), which takes Meta past OpenAI as the largest counterparty. NVIDIA's $6.3 billion capacity purchase (4352, 20209) is a signed order form, but it comes from CoreWeave's own GPU supplier and should be read as circular. Jane Street's roughly $6 billion (10304) and the Anthropic multi-year agreement (9318) are described as signed, but the Anthropic agreement carries no disclosed value.
Much of the remaining language is framework or sponsorship rather than revenue contract. This covers the IBM 'partnership' (4971), the NVIDIA 'collaboration framework' toward 5 GW (3892, 17596, 27948), Core Scientific 'collaboration' (20313), the CrowdStrike 'global partnership' (11768), the Genesis Mission (11778), the Aston Martin F1 designation (25576) and 'Exemplar Cloud' status (10332). Logo lists such as Cohere, Mistral, Cursor and Midjourney (25575, 11767, 9319) name customers but attach no values. Three counterparties remain unidentified: a 'new hyperscaler customer' (25574), the DDTL 3.0 'customer contract' (4595, later tied to OpenAI by 26687), and the 'leading AI enterprise' behind DDTL 4.0 (11224).
Concentration has deepened rather than diversified. OpenAI, Meta and NVIDIA together account for about $42.9 billion of the $60.7 billion RPO at year-end 2025 (3555), roughly 70 percent. The 2026 Meta expansion lifts that counterparty alone to as much as $35 billion.
The revenue arithmetic only partially reconciles. RPO fell from $15.1 billion (3572) to $14.7 billion by March 2025 (4970), despite the OpenAI signing. That implies most of the OpenAI deal sat in the non-RPO, delivery-contingent portion of the $25.9 billion backlog. The bridge from $15.1 billion to $60.7 billion leaves an unexplained residual in the high teens of billions after named deals and 2025 recognition, plausibly the unnamed hyperscaler. Many figures are 'up to' caps. Some source values carry unit errors (10729, 3555), and claim 9320 was truncated in the record.
Customer disclosures, read
2026-10-17CoreWeave's record is unusually rich in signed, filed agreements, but they cluster around very few counterparties. The hard contracts are order forms under existing master services agreements, disclosed in 8-Ks. These cover OpenAI (claims 19820, 4296), NVIDIA (4352) and Meta (2123). The headline values attached to them are $11.9 billion, then $4 billion and $6.5 billion expansions for OpenAI (25573, 20198), $6.3 billion for NVIDIA (20209), and $14.2 billion followed by roughly $21 billion for Meta (4282, 10340). Several of these are framed as 'up to' amounts (4282, 20198), so they are ceilings rather than fixed take-or-pay figures. The opening OpenAI number also does not match across documents: $11.9 billion in the announcement (19820) against $11.2 billion added to backlog (4969). The Jane Street commitment of about $6 billion (10304) and the Anthropic agreement (9318) are described as signed. Anthropic carries no disclosed value, and neither deal appears in the record as a filed order form. Everything else is softer. The IBM 'partnership' (4971), the NVIDIA 'collaboration framework' targeting 5 GW (3892, 17596, 27948), the CrowdStrike and Core Scientific relationships (11768, 20313), the Aston Martin sponsorship (25576) and the Genesis Mission participation (11778) are not customer contracts. The recurring logo lists (25575, 11767, 9320, 9319) name customers but give no economics. Anonymity is an issue in three places. The 'new hyperscaler customer' (25574) is never identified. The DDTL 3.0 'customer contract' (4595) was later tied to OpenAI (26687). The 'leading AI enterprise' financed under DDTL 4.0 (11224) remains unnamed. Concentration has broadened in name only. OpenAI and Meta together account for roughly $57 billion of announced commitments. NVIDIA is both CoreWeave's supplier and a buyer of its capacity (4352), which makes it a circular counterparty. The arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555). The named 2025 deals sum to about $43 billion: OpenAI $22.4 billion, Meta $14.2 billion and NVIDIA $6.3 billion. That brings the total to roughly $58 billion before deducting revenue recognized during the year. Once burn-off is subtracted, a residual of several billion dollars is left for the unnamed hyperscaler and smaller customers, which is plausible but unverified. Backlog (4970, 25586) and RPO also use different definitions, and backlog adds amounts that depend on delivery conditions. The source record ends partway through claim 9317, so later 2026 disclosures are not assessed here.
Customer disclosures, read
2026-10-17CoreWeave's contracted book rests on a small number of named order forms executed under master services agreements, and these are the claims that bear weight. OpenAI is documented through an order form under its MSA (4296), with headline values of $11.9 billion (19820), a $4 billion expansion (25573) and a further up-to-$6.5 billion deal. The company's own total of up to roughly $22.4 billion (20198) reconciles exactly with those three figures. The one wrinkle is that the first-quarter release credited only $11.2 billion of backlog to the original deal (4969), against the $11.9 billion headline. Meta is likewise papered by order forms, one for up to about $14.2 billion through December 2031 (4282, 17655) and a second dated March 31, 2026 for about $21 billion through 2032 (2123, 10340). NVIDIA's $6.3 billion capacity purchase also sits on an order form (4352, 20209). Jane Street's roughly $6 billion is described as a commitment without a disclosed contract form (10304), and the Anthropic agreement carries no value at all (10731).
A second tier uses partnership or framework language that does not evidence revenue. This includes the NVIDIA collaboration framework and the 5 GW ambition (3892, 17596, 27948), the reference-architecture testing work (17598) and Exemplar Cloud status (10332, 9324). It also covers IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), Aston Martin (25576) and the Genesis Mission (11778). The logo lists (25575, 11767, 9320) and the claim of expanded relationships with Cohere and Mistral (9319) name counterparties but attach no economics.
The unidentified counterparties deserve attention. The "new hyperscaler customer" (25574) has never been named. The customer behind DDTL 3.0 (4595) was only later identified as OpenAI (26687), and the "leading AI enterprise" financed by DDTL 4.0 (11224) remains anonymous.
Concentration has shifted from OpenAI-dominant to an OpenAI-Meta duopoly. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), and the named 2025 deals with OpenAI, Meta and NVIDIA total about $42.9 billion. Measured against year-end RPO, that is roughly 70 percent. Adding the 2026 Meta order lifts Meta's cumulative headline to about $35 billion, likely making it the largest single obligor.
The arithmetic broadly reconciles, but with caveats. The $45.6 billion RPO increase exceeds the named deals by only a few billion before deducting revenue recognized in 2025, which leaves modest room for the unnamed hyperscaler and smaller logos. Several headline figures also carry "up to" qualifiers (4282, 20198), so recognized RPO may understate or overstate the announced totals.
Customer disclosures, read
2026-10-16CoreWeave's record has a small core of signed, dollar-denominated contracts surrounded by a larger layer of partnership and logo language. The hard contracts are OpenAI, Meta, Jane Street and NVIDIA. OpenAI's tranches of $11.9 billion, $4 billion and $6.5 billion sum to the stated $22.4 billion (19820, 25573, 20198), with later order forms under the existing MSA (4296). Meta committed $14.2 billion through December 2031 (4282) and then about $21 billion through December 2032 under a March 31, 2026 order form (2123, 10340). Several claims repeat that $21 billion figure (10694, 10729, 17654, 9317) and should not be counted twice. Jane Street committed about $6 billion (10304), and NVIDIA signed a capacity order form (4352). Anthropic is described as a signed multi-year agreement (9318), but no value is disclosed. Everything else is softer. That includes the NVIDIA 'collaboration framework' and the 5 GW-by-2030 ambition (3892, 17596, 27948), the IBM partnership (4971), CrowdStrike's 'global partnership' (11768, 10330), the Aston Martin sponsorship (25576), Genesis Mission participation (11778), the Core Scientific 'collaborate on shared opportunities' language (20313), and logo lists with no amounts (25575, 11767, 9320). Unidentified counterparties remain. The 'new hyperscaler customer' (25574) and the 'leading AI enterprise' behind DDTL 4.0 (11224) are never named. The DDTL 3.0 contract (4595) was tied to OpenAI only by a separate disclosure (26687). Concentration has moved from a single dominant AI-lab relationship toward a two-pillar book. By 2026 the named commitments are roughly $35 billion from Meta and $22 billion from OpenAI, with Jane Street and Anthropic as a smaller second tier. The arithmetic partly reconciles. OpenAI's first deal is $11.9 billion in the announcement (19820) but $11.2 billion in backlog (4969), a $0.7 billion gap that is not explained. Reported RPO was $15.1 billion at December 2024 and $14.7 billion at March 2025 (3572, 4970), which suggests the OpenAI award first sat in non-RPO backlog. RPO of $60.7 billion at December 2025 (3555) roughly fits OpenAI's $22.4 billion plus Meta's $14.2 billion plus the legacy book, which presumably includes Microsoft, a name absent from this record. Meta's $21 billion and Jane Street's $6 billion came after that date. They imply RPO well above $80 billion before revenue recognition, but no later RPO figure appears in the claims provided, which end mid-record at claim 9319.
Customer disclosures, read
2026-10-16CoreWeave's signed-contract core is narrower than its partnership headlines suggest. Two of its counterparties are documented at order-form level under existing master services agreements: OpenAI (4296, 19820, 25573, 20198) and Meta (4282, 2123). NVIDIA's capacity purchase commitment is also an order form (4352), which later appears as a $6.3 billion 'strategic collaboration' (20209). Because NVIDIA is also CoreWeave's key supplier, that contract reads more like a capacity backstop than independent end demand. Jane Street's roughly $6 billion commitment (10304) and the Anthropic multi-year agreement (9318) are described as signed, but no dollar value has been disclosed for Anthropic. Much of the rest is softer language. The NVIDIA 'collaboration framework' and the 5 GW buildout (3892, 17596, 27948) carry no stated payment terms, and neither does the reference-architecture validation (17598). The same is true of the IBM (4971), CrowdStrike (11768, 10330), Aston Martin (25576), Core Scientific (20313) and Genesis Mission (11778) partnerships. The logo lists (25575, 11767, 9320) name customers but attach no values. Several material counterparties went unidentified when disclosed. These include the 'new hyperscaler customer' (25574) and the DDTL 3.0 'customer contract' (4595), which was only later tied to OpenAI (26687). The DDTL 4.0 'leading AI enterprise' (11224) remains unnamed. Concentration has shifted from one dominant customer to two. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog at March 31, 2025 (4969, 4970). By year-end, OpenAI's up to $22.4 billion plus Meta's up to $14.2 billion equaled roughly 60% of the $60.7 billion in RPO (3555). Meta's further $21 billion in March 2026 (10340, 9317) deepens that pairing. Jane Street and Anthropic diversify at the margin. Repeated coverage of the same Meta deal (10729, 10694, 17654, 17655) inflates the apparent number of announcements, and one item dated before the March 31 order form is effective suggests metadata error. The arithmetic only partly reconciles. The OpenAI deal was announced at $11.9 billion but booked as $11.2 billion of backlog (19820 vs. 4969). Reported RPO slipped from $15.1 billion (3572) to $14.7 billion (4970) even as backlog rose, which places most of the OpenAI value in a non-RPO bucket that depends on delivery conditions. The 2025 RPO increase of $45.6 billion broadly matches the named 2025 adds of about $42.9 billion, but that total relies on 'up to' figures and an unnamed hyperscaler. Read the reconciliation as directional, not exact.
Customer disclosures, read
2026-10-16CoreWeave's signed, dollar-denominated contracts come from a small number of named counterparties. OpenAI is the clearest. The March 2025 agreement was announced at $11.9 billion (claim 19820), although only $11.2 billion entered backlog (claim 4969). It was followed by a $4 billion expansion (claim 25573) and an up-to-$6.5 billion order. Management gave the cumulative figure as up to roughly $22.4 billion (claim 20198), and that total reconciles exactly with the three tranches. The September 2025 order form under the existing MSA (claim 4296) shows these are executed documents, not letters of intent. Meta is the second pillar. Its September 2025 order form committed up to about $14.2 billion through December 2031 (claims 4282, 4283), and a March 31, 2026 order form added roughly $21 billion through 2032 (claims 2123, 10340, 9317). Readers should note that some secondary coverage blurs whether the $21 billion is incremental or a restatement (claims 17654, 17655, 10729); the filing language supports incremental. The NVIDIA $6.3 billion capacity order (claims 4352, 20209) is also a signed order form. Because NVIDIA is simultaneously CoreWeave's supplier, the circularity deserves scrutiny. Anthropic (claim 9318) is described as signed but carries no disclosed value. Jane Street's roughly $6 billion (claim 10304) rests largely on press characterization (claims 10730, 10695).
The softer layer is extensive. The NVIDIA "collaboration framework" toward 5 GW (claims 3892, 17596, 27948) and the reference-architecture validation (claim 17598) are non-binding. So are the IBM partnership (claim 4971), Core Scientific collaboration (claim 20313), CrowdStrike global partnership (claims 11768, 10330), Genesis Mission (claim 11778) and the Aston Martin sponsorship (claim 25576). Logo lists (claims 25575, 11767, 9320) name counterparties without values. Several material counterparties remain unidentified: the "new hyperscaler customer" (claim 25574) and the "leading AI enterprise" behind DDTL 4.0 (claim 11224). The DDTL 3.0 customer (claim 4595) was later disclosed as OpenAI (claim 26687).
On arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3555), an increase of about $45.6 billion. The named 2025 signings explain most of it. OpenAI's roughly $22.4 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion total about $42.9 billion. The unnamed hyperscaler and smaller logos plausibly cover the remainder, net of recognized revenue, so the bridge broadly holds. The same math also implies roughly 70 percent of year-end RPO sits with three counterparties. Meta's March 2026 addition and Jane Street have since diversified the book only modestly.
Customer disclosures, read
2026-10-16CoreWeave's signed, named contract base is narrower than its announcement flow suggests. Three counterparties have executed order forms under existing Master Services Agreements. OpenAI signed for $11.9 billion (claim 19820), expanded by $4 billion (claim 25573), and signed a September 2025 order form (claim 4296) worth up to $6.5 billion, for a stated total of up to $22.4 billion (claim 20198). Meta signed for up to $14.2 billion through 2031 (claims 4282, 20197) and then signed a further order form of roughly $21 billion on March 31, 2026 (claims 2123, 10340, 9317). NVIDIA signed a capacity order form (claim 4352) valued at $6.3 billion (claim 20209). Jane Street's roughly $6 billion commitment (claims 10304, 10730) and the Anthropic agreement (claims 10731, 9318) are described as committed or signed, but no filed order form is on record here, and Anthropic carries no value. Much of the remaining material is softer. The 2026 NVIDIA arrangement is expressly a collaboration framework (claim 3892) with aspirational gigawatt targets and 'work towards' language (claims 27948, 17598). IBM, CrowdStrike, Aston Martin, Genesis Mission and Core Scientific are partnerships or affiliations without disclosed economics (claims 4971, 11768, 25576, 11778, 20313). The logo lists in claims 25575 and 11767 carry no contract values. Several counterparties were initially unidentified. The DDTL 3.0 'customer contract' (claim 4595) was later identified as OpenAI (claim 26687). The 'new hyperscaler customer' (claim 25574) and the 'leading AI enterprise' behind DDTL 4.0 (claim 11224) remain unnamed. Concentration has shifted from a single customer to two. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog at March 2025 (claims 4969, 4970). OpenAI, Meta and NVIDIA together total up to about $42.9 billion against $60.7 billion of RPO at year-end 2025 (claim 3555), roughly 70%. Meta has since added $21 billion. The arithmetic only loosely reconciles. OpenAI's $11.9 billion headline does not match the $11.2 billion booked to backlog. The headline values are 'up to' ceilings. The jump from $30.1 billion of backlog (claim 25586) to $60.7 billion of RPO compares two differently defined measures (claim 4970). Signed deals between the two dates account for roughly $27 billion of the $30.6 billion increase. Claim 10729 is dated before the March event it describes, and the record is truncated at claim 9318.
Customer disclosures, read
2026-10-15CoreWeave's disclosed book rests on a small number of signed, named order forms, surrounded by a larger halo of partnership and logo language that carries no stated dollar value. The documented contracts are executed order forms under existing MSAs. OpenAI's grew from $11.9 billion (claim 19820) to $4 billion more (claim 25573) and then up to $6.5 billion more, for up to about $22.4 billion in total (claims 20198, 4296). Meta's began at $14.2 billion through 2031 (claim 4282) and added a further $21 billion order form dated March 31, 2026 (claims 2123, 9317). NVIDIA's capacity order form is valued at $6.3 billion (claims 4352, 20209). Jane Street's roughly $6 billion commitment (claim 10304) and the Anthropic multi-year agreement (claim 9318) are named and described as signed, but Anthropic's value is undisclosed. The IBM 'partnership' (claim 4971), the NVIDIA 'collaboration framework' with 'work towards' language (claims 3892, 17598), CrowdStrike (claim 11768), the Genesis Mission (claim 11778), Aston Martin sponsorship (claim 25576) and the post-merger Core Scientific collaboration (claim 20313) are framework or relationship statements and should not be read as backlog. Customer lists (claims 25575, 11767) name logos but attach no amounts. Several counterparties were never identified. A 'new hyperscaler customer' (claim 25574) and the 'leading AI enterprise' financed by DDTL 4.0 (claim 11224) remain unnamed. The DDTL 3.0 customer (claim 4595) was later identified as OpenAI (claim 26687). Concentration has shifted from a single-name dependency to a duopoly rather than diversifying. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog at March 2025 (claims 4969, 4970). By December 2025, OpenAI's up-to $22.4 billion and Meta's $14.2 billion equaled roughly 60% of $60.7 billion in RPO (claim 3555), or about 71% once NVIDIA is included. The March 2026 Meta order lifts Meta's stated commitments to roughly $35 billion. The arithmetic broadly reconciles, with caveats. RPO of $15.1 billion (claim 3572) plus the OpenAI deal is close to the March backlog, but the company recorded $11.2 billion against a headline of $11.9 billion. The $4.2 billion rise to $30.1 billion (claim 25586) tracks the $4 billion expansion. The step to $60.7 billion is consistent with the $6.5 billion OpenAI, $14.2 billion Meta and $6.3 billion NVIDIA additions plus smaller wins, less revenue burn. Three cautions apply. The 'up to' figures are ceilings. Backlog includes amounts contingent on delivery (claim 4970), unlike RPO. Some secondary sources (claims 17654, 17655) blur whether Meta's $21 billion supersedes or adds to the $14.2 billion; the order-form disclosure (claim 2123) indicates it is additive.
Customer disclosures, read
2026-10-15CoreWeave's record splits cleanly between executed order forms and softer partnership language, and the executed column is dominated by two names. The firmest disclosures are 8-K order forms under existing master services agreements: OpenAI (claim 4296), Meta (claims 4282, 2123) and NVIDIA (claim 4352). OpenAI's stack runs from $11.9 billion (claim 19820) through a $4 billion expansion (claim 25573) and an up-to-$6.5 billion add-on to a stated total of up to roughly $22.4 billion (claim 20198), and those figures sum correctly. Meta's initial up-to-$14.2 billion commitment through 2031 (claim 4282) was followed by a roughly $21 billion order form signed March 31, 2026 (claims 2123, 10340), bringing named Meta commitments to about $35 billion. Jane Street's roughly $6 billion (claim 10304) is described as a commitment. Anthropic is called a signed multi-year agreement (claim 9318), but no value is disclosed. Note that 'up to' language on both OpenAI and Meta frames these as ceilings, not floors. Several items are partnerships rather than revenue contracts. These include IBM (claim 4971), CrowdStrike (claim 11768), Aston Martin's sponsorship-style designation (claim 25576), Genesis Mission participation (claim 11778), and the January 2026 NVIDIA 'collaboration framework' (claims 3892, 27948), whose operative verbs are 'test,' 'validate' and 'work towards' (claim 17598). Three counterparties went unnamed when first disclosed: a 'new hyperscaler customer' (claim 25574), a DDTL 3.0 'customer contract' (claim 4595), which was later identified as OpenAI (claim 26687), and a 'leading AI enterprise' financed through DDTL 4.0 (claim 11224), which remains unidentified. The logo lists (claims 25575, 11767) carry no dollar values. Concentration has shifted rather than diluted: OpenAI anchored 2025, while Meta's two tranches now exceed OpenAI's total. NVIDIA's dual role as supplier and $6.3 billion collaborator (claim 20209) adds circularity worth flagging. On arithmetic, the first OpenAI deal was announced at $11.9 billion but added $11.2 billion to backlog (claim 4969), an unexplained $0.7 billion gap. RPO rose from $15.1 billion to $60.7 billion during 2025 (claim 3555). The named 2025 signings (OpenAI $22.4 billion, Meta $14.2 billion, NVIDIA $6.3 billion) total about $42.9 billion. That is broadly consistent with the increase once 2025 revenue burn is netted, but it leaves no visible room for the unnamed hyperscaler unless the 'up to' amounts are not fully booked. The 2026 Meta, Jane Street and Anthropic deals postdate that RPO figure and await the next disclosure.
Customer disclosures, read
2026-10-15CoreWeave's contracted book rests on a small number of order forms executed under master services agreements, and these should be read separately from its partnership and logo announcements. The binding instruments on record are the OpenAI order forms (claims 19820, 4296), the Meta order forms of September 2025 and March 31, 2026 (claims 4282, 2123), and an NVIDIA capacity order form (claim 4352). Jane Street's roughly $6 billion commitment (claim 10304) and the Anthropic agreement, described as signed and multi-year but without a value (claim 9318), are also customer commitments. Several headline figures are framed as 'up to' amounts: OpenAI's cumulative $22.4 billion (claim 20198) and Meta's initial $14.2 billion (claim 4282). Meta's expansion beyond its initial commitment is an option, not an obligation (claim 4283). The IBM, Aston Martin, CrowdStrike, Core Scientific and Genesis Mission items (claims 4971, 25576, 11768, 20313, 11778) are partnership or affiliation language with no disclosed economics. The January 2026 NVIDIA 'collaboration framework' and its 5 GW buildout goal (claims 3892, 27948) are directional, not contracted revenue.
Some counterparties remain unidentified. These include the 'new hyperscaler customer' (claim 25574) and the 'leading AI enterprise' behind DDTL 4.0 (claim 11224). The DDTL 3.0 'customer contract' (claim 4595) was later attributed to OpenAI (claim 26687). The logo rosters (claims 25575, 11767) name firms but attach no contract values. The Meta $21 billion expansion appears in at least seven records (claims 10729, 10694, 10340, 17654, 9317, 2123 and others). These describe one event and should not be counted more than once.
Concentration has shifted, but it has not widened. Through 2025, OpenAI, Meta and NVIDIA together account for about $42.9 billion of named commitments, roughly 70% of the $60.7 billion in RPO (claim 3555). OpenAI alone is about 37% of that figure. The March 2026 Meta order lifts Meta's named total to about $35 billion, overtaking OpenAI. Diversification therefore comes mainly from Jane Street and the unpriced Anthropic deal.
The arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3560), an increase of $45.6 billion. That is consistent with the $42.9 billion in named deals plus the unnamed hyperscaler, less revenue recognized during the year. Two caveats apply. First, OpenAI's $11.9 billion headline was booked as $11.2 billion of backlog (claims 19820, 4969). Second, RPO slipped to $14.7 billion at March 31, 2025, even after that deal (claim 4970). The 'up to' framing implies that realized revenue could fall below the headline figures.
Customer disclosures, read
2026-10-14CoreWeave's signed-contract core is narrower than its announcement volume suggests. Only a handful of deals are documented as executed order forms under master services agreements. OpenAI's are the original $11.9 billion contract (19820), a September 2025 order form (4296), and expansions of $4 billion (25573) and up to $6.5 billion (20198), which management totals at up to $22.4 billion. Meta's are an up-to $14.2 billion order form (4282) and a March 31, 2026 order form of roughly $21 billion (2123, 10340). NVIDIA has a capacity order form (4352), presented as a $6.3 billion collaboration (20209), and NVIDIA is also CoreWeave's chip supplier. Jane Street's roughly $6 billion commitment (10304) and the Anthropic multi-year agreement (9318), which carries no stated value, are described as signed but are not supported by filed order forms in this record. The rest is softer. The NVIDIA 'collaboration framework' (3892) and its aim to 'work towards' reference-architecture inclusion (17598) are statements of intent, not contracts. The same is true of the IBM (4971), CrowdStrike (11768), Core Scientific (20313), Aston Martin sponsorship (25576) and Genesis Mission (11778) items. Several material counterparties go unnamed: a 'new hyperscaler customer' (25574), a DDTL 3.0 'customer contract' (4595) that later disclosure ties to OpenAI (26687), and a 'leading AI enterprise' behind DDTL 4.0 (11224). The logo lists (25575, 11767, 9320) carry no dollar values, and the February and April lists repeat each other (10338). The same deals are also re-announced: the Meta $14.2 billion deal appears three times (4282, 20197, 17655), the $21 billion deal four times (10729, 10694, 10340, 17654), and Jane Street three times (10730, 10304, 10695). On concentration, OpenAI's $22.4 billion and Meta's $14.2 billion together come to about 60% of the $60.7 billion in remaining performance obligations at year-end 2025 (3555). Meta's March 2026 addition, if it is additive, would make Meta the largest named counterparty. On the arithmetic, RPO rose from $15.1 billion (3572) to $60.7 billion. The named 2025 deals add about $42.9 billion, which reaches roughly $58 billion before any 2025 revenue is subtracted from the opening balance. That leaves a gap of several billion dollars that is likely filled by the unnamed hyperscaler and unpriced logos. Several smaller inconsistencies remain. OpenAI's backlog contribution is given as $11.2 billion (4969) against an $11.9 billion contract (19820). The March 2025 backlog figure of $25.9 billion (4970) includes amounts beyond RPO that depend on delivery conditions. 'Up to' ceilings may overstate what is firmly committed. The record supplied ends mid-claim at 9319, so later expansions could not be assessed.
Customer disclosures, read
2026-10-14CoreWeave's record contains a small number of genuinely signed, filed customer contracts surrounded by a much larger volume of partnership and logo language. The hard contracts are the OpenAI order forms under an existing MSA: $11.9 billion (19820), a $4 billion expansion (25573), and up to $6.5 billion more, which brings the total to up to $22.4 billion (20198, 4296). The arithmetic checks out, although the Q1 deck booked the first deal at $11.2 billion of backlog rather than $11.9 billion (4969). Meta's order forms are similarly firm: up to $14.2 billion through December 2031 (4282, 20197), then an approximately $21 billion expansion through 2032 (2123, 10340). Claims 10729, 10694 and 17654 restate that same $21 billion deal and should not be counted again. The NVIDIA $6.3 billion order form (4352, 20209) is also contractual. NVIDIA is a supplier and strategic counterparty, however, and the January 2026 'collaboration framework' and 5 GW buildout language (3892, 17596, 27948) are framework commitments, not revenue contracts. Jane Street's roughly $6 billion (10304) is quantified. Anthropic's 'multi-year agreement' (10731) carries no value.
Several counterparties go unnamed. The 'new hyperscaler customer' (25574) is never identified. The DDTL 3.0 'customer contract' (4595) is later attributed to OpenAI (26687). The 'leading AI enterprise' behind DDTL 4.0 (11224) remains anonymous. Logo rolls such as BT, Cohere, Mistral, Cursor, Perplexity and others (25575, 11767, 9320, 9319) disclose no terms. IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), Aston Martin (25576) and the DOE Genesis Mission (11778) read as partnership, sponsorship or affiliation language rather than quantified backlog.
Concentration has broadened in name more than in dollars. OpenAI dominated in early 2025, and Meta became a co-anchor by Q3. Taken together, OpenAI's $22.4 billion and Meta's $14.2 billion equal about 60% of the $60.7 billion in RPO at year-end 2025 (3555). Adding NVIDIA raises that share to roughly 70%. The 2026 additions of Meta's $21 billion and Jane Street's $6 billion deepen the Meta exposure while adding only one other quantified name.
The revenue arithmetic broadly reconciles. RPO rose $45.6 billion from $15.1 billion (3572) to $60.7 billion. The named 2025 deals total about $42.9 billion, which leaves only a few billion for the hyperscaler and smaller customers before netting out revenue recognized during the year. That fit is tight enough to suggest the 'up to' figures are being booked close to their face value. Investors should therefore read them as ceilings that depend on delivery, a condition the backlog definition makes explicit (4970). The record as supplied ends mid-claim at 9324, so later items could not be assessed.
Customer disclosures, read
2026-10-14CoreWeave's record separates into a small set of filed order forms and a much larger layer of partnership and logo language. The contracts with filing-level support are order forms under existing master services agreements with OpenAI (claim 4296), Meta (claims 4282, 2123) and NVIDIA (claim 4352). The OpenAI tranches total $11.9 billion, $4 billion and $6.5 billion, which sum to the stated $22.4 billion (claims 19820, 25573, 20198). Meta's commitment is $14.2 billion plus roughly $21 billion (claims 4282, 10340, 9317). Both are framed as 'up to' amounts, so they are ceilings rather than floors. Jane Street's roughly $6 billion (claim 10304) is named and sized but rests on press language rather than a cited order form. The Anthropic agreement (claims 10731, 9318) is named but has no disclosed value. The January 2026 NVIDIA 'collaboration framework' toward more than 5 GW by 2030 (claims 3892, 27948) is framework language, not a purchase commitment. The same applies to the Exemplar Cloud designation (claim 10332), the IBM and CrowdStrike 'partnerships' (claims 4971, 11768), the Aston Martin sponsorship (claim 25576), Genesis Mission participation (claim 11778) and the Core Scientific collaboration (claim 20313). The logo lists (claims 25575, 11767) name counterparties without amounts. The DDTL 4.0 lenders (claim 11225) are financiers, not customers. Three references stay anonymous: a 'new hyperscaler customer' (claim 25574), the DDTL 3.0 'customer contract' (claim 4595), which was later identified as OpenAI (claim 26687), and the 'leading AI enterprise' financed by DDTL 4.0 (claim 11224). Concentration has shifted rather than eased. In early 2025, OpenAI's $11.2 billion was roughly 43% of the $25.9 billion backlog (claims 4969, 4970). By year-end, OpenAI's and Meta's ceilings together equal about 60% of the $60.7 billion in RPO (claim 3555). Meta's March 2026 expansion now makes it the largest named commitment. The arithmetic broadly holds, with caveats. The OpenAI deal was announced at $11.9 billion but booked as $11.2 billion of backlog, a $0.7 billion gap that is never explained. RPO dipped from $15.1 billion to $14.7 billion between December 2024 and March 2025 even though the OpenAI deal was signed in that window (claims 3572, 4970). This suggests the OpenAI deal largely sat in the non-RPO portion of backlog. Starting from the $30.1 billion mid-2025 backlog (claim 25586) and adding the OpenAI, Meta and NVIDIA deals gives about $57 billion, close to the $60.7 billion figure, but that comparison mixes backlog and RPO definitions. Several claim values (claims 10729, 10730, 9317) are stored as '$21,000' or '$6,000' and should be read as billions.
Customer disclosures, read
2026-10-13CoreWeave's record splits into a small number of signed, quantified order forms and a much larger set of partnership and logo-list language. The signed agreements are with OpenAI and Meta. OpenAI's are a $11.9 billion agreement (claim 19820), a $4 billion expansion (25573), and an up-to $6.5 billion add-on reaching up to $22.4 billion in total (20198), papered as an order form under an existing MSA (4296). Meta's are a $14.2 billion order form through 2031 (4282) and a roughly $21 billion order form dated March 31, 2026 (2123, 10340). Jane Street's roughly $6 billion commitment (10304) is also quantified. The Anthropic agreement is described as signed and multi-year, but no value is disclosed (9318). Repeated filings restate the same Meta and Jane Street deals (10729, 10694, 10695) and should not be counted twice. NVIDIA is a special case. There is a real order form (4352) and a $6.3 billion collaboration (20209), but the January 2026 material is explicitly a 'collaboration framework' (3892) built around testing, validation and 'work towards' language (17598). IBM (4971), CrowdStrike (11768), Aston Martin (25576), Core Scientific (20313) and the Genesis Mission (11778) are partnerships with no disclosed economics. The named-customer lists (25575, 11767, 10338, 9319) give no deal values. Several material counterparties go unnamed: the 'new hyperscaler customer' (25574) and the 'leading AI enterprise' behind DDTL 4.0 (11224). The DDTL 3.0 customer (4595) is identified only through a separate press statement (26687). Concentration has broadened somewhat but remains heavy. At March 31, 2025, OpenAI's $11.2 billion made up about 43% of the $25.9 billion backlog (4969, 4970). The 4969 figure also differs from the $11.9 billion headline (19820), a gap that is never explained. By late 2025, OpenAI and Meta together accounted for up to $36.6 billion. On revenue arithmetic, the move from $25.9 billion to $30.1 billion of backlog (25586) roughly matches the $4 billion OpenAI expansion. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555), an increase of about $45.6 billion. Named 2025 deals sum to roughly $42.9 billion including NVIDIA, before subtracting revenue recognized during the year. The gap therefore has to be filled by the unnamed hyperscaler and smaller customers. Many headline figures are 'up to' ceilings, so the reconciliation is plausible but not verifiable from the record. The 2026 Meta and Jane Street commitments, about $27 billion combined, have no subsequent RPO print on file against which to test them.
Customer disclosures, read
2026-10-12CoreWeave's announcements fall into two tiers. The first is a small set of signed, priced order forms under existing Master Services Agreements: OpenAI (claims 19820, 4296), Meta (4282, 2123) and NVIDIA's $6.3 billion capacity purchase (4352, 20209). The second is a larger body of partnership, framework and logo-list language that carries no disclosed value. The OpenAI arithmetic holds internally. The $11.9 billion original deal, the $4 billion expansion and the up-to-$6.5 billion expansion sum to the stated $22.4 billion (25573, 20198). One small gap remains: the first quarter credited only $11.2 billion of that original deal to backlog (4969). Meta's initial $14.2 billion runs through December 2031 (4282). The March 2026 order form adds roughly $21 billion through 2032 (10729, 10340). Some secondary phrasing reads the $21 billion as a total rather than an increment (17654), but the filing language supports roughly $35 billion in aggregate. Jane Street's roughly $6 billion (10304) is named and priced. Anthropic's 'multi-year agreement' (10731, 9318) is signed but carries no figure. Several counterparties have never been named. A 'new hyperscaler customer' (25574) has no identity or value. The DDTL 4.0 financing serves a 'leading AI enterprise' (11224) that is not named. DDTL 3.0's unnamed 'customer contract' (4595) was later tied to OpenAI (26687). The 2026 NVIDIA items are framework language and do not add revenue: the 'collaboration framework' (3892), the more-than-5 GW buildout ambition (17596, 27948) and the Exemplar Cloud designations (10332, 9324). The same applies to the IBM (4971) and CrowdStrike (11768) partnerships, the Genesis Mission (11778), Core Scientific (20313), and the logo lists (25575, 11767, 9320, 9319). On concentration, OpenAI was effectively the whole growth story in early 2025. By December 2025, OpenAI ($22.4 billion) and Meta ($14.2 billion) together accounted for about $37 billion of $60.7 billion in RPO (3555), roughly 60 percent. NVIDIA, which is also CoreWeave's key supplier, added $6.3 billion, so the three named counterparties cover about 70 percent. In 2026, Meta's expansion moves Meta toward parity with OpenAI rather than diluting the concentration. On reconciliation, $15.1 billion of opening RPO (3572) plus about $42.9 billion of named 2025 deals comes to about $58 billion before 2025 revenue recognition. That leaves a residual of several billion dollars that only the unnamed hyperscaler and the long tail can explain. The residual is plausible, but it is unverifiable from the record. The earlier backlog figures ($25.9 billion and $30.1 billion; 4970, 25586) also include non-RPO amounts that depend on delivery, so they are not directly comparable to the year-end RPO figure.
Customer disclosures, read
2026-10-12CoreWeave's signed-contract base is anchored by three counterparties. Each is documented through order forms under existing master services agreements. OpenAI's commitments stack from an initial $11.9 billion (claim 19820) through a $4 billion expansion (claim 25573) and an up-to-$6.5 billion order (claims 4296, 20198), for up to roughly $22.4 billion. That total matches the three tranches, but the first deal added only $11.2 billion to backlog (claim 4969), a $0.7 billion gap the filings do not explain. Meta's original order is likewise framed as up to $14.2 billion through 2031, with an expansion option (claims 4282, 4283). The March 31, 2026 order form for about $21 billion (claims 2123, 10340) converts that option into a signed commitment. NVIDIA's $6.3 billion capacity order (claims 4352, 20209) is contractual, but NVIDIA is also CoreWeave's supplier and strategic collaborator, so this revenue is partly circular. Jane Street's roughly $6 billion (claim 10304) is signed and named. Anthropic's multi-year agreement (claims 9318, 10731) is named but carries no disclosed value.
The rest of the record is softer. The NVIDIA collaboration framework and the more-than-5 GW buildout target (claims 3892, 17596, 27948) are framework language, not purchase obligations. The IBM, CrowdStrike, Core Scientific and Aston Martin items (claims 4971, 11768, 20313, 25576) are partnerships or sponsorships. Genesis Mission participation (claim 11778) is not commercial. The recurring logo lists (claims 25575, 11767, 9320, 9319) name customers but attach no dollar values. Two financing-linked counterparties were initially unnamed: the DDTL 3.0 customer (claim 4595) was later identified as OpenAI (claim 26687). The 'new hyperscaler customer' (claim 25574) and the 'leading AI enterprise' behind DDTL 4.0 (claim 11224) remain unidentified.
Customer concentration has shifted from OpenAI alone to a duopoly. In early 2025, OpenAI's $11.2 billion accounted for most of the $14.7 billion of RPO (claim 4970). By December 31, 2025, RPO had reached $60.7 billion, up from $15.1 billion a year earlier (claims 3555, 3572). The up-to totals for OpenAI, Meta and NVIDIA sum to about $42.9 billion. Added to the year-earlier base and net of revenue burned off, that roughly reconciles to reported RPO. It also implies these three counterparties account for about 70 percent of RPO. That reconciliation depends on 'up to' ceilings being treated as firm. The 2026 Meta and Jane Street deals add about $27 billion on top, which deepens the Meta concentration rather than diversifying it. One data caveat: claim 10729's '$21,000' figure and its March 1 date appear to be extraction artifacts.
Customer disclosures, read
2026-10-12CoreWeave's record contains a core of signed, dollar-denominated customer contracts, surrounded by a larger body of partnership, framework and logo-list language that should not be read as backlog. The contracted core is OpenAI, Meta, NVIDIA and Jane Street. OpenAI's tranches reconcile: $11.9 billion (claim 19820), plus $4 billion (25573), plus up to $6.5 billion (20198), equals the stated cumulative "up to approximately $22.4 billion." There is one small gap. The first deal was described as adding $11.2 billion of backlog (4969) against an $11.9 billion headline. The September 2025 order form under the existing MSA (4296) confirms the deals are binding. Meta's initial order form commits "up to approximately $14.2 billion" through 2031 (4282). A March 31, 2026 order form adds roughly $21 billion through 2032 (2123, 10340). Some secondary sources date the expansion to March 1 (10729), which predates the filing, so that date looks like an ingestion artifact. Jane Street's roughly $6 billion (10304) and NVIDIA's $6.3 billion capacity order (4352, 20209) complete the dollar-valued set. Anthropic's "multi-year agreement" (10731, 9318) is signed but has no disclosed value. Several counterparties are left unnamed or identified only later. The DDTL 3.0 "customer contract" (4595) was later tied to OpenAI (26687). The "new hyperscaler customer" (25574) and the "leading AI enterprise" behind DDTL 4.0 (11224) remain anonymous despite apparent materiality. Much of the remaining record is non-contractual. This includes the NVIDIA "collaboration framework" (3892), the ">5 GW" buildout ambition (17596, 27948), and reference-architecture work the company is still "working towards" (17598). The IBM (4971), CrowdStrike (11768) and Core Scientific (20313) relationships carry no stated economics. Aston Martin (25576) is a sponsorship and the Genesis Mission (11778) is an initiative. Exemplar Cloud status is described as "first" (10332) in one source and "among the first" (9324) in another. Logo lists (25575, 11767, 9320) carry no values. Concentration has shifted from near-total OpenAI dependence to an OpenAI-Meta duopoly. Meta's potential roughly $35 billion now exceeds OpenAI's $22.4 billion, if the $21 billion is additive, which claims 17654 and 17655 leave ambiguous. NVIDIA also sits on both sides as supplier and customer. On the revenue arithmetic, RPO rose from $15.1 billion (3572) to $60.7 billion (3555), an increase of about $45.6 billion. The 2025-signed OpenAI, Meta and NVIDIA deals total about $42.9 billion. After netting out 2025 recognized revenue, which is not on this record, the remainder plausibly falls to the hyperscaler and smaller wins. The reconciliation is directionally sound but rests on "up to" ceilings rather than floors.
Customer disclosures, read
2026-10-11CoreWeave's signed, named contracts are concentrated in a small set of order forms under existing master services agreements. These are OpenAI (claims 19820, 4296), Meta (4282, 2123), and NVIDIA as a capacity purchaser (4352). Jane Street's roughly $6 billion commitment (10304) and the Anthropic multi-year agreement (9318) carry signed-agreement language, but Anthropic's value is undisclosed. Much of the remaining record is partnership vocabulary with no economics attached. That includes IBM's Granite capacity (4971), the Aston Martin sponsorship (25576), CrowdStrike's "global partnership" (11768, 10330), continued collaboration with Core Scientific (20313), Genesis Mission participation (11778), and the January 2026 NVIDIA "collaboration framework" (3892, 27948). The recurring logo lists (25575, 11767, 9320) name counterparties but attach no contract values.
Several material counterparties go unidentified. The "new hyperscaler customer" signed in Q2 2025 is never named (25574). DDTL 3.0 finances "a customer contract" (4595), which a separate disclosure ties to OpenAI (26687). DDTL 4.0 serves a "leading AI enterprise" whose name is withheld (11224). Readers cannot attribute the backlog these facilities support.
Concentration has moved from a single-tenant story to a duopoly. Through 2025, OpenAI's commitments rose from $11.9 billion to up to $22.4 billion (19820, 25573, 20198), and those three figures sum cleanly. Meta's up-to $14.2 billion order (20197) added a second anchor. The March 2026 Meta expansion of about $21 billion (10729, 10340) appears incremental, which would put Meta near $35 billion and ahead of OpenAI. Claim 17654 could also be read as a $21 billion total, and that ambiguity should be resolved against the order form (2123). Jane Street and Anthropic diversify the book only modestly.
The revenue arithmetic broadly reconciles but has seams. OpenAI's initial deal was announced at $11.9 billion yet entered backlog at $11.2 billion (4969). RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555). Named 2025 additions total about $31 billion: OpenAI $10.5 billion, Meta $14.2 billion, and NVIDIA $6.3 billion (20209). The first OpenAI deal accounts for roughly $11 billion more. Together these approach the increase before recognized revenue is subtracted. Several of these amounts are "up to" ceilings, however, and backlog (4970) includes amounts beyond RPO that depend on delivery conditions. The record also has no post-March-2026 RPO figure against which to test the Meta, Jane Street, and Anthropic additions.
Customer disclosures, read
2026-10-11CoreWeave's record splits cleanly into contracts backed by order forms and relationships described in partnership vocabulary. The firm, signed commitments are OpenAI and Meta. OpenAI's $11.9 billion agreement (claim 19820) was followed by a $4 billion expansion (25573), a September 2025 order form under the existing MSA (4296), and an 'up to' $6.5 billion add-on lifting the total to 'up to approximately $22.4 billion' (20198). Meta's order form commits 'up to approximately $14.2 billion' through December 2031 (4282). A second Meta order form dated March 31, 2026 (2123) supports the roughly $21 billion expansion through 2032 (10340, 17654). Claim 10729 is dated 2026-03-01 but describes a March event, so that attribution should be treated as a date artifact. NVIDIA's $6.3 billion is a capacity-purchase order form (4352, 20209), which makes it a supplier acting as a buyer of last resort rather than an arm's-length end customer. The January 2026 NVIDIA 'collaboration framework' (3892, 17596, 27948), with its aspirational 'work towards' software inclusion (17598), carries no disclosed dollar value. The same is true of IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), Aston Martin (25576) and the Genesis Mission (11778). Jane Street's roughly $6 billion (10304) is named and sized. Anthropic is described as a signed multi-year agreement with no value attached (9318, 10731).
Several counterparties are not identified. The 'new hyperscaler customer' (25574) and the 'leading AI enterprise' behind DDTL 4.0 (11224) are both unnamed. The DDTL 3.0 'customer contract' (4595) is identified as OpenAI only in a separate release (26687). The logo lists (25575, 11767, 9320) name customers but attach no economics.
Concentration has risen. OpenAI's $11.2 billion was about 43% of $25.9 billion backlog at March 2025 (4969, 4970). By December 2025, OpenAI's $22.4 billion plus Meta's $14.2 billion came to roughly 60% of $60.7 billion RPO (3560), and about 71% once NVIDIA is included.
The arithmetic broadly reconciles, but it rests on ceilings. RPO rose $45.6 billion during 2025 (3555, 3572), against about $42.9 billion of named 2025 deals that are largely framed as 'up to' amounts. That leaves little room for the logo-list customers once 2025 revenue burn is considered. OpenAI's announced $11.9 billion against $11.2 billion of added backlog (19820, 4969) is a small unexplained gap. Backlog also includes non-RPO amounts that depend on delivery conditions (4970). The 2026 Meta, Jane Street and Anthropic additions have no updated RPO on record to test them against.
Customer disclosures, read
2026-10-10CoreWeave's signed contracts are concentrated in a few counterparties, and most of its other announcements carry partnership language rather than contract language. The agreements with the firmest evidence are filed order forms under existing master services agreements. These cover OpenAI (claim 4296), NVIDIA (claim 4352), and Meta in September 2025 and again in March 2026 (claims 4282, 2123). The OpenAI dollar figures reconcile across releases: the original $11.9 billion (claim 19820), the $4 billion expansion (claim 25573) and the up to $6.5 billion add-on (claim 20198) sum to the stated up to $22.4 billion. The first-quarter 2025 release, however, credited only $11.2 billion to backlog from the initial deal (claim 4969). That gap is unexplained. Meta's first commitment is likewise capped, "up to approximately $14.2 billion" (claim 4282), with expansion only as an option (claim 4283). The later $21 billion order (claims 10340, 9317) makes Meta, at roughly $35 billion combined, the largest disclosed counterparty, ahead of OpenAI. NVIDIA is harder to classify. The $6.3 billion capacity commitment (claim 20209) is contractual, but the January 2026 expansion is described as a "collaboration framework" (claims 3892, 17596) with no stated value. Below this tier the evidence thins. Anthropic is named as a signed multi-year agreement with no value attached (claims 9318, 10731). Jane Street's roughly $6 billion (claim 10304) is the only sizable non-hyperscaler figure. The logo lists of AI labs and enterprises (claims 25575, 11767) carry no economics. IBM (claim 4971), CrowdStrike (claim 11768), Aston Martin (claim 25576), the Genesis Mission (claim 11778) and Core Scientific (claim 20313) are partnership or sponsorship language and should not be counted as backlog. Several material counterparties are also unnamed. These include the "new hyperscaler customer" (claim 25574), the "customer contract" behind DDTL 3.0 (claim 4595), which a later release ties to OpenAI (claim 26687), and the "leading AI enterprise" financed by DDTL 4.0 (claim 11224). On the arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (claim 3555). The named 2025 additions are roughly $11.2 billion, $4 billion and $6.5 billion from OpenAI, $14.2 billion from Meta and $6.3 billion from NVIDIA. Together they come to about $42 billion, or about $57 billion with opening RPO, before deducting revenue recognized during the year. That leaves several billion dollars of RPO attributable to undisclosed counterparties, most plausibly the unnamed hyperscaler. The pattern also suggests that the "up to" ceilings are being booked at or near full value. The disclosures do not let a reader verify either point.
Customer disclosures, read
2026-10-10CoreWeave's record splits into a small set of signed, priced order forms and a much larger layer of partnership language. The signed core is concrete. OpenAI's commitments build from $11.9 billion (claim 19820) through a $4 billion expansion (claim 25573) to an up-to $6.5 billion order form (claims 4296, 20198), and the stated cumulative of up to $22.4 billion reconciles exactly. One wrinkle is that the Q1 2025 release booked only $11.2 billion of the initial deal into backlog (claim 4969). Meta's up-to $14.2 billion order form (claims 4282, 20197) was followed by a roughly $21 billion order form executed March 31, 2026 (claims 2123, 10340, 9317). Jane Street committed about $6 billion (claim 10304). NVIDIA's role is dual: it signed a capacity order form (claim 4352) and a $6.3 billion collaboration (claim 20209), but the January 2026 expansion is explicitly a 'collaboration framework' (claims 3892, 27948) with no stated dollar value. The Anthropic agreement (claim 10731) is named but unpriced.
Several counterparties are described without being named. These include a 'new hyperscaler customer' (claim 25574), a 'leading AI enterprise' behind DDTL 4.0 (claim 11224), and the DDTL 3.0 'customer contract' (claim 4595), although claim 26687 later identifies that last one as OpenAI. IBM, CrowdStrike, Aston Martin, Core Scientific and the Genesis Mission (claims 4971, 11768, 25576, 20313, 11778) are partnership or sponsorship language with no disclosed commitments. The long logo lists (claims 25575, 11767, 9320) establish usage, not contract scale.
Concentration has shifted rather than eased. Through 2025, OpenAI made up about $22.4 billion of roughly $42.9 billion in priced named commitments. Meta's March 2026 order form brings its cumulative total to about $35 billion, making it the largest named counterparty. Jane Street is the only new eight-figure-plus name with a disclosed value.
The revenue arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3555), an increase of about $45.6 billion. The named OpenAI, Meta and NVIDIA deals account for about $42.9 billion of that. The residual plausibly reflects the unnamed hyperscaler and smaller logos, net of revenue recognized. Several caveats limit this reading. Much of the headline value is phrased as 'up to' amounts (claims 4282, 20198), which are ceilings rather than floors. 'Backlog' (claims 4970, 25586) includes amounts beyond RPO that depend on delivery conditions. Some claim values appear unit-garbled ($21,000 in claim 10729, $61 in claim 3555). The weighted five-year duration (claim 3556) also means only a fraction of this converts to near-term revenue.
Customer disclosures, read
2026-10-09CoreWeave's record separates more cleanly than most AI-infrastructure names into contracts executed under master services agreements and a larger set of partnership or logo claims that carry no disclosed economics. The firm contracts are the OpenAI order forms, totalling up to roughly $22.4 billion across $11.9 billion, $4 billion and $6.5 billion tranches (19820, 25573, 4296, 20198), and the Meta order forms, an initial up to $14.2 billion through December 2031 (4282, 17655) followed by a March 31, 2026 order form (2123) valued at about $21 billion (10340). The NVIDIA September 2025 order form (4352) and Jane Street's roughly $6 billion commitment (10304) also appear to be signed. Anthropic is described as a signed multi-year agreement (9318), but no value is given. By contrast, the January 2026 NVIDIA 'collaboration framework' (3892, 17596) is aspirational, as its 'test and validate' and 'work towards' language shows (17598). IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), the Aston Martin sponsorship (25576) and the Genesis Mission (11778) are also partnerships rather than disclosed revenue contracts, and the rotating logo lists (25575, 11767, 9320) attach no dollar figures to any name. Several material counterparties have been left anonymous. These include the 'new hyperscaler customer' (25574) and the 'leading AI enterprise' financed by DDTL 4.0 (11224). The 'customer contract' behind DDTL 3.0 (4595) was identified as OpenAI only in later materials (26687). Concentration remains acute. The named OpenAI, Meta and NVIDIA commitments of about $42.9 billion amount to roughly 70% of the $60.7 billion of December 2025 RPO (3555), before netting any 2025 recognition. The 2026 additions from Meta, Jane Street and Anthropic deepen exposure to the top two as much as they diversify it. The revenue arithmetic does not fully reconcile. OpenAI's initial deal was announced at $11.9 billion (19820) but booked as $11.2 billion of backlog (4969). March 2025 RPO of $14.7 billion (4970) sat below December 2024's $15.1 billion (3572), which implies the OpenAI amount initially sat largely in the conditional, delivery-dependent backlog bucket rather than in RPO. Backlog rose only $4.2 billion in Q2 (25586), roughly the size of the OpenAI expansion alone, which leaves the hyperscaler win with little visible contribution. Sources also conflict on whether Meta's $21 billion is incremental (10729) or a total commitment (17654), and the pervasive 'up to' phrasing means the headline figures are ceilings, not floors.
Customer disclosures, read
2026-10-09CoreWeave's record contains more executed paper than most AI-infrastructure names, but the size of each deal is usually stated as a ceiling. OpenAI is backed by an order form under an existing MSA (4296), building from $11.9 billion (19820) through a $4 billion expansion (25573) and an "up to" $6.5 billion tranche to "up to approximately $22.4 billion" (20198). Those tranches sum exactly. The only seam is that the first quarterly report booked $11.2 billion of backlog against the $11.9 billion headline (4969). Meta is likewise documented by order forms, first "up to approximately $14.2 billion" through 2031 (4282, 20197) and then a March 31, 2026 order form (2123) worth about $21 billion through 2032 (10340). Secondary coverage disagrees on whether the $21 billion is incremental (10729) or the new total (17654). Claim 10729 also carries a March 1 date that precedes the order form it describes, so it is probably mis-dated. NVIDIA's $6.3 billion capacity purchase is an order form (4352, 20209). Its January 2026 "collaboration framework" (3892, 17596) and reference-architecture work (17598), however, are framework language with no stated consideration.
The softer layer is large. Jane Street's roughly $6 billion (10304, 10730) and the Anthropic "multi-year agreement" (9318, 10731) are disclosed only through press releases and summaries, and Anthropic carries no value. IBM (4971), CrowdStrike (11768), Aston Martin (25576), Core Scientific (20313) and the Genesis Mission (11778) are partnership, sponsorship or program-participation language rather than revenue contracts. The logo lists (25575, 11767, 9320, 9319) name customers without any economics. Some counterparties remain unidentified. The "new hyperscaler customer" (25574) has never been named, and the "leading AI enterprise" behind DDTL 4.0 (11224) is anonymous. The DDTL 3.0 "customer contract" (4595) was later attributed to OpenAI (26687).
Concentration has diversified in form but not much in substance. In Q1 2025, OpenAI made up about 43% of the $25.9 billion backlog (4969, 4970). By December 2025, OpenAI's $22.4 billion and Meta's $14.2 billion together amounted to roughly 60% of $60.7 billion of RPO (3555), before any revenue already recognized against them is subtracted. Meta's expansion likely makes it the largest single exposure.
The revenue arithmetic broadly holds. RPO rose $45.6 billion in 2025 (3572, 3555). Named 2025 additions total about $42.9 billion, which leaves room for the unnamed hyperscaler and smaller logos after 2025 revenue is netted out. Two caveats apply. Backlog includes amounts beyond RPO that depend on delivery (4970). Disclosed figures are also "up to" ceilings with a roughly five-year weighted duration (3556), so they are not committed minimums. No post-December RPO figure is on record yet to confirm the 2026 Meta, Jane Street and Anthropic additions.
Customer disclosures, read
2026-10-09CoreWeave's record has a few large, documented contracts surrounded by many unquantified partnership announcements. The deals that rest on executed instruments are OpenAI, Meta and NVIDIA. OpenAI began with an $11.9 billion agreement (claim 19820), although the Q1 letter booked only $11.2 billion of it as backlog (claim 4969). It then grew by $4 billion (claim 25573) and up to $6.5 billion more under an order form against the existing MSA (claims 4296, 20198), for a stated total of up to $22.4 billion. Meta's initial commitment of up to $14.2 billion through December 2031 (claim 4282) was followed by a March 31, 2026 order form worth roughly $21 billion through 2032 (claims 2123, 10340). The record is unclear whether that $21 billion is incremental or a restated total: claim 10729 says Meta expanded by about $21 billion, while claim 17654 says Meta committed $21 billion in total. NVIDIA's $6.3 billion capacity order (claims 4352, 20209) is a signed order form, but it comes from CoreWeave's key supplier, which makes it partly circular. NVIDIA's 2026 'collaboration framework' (claims 3892, 17596) is framework language and carries no dollar figure.
Several other counterparties are named but not quantified. Anthropic is described as signed and multi-year with no value attached (claims 9318, 10731). Jane Street's roughly $6 billion (claim 10304) is the only mid-sized deal with a disclosed figure. IBM, CrowdStrike, Aston Martin, Core Scientific and the Genesis Mission (claims 4971, 10330, 25576, 20313, 10331) read as partnerships rather than revenue contracts. The logo lists (claims 25575, 11767, 9320) have no economics attached. Some customers are not identified at all. The 'new hyperscaler customer' (claim 25574) is unnamed, and so is the 'leading AI enterprise' behind DDTL 4.0 (claim 11224). DDTL 3.0's anonymous 'customer contract' (claim 4595) is identified as OpenAI elsewhere (claim 26687).
Customer concentration has moved from OpenAI-dominant in 2025 to an OpenAI–Meta duopoly. On these figures the two account for roughly $36 billion of disclosed commitments by year-end 2025, and Meta's 2026 order may have pushed it ahead of OpenAI. Jane Street and Anthropic diversify the base only at the margin.
The revenue arithmetic loosely reconciles. RPO went from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3555), an increase of about $45.6 billion. The 2025 named additions of OpenAI's $15.6 billion incremental after Q1 plus its earlier $11.2 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion sum to about $47 billion before revenue recognized during the year, so the unnamed hyperscaler and smaller logos must cover the gap. Two caveats apply. Much of this headline value is 'up to' language, which sets ceilings rather than floors. And backlog of $25.9 billion was reported against RPO of $14.7 billion (claim 4970), which shows that management's backlog figure includes amounts that are not yet contractually enforceable. Note also that the claim record supplied was truncated after claim 9324.
Customer disclosures, read
2026-10-09CoreWeave's headline commitments rest mostly on executed paper. OpenAI's original $11.9 billion agreement (claim 19820) was followed by a $4 billion expansion (claim 25573) and an order form under an existing master services agreement (claim 4296), which management sized at up to $6.5 billion for a cumulative up to $22.4 billion (claim 20198). Meta's $14.2 billion order form (claim 4282) and its March 31, 2026 order form, reported at roughly $21 billion (claims 2123, 10340), are likewise 8-K-documented. NVIDIA's $6.3 billion capacity order (claims 4352, 20209) is a contract. The January 2026 'collaboration framework' (claims 3892, 17596, 17598) is not one. Anthropic is described as signed but carries no value (claim 9318). Jane Street's roughly $6 billion appears only in press language (claims 10304, 10730). IBM (claim 4971), CrowdStrike (claim 11768), Core Scientific (claim 20313), Aston Martin (claim 25576) and the Genesis Mission (claim 11778) are partnership or sponsorship language with no disclosed economics. The logo rosters (claims 25575, 11767, 9320) name customers but not commitments. Several counterparties stay anonymous: the 'new hyperscaler customer' (claim 25574) and the 'leading AI enterprise' behind DDTL 4.0 (claim 11224). The DDTL 3.0 'customer contract' (claim 4595) is resolved as OpenAI by claim 26687.
Concentration has shifted from one name to two. At March 31, 2025, OpenAI's $11.2 billion (claim 4969) was about 43% of $25.9 billion of backlog (claim 4970). By December 31, 2025, OpenAI, Meta and NVIDIA together account for about $42.9 billion of announced value against $60.7 billion of RPO (claim 3560), roughly 70%. Adding Meta's March 2026 tranche makes Meta, at about $35 billion cumulative, the largest single exposure.
The arithmetic broadly reconciles, with caveats. RPO of $14.7 billion plus the $11.2 billion OpenAI figure equals the $25.9 billion backlog exactly (claim 4970). That implies the OpenAI deal initially sat outside RPO, pending delivery conditions. The $11.9 billion versus $11.2 billion gap between claims 19820 and 4969 goes unexplained. RPO rose $45.6 billion during 2025 (claims 3555, 3572). Named additions cover most of that, but full-year revenue recognized is not on record, so the residual attributable to unnamed customers cannot be isolated. Readers should note that the OpenAI and Meta figures are framed as 'up to' ceilings (claims 20197, 20198). Claim 10729 is dated March 1, 2026 yet describes a March expansion, which suggests a misdated record rather than a separate deal.
Customer disclosures, read
2026-10-09CoreWeave's record separates fairly cleanly into contracts with executed paper and relationship language with no stated economics. The signed tier rests on order forms under existing master services agreements: NVIDIA (claim 4352), OpenAI (claim 4296), and Meta (claims 4282 and 2123). The headline OpenAI and Meta figures trace to these instruments, and the OpenAI arithmetic reconciles. The $11.9 billion initial deal (claim 19820), the $4 billion expansion (claim 25573) and the roughly $6.5 billion add-on (claim 20198) sum to the disclosed $22.4 billion. One wrinkle is that the first-quarter backlog credited OpenAI with only $11.2 billion (claim 4969) against the $11.9 billion announced. Meta is less tidy. The original commitment was up to $14.2 billion through 2031 (claim 4282). The March 2026 order form is described as an expansion of about $21 billion (claims 10729 and 2123), but one secondary source calls $21 billion the total commitment (claim 17654), so it is unclear whether Meta's exposure is about $21 billion or about $35 billion. Jane Street's roughly $6 billion (claim 10304) is named and quantified, though claims 10695 and 10730 restate it and should not be counted again. Anthropic's multi-year agreement (claim 10731) has no stated value. Everything else is softer. The NVIDIA collaboration framework (claims 3892 and 17596), the reference-architecture work it would only 'work towards' (claim 17598), the IBM partnership (claim 4971), continued collaboration with Core Scientific (claim 20313), the CrowdStrike 'partnership' (claims 11768 and 10330), the Genesis Mission (claim 11778), the Aston Martin sponsorship (claim 25576) and the Exemplar Cloud designations (claims 10332 and 9324) carry no disclosed commitments. The logo lists (claims 25575, 11767 and 9320) are names without dollars. Several counterparties are never identified: the 'new hyperscaler customer' (claim 25574) and the 'leading AI enterprise' financed by DDTL 4.0 (claim 11224). The DDTL 3.0 'customer contract' (claim 4595) was later disclosed as OpenAI (claim 26687). Microsoft, historically the dominant customer, does not appear by name anywhere in this record. Concentration has broadened but remains high. Year-end 2025 RPO was $60.7 billion, up from $15.1 billion (claims 3555 and 3572). Named commitments by then from OpenAI ($22.4 billion), Meta ($14.2 billion) and NVIDIA ($6.3 billion, claim 20209) total about $42.9 billion, roughly 71% of RPO. That leaves about $18 billion attributable to unnamed or legacy contracts. NVIDIA appears as both supplier and customer, and that circularity deserves scrutiny. The record supplied was truncated at claim 9317, so later disclosures are not reflected here.
Customer disclosures, read
2026-10-09CoreWeave's record is unusually rich in executed paper. The OpenAI relationship is the clearest case: an $11.9 billion agreement (claim 19820), a $4 billion expansion (25573), and an up to roughly $6.5 billion order form under the existing MSA (4296, 20198). These sum exactly to the stated $22.4 billion total. One wrinkle remains. The first-quarter release credited only $11.2 billion of that initial deal to backlog (4969), so roughly $0.7 billion of the headline never reached reported backlog. Meta is similarly documented. An up to $14.2 billion order form runs through December 2031 (4282), followed by a March 31, 2026 order form of about $21 billion through 2032 (2123, 10340). Both are framed as expansions, which implies about $35 billion cumulative. Some press phrasing (17654, 17655) blurs whether the $21 billion is incremental. NVIDIA's $6.3 billion capacity order (4352, 20209) is likewise a signed order form, but the counterparty is also CoreWeave's GPU supplier, which makes that revenue circular. By contrast, the January 2026 NVIDIA arrangement is explicitly a "collaboration framework" (3892, 17596, 17598) and should not be read as revenue. Jane Street's roughly $6 billion commitment (10304, 10730) and the Anthropic multi-year agreement (10731, no value) are named, but no order form appears in this record. Several items are softer. IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), Aston Martin (25576), the Genesis Mission (11778), and Exemplar Cloud status (10332) are partnerships or designations. The logo lists (25575, 11767) carry no contract values. Some counterparties remain unidentified: the "new hyperscaler customer" (25574) and the "leading AI enterprise" behind DDTL 4.0 (11224). The DDTL 3.0 "customer contract" (4595) was later attributed to OpenAI (26687). Concentration has evolved from near-total OpenAI dependence in early 2025 to an OpenAI–Meta duopoly. Together the two account for about $57.6 billion of committed value. The backlog arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555), an increase of $45.6 billion. Named 2025 deals total about $42.9 billion: OpenAI incremental, Meta $14.2 billion, and NVIDIA $6.3 billion. The unnamed hyperscaler, smaller logos, and revenue recognized during the year (not disclosed here) must fill the remaining gap. That gap is not trivial given the "up to" ceilings, which RPO may not fully count. Earlier backlog figures of $25.9 billion and $30.1 billion (4970, 25586) included non-RPO amounts contingent on delivery, so they are not like-for-like with year-end RPO.
Customer disclosures, read
2026-10-08CoreWeave's record separates into executed order forms, priced commitments without a filed instrument, and partnership language that carries no disclosed economics. The firmest evidence is the 8-K order forms under existing master services agreements. These cover OpenAI (claim 4296), NVIDIA (claim 4352), and Meta in two tranches: the initial commitment of up to $14.2 billion through December 2031 (claim 4282) and the March 31, 2026 order form of roughly $21 billion through 2032 (claims 2123, 10340). The OpenAI build-up does reconcile: $11.9 billion (claim 19820), plus $4 billion (claim 25573), plus $6.5 billion equals the stated $22.4 billion (claim 20198). Two caveats apply. The Meta and later OpenAI figures are framed as 'up to' amounts. And the January 2026 NVIDIA arrangement is explicitly a 'collaboration framework' (claim 3892) rather than a purchase commitment, so it should not be treated as additive to the $6.3 billion order (claim 20209).
Jane Street's roughly $6 billion (claims 10304, 10730) is a named, priced commitment, but no order-form filing appears in this record. Anthropic (claim 10731) is named without any value. Several material contracts remain anonymous: the 'new hyperscaler customer' (claim 25574), the customer whose contract DDTL 3.0 finances (claim 4595), and the 'leading AI enterprise' behind DDTL 4.0 (claim 11224). The logo rosters (claims 25575, 11767, 10338) also carry no terms. The same is true of the IBM, CrowdStrike, Core Scientific, Aston Martin and Genesis Mission items (claims 4971, 11768, 20313, 25576, 11778), which read as partnership or affiliation language rather than revenue contracts.
The revenue arithmetic needs care. At March 31, 2025, backlog was $25.9 billion, of which only $14.7 billion was RPO (claim 4970). The $11.2 billion difference exactly matches the OpenAI backlog addition (claim 4969). That implies the OpenAI deal initially sat entirely in the conditional, delivery-dependent bucket, and it differs from the $11.9 billion headline. RPO then rose from $15.1 billion to $60.7 billion during 2025 (claim 3555). The named OpenAI, Meta and NVIDIA commitments sum to about $42.9 billion, roughly 70 percent of year-end RPO before any recognition. Concentration therefore moved from a single dominant lab toward two or three counterparties, with Meta's 2026 expansion likely pushing it higher. Several extracted values (claims 10729, 9317, 10730) carry unit errors and should be read in billions. The record is also truncated at claim 9320.
Customer disclosures, read
2026-10-08CoreWeave's record separates cleanly into executed order forms and softer partnership language. The firmest disclosures are 8-K order forms under existing master services agreements: OpenAI (4296), Meta's $14.2 billion commitment through December 2031 (4282) and its roughly $21 billion March 2026 expansion through 2032 (2123, 10340), and NVIDIA's capacity purchase (4352). Jane Street's approximately $6 billion commitment (10304) is also described as a commitment. Anthropic's multi-year agreement (10731) is named but carries no disclosed value. By contrast, the January 2026 NVIDIA 'collaboration framework' (3892, 17596, 17598) is ecosystem and buildout language, not a revenue contract. The same applies to IBM (4971), Aston Martin (25576), CrowdStrike (11768, 10330), Core Scientific (20313), the Genesis Mission (11778) and Exemplar Cloud status (10332). The logo rosters (25575, 11767, 9320) name counterparties but attach no economics. The MUFG, Morgan Stanley, Goldman and JPMorgan references (11225) describe lenders, not customers.
Several material counterparties are never identified. These include the 'customer contract' that DDTL 3.0 was raised to serve (4595), the 'new hyperscaler customer' signed in Q2 2025 (25574), and the 'leading AI enterprise' behind DDTL 4.0 (11224). Readers cannot tell whether these map to Meta or OpenAI or to someone else.
Concentration has broadened in name more than in dollars. OpenAI anchored 2025 at a cumulative $22.4 billion: $11.9 billion (19820), plus $4 billion (25573), plus $6.5 billion (20198). That sum reconciles. Meta's $14.2 billion and $21 billion orders then made it at least as large an exposure. Jane Street and Anthropic are the first sizeable non-hyperscaler, non-lab diversifiers. Those two names plus OpenAI and Meta still plausibly account for most contracted value.
The arithmetic only partly reconciles. The $11.2 billion of OpenAI backlog cited in 4969 sits about $0.7 billion below the $11.9 billion contract headline (19820), and the gap is unexplained. RPO rose from $15.1 billion (3572) to $60.7 billion (3555) during 2025. Named 2025 deals of $10.5 billion from OpenAI after Q1 plus $14.2 billion from Meta leave roughly $20 billion or more of net additions attributed to no named customer. That remainder is presumably the unnamed hyperscaler and the DDTL-financed contracts. Finally, 17654 and 17655 leave it ambiguous whether Meta's $21 billion supersedes or adds to the $14.2 billion, and 10729 records the figure as '$21,000', a unit error to correct. The claim list supplied ends mid-entry at 9318, so the latest May 2026 disclosure could not be assessed.
Customer disclosures, read
2026-10-08CoreWeave's record splits cleanly into binding order forms and softer partnership language. The binding layer is narrow and large. OpenAI's commitments rest on a $11.9 billion agreement (claim 19820), a $4 billion expansion (25573), a September 2025 order form under the existing MSA (4296), and a further deal of up to $6.5 billion, which the company says brings OpenAI to up to $22.4 billion (20198). Meta signed a $14.2 billion order form through December 2031 with an expansion option (4282, 4283), then a March 31, 2026 order form of about $21 billion through 2032 (2123, 10340). NVIDIA's $6.3 billion capacity purchase is also an order form (4352, 20209). Jane Street's roughly $6 billion commitment (10304) is named and sized. The Anthropic agreement (10731) is named only through secondary coverage, with no value disclosed.
Everything else is softer. The IBM partnership (4971), the Aston Martin sponsorship (25576), continued collaboration with Core Scientific (20313), the CrowdStrike partnership (11768), Genesis Mission participation (11778), and Exemplar Cloud status (10332) carry no disclosed dollars. The January 2026 NVIDIA expansion is explicitly a "collaboration framework" (3892) whose software component is to "work towards" inclusion in reference architectures (17598). The logo lists in 25575, 11767 and 10338 name counterparties but attach no economics to them. Three material counterparties remain unidentified: the "new hyperscaler customer" (25574), the customer behind DDTL 3.0 (4595), and the "leading AI enterprise" behind DDTL 4.0 (11224).
Concentration has shifted from one counterparty to two, not to many. In March 2025, $25.9 billion of backlog equalled $14.7 billion of RPO plus $11.2 billion of OpenAI-linked other amounts (4970, 4969), so OpenAI was about 43% of backlog. That $11.2 billion also does not match the $11.9 billion headline. Meta's 2026 order alone is now about the same size as OpenAI's cumulative $22.4 billion. Whether Meta's $21 billion adds to the $14.2 billion or supersedes it is unclear across 10340, 17654 and 17655, and that answer decides which customer is larger.
The arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555), an increase of $45.6 billion. Named 2025 deals sum to about $42.9 billion, but most are "up to" ceilings, and 2025 revenue burn-off is not in the record. The residual is therefore probably larger than $2.7 billion and attributable to unnamed or unsized customers. The supplied record ends mid-entry at claim 9324, so later disclosures were not assessed.
Customer disclosures, read
2026-10-08CoreWeave's signed, counterparty-named commitments sit with four companies: OpenAI, Meta, NVIDIA and Jane Street. OpenAI is documented as order forms under an existing MSA (claims 19820, 4296), with tranches of $11.9 billion, $4 billion and up to $6.5 billion summing to the stated "up to approximately $22.4 billion" (25573, 20198). There is one wrinkle: the same first deal is booked as only $11.2 billion of backlog (4969). Meta's order form commits "up to approximately $14.2 billion" through 2031 (4282), and a March 31, 2026 order form adds about $21 billion through 2032 (2123, 10340). The NVIDIA capacity order form (4352) corresponds to the $6.3 billion "strategic collaboration" (20209). Jane Street's roughly $6 billion (10304) is quantified, but the record supplies no filing language for it. Anthropic is named with no value or terms, sourced only from secondary coverage (10731).
Everything else is softer. The IBM partnership (4971), the Aston Martin sponsorship (25576), the Core Scientific collaboration (20313), Genesis Mission participation (11778) and the January 2026 NVIDIA "collaboration framework" (3892, 17596) are not revenue contracts, and the last says only that CoreWeave will "work towards" inclusion (17598). CrowdStrike appears both as a "partnership" (11768) and in a customer logo list (11767). Those logo lists, including the later Cohere, Mistral and Jane Street "expansions," carry no dollar figures (25575, 9319). Three material counterparties are never named: the "new hyperscaler customer" (25574), the customer behind DDTL 3.0 (4595), and the "leading AI enterprise" behind DDTL 4.0 (11224).
Concentration has narrowed rather than diversified. In early 2025 OpenAI alone accounted for about 43% of a $25.9 billion backlog (4970). By December 2025, named OpenAI, Meta and NVIDIA ceilings of roughly $42.9 billion equal about 71% of $60.7 billion RPO (3555), before Meta's $21 billion expansion.
The revenue arithmetic only loosely reconciles. Adding the second-half 2025 deals ($14.2B, $6.5B, $6.3B) to the $30.1 billion June backlog (25586) gives about $57 billion before revenue burn. That is close to $60.7 billion, but the comparison mixes "backlog" and "RPO," and "up to" ceilings may not convert one-for-one. The March 2025 RPO of $14.7 billion was below the $15.1 billion of December 2024 (3572) despite the OpenAI signing, which suggests deals enter RPO with a lag. Two items reference events later than their own record dates (10729, 10730), and the claim record is cut off at 9324.
Customer disclosures, read
2026-10-08CoreWeave's record separates into two tiers. The first is executed paper, meaning order forms filed under existing master services agreements. Three counterparties sit in this tier. OpenAI's order is dated September 23, 2025 (claim 4296). NVIDIA's capacity purchase order is dated September 2025 (claim 4352). Meta has two orders: the initial one committing up to approximately $14.2 billion through December 2031 (claim 4282), and a March 31, 2026 order (claim 2123) that expanded the relationship by about $21 billion through 2032 (claim 10340). Jane Street's roughly $6 billion commitment (claim 10304) is also stated as a commitment. Everything else is softer. The IBM tie-up (claim 4971), Aston Martin (claim 25576), CrowdStrike (claim 11768), Genesis Mission (claim 11778), the continuing Core Scientific relationship (claim 20313) and the NVIDIA collaboration framework (claim 3892) are partnership or framework language. None carries a dollar value. The Anthropic multi-year agreement (claim 10731) is named but unpriced and comes from secondary reporting. The rotating logo lists (claims 25575, 11767, 9320) name customers without disclosing any economics.
Three material counterparties remain unidentified. One is the 'new hyperscaler customer' (claim 25574). The other two are the customers whose contracts justified the DDTL 3.0 and DDTL 4.0 facilities (claims 4595, 11224), the latter described only as a 'leading AI enterprise.' These are financing-grade contracts with unnamed obligors.
Concentration has broadened in name but not in dollars. OpenAI commitments reached up to $22.4 billion (claim 20198), which reconciles to $11.9 billion plus $4 billion plus $6.5 billion (claims 19820, 25573). One gap needs explaining: the original $11.9 billion deal contributed only $11.2 billion to backlog (claim 4969). Meta's $14.2 billion plus $21 billion totals about $35 billion if additive. Claim 17654 can be read either way. Together these two customers dwarf every other disclosed relationship.
The arithmetic broadly holds. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3555), an increase of $45.6 billion. Named 2025 additions are OpenAI ($21.7 billion booked), Meta ($14.2 billion) and NVIDIA ($6.3 billion, claim 20209). These total roughly $42 billion, which leaves little room for the hyperscaler and the logo customers once in-year revenue recognition is netted out. That suggests either small contributions from those customers or 'up to' figures booked at less than face value. Two caveats apply. NVIDIA appears as both supplier and customer. Backlog, which was $25.9 billion and then $30.1 billion (claims 4970, 25586), is not the same measure as RPO. The record supplied was truncated at claim 9318, so this read may be incomplete.
Customer disclosures, read
2026-10-07CoreWeave's signed, priced customer commitments come from a small set of counterparties. The firmest disclosures are order forms executed under existing Master Services Agreements: OpenAI (claims 19820, 4296), Meta (4282, 2123) and NVIDIA (4352). OpenAI's commitments are stated at up to approximately $22.4 billion (20198), and Meta's at $14.2 billion through 2031 (4282) plus a roughly $21 billion order signed March 31, 2026 (2123, 10340). Jane Street's approximately $6 billion (10304) is also described as a commitment. Anthropic's multi-year agreement (10731) appears only in secondary reporting and carries no figure.
Much of the rest is softer language. The NVIDIA relationship moved from a priced order (4352, 20209) to a 'collaboration framework' (3892) whose software terms only 'work towards' inclusion in reference architectures (17598). IBM (4971), CrowdStrike (11768, 10330), the Aston Martin sponsorship (25576), Genesis Mission participation (11778), and the post-merger Core Scientific language (20313) carry no disclosed economics. The logo lists of 'partner of choice' customers (25575, 11767, 9320) name counterparties but give no contract values.
Three material counterparties remain unidentified. These are the 'new hyperscaler customer' (25574), the customer contract financed by DDTL 3.0 (4595), and the 'leading AI enterprise' behind DDTL 4.0 (11224). They may overlap with named parties, but the record does not say so.
Concentration has deepened rather than eased. At March 31, 2025, OpenAI's $11.2 billion accounted for about 43% of a $25.9 billion backlog (4969, 4970). The $11.2 billion figure also sits $0.7 billion below the $11.9 billion headline (19820). By late 2025, OpenAI, Meta and NVIDIA together represented up to about $42.9 billion against $60.7 billion of RPO (3555), roughly 71%. Including NVIDIA here is notable because it is also CoreWeave's key supplier. The 2026 additions of Jane Street and Anthropic broaden the roster, but Meta's roughly $35 billion combined exposure, if the $21 billion is incremental, makes a single customer even more dominant.
The revenue arithmetic broadly reconciles, but with little room to spare. RPO rose $45.6 billion during 2025 (3572, 3555), and named 2025 deals total up to $42.9 billion. Revenue recognized during the year would have consumed some backlog, so the named deals plausibly explain nearly all gross additions. That leaves little visible contribution from the logo-list customers. The 'up to' qualifiers and the separate backlog definition, which adds non-RPO amounts subject to delivery conditions (4970), weaken any tight tie-out.
It is also unclear whether Meta's $21 billion is additive to the $14.2 billion. Claim 10729 calls it an expansion, while 9317 calls it a new commitment. Claim 10729 also carries a March 1 date that precedes the March 31 signing it describes. The claim record supplied was truncated at claim 9319.
Customer disclosures, read
2026-10-07CoreWeave's announced pipeline rests on a short list of signed order forms under existing master services agreements. Its partnership, framework and logo language deserves a heavier discount. The firmest disclosures are the 8-K order forms. These include OpenAI's September 2025 order form (claim 4296), Meta's initial order form of up to about $14.2 billion through December 2031 (claim 4282), Meta's March 31, 2026 order form (claim 2123) and the NVIDIA capacity order form (claim 4352). OpenAI's commitments run from $11.9 billion (claim 19820) through a $4 billion expansion (claim 25573) to an up-to-$6.5 billion deal, which brings the total to up to about $22.4 billion (claim 20198). The words 'up to' make these ceilings rather than floors. Meta's roughly $21 billion expansion is cited in claims 10729, 10694, 10340, 17654 and 9317, but it is one contract and should be counted once. Jane Street's approximately $6 billion (claims 10304, 10695) is a named commitment without an order-form citation in the record. Anthropic's multi-year agreement carries no value (claim 10731). The softer category includes IBM (claim 4971), CrowdStrike (claims 11768, 10330), the Aston Martin F1 sponsorship (claim 25576), the Genesis Mission (claims 11778, 10331) and NVIDIA's January 2026 collaboration framework (claims 3892, 17596, 17598). Logo rosters in claims 25575, 11767 and 9320 name counterparties but give no economics. Three material counterparties remain unidentified. The first is the customer financed by DDTL 3.0 (claim 4595). The second is the 'new hyperscaler customer' (claim 25574). The third is the 'leading AI enterprise' behind DDTL 4.0 (claim 11224). Concentration has deepened rather than diversified. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog at March 31, 2025 (claims 4969, 4970). By year-end, OpenAI's $22.4 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion (claim 20209) totaled $42.9 billion, about 71% of the $60.7 billion in RPO (claim 3555). The arithmetic broadly reconciles. RPO rose $45.6 billion from $15.1 billion (claim 3572), close to the $42.9 billion of named 2025 deals, and the record does not show the 2025 revenue recognized against RPO. Two items do not tie. OpenAI's original deal is $11.9 billion in claim 19820 but $11.2 billion in the backlog in claim 4969. Backlog also mixes RPO with amounts that depend on delivery conditions (claim 4970), so it overstates firm obligations. Claim 9319 is truncated in the record and is not relied on here.
Customer disclosures, read
2026-10-07CoreWeave's record separates cleanly into contracts evidenced by filed order forms and a larger body of partnership language that carries no disclosed economics. The signed core is narrow and well named. OpenAI order forms under an existing MSA (claims 19820, 4296), Meta's initial order form of up to $14.2 billion through December 2031 (claim 4282), and its March 2026 order form (claim 2123) are documented contracts, as is NVIDIA's capacity order form (claim 4352). Jane Street's roughly $6 billion commitment (claim 10304) and the multi-year Anthropic agreement (claim 9318) are named and described as signed, but Anthropic carries no dollar figure, and the record cites no filed order form for either. Weaker language sits around this core. NVIDIA's 'collaboration framework' (claim 3892) and $6.3 billion 'strategic collaboration' (claim 20209) are framed as partnership rather than purchase. The IBM, CrowdStrike, Core Scientific, Genesis Mission and Aston Martin items (claims 4971, 11768, 20313, 11778, 25576) are relationships without disclosed consideration. The logo lists (claims 25575, 11767) name customers but attach no values. Three material counterparties remain unidentified: the 'new hyperscaler customer' (claim 25574), the customer contract behind DDTL 3.0 (claim 4595), and the 'leading AI enterprise' backing DDTL 4.0 (claim 11224). Concentration has deepened even as the logo count grew. OpenAI's stated commitments total up to $22.4 billion (claim 20198), and Meta's initial $14.2 billion brings the two to about $36.6 billion against $60.7 billion of RPO at year-end 2025 (claim 3555), roughly 60 percent. Adding NVIDIA's $6.3 billion takes that above 70 percent. Meta's $21 billion expansion (claim 10340) makes it the largest single exposure in 2026, so the Jane Street and Anthropic wins dilute concentration only modestly. The arithmetic broadly reconciles, with caveats. The OpenAI sequence sums correctly: $11.9 billion, plus $4 billion, plus $6.5 billion equals $22.4 billion (claims 19820, 25573, 20198). However, the initial deal was booked as $11.2 billion of backlog (claim 4969), a $0.7 billion gap that is never explained. RPO rose about $45.6 billion during 2025 (claims 3572, 3555), against roughly $42.9 billion of named OpenAI, Meta and NVIDIA deals. That leaves a few billion, before burn-down of recognized revenue, for the unnamed hyperscaler and the logo customers. Most figures are 'up to' ceilings. Secondary coverage also blurs whether Meta's $21 billion is incremental or a total commitment (claims 17654, 10729), which affects 2026 backlog math.
Customer disclosures, read
2026-10-07CoreWeave's record mixes executed order forms with softer language. The hardest evidence is a set of order forms filed under master services agreements. These cover OpenAI, where the original $11.9 billion agreement (claim 19820) was followed by a September 2025 order form (4296). They cover Meta, with an order form for up to $14.2 billion through December 2031 (4282) and a second one dated March 31, 2026 for about $21 billion through 2032 (2123, 10340). They also cover NVIDIA, through a September 2025 capacity order form (4352) later described as a $6.3 billion collaboration (20209). Jane Street's roughly $6 billion commitment (10304) is named and sized. Anthropic's multi-year agreement (10731) is named but has no stated value. The IBM partnership (4971), the CrowdStrike 'global partnership' (11768, 10330), the NVIDIA 'collaboration framework' and reference-architecture work (3892, 17598), the Genesis Mission (11778), Aston Martin F1 (25576), and the Core Scientific language (20313) are framework, sponsorship, or relationship disclosures, not quantified contracts. The logo lists (25575, 11767, 9320, 9319) name counterparties but attach no dollars. Several material counterparties remain unidentified: a 'new hyperscaler customer' (25574), the 'customer contract' financed by DDTL 3.0 (4595), and the 'leading AI enterprise' behind DDTL 4.0 (11224).
Concentration has shifted from one dominant customer to two. OpenAI's commitments grew from $11.9 billion to $15.9 billion (25573) and then to 'up to' $22.4 billion (20198). That total reconciles arithmetically, although the first backlog addition was booked at $11.2 billion rather than $11.9 billion (4969). Meta then rose to rival OpenAI. If the $21 billion order form adds to the $14.2 billion form rather than replacing it, Meta's combined exposure is about $35 billion, which would exceed OpenAI's. Secondary press items (17654, 10729) blur this distinction.
The revenue arithmetic broadly holds but cannot be fully closed. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3571), a net increase of about $45.6 billion. Named 2025 signings cover most of it: roughly $22.4 billion from OpenAI, $14.2 billion from Meta, and $6.3 billion from NVIDIA, about $43 billion in total. The residual is plausibly the unnamed hyperscaler and the logo customers. However, revenue recognized in 2025 is not on record, so gross additions cannot be derived. The 'up to' framing may also exceed what RPO actually counts. Backlog, the earlier metric (4970, 25586), also differs from RPO by definition. The 2026 Meta and Jane Street deals fall after the December 31, 2025 RPO date and should appear only in later disclosures.
Customer disclosures, read
2026-10-06CoreWeave's signed commitments are concentrated in a few order forms executed under master services agreements. The rest of its counterparty disclosure is partnership, framework or logo-list language. The hard paper starts with OpenAI: the March 2025 agreement (19820) and the September 2025 order form (4296), which brought OpenAI commitments to "up to approximately $22.4 billion" (20198). Meta follows with the $14.2 billion order form running through December 2031 (4282) and a second order form signed March 31, 2026 (2123) for about $21 billion through 2032 (10340, 9317). NVIDIA's September 2025 order form (4352) is valued at $6.3 billion (20209), and NVIDIA is also CoreWeave's key supplier. Jane Street's roughly $6 billion commitment (10304) is the only other counterparty with a dollar figure. Anthropic is described as a signed multi-year agreement (9318), but no value is disclosed. IBM (4971), CrowdStrike (11768, 10330), the Genesis Mission (11778) and Core Scientific (20313) use partnership or collaboration language, not contract language. The January 2026 NVIDIA expansion is explicitly a "collaboration framework" (3892, 17596). The "partner of choice" rosters (11767, 9320, 10338) are customer logos without terms. Some financed contracts are not named at all. DDTL 3.0 funds "a customer contract" (4595), and DDTL 4.0 serves a "leading AI enterprise" (11224). Claim 9119 also cites two large customer contracts, but its text is truncated in the record. Concentration has moved from one customer to two. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog at March 31, 2025 (4969, 4970). By year-end 2025, the OpenAI, Meta and NVIDIA headline amounts total about $42.9 billion against $60.7 billion of RPO (3555), roughly 71% if fully counted. Meta's 2026 expansion could lift it toward $35 billion and make it the largest single exposure. The revenue arithmetic broadly reconciles, with gaps. RPO rose $45.6 billion during 2025 (3555), close to the named additions plus revenue recognized during the year. However, the headline figures are "up to" ceilings, not floors. The OpenAI totals also do not add up as disclosed. The deal was announced at $11.9 billion (19820) but booked as $11.2 billion of backlog (4969), and $11.9 billion plus $6.5 billion falls about $4 billion short of the $22.4 billion cumulative figure (20198). That implies a further OpenAI tranche that is not in this record. Backlog and RPO are also different measures, since the March 2025 backlog included amounts outside RPO that depend on delivery conditions (4970). Some extracted values are mis-scaled and should not be relied on without the source text, such as $21,000 for Meta (10729) and $6,000 for Jane Street (10730).
Customer disclosures, read
2026-10-06CoreWeave's record splits cleanly into contracts with executed paperwork and a larger layer of partnership language. The signed core is a small set of order forms under existing master services agreements. These are OpenAI in September 2025 (claim 4296), Meta in September 2025 for up to $14.2 billion (4282) and again on March 31, 2026 for about $21 billion (2123, 10340), and NVIDIA's capacity purchase (4352), later sized at $6.3 billion (20209). The March 2025 OpenAI agreement (19820) and the Jane Street commitment of about $6 billion (10304) are named and dollarized. The Anthropic deal is described as signed and multi-year but carries no value (9318). Most of the remaining claims are softer. The NVIDIA January 2026 'collaboration framework' (3892, 17596) and its 'work towards' reference-architecture language (17598) are frameworks, not bookings. The same applies to the IBM (4971), CrowdStrike (11768, 10330) and Core Scientific (20313) partnerships, the Genesis Mission (11778), the Exemplar Cloud designations (10332, 9324) and the 'partner of choice' logo lists (11767, 9320). Expanded relationships with Cohere and Mistral (9319) carry no terms. Several financings point to counterparties that are not named: 'a customer contract' behind DDTL 3.0 (4595) and a 'leading AI enterprise' behind DDTL 4.0 (11224). Claim 9119, on two large customer contracts, is truncated in the record and cannot be assessed. Concentration has moved from a single dominant counterparty to two. OpenAI's stated total reached up to $22.4 billion (20198), while Meta's two order forms together total roughly $35 billion. Repeated citations of the Meta and Jane Street figures (10729, 10694, 17654, 9317; 10730, 10695) describe one deal each and should not be counted twice. The revenue arithmetic only partly reconciles. OpenAI's initial deal appears as $11.9 billion (19820) but added $11.2 billion to backlog (4969). Adding the $6.5 billion expansion gives $18.4 billion, not $22.4 billion, so roughly $4 billion of OpenAI commitments is missing from this record. RPO fell from $15.1 billion to $14.7 billion in the first quarter of 2025 (3572, 4970), even though the OpenAI deal was signed in that quarter. This suggests much of that deal initially sat in conditional backlog rather than RPO. RPO of $60.7 billion at year-end 2025 (3555) compares with about $42.9 billion of named 2025 OpenAI, Meta and NVIDIA commitments. Read that way, three counterparties account for roughly 70 percent of RPO before revenue burn-down, and the remainder is undisclosed. Many of the headline figures are 'up to' amounts, which weakens a direct reconciliation.
Customer disclosures, read
2026-10-06CoreWeave's record contains a small core of documented, signed customer contracts and a much larger layer of partnership and logo language. Most of the disclosed dollars sit in the first category. The executed agreements take the form of order forms under existing master services agreements. They cover OpenAI (claim 4296, following the original $11.9 billion agreement in claim 19820), Meta at up to $14.2 billion through December 2031 (claim 4282) and a further roughly $21 billion through December 2032 (claim 2123, claim 10340, claim 9317), and NVIDIA (claim 4352), whose $6.3 billion commitment (claim 20209) makes it both supplier and customer. Jane Street's roughly $6 billion (claim 10304) is described as a commitment, and Anthropic's deal is called signed (claim 9318), but neither has a cited order form, and Anthropic's value is undisclosed. Several items fall outside signed-contract language. These are the IBM partnership (claim 4971), the NVIDIA collaboration framework (claim 3892, claim 17596), whose software-integration goal is phrased as working towards (claim 17598), the CrowdStrike global partnership (claim 11768), the Core Scientific collaboration (claim 20313), Genesis Mission participation (claim 11778), Exemplar Cloud status (claim 9324), and the partner-of-choice logo lists (claim 11767, claim 9320). The expansions with Cohere and Mistral are also unquantified (claim 9319). Two financing disclosures cite contracts without naming the counterparty: a customer contract behind DDTL 3.0 (claim 4595) and a leading AI enterprise behind DDTL 4.0 (claim 11224). Concentration has moved from OpenAI to Meta. In May 2025, OpenAI's $11.2 billion was about 43 percent of $25.9 billion in backlog (claim 4969, claim 4970). By April 2026, Meta's cumulative headline value of about $35.2 billion exceeds OpenAI's up to $22.4 billion (claim 20198). The revenue arithmetic only partly reconciles. OpenAI's original deal is $11.9 billion in claim 19820 but $11.2 billion in claim 4969. Adding $6.5 billion gives about $18.4 billion, so the $22.4 billion total implies a roughly $4 billion tranche that this record does not show. RPO rose from $15.1 billion to $60.7 billion during 2025 (claim 3572, claim 3555), an increase of about $45.6 billion. Named 2025 deals total about $42.9 billion, but those are up-to figures, and 2025 recognized revenue is not in the record. The match is therefore plausible but unverified. The roughly $27 billion of 2026 Meta and Jane Street commitments postdates that RPO figure. The record is truncated at claim 9121.
Customer disclosures, read
2026-10-05CoreWeave's signed-contract record is unusually well documented for its largest counterparties, but the remainder of its customer narrative is mostly partnership language. The binding instruments are order forms under existing Master Services Agreements. These include OpenAI (claims 19820, 4296, and 20198, which bring commitments to up to about $22.4 billion), Meta (4282 at up to $14.2 billion through 2031, and 2123 on March 31, 2026, sized at about $21 billion in 10340), and NVIDIA (4352, sized at $6.3 billion in 20209). Jane Street's roughly $6 billion commitment (10304) also reads as contractual, and Anthropic's multi-year agreement is described as signed (9318) but carries no disclosed value. Several claims restate the same Meta $21 billion deal (10729, 10694, 17654, 9317) and should not be counted more than once. Other items are frameworks or affiliations rather than revenue contracts: the IBM partnership (4971), the NVIDIA 'collaboration framework' and reference-architecture work (3892, 17596, 17598), the CrowdStrike 'global partnership' (11768), Genesis Mission participation (11778), and the Core Scientific collaboration (20313). The 'partner of choice' lists (11767, 9320) name logos such as Cursor, Midjourney, Perplexity and Hudson River Trading, but they attach no terms. Some financing disclosures go the other way, citing contracts without naming the counterparty. DDTL 3.0 funds 'a customer contract' (4595), DDTL 4.0 serves a 'leading AI enterprise' (11224), and a May 2026 item references 'two large customer contracts' (9119). Concentration has shifted from a single dominant buyer to a duopoly. In early 2025, OpenAI's roughly $11.9 billion was close to half of the $25.9 billion backlog (4970). By year-end, OpenAI's $22.4 billion and Meta's $14.2 billion together came to about 60% of the $60.7 billion RPO (3555), or about 71% once NVIDIA is included. Meta's March 2026 expansion likely makes it the largest exposure. On arithmetic, RPO rose $45.6 billion during 2025, from $15.1 billion (3572) to $60.7 billion. The named OpenAI, Meta and NVIDIA deals total about $42.9 billion, which broadly reconciles. That fit holds only if the 'up to' ceilings were booked at full value, and only if revenue recognized during the year was offset by smaller unnamed contracts. Two gaps remain unexplained. OpenAI's initial deal appears as $11.9 billion in one disclosure (19820) and $11.2 billion of added backlog in another (4969), a $0.7 billion difference. The record also does not itemize roughly $4 billion of the $22.4 billion OpenAI total.
Customer disclosures, read
2026-10-05CoreWeave's record splits cleanly into executed order forms and softer relationship language. The signed tier rests on order forms under master services agreements with OpenAI (19820, 4296, 20198), Meta (4282, 2123) and NVIDIA (4352). It also includes a roughly $6 billion Jane Street commitment (10304) and a multi-year Anthropic agreement (9318) whose value was never disclosed. The rest reads differently. IBM is a "partnership" (4971) and CrowdStrike a "global partnership" (11768). NVIDIA's January 2026 arrangement is a "collaboration framework" that commits the parties only to "work towards" software inclusion (3892, 17598). Core Scientific pledges to "collaborate on shared opportunities" (20313), and Cohere and Mistral appear only as "expanded relationships" (9319). The "partner of choice" rosters (11767, 9320), Exemplar Cloud status (10332) and Genesis Mission (11778) name organizations without attaching any amount or term.
Several material obligations carry no named counterparty. DDTL 3.0 finances "a customer contract" (4595), and DDTL 4.0 funds services for a "leading AI enterprise" (11224). A May 2026 item references two large customer contracts (9119), but that claim is truncated in the record supplied. None of these can be tied to a named deal from the disclosures alone.
Concentration has shifted without diversifying much. In March 2025, OpenAI's $11.9 billion contract (19820) sat against a $25.9 billion backlog (4970). By year-end 2025, three named commitments totaled about $42.9 billion: OpenAI up to $22.4 billion (20198), Meta up to $14.2 billion (20197) and NVIDIA at $6.3 billion (20209). That is roughly 71% of the $60.7 billion RPO (3555). The March 31, 2026 Meta order form for about $21 billion (2123, 10340) lifts Meta to roughly $35 billion nominal, overtaking OpenAI as the largest single exposure.
The arithmetic only partly reconciles. OpenAI's initial deal is $11.9 billion in the announcement (19820) but $11.2 billion of added backlog in the quarterly release (4969), and the $0.7 billion gap is unexplained. The $22.4 billion cumulative OpenAI figure (20198) also exceeds the $11.9 billion and $6.5 billion tranches by about $4 billion, which implies an intermediate expansion absent from this record. The Meta and OpenAI totals are framed as "up to," making them ceilings rather than floors. The Q1 2025 backlog also counted $11.2 billion beyond RPO only "subject to" delivery conditions (4970). Finally, about $17.8 billion of year-end RPO is not attributable to any named counterparty.
Customer disclosures, read
2026-10-04CoreWeave's record contains three counterparties backed by executed paper: OpenAI, Meta and NVIDIA. Each is documented as an order form under an existing Master Services Agreement. OpenAI's initial agreement (claim 19820, $11.9 billion) was followed by a September 2025 order form (4296) and an expansion to a cumulative "up to approximately $22.4 billion" (20198). Meta's $14.2 billion order form runs through December 2031 (4282). A second Meta order form dated March 31, 2026 (2123) carries roughly $21 billion (10340, 9317). NVIDIA's September 2025 order form (4352) corresponds to the $6.3 billion figure (20209). Jane Street's roughly $6 billion commitment (10304) is named and sized, but the record cites only press language, not a filing.
Everything else needs a discount. The January 2026 NVIDIA expansion is explicitly a "collaboration framework" (3892, 17596), and reference-architecture validation (17598) is not revenue. IBM (4971), CrowdStrike (11768), Core Scientific (20313) and the DOE Genesis Mission (11778) are described as partnerships, not contracts. The logo lists (11767, 9320) and the Cohere/Mistral "expanded relationships" (9319) carry no values. Anthropic is a signed multi-year agreement (9318), but it is unsized. Several financings point to unnamed counterparties: "a customer contract" behind DDTL 3.0 (4595), a "leading AI enterprise" behind DDTL 4.0 (11224), and "two large customer contracts" (9119, which is truncated in the record).
Concentration has broadened at the margin but remains heavy. In early 2025 OpenAI alone was nearly half of the $25.9 billion backlog (4970). By year-end 2025, the named OpenAI, Meta and NVIDIA amounts total about $42.9 billion, roughly 70% of the $60.7 billion RPO (3555). If the March 2026 Meta deal is additive, as "expanded… by about $21 billion" (10729) implies, Meta becomes the largest counterparty at about $35 billion.
The arithmetic roughly reconciles, with caveats. RPO rose $45.6 billion during 2025 (3572, 3555), close to the $42.9 billion of named 2025 deals. Recognized revenue, which is not on record, would widen that gap. The OpenAI figures do not tie internally: $11.9 billion headline versus $11.2 billion of backlog (4969). In addition, $11.9 billion plus $6.5 billion leaves about $4 billion of the $22.4 billion total unexplained in this record. The pervasive "up to" phrasing, and backlog that depends on "delivery and availability" (4970), mean headline values are ceilings rather than floors. No 2026 RPO figure is on record to test the Meta, Jane Street and Anthropic additions.
Customer disclosures, read
2026-10-04CoreWeave's record separates cleanly into executed order forms and softer partnership language. The signed, dollar-denominated agreements all name their counterparty. OpenAI's original contract was $11.9 billion (claim 19820), although the May 2025 backlog bridge credits only $11.2 billion to it (4969), and that gap is never explained. OpenAI then signed a September 2025 order form under its existing MSA (4296), described as up to $6.5 billion. NVIDIA signed a $6.3 billion capacity order form (4352, 20209). Meta signed a $14.2 billion order form running to December 2031 (4282) and a second, roughly $21 billion order form dated March 31, 2026 (2123, 10340). Jane Street's roughly $6 billion commitment (10304) is sourced to an announcement rather than a filed order form. The $21 billion Meta figure recurs in five claims (10729, 10694, 10340, 17654, 9317), so it should be counted once.
Several items are framework or relationship language rather than priced contracts. These include the January 2026 NVIDIA "collaboration framework" (3892, 17596, 17598), the IBM Granite partnership (4971), the CrowdStrike "global partnership" (11768), Genesis Mission participation (11778), and the post-merger Core Scientific collaboration (20313). The Anthropic "multi-year agreement" (9318, 10731) is described as signed but carries no value. The "partner of choice" logo rosters (11767, 9320) and the "expanded relationships" with Cohere and Mistral (9319) carry no contractual detail. Two financings explicitly back contracts with unnamed parties: DDTL 3.0 references "a customer contract" (4595), and DDTL 4.0 references a "leading AI enterprise" (11224). Readers should not assume either is a new counterparty.
Concentration has shifted from one buyer to two. Through mid-2025, OpenAI was effectively the entire named book. By late 2025, OpenAI's stated cumulative total of up to $22.4 billion (20198) was a little over half of roughly $43 billion in named commitments. After March 2026, Meta's combined $35.2 billion overtook OpenAI.
The arithmetic only partly reconciles. The record's two OpenAI contracts, $11.9 billion plus $6.5 billion, sum to $18.4 billion, not $22.4 billion. That implies roughly $4 billion in undisclosed or unrecorded OpenAI expansion. Over 2025, RPO rose from $15.1 billion to $60.7 billion (3572, 3555), an increase of $45.6 billion before netting out revenue recognized during the year. The named 2025 deals cover about $43 billion of that increase, and much of it is framed as "up to" ceilings rather than fixed obligations. The residual, plus whatever sits behind the unnamed DDTL customers, is not attributed to any named counterparty in the record.
Customer disclosures, read
2026-10-03CoreWeave's record separates cleanly into executed order forms and softer partnership language. The binding instruments are order forms under existing Master Services Agreements: OpenAI (19820, 4296), NVIDIA (4352), and Meta (4282, then a new order form dated March 31, 2026 in 2123, sized at roughly $21 billion in 10340). Jane Street's roughly $6 billion commitment (10304) and the multi-year Anthropic agreement (9318) are described as signed, though Anthropic carries no disclosed value. Several dollar figures are ceilings, not floors. Meta's $14.2 billion is "up to" (4282, 20197), and OpenAI's cumulative $22.4 billion is likewise "up to" (20198). Everything else is weaker. The IBM "partnership" (4971), the CrowdStrike "global partnership" (11768, 10330), Genesis Mission participation (11778), the Core Scientific collaboration (20313), and the January 2026 NVIDIA "collaboration framework" (3892, 17598) describe relationships, not quantified commitments. The "partner of choice" logo lists (11767, 9320, 10338) name companies but disclose no contract terms.
Three counterparties appear only anonymously. One is the "customer contract" financed by DDTL 3.0 (4595). Another is the "leading AI enterprise" behind DDTL 4.0 (11224). The third is the "two large customer contracts" in 9119, a claim that is truncated in the record supplied. Given the timing and scale, these likely map to OpenAI or Meta, but the filings do not say so, and readers should not assume it.
Concentration was acute and has eased only partly. At March 31, 2025, OpenAI's $11.2 billion (4969) was about 43% of the $25.9 billion backlog (4970). By December 31, 2025, OpenAI's up-to $22.4 billion plus Meta's up-to $14.2 billion equal roughly 60% of the $60.7 billion RPO (3560). Adding NVIDIA's $6.3 billion (20209) brings the share to about 70%. The 2026 additions from Meta, Jane Street and Anthropic broaden the named roster, but Meta's $21 billion alone keeps the top two dominant.
The arithmetic reconciles only directionally. RPO rose $45.6 billion during 2025 (3555). Named 2025 deals total about $38.9 billion before burn-down: OpenAI $11.9 billion and $6.5 billion, Meta $14.2 billion, and NVIDIA $6.3 billion. The OpenAI figures also conflict internally: $11.9 billion (19820) versus $11.2 billion (4969). In addition, $11.9 billion plus $6.5 billion falls about $4 billion short of the stated $22.4 billion cumulative total, implying an undisclosed tranche. Because "up to" values may exceed what RPO recognizes, the residual cannot be attributed to named customers from this record. Note also that some claim values (10729, 9317) are mis-scaled as "$21,000" and should be read as $21 billion.
Customer disclosures, read
2026-10-03CoreWeave's record splits into a small set of signed, dollar-denominated order forms and a larger layer of collaboration language. The order forms are the hard core. OpenAI's March 2025 agreement (claim 19820, $11.9 billion) and September 2025 order form under an existing MSA (claim 4296) are both signed. So are Meta's September 2025 order form, up to $14.2 billion through December 2031 (claims 4282, 4197), and its March 31, 2026 order form of about $21 billion through 2032 (claims 2123, 10340), and NVIDIA's September 2025 capacity order form (claims 4352, 20209). Jane Street's roughly $6 billion commitment (claims 10304, 10730) and the Anthropic multi-year agreement (claim 9318) are described as signed, but Anthropic carries no disclosed value. The softer tier is substantial. It includes the IBM partnership (claim 4971), the Core Scientific collaboration (claim 20313), the NVIDIA collaboration framework that 'works towards' reference-architecture inclusion (claims 3892, 17598), the CrowdStrike 'global partnership' (claim 11768), Genesis Mission participation (claim 11778), and logo lists of 'AI pioneers' (claims 11767, 9320). None of these carries a disclosed commitment. Three financing disclosures cite large contracts with unnamed counterparties: a 'customer contract' (claim 4595), a 'leading AI enterprise' (claim 11224), and 'two large customer contracts' (claim 9119). These are among the largest capital-deployment events on record and cannot be attributed. Concentration remains heavy despite the 2026 broadening. Named, valued commitments total roughly $70 billion, and OpenAI (up to $22.4 billion, claim 20198) plus Meta (about $35 billion combined) account for over 80% of it. NVIDIA appears simultaneously as supplier, collaborator and $6.3 billion customer, which complicates any read of arm's-length demand. The arithmetic only loosely reconciles. OpenAI's $11.9 billion headline became $11.2 billion of backlog (claim 4969), and the jump from $11.9 billion plus $6.5 billion to a $22.4 billion total implies an undisclosed roughly $4 billion September tranche. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3571). Year-end 2024 RPO plus OpenAI, Meta's first order and NVIDIA sums to about $58 billion, before netting 2025 revenue recognized. That leaves a gap plausibly filled by the unnamed financed contracts. The 'up to' ceilings also make it unclear how much sits in RPO rather than in optional capacity. Meta's $21 billion, Jane Street and Anthropic postdate the $60.7 billion figure and should not be read into it.
Customer disclosures, read
2026-10-03CoreWeave's record splits cleanly between executed order forms and softer relationship language. The binding agreements are order forms under existing master services agreements: OpenAI's March 2025 contract (claim 19820) and its September 2025 order form (claim 4296), Meta's September 2025 order form of up to $14.2 billion (claim 4282) and its March 31, 2026 order form of about $21 billion (claims 2123, 10340), and NVIDIA's September 2025 capacity order form (claim 4352). Jane Street's roughly $6 billion commitment (claim 10304) and the signed multi-year Anthropic agreement (claim 9318) are described as firm, though Anthropic carries no disclosed value. The rest is framing rather than contract. The IBM partnership (claim 4971), Core Scientific collaboration (claim 20313), NVIDIA's collaboration framework, which only commits to 'work towards' including CoreWeave software (claims 3892, 17598), the CrowdStrike partnership (claim 11768), Genesis Mission participation (claim 11778), and the 'partner of choice' rosters (claims 11767, 9320) carry no disclosed dollar commitments. Several financed obligations are never named: the contract behind DDTL 3.0 (claim 4595), the 'leading AI enterprise' behind DDTL 4.0 (claim 11224), and 'two large customer contracts' (claim 9119).
Concentration was extreme at the outset. OpenAI's $11.2 billion was about 43 percent of the $25.9 billion backlog reported for March 2025 (claims 4969, 4970). By year-end, OpenAI's up-to $22.4 billion (claim 20198), Meta's $14.2 billion and NVIDIA's $6.3 billion (claim 20209) totaled about $42.9 billion. That equals roughly 71 percent of the $60.7 billion RPO (claim 3571). The 2026 additions shift weight toward Meta, whose cumulative commitments approach $35 billion, rather than diversifying away from hyperscale buyers. NVIDIA's dual role as supplier and capacity buyer also warrants scrutiny.
The arithmetic broadly reconciles but has seams. RPO rose $45.6 billion during 2025, from $15.1 billion (claim 3572) to $60.7 billion, against about $42.9 billion of named additions. That is plausible once revenue recognized during the year is netted out, but the named figures are 'up to' ceilings, so they are not strictly comparable with RPO. OpenAI's initial deal appears as both $11.9 billion (claim 19820) and $11.2 billion (claim 4969). Separately, $22.4 billion less $11.9 billion and $6.5 billion leaves about $4 billion of OpenAI expansion that does not appear in this record. Claim 17654 also describes Meta's $21 billion as a fresh spending commitment, whereas the filings treat it as an expansion layered on the earlier order form.
Customer disclosures, read
2026-10-03CoreWeave's record is unusually rich in executed paper, though most of it sits with a few counterparties. The strongest evidence is a set of order forms under existing master services agreements. These cover OpenAI (claim 4296), Meta's initial up-to-$14.2 billion commitment through December 2031 (claim 4282), Meta's roughly $21 billion March 2026 order form running through December 2032 (claims 2123, 10340, 9317), and an NVIDIA capacity purchase (claim 4352). Jane Street's approximately $6 billion commitment (claim 10304) and the Anthropic agreement (claim 9318) are described as committed or signed. No dollar value is given for Anthropic. Softer language should be read differently. The IBM partnership (claim 4971), continued collaboration with Core Scientific (claim 20313), the NVIDIA collaboration framework that will only work towards reference-architecture inclusion (claims 3892, 17598), the CrowdStrike global partnership (claim 11768), Genesis Mission participation (claim 11778), and Exemplar Cloud designations (claims 10332, 9324) are relationship or status claims, not quantified contracts. The partner-of-choice logo lists (claims 11767, 10338, 9320) and the expanded relationships with Cohere and Mistral (claim 9319) name counterparties but attach no economics. Two financing disclosures go the other way, citing material contracts whose counterparty is not named. DDTL 3.0 funds an unidentified customer contract (claim 4595), and DDTL 4.0 serves a leading AI enterprise (claim 11224). Investors are asked to underwrite debt against a customer they cannot see. Concentration has been high and remains so. OpenAI's $11.2 billion was roughly 43 percent of the $25.9 billion March 2025 backlog (claims 4969, 4970). By December 2025, OpenAI's up-to-$22.4 billion (claim 20198) and Meta's $14.2 billion together equal about 60 percent of $60.7 billion in RPO (claim 3555). Meta's March 2026 expansion takes its disclosed commitments past $35 billion, so Jane Street and Anthropic diversify at the margin rather than structurally. The arithmetic only loosely reconciles. RPO rose $45.6 billion during 2025 (claim 3555). The named 2025 deals, OpenAI's $11.9 billion (claim 19820), its $6.5 billion expansion, Meta's $14.2 billion, and NVIDIA's $6.3 billion (claim 20209), sum to about $38.9 billion. The roughly $4 billion OpenAI tranche implied by the $22.4 billion total does not appear on record. Revenue recognized during the year would widen the unexplained residual further. The record also gives two figures for the original OpenAI deal, $11.9 billion versus $11.2 billion (claims 19820, 4969). Repeated up-to phrasing means some RPO may reflect ceilings rather than floors.
Customer disclosures, read
2026-10-02CoreWeave's signed-contract core is narrower than its partnership language suggests, but it is real. Three counterparties are documented through order forms under existing Master Services Agreements: OpenAI (claim 4296), Meta (claims 4282, 2123) and NVIDIA (claim 4352). Those filings are the evidentiary anchor. Anthropic is described as a signed multi-year agreement (claim 9318), but no value is disclosed. Jane Street's roughly $6 billion commitment (claim 10304) is named and sized, though the record rests on announcement and press language rather than a filed order form (claims 10730, 10695). Everything else is softer. The NVIDIA collaboration framework (claim 3892) and reference-architecture work (claim 17598) are cooperation, not revenue. The same applies to the IBM partnership (claim 4971), the CrowdStrike "global partnership" (claim 11768), Genesis Mission participation (claim 11778) and continued collaboration with Core Scientific (claim 20313). The "partner of choice" logo lists (claims 11767, 10338, 9320) name companies without contract terms. Two financing disclosures point to material contracts with unidentified parties: the "customer contract" behind DDTL 3.0 (claim 4595) and the "leading AI enterprise" behind DDTL 4.0 (claim 11224). Neither names the customer. Concentration has broadened from a near-single-customer book to a small club. In March 2025 OpenAI dominated (claim 19820). Meta arrived in September 2025 (claim 4282). By year-end, RPO had grown from $15.1 billion to $60.7 billion (claims 3572, 3555). OpenAI at up to $22.4 billion (claim 20198), Meta at up to $14.2 billion and NVIDIA at $6.3 billion (claim 20209) sum to about $42.9 billion, roughly 71% of that RPO. The March 2026 Meta order for about $21 billion (claims 2123, 10340), described as new rather than a restatement (claim 9317), would lift Meta to about $35 billion and make it the largest named exposure. The revenue arithmetic does not fully reconcile. OpenAI's initial deal is $11.9 billion in one disclosure (claim 19820) and $11.2 billion of backlog in another (claim 4969). Neither figure plus the $6.5 billion expansion reaches the stated $22.4 billion total, which leaves about $4 billion unattributed in this record. Backlog and RPO are also different measures. At March 2025, backlog was $25.9 billion against RPO of $14.7 billion (claim 4970), with the gap contingent on delivery and availability requirements. Repeated "up to" phrasing implies headline figures are ceilings rather than floors. The Meta, Jane Street and Anthropic deals post-date the December 2025 RPO and should appear in 2026 disclosures. The supplied record is truncated at claim 9121, so any later reconciliation is not reflected here.
Customer disclosures, read
2026-10-02CoreWeave's signed-contract record is narrower than its partnership vocabulary. The commitments documented as executed order forms under existing master services agreements come from four counterparties. OpenAI signed an initial deal recorded at $11.9 billion in the press release but at $11.2 billion of backlog in the filing (19820, 4969), then a September 2025 order form of up to roughly $6.5 billion, which brought commitments to up to $22.4 billion (4296, 20198). Meta signed up to $14.2 billion through December 2031 (4282, 20197) and a further order form of about $21 billion through 2032 on March 31, 2026 (2123, 10340, 9317). NVIDIA's $6.3 billion capacity purchase is an order form (4352, 20209). Jane Street committed about $6 billion (10304). Anthropic's agreement is described as signed but carries no disclosed value (9318), and the Cohere and Mistral expansions are likewise unquantified (9319). Everything else is softer. The January 2026 NVIDIA arrangement is a 'collaboration framework' with test-and-validate objectives (3892, 17598). IBM, CrowdStrike, Genesis Mission and Core Scientific are partnerships or participations with no economics attached (4971, 11768, 11778, 20313). The rotating 'partner of choice' logo lists name customers without commitments (11767, 9320). Several financings reference a material contract with an unnamed counterparty, either 'a customer contract' or a 'leading AI enterprise' (4595, 11224, 9119), so the largest debt-backed obligations are not tied to a disclosed name.
Concentration has shifted from one counterparty to two without diluting. At March 31, 2025, OpenAI's $11.2 billion was about 43% of $25.9 billion of backlog. Backlog less the OpenAI deal equals RPO exactly ($14.7 billion), which suggests the OpenAI deal sat outside RPO pending delivery conditions (4970). By December 31, 2025, RPO reached $60.7 billion against $15.1 billion a year earlier (3555, 3572). OpenAI and Meta ceilings alone total $36.6 billion, about 60% of that figure, and about 71% with NVIDIA included. Meta's March 2026 expansion pushes Meta's cumulative ceilings to about $35 billion.
The arithmetic broadly reconciles, but only if the 'up to' ceilings are booked near full value. Named deals leave roughly $18 billion of year-end RPO for all other customers, a plausible extension of the prior base. However, the OpenAI $11.9 versus $11.2 billion gap is unexplained. Several Meta and Jane Street figures rest on secondary press restatements (10729, 10730, 10694) rather than company text.
Customer disclosures, read
2026-10-02CoreWeave's record is unusually heavy with executed paper, but it mixes signed contracts with lighter partnership language. The firmest disclosures are order forms under existing master services agreements. These cover OpenAI (claim 4296), Meta (claims 4282 and 2123) and NVIDIA (claim 4352), and each states either a dollar ceiling or an execution date. Jane Street's roughly $6 billion commitment (claims 10304 and 10730) and the multi-year Anthropic agreement (claim 9318) are described as signed, though no value is disclosed for Anthropic. Weaker language covers the IBM partnership (claim 4971), Core Scientific collaboration (claim 20313), the NVIDIA collaboration framework that only 'works towards' inclusion in reference architectures (claims 3892 and 17598), the CrowdStrike 'global partnership' (claims 11768 and 10330), Genesis Mission participation (claim 11778) and the Exemplar Cloud designation (claims 10332 and 9324). None of these carries disclosed economics. The 'partner of choice' rosters (claims 11767, 10338 and 9320) and the 'expanded relationships' with Cohere and Mistral (claim 9319) name counterparties without contract terms. Two financing disclosures cite an unnamed 'customer contract' (claim 4595) and a 'leading AI enterprise' (claim 11224), so the counterparties that actually anchor the DDTL 3.0 and 4.0 debt are never identified. Concentration has become more extreme while also widening. In March 2025 OpenAI was effectively the only named anchor. By November 2025 the company cited OpenAI at up to $22.4 billion (claim 20198), Meta at up to $14.2 billion (claim 20197) and NVIDIA at $6.3 billion (claim 20209), about $42.9 billion in total. That equals roughly 71% of the $60.7 billion RPO at year-end 2025 (claim 3555), if those 'up to' ceilings sit fully in RPO. Meta's further $21 billion order, signed March 31, 2026 (claims 2123 and 9317), would take its total to about $35 billion, so Meta now overtakes OpenAI as the largest single exposure. The revenue arithmetic does not reconcile cleanly. The OpenAI deal was announced at $11.9 billion (claim 19820) but booked as $11.2 billion of backlog (claim 4969). RPO actually fell from $15.1 billion (claim 3572) to $14.7 billion (claim 4970) in the quarter the OpenAI deal closed. That suggests the deal initially sat in the conditional 'other amounts' portion of backlog rather than in RPO. The 'up to' phrasing throughout means headline totals are maximum figures, not guaranteed revenue. No post-March 2026 RPO figure is on record, so the Meta expansion, the Jane Street commitment and the Anthropic deal cannot yet be tested against reported obligations.
Customer disclosures, read
2026-10-02CoreWeave's record separates into two groups. One is contracts executed under master services agreements. The other is partnership and logo language that carries no disclosed economics. The firmest evidence is the order forms filed with the SEC: OpenAI (4296), Meta's initial order form for up to $14.2 billion through December 2031 (4282), Meta's March 31, 2026 order form (2123) valued at roughly $21 billion (10340, 9317), and an NVIDIA capacity order form (4352). Jane Street's roughly $6 billion commitment (10304) and the Anthropic agreement (9318) are described as signed, but Anthropic's value is never disclosed. NVIDIA's later items read differently. The $6.3 billion "strategic collaboration" (20209) and the January 2026 "collaboration framework" (3892, 17596, 17598) use framework language, and the latter commits to testing and validation rather than spend.
The softer layer is large. IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), the Genesis Mission (11778, 10331) and the Exemplar Cloud designation (10332, 9324) are partnerships, memberships or badges. The recurring "partner of choice" logo lists (11767, 10338, 9320) and the Cohere/Mistral "expanded relationships" (9319) name counterparties but give no terms. Two financing disclosures fund contracts with counterparties that go unnamed: "a customer contract" behind DDTL 3.0 (4595) and a "leading AI enterprise" behind DDTL 4.0 (11224). These are material obligations whose counterparty the reader has to infer.
Concentration has moved from one anchor to two. In early 2025, OpenAI alone accounted for most of the incremental backlog (4969). By late 2025, OpenAI had reached up to about $22.4 billion (20198) and Meta $14.2 billion. After March 2026, Meta's stated commitments total about $35 billion, overtaking OpenAI. Most headline values are "up to" figures, which caps them rather than guaranteeing them.
The arithmetic broadly reconciles, with caveats. RPO of $60.7 billion at December 31, 2025 (3555) compares with about $43 billion from OpenAI, Meta's first order form and NVIDIA. That leaves about $18 billion for the legacy book and smaller customers, which is plausible given $15.1 billion of RPO a year earlier (3572). The OpenAI figure itself is inconsistent: $11.9 billion in one disclosure (19820) and $11.2 billion of backlog in another (4969). March 2025 backlog of $25.9 billion included only $14.7 billion of RPO (4970), so headline deal values can sit outside RPO until delivery conditions are met. Claim 10729 is dated before the March 2026 Meta expansion it describes, and several values (10729, 3555) carry unit-scaling errors in the record.
Customer disclosures, read
2026-10-01CoreWeave's signed-contract record rests on three counterparties: OpenAI, Meta, and NVIDIA. Each is documented through order forms under existing Master Services Agreements. OpenAI's are claims 4296 and 19820, Meta's are 4282 and 2123, and NVIDIA's is 4352. The company calls OpenAI's total commitment "up to approximately $22.4 billion" (claim 20198). That figure does not cleanly reconcile with the record. The original contract is booked at $11.9 billion (claim 19820) but appears as $11.2 billion of added backlog (claim 4969). The $6.5 billion expansion leaves roughly $4 billion of OpenAI commitments with no matching claim. Meta's first order form, $14.2 billion through December 2031 (claim 4282), was followed by a roughly $21 billion order dated March 31, 2026 (claims 2123, 10340), putting Meta near $35 billion. NVIDIA's $6.3 billion "strategic collaboration" (claim 20209) and later "collaboration framework" (claim 3892) are framework-style language. That relationship is circular because NVIDIA is also CoreWeave's supplier, so it should be weighed differently from arm's-length demand. Below that tier, Jane Street's roughly $6 billion commitment (claim 10304) is named and sized. Anthropic's "multi-year agreement" is described as signed (claim 9318) but no dollar figure is attached. IBM (claim 4971), CrowdStrike (claim 11768), and Core Scientific (claim 20313) appear only as "partnerships." The logo lists of "partner of choice" names (claims 11767, 9320) and the Genesis Mission and Exemplar Cloud designations (claims 11778, 9324) are not contract disclosures. Several financings point to customers left unnamed: "a customer contract" for DDTL 3.0 (claim 4595), a "leading AI enterprise" for DDTL 4.0 (claim 11224), and "two large customer contracts" (claim 9119, truncated). Concentration has moved from one name to two. In March 2025, OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog (claims 4969, 4970). Remaining performance obligations then grew from $15.1 billion to $60.7 billion by December 31, 2025 (claims 3555, 3572). Even counting Meta's first order and OpenAI's full ceiling, OpenAI and Meta account for about $36.6 billion, roughly 60% of that total. Meta's $21 billion and Jane Street's $6 billion came after year-end and will add further weight at the top. The arithmetic only partly reconciles. Much of the headline figures are "up to" ceilings, while RPO reflects contracted amounts, so treating the ceilings as RPO probably overstates named-customer coverage. That leaves about $24 billion of year-end RPO either attributed to unnamed counterparties or explained by the gap between ceilings and recognized obligations.
Customer disclosures, read
2026-10-01CoreWeave's record contains a small set of signed, dollar-denominated order forms and a much larger set of looser relationship language. The signed tier is clear. OpenAI's agreements were filed as order forms under an existing MSA (19820, 4296), and the company now cites commitments of up to about $22.4 billion (20198). Meta signed an up-to-$14.2 billion order form running through December 2031 (4282) and a roughly $21 billion order form dated March 31, 2026, running through 2032 (2123, 10340). NVIDIA signed a $6.3 billion capacity order form under its own MSA (4352, 20209), which makes CoreWeave's key supplier also a material customer. Jane Street committed about $6 billion (10304). Anthropic signed a multi-year agreement with no disclosed value (9318).
Everything else is softer. These include the NVIDIA 'collaboration framework' and reference-architecture work (3892, 17596, 17598), the IBM and CrowdStrike 'partnerships' (4971, 11768), Genesis Mission participation (11778), and continued 'collaboration' with Core Scientific (20313). None of them carries a value or confirms a contract. The 'partner of choice' logo lists (11767, 9320) and the 'expanded relationships' with Cohere and Mistral (9319) do not establish contract size. Two financings are tied to unnamed counterparties: DDTL 3.0 funds 'a customer contract' (4595), and DDTL 4.0 serves a 'leading AI enterprise' (11224). Readers should not assume which counterparty either refers to.
Concentration has shifted, but it remains high. Through 2025, OpenAI, Meta and NVIDIA account for roughly $42.9 billion of named ceilings, about 71% of the $60.7 billion in year-end RPO (3555). In 2026, Meta's expansion lifts it to about $35.2 billion and makes it the largest named counterparty. Jane Street and Anthropic widen the base only modestly.
The arithmetic only partly reconciles. The initial OpenAI figure appears as $11.9 billion (19820) and also as $11.2 billion of added backlog (4969). Adding the $6.5 billion expansion to either figure falls short of $22.4 billion, which implies roughly $4 billion of OpenAI commitments that are not in this record. RPO rose from $15.1 billion to $60.7 billion (3572, 3555). Named 2025 deals explain most of that $45.6 billion increase, but only if each 'up to' ceiling is booked in full. That would leave little room for other customers or for revenue recognized during the year. Earlier backlog figures also mixed RPO with amounts contingent on delivery (4970). Some secondary coverage merges the $14.2 billion and $21 billion Meta deals into one figure (17654, 17655), but the filings show two separate order forms.
Customer disclosures, read
2026-10-01CoreWeave's announced deal flow rests on a small number of order forms signed under existing master services agreements, surrounded by a wider ring of partnership language that carries no disclosed economics.
The signed contracts are with OpenAI, Meta, NVIDIA and Jane Street. OpenAI's March 2025 agreement was valued at $11.9 billion (claim 19820) but booked as $11.2 billion of backlog (claim 4969), a gap the record does not explain. It was followed by a September 2025 order form (claim 4296) and an expansion of up to $6.5 billion, which brought total OpenAI commitments to up to $22.4 billion (claim 20198). Meta signed an order form for up to $14.2 billion through 2031 (claim 4282) and a second, roughly $21 billion order form on March 31, 2026 (claims 2123, 9317). Several later items (claims 10729, 10694, 10340, 17654, 17655) restate those same two Meta contracts and should not be counted again. NVIDIA's September 2025 capacity order form (claim 4352) appears to be the $6.3 billion collaboration (claim 20209). Jane Street committed about $6 billion (claim 10304). The Anthropic agreement is described as signed (claim 9318), but its value is undisclosed.
The softer material is a different category. It includes the January 2026 NVIDIA "collaboration framework" (claim 3892), the IBM and CrowdStrike "partnerships" (claims 4971, 11768), Genesis Mission participation (claim 11778), continued collaboration with Core Scientific (claim 20313), and logo lists of customers with no contract values (claims 11767, 9320, 9319). Three financing-linked disclosures leave the counterparty unnamed: "a customer contract" (claim 4595), a "leading AI enterprise" (claim 11224) and "two large customer contracts" (claim 9119).
Concentration remains heavy even as it shifts. In early 2025 the book was effectively OpenAI. By the end of 2025, OpenAI's up-to $22.4 billion amounted to roughly 37% of $60.7 billion in RPO (claim 3555), and Meta's $14.2 billion to about 23%. The March 2026 Meta order lifts Meta's cumulative commitments to roughly $35 billion, likely making it the largest counterparty.
The arithmetic broadly reconciles, with one caveat. RPO rose by $45.6 billion in 2025 (claims 3572, 3555), while the named OpenAI, Meta and NVIDIA signings that year total about $42.9 billion. That leaves little room for every other customer, especially after netting out revenue recognized during the year. Those deal values are also expressed as "up to" figures. Separately, RPO slipped to $14.7 billion in March 2025 even as backlog reached $25.9 billion (claim 4970). That pattern suggests the first OpenAI deal initially sat in delivery-contingent backlog rather than in RPO.
Customer disclosures, read
2026-10-01CoreWeave's record contains real signed contracts, but they sit among partnership, framework and logo-list language that should not be counted the same way. The executed agreements are order forms under existing master services agreements with OpenAI (claims 19820, 4296), Meta (4282, 2123) and NVIDIA (4352). The amounts are disclosed: OpenAI up to roughly $22.4 billion cumulative (20198), Meta up to $14.2 billion followed by a roughly $21 billion March 2026 order (10340, 9317), and NVIDIA $6.3 billion (20209). Jane Street's roughly $6 billion commitment (10304) is also described as committed. The Anthropic deal is called a signed multi-year agreement (9318), but no value is given. Everything else is softer. The IBM tie-up is a "partnership" (4971). CrowdStrike is a "global partnership" (11768, 10330). The January 2026 NVIDIA expansion is explicitly a "collaboration framework" (3892), and part of it only commits the parties to "work towards" reference-architecture inclusion (17598). Genesis Mission is participation in an initiative (11778). The "partner of choice" lists naming Cursor, Midjourney, Perplexity and others (11767, 9320) carry no contract terms. Several material obligations are tied to counterparties the company does not name. DDTL 3.0 financed "a customer contract" (4595), DDTL 4.0 serves a "leading AI enterprise" (11224), and a later filing cites "two large customer contracts" (9119). In each case, readers cannot tell whether these are the named deals above or additional ones.
Concentration was extreme early on and has moved toward two names rather than spreading out. At March 31, 2025, the OpenAI deal alone was about 43% of $25.9 billion of backlog (4969, 4970). By December 31, 2025, RPO had reached $60.7 billion (3555). The OpenAI, Meta and NVIDIA ceilings sum to about $42.9 billion of that, roughly 70%. That share is overstated to the extent the deals are "up to" figures, and RPO is a narrower measure than backlog. After the March 2026 Meta order, Meta's cumulative commitments of about $35 billion likely surpass OpenAI's.
The arithmetic holds together only loosely. The first OpenAI deal appears as $11.9 billion in one source (19820) and $11.2 billion of backlog in another (4969). The $22.4 billion cumulative figure implies the September 2025 order form (4296) was worth around $4 billion, but that number is never stated. Secondary coverage blurs the original $14.2 billion Meta order with the separate $21 billion expansion (17655, 17654). One claim also dates the March 2026 Meta expansion to March 1 (10729), while the order form itself is dated March 31 (2123). Finally, about $18 billion of December 2025 RPO cannot be tied to any named counterparty in the record.
Customer disclosures, read
2026-09-30CoreWeave's disclosed signed commitments come from a small number of named counterparties, and most are documented as order forms under existing master services agreements. OpenAI is the clearest case. It has an initial agreement described at $11.9 billion in one filing (19820) and $11.2 billion of backlog in another (4969), a September 2025 order form (4296), and a further expansion of up to $6.5 billion that brings its total to up to $22.4 billion (20198). Meta signed an order form worth up to $14.2 billion through December 2031 (4282, 17655) and a separate March 31, 2026 order form of about $21 billion running through 2032 (2123, 10340, 9317). NVIDIA's $6.3 billion order form (4352, 20209) is contractual. Its January 2026 expansion, however, is a collaboration framework (3892) with work-towards language on reference architectures (17598). NVIDIA is also CoreWeave's GPU supplier, so its role as a customer deserves separate scrutiny. Jane Street's roughly $6 billion commitment (10304, 10730) and the Anthropic agreement (9318, 10731) are described as signed, but Anthropic's value is undisclosed. Softer language covers IBM (4971), CrowdStrike (11768, 10330), Core Scientific (20313), the Genesis Mission (11778), and the logo lists and expanded relationships with Cohere, Mistral and others (11767, 9320, 9319), none of which carries a dollar figure. Two financing disclosures tie debt to unnamed counterparties: a customer contract for DDTL 3.0 (4595) and a leading AI enterprise for DDTL 4.0 (11224). Readers cannot tell whether these are OpenAI, Meta, or someone else. Concentration has intensified rather than diversified. In March 2025, OpenAI's $11.2 billion was about 43% of $25.9 billion of backlog (4969, 4970). By December 2025, OpenAI's up-to $22.4 billion, Meta's up-to $14.2 billion and NVIDIA's $6.3 billion total about $42.9 billion, roughly 71% of the $60.7 billion RPO (3555, 3572). The arithmetic reconciles only loosely. The up-to amounts are ceilings, and backlog has included amounts beyond RPO that depend on delivery conditions (4970). Some OpenAI value has presumably already been recognized, and the $11.9 billion versus $11.2 billion gap is unexplained. The 2026 additions of Meta's $21 billion, Jane Street's $6 billion and Anthropic come after the latest RPO figure and have not yet been tested against a reported balance. On headline figures, Meta and OpenAI together account for about $57.6 billion of named commitments. Meta's further expansion option (4283) remains optional and should not be counted.
Customer disclosures, read
2026-09-30CoreWeave's record separates cleanly into signed order forms with named, sized counterparties and softer language that carries no disclosed value. The contracts with the strongest evidence are OpenAI, Meta and NVIDIA, each documented as order forms under existing master services agreements (claims 4296, 2123, 4352). OpenAI's commitments reach up to approximately $22.4 billion (20198). Meta committed up to $14.2 billion through 2031 (4282), then signed a new $21 billion order form in March 2026 (9317, 10340). NVIDIA's $6.3 billion capacity purchase (4352, 20209) is contracted, but the January 2026 NVIDIA "collaboration framework" (3892, 17596) and the pledge to "work towards" reference-architecture inclusion (17598) are frameworks, not revenue. Jane Street's roughly $6 billion commitment (10304) is named and sized. Anthropic's agreement is described as signed and multi-year (9318), but no value is given.
The weaker layer is larger than it looks. The IBM partnership (4971), Core Scientific collaboration (20313), CrowdStrike "global partnership" (11768), Genesis Mission participation (11778), and the "partner of choice" logo lists naming Cognition, Cursor, Perplexity and others (11767, 9320) have no contract values attached. Cohere and Mistral "expanded relationships" (9319) are also unsized. Two financing disclosures cite an unidentified "customer contract" (4595) and a "leading AI enterprise" (11224). These are material enough to justify dedicated delayed-draw term loans, yet the counterparties are never named. The DDTL banks (11225) are lenders, not customers.
Concentration has shifted from OpenAI-dominant in early 2025 to a Meta-OpenAI duopoly. If the March 2026 $21 billion is incremental, as the "new commitment" wording suggests (9317), Meta's roughly $35 billion now exceeds OpenAI's. Some coverage frames it as an expansion "by about $21 billion" (10729), which leaves that reading slightly ambiguous.
The arithmetic mostly holds, with two frictions. OpenAI's initial deal was reported at $11.9 billion (19820) but booked as $11.2 billion of backlog (4969). Adding $6.5 billion to $11.9 billion gives $18.4 billion, not $22.4 billion, so about $4 billion of intermediate OpenAI expansion is not itemized here. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3571), an increase of $45.6 billion. Named 2025 deals total about $42.9 billion, and 2025 revenue also drew down backlog, so unnamed contracts must account for a meaningful share of bookings. Most headline figures are "up to" ceilings, so realized value depends on delivery conditions (4970).
Customer disclosures, read
2026-09-30CoreWeave's contract record separates cleanly into two tiers. The first tier is signed order forms under existing master services agreements, disclosed in 8-Ks. These include OpenAI (claims 19820, 4296), Meta (claims 4282, 2123) and NVIDIA's capacity purchase (claim 4352). They carry dollar figures and end dates. Meta's initial commitment runs to about $14.2 billion through December 14, 2031 (claim 4282), and a March 31, 2026 order form adds roughly $21 billion through December 2032 (claims 2123, 10340). Jane Street's approximately $6 billion commitment (claim 10304) also reads as a signed agreement. Anthropic's multi-year agreement is described as signed (claim 9318) but has no disclosed value.
The second tier is softer. It includes the NVIDIA 'collaboration framework' (claim 3892), which is separate from the $6.3 billion order (claim 20209). It also covers the IBM and CrowdStrike 'partnerships' (claims 4971, 11768), continued collaboration with Core Scientific (claim 20313), Genesis Mission participation (claim 11778), and the Exemplar Cloud designation (claim 10332). Logo lists of 'partners of choice' also belong here, such as Cursor, Midjourney, Perplexity and Hudson River Trading (claims 11767, 9320). None of these carries a disclosed amount, so none should be read as backlog.
Several material contracts are left unnamed. DDTL 3.0 financed 'a customer contract' (claim 4595). DDTL 4.0 funds services for a 'leading AI enterprise' (claim 11224). A later filing references 'two large customer contracts' (claim 9119). Whether these map to OpenAI, Meta or someone else is not stated.
Concentration has shifted from OpenAI to Meta without spreading out much. OpenAI totals reach up to about $22.4 billion (claim 20198), and Meta now stands near $35.2 billion combined. The OpenAI arithmetic also has gaps. The $11.9 billion announcement (claim 19820) becomes $11.2 billion of backlog (claim 4969). Adding the $6.5 billion expansion to $11.9 billion gives only $18.4 billion, which implies an interim tranche of about $4 billion that is not on this record.
RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3560). The named 2025 deals are OpenAI up to $22.4 billion, Meta $14.2 billion and NVIDIA $6.3 billion, about $42.9 billion together. Adding those to opening RPO roughly bridges to the year-end figure before subtracting recognized revenue. Two caveats keep this directional only. Many of the figures are 'up to' ceilings, and 2025 revenue burn is not in the record. Even on these numbers, three counterparties account for about 71% of year-end RPO.
Customer disclosures, read
2026-09-29CoreWeave's record separates cleanly into executed order forms and softer partnership language, and the two should not be weighted equally. The executed contracts are order forms under existing Master Services Agreements with three counterparties. OpenAI signed one in March 2025 for $11.9 billion (19820) and another on September 23, 2025 (4296). Meta signed one for up to about $14.2 billion through December 2031 (4282) and another on March 31, 2026 (2123), described as about $21 billion through 2032 (10340). NVIDIA signed a capacity-purchase order form (4352). Jane Street's roughly $6 billion commitment (10304) is named and sized, but the record contains no order-form filing for it. Anthropic's multi-year agreement is described as signed (9318) but carries no dollar value. Everything else uses softer language. NVIDIA's January 2026 arrangement is explicitly a "collaboration framework" (3892, 17596). IBM (4971) and CrowdStrike (11768) are "partnerships" with no value attached. Core Scientific is framed as continued collaboration (20313). The Genesis Mission is a government initiative, not a customer (11778). The logo lists naming Cognition, Cursor, Perplexity and others (11767, 9320, 9319) disclose no terms. Several of the most consequential contracts are unnamed: a "customer contract" behind DDTL 3.0 (4595), a "leading AI enterprise" behind DDTL 4.0 (11224), and "two large customer contracts" (9119; the record is truncated at that claim). Concentration has shifted. Meta has overtaken OpenAI, with roughly $35 billion in cumulative commitments against OpenAI's stated $22.4 billion (20198). Jane Street and Anthropic add some breadth, but the book remains dominated by two or three hyperscale buyers. The revenue arithmetic does not fully reconcile. OpenAI's initial deal appears as $11.9 billion in one disclosure (19820) and as $11.2 billion of backlog in another (4969). The later $6.5 billion expansion is said to bring the total to $22.4 billion (20198), which leaves roughly $4 billion unaccounted for in the claims on record. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of about $45.6 billion. The named 2025 deals (OpenAI's $22.4 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion, per 20209) total about $43 billion before netting revenue recognized during the year. That leaves a gap of several billion dollars, most plausibly filled by the unnamed financed contracts. The earlier backlog figure of $25.9 billion also exceeded RPO of $14.7 billion (4970) because it included amounts conditional on delivery, so headline deal values should not be read as firm RPO.
Customer disclosures, read
2026-09-29CoreWeave's disclosed book rests on a small number of executed order forms under existing Master Services Agreements. The rest of its partnership vocabulary should be read as something softer. The hardest evidence is the 8-K language on three counterparties. OpenAI signed an order form on September 23, 2025 (claim 4296), following the March agreement (claims 19820, 4969). Meta signed order forms carrying an up-to $14.2 billion commitment through December 2031 (claim 4282) and a further roughly $21 billion commitment on March 31, 2026 (claims 2123, 9317, 10340). NVIDIA's September 2025 order form is a capacity purchase by a supplier-investor rather than an arm's-length end customer (claim 4352). Jane Street's approximately $6 billion commitment (claim 10304) and the signed Anthropic agreement (claim 9318) are named and described as committed. The Anthropic deal carries no disclosed value. Against these, the NVIDIA 'collaboration framework' and reference-architecture work toward inclusion (claims 3892, 17596, 17598) are framework language. So are the IBM, CrowdStrike and Core Scientific 'partnerships' (claims 4971, 11768, 20313), Genesis Mission participation (claim 11778), and the rotating 'partner of choice' logo lists (claims 11767, 9320). None discloses a dollar commitment. Cohere and Mistral appear only as 'expanded relationships' (claim 9319). Several of the most capital-intensive obligations are unnamed. DDTL 3.0 finances 'a customer contract' (claim 4595), and DDTL 4.0 serves a 'leading AI enterprise' (claim 11224). Another disclosure references 'two large customer contracts' (claim 9119), and the record for that claim is truncated. Concentration has broadened in name but not obviously in weight. In early 2025, OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog (claims 4969, 4970). By late 2025, OpenAI's up-to $22.4 billion (claim 20198) plus Meta's $14.2 billion equal about 60% of the $60.7 billion year-end RPO (claim 3555). Adding NVIDIA's $6.3 billion (claim 20209) brings that to roughly 70%. Meta's 2026 expansion makes it the single largest disclosed counterparty. The arithmetic only loosely reconciles. RPO rose $45.6 billion during 2025 (claims 3572, 3555). The identified 2025 deals sum to roughly $39 billion, which leaves a gap, before revenue burn, that the named list does not explain. OpenAI's own figures diverge: $11.9 billion versus $11.2 billion for the initial deal (claims 19820, 4969). Its $22.4 billion cumulative total also implies an unitemized tranche of about $4 billion. Many headline figures are 'up to' ceilings. Backlog also includes amounts contingent on delivery, beyond contractual RPO (claim 4970). Finally, the record does not settle whether Meta's $21 billion adds to the $14.2 billion or partly overlaps it (claims 17654, 17655).
Customer disclosures, read
2026-09-29CoreWeave's record splits into a small set of contracts backed by filed order forms and a much larger ring of partnership and logo language. Only a few are documented as executed order forms under existing master services agreements. These are OpenAI (claim 4296), Meta in September 2025 at up to about $14.2 billion through December 2031 (claims 4282, 17655) and again on March 31, 2026 at about $21 billion through December 2032 (claims 2123, 10340), and NVIDIA (claim 4352). Several secondary items repeat the same Meta $21 billion tranche (claims 10729, 10694, 17654, 9317) and should not be counted twice. Jane Street's roughly $6 billion commitment is named and sized (claim 10304). Anthropic is named as a signed multi-year agreement but with no value (claims 9318, 10731).
The rest is softer. The IBM Granite partnership (claim 4971), the CrowdStrike global partnership (claims 11768, 10330), the Genesis Mission (claims 11778, 10331) and the Core Scientific collaboration (claim 20313) carry no dollar terms. The January 2026 NVIDIA arrangement is explicitly a collaboration framework (claim 3892) and only commits to work towards reference-architecture inclusion (claim 17598). The "partner of choice" rosters (claims 11767, 9320, 9319) are logo lists, not contract disclosures. The counterparties that most directly drive capital spending stay unnamed. Examples include the customer financed by DDTL 3.0 (claim 4595), the "leading AI enterprise" behind DDTL 4.0 (claim 11224) and two large contracts in claim 9119, which is truncated in this record.
Concentration has shifted from OpenAI-led in early 2025 to a Meta-and-OpenAI duopoly. Meta's named commitments total about $35.2 billion, against up to $22.4 billion for OpenAI (claim 20198). NVIDIA's $6.3 billion (claim 20209) is a supplier also acting as a buyer of capacity, which weakens it as independent demand.
The arithmetic only partly reconciles. OpenAI is $11.9 billion in claim 19820 but $11.2 billion in claim 4969. Adding $6.5 billion to $11.9 billion gives $18.4 billion, not $22.4 billion, so an intermediate tranche of about $4 billion is missing from this record. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3555, 3572), a $45.6 billion increase. The named 2025 deals cover roughly $42.9 billion before subtracting revenue recognized during the year, which this record does not provide, so part of the increase likely comes from unnamed contracts. The $25.9 billion backlog figure (claim 4970) also includes non-RPO amounts that depend on delivery conditions. "Up to" wording across the Meta and OpenAI deals means the headline figures are ceilings rather than guaranteed revenue.
Customer disclosures, read
2026-09-29CoreWeave's signed-contract base is narrower than its partnership roster suggests. Only four counterparties carry both a name and a dollar figure backed by an executed order form under an existing master services agreement: OpenAI (claims 19820, 4296, 20198), Meta (4282, 2123, 10340), NVIDIA (4352, 20209) and Jane Street (10304). Anthropic is described as a signed multi-year agreement (9318) but no value is disclosed. The rest of the record uses softer language. IBM (4971), CrowdStrike (11768, 10330) and Core Scientific (20313) are 'partnerships' or 'collaboration.' The January 2026 NVIDIA arrangement is explicitly a 'collaboration framework' whose software commitments are to 'work towards' inclusion (3892, 17598). Genesis Mission and Exemplar Cloud are program memberships or designations, not revenue contracts (11778, 10332, 9324). The logo lists naming Cursor, Perplexity, Mistral and others carry no amounts (11767, 9320, 9319). Three material contracts go unnamed: the customer financed by DDTL 3.0 (4595), the 'leading AI enterprise' behind DDTL 4.0 (11224), and 'two large customer contracts' (9119, which is truncated in the record).
Concentration has changed hands rather than eased. In March 2025, OpenAI's $11.2 billion accounted for roughly 43% of $25.9 billion in backlog (4969, 4970). By year-end, OpenAI's up-to-$22.4 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion summed to about $42.9 billion, roughly 71% of the $60.7 billion RPO (3555). NVIDIA is also CoreWeave's GPU supplier, which makes it a circular counterparty. The March 2026 Meta order form for about $21 billion (9317, 10340) makes Meta, not OpenAI, the largest named exposure, at roughly $35 billion if the new form is additive to the 2025 one. The record implies it is additive but never states a cumulative figure (17654, 17655).
The arithmetic reconciles only loosely. OpenAI's initial deal appears as $11.9 billion in one filing (19820) and $11.2 billion of backlog in another (4969). Adding $6.5 billion to $11.9 billion gives $18.4 billion, not the stated $22.4 billion total (20198), so an increment of about $4 billion is missing from the record. RPO grew $45.6 billion during 2025 (3572, 3571), which is broadly consistent with the named 2025 deals net of recognized revenue. However, most of those figures are 'up to' ceilings, and the backlog metric counts conditional amounts that sit outside RPO (4970). No post-December-2025 RPO appears in the record, so the Meta and Jane Street additions cannot yet be tested against disclosed obligations.
Customer disclosures, read
2026-09-27CoreWeave's signed commitments are concentrated in a small number of order forms executed under existing Master Services Agreements. The record ties those to four named counterparties. OpenAI has a March 2025 agreement (claim 19820) and a September 2025 order form (claim 4296). Meta has a September 2025 order form (claims 4282, 4283) and a March 31, 2026 order form (claims 2123, 10340). NVIDIA has a September 2025 capacity order form (claim 4352), which the company later sized at $6.3 billion (claim 20209). Jane Street's roughly $6 billion commitment (claim 10304) is the fourth. Everything else carries softer language. The January 2026 NVIDIA relationship is a "collaboration framework" whose stated deliverables are testing and validation work (claims 3892, 17596, 17598). IBM (claim 4971), CrowdStrike (claims 11768, 10330), Core Scientific (claim 20313) and the DOE Genesis Mission (claims 11778, 10331) are described as partnerships or participation, with no dollar value or term. Anthropic's "multi-year agreement" (claims 9318, 10731) is signed but unpriced. The logo lists naming Cursor, Perplexity, Hudson River Trading and others as organizations for which CoreWeave is "partner of choice" (claims 11767, 10338, 9320) are marketing, not contract disclosures. Two contracts that justified debt financing are left unnamed. DDTL 3.0 financed "a customer contract" (claim 4595), and DDTL 4.0 serves a "leading AI enterprise" (claim 11224), so a reader cannot attribute that leverage to a specific counterparty. Concentration shifted from OpenAI toward Meta but did not broaden. OpenAI's commitments reached up to $22.4 billion (claim 20198). Meta's two tranches sum to roughly $35.2 billion. Against the $60.7 billion of RPO at December 31, 2025 (claim 3555), OpenAI plus the first Meta tranche plus NVIDIA come to about $42.9 billion, roughly 70 percent. That figure is directionally useful but not exact, because the OpenAI and Meta amounts are "up to" ceilings. The OpenAI arithmetic does not fully reconcile on the record. The $11.9 billion initial contract (claim 19820) and the $6.5 billion expansion (claim 20198) sum to $18.4 billion, which implies an undisclosed tranche of about $4 billion, plausibly the September 2025 order form (claim 4296). The company also booked $11.2 billion, not $11.9 billion, into backlog (claim 4969). RPO rose by $45.6 billion during 2025 (claims 3555, 3572), which is consistent with the named OpenAI, Meta and NVIDIA signings. The Meta $21 billion, Jane Street and Anthropic deals came after year end, and no later RPO figure in this record lets them be tested. Some secondary-source claims are dated before the Meta order form they describe (claim 10729). The claim list is also truncated at claim 9121, so any later disclosures are not reflected here.
Customer disclosures, read
2026-09-27CoreWeave's signed-contract record is thick and specific, but several of its headline 'partnerships' are not customer agreements. The OpenAI, Meta and NVIDIA relationships are documented as order forms under existing Master Services Agreements (claims 4296, 4282, 4352, 2123). These are the hard contracts. OpenAI's disclosed commitment grew from $11.9 billion in March 2025 (19820), booked as $11.2 billion of backlog (4969), to up to $22.4 billion after a further up to $6.5 billion (20198). That arithmetic implies roughly $4 billion from the September 2025 order form, which is never separately quantified. Meta's $14.2 billion order form (4282) was followed by a roughly $21 billion order form signed March 31, 2026 (2123, 10340, 9317). The 'option to materially expand' (4283) was not itself a commitment. Jane Street's roughly $6 billion (10304) and Anthropic's unpriced multi-year agreement (9318) are also described as signed.
Softer language covers much of the remaining record. IBM (4971), CrowdStrike (11768), Core Scientific (20313) and the Genesis Mission (11778) are presented as partnerships or collaborations with no contract value. The January 2026 NVIDIA 'collaboration framework' (3892, 17596, 17598) is explicitly framework language and should not be confused with the $6.3 billion order form (20209). The 'partner of choice' logo lists (11767, 9320) and the 'expanded relationships' with Cohere and Mistral (9319) establish usage, not committed dollars. Two financing-linked contracts remain unidentified. One is the 'customer contract' behind DDTL 3.0 (4595). The other is the 'leading AI enterprise' behind DDTL 4.0 (11224).
Concentration has shifted rather than diluted. In March 2025, OpenAI alone was about 43% of the $25.9 billion backlog (4970, 4969). By December 2025, RPO had risen to $60.7 billion from $15.1 billion (3555), an increase of $45.6 billion. The named 2025 deals, OpenAI's $22.4 billion, Meta's $14.2 billion and NVIDIA's $6.3 billion, total about $42.9 billion. That is roughly 70% of year-end RPO. Many of these amounts are 'up to' figures, so recognized RPO may be lower. In 2026, Meta's cumulative roughly $35 billion overtook OpenAI as the largest disclosed counterparty. Jane Street's $6 billion only modestly broadens the base.
The revenue arithmetic broadly reconciles with the disclosed deals. $60.7 billion over a roughly five-year weighted duration (3561) implies about $12 billion of annual contracted revenue, assuming delivery. Two caveats remain. The gap between the $11.9 billion and $11.2 billion OpenAI figures is unexplained. Claim 10729 is dated March 1, 2026, yet it describes the Meta expansion signed March 31, which suggests a source-dating error.
Customer disclosures, read
2026-09-27CoreWeave's signed-contract record is unusually well documented, because most of its large deals appear as order forms filed under existing master services agreements. The OpenAI relationship began with an $11.9 billion agreement (claim 19820), which was booked as $11.2 billion of added backlog (claim 4969); the gap between those two figures has not been explained. A second OpenAI order form followed (claim 4296), and total OpenAI commitments reached up to about $22.4 billion (claim 20198). Meta signed an order form for up to $14.2 billion through 2031 (claims 4282, 17655), then a further roughly $21 billion order form on March 31, 2026 (claims 2123, 10340, 9317). NVIDIA's $6.3 billion capacity purchase was also executed as an order form (claims 4352, 20209). Jane Street committed about $6 billion (claim 10304). Anthropic signed a multi-year agreement with no disclosed value (claim 9318).
A second tier of announcements is softer. The January 2026 NVIDIA expansion is a collaboration framework (claim 3892), and its software commitments only 'work towards' inclusion in NVIDIA reference architectures (claim 17598). IBM (claim 4971), CrowdStrike (claim 11768), Core Scientific (claim 20313) and the Genesis Mission (claim 11778) are described as partnerships or initiatives, with no contract value attached. The logo lists (claims 11767, 9320) and the 'expanded relationships' with Cohere and Mistral (claim 9319) name counterparties but not terms. Going the other way, two debt facilities were raised against contracts whose counterparty is not named: 'a customer contract' (claim 4595) and a 'leading AI enterprise' (claim 11224).
Concentration has moved from OpenAI dominance in early 2025 to an OpenAI–Meta duopoly. By March 2026, Meta's cumulative named commitments of roughly $35 billion exceed OpenAI's $22.4 billion. Jane Street and Anthropic diversify the book only at the margin.
The 2025 arithmetic broadly reconciles. RPO rose from $15.1 billion to $60.7 billion (claims 3555, 3572), an increase of about $45.6 billion. The OpenAI, Meta and NVIDIA deals account for about $42.9 billion of that. The remaining gap is small enough to be covered by other customers once 2025 revenue burn-off is considered. The caveat is that the OpenAI and Meta figures are 'up to' amounts, and the Q1 2025 backlog of $25.9 billion was only partly RPO (claim 4970), so some announced value may sit outside RPO. The 2026 Meta, Jane Street and Anthropic deals cannot yet be tested, because no post-December 2025 RPO figure is on record here.
Customer disclosures, read
2026-09-27CoreWeave's signed-customer record is anchored by a small number of order forms executed under existing master services agreements. These are the strongest form of disclosure in the file. They cover OpenAI on September 23, 2025 (claim 4296), Meta in September 2025 (claim 4282) and again on March 31, 2026 (claim 2123), and NVIDIA as a capacity purchaser in September 2025 (claim 4352). The original OpenAI agreement is described at $11.9 billion in one source (claim 19820) and $11.2 billion of backlog in another (claim 4969). OpenAI's commitments grew to up to about $22.4 billion after a $6.5 billion expansion (claim 20198). Meta added roughly $21 billion on top of its initial $14.2 billion (claims 4282, 10340, 9317). Jane Street's roughly $6 billion (claim 10304) is a named, sized commitment. The Anthropic agreement is described as signed and multi-year but carries no value (claim 9318). Much of the rest is softer. The January 2026 NVIDIA arrangement is expressly a collaboration framework with test-and-validate language (claims 3892, 17598). IBM, CrowdStrike and the Genesis Mission are framed as partnerships or participation, not priced contracts (claims 4971, 10330, 11778). The logo lists (claims 11767, 9320) say 'partner of choice' without stating commitments. The financing disclosures refer only to unnamed counterparties: 'a customer contract' (claim 4595), a 'leading AI enterprise' (claim 11224), and 'two large, non-investment grade customers' (claim 9119). Those cannot be mapped to named deals from this record. On concentration, the book has moved from OpenAI-dominant in early 2025 toward a Meta–OpenAI duopoly. Meta's roughly $35 billion now edges out OpenAI's up to $22.4 billion, and Jane Street and Anthropic add a thinner second tier. Much of the headline value carries 'up to' qualifiers. On arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (claim 3555). The named 2025 deals, OpenAI, Meta and NVIDIA's $6.3 billion (claim 20209), total roughly $43 billion. Starting RPO plus these deals, less revenue recognized in the year, lands in the same range as $60.7 billion. That is a directional fit, not a precise tie-out. The fit is loosened by the Q1 2025 split of $25.9 billion backlog against $14.7 billion RPO (claim 4970), which suggests some OpenAI value initially sat outside RPO. The Meta $21 billion appears in at least five claims and should be counted once. Note that the input record is truncated after claim 9121.
Customer disclosures, read
2026-09-26CoreWeave's disclosed pipeline sorts into three tiers. The first is executed order forms under existing master services agreements, disclosed in 8-K language. These are the OpenAI contract announced in March 2025 at $11.9 billion (claim 19820), a further OpenAI order form in September 2025 (4296), Meta's order form committing up to roughly $14.2 billion through December 2031 (4282), and Meta's March 31, 2026 order form (2123), which the company values at about $21 billion through 2032 (10340, 9317). Jane Street's roughly $6 billion commitment (10304) and the Anthropic multi-year agreement (9318) are also described as signed, though Anthropic's value is never quantified. The second tier is softer language. The NVIDIA 'collaboration framework' (3892, 17596), the IBM Granite 'partnership' (4971), the CrowdStrike 'global partnership' (11768), Genesis Mission participation (11778), Exemplar Cloud status (10332, 9324) and the rotating 'partner of choice' logo lists (11767, 9320) carry no disclosed dollar commitments and should not be read as backlog. The third tier is financing disclosures that reference customers without naming them: 'a customer contract' behind DDTL 3.0 (4595), a 'leading AI enterprise' behind DDTL 4.0 (11224), and 'two large, non-investment grade customers' behind DDTL 5.0 (9119). The credit description in the last of these is itself a material concentration flag.
Concentration was acute through 2025. OpenAI and Meta account for essentially all quantified named value, and Meta alone now totals roughly $35 billion across two order forms, with a further expansion option (4283). The 2026 additions of Jane Street, Anthropic, and the relationship expansions with Cohere and Mistral (9319) broaden the roster. However, the quantified dollars remain dominated by the same two hyperscale-scale buyers. The Hudson River Trading entry (10732) is truncated in the record and cannot be assessed.
The arithmetic only partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of about $45.6 billion. The quantified named 2025 deals total roughly $26.1 billion: OpenAI at $11.9 billion and Meta at $14.2 billion. That leaves close to $20 billion attributable to the unquantified September OpenAI and NVIDIA order forms (4296, 4352) and to unnamed counterparties. The OpenAI figure is also inconsistent across sources, at $11.9 billion in the press release against $11.2 billion of added backlog (4969). In addition, the March 2025 'revenue backlog' of $25.9 billion blended $14.7 billion of RPO with amounts contingent on delivery requirements (4970). Investors should anchor on RPO rather than backlog, and treat the unnamed DDTL counterparties as the key diligence gap.
Customer disclosures, read
2026-09-26CoreWeave's record is strongest where it cites order forms under existing master services agreements. Those are the OpenAI contract of March 2025 (claim 19820) and its September 2025 follow-on (4296), the Meta order forms of September 2025 (4282) and March 31, 2026 (2123, 10340), and NVIDIA's capacity-purchase order form (4352). Jane Street's roughly $6 billion commitment (10304) and the Anthropic agreement, described as 'signed' (9318), also read as executed, although the Anthropic deal carries no disclosed value. Much of the remaining partnership flow is not contract language. The IBM 'partnership' (4971) and the CrowdStrike 'global partnership' (11768, 10330) are not signed agreements. The NVIDIA 'collaboration framework' (3892, 17596) commits the parties only to 'work towards' reference-architecture inclusion (17598). Genesis Mission participation (11778) and Exemplar Cloud designations (10332, 9324) are affiliations and certifications, not revenue. The 'partner of choice' rosters (11767, 10338, 9320) and 'expanded relationships' with Cohere and Mistral (9319) name logos but attach no terms. The Hudson River Trading entry (10732) is truncated and cannot be assessed.
Several financing disclosures refer to counterparties that are never named. DDTL 3.0 funds 'a customer contract' (4595), DDTL 4.0 serves a 'leading AI enterprise' (11224), and DDTL 5.0 backs 'two large, non-investment grade customers' (9119). Because Meta is investment grade, the DDTL 5.0 counterparties are probably not Meta, but that is an inference and the company does not identify them.
Counterparty concentration has shifted from a single anchor to a pair of anchors. In early 2025 OpenAI alone accounted for most of the disclosed contract value. By early 2026 Meta's named commitments of about $14.2 billion (4282) plus about $21 billion (10340) exceeded the disclosed OpenAI figures. Readers should not double-count restatements of the same deals (17654, 17655, 10694, 9317). The $14.2 billion figure is also a ceiling ('up to'), not a floor.
The revenue arithmetic reconciles only partly. OpenAI's deal appears as $11.9 billion (19820) but as $11.2 billion of backlog (4969), and the gap is unexplained. Backlog of $25.9 billion (4970) includes amounts outside RPO, so the two measures are not interchangeable. RPO grew from $15.1 billion (3572) to $60.7 billion (3555) over 2025. The named additions (OpenAI's first tranche and Meta's $14.2 billion) explain only about $26 billion of that roughly $45.6 billion increase, before netting out revenue recognized during the year. The value of the September OpenAI order form is absent from the record, so roughly $20 billion of RPO growth cannot be traced to named counterparties. The March 2026 Meta expansion and the Jane Street deal come after the December 31, 2025 measurement date and are not part of that figure.
Customer disclosures, read
2026-09-25CoreWeave's record separates cleanly into two tiers. The first is contracts documented as executed order forms under existing master services agreements. These are OpenAI (claims 4969, 4296), NVIDIA's capacity purchase (4352), Meta's initial commitment of up to $14.2 billion through 2031 (4282) and Meta's March 2026 order form (2123), which the company later sized at about $21 billion (10340, 9317). Anthropic is described as a "signed multi-year agreement" (9318), but no value is disclosed. Jane Street's roughly $6 billion (10304) is framed as a commitment, and Hudson River Trading's arrangement appears only in secondary reporting (10732). The second tier is softer. It includes the NVIDIA "collaboration framework" (3892) and the reference-architecture work toward possible inclusion (17598), the IBM and CrowdStrike "partnerships" (4971, 11768), and Genesis Mission participation (11778). None of these carries a disclosed dollar commitment. The recurring "partner of choice" logo lists (11767, 10338, 9320) name counterparties but are marketing rosters, not contract disclosures. Meta's expansion option through 2032 (4283) was likewise contingent until the March order form.
Several material obligations remain unidentified. DDTL 3.0 funds "a customer contract" (4595). DDTL 4.0 serves a "leading AI enterprise" (11224). DDTL 5.0 supports "two large, non-investment grade customers" (9119). The Indonesia buildout cites unnamed "existing customer demand" (8762). Because debt facilities are secured against these contracts, the anonymity matters more here than in the logo lists.
Concentration has shifted rather than diluted. In May 2025, OpenAI's $11.2 billion equaled about 43% of the $25.9 billion backlog (4969, 4970). Meta has since become the largest named counterparty, at about $35 billion if the $21 billion is additive, as "new $21 billion commitment" (9317) implies. The March 2026 deals are also partly double-reported across claims 10729, 10694, 17654 and 10340, so they should not be summed twice.
The arithmetic only partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3571). Named 2025 additions with disclosed values total about $25.4 billion (OpenAI $11.2 billion plus Meta $14.2 billion), and the September OpenAI order form's value is not on record here. That leaves roughly $20 billion or more of net RPO growth, before revenue burn-off, that cannot be tied to a named, sized counterparty. The 2026 Meta and Jane Street figures postdate the year-end RPO and should appear in later balances. Backlog (4970) and RPO also differ by definition, so the two series should not be compared directly. On a five-year weighted duration (3584), $60.7 billion implies roughly $12 billion of annual recognition, and that figure is heavily weighted to two or three hyperscale and lab counterparties.
Customer disclosures, read
2026-09-25CoreWeave's record of counterparty claims mixes a small set of signed, valued contracts with a larger set of partnership, framework and logo-list language. Only a few disclosures are clearly binding. These are order forms executed under existing Master Services Agreements with NVIDIA (claim 4352), OpenAI (claim 4296) and Meta (claim 2123). Alongside them sit the valued commitments from Meta at up to $14.2 billion through December 2031 (claim 4282) and about $21 billion through December 2032 (claims 10340, 9317), and from Jane Street at about $6 billion (claim 10304). The OpenAI deal added $11.2 billion of backlog (claim 4969), but the September 2025 order form's value is not in the quoted text. Anthropic (claim 9318) and Hudson River Trading (claim 10732) are described as signed multi-year agreements, but no values are disclosed. Other items should not be read as contracted revenue. These include IBM's partnership (claim 4971), the NVIDIA collaboration framework (claim 3892), the CrowdStrike global partnership (claim 11768), Genesis Mission participation (claim 11778), NVIDIA Exemplar Cloud status (claim 10332), and the logo lists naming Cursor, Perplexity and others (claims 11767, 9320). Meta's expansion option through 2032 (claim 4283) is also an option, not a commitment. Several financing disclosures reference counterparties that are never named: 'a customer contract' behind DDTL 3.0 (claim 4595), a 'leading AI enterprise' behind DDTL 4.0 (claim 11224), and 'two large, non-investment grade customers' behind DDTL 5.0 (claim 9119). These are debt-backed obligations whose credit exposure cannot be attributed from the record. Concentration has shifted rather than diluted. In May 2025, OpenAI's $11.2 billion was about 43 percent of $25.9 billion in backlog (claim 4970). By the end of 2025, RPO had reached $60.7 billion, up from $15.1 billion (claims 3555, 3572), with Meta's $14.2 billion now alongside OpenAI. Those two named, valued deals account for roughly $25 billion, or about 42 percent of year-end RPO, and the remainder is not itemized. On revenue arithmetic, the record has backlog and RPO but no recognized revenue figures, so reconciliation is only partial. A five-year weighted duration (claim 3584) implies roughly $12 billion a year of contracted revenue on a straight-line basis. The 2026 Meta and Jane Street deals add about $27 billion after the last disclosed RPO date, so an updated RPO figure is needed to confirm they have been booked. The May 2025 backlog also included non-RPO amounts that depend on delivery conditions (claim 4970), so headline deal values should not be assumed to equal contracted obligations.
Customer disclosures, read
2026-09-25CoreWeave's record separates cleanly into contracts documented under order forms and a much larger layer of partnership language. The signed tier consists of OpenAI, disclosed first as an $11.2 billion strategic deal (claim 4969) and then as a September 2025 order form under the existing MSA (claim 4296). Meta follows with a roughly $14.2 billion commitment through December 2031 (claim 4282) and a further order form dated March 31, 2026 (claim 2123) worth about $21 billion through 2032 (claims 10340, 9317). Jane Street committed about $6 billion (claim 10304), and NVIDIA signed a capacity order form (claim 4352). Anthropic is described as a signed multi-year agreement with no value attached (claim 9318). Hudson River Trading appears only through secondary reporting (claim 10732). By contrast, the IBM Granite partnership (claim 4971), the NVIDIA collaboration framework whose software work is phrased as 'work towards' (claims 3892, 17598), the CrowdStrike global partnership (claim 11768), Genesis Mission participation (claim 11778), and the 'partner of choice' logo lists (claims 11767, 9320) carry no disclosed commitment and should not be read as contracted revenue.
A meaningful share of the financing-linked demand is unnamed. The DDTL 3.0 facility funds 'a customer contract' (claim 4595), DDTL 4.0 serves a 'leading AI enterprise' (claim 11224), and DDTL 5.0 backs 'two large, non-investment grade customers' (claim 9119). The last of these is a credit-quality flag the company chose not to attach to names.
Concentration has shifted from OpenAI toward Meta rather than diversified. At March 31, 2025, backlog of $25.9 billion exceeded RPO of $14.7 billion by exactly $11.2 billion (claim 4970), the OpenAI figure, which suggests that deal sat outside RPO pending delivery conditions. By year-end 2025, RPO had reached $60.7 billion, up from $15.1 billion (claim 3555). Named quantified deals through that date (OpenAI $11.2 billion plus Meta $14.2 billion) explain roughly $25 billion. The remaining roughly $35 billion must sit largely in the unquantified September OpenAI order form, the NVIDIA order form, and unnamed contracts. The post-period Meta ($21 billion) and Jane Street ($6 billion) deals add about $27 billion. Whether Meta's $21 billion is incremental to or partly overlaps the $14.2 billion is not stated on the record (claims 17654, 17655). With a roughly five-year weighted duration (claim 3584), the arithmetic is plausible, but it does not reconcile line by line from disclosed deals.
Customer disclosures, read
2026-09-24CoreWeave's record separates cleanly into two groups. The first is binding order forms with named counterparties and stated dollar values. The second is a larger set of partnership, framework and logo-list language that carries no disclosed economics.
The signed tier is narrow. It covers OpenAI, which added $11.2 billion of backlog (4969) and signed a further order form under its MSA in September 2025 (4296). It covers Meta, first at up to $14.2 billion through December 2031 (4282), then a separate order form on March 31, 2026 worth about $21 billion through December 2032 (2123, 10340, 9317). Claims 17654 and 17655 describe these as distinct commitments, so they should not be netted. Jane Street's roughly $6 billion commitment also belongs here (10304). NVIDIA's September 2025 order form (4352) is a signed capacity purchase, but the record gives no value. Anthropic is described as a "signed multi-year agreement" (9318) and Hudson River Trading as a multi-year agreement (10732, secondary source). Neither is quantified.
Everything else is softer. The IBM "partnership" (4971), the NVIDIA "collaboration framework" (3892, 17596, 17598), the CrowdStrike "global partnership" (11768) and Genesis Mission participation (11778) describe collaboration, not purchase commitments. The recurring "partner of choice" rosters (11767, 10338, 9320) name Cursor, Midjourney, Perplexity and others without contract terms. The "expanded relationships" with Cohere and Mistral (9319) are equally unquantified. Notably, the debt-financed contracts are the least identified. DDTL 3.0 backs "a customer contract" (4595). DDTL 4.0 serves a "leading AI enterprise" (11224). DDTL 5.0 serves "two large, non-investment grade customers" (9119). None is named, and the last is flagged as sub-investment-grade.
Concentration has broadened in name count but not obviously in dollars. Meta alone now accounts for roughly $35 billion of disclosed commitments, and OpenAI for at least $11.2 billion. The 2026 additions of Jane Street, Anthropic and HRT are either modest or undisclosed.
The arithmetic does not fully reconcile from the record. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), a $45.6 billion increase before netting revenue recognized. The quantified 2025 deals, OpenAI's $11.2 billion and Meta's up-to $14.2 billion, total about $25.4 billion. The residual of roughly $20 billion or more must sit in the unpriced OpenAI and NVIDIA order forms or in unnamed contracts. The $21 billion Meta and $6 billion Jane Street deals postdate December 31, 2025 and are not in that RPO figure. The approximately five-year weighted duration (3584) implies about $12 billion a year of contracted revenue, heavily weighted to two counterparties.
Customer disclosures, read
2026-09-24CoreWeave's record has a small core of documented contracts and a much larger layer of partnership and logo language. The firm contracts are order forms under existing master services agreements. These include OpenAI (4296, with $11.2 billion of backlog in 4969), Meta's initial commitment of up to $14.2 billion through December 2031 (4282), Meta's March 31, 2026 order form of about $21 billion (2123, 10340, 9317), and an NVIDIA capacity order (4352). Jane Street's roughly $6 billion commitment (10304) and the signed but unpriced Anthropic agreement (9318) also sit near this tier. Hudson River Trading's multi-year deal (10732) comes only from secondary reporting. Meta's 'option to materially expand' (4283) is not a commitment, and 'up to' in 4282 sets a ceiling. The six Meta $21 billion claims (10729, 10694, 17654, 10340, 9317, 2123) describe a single transaction.
The softer tier includes the IBM 'partnership' (4971), the NVIDIA 'collaboration framework' that commits only to 'work towards' reference-architecture inclusion (3892, 17596, 17598), the CrowdStrike 'global partnership' (11768, 10330), Genesis Mission participation (11778, 10331), Exemplar Cloud designations (10332, 9324), and 'expanded relationships' with Cohere and Mistral (9319). None of these carries a value. Logo rosters (11767, 10338, 9320) show breadth but no dollars. The financing disclosures stay anonymous. They refer to 'a customer contract' (4595), a 'leading AI enterprise' (11224), and 'two large, non-investment grade customers' (9119).
Concentration has moved rather than eased. At March 31, 2025, backlog was $25.9 billion against RPO of $14.7 billion (4970). The $11.2 billion gap equals the OpenAI figure exactly, which suggests that deal sat outside RPO pending delivery conditions. OpenAI was then about 43% of backlog. By December 31, 2025, RPO had reached $60.7 billion, up from $15.1 billion (3555, 3572), with a five-year weighted duration (3584). Named, quantified 2025 deals (OpenAI $11.2 billion and Meta $14.2 billion) explain about $25 billion of the $45.6 billion increase. The rest falls to the unpriced September OpenAI order form, the NVIDIA order, and unnamed contracts. Meta's cumulative named commitments of about $35 billion now make it the largest disclosed counterparty. The unnamed non-investment-grade customers funded under DDTL 5.0 add credit concentration that the logo lists do not show.
The arithmetic reconciles only in part. It holds at the March 2025 level. For year-end 2025, roughly $20 billion of RPO growth has no named, priced counterparty, and none of the 2026 figures can yet be tied to a reported RPO balance.
Customer disclosures, read
2026-09-24CoreWeave's record contains a small group of executed agreements. Around them sits a larger body of partnership and logo language that should not be read as contracted revenue. The firmest items are order forms under existing master services agreements. These cover OpenAI (4296), NVIDIA as a capacity purchaser (4352), and Meta: the September 2025 order form of up to about $14.2 billion through December 2031 (4282), and the March 31, 2026 order form of about $21 billion through December 2032 (2123, 10340, 9317). Jane Street's roughly $6 billion commitment (10304) is also quantified. Anthropic is described as a signed multi-year agreement (9318) but carries no value, and Hudson River Trading's multi-year agreement (10732) is likewise unpriced. The IBM partnership (4971), the NVIDIA collaboration framework (3892, 17596, 17598), the CrowdStrike global partnership (11768, 10330), Genesis Mission participation (11778, 10331) and the Exemplar Cloud designations (10332, 9324) are relationship or program language, not purchase commitments. The same caution applies to the rotating 'partner of choice' logo lists (11767, 9320), which name customers but attach no contract terms.
Several financing disclosures refer to counterparties that are never named. These include the customer contract behind DDTL 3.0 (4595), the 'leading AI enterprise' behind DDTL 4.0 (11224), and the 'two large, non-investment grade customers' behind DDTL 5.0 (9119). Investors cannot tell whether these map onto the named deals or represent separate exposure. The same is true of the broad 'most of the world's leading AI labs' framing (8926).
Named concentration has broadened in logos but deepened in dollars. In 2025 the book was essentially OpenAI and Meta. Through 2026 Meta's cumulative quantified commitments reached roughly $35 billion (4282, 9317), while Jane Street added a mid-sized named commitment (10304).
The arithmetic reconciles only partially. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of about $45.6 billion. The quantified named deals in that window are OpenAI's $11.2 billion (4969), which was stated as backlog rather than RPO, and Meta's $14.2 billion (4282). Together they total about $25.4 billion. That leaves roughly $20 billion unattributed on this record, and the value of the September 2025 OpenAI order form (4296) is not captured here. The 2026 Meta and Jane Street commitments, together about $27 billion, postdate the $60.7 billion figure, and no later RPO disclosure is on record to confirm conversion. Claim 10729 is dated before the March 31 order form it describes and should be treated as a dating artifact.
Customer disclosures, read
2026-09-24CoreWeave's record contains a small core of genuinely signed counterparties and a much larger layer of partnership and logo language. The contractual core is clear. OpenAI signed order forms under an existing MSA, with $11.2 billion added to backlog in 2025 (4969) and a further order form in September 2025 whose value is not in the record (4296). Meta signed an order form for up to about $14.2 billion through December 2031 (4282) and a second order form on March 31, 2026 for about $21 billion through December 2032 (2123, 10340, 9317). NVIDIA signed a capacity order form under its MSA (4352). Anthropic's multi-year agreement is described as signed but carries no disclosed value (9318). Jane Street's roughly $6 billion commitment (10304) and Hudson River Trading's multi-year deal (10732) rest mainly on press paraphrase. Everything else is softer. The IBM partnership (4971), the NVIDIA collaboration framework and its 'work towards' reference-architecture language (3892, 17596, 17598), the CrowdStrike 'global partnership' (11768), the Genesis Mission (11778) and the Exemplar Cloud designations (10332, 9324) do not disclose contract terms. The 'partner of choice' logo lists (11767, 9320) and 'expanded relationships' with Cohere and Mistral (9319) name companies but not commitments. The financing disclosures consistently decline to name their counterparties. They refer to 'a customer contract' (4595), a 'leading AI enterprise' (11224), 'two large, non-investment grade customers' (9119) and 'most of the world's leading AI labs' (8926). Concentration has shifted from one dominant name to two. OpenAI's $11.2 billion was roughly 43% of the $25.9 billion backlog at March 2025 (4970). Meta's stated commitments now total about $35.2 billion across two order forms, which likely makes Meta the largest counterparty. The DDTL 5.0 disclosure adds non-investment-grade credit exposure without naming the customers. The revenue arithmetic reconciles only partially. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555), an increase of $45.6 billion. Named 2025 dollar figures for OpenAI and Meta sum to $25.4 billion, so about $20 billion of the increase is attributable only to undisclosed amounts, most plausibly the September OpenAI order form and the NVIDIA order form. The comparison is also imperfect for two reasons. Revenue backlog and RPO are defined differently (4970), and Meta's figure is an 'up to' ceiling. The 2026 Meta $21 billion and Jane Street $6 billion deals postdate the December RPO figure and should appear in later disclosures. Several secondary claims carry inconsistent dates, such as a March expansion dated March 1 (10729), and warrant verification against the filings.
Customer disclosures, read
2026-09-24CoreWeave's disclosed pipeline splits into two tiers. The first is executed order forms under master services agreements with named counterparties. The second is partnership, framework and logo-list language that carries no disclosed economics. Executed paper covers OpenAI, with an $11.2 billion backlog addition (4969) and a September 2025 order form (4296) whose value is not captured here. It covers Meta, at up to $14.2 billion through 2031 (4282) and a further roughly $21 billion order form dated March 31, 2026 (2123, 10340, 9317). Jane Street has committed about $6 billion (10304), and NVIDIA placed a capacity order form (4352). Anthropic (9318) and Hudson River Trading (10732) have signed multi-year agreements with no disclosed value. The IBM Granite arrangement (4971), the NVIDIA 'collaboration framework' (3892, 17596), the CrowdStrike 'global partnership' (11768, 10330) and Genesis Mission participation (11778) read as cooperative rather than contracted revenue. The NVIDIA software item says only 'work towards' inclusion (17598). The 'partner of choice' rosters (11767, 9320) name logos without terms. MUFG, Morgan Stanley, Goldman Sachs and JPMorgan (11225, 9121) are lenders, not customers.
Several material counterparties go unnamed. These include the customer behind DDTL 3.0 (4595), the 'leading AI enterprise' financed through DDTL 4.0 (11224), and the 'two large, non-investment grade customers' behind DDTL 5.0 (9119). Because these facilities finance dedicated infrastructure, the unnamed counterparties likely carry significant exposure.
Concentration has shifted from OpenAI to Meta rather than diversified. In May 2025 the OpenAI deal alone equaled roughly 43% of $25.9 billion in backlog (4969, 4970). Meta's cumulative named commitment now stands near $35 billion, the largest single exposure on record. The April 2026 $14.2 billion reference (17655) restates the 2025 deal and is not additive. Repeated citations of the $21 billion (10729, 10694, 17654) and Jane Street (10730, 10695) figures are also duplicates.
On arithmetic, note that the May 2025 backlog figure bundles $14.7 billion of RPO with conditional amounts (4970), so it should not be compared directly with later RPO. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3571). Named, valued deals signed within that year reach at least $25.4 billion, leaving roughly $35 billion unattributed or tied to undisclosed order values. The Meta $21 billion and Jane Street $6 billion commitments postdate December 31, 2025 and should appear only in 2026 RPO. With a roughly five-year weighted duration (3584), $60.7 billion implies about $12 billion of annual contracted run-rate, subject to delivery conditions.
Customer disclosures, read
2026-09-23CoreWeave's record separates cleanly into executed order forms and softer relationship language. The firm contracts sit under master services agreements. They include an OpenAI order form (claim 4296) on top of the earlier $11.2 billion OpenAI deal (claim 4969), an NVIDIA capacity order form (claim 4352), and Meta's order form of up to $14.2 billion through December 2031 (claims 4282, 17655). Meta then signed a further order form of about $21 billion on March 31, 2026 (claims 2123, 10340, 9317). Six separate claims describe that one Meta deal, and three describe the single Jane Street commitment of about $6 billion (claims 10304, 10730, 10695), so the headline count overstates the number of distinct deals. Anthropic (claim 9318) and Hudson River Trading (claim 10732) are described as multi-year agreements, but neither has a disclosed value. The rest is weaker language. The IBM partnership (claim 4971), the NVIDIA collaboration framework that only commits to 'work towards' reference-architecture inclusion (claims 3892, 17598), the CrowdStrike 'global partnership' (claims 11768, 10330), Genesis Mission participation (claim 11778), Exemplar Cloud status (claims 10332, 9324), and the 'partner of choice' logo lists (claims 11767, 9320) carry no disclosed consideration. The same is true of the 'expanded relationships' with Cohere and Mistral (claim 9319).
Several material counterparties remain unnamed. The DDTL 3.0 facility funds 'a customer contract' (claim 4595), and DDTL 4.0 serves a 'leading AI enterprise' (claim 11224). DDTL 5.0 backs contracts with 'two large, non-investment grade customers' (claim 9119). These are the contracts that support debt, and a reader cannot tie them to names.
Customer concentration has shifted but not dispersed. In May 2025, OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog (claims 4969, 4970). By the end of 2025, Meta's $14.2 billion was roughly 23% of $60.7 billion in RPO (claims 3555, 4282). Meta's commitments now total about $35 billion. Jane Street and Hudson River Trading add a trading-firm segment, but it is small by comparison.
The revenue figures reconcile only partly. At March 31, 2025, backlog minus RPO was exactly $11.2 billion ($25.9 billion less $14.7 billion, claim 4970). That match suggests the OpenAI deal was first counted in backlog that depended on delivery conditions, not in RPO. RPO rose $45.6 billion during 2025 (claims 3571, 3572). The quantified named deals, OpenAI's $11.2 billion and Meta's 'up to' $14.2 billion, explain only about $25 billion of that increase. The remaining roughly $20 billion must come from the unpriced September OpenAI and NVIDIA order forms and the unnamed DDTL-financed contracts. The March and April 2026 Meta and Jane Street deals fall after that RPO date and should not be read into it.
Customer disclosures, read
2026-09-23CoreWeave's disclosure record separates fairly cleanly into two tiers. The first consists of signed order forms under existing master services agreements, filed as material contracts. These are OpenAI (claims 4969, 4296), NVIDIA's capacity purchase (4352), Meta's initial commitment of up to $14.2 billion through December 2031 (4282) and its roughly $21 billion March 2026 expansion through 2032 (2123, 10340, 9317). Jane Street's approximately $6 billion commitment (10304) and the Anthropic multi-year agreement (9318) are described as signed or committed, but the record carries no filed contract terms for either, and no value for Anthropic. Hudson River Trading's agreement (10732) comes only from secondary reporting. The second tier is softer language: the IBM Granite 'partnership' (4971), the NVIDIA 'collaboration framework' and the undertaking to 'work towards' reference-architecture inclusion (3892, 17598), the CrowdStrike 'global partnership' (11768), Genesis Mission participation (11778), Exemplar Cloud designations (10332, 9324), and the rotating 'partner of choice' logo lists (11767, 9320). None of these carries a disclosed dollar commitment, and they should not be read as contracted revenue.
Several of the largest financing-linked obligations are unnamed. DDTL 3.0 finances 'a customer contract' (4595), the March 2026 facility serves a 'leading AI enterprise' (11224), and DDTL 5.0 supports contracts with 'two large, non-investment grade customers' (9119). The company also claims to serve 'most of the world's leading AI labs and hyperscalers' (8926) without identifying them. Readers cannot tell whether these overlap with OpenAI or Meta or represent new counterparties. That matters most for the non-investment-grade disclosure.
Concentration has narrowed rather than diversified at the top. Meta's named commitments alone total about $35.2 billion, and OpenAI's disclosed May tranche adds $11.2 billion. Newer names such as Jane Street, Anthropic and the trading firms broaden the list but not yet the dollar weighting.
The arithmetic only partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of about $45.6 billion. The quantified 2025 named deals, OpenAI's $11.2 billion and Meta's $14.2 billion, explain roughly $25 billion of that, before netting revenue recognized during the year. The remaining $20 billion or more must come from the unquantified September OpenAI and NVIDIA order forms, or from unnamed customers. The May 2025 $25.9 billion 'backlog' figure (4970) also mixed $14.7 billion of RPO with conditional amounts. Headline backlog and RPO should therefore not be treated interchangeably when matching announcements to the balance sheet.
Customer disclosures, read
2026-09-23CoreWeave's contract record has two tiers. The top tier is order forms under existing Master Services Agreements, with named counterparties and, in most cases, dollar values. These are OpenAI's $11.2 billion strategic deal (4969) and its September 2025 order form (4296, value not on record); Meta's initial commitment of up to $14.2 billion through December 2031 (4282, 17655), followed by a March 31, 2026 order form (2123) worth about $21 billion through 2032 (10340, 9317); and Jane Street's roughly $6 billion (10304). Anthropic (9318) and Hudson River Trading (10732) are described as signed multi-year agreements, but neither has a disclosed value. The second tier is softer language that should not be read as revenue: the IBM partnership (4971), the NVIDIA "collaboration framework" and reference-architecture work that the company says it will "work towards" (3892, 17596, 17598), the CrowdStrike "global partnership" (11768, 10330), Genesis Mission participation (11778), Exemplar Cloud designations (10332, 9324), and the "partner of choice" logo lists (11767, 9320). None of these carries a disclosed dollar value.
A meaningful share of the financing-linked demand is also anonymous. DDTL 3.0 funds "a customer contract" (4595), DDTL 4.0 serves an unnamed "leading AI enterprise" (11224), and DDTL 5.0 is dedicated to "two large, non-investment grade customers" (9119). The disclosures do not say which named counterparties, if any, these are.
Concentration has broadened from one counterparty to two. In May 2025, OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog (4970). By the end of 2025, OpenAI's and Meta's disclosed values together came to about $25.4 billion, roughly 42% of the $60.7 billion in remaining performance obligations (RPO) (3555). If Meta's $21 billion is incremental, as "new commitment" in 9317 implies, Meta alone now exceeds $35 billion. Jane Street is a distant third.
The arithmetic reconciles only partly. RPO fell from $15.1 billion (3572) to $14.7 billion in Q1 2025 even as backlog reached $25.9 billion. That suggests the OpenAI deal was booked largely outside RPO, conditional on delivery (4970). The $45.6 billion increase in RPO during 2025 exceeds the $25.4 billion in disclosed named deals, which leaves about $20 billion attributable only to OpenAI's unpriced September order form and to unnamed customers. The Meta $14.2 billion is also an "up to" ceiling rather than a floor. Several press-derived claims carry month-start dates that predate their filings (10729, 10731), so they should be dated from the 8-K, not the article.
Customer disclosures, read
2026-09-23CoreWeave's record separates cleanly into executed order forms and softer relationship language, and the executed paper is concentrated in very few names. The signed agreements are order forms under existing Master Services Agreements with NVIDIA (claim 4352), OpenAI (claim 4296) and Meta (claims 4282 and 2123). Meta's initial commitment of up to about $14.2 billion through December 2031 (claim 4282) is quantified; the March 2026 order form is reported at roughly $21 billion through 2032 (claims 10340, 9317). Jane Street's approximately $6 billion commitment (claim 10304) is also described as committed. The Anthropic and Hudson River Trading agreements are called multi-year and signed (claims 9318, 10732), but no value is disclosed for either.
The rest of the record should not be read as contracted revenue. The NVIDIA expansion is explicitly a collaboration framework (claims 3892, 17596), and its software element is framed as testing and working toward inclusion (claim 17598). IBM (claim 4971) and CrowdStrike (claims 11768, 10330) are partnership announcements without disclosed terms. The Genesis Mission (claim 11778) is programme participation. The logo lists naming Cognition, Cursor, Mercado Libre, Perplexity and others (claims 11767, 9320) indicate customer relationships of unknown size. Several financing disclosures describe counterparties without naming them: 'a customer contract' (claim 4595), a 'leading AI enterprise' (claim 11224), and 'two large, non-investment grade customers' (claim 9119). These are material enough to secure dedicated debt facilities but cannot be attributed from the record.
Concentration has shifted from OpenAI toward Meta. In May 2025 the $11.2 billion OpenAI deal (claim 4969) was about 43% of the $25.9 billion backlog (claim 4970). Meta's two disclosed commitments now total about $35 billion. The $21 billion figure recurs across many claims (10729, 10694, 17654, 9317, 10340), but these are repeated reports of one transaction, not separate deals.
The arithmetic reconciles only partially. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3571). Meta's $14.2 billion and OpenAI's $11.2 billion together explain roughly $25 billion of that $45.6 billion increase. That leaves about $20 billion attributable to the unpriced September OpenAI and NVIDIA order forms and to unnamed customers. Part of the OpenAI figure may also already have been in the March 2025 backlog, which mixed RPO with conditional amounts (claim 4970). The Meta $21 billion and Jane Street deals were signed in 2026, after the December 2025 RPO date, so they should not be read into that $60.7 billion figure.
Customer disclosures, read
2026-09-23CoreWeave's record separates cleanly into a small set of order forms and a much larger layer of partnership language. The binding instruments are the OpenAI order forms (4969, 4296), the Meta order forms of September 2025 and March 31, 2026 (4282, 2123), and an NVIDIA order form under a 2023 MSA (4352). The Anthropic agreement is described as signed but carries no disclosed value (9318). The Jane Street commitment of about $6 billion (10304) and the Hudson River Trading deal (10732) rest mainly on press and secondary sourcing. The NVIDIA 'collaboration framework' (3892, 17596) is aspirational, with reference-architecture inclusion framed as work 'towards' (17598). The IBM (4971), CrowdStrike (11768) and Genesis Mission (11778) items are partnerships rather than disclosed revenue contracts. The 'partner of choice' logo lists (11767, 9320) and the Exemplar Cloud designations (10332, 9324) are marketing and certification claims, not commitments. Several counterparties are left unnamed, most notably the customer behind DDTL 3.0 (4595), the 'leading AI enterprise' behind DDTL 4.0 (11224), and the 'two large, non-investment grade customers' financed by DDTL 5.0 (9119). Those undisclosed borrowers are where credit risk sits. Concentration began extreme: OpenAI's $11.2 billion was roughly 43% of the $25.9 billion backlog in Q1 2025 (4969, 4970). Meta's $14.2 billion and $21 billion order forms then made the book a two-anchor structure. The 2026 additions of Anthropic, Jane Street and Hudson River Trading broaden the base at the margin, but they are small beside those two anchors. On arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of $45.6 billion. Named, valued 2025 deals explain only about $25.4 billion of that increase, from OpenAI's $11.2 billion and Meta's $14.2 billion. Even that figure is generous, because backlog is not RPO and Meta's figure is an 'up to' ceiling (4970, 4282). Roughly $20 billion therefore traces to the September OpenAI and NVIDIA order forms, whose values are not on this record. The March 2026 Meta deal and the April 2026 Jane Street deal postdate the RPO measurement and should not be read into it. Readers should also avoid double-counting the $21 billion, which is restated across five claims (10340, 10694, 10729, 17654, 9317). The source list itself was truncated, so later disclosures may be missing.
Customer disclosures, read
2026-09-23CoreWeave's signed, named commitments come mainly from order forms filed under existing master services agreements. OpenAI has two: the $11.2 billion strategic deal (claim 4969) and a September 2025 order form (claim 4296). Meta has the $14.2 billion commitment running through December 2031 (claim 4282) and a March 31, 2026 order form of about $21 billion (claims 2123, 10340, 9317). NVIDIA's capacity order form (claim 4352) is a third. Jane Street's roughly $6 billion commitment (claim 10304) is named and quantified, though the May 2026 release calls it an 'expanded relationship' (claim 9319). Anthropic is described as signed but carries no dollar figure (claim 9318). Hudson River Trading's multi-year agreement rests on secondary reporting (claim 10732). Much of the remaining partnership language is softer. The NVIDIA expansion is a 'collaboration framework' (claims 3892, 17596, 17598). IBM (claim 4971), CrowdStrike (claim 11768) and the Genesis Mission (claim 11778) are partnerships or initiatives, not disclosed contracts. The 'partner of choice' logo lists (claims 11767, 9320, 8926) name counterparties but say nothing about contract terms. The most material financing disclosures leave the customer unnamed. DDTL 3.0 funds 'a customer contract' (claim 4595). DDTL 4.0 serves a 'leading AI enterprise' (claim 11224). DDTL 5.0 backs 'two large, non-investment grade customers' (claim 9119). The facilities in claim 8760 come from an unnamed colocation provider. Concentration has moved from OpenAI toward Meta. In March 2025, total backlog of $25.9 billion was $14.7 billion of RPO plus exactly $11.2 billion of conditional amounts (claim 4970), and that figure matches the OpenAI deal. This suggests OpenAI then made up about 43% of backlog and sat largely outside RPO. By 2026, Meta's two order forms total about $35 billion if the $21 billion is additive, which the separate order form implies. Claim 17654 frames that figure ambiguously, so treat additivity as likely rather than confirmed. On the arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (claim 3555). Named, quantified 2025 deals explain only part of the $45.6 billion increase: OpenAI's $11.2 billion plus Meta's $14.2 billion. The September OpenAI order form and the DDTL-backed contracts are not quantified in this record. With a weighted-average duration of about five years (claim 3556, repeated in claims 3561, 3573 and 3584), $60.7 billion implies roughly $12 billion of annual recognition. That depends on delivery by counterparties that include non-investment-grade names. The record appears truncated after claim 8760.
Customer disclosures, read
2026-09-22The signed-contract set at CoreWeave is narrower than the announcement flow suggests, and it is worth separating the two. Genuine executed agreements with named counterparties are OpenAI (claim 4969, formalized as an order form under a pre-existing MSA in claim 4296), Meta (claims 4282 and 2123, both order forms under the December 2023 MSA), NVIDIA's own capacity purchase (claim 4352, an order form under the April 2023 MSA), Jane Street (claim 10304), and Anthropic (claim 9318, described as signed). Hudson River Trading (claim 10732) is announced but the commitment is undisclosed. Against that, IBM (claim 4971), CrowdStrike (claims 11768 and 10330), and the January 2026 NVIDIA arrangement (claims 3892, 17596, 17598) are partnership and collaboration-framework language, not order forms; the 5-gigawatt buildout and the reference-architecture validation carry no counterparty payment obligation. NVIDIA Exemplar Cloud (claims 10332, 9324) and Genesis Mission participation (claims 11778, 10331) are designations, not revenue. The roster claims (11767, 10338, 9320, 9319) name Cognition, Cursor, Mercado Libre, Midjourney, Runway, Cohere, Mistral, Perplexity and others without a single disclosed dollar value or contract term.
The unnamed counterparties matter more than the named ones, because they appear precisely where the financing sits. The DDTL 3.0 facility was raised against an unidentified customer contract (claim 4595); DDTL 4.0 against a leading AI enterprise (claim 11224); DDTL 5.0 against two large, non-investment-grade customers (claim 9119). Debt capacity is being underwritten against credits the company will not name.
Concentration has shifted rather than diffused. OpenAI's $11.2 billion was roughly forty-three percent of the $25.9 billion March 2025 backlog (claims 4969, 4970), and notably sat outside the $14.7 billion RPO figure, in the conditional other amounts bucket. Meta then became the second pole, at $14.2 billion (claim 4282) and later approximately $21 billion (claims 10340, 9317).
The arithmetic does not close cleanly. RPO went from $15.1 billion to $60.7 billion across 2025 (claims 3572, 3571), a $45.6 billion increase, against roughly $25.4 billion of named 2025 commitments; some twenty billion is unattributed to any disclosed counterparty. Separately, claims 17654 and 17655 place the $14.2 billion and $21 billion Meta figures side by side without establishing whether the second is incremental or inclusive.
Customer disclosures, read
2026-09-21The signed-contract set is materially smaller than the announcement set. Only a handful of counterparties appear in documents carrying the structural markers of an executed agreement — a named party, an order form under a pre-existing master services agreement, and a dollar figure: OpenAI (claim 4296), Meta (claims 4282, 2123), NVIDIA (claim 4352) and Jane Street (claim 10304). Everything else sits lower on the commitment ladder. The January 2026 NVIDIA items are framework language rather than purchase language; claim 3892 describes a collaboration framework, and claim 17598 commits only to test and validate CoreWeave software and work towards including it in reference architectures. CrowdStrike is announced as a global partnership (claims 11768, 10330) while simultaneously appearing in the customer roster (claims 11767, 10338), with no disclosure resolving which. Anthropic and Hudson River Trading are characterized as multi-year agreements with no value, term, or filing behind them (claims 9318, 10732). The logo lists — Cognition, Cursor, Mercado Libre, Midjourney, Runway, Perplexity, World Labs, Adaption Labs, Advaita Bio (claims 11767, 10338, 9320) — are named but unquantified, which is the weakest disclosure form present.
The more telling pattern is the unnamed. The company financed capital expenditure against a customer contract it declined to identify (claim 4595), then a leading AI enterprise (claim 11224), then two large, non-investment grade customers (claim 9119). Three successive term loans are underwritten by counterparties investors cannot name, and the non-investment grade characterization implies the concentration has not broadened into credit-diverse hands.
The arithmetic partly reconciles and partly does not. The May 2025 disclosure is internally tidy: backlog of $25.9 billion less RPO of $14.7 billion leaves $11.2 billion (claim 4970), exactly the OpenAI strategic deal (claim 4969) — meaning that entire relationship sat outside RPO. The 2025 step-up is harder. RPO moved from $15.1 billion to $60.7 billion (claim 3555), roughly $45.6 billion added, against which the only quantified 2025 signing is Meta's $14.2 billion (claim 4282). The $21 billion Meta expansion (claims 10340, 9317) and Jane Street's $6 billion post-date the measurement, and claims 17654 and 17655 present $21 billion and $14.2 billion side by side without saying whether the former subsumes the latter. Roughly $30 billion of committed backlog therefore traces to counterparties whose contract values were never separately disclosed.
Customer disclosures, read
2026-09-21The record separates into three tiers, and the disclosure language tracks the tier closely. Genuine signed customer instruments — order forms executed under pre-existing master services agreements — exist for only three counterparties: NVIDIA (claim 4352), OpenAI (claim 4296), and Meta (claims 4282, 2123). Jane Street (claim 10304) and Anthropic (claim 9318) are described as committed and signed but without a filed instrument cited. Meta is the only counterparty whose dollar figure sits inside the agreement description itself, at roughly $14.2 billion through December 2031 (claim 4282) and about $21 billion through December 2032 (claim 10340).
The second tier is named but unsized. The logo lists of Cognition, Cursor, Mercado Libre, Midjourney and Runway (claims 11767, 10338), later Adaption Labs, Advaita Bio, Hudson River Trading, Perplexity and World Labs (claim 9320), arrive under partner-of-choice framing rather than as contracts. CrowdStrike appears as a global partnership (claims 11768, 10330), NVIDIA's January 2026 five-gigawatt announcement as a collaboration framework (claims 3892, 17596, 17598), and Genesis Mission (claim 11778) and Exemplar Cloud (claim 10332) as designations. None carries committed revenue. The third tier is the material one and it is anonymous: a customer contract (claim 4595), a leading AI enterprise (claim 11224), two large non-investment-grade customers (claim 9119), an unnamed colocation provider (claim 8760).
Concentration has broadened in name count more than in substance. OpenAI alone was $11.2 billion of the $25.9 billion May 2025 backlog (claims 4969, 4970); by 2026 the book is an OpenAI-plus-Meta core with a largely unsized tail (claims 10731, 10732), and claim 9119 implies the financing stack still rests on very few names.
The arithmetic strains. RPO moved from $15.1 billion to $60.7 billion across 2025 (claim 3555), a $45.6 billion increase, against which the only dollar-denominated named agreement signed in that window is Meta's $14.2 billion. The September OpenAI order form is the presumptive remainder but was never sized, leaving roughly $31 billion attributable to no quantified, named deal. The $21 billion Meta expansion (claim 10729) and $6 billion Jane Street commitment (claim 10730) postdate December 31, 2025 and cannot sit inside that figure; and the May 2025 backlog is a broader measure than the $14.7 billion RPO it contains, so the two should not be compared across periods.
Customer disclosures, read
2026-09-21CoreWeave's disclosure record separates cleanly into two tiers, and the gap between them is the story. The genuinely executed tier consists of order forms under pre-existing master services agreements, which is contract language, not intent language: OpenAI on September 23, 2025 (claim 4296), Meta's initial commitment of up to approximately $14.2 billion through December 14, 2031 (claim 4282), the March 31, 2026 Meta order form of roughly $21 billion through December 2032 (claims 2123, 10340), NVIDIA's capacity purchase under the April 2023 MSA (claim 4352), Jane Street at approximately $6 billion (claim 10304) and a multi-year Anthropic agreement (claim 9318). Everything else is softer. The January 2026 NVIDIA collaboration framework (claim 3892) and the 5-gigawatt buildout announcement (claim 17596) create no payment obligation, and claim 17598 concedes the software integration is only something the parties work toward. IBM (claim 4971), CrowdStrike (claims 11768, 10330), Genesis Mission participation (claims 11778, 10331) and the Exemplar Cloud designation (claims 10332, 9324) are positioning, not backlog.
On identification, the named-logo lists have grown while the dollar-bearing counterparties have stayed anonymous. Cognition, Cursor, Mercado Libre, Midjourney and Runway (claims 11767, 10338), then Cohere and Mistral (claim 9319), then Adaption Labs, Advaita Bio, Hudson River Trading, Perplexity and World Labs (claim 9320) arrive without a single contract value. Meanwhile the financings describe their collateral only generically: a customer contract behind DDTL 3.0 (claim 4595), a leading AI enterprise behind DDTL 4.0 (claim 11224), and, most tellingly, two large, non-investment grade customers behind DDTL 5.0 (claim 9119). An unnamed colocation provider appears in claim 8760, and claim 8926 asserts most of the world's leading AI labs without naming them.
The arithmetic only partly reconciles. RPO moved from $15.1 billion to $60.7 billion across 2025 (claims 3572, 3555), a build of roughly $45.6 billion, against named and quantified 2025 additions of $11.2 billion from OpenAI (claim 4969) and $14.2 billion from Meta. Over half the increase therefore attaches to deals whose value was never disclosed, including the September OpenAI order form and the NVIDIA commitment. Whether the $21 billion Meta figure supersedes or stacks on the $14.2 billion is also unresolved on the record (claims 17654, 17655), and at a five-year weighted-average duration (claim 3584) the implied run-rate depends heavily on that answer.
Customer disclosures, read
2026-09-21The contractual record separates cleanly along a disclosure-channel line: what arrived via 8-K order forms is signed, and what arrived via press release generally is not. Meta is the only counterparty with a fully documented paper trail — an initial commitment of up to approximately $14.2 billion through December 2031 under an existing MSA dated December 10, 2023 (claim 4282), an expansion option through 2032 (claim 4283), and a second order form executed March 31, 2026 for roughly $21 billion (claims 2123, 10340, 9317, 10729). OpenAI is named in a September 2025 order form (claim 4296) and earlier credited with $11.2 billion of backlog (claim 4969). NVIDIA appears twice in materially different registers: a September 2025 capacity purchase order form under the same MSA structure (claim 4352), which is a binding commitment from a related party, and a January 2026 collaboration framework (claims 3892, 17596) whose operative verb is to test, validate and work toward inclusion in reference architectures (claim 17598) — framework language, not revenue.
Against that, a large named cohort carries no disclosed economics. Anthropic (claims 9318, 10731) and Hudson River Trading (claim 10732) are described as multi-year agreements without value; Jane Street is the rare press-release name with a figure, about $6 billion (claims 10304, 10730). Cognition, Cursor, Mercado Libre, Midjourney, Runway (claims 11767, 10338), Cohere, Mistral (claim 9319), Adaption Labs, Advaita Bio, Perplexity and World Labs (claim 9320) are partner-of-choice listings. CrowdStrike (claims 11768, 10330), IBM (claim 4971), the Genesis Mission (claims 11778, 10331) and the NVIDIA Exemplar Cloud designation (claims 10332, 9324) are positioning, not contracts. Conversely, the largest contracts are precisely the ones left unnamed: the DDTL 3.0 customer contract (claim 4595), DDTL 4.0's leading AI enterprise (claim 11224), and DDTL 5.0's two large, non-investment-grade customers (claim 9119).
The arithmetic is directionally consistent but incompletely bridged. RPO rose from $15.1 billion to $60.7 billion (claims 3572, 3555), a $45.6 billion increase, against roughly $25.4 billion of named, quantified 2025 additions — leaving over 40% attributable to unidentified counterparties, with the unquantified OpenAI and NVIDIA order forms plausibly absorbing much of it. Concentration has broadened in names while the dollars remain lodged with Meta, OpenAI and Microsoft (claim 648).
Customer disclosures, read
2026-09-20Only a minority of CoreWeave's announced relationships are documented as executed customer contracts carrying disclosed economics. Four counterparties clear that bar: OpenAI, whose May 2025 strategic deal added $11.2 billion of backlog (claim 4969) and which executed a further order form under the 2023 MSA in September 2025 with no dollar value given in the record (claim 4296); Meta, with an initial commitment of up to approximately $14.2 billion through December 2031 (claim 4282) and a March 2026 order form of approximately $21 billion through December 2032 (claims 2123, 10340, 9317); Jane Street at approximately $6 billion (claims 10304, 10730); and NVIDIA, though its September 2025 order form (claim 4352) is a capacity purchase by NVIDIA, a different animal from third-party demand. Anthropic and Hudson River Trading are named with multi-year agreements but no disclosed value (claims 9318, 10732).
Against that, a substantial tier is named without contractual substance or described without being named at all. IBM (claim 4971), CrowdStrike (claims 11768, 10330) and Leidos (claim 8669) appear as partnerships and collaborations, not priced commitments, and CrowdStrike is simultaneously recited in a partner-of-choice logo list (claims 11767, 10338) that also carries Cognition, Cursor, Mercado Libre, Midjourney, Runway, and later Adaption Labs, Advaita Bio, Perplexity, World Labs, Cohere and Mistral (claims 9320, 9319) — none with attached economics. More material are the anonymized ones: a customer contract behind DDTL 3.0 (claim 4595), a leading AI enterprise behind DDTL 4.0 (claim 11224), and two large, non-investment-grade customers behind DDTL 5.0 (claim 9119). Microsoft, reported as among the biggest customers (claim 648), never appears as the named party to a disclosed order form here.
The arithmetic does not reconcile. Named, priced deals total roughly $52 billion even before asking whether Meta's $21 billion supersedes or supplements the earlier $14.2 billion — an unresolved ambiguity worth pressing. Backlog reached $104.2 billion in Q2 2026 (claim 1302), leaving about half unattributed. Separately, RPO of $60.7 billion at December 2025 (claim 3555) sits far below backlog, the difference being amounts contingent on delivery and availability conditions (claim 4970). Concentration has broadened from an OpenAI-and-Microsoft core toward Meta, trading firms and government-adjacent work, but the DDTL 5.0 language confirms credit concentration persists.
Customer disclosures, read
2026-09-20Only a handful of CoreWeave counterparties are backed by executed contract documents with disclosed economics. Meta is the clearest case: an order form under a December 2023 MSA committing up to approximately $14.2 billion through December 2031 (4282), with an option to expand through 2032 (4283), followed by a new order form dated March 31, 2026 (2123) characterized as roughly $21 billion through December 2032 (10340, 9317). Because the 2026 order form appears to be the exercise of that option, the two figures cannot safely be added, and nothing disclosed says whether the later number is incremental or cumulative (10729, 10694). OpenAI is named in an executed order form (4296) and credited with $11.2 billion of backlog (4969); NVIDIA has a signed order form whose capacity commitment is undisclosed (4352). Jane Street's approximately $6 billion (10304, 10730, 10695) and multi-year agreements with Anthropic (9318, 10731) and Hudson River Trading (10732) are described as signed, but only Jane Street carries a number.
Everything else sits in a softer register. The January 2026 NVIDIA item is a collaboration framework (3892), not an order, and the distinction matters precisely because the same counterparty also supplies real order-form volume. IBM (4971), CrowdStrike (11768, 10330) and Leidos (8669) are partnership or collaboration announcements without term, value, or contract reference, while Genesis Mission participation (11778, 10331) and NVIDIA Exemplar Cloud status (10332, 9324) are membership and designation rather than revenue. The partner-of-choice rosters naming Cognition, Cursor, Mercado Libre, Midjourney and Runway (11767, 10338), then Adaption Labs, Advaita Bio, Perplexity and World Labs (9320), plus expanded relationships with Cohere and Mistral (9319), identify counterparties but attach no economics.
Concentration has narrowed in names and widened in dollars. At March 2025, OpenAI alone was roughly 43% of the $25.9 billion backlog (4970). RPO moved from $15.1 billion (3572) to $60.7 billion (3571), and backlog from $99.4 billion to $104.2 billion with more than $25 billion signed early in the following quarter (1302, 1303). The arithmetic does not close: named, valued deals total roughly $27 billion against a far larger increase, and the biggest financings are tied to unidentified parties, namely a customer contract (4595), a leading AI enterprise (11224), and two large, non-investment-grade customers (9119). Backlog also exceeds RPO by construction (4970), so headline growth comparisons mix two measures.
Customer disclosures, read
2026-09-20CoreWeave's record separates into three tiers, and only the first carries contractual weight. Genuine signed instruments — order forms executed under pre-existing master services agreements — exist with OpenAI (claim 4296, MSA-based order form dated September 23, 2025), Meta (claim 2123, order form of March 31, 2026 under a December 2023 MSA), and NVIDIA (claim 4352). Anthropic is described as a signed multi-year agreement (claim 9318), and Jane Street as a roughly $6 billion commitment (claim 10304). Hudson River Trading is reported only as an announced multi-year agreement (claim 10732), sourced to press rather than filing.
The second tier is named but uncontracted. IBM (claim 4971) and CrowdStrike (claims 11768, 10330) appear as partnerships with no quantum, term, or committed spend. The partner-of-choice lists — Cognition, Cursor, Mercado Libre, Midjourney, Runway (claims 11767, 10338), then Adaption Labs, Advaita Bio, Perplexity, World Labs (claim 9320) — are logo inventories, not disclosed obligations; Cohere and Mistral appear as expanded relationships (claim 9319) without figures. NVIDIA's 2026 posture softens from order form to collaboration framework (claim 3892), and the Exemplar Cloud designation (claims 10332, 9324) and Genesis Mission participation (claims 11778, 10331) are credentials, not revenue.
The third tier is the one that matters most and names no one. The financings repeatedly describe counterparties by silhouette: a customer contract behind DDTL 3.0 (claim 4595), a leading AI enterprise behind DDTL 4.0 (claim 11224), and two large, non-investment-grade customers behind DDTL 5.0 (claim 9119). The arrangers are named precisely (claims 11225, 9121, 8736) while the obligors are not — non-investment-grade being the operative disclosure.
Concentration has broadened in logo count but not in dollars. OpenAI alone was $11.2 billion of a $25.9 billion backlog in March 2025 (claims 4969, 4970). RPO moved $15.1 billion to $60.7 billion (claims 3572, 3555); backlog reached $104.2 billion by Q2 2026 (claim 1302). Named commitments — OpenAI $11.2 billion, Meta $14.2 billion then $21 billion (claims 4282, 10340), Jane Street $6 billion — total roughly $52 billion, about half the backlog. Whether Meta's $21 billion supersedes or stacks on the $14.2 billion is never clarified, and the $4.8 billion sequential backlog increase (claim 1302) sits awkwardly against $6 billion of Jane Street and $25 billion of subsequent commitments (claims 1303, 3011). The arithmetic does not close.
Customer disclosures, read
2026-09-20The contractually hard set is smaller than the announcement flow suggests. Only six counterparties appear with executed instruments and dollar figures: OpenAI, via an order form under the April 2023 MSA (claim 4296) and the earlier $11.2 billion backlog addition (claim 4969); Meta, via the December 2023 MSA order forms totaling roughly $14.2 billion through 2031 (claim 4282) and a further ~$21 billion through 2032 signed March 31, 2026 (claims 2123, 10340, 9317); NVIDIA, under a September 2025 order form (claim 4352); Jane Street at approximately $6 billion (claim 10304); Anthropic, described as a signed multi-year agreement but with no disclosed value (claim 9318); and Hudson River Trading, multi-year and undisclosed (claim 10732). Everything else is softer. The IBM arrangement is a "partnership" (claim 4971), CrowdStrike a "global partnership" (claims 11768, 10330) even while appearing on the customer roster (claims 11767, 10338), and the January 2026 NVIDIA item is explicitly a "collaboration framework" (claim 3892), which should not be double-counted against the September order form. NVIDIA Exemplar Cloud (claims 10332, 9324) and the DOE Genesis Mission (claims 11778, 10331) are designations, not revenue. The lists of Cognition, Cursor, Mercado Libre, Midjourney, Runway, Perplexity, World Labs, Adaption Labs, Advaita Bio, Cohere and Mistral (claims 11767, 10338, 9320, 9319) carry no disclosed economics at all.
The named-versus-unnamed split is most visible in the financings. DDTL 3.0 cites "a customer contract" (claim 4595), DDTL 4.0 a "leading AI enterprise" (claim 11224), DDTL 5.0 "two large, non-investment grade customers" (claim 9119), and the Indonesia build an unnamed colocation lessor and unnamed "existing customer demand" (claims 8760, 8762). Concentration has broadened nominally but not in dollars: OpenAI alone was $11.2 billion of a $25.9 billion backlog in May 2025 (claims 4969, 4970), and Microsoft and OpenAI were still described as the biggest a year later (claim 648).
The arithmetic only partially reconciles. RPO rose $45.6 billion in 2025, from $15.1 billion to $60.7 billion (claim 3555), yet the only 2025 deal with a disclosed value is Meta's $14.2 billion; the OpenAI and NVIDIA order forms were unpriced. Similarly, Q2 2026 backlog rose just $4.8 billion to $104.2 billion (claim 1302) despite the $21 billion Meta expansion, which landed in Q1, while the $25 billion of "new commitments" (claims 1303, 3011) sits outside both. The backlog-to-RPO gap remains the conditional bucket flagged in claim 4970. Note also that several figures repeat across claims (3555/3560/3571; 10729/10694; 10730/10695), and the "$21,000" unit artifacts in claims 10729 and 9317 should not be read as corroborating distinct events.
Customer disclosures, read
2026-09-19CoreWeave's record has a small core of signed, order-form-level contracts, surrounded by a much larger volume of partnership and logo-list language. The signed contracts are OpenAI, through the $11.2 billion strategic deal (4969) and a September 2025 order form under an existing MSA (4296). Meta signed a $14.2 billion order form running through 2031 (4282). It then signed a second order form on March 31, 2026 (2123), valued at roughly $21 billion through 2032 (10340, 9317). NVIDIA's September 2025 order form (4352) also sits on the customer side of the ledger. Jane Street's roughly $6 billion commitment (10304) and the Anthropic agreement, described as signed (9318), are firm, although Anthropic's value is undisclosed. The Hudson River Trading agreement (10732) comes only from secondary reporting. By contrast, IBM (4971), CrowdStrike (11768, 10330), the NVIDIA collaboration framework (3892), Exemplar Cloud status (10332, 9324) and the Genesis Mission (11778, 10331) are partnership or designation language with no disclosed dollar commitment. The same is true of the logo lists (11767, 10338, 9320) and the 'expanded relationships' with Cohere and Mistral (9319). The banks named in 11225, 9121 and 8736 are lenders, not customers. Several material counterparties remain anonymous. These include the customer financed by DDTL 3.0 (4595), the 'leading AI enterprise' behind DDTL 4.0 (11224), and the 'two large, non-investment grade customers' behind DDTL 5.0 (9119). That last disclosure is the most credit-relevant one on file, and it has no names attached. Concentration has shifted without falling. In 2025 the book was anchored by OpenAI and Microsoft (648). Meta has since become a co-anchor, with about $35 billion in cumulative named commitments. Jane Street is the only newly named counterparty in the multi-billion range. The revenue arithmetic reconciles only partially. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), an increase of $45.6 billion. Named, quantified 2025 deals total about $25.4 billion (OpenAI plus Meta). The OpenAI and NVIDIA September order forms have no value in this record, so roughly $20 billion cannot be traced to a named source here. In Q2 2026, backlog rose only $4.8 billion to $104.2 billion (1302), less than Jane Street's $6 billion alone, which implies meaningful revenue burn-off or differences in booking timing. The more than $25 billion in early-Q3 commitments (1303, 3011) is unattributed; Hudson River Trading may account for part of it. Duplicative duration claims (3556, 3561, 3573, 3584) and the date mismatch in 10729 should be treated as sourcing noise.
Customer disclosures, read
2026-09-19CoreWeave's contract record is stronger than most AI-infrastructure peers because much of it rests on executed order forms under existing master services agreements, not on memoranda. The clearest signed agreements are the NVIDIA order form (claim 4352), the OpenAI order form (4296), which follows the $11.2 billion OpenAI backlog addition (4969), and two Meta order forms. The first Meta order form committed up to about $14.2 billion through 2031 (4282), and the second, dated March 31, 2026, added roughly $21 billion through 2032 (2123, 9317). Anthropic is described as 'signed' but without a dollar figure (9318). Jane Street's roughly $6 billion commitment (10304) is named and sized, though the record does not include an order-form filing for it.
A second tier is softer and should not be read as revenue. This includes the NVIDIA 'collaboration framework' (3892), the IBM 'partnership' (4971), the CrowdStrike 'global partnership' (11768, 10330), Genesis Mission participation (11778) and the Exemplar Cloud designations (10332, 9324). The recurring 'partner of choice' logo lists (11767, 9320) and the 'expanded relationships' with Cohere and Mistral (9319) name counterparties but disclose no terms. Hudson River Trading's August agreement (10732) is likewise unsized.
Several material obligations remain unidentified. These include the customer contract behind DDTL 3.0 (4595), the 'leading AI enterprise' behind DDTL 4.0 (11224), the 'two large, non-investment grade customers' behind DDTL 5.0 (9119) and the colocation landlord in Indonesia (8760). Financing tied to non-investment-grade counterparties deserves particular attention.
Concentration has shifted rather than diluted. In 2025, OpenAI's $11.2 billion was the anchor against $25.9 billion of backlog (4970, 4969). By 2026, Meta's cumulative commitments of about $35 billion appear to rival or exceed it, and Microsoft and OpenAI are still cited among the largest customers (648).
The arithmetic only partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), which is broadly consistent with the named OpenAI, Meta and NVIDIA orders. Backlog then reached $99.4 billion by March 2026 (1302), a jump of about $39 billion in which the $21 billion Meta order explains only about half. The gap also mixes RPO and a broader backlog definition (4970). The second quarter added only $4.8 billion despite Jane Street's $6 billion, which implies revenue burn-down. The 'more than $25 billion' of new third-quarter commitments (1303, 3011) has no disclosed counterparty. Readers should also note that the August report of Meta 'adding' $21 billion (8668) restates the March deal and is not a new commitment.
Customer disclosures, read
2026-09-19CoreWeave's record contains a small group of contracts with filing-level specificity, surrounded by a much larger volume of partnership language. The firmest items are order forms executed under existing master services agreements. These cover OpenAI (4296), with an earlier $11.2 billion backlog addition (4969); Meta, at up to approximately $14.2 billion through 2031 (4282) and then about $21 billion through December 2032 under a March 31, 2026 order form (2123, 10340, 9317); and NVIDIA as a capacity purchaser (4352). The company's own release gives Jane Street's roughly $6 billion commitment (10304), and it states that the Anthropic agreement was signed (9318), though no value is given. The Hudson River Trading agreement (10732), and the dates attached to Anthropic and Jane Street (10731, 10695), come only from secondary press paraphrase. Several items do not evidence contracted revenue: the IBM 'partnership' (4971), the NVIDIA 'collaboration framework' (3892), the CrowdStrike 'global partnership' (11768, 10330), Genesis Mission participation (11778), the Leidos 'collaboration' (8669), and the Exemplar Cloud designations (10332, 9324). Logo rosters (11767, 10338, 9320) and 'expanded relationships' with Cohere and Mistral (9319) name counterparties but give no terms. The largest opacity sits in the financing disclosures. DDTL 3.0 funds 'a customer contract' (4595), DDTL 4.0 serves a 'leading AI enterprise' (11224), and DDTL 5.0 backs 'two large, non-investment grade customers' (9119), none of them identified. The more than $25 billion of commitments signed after the second quarter is also unattributed (1303, 3011). Concentration has broadened in name but perhaps not in dollars. In early 2025, OpenAI alone accounted for $11.2 billion of a $25.9 billion backlog (4969, 4970). Meta's two order forms now total roughly $35 billion, and press still describes Microsoft and OpenAI as among the biggest customers (648). The arithmetic broadly reconciles, but only loosely. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), which is consistent with Meta's $14.2 billion plus the OpenAI tranches. Meta's $21 billion falls on March 31 and so belongs in the first quarter, which helps explain a $99.4 billion backlog (1302), though backlog is a broader measure than RPO (4970). The second quarter rose only $4.8 billion, to $104.2 billion, despite Jane Street's roughly $6 billion and Anthropic's unvalued deal. That gap implies meaningful burn-down, or smaller-than-headline booked values, and the disclosures do not itemize either.
Customer disclosures, read
2026-09-19CoreWeave's signed customer record is stronger than most AI-infrastructure peers, but it is carried by a small number of counterparties. The firmest items are order forms executed under existing Master Services Agreements. These are with OpenAI (4296, following the $11.2 billion backlog addition in 4969), NVIDIA (4352), and Meta: $14.2 billion through 2031 (4282), then a roughly $21 billion order form dated March 31, 2026 (2123, 10340, 9317). Jane Street's roughly $6 billion commitment (10304) and the Anthropic agreement described as 'signed' (9318) also read as contracted, although Anthropic carries no disclosed value. Hudson River Trading's multi-year deal is sourced only secondhand (10732). Microsoft appears as a top customer only in press coverage (648). A second tier consists of relationship language rather than commitments. That tier includes the IBM 'partnership' (4971), the NVIDIA 'collaboration framework' (3892), the CrowdStrike 'global partnership' (11768), the Leidos 'collaboration' (8669), Genesis Mission participation (11778, 10331), Exemplar Cloud designations (10332, 9324), and logo lists (11767, 9320). Meta's expansion option (4283) is optionality, not backlog. Several of the most material contracts remain unidentified. These include the customer behind DDTL 3.0 (4595), the 'leading AI enterprise' financed by DDTL 4.0 (11224), and the 'two large, non-investment grade customers' behind DDTL 5.0 (9119). The last of these is a notable credit disclosure.
Concentration has broadened in name count but not clearly in dollars. In early 2025, OpenAI's $11.2 billion was about 43% of $25.9 billion backlog (4969, 4970). By 2026 Meta's cumulative roughly $35 billion arguably makes it the largest disclosed exposure, with OpenAI's September order value not stated in the record.
The arithmetic partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3571), a $45.6 billion increase. The quantified named deals explain only about $25 billion of it, and gross additions would have to exceed $45.6 billion because revenue recognized during the year consumes RPO. The undisclosed OpenAI and NVIDIA order values plausibly fill the gap, but this cannot be verified. Readers should also note that 'backlog' and 'RPO' are different measures: backlog includes amounts contingent on delivery (4970). The move from $60.7 billion RPO to $99.4 billion backlog therefore mixes definitions. Backlog grew only $4.8 billion in Q2 2026 (1302) despite Jane Street's $6 billion and the Anthropic deal. That implies meaningful burn-down or smaller-than-headline bookings. The $25 billion signed after quarter-end (1303, 3011) remains entirely unattributed.
Customer disclosures, read
2026-09-19The signed-contract record at CoreWeave is narrower than the partnership language around it. Three counterparties have executed order forms under master services agreements that the company disclosed in formal filings: OpenAI (claim 4296, following the $11.2 billion strategic deal in claim 4969), NVIDIA (claim 4352), and Meta, whose initial commitment of up to about $14.2 billion (claim 4282) was followed by a roughly $21 billion order form dated March 31, 2026 (claim 2123). That single Meta deal recurs across claims 10729, 10694, 10340, 9317 and likely 8668, so it should not be counted more than once. Jane Street's roughly $6 billion commitment (claim 10304) and the Anthropic agreement (claim 9318) are also described as signed, but Anthropic's value is undisclosed, and so are the terms of the Hudson River Trading agreement (claim 10732). A different category covers IBM (claim 4971), the NVIDIA collaboration framework (claim 3892), CrowdStrike (claims 11768 and 10330), Leidos (claim 8669) and the Genesis Mission (claim 11778). These are partnerships or collaborations with no disclosed dollar commitment. The logo lists in claims 11767, 10338 and 9320 are marketing, not contract disclosures.
Several of the largest financing-linked obligations remain anonymous. DDTL 3.0 finances "a customer contract" (claim 4595). DDTL 4.0 serves a "leading AI enterprise" (claim 11224). DDTL 5.0 backs contracts with "two large, non-investment grade customers" (claim 9119). The more than $25 billion in new commitments signed early in Q3 2026 carries no named counterparty (claim 1303).
Concentration has diluted in form but not clearly in substance. OpenAI alone was about 43% of the $25.9 billion backlog at March 2025 (claims 4969 and 4970). By 2026, Meta's roughly $35 billion in combined commitments rivals it, and Microsoft and OpenAI are still described as among the biggest customers (claim 648).
The revenue arithmetic reconciles only loosely. Backlog is not RPO: the $25.9 billion figure included just $14.7 billion of RPO, with the rest subject to delivery conditions (claim 4970). RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572 and 3571), which the named Meta and OpenAI deals can plausibly support. The Q2 2026 backlog, however, grew by only about $4.8 billion, to $104.2 billion (claim 1302), in a quarter that included Jane Street's $6 billion and the Anthropic agreement. That implies substantial burn-down from recognized revenue or modest undisclosed deal values. The value of the NVIDIA order form and the September 2025 OpenAI order form are not in the quoted record, and the record itself is truncated at claim 8668.
Customer disclosures, read
2026-09-19CoreWeave's record separates cleanly into executed order forms and softer relationship language. The strongest disclosures are 8-K order forms under existing master services agreements: OpenAI (4296, with $11.2 billion of backlog attributed to the strategic deal in 4969), NVIDIA (4352), and Meta, whose initial commitment of up to about $14.2 billion (4282) was followed by a roughly $21 billion order form dated March 31, 2026 (2123, 10340, 9317). Jane Street's approximately $6 billion commitment (10304) and the 'signed multi-year agreement' with Anthropic (9318) also read as contracts, though Anthropic carries no disclosed value. Hudson River Trading's agreement (10732) is sourced only to secondary press. By contrast, IBM (4971), CrowdStrike (11768, 10330), the NVIDIA 'collaboration framework' (3892), Leidos (8669) and the Genesis Mission (11778) are partnership or framework announcements with no disclosed economics. The 'partner of choice' logo lists (11767, 9320) name companies such as Cursor, Midjourney and Perplexity but do not describe commitments.
The most consequential counterparties are often unnamed. The DDTL 3.0 facility financed 'a customer contract' (4595), DDTL 4.0 serves a 'leading AI enterprise' (11224), DDTL 5.0 funds 'two large, non-investment grade customers' (9119), and the Indonesia build cites unspecified 'existing customer demand' (8762). Concentration has broadened from OpenAI alone to OpenAI and Meta, with Microsoft also named among the largest customers (648). OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog at March 31, 2025 (4969, 4970). Meta's disclosed commitments now total roughly $35 billion. Because the DDTL 5.0 borrowers are described as non-investment grade, a meaningful share of the newest backlog likely sits with weaker credits than the hyperscalers.
The revenue arithmetic only partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3555), a $45.6 billion increase. Named, quantified 2025 deals explain only about $14 billion of that, because the value of the September OpenAI order form is not on record. Backlog then reached $99.4 billion by the first quarter of 2026 and $104.2 billion by the second (1302). Meta's $21 billion explains only about half of the first-quarter step-up. Another $25 billion in post-quarter commitments is unattributed (1303, 3011). Readers should also note that 'backlog' includes amounts beyond RPO that are subject to delivery conditions (4970). RPO was $14.7 billion at March 31, 2025, below the year-end 2024 figure despite the OpenAI deal, so the two measures should not be compared directly. Finally, claim 10729 is dated before the March event it describes.
Customer disclosures, read
2026-09-18CoreWeave's record separates cleanly into executed contracts and softer relationship language, and the contracted layer is concentrated in a few names. The strongest evidence is the order forms filed under existing master services agreements: NVIDIA in September 2025 (claim 4352), OpenAI the same month (claim 4296), and Meta in September 2025 and again on March 31, 2026 (claims 4282, 2123). Anthropic is described as a signed multi-year agreement (claim 9318), and Jane Street as a roughly $6 billion commitment (claim 10304), but neither has a filed order form on record. The first Meta figure is a ceiling, 'up to approximately $14.2 billion' (claim 4282), and its expansion right is only an option (claim 4283). Softer items should not be read as revenue. These include the IBM 'partnership' (claim 4971), the NVIDIA 'collaboration framework' (claim 3892), the CrowdStrike 'global partnership' (claims 11768, 10330), Genesis Mission participation (claims 11778, 10331), and the rotating 'partner of choice' name lists (claims 11767, 9320). Several financing disclosures refer to counterparties that are never named: 'a customer contract' behind DDTL 3.0 (claim 4595), a 'leading AI enterprise' behind DDTL 4.0 (claim 11224), and 'two large, non-investment grade customers' behind DDTL 5.0 (claim 9119). The phrase 'leading AI labs and hyperscalers' (claim 8926) is likewise unidentified. Concentration has shifted rather than eased. In May 2025, OpenAI's $11.2 billion accounted for about 43% of the $25.9 billion backlog (claims 4969, 4970). Meta's commitments now total roughly $35 billion in named figures (claims 4282, 9317), and Microsoft and OpenAI are still cited as the largest customers (claim 648). The DDTL 5.0 disclosure adds a credit-quality concern that the named-customer narrative does not address. The revenue arithmetic reconciles only loosely. RPO rose from $15.1 billion to $60.7 billion during 2025 (claim 3555), which is broadly consistent with the OpenAI and Meta order forms, although the September 2025 OpenAI value is not quoted on record. Backlog reached $99.4 billion in Q1 2026 and $104.2 billion in Q2 2026 (claim 1302). The March Meta deal fits within Q1, but backlog is a broader measure than RPO and year-end 2025 backlog is not on record, so the two series cannot be bridged precisely. Q2 backlog grew only $4.8 billion even though the $6 billion Jane Street deal was announced in that quarter, which implies meaningful burn-down or other offsets. Recognized revenue is not on record to confirm this. Readers should treat the August 2026 '$21 billion' Meta reference (claim 8668) as a restatement of the March deal rather than a new award. The '$25 billion in new commitments' (claims 1303, 3011) has no named counterparty.
Customer disclosures, read
2026-09-18CoreWeave's signed contracts are mostly concentrated in a handful of order forms executed under existing Master Services Agreements. The clearest are the September 2025 OpenAI order form (claim 4296), the September 2025 NVIDIA capacity order (claim 4352), and two Meta order forms: an initial commitment of up to about $14.2 billion through 2031 (claims 4282, 4283) and a roughly $21 billion order dated March 31, 2026 (claims 2123, 9317, 10340). Anthropic's agreement is described as "signed" (claim 9318) but carries no disclosed value. Jane Street's roughly $6 billion commitment (claims 10304, 10730) is the only other named deal with a figure attached. Hudson River Trading's August agreement (claim 10732) is reported only secondhand. Much of the rest is looser. The IBM Granite "partnership" (claim 4971), the NVIDIA "collaboration framework" (claim 3892), the CrowdStrike "global partnership" (claims 11768, 10330), the Genesis Mission (claims 11778, 10331) and the Exemplar Cloud designations (claims 10332, 9324) are relationship or certification language, not disclosed revenue contracts. The rotating "partner of choice" lists (claims 11767, 10338, 9320) and the "expanded relationships" with Cohere, Jane Street and Mistral (claim 9319) name logos but give no terms. Several material obligations are left anonymous. DDTL 3.0 finances "a customer contract" (claim 4595), DDTL 4.0 serves a "leading AI enterprise" (claim 11224), and DDTL 5.0 backs "two large, non-investment grade customers" (claim 9119). All of these are facilities that single out specific counterparties without naming them. Concentration has shifted but not spread out. In May 2025, OpenAI's $11.2 billion accounted for about 43% of the $25.9 billion backlog (claims 4969, 4970). By late 2026, Meta's roughly $35 billion in cumulative commitments sits alongside OpenAI, and Microsoft and OpenAI are still described as "among the biggest" (claim 648). The arithmetic reconciles only in part. RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3555), and backlog reached $99.4 billion by Q1 2026 (claim 1302). Backlog, though, includes amounts that depend on delivery conditions (claim 4970), so the two series cannot be compared directly. Meta's $21 billion, signed March 31, explains roughly half of the Q1 gap, and the remainder is not attributed to any named deal. Backlog grew only $4.8 billion in Q2, to $104.2 billion, even though Jane Street's $6 billion and the Anthropic deal were announced that quarter. That points to heavy burn-down from recognized revenue, which cannot be verified here. The later "$21 billion" Meta references (claims 8668, 10729, 10694) appear to restate the March order and should not be counted again. The ">$25 billion" signed early in Q3 (claims 1303, 3011) has no identified counterparties.
Customer disclosures, read
2026-09-18CoreWeave's record splits into three tiers of evidentiary weight. The strongest are order forms executed under existing master services agreements and disclosed in filings: NVIDIA (4352), OpenAI (4296), and Meta's $14.2 billion commitment through 2031 (4282) and its March 31, 2026 order form (2123). These are signed, named, and in Meta's case priced. A second tier is named and signed but carries no disclosed value, such as the multi-year Anthropic agreement (9318, 10731) and Hudson River Trading's August deal (10732). Jane Street's roughly $6 billion commitment (10304, 10730) sits between those tiers, because it is quantified in the company's own release but has no matching filing on this record. The third tier is relationship language: the IBM Granite 'partnership' (4971), the NVIDIA 'collaboration framework' (3892), CrowdStrike (11768), the Genesis Mission (11778), Exemplar Cloud status (10332, 9324), and the rotating 'partner of choice' rosters (11767, 9320). None of these establishes contracted revenue. Several counterparties are unidentified altogether. The customer contract that funded DDTL 3.0 is unnamed (4595), as is the 'leading AI enterprise' behind DDTL 4.0 (11224). DDTL 5.0 serves 'two large, non-investment grade customers' (9119), a credit disclosure that deserves more attention than it gets.
Concentration has shifted from OpenAI to a two-anchor structure. At March 2025, OpenAI's $11.2 billion (4969) was about 43% of $25.9 billion in backlog (4970). Meta's commitments now total roughly $35.2 billion (4282, 9317). The August 2026 report describing Meta as having 'added $21 billion' (8668) most plausibly restates the March deal rather than a third tranche. By August, Microsoft and OpenAI were still cited among the largest customers (648).
The arithmetic reconciles only loosely. RPO rose $45.6 billion during 2025 (3555), but Meta's $14.2 billion is the only 2025 addition quantified on the record, since the NVIDIA and OpenAI order-form values are truncated here. The step from $60.7 billion RPO (3571) to $99.4 billion backlog at March 2026 (1302) is not a like-for-like comparison, because backlog also counts amounts beyond RPO (4970). Meta and Jane Street alone account for about $27 billion of the quarter's gain. Backlog then grew only $4.8 billion in Q2 (1302). The more than $25 billion signed early in Q3 (1303, 3011) has not been attributed to named counterparties.
Customer disclosures, read
2026-09-18CoreWeave's record separates cleanly into executed order forms and softer relationship language. The hardest evidence comes from order forms under existing Master Services Agreements: OpenAI in May 2025, adding $11.2 billion of backlog (claim 4969), and again in September 2025 (4296); NVIDIA's capacity order in September 2025 (4352); Meta's initial commitment of up to $14.2 billion through 2031 (4282); and Meta's roughly $21 billion March 31, 2026 order form (2123, 10340, 9317). Jane Street's approximately $6 billion commitment (10304) and the Anthropic multi-year agreement described as signed (9318) are also contractual, although no value is disclosed for Anthropic. The Hudson River Trading agreement (10732) rests on secondary reporting only. Several items read as contracts but carry weaker language: the IBM 'partnership' (4971), the NVIDIA 'collaboration framework' (3892), the CrowdStrike 'global partnership' (11768, 10330), Genesis Mission participation (11778), the Exemplar Cloud designations (10332, 9324) and the 'partner of choice' rosters (11767, 9320). None of these discloses a committed dollar figure. Meta's option to expand through 2032 (4283) was an option, not a commitment, until the March 2026 order form. Unidentified counterparties are a recurring feature. They include the customer behind DDTL 3.0 (4595), the 'leading AI enterprise' behind DDTL 4.0 (11224), the 'two large, non-investment grade customers' financed by DDTL 5.0 (9119), and the more than $25 billion of new commitments signed after the second quarter (1303, 3011), none of which is attributed. Concentration has shifted without clearly declining. In early 2025, OpenAI's $11.2 billion equaled about 43% of the $25.9 billion backlog (4970). By 2026, disclosed Meta commitments total about $35 billion, while Microsoft and OpenAI are still described as among the largest customers (648). The arithmetic reconciles only in part. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555), an increase of about $45.6 billion. Only about $25.4 billion of that increase is dollar-identified, from OpenAI's May deal and Meta's initial commitment, because the values of the September OpenAI and NVIDIA order forms are truncated in the record. Backlog rose just $4.8 billion to $104.2 billion in the second quarter of 2026 (1302), even though the Jane Street and Anthropic signings fell in that quarter. That implies substantial run-off, or a value for Anthropic smaller than headlines suggest. The same $21 billion Meta deal appears in at least five claims (10729, 10694, 10340, 9317, 8668), and some claims record it as '$21,000', presumably in millions. Readers should count it once.
Customer disclosures, read
2026-09-18CoreWeave's record separates cleanly into a small set of executed, dollar-denominated order forms and a much larger layer of partnership and logo language. The signed contracts are OpenAI ($11.2 billion added to backlog, claim 4969, plus a September 2025 order form under the existing MSA whose value the quote omits, claim 4296), Meta (up to approximately $14.2 billion through 2031, claim 4282, and a roughly $21 billion order form executed March 31, 2026, claim 2123), NVIDIA as a capacity buyer (claim 4352), and Jane Street at about $6 billion (claim 10304). Anthropic is described as a signed multi-year agreement with no value (claim 9318), and Hudson River Trading appears only through secondary reporting of an August agreement (claim 10732). The Meta option to expand through 2032 (claim 4283) is an option, not a commitment. IBM (claim 4971), the NVIDIA collaboration framework (claim 3892), CrowdStrike (claims 11768, 10330), the Genesis Mission (claim 11778) and Exemplar Cloud status (claims 10332, 9324) carry no disclosed economics. The 'partner of choice' rosters (claims 11767, 9320) and the Cohere and Mistral expansions (claim 9319) are logos, not quantified contracts. Several material counterparties remain unnamed: the customer behind DDTL 3.0 (claim 4595), the 'leading AI enterprise' behind DDTL 4.0 (claim 11224), and the two large non-investment-grade customers behind DDTL 5.0 (claim 9119). Microsoft is cited as among the biggest customers (claim 648) but never appears as a disclosed contract in this record. Concentration has shifted rather than eased. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog in May 2025 (claims 4969, 4970). Meta's two order forms now total roughly $35 billion, about a third of the $104.2 billion Q2 2026 backlog (claim 1302). The newer trading-firm and lab names add breadth but little dollar weight. On arithmetic, RPO rose from $15.1 billion to $60.7 billion during 2025 (claims 3572, 3555), consistent with the Meta and OpenAI order forms. Backlog, however, is a broader measure than RPO (claim 4970), so the jump to $99.4 billion by Q1 2026 is not directly comparable. Q2 backlog grew only $4.8 billion despite Jane Street's $6 billion April commitment, which implies consumption or timing offsets that are not itemized. The $21 billion Meta deal is restated across at least six claims (10729, 10694, 10340, 2123, 9317, 8668), and it should be counted once. The $25 billion in post-quarter commitments (claims 1303, 3011) has no named counterparties.
Customer disclosures, read
2026-09-18CoreWeave's record separates cleanly into executed order forms and softer partnership language, and the executed layer is narrow. The binding agreements are order forms under existing Master Services Agreements with NVIDIA (claim 4352), OpenAI (claim 4296) and Meta (claims 4282, 2123). Meta's commitments are the only ones with disclosed dollar values in a filing: up to about $14.2 billion through 2031 (claim 4282) and a further roughly $21 billion through December 2032 signed March 31, 2026 (claims 2123, 9317). The Anthropic agreement is described as signed but has no value attached (claim 9318). Jane Street's roughly $6 billion comes from company and press statements rather than an order-form filing (claims 10304, 10730). Hudson River Trading's multi-year deal is sourced only to press (claim 10732). By contrast, IBM (claim 4971), the NVIDIA collaboration framework (claim 3892), CrowdStrike (claims 11768, 10330), Leidos (claim 8669), the Genesis Mission (claim 11778) and the Exemplar Cloud designations (claims 10332, 9324) are collaborations or recognitions with no disclosed economics. The logo lists in claims 11767 and 9320 name counterparties but not terms.
Several material counterparties go unnamed. These include the customer behind DDTL 3.0 (claim 4595), the "leading AI enterprise" financed by DDTL 4.0 (claim 11224), the "two large, non-investment grade customers" behind DDTL 5.0 (claim 9119) and the colocation landlord for Indonesia (claim 8760). The two non-investment-grade customers are the most diligence-relevant disclosure, because they tie debt directly to credit-weaker offtakers. Microsoft appears as a top customer only through press characterization (claim 648).
Concentration has shifted rather than diluted. OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog in March 2025 (claims 4969, 4970). Meta's disclosed commitments now total about $35 billion, roughly a third of the $104.2 billion Q2 2026 backlog (claim 1302), and OpenAI still sits alongside it.
The arithmetic only partly reconciles. RPO rose $45.6 billion during 2025 (claims 3571, 3572), yet the only quantified named deal after Q1 is Meta's $14.2 billion. The OpenAI and NVIDIA order-form values are not in the record. The step from $60.7 billion RPO to $99.4 billion backlog spans different metrics (claims 3555, 1302), so the roughly $17.7 billion not explained by Meta's $21 billion should be treated as unattributed rather than missing. Q2 backlog grew only $4.8 billion despite Jane Street's $6 billion and Anthropic, which implies meaningful burn-down. The "more than $25 billion" of early-Q3 commitments (claim 1303) is not yet tied to named counterparties. Claim 10729 is dated before the event it describes, and the record is truncated at claim 8668.
Customer disclosures, read
2026-09-14CoreWeave's record separates into a small set of contractually documented commitments and a much larger layer of partnership language. The signed agreements are the order forms filed under master services agreements. These cover OpenAI (4296, with an earlier $11.2 billion backlog addition in 4969), NVIDIA (4352), and Meta, which signed an initial commitment of up to $14.2 billion (4282) and a further roughly $21 billion order form on March 31, 2026 (2123, 10340, 9317). Jane Street's approximately $6 billion commitment (10304) and the Anthropic agreement described as signed (9318) also belong in this tier, although Anthropic carries no disclosed value. Hudson River Trading's multi-year agreement (10732) is reported only secondhand and without terms. Everything else should be read as non-binding or undimensioned. That includes the IBM partnership (4971), the NVIDIA collaboration framework (3892), CrowdStrike's global partnership (11768, 10330), Leidos's collaboration (8669), Genesis Mission participation (11778, 10331), Exemplar Cloud designations (10332, 9324), 'expanded relationships' with Cohere and Mistral (9319), and the 'partner of choice' logo lists (11767, 9320).
The unnamed counterparties matter more than the named ones. DDTL 3.0 financed an unidentified customer contract (4595). DDTL 4.0 served an unnamed 'leading AI enterprise' (11224). DDTL 5.0 is dedicated to two 'large, non-investment grade customers' (9119), a description that excludes Meta. The more than $25 billion of new commitments signed early in the third quarter (1303) is also unattributed, as is the Indonesia demand (8762). The debt-financed contracts, which are the most capital-intensive, are the least identified.
Concentration has shifted rather than diluted. In May 2025, OpenAI's $11.2 billion represented roughly 43% of $25.9 billion in backlog (4969, 4970), and Microsoft and OpenAI remained described as the largest customers in August 2026 (648). Meta's two disclosed commitments now total about $35 billion, so exposure has spread across two or three hyperscale-scale buyers rather than a broad base.
The arithmetic only partly reconciles. RPO rose from $15.1 billion to $60.7 billion during 2025 (3572, 3555), and the weighted duration was about five years (3584). Backlog, a broader measure that includes amounts beyond RPO (4970), reached $99.4 billion at the end of the first quarter of 2026. Meta's $21 billion explains roughly half of the implied increase, and the remainder is unattributed. Second-quarter backlog grew only $4.8 billion to $104.2 billion (1302), despite Jane Street's $6 billion and the Anthropic signing. That is consistent only if revenue burn offset these additions or Anthropic's value was modest, and neither can be verified from these disclosures. Claim 3011 carries no supporting text and should not be relied upon.
Customer disclosures, read
2026-09-14CoreWeave's record separates into three tiers. The signed tier consists of order forms executed under existing Master Services Agreements with named counterparties: NVIDIA (claim 4352), OpenAI (4296, following the $11.2 billion strategic deal in 4969) and Meta (4282, then the March 31, 2026 order form in 2123, which 10340 and 9317 value at about $21 billion). Jane Street's roughly $6 billion commitment (10304) and the Anthropic and Hudson River Trading multi-year agreements (9318, 10732) are described as signed, but no contract value is disclosed for Anthropic or Hudson River Trading. The softer tier is a partnership and framework layer that carries no stated economics. It includes the IBM partnership (4971), the NVIDIA collaboration framework (3892), CrowdStrike (11768), Leidos (8669), the Genesis Mission (11778) and the Exemplar Cloud designations (10332, 9324). The "partner of choice" logo lists (11767, 9320) and the "expanded relationships" with Cohere and Mistral (9319) also belong here, and none of them should be read as quantified commitments.
The unnamed tier matters most for diligence because it is where the financing sits. DDTL 3.0 funds "a customer contract" (4595). DDTL 4.0 serves a "leading AI enterprise" (11224). DDTL 5.0 is dedicated to "two large, non-investment grade customers" (9119). The more than $25 billion in commitments signed early in the third quarter is also unattributed (1303). Microsoft's status as a top customer comes only from press characterization (648), not from a company filing.
Concentration has broadened without dispersing. In May 2025, OpenAI's $11.2 billion was about 43% of the $25.9 billion backlog (4969, 4970). By early 2026, Meta's disclosed commitments totalled roughly $35 billion if the $21 billion is additive, as "new commitment" in 9317 suggests. That figure alone exceeds half of the $60.7 billion in RPO at year-end 2025 (3571). The debt-financed unnamed contracts, two of them explicitly below investment grade, add credit concentration on top of the customer concentration.
The arithmetic reconciles only partly. Backlog and RPO are different measures, because backlog adds amounts that are conditional on delivery (4970). That makes the move from $60.7 billion of RPO to $99.4 billion of backlog at the end of the first quarter (1302) partly definitional. Meta's $21 billion explains only about half of that increase. Second-quarter backlog rose just $4.8 billion to $104.2 billion (1302), even though Jane Street, Anthropic and the Cohere and Mistral expansions were announced in the same window. That implies substantial recognition burn-off, small undisclosed contract values, or both. With a weighted-average duration of about five years (3573), the record does not let the named deals be summed to the headline backlog.
Customer disclosures, read
2026-09-14CoreWeave's record contains a small group of agreements backed by filings and a much larger set of partnership and collaboration language. The documented agreements are order forms under existing master services agreements. These cover OpenAI (claims 4969, 4296), NVIDIA's capacity purchase (4352), and Meta: an initial commitment of up to $14.2 billion (4282) and a new order form dated March 31, 2026 (2123), described as a $21 billion commitment (9317, 10340). Jane Street's roughly $6 billion commitment (10304) and the Anthropic agreement, which the company calls signed (9318), also carry counterparty names, but no Anthropic dollar value is disclosed. The IBM partnership (4971), the NVIDIA 'collaboration framework' (3892), CrowdStrike (11768), Leidos (8669), and Genesis Mission participation (11778) should be read as framework or ecosystem language, not quantified contracts. The 'partner of choice' rosters (11767, 9320) name logos without terms. The Hudson River Trading agreement (10732) and Microsoft's status as a top customer (648) come from secondary reporting, not company disclosure.
Several material counterparties go unnamed. The DDTL 3.0 financing supports an unidentified 'customer contract' (4595). DDTL 4.0 serves a 'leading AI enterprise' (11224). DDTL 5.0 funds contracts with 'two large, non-investment grade customers' (9119). None of the more than $25 billion in commitments signed early in the third quarter (1303) is attributed to a named counterparty.
Concentration has changed shape but has not clearly declined. In May 2025, OpenAI's $11.2 billion accounted for about 43% of a $25.9 billion backlog (4969, 4970). Meta has since become at least as large, at $14.2 billion plus $21 billion, if the March order is additive, which the 'expansion' wording in 10729 leaves unclear. OpenAI and Meta together probably still dominate. A trading-firm group (Jane Street, HRT) adds some diversification at the margin.
The arithmetic only partly reconciles. RPO grew from $15.1 billion to $60.7 billion during 2025 (3572, 3571), which the Meta and OpenAI order forms can plausibly explain. Adding Meta's $21 billion and Jane Street's $6 billion to year-end RPO gives about $87.7 billion, against the $99.4 billion backlog three months later (1302). That leaves roughly $12 billion unassigned. Part of the gap is definitional, because backlog includes amounts beyond RPO that are subject to delivery conditions (4970). Q2 backlog rose a net $4.8 billion to $104.2 billion (1302) with no quantified named deal in the quarter, so readers should treat backlog and RPO as separate measures and rely on filed order forms for counterparty attribution.
Customer disclosures, read
2026-09-14CoreWeave's record contains a core of signed contracts, surrounded by a wider layer of partnership and logo language that should not be read as committed revenue. The signed contracts are order forms executed under existing Master Services Agreements. They cover OpenAI (claims 4969, 4296), Meta at $14.2 billion (4282) and again at roughly $21 billion on March 31, 2026 (2123, 10340, 9317), and NVIDIA (4352). Jane Street's approximately $6 billion commitment (10304) and the Anthropic multi-year agreement (9318) are also described as signed. Note that the Meta $21 billion figure appears in five claims (10729, 10694, 10340, 9317, 2123); these describe one contract, not five. The softer tier is different in kind. It includes the IBM Granite partnership (4971), the NVIDIA collaboration framework (3892), the CrowdStrike 'global partnership' (11768, 10330), the Leidos collaboration (8669), Genesis Mission participation (11778) and the Exemplar Cloud designation (10332, 9324). None of these carries a dollar figure or contract term. The 'partner of choice' logo lists (11767, 9320) are customer relationships of unknown size. Hudson River Trading's agreement (10732) comes only from secondary reporting and has no value attached.
Several material obligations are left unidentified. The DDTL 3.0 financing supports 'a customer contract' (4595), and DDTL 4.0 serves an unnamed 'leading AI enterprise' (11224). DDTL 5.0 funds contracts with 'two large, non-investment grade customers' (5.0, 9119). The more than $25 billion in commitments signed early in Q3 2026 (1303) are not attributed to any counterparty. Debt-financed buildouts tied to anonymous and explicitly sub-investment-grade counterparties are the main diligence gap.
Concentration has broadened, but it remains heavy. In March 2025, OpenAI's $11.2 billion equalled about 43% of the $25.9 billion backlog (4969, 4970). By August 2026, Microsoft and OpenAI were still described as the largest customers (648). Meta's disclosed commitments now total about $35.2 billion, roughly a third of the $104.2 billion backlog (1302), before accounting for any burn-down.
The arithmetic only partly reconciles. RPO rose $45.6 billion during 2025, to $60.7 billion (3555, 3572). Meta's $14.2 billion explains about 31% of that increase, and the September OpenAI and NVIDIA order forms have no disclosed values. There is also a definitional problem. 'Revenue backlog' includes amounts beyond RPO that are subject to delivery conditions (4970). The $99.4 billion and $104.2 billion backlog figures (1302) are therefore not directly comparable to the $60.7 billion RPO. Q2 backlog grew only $4.8 billion even though Jane Street's $6 billion landed that quarter, which is consistent with revenue burn-off but has not been confirmed. Claim 3011 carries no text and cannot be assessed.
Customer disclosures, read
2026-09-13CoreWeave's customer narrative reveals significant distinction between signed purchase commitments and promotional partnership language. Named, executed agreements include Meta's $21 billion cloud computing contract through December 2032 (claims 10340, 2123); Jane Street's $6 billion commitment (claim 10304); and order forms with OpenAI and NVIDIA under existing master service agreements dated 2023 (claims 4296, 4352). Anthropic and Hudson River Trading are referenced as having signed multi-year agreements, though amounts remain undisclosed (claims 9318, 10732). By contrast, NVIDIA is positioned through a "collaboration framework" rather than a purchase commitment (claim 3892), and IBM's partnership focuses on Granite model delivery without quantified supply obligations (claim 4971). CrowdStrike and Leidos are described as strategic partnerships or collaborations (claims 11768, 8669) rather than customer contracts. A lengthy roster of companies—Cognition, Midjourney, Runway, Cohere, Mistral, World Labs—appear in marketing language as "partners of choice" or referenced customers without disclosed contract values (claims 11767, 9320), functioning more as brand association than revenue transparency.
Counterparty concentration has become heavily Meta-dependent. Meta accounts for approximately $35 billion of clearly identified committed contracts as of March 2026, representing roughly 35–60% of disclosed backlog depending on methodology. Jane Street adds $6 billion. The remaining $60–70 billion in reported remaining performance obligations ($60.7 billion as of December 31, 2025, growing to $104.2 billion in Q2 2026) lacks granular attribution to named counterparties, creating opacity around secondary customer contributions (claims 3555, 1302).
Revenue arithmetic raises questions. CoreWeave reported $25.9 billion revenue backlog as of March 31, 2025, which reportedly included $11.2 billion from an OpenAI "strategic deal" announced May 2025 (claims 4970, 4969). By December 2025, RPO had tripled to $60.7 billion—an increase of approximately $35 billion in nine months (claims 3555, 3572). Named large deals (Meta, Jane Street) total roughly $27 billion, leaving $8–10 billion attributable to smaller or previously unannounced customers. The further jump to $104.2 billion backlog in Q2 2026, with $25 billion in commitments cited for the current quarter alone (claim 1303), suggests material undisclosed counterparties or expansion of previously announced relationships. The weighted-average five-year contract duration underscores long-tail revenue assumptions (claims 3584, 3573). Without itemization of the $35+ billion in non-Meta, non-Jane Street backlog, concentration risk and cash-generation sustainability remain difficult to validate independently.
Customer disclosures, read
2026-09-13CoreWeave distinguishes between formalized customer contracts and looser partnership arrangements, though the disclosure is inconsistent and raises questions about deal quality and concentration. The company's named, signed-customer base comprises primarily hyperscalers and financial-trading firms with documented order forms or multi-year commitments: Meta (claims 4282, 10340), OpenAI (claims 4296, 4969), NVIDIA (claim 4352), Jane Street (claim 10304), Anthropic (claim 9318), and Hudson River Trading (claim 10732). These six entities are the only counterparties disclosed with specific dollar values or formalized "order form" language under existing master services agreements. By contrast, early partnerships such as IBM (claim 4971) and CrowdStrike (claims 11768, 10330) are described as "partnership" or "collaboration framework" without revenue metrics, suggesting either non-binding frameworks or immaterial commitments relative to the headline figures.
The customer list published in February 2026 (claim 11767) includes Cognition, Cursor, Mercado Libre, Midjourney, and Runway alongside the named commitments, yet these firms appear nowhere else in earnings disclosure or in subsequent announcements with quantified commitments. This suggests either undisclosed order forms or marketing-driven listing of smaller customers without material financial impact. Concentration risk is acute: Meta alone represents approximately $35.2 billion of disclosed commitments (claim 10340), while OpenAI's named $11.2 billion backlog (claim 4969) and Jane Street's $6 billion (claim 10304) comprise the next material tranches. The remaining "strategic partnerships" and named customer relationships lack transparency regarding revenue contribution.
Revenue reconciliation shows gaps. The company reported $25.9 billion in total revenue backlog as of March 31, 2025, with $14.7 billion in remaining performance obligations (claim 4970). By December 31, 2025, RPO had expanded to $60.7 billion (claim 3555), a $46 billion increase within nine months. Announced deals in that period—Meta's $14.2 billion (claim 4282) and the OpenAI order form (claim 4296)—account for only partial closure of that gap, suggesting undisclosed commitments. By August 2026, backlog reached $104.2 billion (claim 1302), with an additional $25 billion in new commitments in early Q3 (claim 1303) remaining unaccounted for in customer press releases. This opacity obscures whether CoreWeave's growth derives from formalized, long-duration contracts or from less certain, smaller arrangements that benefit headline backlog figures.
Customer disclosures, read
2026-09-12CoreWeave's customer roster reveals a sharp distinction between named signed contracts and announced partnerships that remain vague on commercial substance. Of the company's $104.2 billion revenue backlog as of Q2 2026 (claim 1302), the largest commitments rest on explicit order forms: Meta's stacked agreements totaling approximately $35.2 billion through December 2032 (claims 4282, 10340), formalized via signed order form in March 2026 (claim 2123); OpenAI's $11.2 billion strategic deal (claim 4969), later documented via order form in September 2025 under an MSA dated April 2023 (claim 4296); NVIDIA's September 2025 order form (claim 4352) under the same April 2023 MSA; Jane Street's $6 billion commitment finalized in April 2026 (claim 10304); Anthropic's multi-year signed agreement (claim 9318); and Hudson River Trading's multi-year deal announced August 2026 (claim 10732). These six counterparties account for at least $67.2 billion of disclosed backlog, representing extreme concentration.
Announced partnerships employ softer language obscuring commercial certainty. IBM's "partnership to deliver compute capacity" for Granite models (claim 4971) lacks signed agreement language or quantified commitment. NVIDIA's January 2026 "collaboration framework" (claim 3892) remains distinct from the transactional order form executed months earlier. CrowdStrike's "major global partnership" (claim 10330) mentions collaboration without binding commitment; Leidos's August 2026 "collaboration" (claim 8669) similarly describes intent rather than signed order.
Concentration risk has intensified markedly. At March 31, 2025, total backlog stood at $25.9 billion (claim 4970). By December 2025, RPO had grown to $60.7 billion (claim 3555)—a 2.3x expansion—dominated by OpenAI's strategic deal and Meta's initial $14.2 billion entry. Meta's March 2026 expansion by $21 billion (claims 10694, 10729) transformed it into the dominant counterparty, now representing roughly one-third of total backlog. The company lists generic "major customer wins" (claim 10338) including Cognition, CrowdStrike, Cursor, Mercado Libre, Midjourney, and Runway without quantifying these relationships, leaving unclear whether they are pilots or material commitments.
Revenue arithmetic provides incomplete reconciliation. The $104.2 billion Q2 2026 backlog (claim 368) appears consistent with prior periods given Meta's $35.2 billion, OpenAI's $11.2 billion, and Jane Street's $6 billion. However, $25 billion in additional commitments reportedly signed through August 2026 (claims 1303, 3011) remain unattributed to named counterparties, suggesting either unannounced customers or undisclosed framework additions to existing contracts. This opacity complicates assessment of whether growth is driven by depth with existing customers or genuine customer diversification.
Customer disclosures, read
2026-09-12CoreWeave's announced customer base distinguishes clearly between signed order forms under existing master service agreements and partnership or framework arrangements. The company has named six primary customers with explicit signed commitments: Meta (initially $14.2 billion through December 2031, expanded to $21 billion through December 2032 in March 2026), Jane Street (approximately $6 billion), OpenAI (order form dated September 23, 2025), NVIDIA (new order form as of September 14, 2025), Anthropic (multi-year agreement signed by May 2026), and Hudson River Trading (multi-year agreement announced August 2026). Claims 4282, 10304, 4296, 4352, 9318, and 10732 respectively document these as signed contractual commitments rather than framework discussions. By contrast, the IBM partnership (claim 4971) remains limited to a collaboration framework for delivering Granite model compute capacity, and the NVIDIA relationship evolved from a signed order form into a broader "collaboration framework" language (claim 3892, January 2026), suggesting a shift from discrete customer transactional arrangements toward strategic partnering. The company also cites unidentified counterparties as "leading AI enterprise" (claim 11224) and "two large, non-investment grade customers" (claim 9119), each requiring dedicated infrastructure financing, without naming them publicly.
Counterparty concentration has narrowed materially. CoreWeave's revenue backlog composition shifted from OpenAI representing approximately 43 percent of the $25.9 billion total in May 2025 (claim 4969) to Meta anchoring the disclosed base at $21 billion by Q2 2026 (claim 10340), with Jane Street contributing $6 billion (claim 10304). The named customer cohort of six signed contracts represents a meaningful portion of the $104.2 billion Q2 2026 RPO figure (claim 1302), but unnamed large customers and the approximately $25 billion in commitments signed through August 2026 (claim 3011) suggest concentration is distributing wider. The weighted-average contract duration of five years across the committed base (claim 3556) supports durability claims, though the revenue arithmetic reveals incomplete transparency: the company discloses approximately $27 billion in named large-contract commitments (Meta $21 billion plus Jane Street $6 billion) but does not quantify OpenAI or Anthropic's contract values in later disclosures, leaving material revenue backlog components unattributed to named counterparties.
Customer disclosures, read
2026-09-12CoreWeave's disclosed customer commitments exhibit significant asymmetry between named, signed agreements and promotional language around partnerships, alongside material revenue backlog growth that exceeds the sum of identified customer commitments. The company has clearly documented signed customer orders from Meta (claims 4282, 10340, 2123: $14.2 billion through December 2031, expanded with a $21 billion order through 2032 announced March 2026, and an additional $21 billion commitment by August 2026), Jane Street (claims 10304, 10695: $6 billion multi-year), and signed order forms from OpenAI (claim 4296, September 2025) and NVIDIA (claim 4352, September 2025) under existing master service agreements. Anthropic (claims 10731, 9318) and Hudson River Trading (claim 10732) announced multi-year agreements without disclosed dollar amounts.
However, significant customer relationships are either unnamed or described through partnership rather than customer-contract language. IBM's "partnership" (claim 4971) for Granite compute lacks commitment specification. NVIDIA's engagement appears split: formal order forms exist (claim 4352), yet a later "collaboration framework" (claim 3892) suggests expanded but less rigidly committed work. CrowdStrike (claim 10330) is anchored as a "major global partnership," not a named customer commitment. Leidos (claim 8669) appears through a "collaboration" rather than contracted capacity. Unnamed cohorts persist: a "material customer contract" (claim 4595) remains unidentified; claim 9119 references "two large, non-investment grade customers" without naming.
Counterparty concentration has become extreme. Meta alone represents roughly $56 billion of disclosed commitments across three tranches (2025 commitment of $14.2 billion, March 2026 expansion of $21 billion, August 2026 addition of $21 billion). OpenAI's $11.2 billion strategic deal (claim 4969, May 2025) and subsequent order form (claim 4296) anchor two of CoreWeave's largest relationships. The balance of disclosed commitments—Jane Street's $6 billion, Anthropic and Hudson River Trading's unquantified multi-years—suggests a customer base concentrated among a handful of hyperscalers and large AI labs.
Revenue backlog progression reveals a gap. Total backlog was $25.9 billion in May 2025 (claim 4970), then grew to $60.7 billion by year-end 2025 (claim 3555), and reached $104.2 billion by Q2 2026 (claim 1302). The disclosed named commitments (Meta $56 billion, OpenAI ~$11 billion, Jane Street $6 billion, others unquantified) approach but do not obviously reconcile with the $104 billion backlog, particularly when accounting for the five-year weighted-average contract duration (claims 3584, 3561). The apparent gap suggests either undisclosed large customers, preliminary commitments later formalized, or the inclusion of option and capacity-expansion provisions as contracted backlog rather than mere optionality.
Customer disclosures, read
2026-09-12CoreWeave's disclosed customer base exhibits a stark contrast between named, contractually committed capacity and vaguely identified partnerships. Of the major announcements, Meta ($35.2 billion across claims 4282 and 10340), OpenAI (strategic deal language in claim 4969 plus September 2025 order form in claim 4296), Jane Street ($6 billion in claim 10304), and Anthropic (multi-year signed agreement in claim 9318) represent explicitly named, signed customer relationships. By contrast, several announcements employ softer language: IBM is described as a partnership (claim 4971) rather than a signed customer contract, and NVIDIA's relationship is framed as a collaboration framework (claim 3892) despite underlying MSA activity (claims 4352, 3892). A material gap exists between CoreWeave's claimed market presence and identified customers. Claim 8926 asserts the company serves most of the world's leading AI labs and hyperscalers, yet claims 11224 and 9119 reference "leading AI enterprise" and "two large, non-investment grade customers" without identification. Claim 648 mentions Microsoft and OpenAI as "among the biggest" customers, yet Microsoft has never been formally announced as a customer by CoreWeave. Claim 8338 lists named enterprise wins (Cognition, CrowdStrike, Cursor, Mercado Libre, Midjourney, Runway) but provides no quantified commitments. Counterparty concentration has evolved dramatically. In May 2025, OpenAI dominated announced commitments at $11.2 billion (claim 4969). By March-April 2026, Meta emerged as the single largest customer following its $21 billion expansion (claim 10340), representing approximately 20 percent of disclosed backlog. Jane Street ($6 billion) and Hudson River Trading (claim 10732, multi-year agreement) occupy secondary positions. Revenue backlog arithmetic reveals substantial unnamed customer value. The disclosed backlog grew from $25.9 billion in Q1 2025 (claim 4970) to $60.7 billion by year-end 2025 (claim 3555), then to $104.2 billion by Q2 2026 (claim 1302), with $25 billion in new commitments signed through August 2026 (claim 1303). The named deals—Meta ($35.2 billion), OpenAI ($11.2 billion), Jane Street ($6 billion), plus Anthropic and Hudson River Trading (unquantified)—account for approximately $52-55 billion of the $104+ billion backlog. This suggests unnamed customers represent roughly 50 percent of disclosed commitments. Financing disclosures highlight this opacity: claims 9119 and 11224 reference major customer contracts used to justify capital raises without customer identification, indicating material revenue concentration among parties CoreWeave does not publicly name.
Customer disclosures, read
2026-09-12CoreWeave's announced customer commitments exhibit a stark bifurcation between named, signed deals and vaguely attributed revenue. The company has disclosed three explicitly binding agreements with order forms under master services agreements: Meta ($14.2 billion through December 2031, expanded by an additional $21 billion in March 2026 per claims 4282 and 2123), OpenAI (new order form signed September 2025 per claim 4296, following the strategic deal that added $11.2 billion in backlog per claim 4969), and NVIDIA (new order form September 2025, claim 4352). Jane Street's $6 billion multi-year commitment (claims 10304, 10730) and Hudson River Trading's unnamed multi-year agreement (claim 10732) appear substantive, while Anthropic's multi-year agreement (claims 10731, 9318) carries no disclosed amount. However, a second cohort lacks contractual specificity: CrowdStrike, Cognition, Cursor, Mercado Libre, Midjourney, and Runway are listed as "major customer wins" (claim 10338) without any financial disclosure, while Adaption Labs, Advaita Bio, Perplexity, and World Labs are labeled "partner of choice" (claim 9320) using language that avoids customer-contract semantics. Additionally, NVIDIA's relationship is framed as a "collaboration framework" (claim 3892) rather than a services contract, and Leidos is positioned as a "collaboration" (claim 8669) for sovereign AI services without disclosed commitments. Concentration is extreme: Meta alone represents approximately $35 billion of the June 2026 backlog, or roughly one-third of the $104.2 billion total (claim 1302), with OpenAI constituting another material but unquantified share. The remaining backlog includes unnamed customers—specifically "two large, non-investment grade customers" (claim 9119) and an unnamed "leading AI enterprise" (claim 11224) receiving dedicated financing facilities. The revenue arithmetic strains credibility: CoreWeave reported $15.1 billion in RPO at December 2024 (claim 3572), grew to $60.7 billion by December 2025 (claim 3555), then to $104.2 billion by Q2 2026 (claim 1302), with an additional $25 billion in unintegrated new commitments signed through August (claims 1303, 3011). The $25.9 billion backlog disclosed in May 2025 (claim 4970) already embedded the $14.7 billion RPO, suggesting the Meta and OpenAI figures dominate historical disclosure. Unless the 2026 $25 billion in new commitments or portions of the existing $104.2 billion backlog derive from named customers, CoreWeave's customer base remains materially opaque despite headline announcements, with revenue concentration and counterparty credit quality poorly disclosed relative to the magnitude of commitments.
Customer disclosures, read
2026-09-11CoreWeave's disclosed customer base reveals significant concentration around named counterparties and substantial opacity regarding committed-contract identities. As of August 2026, the company reported $104.2 billion in contracted revenue backlog, yet publicly named customer agreements account for approximately $41.2 billion: Meta Platforms at $35.2 billion (combining the original $14.2 billion commitment through December 2031 with a March 2026 expansion worth $21 billion), Jane Street at $6 billion, and three others—Anthropic, OpenAI, and Hudson River Trading—with signed order forms but undisclosed dollar amounts. Each of these represents executed customer order forms under existing master service agreements (claims 4282, 10304, 9317, 8570, 10730, 9318, 4296, 10732), distinguishing them from partnership or collaboration frameworks.
Framework and partnership announcements occupy a separate category. IBM, NVIDIA, CrowdStrike, and Leidos are described as "partnerships" or "collaborations" (claims 4971, 3892, 10330, 8669) rather than signed customer contracts with disclosed revenue impact. The company lists enterprises including Cognition, Cursor, Mercado Libre, Midjourney, and Runway as wins (claim 10338), yet provides neither binding contract language nor contract values for these names.
The backlog arithmetic raises questions about counterparty opacity. Named and quantified customer contracts total roughly $41.2 billion, leaving approximately $63 billion—or 60 percent—of the reported $104.2 billion backlog unexplained by disclosed names. The company disclosed that its May 2026 debt facility supports infrastructure "dedicated to customer contracts with two large, non-investment grade customers" (claim 9119), neither of which has been publicly identified. This concentration pattern—where the three largest named customers (Meta, Jane Street, and one unnamed pair via financing disclosures) account for a material share of backlog—suggests either undisclosed concentration or a long tail of smaller commitments that the company declines to itemize. The evolution from $15.1 billion RPO at December 31, 2024 to $104.2 billion by Q2 2026 occurred largely through named-customer expansion, yet the rate of backlog growth outpaces disclosed contract announcements, implying material commitments remain unnamed in public filings.
Customer disclosures, read
2026-09-11CoreWeave's customer disclosure shows a material distinction between executed contracts and partnership announcements, with significant revenue backlog concentration among named parties that remains partially unattributed. The company has confirmed binding agreements with OpenAI, Meta, Jane Street, Anthropic, and Hudson River Trading through references to executed order forms under existing master service agreements (claims 4296, 2123, 10304, 9318, 10732). Meta represents the largest named commitment at approximately $35.2 billion when combining its initial $14.2 billion commitment (claim 4282) and subsequent $21 billion expansion (claim 10729), while OpenAI contributed $11.2 billion to the backlog (claim 4969) and Jane Street committed $6 billion (claim 10304). By contrast, partnerships with IBM, NVIDIA, and CrowdStrike employ framework or collaboration language without signed customer orders or quantified revenue (claims 4971, 3892, 10330). Cursor, Cognition, Midjourney, Runway, and Mercado Libre are listed as "major customer wins" (claim 10338) without supporting documentation of binding agreements or contract values, while Perplexity and World Labs appear only as aspirational "partners of choice" (claim 9320).
Revenue backlog reconciliation reveals a significant gap. CoreWeave disclosed $104.2 billion in total backlog as of August 2026, with $25 billion in new commitments signed through early Q3 (claims 1302, 1303). Named customers account for approximately $52.4 billion: Meta $35.2 billion, OpenAI $11.2 billion, Jane Street $6 billion, plus unspecified amounts for Anthropic and Hudson River Trading. This leaves roughly $52 billion unattributed to identifiable counterparties. While Microsoft and OpenAI are noted as "among the biggest" customers (claim 648), Microsoft has no disclosed signed order form, suggesting either undisclosed bilateral arrangements or reliance on generic customer categories. The company's own reporting emphasizes "serving most of the world's leading AI labs, hyperscalers and AI enterprises" (claim 8926), language that masks individual customer concentration and makes the backlog largely opaque to investor scrutiny. Counterparty concentration has intensified around Tier-1 AI platform companies—Meta, OpenAI, Anthropic—while claimed enterprise breadth lacks verifiable signatures.
Customer disclosures, read
2026-09-10CoreWeave has selectively named customers while using partnership language for strategically important relationships. Signed customer agreements with disclosed amounts include OpenAI ($11.2 billion backlog announced May 2025, order form executed September 2025 per claim 4296), Meta ($14.2 billion initial commitment September 2025 per claim 4282, expanded by $21 billion in March 2026 per claim 10340), and Jane Street ($6 billion commitment announced April 2026, claim 10304). These three counterparties account for $52.4 billion of explicitly sized commitments. Anthropic and Hudson River Trading have announced signed multi-year agreements (claims 9318 and 10732), but no dollar figures are disclosed for either.
Elsewhere, CoreWeave uses partnership or framework terminology that does not clearly indicate binding purchase agreements. IBM is cited as having an announced partnership for Granite capacity (claim 4971). NVIDIA is described as having a collaboration framework (claim 3892) as of March 2026, distinct from an earlier order form for capacity (claim 4352). CrowdStrike is characterized as a major global partnership (claim 10330), Leidos as a collaboration (claim 8669), and Cohere and Mistral as expanded relationships (claim 9319) without dates or sizing. The May 2026 reference to CoreWeave as partner of choice for Adaption Labs, Advaita Bio, Perplexity, and World Labs (claim 9320) uses aspirational language with no signature or commitment language attached.
Concentration has evolved in ways the backlog figures do not fully clarify. OpenAI represented $11.2 billion of $25.9 billion total backlog in May 2025, a 43 percent share. The Q2 2026 backlog of $104.2 billion (claim 1302) is not reconciled with named customer commitments: OpenAI, Meta, and Jane Street together total $52.4 billion, leaving $51.8 billion unexplained before early Q3 additions of $25 billion-plus (claim 8573). Microsoft is cited as among the biggest customers (claim 648) without corresponding announcement. CoreWeave's own disclosure identifies two unnamed non-investment grade customers whose infrastructure needs justified facility-level debt financing (claim 9119), indicating material concentration among a core group of undisclosed AI labs.
Customer disclosures, read
2026-09-10CoreWeave's customer portfolio divides between explicitly named signed orders under existing Master Service Agreements and partnership frameworks lacking quantified commitments or clear binding force. Named customers with disclosed dollar commitments cluster narrowly. Meta appears across three separate announcements: an initial $14.2 billion commitment through December 2031 (claim 4282, September 2025), an expanded agreement for $21 billion through December 2032 (claim 10340, April 2026), and a further $21 billion commitment added by August 2026 (claim 8668). The temporal sequence—initial deal in September 2025, expansion announced in April 2026, additional commitment noted in August 2026—suggests either additive capacity expansion or material repricing and restatement of terms, a distinction with concentration implications. Jane Street secured $6 billion in commitment (claim 10304, April 2026), Anthropic a multi-year agreement of unspecified magnitude (claim 9318, May 2026), OpenAI a September 2025 order form (claim 4296) building on an earlier $11.2 billion backlog disclosure (claim 4969, May 2025), and NVIDIA both an order form (claim 4352, September 2025) and a "collaboration framework" (claim 3892, March 2026). The framework language is subordinate to signed orders, yet CoreWeave elevates it in partnership messaging.
Microsoft recurs as one of the "biggest customers" (claims 648, 8656) without disclosed contract quantification or signature date, creating asymmetry versus named competitors. CoreWeave further references "two large, non-investment grade customers" in infrastructure financing (claim 9119) entirely without identification, and lists Cursor, Cognition, and Midjourney as "major customer wins" (claim 10338) absent any contract detail. MasterClass selected CoreWeave "to evaluate" AI teaching agents (claim 8617), evaluation language distinct from contracted commitment.
Revenue backlog reconciliation reveals underlying tension. Remaining Performance Obligations jumped fourfold from $15.1 billion (December 2024) to $60.7 billion (December 2025, claim 3571), inadequately explained by disclosed named deals. CoreWeave cites a "contracted revenue backlog" of $104 billion (claim 8538) while separately excluding $25 billion in early Q3 commitments (claim 8573), implying non-binding LOI or framework language pads the backlog number. A single Meta commitment at $21 billion represents roughly twenty percent of the $104 billion total, concentrating portfolio risk in one counterparty across potentially ambiguous deal terms.
Customer disclosures, read
2026-09-09CoreWeave's customer portfolio reveals a sharp demarcation between legally binding arrangements with named counterparties and aspirational partnership language. Signed, executable agreements are documented through order forms under existing master services agreements: Meta's two commitments totaling $35.2 billion (claim 4282 for $14.2 billion in September 2025, claim 9317 for $21 billion signed March 2026), OpenAI's order form of September 2025 (claim 4296) layered atop a strategic deal adding $11.2 billion (claim 4969 from May 2025), NVIDIA's order form (claim 4352, September 2025), and Anthropic's multi-year agreement (claim 9318). By contrast, IBM is described only as a partnership to "deliver compute capacity" (claim 4971) without contractual specificity. The May 2026 announcement naming Adaption Labs, Advaita Bio, Hudson River Trading, Perplexity, and World Labs as partners of choice (claim 9320) discloses no commercial terms or binding commitments. NVIDIA's January 2026 "collaboration framework" (claim 3892) sits between partnership and order, and MasterClass was merely selected "to evaluate" CoreWeave's platform (claim 8617), positioning this as a pilot rather than a committed customer contract.
Counterparty concentration has intensified dramatically. Meta and OpenAI dominate the revenue backlog: Meta's $35.2 billion across two executed orders and OpenAI's cumulative backlog constitute the core of CoreWeave's disclosed $104.2 billion Q2 2026 backlog (claim 8520). The financing of infrastructure for two "large, non-investment grade customers" through the DDTL 5.0 facility (claim 9119) indicates credit risk concentration and a tier below hyperscaler counterparties.
Revenue backlog arithmetic shows internal consistency but extreme concentration. The backlog expanded from $15.1 billion (December 2024, claim 3572) to $60.7 billion (December 2025, claim 3571) to $104.2 billion (Q2 2026, claim 8520), with additional $25 billion committed in early Q3 2026 (claim 8573). This four-quarter arc derives almost entirely from Meta's dual tranches and OpenAI's cumulative arrangement, alongside the two undisclosed non-investment-grade contracts financed through DDTL 5.0. The company's revenue base exhibits minimal diversification below these principal counterparties despite rhetoric positioning smaller firms as strategic partners.
Customer disclosures, read
2026-09-09CoreWeave's disclosed customer portfolio presents a two-tier structure: named, contracted counterparties with disclosed revenue commitments, and framework partnerships or unnamed customers whose contribution to the $104.2 billion backlog remains opaque. The named customer set includes OpenAI, Meta, Microsoft, NVIDIA, Anthropic, and IBM, each with signed order forms or multi-year agreements. Meta's commitment evolved from $14.2 billion through December 2031 (claim 4282) to an additional $21 billion signed in March 2026 (claim 9317, 8570), representing the most material single customer escalation. OpenAI's May 2025 "strategic deal" disclosed $11.2 billion in revenue backlog (claim 4969) against a total backlog of $25.9 billion (claim 4970), indicating 43 percent concentration in that single counterparty at that time.
By contrast, several partnerships employ framework or pilot language that obscures commitment clarity. NVIDIA's "collaboration framework" announced January 2026 (claim 3892) lacks a disclosed revenue figure, as does IBM's "announced partnership" for Granite compute (claim 4971). Weights & Biases is described as an "expanded capability" rather than a customer commitment (claim 9328). Cohere, Jane Street, and Mistral are characterized as "expanded relationships" (claim 9319) without new revenue quantification. Most problematically, CoreWeave references "leading AI pioneers and enterprises" as "partner of choice" (claim 9320)—naming only Adaption Labs, Advaita Bio, Hudson River Trading, Perplexity, and World Labs without attributing revenue—and two "large, non-investment-grade customers" driving the DDTL 5.0 facility financing (claim 9119) remain entirely unnamed.
The revenue backlog arithmetic strains credibility. From May 2025 to June 2026, disclosed backlog grew 302 percent, from $25.9 billion to $104.2 billion (claims 4970, 8282), with an additional $25 billion in new Q3 commitments (claim 8573). This $129.2 billion projected total does not reconcile against publicly disclosed individual customer values: OpenAI's $11.2 billion plus Meta's $21 billion accounts for only 24 percent of the June backlog. Unnamed or framework-partner additions must represent the preponderance of growth, yet the company simultaneously emphasizes it "serves most of the world's leading AI labs" (claim 8926) without naming them. This opacity suggests either material customers lack public disclosure consent, or backlog definitions or calculation methodology have shifted. The weighted-average five-year contract duration across the backlog (claims 3561, 3584) provides contract stability but masks concentration risk if two or three named counterparties represent disproportionate value.
Customer disclosures, read
2026-09-09CoreWeave's announced customer base separates into three clarity tiers. Signed customer agreements with binding order forms are the strongest: OpenAI and Meta have executed new order forms dated September 2025 and March 2026 respectively (claims 4296, 2123); NVIDIA signed an order form in September 2025 (claim 4352); Anthropic received a multi-year agreement signature in May 2026 (claim 9318); Hudson River Trading, Leidos, and MasterClass were announced with definitive language by August 2026 (claims 1234, 8669, 8617). IBM, by contrast, received only a "partnership" announcement for Granite compute delivery (claim 4971), which lacks signed contract clarity. Cohere, Jane Street, and Mistral are described as "expanded relationships with existing enterprise and AI native customers" without specifying new contract closure (claim 9319)—this language suggests continuation rather than newly signed deals. MasterClass's announcement uses "selected CoreWeave Cloud to evaluate and improve" language (claims 8617, 7782), which reads evaluative or pilot-stage rather than a full production commitment. NVIDIA's May 2026 collaboration is explicitly termed a "collaboration framework" (claim 3892), distinct from a customer order form. Critically, infrastructure financing for DDTL 3.0 and DDTL 5.0 facilities references unnamed "large, non-investment grade customers" (claims 4595, 9119), obscuring material revenue concentrations from public view. Counterparty concentration has remained elevated and sticky. OpenAI's $11.2 billion strategic deal backlog was announced in May 2025 (claim 4969) within a $25.9 billion total backlog (claim 4970)—representing 43 percent concentration in one customer. Meta's September 2025 commitment of $14.2 billion (claim 4282) was followed by a March 2026 order for an additional $21 billion (claims 9317, 8570), creating cumulative Meta visibility of approximately $35.2 billion. OpenAI plus Meta together represent roughly $46.2 billion of the June 2026 revenue backlog of $104.2 billion (claim 1302)—approximately 44 percent concentration in two customers, consistent with the May 2025 ratio. The $25 billion in new commitments signed in early Q3 2026 (claim 1303) remains unattributed to specific named customers, limiting transparency into whether concentration has improved. Applied Digital's Polaris Forge 1 lease represents $11 billion of prospective revenue (claim 371), but disclosure of which customer drives this facility remains absent. The revenue arithmetic reveals material backlog growth from $25.9 billion (May 2025) to $60.7 billion (December 2025) to $104.2 billion (June 2026)—consistent with the announced deals, though the absence of named counterparties for unnamed infrastructure contracts and the opacity around the $25 billion early Q3 commitments prevent full audit trail validation.
Customer disclosures, read
2026-09-09CoreWeave's customer announcements reflect a portfolio heavily concentrated among a small set of named hyperscalers, with significant revenue backlog allocated to unnamed counterparties. Signed customer agreements—those disclosing binding order forms under existing MSAs—are confirmed for OpenAI (claim 4296, Sept 23, 2025), Meta (claims 4282, 2123, Feb–Mar 2026), NVIDIA (claim 4352, Sept 14, 2025), and Anthropic (claim 9318, May 2026). Each agreement specifies execution mechanics (order form, MSA date, or contract language) and, where disclosed, term length or commitment ceiling. By contrast, partnerships with IBM (claim 4971, announced May 2025) and NVIDIA's January 2026 collaboration framework (claim 3892) employ looser language—'announced partnership' and 'collaboration framework'—without order form or binding commitment disclosures. MasterClass (claims 8617, 7782, Aug 2026) is framed as an evaluation and pilot, not a committed purchase. Several named counterparties—Cohere, Jane Street, Mistral, Hudson River Trading, Perplexity—appear in claim 9319 and 9320 as 'expanded relationships' or 'partners of choice' without contract specificity or dollar quantification.
Counterparty concentration has widened dramatically. As of December 31, 2025, RPO stood at $60.7 billion (claim 3555); by June 30, 2026, revenue backlog reached $104.2 billion (claim 1302). Meta alone accounts for $35.2 billion ($14.2 billion signed Sept 29, 2025, plus $21 billion signed March 2026, claims 4282, 9317). OpenAI's backlog contribution is pegged at $11.2 billion from a strategic deal announced May 2025 (claim 4969), though September 2025 and subsequent order forms lack disclosed amounts. NVIDIA's capacity purchase (Sept 2025) and Leidos collaboration (Aug 2026) remain unquantified. This leaves $46.8 billion of the $104.2 billion backlog unattributed to named customers—roughly 45 percent. Claim 9119 references 'two large, non-investment-grade customers' for infrastructure deployment without identifying them by name, further obscuring concentration risk.
Revenue arithmetic does not reconcile disclosed backlog to named deals. Identified commitments (Meta $35.2 billion, OpenAI $11.2 billion) sum to $46.4 billion, leaving a gap of $57.8 billion as of mid-2026. Anthropic's multi-year agreement is confirmed as 'signed' (claim 9318) but carries no dollar amount. MasterClass and other named partners carry no explicit revenue commitments. CoreWeave discloses $25 billion in new commitments secured in early Q3 2026 (claims 1303, 8573), bringing the backlog to approximately $129 billion by inference, yet the customer composition of these incremental commitments is entirely unnamed (claims 8267, 8261). The weighted-average contract duration of five years (claim 3556) and the shift from $15.1 billion RPO (Dec 2024) to $60.7 billion (Dec 2025) suggest material customer wins, but the absence of granular disclosure on unnamed counterparties limits visibility into concentration and revenue stability.
Customer disclosures, read
2026-09-09CoreWeave's partnership announcements reveal a material distinction between signed customer contracts and softer framework or partnership language. Named customers with executed order forms or binding agreements include OpenAI (claim 4296), Meta (claims 2123, 8668), NVIDIA (claim 4352), Anthropic (claim 9318), Hudson River Trading (claim 7598), and MasterClass (claim 8617). By contrast, IBM is described only as a partner to deliver capacity for Granite models without contractual detail (claim 4971), while NVIDIA's collaboration framework language (claim 3892) appears exploratory rather than revenue-bearing. The announcement on May 6, 2026, listing partnerships with Adaption Labs, Advaita Bio, Perplexity, and World Labs (claim 9320) contains no indication of signed commitments or quantified spend.
Counterparty concentration has shifted markedly. Through mid-2025, OpenAI's $11.2 billion strategic deal (claim 4969) dominated disclosed backlog. Meta's emergence as a customer with $14.2 billion committed through December 2031 (claim 4282) and subsequent expansion to $21 billion (claim 8668) by March 2026 now positions Meta as the largest named customer, representing approximately 20 percent of the June 2026 backlog of $104.2 billion (claim 8520). Yet this concentration may mask deeper risk: the company discloses that DDTL 5.0 facility proceeds support infrastructure for two large, non-investment-grade customers (claim 9119) whose identities remain undisclosed, suggesting either commercial sensitivity around credit quality or significant customer hiding.
The revenue arithmetic presents a reconciliation gap. Identifiable named customers—OpenAI, Meta ($35.2 billion combined), Anthropic, Hudson River Trading, MasterClass, and Applied Digital's Polaris Forge commitment ($11 billion, claim 371)—account for roughly $57 billion of the $104.2 billion backlog disclosed in June 2026. The remaining $47 billion remains attributed to unnamed counterparties. While the company notes $25 billion in new Q3 commitments (claim 1303), the identity of these customers is not disclosed. This gap between named and unnamed customer backlog, coupled with specific mention of two undisclosed non-investment-grade customers requiring dedicated infrastructure financing, suggests either significant opaqueness around customer identity or concentration among customers CoreWeave prefers not to name in public filings.
Customer disclosures, read
2026-09-08CoreWeave's customer announcements conflate signed agreements with framework partnerships. Named counterparties with binding order forms include Meta (signed September 2025 and March 2026 for $14.2 billion and $21 billion respectively, totaling $35.2 billion through 2031; claims 4282, 9317), OpenAI (order form finalized September 2025 with amount unspecified, though May 2025 language citing a "strategic deal" added $11.2 billion to revenue backlog; claims 4296, 4969), NVIDIA (order form executed September 2025, amount undisclosed; claim 4352), and Anthropic (multi-year agreement announced May 2026 with commitment amount withheld; claim 9318). These carry binding contractual language via master service agreements and order forms.
Partnerships without disclosed signed contracts are labeled "framework," "collaboration," or simply "partnership." IBM's involvement is described solely through "partnership" terminology (claim 4971). NVIDIA's January 2026 announcement positions their relationship as a "collaboration framework" (claim 3892), distinct from the September order form, indicating supplier and strategic partner roles. Microsoft appears repeatedly as "among the biggest" customers (claims 648, 8656) yet CoreWeave discloses zero order form amounts, commitment dates, or purchase obligations—a striking omission for a supposed anchor customer. Leidos is announced as a "collaboration" for sovereign AI services (claim 8669). Five companies named as "partners of choice"—Adaption Labs, Advaita Bio, Hudson River Trading, Perplexity, World Labs—carry no disclosed commitment terms (claim 9320). MasterClass "selected CoreWeave Cloud to evaluate...AI teaching agents" (claim 8617), indicating pilot status, not a signed customer contract. Most opaque: two "large, non-investment grade customers" drive the DDTL 5.0 facility's capital deployment (claim 9119) without identification, precluding concentration analysis.
Customer concentration has tightened dramatically toward Meta and OpenAI. Meta's $35.2 billion in quantified commitments dwarfs peers. OpenAI's true commitment remains ambiguous—the May 2025 "strategic deal" cites $11.2 billion, yet the September order form specifies no amount. Customer backlog arithmetic broadly reconciles: RPO grew from $14.7 billion within March 2025's $25.9 billion revenue backlog (claim 4970) to $60.7 billion by December 2025 (claim 3555), then $104.2 billion in Q2 2026 (claim 8546). Meta's disclosed commitments ($35.2 billion) plus OpenAI ($11.2 billion+) account for roughly $46 billion of the $89.5 billion backlog growth from March 2025 to Q2 2026. The remainder—including $25+ billion of new commitments added in early Q3 2026, NVIDIA's and Anthropic's undisclosed amounts, and the two unnamed DDTL 5.0 customers—remain opaque. This opacity obscures whether CoreWeave's top-three customers represent 50%, 70%, or 90% of backlog, a material concentration metric for assessing customer diversification and revenue sustainability.
Customer disclosures, read
2026-09-07CoreWeave's disclosed customer commitments reveal concentration among three named hyperscalers—Meta, OpenAI, and Anthropic—while substantial unnamed parties account for the majority of announced backlog. Meta is the only customer with fully disclosed, staged commitments: $14.2 billion through December 2031 (signed order form, September 2025, claim 4282), an additional order form (April 2026, claim 2123), and a $21 billion incremental commitment (August 2026, claims 8668, 8570), totaling $35.2 billion identified. OpenAI secured an $11.2 billion strategic deal allocation (May 2025, claim 4969), formalized by signed order form (September 2025, claim 4296), but no incremental commitment amount is disclosed. Anthropic signed a multi-year compute agreement for Claude development (August 2026, claim 8571) without disclosed magnitude.
Secondary-tier named customers include Hudson River Trading (multibillion-dollar multiyear agreement, August 2026, exact value withheld, claim 7609), Jane Street ($6 billion commitment, August 2026, claim 7611), and IBM (partnership for Granite capacity, May 2025, no revenue specified, claim 4971). MasterClass is described as "selected" for evaluation, indicating pilot rather than binding commitment (claim 8617). Leidos was framed as a "collaboration framework" for sovereign defense AI services (August 2026, claim 8669), not a traditional customer agreement. Microsoft appears only as "among the biggest" customers (August 2026, claim 648) with no dated order form.
The backlog arithmetic presents a significant reconciliation gap. As of June 30, 2026, CoreWeave disclosed $104.2 billion contracted backlog plus $25+ billion in early Q3 commitments (claims 1302, 8282). Named commitments—Meta $35.2 billion, Jane Street $6 billion, plus unquantified allocations for OpenAI, Anthropic, and Hudson River Trading—account for less than half the disclosed backlog. A May 2026 financing disclosure references "two large, non-investment-grade customers" supporting infrastructure (claim 9119), but these counterparties remain publicly unnamed. Backlog expanded from $15.1 billion RPO (December 2024, claim 3572) to $60.7 billion RPO (December 2025, claims 3555, 3560), then to $104.2 billion (June 2026), yet the announced customer roster does not explain this trajectory.
NVIDIA's relationship requires clarification: a September 2025 order form (claim 4352) may indicate CoreWeave hardware purchases, while a January 2026 "collaboration framework" (claim 3892) is positioned as partnership infrastructure, not direct revenue commitment.
Customer disclosures, read
2026-09-07CoreWeave's disclosed customer portfolio exhibits acute concentration risk masked by backlog growth rhetoric. Between May 2025 and June 2026, named customers account for approximately 40–50% of disclosed commitments, with Meta and OpenAI dominating. Meta's position crystallized through two signed order forms: $14.2 billion committed through December 2031 (claim 4282, Sept 29, 2025) and an additional $21 billion signed in March 2026 (claim 8570), aggregating roughly $35.2 billion of the $104.2 billion backlog reported at Q2 2026. OpenAI secured $11.2 billion in revenue backlog by May 2025 (claim 4969) and signed a new order form in September 2025 (claim 4296), though incremental commitment size remains undisclosed. Hudson River Trading announced a multi-year deal characterized as multi-billion-dollar (claim 1234, 1058) but without specific revenue quantification.
The remaining disclosed backlog—roughly 50–60%—belongs to entities identified only through vague language. Anthropic committed through a "multi-year agreement" (claim 8571) with no dollar figure. NVIDIA, initially appearing as a customer, operated under an existing Master Services Agreement (claim 4352) with a new order form signed September 2025, yet NVIDIA remains CoreWeave's primary GPU supplier and is better characterized as a partner than customer. IBM and Leidos received announcement treatment as "partnerships" and "collaborations" (claims 4971, 8669) without binding order form language. Two large, non-investment-grade customers (claim 9119) driving facility financing remain entirely unnamed. Microsoft, mentioned as "among the biggest" (claim 648), has no disclosed signed agreement in the record.
Revenue arithmetic reveals aggressive backlog expansion. Remaining performance obligations grew from $15.1 billion at December 31, 2024, to $60.7 billion at December 31, 2025—a 300% increase—then reached $104.2 billion by June 30, 2026 (claims 3555, 1302). CoreWeave cited $25 billion in net new commitments secured in early Q3 2026 (claims 8283, 8573) but did not publicly identify the counterparty. This unattributed quarter represents 24% of Q2 backlog. The weighted-average contract duration of approximately five years (claim 3584) suggests backlog concentration creates execution risk and customer substitution risk, particularly if Meta or OpenAI materially reduce utilization or renegotiate.
Customer disclosures, read
2026-09-07CoreWeave's customer disclosures distinguish sharply between binding signed agreements and strategic framework language. Named customers with signed order forms under existing master service agreements include Meta (claims 4282, 8570: $35.2 billion committed through 2031 plus expansion optionality), OpenAI (claims 4296, 4969: $11.2 billion explicitly disclosed for strategic deal, with additional September 2025 order form of unspecified magnitude), NVIDIA (claim 4352: order form under 2023 MSA, amount undisclosed), Hudson River Trading (claims 1234, 958: multi-year deal, exact volume unstated but described as multi-billion), and Anthropic (claim 8571: multi-year agreement, value not disclosed). Applied Digital represents approximately $11 billion in contracted lease revenue (claim 371). By contrast, partnerships lack binding language: IBM's Granite arrangement (claim 4971) is merely an announcement to deliver capacity; NVIDIA's January 2026 collaboration framework (claim 3892) explicitly uses framework terminology rather than order-form language; Leidos' August 2026 collaboration (claim 8669) is similarly styled; and MasterClass (claim 8617) appears to be an evaluation or pilot, described as selection to "evaluate and improve" teaching agents. Two large customers financing the DDTL 3.0 facility (claim 4595) and two others in DDTL 5.0 (claim 9119) remain completely unnamed, with only credit ratings disclosed.
Concentration has intensified. Meta alone represents 34% of disclosed backlog commitments ($35.2 billion of $104.2 billion as of June 2026, claims 1302, 8282). OpenAI, Applied Digital, and Hudson River Trading collectively account for an estimated additional $32+ billion in named capacity, implying roughly 64% of the $104.2 billion backlog (claim 1302) derives from four counterparties. The backlog exploded from $15.1 billion at year-end 2024 to $60.7 billion nine months later (claim 3555) and $104.2 billion by Q2 2026 (claim 1302)—a 588% increase in eighteen months. The company notes weighted-average contract duration of five years (claims 3584, 3556), suggesting backlog scales with acquisition velocity rather than price inflation.
Revenue arithmetic presents transparency gaps. Disclosed customer commitments—Meta ($35.2B), OpenAI ($11.2B), Applied Digital (~$11B), and Hudson River Trading (unspecified but multi-billion)—account for perhaps $57.4 billion of the $104.2 billion backlog, leaving $46.8 billion (45%) unexplained. Unnamed customers in infrastructure financings, Microsoft's mention (claim 648) without quantification, and several other partnerships lack specificity. The distinction between RPO (remaining performance obligations: $60.7 billion, claim 3555) and total revenue backlog ($104.2 billion) itself remains undefined in the claims provided, limiting reconciliation of accounting versus marketing narratives.
Customer disclosures, read
2026-09-07CoreWeave's disclosed customer base exhibits a stark divide between named, binding agreements and partnership rhetoric lacking contractual clarity. The company has secured actual signed order forms from OpenAI (September 2025), Meta (December 2023 MSA with order forms in April 2026), NVIDIA (April 2023 MSA with September 2025 order form), and newer multi-year agreements with Anthropic and Hudson River Trading, all of which carry explicit contract execution language and defined payment terms. Conversely, the IBM partnership announced May 2025 remains described only as a 'strategic deal' contributing $11.2 billion to backlog without a disclosed order form or MSA date—leaving the enforceability and timing of IBM's $11.2 billion commitment materially ambiguous relative to the Meta and OpenAI arrangements. The NVIDIA relationship evolved from existing MSA to a January 2026 'collaboration framework,' language that typically signals non-binding intent rather than revenue-bearing obligation. Supporting details like MasterClass and Leidos are characterized as 'evaluations' and 'collaborations' respectively, suggesting pilot rather than committed-revenue status.
Counterparty concentration has intensified dramatically. Meta and OpenAI dominate: Meta committed $14.2 billion through December 2031 and added $21 billion in March 2026, alone representing a substantial portion of the $104.2 billion Q2 2026 backlog. OpenAI's backlog contribution remains undisclosed post-September 2025 order form. Critically, CoreWeave references two unnamed 'large, non-investment grade customers' (May 2026 debt facility disclosure) and generic language like 'serving most of the world's leading AI labs' without identifying material counterparties, obscuring true customer concentration risk.
Revenue arithmetic raises material reconciliation questions. The disclosed named contracts—Meta $35.2 billion cumulative, IBM $11.2 billion, Applied Digital Polaris Forge $11 billion—total approximately $57.4 billion, yet RPO reached $60.7 billion by December 2025 and $104.2 billion by June 2026. The gap between identified counterparties and stated backlog has widened, not narrowed. August 2026 announcements of '$25 billion in new commitments' lack counterparty identification entirely. This structure suggests either massive undisclosed customer concentration or a reliance on shorter-duration commitments and estimated future demand rather than binding orders, materially complicating assessment of backlog quality and revenue visibility.
Customer disclosures, read
2026-09-06CoreWeave's disclosure record distinguishes sharply between binding orders and framework language, though material opacity persists around customer identity and concentration. Signed customer agreements include: Meta ($14.2 billion through December 2031 under an order form dated September 2025, claim 4282, plus a $21 billion commitment via order form on March 31, 2026, claim 2123; these appear to be separate tranches totaling ~$35 billion); OpenAI (order form executed September 23, 2025, claim 4296, amount undisclosed); Jane Street ($6 billion capacity commitment, claim 7611); Hudson River Trading (multi-year infrastructure agreement, claim 1234); Anthropic (multi-year agreement for Claude deployment, claim 8571); Backblaze (multi-year data storage agreement, claim 7645); and NVIDIA (new order form under existing MSA, claim 4352, amount undisclosed). By contrast, IBM's May 2025 announcement (claim 4971) uses vague "partnership" language without contract specifics. NVIDIA's January 2026 announcement (claim 3892) describes a "collaboration framework" rather than a customer contract. MasterClass's August 2026 selection (claim 8617) reads as evaluation pilot language ("evaluate and improve"), not signed capacity commitment. Leidos (claim 8669) is characterized as "collaboration" for defense services without binding contract disclosure.
Counterparty concentration has intensified toward hyperscalers. Early 2025 rhetoric emphasized OpenAI and IBM; by August 2026, Meta dominates disclosed commitments at ~$35 billion, with OpenAI and Microsoft identified as "among the biggest" (claim 648) but without quantified commitments. The six-month backlog expansion from $60.7 billion RPO (December 31, 2025, claim 3555) to $104.2 billion (June 30, 2026, claim 1302) mirrors $25+ billion in unattributed new Q3 commitments (claim 8573), suggesting significant customer wins remain undisclosed by name.
Revenue arithmetic exhibits material gaps. Meta's contracts account for roughly one-third of disclosed June 2026 backlog; Jane Street adds $6 billion. Remaining ~$63 billion includes OpenAI, Microsoft, NVIDIA, Anthropic, and others—but specific customer contract values are absent. The claim that $104.2 billion excludes $25+ billion in early-Q3 commitments (claim 8283) implies total signed backlog near $129 billion by mid-2026, yet customer-level breakdowns necessary to verify concentration risk remain undisclosed. No reconciliation addresses whether Microsoft (listed as customer, claim 8656) has signed binding agreements with disclosed values, or whether Microsoft's position derives from pilot arrangements or framework discussions.
Customer disclosures, read
2026-09-06CoreWeave's disclosure of customer agreements distinguishes clearly between binding order forms and collaborative frameworks, though material gaps in counterparty identification and deal attribution limit revenue reconciliation.
Signed customer contracts with explicitly named counterparties include OpenAI (claim 4296, Sept 2025), which executed an order form under an existing master services agreement; Meta Platforms (claims 4282 and 2123, Sept 2025 and March 2026), which committed $14.2 billion through December 2031 and subsequently added $21 billion in March 2026 (claim 8570); NVIDIA (claim 4352, Sept 2025), under its existing MSA dated April 2023; and Hudson River Trading (claim 7598, Aug 2026), described as a multi-year, multi-billion-dollar agreement without specific dollar disclosure. Jane Street is named with a $6 billion commitment (claim 7611, Aug 2026), and Anthropic with a multi-year agreement (claim 8571, Aug 2026). These represent binding revenue backlog with enforceable legal instruments.
Framework arrangements and evaluations lack revenue weight. IBM's partnership (claim 4971, May 2025) uses explicitly non-transactional language. NVIDIA's collaboration framework (claim 3892, Jan 2026) is similarly promotional. MasterClass (claim 8617, Aug 2026) was selected to evaluate and improve AI teaching agents—a platform pilot, not a committed customer contract.
Counterparty concentration is dominated by Meta, which represents $35.2 billion across two tranches, or roughly 34 percent of the $104.2 billion revenue backlog as of June 30, 2026 (claim 8538). Microsoft and OpenAI are identified as among the largest customers (claim 648, Aug 2026), but recent deal values are undisclosed; the May 2025 $11.2 billion OpenAI contribution (claim 4969) predates the September order form and lacks update.
Revenue attribution reveals substantial gaps. Meta ($35.2B) plus Jane Street ($6B) plus Applied Digital's prospective Polaris Forge lease revenue ($11B, claim 371) total $52.2 billion, leaving approximately $52 billion of the $104.2 billion backlog unattributed to named customers. The company separately disclosed $25 billion in early Q3 commitments (claim 8521) without counterparty identification. Either unnamed customers represent material backlog concentration, or deal structures—including pilot programs or framework arrangements—are embedded within backlog figures.
Customer disclosures, read
2026-09-06CoreWeave's disclosed customer base reveals sharp concentration among AI giants alongside material vagueness about counterparty identity. Named, signed agreements cluster around hyperscalers: Meta accounts for approximately $35.2 billion in contracted capacity through 2032, combining the $14.2 billion initial commitment of December 2025 per claim 4282 with the subsequent $21 billion expansion signed in March 2026 per claim 8570. OpenAI represents $11.2 billion in committed revenue backlog (claim 4969). Jane Street, Hudson River Trading, and Applied Digital contribute material but smaller positions—Jane Street $6 billion (claim 7611), Applied Digital $11 billion as leased infrastructure revenue (claim 371)—while Hudson River Trading's multiyear arrangement lacks a specific figure (claim 7609). Anthropic and Backblaze appear signed to multiyear agreements (claims 8571, 7645) without disclosed volumes.
Yet the largest share of CoreWeave's $104.2 billion Q2 2026 backlog (claims 8520, 1302) remains sourced from unnamed counterparties. Leidos is described through "collaboration" framework language rather than binding orders (claim 8669). MasterClass is explicitly characterized as an evaluation pilot, not a production commitment (claim 8617). Microsoft appears only as an unnamed "major customer" referenced alongside OpenAI (claim 648). An undisclosed colocation provider and "existing customer demand" drive Southeast Asia deployment (claims 8760, 8762) without identification.
The revenue arithmetic raises reconciliation questions. Named, publicly committed deals total roughly $63 billion when summed: Meta ($35.2B), OpenAI ($11.2B), Applied Digital ($11B), Jane Street ($6B). Anthropic, Backblaze, Hudson River Trading, and other named signatories lack disclosed contract values. This leaves approximately $41 billion in backlog unexplained by public announcements—either drawn from unnamed customers, framework arrangements not yet formalized into orders, or pending disclosure. The progression from $60.7 billion RPO at year-end 2025 (claim 3555) to $104.2 billion by Q2 2026, plus claimed $25 billion in "new commitments" in early Q3 (claim 8573), suggests aggressive acceleration, though the distinction between signed orders and LOI-stage commitments remains opaque outside the named tier.
Customer disclosures, read
2026-09-06CoreWeave has disclosed a substantive customer roster, though the nature and materiality of commitments varies significantly across counterparties. Named customers with explicitly signed order forms include OpenAI (claim 4296, September 2025), Meta (claims 4282, 2123, $14.2 billion initial commitment plus $21 billion expansion in March 2026 per claim 8570), NVIDIA (claim 4352, September 2025), and Hudson River Trading (claims 958, 1234, multi-year agreement announced August 2026). Anthropic (claim 8571) and Jane Street (claim 7611, $6 billion commitment) also appear with signed agreements. By contrast, IBM is described only as a partnership (claim 4971) for delivering capacity, lacking specificity on commitment terms, and NVIDIA's more recent collaboration framework announcement (claim 3892, January 2026) uses structurally softer language than the preceding order-form disclosures.
The roster reveals sharp concentration risk. Meta has evolved from $14.2 billion contractual obligation (claim 4282, September 2025, through December 2031) to $35.2 billion total commitment when combining the March 2026 expansion (claim 8570). OpenAI accounts for $11.2 billion of backlog (claim 4969). These two counterparties represent the material spine of disclosed arrangements. Microsoft and OpenAI are cited as among the biggest customers (claim 648) without quantified commitments; this opacity is material.
Revenue backlog reconciliation reveals a critical disclosure gap. Remaining performance obligations surged from $15.1 billion (December 2024) to $60.7 billion (December 2025, claim 3555), then to $104.2 billion (June 2026, claim 1302). The six-month jump from year-end 2025 to mid-2026 exceeded $43 billion. Named additions in that window include Meta's $21 billion (March 2026, claim 8570) and Jane Street's $6 billion (claim 7611, announced August). These account for approximately $27 billion of the $43 billion growth. The remaining $16-18 billion of growth and the separately disclosed $25 billion in net new commitments signed in early Q3 (claims 1303, 8261) remain unattributed to named counterparties, suggesting material undisclosed customers or framework commitments not yet reflected as binding order forms. Pilot arrangements—notably MasterClass (claim 8617, described as evaluation), which lacks committed spend—sit outside this backlog arithmetic and should not be conflated with revenue-bearing contracts. The IBM partnership similarly lacks committed revenue specification despite its headline prominence.
Customer disclosures, read
2026-09-06CoreWeave's customer portfolio distinguishes sharply between binding signed order forms and strategic framework arrangements. Named signed customers with quantified commitments include Meta ($14.2 billion through 2031, claim 4282, plus $21 billion commitment, claim 8570), OpenAI (new order form signed September 2025, claim 4296, building on $11.2 billion strategic deal from May 2025, claim 4969), Anthropic (multi-year agreement, claim 8571), Hudson River Trading (multi-year infrastructure deal, claim 7558), Jane Street ($6 billion commitment, claim 7611), and NVIDIA (new order form September 2025, claim 4352). By contrast, IBM's relationship is labeled partnership framework for Granite compute (claim 4971), NVIDIA's January 2026 arrangement is explicitly a collaboration framework (claim 3892), and Leidos is described as a collaboration for sovereign AI services (claim 8669), none of which disclose customer revenue. MasterClass represents pilot language—selected to evaluate AI teaching agents (claim 8617), not a committed spending obligation.
Counterparty concentration has intensified dramatically. Meta and OpenAI represent the disclosed centerpiece: Meta alone accounts for approximately $35.2 billion of named commitments (combining claims 4282 and 8570), while OpenAI's total remains partially opaque beyond the $11.2 billion strategic deal and subsequent order forms. By June 2026, Microsoft and OpenAI together were described as among the biggest customers (claim 648), suggesting a two-to-three customer dependency. A single unnamed material customer drove DDTL 3.0 facility financing (claim 4595), implying additional concentration risk not publicly identified.
Revenue arithmetic broadly reconciles but with opacity. March 2025 backlog stood at $25.9 billion including $14.7 billion RPO (claim 4970). By December 2025, RPO had expanded to $60.7 billion (claim 3555), implying $46 billion in net new commitments. Named signed deals—Meta's $14.2 billion plus option, OpenAI's ongoing orders, Anthropic, Hudson River ($6+ billion implied), Jane Street ($6 billion)—account for approximately $45+ billion, matching the gap. By June 2026, total backlog reached $104.2 billion (claim 1302), with an additional $25 billion signed in early Q3 (claim 1303). The arithmetic holds consistently across five-year weighted-average contract duration (claim 3556), though the concentration of two or three hyperscalers and the shadowed customer suggests revenue quality risk concentrated in AI infrastructure spending cycles.
Customer disclosures, read
2026-09-06CoreWeave's customer portfolio has shifted materially from heavily concentrated to more diversified, though quantified exposure to specific counterparties remains opaque in critical cases. Through mid-2025, the backlog narrative hinged on OpenAI's $11.2 billion strategic commitment (claim 4969), which represented nearly half of the stated $25.9 billion revenue backlog as of March 31, 2025 (claim 4970). By September 2025, Meta entered as a named customer with a signed order form committing $14.2 billion through December 2031 (claim 4282), supplemented by an expansion option through 2032 (claim 4283). This Meta commitment increased further to $21 billion through a March 2026 order form (claim 8570), suggesting either renewal or expansion rather than replacement. NVIDIA appears in binding terms via order forms dated September 14, 2025 (claim 4352), though the January 2026 announcement shifted to looser "collaboration framework" language (claim 3892), signaling a downgrade from execution certainty. OpenAI similarly announced a new order form on September 23, 2025 (claim 4296) under an existing Master Services Agreement, confirming continued relationship but leaving incremental value undisclosed.
Recent announcements exhibit concerning vagueness. Anthropic and Hudson River Trading are described via multi-year agreements (claims 8571, 7598), yet Hudson River Trading's commitment remains labeled only as "multi-billion-dollar" without specification (claim 7609). Jane Street's $6 billion commitment is named (claim 7611), but MasterClass's involvement is framed as evaluation—"selected CoreWeave Cloud to evaluate and improve AI teaching agents" (claim 8617)—implying pilot rather than committed capacity. IBM's arrangement remains at "partnership" level without binding language (claim 4971). The backlog arithmetic tracks approximately: base $25.9 billion growing to $60.7 billion RPO by December 2025 (claim 3555), then $104.2 billion by June 2026 (claim 8282), plus $25 billion claimed in early Q3 2026 (claim 8573). Visible additions (Meta's combined $35.2 billion, Jane Street's $6 billion, OpenAI's base $11.2 billion) approximate $52 billion, leaving ~$26 billion attributable to Hudson River Trading, Anthropic, Backblaze, and other undisclosed parties. The widening gap between backlog expansion and disclosed customer names—particularly the unquantified $25 billion Q3 contribution—raises questions about whether the remaining commitments represent binding orders or looser framework commitments.
Customer disclosures, read
2026-09-05CoreWeave's publicly identified customers represent only a portion of its reported revenue backlog, highlighting material concentration risk in unnamed counterparties. Named signed customers with specific dollar commitments include OpenAI ($11.2 billion backlog as of May 2025, with a September 2025 order form under its existing Master Services Agreement, claim 4296), Meta ($21 billion commitment through December 2032 announced March 2026, claim 8570, building on an earlier $14.2 billion through-2031 agreement from September 2025, claim 4282), Jane Street ($6 billion, claim 7611), and Hudson River Trading (multibillion-dollar multiyear agreement, claims 7604/7609). Anthropic is disclosed with a multiyear agreement for Claude model compute (claims 8571/7630) and Backblaze with a multiyear storage partnership (claim 7645), though their dollar commitments remain undisclosed. IBM is named for a Granite compute partnership (claim 4971); NVIDIA appears in both an order form (September 2025, claim 4352) and a collaboration framework (January 2026, claim 3892, non-binding language). The explicitly named commitments—approximately $38 billion to OpenAI, Meta, and Jane Street combined, plus undisclosed sums from Hudson River Trading and Anthropic—fall substantially short of CoreWeave's stated $104.2 billion revenue backlog as of June 30, 2026 (claim 8520), leaving $50+ billion in unannounced customer concentration. RPO escalated from $15.1 billion (December 2024, claim 3572) to $60.7 billion (December 2025, claim 3571) to $104.2 billion (June 2026, claim 8520), with an incremental $25 billion in commitments secured in early Q3 2026 (claim 8573). Microsoft is mentioned as among the biggest customers (claim 648) without quantification. The weighted-average five-year contract duration (claim 3561) provides revenue visibility, yet the opacity regarding unnamed customer concentration—specifically whether any undisclosed counterparty exceeds Meta's disclosed $21 billion—creates material risk in assessing revenue durability and customer relationship resilience.
Customer disclosures, read
2026-09-05CoreWeave's named-customer base is exceptionally transparent and verifiable through SEC filings and press releases, distinguishing most deals from vague "strategic partnership" nomenclature. Confirmed signed agreements include OpenAI (claim 4969: $11.2 billion backlog as of May 2025; claim 4296: September 2025 order form under existing MSA), Meta (claim 4282: $14.2 billion commitment through December 2031, later revised to $21 billion through 2032 per claim 7628), Jane Street (claim 7611: $6 billion capacity spend), Hudson River Trading (claims 7604–7611: multiyear agreement explicitly "multibillion-dollar" per claim 7609, with early Vera Rubin chip access), Anthropic (claim 7630: multiyear compute deal), and Backblaze (claim 7645: multiyear data storage agreement). NVIDIA's engagement is more ambiguous, characterized as a "collaboration framework" (claim 3892) rather than a binding customer contract, and IBM's Granite partnership (claim 4971) carries partnership semantics rather than purchase commitments.
Counterparty concentration has compressed vertically. Meta and OpenAI dominate at an estimated $35+ billion combined against a total backlog of $104.2 billion as of Q2 2026 (claim 8520). The quantitative trading bloc—Jane Street, Hudson River Trading, IMC, and Flow Traders (claim 1792)—forms a secondary cluster. This oligopolistic structure diverges sharply from traditional infrastructure providers.
Revenue arithmetic reveals material gaps. CoreWeave's backlog expanded from $25.9 billion (March 2025, claim 4970) to $60.7 billion RPO (December 2025, claim 3555) to $104.2 billion (June 2026, claim 8520)—a fourfold increase in 15 months. The intermediate jump to $60.7 billion suggests a major contract booking not fully articulated in concurrent announcements, likely reflecting amendments to Meta's or OpenAI's commitments. The $25 billion in "new commitments signed early Q3" (claim 1303) remain unnamed. Hudson River Trading's value is explicitly withheld as "multibillion-dollar" (claim 7609) without magnitude, preventing independent reconciliation. The weighted-average five-year contract term (claim 3561) implies backlog includes distant-year obligations, not near-term revenue certainty. Cumulatively, named customer commitments (Meta $21B + OpenAI $11.2B+ + Jane Street $6B + Anthropic unspecified + Hudson River unspecified) account for a material but indeterminate fraction of the $104.2 billion total, leaving substantial backlog unattributed to publicly disclosed counterparties.
Customer disclosures, read
2026-09-05CoreWeave has disclosed a material shift in customer concentration and commitment structure between mid-2025 and mid-2026. Through September 2025, the company's revenue narrative centered on two strategic relationships: OpenAI, contributing $11.2 billion to backlog (claim 4969), and a material customer contract financing the DDTL 3.0 facility (claim 4595). By March 2026, RPO had surged to $60.7 billion from $15.1 billion year-over-year (claim 3555), yet the company disclosed no single named agreement accounting for this 304% increase. The verbatim record suggests that expansion derived from existing MSAs: new order forms with OpenAI (September 2025, claim 4296), NVIDIA (September 2025, claim 4352), and Meta (September 2025, claim 4282 for $14.2 billion through 2031, expanded March 2026, claim 2123).
By August 2026, the concentration risk had visibly diversified. Meta emerged as a named $21 billion commitment through 2032 (claim 7628), Hudson River Trading signed a disclosed multibillion-dollar multiyear agreement (claim 7609), and Jane Street committed $6 billion to data center capacity (claim 7611). Microsoft remained identified only as "among the biggest" customers without deal specificity (claim 648). IBM's May 2025 "partnership" language (claim 4971) lacked contractual terms and revenue quantification; it remained a framework announcement rather than a binding capacity agreement.
Revenue arithmetic presents a reconciliation gap. Q2 2026 backlog reached $104.2 billion (claim 1302), with $25 billion in net new commitments added in early Q3 (claim 1303). Named deals—Meta $21 billion, Hudson River Trading multibillion (unquantified), Jane Street $6 billion, Anthropic multiyear (claim 7630, unquantified), and earlier OpenAI $11.2 billion—do not sum to disclosed totals, indicating either substantial undisclosed counterparties or higher aggregation from existing customers. The weighted-average contract duration of five years (claim 3584) suggests long-term lock-in; however, the gap between publicly named commitments and reported backlog magnitude implies conservative disclosure around existing customer expansions, obscuring true concentration metrics.
Customer disclosures, read
2026-09-05CoreWeave's customer disclosure exhibits a critical distinction between named signed agreements and strategic framework language that obscures the actual customer base. The company has publicly named five substantial customers with explicit order forms or financial commitments: OpenAI (claim 4296, September 2025), Meta (claims 4282, 2123, 7628—$14.2B through 2031, expanding to $21B through 2032), Hudson River Trading (claim 7598, multi-billion dollar agreement, August 2026), Jane Street (claim 7611, $6B), and NVIDIA (claim 4352, order form). By contrast, IBM appears only as a "partnership" to deliver compute capacity for Granite models (claim 4971), representing a supplier relationship rather than a customer commitment. Microsoft and OpenAI are mentioned as "among the biggest" clients (claim 648) and "major clients" (claim 618), yet CoreWeave has disclosed specific deal amounts only for OpenAI and not for Microsoft, suggesting material asymmetry in revenue concentration disclosure.
Counterparty concentration has intensified dramatically. Meta alone represents at least $35.2 billion in announced commitments across three separate order forms (September 2025, March 2026, August 2026), with an expansion option through 2032. When combined with the multi-billion-dollar Hudson River Trading deal and $6 billion from Jane Street, these three customers account for over $41 billion in disclosed commitments. Against a total revenue backlog of $104.2 billion as of June 2026 (claim 1302), this means roughly forty percent of backlog derives from three named customers, with OpenAI and Microsoft comprising an undisclosed but likely material portion of remaining obligations.
The revenue arithmetic reveals material gaps. The reported progression from $25.9 billion backlog (March 2025, claims 4970) to $60.7 billion remaining performance obligations (December 2025, claim 3555) to $104.2 billion (June 2026, claim 1302) represents a four-fold increase over fifteen months. Yet the disclosed deals—Meta $35.2B, Jane Street $6B, and Hudson River Trading's unnamed amount—do not reconcile with an $104 billion backlog without substantial undisclosed customer commitments. The August 2026 announcement of "$25 billion in net new customer commitments in early Q3" (claim 8283) further suggests material customers remain either unnamed or characterized only through partnership language, creating opacity around whether CoreWeave's growth reflects diversified customer acquisition or concentration risk masked by framework agreements with strategic suppliers.
Customer disclosures, read
2026-09-05CoreWeave's customer announcements reveal a sharp evolution from strategic framework language to binding contractual agreements. Through mid-2025, the company emphasized "strategic deals" with OpenAI and IBM—language that often masks LOI or MOU structures. OpenAI was cited (claim 4969) as a "$11.2 billion revenue backlog" partnership in May 2025, yet the actual binding order form wasn't announced until September 23, 2025 (claim 4296), suggesting a lag between commercial interest and executable contracts. IBM's Granite partnership (claim 4971) similarly employed partnership terminology without quantified delivery commitments or order form disclosure. NVIDIA's initial announcement used "collaboration framework" language (claim 3892), distinguishing it from the later signed order form (claim 4352).
Starting in September 2025, CoreWeave shifted to naming signed order forms explicitly. Meta's September 2025 commitment—$14.2 billion through December 2031 (claim 4282)—and subsequent March 2026 order form (claim 2123) introduced dated, binding language, followed by a higher $21 billion agreement announced August 2026 (claim 7628). The August 2026 announcements of Hudson River Trading's "multi-year, multi-billion-dollar agreement" (claim 7598), Anthropic's "multi-year deal" (claim 7630), Jane Street's "$6 billion" commitment (claim 7611), and Backblaze's "multi-year foundational data storage agreement" (claim 7645) all specified counterparty identity and term. MasterClass (claim 7782) lacks this precision, referring only to platform selection—closer to pilot than committed purchase.
Counterparty concentration remains heavily weighted: Meta and OpenAI dominate the backlog, with Microsoft described generally as "among the biggest" (claim 648) and 1241 without specific contract disclosure. Diversification to Hudson River Trading, Anthropic, Jane Street, and IBM suggests evolution toward a broader customer base, though three to four hyperscalers likely represent the majority of revenue. Revenue arithmetic shows consistency: $14.7 billion RPO in May 2025 (claim 4970) grew to $60.7 billion by December 2025 (claim 3555), then $104.2 billion by Q2 2026 (claim 1302), with an additional $25 billion in new commitments through early Q3 2026 (claim 1303). These figures align with disclosed agreements, though reliance on hyperscaler concentration introduces material customer concentration risk despite backlog scale.
Customer disclosures, read
2026-09-05CoreWeave has successfully named and executed binding contracts with several major counterparties, though concentration risk is acute and revenue reconciliation raises questions. The company has disclosed signed order forms under existing Master Service Agreements with OpenAI (claim 4296, September 2025), NVIDIA (claim 4352, September 2025), and Meta (claim 2123, March 2026), substantiated by quantified commitments: Meta $14.2 billion through December 2031 (claim 4282, September 2025) and a subsequent $21 billion commitment through 2032 (claim 7628, August 2026). Additional named customers with binding agreements include Hudson River Trading (multi-billion-dollar multiyear deal, claim 7598, August 2026), Anthropic (multi-year arrangement, claim 7630, August 2026), Jane Street ($6 billion capacity commitment, claim 7611, August 2026), and Backblaze ($335 million five-year storage agreement, claim 7448, August 2026). IBM and NVIDIA, however, appear in framework language—IBM as an announced "partnership" for Granite compute capacity (claim 4971) and NVIDIA transitioning from order forms to a "collaboration framework" to advance AI adoption globally (claim 3892, January 2026)—suggesting these may be softer commitments than true signed contracts.
The counterparty concentration has shifted dramatically toward hyperscalers and AI leaders. Meta and OpenAI together account for at least $50.4 billion of named commitments, while Microsoft appears only as a referenced "major client" (claims 648, 632, 618, 1100) without any disclosed signed deal, creating an asymmetry in transparency. This naming gap raises questions about whether Microsoft's contribution to backlog is material but undisclosed, or whether the characterization overstates actual commitments.
Revenue reconciliation presents arithmetic tension. CoreWeave disclosed $60.7 billion in remaining performance obligations as of December 31, 2025 (claim 3555), yet Meta alone committed $35.2 billion across two separately announced deals (September 2025 and August 2026). When adding OpenAI's $11.2 billion (claim 4969, May 2025), Jane Street's $6 billion, Hudson River Trading's unquantified but explicitly "multibillion-dollar" commitment, and Applied Digital's $11 billion prospective lease revenue (claim 371, August 2026), the disclosed named commitments exceed the reported RPO figure. This gap suggests either that some announcements represent framework options rather than fully committed RPO, that deals announced as separate tranches overlap the same underlying MSA, or that some "commitments" remain subject to conditions (like delivery and availability requirements mentioned in claim 4970). The August 2026 announcement of $25 billion in additional commitments secured in early Q3 (claims 1303, 3011, 368)—not yet reflected in the $104.2 billion Q2 backlog (claim 624)—further indicates that disclosure lags execution, complicating verification of actual binding exposure.
Customer disclosures, read
2026-09-05CoreWeave has disclosed a materially differentiated set of arrangements across its customer roster, mixing binding customer contracts with framework partnerships that require parsing. The majority of named, major customers—Meta, OpenAI, Hudson River Trading, Jane Street, Anthropic, Backblaze, and Microsoft—are confirmed through executed order forms or definitive statements of commitment. Meta's arrangements are particularly clear: a $14.2 billion contract through December 2031 (claim 4282, Sept 2025) followed by an expanded $21 billion agreement through 2032 (claim 7628, Aug 2026), both signed order forms. OpenAI similarly executed an order form in September 2025 (claim 4296) building on an existing master services agreement from April 2023. Hudson River Trading, Jane Street, and Anthropic all feature explicit "multi-year" or multi-billion-dollar commitment language consistent with signed deals (claims 7605, 7611, 7630).
IBM and NVIDIA, by contrast, are positioned as framework partnerships rather than disclosed customer revenue contracts. IBM's Granite compute capacity arrangement (claim 4971) reads as a strategic partnership announcement. NVIDIA's relationship has explicitly evolved into a "collaboration framework" (claim 3892, Jan 2026), suggesting alignment but not a binding customer contract with specified revenue.
Counterparty concentration has shifted dramatically. In May 2025, OpenAI represented 43% of disclosed revenue backlog at $11.2 billion of $25.9 billion total (claim 4969). By August 2026, OpenAI remains material but diversification is evident: the customer roster disclosed includes Meta, Microsoft, Jane Street, Hudson River Trading, Anthropic, Perplexity AI, Google, IBM, and others (claim 1241). Meta has emerged as or remains the largest single commitment.
Revenue arithmetic raises reconciliation questions. OpenAI's contract value is reported both as $22.4 billion as of September 2024 (claim 1242) and $11.2 billion in May 2025 (claim 4969)—suggesting either partial recognition, an interim reporting window, or expansion between those statements. Meta's expansion from $14.2B to $21B year-over-year confirms material growth in a core account. Total RPO quadrupled from $15.1 billion (end of 2024) to $60.7 billion (end of 2025, claim 3571), and revenue backlog reached $104.2 billion by Q2 2026 (claim 624), with an additional $25 billion in commitments signed in early Q3 (claim 1303). This growth is consistent with disclosed deal volume, though OpenAI contract value requires clearer reconciliation.
Customer disclosures, read
2026-09-05CoreWeave's disclosed customer announcements conflate binding customer contracts with softer partnership language, creating opacity around revenue concentration and contractual substance. Named customers with explicit order-form or master services agreement references include Meta (claims 4282, 2123), OpenAI (claim 4296), Hudson River Trading (claims 7602–7609), Anthropic (claim 7630), Backblaze (claim 7448), and Jane Street (claim 7611). By contrast, IBM's May 2025 announcement (claim 4971) uses "partnership" language without order-form documentation, and NVIDIA's January 2026 "collaboration framework" (claim 3892) explicitly eschews binding commercial terms.
Counterparty concentration has narrowed around two majors: Meta and OpenAI. Meta's disclosed commitment almost doubled from $14.2 billion through 2031 (claim 4282, September 2025) to $21 billion through 2032 (claim 7628, August 2026)—a 48-percent increase warranting explanation as either new scope or contract repricing, yet neither rationale is disclosed. OpenAI appears twice in the record: first as a "strategic deal" contributing $11.2 billion to revenue backlog in May 2025 (claim 4969), then as a signed order-form counterparty in September 2025 (claim 4296) with no updated dollar amount attached to the executed agreement. Microsoft's status as a "major client" (claims 618, 632, 648) lacks any signed agreement detail or financial disclosure.
The revenue backlog trajectory does not reconcile cleanly with disclosed signed deals. Remaining performance obligations grew from $15.1 billion (December 2024, claim 3572) to $60.7 billion (December 2025, claim 3571) to $104.2 billion (June 2026, claim 624), alongside unspecified $25 billion in early Q3 2026 commitments (claim 1303). Named-customer contracts with specific values—Meta ($21 billion), Jane Street ($6 billion), Backblaze ($335 million)—account for roughly $27 billion of the $104 billion backlog. Hudson River Trading is described as multibillion-dollar but lacks a disclosed amount, and OpenAI's executed contract carries no stated value. This leaves substantial unattributed backlog, suggesting either undisclosed customers or that earlier "strategic partnerships" have been reclassified into financial backlog without explicit customer identification.
Customer disclosures, read
2026-09-02CoreWeave's customer disclosure pattern reveals a sharp distinction between contractually signed agreements and strategic naming without valuation. Meta emerges as the longest-standing counterparty, with an explicit order form under an existing Master Services Agreement dated December 2023 (claim 2123), renewed on March 31, 2026. OpenAI represents the second material commitment: CoreWeave disclosed contracts worth $22.4 billion as of September 2025 (claim 1242), though this figure carries a historical date qualifier and no subsequent refresh. Hudson River Trading was introduced as a newly signed customer in late August 2026, described as a "multiyear, multibillion-dollar agreement" (claim 1809) with explicit chip-access provisions, but without quantified revenue attribution.
The remaining large-name roster—Anthropic, Google, IBM, Perplexity AI—appears in claim 1241 as members of a "diverse and expanding set of customers" without attached contract language or financial terms. Jane Street, IMC, and Flow Traders are noted as customers who "have already adopted" CoreWeave's infrastructure (claim 1792), equally bereft of specifics. This pattern—named without signed-agreement evidence—inflates the appearance of customer diversification while obscuring concentration. Rescale shifted from strategic narrative to explicit partnership in August 2025 (claims 1804–1806), with integration commitments but no revenue guarantee quantified. Applied Digital's 400 MW lease commitment totals $11 billion in "prospective lease revenue" (claim 371), language that defers actual cash collection, and Backblaze's five-year, $335 million contract (claim 1243) is the clearest single-named deal outside the three largest.
CoreWeave's $104.2 billion Q2 revenue backlog (claim 1810) stands as the critical reconciliation problem. Named customers with disclosed valuations—OpenAI ($22.4 billion), Applied Digital ($11 billion), Backblaze ($335 million)—sum to roughly $33.7 billion, leaving $70 billion unexplained by public counterparty identification. The backlog's composition reveals profound customer concentration among a narrow set (Meta, OpenAI, Microsoft) whose exact allocations within the $104.2 billion are undisclosed. The $25 billion in net new commitments claimed for early Q3 (claim 1811) adds opacity; no named customers are attributed to this acceleration.
delivery_arc
Delivery vs. promise
2026-10-19CoreWeave's headline capacity has grown on two tracks, and the gap between them is widening. Active power rose from roughly 420 MW in May 2025 (4972, 29785) to 470 MW (25577), then 590 MW (20199), then 850 MW at year-end 2025 (3553, 11769), and past 1 GW by May 2026 (9321). That follows the 70 MW and 360 MW year-end figures for 2023 and 2024 (3551, 3552). Contracted power grew faster, from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW (26367). The unenergized backlog went from about 1.2 GW to more than 3 GW. Contracting is outrunning energization, and the long-range targets keep rising. The 5+ GW NVIDIA-linked goal for 2030 (31932, 3893, 27948, 9329) was joined in May by an 8 GW active-power target (9322) with no bridging schedule. Reaching it would mean adding about 7 GW in under five years, against roughly 1 GW delivered to date.
The largest single capacity claim did not hold. The Core Scientific deal promised about 1.3 GW of owned power (28335), with closing guided to Q4 2025 (28334). It was terminated (19825, 4166) and reverted to a partnership (20313). After that, the company itself disclosed an OpenAI installation delay and Core Scientific weather and design setbacks (19828, 19829). The 1.3 GW never formally left the narrative. Contracted totals kept climbing as if nothing had been lost.
Independent corroboration is thin. Apart from one financing date (4593), every capacity and timeline claim on record is self-stated. The record contains no permits, interconnection-queue positions or site reporting for Kenilworth (25583), Lancaster (20201), Indonesia (26366) or the other announced campuses. None of these projects carries a capacity or cost figure at the project level, so the company-wide totals cannot be traced to specific sites.
Over the next 90 days, Kenilworth is the clearest test. Its initial phase is promised for 2026 (25584), the deadline falls within this window, and no update has followed. The Q3 report should show whether active power stayed on its roughly 150 to 250 MW per quarter pace. It should also show whether contracted power rises again without matching energization, and whether the Vera Rubin deployments (17621, 10341) reach named sites. The final record (27051) arrived truncated and is not assessed here.
Delivery vs. promise
2026-10-18CoreWeave's active footprint has grown on a steep and mostly consistent curve: 70 MW at end-2023 (3551), 360 MW at end-2024 (3552), roughly 420 MW in spring 2025 (4972, 29785), 470 MW by August (25577), 590 MW in November (20199), 850 MW at year-end 2025 (3553, 11769), and past 1 GW by May 2026 (9321). Contracted power has climbed faster still, from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (3554), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). The gap between contracted and energized capacity has therefore widened rather than closed, to roughly four to one. Long-range ambition has also escalated. A 5 GW-by-2030 framing tied to NVIDIA (3893, 27948) was joined in May 2026 by an 8 GW active-power target for the same year (9322). Reaching it implies sustained additions near 1.75 GW a year, well above anything delivered so far.
On dates, the largest revision was structural. The Core Scientific deal promised about 1.3 GW of owned gross power (28335) and a Q4 2025 close (28334), but it was terminated in October 2025 (4166, 19825) and recast as a continuing partnership (20313). Contracted-capacity figures kept rising afterward with little public reconciliation of what the lost owned megawatts meant. Weather and design delays at Core Scientific sites (19829) and a delayed OpenAI installation (19828) were disclosed soon after management had characterized performance problems as isolated (19827). That sequence warrants scepticism toward later reassurances. Kenilworth's initial phase remains pinned to 2026 (25584), with about ten weeks left. Indonesia's 360 MW is dated to 2028 (26332).
Independent corroboration in this record is thin. Every named campus apart from Polaris Forge 1 sits at announced status with no capacity or cost fields populated. No permits, interconnection-queue positions or site reporting are attached for Kenilworth's 250 MW (25583) or Lancaster's 300 MW (20201). The supplied record also ends partway through the Indonesia entries. The announced pace rests almost entirely on company disclosures.
Over the next 90 days, watch the Q3 2026 report for active power meaningfully above the 1 GW mark and any change to the 4.2 GW contracted figure. Watch for confirmation or quiet deferral of Kenilworth energization before year-end. PJM queue or local permitting activity for Lancaster and Kenilworth would be the first external evidence. Look also for any reconciliation of the 8 GW target with current build rates.
Delivery vs. promise
2026-10-17CoreWeave's capacity story has two curves, and the gap between them is the central fact. Active power has risen steadily: roughly 420 MW in early 2025 (4972, 29785), 470 MW by August (25577), 590 MW in November (20199), 850 MW at year-end (11769, 3569), and past 1 GW by May 2026 (9321). That is a real ramp. The 10-K history of 70 MW in 2023 and 360 MW in 2024 (3551, 3552) shows annual additions growing from about 290 MW to about 490 MW. Contracted power has grown faster, from 1.6 GW (4973) through 2.2, 2.9, 3.1 and 3.5 GW (25578, 20200, 3554, 9323) to 4.2 GW (26367). Contracted capacity has stayed at roughly four times active capacity throughout. So the backlog is growing in step with delivery rather than being worked down. The 2030 framing has also grown, from 5 GW of NVIDIA-linked AI factories (3893, 27948) to an 8 GW active target (9322). The company has not reconciled the two figures. Reaching 8 GW from about 1 GW requires roughly 1.5 GW of energization a year, about three times the 2025 pace.
On dates, the largest revision was structural. The Core Scientific deal carried 1.3 GW of owned power and a Q4 2025 close (28335, 28334). It was terminated in October (4166), and the relationship continued only as a partnership (20313). Weeks later the company disclosed weather and design delays at Core Scientific sites and a delayed OpenAI installation (19829, 19828), while describing the problems as isolated (19827). Most project-level dates in the record are loose or missing. Kenilworth's initial phase is pegged to 2026 (25584), with no later reaffirmation on file. Lancaster has a 300 MW figure but no timeline (20201). Indonesia is the only project with a capacity and year attached: 360 MW online in 2028 (26331, 26332).
Independent corroboration is thin. Nearly every facility claim is company-stated. The only verified timeline item, the DDTL 3.0 termination date (4593), concerns financing, not construction. The record contains no permits, PJM interconnection filings for New Jersey or Pennsylvania, or site reporting that confirms the announced pace.
Over the next 90 days, the Q3 report is the key test. Watch whether active power has moved meaningfully beyond the 1 GW mark, whether Kenilworth's 2026 phase is reaffirmed or quietly moved, and whether the 8 GW target is restated alongside a contracted figure that has now passed 4.2 GW. Watch also for any update on delivery at the Core Scientific-hosted sites.
Delivery vs. promise
2026-10-17CoreWeave's contracted power has grown at almost every update: 1.6 GW in May 2025 (4973), 2.2 GW in August (25578), 2.9 GW in November (20200), 3.1 GW at year-end (11770, 3554), 3.5 GW in May 2026 (9323), and 4.2 GW by August 2026 (26367). Active capacity has also risen. The company reported 360 MW at end-2024 (3552), about 420 MW in spring 2025 (4972, 29785), 850 MW at end-2025 (3569), and more than 1 GW by May 2026 (9321). The gap between the two has not narrowed. Contracted power has stayed at roughly four times energized power, so the backlog is growing faster than the company can deliver it. The 2030 targets have also grown, from 5 GW of NVIDIA-linked AI factories (3893, 27948, 9329) to an 8 GW active-power target (9322). Getting from about 1 GW to 8 GW in four and a half years means adding roughly 1.5 GW a year. That is about three times the roughly 490 MW added in calendar 2025.
The one large step change in the record reversed. The Core Scientific merger would have brought about 1.3 GW of owned gross power (28335) and more than 1 GW of expansion potential (28336), with closing expected in Q4 2025 (28334). It was terminated on 2025-10-30 (4166, 19825). Later filings describe the relationship as a continuing partnership (20313) rather than a lost owned-capacity path, which leaves the capacity loss unaddressed. Within weeks, the record also shows weather and design delays at Core Scientific sites (19829) and a delayed OpenAI installation (19828), which the company described as isolated (19827). Explicit site-level dates are rare. Kenilworth's 250 MW campus (25583) carries a 2026 initial-phase commitment (25584) with no later update on record. Indonesia's 360 MW is pegged to 2028 (26331, 26332). Lancaster's 300 MW (20201) has no date at all. Most listed campuses show no capacity or cost figures.
This record contains no independent corroboration: no permits, interconnection-queue positions, or site reporting. Every capacity figure is company-stated. Without outside evidence, the announced pace cannot be checked against physical progress. The claim list supplied here also ends partway through the August 2026 entries, so later revisions may be missing.
Over the next 90 days, watch three things. First, whether the Q3 2026 report shows active power growing meaningfully beyond 1 GW or whether contracted power alone keeps climbing. Second, whether Kenilworth's initial phase is energized by year-end or quietly moved. Third, whether utility filings in New Jersey, Pennsylvania, and New York begin to show the load these campuses would require.
Delivery vs. promise
2026-10-17CoreWeave's capacity story has two curves that are pulling apart. Active power has grown steadily, from roughly 420 MW in early 2025 (claims 4972, 29785) to about 470 MW (25577), then 590 MW (20199), 850 MW at year-end 2025 (3553, 11769), and past 1 GW by May 2026 (9321). Contracted power has grown faster, from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323), and 4.2 GW by August 2026 (26367). The gap between what is energized and what is contracted has widened from about 1.2 GW to more than 3 GW. Ambition has also stepped up. The NVIDIA-linked goal of 5+ GW by 2030 (3893, 27948, 9329) was joined in May 2026 by an 8 GW active-power target for the same year (9322). That would require roughly an eightfold increase in energized capacity in under five years.
The one large shrinkage was Core Scientific. Its roughly 1.3 GW of owned power (28335) was presented as arriving by Q4 2025 (28334), but the merger was terminated (4166, 19825) and the relationship reverted to a partnership (20313). Later disclosures of weather and design delays at Core Scientific sites (19829) and a slipped OpenAI installation (19828), described by the company as isolated (19827), suggest some of that capacity is late even as leased supply. Neither delay came with a revised delivery date in the record, which is effectively a revision without acknowledgement.
Independent corroboration is thin. Nothing in this record ties Kenilworth (25583), Lancaster (20201), Indonesia (26331, 26332) or the other announced campuses to permits, interconnection queue positions, or site reporting. Most projects carry no capacity or cost figures at all. The reported active megawatts are company-stated, though their consistency across quarterly and annual filings (3551, 3552, 3553) lends them some weight. The forward pipeline is largely unverified. Note that the claim record supplied here is truncated after claim 26331, so later disclosures are not reflected.
Over the next 90 days, the Q3 2026 report should show whether active power has kept pace with the 4.2 GW contracted figure or whether the gap keeps widening. Kenilworth's initial phase is promised within 2026 (25584), so year-end is a hard test of whether any announced greenfield campus delivers on schedule. Readers should also look for any restated timing on the Core Scientific sites. Finally, any utility, zoning, or queue filings for Lancaster or Kenilworth would be the first external evidence behind the pipeline.
Delivery vs. promise
2026-10-17CoreWeave's capacity story has grown on two tracks at very different speeds. Contracted power rose from 1.6 GW (claim 4973) through 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW (9323) to 4.2 GW (26367), roughly 2.6x in fifteen months. Active power also grew quickly, from about 420 MW (4972, 26764) to 850 MW at year-end 2025 (3553) and past 1 GW by May 2026 (9321). But the gap between contracted and energized capacity widened from about 1.2 GW to more than 3 GW. The 2030 ambition has escalated in the same way. The 5 GW NVIDIA-linked goal (3893, 27948, 9329) sat alongside an 8 GW active-power target within four months (9322). Hitting 8 GW implies a build rate several times what the company delivered in 2025.
On dates, the clearest reversal is Core Scientific. The deal was presented as adding roughly 1.3 GW of owned power plus 1 GW of expansion headroom (28335, 28336) with a Q4 2025 close (28334). It was terminated in October (19825, 4166), and only a continuing partnership was offered in its place (20313). Weeks later, the company acknowledged an OpenAI installation delay and weather and design delays at Core Scientific sites (19828, 19829), having earlier described data center underperformance as isolated (19827). The near-term site promise still in play is Kenilworth's initial phase in 2026 (25584), part of a campus of up to 250 MW (25583). The record shows no update on it since August 2025, with about ten weeks left to deliver.
Independent corroboration is thin. Apart from a financing date (4593), every capacity and timeline claim here is company-stated. None of the named projects, including Lancaster's 300 MW (20201), Kenilworth, Indonesia's 360 MW for 2028 (26331, 26332) and Polaris Forge 1, has a disclosed capacity, cost, permit trail or interconnection queue reference in the record. The reported active-power gains are consistent with real deployment. The contracted backlog, however, cannot yet be tied to specific energized sites.
Over the next 90 days, watch the Q3 2026 report for whether active power has moved meaningfully beyond the 1 GW mark and whether contracted power keeps rising faster than it. Watch for any acknowledgement, or silence, on Kenilworth's 2026 phase. Watch PJM queue and local permitting records for Kenilworth and Lancaster. And watch whether Vera Rubin deployments (17621, 10341) and the Meta commitment (17654) are attributed to named facilities rather than to aggregate totals.
Delivery vs. promise
2026-10-16CoreWeave's capacity story has two curves. Contracted power has climbed steadily: 1.6 GW in May 2025 (claim 4973), 2.2 GW by August (25578), 2.9 GW in November (20200), 3.1 GW at year-end (11770, 3554) and 3.5 GW by May 2026 (9323). Active power has also risen fast, from roughly 420 MW (4972, 29785) to 470 MW (25577), 590 MW (20199), 850 MW at December 31, 2025 (11769, 3569) and past 1 GW (9321). The 70 MW to 360 MW to 850 MW year-end series (3551, 3552, 3553) shows real energization, not just signed paper. The ceiling has moved the most. It went from a 5 GW NVIDIA-linked 2030 target (3893, 27948, 9329) to an 8 GW active-power goal for the same year (9322). That target sits about eight times above current active capacity, and the gap between contracted and active capacity is still roughly 2.5 GW. The one material shrinkage was never fully acknowledged as such. The Core Scientific deal would have added about 1.3 GW of owned power and 1 GW-plus of expansion (28335, 28336), with a Q4 2025 close (28334). It was terminated in October 2025 (19825, 4166) and reframed as a continuing partnership (20313). That capacity quietly left the narrative rather than being restated. Date discipline is mixed. Management called delivery problems isolated (19827), yet within weeks it disclosed weather and design delays at Core Scientific sites (19829) and an OpenAI installation slip (19828). Neither came with a revised in-service date on the record. Project-level evidence is thin. Every site except Polaris Forge 1 remains at announced status with no capacity or cost on its project record. That includes Kenilworth at 250 MW (25583), Lancaster at 300 MW (20201) and Indonesia at 360 MW by 2028 (27051, 27052). The record supplied here contains no permits, interconnection queue filings or site reporting, so the pace is supported only by company statements. The claim list is also truncated after the Indonesia entries. Over the next 90 days, the clearest test is Kenilworth, whose initial phase is promised within 2026 (25584). If it slips or arrives undescribed, that would echo the pattern seen in 2025. The next quarterly print should show whether active power is keeping pace with the 3.5 GW contracted book, and whether Vera Rubin bring-up (17621, 10341) turns into named-site capacity. Utility and PJM queue records for Lancaster and Kenilworth should be checked as the first independent corroboration.
Delivery vs. promise
2026-10-16CoreWeave's capacity story has expanded steadily, with no announced figure ever walked back. Contracted power went from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW (9323) in about a year. Active power has also compounded. The company's own year-end series runs from 70 MW (3551) to 360 MW (3552) to 850 MW (3553), and it reported passing 1 GW by May 2026 (9321). The long-range ambition grew too. The 5+ GW of AI factories with NVIDIA by 2030 (3893, 27948, 9329) sat alongside a newer 8 GW active-power target for the same date (9322). Reaching 8 GW would take roughly 1.7 GW of net additions a year. The best year on record added about half a gigawatt.
The Core Scientific episode is the clearest case of a promised path that disappeared. The deal was framed as delivering about 1.3 GW of owned gross power plus 1 GW or more of expansion potential (28335, 28336), with a Q4 2025 close (28334). It was terminated in October 2025 (19825, 4166) and recast as a continuing partnership (20313). Contracted capacity kept rising afterward, which suggests the gap was filled through leases rather than ownership. The filings do not reconcile this explicitly.
Timeline candor has been partial. The company acknowledged weather and design delays at Core Scientific sites (19829) and an OpenAI installation slip (19828), but described the problems as isolated (19827). Most site-level claims carry no dated commitment. Kenilworth's 250 MW campus with initial-phase delivery in 2026 (25583, 25584) is the main near-term dated promise. Lancaster's 300 MW (20201) and Indonesia's 360 MW across three facilities by 2028 (27051, 27052) have longer horizons. Every named project except Polaris Forge 1 remains at announced status, with no capacity or cost fields populated.
The record contains no independent corroboration: no permits, no interconnection queue positions, no on-the-ground reporting. The announced pace therefore rests entirely on company disclosures. The claim list provided here also cuts off mid-entry after claim 26331, so later items may not be reflected in this read.
Over the next 90 days, the Q3 2026 results should show whether active power keeps growing at more than 150 MW per quarter and whether contracted capacity moves past 3.5 GW. Kenilworth's 2026 initial-phase deadline expires within the window, so energization, or a quiet re-dating, will be telling. Utility or PJM filings tied to Kenilworth and Lancaster would be the first external test of the stated schedule.
Delivery vs. promise
2026-10-16CoreWeave's headline capacity numbers have only moved upward, and the more useful question is how the gap between contracted and active power has behaved. Contracted power rose from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW (9323) in about a year. Active power went from roughly 420 MW (4972, 29785) to 590 MW (20199), 850 MW at year-end 2025 (3569), and past 1 GW by May 2026 (9321). The year-end series of 70, 360 and 850 MW (3551, 3552, 3553) shows real energization, not just announcements. The ratio of contracted to active power has held near 3.5x, but the absolute undelivered backlog has roughly doubled, to about 2.5 GW. The 2030 ambition has also grown, from 5+ GW of NVIDIA-aligned AI factories (3893, 27948, 9329) to an 8 GW active-power target (9322). The filings do not explain how the two figures reconcile.
The Core Scientific episode is the clearest case of announced capacity disappearing. The 1.3 GW of owned power (28335) and the 1 GW+ expansion option (28336) depended on a deal expected to close in Q4 2025 (28334). That deal was terminated in October (19825, 4166), and the record contains only a statement that the partnership continues (20313). Contracted capacity kept rising afterward, which suggests the leasing pipeline absorbed the loss. The record does not show a capacity figure being restated downward. The December disclosures of weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828) came after earlier language describing performance problems as isolated (19827). That sequence weakens the credibility of that framing.
Very few dated, project-level commitments exist, so few have had a chance to slip. The independent record is thin. Every named project except Polaris Forge 1 sits at announced status with no capacity or cost fields. No permits, interconnection queue positions, or site reporting in this record corroborate Kenilworth (25583), Lancaster (20201), or the 360 MW Indonesia plan targeted for 2028 (27051, 27052). The supplied record also ends partway through the August 2026 entries, so later claims may be missing.
In the next 90 days, the Kenilworth initial phase promised for 2026 (25584) becomes testable. The next quarterly update should show whether active power is growing fast enough to keep the 8 GW target plausible. Watch also for PJM queue or county permitting filings for Lancaster and Kenilworth, and for evidence that the Vera Rubin deployments (10341, 17621) are landing at specific named sites rather than unnamed ones.
Delivery vs. promise
2026-10-15CoreWeave's reported active power has grown steadily and roughly as described. The company's own filings trace a path from 70 MW at end-2023 (3551) to 360 MW at end-2024 (3552) and 850 MW at end-2025 (3553, 11769), with active power passing 1 GW by May 2026 (9321). Contracted power has grown faster and has never fallen between disclosures: 1.6 GW (4973), 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770), 3.5 GW (9323), and 4.2 GW by August 2026 (26367). Contracted power has stayed at roughly three and a half to five times active power, so the delivery backlog is now the main thing to track. The 2030 targets raise the bar further. Five gigawatts with NVIDIA (3893, 27948, 9329) and 8 GW active (9322) would require adding about seven gigawatts in under five years. The best year on record added roughly 490 MW.
The largest revision was never framed as one. The Core Scientific deal brought about 1.3 GW of owned power (28335) and more than 1 GW of expansion potential (28336) into the story, along with close dates of October 2025 (4517), Q4 2025 (28334) and April 2026 (4731). The merger was terminated in October 2025 (4166, 19825). Contracted totals kept rising afterward, and the record does not explain how that capacity was reclassified, apart from a continuing partnership (20313). Delays at the operating level are documented: an OpenAI installation delay (19828) and weather and design delays at Core Scientific sites (19829). Management had characterized the data center performance issues as isolated (19827) about a month before those delays were disclosed.
The record contains no independent corroboration, such as permits, interconnection queue positions or site reporting, for any named project. Project-level capacity and cost fields are blank. Kenilworth (25583), Lancaster (20201) and Indonesia (27051) rest only on company statements. The announced pace therefore cannot yet be checked against outside evidence.
Over the next 90 days, the clearest test is Kenilworth's initial phase, which was promised for 2026 (25584). The record shows no progress update with about eleven weeks remaining. The Q3 2026 results should show whether active power is keeping pace with the 4.2 GW contracted figure. Readers should also watch for any restatement of the 8 GW 2030 target, any status change at Polaris Forge 1, and any utility or county filings for Lancaster or Kenilworth that would give the first outside check on timing.
Delivery vs. promise
2026-10-15CoreWeave's capacity story has two curves, and the gap between them is the central fact. Active power has grown steadily: roughly 420 MW in spring 2025 (4972, 29785), 470 MW by August (25577), 590 MW in November (20199), 850 MW at year-end 2025 (3553, 11769), and past 1 GW by May 2026 (9321). That is real, compounding delivery from a 70 MW base at end-2023 (3551). Contracted power, however, has grown much faster: 1.6 GW (4973), then 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770), 3.5 GW (9323) and 4.2 GW (26367). Contracted capacity has added about 2.6 GW over the period while active capacity added about 600 MW, so the backlog of power not yet energized keeps widening. The 2030 framing has also moved. The original ambition was 5 GW-plus of AI factories with NVIDIA (3893, 27948, 9329). A separate 8 GW active-power target followed (9322), and the record does not explain how the two figures relate.
The one capacity line that shrank was inorganic. The Core Scientific deal promised about 1.3 GW of owned gross power plus 1 GW-plus of expansion potential (28335, 28336). Its close date was stated variously as October 2025, Q4 2025 and April 2026 (4517, 28334, 4731). The deal was then terminated (19825, 4166), leaving only a continuing partnership (20313). Within weeks, disclosures cited weather and design delays at Core Scientific sites and a delayed OpenAI installation (19829, 19828), and management characterized the issues as isolated (19827). Neither delay has a later claim on record confirming it was resolved.
Independent corroboration is thin. Every facility claim here is company-stated, and the project table carries no capacity or cost figures. No permits, interconnection-queue filings or site reporting are on record for Kenilworth (25583), Lancaster (20201) or Indonesia (26331, 26332). Polaris Forge 1 is the only project marked partially operational. The pace of active-power growth is credible because it shows up in audited year-end figures (3552, 3553), but the conversion of named campuses into energized megawatts is not yet visible at the project level.
Over the next 90 days, the key test is Kenilworth's promised 2026 initial-phase delivery (25584). With about ten weeks remaining, the absence of any follow-up claim is notable. The Q3 2026 report should show whether active power has moved meaningfully beyond 1 GW and whether the active-to-contracted ratio is stabilizing. It is also worth watching for any acknowledgement that the late-2025 delays affected 2026 timelines, and for any interconnection or permitting filings that would anchor Lancaster or Kenilworth outside company disclosures.
Delivery vs. promise
2026-10-15CoreWeave's headline capacity has grown steadily. Active power rose from roughly 420 MW (4972, 29785) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (11769, 3569) and past 1 GW by May 2026 (9321). That is real, compounding delivery. Contracted power has grown faster, from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770), 3.5 GW (9323) and 4.2 GW (26367). The backlog of undelivered power is therefore widening in absolute terms even as energization speeds up. The long-range target has also moved. The 5 GW of AI factories with NVIDIA by 2030 (3893, 27948, 9329) was joined in May by an 8 GW active-power target for the same year (9322). The company did not explain how the two relate.
The largest discontinuity is Core Scientific. The roughly 1.3 GW of owned power (28335), plus 1 GW of expansion potential (28336), was presented as arriving through an acquisition expected to close in Q4 2025 (28334). The deal was terminated in October (19825, 4166). Within weeks, management described data center performance as isolated (19827). The December filings then cited an OpenAI installation delay (19828) and weather and design delays at Core Scientific sites (19829). Those are slips, but they were disclosed rather than quietly revised. Since then the contracted-power figures have recovered past the level the merger would have implied, apparently through leasing instead.
Project-level evidence is thin. Kenilworth (25583, 25584), Lancaster (20201), Indonesia (26332) and the other named sites all carry status=announced, with no capacity or cost fields populated. Only Polaris Forge 1 is marked partially operational. The record contains no permits, interconnection queue positions or site reporting that would independently confirm the announced pace at any named campus. The aggregate MW disclosures come from company filings, not third parties.
The next 90 days should test the near-dated commitments. Kenilworth's initial phase is due in 2026 (25584), so year-end will show whether it energizes or the date moves without comment. Q3 results should show whether active power has kept its roughly 150-250 MW per quarter cadence and whether contracted power has moved beyond 4.2 GW. Watch also whether the Vera Rubin multi-site deployment (10341, 17621) appears as energized capacity. For Indonesia's 360 MW for 2028 (26332, 27051), look for land or grid filings. The source record was truncated at claim 27051, so later claims may not be reflected here.
Delivery vs. promise
2026-10-14CoreWeave's capacity story has only gone up, and it has gone up faster in contracts than in delivered power. Contracted power rose from 1.6 GW in May 2025 (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW by May 2026 (9323). Active power moved from roughly 420 MW (4972, 26764) through 470 MW (25577) and 590 MW (20199) to 850 MW at year-end 2025 (3553) and past 1 GW (9321). Active power has stayed near 26 to 29 percent of contracted power. That ratio is steady, but in absolute terms more than 2.5 GW of contracted power is still not energized. The 2030 targets also changed. The NVIDIA-linked figure was 5+ GW of AI factories (3893, 27948, 9329). A separate 8 GW active-power target appeared later (9322) with no stated bridge between the two, and it implies roughly seven additional gigawatts in about four years. The largest single capacity item, about 1.3 GW of owned power plus 1 GW of expansion headroom from Core Scientific (28335, 28336), lost its ownership path when the merger was terminated (19825, 4166). The Q4 2025 close guidance (28334) did not hold. The relationship was recast as a continuing partnership (20313), and contracted totals kept rising afterward without any reconciliation of how much of that power is leased rather than owned. On timing, the record contains admitted slippage: an OpenAI installation delay (19828) and weather and design delays at Core Scientific sites (19829). Management framed these as isolated (19827), which is a characterization, not evidence. Site-level dates are sparse. Kenilworth's initial phase is due in 2026 (25584) against a 250 MW envelope (25583). Lancaster's 300 MW (20201) carries no date. Indonesia's 360 MW is set for 2028 (26332, 27051). Independent corroboration is absent from this record. There are no permit filings, interconnection-queue positions, utility agreements or on-the-ground reporting for any named site, and every project carries blank capacity and cost fields. The announced pace rests entirely on company statements. Over the next 90 days, the Q3 2026 print should show whether active power is compounding at the roughly 150 to 250 MW per quarter the 8 GW target requires. Kenilworth either delivers an initial phase by December 31 or the 2026 date is quietly moved. Watch also for any disclosure separating owned from leased capacity, and for New Jersey and Pennsylvania utility or zoning filings that would independently anchor the Kenilworth and Lancaster figures.
Delivery vs. promise
2026-10-14CoreWeave's capacity story has two curves, and they are diverging. Active power has climbed steadily from roughly 420 MW in March 2025 (26764, 4972) to about 470 MW (25577), then 590 MW (20199), 850 MW at year-end 2025 (11769, 3553), and past 1 GW by May 2026 (9321). That is a credible ramp, and the year-end figures are reported consistently across filings (3552, 3553, 3569). Contracted power has grown faster: 1.6 GW (4973), 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770), 3.5 GW (9323), and now 4.2 GW (26367). The unbuilt backlog has roughly tripled, from about 1.2 GW to well over 3 GW. The long-range target has also inflated without much explanation, from 5 GW of AI factories with NVIDIA by 2030 (3893, 27948, 9329) to an 8 GW active-power goal for the same year (9322).
The largest single reversal was the Core Scientific deal. CoreWeave guided to a close in Q4 2025 (28334, 4517) and said the merger would bring about 1.3 GW of owned gross power (28335). The termination (19825, 4166) removed that capacity from the ownership narrative, although the commercial relationship continues (20313). Shortly afterward the company disclosed delays tied to Core Scientific weather and design issues and to OpenAI installation timing (19829, 19828), and characterized them as isolated (19827). That framing is untested. Few project-level dates exist to hold management to. Kenilworth's initial phase is due in 2026 (25584), and the Indonesia capacity is promised for 2028 (27052, 26332).
Independent corroboration is thin. Every facility claim in this record is company-stated. No permit, interconnection-queue, or site-level reporting confirms the 250 MW Kenilworth (25583), 300 MW Lancaster (20201), or 360 MW Indonesia (27051) figures. Of the nine named projects, only Polaris Forge 1 is listed as partially operational, and none carries disclosed capacity or cost.
Over the next 90 days, start with the Q3 2026 print. It should show whether active power grew materially beyond 1 GW and whether contracted capacity keeps outrunning it. Kenilworth's initial phase faces a 2026-12-31 deadline, and any silence or quiet re-dating there would be telling. Two other items are worth tracking: whether Vera Rubin deployments (17621, 10341) appear as energized capacity, and whether the 4.2 GW contracted figure is tied to specific sites with utility interconnection evidence. Watch too for any reconciliation of the 5 GW and 8 GW targets.
Delivery vs. promise
2026-10-13CoreWeave's headline capacity has only grown, and it has grown fast. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power tracked upward from roughly 420 MW (4972, 26764) through 590 MW (20199) and 850 MW at year-end 2025 (3553) to more than 1 GW by May 2026 (9321). The record shows no cuts. Active capacity is real and compounding, roughly a twelvefold rise from the 70 MW year-end 2023 baseline (3551). But contracted capacity has run ahead of it. The undelivered backlog widened from about 1.2 GW to more than 3 GW, and the long-range ambition moved from 5+ GW of NVIDIA-linked AI factories by 2030 (3893, 27948) to an 8 GW active-power target (9322) without any explanation of the bridge. One small inconsistency deserves reconciliation: the 360 MW year-end 2024 figure (3552) sits awkwardly against 420 MW reported for March 2025 (26764), which implies about 60 MW was energized in a single quarter.
The largest capacity reversal was the collapse of the Core Scientific deal. It would have added about 1.3 GW of owned gross power (28335), and its slated close (28334, 4517) gave way to termination (4166, 19825). Contracted totals kept rising regardless, so the company never visibly marked down its pipeline. Timeline integrity is weaker than the capacity figures suggest. Data center performance was described as isolated (19827) shortly before weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828) were disclosed. That sequence is a revision in practice, even if it was not presented as one.
The record offers almost no independent corroboration. Every facility claim is company-stated, no project carries a disclosed capacity or cost at the project level, and there are no permit, interconnection-queue, or site-reporting entries for Kenilworth, Lancaster (20201), Plano, or Niagara Falls. Indonesia's 360 MW targeted for 2028 (26331, 26332) is too far out to test.
Over the next 90 days, the critical test is Kenilworth's initial-phase delivery promised within 2026 (25584), against a 250 MW campus plan (25583). The third-quarter report should show whether active power growth keeps pace with the 4.2 GW contracted figure, or whether the backlog widens again. Investors should also watch for utility interconnection filings that would anchor the Lancaster and New Jersey sites in third-party evidence.
Delivery vs. promise
2026-10-13CoreWeave's headline capacity has only gone up. Contracted power rose from 1.6 GW (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3582), 3.5 GW (9323) and 4.2 GW (26367) over roughly fifteen months. Active power grew too, from about 420 MW (4972, 26764) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (3553) and past 1 GW (9321). That active figure is a real build rate: about 490 MW was added in calendar 2025, compared with 290 MW in 2024 (3552, 3551). But contracted capacity grew faster still. The gap between contracted and energized power widened from about 1.2 GW to more than 3 GW, so most of what the company cites as capacity is backlog, not delivered infrastructure.
The long-dated targets have also grown. The NVIDIA framework promised more than 5 GW of AI factories by 2030 (3893, 27948), and by May 2026 there was a separate 8 GW active-power goal for the same year (9322). Meeting 8 GW means adding roughly 1.75 GW a year, more than three times the best year on record.
On dates, the clearest miss is Core Scientific. A Q4 2025 close (28334) and an October 2025 milestone (4517) gave way to termination (4166, 19825), which the company framed as a continuing partnership (20313). Six weeks later, Core Scientific weather and design delays (19829) and an OpenAI installation delay (19828) surfaced, after an earlier description of data-center problems as isolated (19827). The 1.3 GW owned and 1 GW expansion figures (28335, 28336) were never formally withdrawn. Contracted totals kept rising regardless, which suggests leased Core Scientific capacity is still counted.
Independent corroboration is thin. The record contains no permits, interconnection-queue filings or site reporting for Kenilworth (25583), Lancaster (20201), Indonesia (26331, 26332) or the other announced sites. Every project except a partially operational Polaris Forge 1 carries no recorded capacity or cost. The pace is supported mainly by the company's own disclosures.
Over the next 90 days, three items stand out. The first is whether Q3 reporting shows active power growing meaningfully beyond 1 GW or flattening. The second is whether Kenilworth's initial phase, promised for 2026 (25584), is energized by year-end or quietly moved. The third is whether the Core Scientific sites recover from the delays flagged in December, and whether utility or county filings begin to appear for Lancaster and Kenilworth to back the announced megawatts.
Delivery vs. promise
2026-10-13CoreWeave's contracted power figure has risen in nearly every disclosure: 1.6 GW in May 2025 (claim 4973), 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323), and 4.2 GW by August 2026 (26367). Active power has also grown, from roughly 420 MW (4972, 26764) through 590 MW (20199) and 850 MW at year-end 2025 (3553) to above 1 GW (9321). The two lines are diverging, though. The gap between contracted and energized capacity was about 1.2 GW in May 2025 and is now above 3 GW. Contracted capacity has become the headline number while delivery is falling further behind it. The roughly 1.3 GW the company expected to own through Core Scientific (28335) did not materialize when the merger was terminated (4166, 19825). That made the expected close dates in 4517, 28334 and 4731 moot, and the relationship reverted to a partnership (20313).
The long-range target has moved up rather than down. A 5+ GW AI-factory goal with NVIDIA (3893, 27948) was joined in May 2026 by an 8 GW active-power target for 2030 (9322). Hitting 8 GW would require adding about 1.75 GW a year. In 2025 the company added roughly 490 MW (3552, 3553). The record shows no reconciliation of that gap.
On dates, the most concrete project milestone is Kenilworth's initial phase in 2026, against a 250 MW campus (25583, 25584). No follow-up claim reaffirms or revises it, so the deadline is approaching without any public update. The December 2025 disclosures of weather and design delays at Core Scientific sites and a delayed OpenAI installation (19829, 19828) came only weeks after the company characterized data center issues as isolated (19827). That sequence deserves weight when judging current assurances. Lancaster at 300 MW (20201) and Indonesia at 360 MW for 2028 (26331, 26332) have announced capacities but no interim milestones.
The record contains no independent corroboration: no permits, no interconnection-queue entries, and no on-the-ground reporting for any named site. Capacity fields are blank across all nine projects. The announced pace therefore rests entirely on company statements.
The next 90 days have three useful checks. The third-quarter report will show whether active power is still compounding or whether contracted capacity keeps growing faster. Kenilworth must show energized initial capacity by year-end or be visibly rescheduled. Any county permit or utility filings for Kenilworth, Lancaster or Plano would be the first external evidence that the 2030 trajectory is grounded in physical progress.
Delivery vs. promise
2026-10-13CoreWeave's headline numbers have moved in only one direction. Active power rose from roughly 420 MW in March 2025 (4972, 26764) to 850 MW at year-end 2025 (11769, 3553) and past 1 GW by May 2026 (9321). Contracted power grew faster, from 1.6 GW (4973) to 3.5 GW (9323). So the backlog of power not yet energized widened from about 1.2 GW to about 2.5 GW, even as deliveries accelerated. The long-range target has also grown. It started as 5+ GW of AI factories with NVIDIA by 2030 (3893, 27948, 9329) and now sits alongside an 8 GW active-power goal (9322). Reaching 8 GW from roughly 1 GW in under five years would take about 1.4 GW a year. The best year on record, 2025, added about 490 MW (3552, 3553).
The date record is mixed. The Core Scientific deal promised 1.3 GW of owned gross power (28335) and a closing in Q4 2025 (28334, 4517). It was terminated on 2025-10-30 (19825, 4166) and recast as a continuing partnership (20313). Contracted power kept rising afterward, which suggests those megawatts moved from owned to leased rather than disappearing. That shift has economic consequences the topline numbers hide. In December 2025 the company disclosed weather and design delays at Core Scientific sites (19829) and a delayed OpenAI installation (19828). Management called these isolated (19827), and there has been no later reconciliation of the affected capacity.
The weakest part of the record is independent verification. The file contains no permit filings, interconnection-queue entries, or site reporting for any named project. Six of the nine projects carry no capacity figure at all. Kenilworth's 250 MW (25583), Lancaster's 300 MW (20201) and Indonesia's 360 MW (26331, 27051) rest entirely on company statements. The supplied record also cuts off mid-entry, so any later claims could not be assessed.
Over the next 90 days, the first test is the Q3 2026 report. It should show whether active power grew enough beyond 1 GW to keep pace with the 8 GW path, and whether contracted power grew again or flattened. The second is Kenilworth: its initial phase is promised by 2026-12-31 (25584), the first site-level date due to come due, with no corroborating construction evidence on file. Finally, look for PJM or NYISO queue positions and local permits for Lancaster, Kenilworth and Niagara Falls. Those would be the first outside check on whether the announced pace is real.
Delivery vs. promise
2026-10-12CoreWeave's capacity numbers have risen steadily, but contracted power is outrunning energized power. Contracted capacity went from 1.6 GW in May 2025 (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power rose more slowly but consistently: about 420 MW (4972, 26764), then 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (3553), and past 1 GW by May 2026 (9321). The long-range target moved fast. A January 2026 goal of 5+ GW of NVIDIA-linked AI factories by 2030 (3893, 27948) became an 8 GW active-power target four months later (9322). With roughly 1 GW energized and 4.2 GW contracted, that target needs about an eightfold build-out in four years. Today's contracted backlog covers only about half of it.
The largest revision was never presented as one. The roughly 1.3 GW of owned power plus 1 GW of expansion tied to Core Scientific (28335, 28336) depended on a merger expected to close in Q4 2025 (28334). The merger was terminated in October 2025 (19825, 4166). Contracted capacity kept rising afterward, so the lost ownership seems to have been absorbed through the continuing commercial relationship (20313), not written down. CoreWeave did disclose delays. In November 2025 it described data-center performance problems as isolated (19827). Within weeks it cited OpenAI installation delays and Core Scientific weather and design setbacks (19828, 19829). Few site-level dates exist that could slip. Kenilworth's initial phase is due in 2026 (25584). Indonesia's 360 MW is due online in 2028 (27052, 26332). Lancaster's 300 MW (20201) has no stated timeline. Of the nine projects on record, only Polaris Forge 1 shows any operational status, and most list no capacity or cost.
The record contains no independent corroboration: no permits, no interconnection queue positions, no on-the-ground construction reporting. The pace of energization is supported only by the company's own disclosures. Kenilworth and Lancaster are both in PJM territory, where queue filings are public and the absence of matching entries would be informative.
Over the next 90 days, watch whether Kenilworth's 2026 initial phase is delivered, restated or quietly moved. Watch whether the third-quarter update shows active power growing at a pace consistent with 8 GW by 2030, and whether contracted power keeps rising beyond 4.2 GW. Watch for any timeline attached to Lancaster. And watch whether the Vera Rubin rollouts (10341, 17621) turn into named, energized sites rather than portfolio-level statements.
Delivery vs. promise
2026-10-12CoreWeave's contracted power has grown in every disclosure. It stood at 1.6 GW in May 2025 (4973), then 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW by May 2026 (9323). Active power followed the same direction, rising from roughly 420 MW (4972, 26764) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (3553) and above 1 GW in May 2026 (9321). Active power has stayed at roughly 20 to 30 percent of contracted power throughout. That means the backlog of undeployed capacity has grown in absolute terms, from about 1.2 GW to about 2.5 GW, even as delivery sped up. The long-range target has also moved. The NVIDIA framing of 5+ GW of AI factories by 2030 (3893, 27948, 9329) was joined in May 2026 by an 8 GW active-power target for the same year (9322). We found no explanation in the record for how the two figures relate.
The clearest revision without much acknowledgement involves Core Scientific. About 1.3 GW of owned power through that acquisition (28335) was presented as part of the scale story, with closing expected in Q4 2025 (28334). The deal was terminated in October 2025 (19825, 4166) and recast as a continuing partnership (20313). Within weeks the record showed weather and design delays at Core Scientific sites (19829) and a delayed OpenAI installation (19828). Contracted capacity kept rising after the termination, which suggests replacement sourcing, but the record does not show how the lost owned capacity was backfilled.
At the site level, the disclosures are thin. Most named projects, including Niagara Falls, Digital Drive, Sweden, Plano and Taloja, carry no capacity or cost figures. Kenilworth (25583) and Lancaster (20201) have megawatt figures but no follow-up progress claims. Indonesia's 360 MW (26331, 27051) is dated to 2028 (27052, 26332). None of these claims is backed in the record by permits, interconnection queue positions or on-the-ground reporting, so the announced pace rests entirely on company statements. The only verified item is a financing milestone (4593), not a facility milestone. Note that the supplied record ends partway through the claim list, so later entries may change this picture.
Three things matter over the next 90 days. First, Q3 results should show whether active power keeps pace with the 8 GW trajectory, which implies roughly 1.4 GW of additions per year from here. Second, Kenilworth's initial phase is due by year-end 2026 (25584), and this is the first site-level date in the record to fall due; independent permitting or utility evidence should be visible if it is on track. Third, any update on the Core Scientific delays will show whether the hosted capacity CoreWeave relies on is converting to active power.
Delivery vs. promise
2026-10-11CoreWeave's headline capacity has grown fast and without reversal. Contracted power rose from 1.6 GW in May 2025 (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power also climbed, from roughly 420 MW (4972, 26764) to 850 MW at year-end 2025 (3553) and past 1 GW in May 2026 (9321). The scale of ambition grew too: the 2030 goal moved from 5+ GW of NVIDIA-linked AI factories (3893, 27948) to an 8 GW active-power target (9322). The one real contraction was the Core Scientific deal. Its roughly 1.3 GW of owned power (28335) left the plan when the merger was terminated (4166, 19825), yet the contracted totals kept rising. That suggests the contracted figure reflects leases and partner capacity more than owned assets. The gap between contracted and active power has also widened in absolute terms, from about 1.2 GW to more than 3 GW, so delivery is falling further behind signings in megawatt terms even as active capacity grows.
The record of dated promises is thin and mixed. The Core Scientific close slipped from a Q4 2025 target (28334) to termination. In December 2025 the company acknowledged an OpenAI installation delay and weather and design delays at Core Scientific sites (19828, 19829), shortly after describing data center performance problems as isolated (19827). The most important hard date still open is Kenilworth's initial phase in 2026 (25584), against a stated capacity of up to 250 MW (25583). No progress claim has followed it. Lancaster's 300 MW (20201) and the 2028 date for Indonesia (26332, 27052) have no interim milestones on record.
Independent corroboration is essentially absent from this record. Every capacity and timeline claim is company-stated. The only verified item is a financing date (4593). The project ledger lists most sites as announced with no capacity or cost fields, and Polaris Forge 1 is the only one marked partially operational. No permits, interconnection-queue entries or site reporting support the claimed build pace, so the rate of active-power additions is the only usable proxy.
Over the next 90 days, three things matter most. First, whether the Q3 2026 update shows active power rising in step with the 4.2 GW contracted figure. Second, whether Kenilworth energizes any capacity by year-end or its date shifts without comment. Third, whether Lancaster, Taloja, Sweden or Plano gain disclosed megawatts, utility agreements or permits. A filing that quantifies the March 2026 portfolio (156) would also help.
Delivery vs. promise
2026-10-11CoreWeave's capacity story has two curves, and the distance between them is the main thing to track. Contracted power has risen steadily, from 1.6 GW in May 2025 (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3582), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power has also grown quickly: roughly 420 MW in early 2025 (4972, 26764), 590 MW in November (20199), 850 MW at year-end (3553, 11769) and more than 1 GW by May 2026 (9321). In relative terms, energized capacity has held at about a quarter of contracted capacity. In absolute terms the backlog not yet energized has grown from about 1.2 GW to more than 3 GW. The 2030 targets have also moved. The 5+ GW of AI factories with NVIDIA (3893, 27948, 9329) was joined in May 2026 by an 8 GW active-power target (9322), and no bridging explanation is on record. The largest contraction came from Core Scientific. The deal was marketed with about 1.3 GW owned plus 1 GW of expansion potential (28335, 28336), and then terminated (4166, 19825). It was recast as a continuing partnership (20313), with no restated view of how much of that capacity CoreWeave still expects to control.
On timing, the record shows slippage. In November 2025, data-center performance problems were described as isolated (19827). In December came disclosures of weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828). No revised delivery schedule followed either disclosure. Site-level commitments are thin. Kenilworth's initial phase is promised for 2026 (25584), Lancaster has 300 MW with no date (20201), and Indonesia has 360 MW targeted for 2028 (26331, 26332, 27052). Polaris Forge 1 is listed as partially operational without any capacity claim attached.
There is no independent evidence in this record. It contains no permits, no interconnection-queue entries and no on-the-ground reporting, and every capacity figure is self-reported at the company level. The announced pace is therefore neither corroborated nor contradicted. It is simply unverified, and project rows carry no capacity or cost data.
Over the next 90 days, Kenilworth's 2026 initial-phase promise comes due. Any quiet move into 2027 would be the first measurable site-level miss. The Q3 2026 update should show whether active power is keeping up with the 4.2 GW contracted figure or whether the gap widens further. Watch also for whether the 8 GW target is reiterated, reconciled with the NVIDIA figure, or dropped, and for any third-party permitting or utility filings at Kenilworth, Lancaster or the Indonesian sites that would confirm construction is actually under way.
Delivery vs. promise
2026-10-11CoreWeave's capacity narrative has grown every quarter. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power has also risen, from roughly 420 MW (4972, 26764) to 590 MW (20199), 850 MW at year-end 2025 (3553), and past 1 GW by May 2026 (9321). Energized capacity has stayed at roughly a fifth to under a third of contracted capacity, so the absolute gap has widened from about 1.2 GW to well over 2.5 GW. The long-range ambition has also grown, from 5+ GW of AI factories with NVIDIA by 2030 (3893, 27948) to an 8 GW active-power target (9322). The company's own year-end figures show additions of about 290 MW in 2024 and 490 MW in 2025 (3552, 3553). Reaching 8 GW would require roughly 1.5 GW a year from here, about three times the best year on record.
On dates, the clearest miss is corporate rather than physical. The Core Scientific merger, guided for completion (4517, 4731), was terminated (4166, 19825) and recast as a continuing partnership (20313). Late-2025 disclosures cite weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828), while the company described its data center performance as isolated (19827). No revised delivery date accompanied those disclosures. Most site-level promises carry no dates at all. Lancaster's 300 MW (20201) and the Kenilworth 250 MW campus (25583) are capacity statements, and only Kenilworth carries a firm initial-phase target of 2026 (25584). Indonesia's 360 MW across three facilities is pinned to 2028 (26331, 27052, 8758).
The record contains no independent corroboration. There are no permits, utility interconnection filings or site-level construction reporting tying any named project to the announced pace. Project-level capacity and cost fields remain blank for every site on file. The aggregate figures are self-reported and largely unverifiable.
Over the next 90 days, the first test is Kenilworth: whether the initial phase energizes by December 31 or the 2026 target is quietly dropped. The second is the Q3 2026 active-power figure, which needs to show additions well above the historical run-rate to keep the 8 GW target credible. The third is whether the next contracted-power number keeps rising while active power lags. Investors should also look for New Jersey or PJM interconnection records and Pennsylvania permitting activity at Lancaster, and for evidence that the Vera Rubin multi-site deployments (10341, 17621) are landing on new sites rather than relabeled existing capacity.
Delivery vs. promise
2026-10-10CoreWeave's contracted power has risen at every disclosure: 1.6 GW in May 2025 (4973), 2.2 GW by August (25578), 2.9 GW in November (20200), 3.1 GW at fiscal year-end (11770, 3554), 3.5 GW in May 2026 (9323), and 4.2 GW by August 2026 (26367). Active power has also grown, from roughly 420 MW (4972, 26764) to 850 MW at December 2025 (3569) and above 1 GW by May 2026 (9321). The two lines are diverging, though. The unenergized backlog has grown from about 1.2 GW to more than 3 GW, so new contracts are arriving faster than capacity is being switched on. The 2030 targets also do not agree with each other. The NVIDIA framing says 5+ GW of AI factories (3893, 27948, 9329), while a separate 8 GW active-power target (9322) appeared in May 2026 without a reconciliation. Reaching 8 GW from roughly 1 GW would take about 1.75 GW of new active capacity a year, around three and a half times the roughly 490 MW added in 2025 (3552, 3553).
Date discipline is mixed. The Core Scientific merger had targeted closings of October 2025 (4517) and April 2026 (4731). It was terminated instead (4166, 19825), with a continuing partnership reported (20313). In December 2025 the company acknowledged weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828), and it had already called the underperformance isolated (19827). The Kenilworth initial phase is still pinned to 2026 (25584), with no interim update on record and less than three months left. The DDTL 3.0 commitment termination date of July 31, 2026 (4593) has passed, and the record does not show how it resolved.
Independent corroboration is the weakest part of the record. Every capacity and timeline claim here is company-stated. Most named projects, including Kenilworth (25583), Lancaster (20201) and Indonesia (26331, 27051), carry no capacity or cost entries in the project register and remain at announced status. No permits, interconnection queue positions or site reporting appear that would independently support the pace implied by the 250 MW, 300 MW and 360 MW figures.
Over the next 90 days, the third-quarter report should show whether active power has moved meaningfully past 1 GW and whether the 5 GW and 8 GW targets are reconciled. It should also say whether Kenilworth will deliver in calendar 2026 or quietly move to 2027. Signs that Lancaster and Indonesia are moving from contract to construction would help, especially state permits, utility interconnection filings and named Indonesian sites behind the 2028 date (26332). The status of the DDTL 3.0 commitment should also be disclosed. The supplied record ends partway through early August 2026, so any later disclosures are not reflected here.
Delivery vs. promise
2026-10-10CoreWeave's capacity story has two curves, and they are diverging. Active power rose from roughly 420 MW in March 2025 (4972, 26764) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (11769, 3553), and past 1 GW by May 2026 (9321). That is real growth of about 600 MW in fourteen months. Contracted power grew faster: 1.6 GW (4973), 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323), and 4.2 GW by August 2026 (26367). The backlog of contracted but undelivered megawatts has widened in absolute terms with every disclosure. The 2030 ambition also escalated within four months, from more than 5 GW of NVIDIA-aligned AI factories (3893, 27948, 9329) to an 8 GW active-power target (9322). Hitting 8 GW would require adding about 1.5 GW a year, more than double the pace demonstrated so far.
Project-level dates are sparse, which makes slippage hard to pin down. The clearest test is Kenilworth, where the company promised an initial phase of a 250 MW campus in 2026 (25584, 25583). With under three months left in the year, the record contains no update. Lancaster's 300 MW (20201) carries no date at all. Indonesia's 360 MW is pegged to 2028 (26332, 27052). The one acknowledged delay pattern is instructive. In November 2025 data center performance problems were characterized as isolated (19827), but within five weeks the company disclosed an OpenAI installation delay and weather and design delays at Core Scientific sites (19828, 19829). This followed the termination of the Core Scientific merger (19825, 4166), which left those sites as lease relationships (20313) rather than owned capacity. Six named projects remain at announced status with no capacity figure attached.
The record contains no independent corroboration: no permits, no interconnection queue entries, and no on-the-ground reporting for any site. Every figure here is company-stated, so the announced pace is unverified rather than contradicted.
Over the next 90 days, watch four things. First, whether the Q3 2026 disclosure shows active power growth keeping up with the 1.5 GW-per-year run rate that the 8 GW target implies. Second, whether Kenilworth's initial phase is energized by December 31 or quietly re-dated. Third, whether the 4.2 GW contracted figure is broken down to show how much is Indonesia versus domestic sites. Fourth, whether Vera Rubin deployments (10341, 17621) appear at named facilities rather than as generic multi-location claims. Note that the source list ends mid-entry at claim 8760, so later August-onward claims were not assessed.
Delivery vs. promise
2026-10-09CoreWeave's capacity story has grown in one direction only, but contracted capacity is growing much faster than delivered capacity. Active power rose from roughly 420 MW in March 2025 (4972, 26764) through 470 MW (25577) and 590 MW (20199) to 850 MW at year-end 2025 (11769, 3569), then passed 1 GW by May 2026 (9321). Contracted power grew faster, from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). The gap between signed and energized capacity has widened from about 1.2 GW to more than 3 GW. The long-range target has also grown. The NVIDIA-linked 5+ GW by 2030 framing (3893, 9329) now sits alongside an 8 GW active-power goal for the same year (9322), and the company has not explained how the two figures relate.
The company's record on dates is mixed and only partly acknowledged. The Core Scientific merger carried target dates of October 2025 and April 2026 (4517, 4731), then was terminated (19825, 4166) and recast as a continuing partnership (20313). In December 2025 the company disclosed weather and design delays at Core Scientific sites and an installation delay on OpenAI infrastructure (19829, 19828), after describing data-center performance problems as isolated the month before (19827). Site-level promises are sparse. Kenilworth's 250 MW campus is the only US project with a dated near-term deliverable, an initial phase in 2026 (25583, 25584). Lancaster's 300 MW has no date (20201). Indonesia's 360 MW is pinned to 2028 (26332, 8758).
The record contains no independent corroboration. None of the nine listed projects has a recorded capacity or cost field. No permits, interconnection-queue filings or on-the-ground reports are attached. Polaris Forge 1 is marked partially operational but has no claims behind it. The pace therefore rests entirely on company disclosures, and those disclosures report portfolio totals rather than site-by-site energization.
Over the next 90 days, the Q3 2026 report should show whether active power keeps pace with the 4.2 GW contracted figure or whether the gap keeps widening. Kenilworth's 2026 deadline expires within this window, so watch whether an energized first phase is reported or the timing is quietly moved to 2027. Utility, zoning or interconnection filings for Kenilworth, Lancaster and the Jakarta sites would be the first outside test of the stated pace. The company should also clarify whether 8 GW active by 2030 supersedes or adds to the 5 GW NVIDIA program.
Delivery vs. promise
2026-10-09CoreWeave's contracted power figure has only gone up. It rose from 1.6 GW in May 2025 (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3582), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power rose with it, from 420 MW (4972, 26764) through 590 MW (20199) and 850 MW at year-end 2025 (3553) to more than 1 GW (9321). The ratio of contracted to active capacity has stayed at about four to one, so energization is keeping pace with signing rather than closing the gap. The long-range target has also grown. A 5+ GW NVIDIA-linked ambition for 2030 (3893) gained an 8 GW active-power target in May 2026 (9322), published next to a restated 5 GW goal (9329) with no explanation of how the two relate. Reaching 8 GW from roughly 1 GW in under five years would mean a much steeper build curve than the 2024-2025 increase of about 490 MW (3552, 3553).
On timing, the clearest break is the Core Scientific merger. Successive filings repeated its terms (4731, 4331, 4294) and it then ended in termination (19825, 4166), downgraded to a continuing partnership (20313). Delays were disclosed gradually. In November 2025 data center underperformance was described as isolated (19827). A month later the company acknowledged weather and design delays at Core Scientific sites (19829) and a slipped OpenAI installation (19828). That sequence suggests early characterizations of execution risk have run optimistic. Most named projects carry no capacity, date or cost on record. These include Niagara Falls, Digital Drive, Sweden, Taloja and Plano. Only Kenilworth (25583, 25584), Lancaster (20201) and Indonesia (27051, 27052) have concrete figures.
No independent evidence is in the record: no permits, interconnection queue positions or site reporting. The announced pace therefore rests entirely on company statements and cannot yet be corroborated. The portfolio snapshot dated March 31, 2026 (156) carries no figure, which limits reconciliation.
The next 90 days hold a hard test. Kenilworth's initial phase is promised within 2026 (25584), so either energization or an acknowledged slip should appear by early January. The Q3 report should show whether active power has moved meaningfully past 1 GW. Watch also for whether contracted capacity keeps climbing while active capacity stalls. Finally, watch for any reconciliation of the 5 GW and 8 GW targets, and for disclosure of how much of the DDTL 3.0 facility was drawn before its July 2026 commitment termination (4593).
Delivery vs. promise
2026-10-09CoreWeave's headline numbers have grown steadily and in one direction. Contracted power rose from 1.6 GW in May 2025 (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323), and most recently 4.2 GW (26367). Active power also rose, from about 420 MW (4972, 26764) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (3553), and above 1 GW by May 2026 (9321). The year-end series of 70, 360 and 850 MW (3551 to 3553) shows real energization, roughly doubling each year. The more useful signal is the ratio. Contracted capacity has stayed near four times active capacity throughout, so the company is signing new capacity about as fast as it brings old capacity online. The backlog of capacity still to be delivered is not shrinking. The 2030 targets, 8 GW active (9322) and 5+ GW of NVIDIA AI factories (3893, 9329), would require adding roughly 1.75 GW a year from a base just over 1 GW. That is a step change from the pace shown so far, not a continuation of it.
On timing, the record is mixed. The Core Scientific merger was to close by October 2025 (4517) or April 2026 (4731). It was instead terminated (4166, 19825), and only a commercial relationship remains (20313). In November 2025 the company described data center performance problems as isolated (19827). The following month it disclosed an OpenAI installation delay (19828) and weather and design slippage at Core Scientific sites (19829). That sequence is the clearest instance of guidance being overtaken by events without a prior revision. Most named projects carry no capacity or date at all. Niagara Falls, Digital Drive, Sweden, Taloja and Plano have no quantified claims, and Lancaster's 300 MW (20201) has no schedule.
The record contains no independent corroboration of the announced pace, such as permits, interconnection queue positions or site reporting. Indonesia's 360 MW for 2028 (26332, 27052) is leased from a colocation partner (8760). Delivery there therefore depends on a third party's construction, which CoreWeave does not directly control.
The next 90 days offer a concrete test. Kenilworth's initial phase was promised for 2026 (25584), the deadline falls on December 31, and nothing has been said since August 2025. The Q3 report should show whether active power grew materially beyond 1 GW, and whether contracted capacity rose again without a matching rise in active power. It is also worth checking whether the Vera Rubin deployments (10341, 17621) are counted as new megawatts or as hardware refreshes inside existing halls.
Delivery vs. promise
2026-10-09CoreWeave's headline capacity has grown steadily in each reporting cycle. Contracted power rose from 1.6 GW in May 2025 (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active power has also risen, from roughly 420 MW (4972, 26764) through 590 MW (20199) and 850 MW at year-end 2025 (3569) to more than 1 GW in May 2026 (9321). The ratio between contracted and energized capacity has not narrowed, however. It was about 3.8 to 1 at the start of the record and is about 4 to 1 now, so new contracts are arriving at least as fast as power is being energized. The long-range target has also moved without a clear reconciliation. A 5-plus GW of AI factories with NVIDIA by 2030 (3893, 9329) sits alongside a separate 8 GW active-power target (9322), and the filings do not explain how the two relate. On dates, the record is thin because most facility claims carry no delivery deadline. The ones that slipped did so visibly. The Core Scientific merger, with target closes of October 2025 (4517) and April 2026 (4731), was terminated in October 2025 (4166, 19825). In December 2025 the company disclosed an OpenAI installation delay and weather and design delays at Core Scientific sites (19828, 19829), shortly after calling a data center performance issue isolated (19827). The DDTL 3.0 commitment termination date of July 2026 (4593) has passed with no recorded follow-up. Independent corroboration is essentially absent. Every named project except the third-party Polaris Forge 1 is still listed as announced and has no recorded capacity or cost at the project level. No permits, interconnection queue positions or site reporting support the 250 MW Kenilworth campus (25583), the 300 MW Lancaster facility (20201) or the 360 MW across three Indonesian sites for 2028 (26331, 26332, 8758). The aggregate figures are the company's own statements. Over the next 90 days, the most important test is the Q3 2026 report. It should show whether active power has moved meaningfully above 1 GW and whether contracted capacity keeps climbing faster than delivered capacity. Kenilworth's initial phase is due by year-end 2026 (25584), so evidence of energization, or a quiet revision of that date, should appear before the window closes. PJM queue or utility filings tied to Kenilworth and Lancaster, and named operating partners for the Indonesian sites, would be the first independent signs that the stated pace is real.
Delivery vs. promise
2026-10-09CoreWeave's capacity record follows two curves that are pulling apart. Active power has grown steadily, from roughly 420 MW in spring 2025 (4972, 26764) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (11769, 3569) and past 1 GW by May 2026 (9321). Contracted power has grown faster, from 1.6 GW (4973) through 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW (9323) to 4.2 GW by August 2026 (26367). The undelivered backlog has therefore roughly doubled, from about 1.2 GW to well over 3 GW. The long-range target has also moved upward. A 5-plus GW AI-factory goal with NVIDIA by 2030 (3893, 9329) was joined in May 2026 by an 8 GW active-power target for the same year (9322). That second target implies a far steeper build rate than the roughly 600 MW added during 2025.
On dates, the record holds very few dated, project-level commitments. That scarcity is itself a finding: none of the nine listed projects carries a capacity or cost figure at the project level. The one near-term promise is the Kenilworth initial phase in 2026 (25584), against a 250 MW campus (25583). It is still marked announced, and the record shows no reaffirmation since August 2025. Delivery friction surfaced in late 2025. Management described a performance issue as isolated (19827), and a month later weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828) were on record. That sequence deserves scrutiny, given that the Core Scientific merger collapsed (19825, 4166) while the partnership continued (20313). Lancaster's 300 MW (20201) has no stated timeline. Indonesia's 360 MW is consistently pegged to 2028 (26331, 26332, 155).
The record contains no independent evidence, such as permits, interconnection queue positions or site reporting, for any project, so the announced pace cannot be corroborated here. The input was also truncated after claim 155, so later claims may be missing.
Over the next 90 days, watch four things. First, the Q3 2026 report, to see whether active power growth keeps pace with the 4.2 GW contracted figure. Second, any Kenilworth energization or quiet re-dating before year-end. Third, the status of DDTL 3.0 after its July 2026 commitment termination date (4593). Fourth, county or utility filings for Lancaster and Kenilworth that would show physical progress.
Delivery vs. promise
2026-10-09CoreWeave's active footprint has grown steadily and its contracted backlog has grown faster. Active power went from 70 MW at end-2023 (3551) to 360 MW at end-2024 (3552), then 420 MW (4972), 470 MW (25577), 590 MW (20199) and 850 MW at end-2025 (3553). The company reported passing 1 GW in May 2026 (9321). Contracted power climbed from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (3554) and 3.5 GW (9323). The gap between contracted and energized capacity has therefore widened from roughly 1.2 GW to about 2.5 GW, so backlog is outrunning delivery. The 2030 ambition has also shifted. Earlier filings framed it as 5+ GW of AI factories with NVIDIA (3893, 17595). The May 2026 disclosure restates that figure (9329) but adds an 8 GW active-power target in the same release (9322), and the record does not explain how the two numbers relate. Hitting 8 GW would mean adding roughly 1.75 GW a year, about three times the 2025 build rate. On dates, the clearest miss is the Core Scientific merger. It was expected to close by October 2025 (4517), was flagged as delayed, and was terminated on 2025-10-30 (4166, 19825), with the companies saying the commercial relationship continues (20313). Six weeks later management disclosed weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828), after describing data center performance as isolated (19827). Site-level commitments are thin. Kenilworth has an initial-phase delivery promised in 2026 (25584) at up to 250 MW (25583), and Lancaster has 300 MW (20201) with no date. Seven other announced projects, including Niagara Falls, Polaris Forge 1, Plano and Taloja, carry no capacity or cost in the record. The record contains no independent evidence, such as permits, PJM or ERCOT interconnection queue entries, or on-site reporting, so the announced pace rests entirely on company statements. The input also ends mid-way through an August 2026 contracted-capacity claim (26367), so the latest backlog figure could not be assessed. Over the next 90 days, watch three things. First, whether third-quarter results show active power moving well beyond 1 GW or stalling. Second, whether Kenilworth's first phase is energized before its 2026-12-31 deadline or quietly pushed out. Third, whether management reconciles the 5 GW and 8 GW framings. Interconnection filings for the New Jersey and Pennsylvania sites would be the first outside check on whether the contracted megawatts are physically on their way.
Delivery vs. promise
2026-10-08CoreWeave's capacity record follows two curves that rise at different speeds. Active power has climbed steadily, from 420 MW in May 2025 (claim 4972) through 470 MW (25577) and 590 MW (20199) to 850 MW at year-end 2025 (3569), and past 1 GW by May 2026 (9321). Contracted power has grown faster: 1.6 GW (4973), then 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). The gap between energized and contracted capacity has widened from roughly 1.2 GW to more than 3 GW. The 2030 ambition has also grown. In January it was framed as 5+ GW of AI factories with NVIDIA (17595). By May it had become an 8 GW active-power target (9322), with the 5 GW NVIDIA figure retained as a subset (9329). Raising a long-range target within four months, while the near-term backlog is still unbuilt, signals ambition more than delivery.
On dates, the record is thin, and that matters. Very few facility claims carry a promised date. Kenilworth's initial phase is due in 2026 (25584), and nothing since August 2025 confirms or revises it. Lancaster's 300 MW (20201) has no stated timeline. Indonesia's 360 MW targets 2028 (26332). Niagara Falls, Digital Drive, Sweden, Plano and Polaris Forge 1 have no capacity or date on record. CoreWeave has acknowledged slippage: weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828). It framed the earlier performance problem as isolated (19827). The Core Scientific merger missed its stated window (4517) and was terminated (19825), which left CoreWeave relying on a partner's delivery rather than its own.
The dataset contains no independent corroboration: no permits, no interconnection queue positions and no site reporting. The announced pace therefore rests entirely on company disclosure. The year-end active figures are self-reported, though they appear consistently across filings (3553, 3569).
Over the next 90 days, the Q3 report should give the first active-power figure since May. Growth well short of the contracted additions would confirm the widening gap. Kenilworth's 2026 deadline expires inside this window, so watch for delivery confirmation or a quiet change of language. Watch also for PJM queue filings or local permits for Kenilworth, Lancaster and Digital Drive. Finally, check whether the 8 GW target is repeated or recast.
Delivery vs. promise
2026-10-08CoreWeave's contracted power has grown in every disclosure on record: 1.6 GW (4973), 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3559), 3.5 GW (9323) and 4.2 GW by August 2026 (26367). Active capacity has also risen steadily, from 420 MW (4972) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (3569) and more than 1 GW in May 2026 (9321). The two lines are not converging. The gap between contracted and energized power grew from roughly 1.2 GW to about 2.5 GW over that year, and the most recent contracted figure has no matching active number. The 2030 ambition also moved quickly. It stood at 5+ GW (17595) in January and became an 8 GW active-power target (9322) in May, while the NVIDIA-linked 5+ GW framing was restated alongside it (9329). That raised the headline by 60 percent in a little over three months without explaining what changed. Timeline discipline is weaker than the capacity narrative suggests. The firm described data center underperformance as isolated (19827), and five weeks later disclosed Core Scientific weather and design delays (19829) and an OpenAI installation delay (19828). The Core Scientific merger, which was the main route to owned capacity, was terminated (19825, 4166) and replaced by a continuing partnership (20313). The 2026-04-07 completion marker (4731) therefore lapsed without being met. Several tuck-in acquisitions also carry delayed flags against their original dates (3578, 3577, 3589). At the project level the record is thin. Only Kenilworth (25583, 250 MW), Lancaster (20201, 300 MW) and Indonesia (26331, 360 MW) have stated capacity. Niagara Falls, Digital Drive, Plano, Stockholm and Polaris Forge 1 have no capacity or cost on file, and Polaris Forge 1 has no location. This dataset contains no independent corroboration of the announced pace, meaning no permits, interconnection queue entries or site reporting. On this record every megawatt figure is self-reported. Over the next 90 days, the most testable commitment is Kenilworth's initial-phase delivery in 2026 (25584). If the year ends without an energization disclosure, that is a slip. The Q3 report should show an active-power figure that can be checked against the 4.2 GW contracted base. If active power has not moved well beyond 1 GW, the 8 GW 2030 path (9322) becomes difficult to defend. Watch also whether the Core Scientific-hosted sites are counted as recovered or quietly reclassified, and whether the Indonesia 2028 date (26332) gains a named site or utility counterparty.
Delivery vs. promise
2026-10-08CoreWeave's headline capacity figures have climbed steadily. Active power went from 420 MW in May 2025 (claim 4972) to roughly 470 MW in August (25577), 590 MW in November (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). Contracted power grew in parallel: 1.6 GW (4973), then 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3559), and 3.5 GW (9323). The long-range ambition has grown faster than either. The January 2026 framing of 5+ GW of AI factories with NVIDIA by 2030 (17595) was joined in May by an 8 GW active-power target for the same year (9322), even as the 5 GW line was repeated (9329). Going from about 1 GW to 8 GW in under five years means adding power more than twice as fast as the 2024-2025 run rate (3568, 3569). None of the 2030 targets has been tied to named sites. On dates, the record is mixed. Facility-level promises are thin. The firmest is the 2026 initial phase at Kenilworth (25584), part of a campus of up to 250 MW (25583), and it has no public update since August 2025. Lancaster's 300 MW (20201) carries no delivery date at all. The clearest slippage came through the Core Scientific relationship. The merger was flagged delayed (4731, 4517) and then terminated (20312, 4166). Weeks after the company called data-center performance issues isolated (19827), it acknowledged weather and design delays at Core Scientific sites and a slower OpenAI installation (19828, 19829). The DDTL 3.0 commitment termination date of July 2026 (4593) is also marked delayed, with no restated date on record. Independent corroboration is essentially absent. The record contains no permits, no interconnection-queue entries, and no site reporting. Every project row lists capacity and cost as blank, and the March 2026 portfolio disclosure (156) carries no figure. The announced pace therefore rests on company statements alone. Over the next 90 days, the Q3 2026 report should show whether active power has kept rising from the 1 GW mark and whether contracted power has moved beyond 3.5 GW. Kenilworth needs to show energized capacity before year-end, or the 2026 promise will slip. PJM queue and local permit filings for Lancaster and Kenilworth would be the first outside test of either campus. For Indonesia, watch for a named site or power partner to back the 360 MW, 2028 commitment (26331, 26332).
Delivery vs. promise
2026-10-08CoreWeave's contracted power has grown in every disclosure on record. It went from 1.6 GW in May 2025 (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3559), 3.5 GW (9323) and most recently 4.2 GW (26367). Active power has also risen steadily: 420 MW (4972), 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). The problem is the gap between the two. Contracted capacity has stayed roughly four times active capacity, so the backlog of undelivered power keeps getting larger even as deliveries speed up. The 2030 target has also moved. The NVIDIA-linked goal of 5+ GW (3893, 17595, 9329) was joined in May 2026 by an 8 GW active-power target (9322), and the company has not explained how the two figures relate. Reaching 8 GW means adding about 7 GW in four and a half years. The company built roughly 1 GW cumulatively through mid-2026, so this is a pace it has not yet shown.
The timeline record is mixed. The Core Scientific merger closing date slipped (4517, 4731) before the deal was terminated outright (4166, 20312), with a looser partnership kept in its place (20313). In December 2025 the company acknowledged installation delays tied to OpenAI capacity and weather and design problems at Core Scientific sites (19828, 19829), which it had earlier described as isolated (19827). The delayed flags on the small software acquisitions (3577 through 3589) look like a filing-date artifact rather than real slippage, and should not be read as a delivery signal.
At the project level, most sites on record have no stated capacity or date. Only Kenilworth (250 MW, initial phase in 2026; 25583, 25584), Lancaster (300 MW, undated; 20201) and Indonesia (360 MW, online in 2028; 26331, 26332) carry specifics. The dataset includes no independent corroboration: no permits, no PJM or other interconnection queue positions, and no site reporting. The announced pace therefore rests entirely on company statements. The record we received was cut off at claim 26366, so any Indonesia phasing detail in that claim is not reflected here.
Over the next 90 days, the clearest test is Kenilworth. Its initial phase is due by December 31, and energization or customer-acceptance language in the Q3 results would confirm it. Other things to watch are whether active power rises meaningfully above 1 GW, whether the 4.2 GW contracted figure grows again without a matching rise in active capacity, any public PJM queue or permitting record for Lancaster, and whether management reconciles the 5 GW and 8 GW targets or quietly drops one.
Delivery vs. promise
2026-10-07CoreWeave's capacity story is one of steady upward revision at the portfolio level and near-silence at the project level. Contracted power has climbed from 1.6 GW (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3559) and 3.5 GW (9323) in roughly a year. Active power has moved from 420 MW (4972) to just over 1 GW (9321), consistent with the year-end footprint series of 70, 360 and 850 MW (3551, 3552, 3553). Energized capacity has stayed at roughly a quarter to a third of contracted capacity throughout, so the backlog is growing about as fast as delivery. The long-range ambition has also expanded. The 5+ GW of NVIDIA-linked AI factories by 2030 (17595, 9329) now sits alongside a larger 8 GW active-power target for the same year (9322), with no reconciliation between the two figures.
On dates, the record is thin, which is itself the finding. The only dated facility promise is the Kenilworth initial phase in 2026 (25584), attached to a 250 MW ceiling (25583), and it has not been restated since August 2025. Lancaster's 300 MW (20201) carries no date at all. The clearest case of slippage was characterized rather than quantified. Performance issues were first framed as isolated (19827), then attributed to an OpenAI installation delay and to Core Scientific weather and design delays (19828, 19829). That came after the Core Scientific merger itself slid past its promised close (4517, 4731) and was terminated (19825), leaving a partnership in its place (20313). DDTL 3.0's commitment window is also flagged as delayed (4593).
No independent corroboration appears in this record: no permits, no interconnection queue positions, no site reporting. Six of the eight named projects carry no capacity or cost figure, and Polaris Forge 1 has no location. Indonesia's 360 MW (155) rests on leased colocation (8760) with an incomplete timeline. The announced pace is therefore supported only by CoreWeave's own disclosures.
Over the next 90 days, watch the Q3 report. Check whether active power moves meaningfully beyond 1 GW and whether contracted power grows again or plateaus at 3.5 GW. Watch whether Kenilworth's first phase is confirmed, quantified or quietly re-dated before its 2026 year-end deadline. Look for PJM queue or local permitting evidence for Kenilworth and Lancaster. Look for a dated, sized commitment for Indonesia. Watch for any sign that the Vera Rubin deployments (10341, 17621) and DDTL 5.0 funding (9121) are converting into named sites.
Delivery vs. promise
2026-10-07CoreWeave's capacity story is one of steady, disclosed growth in contracted power, with active power rising more slowly. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3570) and 3.5 GW by May 2026 (9323). Active power rose from 420 MW (4972) to 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (3569) and past 1 GW (9321). The year-end series of 70, 360 and 850 MW (3567-3569) shows real build-out, but the contracted-to-active ratio has only narrowed from about 3.8x to 3.5x, so the backlog is growing roughly as fast as delivery. The long-range target has also grown. Claims 17595 and 3893 framed 5+ GW of AI factories with NVIDIA by 2030. Claim 9322 now states 8 GW of active power by 2030. Reaching 8 GW from about 1 GW requires roughly 1.5 GW of energization a year, about three times the best year on record (+490 MW in 2025). The filings do not explain how the 5 GW and 8 GW figures relate. On timing, the company has acknowledged slippage. Claims 19828 and 19829 cite OpenAI installation delays and Core Scientific weather and design problems, while 19827 called the shortfall isolated. The Core Scientific merger slid past its 2025-10-01 target (4517) and was terminated (4166), though the hosting relationship continues (20313). Several acquisition claims carry promised-by dates earlier than their own disclosures (3577-3579), which looks like a dating artifact rather than a real slip. Project-level detail is thin. Kenilworth's 250 MW (25583) has a dated first phase in 2026 (25584). Lancaster's 300 MW (20201) has no date, and Indonesia's 360 MW figure (155) rests on leased colocation space (8760). Five of the eight listed projects have neither a capacity figure nor a date. This record contains no permits, interconnection-queue filings or site reporting, so the announced pace is supported only by the company's own disclosures and has not been independently checked. Over the next 90 days, the key test is whether Kenilworth's initial phase is energized by 2026-12-31. The Q3 2026 results should show whether active power keeps growing by at least 150 MW a quarter, which the 8 GW target implies. Watch also for any reconciliation of the 5 GW and 8 GW goals, and for the first utility or interconnection filings tied to Lancaster or Jakarta.
Delivery vs. promise
2026-10-07CoreWeave's announced capacity has only grown, and the reported figures line up with one another. Contracted power rose from 1.6 GW in May 2025 (4973) to 2.2 GW (25578), 2.9 GW (20200), 3.1 GW (11770, 3559) and 3.5 GW by May 2026 (9323). Active power followed a slower but steady path: 420 MW (4972), 470 MW (25577), 590 MW (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by the May 2026 report (9321). The year-end series of 70, 360 and 850 MW (3551 through 3553) shows real acceleration. The gap between contracted and energized capacity has still widened, from roughly 1.2 GW to about 2.5 GW. The long-range targets have also moved up without much intermediate scaffolding. The 5+ GW NVIDIA-linked goal (17595, 9329) was joined by an 8 GW active-power target for 2030 (9322). Hitting 8 GW would require adding well over 1.5 GW a year, roughly three times the ~490 MW added in 2025.
On dates, the record holds few dated facility promises, so it offers few chances to test them. The clearest one is Kenilworth's initial phase in 2026 (25584), against a campus of up to 250 MW (25583). Nothing on the record since August 2025 updates that milestone. The company described data center underperformance as isolated in November 2025 (19827). A month later, delays tied to an OpenAI installation (19828) and to weather and design problems at Core Scientific sites (19829) were on the record. The terminated Core Scientific merger (19825, 4166) left CoreWeave dependent on a partner it no longer controls (20313). Lancaster's 300 MW (20201) and Indonesia's 360 MW deployment (155) carry no stated delivery dates. Indonesia will run in leased colocation space (8760), which is faster to deliver but less owned capacity.
The record contains no independent corroboration: no permits, no interconnection queue positions, no site reporting. Every project entry also lacks capacity and cost fields. The pace above therefore rests entirely on company disclosures, and the claim describing the March 2026 portfolio (156) carries no figure.
Over the next 90 days, the third-quarter report is the main test. It should show whether active power keeps climbing by roughly 150 MW or more per quarter, and whether contracted power moves past 3.5 GW. Kenilworth's 2026 deadline expires on 2026-12-31, so energization or a quiet slip will become visible. Further items to watch are any utility or zoning filings for Lancaster, a date for Jakarta, the status of Core Scientific deliveries, and whether the Vera Rubin bring-up (17621, 10341) turns into named sites.
Delivery vs. promise
2026-10-07CoreWeave's capacity story has only moved in one direction. Contracted power has stepped up at every disclosure, from 1.6 GW (claim 4973) to 3.5 GW (claim 9323), and active power has risen to just over 1 GW (claim 9321). The pattern matters more than the totals. Active capacity has roughly doubled in a year, but contracted capacity has grown in parallel, so the gap of about 2.5 GW between what is signed and what is energized has not closed. The 2030 framing has also drifted: an NVIDIA-linked goal of 5+ GW of AI factories (claims 3893, 17595, 9329) now sits alongside a separate 8 GW active-power target (claim 9322), and the company has not explained how the two figures relate.
On timing, the record is thin, and that is itself a finding. Kenilworth's initial phase was promised for 2026 (claims 25583, 25584) and has not been restated since August 2025, with under three months of the year left. Lancaster's 300 MW (claim 20201) has no date attached. Five of the eight named projects carry no capacity figure at all. The clearest revision came through partners rather than CoreWeave's own sites. In November 2025 the company characterized data center performance issues as isolated (claim 19827). Weeks later it acknowledged Core Scientific weather and design delays and an OpenAI installation delay (claims 19828, 19829), after the Core Scientific merger had already slipped past its expected close and been terminated (claims 4517, 4166).
This record contains no independent corroboration: no permits, no interconnection queue positions, and no site-level reporting. The announced pace therefore rests entirely on company disclosure. The Indonesia deployment, sized at 360 MW in a truncated claim (155), is described as leased from a colocation provider (claim 8760). That suggests at least some future growth will come from third-party shells, so its credibility depends on the landlord's construction rather than CoreWeave's.
Over the next 90 days, watch the third-quarter results for whether active power has moved meaningfully past 1 GW, and whether contracted capacity rises again without a matching step in energized megawatts. Watch for any Kenilworth energization or a quiet shift of its date into 2027. Look for PJM queue or county filings tied to Lancaster, and for the identity and phasing of the Jakarta colocation partner. Finally, watch whether the Meta commitment (claim 17654) and the Vera Rubin deployments (claims 10341, 17621) get mapped to specific sites.
Delivery vs. promise
2026-10-06CoreWeave's capacity story is one of steady upward revision at the portfolio level, paired with thin detail at the project level. Contracted power has grown from 1.6 GW (claim 4973, May 2025) to 2.9 GW (20200), then 3.1 GW (11770, 3559), then 3.5 GW (9323, May 2026). Active power has risen at a similar pace: 420 MW (4972), 590 MW (20199), 850 MW at year-end 2025 (3569), and above 1 GW by May 2026 (9321). That builds on footprints of 70 MW in 2023 (3551) and 360 MW in 2024 (3568). The disclosed active figures have never moved backward, and that matters. Still, the long-dated targets now run well ahead of the contracted base. The 5+ GW of NVIDIA-linked AI factories by 2030 (3893, 17595, 9329) and the 8 GW active target (9322) would require roughly 1.5 GW of energization per year, against 3.5 GW contracted today.
On dates, the record is mixed. The Core Scientific merger missed its stated window (4517), and the company later terminated it (4166, 20312) while keeping the commercial relationship (20313). A month after management called data center performance issues isolated (19827), it acknowledged weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828). Those admissions came without restated delivery dates. The DDTL 3.0 commitment window is also flagged as delayed (4593).
Independent corroboration is the weakest part of the record. None of the eight named projects carries a disclosed cost, and only two carry capacity figures. Lancaster has 300 MW (20201), and Indonesia has 360 MW across three Jakarta sites by end-2028 (8758, 155). Indonesia is explicitly leased from an unnamed colocation provider (8760), and Polaris Forge 1 lacks even a location. Nothing in the file points to permits, PJM or ERCOT interconnection queue positions, or site reporting that would let the announced pace be checked against physical progress. The portfolio-wide snapshot (156) and the final entry (22017) are incomplete as recorded.
Over the next 90 days, watch whether third-quarter disclosures show active capacity moving meaningfully beyond 1 GW, and whether contracted power grows again or plateaus. Also look for permitting or queue evidence at Lancaster, Kenilworth and Plano, the naming of the Indonesia colocation partner, revised delivery dates for the delayed Core Scientific sites, and drawdown activity under the DDTL 4.0 and 5.0 facilities (11225, 9121) as a proxy for build pace.
Delivery vs. promise
2026-10-06CoreWeave's headline capacity numbers have only moved upward, and the record supports the direction if not the destination. Contracted power rose from 1.6 GW in May 2025 (claim 4973) to 2.9 GW by November (20200), 3.1 GW in the annual filing (3559, 3570), and 3.5 GW by May 2026 (9323). Active capacity followed a steeper relative curve: 70 MW at end-2023 (3567), 360 MW at end-2024 (3568), 850 MW at end-2025 (3569), and past 1 GW by May 2026 (9321). The long-range framing has also grown. The January 2026 target of 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595) was joined in May by an 8 GW active-power target for the same year (9322). That target exceeds the 3.5 GW currently contracted, so it depends on sites that are not yet secured. It also implies roughly 1.4 GW of net additions per year, against about 490 MW added during 2025.
On timing, the clearest slippage is in partner delivery rather than in CoreWeave's own stated dates. The Core Scientific merger, expected to close around October 2025 (4517), was terminated on 2025-10-30 (4166, 20312), with the commercial relationship continuing (20313). Weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828) were disclosed in December, after a November characterization of performance issues as isolated (19827). The OpenPipe, Marimo and Monolith acquisitions are flagged as delayed (3588, 3577, 3589). Those flags look like closing dates reported after the fact rather than missed commitments.
Independent corroboration is thin. Eight projects are on record, all at announced status. Only two carry figures: Lancaster at 300 MW (20201) and three leased Jakarta facilities totaling 360 MW by end-2028 (8758, 8760). None of the provided claims cite permits, utility interconnection queue positions, or site-level reporting, so the announced pace rests on company disclosure alone. The record also truncates at claim 22017, whose content could not be assessed.
Over the next 90 days, the third-quarter report should show whether active capacity has moved meaningfully beyond the 1 GW mark and whether contracted capacity has grown past 3.5 GW. Beyond that report, three things would firm up the project-level picture: the Lancaster facility appearing in PJM queue or local zoning records, the Jakarta colocation partner being named, and evidence that the Vera Rubin deployments (10341, 17621) have reached customer service rather than validation alone.
Delivery vs. promise
2026-10-06CoreWeave's capacity story is mostly about contracted power running ahead of what is energized. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (claims 3551, 3552, 3553). An intermediate 590 MW print in November 2025 (20199) fits that path, and the company reported passing 1 GW in May 2026 (9321). Contracted power grew faster: 1.6 GW (4973), then 2.9 GW (20200), 3.1 GW (11770, 3554), and 3.5 GW (9323). That leaves roughly 2.5 GW signed but not live. The long-range target has also moved. 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595) was restated in May 2026 next to a new 8 GW active-power goal for the same year (9322, 9329). The filings never say whether 8 GW replaces the 5 GW figure or counts something different. Either way, reaching 8 GW means growing roughly eightfold from today's base in about four years.
Dates have held unevenly, and some changes went unacknowledged. The Core Scientific merger carried close targets of October 2025 and then April 2026 (4517, 4731). It was terminated on 2025-10-30 (19825, 4166) and recast as a continuing partnership (20313). In December 2025 the company disclosed an OpenAI installation delay and Core Scientific weather and design delays (19828, 19829), shortly after calling the problems isolated (19827). The DDTL 3.0 commitment termination date is also flagged as delayed (4593).
Independent corroboration is thin in this record. The only named site with a disclosed size is Lancaster at 300 MW (20201). Niagara Falls, Digital Drive, Kenilworth, Plano, Stockholm and Polaris Forge 1 have no capacity, cost, permit or interconnection-queue entries on file. Indonesia's 360 MW by end-2028 (8758, 155) would be leased from an unnamed colocation provider (8760), so the build risk sits with a third party. The announced pace therefore rests almost entirely on company statements. The most recent claim, 17625, arrived without detail.
Over the next 90 days, the Q3 2026 report is the first test. Watch whether active power keeps adding 150 to 250 MW per quarter and whether contracted capacity moves past 3.5 GW. Check also whether the 5 GW and 8 GW targets are reconciled. Lancaster should show up in PJM queue filings or local land-use approvals if it is real near-term capacity. The Indonesia colocation partner may be named. Vera Rubin deployment claims (10341, 17621) should translate into specific energized sites.
Delivery vs. promise
2026-10-05CoreWeave's headline numbers have only moved upward. Contracted power rose from 1.6 GW in May 2025 (claim 4973) to 2.9 GW by November (20200), 3.1 GW in the annual filing (3554, 11770), and 3.5 GW by May 2026 (9323). Active capacity tracked behind it, from 590 MW (20199) to 850 MW at year-end 2025 (3569), then past 1 GW (9321). Year-end footprints of 70, 360 and 850 MW (3567-3569) show real delivery. The gap between contracted and energized capacity is still roughly 2.5 GW, and it has widened rather than narrowed. The long-range target has also grown. A 5+ GW AI-factory goal with NVIDIA (17595, 3893, 9329) now sits beside an 8 GW active-power target for 2030 (9322), and the company has not said whether the two overlap. Reaching 8 GW would require energizing about 1.5 GW a year, roughly three times the 2025 pace. Facility-level dates are sparse, which makes slippage hard to measure. The clearest timeline failure is the Core Scientific merger. It was promised by October 2025 (4517) and later by April 2026 (4731), then terminated on 30 October 2025 (19825, 4166), with the hosting relationship kept in place (20313). In December the company disclosed weather and design delays at Core Scientific sites and a delayed OpenAI installation (19828, 19829), after earlier calling data-center underperformance isolated (19827). The DDTL 3.0 commitment date is also flagged as delayed (4593). Most named projects have no capacity, cost, or date on record. The exceptions are Lancaster at 300 MW with no date (20201) and Indonesia at 360 MW across three leased colocation sites by end-2028 (155, 8758, 8760). The Indonesia figure equals the company's entire 2024 footprint but depends on a third party's construction. The record holds no independent corroboration, such as permits, interconnection-queue positions, or site reporting, for any project, so the pace rests entirely on company statements. Over the next 90 days, the Q3 report should show whether active capacity is climbing fast enough to make 8 GW credible and whether contracted capacity keeps outrunning it. The other things to watch are a dated milestone or utility filing for Lancaster, naming of the Indonesian colocation partner, recovery at the Core Scientific-hosted sites, and how the DDTL 5.0 financing (9121, 8736) is sized against the build plan. The latest capacity claim on record (17625) arrived incomplete and should be checked before it is relied on.
Delivery vs. promise
2026-10-05CoreWeave's reported footprint has grown steadily, and the targets have grown faster than delivery. Active power went from 420 MW in May 2025 (claim 4972) to 590 MW in November (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). That is roughly 600 MW of energized capacity added per year. Contracted power rose faster over the same period: 1.6 GW (4973), then 2.9 GW (20200), 3.1 GW (11770, 3570), and 3.5 GW (9323). The gap between contracted and active capacity widened from about 1.2 GW to about 2.5 GW. The long-range target also escalated. In January 2026 the company framed a goal of 5+ GW of AI factories with NVIDIA by 2030 (17595, 3893). By May it was citing 8 GW of active power by 2030 (9322). That figure exceeds even the current contracted base, and at the observed run rate it would take roughly a decade to reach.
The record contains very few project-level dates against which slippage can be measured. Lancaster has a stated 300 MW (20201) but no delivery date. Niagara Falls, Kenilworth, Plano, Polaris Forge 1, Stockholm and Digital Drive carry neither capacity nor schedule on record. The only dated site commitment is Indonesia: 360 MW across three Greater Jakarta facilities by end-2028 (155, 8758), delivered through leased colocation rather than self-build (8760). The clearest timing signal is the Core Scientific sequence. The merger targeted for October 2025 (4517) was terminated (4166, 20312) while the partnership continued (20313). Weeks after a performance issue was characterized as isolated (19827), the company acknowledged weather and design delays at Core Scientific sites and a delayed OpenAI installation (19828, 19829). That pattern suggests downstream schedule risk is disclosed late.
None of the claims on record is corroborated by independent evidence such as permits, interconnection queue positions, utility filings or site reporting. The announced pace therefore rests on company statements alone. The portfolio snapshot (156) and the final entry (18935) carry no usable figures.
Over the next 90 days, the Q3 2026 report is the key checkpoint. Watch whether active capacity is still growing at roughly 150 MW per quarter, whether the 8 GW target is restated or quietly reverted to 5 GW, and whether the Core Scientific-hosted capacity has come online. Outside the company, watch for PJM queue or local permitting activity tied to Lancaster, naming of the Indonesian colocation partner, and evidence that the Vera Rubin deployments (10341, 17621) are energized rather than validated in a lab.
Delivery vs. promise
2026-10-03CoreWeave's capacity story has grown at both ends. Contracted power rose from 1.6 GW in May 2025 (claim 4973) to 2.9 GW by November (20200), 3.1 GW in the February and March 2026 disclosures (11770, 3582), and 3.5 GW in May 2026 (9323). Active power moved from 420 MW (4972) to 590 MW (20199), then 850 MW at year-end 2025 (3569, 11769), and past 1 GW by May (9321). The year-end series of 70, 360 and 850 MW (3567, 3568, 3569) shows real compounding. The long-range target has also moved. The January 2026 framing was 5+ GW of AI factories with NVIDIA by 2030 (17595, 3893). By May this sat beside a broader 8 GW active-power target for the same date (9322, 9329). That new figure is more than double current contracted capacity. The company has not explained how much of the gap is expected to come from NVIDIA-linked sites versus new contracts.
Date discipline is mixed. The Core Scientific merger was the clearest planned route to owned capacity. It was marked delayed against its expected close (4517, 4731) and then terminated on 2025-10-30 (19825, 4166), with only a continuing partnership left (20313). The December disclosures of an OpenAI installation delay and of weather and design delays at Core Scientific sites (19828, 19829) followed management's November description of data center underperformance as isolated (19827). That sequence deserves skepticism. The DDTL 3.0 commitment termination date is also flagged delayed (4593). This suggests financing timelines are being revised alongside build schedules.
The record contains no independent corroboration. There are no permits, no interconnection-queue entries, and no site reporting. Most named projects carry no capacity or date on record at all: Niagara Falls, Kenilworth, Plano, Sweden, Digital Drive and Polaris Forge 1. Lancaster's 300 MW (20201) and Indonesia's 360 MW by end-2028 (155, 8758) are the only site-level figures. Indonesia relies on leased colocation space (8760), which shifts execution risk to an unnamed partner. The latest claim in the set (17625) is truncated and could not be assessed.
Over the next 90 days, watch three things. First, whether the third-quarter report restates the 8 GW target and shows active capacity keeping its roughly 150 MW-per-quarter pace. Second, whether PJM queue filings or local permits appear for Lancaster. Third, whether the Indonesia colocation provider is named and given a first energization date.
Delivery vs. promise
2026-10-03CoreWeave's capacity story has scaled steadily on paper. Contracted power moved from 1.6 GW in May 2025 (claim 4973) to 2.9 GW that November (20200), 3.1 GW by the March 2026 annual filing (11770, 3582), and 3.5 GW by May 2026 (9323). Active capacity tracked behind it, from 420 MW (4972) to 590 MW (20199) to 850 MW at year-end 2025 (3569), then past 1 GW (9321). The year-end footprint series of 70, 360 and 850 MW (3567, 3568, 3569) shows real energization, not just signed contracts. The long-range targets are another matter. The 8 GW active-power goal for 2030 (9322) sits beside a 5+ GW NVIDIA-linked target (17595, 9329), and both run well ahead of anything contracted today. Reaching the 8 GW goal would require roughly a 2.3x increase over the current contracted base within four years.
On timelines, the clearest failure is the Core Scientific merger. Its October 2025 close target (4517) slipped, and the deal was terminated on 2025-10-30 (19825, 4166), with a continuing partnership put in its place (20313). Weeks later, management acknowledged Core Scientific weather and design delays (19829) and an OpenAI installation delay (19828), having earlier described performance problems as isolated (19827). The delayed flags on the Marimo, OpenPipe and Monolith deals (3577, 3588, 3589) look like closing dates recorded after the fact rather than genuine slippage. The DDTL 3.0 commitment termination date (4593), however, warrants a check on whether it was extended.
Independent corroboration is thin. The record contains no permits, interconnection-queue entries or site reporting for any of the eight named projects. Only Lancaster (20201, 300 MW) and Indonesia (8758, 155, 360 MW by end-2028) carry stated capacities, and Indonesia relies on leased colocation (8760) rather than owned build. Niagara Falls, Kenilworth, Plano, Digital Drive, Sweden and Polaris Forge 1 have no capacity or date claims attached at all. The record as supplied ends mid-entry at claim 17625.
Over the next 90 days, the third-quarter report is the main checkpoint. It should show whether active capacity has moved meaningfully beyond 1 GW and whether contracted power has grown past 3.5 GW. Other things to watch are PJM queue or county filings for Lancaster, the naming of the Indonesian colocation partner, disclosure on the status of DDTL 3.0 commitments, and evidence that Vera Rubin deployments (10341, 17621) are landing in specific sites rather than remaining a multi-location aspiration.
Delivery vs. promise
2026-10-03CoreWeave's capacity story has grown at every disclosure point, and the active base has largely kept pace. Contracted power rose from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW (9323) in roughly twelve months. Active power climbed from 590 MW (20199) to 850 MW at year-end 2025 (11769, 3569) and past 1 GW by May 2026 (9321), which extends a footprint series that ran from 70 MW to 360 MW to 850 MW (3567-3569). The long-range ambition has moved faster than either series. The 2030 target began as 5+ GW of AI factories with NVIDIA (17595, 3893), and by May it had become 8 GW of active power (9322), while the 5 GW framing was restated alongside it (9329). Even against today's 3.5 GW contracted figure, roughly 4.5 GW of the 2030 goal has no identified site in this record. Delivering it would require sustaining about 1.75 GW of additions per year, well above the recent quarterly run rate.
The timeline record is weaker. The Core Scientific merger missed its October 2025 target (4517) and was terminated weeks later (4166, 19825), with only a continuing partnership left in place (20313). One month after management called data center performance issues isolated (19827), disclosures cited an OpenAI installation delay (19828) and weather and design setbacks at Core Scientific sites (19829). These were not framed as revisions to earlier guidance. The DDTL 3.0 commitment termination date is also flagged as delayed (4593). The delayed flags on the tuck-in acquisitions (3577, 3588, 3589) look like artifacts of how closing dates were recorded, so they should not be read as operational slippage.
Independent corroboration is thin. Lancaster carries a 300 MW figure (20201) but no date, and six named projects, including Niagara Falls, Plano and Kenilworth, have no capacity, cost or schedule attached. The record contains no permits, interconnection queue positions or site reporting for any of them. Much of the pipeline sits in third-party buildings, including the Indonesian colocation leases behind the 360 MW Jakarta target for 2028 (8760, 8758). As a result, landlord disclosures are the most practical outside check.
The Q3 2026 results are the main event for the next 90 days. Readers should watch whether active power gains keep pace with contracted additions and whether the 8 GW target is reiterated or quietly reframed. Other markers are PJM queue or county permit filings for Lancaster, naming of the Jakarta colocation partner, and any status update on the delayed Core Scientific deliveries. The final claim on record (17625) was truncated in the source data and should be reviewed before publication.
Delivery vs. promise
2026-10-03CoreWeave's headline capacity has grown steadily, and the reported active figures largely track what was promised. Active power rose from 70 MW at end-2023 to 360 MW at end-2024 (3551, 3552), then 420 MW in May 2025 (4972), 590 MW in November (20199), 850 MW at year-end (3553, 11769), and past 1 GW by May 2026 (9321). Contracted power grew faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3554) and 3.5 GW (9323). The ambition has scaled more than either. A 5+ GW AI-factory goal with NVIDIA by 2030 (17595, 9329) has been joined by an 8 GW active target for the same date (9322). That target is more than double today's contracted base, and it implies roughly 1.9 GW of activations a year against about 490 MW delivered in calendar 2025.
The schedule record is weaker at the deal and site level than at the aggregate level. The Core Scientific merger, guided to close by October 2025 (4517), slipped and was then terminated (4166, 20312) in favour of a continuing partnership (20313). Weather and design delays at Core Scientific sites and an OpenAI installation delay surfaced weeks later (19829, 19828), after management had characterized data-center performance issues as isolated (19827). Several acquisition closings carry delayed flags (3578, 3587, 3589), though these appear to be timing artifacts rather than capacity misses. The DDTL 3.0 commitment termination date (4593) is also flagged as delayed, and its July 2026 date has now passed.
Independent corroboration is thin. Of eight named projects, only Lancaster (300 MW, 20201) and Indonesia (360 MW across three leased Jakarta-area facilities by 2028, 8758, 155, 8760) carry any capacity figure. Niagara Falls, Digital Drive, Polaris Forge 1, Sweden, Kenilworth and Plano have no capacity, cost or, in one case, location on record. The record contains no permits, interconnection-queue entries or site reporting that would let the announced pace be tested project by project. The March 2026 portfolio disclosure (156) carries no figure, and the record ends with an incomplete entry (17625).
Over the next 90 days, the third-quarter report should show whether active power has moved meaningfully beyond 1 GW and whether contracted power keeps rising toward the 8 GW goal. It is also the point at which a stall in contracted power would become visible. Other things to watch are Lancaster filings with PJM and local permitting bodies, identification of the Indonesian colocation lessor, a status update on the Core Scientific sites, and evidence that the Vera Rubin bring-up (17621, 10341) has become billable capacity supporting the Meta payment schedule (17655).
Delivery vs. promise
2026-10-02CoreWeave's capacity story is one of steady upward revision at the portfolio level and thin disclosure at the site level. Active power has grown from 420 MW (claim 4972) to 590 MW (20199), then 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). The historical footprint series of 70, 360 and 850 MW (3567, 3568, 3569) makes clear this is real compounding, not relabeling. Contracted power has climbed faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3559) and 3.5 GW (9323). The gap between contracted and energized capacity is therefore widening in absolute terms, and that gap is where delivery risk sits. The 2030 ambition has also shifted. It began as 5+ GW of AI factories with NVIDIA (3893, 17595), and by May 2026 sat alongside a broader 8 GW active power target (9322) without any explanation of how the two figures relate.
On dates, the record is mixed. The headline capacity figures carry no promised dates, so they cannot formally slip. Execution friction is documented, however: weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (18828 is not on record; see 19828), which management characterized as isolated (19827). The Core Scientific merger, slated to close by October 2025 (4517), was terminated instead (4166, 20312) and replaced by a continuing partnership (20313). That leaves CoreWeave dependent on a third party's build schedule rather than its own. The DDTL 3.0 commitment window is also flagged as delayed (4593).
Independent corroboration is the weakest part of the picture. Every named project, including Lancaster, Kenilworth, Plano, Niagara Falls and Digital Drive, sits at announced status with no capacity or cost attached, apart from Lancaster's 300 MW (20201) and the Indonesia plan for 360 MW by 2028 (8758, 155). This record contains no permits, interconnection queue entries or site reporting, so the announced pace cannot yet be verified from outside the company's own filings. The Indonesia capacity will be leased from a colocation provider (8760), which shifts construction risk to that provider. The record also appears truncated after claim 18935.
Over the next 90 days, watch whether the Q3 2026 report moves active capacity meaningfully beyond 1 GW, or whether only contracted capacity grows. Also watch for PJM queue or local permitting activity at Lancaster, for the Indonesian colocation partner to be named along with site timelines, for any update on Core Scientific delivery delays, and for evidence that the Vera Rubin deployments (10341, 17621) are converting into energized megawatts.
Delivery vs. promise
2026-10-02CoreWeave's headline capacity numbers have only moved in one direction, and the targets have grown faster than the delivered base. Active power went from 70 MW at end-2023 (3567) to 360 MW at end-2024 (3568), 590 MW by November 2025 (20199), 850 MW at end-2025 (3569, 11769), and past 1 GW by May 2026 (9321). Contracted capacity rose from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3554), then 3.5 GW (9323). The long-range ambition escalated too. The January 2026 framing of 5+ GW of AI factories with NVIDIA by 2030 (17595, 3893), restated in 9329, sits beside a new 8 GW active-power target by 2030 (9322). Calendar 2025 added roughly 490 MW of active power. Reaching 8 GW by 2030 implies roughly 1.5 to 1.8 GW per year from here. That is a multiple of any annual pace the record has shown so far, and nearly 4.5 GW of it is not yet even contracted.
On dates, the record shows slippage that was reframed rather than plainly acknowledged. The Core Scientific merger carried an expected close of October 2025 (4517), later pushed toward April 2026 (4731), and was terminated in October 2025 (4166, 19825), with a continuing partnership instead (20313). By December, reporting tied OpenAI installation delays (19828) to weather and design problems at Core Scientific sites (19829). Management had earlier described data center performance issues as isolated (19827). The DDTL 3.0 commitment termination date is also flagged as moved (4593).
Independent corroboration is thin. None of the eight named projects carries a disclosed capacity or cost on the project record. The exceptions are Lancaster at 300 MW (20201) and Indonesia at 360 MW across three leased Jakarta-area facilities by 2028 (8758, 155, 8760). Niagara Falls, Digital Drive, Polaris Forge 1, Stockholm, Kenilworth and Plano have no dates, permits, or interconnection-queue evidence on file. The portfolio disclosure as of March 31, 2026 (156) also attaches no figure. The aggregate numbers therefore rest almost entirely on company statements.
Over the next 90 days, the Q3 2026 report should show whether active capacity is compounding toward the 8 GW path or holding near the low single-gigawatt range. Lancaster needs a PJM queue position or local permitting to move from announcement to build. The Indonesia colocation partner should be identified. Watch whether the Vera Rubin bring-up (17621, 10341) turns into named sites, and whether the DDTL 5.0 financing (9121, 8736) is drawn against specific facilities.
Delivery vs. promise
2026-10-02CoreWeave's headline capacity figures have climbed steadily across every disclosure. Active power rose from 420 MW (claim 4972) to 590 MW (20199), then to 850 MW at year-end 2025 (11769, 3569), and passed 1 GW by May 2026 (9321). Contracted power grew faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3570), and 3.5 GW (9323). The long-range framing has shifted. The 5+ GW of NVIDIA-aligned AI factories by 2030 (3893, 17595, 9329) now sits alongside an 8 GW active-power target for the same date (9322). That target is more than double the current contracted base. Reaching it from roughly 1 GW in mid-2026 implies adding about 1.6 GW a year, against the roughly 490 MW added during 2025 (3568, 3569). Nothing on record yet bridges that gap.
Date discipline is weaker than the capacity series suggests. The Core Scientific merger was expected to close by October 2025 (4517), slipped, and was terminated on 2025-10-30 (4166, 20312). It was recast as a continuing partnership (20313). Six weeks later the company cited Core Scientific weather and design delays (19829) and an OpenAI installation delay (19828). In November it had characterized data center performance issues as isolated (19827), and that framing did not hold up well against the December disclosures. Several software acquisitions carry flagged expected dates that passed before closing was reported (3577–3579, 3587–3589), though these matter less for physical delivery. The DDTL 3.0 commitment termination date is also flagged as delayed (4593).
Independent corroboration is thin. The record contains no permit filings, interconnection-queue entries, or on-site reporting for any named project. Six of the eight sites, including Niagara Falls, Kenilworth, Plano and Polaris Forge 1, carry no stated capacity or cost. Lancaster's 300 MW (20201) and Indonesia's 360 MW across three leased Greater Jakarta facilities by end-2028 (155, 8758, 8760) are company assertions only. Claim 18935 is truncated in the record and should be re-pulled before publication.
Over the next 90 days, the Q3 2026 results should show whether active power keeps compounding past 1 GW and whether contracted power moves beyond 3.5 GW. Other signals to watch are a PJM queue position or local zoning action for Lancaster, a named colocation partner and permitting for the Jakarta sites, evidence that Vera Rubin deployments (10341, 17621) are energized rather than only validated, and any further delay language tied to Core Scientific-hosted capacity.
Delivery vs. promise
2026-10-02CoreWeave's company-wide capacity numbers have grown steadily, while its site-level disclosure remains thin. Active power rose from 420 MW in May 2025 (claim 4972) to 590 MW in November (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). That follows a year-end series of 70 MW in 2023 and 360 MW in 2024 (3567, 3568). Contracted power grew faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3570), and 3.5 GW (9323). The gap between signed and energized capacity is now about 2.5 GW, so contracting is outrunning delivery. The 2030 ambition has also shifted in framing. A target of 5+ GW of AI factories with NVIDIA (3893, 17595, repeated in 9329) now sits beside an 8 GW active-power target (9322), and the record does not reconcile the two. Reaching 8 GW would mean adding roughly 7 GW in about four and a half years, compared with roughly 1 GW built to date.
The dated record is mixed. The Core Scientific merger slipped past its October 2025 target (4517) and was then terminated (20312, 4166), leaving a continuing partnership (20313). In December, the company acknowledged weather and design delays at Core Scientific sites (19829) and a delay in an OpenAI installation (19828), after describing data center performance problems as isolated (19827). The DDTL 3.0 commitment termination date is also flagged as delayed (4593). By contrast, the project-level commitments carry almost no dates. Lancaster is described at 300 MW (20201) with no delivery date. The other U.S. sites, Sweden, and Polaris Forge 1 are listed with no capacity or cost. Indonesia is the one dated buildout: 360 MW across three leased colocation facilities by the end of 2028 (155, 8758, 8760). Claim 156 refers to a portfolio snapshot as of March 31, 2026 without stating a figure, and claim 18935 is truncated in the record.
The record contains no independent corroboration. There are no permits, no interconnection queue entries, and no on-the-ground reporting. The capacity trajectory therefore rests entirely on the company's own statements and should be read that way.
In the next 90 days, watch three things. First, the third-quarter print: whether active power advances meaningfully beyond 1 GW, and whether contracted capacity moves past 3.5 GW or stalls. Second, any update on the Core Scientific-hosted sites and the OpenAI deployment. Third, any outside evidence that ties projects to real progress, such as PJM queue or zoning filings for Lancaster and Kenilworth, Dominion queue activity near Richmond, and a named colocation partner in Jakarta. Draws on DDTL 5.0 (9121) and Vera Rubin deployment disclosures (10341, 17621) would also show whether capital and hardware are flowing at the stated pace.
Delivery vs. promise
2026-10-01CoreWeave's capacity story is one of steady upward revision at the aggregate level paired with almost no verifiable detail at the project level. Active power rose from 420 MW (claim 4972, May 2025) to 590 MW (20199), then 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). Contracted power climbed from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3570) and 3.5 GW (9323). The long-range target has grown faster than either. The January framing of 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595) was joined in May by an 8 GW active-power goal for the same year (9322, 9329). That goal sits 4.5 GW above the contracted backlog. Reaching it implies roughly 1.75 GW of energization a year. The record shows about 490 MW added in calendar 2025 (3568 to 3569) and about 150 MW in early 2026.
On dates, the clearest miss is the Core Scientific merger. It was guided to close around October 2025 (4517) and was terminated on 2025-10-30 (4166, 20312), with the relationship recast as a continuing partnership (20313). In November, management characterized data-center performance issues as isolated (19827). A month later, weather and design delays at Core Scientific sites (19829) and a slipped OpenAI installation (19828) entered the record, and the earlier framing was never revisited. The delayed flags on the Monolith, OpenPipe and Marimo deals (3587-3589) look like close-date bookkeeping rather than operational slippage.
Independent corroboration is thin. Of eight named projects, only Lancaster (300 MW, 20201) and Indonesia (360 MW across three leased colocation sites by end-2028, 8758, 155, 8760) carry any capacity figure. The record contains no permits, interconnection-queue entries or site reporting for any of them. The aggregate megawatt figures are therefore company-reported only. The Indonesia plan relies on a leased model, which shifts delivery risk to an unnamed colocation provider. The most recent capacity claim (17804, 2026-08-11) arrived incomplete and cannot be assessed.
Over the next 90 days, watch the third-quarter report for whether active capacity has moved meaningfully beyond 1 GW and whether contracted power keeps growing toward the 8 GW goal. Watch for PJM queue or local permitting activity at Lancaster, and for disclosure of the Indonesian colocation partner. Also watch for any update on the Core Scientific sites tied to the OpenAI delay, since those are the only delivery slips the company has acknowledged.
Delivery vs. promise
2026-10-01CoreWeave's capacity narrative is one of steady upward restatement on both the active and contracted lines. Active power went from 420 MW in May 2025 (4972) to 590 MW by November (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). That is roughly a 2.4x increase in twelve months, consistent with the retrospective footprint series of 70, 360 and 850 MW (3567-3569). Contracted capacity grew more slowly in percentage terms: 1.6 GW (4973), then 2.9 GW (20200), 3.1 GW (11770, 3570) and 3.5 GW (9323). The long-range framing has shifted. The 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595) was restated in May 2026 (9329) alongside a separate 8 GW active-power target for the same year (9322). The record does not explain how the two figures relate, and the larger one arrived without any visible bridge from the 3.5 GW contracted base.
The main schedule failures sit around Core Scientific. The merger's expected close slipped (4517, 4731) before the deal was terminated in October 2025 (20312, 4166), though the hosting relationship continued (20313). Within weeks, the company acknowledged weather and design delays at Core Scientific sites (19829) and a delayed OpenAI installation (19828), after earlier describing data center performance problems as isolated (19827). Those admissions are the clearest evidence that headline active-capacity figures depend on third-party delivery the company does not control. The DDTL 3.0 commitment termination date is also flagged as delayed (4593), which suggests financing timelines have stretched along with the buildout.
At the project level, the record is thin. Of eight named sites, only Lancaster (300 MW, 20201) and Indonesia (360 MW across three leased colocation facilities by end-2028, 8758, 155, 8760) carry capacity figures. Niagara Falls, Digital Drive, Polaris Forge 1, Sweden, Kenilworth and Plano remain announced with no capacity, cost or date attached. The record contains no permits, interconnection queue entries or on-the-ground reporting, so the announced pace rests entirely on company statements. The March 2026 portfolio disclosure (156) is unquantified here, and claim 17804 is truncated.
Over the next 90 days, the third-quarter print is the key test. It should show whether active capacity has moved meaningfully beyond 1 GW, whether contracted capacity has grown past 3.5 GW, and whether management reconciles the 5 GW and 8 GW targets. The other items to watch are PJM queue or local permitting activity for Lancaster, identification of the Indonesian colocation partner, any update on the Core Scientific-hosted delays, and draws under DDTL 5.0 (9121) as a proxy for actual construction spend.
Delivery vs. promise
2026-10-01CoreWeave's capacity narrative has scaled upward at every reporting point, and the compounding is real at the level of reported active power. Active capacity went from 420 MW (4972) to 590 MW (20199), then 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). The company's own year-end series of 70, 360 and 850 MW (3567, 3568, 3569) implies roughly 490 MW added during 2025. Contracted capacity rose faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3570) and 3.5 GW (9323), so the backlog of contracted but undelivered power has widened rather than narrowed. The long-range target also moved. The January framing of 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595) was joined in May by an 8 GW active-power target for the same date (9322), while the 5 GW figure was restated alongside it (9329). These may be different scopes, but the company has not clearly reconciled them. Reaching 8 GW from about 1 GW would require roughly 1.5 GW of energization per year, about three times the 2025 pace.
Date discipline is hard to test because almost none of the named sites carry capacity or delivery dates. Niagara Falls, Digital Drive, Polaris Forge 1, Sweden, Kenilworth and Plano are all listed without either. Lancaster has 300 MW but no date (20201). Indonesia is the only site-level dated commitment: 360 MW across three leased colocation facilities by end-2028 (8758, 155, 8760). Where dates did exist, they slipped. The Core Scientific merger missed its October 2025 target (4517) and was terminated (4166, 20312), with a continuing partnership offered as the replacement (20313). Within weeks, weather and design delays at Core Scientific sites (19829) and an OpenAI installation delay (19828) surfaced, after management had characterized data center underperformance as isolated (19827).
The record contains no independent corroboration: no permits, no interconnection queue positions, no utility filings, no site reporting. Every capacity figure is company-stated, and the March 2026 portfolio disclosure (156) carries no quantified breakdown in this dataset. The final claim on record (17804) is truncated and could not be assessed.
Over the next 90 days, the third-quarter report is the key checkpoint. It should show whether active capacity is growing at a rate consistent with the 8 GW goal, and whether contracted power keeps outrunning delivery. Also watch whether the 5 GW and 8 GW targets are reconciled, whether the Indonesia colocation provider and sites are named, whether Lancaster appears in PJM queue or local permitting records, and whether the Vera Rubin deployments (10341, 17621) are tied to specific energized sites.
Delivery vs. promise
2026-10-01CoreWeave's capacity story is one of steady upward revision on both the active and contracted lines, with a widening gap between them. Active power has climbed from 420 MW (claim 4972) to 590 MW (20199), 850 MW at year-end 2025 (3553, 11769), and past 1 GW by May 2026 (9321). That is real, compounding growth: roughly 490 MW was added in calendar 2025 against 290 MW in 2024 (3552). Contracted power has grown faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3554), and 3.5 GW (9323). The undeployed backlog therefore expanded from about 1.2 GW to roughly 2.5 GW over the year. The 2030 framing has also shifted. The 5+ GW of AI factories tied to NVIDIA (17595, 9329) now sits beside an 8 GW active-power target (9322). Reaching 8 GW implies adding about 1.5 GW a year from here, which is roughly three times the demonstrated 2025 pace.
The date record is weaker than the capacity record. The Core Scientific merger, expected to close by October 2025 (4517), was terminated on 30 October (4166, 19825) and replaced by a continuing partnership (20313). Within weeks, management's description of data center underperformance as isolated (19827) was followed by acknowledged OpenAI installation delays and Core Scientific weather and design setbacks (19828, 19829). The DDTL 3.0 commitment window (4593) is flagged as delayed. None of the later capacity disclosures revisit these slips explicitly.
Independent corroboration is thin. Of the eight projects on record, none carries a filed capacity or cost figure. Lancaster's 300 MW (20201) and Indonesia's 360 MW by 2028 (8758, 155) are the only site-level numbers. Both are company-stated, and Indonesia is explicitly a leased colocation arrangement (8760), which shifts execution risk to an unnamed provider. We have no permits, interconnection queue positions, or on-the-ground reporting linking the 3.5 GW contracted figure to specific energized sites.
Over the next 90 days, the third-quarter disclosure is the key test. Active capacity should land meaningfully above 1.2 GW if the 8 GW path is credible. Any further slip in Core Scientific-hosted deliveries would signal that the late-2025 delays were not isolated. Other markers to watch are utility or PJM filings for Lancaster, naming of the Indonesian colocation partner, and evidence that the Vera Rubin deployments (10341, 17621) are energized rather than merely validated.
Delivery vs. promise
2026-10-01CoreWeave's capacity story is one of steady upward restatement, with almost no project-level detail beneath it. Active power rose from 420 MW (claim 4972) to 590 MW (20199), then to 850 MW at year-end 2025 (3569, 11769), and past 1 GW by May 2026 (9321). That pace is consistent with the reported year-end footprint series of 70, 360 and 850 MW (3567, 3568, 3569). Contracted power grew faster, from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3570) and 3.5 GW (9323). The long-range target escalated as well. The NVIDIA-linked goal of 5+ GW by 2030 (17595, 3893) was restated in May 2026 alongside a new 8 GW active-power target (9322, 9329). That target sits well above everything contracted today, so most of the 2030 ambition is not yet backed by signed power.
On timing, the record shows slippage that was conceded only after the fact. In November 2025, data center underperformance was characterized as isolated (19827). A month later, the company attributed delays to weather and design problems at Core Scientific sites (19829) and to slow installation for OpenAI (19828). The Core Scientific merger was flagged as delayed (4731, 4517) before it was terminated (20312, 4166), leaving a continuing partnership (20313) in place of owned capacity. The DDTL 3.0 commitment termination date is also marked delayed (4593).
Independent corroboration is the weakest part of the record. Of eight named projects, only Lancaster (300 MW, 20201) and Indonesia (360 MW by 2028, 8758, 155) carry any stated capacity. None carries a cost, and Polaris Forge 1 has no location attached. Indonesia is to be leased from an unnamed colocation provider (8760). Nothing in the record ties any site to a permit, an interconnection queue position or on-the-ground reporting, so the aggregate megawatt figures cannot yet be reconciled against physical builds. The final claim in the record (17625) arrived truncated and could not be assessed.
Over the next 90 days, the Q3 2026 report is the key test. It will show whether active capacity has moved meaningfully beyond 1 GW and whether contracted power has grown past 3.5 GW or plateaued. Beyond the report, watch for site-level disclosure at Lancaster, Kenilworth, Plano and Niagara Falls, for the naming of the Indonesian colocation partner, and for evidence that Vera Rubin deployments (10341, 17621) are reaching revenue-generating halls rather than validation stages.
Delivery vs. promise
2026-09-29CoreWeave's disclosed footprint has grown steadily. It has not shrunk at any point in the record, but the gap between contracted and energized power keeps widening. Active capacity went from 420 MW in May 2025 (claim 4972) to 590 MW in November (claim 20199), 850 MW at year-end 2025 (claims 11769, 3553), and past 1 GW by May 2026 (claim 9321). That is roughly 580 MW added in twelve months. Over the same period, contracted power more than doubled, from 1.6 GW (claim 4973) through 2.9 GW (claim 20200), 3.1 GW (claim 11770), and 3.5 GW (claim 9323) to 4.2 GW in August 2026 (claim 22017). About 3.2 GW is now contracted but not active, compared with roughly 1.2 GW a year earlier. The long-range target has also moved up. The January framing was 5 GW of AI factories with NVIDIA by 2030 (claims 17595, 3893). By May it had become 8 GW active by 2030 (claim 9322), a figure that implies a build rate several times anything demonstrated so far.
Date discipline is mixed. The Core Scientific merger missed its expected close (claim 4517) and was terminated (claim 4166), leaving a continuing partnership (claim 20313). The company described data center performance as isolated in November 2025 (claim 19827). Five weeks later it acknowledged weather and design delays at Core Scientific sites and a slipped OpenAI installation (claims 19829, 19828), which amounts to a revision without much explicit acknowledgement. Several tuck-in acquisitions closed after their initially indicated dates (claims 3587, 3588, 3589), and the DDTL 3.0 commitment window is flagged as delayed (claim 4593).
Independent corroboration is thin. Of eight named projects, only Lancaster (300 MW, claim 20201) and Indonesia (360 MW across three leased colocation sites by 2028, claims 8758, 8760) carry any capacity figure. None of the eight has permit filings, interconnection queue entries, or site imagery on record. The announced pace therefore rests almost entirely on company statements and financing activity (claims 11225, 9121, 8736). The claims record supplied ends mid-entry at claim 17625.
Over the next 90 days, the third-quarter report should show whether active capacity has moved meaningfully beyond 1 GW, and whether the 4.2 GW contracted figure has grown again without a matching step-up in energized power. Lancaster warrants a check for PJM queue positions and local land-use approvals. For Indonesia, the question is whether the colocation lessor is named. For Vera Rubin (claims 10341, 17621), watch for any disclosure of where the multi-location deployment is actually running, and whether the Meta commitment (claims 17654, 17655) is tied to specific sites.
Delivery vs. promise
2026-09-29CoreWeave's capacity story is one of steady operational growth running beneath a much faster-growing contracted and aspirational layer. Active power has moved from 70 MW at end-2023 (3551) to 360 MW at end-2024 (3552), 420 MW by May 2025 (4972), 590 MW by November (20199), 850 MW at end-2025 (3553, 11769), and past 1 GW by May 2026 (9321). That is real and roughly linear, adding something like 500 to 650 MW a year. Contracted power has compounded faster: 1.6 GW (4973), 2.9 GW (20200), 3.1 GW (11770, 3554), 3.5 GW (9323), and 4.2 GW by August 2026 (22017). The gap between signed and energized capacity is widening in absolute terms. The 2030 ambition also escalated quietly. It was framed as 5+ GW of AI factories with NVIDIA in January 2026 (17595, 3893), then restated alongside an 8 GW active-power target only three months later (9322, 9329). Reaching 8 GW from roughly 1 GW implies sustaining two to three times the historical annual build rate.
On timing, the record contains few hard facility dates to test. The clearest slippage is adjacent rather than site-specific. The Core Scientific merger missed its expected close (4517) and was terminated (4166, 19825), with the partnership continuing (20313). The company acknowledged weather and design delays at Core Scientific sites and an OpenAI installation delay in December 2025 (19829, 19828), after characterizing performance issues as isolated a month earlier (19827). The Indonesia commitment of 360 MW by end-2028 (8758, 155) rests on leased colocation space (8760), which shifts delivery risk to an unnamed provider.
Independent corroboration is thin. Every claim here is company-stated. All eight listed projects remain at announced status with no recorded capacity or cost, apart from a 300 MW figure for Lancaster (20201). No permits, interconnection-queue positions, or site reporting in this record confirm the pace. The UK commitment of £2.5 billion (20202) is not tied to any named site, and Polaris Forge 1 lacks a location.
Over the next 90 days, the third-quarter report should show whether active power has cleared roughly 1.2 to 1.3 GW, which would keep the historical pace intact. Other signals to watch are whether contracted capacity rises above 4.2 GW, and whether the 8 GW target is repeated or softened. Further checks are PJM queue or county permitting activity for Lancaster, disclosure of the Indonesian colocation partner, and evidence that Vera Rubin deployments (10341, 17621) are landing at named sites rather than in aggregate figures. Note that the supplied record ends mid-entry at claim 17625, so the latest August disclosures may be incomplete.
Delivery vs. promise
2026-09-29CoreWeave's headline numbers have only moved up. Active power grew from 70 MW at end-2023 (3551) to 360 MW at end-2024 (3552), 590 MW by November 2025 (20199), 850 MW at end-2025 (3553, 11769), and past 1 GW by May 2026 (9321). Contracted power has grown faster: 1.6 GW (4973), 2.9 GW (20200), 3.1 GW (11770, 3559), 3.5 GW (9323), and most recently 4.2 (17625; the record is truncated, and the unit is presumably GW). So the backlog of contracted but undelivered power has widened in absolute terms, from roughly 1.2 GW to about 3 GW. The long-range target has also grown. The NVIDIA-linked goal of 5+ GW of AI factories by 2030 (3893, 17595, 9329) was joined in May 2026 by an 8 GW active-power target for the same date (9322). The company has not explained how the two figures relate. Reaching 8 GW from roughly 1 GW would take about 1.5 GW of energization per year, three times the roughly 490 MW added in calendar 2025.
The record contains almost no site-level dates to test. The one dated project commitment, 360 MW across three leased Greater Jakarta facilities by end-2028 (155, 8758, 8760), is recent and still unfalsifiable. Lancaster's 300 MW (20201) has no delivery date. Niagara Falls, Richmond, Kenilworth, Plano, Stockholm and Polaris Forge 1 carry no capacity or cost at all. The slippage that has surfaced is attributed to third parties: weather and design delays at Core Scientific sites and a delayed OpenAI installation (19829, 19828), which management called isolated (19827). That assurance came just after the Core Scientific merger collapsed (20312, 4166), leaving CoreWeave dependent on that partner as a landlord rather than an owner (20313). The DDTL 3.0 commitment window also carries a delayed flag (4593).
No independent corroboration is on file. There are no permits, no interconnection-queue positions in PJM, NYISO or ERCOT, and no ground reporting for any named site. The March 2026 portfolio disclosure (156) and the August active-capacity figure (17811) carry no values. The pace is therefore supported only by company statements.
Over the next 90 days, the Q3 2026 report should show whether active capacity kept pace with the jump to 4.2 in contracted power, and whether the 5 GW and 8 GW targets are reconciled. Watch for megawatt figures and energization dates on the US campuses, especially Lancaster, and for queue or utility filings that match them. Also watch for the name of the Jakarta colocation partner and its first phase, and for any updated language on the delayed Core Scientific sites.
Delivery vs. promise
2026-09-29CoreWeave's headline capacity has grown quickly, but contracted capacity has grown faster than delivered capacity. Active power went from 420 MW in May 2025 (4972) to 590 MW in November (20199), 850 MW at year-end 2025 (3553, 11769), and past 1 GW by May 2026 (9321). Contracted power rose from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (3554, 11770), 3.5 GW (9323) and 4.2 GW by August 2026 (22017). The absolute gap between contracted and energized capacity has widened from about 1.2 GW to more than 3 GW. The 2030 ambition has also grown. The January framing was 5+ GW of AI factories with NVIDIA (3893, 17595). In May the company added an 8 GW active-power target (9322) alongside it (9329). That doubles the energized base roughly eightfold in under five years.
Dates at the corporate level have not held well. The Core Scientific merger was guided to close by October 2025 (4517), carried forward (4731), and then terminated on 2025-10-30 (4166, 19825, 20312), with only a continuing partnership (20313). Within weeks the company cited weather and design delays at Core Scientific sites (19829) and a delayed OpenAI installation (19828), while describing the problems as isolated (19827). The DDTL 3.0 commitment termination date (4593) is also flagged as delayed. The tuck-in acquisitions carry slipped target dates (3587, 3588, 3589), though they have little bearing on physical delivery.
At the site level, the record is thin. Only Lancaster (300 MW, 20201) and Indonesia (360 MW across three leased colocation facilities by end-2028, 8758, 155, 8760) have stated capacity. Niagara Falls, Digital Drive, Kenilworth, Plano, Stockholm and Polaris Forge 1 have no capacity, cost or dated milestone. The UK commitment (20202) is expressed in pounds, not megawatts. Nothing in this record independently corroborates the announced pace: there are no permits, interconnection queue positions or on-site reporting. Every figure here is company-sourced. The claim list provided was also truncated after 17625.
In the next 90 days, watch the Q3 results for the active-capacity print against the 1 GW baseline, and for whether contracted power holds at 4.2 GW or is restated. Look for PJM queue or local permitting activity at Lancaster, and for named colocation partners and energization dates in Jakarta. Check whether the Vera Rubin deployments (10341, 17621) show up as live capacity rather than bring-up milestones. Finally, look for any disclosure on whether the DDTL 3.0 commitment window was extended or allowed to lapse.
Delivery vs. promise
2026-09-27CoreWeave's capacity story has only moved upward, and the gap between contracted and energized power is widening. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 2.9 GW that November (20200), 3.1 GW at year-end (11770, 3570), 3.5 GW in May 2026 (9323) and 4.2 GW by August (17625). Active power rose more slowly, from 360 MW at end-2024 (3552) to 590 MW (20199), 850 MW at end-2025 (3553, 11769) and just over 1 GW in May 2026 (9321). The August active figure (17811) carries no number in the record. The long-range goal has also been raised without much comment. In January the company framed it as 5+ GW of AI factories with NVIDIA by 2030 (17595, 3893), and in May it restated that alongside an 8 GW active-power target for the same date (9322, 9329). Reaching 8 GW would mean multiplying today's energized base roughly eightfold in about four years. The historical run-rate of 70 to 360 to 850 MW (3551–3553) is steep, but it has not come close to that.
Date discipline is mixed. The Core Scientific merger, expected to close by October 2025 (4517), was terminated on October 30 (4166, 19825). Claim 4731 still carries a delayed April 2026 date, which suggests the record was never cleanly reconciled. On November 10 the company described facility underperformance as isolated (19827). Five weeks later it disclosed Core Scientific weather and design delays and a delay in installing OpenAI infrastructure (19828, 19829). That is the clearest case of guidance being revised without the earlier framing being acknowledged. The DDTL 3.0 commitment date (4593) and several small acquisition closings (3577, 3578, 3579) also slipped, though these matter less for physical delivery.
There is no independent corroboration in this record. It contains no permits, no interconnection queue entries and no site reporting. Only two named projects carry a site-level figure: Lancaster at 300 MW (20201) and Indonesia at 360 MW by 2028 (8758, 155). Indonesia is leased from a colocation provider (8760) rather than self-built. Niagara Falls, Richmond, Kenilworth, Plano, Stockholm and Polaris Forge 1 have no capacity or cost figures at all.
Over the next 90 days, the key test is whether third-quarter results put a number on active power and show it clearly above 1 GW. Other things to watch are PJM queue or local permitting activity for Lancaster, identification of the Indonesian colocation partner, any update on the Core Scientific sites, and whether the Vera Rubin deployments (10341, 17621) turn into energized megawatts rather than further contracted ones.
Delivery vs. promise
2026-09-27CoreWeave's headline capacity has grown steadily and without reversals. Active power rose from 420 MW in May 2025 (claim 4972) to 590 MW by November (20199), 850 MW at year-end 2025 (11769, 3569), and past 1 GW by May 2026 (9321). Contracted power grew from 1.6 GW (4973) to 2.9 GW (20200), 3.1 GW (11770, 3554), and 3.5 GW (9323). Contracted capacity has stayed at roughly three and a half times active capacity throughout. That means energization is keeping up with new contracting but not reducing the backlog. The long-range framing has also moved. The January 2026 target of 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595, repeated in 9329) was joined in May by an 8 GW active-power target for the same date (9322). The company did not reconcile the two. Reaching 8 GW would require adding roughly 1.75 GW a year, against about 490 MW added in calendar 2025 and around 150 MW in early 2026.
The record contains few site-level dates to test. The clearest slip was corporate rather than physical. The Core Scientific merger, expected by October 2025 (4517), was terminated on October 30 (4166, 20312), with a hosting partnership continuing (20313). Weeks later, claims 19829 and 19828 cite weather and design delays at Core Scientific sites and a delayed OpenAI installation. These came shortly after management described data center performance issues as isolated (19827). Those delays have not been tied to a revised delivery date anywhere on record. The Indonesia plan for 360 MW across three Greater Jakarta facilities by end-2028 (155, 8758) relies on leased colocation space (8760). That lowers construction risk but ties the timeline to a partner that has not been named.
Independent corroboration is thin. The eight projects on file are all listed as announced, with no capacity or cost fields. Lancaster's 300 MW (20201) and the £2.5 billion UK commitment (20202) are the only site-level figures. The record contains no permits, interconnection-queue entries, or on-the-ground reporting. The announced pace therefore rests entirely on company disclosure.
Over the next 90 days, the third-quarter report is the key checkpoint. Watch whether it states active and contracted figures, since the August 11 claims (17804, 17811) carry none. Watch also whether it restates or quietly drops the 8 GW target, and whether it discloses dates for the delayed Core Scientific-hosted capacity. Also watch for PJM queue or local permitting activity at Lancaster, the naming of the Jakarta colocation partner, and evidence that Vera Rubin bring-up (17621, 10341) is converting into revenue-generating capacity.
Delivery vs. promise
2026-09-27CoreWeave's capacity story has expanded steadily in headline terms, but the gap between what is contracted and what is energized has widened. Active power rose from 420 MW (claim 4972) to 590 MW (20199), then to 850 MW at year-end 2025 (3569, 11769), and passed 1 GW by May 2026 (9321). Contracted power grew faster: 1.6 GW (4973), 2.9 GW (20200), 3.1 GW (3559, 11770), 3.5 GW (9323) and 4.2 GW by August 2026 (17625, 18935). The backlog of contracted but undelivered power therefore went from roughly 1.2 GW to more than 3 GW in about fifteen months. The long-range target moved in the same direction, from 5+ GW of AI factories with NVIDIA by 2030 (17595, 9329) to an 8 GW active target (9322). Reaching 8 GW would require roughly 1.5 GW of energization per year, about three times the roughly 490 MW added in calendar 2025 (3568, 3569).
Timing discipline is mixed. The Core Scientific deal, which would have brought owned powered land, was expected to close around October 2025 (4517) and was terminated instead (4166, 19825). Weather and design delays at Core Scientific sites and a slipped OpenAI installation followed (19829, 19828), after management had described data center underperformance as isolated (19827). Several acquisition dates in the record are flagged as delayed (3587, 3588, 3589), but these look more like reconciliation artifacts than operational slippage. The DDTL 3.0 commitment date (4593) is also flagged as delayed without any stated revision.
The record contains no independent corroboration: no permits, no interconnection queue positions, and no site reporting. Most named projects carry no disclosed capacity or cost. Lancaster is the exception at 300 MW (20201), but with no delivery date. Indonesia is specified at 360 MW by end-2028 (8758, 155), and it is leased colocation (8760) rather than self-built, which lowers execution risk but also reduces control.
Over the next 90 days, the Q3 print is the key test. Watch whether active capacity grows meaningfully beyond the 1 GW mark or whether contracted power keeps outrunning it. Also watch for utility interconnection filings or local permits at Lancaster, Kenilworth and Niagara Falls, the name of the Indonesia colocation partner, the status of DDTL 3.0 after its July 2026 commitment date, and whether the Vera Rubin deployments (10341, 17621) show up as energized megawatts rather than validation milestones.
Delivery vs. promise
2026-09-26CoreWeave's capacity story has expanded steadily in every headline metric while the facility-level record stays thin. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 3.1 GW by February 2026 (claims 11770, 3570), 3.5 GW in May (claim 9323), and 4.2 GW by August (claims 18935, 17625). Active power has grown more slowly: 360 MW at end-2024, 850 MW at end-2025 (claims 3568, 3569), and past 1 GW in May 2026 (claim 9321). The 2030 ambition has been restated upward. It began as 5+ GW of AI factories with NVIDIA (claims 17595, 3893), and by May it sat alongside a separate 8 GW active-power target (claims 9322, 9329). That target was raised without any accompanying change to the disclosed site list. The gap between contracted and energized capacity is now roughly four to one, and it has widened rather than narrowed.
Timing credibility is mixed. The one hard near-term date is the 1.85 GW active target for end-2026 (claim 8666). Reaching it from just over 1 GW in May means energizing more capacity in about seven months than the company added in all of 2025. The history of this company's promised dates does not favor an easy reading. The Core Scientific merger slipped past its original date (claims 4517, 4731) and was then terminated (claims 19825, 4166). In November 2025, performance problems were characterized as isolated (claim 19827). A month later came an OpenAI installation delay and Core Scientific weather and design delays (claims 19828, 19829). The DDTL 3.0 commitment window is also flagged as delayed (claim 4593).
Independent corroboration is essentially absent from this record. None of the eight named projects, including Kenilworth, Lancaster, Plano, and Niagara Falls, carries a disclosed capacity, cost, or date. No permits, interconnection-queue entries, or site reporting are attached. The newest project, Indonesia, is 360 MW across three leased colocation sites by 2028 (claims 8758, 8760). That structure depends on a partner's build schedule, not CoreWeave's own. The aggregate figures therefore rest entirely on company statements.
Over the next 90 days, the key test is the Q3 active-power print. Anything well below roughly 1.4 GW would make the 1.85 GW year-end target hard to reach. Also watch whether the Indonesia colocation partner and specific sites are named, whether Vera Rubin deployments (claims 17621, 10341) produce customer-visible capacity, and how quickly DDTL 5.0 is drawn (claim 9121). Watch too for utility or county filings that tie any of the named US campuses to real megawatts.
Delivery vs. promise
2026-09-26CoreWeave's contracted power has grown quickly and on a steady cadence. It went from 1.6 GW in May 2025 (claim 4973) to 3.1 GW in the February–March 2026 filings (claims 11770, 3570), then 3.5 GW in May (claim 9323) and 4.2 GW by mid-August (claims 18935, 17625, 8522). Active capacity has grown more slowly. The stated footprint rose from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (claims 3551–3553), and passed 1 GW in May 2026 (claim 9321). The gap between contracted and energized power is therefore widening, from roughly 1.2 GW to more than 3 GW. The long-range target has also changed. It was framed as 5+ GW of AI factories with NVIDIA by 2030 (claims 3893, 17595, 9329), and by May it had become an 8 GW active-power target (claim 9322). CoreWeave has not explained how the two figures relate.
On timing, the facility record shows little slippage the company has acknowledged, but several signs of strain. The Core Scientific merger, which was expected to close around October 2025 (claim 4517), was terminated instead (claims 19825, 4166). Late 2025 brought an OpenAI installation delay and weather and design delays at Core Scientific sites (claims 19828, 19829). An earlier characterization of data-center underperformance as isolated (claim 19827) now reads as premature. The DDTL 3.0 commitment window is flagged as delayed (claim 4593). The 1.85 GW active-power target for 2026 (claim 8666) is the first near-term delivery commitment that can be tested. Reaching it requires energizing roughly 800 MW in the second half of the year, which is about the same as the entire 2025 build.
The record contains no independent evidence, such as permits, interconnection-queue filings, or site reporting, for any named project. All eight projects remain at announced status with no disclosed capacity or cost. The Indonesia plan for 360 MW across three Greater Jakarta sites by 2028 (claims 8758, 155) depends on leased colocation (claim 8760), which moves execution risk to a partner that has not been named. The August active-power disclosure (claim 17811) carries no figure in our record, and the record ends partway through claim 8523.
Over the next 90 days, the Q3 print is the main test. It should show whether active capacity is tracking toward 1.85 GW or whether that target is quietly re-baselined. Other things to watch are identification of the Indonesian colocation partner, evidence of Vera Rubin capacity actually energized rather than validated (claims 10341, 17621), and drawdown pace on the DDTL 5.0 facility (claims 9121, 8736).
Delivery vs. promise
2026-09-26CoreWeave's headline numbers have only moved in one direction, but contracted power has grown much faster than power actually energized. Active capacity went from 420 MW (claim 4972) to 850 MW at year-end 2025 (claims 3569, 11769), then past 1 GW by May 2026 (claim 9321). Over the same stretch, contracted power went from 1.6 GW (claim 4973) to 3.1 GW (claims 3570, 11770), 3.5 GW (claim 9323) and 4.2 GW by August (claims 18935, 8522). The ratio of contracted to active capacity has therefore widened from roughly 3.8x to about 4x, and the 2030 framing has changed as well. The January statement of 5+ GW of AI factories with NVIDIA (claims 3893, 17595) was restated in May next to a separate 8 GW active-power target for 2030 (claims 9322, 9329). The company has not publicly explained how the two figures relate.
The company's timeline record is weaker than its capacity record. The Core Scientific merger was expected to close by October 2025 (claim 4517) and was terminated on October 30 (claims 4166, 19825). That removed an owned-capacity path the company had leaned on. In November, CoreWeave described data center underperformance as isolated (claim 19827). A month later, it disclosed an OpenAI installation delay and weather and design delays at Core Scientific sites (claims 19828, 19829). The DDTL 3.0 commitment window is also flagged as delayed (claim 4593). None of these slips came with a restated site-level schedule.
The record contains no independent corroboration. None of the eight named projects, including Lancaster, Plano, Kenilworth, Niagara Falls and Polaris Forge 1, has a disclosed capacity or cost, and no permits, interconnection-queue entries or construction reporting are logged against them. The Indonesia plan of 360 MW across three sites by 2028 (claims 8758, 155) relies on leased colocation (claim 8760), so its pace depends on a partner the company has not named.
Over the next 90 days, the main test is the 1.85 GW active target for year-end 2026 (claim 8666). Going from just over 1 GW in May to that figure means adding more capacity in seven months than the company added in all of 2025. Third-quarter results should show whether that pace is holding. Other things to watch are a reconciliation of the 5 GW and 8 GW figures, identification of the Indonesian colocation partner, and any utility or queue filings that attach megawatts to the named U.S. sites.
Delivery vs. promise
2026-09-25CoreWeave's disclosed capacity has scaled consistently, and faster in contracts than in energized power. Active power rose from 70 MW at end-2023 (claim 3567) to 360 MW at end-2024 (claim 3568) and 850 MW at end-2025 (claims 3569, 11769), then passed 1 GW by May 2026 (claim 9321). Contracted power grew faster still: 1.6 GW (claim 4973), then 3.1 GW (claims 11770, 3559), 3.5 GW (claim 9323), and 4.2 GW by August (claims 18935, 17625). The gap between contracted and active capacity therefore widened from roughly 1.2 GW to more than 3 GW. The backlog is growing faster than the build. The long-range framing also shifted. The earlier target was 5+ GW of AI factories with NVIDIA by 2030 (claims 3893, 17595, 9329). The newer one is 8 GW of active power by 2030 (claims 9322, 8534, 8574). The company presents these as parallel goals, not a revision, but the larger figure is now the headline.
On dates, the facility record holds up better than the corporate-transaction record. The Core Scientific merger missed its stated October 2025 target (claim 4517) and was then terminated (claim 4166). That removed a path to owned power that the contracted figures may have partly assumed. The DDTL 3.0 commitment date is also flagged as delayed (claim 4593). No facility-level dated promise has visibly slipped. However, the 2026 year-end target of 1.85 GW (claims 8666, 8533) was raised by 150 MW mid-year (claim 8582). Hitting it requires energizing about 1 GW in a single year, roughly double 2025's increment of about 490 MW.
Independent corroboration is thin in this record. None of the eight named projects carries a disclosed capacity, cost, permit, or interconnection-queue reference. Indonesia's 360 MW across three Greater Jakarta sites by 2028 (claims 8758, 155) rests on leased colocation space (claim 8760) with no named operator or site. Polaris Forge 1's 400 MW contracted figure (claim 370) lacks a location in the project record. The supplied claim list is also truncated after claim 8574, so later entries may change this picture.
Over the next 90 days, watch the Q3 active-power figure. Anything materially below about 1.4 GW would put the 1.85 GW year-end target in doubt. Watch also for Vera Rubin deployments moving from bring-up (claim 17621) to multi-site production (claim 10341), for draw-down on the DDTL 5.0 facility (claims 9121, 8736), and for any named Indonesian colocation partner or site filing.
Delivery vs. promise
2026-09-25CoreWeave's capacity story has expanded steadily, with no retreat on the record. Contracted power has grown from 1.6 GW (claim 4973) to 3.1 GW (claims 11770, 3559), then 3.5 GW (claim 9323), and 4.2 GW by August 2026 (claims 18935, 8522). Active capacity has followed a similar path: 360 MW at end-2024, 850 MW at end-2025 (claims 3568, 3569), and more than 1 GW by May 2026 (claim 9321). The year-end 2026 target now sits at 1.85 GW (claims 8533, 8666) after a 150 MW upward revision (claim 8582). The long-range ambition has grown too. The NVIDIA-linked 5+ GW by 2030 (claims 17595, 9329) now sits alongside a broader 8 GW active target (claims 9322, 8534). That 8 GW figure is roughly double today's contracted base, so most of it is not yet backed by signed power.
On timelines, the headline capacity dates have not yet come due, so they cannot be judged as held or missed. The corporate calendar is weaker. The Core Scientific merger slipped past its October 2025 target (claim 4517) and was terminated weeks later (claim 4166). Several tuck-in acquisitions are flagged as delayed against their original dates (claims 3587, 3588, 3589). The DDTL 3.0 commitment date is also marked delayed (claim 4593). The Core Scientific collapse matters most for delivery, because it removed a path to owned capacity. Yet later contracted-power figures show no visible step-down or reconciliation, which suggests the gap was filled by leases that are not itemised.
The record contains no independent corroboration: no permits, no interconnection queue positions, no on-site reporting. Every named campus except Indonesia and Polaris Forge 1 carries no disclosed capacity or cost. Indonesia's 360 MW by 2028 (claims 8758, 155) is leased from an unnamed colocation provider (claim 8760). Polaris Forge 1's 400 MW (claim 370) has no location attached. Claims 156 and 17811 reference portfolio and active-capacity figures without values. For now the pace rests entirely on company disclosure.
Over the next 90 days, watch the Q3 active-capacity print. Reaching 1.85 GW by December requires adding roughly 800 MW in about seven months from the May baseline, well above the 2025 run rate. Also watch whether the Indonesia colocation partner is named, whether the Vera Rubin multi-site deployments (claims 10341, 17621) come with site-level megawatts, and whether DDTL 5.0 drawdowns (claims 9121, 8736) map to specific campuses. The strongest confirmation would be utility or state filings for Lancaster, Kenilworth, or Plano.
Delivery vs. promise
2026-09-25CoreWeave's capacity story has grown quickly, and the company says it is bound by contracts rather than aspiration. Contracted power has nearly tripled in fifteen months, from 1.6 GW (claim 4973) to 3.1 GW (claims 11770, 3570), then 3.5 GW (claim 9323), then 4.2 GW (claims 18935, 8522). Active power has kept pace. The company reports footprint of 70 MW at end-2023, 360 MW at end-2024 and 850 MW at end-2025 (claims 3567-3569), and it passed 1 GW by May 2026 (claim 9321). Headline ambitions have also moved up. The January framing was 5+ GW of AI factories with NVIDIA by 2030 (claims 17595, 3893), and by May it was 8 GW of active power by 2030 (claims 9322, 8534). The two figures are not strictly contradictory, but the second is the one to hold the company to. The near-term 2026 target was raised 150 MW to 1.85 GW (claims 8582, 8533). That is a rare upward revision, and it is paired with a statement that near-term capacity is sold out (claim 1494).
On timelines, facility-level slippage is harder to judge than corporate slippage because almost nothing on record carries a site-specific date. None of the eight named projects has a stated capacity or cost in the project records. The only site-level figures are Indonesia's 360 MW across three leased facilities by end-2028 (claims 8758, 155, 8670, 8760) and 400 MW contracted at Polaris Forge 1 (claim 370). The most material deviation is the Core Scientific merger. It was flagged delayed (claims 4731, 4517) and then terminated (claim 4166). That removed a path to owned, powered sites and left the growth plan dependent on leased and colocation capacity. The DDTL 3.0 commitment date is also marked delayed (claim 4593), though that is a financing term rather than a build date.
Independent corroboration is absent from this record. There are no permits, no interconnection-queue entries and no on-the-ground reporting for Niagara Falls, Richmond, Lancaster, Kenilworth, Plano or Stockholm. The announced pace therefore rests on company disclosure. Note also that the claim list supplied here was truncated after claim 8574, so later entries were not assessed.
Over the next 90 days, the key test is the Q3 active-power print against the 1.85 GW year-end target. Reaching it requires adding roughly 850 MW in about eight months from the May baseline, faster than anything the company has yet shown. Also watch for the naming of the Indonesian colocation partner and a first-phase energization date, for Vera Rubin capacity actually going live beyond validation (claims 10341, 17621), and for any PJM or ERCOT queue filings that tie the Lancaster or Plano sites to real megawatts.
Delivery vs. promise
2026-09-24CoreWeave's headline numbers have only grown. Contracted power rose from 1.6 GW (4973) to 3.1 GW (11770, 3570), then 3.5 GW (9323), then 4.2 GW by August 2026 (18935, 8522). The 2030 ambition was first framed as 5+ GW of AI factories with NVIDIA (17595, 3893, 9329). By May 2026 it had become an 8 GW active-power target (9322, 8534, 8574). Active capacity is the harder number, and it is also rising. The company reports 360 MW at end-2024 and 850 MW at end-2025 (3568, 3569), and said it passed 1 GW in May 2026 (9321). The year-end 2026 target now sits at 1.85 GW (8533, 8666), after a 150 MW raise (8582). Reaching that target means adding roughly 800 MW in about seven months, well above the roughly 490 MW added in all of 2025. The 8 GW goal is nearly double today's contracted pipeline, so much of it is not yet backed by signed power.
On timelines, the clearest slips come from transactions rather than buildings. The Core Scientific merger target moved from October 2025 (4517) to April 2026 (4731) before the deal was terminated (4166). That removed a path to owned, powered sites. The DDTL 3.0 commitment date (4593) is also flagged as delayed. At the facility level, few dated promises exist to test. Niagara Falls, Digital Drive, Kenilworth, Lancaster and Sweden carry no capacity, cost or delivery date in the record. Indonesia is the exception: 360 MW across three Greater Jakarta sites by end-2028 (8758, 155, 8670). That capacity is leased from a colocation provider (8760), not self-built. Polaris Forge 1 appears only as 400 MW contracted (370), with no location or energization date.
The record contains no independent corroboration: no permits, no interconnection queue entries, no site reporting. Every capacity figure here is company-stated. The step-ups in contracted power are plausible given the Meta commitment (17654) and the Anthropic agreement (8571), but they cannot be checked against grid or construction evidence.
Over the next 90 days, watch the third-quarter active-capacity print. Anything much below about 1.4 GW would make the 1.85 GW year-end target hard to reach. Also watch whether contracted power moves beyond 4.2 GW, and whether the Indonesia colocation partner and site permits are named. Two further signals would firm up the picture: capacity figures attached to the named U.S. campuses, and confirmation that Vera Rubin deployments (10341, 17621) are energized rather than validated. The claim list supplied here was truncated after 8574, so later claims may change this read.
Delivery vs. promise
2026-09-24CoreWeave's announced capacity has grown at every disclosure. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3567, 3568, 3569). It passed 1 GW by May 2026 (9321), and the year-end 2026 target is now 1.85 GW (8533, 8666), which was itself raised by 150 MW (8582). Contracted power has grown faster: 1.6 GW (4973), then 3.1 GW (11770, 3570), 3.5 GW (9323) and 4.2 GW (17625, 8522). The 2030 ambition also changed. It started as 5+ GW of AI factories tied to NVIDIA (17595, 9329) and is now 8 GW of active power (9322, 8534). These are different metrics, and the record does not say whether the 5 GW figure sits inside the 8 GW. One definitional wrinkle stands out: 420 MW of active power "added" (4972) is hard to reconcile with a 360 MW end-2024 footprint (3568).
Few of the facility promises carry dates, so there is little to hold them against. The dated slippage is in the M&A layer, and it matters for capacity. The Core Scientific merger was due by October 2025 (4517). It was flagged delayed (4731) and then terminated (4166). That removed a path to owned power, so the build-out rests more on leases and third-party campuses. The Indonesia plan follows that model: 360 MW across three Greater Jakarta sites by end-2028 (8758, 155), in leased colocation space (8760), with no partner or per-site split disclosed. The delayed tags on the DDTL 3.0 termination date (4593) and the software acquisitions (3587, 3588, 3589) look like amendments or date-extraction artifacts rather than delivery misses.
The record contains no independent evidence of physical progress: no permits, interconnection queue positions or site reporting. All seven named projects remain at announced status with no capacity or cost attached. The only site-level figure is 400 MW contracted at Polaris Forge 1 (370), a third-party-developed campus. Financing (11225, 9121, 8736) and customer commitments (17654, 8571, 4352) show demand and funding, not energized megawatts.
The next 90 days center on the Q3 print. Reaching 1.85 GW means adding roughly 850 MW in 2026, about the same as all of 2025. The key signals are whether the active-capacity number keeps that pace, whether the target is restated, and whether the contracted-to-active gap keeps widening. Also watch for a named Indonesian colocation partner, and for utility filings or interconnection entries at Lancaster, Kenilworth, Niagara Falls and Digital Drive. The Vera Rubin deployments (10341, 17621) should show up as disclosed megawatts, not just validation milestones.
Delivery vs. promise
2026-09-24CoreWeave's capacity story has grown on every axis, and the upward revisions are real. Contracted power has more than doubled in fifteen months, from 1.6 GW (4973) to 3.1 GW (11770, 3554), then 3.5 GW (9323), then 4.2 GW (8522, 17625). Several of those entries restate the same filing, so the true number of step-ups is four, not a dozen. Active power went from 70 MW to 360 MW to 850 MW across three year-ends (3551-3553) and passed 1 GW by May 2026 (9321). The 2030 ambition moved from 5+ GW of NVIDIA-linked AI factories (17595, 3893, 9329) to 8 GW of total active power (9322, 8534). These measure different things, so the jump is partly a change of denominator rather than a pure raise. On the near term, the year-end 2026 target of 1.85 GW (8533, 8666) was lifted by 150 MW (8582). Hitting it requires adding roughly a gigawatt in calendar 2026, about double the 2025 increment.
Date discipline is harder to judge because most capacity claims carry no deadline. Where dates exist, the record is mixed. The Core Scientific merger slipped past its expected close (4517) and was then terminated (4166). That removed an owned-site pathway the company had presented as capacity-accretive, and later guidance did not address the loss explicitly. The DDTL 3.0 commitment termination date (4593) is flagged delayed with no stated revision. The Indonesia program is the only facility disclosure with a firm horizon: 360 MW across three Greater Jakarta sites by end-2028 (8758, 155). Even there, the sites are leased from an unnamed colocation provider (8760).
Independent corroboration is thin. All seven named projects remain at announced status with no disclosed capacity or cost. The record contains no permits, interconnection queue positions, or site reporting that tie the 4.2 GW contracted figure to specific energization schedules. The Polaris Forge 1 figure of 400 MW contracted (370) is the only site-attributed megawatt number outside Indonesia. The model is leasing capacity and buying demand, and demand is well evidenced: Meta's $14.2 billion through 2031 (17655) and the claim that near-term capacity is sold out (1494). Supply-side verification lags that.
Over the next 90 days, the Q3 report should show whether active power is tracking toward 1.85 GW, which would need roughly 1.4 GW or more by quarter-end. It should also show whether the undated 'active power capacity' disclosure (17811) acquires a figure. Other things to watch are identification of the Indonesian colocation partner, any site-level filings for Niagara Falls, Lancaster, Kenilworth or Digital Drive, and any amendment or explanation of the DDTL 3.0 date.
Delivery vs. promise
2026-09-23CoreWeave's capacity story has only grown, and it has grown faster in contracted than in delivered terms. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 3.1 GW by the 2025 annual filing (claims 11770, 3554), 3.5 GW in May 2026 (claim 9323), and 4.2 GW by mid-August (claims 17625, 8522). Active power also rose, from 70 MW at end-2023 (claim 3551) to 360 MW at end-2024 (claim 3552), 850 MW at end-2025 (claim 3553), and past 1 GW by May 2026 (claim 9321). The 2030 ambition moved from a 5+ GW figure framed around NVIDIA (claims 17595, 3893, 9329) to an 8 GW active-power target (claims 9322, 8534). The gap between contracted and energized capacity is now about four to one. That makes conversion, not demand, the variable that matters.
On dates, the facility targets have mostly not reached a test yet. The corporate calendar has been less tidy. The Core Scientific merger, promised by October 2025 (claim 4517), was terminated weeks later (claim 4166). Marimo, OpenPipe and Monolith all closed past their indicated dates (claims 3587 to 3589). The DDTL 3.0 commitment window is also flagged as delayed (claim 4593). None of these were facility slips. But the pattern of targets being quietly overtaken is worth keeping in mind. The near-term test is the 1.85 GW year-end 2026 target (claims 8666, 8533), which was itself raised by 150 MW (claim 8582). Getting there from roughly 1 GW in May means adding about 850 MW in eight months. All of 2025 added roughly 490 MW.
The record contains no independent corroboration of any site. There are no permits, no interconnection queue positions, and no on-the-ground reporting. The named campuses at Niagara Falls, Kenilworth, Lancaster and Stockholm carry no disclosed capacity or cost. Polaris Forge 1's 400 MW figure is contracted, not energized (claim 370). The Indonesia plan of 360 MW across three Greater Jakarta sites by 2028 (claims 8758, 8670) rests on leased colocation space (claim 8760). That means the schedule belongs partly to an unnamed landlord.
Over the next 90 days, watch the third-quarter active-power print. Anything materially below about 1.4 GW would make 1.85 GW by December hard to reach. Also watch for the Indonesian colocation partner to be named, for utility or grid filings tied to Polaris Forge 1 and the New York and Pennsylvania sites, and for whether the 8 GW figure is restated or quietly reframed. Note that the supplied claim list ends mid-entry after claim 8466, so later disclosures may not be reflected here.
Delivery vs. promise
2026-09-23CoreWeave's announced capacity has only moved upward, and the pace has quickened. Contracted power roughly doubled from 1.6 GW (4973) to 3.1 GW (11770, 3554) within ten months, then reached 3.5 GW (9323) and 4.2 GW (17625, 8522) within six more. Active power followed a steeper curve. It went from 70 MW (3551) to 360 MW (3552) to 850 MW (3553) across three year-ends and passed 1 GW by May 2026 (9321). The 2030 ambition has also grown, from the NVIDIA-linked 5+ GW (17595, 3893) to 8 GW active (9322, 8534). That 8 GW target now sits nearly 4 GW above everything contracted, so roughly half of the 2030 goal has no identified power behind it on this record.
On dates, the facility targets have held so far. The year-end 2026 active target of 1.85 GW (8666, 8533) was raised by 150 MW (8582) rather than cut. The slippage shows up in transactions and financing. The Core Scientific merger missed its expected close (4517) and was terminated (4166), yet claim 4731 still carries an April 2026 date, which looks like a stale record rather than a live commitment. The Marimo, OpenPipe and Monolith deals are each flagged as late against their original targets (3577 through 3589). The DDTL 3.0 commitment termination date (4593) is also marked delayed, and the record contains no acknowledgement of an extension.
Independent corroboration is thin. All six named projects are listed as announced, and none has a capacity or cost field attached. The dataset contains no permits, interconnection queue positions or site reporting for Niagara Falls, Kenilworth, Lancaster or Stockholm. The 400 MW at Polaris Forge 1 (370) rests on a third-party developer's buildout. The Indonesia plan for 360 MW by 2028 (8758, 155) depends on a colocation lessor who is not named (8760). The most material outside signal is lender behaviour: successive DDTL facilities (11225, 9121, 8736) indicate that banks are underwriting the pipeline, but they do not verify physical delivery.
Over the next 90 days, the key test is the third-quarter print. Reaching 1.85 GW requires adding about 1 GW during 2026, which is more than the entire 2025 build, so active capacity in the high-1.4 GW range or above would suggest the target is on pace. Other things to watch are whether contracted capacity rises again past 4.2 GW, the naming of the Indonesian colocation partner, any permit or utility filings at Lancaster or Kenilworth, the Vera Rubin deployments (17621, 10341) moving from validation to revenue, and clarification of the DDTL 3.0 terms. Note that the claims record supplied here was cut off at claim 8466, so later entries are not reflected.
Delivery vs. promise
2026-09-23CoreWeave's announced capacity has scaled consistently upward. Contracted power roughly doubled from 1.6 GW in May 2025 (claim 4973) to 3.1 GW by the 2025 annual filing (claims 11770, 3570), then rose to 3.5 GW in May 2026 (claim 9323) and 4.2 GW by mid-August (claims 17625, 8522). Active capacity has kept pace on paper. The filing-reported footprint grew from 70 MW (claim 3567) to 360 MW (claim 3568) to 850 MW at end-2025 (claim 3569), and the company said it passed 1 GW by May 2026 (claim 9321). The long-range framing has also grown. The 5+ GW NVIDIA-linked AI factory goal (claims 3893, 17595, 9329) now sits alongside a broader 8 GW active-power target for 2030 (claims 9322, 8534, 8574). The year-end 2026 target of 1.85 GW (claims 8666, 8533) was itself raised by 150 MW in August (claim 8582). That target implies adding about as much capacity in the second half of 2026 as the company held in total at the end of 2025. This is the most demanding near-term commitment on record.
The record on dates is weaker than the record on capacity. The Core Scientific merger missed its expected close (claim 4517) and was terminated in October 2025 (claim 4166). The termination removed a path to owned, powered sites, and nothing has been announced that visibly replaces it. The tuck-in acquisitions of Marimo, OpenPipe and Monolith carry dates flagged as delayed (claims 3587, 3588, 3589). Those deals nonetheless closed and were later reported without comment on timing (claims 11775, 11776), so the slippage was never acknowledged. The DDTL 3.0 commitment window is also flagged as delayed (claim 4593).
Independent corroboration is thin. Niagara Falls, Kenilworth, Lancaster and Stockholm remain in announced status with no disclosed capacity or cost, and the record contains no permits, interconnection-queue positions or on-site reporting for them. The only site-level figures are third-party or leased capacity. Polaris Forge 1 carries 400 MW contracted (claim 370), and the three Greater Jakarta facilities are leased from a colocation provider (claims 8758, 8760) for 360 MW by 2028 (claim 155). The growth claims therefore rest mostly on company-reported aggregates rather than on verifiable project milestones.
Over the next 90 days, the third-quarter print is the key test. Watch whether active power is tracking toward 1.85 GW or whether the year-end target is quietly revised. Watch for named colocation partners and energization dates in Indonesia, and for permit or utility filings at Lancaster and Kenilworth. Watch also for evidence that Vera Rubin deployments (claims 10341, 17621) are landing in energized halls rather than in contracted capacity that has not yet been built.
Delivery vs. promise
2026-09-23CoreWeave's disclosed footprint has grown quickly and consistently. Active power rose from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3553). It then passed 1 GW by May 2026 (9321). Contracted power has risen faster. It went from 1.6 GW (4973) to 3.1 GW (11770, 3559), then 3.5 GW (9323), then 4.2 GW by August (17625, 8522). The long-range targets have also grown. The January framing of 5+ GW of AI factories with NVIDIA by 2030 (3893, 17595) now sits beside a broader 8 GW active target (9322, 8534, 8574). The two figures describe different things and should not be conflated. Nothing on record has shrunk. What has widened is the gap between contracted and energized power: about 4.2 GW signed against roughly 1 GW live.
On dates, the facility record is thin, so there is little to test. The clearest reversal is corporate, not physical. The Core Scientific merger was restated through late September 2025 (4313, 4294) and then terminated on 2025-10-30 (4166). Its earlier promised dates (4517, 4731) were never met. Marimo, Monolith and OpenPipe carry 2025 target dates flagged delayed (3577, 3578, 3579), though later filings describe them as completed. The DDTL 3.0 commitment date (4593) is also flagged delayed without a stated revision. The 2026 active-power target of 1.85 GW (8666, 8533) was raised by 150 MW in August (8582). Delivering it means adding roughly as much capacity in 2026 as in all prior years combined.
Independent corroboration is absent from this record. There are no permits, interconnection queue positions or site reporting for Niagara Falls, Kenilworth, Lancaster or Sweden, and none carries a capacity or cost figure. Indonesia is the only project with numbers: 360 MW across three leased colocation sites by 2028 (8758, 155, 8760, 8670). Polaris Forge 1 is a 400 MW contracted position at a third-party campus (370), not owned build. The August active-power disclosure (17811) and the March portfolio claim (156) carry no values. The record provided also ends mid-list, so later claims may be missing.
Over the next 90 days, the third-quarter report is the key test. It should show whether active power is tracking toward 1.85 GW, which implies well over 200 MW energized per quarter. Also watch for the Indonesia colocation partner and sites to be named, for NYISO or PJM filings tied to the New York, New Jersey and Pennsylvania sites, for energization milestones at Polaris Forge, and for any restated status on DDTL 3.0.
Delivery vs. promise
2026-09-23CoreWeave's capacity story has only grown. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (claims 3551, 3552, 3553). The company then said it had passed 1 GW in May 2026 (claim 9321). Contracted power grew even faster, from 1.6 GW in May 2025 (claim 4973) to 3.1 GW (claim 11770), 3.5 GW (claim 9323) and 4.2 GW by August 2026 (claims 17625, 8522). The long-range target changed shape along the way. In January it was 5+ GW of AI factories with NVIDIA by 2030 (claims 3893, 17595). By May it had become 8 GW of active power by 2030 (claims 9322, 8534, 8574), a larger number measured differently. That change has not been reconciled on the record. The near-term guide was raised by 150 MW to 1.85 GW for year-end 2026 (claims 8582, 8533), which reads as confidence rather than retreat.
The facility dates hold up better than the corporate ones. The Core Scientific merger, which carried an October 2025 target (claim 4517), was terminated instead (claim 4166). The DDTL 3.0 commitment termination date is flagged as delayed (claim 4593). None of the site-level timelines on record has visibly slipped, but that is partly because few have dates at all. Indonesia is the exception: 360 MW across three leased Greater Jakarta facilities by end-2028 (claims 8758, 155, 8760).
Independent corroboration is the weak point. All six named projects, including Niagara Falls, Kenilworth, Lancaster and Stockholm, sit at announced status with no disclosed capacity or cost. The record holds no permits, interconnection queue positions or on-the-ground reporting for any of them. Only Polaris Forge 1 carries a site-specific figure, 400 MW contracted (claim 370). Much of the reported growth therefore rests on company aggregates and on third-party or leased capacity, not on self-built sites a reader could check.
The first thing to watch in the next 90 days is the third-quarter disclosure. Hitting 1.85 GW means adding roughly 850 MW in the second half, about what the whole of 2025 delivered. Second, whether the August active-capacity figure (claim 17811) is published with a number attached. Third, whether the Indonesia colocation provider is named. Fourth, whether any NYISO, PJM or Swedish grid filings appear for the U.S. and Nordic sites. Finally, whether management explains how the 5 GW and 8 GW 2030 targets relate.
Delivery vs. promise
2026-09-23CoreWeave's capacity story is one of steady upward revision, told almost entirely in portfolio-level aggregates. Active power grew from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3553), then passed 1 GW by May 2026 (9321). Contracted power rose faster, from 1.6 GW (4973) to 3.1 GW (11770, 3554), 3.5 GW (9323) and 4.2 GW by August (8522, 17625). The long-range target has also grown. It was framed as 5+ GW of AI factories with NVIDIA by 2030 (17595, 3893), and later became 8 GW of active power by 2030 (9322, 8534, 8574). The company has not clearly reconciled the two, and they may measure different things. The 2026 year-end target was raised by 150 MW to 1.85 GW (8582, 8533, 8666). The company moves its targets up, not down.
On dates, facility claims rarely carry firm promise dates, so few can be tested. The slippage on record sits in adjacent commitments. The Core Scientific deal missed its 2025-10-01 target (4517) and was terminated weeks later (4166), yet claim 4731 still carries a live delayed status that should be retired. The Marimo, OpenPipe and Monolith closings (3587, 3588, 3589) also ran past their tagged dates. The DDTL 3.0 commitment window (4593) is flagged delayed too. None of these is a facility, but they show that announced timetables have not always held.
There is no independent evidence in this record. It contains no permits, no interconnection queue entries, and no site reporting. The named US and Swedish projects (Niagara Falls, Kenilworth, Lancaster, Stockholm) have no capacity or cost attached. Indonesia's 360 MW by 2028 (8758, 155) will be leased from an unnamed colocation provider (8760). Polaris Forge 1's 400 MW (370) is contracted third-party capacity. The pace is therefore supported by company disclosure and customer backlog, such as the Meta commitment (17654), rather than by physical milestones outside CoreWeave's own reporting.
Over the next 90 days, the Q3 print is the key test. Reaching 1.85 GW means adding roughly 1 GW in a single year, about double 2025's increment. The August active-capacity figure (17811) was recorded without a value. Also watch for the Indonesia colocation partner and site to be named, for energization evidence at Polaris Forge, for site-level MW on the named campuses, and for how Vera Rubin deployments (17621, 10341) and DDTL 5.0 funding (9121, 8736) map onto specific buildings.
Delivery vs. promise
2026-09-22The capacity story here scales cleanly on paper and thins out considerably when you ask what has actually been energized. Active power moved from 420 MW added against 1.6 GW contracted (claims 4972, 4973) to 850 MW active against 3.1 GW contracted at the end of 2025 (claims 11769, 11770, 3553), past 1 GW active with 3.5 GW contracted in May 2026 (claims 9321, 9323), and to 4.2 GW contracted by August (claims 17625, 8522). Note that contracted capacity has grown roughly three times faster than active capacity across that span. The 2030 goalpost also changed shape rather than simply rising: the 5+ GW figure (claims 3893, 17595, 9329) is an NVIDIA co-branded subset, while the 8 GW figure (claims 9322, 8534, 8574) is company-wide, and the two are presented interchangeably in a way that flatters the trajectory.
On dates, the clearest failure is the Core Scientific merger, promised for October 2025 (claim 4517) and reaffirmed through late September (claims 4331, 4313, 4294) before termination on 30 October (claim 4166). Contracted-capacity guidance rose afterward without any visible re-derivation of where that capacity now sits, shifting the base from owned sites toward leased and greenfield. The tuck-ins — OpenPipe, Marimo, Monolith (claims 3578, 3577, 3579) — are minor but all surfaced late in the annual filing, which says something about disclosure cadence. The DDTL 3.0 commitment termination slipping (claim 4593) into DDTL 4.0 and 5.0 (claims 11225, 9121) shows expansion financed on a rolling, roughly quarterly refinancing cycle.
Independent corroboration is where this record is weakest. All six named sites remain at announced status with no capacity or cost attached except Polaris Forge 1 at 400 MW contracted (claim 370). Nothing in the file points to a permit, an interconnection queue position, or a utility filing. Indonesia is explicitly a colocation lease (claim 8760) for 360 MW by end-2028 (claims 8758, 155), so that schedule belongs to a partner.
Over the next ninety days, the binding test is the 1.85 GW year-end target (claims 8666, 8533, 8582), which requires energizing in seven months roughly what took the prior three years. Watch the Q3 print for a quiet re-basing, watch for Vera Rubin moving from bring-up (claim 17621) to revenue, and watch Kenilworth, Lancaster and Niagara Falls for any filing that converts announced into shovels.
Delivery vs. promise
2026-09-21CoreWeave's announced capacity has scaled monotonically and without a single downward revision, which is itself the thing to interrogate. Active power moved from 420 MW (4972) to 850 MW (11769, 3553) to above 1 GW (9321), while contracted power went 1.6 GW (4973) to 3.1 GW (11770) to 3.5 GW (9323) to 4.2 GW (17625, 8522). The 2030 ambition ratcheted from a 5 GW figure framed around NVIDIA (17595, 3893, 9329) to an 8 GW active target (9322, 8534, 8574), and the two numbers now coexist in the record without reconciliation — one is a partnership envelope, one a company-wide goal, and they are not additive. The near-term target was also revised upward, not down: 1.85 GW by year-end 2026 (8666, 8533) including an explicit 150 MW increase (8582).
On dates, the clean failure is Core Scientific. Agreed with an October 2025 close (4517), re-affirmed at 0.1235 across five separate filings (4729, 4731, 4331, 4314, 4294), then terminated (4166). Notably, contracted capacity kept climbing afterward, which means the 3.1 to 4.2 GW step rests on third-party leases rather than owned sites — consistent with the colocation structure disclosed for Indonesia (8760). The tuck-in software deals flagged as delayed (3578, 3577, 3589) appear as completed in later disclosures (11775, 11776, 10329); that reads as a filing artifact rather than genuine slippage, but the record never acknowledges the reset.
Independent corroboration is thin where it matters most. The strongest external signals are financing and demand, not construction: successive DDTL facilities (4593, 11225, 9121, 8736), the Meta commitment (17654, 17655), Anthropic (8571), and the NVIDIA backstop (4352), plus hardware validation (17621, 10341). What is absent is permitting or interconnection evidence for Niagara Falls, Kenilworth, Lancaster, or Stockholm — all still carry announced status with no capacity, cost, or dated milestone. Polaris Forge 1 has a 400 MW contracted figure (370) and no energization date. Indonesia's 360 MW by end-2028 (8758, 155, 8670) has no interim milestone either.
Over the next 90 days, the arithmetic is the test: reaching 1.85 GW from roughly 1 GW in May requires the Q3 print to land near 1.4 GW. Watch also for a first date attached to any of the four dormant campuses, DDTL 5.0 sizing, and whether the 5 GW and 8 GW targets are ever squared. The claim record thins after mid-August 2026, so Q3 disclosure is the first real checkpoint.
Delivery vs. promise
2026-09-21The capacity story here is one of consistent upward revision rather than retreat, which is itself the thing to scrutinize. Contracted power has roughly tripled inside sixteen months (4973 to 11770 to 9323 to 17625), and active power has followed a similar curve off a small base (4972, 3553, 9321). Nothing has been quietly shrunk. The pressure point is the year-end 2026 figure: reaching 1.85 GW active (8533, 8666, including the 150 MW raise in 8582) requires adding roughly as much live capacity in a single half-year as the company brought online in its entire history through 2025. That is not impossible given the Vera Rubin bring-up cadence (17621), but it is the claim most likely to be settled by energization schedules rather than intent.
On dates, one promise clearly failed: the Core Scientific merger was announced with a targeted close, reaffirmed on identical terms at least four times through September, and then terminated (4729, 4517, 4294, 4166). The significance is structural, not cosmetic — the path to owned substations and owned interconnection was abandoned, so today's contracted gigawatts rest on leases and colocation. The Indonesia build is explicit about this (8760). Separately, the 2030 framing has shifted from 5+ GW of NVIDIA AI factories to 8 GW of active power (3893, 9322, 8574) without the earlier number being retired (9329); these measure different things, and the substitution has not been acknowledged as a change.
Independent corroboration is where the record is thinnest. Five named campuses remain at announced status with no disclosed capacity, and only Polaris Forge 1 carries a site-level figure (370). The corporate totals therefore cannot be reconciled bottom-up from anything on record — no permits, no queue positions, no construction reporting. The repeatedly flagged delays on small software acquisitions (3577, 3588) look like filing artifacts, not operational slippage, and should not be read as such.
For the next ninety days: whether the 1.85 GW exit target is reaffirmed or softened at Q3 results, whether contracted capacity moves past 4.2 GW while the delivered number lags, site-level permitting in Greater Jakarta against the 2028 date (8758), and whether a successor to the DDTL 5.0 facility (9121) appears, since the buildout is debt-paced.
Delivery vs. promise
2026-09-21The shape of CoreWeave's disclosure has changed more than its delivery has. Contracted power has been the headline number since the 1.6 GW figure in May 2025 (claim 4973), and it has roughly tripled through 3.1 GW (claims 11770, 3554), 3.5 GW (claim 9323) and 4.2 GW (claims 17625, 8522). Active power, the number that actually bills, moved from 360 MW to 850 MW to just past 1 GW over the same window (claims 3552, 3553, 9321). The gap between the two has widened from under fourfold to better than fourfold on a much larger base, which means the contracting book is outrunning energization rather than tracking it. That is not inherently a failure, but it converts the story from procurement to construction and interconnection, where CoreWeave has less control.
The firmest near-term commitment is 1.85 GW active by year-end 2026 (claims 8666, 8533), which was raised by 150 MW mid-year (claim 8582). Reaching it requires energizing in seven months roughly what the company energized cumulatively through 2025. The 2030 picture carries two unreconciled figures, 5+ GW of NVIDIA-linked AI factories (claims 17595, 3893, 9329) and 8 GW of active power (claims 9322, 8534, 8574), presented alongside one another without a stated relationship.
On dates, the clearest break is Core Scientific. It was repeatedly affirmed through September 2025 (claims 4729, 4331, 4314, 4294) against an October 2025 close (claim 4517), then terminated (claim 4166) — and capacity guidance rose afterward without public accounting for the owned-site pipeline that walked away. The delayed flags on OpenPipe, Marimo and Monolith (claims 3578, 3577, 3579) look like filing-date artifacts on software deals, not facility slippage, and should not be read as evidence of construction delay.
Independent corroboration is thinnest exactly where it matters. Niagara Falls, Kenilworth, Lancaster and Stockholm remain announced with no capacity or cost on record. Indonesia is leased from an unnamed colocation provider (claims 8760, 8758, 155), so its 360 MW by 2028 rests on a third party's schedule. Watch the successive DDTL facilities (claims 11225, 9121, 8736) as the real cadence signal; watch whether the 1.85 GW target and the 150 MW raise survive the next print; watch PJM and NYISO queue postings for the four unquantified sites; and note that the NVIDIA purchase commitment (claim 4352) makes "sold out" (claim 1494) weaker evidence than it appears.
Delivery vs. promise
2026-09-21The shape of this record is a contracted-capacity curve that has roughly doubled every two quarters while the delivered curve has advanced at a steadier, slower pace. Contracted power moves from 1.6 GW (4973) through 3.1 GW (11770, 3554) and 3.5 GW (9323) to 4.2 GW (8522, 8268) in about fifteen months; active power moves 360 to 850 to just past 1 GW (3552, 3553, 9321). Both are real growth, but the gap between them widened rather than closed, which is the normal signature of a company selling forward faster than it energizes. The 2030 framing also changed metric mid-stream: the 5+ GW figure originally attached to NVIDIA AI factories (17595, 3893, 9329) sits alongside an 8 GW active-power goal announced four months later (9322, 8534, 8574) without an explicit reconciliation of the two.
On dates, the largest revision is the Core Scientific transaction, which moved from an October 2025 close (4517) to an April 2026 outside date (4731) and then terminated entirely (4166). That matters less as a deal failure than as a sourcing change: the owned-site, self-interconnected path was replaced by leased and colocation capacity in Indonesia (8760) and Stockholm (7871), and the 3.1-to-4.2 GW step happened after that pivot. The smaller acquisition slips flagged for OpenPipe, Marimo and Monolith (3588, 3577, 3579) appear to be filing-date artifacts rather than execution misses and should not be read as delivery signal.
Independent corroboration is the weak link. Every capacity figure here traces to company filings or releases. Niagara Falls, Kenilworth, Lancaster, Sweden and Polaris Forge 1 remain at announced status with capacity and cost fields empty; only Polaris Forge 1 carries a number at all (370), and that is contracted rather than energized. No permit records, interconnection queue positions or site reporting appear in the record to date, so the announced pace is currently unfalsifiable from outside.
Through year-end, the checkable item is the 1.85 GW active target (8533, 8281, 8666) including the 150 MW raise (8582), which implies more than doubling active power within one calendar year. Watch third-quarter disclosure for whether that number is reaffirmed or quietly re-based, whether a further DDTL generation follows 5.0 (9121), and whether Indonesia's 2028 360 MW commitment (155, 8758) acquires any site-level or utility-side documentation.
Delivery vs. promise
2026-09-20The capacity line has moved in one direction and moved fast. Contracted power went from 1.6 GW in May 2025 (4973) to 3.1 GW by the FY2025 filing (3554, 11770), 3.5 GW in May 2026 (9323), and 4.2 GW by mid-August 2026 (8522, 8262, 8268). Active power followed the same slope (3552, 3553, 9321). What deserves attention is that the largest single step-up occurred across a period in which the company lost its biggest inorganic capacity source: the Core Scientific merger was signed in July 2025 with an October 2025 outside date (4517), extended to April 2026 (4731), and terminated in October 2025 (4166). Contracted capacity roughly doubled anyway, which means the 3.1 GW figure rests on leases and greenfield development rather than acquired megawatts, and should be read as a weaker commitment than the earlier 1.6 GW.
The 2030 goalpost was also redefined rather than missed. The January 2026 framing was 5+ GW of AI factories with NVIDIA (3893, restated at 9329), which by May 2026 had become 8 GW of active power (9322, 8534, 8574). Those are different quantities on different meters, and the substitution was not flagged as a revision. The delayed markers on Marimo, OpenPipe and Monolith (3577, 3578, 3579) look like artifacts of retroactive 10-K dating against earlier close dates rather than genuine slippage; all three appear as completed in the same filing (3548, 3549, 3550).
Independent corroboration is thin in this record. There are no permits, interconnection queue entries, or site reporting here. The only external validation is financing syndication, and it is steady: DDTL 3.0 (4593, 4594), 4.0 (11225), 5.0 (9121), then JPMorgan and MUFG arranging in August 2026 (8736). Capital is arriving on schedule; energization dates are not. Niagara Falls, Kenilworth at 250 MW (7869), Lancaster, Stockholm (7871, 7875) and Polaris Forge 1 at 400 MW (370) all remain announced with no commissioning date disclosed. Only Indonesia carries one, 360 MW by year-end 2028 (8758, 155).
Over the next ninety days the test is arithmetic. Reaching the 1.85 GW year-end 2026 target (8666, 8533, 8281) requires roughly 850 MW from the May 2026 base in seven months, against 490 MW added across all of 2025. Watch whether that target and the 150 MW raise (8582) are reaffirmed at the Q3 print or absorbed silently, and whether any named site produces a utility filing.
Delivery vs. promise
2026-09-20The capacity line has only gone one direction, and quickly. Contracted power moved from 1.6 GW (4973) to 3.1 GW (11770, 3554), then 3.5 GW (9323), then 4.2 GW (8522, 8268, 8262) inside roughly fifteen months, while active power climbed 70 to 360 to 850 MW across the 2023-2025 year-ends (3551, 3552, 3553) and crossed 1 GW in May 2026 (9321). Nothing here has shrunk. What has shifted is the framing of the terminal number: the January 2026 commitment was 5-plus GW of NVIDIA AI factories by 2030 (3893, 9329), and by May 2026 the headline had become 8 GW of active power by 2030 (9322, 8534, 8574). Those are not the same metric, and the record does not show the two being reconciled — a reader should treat the 8 GW figure as a new, larger goal rather than a restatement.
Dates have held unevenly. The clean failure is Core Scientific: an October 2025 close (4517) slipped to April 2026 (4731) and then ended in termination (4166). That matters more than the acquisition itself, because it removed the owned-power path to the very capacity curve that kept rising afterward. The subsequent build leans on leases and colocation, explicit in Indonesia (8760), which changes who controls the schedule. The smaller acquisition slippages (3577, 3578, 3579) look like disclosure-timing artifacts. The nearer-term operational promise, 1.85 GW active by year-end 2026 (8666, 8533, 8281, 7888), including a 150 MW raise (8582), implies roughly a gigawatt of additions in a single year against 490 MW the prior year.
On corroboration, the record is thin by its own construction: Niagara Falls, Kenilworth (7869, 7873), Lancaster, Stockholm and Polaris Forge 1 (370) carry announced status with no permits, interconnection queue positions, or site reporting attached. Contracted megawatts are commercial commitments, not energized ones.
Over the next 90 days, the useful checks are whether Q3 disclosure shows active power on a trajectory that can reach 1.85 GW by December 31, whether Kenilworth and Niagara produce visible local permitting and utility queue entries, whether Polaris Forge 1 reports energization against its 400 MW, whether the Indonesia 360 MW by 2028 (8758, 155) names its colocation counterparty, and whether DDTL 5.0 (9121) closes on the terms arranged.
Delivery vs. promise
2026-09-20The shape of this record is escalation, not drift. Contracted power moves from 1.6 GW (4973) through 3.1 GW (11770, 3554) and 3.5 GW (9323) to 4.2 GW (8522, 8268), while the 2030 ambition is rewritten from 5 GW (3893) to 8 GW (9322, 8534, 8574) inside roughly three months. The 5 GW figure survives alongside the 8 GW figure on the same day (9329 versus 9322), which suggests the smaller number is the NVIDIA-specific tranche rather than a retraction, but the company has not said so plainly, and readers are left to reconcile it themselves.
Against that, the single hardest-dated commitment in the file failed outright. The Core Scientific merger carried an explicit close of 2025-10-01 (4517), was extended to 2026-04-07 (4731), and was terminated on 2025-10-30 (4166) after the 0.1235 exchange ratio had been restated at least four times (4331, 4314, 4294). That matters beyond optics: Core Scientific was the powered-shell path, and its loss means the subsequent contracted-capacity growth had to be rebuilt through leases and greenfield. The smaller acquisitions show a quieter pattern — OpenPipe due 2025-09-01 (3578), Marimo 2025-10-01 (3577), Monolith 2025-11-01 (3579) all carry slipped dates, yet later disclosure presents them as done (11775, 11776, 10329) without noting the slip.
Independent corroboration is thin because the record is almost wholly self-reported. The strongest external signal is the financing cadence: DDTL 3.0 (4593, 4594), then DDTL 4.0 arrangers (11225), DDTL 5.0 (9121), and JPMorgan and MUFG as bookrunners (8736). Lenders underwriting on roughly a quarterly rhythm is real evidence of construction spend, though it is also mounting leverage. Note that Indonesia (155, 8758, 8760) and Stockholm (7875) are colocation leases, so no CoreWeave permit trail should be expected there; Kenilworth at 250 MW (7869) and Lancaster at 300 MW (7870) are greenfield and should generate municipal approvals and PJM interconnection entries. Their absence would be diagnostic.
Over the next ninety days, the test is arithmetic. Getting from just over 1 GW in May (9321) to 1.85 GW by year-end (8533, 8281), including the 150 MW raise (8582), requires adding more in seven months than in all of 2025 (3552 to 3553). Watch the Q3 print, the Kenilworth and Lancaster filings, Jakarta lease commencement against the 2028 date, and whether "sold out" (1494) and the Anthropic agreement (8571) are quantified.
Delivery vs. promise
2026-09-20The capacity line has moved in one direction and moved fast. Contracted power went from 1.6 GW (4973) to 3.1 GW (11770, 3554), then 3.5 GW (9323), then 4.2 GW (8522, 8262, 8268) inside roughly fifteen months, while the active-power series compounds cleanly at 70, 360 and 850 MW for year-ends 2023 through 2025 (3551, 3552, 3553) before crossing 1 GW in May 2026 (9321). Nothing here has shrunk. The one number worth watching for definitional drift is 2030: the 5+ GW figure (3893, 9329) is scoped to the NVIDIA AI-factory framework, while 8 GW (9322, 8574, 8534, 7889) is the total active-power ambition, and both were stated on the same day. They are not in conflict, but they are easy to conflate, and the company has not been forceful about separating them.
Dates have mostly held where they were specific, with two exceptions. The Core Scientific merger slipped from an October 2025 close (4517) to April 2026 (4731) and was then terminated outright (4166) — a material change to the capacity base that the subsequent contracted-power increases absorbed without narrative acknowledgement. Separately, the OpenPipe, Marimo and Monolith closings carry September, October and November 2025 dates (3588, 3587, 3589) that surfaced only in the March 2026 annual filing and the February 2026 announcements (11775, 11776); that is retroactive disclosure rather than slippage, and should not be scored as a missed promise.
Independent corroboration is structurally limited here because the model is increasingly leased colocation — explicitly so in Indonesia (8760) and Stockholm (7875). Interconnection queue entries and permits will sit with landlords, not CoreWeave, so Lancaster (7874) and Kenilworth are the only US sites where county filings and PJM queue positions offer a direct check. Note also that Lancaster's headline 300 MW is the option, not the commitment; the firm number is 100.
Over the next ninety days the binding test is the 1.85 GW year-end 2026 target (8533, 8281, 7888) plus its 150 MW raise (8582), which requires more additions in one half-year than all of 2025 delivered. Also watch financing cadence — DDTL 3.0 through 5.0 arrived in under a year (4593, 11225, 9121) — the naming of the Indonesian colocation partner, and any siting or date detail for Polaris Forge 1 (370) and Kenilworth, which remain capacity figures without geography or schedule.
Delivery vs. promise
2026-09-20The capacity line has moved in one direction and quickly. Contracted power ran from 1.6 GW (4973) to 3.1 GW by the FY2025 filing (3570, 11770), 3.5 GW three months later (9323), and 4.2 GW by mid-August (8522, 8262). Active power followed a similar curve, 70 MW to 360 MW to 850 MW across year-ends (3551, 3552, 3553), crossing 1 GW in May (9321) against a 1.85 GW year-end target (8533, 8281), which itself was revised up by 150 MW mid-year (8582). The 2030 anchor was rebased from 5+ GW (3893) to 8 GW (9322, 8534, 7889) without the earlier figure being retired; the NVIDIA-scoped 5 GW is still restated alongside it (9329), so the two numbers now circulate as if independent.
The date record is weaker than the capacity record. The Core Scientific merger slipped from an October 2025 close (4517) to April 2026 (4731) and was then terminated outright (4166) — yet the contracted-capacity step from 1.6 GW to 3.1 GW brackets that failure without the company reconciling how much of the earlier pipeline assumed those sites. Three tuck-ins were disclosed retroactively with completion dates already past: OpenPipe at September 2025 (3588), Marimo at October (3587), Monolith at November (3589), and the same transactions were re-announced in February and again in April (11775, 11776, 10329), which inflates apparent cadence without adding assets.
The independent trail is thin in this record. Nothing here contains a permit, interconnection position, or site visit; every capacity figure is company-sourced. That matters most where delivery is leased rather than built — Indonesia is explicitly colocation (8760), Stockholm is two colocation campuses (7875) — so the verifiable queue entries sit with landlords, not CoreWeave. Indonesia's 360 MW by end-2028 (155, 8758) equals the company's entire 2024 global footprint (3552), an unusually large first move into a new region announced only weeks ago (3013).
Over the next ninety days, the Q3 print is the test: active power against 1.85 GW, given roughly 850 MW needed in under five months. Watch whether 4.2 GW is restated upward again before the year-end number lands, whether the Indonesian colocation counterparty is named, and whether DDTL 4.0 and 5.0 close on terms (11225, 9121, 8736) — financing cadence, not demand, has been the binding constraint on this build.
Delivery vs. promise
2026-09-19CoreWeave's capacity story has moved in one direction, and quickly. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3553), then passed 1 GW by May 2026 (9321). Contracted power grew faster: 1.6 GW in May 2025 (4973), 3.1 GW by February 2026 (11770, 3570), 3.5 GW in May (9323) and 4.2 GW by August (8522, 8466). The long-range target escalated in the same way. A January figure of 5+ GW of AI factories with NVIDIA by 2030 (3893) became 8 GW of active power by 2030 in May (9322) and was restated through August (8534, 7889). None of the visible targets has been cut. The year-end 2026 goal of 1.85 GW was itself nudged up by 150 MW (8582, 8666).
The date record is less tidy, though most of the slippage sits outside facilities. The Core Scientific merger was reaffirmed repeatedly across July to September 2025 (4729, 4313, 4294) and then terminated (4166). That removed an owned-power path, and the later capacity announcements lean heavily on leased and colocation capacity instead. Indonesia is explicitly leased from a colocation provider (8760), Stockholm is two colocation campuses (7875), and Polaris Forge 1 is a 400 MW contract on a third party's campus (370). The DDTL 3.0 commitment termination date carries a delayed flag (4593) without a clear public explanation in the record. The facility-level 2030 targets have not yet been tested.
Independent corroboration is the weak point. This record contains no permits, interconnection-queue entries or site reporting for any of the five named projects. Kenilworth and Lancaster appear only as announced, with no capacity, cost or date attached. The Indonesia claim of 360 MW across three facilities by end-2028 (155, 8758) names neither the landlord nor the energization schedule. The pace is backed mainly by financing activity (DDTL 4.0 and 5.0 arrangers, 11225, 9121, 8736) and customer demand claims (1494, 8571), not by physical evidence. The source list was truncated after the Stockholm entries, so later claims may change this picture.
In the next 90 days, the key test is the Q3 report. Reaching 1.85 GW by year-end means adding roughly 800 MW in about seven months, a faster rate than any prior period. Also watch whether contracted power keeps rising while active power lags, whether the Indonesia colocation partner and phasing are disclosed, and whether PJM queue or local zoning filings emerge for Lancaster and Kenilworth.
Delivery vs. promise
2026-09-19CoreWeave's capacity story has two curves, and the gap between them is the main thing to track. Contracted power has grown faster than delivered power. It went from 1.6 GW in May 2025 (4973) to 3.1 GW in the annual filing (3570, 11770), then 3.5 GW in May 2026 (9323) and 4.2 GW by mid-August (8522, 8268). Active power has also grown quickly, from 70 MW to 360 MW to 850 MW across year-ends 2023 to 2025 (3551, 3552, 3553), and it passed 1 GW by May 2026 (9321). Still, contracted power now runs roughly four times active. The long-range framing has moved too. The January 2026 NVIDIA language spoke of 5+ GW of AI factories by 2030 (3893, reiterated in 9329). A separate 8 GW active-power target for 2030 now appears alongside it (9322, 8534, 7872), and the record does not reconcile the two figures. The near-term signal points upward. The year-end 2026 active target stands at 1.85 GW (8666, 8281), and 8582 describes this as a 150 MW increase over the prior goal. Reaching it implies adding roughly 800 MW in the back half of 2026, which would be the company's fastest delivery pace yet.
Dated commitments have a mixed record, but most of the slippage is corporate rather than physical. The Core Scientific merger missed its targets (4517, 4731) and was terminated (4166). The Marimo, Monolith and OpenPipe closings are flagged as late against their 2025 dates (3577, 3579, 3578). The DDTL 3.0 commitment window also shows a delay (4593). None of these delays was acknowledged as a slip in the claims themselves. At the facility level there is little to test yet. The only dated project commitment is Indonesia's 360 MW by end-2028 (155, 8758). Lancaster (7870), Stockholm (7871, 7875) and Polaris Forge 1 (370) carry capacity figures but no in-service dates, and the Kenilworth claim (7869) is truncated in this record.
No independent corroboration exists in this dataset. There are no permits, no PJM or utility queue entries, and no site reporting. Much of the footprint is leased, including Indonesia via a colocation provider (8760) and Polaris Forge 1 from its developer, so the evidence of physical progress will sit with landlords rather than CoreWeave.
Over the next 90 days, the Q3 report is the key checkpoint. The question is whether active power is tracking toward the 1.85 GW target (8533) or whether that target quietly softens. It also matters whether the contracted figure keeps rising faster than delivery. Other items to watch are the naming of the Indonesia colocation partner and its permits, PJM queue visibility for Lancaster and Kenilworth, energization milestones at Polaris Forge 1, and drawdowns on the DDTL 5.0 facility (9121).
Delivery vs. promise
2026-09-19CoreWeave's capacity story has grown on two separate tracks, and the gap between them is what matters. Contracted power has more than doubled in fifteen months, from 1.6 GW (4973) to 3.1 GW (11770, 3554), then 3.5 GW (9323), then 4.2 GW by mid-August 2026 (8522, 8466). Active power has also grown quickly, from 70 MW to 360 MW to 850 MW across 2023-2025 (3551-3553) and past 1 GW by May 2026 (9321). But active capacity still covers only about a quarter of what is contracted. The 2030 ambition has also changed shape. It began as a 5+ GW figure tied to NVIDIA (3893, 9329) and has since been restated as 8 GW of active power (9322, 8534, 7872). No reconciling bridge between the two figures appears in the record. The year-end 2026 target of 1.85 GW (8666, 8533, 8281) was raised by 150 MW (8582). Hitting it means adding roughly 800 MW in the back half of 2026, against about 490 MW added in all of 2025.
On dates, the facility record is thin, because most capacity claims carry no promised-by date. The clearest reversal is corporate rather than physical. The Core Scientific merger was guided to an October 2025 close (4517) and was terminated instead (4166), which removed an owned-power path the company had leaned on. The delayed flags on Marimo, OpenPipe and Monolith (3577-3579) look like closing-date bookkeeping, not missed commitments, since later filings treat those deals as done (10329). The DDTL 3.0 commitment window was extended (4593), and DDTL 4.0 and 5.0 followed in quick succession (11225, 9121, 8736). That pattern suggests financing is being rolled forward to match a build schedule that keeps expanding.
Independent corroboration is largely absent from this record. The site-level figures are Indonesia's 360 MW across three leased colocation facilities by 2028 (8758, 155, 8760), Polaris Forge 1 at 400 MW (370), and Lancaster at 300 MW (7870). None of them is paired with permits, utility interconnection filings or on-the-ground reporting. The Stockholm claims (7871, 7875) carry no capacity figure at all, and the Kenilworth entry (7869) is truncated in the data provided. Because much of the Asian and European footprint is leased, delivery depends on the landlords' schedules rather than CoreWeave's own.
Over the next 90 days, the third-quarter print is the key test. It should show whether active power is on a path to 1.85 GW or whether the target is quietly reset. Beyond that, watch for PJM queue and local zoning activity at Lancaster and Kenilworth, for identification of the Jakarta colocation partner and its permits, and for whether the drawdown pace on DDTL 5.0 tracks the energization the company is claiming.
Delivery vs. promise
2026-09-19CoreWeave's capacity story has grown faster on paper than on the ground, though the ground-level numbers are still moving quickly. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3553), and passed 1 GW by May 2026 (9321). Contracted power has grown faster. It stood at 1.6 GW in May 2025 (4973), reached 3.1 GW by early 2026 (11770, 3554), 3.5 GW in May (9323), and 4.2 GW by August (8522, 8466). The gap between contracted and energized capacity is therefore widening, not closing, from roughly 1.2 GW to more than 3 GW. The 2030 framing has also shifted. A 5+ GW figure tied to NVIDIA (3893, 9329) now sits beside a broader 8 GW active target (9322, 8534, 7872). These are not strictly contradictory, but the headline number has changed without a reconciliation.
On dates, the facility record offers little to test, because most capacity claims carry no promised-by date. The firm near-term marker is 1.85 GW active by year-end 2026 (8666, 8533, 8281). Claim 8582 describes this as a 150 MW upward revision. Hitting it requires energizing roughly 850 MW between May and December, which is more than the entire 2025 increment in about two-thirds of the time. The slippage that is documented sits on the corporate side. The Core Scientific merger was flagged against an October 2025 date (4517) and then terminated (4166), removing a path to owned, powered sites. Several tuck-in acquisitions also carry delayed flags (3577, 3578, 3579), although those look like close-timing artifacts rather than capacity misses.
The dataset contains no independent corroboration of any kind: no permits, interconnection queue positions, or site reporting. The newer projects also lean on third parties. Indonesia is a leased colocation arrangement for 360 MW by end-2028 (8760, 8758). Stockholm is colocation as well (7875). Polaris Forge 1's 400 MW is framed as contracted rather than built (370). Lancaster's 300 MW (7870) and the Kenilworth greenfield campus (7869, whose record is truncated here) are the projects where public permitting and PJM queue filings should eventually appear.
Over the next 90 days, the third-quarter print is the key checkpoint. Active capacity would need to be well above 1.3 GW to keep 1.85 GW credible, and any quiet softening of that target would matter more than another contracted-capacity increase. Other things to watch are the naming of the Indonesian colocation partner, municipal or utility filings for Lancaster and Kenilworth, and drawdown activity under the DDTL 5.0 facility (9121) as a proxy for actual build spend.
Delivery vs. promise
2026-09-18CoreWeave's announced capacity has scaled steadily and in one direction. Contracted power went from 1.6 GW in May 2025 (claim 4973) to 3.1 GW by early 2026 (claims 11770, 3559), 3.5 GW in May (9323) and 4.2 GW by mid-August (8522, 8268). Active power followed a consistent reported path: 70 MW at end-2023, 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3569), then past 1 GW by May 2026 (9321). The long-range framing also grew. The earlier 5+ GW of AI factories with NVIDIA by 2030 (3893, 9329) now sits alongside a broader 8 GW active-power target (9322, 8534, 7868). The two are not strictly comparable, since the first is partner-scoped, but the headline number the company leads with has risen by more than half. The one clear contraction was the terminated Core Scientific merger (4166), which removed a path to owned capacity that had been repeated across five filings.
On dates, most facility claims carry no delivery date, which limits accountability. The year-end 2026 target of 1.85 GW (8666, 8533, 8281) is the only near-term dated commitment. Claim 8582 describes a 150 MW increase to it, which implies an earlier, lower figure that does not appear in this record. Meeting 1.85 GW means adding roughly 800 MW in about seven months, more than the roughly 490 MW brought online in all of 2025. The DDTL 3.0 commitment date (4593) and the Core Scientific timeline (4731, 4517) are both flagged delayed. Neither was framed publicly as a slip.
This record contains no independent corroboration. There are no permits, no interconnection-queue entries and no site reporting for Lancaster (300 MW, 7870), Kenilworth (250 MW, 7869), Stockholm (7871, unsized) or the three leased Indonesia sites (8758, 8760), which have a 2028 horizon. Polaris Forge 1 (370) is contracted capacity at a third party's campus, so energization evidence would come from that operator. The claim list as supplied also appears truncated at 7872.
Over the next 90 days, the Q3 report is the key checkpoint: whether active power has moved meaningfully above 1 GW, and whether 1.85 GW is reaffirmed or quietly softened. Other items to watch are PJM queue positions and local land-use filings for Lancaster and Kenilworth, identification of the Indonesian colocation partner, and energization milestones at Polaris Forge 1.
Delivery vs. promise
2026-09-18CoreWeave's announced capacity has only grown. Contracted power was 1.6 GW in May 2025 (claim 4973), 3.1 GW by early 2026 (claims 11770, 3559), 3.5 GW in May (claim 9323) and 4.2 GW by mid-August (claims 8522, 8268). That is roughly 2.6x in fifteen months. Active capacity has also grown, from 360 MW at end-2024 (claim 3552) to 850 MW at end-2025 (claim 3569) and past 1 GW by May (claim 9321). The long-range framing has shifted, though. The 5+ GW NVIDIA-linked figure for 2030 (claims 3893, 9329) now sits beside an 8 GW active-power goal (claims 9322, 8534, 7868). The newer goal is almost double the contracted base. Treat it as an aspiration rather than a pipeline.
The company's own timelines are uneven. The year-end 2026 target of 1.85 GW (claims 8666, 8533, 8281) was restated consistently through August. Claim 8582 describes a 150 MW increase to that target, which suggests it was raised rather than cut. The slips in the record are corporate, not physical. The Core Scientific merger, first slated for October 2025 (claim 4517), was terminated (claim 4166). That removed what would have been a large owned-power pathway. Filings later labelled the Marimo, OpenPipe and Monolith deals as delayed against their original dates (claims 3577 through 3589). Those revisions were recorded without much narrative explanation.
Independent evidence is thin. The site-level figures of 400 MW at Polaris Forge 1 (claim 370), 300 MW at Lancaster (claim 7870) and 250 MW at Kenilworth (claim 7869) carry no delivery dates or costs. Stockholm carries no capacity at all (claim 7871). No permits, utility agreements or interconnection-queue entries appear in the record. Indonesia's 360 MW by 2028 (claims 8758, 155) depends on leased colocation (claim 8760) with an unnamed provider. That dependency moves execution risk onto a third party.
For the next 90 days, the Q3 print is the key test. Reaching 1.85 GW means adding roughly 800 MW of active power in about seven months, a faster pace than 2025 delivered. Watch whether reported active capacity is on that line or the year-end figure gets quietly reframed. Watch for PJM queue or municipal filings for Kenilworth and Lancaster, since the greenfield New Jersey site is the most exposed to permitting drag. Also watch for disclosure of the Indonesia colocation partner and energization schedule. The claim record supplied here ends mid-entry at claim 7872, so any later restatement is not reflected in this read.
Delivery vs. promise
2026-09-18CoreWeave's capacity story has grown on every axis at once, and the growth in commitments is outpacing the growth in delivered power. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (claims 3551-3553, 11769). The company then reported crossing 1 GW in May 2026 (9321) and set a year-end 2026 target of 1.85 GW (8666, 8533, 8281). Claim 8582 describes that target as a 150 MW increase, so management raised the bar mid-year rather than hedging it. Contracted power has compounded faster: 1.6 GW (4973), then 3.1 GW (11770, 3554), 3.5 GW (9323), and 4.2 GW by August 2026 (8522, 8466). The 2030 figure moved from 5+ GW of NVIDIA-linked AI factories (3893, 9329) to 8 GW of active power (9322, 8574, 7868). The filings do not reconcile the two numbers, and readers should not assume one replaced the other.
Facility dates are hard to test because most capacity claims carry no deadline. The misses on record are transactional rather than physical. The Core Scientific merger slipped past its 2025-10-01 target (4517) and was terminated (4166), and the DDTL 3.0 commitment window is flagged as delayed (4593). That termination matters for facilities, because acquiring Core Scientific would have brought owned powered sites. Without it, CoreWeave remains dependent on leases, as the Indonesia arrangement shows: 360 MW across three Greater Jakarta sites by 2028, leased from a colocation provider (8758, 155, 8760, 8670). The 400 MW Polaris Forge 1 figure (370) is likewise contracted capacity at a third-party campus, not a CoreWeave build.
The record contains no independent evidence for any named project: no permits, no interconnection queue positions, and no site reporting. The 250 MW Kenilworth greenfield campus (7873, 7869) is the claim most in need of it, because a greenfield site in PJM territory is where timelines usually slip. Lancaster and the Stockholm colocation (7871) have no stated capacity or dates. The claim list supplied here ends at 7872, so later entries may change this picture.
The arithmetic is demanding. Reaching 1.85 GW means adding roughly 850 MW in the second half of 2026, more than CoreWeave delivered in all of 2025. Over the next 90 days, watch the Q3 print for the active-power figure and whether the 1.85 GW target is reaffirmed or quietly reframed. Watch Kenilworth for local land-use filings and a PJM queue entry, and look for the Indonesia landlord to be named. Watch Applied Digital's energization disclosures for Polaris Forge 1. Finally, look for any statement explaining how the 5 GW and 8 GW 2030 figures relate.
Delivery vs. promise
2026-09-14CoreWeave's capacity story has only moved in one direction, and it has moved fast. Active power grew from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3553). The company said it passed 1 GW in May 2026 (9321). Contracted power grew faster still: 1.6 GW in May 2025 (4973), 3.1 GW in February 2026 (11770, 3554), 3.5 GW in May (9323) and 4.2 GW by mid-August (8522, 8268). The long-range target has also grown. It was framed as 5+ GW of NVIDIA-linked AI factories by 2030 (3893, 9329) and is now 8 GW of active power by 2030 (9322, 8534, 7868). The two figures have been cited side by side, which blurs whether 8 GW replaces the earlier number or includes it. The year-end 2026 target of 1.85 GW (8666, 8533) came with a 150 MW upward revision (8582). So the guidance has been raised, not cut.
The record shows no outright facility-date slips, but that is partly because few site-level claims carry dates at all. The one significant reversal was the Core Scientific merger. It was expected by October 2025 (4517), and the termination was announced on 2025-10-30 (4166). That removed a self-owned capacity pathway without any restated capacity plan following it. The DDTL 3.0 commitment date is flagged as delayed (4593) with no explanation on record. Of the named projects, only Indonesia has a deadline: 360 MW across three leased Greater Jakarta sites by end-2028 (8758, 155, 8670, 8760). Kenilworth's 250 MW (7873), Stockholm (7871) and Polaris Forge 1's 400 MW (370) have no dates, and Lancaster has no quantified claim in the visible record.
No independent corroboration appears in this file: no permits, no interconnection-queue positions, no site reporting. The supplied claim list is also truncated after 7872. The near-term math is demanding. Reaching 1.85 GW means adding roughly 850 MW in the second half of 2026, far more than the 490 MW added in all of 2025. Contracted capacity also covers only about half of the 8 GW goal.
Over the next 90 days, watch whether the Q3 report shows active power on a path toward 1.85 GW or quietly redefines the metric. For Kenilworth, look for municipal site-plan approvals and PSE&G or PJM interconnection filings. For Indonesia, watch for the colocation partner to be named and a phase schedule. Watch too for any capacity figure for Stockholm or Lancaster.
Delivery vs. promise
2026-09-14CoreWeave's capacity story has grown faster on paper than on the ground, though the ground numbers are also moving quickly. Contracted power roughly went from 1.6 GW in May 2025 (claim 4973) to 3.1 GW in February 2026 (11770), 3.5 GW in May (9323) and 4.2 GW by mid-August (8522). That is more than a 2.5x increase in fifteen months, and none of the steps was ever revised down. Active power has also risen. The company reported 360 MW at year-end 2024 (3552) and 850 MW at year-end 2025 (3553). It said active power passed 1 GW in May 2026 (9321), and the 2026 year-end target now stands at 1.85 GW (8666). That target was raised by 150 MW in August (8582). The longer-range goal has changed in a way the company has not reconciled. The NVIDIA-linked figure of 5+ GW by 2030 (3893, 9329) now appears alongside an 8 GW active-power target for the same year (9322, 8534, 7868), and CoreWeave has not explained how the two relate. Many of these entries repeat the same filing figures and should not be read as separate confirmations.
On dates, no facility-capacity deadline has visibly slipped, largely because almost none carry one. The exceptions are the 2026 year-end target and Indonesia's 360 MW by end-2028 (8758, 155). The clearest miss is structural rather than a slipped schedule. The Core Scientific merger was flagged as delayed (4517, 4731) and then terminated (4166). That removed an owned-capacity route, and the company has not publicly tied the termination to any change in its targets. The 'delayed' flags on OpenPipe, Marimo and Monolith (3577–3589) concern software deals and say nothing about data-center delivery.
Independent corroboration is thin. The record contains no permits, interconnection-queue positions or site reporting for Kenilworth (7873), Stockholm (7871), Lancaster or Indonesia. Indonesia and Stockholm are leased colocation arrangements (8760, 7871), so their timing depends on the landlords. Polaris Forge 1's 400 MW (370) is likewise contracted capacity at a third party's campus. Kenilworth, a 250 MW greenfield site in New Jersey, is the project where public planning and PJM grid-queue records should exist, and so far they have not been cited.
Over the next 90 days, the third-quarter print is the main test. Reaching 1.85 GW means adding roughly another 800 MW of active power in the second half of the year, which would be a pace above any prior half-year. Beyond that, the items to track are whether the 2030 target settles on 5 GW or 8 GW, whether Kenilworth zoning or interconnection filings appear, whether the Indonesia colocation provider is named, and how much of the DDTL 4.0 and 5.0 financings (11225, 9121, 8736) is actually drawn against specific sites.
Delivery vs. promise
2026-09-14CoreWeave's capacity record has only grown. Active power went from 70 MW at end-2023 to 360 MW at end-2024 and 850 MW at end-2025 (3551, 3552, 3553). The company said it passed 1 GW by May 2026 (9321). Contracted power has grown faster: 1.6 GW in May 2025 (4973), 3.1 GW in February 2026 (11770), 3.5 GW in May (9323) and 4.2 GW by mid-August (8522). The 2030 goal has also moved. It was framed as 5+ GW of AI factories under the NVIDIA framework (3893, 9329). It is now 8 GW of active power (9322, 8574). These may be different scopes rather than a revision, but the company has not reconciled them. As contracted capacity grows faster than energized capacity, more of the story depends on future delivery.
The near-term dates hold up better than the M&A dates. The year-end 2026 active target of 1.85 GW (8666, 8533) was raised by 150 MW in August (8582), which points to confidence rather than slippage. Reaching it requires roughly 850 MW of additions in 2026, about equal to all of 2025's growth. The clearer failure is Core Scientific. It was promised for October 2025 (4517), and the agreement was terminated (4166). That removed an owned-power path the capacity plan had seemed to lean on. The delayed flags on Marimo, OpenPipe and Monolith (3577 through 3589) sit awkwardly beside later statements that treat those deals as done (10329). They look more like date-parsing artifacts than real misses. The DDTL 3.0 commitment termination date (4593) is also flagged delayed and deserves a check against the latest credit filings.
The project-level claims are thin on specifics. Indonesia is described as 360 MW across three leased Greater Jakarta sites by end-2028 (8758, 155, 8670). The colocation provider is not named (8760). Polaris Forge 1 carries 400 MW contracted (370) with no energization date. Kenilworth is a 250 MW greenfield campus (7873), and Stockholm (7871) and Lancaster have no capacity or timing on record. The record contains no permits, no interconnection queue positions and no site reporting. The announced pace is therefore unverified, not contradicted.
Over the next 90 days, the Q3 print is the key test. Active capacity near 1.4 GW would keep 1.85 GW believable, and a flat figure with a reaffirmed target would suggest a back-loaded fourth quarter. Look for Kenilworth and Lancaster in the PJM queue and in local site-plan approvals, a named Indonesian colocation partner, and any restatement that aligns the 5 GW and 8 GW figures. This review was built on a truncated claim list, so later entries may change these findings.
Delivery vs. promise
2026-09-14CoreWeave's capacity numbers have only moved up, and the reported history is internally consistent. Active power went from 70 MW at end-2023 (3551) to 360 MW at end-2024 (3552), 850 MW at end-2025 (3553, 11769), and more than 1 GW by May 2026 (9321). The year-end 2026 target is 1.85 GW (8666, 8533, 8281), which includes a 150 MW upward revision (8582). Contracted power rose faster, from 1.6 GW in May 2025 (4973) to 3.1 GW (11770, 3554), then 3.5 GW (9323), then 4.2 GW by August 2026 (8522, 8466). The 2030 framing has drifted. A 5+ GW figure tied to NVIDIA (3893, 9329) now sits beside an 8 GW active-power goal (9322, 8534, 7868). The two may measure different things, but the company has not reconciled them in the record. Reaching 8 GW from 1.85 GW requires about 1.5 GW of energization a year, and current contracts cover only about half of that endpoint.
On dates, the capacity milestones that can be checked have held. The slips are corporate rather than physical. The Core Scientific deal missed its October 2025 target (4517) and was terminated openly (4166). The Marimo, OpenPipe and Monolith closings ran a few months behind their flagged dates (3577-3579) before being confirmed (11776, 11775). The DDTL 3.0 commitment window passed its flagged date (4593), and DDTL 4.0 and 5.0 followed (11225, 9121, 8736). We found no silent revision of a capacity date.
The weakness is at the project level. None of the five named projects has a capacity or cost field populated. The site figures in the record are 360 MW across three leased Indonesian facilities by end-2028 (8758, 155, 8760), a 250 MW greenfield campus at Kenilworth (7873, 7869), and 400 MW contracted at Polaris Forge 1 (370). Stockholm (7871) and Lancaster have no figures attached. The record contains no permits, interconnection queue positions or on-the-ground reporting, so the announced pace rests entirely on company disclosure. Most of the pipeline is also leased or third-party developed, which moves execution risk onto partners the record does not name.
Over the next 90 days, the Q3 print should show whether active capacity is on a credible path to 1.85 GW. It should also show whether contracted power moves past 4.2 GW and whether the 5 GW and 8 GW targets are reconciled. The strongest independent tests are local zoning and utility or PJM interconnection filings for Kenilworth and Lancaster, and naming of the Indonesian colocation partner with a first-phase energization date. Draw activity under DDTL 5.0 would confirm that the claim of sold-out near-term capacity (1494) is turning into funded builds.
Delivery vs. promise
2026-09-13CoreWeave's announced capacity has expanded substantially while execution discipline has wavered. Contracted power capacity grew from 1.6 GW in May 2025 (claim 4973) to 4.2 GW by August 2026 (claims 8522, 8262)—a 163 percent increase in fifteen months. Active power capacity has followed a more measured path: 70 MW end-2023 (claim 3551), 360 MW end-2024 (claim 3552), 850 MW end-2025 (claim 3553), and surpassing 1 GW by May 2026 (claim 9321). This trajectory aligns with publicly stated quarterly targets, but the gap between contracted and active capacity widened throughout 2026, suggesting either customer demand outpaced deployment or timelines shifted without formal revision.
M&A plans faltered materially. The Core Scientific merger, promised closure by April 2026 (claim 4731), terminated in October 2025 (claim 4166). Acquisitions of Marimo, OpenPipe, and Monolith all missed Q4 2025 targets (claims 3577, 3588, 3589). Instead, capacity growth now relies on facility partnerships: Indonesia's three-facility, 360 MW commitment targets end-2028 (claims 8758, 155) via leased colocation (claim 8760), not acquisition. Kenilworth's 250 MW greenfield campus (claim 7869) and Swedish sites (claim 7871) follow similar models, with recent financing from JPMorgan and MUFG (claim 8736) supporting deployment.
The 1.85 GW active power target for year-end 2026 (claims 8533, 8666, 8281) arrives in approximately 3.5 months and offers near-term verification. Interconnection queue status with regional grid operators, executed power purchase agreements, and permit filings for Kenilworth and Indonesian facilities should confirm whether claimed capacity is funded and under construction. The Indonesia project's 2028 deadline requires demonstration of land access, local power authority agreements, and colocation vendor commitments. Watch for whether CoreWeave reaches 1.85 GW active by year-end, how capacity is distributed across announced geographies, and whether any 2027-2028 deliverables are revised downward without acknowledgement.
Delivery vs. promise
2026-09-13CoreWeave has demonstrated aggressive capacity expansion targets while managing persistent execution delays. The company's announced active power capacity nearly doubled from 420 MW in May 2025 to 850 MW by year-end 2025, a credible growth rate that continued to surpass 1 GW by May 2026 and targeted 1.85 GW by December 2026 (claims 4972, 11769, 9321, 8666). However, the trajectory reveals a consistent pattern: contracted capacity outpaces deployed capacity by widening margins. Contracted power jumped from 1.6 GW (May 2025) to 4.2 GW (August 2026)—a 2.6x expansion—while active capacity grew roughly 3.5x in the same window (claims 4973, 8522). This gap signals either accelerating deployment in later phases or optimistic contracted projections that may not materialize.
The company's merger strategy merits scrutiny. The Core Scientific acquisition consumed strategic attention throughout 2025, with promised close dates slipping from October to April 2026 before outright termination in October (claims 4731, 4517, 4166). Simultaneously, three smaller acquisitions—Marimo, OpenPipe, and Monolith—missed their original 2025 deadlines and resurfaced in March 2026 announcements without revised timelines (claims 3577, 3578, 3579). These execution setbacks raise questions about CoreWeave's M&A integration capacity when pursuing transformative partnerships like the NVIDIA capacity commitment and Anthropic's multi-year agreement.
On the facility side, only the Indonesia expansion carries a specific near-term commitment: 360 MW across three Greater Jakarta sites by December 2028 (claims 8758, 155). This stands as one of few timeline-bound projects with named capacity. Polaris Forge 1 carries a 400 MW contracted label but no deployment date (claim 370). Kenilworth Campus shows 250 MW without timeline specificity (claim 7869). The 8 GW target by 2030 appears anchored primarily to these unspecified facilities rather than detailed project schedules (claims 8534, 9322).
The recent DDTL 3.0 termination date slipped from July 2026 without public acknowledgement (claim 4593). Over the next 90 days, CoreWeave's credibility hinges on delivering the 1.85 GW year-end 2026 target and clarifying whether Indonesia facilities remain on track. Permit filings, interconnection queue positions, and infrastructure reporting will reveal whether the gap between contracted and active capacity narrows as promised.
Delivery vs. promise
2026-09-12CoreWeave has aggressively expanded its capacity announcements over 16 months. Contracted power capacity increased from 1.6 GW (May 2025, claim 4973) to 4.2 GW (August 2026, claim 8522), while active operational capacity grew from 420 MW (May 2025, claim 4972) through 850 MW (December 2025, claim 3553) to a target of 1.85 GW by year-end 2026 (claim 8533). The announced 2030 capacity target has also expanded: initial "5+ GW" guidance in January 2026 (claim 3893) shifted to 8 GW active capacity by August (claim 8534), suggesting ambition has accelerated faster than near-term buildout.
Execution risk is evident in the acquisition record. The Core Scientific merger, promised for October 2025 (claim 4517), was terminated by October 2025 with no disclosed rationale (claim 4166). Three software acquisitions—Marimo, OpenPipe, and Monolith—all slipped from 2025 targets to "stated" status by March 2026 without revised dates. Only Weights & Biases appears to have closed. These delays suggest the company is stretched across parallel hardware buildout and M&A, raising questions about execution bandwidth.
The gap between contracted and active capacity is widening. CoreWeave claims 4.2 GW contracted but surpassed only 1.0 GW active by May 2026 (claim 9321), implying a 7–12 month deployment lag. The company stated "near-term capacity sold out" in August 2026 (claim 1494) while simultaneously targeting 1.85 GW active by year-end (claim 8533), requiring 0.85 GW in 120 days—approximately 2× the 2025 deployment rate. No permits, grid interconnection filings, or third-party construction milestones have been disclosed; all statements are corporate announcements.
Geographic expansion appears nascent. Indonesia's 360 MW facility is promised for end-2028 (claim 155) but was announced only in August 2026 with no disclosed permitting or closed funding. Kenilworth (250 MW, claim 7869) and Lancaster (300 MW, claim 7870) sites are named but lack timelines.
Watch for: Q4 2026 commissioning data to validate the 1.85 GW target, public permits or grid operator filings for any of the five geographies, interconnection queue positions, and disclosure of which contracted capacity is backed by signed customer agreements.
Delivery vs. promise
2026-09-12CoreWeave's power capacity trajectory shows acceleration in contracted commitments alongside execution gaps. The company reported 70 MW deployed at end-2023, scaling to 850 MW by end-2025, representing a 12-fold increase in eighteen months. However, the gap between contracted and active capacity widened significantly. By May 2026, CoreWeave claimed to have surpassed 1 GW active power (claim 9321) while contracted capacity had grown to 3.5 GW (claim 9323)—a three-to-one ratio. By August 2026, contracted capacity reached 4.2 GW (claim 8522) against an end-of-year 2026 active deployment target of 1.85 GW (claims 8666, 8533, 8281), suggesting the contracted-to-active ratio remains roughly 2.3:1 as of today.
Timeline adherence has been inconsistent. The Core Scientific merger, announced in May 2025 and promised for October 2025 (claim 4517), was terminated outright by October 30, 2025 (claim 4166), representing a material strategic reversal rather than a simple delay. Three smaller acquisitions—Marimo, OpenPipe, and Monolith—were promised for September through November 2025 (claims 3577-3579) but appear unresolved as of March 2026 claims (claims 3587-3589), with no subsequent confirmation through August 2026. The DDTL 3.0 commitment termination, promised by July 31, 2026 (claim 4593), is marked delayed.
Recent messaging shows CoreWeave has shifted toward geographically distributed build-out. The August 2026 Indonesia announcement (claims 8758, 155) commits 360 MW across three facilities with a 2028 year-end deadline. U.S. campus announcements include Kenilworth, New Jersey (250 MW, claim 7873) and Lancaster, Pennsylvania (300 MW potential, claim 7874). The 8 GW target by 2030 (claims 8574, 8534, 7868, 8534, 7889) has become consistent messaging across multiple recent announcements, though the path from current 1+ GW active to that goal remains heavily contingent on execution at five announced locations simultaneously.
Watch for: (1) quarterly active capacity disclosures through Q4 2026 to confirm the 1.85 GW year-end target; (2) Indonesia facility construction permits and interconnection queue entries to validate the 2028 timeline; (3) any further delays or terminations in the DDTL facility financing, given the July miss; (4) whether contracted capacity growth moderates or continues outpacing deployment.
Delivery vs. promise
2026-09-12CoreWeave's operational capacity footprint has grown from 70 megawatts at year-end 2023 to 1.0 gigawatt by May 2026, a 14-fold expansion over two years. Year-end 2025 brought 850 megawatts of claimed active capacity (claims 3551–3553). However, the company's announced contracted capacity has scaled more aggressively: 1.6 gigawatts in May 2025, 3.1 gigawatts by March 2026, expanding to 4.2 gigawatts by August 2026 (claims 4973, 3554, 8522). The ratio of contracted-to-active capacity has widened from roughly 1.9:1 in May 2025 to 4.2:1 in August 2026, indicating either aggressive forward contracting, deployment constraints, or timing mismatches between customer commitments and power availability. Timeline execution has been uneven. Multiple software acquisitions—OpenPipe, Marimo, and Monolith—carried specific 2025 completion dates that shifted without acknowledgment (claims 3577–3579, 3587–3589). The Core Scientific merger, a more material expansion attempt, initially targeted October 1, 2025 but was terminated in October after delays (claims 4517, 4166). Facility financing arrangements show similar delay patterns through mid-2026, suggesting operational execution or financial constraints. The company's December 31, 2026 active capacity target of 1.85 gigawatts requires 850 megawatts of new deployment in the final three quarters of 2026 (claims 8666, 8281). This depends primarily on facilities lacking announced construction dates or regulatory filings: Kenilworth, New Jersey (250 megawatts), Lancaster, Pennsylvania (300 megawatts), three Indonesian facilities (360 megawatts by 2028), and Stockholm campuses (claims 7869, 7870, 8758, 7875). No permits, interconnection queue positions, or on-the-ground reports are cited. The pattern combines ambitious future targets—8.0 gigawatts by 2030 (claim 7889)—with near-term execution gaps. Over the next 90 days, watch whether CoreWeave delivers the 1.85 gigawatt year-end result; a material miss would indicate systematic overestimation of deployment velocity and undermine confidence in 2028–2030 timelines. Monitor financing closures for Indonesia and Sweden expansions and track quarterly capacity additions to determine whether the widening contract-to-active ratio reflects customer phasing or execution friction.
Delivery vs. promise
2026-09-11CoreWeave's capacity narrative has expanded dramatically over eighteen months, but deployment velocity remains uncertain. The company announced 420 MW of active power (claim 4972) and 1.6 GW contracted (claim 4973) in May 2025. By March 2026, it retroactively reported 850 MW as of year-end 2025 (claim 3553) against 3.1 GW contracted (claim 3554)—a 5.2x increase in contracted pipeline. Current posture targets 1.85 GW active by December 2026 (claims 8666, 8533, 8281) and 4.2 GW contracted (claims 8522, 8268), with longer-term ambitions of 8 GW by 2030 (claims 8534, 8574). This represents scaling upward, though the company has not revised earlier targets downward in explicit statements.
Promised dates tell a different story. The Core Scientific merger, initially promised for April 2026 (claim 4731), slipped to October 2025 (claim 4517) before termination was announced in October 2025 (claim 4166). Separately, three software acquisitions—Marimo, OpenPipe, and Monolith—were each promised for fall 2025 (claims 3577, 3578, 3579) but appear delayed as of March 2026 (claims 3587, 3588, 3589). These slippages cluster in the M&A domain and predate the March 2026 filing, suggesting the company did not acknowledge delays contemporaneously.
The gap between contracted and active capacity warrants scrutiny. By May 2026, CoreWeave claimed 1 GW active (claim 9321) against 3.5 GW contracted (claim 9323)—a 29 percent deployment ratio. The dataset contains no reference to power interconnection queue positions, state permitting milestones, or third-party infrastructure audits. Indonesia facilities are promised at 360 MW across three locations by end-2028 (claims 8758, 155), but no ground reporting or construction timelines are evident. Kenilworth, New Jersey and Lancaster, Pennsylvania projects are noted (claims 7869, 7873, 7874) without delivery dates.
In the next 90 days, watch whether active capacity reaches the stated 1.85 GW target by December 2026. Observe whether Indonesia development announcements provide specific construction milestones or power procurement commitments. Monitor whether the contracted-to-deployed ratio improves or narrows. Track whether the company revises 2030 capacity goals upward or establishes binding 2027–2028 intermediate targets. Any announcement of facility delays or power procurement setbacks would signal execution stress.
Delivery vs. promise
2026-09-11CoreWeave has scaled active capacity 14-fold in 30 months, from 70 MW in late 2023 to 1 GW by May 2026, demonstrating execution at the infrastructure level. Contracted capacity has grown more aggressively, from 1.6 GW announced in May 2025 (claim 4973) to 4.2 GW by August 2026 (claims 8522, 8466), creating a 4:1 ratio between contracted and active capacity that suggests deployment velocity lags deal pace. This gap raises questions about power infrastructure readiness and construction timelines.
The long-term target trajectory reveals unacknowledged scope expansion. Claims from January 2026 specified 5+ GW by 2030 (claim 3893). By May-August 2026, this had shifted to 8 GW (claims 9322, 8534, 7889)—a 60 percent uplift presented without explicit walk-back of prior guidance. The company has not publicly acknowledged this revision.
M&A execution has faltered. The Core Scientific merger faced multiple delays before termination in October 2025 (claim 4166). Smaller acquisitions slipped 2-6 months: OpenPipe and Marimo delayed from September and October 2025 respectively (claims 3588, 3577). These delays suggest capital constraints or integration challenges emerged during rapid growth.
Facility announcements remain light on independent corroboration. Indonesia's three facilities (360 MW by end-2028, claims 8758, 8670) operate under lease arrangements (claim 8760), reducing construction risk but introducing landlord dependencies. Kenilworth (250 MW) and Lancaster (300 MW) campus announcements lack interconnection queue positions, power agreements, or permitting documentation in the record. The Sweden footprint cites colocation partnerships (claims 7871, 7875) without specific capacity or timing.
The immediate test arrives year-end 2026. CoreWeave has committed to 1.85 GW active capacity by December 31 (claims 8666, 8281, 8533). With 1.0 GW confirmed in May, the company must add 850 MW in the final four months—a pace 15 percent faster than the prior quarter. If this target slips, it signals the first explicit miss on an announced active-capacity deadline and may indicate power or deployment bottlenecks. Watch for Indonesia site commencement announcements, permitting releases, Weights & Biases integration progress, and any revised year-end guidance.
Delivery vs. promise
2026-09-10CoreWeave's announced capacity has grown substantially in absolute terms—from 70 MW at end-2023 (claim 3551) to 1 GW active by mid-2026 (claim 9321)—but the company has consistently inflated and revised its contracted power pipeline. Total contracted capacity claims escalated from 1.6 GW (claim 4973, May 2025) to 3.1 GW (claims 3554, 3570, March 2026) to 3.5 GW (claim 9323, May 2026) to 4.2 GW (claims 8522, 8262, August 2026), each revision nominally justified by new partnerships or facility announcements but lacking contemporaneous third-party validation. The company's acquisition strategy—repeatedly telegraphed but repeatedly delayed—undermines confidence in execution velocity. The Core Scientific merger was announced four times with different deal terms (claims 4313, 4314, 4294, 4331) before termination in October 2025 (claim 4166). Three smaller acquisitions (Monolith, Marimo, OpenPipe) announced in March 2026 with closure dates in September-November 2025 remain marked as delayed through August 2026, suggesting post-announcement lag between public statements and actual closings. The active-to-contracted ratio has tightened: CoreWeave is now claiming 1 GW deployed against 4.2 GW contracted, a 23% realization rate roughly consistent with industry deployment lags but requiring visible progress on the near-term pipeline. The year-end 2026 active power target of 1.85 GW (claims 8533, 8281, 7888) implies adding 850 MW in roughly 3.5 months, demanding demonstrated construction momentum by September-October. Recent facility announcements clustered in mid-August 2026—Indonesia's 360 MW, three-facility Greater Jakarta campus targeting 2028 completion (claims 155, 8758); Kenilworth's 250 MW greenfield (claim 7869); Lancaster's 300 MW (claim 7870); Stockholm colocation (claim 7875)—are concrete in naming but extremely long in timeline, with only Indonesia's carrying a specific delivery date. Over the next 90 days, watch for: permit filings for Kenilworth and Lancaster; any Indonesia construction commencement notices or interconnection queue progression; achieved active power capacity by November 15 relative to the 1.85 GW target; and disclosure of any further acquisition delays or deal terminations. Partnership announcements with Anthropic, NVIDIA, and Leidos provide revenue underpins but do not reduce execution risk on the physical capacity side.
Delivery vs. promise
2026-09-10CoreWeave's announced capacity has scaled sharply, growing from 70 megawatts in late 2023 to 850 megawatts by year-end 2025, with a stated 1.85-gigawatt target for December 2026 (claims 3551, 3553, 8533). Contracted power commitments have more than doubled within eighteen months, rising from 1.6 gigawatts in May 2025 to 4.2 gigawatts by August 2026 (claims 4973, 8522). This trajectory reflects genuine momentum, yet the company's acquisition playbook reveals persistent execution friction. Monolith, Marimo, and OpenPipe were each promised by late 2025, then disclosed as pending through March 2026, representing four-to-six-month delays without public timeline revision (claims 3589, 3588, 3579). The Core Scientific merger, announced with fixed closing dates through September 2025, was terminated in October 2026, suggesting either operational constraints or financial reassessment (claims 4731, 4166). The DDTL 3.0 commitment termination also slipped past its July 2026 target without acknowledged revision (claim 4593).
CoreWeave's capacity growth from 2023 through 2025 is substantive—year-on-year doubling is credible for a specialized AI infrastructure platform. The May 2026 active-power milestone of 1 gigawatt and corresponding 3.5-gigawatt contracted base anchor near-term reality (claims 9321, 9323). However, the 1.85-gigawatt year-end 2026 target represents an 118-percent eight-month increase that lacks independent corroboration. No cross-checks via permits, utility interconnection filings, or third-party audits are provided to validate this pace.
New facility announcements—Indonesia (360 megawatts across three leased colocations by 2028-12-31), Kenilworth (250 megawatts), Lancaster (300 megawatts), and Sweden—remain light on near-term deployment specifics (claims 155, 7869, 7870, 7875). Strategic partnerships with Anthropic and NVIDIA underpin demand signals, but the acquisition slip pattern compounds uncertainty around integration velocity and operational bandwidth.
Monitor over the next ninety days: actual deployed capacity trajectories toward the 1.85-gigawatt year-end target; granular per-facility breakdowns to reconcile the 4.2-gigawatt contracted pool; any public revision to the 2030 8-gigawatt goal (claim 8534) should near-term growth falter; and whether Indonesia phase-one facilities advance from announcement to signed lease or permit filing.
Delivery vs. promise
2026-09-10CoreWeave's operational footprint has expanded substantially, growing from 70 MW of active power at end-2023 (claim 3551) to 1+ GW by May 2026 (claim 9321), validating the rough trajectory implied by its December 2025 capacity statement of 850 MW (claim 3569). This near-doubling-annually pace through 2026 appears supported by the timing of announced facilities: Lancaster (300 MW potential, claim 7870), Kenilworth (250 MW, claim 7869), and Polaris Forge 1 (400 MW contracted, claim 370). However, the company has built a significant gap between contracted and operational capacity. By August 2026, CoreWeave claimed 4.2 GW of contracted power capacity (claim 8522) against a stated target of 1.85 GW active by year-end 2026 (claim 8281)—a 2.3x overhang that suggests either aggressive procurement ahead of actual deployment or risk of slower-than-announced ramp. Contracted capacity claims have themselves escalated consistently: from 1.6 GW in May 2025 (claim 4973) to 3.1 GW by March 2026 (claim 3554) to 4.2 GW by August 2026 (claim 8466). This acceleration reflects Indonesia's entry into the pipeline (360 MW by end-2028, claim 8758) and expanded customer commitments, but no independent evidence of grid-side or power-purchase agreements has been provided to verify takeability of that contracted power. CoreWeave's M&A narrative has been chaotic. The Core Scientific merger, promised for October 2025 (claim 4731), was terminated outright by late October (claim 4166). Acquisitions of Marimo, OpenPipe, and Monolith, each promised for September–November 2025 (claims 3577–3589), were still listed as delayed in March 2026 (claim 3589) with no subsequent closure announcement. The Weights & Biases acquisition ($1 billion, claim 4516) has not been updated since March 2026 claims (claim 3576), leaving its status unclear. The 2030 capacity target has been restated at 8 GW (claims 8534, 8574) and separately as 5+ GW (claim 3893), a range that reflects either uncertainty or audience segmentation. Watch whether the 1.85 GW year-end 2026 target is met, whether any of the stalled acquisitions close or are formally abandoned, and whether Indonesia's 2028 deadline stays firm as a credibility signal for longer-horizon commitments.
Delivery vs. promise
2026-09-09CoreWeave has demonstrated aggressive capacity acceleration, with active power growing from 70 MW at end-2023 to 1 GW by May 2026—a 14-fold increase in roughly 18 months (claim 3551, claim 9321). The company is targeting 1.85 GW in active power by year-end 2026, matching its disclosed guidance (claims 8533, 8666). Contracted capacity has scaled even more sharply, expanding from 1.6 GW in May 2025 (claim 4973) to 4.2 GW as of August 2026 (claim 8522), suggesting a two-to-three-year deployment pipeline filling with customer commitments. The 850 MW footprint announced for end-2025 (claim 3569) aligns with disclosed milestones, though third-party validation of quarterly capacity additions remains sparse.
On the M&A front, CoreWeave's execution record is uneven. The Core Scientific merger, promised to close by October 2025 (claim 4517), was terminated in October 2026 after repeated delays (claim 4166)—a nine-month slip. The Weights & Biases acquisition, announced in May 2025 with a $1 billion valuation (claim 4516), appears to have closed and is now generating platform updates (claim 9328). Three smaller acquisitions—Marimo, OpenPipe, and Monolith—all missed their original close windows (promised September-November 2025, claims 3588–3589) and have not been updated as closed.
The company's eight-year roadmap to 8 GW by 2030 (claims 9322, 8534) demands reaching that target from a projected 1.85 GW run-rate, implying 4.3x growth over 3.3 years. Recent facility announcements cluster in the latter half of 2026: 250 MW in Kenilworth, NJ (claim 7869), 300 MW in Lancaster, PA (claim 7870), Stockholm colocation facilities (claim 7875), and Indonesia expansion targeting 360 MW by end-2028 (claim 8758). These totals easily exceed 1 GW in newly announced capacity, but granular deployment schedules for each remain unspecified, raising questions about deployment cadence relative to the contracted pipeline.
Over the next 90 days, monitor whether CoreWeave sustains its active-power trajectory toward the 1.85 GW year-end target and whether the delayed M&A transactions (Marimo, OpenPipe, Monolith) receive closure statements. Watch also for Indonesia infrastructure filings or announcements that could validate the 2028-2030 deployment window and clarify whether this represents genuine geographic diversification or pre-signed capacity ahead of firm, disclosed customer wins.
Delivery vs. promise
2026-09-09CoreWeave has demonstrated aggressive capacity commitments alongside operational deployment lags that merit close monitoring. Active power capacity grew from 70 MW (end 2023, claim 3551) to 360 MW (end 2024, claim 3552) to 850 MW (end 2025, claim 3553), reaching 1+ GW by May 2026 (claim 9321). However, contracted capacity has scaled faster: from 1.6 GW (May 2025, claim 4973) to 3.1 GW (March 2026, claim 3582) to 4.2 GW (August 2026, claim 8522). This widening gap—contracted at 4.2 GW versus active at 1 GW as of early summer—suggests either accelerating deployment ahead or overpromised contract book. The company targets 1.85 GW active by year-end 2026 (claims 8666, 8281), requiring 850 MW deployment in four months from today's date.
Acquisition execution has faltered. The Core Scientific merger, initially promised for October 2025 (claim 4517) then April 2026 (claim 4731), was terminated by October 2025 (claim 4166). Three software acquisitions—OpenPipe (promised September 2025, claim 3588), Marimo (promised October 2025, claim 3587), and Monolith (promised November 2025, claim 3579)—all show delays as announced March 2026. This pattern suggests integration challenges or deal fatigue, though none have been formally abandoned as of the latest claims in August 2026.
Partnerships appear substantive. NVIDIA designated CoreWeave an Exemplar Cloud partner (claim 9324) and committed $6.3 billion in capacity purchases through 2032 (claim 4352). Anthropic multi-year agreement (claim 8571) and JPMorgan/Mitsubishi UFJ as DDTL 5.0 arrangers (claim 8736) provide financial and commercial validation. The Indonesia facility announcement (August 2026, claim 8758) targeting three sites with 360 MW in Greater Jakarta by end 2028 represents Asia-Pacific entry, though the 2028 timeline sits far enough out to absorb delays.
The 8 GW target by 2030 (claims 8574, 8534, 8872) requires roughly 3× the active capacity in 3.3 years. Over the next 90 days, watch whether the company closes the contracted-to-active gap through accelerated deployments at Polaris Forge 1 (400 MW, claim 370), Kenilworth (250 MW, claim 7869), or Lancaster (300 MW, claim 7870). Permitting status and grid interconnection queue positions for Indonesia and greenfield U.S. sites remain undisclosed. Any acquisition closures, particularly Weights & Biases (repeatedly cited, claims 3562, 3576), would signal execution capability recovery.
Delivery vs. promise
2026-09-09CoreWeave's announced capacity trajectory reveals aggressive expansion paired with significant execution risk. In May 2025, the company claimed 420 MW active and 1.6 GW contracted (claims 4972, 4973). By March 2026, three months into operations as a public company, it had revised contracted capacity upward to 3.1 GW (claim 3554) while reporting 850 MW active as of December 31, 2025 (claim 3553). By August 2026, contracted capacity escalated further to 4.2 GW (claim 8522), but the company was only half way to its stated 1.85 GW year-end active target (claims 8533, 8281). This 40 percent deployment ratio—active-to-contracted—has remained consistent across multiple reporting cycles, suggesting either aggressive contracting, phased power availability from suppliers, or capacity not yet drawing load.
Promised timelines show acute slippage on strategic acquisitions. The Weights & Biases acquisition was announced twice (May 2025 claim 4974, March 2026 as core vertical integration play), but its completion date has never been disclosed. The Core Scientific merger, originally promised to close by October 2025 (claim 4517), was terminated in October 2026 (claim 4166)—a complete reversal announced without prior disclosure of material obstacles. Marimo, OpenPipe, and Monolith were each promised by September-November 2025 but remain unresolved as of March 2026 (claims 3577, 3578, 3579), nine months overdue.
Capacity targets have escalated without acknowledgement of prior commitments. January 2026 stated a 5 GW target by 2030 (claim 3893). Seven months later, August 2026 announcements introduced an 8 GW target for the same deadline (claims 8534, 7868)—a 60 percent increase in ambition in under a year. Simultaneously, new geographies entered public record in August: Indonesia (360 MW by 2028), Lancaster (300 MW potential), Kenilworth (250 MW greenfield), and Stockholm (two campuses)—projects that were not named in prior filings and whose power sourcing remains unclear.
Over 90 days, observe whether CoreWeave publishes Q3 2026 active capacity trending toward 1.85 GW, whether Indonesia facilities secure formal power contracts with PT PLN, and whether August's newly announced projects receive filed interconnection queue positions. The gap between contracted and deployed capacity will signal whether the company is constrained by supply-chain, power availability, or customer off-take.
Delivery vs. promise
2026-09-09CoreWeave's capacity roadmap has undergone dramatic expansion in the nine months since May 2025, yet the trajectory reveals persistent gaps between announced ambitions and tangible progress. Contracted power capacity claims have escalated from 1.6 GW (claim 4973, May 2025) to 4.2 GW (claim 8522, August 2026), while active deployments have crossed 1 GW (claim 9321, May 2026) against a year-end 2026 target of 1.85 GW. The company reported 70 MW operational as of end-2023 (claim 3567), 360 MW by end-2024 (claim 3552), and 850 MW by end-2025 (claim 3569)—a credible progression if verified. However, announced capacity has outpaced visible execution: the four facility announcements (Indonesia, Kenilworth, Lancaster, Stockholm) remain undated for operational launch, with only the Indonesia cluster carrying a delivery promise (360 MW by December 2028, claim 8758).
The acquisition strategy demonstrates material execution risk. Three attempted purchases—Marimo (claim 3577), OpenPipe (claim 3588), and Monolith (claim 3589)—all missed their late-2025 close dates. The Core Scientific merger, positioned as transformative, was terminated in October 2025 (claim 4166) after slipping repeatedly from its original September 2025 close. Weights & Biases acquisition announcements recurred without closure indication (claims 4974, 3547, 3562, 3576, 3586). This pattern suggests either integration challenges or shifts in strategic priorities that have not been publicly acknowledged as reversals.
No claims cite independent validation: permits filings, regional interconnection queue entries, or equipment procurement notices. All facility and partnership claims carry [stated] status, indicating announced commitments rather than third-party corroboration. The partnership announcements—IBM Granite (claim 4971), NVIDIA collaboration (claim 3892 and subsequent NVIDIA-tied claims), Anthropic (claim 8571), and Hudson River Trading (claim 1234)—lack specificity on capacity allocation or delivery timing. The NVIDIA Exemplar Cloud designation (claim 9324) and joint 5+ GW commitment by 2030 (claim 9329) are significant but carry no enforcement mechanism disclosed.
In the next 90 days, watch whether CoreWeave reports Q3 2026 active power results (expected near October earnings) and whether the 1.85 GW year-end target remains intact (claim 8281, claim 8666). Monitor Indonesia facility announcements for permit filings or colocation provider confirmations (claim 8760). Track whether any of the three stalled acquisitions relaunch or formally dissolve. Finally, observe whether the 4.2 GW contracted capacity shows signs of actual build-out through procurement announcements or customer SLA confirmations.
Delivery vs. promise
2026-09-09CoreWeave has disclosed a consistent upward capacity curve: 70 megawatts at year-end 2023 (claim 3551), 360 MW by end of 2024 (claim 3552), and 850 MW at end of 2025 (claim 3553). The company announced it surpassed 1 gigawatt of active power in May 2026 (claim 9321), with a stated year-end 2026 target of 1.85 GW (claims 8281, 8533, 8666). This trajectory—roughly 5x growth over three years—shows disciplined scaling without announced reductions. Contracted capacity claims have also shifted upward: from 1.6 GW stated in May 2025 (claim 4973) to 3.5 GW by May 2026 (claim 9323) to 4.2 GW by August 2026 (claim 8522). The company projects 8 GW of active power by end of 2030 (claims 9322, 8534, 8574), implying a near-doubling requirement from mid-2026 levels over four years.
The acquisition program shows material slippage. The Core Scientific merger, promised by April 2026 (claim 4731) and then October 2025 (claim 4517), was terminated entirely (claim 4166). Marimo, OpenPipe, and Monolith acquisitions, each promised between September and November 2025 (claims 3578, 3579, 3588, 3589), remain unresolved as of September 2026. Weights & Biases has been announced multiple times without a stated close (claims 4974, 3562, 3576) and carries a $1 billion reported price (claim 4516). One commitment—DDTL 3.0's termination date of July 31, 2026 (claim 4593)—has already passed without public acknowledgement of impact.
Facility announcements arrived en masse in August 2026: Indonesia (360 MW by end 2028, claims 155, 8758), Kenilworth greenfield (250 MW, claim 7869), Lancaster expansion (300 MW, claim 7874), and Sweden co-location (claims 7871, 7875). These are geographically diversified but timeline-distant. No independent evidence from permits, interconnection queue entries, or construction reports appears in the claims record.
Watch the next 90 days for end-of-year capacity delivery against the 1.85 GW target. Any Indonesia or Kenilworth project updates, clarifications on delayed acquisitions, or revised timelines will signal whether the 8 GW 2030 path rests on binding commitments or optimistic guidance.
Delivery vs. promise
2026-09-08CoreWeave's capacity narrative shows aggressive scaling promises paired with notable execution gaps. Active power capacity has grown from 70 MW (end-2023) to a 1.85 GW target for end-2026 (claims 3551, 8281)—a compounded rate that would place the company on track for its 8 GW ambition by 2030 (claims 9322, 8534). Yet contracted capacity now stands at 4.2 GW (claim 8522), nearly 2.3x the active power target, widening the gap between commitments and live deployment. This divergence signals either aggressive forward bookings ahead of build-out or execution risk that customers won't take allocated capacity on schedule.
Acquisition activity reveals operational strain. The Core Scientific merger, initially pledged by April 2026 (claim 4731), then October 2025 (claim 4517), was terminated outright by late October (claim 4166)—a significant strategic reversal not explicitly acknowledged in later announcements. The Weights & Biases acquisition, announced May 2025 (claim 4974) at $1 billion (claim 4516), appears stalled; March 2026 filings list it without completion dates, signaling delay. Marimo, OpenPipe, and Monolith acquisitions all slipped past their 2025 close dates (claims 3577-3589). This clustering suggests CoreWeave is deprioritizing M&A in favor of capital deployment and operational execution.
Geographic footprint is expanding rapidly. Indonesia's 360 MW commitment by end-2028 (claim 8758) marks Asia-Pacific entry; Kenilworth, New Jersey targets 250 MW greenfield (claim 7873); Lancaster, Pennsylvania 300 MW (claim 7874); Stockholm colocation arrangements (claim 7871). These August announcements add geographic credibility, though no independent permit filings, construction updates, or interconnection queue entries appear in the disclosed record. Partnership announcements—Anthropic (claim 8571), Leidos (claim 8669), Hudson River Trading (claim 958)—signal demand strength but not capacity proof.
The critical near-term test arrives in four months: whether active power reaches 1.85 GW by December 2026. Watch whether the 4.2 GW contracted pipeline begins converting to live deployment or whether revised guidance follows. Indonesia project visibility—site acquisition, permitting, power interconnection queue movement—will establish credibility for the 2028 timeline. Any further contraction in the 8 GW 2030 target or public acknowledgment of the capacity overhang would signal material execution challenge.
Delivery vs. promise
2026-09-07CoreWeave has articulated one of the industry's most aggressive power expansion roadmaps: 70 MW in 2023 rising to 850 MW by year-end 2025 and targeting 1.85 GW by December 2026 (claims 3551, 3553, 8666), with an ultimate 8 GW vision by 2030 (claim 8574). The capacity trajectory reflects near-exponential growth, but execution has proven uneven and independent verification remains limited.
The most significant slippage involves the Core Scientific merger, originally promised to close by October 2025 (claim 4517) but terminated entirely in October 2026 (claim 4166). This was CoreWeave's marquee infrastructure acquisition and its failure suggests overconfidence in earlier deal timelines. Smaller acquisitions targeting software—OpenPipe, Monolith, and Marimo—also each missed promised closeout dates (claims 3578, 3589, 3577). The Weights & Biases acquisition, announced mid-2025 for $1 billion, did close successfully, but the acquisition tempo has noticeably slowed.
CoreWeave has pivoted strategy, anchoring growth through long-term partnerships rather than asset purchases. NVIDIA committed $6.3 billion in capacity purchases through 2032 (claim 4352); Anthropic, Hudson River Trading, Backblaze, and Leidos signed multi-year agreements (claims 8571, 1234, 7645, 8669). These partnerships offset capacity risk by pre-selling power, but they also lock in unfavorable pricing if demand outpaces supply.
The 4.2 GW of contracted power capacity (claim 8522) substantially exceeds deployed MW, signaling either legitimate growth confidence or exposure to non-completion risk. Indonesia's first Asia-Pacific deployment targets 360 MW by end of 2028 (claim 8758); Kenilworth, New Jersey and Lancaster, Pennsylvania greenfield sites are also underway (claims 7869, 7870). What's notably absent from the record: permits, interconnection queue entries, or public filings from colocation partners that would independently validate these timelines. Reliance on announcement cadence alone leaves material risk unpriced.
CoreWeave must hit 1.85 GW by December 31, 2026—roughly 1 GW of new capacity in four months (claim 8281). If this target slips, the 8 GW 2030 vision becomes questionable, especially given Core Scientific's abandonment and acquisition delays. Watch also for updates to the DDTL 3.0 debt facility (claim 4593), which saw its termination date pushed beyond original guidance—financial flexibility underpins execution.
Delivery vs. promise
2026-09-07CoreWeave's infrastructure trajectory shows aggressive growth commitments paired with execution headwinds. From December 2023 to December 2025, the company deployed from 70 MW to 850 MW of active power capacity, a compound 2.4x annual growth rate (claims 3551, 3553). That growth continues by design: claims 8533 and 8281 target 1.85 GW active capacity by year-end 2026. But a critical signal emerged in August: claim 8666 set the year-end 2026 target at 1.85 GW on August 13, yet eight days later claim 7652 revised it downward to 1.7 GW without public acknowledgement. This 150 MW contraction, precisely matching the incremental increase cited in claim 8582, suggests internal pacing delays or pushed-out facility timelines.
The contracted-to-active capacity gap widens considerably. While active power is projected at 1.7–1.85 GW by year-end 2026, contracted capacity now sits at 4.2 GW (claims 8522, 8262). The company is signing customer commitments faster than deploying hardware—a pattern that intensifies execution risk if customer timelines harden against the announced schedule.
Announced facilities lack delivery precision. Kenilworth (250 MW), Lancaster (300 MW), Sweden (unspecified), and Indonesia (360 MW by end-2028) carry no granular construction or permitting milestones (claims 7869, 7870, 155). Indonesia, CoreWeave's stated first Asia-Pacific facility, targets three Greater Jakarta sites with colocation via 360 MW by December 2028 (claim 8758)—ambitious given typical land-power-interconnection lead times in that region.
Acquisition delays compound integration uncertainty. The Core Scientific merger, promised for October 2025, terminated the following month (claim 4166). Marimo, OpenPipe, Monolith, and Weights & Biases acquisitions all slipped past 2025 windows (claims 3577–3589), suggesting financing friction or due-diligence friction.
Watch for: (1) whether CoreWeave reaches the revised 1.7 GW target by December 31, requiring 850 MW deployment in four months; (2) filing or public permitting news on Kenilworth greenfield or Indonesia grid interconnection; (3) customer renegotiation signals in the 4.2 GW contracted backlog as lead times compress against the 2030 8 GW target (claim 8534).
Delivery vs. promise
2026-09-07CoreWeave has demonstrated substantial capacity growth from 70 megawatts at year-end 2023 to 850 megawatts by year-end 2025, representing a twelve-fold increase in deployed infrastructure (claims 3551, 3569). The company has announced an 8-gigawatt target by 2030, supported by 4.2 gigawatts of contracted capacity currently in various stages of deployment (claims 8522, 7629). However, this trajectory masks significant execution challenges and ambiguities.
The core issue is the gap between contracted and deployed capacity. As of mid-2026, CoreWeave has contracted 4.2 GW of power but will have deployed roughly 1.85 GW by year-end 2026 if it meets its target (claims 8533, 8522). This 2.4x multiple suggests either aggressive purchasing ahead of actual deployment needs or confidence in acceleration. The slight variance between claimed year-end 2026 targets—1.85 GW in claims 8533 and 8281 versus 1.7 GW in claim 7652—suggests internal planning uncertainty.
Execution risk is evident in the company's acquisition history. The Core Scientific merger, announced with a 0.1235 share exchange ratio (claims 4331, 4314), was terminated outright on 2025-10-30, only two months past its promised close date (claim 4166). Smaller acquisitions of Marimo, OpenPipe, and Monolith, each promised for Q3-Q4 2025, remain unresolved as of March 2026 (claims 3577, 3578, 3579). The Weights & Biases acquisition for 1 billion dollars was stated without a date.
Geographic expansion plans—Indonesia's 360-megawatt facility by 2028-12-31, Lancaster's 300 megawatts, Kenilworth's 250 megawatts, and Stockholm colocation deals—appear stated but lack dated deadlines for most (claims 155, 7870, 7869, 7875). Indonesia is the only facility with a firm timeline.
Independent verification is absent from this record. No permits, grid interconnection queue entries, or third-party construction reports are referenced. The Anthropic and Hudson River Trading partnerships are named but lack capacity or duration specifics (claims 8571, 7605).
Watch whether CoreWeave hits its 1.85 gigawatt target by year-end 2026, only four months away. Any miss would signal execution slowing below the 12-month doubling pace shown through 2025. Track Indonesia's site status and grid connection progress toward the 2028-12-31 deadline, and monitor whether the 4.2 gigawatts of contracted capacity begins materializing into deployment schedules with quarterly milestones.
Delivery vs. promise
2026-09-07CoreWeave's deployment trajectory reveals substantial contracted capacity paired with more modest active deployment, creating a widening gap between announcement and execution. The company claimed 70 MW active capacity at end-2023, reaching 360 MW by end-2024 and 850 MW by end-2025—maintaining roughly 5x to 2.4x annual growth rates through those periods. However, claims 8533 and 8666 project 1.85 GW active capacity by year-end 2026, representing just 2.2x growth and falling meaningfully short of the 4.2 GW total contracted capacity now claimed across claims 8522, 8262, and 8268. This suggests CoreWeave is contracting power faster than deploying it, a pattern typical of infrastructure companies in expansion mode but worth monitoring for demand-supply misalignment.
Timeline adherence has been inconsistent. CoreWeave announced multiple acquisitions with specific promised dates—OpenPipe by September 2025 (claims 3578, 3588), Marimo by October 2025 (claims 3577, 3587), and Monolith by November 2025 (claims 3579, 3589)—all marked delayed. More significantly, the Core Scientific merger was announced repeatedly with evolving promised dates, culminating in a April 2026 target (claim 4731), before termination on October 30, 2025 (claim 4166). These misses suggest execution challenges in both M&A and facility delivery, though the company has consistently reiterated an 8 GW target by 2030 across claims 8534, 7872, and 7888.
Recent announcements reveal geographic diversification: Indonesia's first Asia-Pacific facility targeting 360 MW by end-2028 (claim 155, 8758), Polaris Forge 1 at 400 MW (claim 370), Kenilworth Campus at 250 MW (claim 7869), and Lancaster expansion to 300 MW (claim 7870), plus two Stockholm colocation campuses (claims 7871, 7875). August 2026 brought major partnerships—JPMorgan and Mitsubishi UFJ as lead arrangers (claim 8736), NVIDIA's 6.3 billion USD commitment through 2032 (claim 4352), and Anthropic's multi-year deal (claim 8571)—suggesting serious financial and customer backing despite M&A stumbles.
For the next 90 days, watch whether active capacity actually reaches 1.85 GW by December 2026. CoreWeave must add roughly 1 GW in four months—achievable given announced sites but dependent on power interconnection readiness, which independent queue data will clarify. Also track whether delayed acquisitions (Marimo, OpenPipe, Monolith) finally close or vanish from discourse entirely.
Delivery vs. promise
2026-09-06CoreWeave's announced capacity has followed an aggressive expansion trajectory, growing from 70 MW at end-2023 to a stated 850 MW by end-2025, with a 1.85 GW target for end-2026. Contracted capacity tells a more expansive story: rising from 1.6 GW in May 2025 to 3.1 GW by March 2026 to 4.2 GW by August 2026. This gap between contracted and active capacity—currently 2.35 GW—reflects typical lag between commitment and deployment but suggests execution risk if operational ramp-up falters. Timeline performance has been mixed. The Core Scientific merger, promised by October 2025, was terminated entirely by October 30, 2025. Three smaller acquisitions (Marimo, OpenPipe, Monolith) each promised by September–November 2025 remained delayed as of March 1, 2026. A DDTL 3.0 commitment termination also slipped past its July 31, 2026 date. These misses represent strategic repositioning rather than pure failure—the Core Scientific deal abandonment coincided with partnerships announced six months later—but they signal execution friction on the M&A side. What supports the pace: major institutional backing materialized. JPMorgan and Mitsubishi UFJ jointly arranged financing by August 9, 2026; NVIDIA committed $6.3 billion across partnership frameworks and capacity purchases; Anthropic, Hudson River Trading, and Leidos signed multi-year agreements. The speed of recent partnership announcements (all August 2026) suggests operational readiness. Indonesia's three-facility footprint, announced August 6, 2026 and targeting 360 MW by end-2028, indicates geographic expansion timing but relies on colocation partnerships, not greenfield construction. Domestic projects (Kenilworth, 250 MW; Lancaster, 300 MW; Polaris Forge 1, 400 MW) suggest real pipeline activity. Watch whether CoreWeave hits the 1.85 GW active capacity target by December 31, 2026—a miss would signal either demand absorption issues or sustained construction delays. Monitor Indonesia site activation timing, which could compress if third-party colocation partners accelerate provisioning, or extend if power and networking infrastructure lags. Track whether the delayed acquisitions close and whether their integration actually adds compute-adjacent capabilities or remains aspirational.
Delivery vs. promise
2026-09-06CoreWeave's capacity trajectory shows aggressive acceleration alongside delayed acquisitions. From May 2025 through March 2026, the company more than doubled stated active power capacity from 420 MW (claim 4972) to 850 MW (claim 3553), while contracted capacity grew from 1.6 GW (claim 4973) to 3.1 GW (claim 3570). However, year-end 2026 targets show inconsistency: August announcements cite both 1.85 GW (claims 8666, 8533, 8281) and 1.7 GW (claim 7652) as the active power target. Reaching either would require 1–1.2 GW of deployment in nine months—a meaningful acceleration from the 490 MW added across 2025.
The company's acquisition track record has been mixed. Core Scientific merger, initially promised for October 2025 (claim 4517), slipped and was terminated by October 30 (claim 4166). Marimo, OpenPipe, and Monolith acquisitions, all promised for September–November 2025 and flagged in the March 2026 filing as delayed (claims 3577, 3578, 3579), show no completion status. The Weights & Biases acquisition was stated without a deadline (claims 4974, 3547).
Geographically, CoreWeave is expanding rapidly but with limited near-term specificity. Indonesia's first Asia-Pacific facility targets 360 MW by end-2028 (claims 155, 8758)—a longer timeline than domestic projects. Lancaster, Pennsylvania and Kenilworth, New Jersey facilities are announced with 300 MW and 250 MW potential respectively (claims 7874, 7873), but no completion dates. Sweden's Stockholm facilities are described in general terms (claims 7871, 7875). Polaris Forge 1 carries 400 MW of contracted capacity (claim 370) with no timeline attached.
Recent activity shows renewed momentum. August announcements brought partnerships with JPMorgan and Mitsubishi UFJ (claim 8736), Leidos, Anthropic, Hudson River Trading, and Backblaze. The 8 GW by 2030 target (claims 8534, 7872, 7889, 7629) appears standardized across recent communications.
Watch whether the company closes the year-end 2026 target gap, clarifies the 1.85/1.7 GW variance, and demonstrates facility progress beyond announcements. The pending M&A completions and Indonesia facility operational timeline matter; if domestic capacity targets slip again while international facilities lag, the 2030 8 GW goal becomes harder to credibly defend.
Delivery vs. promise
2026-09-06CoreWeave's announced capacity has grown materially from 70 MW at end-2023 to 850 MW at end-2025, with targets reannounced at 1.85 GW for year-end 2026 and 8 GW by 2030. The historical doubling-per-year trajectory is notable, though the 2026 target (1.85 GW per claims 8533, 8666, 8281, 7888) faced internal revision downward to 1.7 GW as recently as August 20th (claim 7652), suggesting forecast confidence may have wavered. The company has restated its 2030 target identically across six separate announcements since January (claims 3893, 8534, 8574, 7872, 7629, 7889) without adjustment despite nine months of operational history, implying either unchanged planning or unrevised modeling.
Promised acquisition dates have consistently slipped or terminated. The Core Scientific merger moved from an April 2026 close to October 2025 (claims 4731, 4517) and was terminated entirely by October 30th (claim 4166). Software acquisitions of Marimo, OpenPipe, and Monolith all exceeded their target close windows of September through November 2025 (claims 3577, 3578, 3579). The DDTL 3.0 commitment termination date promised for July 2026 now appears delayed (claim 4593). Only the Weights & Biases acquisition received restatement without explicit date revision, though no close date was promised in the record provided.
Independent evidence from permitting or grid interconnection queues is not visible in the claim record. The portfolio includes three Indonesia facilities (360 MW by 2028-12-31) using colocation lease arrangements rather than owned infrastructure, reducing capital risk but introducing third-party landlord and permitting dependencies (claims 155, 8758, 8760). Announced greenfield builds in New Jersey (250 MW) and Pennsylvania (300 MW potential) carry longer lead times. Contracted capacity across all projects stands at 4.2 GW (claims 8262, 8268, 8466) against deployed power of 850 MW—a ratio suggesting either aggressive bookings or execution risk.
The company stated near-term capacity sold out by mid-August (claim 1494), indicating demand elasticity, but the next ninety days will test whether this translates to builds. Reaching 1.85 GW by year-end requires approximately 1 GW of deployed capacity between now and December 31st—a quarterly pace roughly four times historical ramps. Indonesia deployment schedules remain unvalidated against local permitting timelines. Watch for actual commissioning announcements and any further revision to the 2026 active capacity target.
Delivery vs. promise
2026-09-06CoreWeave's announced infrastructure capacity has expanded dramatically and repeatedly. In May 2025, contracted power stood at 1.6 gigawatts (claim 4973). By March 2026, that figure had roughly doubled to 3.1 GW (claim 3554), and by August 2026 it climbed to 4.2 GW (claim 8522)—a 2.6-fold increase in fifteen months. The trajectory resembles a company aggressively acquiring commitments, yet active capacity—the compute already running—tells a different story. Year-end 2025 active capacity was claimed at 850 MW (claim 3553), with a 2026 target of 1.85 GW (claim 8533). The gap between 4.2 GW contracted and 1.85 GW targeted for operational deployment at year-end suggests either that contracts are outpacing buildout capability, or that near-term construction pipelines face headwinds.
Acquisition discipline has slipped. The Core Scientific merger, promised for April 2026, was terminated by October 2025 (claim 4166) after missing its original October 2025 deadline (claim 4517). Smaller bolt-ons—Marimo, OpenPipe, Monolith—each missed late-2025 close dates (claims 3577, 3588, 3589). These delays suggest integration complexity or shifting strategic priorities.
The Indonesia announcement in August 2026 introduces both promise and calendar risk. CoreWeave committed to three facilities in Greater Jakarta totaling 360 MW by end of 2028 (claims 8758, 155). The geographic diversification is strategic, but the 2028 delivery window is two years out, making near-term verification difficult. Domestically, three projects anchor the next phase: Polaris Forge 1 (400 MW, claim 370), Kenilworth (250 MW, claim 7873), and Lancaster (300 MW, claim 7870). CoreWeave has stated near-term capacity is sold out (claim 1494), suggesting demand, not supply constraints—but converting contracted megawatts into operational capacity has proven harder than anticipated.
By December 2026, CoreWeave must deliver the 1.85 GW active target to sustain momentum and investor confidence. The next ninety days will reveal execution velocity against major domestic projects and validate whether 2030's 8 GW goal remains credible or drifts further.
Delivery vs. promise
2026-09-06CoreWeave has announced an aggressive expansion trajectory, progressing from 70 MW of operational capacity at end-2023 to 850 MW by end-2025, with a stated target of 1.7–1.85 GW active capacity by year-end 2026 and 8 GW by 2030 (claims 3551–3553, 7652, 7889). This implies roughly doubling deployed capacity in four months from the August 2026 announcement window, followed by sustained annual growth of ~1.5 GW through 2030. Contracted power capacity stands at 4.2 GW (claim 8522), meaning only a fraction of long-term commitments are operationalized. The company's acquisition roadmap has proven volatile: Core Scientific was announced for merger in May 2025, re-confirmed through September 2025, then terminated by late October 2025 (claims 4731, 4517, 4166). Three software acquisitions (OpenPipe, Monolith, Marimo) initially targeted for September–November 2025 close-out appear delayed as of the March 2026 reporting cycle (claims 3577–3589). On timeline execution, a DDTL 3.0 commitment termination was promised for July 31, 2026 (claim 4593), yet no public closure has been documented past that deadline. Named projects suffer from uneven specificity: the Indonesia facility (first Asia-Pacific deployment) has a single operational milestone pegged to 360 MW by end-2028 (claim 155), while Polaris Forge 1 (400 MW contracted; claim 370) and Sweden expansion (claim 7644) carry no delivery dates. Recent partnership announcements—Anthropic, Hudson River Trading (including alleged $22.4 billion in aggregate commitments), Backblaze, and JPMorgan/MUFJ financing roles—arrived in mid-to-late August 2026 and remain unvalidated on deployment. Notably, August claims contain contradictory year-end 2026 targets: multiple sources cite 1.85 GW (claims 8666, 8281, 7888) while claim 7652 specifies 1.7 GW, suggesting either mid-campaign recalibration or conflicting internal estimates. No permits, interconnection queue positions, or third-party construction verification are cited in disclosed materials. Watch whether the 1.7–1.85 GW year-end target materializes, conversion velocity from contracted to active megawattage, and whether the major partnership announcements translate into firm capacity bookings or remain aspirational commitments.
Delivery vs. promise
2026-09-06CoreWeave's announced capacity has experienced significant expansion with a pattern of aggressive target-setting followed by partial realization. Historical capacity grew from 70 MW (end 2023) to 360 MW (end 2024) to 850 MW (end 2025), representing an acceleration trajectory. However, contracted capacity outpaces active deployments substantially: as of March 2026, CoreWeave held 3.1 GW in contracts against 850 MW operational, a 27% conversion rate (3551, 3552, 3553, 3554). Most recent guidance targets 1.85 GW active by year-end 2026 (8533, 8281), yet claim 7652 issued four days later revises this downward to 1.7 GW without explanation, suggesting internal uncertainty or miss on interim milestones.
Timeline discipline remains the clearest vulnerability. The Core Scientific merger, announced in May 2025, was promised by April 2026 (4731), then October 2025 (4517), before termination in October without public acknowledgment of failure (4166). Smaller acquisitions—Marimo, OpenPipe, Monolith—each slipped three to six months from initial September-November 2025 windows, now buried in March 2026 filings (3577, 3588, 3589) without revision commentary. Weights & Biases acquisition claims repeat across multiple filings with no closure announcement despite a stated 1 billion USD value (4516).
Independent verification is absent from the record. No permit filings, interconnection queue entries, or third-party construction milestones substantiate the announced pace. Recent facility announcements—Kenilworth, NJ greenfield (250 MW), Lancaster, PA expansion (300 MW), Stockholm colocation (undisclosed MW), Indonesia (360 MW by 2028-12-31, claim 155)—are early-stage and carry execution risk typical of greenfield and international projects. The Indonesia timeline particularly warrants scrutiny: 2.5 years to 360 MW in a new jurisdiction with grid, permitting, and supply-chain dependencies.
Capacity growth from 850 MW to claimed 1.85 GW in 12 months would require roughly 2x historical annual deployment rates. Watch for Q3 and Q4 2026 earnings reports detailing actual active capacity adds; resolution of the 1.85 GW versus 1.7 GW target discrepancy; and meaningful progress on Kenilworth and Lancaster projects (permit filings, land acquisition). Customer ramp data from Anthropic, Hudson River, and OpenAI partnerships will signal demand-pull validity.
Delivery vs. promise
2026-09-06CoreWeave has scaled announced power capacity substantially but faces execution questions. Operational capacity grew from 70 megawatts at end-2023 (claim 3551) to 850 megawatts by year-end 2025 (claim 3553), roughly a tenfold gain. Contracted capacity tells a different story: 1.6 gigawatts in May 2025 (claim 4973) expanded to 3.1 gigawatts by March 2026 (claim 3559) and reached 4.2 gigawatts by mid-August 2026 (claim 8522). This gap between contracted and operational—currently a 2.35 gigawatt spread—reflects announcement velocity outpacing deployment.
The company's timeline track record is uneven. The Core Scientific merger, announced mid-2025 with a targeted October close (claim 4517) and detailed exchange ratios across multiple announcements, terminated entirely by late October (claim 4166). Three concurrent acquisitions announced March 2026—Marimo, OpenPipe, and Monolith—carried promised completion dates in autumn 2025, already months past when they were announced (claims 3577, 3588, 3589). CoreWeave's commitment termination deadline for DDTL 3.0 was promised for July 31, 2026, and marked delayed (claim 4593). These reversals and missed dates suggest either aggressive initial guidance or strategic pivots not transparently communicated.
Facility anchors provide some grounding. Named projects include Kenilworth, New Jersey (250 megawatts, claim 7873) and Lancaster, Pennsylvania (300 megawatts potential, claim 7874), with Swedish colocation campuses and an Indonesia facility promised for 360 megawatts by December 2028 (claim 155). The Indonesia deployment carries particular risk given geographic complexity and 25-month window. CoreWeave's 2026 year-end active capacity target appears inconsistent across filings—flagged at both 1.85 gigawatts (claim 8533) and 1.7 gigawatts (claim 7652)—suggesting imprecision in forward guidance or mid-course corrections.
Watch for Q4 2026 delivery against the 1.7–1.85 gigawatt target, Indonesia's permitting trajectory, and whether the 4.2 gigawatt contracted capacity begins converting to active deployment at promised rates. The 8 gigawatt 2030 ambition requires roughly 6-7x current active capacity in four years.
Delivery vs. promise
2026-09-05CoreWeave's capacity trajectory shows aggressive expansion, growing from 70 MW at end-2023 to 850 MW by end-2025 before targeting 1.85 GW by year-end 2026 (claims 3551, 3553, 8533). To hit that intermediate target from current levels represents a sustained doubling pace, consistent with prior growth but arriving just four months out. The company's contracted power capacity sits at 4.2 GW (claim 8522), more than double its 2026 active target and half its 2030 ambition of 8 GW (claims 8534, 8574). This gap warrants scrutiny: either deployment velocity will accelerate significantly or contracted commitments face pressure. Recent capacity announcements (late August) reference specific sites—Kenilworth, New Jersey at 250 MW and Lancaster, Pennsylvania at 300 MW, plus Indonesia at 360 MW by end-2028 (claims 7869, 7870, 155)—providing geographic diversification but fragmenting execution focus across multiple construction and grid-connection timelines.
CoreWeave's M&A discipline shows cracks. The Core Scientific merger, announced multiple times from May through September 2025, terminated in late October (claim 4166) after a promised close date of October 1 slipped (claim 4517). Smaller acquisitions of Marimo, OpenPipe, and Monolith, all announced in March 2026, missed their promised September-through-November 2025 dates by months (claims 3577, 3578, 3579). The company has not publicly acknowledged these reversals as formal cancellations; the record shows delays without explicit withdrawal language. More concerning, the DDTL 3.0 commitment termination date promised for July 31, 2026 (claim 4593) is now past; no updates clarify whether the commitment stands, was extended, or was quietly abandoned.
Partnership announcements accelerated sharply in August 2026—multi-year agreements with Anthropic, Hudson River Trading, and Backblaze, alongside reported OpenAI commitments exceeding $22 billion (claims 8571, 1242, 7448, 7598). Partnership velocity suggests strong demand capture but creates execution dependencies external to CoreWeave's control. Watch whether the 1.85 GW active target is hit on schedule by December 31; whether Indonesia begins major construction milestones; and whether delayed acquisition closures are formally updated or quietly shelved. The next quarterly filing should clarify M&A status and DDTL 3.0 standing. Slippage on the 2026 capacity target, coupled with further unacknowledged timeline slides on smaller deals, would signal execution constraints beneath the surface.
Delivery vs. promise
2026-09-05CoreWeave's expansion narrative reveals escalating commitments alongside unresolved dependencies. Historical deployment data (claims 3551–3553) shows genuine momentum: 70 megawatts at end-2023, 360 megawatts at end-2024, and 850 megawatts at end-2025. However, contracted capacity—1.6 gigawatts announced May 2025—jumped to 4.2 gigawatts by August 2026 (claims 4973, 8522), outpacing deployed volumes by five times. This gap suggests either accelerating deployment velocity or unexecuted commitments.
Near-term targets introduced numerical inconsistency. Year-end 2026 guidance ranged from 1.7 to 1.85 gigawatts across four separate August announcements (claims 8533, 8281, 7652, 1489). Even at the high end, 1.85 gigawatts represents only 2.2 times 2025 deployed capacity—modest compared to historical growth rates and the gulf to 4.2 gigawatts contracted. This suggests deployment velocity is decelerating.
Strategic acquisitions introduced execution risk with no resolution. Core Scientific merger, promised October 2025 close (claim 4731), terminated without stated cause by January 2026 (claim 4166). Marimo, OpenPipe, and Monolith, each promised to close in September–November 2025, remained delayed in March 2026 filings (claims 3577–3589). Weights & Biases acquisition remains undated despite $1 billion valuation (claim 4516). These delays matter if acquisition targets were capacity enablers; their absence may explain the deployment gap.
Long-term guidance revised without acknowledgement. January 2026 communications projected five-plus gigawatts by 2030; August 2026 messaging escalated to eight-plus gigawatts (claims 3893, 8534, 7872). The sixty-percent increase coincides with acquisition failures, raising questions about planning basis.
Geographic diversification lacks transparent foundation. Indonesia targets 360 megawatts by end-2028 (claim 155); Kenilworth and Lancaster projects are named but lack visible permits or construction milestones. Sweden mentions colocation without timeline. NVIDIA co-engineering (claim 1501) and OpenAI contract ($22.4 billion, claim 1242) confirm customer demand but not deployment certainty.
Monitor Q4 2026 results for actual year-end capacity versus stated targets. Track acquisition closure dates, Indonesia progress milestones, and Kenilworth/Lancaster permit filings. Watch whether 2027 guidance addresses contraction between contracted and deployed capacity or explains the 2030 target escalation.
Delivery vs. promise
2026-09-05CoreWeave has plotted an aggressive capacity expansion trajectory that shows significant scaling velocity but faces execution credibility questions. Reported active capacity grew from 70 MW (end 2023, claim 3551) through 360 MW (2024, claim 3552) to 850 MW (2025, claim 3553), reaching approximately 1.5 GW by late August 2026 (claim 1455). This represents compound growth, but contracted capacity has outpaced active deployment: claims 3554 and 3582 from March 2026 cited 3.1 GW total contracted capacity, while claims 8262 and 1456 from mid-to-late August now place contracted capacity at 4.2 GW. This 35 percent jump in contracted commitments over five months suggests either aggressive customer wins or revised internal assumptions about deployment feasibility.
Promised timelines reveal execution risk. The Core Scientific merger, initially promised by April 2026 (claim 4731), faced delays and ultimately terminated (claim 4166). Parallel acquisitions of Marimo, OpenPipe, and Monolith promised for September through November 2025 were reported as incomplete by March 2026 (claims 3587–3589). These setbacks suggest integration capacity constraints that may affect infrastructure buildout.
Year-end 2026 targets now present a critical test. Claims 8281 and 7652 project 1.85 GW and 1.7 GW of active capacity respectively by December 31, 2026—roughly 200 to 350 MW above current levels in approximately four months. This timing is tight but not implausible given industry deployment cadences. The long-term 2030 target of 8 GW (claims 7872, 7889, 7629) requires sustained delivery and implies roughly 1.5 GW per year growth over the next four years.
Third-party indicators offer partial validation. Recent partnership announcements—NVIDIA frameworks (claim 3892), multi-year deals with Hudson River Trading (multiple August 2026 claims), Anthropic, and Backblaze storage commitment (claim 7448)—suggest customer confidence and revenue locked in. The Indonesia facility commitment (claim 155) targets 360 MW by end 2028, a realistic timeline for greenfield deployment in Southeast Asia.
The gap between active and contracted capacity remains the primary concern. CoreWeave must convert 2.7 GW of contracted commitments into operational infrastructure while maintaining execution on M&A. Monitor fourth-quarter 2026 capacity reporting, Indonesia project permitting status, and any guidance revisions on the 8 GW by 2030 target. Merger failures and acquisition delays suggest the company may face capital allocation or integration headwinds that could pressure timelines.
Delivery vs. promise
2026-09-05CoreWeave's facility roadmap shows acceleration in headline targets alongside execution inconsistencies. Organic capacity growth from 2023 to 2025 tracked steadily—70 MW (claim 3551) to 360 MW (claim 3552) to 850 MW (claim 3553)—but the 2030 ambition jumped sharply from 5+ gigawatts (claim 3893, January 2026) to 8+ gigawatts (claim 7629, August 2026) within seven months. The 4.2 GW contracted pipeline announced in August (claim 8268) provides nominal justification, yet the jump itself suggests either opportunistic expansion or revised capacity counting rather than organically validated demand. Year-end 2026 guidance muddied in a single week: August 17 targeted 1.85 GW active (claim 8281), August 20 restated 1.7 GW (claim 7652), and August 24 claimed 1.5 GW already live (claim 1445). These figures contradict or collapse into one another depending on whether they reference targets or actuals, creating ambiguity about real-time deployment status. Acquisition execution stumbled on smaller infrastructure bets. The Marimo, OpenPipe, and Monolith acquisitions promised for September through November 2025 (claims 3577, 3578, 3579) were marked delayed by March 2026's quarterly filing. The Core Scientific merger, revised multiple times—April 2026 (claim 4731), October 2025 (claim 4517)—ultimately terminated in January (claim 4166). These delays suggest either integration complexity or capital discipline, but they pile up without formal explanation. Geographic diversification accelerated late: Indonesia's 360 MW (claim 155, promised by December 2028), Lancaster's 300 MW (claim 7874), Kenilworth's 250 MW (claim 7873), and Stockholm (claim 7875) were all disclosed in August 2026, giving little runway to validate site readiness. The Indonesia timeline provides the longest sightline—a 2.5-year window carries real risk given typical build cycles. Over the next 90 days, watch whether CoreWeave crosses 1.7–1.85 GW active capacity. Reaching mid-2 gigawatt range by year-end from 1.5 GW in early September requires adding 200–350 MW quarterly, a step change from the 122 MW average quarterly addition in 2025. Permits and utility interconnection agreements for Indonesian and Lancaster sites should begin surfacing if timelines hold. Partnership deployment rates—the Hudson River Trading (claim 7463) and Anthropic (claim 7630) agreements signed in August—will signal whether bookings translate to utilization pressure or contractual optionality.
Delivery vs. promise
2026-09-05CoreWeave's capacity trajectory shows steep acceleration from 70 MW in December 2023 to 850 MW by December 2025, with contracted capacity now standing at 4.2 GW (claims 3551, 3553, 8262). The company targets 1.7 to 1.85 GW active by year-end 2026 and 8 GW by 2030, but delivery credibility faces headwinds from several timeline slippages. The Core Scientific merger announced in May 2025 with a promised October 2025 close (claims 4517, 4331, 4313) was terminated in January 2026 without prior disclosure of execution risk (claim 4166). Three platform acquisitions—Marimo, OpenPipe, and Monolith—promised for September through November 2025 remained undisclosed as delayed until the March 2026 filing (claims 3577, 3578, 3579). The DDTL 3.0 commitment termination date shifted from July 2026 without explanation (claim 4593). These reversals suggest internal capacity constraints or strategic pivots occurring faster than public communication cycles.
Recent August announcements reveal aggressive customer lock-in: a $22.4 billion OpenAI contract, multi-year agreements with Anthropic and Hudson River Trading, and $335 million from Backblaze (claims 1242, 7630, 1820, 7448). CoreWeave claims near-term capacity is fully booked (claims 1494, 6721), creating a critical dependency on new facility activation. The 1.7–1.85 GW target requires roughly doubling utilization in six months, relying on Kenilworth (250 MW), Lancaster (300 MW), and overseas expansion. Indonesia's first Asia-Pacific site is promised for end-2028 at 360 MW (claim 155), a 2.5-year deployment window that lacks visible permitting evidence or ground-truth updates. The gap between contracted (4.2 GW) and active capacity (0.85 GW as of early 2026) is substantial; meeting the 1.85 GW year-end target would still leave 2.4 GW of signed capacity unlit. Over the next 90 days, watch for actual power draw and energy procurement announcements, first-phase completion milestones at Kenilworth and Lancaster, any disclosure of customer attrition or postponement, and quarterly commentary on whether the contracted backlog remains firm or is being renegotiated.
Delivery vs. promise
2026-09-05CoreWeave's capacity ambitions have escalated sharply since mid-year. In May 2025, the company cited 1.6 GW of contracted power (claim 4973); by March 2026, it announced 3.1 GW to deploy (claim 3554); by August 2026, that target doubled to 8 GW by 2030 (claims 7868, 7629). Near-term deployment paints a different picture: 70 MW (end 2023), 360 MW (end 2024), 850 MW (end 2025), with August forecasts targeting 1.7–1.8 GW by year-end 2026 (claims 7652, 1489). That rate of growth—roughly 450 MW over one year—would require 6–7 years to reach the 8 GW target, assuming linear expansion.
Acquisition momentum has stalled. OpenPipe, Marimo, and Monolith were announced in March 2026 with promised close dates (September, October, and November 2025, respectively) already past, flagged as delayed at announcement (claims 3588, 3587, 3589). Weights & Biases, announced May 2025 and priced at $1 billion in August (claim 4516), shows no completion confirmation across subsequent filings. The Core Scientific merger, delayed multiple times beginning July 2025 (claim 4731, promised April 2026), was terminated outright by October (claim 4166). DDTL 3.0's commitment termination date (promised July 31, 2026) is marked delayed (claim 4593).
Partnership depth is notable: Anthropic (claim 7630), Hudson River Trading (multiple references, August claims 7598–7605), Backblaze ($335M, claim 7448), and NVIDIA (co-engineering, claims 1501, 1778). OpenAI is cited for $22.4 billion in contract value (claim 1242, August 2026). Yet these agreements remain unverified by independent infrastructure signals—permit filings, interconnection queue entries, or third-party on-the-ground reporting are absent from the record.
Geographic footprint announcements are recent (Kenilworth, NJ 250 MW; Lancaster, PA 300 MW; Stockholm colocation; Indonesia 360 MW targeting 2028–end claim 155) but lack corroborating permit or construction evidence. Watch through December for three markers: (1) whether actual deployed capacity meets the 1.7–1.8 GW year-end forecast, now just four months out; (2) public confirmation of Weights & Biases integration or announcement of deal termination; (3) any permit or interconnection queue filings for Indonesia, Kenilworth, or Lancaster that signal material progress on the 8 GW roadmap.
Delivery vs. promise
2026-09-05CoreWeave has demonstrated significant year-over-year capacity growth, expanding from 70 MW (Dec 2023) to 360 MW (Dec 2024) to 850 MW (Dec 2025)—a 12x increase over two years. However, recent capacity guidance shows moderation: claims from August 2026 set end-of-year 2026 targets between 1.7 and 1.85 GW (claims 7652, 7888, 1489), representing 2–2.2x growth rather than the higher multiples of prior periods. The company's announced 8 GW target by 2030 remains consistent across claims 7868, 7872, 7889, 7629, 943, and 1490 but requires sustained 25%+ annual growth from a modestly expanding base.
A pattern of slipped M&A milestones suggests operational constraints. The Core Scientific merger (initially claim 4731, due 2026-04-07) was terminated entirely by October 2025 (claim 4166). Monolith, OpenPipe, and Marimo—all promised in Q3 2025 (claims 3579, 3578, 3577)—showed [delayed] status by March 2026 (claims 3589, 3588, 3587). Weights & Biases acquisition appears repeatedly (claims 4516, 3562, 3547, 3586, 3576) without closure signals. These delays contrast sharply with locked customer commitments: OpenAI ($22.4B, claim 1242), NVIDIA ($6.3B through 2032, claim 4352), Backblaze ($335M over five years, claim 7448), and Hudson River Trading multiyear agreements (claims 1820, 7463). Near-term capacity is described as sold out (claim 1494).
Geographic expansion announcements lack specificity. Indonesia's 360 MW deployment extends to 2028-12-31 (claim 155); New Jersey (250 MW, claim 7873), Pennsylvania (300 MW, claim 7870), and Sweden colocation sites (claims 7871, 7875) have no stated delivery dates. Current active capacity stands around 1.5 GW (claim 1445), requiring 200–350 MW deployment within four months to hit year-end 2026 targets. The firmware maturity of NVIDIA Vera Rubin and Spectrum-X networking (claims 1773, 7600) and the 128,000 GPU multi-plane claim (claim 1497) lack independent validation.
Watch for: (1) December 2026 capacity realization—whether CoreWeave closes the gap from 1.5 GW to stated 1.7–1.85 GW targets, signaling execution credibility; (2) Indonesia site progress and interconnection queue entries, which would evidence the 2028 timeline; (3) any further target revision downward, indicating demand or infrastructure constraints.
Delivery vs. promise
2026-09-05CoreWeave has demonstrated rapid capacity growth but faces execution uncertainty across multiple vectors. From December 2023 through year-end 2025, operational footprint expanded nearly six-fold, from 70 MW (claim 3551) to 850 MW (claim 3553). The company's stated trajectory targets 1.7 to 1.85 GW active capacity by 2026 year-end (claims 7652, 7888), implying roughly doubling from the 2025 baseline. However, this growth masks deeper complications in the M&A pipeline. CoreWeave's October 2025 Core Scientific merger terminated (claim 4166) after a promised October 1 close date (claim 4517) slipped and failed entirely. Additionally, claims filed March 1, 2026 indicate delayed acquisition closures: OpenPipe and the Monolith deal both missed original 2025 deadlines (claims 3588, 3589), suggesting integration velocity challenges.
The company has escalated its 2030 target significantly. January 2026 communications referenced 5+ gigawatts by 2030 (claim 3893), but August announcements pushed this to 8 GW (claims 7872, 7629, 7889). This 60 percent upward revision in seven months warrants scrutiny—growth targets often retract rather than expand if underlying unit economics deteriorate.
Recent partnership announcements, concentrated in late August 2026, included major commitments: a multi-year compute deal with Anthropic (claim 7630), a $22.4 billion OpenAI contract (claim 1242), and a $335 million storage partnership with Backblaze (claim 7448). These are substantive, though claim entries reference Hudson River Trading repeatedly without clear delineation of distinct deals versus redundant reporting. The Indonesia Data Center is promised for December 31, 2028 at 360 MW (claim 155), representing geographic expansion but offering no near-term relief.
Critical near-term metrics: CoreWeave must demonstrate 1.7+ GW in active capacity by year-end 2026 to maintain credibility. The Polaris Forge 1 facility (400 MW contracted, claim 370) timeline remains unspecified. Acquisition closures of Marimo, OpenPipe, and Monolith warrant monitoring for further delays. Watch whether the 8 GW 2030 target gets revised downward as integration pressures mount or whether independent evidence—permit filings, power purchase agreements, utility interconnection queue positions—validates the accelerating deployment pace.
Delivery vs. promise
2026-09-05CoreWeave's announced capacity has accelerated sharply, growing from 70 MW at end-2023 (claims 3551, 3567) to 850 MW by end-2025 (claims 3553, 3569), yet the 2026 trajectory shows deceleration. Mid-year targets for 2026 year-end ranged from 1.7 GW (claim 7652) to 1.85 GW (claim 7888), representing a two-fold gain rather than the five-fold growth of the prior two years. This suggests either capacity constraints or revised internal projections, though the company has not explicitly walked back the 8 GW by 2030 commitment (claims 7868, 7872, 7629, 1490).
Promised acquisition timelines have not held. The Core Scientific merger, initially promised by October 2025 (claim 4517), was terminated in October (claim 4166). OpenPipe, Marimo, and Monolith acquisitions all missed original delivery windows—September, October, and November 2025 respectively (claims 3588, 3587, 3589)—yet appear ongoing as of the most recent filings without explicit revised dates. Weights & Biases acquisition claims span from May 2025 through March 2026 (claims 4974, 4516, 3586, 3576), suggesting protracted negotiations rather than failure.
Ground-level evidence partially supports claimed pace. Polaris Forge 1 claims 400 MW contracted capacity (claim 370); Kenilworth, New Jersey and Lancaster, Pennsylvania announce 250 MW and 300 MW respectively (claims 7869, 7874). Indonesia's Greater Jakarta deployment commits 360 MW by end-2028 (claim 155), a substantial but distant milestone. Partnership announcements—NVIDIA's $6.3 billion commitment through 2032 (claim 4352), Anthropic's multi-year deal (claim 7630), and OpenAI's stated $22.4 billion contract value (claim 1242)—indicate demand support, though execution risk remains. The company noted near-term capacity as sold out (claim 1494), a bullish signal if actual deliveries materialize.
In the next 90 days, track whether CoreWeave closes the Weights & Biases acquisition and provides completion dates for OpenPipe, Marimo, and Monolith. Assess whether 2026 year-end capacity lands within stated ranges or undershoots. Monitor Indonesia's first Asia-Pacific facility for site acquisition and initial build notices. Watch for revised guidance on the 2030 8 GW target, especially if H2 2026 deployment lags the stated path.
Delivery vs. promise
2026-09-05CoreWeave presents an accelerating capacity deployment trajectory that has scaled meaningfully since mid-2025, though with notable execution friction on the acquisition front. On the infrastructure side, the company reported 70 MW of active capacity at end-2023, grew to 360 MW by end-2024, and reached 850 MW by end-2025 (claims 3551–3553). The contracted pipeline has expanded correspondingly: from 1.6 GW announced in May 2025 (claim 4973) to 3.1 GW by March 2026 (claim 3559) to 4.2 GW by August 2026 (claim 1456). The company is targeting 1.7–1.8 GW of active capacity by year-end 2026 (claims 7652, 1489), then 8 GW by 2030 (claims 1490, 6738)—roughly a 4.7x multiplier over four years.
Date slippage has been persistent on acquisitions rather than infrastructure. The Core Scientific merger, promised via multiple announcements with closing dates through October 2025, was terminated entirely in October (claim 4166). Three acquisitions—OpenPipe, Marimo, and Monolith—each slipped from original Q3 or Q4 2025 closure windows with no announced revised dates or withdrawal as of March 2026 (claims 3577–3579, 3588–3589). By contrast, infrastructure timelines have held or revised cleanly: the Indonesia facility is confirmed for 360 MW deployment by end-2028 (claim 155), and near-term capacity is marked fully booked (claim 6721).
Capacity figures have been revised without explicit acknowledgement of the change. Contracted power jumped from 1.6 GW to 3.1 GW in an eight-week window spanning March 2026, suggesting either delayed disclosure of earlier contracts or material new wins. The active-to-contracted ratio remained roughly 20–36 percent through August 2026 (1.5 GW active, 4.2 GW contracted), implying significant deployment lag ahead even at current ramp rates.
No independent corroboration is evident from permits, interconnection queues, or third-party facility surveys in the data set. In the next 90 days, watch whether CoreWeave closes the three delayed software acquisitions or formally abandons them, whether active capacity reaches the stated 1.7–1.8 GW run-rate by December, and whether any of the major partnerships (NVIDIA's 6.3 billion commitment, Anthropic, OpenAI's 22.4 billion contract value) show signs of meaningful utilization across live deployments.
Delivery vs. promise
2026-09-05CoreWeave's capacity targets have scaled dramatically and repeatedly within months. The company grew from 70 megawatts at the end of 2023 to 850 megawatts by end-2025, and now targets 1.7 to 1.8 gigawatts by December 2026 (claims 3551, 3553, 1489, 6737). The 2030 target jumped from 5 gigawatts announced in January to 8 gigawatts announced in August—a 60 percent upward revision in under seven months (claims 3893, 7629). This pattern reflects real customer demand acceleration, but the frequency of target increases also suggests initial planning was conservative.
Current active capacity sits at 1.5 gigawatts against 4.2 gigawatts contracted, with the company stating near-term capacity is fully booked (claims 1455, 1456, 6721). The 200 to 300 megawatt gap between current deployed and end-2026 target represents a compressed deployment schedule—feasible but tight. This timing concentration creates execution risk if any single facility slips.
Timeline performance shows mixed results. The DDTL 3.0 commitment termination originally promised for July 2026 now carries a delayed flag (claim 4593). Core Scientific merger negotiations collapsed entirely after running from May through October 2025 (claims 4731, 4166). The company then announced two new major facilities—Indonesia and Polaris Forge 1—both in August 2026, with only Indonesia carrying an explicit delivery date: December 2028 for 360 megawatts in Greater Jakarta (claims 3013, 155). Polaris Forge 1 lists 400 megawatts contracted but no timeline (claim 370).
Public statements anchor expectations to booked capacity rather than deployed capacity, which creates a measurement problem: if 4.2 gigawatts is contracted against a 2030 target of 8 gigawatts, the company is discussing sales success rather than delivery progress. The data provided contains no independent verification—no permit records, interconnection queue positions, or engineering milestones to calibrate announced timelines against real-world constraints.
Watch over the next 90 days whether active capacity reaches 1.7 to 1.8 gigawatts or undergoes further revision, whether Indonesia or Polaris files for grid interconnection, and whether 2030 targets shift again as new customer contracts land.
Delivery vs. promise
2026-09-02CoreWeave's announced capacity trajectory shows aggressive near-term ambitions paired with softer long-term commitments. From 70 MW at end-2023 to 1.5 GW active capacity by mid-2026, the company has demonstrated roughly 20x growth in two years (claim 1794). This acceleration is material, yet the gap between active (1.5 GW) and contracted capacity (4.2 GW) suggests announced demand significantly outpaces delivered infrastructure—a pattern common in AI compute but worth monitoring for execution risk.
Near-term forecasts remain unchanged. CoreWeave restated its end-of-2026 target at 1.8 GW as recently as August 25 (claim 1795), implying only 300 MW of new active capacity needed in the final four months of the year. Given mid-year stood already at 1.5 GW, this represents a material deceleration from the 2023–2026 pace and warrants independent verification as year-end approaches. The company's August 24 manufacturing change notification (claim 2525) signals active infrastructure work but provides no capacity update.
Partnership announcements clustered heavily in late August, particularly the repeated Hudson River Trading deal (claims 958, 1234, 1790, 1820, 1502, 1809 across five days) and the 22.4-billion-dollar OpenAI contract (claim 1242). The Hudson River Trading repetition raises questions about whether these represent distinct phases of a single partnership or overwording of a single commitment. Two partnerships withdrawn—Backblaze (claim 1243) and Anyscale (claim 1769)—hint at deals that either failed to close or proved immaterial enough to de-announce.
Long-term targets show a consistent 8 GW by 2030 goal across multiple statements (claims 943, 1490). The intermediate 3.2 GW target for end-2027 (claim 1796) extends the slowing growth trajectory and suggests CoreWeave may be normalizing expansion rates as it scales.
Watch for: achievement of the 1.8 GW EOY target in Q4 2026; third-party evidence of Indonesia's 360 MW deployment timeline (due 2028); NVIDIA partnership deliverables and validation timeline on Vera Rubin hardware (claim 1773); whether the contracted-to-active capacity ratio begins closing, signaling actual customer workload migration. The next 90 days will clarify whether CoreWeave's mid-year pace was sustainable or an anomaly.
faq
Frequently asked
2026-10-19A. CoreWeave rents out GPU computing capacity for training and running AI models. It operates data centers filled with NVIDIA GPUs and sells access to them as a cloud service. At its May 2025 update it reported about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It also added software and tools, including AI Object Storage (claim 4975) and the acquisition of Weights & Biases, a developer tooling company (claims 4974, 29787).
A. The strategy is to sign large multi-year compute contracts and then borrow heavily to build the capacity to serve them. CoreWeave went public on Nasdaq in March 2025 at $40 per share (claims 17815, 18881), raising about $1.5B gross (claim 19821) and about $1.4B net (claim 4967). It reported $17.2B in total debt and equity raised (claim 4968). It then layered on more financing: an expanded $1.5B revolving credit facility (claim 5010), a delayed-draw term loan of up to $2.6B (claim 11922), and senior notes. It projected roughly $8.9B of secured debt tied to servicing contracts (claim 29783). It also markets technical leadership, citing a top 'Platinum' rating in SemiAnalysis's ClusterMAX evaluation (claims 18878, 4981) and MLPerf benchmark results (claim 4980).
A. The only named customer in the record is OpenAI. The disclosed contract value differs by source: $11.9B in one claim (claim 19820) and $11.2B of backlog in another (claim 4969). This gap is unreconciled. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but no dollar value is disclosed. CoreWeave reported $25.9B of total contracted backlog (claim 4970). OpenAI accounts for less than half of that, and the customers behind the rest are not named in this record.
A. Almost everything in the record has status 'stated'. That means the company disclosed it, but the item has not been independently confirmed as delivered. The only verified items are the closing of the $2.0B 9.250% senior notes due 2030 on the expected date of May 27, 2025 (claims 29434, 11919, 29421). That offering was upsized from an initially described $1.5B (claims 29774, 29433). Capacity figures, backlog, product launches, and the run-rate adjusted EBITDA of about $5.17B (claim 29784) are all company statements that have not been verified.
A. The debt load is substantial and expensive. The $2.0B of notes carry a 9.250% coupon and mature June 1, 2030 (claims 29433, 29435). Proceeds from the notes were used in part to repay about $450M of revolver borrowings (claim 29778). The company also repaid a $1B 2024 term loan (claim 29779). Around the same time it drew $444M more on the revolver (claim 29780) and $505M on its DDTL-2 term loan (claim 29781). In plain terms, the company is refinancing and stacking debt rather than paying it down overall.
A. Three things stand out. First, the 'springing' maturity date of December 30, 2026 on the credit facility (claim 11926). A springing maturity can pull a loan's due date forward if certain conditions are met, so check whether it is triggered or waived. The revolver otherwise runs to May 2, 2028 (claim 5012). Second, whether the 1.6 GW of contracted power (claim 4973) becomes active capacity beyond the roughly 420 MW reported (claim 4972). Third, whether the $25.9B backlog (claim 4970) turns into recognized revenue on schedule.
A. Yes. Shortly after the IPO, the record shows about $29.1M of stock sales by the CFO (claim 19831) and about $217M by the Chief Development Officer (claim 19832). Insider selling after an IPO is common and is not proof of a problem. The size of the sales is still worth weighing alongside the company's growth claims.
A. The first is customer concentration: OpenAI is the only named customer, and who makes up the rest of the $25.9B backlog is undisclosed (claim 4970). The second is the conflicting OpenAI figures of $11.9B and $11.2B (claims 19820, 4969). The third is whether contracted revenue can cover high-cost debt (9.25% notes, claim 29433) as it comes due. The fourth is the gap between contracted power (1.6 GW) and active power (about 420 MW). Finally, the claims supplied to this FAQ end in late May 2025 and the list was cut off mid-entry, so later developments may not be reflected here.
Frequently asked
2026-10-19A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity to companies that train and run AI models. It operates data centers filled with NVIDIA hardware and sells access through its own cloud software. As of May 2025 it reported about 420 MW of active power across 33 data centers [29785] and more than 250,000 GPUs online [29786]. It also acquired Weights & Biases, a developer tools company for machine learning [4974, 29787]. Third-party recognition on record includes the only Platinum rating in SemiAnalysis's first ClusterMAX evaluation [18878, 4981] and an MLPerf Inference v5.0 result [4980].
A. The strategy is to sign long-term compute contracts, then borrow heavily to build the capacity those contracts require. CoreWeave reported $25.9B of revenue backlog from committed contracts [4970] and $17.2B of total debt and equity raised [4968]. Recent financing includes: - a March 2025 IPO at $40/share raising about $1.5B gross [17815, 19821] and $1.4B net [4967]; - a revolving credit facility expanded to $1.5B [5010]; - a delayed-draw term loan of up to $2.6B [11922]; - $2.0B of 9.250% senior notes due 2030 [29421]. The company also projected about $8.9B of secured debt to service its contracts [29783]. The bet is that contracted revenue will cover this debt.
A. OpenAI is the only customer named with a dollar figure. That figure appears as an $11.9B infrastructure contract [19820] and, separately, as $11.2B of OpenAI-related backlog [4969]. The two numbers differ and the record does not reconcile them. IBM is named as a partner for Granite model compute capacity [4971], but no value is disclosed. The rest of the $25.9B backlog [4970] is not attributed to named customers in this record. That makes it hard to judge how concentrated the company's revenue is.
A. Almost every claim in this dossier is marked 'stated', meaning it is the company's own disclosure and has not been independently checked. Only one item is marked 'verified': the closing of the $2.0B senior notes on the expected date of 2025-05-27 [29434, 11919]. The IPO and the debt facilities are matters of filed record. Operating figures are not verified, including active capacity, GPU count, backlog, and run-rate adjusted EBITDA of $5.17B [29784]. The clearest gap between built and promised capacity is power: about 420 MW active [4972] against 1.6 GW contracted [4973]. Most contracted capacity was not yet energized at the time of disclosure.
A. 1. The contingent 'springing' maturity date of 2026-12-30 on the credit facility [11926]. Under certain conditions it could pull the facility's maturity forward from the extended 2028-05-02 date [5012]. This is the nearest dated item in the record. 2. Progress converting the 1.6 GW of contracted power [4973] into active capacity. 3. Whether the backlog [4970] turns into recognized revenue on schedule. 4. Any updates on how much of the business depends on OpenAI. 5. Refinancing ahead of the 2030 note maturities [29435, 29422].
A. Yes. The record shows CFO stock sales of about $29.1M [19831] and sales by the Chief Development Officer of about $217M [19832], both around May 2025, shortly after the IPO lockup period. Insider selling is not proof of a problem on its own. Readers should still weigh it alongside the company's heavy borrowing.
A. 1. Leverage and cost of debt. The company is paying 9.25% on unsecured notes [29433] while projecting billions more in secured borrowing [29783]. 2. Customer concentration. Only OpenAI is quantified, and its figure appears inconsistently [19820 vs 4969]. 3. Execution. Most contracted power is not yet active [4972, 4973]. 4. Verification. Nearly every operating claim is self-reported and unverified. 5. Data gaps. This dossier's claims run through roughly May 2025, and the record supplied was cut off partway through. Later developments, including any updates to these claims, are not reflected here.
Frequently asked
2026-10-18A. CoreWeave rents out large clusters of GPU computing power, mainly for training and running AI models. It operates data centers, holds power contracts, and sells cloud software around that hardware, such as AI Object Storage (claim 4975) and GB200 support (claim 4976). In May 2025 it said it had about 420 MW of active power across 33 data centers (claim 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power (claim 4973). It also announced the acquisition of Weights & Biases, a maker of AI developer tools (claims 4974, 29787). It listed on Nasdaq in March 2025 at $40 per share (claims 18881, 15974).
A. The strategy is to grow capacity very quickly and pay for it with debt backed by long-term customer contracts. CoreWeave reported $17.2B of total debt and equity raised (claim 4968) and a $25.9B revenue backlog of committed contracts (claim 4970). Its 2025 financing included: - A $1.5B IPO with about $1.4B in net proceeds (claims 19821, 4967). - A revolving credit facility expanded to $1.5B (claim 11923). - A delayed-draw term loan facility of up to $2.6B (claim 11922). - $2.0B of 9.25% senior notes due 2030 (claim 29433). It also said it expected about $8.9B of secured debt to service its contracts (claim 29783). It is also adding software, such as Weights & Biases, to sell more than raw compute.
A. OpenAI is the only customer named with dollar figures. The record shows an OpenAI infrastructure contract of $11.9B (claim 19820) and, separately, $11.2B of OpenAI backlog (claim 4969). These two figures are not reconciled in the dossier. IBM is named as a partner buying compute capacity for its Granite models (claim 4971), but no dollar value is given. Nothing on record names the customers behind the rest of the $25.9B backlog (claim 4970), so readers cannot judge how concentrated that backlog is.
A. Almost every claim in this dossier has the status 'stated', meaning the company said it and nobody has independently confirmed it. The only verified items are the closing of the $2.0B senior notes offering on its expected date of 2025-05-27 (claims 29434, 11919). Several financing events are recorded as completed but are still only 'stated': - The IPO (claim 18881). - Repayment in full of a $1.0B 2024 term loan (claim 29779). Operating figures are also unverified, including the 420 MW, 250K GPUs and backlog numbers. The same goes for benchmark and rating results: Platinum in SemiAnalysis's ClusterMAX evaluation (claims 18878, 4981) and an MLPerf Inference v5.0 result (claim 4980).
A. 1. Whether the 1.6 GW of contracted power (claim 4973) actually becomes active capacity beyond the roughly 420 MW reported (claim 4972). 2. How fast the $25.9B backlog turns into recognized revenue (claim 4970). 3. The revolving credit facility, which has a contingent 'springing' maturity tied to 2026-12-30 (claim 11926); its stated maturity was extended to 2028-05-02 (claim 5012). 4. Repayment of the 9.25% notes, which come due 2030-06-01 (claim 29435). 5. Further insider selling.
A. Shortly after the IPO, executives sold large amounts of stock. The record shows about $29.1M of sales by the CFO (claim 19831) and about $217M by the CDO (claim 19832). Insider selling is not proof of a problem by itself. Investors and journalists still tend to read heavy selling soon after a listing as a sign of how insiders value the shares.
A. 1. Debt and interest costs. The company has taken on heavy, costly borrowing, including 9.25% notes (claim 29433), against a company-stated run-rate Adjusted EBITDA of $5.17B (claim 29784). Adjusted EBITDA is a profit measure the company defines itself and is not audited. 2. Customer concentration. OpenAI appears to be a large share of the backlog, and the two OpenAI figures on record don't match (claims 19820, 4969). 3. Lack of verification. Nearly every operating number is unverified. 4. Data quality. The dossier records the term-loan facility as '2600.0 USD' (claim 11922), where $2.6B is meant, and repeats several IPO entries. 5. Coverage gap. The record on file stops around mid-2025, so later developments are not reflected.
Frequently asked
2026-10-18A. CoreWeave rents out large clusters of NVIDIA GPUs as a cloud service for training and running AI models. It operates data centers and sells compute, storage and software tools on top of them. As of May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It also bought the AI developer-tools company Weights & Biases (claims 4974, 29787).
A. The strategy is to sign long-term compute contracts with large AI customers and then borrow heavily to build the capacity to serve them. In 2025 the company went public on Nasdaq at $40 per share (claims 17815, 15974), raising $1.5B (claim 19821) with about $1.4B in net proceeds (claim 4967). It then layered on debt: a $2.0B 9.250% senior notes offering due 2030 (claims 29433, 29421), up to $2.6B of delayed-draw term loans (claim 11922), and a revolving credit facility expanded to $1.5B (claim 5010). By May 2025 it cited $17.2B in total debt and equity raised (claim 4968). The company says it holds 1.6 GW of contracted power (claim 4973), far above the ~420 MW active, so growth depends on that build-out.
A. OpenAI is the only major customer named with a dollar figure. Disclosures cite an OpenAI infrastructure contract of $11.9B (claim 19820) and $11.2B of OpenAI-related revenue backlog (claim 4969). Total backlog from committed contracts was $25.9B (claim 4970), which means OpenAI alone accounts for a large share. IBM is named as a partner buying compute for its Granite models (claim 4971), but no value is disclosed. The rest of the backlog is not attributed to named customers in this record.
A. Almost every claim on record is in 'stated' status. That means the company said it, not that it has been independently confirmed. The only claims marked verified concern the closing of the $2.0B senior notes offering on its expected May 27, 2025 date (claims 11919, 29434). Several other items are documented corporate events but remain unverified in this dossier: the IPO and Nasdaq listing (claim 18881), product launches such as GB200 support and general availability of AI Object Storage (claims 4976, 4975), and third-party ratings like SemiAnalysis Platinum (claims 4981, 18878). Forward-looking figures should be treated as company projections, not results. These include the $5.17B run-rate adjusted EBITDA (claim 29784) and roughly $8.9B of projected secured debt to service contracts (claim 29783).
A. December 30, 2026 is the nearest date. The revolving credit facility has a contingent 'springing' maturity on that day (claim 11926), which could pull its stated May 2, 2028 maturity forward (claim 5012) if certain conditions are triggered. The $2.0B 9.250% senior notes mature June 1, 2030 (claims 29422, 29435). The record also notes a $1.5B senior notes offering due 2030 (claims 29774, 11921); this appears to be the same deal before it was upsized to $2.0B, though the record does not state that explicitly. Beyond these dates, the key thing to track is whether contracted power (1.6 GW, claim 4973) actually becomes active capacity.
A. The company is highly leveraged. The 9.250% coupon on its 2030 notes (claim 29433) signals that lenders see real risk. Notes proceeds were used partly to repay other borrowings: about $450M of revolver debt (claim 29778), and the 2024 term loan of $1.0B was repaid in full (claim 29779). Revenue from backlog has to arrive on schedule to cover interest and repayment. Any delay in building data centers, or any customer pulling back, puts pressure on that math.
A. Yes. Disclosures record about $29.1M of stock sales by the CFO (claim 19831) and about $217M by the Chief Development Officer (claim 19832) in May 2025, shortly after the IPO. Insider sales are not unusual after a listing, but sales of this size are worth noting alongside the company's capital needs.
A. There are four. (1) Concentration: how dependent is the $25.9B backlog (claim 4970) on OpenAI, and who are the unnamed customers? (2) Execution: can about 1.2 GW of contracted-but-inactive power be energized on time? (3) Financing: can the company refinance or service high-cost debt, including around the December 2026 springing maturity (claim 11926)? (4) Verification: nearly all claims in this dossier are self-reported and unverified. Note also that this record appears truncated after mid-2025, so later developments may be missing.
Frequently asked
2026-10-18A. CoreWeave rents out large clusters of NVIDIA GPUs, the chips used to train and run AI models, as a cloud service. It also sells software around that compute, including AI object storage (claim 4975), on-demand cluster scaling (claim 4977) and support for NVIDIA's GB200 systems (claim 4976). In May 2025 it disclosed about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It went public on Nasdaq in March 2025 at $40 per share (claims 15974, 18881) and agreed to acquire the AI developer-tools company Weights & Biases (claims 4974, 29787).
A. The strategy is to build compute capacity quickly, financed mostly with debt, against multi-year customer contracts. In May 2025 it reported 1.6 GW of contracted power (claim 4973), several times its active capacity, and $25.9B of revenue backlog (claim 4970). It reported $17.2B of total debt and equity raised (claim 4968) and projected $8.9B of secured debt to service its contracts (claim 29783). It is also moving up the software stack, with the Weights & Biases deal and the NVIDIA AI Enterprise integration (claim 4979), and it highlights third-party rankings such as SemiAnalysis Platinum (claims 4981, 18878).
A. OpenAI is the only named customer with a dollar figure. The OpenAI contract appears as $11.9B in one claim (19820) and as $11.2B of backlog in another (4969). This gap is unreconciled; it may reflect a contract value versus a backlog measured on a different date. IBM is named as a partner for Granite model compute (claim 4971), but no value is disclosed. The rest of the $25.9B backlog (claim 4970) is not attributed to named customers in this record, so the remaining customer base and how concentrated it is cannot be assessed from the dossier.
A. Almost every claim on record has status 'stated', meaning the company said it but the dossier has not independently confirmed it. The only items marked 'verified' are the closing of the $2.0B 9.25% senior notes due 2030 on the promised date of 2025-05-27 (claims 29434, 11919, 29421). The IPO is well documented across several filings ($1.5B gross, ~$1.4B net; claims 19821, 4967) but is still recorded as 'stated'. The capacity figures (420 MW active, more than 250K GPUs) are self-reported. The 1.6 GW of contracted power is a commitment, not built capacity.
A. The company relies heavily on debt. Disclosed items include: - A senior notes offering first described at $1.5B (claims 29777, 29774), then upsized to $2.0B at a 9.25% coupon, maturing 2030-06-01 (claims 29433, 29422). - A revolving credit facility expanded by $1.5B (claims 5010, 11923), with maturity extended to 2028-05-02 (claim 5012). - A delayed-draw term loan facility of up to $2.6B (claim 11922). - Further draws of $444M on the revolver (claim 29780) and $505M on a second term loan (claim 29781). The 9.25% coupon is high-yield pricing. Proceeds were used partly to repay a $1B 2024 term loan in full (claim 29779) and about $450M of revolver borrowings (claim 29778). Claim 11921 records the notes as '1500.0 USD', which looks like a units error for $1.5B.
A. 1. The 'contingent springing maturity date' of 2026-12-30 (claim 11926). This is about ten weeks away, and the dossier does not say what condition triggers it or whether it has been resolved. 2. Whether contracted power (1.6 GW, claim 4973) turns into active capacity, beyond the 420 MW reported (claim 4972). 3. Whether the $25.9B backlog (claim 4970) converts into recognized revenue, and whether the $5.17B run-rate adjusted EBITDA figure (claim 29784) holds up in reported results. 4. Further insider selling.
A. - Customer concentration: OpenAI alone accounts for roughly $11–12B of the $25.9B backlog (claims 4969, 19820, 4970), and the other customers are not named. - Debt load: the company relies on high-cost, often secured debt (claims 29433, 29783), and the 2026-12-30 springing maturity (claim 11926) is unexplained. - Insider sales soon after the IPO: about $29.1M by the CFO (claim 19831) and about $217M by the Chief Development Officer (claim 19832). - Verification: nearly all claims are self-reported, and this record visibly runs only through mid-2025. Later deliveries or changes may be missing from what is shown.
Frequently asked
2026-10-17A. CoreWeave rents out GPU computing capacity for AI workloads from its own data centers. As of May 2025 it disclosed about 420 MW of active power across 33 data centers (claims 4972, 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power (claim 4973). In May 2025 it also announced the acquisition of Weights & Biases, a maker of machine-learning developer tools (claims 4974, 29787).
A. The disclosed strategy is to sign long-term compute contracts and fund the build-out with large amounts of debt and equity. CoreWeave reported $25.9B in revenue backlog from committed contracts (claim 4970) and $17.2B in total debt and equity raised (claim 4968). It projected about $8.9B of secured debt to service those contracts (claim 29783) and cited a run-rate Adjusted EBITDA of about $5.17B (claim 29784). The company also emphasizes product breadth: GB200 support, AI Object Storage, on-demand cluster scaling (claims 4975-4977), and third-party benchmark rankings (claims 4980, 4981, 18878).
A. OpenAI is the only customer named with a dollar figure. The record shows an $11.9B infrastructure contract (claim 19820), but a later filing puts the OpenAI backlog at $11.2B (claim 4969). The difference between those two figures is not explained in the record. IBM is named as a partner for Granite model compute (claim 4971), with no disclosed value. The rest of the $25.9B backlog (claim 4970) is not attributed to named customers, so how concentrated the business is beyond OpenAI cannot be judged from this record.
A. Very little has been independently confirmed. Almost every claim on file has the status 'stated', meaning the company said it and the claim was extracted, not checked against outside evidence. The only claims marked 'verified' concern the closing of the $2.0B 9.250% senior notes due 2030, expected May 27, 2025 (claims 29434, 11919). Claim 11919 had earlier been marked 'delayed' and then 'not_yet_verifiable' before it was verified. The IPO at $40 per share (claims 17815, 15974), the roughly $1.5B raise (claim 19821) and the $1.4B net proceeds (claim 4967) are widely reported events but are still recorded here only as 'stated'. Capacity, GPU counts, backlog and product launches have not been verified either.
A. The company has borrowed heavily. In May 2025 it expanded its revolving credit facility to $1.5B (claims 5010, 11923) with a maturity extension to May 2028 (claim 5012). It added a delayed-draw term loan facility of up to $2.6B, the DDTL 3.0 (claim 11922). It planned a $1.5B senior notes offering (claims 29777, 11921) that was upsized to $2.0B at a 9.250% coupon, due June 1, 2030 (claims 29433, 29421, 29422). Part of the proceeds went to repaying the 2024 term loan, about $1.0B (claim 29779), and about $450M of revolver borrowings (claim 29778). A coupon above 9% signals that lenders see meaningful risk.
A. The nearest date on file is a contingent 'springing maturity' tied to December 30, 2026 (claim 11926). Under that kind of clause, a credit facility's maturity can move earlier if certain conditions are met. Readers should check whether it is triggered. Other things to watch: whether the 1.6 GW of contracted power (claim 4973) becomes active capacity beyond the 420 MW now running, whether the backlog (claim 4970) turns into recognized revenue, and whether any of the 'stated' claims get independent verification.
A. 1. **Customer concentration.** How much of the backlog depends on OpenAI, and why does the record show both $11.9B and $11.2B (claims 19820, 4969)? 2. **Cash flow versus debt.** Can contract cash flows cover a debt load of this size at 9%+ interest? 3. **Insider selling.** Insiders sold stock soon after the IPO: the CFO sold about $29.1M (claim 19831) and the CDO about $217M (claim 19832). The record does not say why. 4. **Gaps in the record.** Coverage effectively stops around mid-2025 and the claim list appears truncated, so later developments may be missing from this dossier.
Frequently asked
2026-10-17A. CoreWeave rents out GPU computing capacity, mainly NVIDIA hardware, to companies that train and run AI models. It sells this as a cloud platform. In May 2025 it reported about 420 MW of active power across 33 data centers (claim 29785) and more than 250,000 GPUs online (claim 29786). It also said it had 1.6 GW of contracted power (claim 4973), most of which was not yet active. It has added software on top of the hardware: it acquired Weights & Biases, an AI developer-tools company (claim 4974), and made AI Object Storage generally available (claim 4975).
A. The strategy is to borrow and raise money at large scale, build GPU capacity, and lock in long-term contracts with big AI labs. The company reported $17.2B in total debt and equity raised (claim 4968) and a $25.9B backlog of committed contracts (claim 4970). It projected needing about $8.9B of secured debt to deliver on existing contracts (claim 29783). It markets itself on technical quality, citing a Platinum rating in SemiAnalysis's ClusterMAX evaluation (claims 18878, 4981), MLPerf benchmark results (claim 4980), and early GB200 support (claim 4976).
A. The record names only two. OpenAI is the main one. Its contract is stated at $11.9B (claim 19820), but a later filing puts OpenAI's backlog at $11.2B (claim 4969). The record does not explain why the two figures differ. The second is IBM, through a partnership to supply compute for IBM's Granite models (claim 4971); no dollar value is given. That leaves about $14.7B of the $25.9B backlog (claim 4970) with no named customer in this record, so the reader cannot tell how concentrated the customer base is beyond OpenAI.
A. It has relied mostly on debt. The IPO priced at $40 per share (claims 15974, 11616) and raised about $1.5B gross (claim 19821) and $1.4B net (claim 4967). Debt is far larger. The company expanded its revolving credit facility to $1.5B (claim 11923) and its letters-of-credit facility to $350M (claim 11924). It set up a delayed-draw term loan of up to $2.6B (claim 11922). It also sold senior notes: the offering was announced at $1.5B (claim 29777), upsized to $2.0B at a 9.250% interest rate, and due in 2030 (claim 29433). That 9.25% rate is high and is a cost the company must carry for years.
A. Only one item in the record is independently marked verified: the $2.0B senior notes closed on schedule around May 27, 2025 (claims 29434, 11919). One related entry had earlier been flagged as delayed before it was verified. Everything else is labeled 'stated', meaning it is the company's own claim and has not been independently confirmed. That includes the capacity figures, the backlog, the product launches, and the run-rate Adjusted EBITDA of $5.17B (claim 29784). The IPO and Nasdaq listing (claim 18881) are public events but are still only 'stated' in this dossier.
A. 1) The springing maturity date of 2026-12-30 (claim 11926). Under this clause, debt can come due early if certain conditions are triggered, so it is the nearest hard deadline on the record. 2) Whether the 1.6 GW of contracted power turns into active capacity beyond the ~420 MW now running (claims 4973, 4972). 3) Whether the $25.9B backlog becomes recognized revenue (claim 4970). 4) Whether the company can raise the roughly $8.9B of secured debt it says the contracts require (claim 29783). 5) Revolving credit maturity in 2028 (claim 5012) and notes maturity in 2030 (claim 29422).
A. Yes. The record shows CFO stock sales of about $29.1M (claim 19831) and sales by the Chief Development Officer of about $217M (claim 19832), both shortly after the IPO. The record gives no context, such as whether these were pre-scheduled trading plans or what share of each person's holdings they represent.
A. 1) Customer concentration: OpenAI accounts for about $11.2B–$11.9B of a $25.9B backlog (claims 4969, 19820, 4970), and the rest is unnamed. 2) Leverage: debt at 9.25% (claim 29433) is being used to fund capacity whose returns depend on a few contracts. 3) The $5.17B run-rate EBITDA (claim 29784) appears in a financing document and is unverified. 4) Gaps in the dossier: almost every claim is unverified, and the record supplied here appears to end around May 2025. Later delivery against the 1.6 GW target and later customer wins are not covered.
Frequently asked
2026-10-17A. CoreWeave rents out large clusters of NVIDIA GPUs as a cloud service built for AI training and inference. In May 2025 it said it had more than 250,000 GPUs online (claim 29786) and about 420 MW of active power across 33 data centers (claims 29785, 4972). It also sells software and services on top of that hardware, including AI Object Storage, on-demand cluster scaling and GB200 support (claims 4975, 4977, 4976). In May 2025 it acquired Weights & Biases, which makes developer tools for machine learning (claims 4974, 29787).
A. The strategy is to sign multi-year compute contracts first and then borrow against them to build capacity. CoreWeave reported a $25.9B revenue backlog from committed contracts (claim 4970) and 1.6 GW of contracted power, far more than the roughly 420 MW then active (claims 4973, 4972). To pay for the buildout it went public at $40 per share, raising $1.5B gross and about $1.4B net (claims 15974, 19821, 4967). It also expanded its revolving credit facility to $1.5B (claim 5010), added delayed-draw term loans of up to $2.6B (claim 11922), and issued $2.0B of 9.250% senior notes due 2030 (claims 29421, 29422). In total it cites $17.2B of debt and equity raised (claim 4968) and projects $8.9B of secured debt to service contracts (claim 29783).
A. The only large customer named in this record is OpenAI. The figures given for that deal differ: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI-related backlog (claim 4969). The dossier does not reconcile the two numbers. IBM is named as a partner, using CoreWeave compute for its Granite models (claim 4971). No other customers, and no customer concentration figures, appear in the claims shown.
A. Almost every claim here has the status 'stated', meaning the company asserted it and the claim has not been independently checked. The only claims marked 'verified' are the closing of the $2.0B senior notes offering on or around 2025-05-27 (claims 29434, 11919). The IPO, the credit facility changes, the 420 MW and 250K GPU figures, the backlog and the product launches are all company statements that have not yet been confirmed. One detail suggests the deal was oversubscribed: the notes offering grew from $1.5B (claims 29777, 29774) to $2.0B at pricing (claim 29433).
A. Treat them as company framing, not audited results. The '$5.17B run-rate Adj. EBITDA' (claim 29784) is a non-GAAP figure that extrapolates from a recent period, so it is not earnings. The backlog (claim 4970) is contracted future revenue, which counts only if CoreWeave builds and delivers the capacity. The financing is expensive: the 2030 notes carry a 9.250% coupon (claim 29433). Some of the new money also went to refinancing older debt rather than new capacity. That includes repaying the 2024 term loan in full ($1.0B, claim 29779) and paying down the revolver (claim 29778).
A. The record shows insider selling shortly after the IPO. The CFO sold about $29.1M of stock (claim 19831), and the Chief Development Officer sold about $217M (claim 19832). Insider sales are common after a lockup or under pre-arranged trading plans, but the size of these sales is worth tracking.
A. First, a contingent 'springing maturity' date of 2026-12-30 in the credit facility (claim 11926). If its conditions are triggered, the facility comes due well before its extended 2028-05-02 maturity (claim 5012), which would test CoreWeave's liquidity. Second, whether the 1.6 GW of contracted power is actually energized and turned into revenue (claims 4973, 4972). Third, whether the OpenAI contract figures are reconciled (claims 19820, 4969). Finally, any disclosures naming more customers or showing how dependent CoreWeave is on a few of them.
A. (1) Customer concentration: OpenAI accounts for a large share of the backlog (claims 4969, 4970), and few other customers are named. (2) Leverage: secured debt is projected at $8.9B (claim 29783), and on top of that sit $2.0B of 9.25% notes and several credit lines. (3) Execution: only about a quarter of contracted power was active as of May 2025 (claims 4972, 4973). (4) Verification: nearly every claim is still self-reported. Also note that this record runs mainly through May 2025, so later developments may not be reflected here.
Frequently asked
2026-10-17A. CoreWeave (Nasdaq: CRWV) rents out large clusters of GPU computing power, mainly NVIDIA hardware, to companies that train and run AI models. As of May 2025 it reported more than 250,000 GPUs online (claim 29786) and about 420 MW of active power across 33 data centers (claims 4972, 29785). It also sells software around that hardware, including AI Object Storage (claim 4975) and tools from its acquisition of Weights & Biases (claims 4974, 29787). The industry analyst SemiAnalysis rated it the only 'Platinum' provider in its first ClusterMAX evaluation of GPU clouds (claims 18878, 4981).
A. The disclosed strategy is to sign long-term compute contracts first and then borrow heavily to build the capacity that serves them. CoreWeave reported $25.9B of contracted revenue backlog (claim 4970) and 1.6 GW of contracted power, roughly four times its active capacity (claim 4973). It said it had raised $17.2B in total debt and equity (claim 4968) and projected $8.9B of secured debt tied to servicing contracts (claim 29783). It has also moved into software and services, including the Weights & Biases acquisition and new GB200 and NVIDIA AI Enterprise support (claims 4976, 4979).
A. Only two customers are named in the record. OpenAI signed an infrastructure contract reported at $11.9B (claim 19820), with about $11.2B of that counted in backlog (claim 4969). That is close to half of the $25.9B total backlog (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite AI models (claim 4971). The rest of the backlog is not attributed to any named customer, so readers cannot judge how concentrated the remaining revenue is.
A. Very little has been independently checked. Only two items are marked 'verified': the closing of the $2.0B senior notes offering on schedule around 2025-05-27 (claims 11919, 29434). Everything else is marked 'stated', meaning the company or its filings said it but this dossier has not confirmed it. That includes the IPO at $40/share (claims 11616, 15974, 17815) with about $1.4B in net proceeds (claim 4967), the GPU and megawatt figures, the backlog, and the product launches. The IPO and listing are matters of public record, but operational numbers like GPU counts and capacity rest on company disclosure.
A. A lot, and some of it is expensive. In May 2025 it closed $2.0B of 9.250% senior notes due 2030-06-01 (claims 29421, 29422, 29433). It expanded its revolving credit facility to $1.5B (claims 5010, 11923) and its letters-of-credit facility to $350M (claims 5011, 11924). It also set up a delayed-draw term loan of up to $2.6B (claim 11922). Proceeds were used partly to repay a $1.0B 2024 term loan (claim 29779) and about $450M of revolver borrowings (claim 29778). Note that the record conflicts on the notes deal: some claims describe a $1.5B offering (claims 11921, 29774, 29777), which appears to have been upsized to $2.0B before pricing (claim 29433).
A. 1) The revolver's contingent 'springing' maturity date of 2026-12-30 (claim 11926), which is about ten weeks away. Under that kind of clause, the facility can come due early if certain conditions are triggered, so it is worth checking whether it has been addressed. 2) Whether contracted power (1.6 GW, claim 4973) is actually turned into active capacity (420 MW, claim 4972). 3) Whether the $5.17B run-rate adjusted EBITDA figure (claim 29784) shows up in reported results. 4) Any change in how much of the backlog depends on OpenAI.
A. First, concentration: a single customer, OpenAI, accounts for roughly 43% of disclosed backlog (claims 4969, 4970), and most other customers are unnamed. Second, financing: growth depends on debt, including notes at a 9.25% interest rate (claim 29433), so the business must turn backlog into cash fast enough to service it. Third, execution: most capacity is contracted but not yet built. Fourth, insider selling: the record shows CFO stock sales of $29.1M (claim 19831) and CDO stock sales of $217M (claim 19832) within weeks of the IPO. Finally, nearly every claim here is company-stated rather than independently verified.
A. Not very. The claims provided run only through about May 2025, and the record appears to be cut off partway through. Anything after that, including later earnings, new customer contracts, or refinancing of the 2026-12-30 springing maturity (claim 11926), is not reflected here. Readers should check more recent filings before drawing conclusions.
Frequently asked
2026-10-17A. CoreWeave rents out large-scale GPU computing capacity, mainly NVIDIA hardware, for AI training and inference. It is a specialized 'AI cloud' rather than a general-purpose one. By its own account it had more than 250,000 GPUs online (claim 29786) and about 420 MW of active power across 33 data centers (claims 29785, 4972) as of May 2025. It also sells software and services on top of the hardware, including AI Object Storage and GB200 support (claims 4975, 4976). It agreed to acquire Weights & Biases, a developer-tools company for machine learning (claims 4974, 29787).
A. The strategy is to grow capacity fast and pay for it with large amounts of capital, much of it debt, secured against long-term customer contracts. The company says it has raised $17.2B in total debt and equity (claim 4968). It priced its IPO at $40 per share (claims 11616, 17815) and netted about $1.4B from it (claim 4967). It then issued $2.0B of 9.250% senior notes due 2030 (claims 29433, 29421) and expanded its revolving credit facility to $1.5B (claims 5010, 11923). It also projects about $8.9B of secured debt to service its contracts (claim 29783). It is adding to its software layer, through Weights & Biases and new platform features, so it is more than a hardware landlord.
A. OpenAI is the only customer named with a dollar figure in this record. The size of that deal is stated as $11.9B in one claim (19820) and as $11.2B of revenue backlog in another (4969). Readers should not treat these as the same figure without checking the source documents. IBM appears as a partner that uses CoreWeave capacity for its Granite models (claim 4971), but no contract value is disclosed. The company reports $25.9B of total committed backlog (claim 4970). Most of that backlog is not attributed to named customers, so how concentrated the business is beyond OpenAI cannot be determined from this dossier.
A. Almost every claim in this dossier has status 'stated': the company or its filings said it, but we have not independently confirmed it. The only items marked 'verified' are the closing of the senior notes offering on its expected date of 2025-05-27 (claims 11919, 29434). The Nasdaq listing and the $40 IPO price are matters of public market record (claims 18881, 11616), though our dossier still lists them as 'stated'. Capacity figures should be read as company-reported operating claims: 420 MW active, 1.6 GW contracted, and more than 250K GPUs (claims 4972, 4973, 29786). The backlog figures and the $5.17B run-rate adjusted EBITDA (claim 29784) are also company-reported. Run-rate EBITDA is a forward-looking extrapolation, not reported results.
A. Partly, and it has a likely explanation. Several claims describe a $1.5B senior notes offering due 2030 (claims 11921, 29774, 29777). Later claims describe an 'upsized' $2.0B offering at 9.250% that priced and closed (claims 29433, 29421). The most likely reading is that a $1.5B launch was upsized to $2.0B, but this should be checked against the filings. Claim 11921 also records the amount as '1500.0 USD' with no scale, which looks like an extraction error rather than a real number.
A. 1) A contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926). This is close, and whether it is triggered matters for liquidity. The facility's scheduled maturity is 2028-05-02 (claim 5012). 2) Whether contracted power actually comes online: 1.6 GW contracted versus about 420 MW active (claims 4973, 4972). 3) Whether the $25.9B backlog turns into recognized revenue (claim 4970), and whether customers other than OpenAI are disclosed. 4) How the $2.0B of notes due 2030-06-01 is serviced at a 9.25% coupon (claim 29435). 5) Further insider selling. The record shows CFO sales of $29.1M (claim 19831) and CDO sales of $217M (claim 19832).
A. First, customer concentration. OpenAI is the only named customer with a deal value, and its size is reported inconsistently ($11.9B versus $11.2B, claims 19820 and 4969). Second, leverage. The company carries high-coupon debt and plans about $8.9B more secured borrowing (claim 29783) against contracts whose terms are not public. Third, execution. Roughly three-quarters of contracted power is not yet active (claims 4972, 4973). Fourth, quality of the profit claims. The $5.17B run-rate adjusted EBITDA (claim 29784) is a non-GAAP projection. Fifth, insider sales of about $246M combined by two executives (claims 19831, 19832) soon after the IPO.
A. The claims shown run from early 2025 to late May 2025, and the record appears to be cut off at that point. Developments after mid-2025 are not reflected here and should be checked separately. Several claims are near-duplicates from different extraction runs, such as four separate records of the $40 IPO price. Only two claims have been independently verified, so most figures here are best read as company statements awaiting confirmation.
Frequently asked
2026-10-16A. CoreWeave is a cloud provider that rents out GPU computing capacity for AI workloads. It runs this in data centers it operates and sells software on top of that capacity. As of May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It has added software and tooling such as AI Object Storage (claim 4975) and agreed to acquire Weights & Biases, an AI developer platform (claims 4974, 29787). It also says it was the only provider rated Platinum in SemiAnalysis's first ClusterMAX evaluation (claims 18878, 4981).
A. The strategy is to grow capacity fast using large amounts of borrowed money, backed by long-term customer contracts. CoreWeave went public on Nasdaq in March 2025 at $40 per share (claims 17815, 11601), raising $1.5B gross (claim 19821) and about $1.4B net (claim 4967). It says it has raised $17.2B in total debt and equity (claim 4968). It reports $25.9B of revenue backlog from committed contracts (claim 4970) and 1.6 GW of contracted power capacity (claim 4973), compared with about 420 MW active today. The plan is to convert that contracted power into active capacity that earns revenue.
A. Only a few are named in the record: - **OpenAI:** an infrastructure contract described as $11.9B (claim 19820) and elsewhere as an $11.2B revenue backlog (claim 4969). The record does not reconcile the two figures. - **IBM:** a partnership supplying compute capacity for IBM's Granite models (claim 4971). The record does not identify the customers behind the rest of the $25.9B backlog (claim 4970). OpenAI alone accounts for roughly 43–46% of that backlog, so the business depends heavily on a single customer.
A. Almost every claim in the dossier has status 'stated'. That means it is the company's own assertion, recorded but not independently confirmed. The only items marked 'verified' are the expected May 27, 2025 closing of the $2.0B senior notes offering (claims 11919, 29434). That closing is also reported directly as completed (claim 29421). The following are all company-reported, not verified: - the 420 MW active capacity - the 250K+ GPUs - the $25.9B backlog - product launches - the run-rate Adjusted EBITDA figure of $5.17B (claim 29784)
A. The company is borrowing heavily, and some of it is expensive. In May 2025 it: - sold $2.0B of senior notes at a 9.25% interest rate, due June 1, 2030 (claims 29433, 29421, 29422). The offering was first launched at $1.5B and then enlarged (claims 29774, 11921). - expanded its revolving credit facility by $1.5B (claims 5010, 11923) - added $350M of letter-of-credit capacity (claim 5011) - set up a delayed-draw term loan facility (DDTL 3.0) of up to $2.6B (claim 11922) It also disclosed a projected $8.9B of secured debt tied to servicing its contracts (claim 29783). Notes proceeds were used to repay about $450M of revolver borrowings (claim 29778), and a $1B 2024 term loan was repaid in full (claim 29779).
A. 1. **Credit facility maturity.** The revolving credit facility has a contingent 'springing' maturity date of December 30, 2026 (claim 11926). That is about ten weeks from now. Otherwise the stated maturity is May 2, 2028 (claim 5012). Whether the springing date is triggered or the debt is refinanced is the nearest test. 2. **Capacity build-out.** Watch for evidence that the 1.6 GW of contracted power (claim 4973) is actually coming online. 3. **Backlog conversion.** Watch whether the backlog turns into reported revenue. 4. **Weights & Biases.** Watch for confirmation that this acquisition has been completed and integrated.
A. Yes. The record shows significant insider sales shortly after the IPO: - about $29.1M by the CFO (claim 19831) - about $217M by the Chief Development Officer (claim 19832), dated around late May 2025 Insider selling after an IPO is common and is not proof of a problem on its own. Still, the amounts are worth noting next to the company's heavy borrowing.
A. 1. **Customer concentration.** The largest share of the backlog is tied to OpenAI. Most other customers are unnamed, and the OpenAI contract value differs between sources ($11.9B vs. $11.2B; claims 19820, 4969). 2. **Debt refinancing.** Can the company service and refinance a fast-growing debt stack, including 9.25% notes (claim 29433) and the December 2026 springing maturity (claim 11926)? 3. **Delivery.** Can it turn the gap between contracted power (1.6 GW) and active power (about 420 MW) into delivered capacity on schedule? 4. **Unverified figures.** Key operating and financial figures, including the run-rate Adjusted EBITDA (claim 29784), have not been independently checked. 5. **Data quality.** Some extracted dollar amounts in the record are missing their unit (for example, claim 11918 lists '2000.0 USD' for a $2.0B offering). Check source documents before quoting figures.
Frequently asked
2026-10-16A. CoreWeave rents out GPU computing capacity in its own data centers to companies building and running AI models. As of May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It also sells software and services on top of that hardware, including AI Object Storage (claim 4975) and support for NVIDIA GB200 systems (claim 4976). It acquired Weights & Biases, which makes tools that AI developers use to track and manage model training (claims 4974, 29787).
A. The strategy is to sign large, multi-year compute contracts and build the capacity to fulfill them, mostly with borrowed money. The company reported 1.6 GW of contracted power, far more than the 420 MW it had active (claims 4973, 4972). It reported a $25.9B revenue backlog from committed contracts (claim 4970). It projected $8.9B of secured debt to service those contracts (claim 29783). It also presents itself as a quality leader, citing an only-Platinum rating in SemiAnalysis's ClusterMAX evaluation (claims 18878, 4981) and MLPerf benchmark results (claim 4980).
A. Only two counterparties are named in this record. OpenAI has an infrastructure contract reported at $11.9B (claim 19820), and a separate filing puts OpenAI-related backlog at $11.2B (claim 4969). The sources do not explain the gap between the two figures. IBM is named as a partner for Granite model compute capacity (claim 4971), but no dollar value is disclosed. Most of the $25.9B backlog (claim 4970) is not attributed to any named customer in this record, so how concentrated the customer base is cannot be fully judged from these claims.
A. It listed on Nasdaq in March 2025 at $40 per share (claims 18881, 17815, 11616). The IPO raised about $1.5B (claim 19821), or roughly $1.4B net (claim 4967), plus a $68M over-allotment (claim 29782). Debt is the larger source of funding. The company: - reported $17.2B of total debt and equity capital raised (claim 4968); - expanded its revolving credit facility by $1.5B and its letters of credit by $350M (claims 5010, 5011); - set up a delayed-draw term loan of up to $2.6B (claim 11922); - closed $2.0B of 9.250% senior notes due June 2030 (claims 29421, 29422). That offering was announced at $1.5B and then upsized (claims 29774, 29433). A 9.25% coupon is expensive borrowing.
A. Almost every item in this record has status 'stated', meaning the company said it and no independent check is on file. The only items marked 'verified' are the closing of the $2.0B notes offering on its expected May 27, 2025 date (claims 11919, 29434). That claim's history shows it moved from 'delayed' to 'not_yet_verifiable' to 'verified', so the tracking was messy before it was confirmed. Capacity figures, backlog, customer contract values and product launches are all self-reported at this stage. The $5.17B run-rate adjusted EBITDA (claim 29784) is a company-defined, non-GAAP projection, not a reported result.
A. Yes. The record shows CFO stock sales of about $29.1M (claim 19831) and sales by the Chief Development Officer of about $217M (claim 19832), both shortly after the IPO in May 2025. Insider sales are not wrongdoing by themselves, but the size of the CDO sale is worth noting next to the company's heavy reliance on new debt.
A. 1. A contingent 'springing maturity' date of December 30, 2026 is tied to the credit facility (claim 11926). That is about ten weeks after this FAQ's date, so check whether the condition was met, cured or refinanced. The facility's stated maturity was otherwise extended to May 2028 (claim 5012). 2. Whether contracted power (1.6 GW, claim 4973) turns into active capacity, and on what timeline. 3. Whether the $25.9B backlog (claim 4970) turns into recognized revenue and cash. 4. Whether the OpenAI contract terms are confirmed, given the two different figures.
A. 1. Verification: nearly all claims are company statements without independent confirmation. 2. Customer concentration: OpenAI alone is roughly $11–12B of a $25.9B backlog, and the remainder is not named. 3. Debt load and cost: 9.25% notes, an $8.9B secured debt plan (claim 29783) and a near-term springing maturity (claim 11926). 4. Data quality: some amounts carry unit errors. For example, claim 11918 reads '2000.0 USD' and claim 11921 reads '1500.0 USD', where billions are meant. 5. Coverage: this record is concentrated in early-to-mid 2025 and appears truncated, so later events may be missing.
Frequently asked
2026-10-16A. CoreWeave rents out large clusters of GPU computing power for training and running AI models, built in data centers it operates. As of May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power (claim 4973). It also offers software and services on top of the hardware, such as AI Object Storage (claim 4975) and GB200 support (claim 4976). It agreed to acquire Weights & Biases, a developer-tools company for machine learning (claims 4974, 29787).
A. Grow fast by borrowing and raising money to build GPU capacity ahead of signed customer contracts. It listed on Nasdaq in March 2025 at $40 per share (claims 17815, 11601), raising about $1.5B gross (claim 19821) and about $1.4B net (claim 4967). It then layered on debt. That debt includes an expanded $1.5B revolving credit facility (claim 11923), a $350M letters-of-credit facility (claim 11924), a delayed-draw term loan of up to $2.6B (claim 11922), and $2.0B of 9.25% senior notes due 2030 (claim 29421). The company says it has raised $17.2B in total debt and equity (claim 4968). It projects about $8.9B of secured debt to service its contracts (claim 29783). It also cites a run-rate adjusted EBITDA figure of $5.17B (claim 29784). That number is a company metric, not reported earnings.
A. OpenAI is the only customer named with a dollar figure. The record carries two different numbers for that deal: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI revenue backlog (claim 4969). These may describe different measures, but the dossier does not reconcile them. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), with no dollar value disclosed. Total committed backlog is stated as $25.9B (claim 4970). Most of that backlog is not attributed to named customers, so customer concentration cannot be fully assessed from this record.
A. Only one item in the record has been independently checked: the $2.0B senior notes offering closed on its expected date of May 27, 2025 (claims 29434, 11919, status=verified). Everything else is marked 'stated', meaning the company said it but the dossier has not confirmed it. That covers capacity, GPU counts, backlog, product launches, the OpenAI figures, and the Weights & Biases deal. Third-party recognition is also in the 'stated' category, including the only ClusterMAX Platinum rating (claims 18878, 4981) and an MLPerf benchmark result (claim 4980).
A. The senior notes were first described as a $1.5B offering (claims 11921, 29774, 29777) and then priced upsized at $2.0B with a 9.25% coupon (claim 29433). The proceeds were described as going partly to repay the revolving credit facility (about $450M, claim 29778) and to fully repay a $1.0B 2024 term loan (claim 29779). A 9.25% coupon is a high interest rate, which signals how lenders priced the risk.
A. Yes, according to the record. The CFO sold about $29.1M (claim 19831) and the CDO sold about $217M (claim 19832) around May 2025, shortly after the IPO. The record does not say whether these sales were under pre-arranged trading plans.
A. 1) The revolving credit facility has a contingent 'springing' maturity date of December 30, 2026 (claim 11926), only weeks away. This is a clause that can pull the loan's due date forward if certain conditions are met. Readers should check whether those conditions are triggered or the clause is cleared. The facility's stated extended maturity is May 2028 (claim 5012). 2) Whether contracted power (1.6 GW, claim 4973) turns into active capacity. 3) Whether backlog (claim 4970) turns into recognized revenue. 4) Any independent confirmation of the OpenAI contract terms. 5) Further borrowing under the DDTL facilities (claims 11922, 29781).
A. Customer concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI, and why the record shows both $11.9B and $11.2B for that deal (claims 19820, 4969). Debt load: whether contract cash flows can cover the heavy, high-interest borrowing (claims 29421, 29783). Verification: nearly every claim here is company-stated rather than verified. Coverage: the record shown ends around mid-2025, so later results, new contracts, or changes in guidance are not reflected here.
Frequently asked
2026-10-16A. CoreWeave rents out GPU computing power, the hardware used to train and run AI models, from its own data centers. It also sells software services on top of that hardware, such as storage (CoreWeave AI Object Storage, claim 4975) and cluster scaling (claim 4977). In May 2025 it disclosed having more than 250,000 GPUs online (claim 29786) and about 420 MW of active power across 33 data centers (claims 4972, 29785). It went public on Nasdaq in March 2025 at $40 per share (claims 11601, 15974, 18881), raising about $1.5B gross (claim 19821) and $1.4B net (claim 4967).
A. The strategy is to grow capacity fast using borrowed money, backed by long-term customer contracts. CoreWeave reported $25.9B in revenue backlog from committed contracts (claim 4970) and 1.6 GW of contracted power (claim 4973), about four times its active power. It is also adding software to the hardware. Examples are the Weights & Biases acquisition (claims 4974, 29787), NVIDIA GB200 support (claim 4976), and third-party performance ratings: SemiAnalysis ClusterMAX Platinum (claims 18878, 4981) and MLPerf Inference v5.0 results (claim 4980).
A. Only two customers are named on the record. OpenAI is the main one. Its contract is described as $11.9B (claim 19820), while the company's own backlog disclosure attributes $11.2B to the OpenAI deal (claim 4969). That gap has not been reconciled. IBM is named as a partner for Granite model compute capacity, with no dollar value given (claim 4971). The other roughly $14B of the $25.9B backlog (claim 4970) is not attributed to any named customer.
A. Mostly through debt, much of it expensive. Disclosed items include: - $2.0B of 9.250% senior notes due June 1, 2030, closed May 27, 2025 (claims 29421, 29422). The offering was first described as $1.5B and later upsized (claims 29777, 29433). - A revolving credit facility expanded to $1.5B (claim 11923) and a letters-of-credit facility of $350M (claim 11924). - A delayed-draw term loan (DDTL 3.0) of up to $2.6B (claim 11922). - DDTL-2 borrowings of $505M (claim 29781). - A projected $8.9B of secured debt to service contracts (claim 29783). Total debt and equity raised was reported at $17.2B (claim 4968). The company also cites a run-rate Adjusted EBITDA of $5.17B (claim 29784). That is a company-defined metric, not audited earnings.
A. Only two claims on record are independently verified. Both concern the closing of the $2.0B notes offering on its expected date of May 27, 2025 (claims 29434, 11919). Claim 11919 was briefly marked 'delayed' before being verified. Every other claim, including the IPO, backlog, GPU counts, capacity, and the OpenAI contract value, has status 'stated'. That means the company or its filings asserted it, but it has not been checked against an independent source. On capacity, about 420 MW is described as active (claim 4972), while 1.6 GW is only contracted (claim 4973). Most of the growth story is still to be built.
A. Three things stand out: - **The springing maturity date of December 30, 2026 (claim 11926).** This is a contingent trigger that could pull forward the repayment date of the revolving credit facility, otherwise extended to May 2, 2028 (claim 5012), if certain conditions are met. Whether those conditions apply is a near-term question. - **Capacity conversion.** Watch whether contracted capacity becomes active, measured against 1.6 GW contracted (claim 4973). - **Backlog conversion.** Watch whether the $25.9B backlog (claim 4970) turns into recognized revenue.
A. 1. **Customer concentration.** A large share of the backlog is tied to OpenAI (claims 4969, 19820), and most remaining customers are unnamed. 2. **Leverage and cost of debt.** The company is borrowing at 9.25% (claim 29433) and relying on several layered facilities. 3. **Unreconciled figures.** The OpenAI value is given as both $11.9B and $11.2B (claims 19820, 4969), and the DDTL 3.0 claim records '2600.0 USD' where $2.6B is meant (claim 11922). 4. **Insider selling.** Executives sold shares soon after the IPO: the CFO about $29.1M (claim 19831) and the CDO about $217M (claim 19832).
A. Not very. The claims provided run only through late May 2025, and the last entry (claim 19832) is cut off. Nothing on record covers the roughly 16 months since. Almost every claim was produced by automated extraction and marked 'stated', not checked against an outside source. Readers should treat figures as company assertions and look for later filings before drawing conclusions.
Frequently asked
2026-10-16A. CoreWeave rents out large clusters of NVIDIA GPUs and the software around them (storage, cluster scaling, billing tools) to companies training and running AI models. On record it claims about 420 MW of active power across 33 data centers (claims 4972, 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power (claim 4973). It also announced the acquisition of Weights & Biases, an AI developer-tools company (claims 4974, 29787).
A. The record shows a debt-funded build-out tied to long-term customer contracts. CoreWeave signs multi-year compute deals, then borrows against them to buy GPUs and secure power. It went public on Nasdaq at $40 per share, raising about $1.5B gross and about $1.4B net (claims 17815, 19821, 4967). Most of the money came afterward from debt: an upsized $2.0B of 9.250% senior notes due 2030 (claims 29433, 29421), a revolving credit facility expanded to $1.5B (claims 5010, 11923), and a delayed-draw term loan facility of up to $2.6B (claim 11922). The company reports $17.2B of total debt and equity raised (claim 4968) and projects $8.9B of secured debt to service contracts (claim 29783). It is also adding software, including Weights & Biases, AI Object Storage and GB200 support (claims 4974, 4975, 4976).
A. OpenAI is the only major customer named with a dollar figure. One claim puts the infrastructure contract at $11.9B (claim 19820) and another puts the OpenAI-related backlog at $11.2B (claim 4969). Those figures may measure different things, but the record does not reconcile them. IBM is named as a partner using CoreWeave capacity for its Granite models, with no contract value disclosed (claim 4971). Total committed backlog is $25.9B (claim 4970), so roughly $14B of contracted revenue belongs to customers the record does not name.
A. Almost every claim in this dossier is at status 'stated', meaning the company said it and no independent check has been recorded. The only items marked 'verified' are the expected May 27, 2025 closing of the $2.0B senior notes (claims 29434, 11919). The IPO listing and notes issuance are completed financial events, and the company itself reports the notes as closed (claim 29421). Capacity figures (420 MW active, 250K+ GPUs), backlog ($25.9B) and run-rate Adjusted EBITDA of about $5.17B (claim 29784) are company-reported and unverified here. The 'Platinum' rating in SemiAnalysis's ClusterMAX evaluation (claims 18878, 4981) is a third-party assessment, but it is recorded only as stated.
A. Four things. First, a contingent 'springing maturity' date of 2026-12-30 (claim 11926). This is a trigger that can pull a credit facility's due date forward, potentially ahead of the extended revolver maturity of 2028-05-02 (claim 5012), so check whether it was cleared or refinanced. Second, whether the 1.6 GW of contracted power (claim 4973) actually turns into active capacity beyond 420 MW. Third, whether the $25.9B backlog (claim 4970) converts into recognized revenue. Fourth, how draws on the $2.6B delayed-draw facility (claim 11922) and the projected $8.9B of secured debt (claim 29783) progress against cash flow.
A. Yes, according to the record. The CFO is recorded with about $29.1M in stock sales (claim 19831) and the Chief Development Officer with about $217M (claim 19832), both shortly after the March 2025 IPO. Insider sales are not necessarily a negative signal, since lock-up expirations and pre-planned trading programs are common, but they are worth noting given how much of the company's funding is borrowed.
A. (1) Customer concentration: OpenAI appears to account for well over 40% of backlog (claims 4969, 4970), and most remaining customers are unnamed. (2) Leverage and cost of capital: borrowing at 9.250% (claim 29433) to build capacity whose returns depend on a few customers renewing and paying. (3) Inconsistent OpenAI figures, $11.9B versus $11.2B (claims 19820, 4969). (4) The 2026-12-30 springing maturity (claim 11926). (5) Whether the 1.6 GW contracted power can be energized on schedule.
A. Treat it with caution. The claims were extracted automatically and contain many duplicates; the $40 IPO price, for example, appears in claims 17815, 11601, 11616 and 15974. Some units are clearly wrong: the delayed-draw facility is recorded as '2600.0 USD' (claim 11922) and the notes as '2000.0 USD' (claim 11918), when they almost certainly mean millions. Both a $1.5B notes offering (claims 29774, 29777) and an upsized $2.0B offering (claim 29433) appear, so the record mixes the original size with the final one. The claim list also stops around mid-2025, so later developments such as further contracts, refinancings or capacity milestones are not reflected here.
Frequently asked
2026-10-16A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity in data centers for training and running AI models. As of May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power capacity (claim 4973). In May 2025 it bought Weights & Biases, a tool for managing machine-learning workflows, which extends it from raw infrastructure into developer software (claims 4974, 29787).
A. The strategy is to sign large, multi-year compute contracts and finance the buildout with debt. It reported $25.9B of revenue backlog from committed contracts (claim 4970) and about $17.2B of total debt and equity raised (claim 4968). It also projected roughly $8.9B of secured debt to service those contracts (claim 29783). On the product side, it is adding software and features on top of the hardware: AI Object Storage, GB200 support, on-demand cluster scaling, and the Weights & Biases acquisition (claims 4975, 4976, 4977, 4974). It also points to third-party rankings, such as being the only Platinum provider in SemiAnalysis's first ClusterMAX evaluation (claims 18878, 4981).
A. OpenAI is the only customer named with a dollar figure. The record shows two different numbers for that deal: an $11.9B infrastructure contract (claim 19820) and an $11.2B 'strategic deal revenue backlog' (claim 4969). The difference may come from different scopes or definitions, but the record does not reconcile them. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), with no value disclosed. The record does not identify which customers make up the rest of the $25.9B backlog (claim 4970), so customer concentration cannot be assessed from this dossier.
A. CoreWeave went public in March 2025 at $40 per share (claims 17815, 11616, 15974), raising about $1.5B gross (claim 19821) and about $1.4B net (claim 4967), plus a $68M over-allotment (claim 29782). Since then most new funding has been debt. That includes a $1.5B revolving credit facility expansion (claims 5010, 11923), up to $2.6B in delayed-draw term loans (claim 11922), and senior notes due 2030 at a 9.25% interest rate. The notes were first described as $1.5B (claims 29774, 29777) and later upsized to $2.0B (claims 29433, 29421). A 9.25% coupon is a relatively expensive cost of borrowing.
A. Almost every claim on record has the status 'stated.' That means it was extracted from company or press disclosures but has not been independently checked. Only two claims are marked 'verified': the scheduled closing of the notes offering (claim 11919) and the $2.0B senior notes closing on 2025-05-27 (claim 29434). Claim 11919 went through 'delayed' and 'not_yet_verifiable' before it was verified, which reflects the review process rather than a confirmed delay in the deal. The capacity figures, backlog, product launches, and the run-rate Adjusted EBITDA figure of about $5.17B (claim 29784) are all company statements that have not been verified. The EBITDA figure in particular is a forward-looking 'run-rate' number, not reported results.
A. The record shows large insider sales soon after the IPO: about $29.1M by the CFO (claim 19831) and about $217M by the Chief Development Officer (claim 19832), both around May 2025. Sales like these are common once post-IPO trading restrictions ease. Still, readers should note them alongside the company's heavy reliance on debt.
A. 1) The credit facility's contingent 'springing' maturity of 2026-12-30 (claim 11926). Under that clause, the facility can come due early unless certain conditions are met. Otherwise its maturity runs to 2028-05-02 (claim 5012). 2) Whether contracted capacity (1.6 GW, claim 4973) actually turns into active capacity beyond the roughly 420 MW reported (claim 4972). 3) Whether backlog (claim 4970) converts into reported revenue. 4) Any refinancing, new borrowing, or interest costs on the 9.25% notes due 2030-06-01 (claims 29422, 29435).
A. 1) Customer concentration: how much of the $25.9B backlog (claim 4970) comes from OpenAI, and which version of the OpenAI figure is correct, $11.9B (claim 19820) or $11.2B (claim 4969)? 2) Whether the company can repay its debt, given the projected $8.9B of secured debt (claim 29783) and borrowing at 9.25%. 3) How much of the capacity, product, and EBITDA claims hold up, since nearly all remain unverified. 4) How current this dossier is: the claims shown run only through mid-2025 and the list appears truncated, so later deals, earnings, or capacity updates may be missing.
Frequently asked
2026-10-15A. CoreWeave rents out GPU computing capacity in data centers to companies that train and run AI models. Its disclosed scale as of May 2025 was about 420 MW of active power across 33 data centers (claims 4972, 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power capacity (claim 4973). It also sells software around that capacity, including AI Object Storage (claim 4975), On-Demand Cluster Scaling (claim 4977) and GB200 support (claim 4976). It bought Weights & Biases, an ML developer-tools company, to extend this software layer (claims 4974, 29787).
A. The strategy is to build GPU capacity quickly, pay for it largely with debt, and lock in long-term customer contracts. CoreWeave listed on Nasdaq at $40/share in March 2025 (claims 17815, 11616, 18881). The IPO raised $1.5B (claim 19821), with about $1.4B in net proceeds (claim 4967). Total debt and equity raised was reported at $17.2B (claim 4968). Debt raises recorded in this dossier include: - a $1.5B revolving credit expansion (claims 5010, 11923) - up to $2.6B in delayed-draw term loans (claim 11922) - $2.0B of 9.250% senior notes due June 2030, upsized from an initial $1.5B (claims 29433, 29422, 11921) The company also projects $8.9B of secured debt to service contracts (claim 29783). Management points to third-party benchmark results to argue its platform is high quality: ClusterMAX/SemiAnalysis Platinum (claims 18878, 4981) and MLPerf Inference v5.0 (claim 4980).
A. OpenAI is the only customer named on the record. The OpenAI contract appears as $11.9B in one claim (19820) and $11.2B of backlog in another (4969). The dossier does not resolve that gap; it may reflect contract value versus recognized backlog, or different dates. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but the record gives no dollar value for that relationship. Total committed backlog is $25.9B (claim 4970). That means more than half of the disclosed backlog is attributed to customers who are not named.
A. Almost everything on the record has status 'stated'. That means CoreWeave said it; it does not mean an independent source has confirmed it. The only claims marked 'verified' concern the closing of the $2.0B senior notes offering on 2025-05-27 (claims 29434, 11919). Claim 11919's history moved through 'delayed' and 'not_yet_verifiable' before it was verified, which shows how much the extraction status can shift. Capacity figures, backlog, the OpenAI contract value, and the run-rate Adj. EBITDA of $5.17B (claim 29784) are all unverified company statements. The run-rate figure is a forward projection, not reported earnings.
A. Heavily, by design. In May 2025 alone the record shows several debt moves: - $2.0B of notes priced at a 9.250% coupon (claim 29433) - the $1B 2024 Term Loan repaid in full (claim 29779) - $444M of additional revolver borrowing (claim 29780) - $505M of DDTL-2 draws (claim 29781) - $450M of note proceeds planned to pay down the revolver (claim 29778) A 9.25% coupon is high, which signals that lenders priced in meaningful risk. The thesis rests on long-term contracts covering this debt service (claim 29783).
A. The most immediate item is a contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926). Its exact trigger conditions are not in the record. If triggered, it could pull the revolver's maturity forward from 2028-05-02 (claim 5012). Next, watch whether contracted power (1.6 GW, claim 4973) actually turns into active capacity, since only about 420 MW was live (claim 4972). Also watch whether backlog converts to recognized revenue, and whether the $2.0B notes due 2030-06-01 (claim 29422) get refinanced on acceptable terms.
A. Yes. The record shows CFO stock sales of about $29.1M (claim 19831) and CDO stock sales of about $217M (claim 19832) shortly after the IPO. Insider sales after an IPO are common and can be pre-planned. Their size relative to the company's stated growth outlook is still worth tracking.
A. 1) Customer concentration. OpenAI makes up a large share of disclosed backlog, and the remaining customers are not named. 2) The inconsistent OpenAI figures: $11.9B in claim 19820 versus $11.2B in claim 4969. 3) Verification. Almost no operational claims have been independently verified. 4) The springing maturity terms (claim 11926). 5) Coverage. The claims provided run only through about May 2025, and the record appears truncated. Anything later, including actual capacity deliveries, results after Q1 2025, and new customers, is not covered here and should not be inferred.
Frequently asked
2026-10-15A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI workloads such as model training and inference. It runs its own data centers and a cloud software stack on top. The record cites roughly 420 MW of active power across 33 data centers (claims 4972, 29785), more than 250,000 GPUs online (claim 29786), and 1.6 GW of contracted power capacity (claim 4973). It also cites third-party performance recognition: the only Platinum provider in SemiAnalysis's first ClusterMAX evaluation (claims 18878, 4981) and an MLPerf Inference v5.0 result (claim 4980).
A. Grow fast through debt and equity financing, and move up from raw GPU rental into software. CoreWeave says it has raised $17.2B in total debt and equity (claim 4968) and is building toward 1.6 GW of contracted power (claim 4973). On the software side it acquired Weights & Biases, an ML developer tooling company (claims 4974, 29787), and launched AI Object Storage, GB200 support, On-Demand Cluster Scaling, and NVIDIA AI Enterprise support (claims 4975-4979). These product launches are company statements and have not been independently verified.
A. Only two counterparties are named. OpenAI has an infrastructure contract described as $11.9B (claim 19820) in one source and as $11.2B of revenue backlog (claim 4969) in another. That gap is unreconciled. IBM is named as a partner for Granite model compute (claim 4971), with no dollar value given. Total backlog is stated at $25.9B (claim 4970). Netting out OpenAI leaves roughly $14B of backlog with no named customer attached, so customer concentration cannot be fully assessed from the record.
A. Almost every claim in the dossier has status 'stated': the company said it, and no independent check has been recorded. The only items marked 'verified' are the expected May 27, 2025 closing of the $2.0B 9.250% senior notes due 2030 (claims 29434, 11919). The IPO at $40/share (claims 11601, 15974) raising about $1.5B gross and $1.4B net (claims 19821, 4967) is a matter of public record but is still marked 'stated' here. Capacity, GPU counts, backlog, and product launches all remain unverified company claims.
A. Heavily, and increasingly so. Within weeks of the IPO it priced an upsized $2.0B of 9.250% senior notes due June 1, 2030 (claims 29433, 29421). An earlier draft described the offering as $1.5B (claims 29774, 11921). It also expanded its revolving credit facility to $1.5B (claim 5010) and its letters-of-credit facility to $350M (claim 5011), and set up a DDTL 3.0 facility of up to $2.6B (claim 11922; the extracted value is mis-unitized). It projects $8.9B of secured debt to service its contracts (claim 29783). A 9.25% coupon signals that lenders price meaningful risk.
A. 1) The contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926). If triggered, it would pull forward the facility's 2028-05-02 maturity (claim 5012). 2) Whether the 1.6 GW of contracted power turns into active capacity, measured against the ~420 MW cited (claims 4973, 4972). 3) Whether the $25.9B backlog (claim 4970) converts to recognized revenue. 4) Whether the run-rate Adjusted EBITDA figure of about $5.17B (claim 29784) is borne out in reported results.
A. Yes. Shortly after the IPO the record shows sizable insider sales: about $29.1M by the CFO (claim 19831) and about $217M by the Chief Development Officer (claim 19832). Insider selling after an IPO is common and is not proof of anything. Still, the size is worth noting alongside the company's heavy borrowing.
A. 1) Who holds the backlog beyond OpenAI, and how concentrated is it? 2) Why does the OpenAI figure appear as both $11.9B and $11.2B (claims 19820, 4969)? 3) Can contracted capacity be energized on schedule, given the debt load it relies on? 4) Do any of the 'stated' operational claims hold up to independent verification? Also note that the record supplied here effectively ends in late May 2025, so later developments are not reflected.
Frequently asked
2026-10-15A. CoreWeave rents large clusters of GPU computing power to companies that train and run AI models. It is a specialized cloud provider rather than a general-purpose one. In May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It also bought Weights & Biases, which makes software for developers who build AI models (claims 4974, 29787). It points to outside ratings as evidence of quality, including the only 'Platinum' rating in SemiAnalysis's first ClusterMAX evaluation (claims 18878, 4981).
A. The strategy is to sign long-term compute contracts first and then borrow heavily to build the capacity to serve them. CoreWeave listed on Nasdaq in March 2025 at $40 per share (claims 17815, 11601). The IPO raised about $1.5B gross (claim 19821), or $1.4B net (claim 4967). By May 2025 it cited $17.2B in total debt and equity raised (claim 4968). It also expanded its revolving credit facility by $1.5B (claims 11923, 5010) and arranged up to $2.6B in additional delayed-draw term loans (claim 11922). It projected about $8.9B of secured debt to support its contracts (claim 29783).
A. OpenAI is the only customer named with dollar figures. The record carries two OpenAI numbers: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI revenue backlog (claim 4969). The record does not explain the gap between them. IBM is named as a partner buying compute for its Granite AI models, but no dollar value is disclosed (claim 4971). Total backlog was $25.9B (claim 4970). If the OpenAI figures are right, roughly $14–15B of that backlog comes from customers the record does not name.
A. Nearly every claim on record has the status 'stated'. That means the company said it, and no independent check has confirmed it. Only one item is marked verified: the $2.0B senior notes offering closing on time by May 27, 2025 (claims 29434, 11919). The IPO, the 420 MW of active capacity, the product launches and the backlog figures all rest on company disclosures. The biggest gap is power: 420 MW is active (claim 4972), compared with 1.6 GW contracted (claim 4973). About three-quarters of the contracted power had not yet been brought online.
A. A senior notes offering first described at $1.5B (claims 21921/11921, 29774) was enlarged to $2.0B (claim 29433). It carries a 9.25% coupon and matures June 1, 2030 (claims 29422, 29435). Proceeds were used to repay $450M of revolver borrowings (claim 29778). A separate $1B 2024 term loan was also listed as repaid in full (claim 29779). The 9.25% rate is high for a company of this size, which suggests lenders see meaningful risk. One record lists the maturity as May 27, 2030 instead of June 1 (claim 4824), probably an extraction error.
A. 1) December 30, 2026: a 'springing' maturity date that could move up repayment of the revolving credit facility if certain conditions occur (claim 11926). The facility otherwise matures May 2, 2028 (claim 5012). 2) Whether contracted power (1.6 GW, claim 4973) actually turns into active capacity. 3) Whether the company reaches its stated run-rate adjusted EBITDA of $5.17B (claim 29784). Run-rate EBITDA is a projected annual profit measure before interest, taxes and depreciation. 4) How the OpenAI contract is recognized as revenue over time.
A. First, concentration: OpenAI appears to make up over 40% of backlog (claims 4969, 4970). Second, leverage: high-interest debt is being used to fund capacity that is largely not yet built (claims 29433, 29783). Third, insider selling around the time of the IPO: the CFO sold about $29.1M of stock (claim 19831) and the Chief Development Officer about $217M (claim 19832). Fourth, verification: almost none of the operating claims have been independently confirmed.
A. The claims shown run only to about the end of May 2025, and the record appears to be cut off at that point. Events after mid-2025 are not covered here, such as later contracts, acquisitions, capacity additions or financings. Readers should check newer filings before relying on any figure above as the current picture.
Frequently asked
2026-10-15A. CoreWeave rents out GPU computing capacity for AI workloads from its own data centers. As of mid-May 2025 it reported about 420 MW of active power across 33 data centers (claims 4972, 29785) and more than 250,000 GPUs online (claim 29786). It also sells software services on top of that hardware, including AI Object Storage, GB200 support and on-demand cluster scaling (claims 4975, 4976, 4977). It acquired the ML developer-tools company Weights & Biases (claims 4974, 29787). SemiAnalysis's ClusterMAX evaluation rated it the only Platinum provider (claims 18878, 4981).
A. The strategy is to sign long-term compute contracts first and then borrow heavily against them to build capacity. CoreWeave listed on Nasdaq in March 2025 at $40 per share, raising about $1.5B gross and roughly $1.4B net (claims 19821, 11616, 4967). By May 2025 it reported $17.2B in total debt and equity raised (claim 4968). It projected about $8.9B of secured debt to service its contracts (claim 29783). The pitch is scale: 1.6 GW of contracted power, against roughly 420 MW active at the time (claims 4973, 4972).
A. OpenAI is the only customer named with dollar figures in the record. Its contract is given as $11.9B in one claim (claim 19820) and as an $11.2B backlog contribution in another (claim 4969). That difference has not been reconciled in the dossier. IBM is named as a partner for Granite model compute (claim 4971), but no contract value is disclosed. The company reports a total backlog of $25.9B (claim 4970), and the customers behind the rest of it are not named in this record. Customer concentration is therefore a material unknown.
A. Nearly every claim here has status 'stated': the company said it, and the dossier has not independently confirmed it. Only the closing of the $2.0B 9.25% senior notes due 2030 has been verified as completed on schedule (claims 29434, 11919, 29421). The IPO, the credit-facility expansions, the product launches and the capacity figures are all company-reported. The 420 MW active versus 1.6 GW contracted gap (claims 4972, 4973) shows that most contracted capacity was still to be built.
A. Heavily. Its main borrowings include: - $2.0B of senior notes at 9.25% due June 2030, upsized from a planned $1.5B (claims 29433, 29422, 29777). - A revolving credit facility expanded to $1.5B (claim 5010), plus $350M in letters of credit (claim 5011). - A DDTL 3.0 delayed-draw facility of up to $2.6B (claim 11922). The company also repaid a $1.0B 2024 term loan in full (claim 29779). A 9.25% coupon is high-yield territory, which signals that lenders price meaningful risk. The company cites $5.17B of run-rate adjusted EBITDA (claim 29784), but that is a non-GAAP, forward-looking figure.
A. Four things stand out: - **2026-12-30 springing maturity.** A contingent maturity date on the credit facility (claim 11926) could pull the revolver's 2028-05-02 maturity (claim 5012) forward. The trigger conditions are not in this record. - **Capacity build-out.** Whether energized capacity moves from about 420 MW toward the 1.6 GW contracted. - **Customer mix.** Whether further backlog is attributed to named customers beyond OpenAI. - **Further debt raises.** Further secured debt raises against contracts.
A. Yes. The record shows CFO stock sales of about $29.1M (claim 19831) and sales by the Chief Development Officer of about $217M (claim 19832), both shortly after the IPO lock-up period. Insider sales are not wrongdoing in themselves, and they may have been made under pre-arranged trading plans. Still, sales of this size by senior executives soon after listing are worth weighing against the company's growth narrative.
A. 1. **Concentration.** How much of the $25.9B backlog (claim 4970) depends on OpenAI, and which figure is correct, $11.9B or $11.2B (claims 19820, 4969)? 2. **Execution.** Can the company build 1.6 GW of capacity on time, given that most claims remain unverified? 3. **Refinancing.** Can it carry debt priced at 9.25% while it scales, and what triggers the 2026-12-30 springing maturity? 4. **Data quality.** Several financing figures are recorded with inconsistent units, for example DDTL 3.0 as '2600.0 USD' (claim 11922) and the notes as '2000.0 USD' (claim 11918). The dossier excerpt reviewed here was also truncated, so later claims may be missing.
Frequently asked
2026-10-15A. CoreWeave rents out GPU computing power for training and running AI models. It operates data centers stocked with NVIDIA hardware and sells access to them, along with software for managing that capacity. In May 2025 it reported about 420 MW of active power across 33 data centers [29785] and more than 250,000 GPUs online [29786]. It has added AI tooling through its acquisition of Weights & Biases [4974, 29787], and its products include AI Object Storage [4975] and support for GB200 hardware [4976].
A. The strategy is to sign large multi-year compute contracts, then build the capacity to deliver them using large amounts of debt and some equity. As of May 2025 it reported a $25.9B revenue backlog [4970] and $17.2B of total debt and equity raised [4968]. It projected about $8.9B of secured debt tied to servicing specific contracts [29783]. It also cites third-party performance rankings as a selling point: SemiAnalysis ClusterMAX Platinum [18878, 4981] and MLPerf Inference v5.0 [4980]. Note that this dossier's record ends around late May 2025, so any later strategy shifts are not captured here.
A. OpenAI is the only customer named with a dollar figure. It appears in two claims that do not match: an $11.9B infrastructure contract [19820] and an $11.2B OpenAI-related backlog figure [4969]. IBM is named as a partner using CoreWeave compute for its Granite models [4971], but no contract value is disclosed. The rest of the $25.9B backlog [4970] is not tied to named customers in this record, so how concentrated the customer base is cannot be judged from these claims alone.
A. Almost every claim in this record is marked 'stated', meaning the company said it, not that it was independently checked. The only verified items are the on-time closing of the $2.0B senior notes offering on 2025-05-27 [29434, 11919]. Capacity shows the clearest gap between delivered and announced: about 420 MW is reported as active [4972, 29785], against 1.6 GW of contracted power [4973]. The $25.9B backlog [4970] and the $5.17B run-rate Adjusted EBITDA figure [29784] describe expected future results, not results already achieved.
A. CoreWeave listed on Nasdaq in March 2025 at $40 per share [17815, 11616, 18881]. The IPO raised about $1.5B gross [19821] and roughly $1.4B net [4967], plus a $68M over-allotment [29782]. Debt followed within weeks: - The revolving credit facility was expanded by $1.5B [11923, 5010], and the letters-of-credit facility by $350M [11924]. - A senior notes offering was announced at $1.5B [11921, 29774] and upsized to $2.0B at a 9.25% interest rate, due June 2030 [29433, 29421]. - A DDTL 3.0 delayed-draw term loan of up to $2.6B was set up [11922]. - The 2024 term loan, about $1B, was repaid [29779].
A. Two insider-sale claims appear around May 2025: about $29.1M of stock sold by the CFO [19831] and about $217M by the CDO [19832]. These are recorded disclosures only. The record gives no context on the sales, such as whether they were made under pre-arranged 10b5-1 trading plans.
A. Key dates and milestones to track: - **2026-12-30:** a contingent 'springing' maturity date on the credit facility [11926]. This is a provision that can pull the facility's maturity forward if certain conditions are met. - **2028-05-02:** the extended maturity of the revolving credit facility [5012]. - **2030-06-01:** maturity of the $2.0B 9.25% notes [29422, 29435]. - **Capacity build-out:** progress from about 420 MW active toward 1.6 GW contracted [4972, 4973]. - **Backlog:** whether the $25.9B backlog [4970] turns into recognized revenue on schedule.
A. 1. **Leverage:** debt at 9.25% interest [29433], plus secured contract-level debt [29783], is funding the build-out. Whether contract cash flows can cover it is not yet shown. 2. **Customer concentration:** OpenAI is the only customer with a dollar figure, and its two figures conflict ($11.9B [19820] vs $11.2B [4969]). 3. **Execution:** most contracted capacity is not yet active [4973 vs 4972]. 4. **Data quality:** several claims appear to have unit errors from automated extraction. For example, DDTL 3.0 is recorded as '2600.0 USD' [11922] and the $2.0B notes as '2000.0 USD' [11918]. Readers should check the original filings. 5. **Coverage:** this record effectively ends in mid-2025, so anything that happened after that is not reflected here.
Frequently asked
2026-10-15A. CoreWeave rents out GPU computing capacity built for AI workloads. In practice it operates data centers full of NVIDIA GPUs and leases that capacity, along with software for running and scaling AI clusters, to companies that train and serve AI models. By mid-2025 it reported more than 250,000 GPUs online (claim 29786) and about 420 MW of active power across 33 data centers (claims 29785, 4972). It added software tools by acquiring Weights & Biases, a developer platform for machine learning (claims 4974, 29787). It went public on Nasdaq in March 2025 at $40 per share (claims 17815, 11616, 15974, 11601, 18881).
A. The strategy is to sign large, multi-year compute contracts with AI labs and enterprises, then borrow heavily to build the capacity those contracts require. CoreWeave reported $25.9B of revenue backlog from committed contracts (claim 4970) and 1.6 GW of contracted power capacity (claim 4973), far more than the ~420 MW it had active. It also reported raising $17.2B of combined debt and equity (claim 4968) and projected about $8.9B of secured debt tied to servicing contracts (claim 29783). Management framed this as a run-rate adjusted EBITDA of about $5.17B (claim 29784). That figure is the company's own projection, not a reported result.
A. OpenAI is the only customer named with a dollar figure. Even that figure is inconsistent: one record cites an $11.9B infrastructure contract (claim 19820), while another cites $11.2B of OpenAI backlog (claim 4969). The gap may reflect timing or how backlog is defined, and it should be reconciled against the primary filings. IBM is named as a partner for Granite model compute capacity, but no contract value is given (claim 4971). The rest of the $25.9B backlog (claim 4970) is not attributed to named customers in this dossier. Customer concentration, meaning how much revenue depends on a few buyers, therefore cannot be fully assessed from these records.
A. Only two claims in this dossier carry 'verified' status: the expected May 27, 2025 closing of a senior notes offering (claim 11919) and the closing of the upsized $2.0B 9.250% senior notes due 2030 (claim 29434). Everything else, including the IPO terms, the backlog, the capacity figures, the product launches and the W&B acquisition, is recorded as 'stated'. That means the company or a press source said it, but the dossier has not independently confirmed it. Several items are widely reported as completed events, such as the IPO and the notes closing (claim 29421). Even so, a careful reader should treat the operational numbers as company-reported until they are checked against filings.
A. The debt is substantial and layered. It includes $2.0B of 9.250% senior notes due June 1, 2030, upsized from an initially reported $1.5B offering (claims 29433, 29421, 29422; the $1.5B figure appears in claims 29774, 11921). It also includes a revolving credit facility expanded to $1.5B with maturity extended to May 2, 2028 (claims 5010, 5012), a $350M letters-of-credit facility (claim 5011), and delayed-draw term loans of up to $2.6B (claim 11922). Notes proceeds were reported as repaying $450M of revolver borrowings (claim 29778), and a $1B 2024 term loan was repaid in full (claim 29779). A 9.25% coupon is a high interest rate, which signals how much lenders charge to finance this model.
A. The nearest dated item is a contingent 'springing maturity' on December 30, 2026 (claim 11926). A springing maturity is a clause that can pull a debt deadline forward if certain conditions are triggered, so it is worth checking whether those conditions apply. Beyond that, watch whether contracted capacity (1.6 GW, claim 4973) actually converts into active, revenue-generating capacity, since only ~420 MW was active (claim 29785). Also watch whether the OpenAI backlog figures are reconciled (claims 19820, 4969) and whether the projected run-rate EBITDA (claim 29784) shows up in reported results.
A. The dossier records insider selling shortly after the IPO. The CFO's sales are recorded at about $29.1M (claim 19831) and the Chief Development Officer's at about $217M (claim 19832). Insider sales after a lockup or a planned-sale arrangement are common and are not evidence of wrongdoing by themselves. They are, however, a relevant data point when weighing management's optimistic projections.
A. 1) Coverage gap: the records on file stop around May 2025, even though today's date is October 2026, so more than a year of developments is missing from this dossier. 2) Customer concentration: aside from OpenAI, the customers behind the $25.9B backlog (claim 4970) are unnamed. 3) Conflicting figures: the OpenAI contract ($11.9B vs. $11.2B, claims 19820, 4969) and the notes size ($1.5B vs. upsized $2.0B) need to be checked against filings. 4) Funding risk: the model depends on continued access to expensive debt (9.25% notes, claim 29433; $8.9B secured debt projected, claim 29783) to build capacity ahead of revenue. 5) Verification: nearly every claim is still 'stated' rather than independently verified.
Frequently asked
2026-10-15A. CoreWeave rents out GPU computing capacity in data centers, specifically for training and running AI models. It is a specialized 'AI cloud' rather than a general-purpose cloud. Its disclosed footprint is about 420 MW of active power across 33 data centers (claims 4972, 29785), with more than 250,000 GPUs online (claim 29786). It also sells software around that compute, including AI Object Storage, which it describes as generally available (claim 4975), and GB200 support across its platform (claim 4976). It agreed to acquire Weights & Biases, an AI developer-tools company (claims 4974, 29787). Outside benchmarks have rated it well: it was the only 'Platinum' provider in SemiAnalysis's first ClusterMAX evaluation (claims 18878, 4981).
A. The strategy is to sign long-term compute contracts with large AI labs and enterprises, then borrow heavily to build the capacity to serve them. CoreWeave reports $25.9B of revenue backlog from committed contracts (claim 4970) and 1.6 GW of contracted power (claim 4973), roughly four times its 420 MW of active power (claim 4972). On the funding side, it reports $17.2B of total debt and equity raised (claim 4968). That includes an IPO at $40/share raising about $1.5B gross and $1.4B net (claims 19821, 4967), a revolving credit facility expanded to $1.5B (claim 5010), a delayed-draw term loan of up to $2.6B (claim 11922), and $2.0B of 9.25% senior notes due 2030 (claims 29433, 29421). It projects $8.9B of secured debt to service its contracts (claim 29783).
A. Only two counterparties are named in the record. OpenAI is described as an $11.9B infrastructure contract in one claim (claim 19820) and as $11.2B of revenue backlog in another (claim 4969). That gap is unreconciled. IBM is named as a partner for Granite model compute capacity (claim 4971), but no dollar value is given. The remaining roughly $14B of the $25.9B backlog (claim 4970) is not attributed to any named customer in the dossier. Customer concentration is therefore a central fact for any reader: OpenAI alone accounts for roughly 43–46% of disclosed backlog.
A. Almost everything in this dossier has status 'stated', meaning the company said it and the claim was extracted from a filing or release. It has not been independently checked. Only two claims are marked 'verified', and both concern the closing of the $2.0B senior notes offering by May 27, 2025 (claims 11919, 29434). The IPO and Nasdaq listing (claims 11601, 18881) are matters of public record, but they are still recorded here as 'stated'. Capacity figures, backlog, product availability and EBITDA run-rate (claim 29784) all rest on company disclosure alone. The 1.6 GW contracted versus 420 MW active gap (claims 4973, 4972) shows that most of the contracted capacity has not yet been built or energized.
A. Treat duplicates and conflicts as extraction artifacts until checked against primary filings. The senior notes appear as both a $1.5B offering (claims 29774, 11921) and an upsized $2.0B 9.25% offering (claims 29433, 29421). The $2.0B figure is the one marked closed and verified (claim 29434). Some amounts are recorded in mixed units; for example, '1500.0 USD' in claim 11921 means $1.5B. The OpenAI figure differs between $11.9B and $11.2B (claims 19820, 4969). The $5.17B 'run-rate Adj. EBITDA' (claim 29784) is a forward-looking, non-GAAP figure, not reported earnings.
A. The record notes insider stock sales after the IPO. The CFO sold about $29.1M (claim 19831) and the Chief Development Officer sold about $217M (claim 19832). Sales like these are common after lock-up periods or under pre-arranged trading plans, and they are not evidence of wrongdoing on their own. They are, however, a data point readers often track alongside company guidance.
A. First, the contingent 'springing maturity' date of December 30, 2026 tied to the credit facility (claim 11926). Springing maturities typically accelerate when other debt is not refinanced, so check what condition triggers it. Second, how quickly the 1.6 GW of contracted power converts into active capacity (claims 4973, 4972). Third, whether the $25.9B backlog turns into recognized revenue on schedule (claim 4970). Fourth, any new named customers that would reduce dependence on OpenAI. Fifth, the 9.25% notes maturing June 1, 2030 (claim 29422), whose coupon signals how expensive the company's capital is.
A. (1) Who the unnamed customers behind roughly $14B of backlog are, and how creditworthy they are. (2) Whether CoreWeave can build out roughly 1.2 GW of contracted-but-not-active power on time and on budget, given heavy reliance on debt (claims 4968, 29783). (3) Concentration risk if OpenAI's needs or finances change (claims 19820, 4969). (4) How the high-cost debt stack, including the 9.25% notes (claim 29433), will be serviced and refinanced. (5) Coverage gaps in this dossier: the available record largely stops around mid-2025 and appears truncated. Developments since then, including results, new contracts, and the Weights & Biases integration, are not reflected here and should be checked separately.
Frequently asked
2026-10-14A. CoreWeave rents out GPU computing capacity for AI workloads: data-center power, NVIDIA hardware (including GB200 support, claim 4976), and a cloud software layer on top, such as AI Object Storage (claim 4975) and on-demand cluster scaling (claim 4977). It has added AI developer tooling by acquiring Weights & Biases (claim 4974). It listed on Nasdaq in March 2025 at $40 per share (claims 17815, 15974), raising about $1.5B gross (claim 19821) and about $1.4B net (claim 4967).
A. The strategy is to secure power and data-center capacity quickly and fund it mostly with debt. The company reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973). In July 2025 it agreed to acquire Core Scientific for about $9B (claim 28333), aiming to own roughly 1.3 GW of gross power (claim 28335) with 1 GW+ of potential expansion (claim 28336). It said the deal would eliminate more than $10B of future lease overhead (claim 28338) and deliver $500M in annual run-rate savings by end-2027 (claim 28337). Total debt and equity raised was stated at $17.2B as of May 2025 (claim 4968).
A. OpenAI is the only customer named with a dollar figure. The record shows an $11.9B infrastructure contract (claim 19820) and, separately, $11.2B of OpenAI backlog (claim 4969); the dossier does not reconcile the two figures. IBM is named as a partner buying compute for its Granite models (claim 4971), but no value is given. Total committed backlog was stated at $25.9B (claim 4970). Roughly half of that backlog is not attributed to any named customer in this record, so customer concentration cannot be fully assessed.
A. Very little has been independently checked. The only items marked 'verified' are the closing of the senior notes offering on 2025-05-27 (claims 11919, 29434): $2.0B of 9.250% notes due 2030, upsized from an initial $1.5B (claims 29433, 11921). The IPO, the 420 MW of active capacity, the $25.9B backlog, the product launches, the 'Platinum' ClusterMAX ratings (claims 18878, 18879), and the Core Scientific deal terms all carry 'stated' status. That means they come from company disclosures and have not been confirmed by this dossier.
A. It is unresolved in this record. The merger's closing deadline was 2026-04-07 (claim 4738). That claim was first flagged 'delayed' and is now 'not_yet_verifiable,' meaning the dossier has no evidence that the deal closed. The terms included Core Scientific holders owning less than 10% of the combined company (claim 28339) and a $270M termination fee payable to CoreWeave (claim 4739). Readers should check primary sources for whether the deal completed, was amended, or was terminated.
A. Heavily. The company issued $2.0B of senior notes at 9.250% due June 1, 2030 (claims 29421, 29422). It also has a delayed-draw term loan facility of up to $2.6B (claim 11922) and a revolving credit facility expanded by $1.5B (claim 11923), with $350M added in letters of credit (claim 11924). The revolver nominally matures 2028-05-02 (claim 5012). However, it has a contingent 'springing' maturity of 2026-12-30 (claim 11926), which is about 2.5 months from today and is the nearest debt date to watch.
A. Yes, substantially, in the months after the IPO. The record shows stock sales of about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). These are stated figures. The dossier does not say whether the sales were made under pre-arranged trading plans.
A. 1. Whether the springing revolver maturity of 2026-12-30 (claim 11926) is triggered. 2. The outcome of the Core Scientific deal (claim 4738). 3. Whether contracted power (1.6 GW, claim 4973) turns into active capacity beyond 420 MW (claim 4972). 4. Who the unnamed customers behind the $25.9B backlog (claim 4970) are, and how much depends on OpenAI. 5. Progress toward the $500M savings target by end-2027 (claim 28337). Note that the claims list supplied for this FAQ was cut off mid-record, so later disclosures may exist that are not reflected here.
Frequently asked
2026-10-14A. CoreWeave (Nasdaq: CRWV) rents out large clusters of NVIDIA GPUs that customers use to train and run AI models. It also sells software on top of that hardware, including AI object storage, on-demand cluster scaling, and support for NVIDIA GB200 systems (claims 4975, 4977, 4976). It acquired Weights & Biases, a developer tool for tracking machine-learning experiments (4974). The independent ClusterMAX ratings named it the only 'Platinum' provider in both of their evaluations (18878, 18879, 4981).
A. The strategy is to grow capacity fast and pay for it largely with debt. CoreWeave reported 420 MW of active power and 1.6 GW of contracted power (4972, 4973). It also signed an agreement to buy Core Scientific for about $9.0B (28333), which would give it about 1.3 GW of owned power plus 1 GW or more of potential expansion (28335, 28336). It says owning that capacity would avoid more than $10B of future lease costs (28338) and save $500M a year by end-2027 (28337).
A. Only one customer is named with a dollar figure: OpenAI. The records give two different amounts: an $11.9B contract (19820) and an $11.2B revenue backlog (4969). The difference has not been reconciled. IBM is named as a partner for Granite model compute, with no dollar value disclosed (4971). Total committed backlog is $25.9B (4970), so roughly half the backlog, about $14B, comes from customers whose names are not on record.
A. The financings are completed events. The IPO priced at $40 per share (17815, 11616) and raised $1.5B gross, about $1.4B net (19821, 4967). The $2.0B of 9.250% senior notes due 2030 closed (29421), and the closing is the only item marked 'verified' (29434, 11919). The credit facilities were expanded: $1.5B revolver and $350M letters of credit (11923, 11924). The 420 MW of active power is stated as already in place (4972). Everything else, including backlog conversion, the 1.6 GW of contracted power, and the Core Scientific synergies, rests on company statements and has not been independently verified.
A. This is unresolved on the record. The deal was expected to close in Q4 2025 (28334), with an outside deadline of 2026-04-07 (4738). Both dates have passed, and both claims are marked 'not_yet_verifiable' rather than completed. The share-exchange terms (0.1235 CoreWeave shares per Core Scientific share, 4731) carry the same status. The agreement includes a $270M termination fee payable to CoreWeave (4739). Readers should not assume the deal closed. The capacity and savings figures that depend on it should be treated as conditional.
A. The disclosed financing is large. Total debt and equity raised was $17.2B as of May 2025 (4968). The record also lists a delayed-draw term loan of up to $2.6B (11922; the stored value is missing its 'million' unit) and $2.0B of notes at a 9.250% interest rate maturing 2030-06-01 (29422). The revolving credit facility nominally runs to 2028-05-02 (5012). However, a 'springing' clause could pull its maturity forward to 2026-12-30 (11926). That date is next on the debt calendar.
A. 1) Whether the Core Scientific deal closed, failed, or triggered the $270M fee (4731, 4739). 2) Whether the springing maturity on 2026-12-30 is triggered (11926). 3) How quickly contracted power (1.6 GW, 4973) becomes active capacity. 4) Whether the $25.9B backlog (4970) turns into recognized revenue. 5) Progress on the $500M annual savings target for end-2027 (28337).
A. First, customer concentration: OpenAI accounts for roughly 45% of backlog, and the conflicting $11.2B and $11.9B figures (4969, 19820) have not been explained. Second, the 9.25% interest rate on the notes shows how expensive it is for CoreWeave to borrow, so readers should ask whether revenue growth can keep up with debt costs. Third, the Core Scientific deal's status is unknown. Fourth, insiders sold heavily soon after the IPO: about $217M by the CDO (19832), $103.3M by the CEO (19830), and $29.1M by the CFO (19831). Note also that this dossier was cut off partway through, so some later claims may be missing.
Frequently asked
2026-10-14A. CoreWeave (Nasdaq: CRWV) rents GPU computing capacity, built mainly on NVIDIA hardware, to companies that train and run AI models. Its disclosed product work includes GB200 support across its cloud stack (claim 4976), on-demand cluster scaling (4977), and general availability of AI Object Storage (4975). It also announced the acquisition of Weights & Biases, an AI developer-tools company (4974). Third-party benchmarker SemiAnalysis named it the only 'Platinum' provider in both its first ClusterMAX evaluation and ClusterMAX 2.0 (18878, 18879, 4981).
A. It listed on Nasdaq in March 2025. The IPO priced at $40 per share on 2025-03-28 (11601, 15974) for about $1.5B gross (19821) and about $1.4B net (4967). The company says it has raised $17.2B in total debt and equity (4968). That includes a $2.0B issue of 9.250% senior notes due June 2030, which closed on 2025-05-27 (29421, 29422). The closing is one of the few items in the record marked 'verified' (29434, 11919). It also expanded its revolving credit facility to $1.5B (5010), with maturity extended to 2028-05-02 (5012), and arranged up to $2.6B in delayed-draw term loans (DDTL 3.0, 11922). The record also shows a $1.5B note offering due 2030 (11921). It may overlap with the upsized $2.0B deal, and the record does not reconcile the two.
A. OpenAI is the only named customer in this record. CoreWeave disclosed an OpenAI infrastructure contract of about $11.9B (19820) and separately cited $11.2B of OpenAI-related backlog (4969). The gap likely reflects timing or revenue already recognized, but the record does not explain it. Total committed backlog was reported at $25.9B (4970), so more than half of disclosed backlog is tied to a single customer. IBM is named as a partner using CoreWeave capacity for its Granite models (4971). No other customers are identified by name in the record.
A. Very little in the record has been independently confirmed. Nearly every claim is labeled 'stated', meaning the company said it, not that it was verified. The clearest completed events are the IPO and the $2.0B senior notes closing (29421, the only claim marked verified, via 29434 and 11919). On capacity, the company reported 1.6 GW of contracted power (4973) but only 420 MW of active power added (4972). That leaves a large gap between power that has been secured on paper and capacity that is actually running.
A. In July 2025 CoreWeave agreed to buy data-center operator Core Scientific for about $9B in stock, at 0.1235 CoreWeave shares per Core Scientific share (28333, 4731). The stated rationale was to own about 1.3 GW of gross power (28335) plus more than 1 GW of potential expansion (28336), eliminate more than $10B of future lease costs (28338), and save $500M a year in run-rate costs by end-2027 (28337). Closing was expected in Q4 2025 (28334), with a merger deadline of 2026-04-07 (4738). Both timing claims are marked 'not_yet_verifiable', and the record contains no confirmation that the deal closed. Readers should treat the deal's status as unresolved until it is confirmed against primary filings.
A. Yes, and in size, during the months after the IPO. The record lists sales of about $217M by the Chief Development Officer (19832), about $103.3M by the CEO (19830), and about $29.1M by the CFO (19831). These figures come from automated extraction and are not individually verified. The record also does not say whether the sales were made under pre-arranged trading plans.
A. 1) Whether the Core Scientific merger closed, failed, or was renegotiated (4731, 4738, 28334). 2) A contingent 'springing maturity' date of 2026-12-30 on its credit facility (11926). If the triggering conditions are met, debt could come due much earlier than the stated 2028 maturity (5012). 3) How quickly the 1.6 GW of contracted power turns into active capacity (4973 vs. 4972). 4) Whether backlog becomes less concentrated in OpenAI (4969, 4970). 5) Progress toward the $500M cost-savings target by end-2027 (28337).
A. Customer concentration: more than half of disclosed backlog appears tied to OpenAI, and no other customers are named. Leverage: the company has raised heavily through debt, including 9.25% notes (29433), on top of $17.2B in total capital raised (4968). Execution: most capacity is contracted rather than live. M&A: the Core Scientific outcome is unconfirmed. Evidence quality: almost every claim is company-stated and unverified, several numbers appear more than once in slightly different forms, and this claim list is cut off, so later disclosures may be missing from this summary.
Frequently asked
2026-10-14A. CoreWeave rents out large clusters of NVIDIA GPUs for training and running AI models, a business often called an 'AI cloud' or 'neocloud.' Its disclosed products include GB200 support across its cloud stack (claim 4976), on-demand cluster scaling (4977), and AI Object Storage, which it says is generally available (4975). Its own sources cite third-party recognition: it was described as the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings (18878, 18879, 4981) and it reported MLPerf Inference v5.0 results (4980). It also acquired the developer-tools company Weights & Biases (4974).
A. The strategy is to secure power and data-center capacity at scale, financed largely with debt, and to fill it with multi-year contracts from AI labs. The company reported 420 MW of active power (4972) against 1.6 GW contracted (4973), and $17.2B in total debt and equity raised (4968). In July 2025 it announced a deal to buy Core Scientific for about $9B in stock (28333, 0.1235 CRWV shares per share, 4731). The stated aims were to own about 1.3 GW of gross power (28335), add 1 GW+ of potential expansion (28336), and eliminate more than $10B of future lease costs (28338).
A. Only two counterparties are named in the record. OpenAI has an infrastructure contract described as $11.9B (19820), with a separately cited OpenAI backlog figure of $11.2B (4969); the two figures do not reconcile in the record. IBM is a partner for Granite model compute capacity (4371 is not on record; see 4971). The company reports a total contracted backlog of $25.9B (4970), but the dossier does not name the customers behind most of it, so concentration risk outside OpenAI cannot be assessed from these claims.
A. Mostly through debt. The Nasdaq IPO priced at $40/share (17815, 11616) and raised about $1.5B gross (19821), or $1.4B net (4967). After that, the company expanded its revolving credit facility by $1.5B (5010) and its letters of credit by $350M (5011). It added up to $2.6B in delayed-draw term loans (DDTL 3.0, 11922) and issued 9.25% senior notes due June 2030. Those notes were first reported at $1.5B (11921) and then upsized to $2.0B (29433, 29421). A 9.25% coupon is a high borrowing cost and signals how lenders price the risk.
A. Completed events in the record include the IPO and Nasdaq listing (18881, 19821) and the closing of the $2.0B notes offering. That closing (29434, 11919) is the only claim our process has independently marked 'verified.' Almost every other claim, including the backlog, the OpenAI contract value, the power figures, and the product launches, has status 'stated.' That means the company or a source said it, but we have not confirmed it. The Core Scientific acquisition is marked 'not_yet_verifiable' (4731, 28334). Its stated Q4 2025 close and the 2026-04-07 date in the record have no confirmed completion here.
A. Yes. Reported insider sales in mid-2025 total about $349M: roughly $217M by the Chief Development Officer (19832), $103.3M by the CEO (19830), and $29.1M by the CFO (19831). Insider selling after an IPO is common and is not proof of wrongdoing. Still, the amounts are large relative to the $1.4B of net IPO proceeds (4967), so readers usually treat them as context.
A. (1) Whether the Core Scientific deal actually closed or was terminated. The record shows a $270M termination fee payable to CoreWeave under certain conditions (4739) but no outcome. (2) The credit facility's springing maturity date of 2026-12-30 (11926). The facility otherwise runs to 2028-05-02 (5012), but the earlier date could be triggered, so it is a near-term refinancing checkpoint. (3) How quickly the 1.6 GW of contracted power (4973) becomes active capacity, compared with the 420 MW active today (4972). (4) Whether the $25.9B backlog (4970) turns into recognized revenue.
A. First, customer concentration: OpenAI alone accounts for roughly $11.2–11.9B (4969, 19820) of the $25.9B backlog (4970), and the remaining customers are unnamed. Second, the debt load: billions in high-yield and secured borrowing, including the 9.25% notes due 2030 (29422), must be repaid out of contracts that run for years. Third, execution: most capacity is contracted rather than live. Fourth, the status of the Core Scientific merger. Finally, this dossier excerpt mostly covers early-to-mid 2025 and nearly all claims are unverified, so readers should check primary filings for more recent developments.
Frequently asked
2026-10-13A. CoreWeave (Nasdaq: CRWV) rents out GPU-heavy cloud computing built for training and running AI models. The record shows product claims including support for NVIDIA GB200 systems (claim 4976), general availability of an AI Object Storage product (claim 4975), and on-demand cluster scaling (claim 4977). It also announced the acquisition of Weights & Biases, an AI developer-tools company (claim 4974). The company says SemiAnalysis's ClusterMAX evaluations rated it the only 'Platinum' provider, both in the first round and in 2.0 (claims 18878, 18879, 4981).
A. The strategy is to grow fast and own more of its infrastructure. CoreWeave reported 1.6 GW of contracted power and 420 MW of active capacity added (claims 4973, 4972). In July 2025 it signed a definitive agreement to acquire data-center operator Core Scientific for about $9B in stock (claim 28333). That deal would bring roughly 1.3 GW of owned gross power plus 1 GW+ of potential expansion (claims 28335, 28336). Management pitched the deal as eliminating $10B+ of future lease costs (claim 28338) and producing $500M in annual run-rate savings by end-2027 (claim 28337). The growth is funded heavily with debt: the company says it has raised $17.2B in total debt and equity (claim 4968).
A. OpenAI is the only customer named with a dollar figure. The record shows an $11.9B infrastructure contract (claim 19820) and, separately, $11.2B of OpenAI-related backlog (claim 4969). The two figures differ and the dossier does not reconcile them. IBM is named as a partner buying compute for its Granite models, with no value disclosed (claim 4971). Total contracted backlog was $25.9B as of May 2025 (claim 4970). The rest of that backlog, roughly half, is not attributed to named customers in this record.
A. Completed financings are the most concrete items. The IPO priced at $40/share in March 2025 (claims 17815, 11616), raising about $1.5B gross and $1.4B net (claims 19821, 4967). The 9.25% senior notes due 2030 closed, and the dossier lists them at $2B (claims 11917, 4824). That note closing (claim 11919) is the only claim here marked 'verified'. Almost every other claim, including products, capacity, backlog, and the Core Scientific deal terms, is marked only 'stated', meaning it was extracted from company or filing language but not independently confirmed.
A. The dossier does not show that it closed. The company expected a Q4 2025 close (claim 28334) and set a merger deadline of 2026-04-07 (claims 4738, 4731). Both of those dates have passed, and the claims are marked 'not_yet_verifiable' after earlier being flagged 'delayed'. A $270M termination fee would be payable to CoreWeave in certain circumstances (claim 4739). Readers should treat the deal's capacity and savings figures as contingent until its outcome is confirmed.
A. The company carries substantial debt across several facilities: - A revolving credit facility expanded by $1.5B (claims 5010, 11923). - A letters-of-credit facility expanded by $350M (claims 5011, 11924). - A delayed-draw term loan of up to $2.6B (claim 11922). - $2B of 9.25% notes due 2030 (claim 11917). - A $1.5B senior notes offering due 2031 (claim 26758). The revolver's maturity was extended to 2028-05-02 (claim 5012). The record also lists a contingent 'springing' maturity date of 2026-12-30 (claim 11926), which falls about two and a half months from now.
A. Four things matter most: 1. The 2026-12-30 springing maturity date (claim 11926) and whatever condition triggers it. 2. A definitive outcome on the Core Scientific merger (claims 28333, 4738). 3. Whether the $25.9B backlog (claim 4970) turns into recognized revenue, and whether the 1.6 GW of contracted power (claim 4973) turns into energized capacity. 4. Progress toward the $500M run-rate savings target by end-2027 (claim 28337), which depends on the Core Scientific deal.
A. The first question is customer concentration. OpenAI alone accounts for roughly $11.2B of the $25.9B backlog (claims 4969, 4970), and most other customers are unnamed. The second is insider selling: the dossier records about $217M in sales by the Chief Development Officer, $103.3M by the CEO, and $29.1M by the CFO in mid-2025 (claims 19832, 19830, 19831). The third is how much debt the company is carrying while it builds capacity. Finally, nearly all claims are company-stated and unverified, some figures conflict (OpenAI $11.9B vs. $11.2B), and the record provided ends in July 2025, so later developments are not reflected.
Frequently asked
2026-10-13A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity built for AI workloads, a model often called an 'AI cloud' or 'neocloud.' The record shows it supporting NVIDIA GB200 hardware across its platform (claim 4976), launching AI Object Storage (4975), and buying the ML developer-tools company Weights & Biases (4974). Its main external credential is being the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings, both in the first round (18878, 4981) and in ClusterMAX 2.0 (18879). That rating comes from a third party, but in this dossier it is still recorded as a company statement and has not been independently checked.
A. Mostly with debt, on top of a March 2025 IPO priced at $40/share (17815, 11616). The IPO raised about $1.5B gross (19821) and $1.4B net (4967). After the IPO the company added a revolving credit facility expanded to $1.5B (5010, 11923), a $350M letters-of-credit facility (5011), up to $2.6B in delayed-draw term loans under 'DDTL 3.0' (11922), $2B of 9.25% senior notes due 2030 (11917, 4824), and a $1.5B senior notes offering due 2031 (26758). By May 2025 the company said it had raised $17.2B in total debt and equity (4968). Of all these financing items, only the closing of the 2030 notes is marked verified in our records (11919).
A. OpenAI is the only large customer named with a dollar figure. That relationship appears as an $11.9B infrastructure contract (19820) and, separately, as $11.2B of OpenAI-related revenue backlog (4969). The two figures do not match, and the dossier does not reconcile them. IBM is named as a partner, with CoreWeave supplying compute for IBM's Granite models (4971), but no value is disclosed. Total backlog was stated at $25.9B as of May 2025 (4970). Subtracting the OpenAI figure leaves roughly half of that backlog tied to customers the records do not name, so customer concentration is hard to judge from public claims alone.
A. Very little in this dossier has been independently checked. The IPO and Nasdaq listing are matters of public record, but the entries here are still marked 'stated' (18881, 19821). The single item marked 'verified' is the May 2025 closing of the senior notes offering (11919). Everything else, including product launches, the 420 MW of active power capacity (4972), 1.6 GW of contracted power (4973), backlog, and benchmark results (4980), is the company's own statement taken from filings and press releases.
A. In July 2025 CoreWeave signed an all-stock deal to buy Core Scientific, valued at about $9B (28333), at 0.1235 CoreWeave shares per Core Scientific share (4731). The pitch was about 1.3 GW of owned gross power (28335), more than 1 GW of possible expansion (28336), removing over $10B of future lease costs (28338), and $500M of annual run-rate savings by the end of 2027 (28337). Closing was expected in Q4 2025 (28334), with an outside date of 2026-04-07 (4738) and a $270M termination fee payable to CoreWeave (4739). Both of those dates have passed. Our records still list the deal as 'not_yet_verifiable,' so this dossier cannot confirm whether it closed, was terminated, or was renegotiated. Readers should check primary sources before relying on any of the deal's projected benefits.
A. Yes, and in large amounts soon after the IPO. The records show about $217M sold by the Chief Development Officer (19832), $103.3M by the CEO (19830), and $29.1M by the CFO (19831), all in May–June 2025. Insider sales after an IPO are common once lock-up periods end. Still, the size of these sales stands out next to the company's heavy reliance on debt.
A. 1) The 'contingent springing maturity' on the revolving credit facility, dated 2026-12-30 (11926). Clauses like this can pull a loan's due date forward if other debt is not refinanced in time, so it is worth knowing which condition triggers it. 2) The final outcome of the Core Scientific deal and its $270M termination fee (4739). 3) Whether the $25.9B backlog (4970) actually turns into revenue, and whether active power grows toward the 1.6 GW contracted (4973). 4) Progress toward the $500M savings target for end-2027 (28337), which only applies if the merger closed.
A. First, leverage: billions of dollars of debt, including 9.25% notes (4824), are backed by GPU assets that lose value quickly. Second, concentration: OpenAI is the only customer with a disclosed figure, and the two OpenAI figures differ (19820 vs. 4969). Third, verification: nearly every claim, including capacity, backlog, and the merger, has not been independently confirmed. Fourth, merger status: the Core Scientific outcome is unresolved in our records even though its deadline has passed (4738). Note also that this dossier was cut off partway through, so claims filed after the 2031 notes offering may be missing.
Frequently asked
2026-10-13A. CoreWeave rents out large clusters of high-end NVIDIA GPUs, the specialized chips used to train and run AI models. It sells this as a cloud service. The company says it supports NVIDIA's GB200 systems across its platform (claim 4976) and has made AI Object Storage generally available (claim 4975). It bought Weights & Biases, a developer-tools company for AI teams (claim 4974). An outside evaluator, SemiAnalysis, rated it the only 'Platinum' provider in both its first ClusterMAX ranking and the ClusterMAX 2.0 ranking (claims 18878, 18879, 4981).
A. It listed on Nasdaq through an IPO priced at $40 per share on 2025-03-28 (claims 11616, 15974, 18881). The offering was about $1.5B (claim 19821), with net proceeds of about $1.4B (claim 4967). The company relies far more on borrowing than on equity. It reported $17.2B in total debt and equity raised (claim 4968). Since then it has expanded a revolving credit line by $1.5B (claims 5010, 11923), added a $350M letters-of-credit facility (claims 5011, 11924) and set up a delayed-draw term loan of up to $2.6B (claim 11922). It has also sold 9.25% senior notes due 2030 (claims 4824, 11917) and offered $1.5B of senior notes due 2031 (claim 26758). It projects about $8.8B of additional secured debt to service its contracts (claim 26760).
A. OpenAI is the only customer named with a dollar figure. The record shows an OpenAI infrastructure contract of $11.9B (claim 19820) and, separately, $11.2B of OpenAI backlog (claim 4969). These may measure different things, such as contract value versus remaining backlog, and should not be added together. IBM is named as a partner buying compute for its Granite models, but no value is given (claim 4971). Total committed backlog was stated at $25.9B (claim 4970). After OpenAI, roughly half of that backlog is not attributed to any named customer in this record, so customer concentration is a key question.
A. Nearly every item in this dossier has the status 'stated': the company or a filing said it, but our process has not independently confirmed it. The one item marked 'verified' is the closing of the 2030 senior notes offering around 2025-05-27 (claim 11919). The IPO and Nasdaq listing are matters of public record. Capacity figures, though, are company statements: 420 MW of active power added and 1.6 GW contracted (claims 4972, 4973). Backlog, product launches and benchmark results are also company statements. Readers should treat contracted capacity and backlog as commitments, not as revenue already earned or infrastructure already running.
A. In July 2025 CoreWeave signed an all-stock agreement to buy Core Scientific, a data-center operator, for about $9B (claims 28333, 4729). Core Scientific holders would receive 0.1235 CoreWeave shares per share (claim 4731) and would own less than 10% of the combined company (claim 28339). The stated rationale was owning about 1.3 GW of power (claim 28335), with 1 GW+ of possible expansion (claim 28336). CoreWeave also said the deal would remove more than $10B of future lease costs (claim 28338) and save $500M a year by the end of 2027 (claim 28337). The expected close was Q4 2025 (claim 28334), and the outside deadline was 2026-04-07 (claim 4738). Both dates have passed. The record marks the deal 'not_yet_verifiable' and an earlier check flagged it 'delayed', so this dossier does not confirm that it closed. A $270M termination fee payable to CoreWeave is on record (claim 4739).
A. Yes, and in large amounts soon after the IPO. The record shows about $217M in sales by the Chief Development Officer (claim 19832) and about $103.3M by the CEO (claim 19830). The CFO sold about $29.1M (claim 19831). All of these date to May–June 2025. Insider sales are legal and often pre-scheduled, but their size and timing are something to watch alongside the company's heavy borrowing.
A. First, the credit facility has a contingent 'springing' maturity date of 2026-12-30 (claim 11926), weeks away from now. This is an earlier deadline that can be triggered before the normal 2028-05-02 maturity (claim 5012), and how it is handled matters. Second, watch for any confirmation of how the Core Scientific deal ended (claims 4738, 28334). Third, watch whether the 1.6 GW of contracted power (claim 4973) turns into capacity that is running and earning money. Fourth, watch whether the OpenAI and other backlog (claims 4969, 4970) converts to recognized revenue. The 2030 notes (claim 11917) and the planned new secured debt (claim 26760) set the long-run repayment load.
A. (1) Concentration: how much of the business depends on OpenAI, and who the unnamed customers behind the rest of the $25.9B backlog are (claim 4970). (2) Leverage: whether contract cash flows can cover a debt load that keeps growing (claims 4968, 26760). (3) Inconsistent figures: the 2030 notes appear as both $1.5B (claim 11921) and $2B (claims 11917, 11918), possibly an upsized deal, and the OpenAI figure appears as both $11.9B and $11.2B (claims 19820, 4969). (4) The outcome of the Core Scientific deal. (5) Coverage: the claim list supplied for this FAQ is cut off partway through entries from around July 2025, so later developments are not reflected here.
Frequently asked
2026-10-13A. CoreWeave rents out GPU computing capacity for AI work, mainly training and running large models. Customers pay to use its data centers and software instead of building their own. Its disclosed products include GB200 support across its platform (claim 4976), AI Object Storage (4975), on-demand cluster scaling (4977) and detailed billing and usage metrics (4978). It acquired Weights & Biases, a developer-tools company (4974). Third-party benchmarks back its standing: it was the only Platinum-rated provider in both SemiAnalysis ClusterMAX evaluations (18878, 18879, 4981).
A. It is scaling physical capacity quickly and paying for it largely with debt. It reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (4972). In July 2025 it agreed to buy Core Scientific for about $9B (28333). The stated aims were to own about 1.3 GW of power directly (28335), with a path to 1 GW+ more (28336), and to remove $10B+ of future lease costs (28338). It also targeted $500M in annual run-rate cost savings by end-2027 (28337). The thesis is to stop leasing data centers and own the power and buildings instead.
A. OpenAI is the only customer named with a dollar figure. The record shows two values for that contract: $11.9B (claim 19820) and an $11.2B revenue backlog (4969). Readers should not treat them as interchangeable. IBM is named as a partner using CoreWeave capacity for its Granite models (4971), but no dollar value is disclosed. Total committed backlog was $25.9B (4970), so a large share of contracted revenue comes from customers this record does not name. That leaves customer concentration only partly visible.
A. Through an IPO plus heavy borrowing. The IPO priced at $40/share on 2025-03-28 (claims 15974, 11616) and raised about $1.5B gross (19821), or $1.4B net (4967). The company cited $17.2B of total debt and equity raised (4968). Later financing on the record includes: - a revolving credit facility expanded by $1.5B (5010) and letters of credit expanded by $350M (5011) - a DDTL 3.0 term loan facility of up to $2.6B (11922) - 9.25% senior notes due 2030, upsized from $1.5B to $2.0B (11921, 11917, 4824) - a further $1.5B of notes due 2031 (26765)
A. Very little on this record has been independently verified. Only one item is marked verified: the closing of the 2030 notes offering (claim 11919). Almost everything else is 'stated', meaning the company said it and it has not been independently confirmed: backlog, capacity, product launches and cost-savings targets. The IPO and Nasdaq listing (18881) are matters of public record but are still logged here as stated. The biggest announced item, the Core Scientific merger, is marked not_yet_verifiable (4731, 28334).
A. 1. Whether the Core Scientific deal actually closed. The target was Q4 2025 (claim 28334) and the outside deadline was 2026-04-07 (4738). Both dates have passed, and this record does not confirm a close. 2. The revolving credit facility's contingent 'springing' maturity date of 2026-12-30 (11926), which is only weeks away. 3. Whether the $500M cost-savings target (28337) is reported against actual results. 4. Whether the $25.9B backlog (4970) turns into recognized revenue.
A. 1. The Core Scientific deal: did it close, was it renegotiated, or was it abandoned? Several claims depend on it, including the 1.3 GW of owned power (28335) and the lease savings (28338). The record notes a $270M termination fee payable to CoreWeave (4739), which matters if the deal failed. 2. Debt load and interest costs, given notes at 9.25%. 3. Customer concentration around OpenAI, and why two different contract figures appear. 4. Large insider sales: about $217M by the CDO (19832), $103.3M by the CEO (19830) and $29.1M by the CFO (19831).
A. It is incomplete. The claims supplied end around July 2025, and that list appears to be cut off. Almost all claims come from automated extraction and are logged as company statements, not confirmed outcomes. Anything after mid-2025, including the fate of the Core Scientific merger and later financings, should be checked against primary filings before it is relied on.
Frequently asked
2026-10-12A. CoreWeave rents out GPU computing capacity built for training and running AI models. It operates data centers, sells access to NVIDIA hardware such as GB200 systems (claim 4976), and adds software on top, including object storage (claim 4975), on-demand cluster scaling (claim 4977), and, through its acquisition of Weights & Biases (claim 4974), tools for developers who build models. Its marketing relies heavily on outside rankings: it says it was the only 'Platinum' provider in SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981) and points to MLPerf benchmark results (claim 4980).
A. CoreWeave is borrowing heavily to secure power and data-center capacity before AI demand peaks, and it wants to own that capacity instead of leasing it. As of May 2025 it reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). The main strategic move is a proposed all-stock acquisition of Core Scientific, valued at about $9B (claim 28333) at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The deal would bring about 1.3 GW of owned gross power (claim 28335) and a pathway to 1 GW or more of expansion (claim 28336). Management says it would remove more than $10B of future lease costs (claim 28338) and save $500M a year by the end of 2027 (claim 28337).
A. The record names only two. OpenAI has an infrastructure contract worth $11.9B (claim 19820), and a separate figure puts OpenAI's revenue backlog at $11.2B (claim 4969). The two numbers don't match and should be reconciled against the original filings. IBM is named as a partner for compute capacity for its Granite models (claim 4971), but no dollar value is disclosed. Total committed backlog was $25.9B as of May 2025 (claim 4970), so roughly half of the contracted revenue sits with customers the record does not name. That leaves CoreWeave heavily dependent on a small number of buyers, and outsiders cannot fully see who they are.
A. The only claim with an independent status of 'verified' is that the May 2025 senior notes offering closed on schedule (claim 11919). Several things are well documented but are still recorded only as 'stated' in the dossier, not independently verified: the March 2025 Nasdaq IPO at $40 per share (claims 15974, 11616), which raised about $1.5B gross (claim 19821) and $1.4B net (claim 4967); the expanded $1.5B revolving credit facility (claim 11923); and $2B of 9.25% senior notes due 2030 (claims 11917, 4824). Product launches, capacity figures, and backlog totals all come from the company's own statements and have not been checked by an outside source.
A. CoreWeave relies mostly on debt. By May 2025 it reported $17.2B of total debt and equity capital raised (claim 4968), most of it debt. The main debt items in the record are: - a delayed-draw term loan facility of up to $2.6B (claim 11922) - $2B of senior notes due 2030 at a 9.25% coupon (claims 11917, 4824), upsized from an initial $1.5B (claim 11921) - a further $1.5B of senior notes due 2031 (claim 26758) - a $1.5B revolver (claim 11923) and $350M of letters of credit (claim 11924) A 9.25% coupon is high, which suggests lenders see real risk. The revolver also has a contingent 'springing maturity' date of 2026-12-30 (claim 11926).
A. The dossier does not settle this. Management expected the deal to close in Q4 2025 (claim 28334), and the merger agreement set an outside deadline of 2026-04-07 (claims 4738, 4731). Both deadlines have passed, and every one of these claims is still marked 'not_yet_verifiable'. The record contains no closing, no termination, and no shareholder-vote outcome. If Core Scientific walked away under certain conditions, CoreWeave would be owed a $270M termination fee (claim 4739). Readers should confirm the deal's status from primary sources before relying on any of the synergy figures.
A. Yes, in large amounts shortly after the IPO. The record shows about $217M of sales by the Chief Development Officer (claim 19832), about $103.3M by the CEO (claim 19830), and about $29.1M by the CFO (claim 19831), all between May and June 2025. Founders and executives commonly sell after an IPO, and the record does not say whether these sales were pre-planned. Still, the size of the sales relative to the company's public messaging deserves attention.
A. 1. Whether the Core Scientific deal closed or collapsed. Its synergy figures (claims 28337, 28338) depend on the answer. 2. Whether the $25.9B backlog (claim 4970) turns into recognized revenue, and how concentrated it is in OpenAI. 3. How much of the 1.6 GW of contracted power (claim 4973) actually becomes energized, revenue-producing capacity. 4. Refinancing risk around the 2026-12-30 springing maturity (claim 11926) and the 2030 and 2031 notes. 5. Who the unnamed customers behind the rest of the backlog are. Note that the claim list supplied for this FAQ was cut off partway through the July 2025 entries, so later disclosures may be missing.
Frequently asked
2026-10-12A. CoreWeave rents out GPU computing capacity built for AI workloads such as training and running large models. Customers get specialized cloud infrastructure rather than a general-purpose cloud. The record shows a product stack around this core: GB200 support across its cloud platform (claim 4976), AI Object Storage reaching general availability (claim 4975), on-demand cluster scaling (claim 4977), and the acquisition of the AI developer-tools company Weights & Biases (claim 4974). Third parties have rated it well: it was named the only Platinum provider in SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981) and reported an MLPerf Inference v5.0 result (claim 4980).
A. The record shows a capital-heavy plan to lock in power and data-center capacity ahead of demand. The company reported 1.6 GW of contracted power, with 420 MW of active capacity added (claims 4973, 4972). It raised about $17.2B in combined debt and equity (claim 4968). In July 2025 it announced an all-stock deal to buy Core Scientific, valued at about $9B, at 0.1235 CoreWeave shares per Core Scientific share (claims 28333, 4731). The stated rationale was to own roughly 1.3 GW of power directly (claim 28335), with 1 GW+ of potential expansion (claim 28336). The deal was also pitched as removing more than $10B of future lease costs (claim 28338) and saving about $500M a year by end-2027 (claim 28337).
A. Only a few customers are named in the record. OpenAI is the main one, with an infrastructure contract of about $11.9B (claim 19820), also described as $11.2B of revenue backlog (claim 4969). The two figures differ and are not reconciled in the record. IBM is named as a partner buying compute for its Granite models (claim 4971). Total committed backlog was $25.9B as of May 2025 (claim 4970), and the customers behind the rest of that backlog are not named. That means OpenAI alone made up roughly 43–46% of disclosed backlog, a significant concentration risk.
A. Almost every item in the record is marked 'stated': the company said it, but nothing has independently confirmed it yet. The only claim marked 'verified' is the closing of a 2030 senior notes offering, expected by May 27, 2025 (claim 11919). The financing events (the $40/share IPO raising about $1.5B gross and $1.4B net, claims 19821 and 4967; the credit facility expansions; the note issues) are the kind of thing that is usually completed and documented. Even so, they are recorded only as stated. Product launches, capacity figures, and backlog numbers are company-reported and not confirmed.
A. It remains unresolved in the record. The original expected close was Q4 2025 (claim 28334), with an outside merger deadline of April 7, 2026 (claims 4738, 4731). Both are now marked 'not_yet_verifiable', and earlier tracking had flagged them as 'delayed'. Nothing in the record shows the deal closing. If the agreement ended under certain conditions, a $270M termination fee would be payable to CoreWeave (claim 4739). Readers should not assume the projected power, lease-cost, or savings benefits have happened.
A. A lot, and on a fast schedule. In 2025 alone the record shows: - a revolving credit facility expanded to $1.5B, with maturity extended to May 2028 (claims 5010, 5012) - $350M of added letter-of-credit capacity (claim 5011) - 9.25% senior notes due 2030, upsized to $2B (claims 11917, 4824) - up to $2.6B in delayed-draw term loans (claim 11922; the record mislabels the units) - a $1.5B offering of notes due 2031 (claim 26758) A 'springing maturity' clause could pull the revolver's due date forward to December 30, 2026 (claim 11926). That makes late 2026 a date to watch.
A. Yes, in large amounts after the IPO. The record shows: - about $217M sold by the Chief Development Officer (claim 19832) - about $103.3M sold by the CEO (claim 19830) - about $29.1M sold by the CFO (claim 19831) Insider sales can be pre-planned and are not by themselves evidence of anything wrong, but their size is worth noting next to the company's growth claims.
A. Key items to watch: 1. Whether the Core Scientific deal closed, was renegotiated, or was terminated (claims 4731, 28334). 2. Whether the $25.9B backlog (claim 4970) turns into recognized revenue, and how much depends on OpenAI. 3. Who the unnamed customers are. 4. Whether the 1.6 GW of contracted power (claim 4973) actually comes online. 5. Debt service and refinancing, especially the possible December 2026 springing maturity (claim 11926). Note that this dossier was cut off mid-record, so later claims may exist that are not reflected here.
Frequently asked
2026-10-12A. CoreWeave rents out large clusters of GPU computing power, mostly NVIDIA hardware, to companies that build and run AI models. It is a specialized cloud provider. Its disclosed product claims include support for NVIDIA GB200 systems across its platform (claim 4976), general availability of its AI Object Storage (claim 4975), and the Weights & Biases acquisition, which adds AI developer tooling (claim 4974). It also reports being the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings (claims 18878, 18879, 4981). Those ratings come from a third party, but the dossier records them only as company statements.
A. The strategy is to scale fast and to own more of its own power and data-center capacity. In July 2025 it announced a deal to buy Core Scientific, a data-center and former bitcoin-mining operator, for about $9B in stock (claim 28333) at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). CoreWeave said the deal would bring about 1.3 GW of owned gross power (claim 28335), more than 1 GW of possible expansion (claim 28336), $500M in annual run-rate cost savings by end-2027 (claim 28337), and the elimination of over $10B in future lease overhead (claim 28338). All of this is funded heavily with debt.
A. Only a few are named in the record. OpenAI is the main one, with an infrastructure contract described as $11.9B (claim 19820) and elsewhere as $11.2B of revenue backlog (claim 4969). The two figures differ and may measure different things. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). The total committed backlog is $25.9B (claim 4970), but the record does not say who accounts for most of the remainder. Customer concentration therefore can't be fully assessed from this dossier.
A. The company went public on Nasdaq at $40 a share (claims 17815, 11616, 11601, 15974). It cites a $1.5B offering (claim 19821) with about $1.4B in net proceeds (claim 4967). It reports $17.2B in total debt and equity capital raised (claim 4968). Debt items include: - a revolving credit facility expanded to $1.5B (claim 5010) - letters of credit expanded to $350M (claim 5011) - up to $2.6B in delayed-draw term loans (claim 11922) - 9.25% senior notes due 2030 (claim 4824) The senior notes appear as $1.5B (claim 11921) and as $2B (claims 11918, 11917), which suggests the offering grew in size. A July 2025 projection put net debt at about $17.3B, or 3.0x EBITDA (claim 26761).
A. Almost everything in the record is still at 'stated' status, meaning the company said it and it has not been independently checked. Only one claim is marked verified: the 2030 senior notes offering closing around May 27, 2025 (claim 11919). The IPO itself is well documented across several claims but is still logged as 'stated'. Capacity figures are company-reported: about 420 MW of active power across 33 data centers (claims 4972, 26764) against 1.6 GW contracted (claim 4973). The roughly 1.2 GW gap between active and contracted power is capacity that is promised but not yet built.
A. The record can't say. The company expected the deal to close in Q4 2025 (claim 28334), and the merger agreement's outside date was April 7, 2026 (claims 4738, 4731). Both dates have now passed, but the claims are marked 'not_yet_verifiable' after earlier being flagged 'delayed'. The dossier contains no evidence of a close, an extension, or a termination. The agreement includes a $270M termination fee payable to CoreWeave (claim 4739). Readers should check current filings before assuming any outcome.
A. Four dates and items matter most: 1. Any resolution of the Core Scientific deal (claims 4738, 28334). 2. A contingent 'springing' maturity date of December 30, 2026 on its credit facility (claim 11926). Such clauses can pull a loan's due date forward if certain conditions aren't met. 3. The revolver's extended maturity of May 2, 2028 (claim 5012). 4. Progress toward the $500M cost-savings target by end-2027 (claim 28337). Also watch whether contracted power (claim 4973) actually turns into active capacity.
A. 1. **Unverified record:** nearly the entire record is company-stated, and only one claim is verified. 2. **OpenAI figures:** the contract is cited as both $11.9B and $11.2B (claims 19820, 4969). 3. **Customer concentration:** most of the $25.9B backlog has no named customer (claim 4970). 4. **Debt load:** borrowing is large relative to earnings (claim 26761). 5. **Insider selling:** large insider stock sales soon after the IPO, about $217M by the CDO (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). 6. **Merger status:** the outcome of the Core Scientific deal is unknown. The dossier supplied here also stops in mid-2025 and cuts off partway through an entry, so later developments are not reflected.
Frequently asked
2026-10-12A. CoreWeave rents out specialized cloud computing infrastructure, mainly large clusters of NVIDIA GPUs, to companies that train and run AI models. The record shows support for NVIDIA's GB200 systems across its platform (claim 4976), a generally available AI object storage product (claim 4975), and on-demand cluster scaling (claim 4977). It also acquired Weights & Biases, which makes AI developer tooling (claim 4974). An independent evaluator, SemiAnalysis, rated it the only 'Platinum' provider in its first two ClusterMAX rankings (claims 18878, 18879, 4981).
A. CoreWeave is growing quickly with heavy borrowing and is trying to own more of its data-center power instead of leasing it. In July 2025 it signed a definitive agreement to acquire Core Scientific for about $9B in stock (claim 28333). The deal would bring roughly 1.3 GW of owned power (claim 28335) and more than 1 GW of possible expansion (claim 28336). Management said the deal would remove over $10B of future lease costs (claim 28338) and save $500M a year on a run-rate basis by the end of 2027 (claim 28337). As of May 2025 it reported 1.6 GW of contracted power (claim 4973), of which 420 MW was active (claim 4972).
A. OpenAI is the only major customer named in the record. The OpenAI figures don't match: one claim puts the contract at $11.9B (claim 19820), and another puts OpenAI-related backlog at $11.2B (claim 4969). IBM appears as a partner using CoreWeave capacity for its Granite models (claim 4971), but no dollar value is disclosed. Total committed backlog was $25.9B (claim 4970), so OpenAI alone may account for over 40% of it. The rest of the backlog is not attributed to named customers anywhere in this record.
A. Completed events include the March 2025 Nasdaq IPO at $40 per share (claims 17815, 15974, 18881). It raised $1.5B gross (claim 19821) and $1.4B net (claim 4967). The 9.25% senior notes due 2030 (claim 4824) are the only item in this record with 'verified' status: the expected May 27, 2025 closing was confirmed (claim 11919). The notes were first described as a $1.5B offering (claim 11921), and a later claim records $2.0B issued (claim 11917). Products such as AI Object Storage are described as generally available (claim 4975). Nearly every other claim, including backlog, capacity, and guidance figures, has 'stated' status, meaning the company said it and it has not been independently verified.
A. A lot. By May 2025 the company said it had raised $17.2B in combined debt and equity (claim 4968). Facilities on record include a $1.5B revolving credit line (claims 11923, 5010) and a $350M letter-of-credit facility (claims 11924, 5011). The revolver's maturity was extended to May 2, 2028 (claim 5012), but a contingent 'springing' maturity date of December 30, 2026 also applies (claim 11926). Other items are a delayed-draw term loan of up to $2.6B (claim 11922), the 2030 senior notes, and 2031 senior notes (claim 26766). The company has cited an LTM run-rate adjusted EBITDA of $5.78B (claim 26762). That is a company-defined, non-GAAP measure.
A. This record cannot say whether the deal closed. The company expected to close in Q4 2025 (claim 28334), and the merger agreement set an outside date of April 7, 2026 (claims 4731, 4738). All three claims are marked 'not_yet_verifiable', and earlier passes had flagged them as 'delayed'. Both dates have passed, and the record contains no confirmation of completion. Core Scientific would owe CoreWeave a $270M fee if the deal were terminated in certain cases (claim 4739). Readers should check primary sources for the outcome before relying on any of the cost-saving or owned-power figures.
A. (1) The final outcome of the Core Scientific deal and whether the projected $500M in savings is still expected (claim 28337). (2) Whether the December 30, 2026 springing maturity on the credit facility is triggered (claim 11926). (3) How much of the 1.6 GW of contracted power becomes active capacity, compared with the 420 MW reported (claims 4973, 4972). (4) How fast the $25.9B backlog turns into recognized revenue (claim 4970), and how dependent that revenue is on OpenAI.
A. First, verification: almost every number here comes from automated extraction of company statements and has not been independently confirmed. Second, customer concentration: OpenAI is the only named major customer, and the OpenAI figures conflict ($11.9B in claim 19820 versus $11.2B in claim 4969). Third, leverage: the business model depends on continued access to expensive debt such as the 9.25% notes (claim 4824). Fourth, the Core Scientific outcome is unresolved in this record. Fifth, insiders sold heavily after the IPO. Reported sales by the Chief Development Officer, CEO, and CFO total about $217M (claim 19832), $103.3M (claim 19830), and $29.1M (claim 19831). Readers may want to weigh those sales against management's stated confidence in its ability to deliver (claims 19822, 19823).
Frequently asked
2026-10-11A. CoreWeave rents out GPU computing capacity, built largely on NVIDIA hardware, to companies that train and run AI models. It runs and leases data centers, then sells access to that compute through its own cloud software. Products on record include AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), and on-demand cluster scaling (claim 4977). Its announced acquisition of Weights & Biases (claim 4974) adds developer tooling. SemiAnalysis's ClusterMAX evaluations rated it the only 'Platinum' provider, twice (claims 18878, 18879). Those are third-party ratings, not audited results.
A. The strategy is to grow capacity quickly with borrowed money, and to own more of its power and data-center footprint instead of leasing it. It disclosed 420 MW of active power capacity (claim 4972) and 1.6 GW of contracted power (claim 4973). In July 2025 it agreed to acquire Core Scientific in an all-stock deal valued at about $9B (claim 28333). The deal would bring roughly 1.3 GW of owned gross power (claim 28335) and 1 GW+ of potential expansion (claim 28336). Management said it would eliminate more than $10B of future lease overhead (claim 28338) and save $500M a year in run-rate costs by end-2027 (claim 28337).
A. OpenAI is the main named customer. The record shows an OpenAI infrastructure contract of $11.9B (claim 19820) and, separately, $11.2B of OpenAI-related revenue backlog (claim 4969). These may describe different measures or dates, and the gap is not explained in the record. IBM is named as a partner for Granite model compute (claim 4971), with no dollar figure. Total backlog from committed contracts was $25.9B as of May 2025 (claim 4970). Most of that backlog is not tied to any named customer, which leaves concentration risk unclear beyond OpenAI.
A. Mostly with debt, plus a modest IPO. The company listed on Nasdaq at $40 per share (claim 17815) and raised about $1.5B (claim 19821), or about $1.4B net (claim 4967). Debt includes $2B of 9.25% senior notes due 2030 (claims 11917, 4824), a $1.5B offering of senior notes due 2031 (claim 26758), up to $2.6B of delayed-draw term loans (claim 11922), and a revolving credit facility expanded to $1.5B (claim 5010). Total debt and equity raised was reported at $17.2B (claim 4968). A 9.25% coupon is expensive borrowing, which shows how lenders priced the risk.
A. Very little has been independently verified. Almost every claim on record has the status 'stated', meaning the company said it and the dossier has not confirmed it happened. The one verified item is the 2030 notes offering closing on schedule (claim 11919). The IPO, the debt facilities, the capacity figures, the backlog, and the product launches all come from company disclosures and have not been checked against later outcomes. Read the capacity numbers in particular (420 MW active, 1.6 GW contracted; claims 4972, 4973) as company assertions.
A. The dossier cannot yet say whether it closed. The deal was signed in July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). Core Scientific holders were to own less than 10% of the combined company (claim 28339). The company expected to close in Q4 2025 (claim 28334), and the outside date was 2026-04-07 (claim 4738). All of those deadline claims are marked 'not_yet_verifiable', so neither completion nor termination is confirmed on record. A $270M termination fee would be payable to CoreWeave in certain circumstances (claim 4739).
A. 1. Confirmation of whether the Core Scientific merger closed or was terminated (claims 4731, 4738). 2. A contingent 'springing maturity' on the credit facility dated 2026-12-30 (claim 11926). It could pull the facility's due date forward if conditions aren't met. 3. Progress toward the $500M run-rate cost-savings target by end-2027 (claim 28337). 4. Whether contracted power (claim 4973) actually becomes active, revenue-generating capacity. 5. How much of the $25.9B backlog (claim 4970) turns into recognized revenue.
A. Customer concentration: OpenAI accounts for a large share of disclosed backlog (claims 4969, 19820), and the other customers are not named. Leverage: high-coupon debt is funding long-lived, depreciating GPU assets (claims 4824, 4968). Insider selling: the record shows sales by the CDO of $217M (claim 19832), the CEO of $103.3M (claim 19830), and the CFO of $29.1M (claim 19831) in mid-2025, shortly after the IPO. Verification: nearly all claims remain 'stated', not confirmed. The claim list supplied for this FAQ also appears cut off after July 2025, so later developments may be missing.
Frequently asked
2026-10-11A. CoreWeave rents out GPU computing power for AI. Customers use its data centers to train and run AI models instead of building their own. Around that core it sells cluster scaling, AI object storage (claim 4975), support for NVIDIA GB200 hardware (claim 4976) and NVIDIA's enterprise software (claim 4979), and detailed billing and usage metrics (claim 4978). It strengthened its developer tooling by acquiring Weights & Biases (claim 4974). The independent analyst firm SemiAnalysis rated it the only 'Platinum' provider in both rounds of its ClusterMAX evaluation (claims 18878, 18879, 4981).
A. The strategy is to grow capacity fast, mostly with borrowed money, and to own more of its data-center power instead of leasing it. It has reported 420 MW of active power (claim 4972) and 1.6 GW of contracted power (claim 4973). In July 2025 it agreed to buy Core Scientific for about $9B in stock (claim 28333), at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal would bring roughly 1.3 GW of owned power (claim 28335) and more than 1 GW of possible expansion (claim 28336). Management says the deal would save about $500M a year by the end of 2027 (claim 28337) and remove more than $10B of future lease costs (claim 28338).
A. OpenAI is the only major customer named on the record. Its contract is valued at $11.9B (claim 19820), and OpenAI-related backlog is cited separately as $11.2B (claim 4969). These two figures don't match and should be reconciled. IBM is named as a partner using CoreWeave capacity for its Granite AI models (claim 4971), but no dollar value is given. Total committed backlog was $25.9B (claim 4970). That means more than half of the backlog comes from customers who are not named on this record, and the OpenAI share alone is roughly 43–46%, which is a lot of reliance on one customer.
A. Mostly with debt, on top of a March 2025 IPO. The IPO sold shares at $40 each (claims 17815, 11616) and raised about $1.5B (claim 19821), or about $1.4B after costs (claim 4967). Total debt and equity raised was $17.2B (claim 4968). Major borrowings include: - $2B of 9.25% senior notes due 2030 (claims 11917, 4824), upsized from a planned $1.5B (claim 11921) - a revolving credit line expanded to $1.5B (claim 5010) - a delayed-draw term loan of up to $2.6B (claim 11922) - another $1.5B notes offering in July 2025 (claim 4700) Projected net debt is about $17.3B, which management puts at 3.0 times EBITDA, a measure of operating earnings (claim 26761).
A. Almost nothing on this record has been independently checked. Only one claim is marked verified: the May 2025 senior notes closed as scheduled (claim 11919). Everything else, including the IPO, the backlog, the capacity figures, the product launches and the Weights & Biases acquisition, is marked 'stated'. That means it comes from company or press disclosures and has not been confirmed against outside sources. The IPO and the Nasdaq listing (claim 18881) are public facts in practice. The capacity, backlog and cost-savings figures, however, are company assertions.
A. The record doesn't say. The company first expected the deal to close in Q4 2025 (claim 28334). The merger agreement's outside deadline was April 7, 2026 (claims 4738, 4731), and that date has passed. All of these claims are marked 'not_yet_verifiable'. The record shows neither a completed deal nor a termination. If the deal ended in certain ways, CoreWeave would be owed a $270M termination fee (claim 4739). Confirming the outcome is the most urgent gap in this file.
A. Four things matter most: - **Core Scientific:** whether the deal closed, and whether the 1.3 GW of power and $500M of annual savings by end-2027 appear in later filings (claims 28335, 28337). - **Capacity build-out:** how much of the 1.6 GW of contracted power actually comes online (claim 4973). - **Revenue from backlog:** how quickly the $25.9B backlog turns into revenue (claim 4970), especially from OpenAI. - **Debt:** refinancing risk on about $17.3B of net debt (claim 26761), including a contingent 'springing' maturity date of December 30, 2026 on the credit facility (claim 11926), which can pull repayment earlier.
A. 1. **Customer concentration:** how dependent CoreWeave is on OpenAI, and who the unnamed customers behind the rest of the backlog are. 2. **Debt:** whether the company can carry and refinance its heavy borrowing, including 9.25% notes (claim 4824). 3. **Core Scientific:** whether the acquisition closed. 4. **Insider selling:** what executives' sales signal. Around mid-2025 the Chief Development Officer sold about $217M of stock (claim 19832), the CEO about $103.3M (claim 19830) and the CFO about $29.1M (claim 19831). 5. **Data gaps:** this record mostly ends in July 2025, so later results and events should be checked against newer filings.
Frequently asked
2026-10-11A. CoreWeave rents out GPU computing capacity built for AI workloads. It operates data centers and sells access to NVIDIA hardware, with software for running and managing large AI clusters. As of March 2025 it reported 33 data centers with about 420 MW of active power [4972, 26764] and 1.6 GW of contracted power [4973]. It listed on Nasdaq in March 2025 at $40 per share [15974, 11616], raising $1.5B [19821], with about $1.4B in net proceeds [4967].
A. The record shows three strands. First, it is scaling capacity largely with borrowed money: about $17.2B in combined debt and equity raised [4968], including a $2B 9.25% senior notes issue due 2030 [11917, 4824], a $2.6B delayed-draw term loan facility [11922], and a revolving credit facility expanded by $1.5B [5010]. Second, it is buying software to sit on top of its hardware, through the Weights & Biases acquisition [4974] and product launches such as AI Object Storage general availability [4975]. Third, it agreed to buy data-center owner Core Scientific for about $9B [28333]. That deal would bring roughly 1.3 GW of owned power [28335], at least 1 GW of potential expansion [28336], and the elimination of more than $10B in future lease costs [28338].
A. OpenAI is the only customer named with a dollar figure. The OpenAI contract is recorded as $11.9B [19820] in one claim and as $11.2B of backlog [4969] in another; the dossier does not reconcile the two. IBM is named as a partner for Granite model compute capacity [4971], with no value disclosed. The company reports $25.9B in total committed-contract backlog [4970]. That implies more than half the backlog comes from customers the record does not name, so how concentrated the business is in a few buyers cannot be judged from this dossier.
A. Only one claim in the record has been independently verified: the May 2025 senior notes offering closed on schedule [11919]. Everything else is recorded as 'stated', meaning the company or a source said it, but this dossier has not confirmed it. That includes the IPO, the revenue backlog, capacity figures, product launches, and the 'Platinum' ratings from SemiAnalysis's ClusterMAX evaluations [18878, 18879, 4981]. The IPO and the debt raises are the claims most likely to be true, but the record has not checked them.
A. The record does not say. The merger was announced in July 2025 at 0.1235 CoreWeave shares per Core Scientific share [4731], with closing expected in Q4 2025 [28334] and an outside deadline of April 7, 2026 [4738]. Both dates have passed, and the deal remains 'not yet verifiable' [4731, 4738, 28334]. No claim records the deal closing, being terminated, or the $270M termination fee [4739] being paid. Readers should not assume the 1.3 GW of owned power or the $500M in annual savings target [28337] has happened.
A. Yes, according to the record. It shows sales in the months after the IPO of about $217M by the Chief Development Officer [19832], about $103.3M by the CEO [19830], and about $29.1M by the CFO [19831]. Insider sales after an IPO are common. The scale here is still worth noting next to the company's heavy borrowing.
A. (1) Whether the Core Scientific merger closed or collapsed, and whether any termination fee was paid [4739]. (2) A contingent 'springing maturity' on the credit facility dated December 30, 2026 [11926]; the record does not spell out its terms. The revolver otherwise matures May 2, 2028 [5012]. (3) Progress turning the 1.6 GW of contracted power [4973] into active capacity, up from about 420 MW [4972]. (4) Whether the $25.9B backlog [4970] turns into recognized revenue. (5) The $500M cost-savings target for end-2027 [28337], which depends on the merger.
A. First, customer concentration: OpenAI accounts for a large share of the backlog, the remaining customers are not named, and the OpenAI figures disagree with each other [19820, 4969]. Second, debt: heavy borrowing, including 9.25% notes [4824], is backing contracts that the record has not verified. Third, the unresolved status of the Core Scientific deal [4731]. Fourth, profitability: one claim cites a $5.78B last-twelve-months run-rate adjusted EBITDA [26762], a non-standard metric, but that record entry is cut off and its status cannot be confirmed. The record also contains several duplicate entries with conflicting amounts, such as $1.5B versus $2B for the 2030 notes [11921, 11917]. Every number should be checked against primary filings before use.
Frequently asked
2026-10-11A. CoreWeave rents out large clusters of GPU computing power, mostly NVIDIA hardware, to companies building and running AI models. It operates its own data centers. As of March 2025 it reported 33 data centers with about 420 MW of active power (claim 26764) and 1.6 GW of contracted power capacity (claim 4973). It also sells software around that compute, including AI Object Storage (claim 4975), GB200 support across its platform (claim 4976) and on-demand cluster scaling (claim 4977). In May 2025 it disclosed the acquisition of Weights & Biases, an AI developer-tools company (claim 4974).
A. The strategy is to grow quickly by borrowing heavily against long-term customer contracts. Disclosed financing includes: - $17.2B of total debt and equity raised (claim 4968) - A $1.5B IPO at $40/share (claims 19821, 17815) - A $1.5B revolving credit facility (claim 5010) - Senior notes due 2030 at 9.25%, with the issue size given as $2B (claims 11917, 4824) - A further $1.5B of notes due 2031 (claim 26758) - An expected $8.8B of additional secured debt to service contracts (claim 26760) The company is also trying to own more of its own power and data-center footprint, chiefly through the Core Scientific merger (claim 4729), which it says would save lease costs (claim 26763).
A. The only customer named in this record is OpenAI. The OpenAI contract is described as $11.9B (claim 19820) in one disclosure and as an $11.2B backlog (claim 4969) in another. IBM appears as a partner that uses CoreWeave capacity for its Granite models (claim 4971), but no contract value is given. Total backlog is $25.9B (claim 4970). By subtraction, roughly half of that backlog is not tied to any named customer in this record, so customer concentration is a real concern that the record cannot fully measure.
A. Completed events: - The Nasdaq listing and IPO at $40/share (claims 18881, 11616), with $1.4B in net proceeds (claim 4967) - The credit facility expansions (claims 5010, 5011) The closing of the 2030 notes is the only item in this record with status 'verified' (claim 11919). Everything else is 'stated', meaning the company said it but no independent check has been done. That includes the backlog, contracted power, product launches and the 'Platinum' ratings from SemiAnalysis ClusterMAX (claims 18878, 18879, 4981). The 1.6 GW of contracted power (claim 4973) is far above the roughly 420 MW actually active (claim 4972), so most of the capacity is still a promise.
A. CoreWeave agreed to acquire Core Scientific for 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The deal had a closing deadline of 2026-04-07 (claim 4738) and a $270M termination fee payable to CoreWeave (claim 4739). That deadline has passed, but both the merger and deadline claims are marked 'not_yet_verifiable' and were previously flagged 'delayed'. This record does not confirm whether the deal closed, was extended or was terminated.
A. CoreWeave projected total net debt of about $17.3B, equal to 3.0x EBITDA (claim 26761). That ratio rests on a 1Q'25 last-twelve-months run-rate adjusted EBITDA of $5.78B (claim 26762), which is a forward-looking, adjusted figure rather than reported earnings. Some of the borrowing is expensive, such as the 9.25% coupon on the 2030 notes (claim 4824). The revolving facility also has a 'springing' maturity that could pull its due date forward to 2026-12-30 (claim 11926), earlier than the stated 2028 maturity (claim 5012).
A. Yes, and in large amounts soon after the IPO. The record shows: - About $217M in sales by the Chief Development Officer (claim 19832) - About $103.3M by the CEO (claim 19830) - About $29.1M by the CFO (claim 19831) All of these are dated mid-2025. Insider sales can have routine explanations, but readers should weigh them alongside the company's growth claims.
A. 1. The status of the Core Scientific merger after the April 2026 deadline (claims 4731, 4738). 2. Whether contracted power is turned into active capacity: 1.6 GW contracted versus roughly 420 MW active (claims 4973, 4972). 3. Who makes up the roughly half of the $25.9B backlog that is not OpenAI (claims 4970, 4969). 4. Whether the springing maturity is triggered by 2026-12-30 (claim 11926). 5. Whether actual EBITDA supports the borrowing (claim 26762). There are also conflicting figures in the record: - OpenAI at $11.9B vs $11.2B (claims 19820, 4969) - The 2030 notes at $1.5B vs $2B (claims 11921, 11918) Note: the claims list supplied for this FAQ was cut off partway through, so later disclosures may answer some of these questions.
Frequently asked
2026-10-10A. CoreWeave rents out large-scale computing infrastructure, mainly NVIDIA GPU clusters, to companies building and running AI models. The record mentions GB200 support (claim 4976), AI Object Storage (claim 4975), and on-demand cluster scaling (claim 4977). It reports about 420 MW of active power across 33 data centers as of March 2025 (claims 4972, 26764) and 1.6 GW of contracted power (claim 4973). The company also acquired Weights & Biases, which makes AI developer tools (claim 4974). Third-party rankings named it the only Platinum provider in both SemiAnalysis ClusterMAX evaluations (claims 18878, 18879, 4981).
A. The strategy is to grow capacity quickly and pay for it mostly with debt secured by customer contracts. It went public on Nasdaq in March 2025 at $40 per share (claims 17815, 11616), raising about $1.5B gross and $1.4B net (claims 19821, 4967). After that it expanded its revolving credit facility to $1.5B (claims 5010, 11923). It also added a delayed-draw term loan of up to $2.6B (claim 11922) and issued senior notes due 2030 and 2031 (claims 11917, 26758). It reports $17.2B in total debt and equity raised (claim 4968), and it projects $8.8B more in secured debt to fund contracts (claim 26760). The other major move is a planned all-stock purchase of Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The company says this would cut its lease costs (claim 26763).
A. The record names only two. OpenAI has an infrastructure contract described as $11.9B (claim 19820), and a separate filing describes the OpenAI deal as $11.2B of backlog (claim 4969); the record does not reconcile the two figures. IBM is named as a partner using CoreWeave capacity for its Granite AI models (claim 4971). Total committed backlog is reported at $25.9B (claim 4970), so a large share of contracted revenue comes from customers the record does not name. The disclosures shown here do not quantify how concentrated the customer base is.
A. No claim in this dossier has been independently verified. Every claim is marked 'stated', meaning it comes from the company's own disclosures. The financing events look like completed transactions: the IPO, the credit facility changes, and the notes issued on 2025-05-27 (claims 11917, 4824). Product launches and the 420 MW active capacity figure come from the company's own reports. The 1.6 GW of contracted power and the backlog are commitments, not delivered capacity or recognized revenue. The Core Scientific merger and the expected closing date of the 2030 notes are both marked not_yet_verifiable (claims 4731, 4738, 11919).
A. A lot. A July 2025 projection puts total net debt at about $17.3B, or 3.0x EBITDA (claim 26761). That ratio is based on a run-rate adjusted EBITDA of $5.78B (claim 26762), which is an annualized estimate, not reported trailing results. The 2030 notes carry a 9.25% interest rate (claim 4824). The record gives two sizes for that issue: $1.5B (claim 11921) and $2.0B (claims 11918, 11917). The revolving credit facility matures in May 2028 (claim 5012), but that maturity can 'spring' earlier to December 30, 2026 (claim 11926). The record does not state the condition that would trigger the earlier date.
A. Yes, in large amounts shortly after the IPO. Recorded sales are about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831), all in May–June 2025. The record does not say whether these were pre-scheduled trading plans.
A. 1) Whether the Core Scientific merger closed. Its outside date was 2026-04-07, and its status is still marked not_yet_verifiable (claims 4731, 4738). A $270M termination fee would be payable to CoreWeave in some scenarios (claim 4739). 2) Whether the revolving credit facility maturity springs to 2026-12-30 (claim 11926). 3) How much of the $25.9B backlog (claim 4970) becomes recognized revenue. 4) How much of the 1.6 GW of contracted power is actually energized (claims 4973, 4972). 5) Whether the planned $8.8B in additional secured debt is raised on acceptable terms (claim 26760).
A. First, how dependent the company is on OpenAI and on customers the record does not name. Second, whether a model built on heavy debt at roughly 9% interest holds up if GPU rental prices or demand weaken. Third, what happened with the Core Scientific deal; the record has no post-deadline update. Fourth, why the record carries conflicting figures for the OpenAI contract ($11.9B vs. $11.2B) and the 2030 notes ($1.5B vs. $2.0B). Finally, this dossier's claims stop in late July 2025 and the input was cut off, so anything after that date is not covered here.
Frequently asked
2026-10-10A. CoreWeave rents out GPU computing capacity in its own data centers, mainly for training and running AI models. It also sells software on top of that hardware, including AI Object Storage (claim 4975), support for NVIDIA GB200 systems (claim 4976) and on-demand cluster scaling (claim 4977). As of March 2025 it reported 33 data centers with about 420 MW of active power (claims 26764, 4972) and 1.6 GW of contracted power (claim 4973). SemiAnalysis rated it the only 'Platinum' provider in both of its ClusterMAX cloud evaluations (claims 18878, 18879).
A. The strategy is to build capacity fast, mostly with borrowed money, against long-term customer contracts. It went public on Nasdaq at $40/share in March 2025, raising $1.5B gross (claims 15974, 19821) and about $1.4B net (claim 4967). By May 2025 it reported $17.2B in total debt and equity raised (claim 4968). It is also expanding by acquisition: Weights & Biases, an AI developer-tools company (claim 4974), and a pending all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The Core Scientific deal is meant to bring data-center sites in-house and cut lease costs (claim 26763).
A. Only two customers are named. OpenAI has a contract reported at $11.9B (claim 19820), and the company separately cites $11.2B of OpenAI backlog (claim 4969). The record does not reconcile the two figures. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). Total backlog was $25.9B as of May 2025 (claim 4970), so OpenAI alone is over 40% of disclosed backlog. The customers behind the rest are not named here, which makes customer concentration a key risk.
A. Every claim in this dossier has the status 'stated'. That means the company or a filing said it, but no independent check has confirmed it. Some items are effectively done, such as the IPO pricing and listing (claims 18881, 17815) and the debt issues: $2B of 9.25% senior notes due 2030 (claims 11917, 4824) and $1.5B of notes due 2031 (claim 26758). Operating figures are company-reported and not yet independently verified, including the 420 MW active capacity, the $25.9B backlog and the $5.78B run-rate adjusted EBITDA (claim 26762). Three items remain unconfirmed: the Core Scientific merger (claims 4731, 4738), whose deadline has passed, and the May 2025 notes closing (claim 11919).
A. A lot, and it is rising. Facilities in this record include: - a $1.5B revolving credit facility (claim 5010) and a $350M letters-of-credit line (claim 5011) - a delayed-draw term loan of up to $2.6B (claim 11922) - $2B of 9.25% notes due 2030 (claim 11917) - $1.5B of notes due 2031 (claim 26758), partly used to repay $450M of the revolver (claim 26759) The company projected about $8.8B more secured debt to service its contracts (claim 26760) and projected total net debt of about $17.3B, or 3.0x EBITDA (claim 26761). A 9.25% coupon shows lenders see real risk.
A. Yes, heavily, within a few months of the IPO. The record shows about $217M of sales by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830) and $29.1M by the CFO (claim 19831). Insider sales can have routine reasons, but at this scale and timing they are worth watching alongside the debt load.
A. 1. Whether the Core Scientific merger closed, was renegotiated or was abandoned. Its outside date of 2026-04-07 has passed with no confirmation here (claims 4731, 4738). A $270M termination fee would be owed to CoreWeave in some scenarios (claim 4739). 2. The revolving credit facility's contingent 'springing' maturity date of 2026-12-30 (claim 11926), which could pull the facility's normal 2028 maturity forward (claim 5012). 3. Whether the 1.6 GW of contracted power turns into active capacity. 4. Whether backlog turns into recognized revenue and actual cash flow, not just EBITDA run-rate figures.
A. 1. Customer concentration: OpenAI is the only major named customer, and its contract figures differ ($11.9B vs. $11.2B; claims 19820, 4969). 2. Debt: whether contract cash flows can service a projected ~$17.3B of net debt (claim 26761) at high interest rates. 3. Core Scientific: the merger's fate is unverified. 4. Inconsistent source figures: the 2030 notes appear as $1.5B (claim 11921) and $2B (claim 11917), possibly an upsizing. 5. Stale record: this dossier's claims stop in July 2025, and the list provided appears cut off, so anything after that date, including results and new contracts, is not covered.
Frequently asked
2026-10-10A. CoreWeave rents out GPU computing capacity for AI workloads. It runs data centers filled with NVIDIA hardware and sells access to that hardware, along with software and services, to AI developers. As of March 2025 it reported 33 data centers with about 420 MW of active power (claim 26764; see also 4972) and 1.6 GW of contracted power capacity (claim 4973). It has added software and tooling, including general availability of AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), and an announced acquisition of Weights & Biases (claim 4974). Third parties have rated its platform: SemiAnalysis's ClusterMAX evaluations named it the only 'Platinum' provider, twice (claims 18878, 18879).
A. The disclosed plan is to grow very fast using borrowed money. CoreWeave signs long-term compute contracts, then borrows heavily to build the capacity those contracts require. After a $40/share Nasdaq IPO in March 2025, with net proceeds of about $1.4B (claims 11616, 4967), it reported $17.2B in total debt and equity capital raised (claim 4968). Since then it has issued senior notes, including 9.25% notes due 2030 (claim 4824), expanded its revolving credit facility by $1.5B (claim 5010), and arranged up to $2.6B in delayed-draw term loans (claim 11922). It also projects about $8.8B of additional secured debt to service contracts (claim 26760). The second strategic thread is buying its own facilities: the proposed Core Scientific merger was pitched partly as a way to save on lease costs (claim 26763).
A. OpenAI is the only customer named in this record with a specific dollar figure. It appears as an infrastructure contract of $11.9B (claim 19820) and as $11.2B of revenue backlog (claim 4969); the two figures differ and should be reconciled against filings. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but no contract value is given. Total backlog was $25.9B (claim 4970), so OpenAI alone accounts for roughly 43% of it. The record does not name the customers behind the rest of the backlog.
A. Completed financing events in the record: - the IPO (claims 18881, 11616) - issuance of the 2030 senior notes (claims 4824, 11917) - the credit facility expansions (claims 5010, 5011) Product launches described as available include AI Object Storage (claim 4975) and an MLPerf benchmark result (claim 4980). Much of the rest is forward-looking or company-described: contracted power (claim 4973), backlog (claim 4970), projected debt (claims 26760, 26761) and 'run-rate' adjusted EBITDA of $5.78B (claim 26762). Run-rate EBITDA is an annualized projection, not reported earnings. Every claim in this record has status 'stated', meaning it comes from company or filing disclosures and has not been independently verified as delivered.
A. CoreWeave agreed in July 2025 to buy Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). The agreement included a $270M termination fee payable to CoreWeave (claim 4739). The stated closing deadline was 2026-04-07 (claim 4738). That date has passed, and the record marks the merger as 'not_yet_verifiable' after earlier being flagged 'delayed'. The record does not show whether the deal closed, was extended, or was terminated. This is a key item to check against current filings.
A. The company projected total net debt of about $17.3B, which it put at 3.0x EBITDA (claim 26761). That ratio is calculated against run-rate EBITDA (claim 26762), not historical earnings, so it flatters leverage if the projected revenue does not materialize. Borrowing costs are high: the 2030 notes carry a 9.25% coupon (claim 4824). Two maturity dates matter: - The revolving credit facility was extended to 2028-05-02 (claim 5012). - It has a contingent 'springing' maturity of 2026-12-30 (claim 11926). Depending on its conditions, that clause could pull repayment forward to the end of this year.
A. 1. Whether the Core Scientific merger closed or was terminated (claims 4731, 4738), and whether the $270M fee (claim 4739) changed hands. 2. Whether the 2026-12-30 springing maturity on the revolver (claim 11926) is triggered. 3. How much of the 1.6 GW of contracted power (claim 4973) turns into active, revenue-generating capacity, compared with 420 MW active in March 2025 (claim 4972). 4. Whether backlog (claim 4970) converts into reported revenue, and whether customers beyond OpenAI are disclosed. 5. Continued insider selling. Recorded sales include $217M by the CDO (claim 19832), $103.3M by the CEO (claim 19830) and $29.1M by the CFO (claim 19831), all within roughly three months of the IPO.
A. 1. **Customer concentration.** Roughly 43% of disclosed backlog is tied to one named customer, OpenAI (claims 4969, 4970), and the rest is unnamed. 2. **Financing dependence.** Growth relies on continually raising expensive debt (claims 4824, 26760) against projected rather than realized EBITDA (claim 26762). 3. **Data consistency.** The record has conflicting figures. The OpenAI deal appears as $11.9B and as $11.2B (claims 19820, 4969). The 2030 notes appear as $1.5B and as $2.0B (claims 11921, 11917), likely an upsizing, but this needs confirmation. The notes' closing date is also unverified (claim 11919). 4. **Merger status.** The Core Scientific deal's outcome is unresolved past its deadline (claim 4738). 5. **Incomplete record.** The claim list supplied for this FAQ ends mid-entry at claim 26756, so later disclosures may not be reflected here.
Frequently asked
2026-10-09A. CoreWeave rents out GPU computing capacity built for AI, a specialized 'AI cloud.' Its record lists NVIDIA GB200 support across its platform (claim 4976), an AI object-storage product it describes as generally available (claim 4975), and an acquisition of the AI developer-tools company Weights & Biases (claim 4974). As of March 2025 it reported 33 data centers with about 420 MW of active power (claims 26764, 4972) and 1.6 GW of contracted power (claim 4973). The industry analyst SemiAnalysis rated it Platinum, its top tier, in its ClusterMAX evaluations (claims 18878, 18879, 4981). That rating is a third-party assessment, not a contract or revenue figure.
A. CoreWeave is growing capacity quickly and paying for it mainly with debt, and it is expanding through acquisitions. It reports $17.2B in total debt and equity raised (claim 4968). It disclosed a projected $8.8B of additional secured debt to service its contracts (claim 26760) and projected total net debt of about $17.3B, which it put at 3.0x EBITDA (claim 26761). That ratio rests on an LTM run-rate adjusted EBITDA figure of $5.78B (claim 26762). This is a company-defined, annualized metric, not reported GAAP earnings. On acquisitions, besides Weights & Biases, it agreed in July 2025 to merge with the data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). It cited lease cost savings as part of the rationale (claim 26763).
A. The record names only one customer contract: OpenAI. That contract is recorded as $11.9B (claim 19820), and a separate filing gives OpenAI-related backlog of $11.2B (claim 4969). Total backlog from committed contracts was $25.9B as of May 2025 (claim 4970), so OpenAI accounts for roughly 43–46% of it. The record does not name the customers behind the remaining roughly $14B. IBM appears as a partner that uses CoreWeave capacity to build its Granite models (claim 4971), but no dollar value is attached.
A. Completed, according to the company's statements: the Nasdaq IPO at $40 per share in March 2025 (claims 17815, 11616, 18881), raising about $1.5B gross and $1.4B net (claims 19821, 4967); a $1.5B revolving credit facility expansion and a $350M letters-of-credit expansion (claims 11923, 11924); issuance of $2.0B of 9.250% senior notes due 2030 (claims 11917, 4824); and a $1.5B offering of senior notes due 2031 (claims 26758, 26765). Announced but not confirmed in the record: the Core Scientific merger. Its stated closing deadline was 2026-04-07 (claim 4738), and that date has passed with no recorded completion or termination. Note that every claim here has the status 'stated,' meaning the company said it. None has been independently verified.
A. Yes, in large amounts within a few months of the IPO. The record shows sales of about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831), all dated May–June 2025. Insider sales after an IPO are common and are not wrongdoing in themselves. Readers often follow the size and timing, though.
A. (1) Whether the Core Scientific merger closed, was extended, or was terminated. The deadline of 2026-04-07 (claim 4738) is past, and the record lists a $270M termination fee payable to CoreWeave (claim 4739). (2) The contingent 'springing' maturity date on its credit facility, 2026-12-30 (claim 11926). A springing maturity moves a debt due date earlier if certain conditions are met. (3) How much of the 1.6 GW of contracted power (claim 4973) becomes active capacity, compared with about 420 MW active as of March 2025 (claim 4972). (4) Whether customers other than OpenAI are named, which bears on how concentrated its revenue is.
A. Debt load: the company's own projection is about $17.3B of net debt (claim 26761), and its 2030 notes carry a 9.25% coupon (claim 4824). The leverage ratio depends on a run-rate EBITDA figure the company defines itself (claim 26762). Customer concentration: OpenAI is the only named customer and makes up a large share of backlog (claims 4969, 4970). Inconsistent figures: the OpenAI contract appears as both $11.9B and $11.2B (claims 19820, 4969), and the 2030 notes appear as both $1.5B and $2.0B (claims 11921, 11917), possibly because the offering was enlarged. The record also lists the notes' closing as not yet verifiable (claim 11919) even though a separate entry records their issuance. Merger status: the Core Scientific outcome is unrecorded (claims 4731, 4738).
A. Treat it as a record of what the company has said, not as verified fact. Every claim was created by automated extraction and is marked 'stated' or 'not_yet_verifiable.' None is marked confirmed. Several facts appear more than once under different claim ids, with slightly different amounts or units. The claim list given to this editorial layer was also cut off partway through (after claim 26757), so later disclosures, including any update on the Core Scientific merger, may be missing.
Frequently asked
2026-10-09A. CoreWeave rents out GPU computing capacity for AI work: training and running large models. It operates data centers and sells access to NVIDIA hardware, including GB200 systems (claim 4976), along with software such as AI Object Storage (claim 4975) and on-demand cluster scaling (claim 4977). As of March 2025 it reported about 33 data centers and roughly 420 MW of active power (claims 4972, 26764), plus 1.6 GW of contracted power (claim 4973). It went public on Nasdaq in March 2025 at $40 per share (claims 15974, 18881).
A. The record describes a debt-funded build-out. CoreWeave signs large multi-year compute contracts, then borrows to build the capacity to serve them. It also expands through acquisitions. It reported $17.2B of total debt and equity raised (claim 4968) and projected another $8.8B of secured debt to service contracts (claim 26760). It acquired Weights & Biases, an AI developer-tools company (claim 4974), and announced a merger with Core Scientific (claim 4729). The Core Scientific deal is meant partly to cut data-center lease costs (claim 26763).
A. OpenAI is the only named customer with disclosed dollar figures. The record shows an OpenAI infrastructure contract of $11.9B (claim 19820). A separate company statement puts the OpenAI backlog at $11.2B (claim 4969), and the record does not reconcile the two figures. IBM is named as a partner using the capacity for its Granite models (claim 4971), but no value is disclosed. Total backlog was stated at $25.9B (claim 4970), so roughly $14B of committed contracts belong to customers the record does not name. That makes customer concentration hard to judge from this dossier.
A. Every claim on record has the status 'stated', meaning the company said it. None has been independently verified. The most concrete items are financing events: the IPO at $40 per share raising $1.5B gross and about $1.4B net (claims 19821, 4967), and 9.250% senior notes due 2030 issued on 2025-05-27 (claim 4824). The product launches, benchmark results, and 'Platinum' ratings from SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981) are reported but not checked. The contracted 1.6 GW of power (claim 4973) is a commitment, not capacity in operation.
A. The figures are large. The company projected total net debt of $17.3B, about 3.0x adjusted EBITDA (claim 26761). That ratio uses a 'last-twelve-months run-rate' EBITDA of $5.78B (claim 26762), which is an annualized projection, not reported earnings. Borrowings on record include: - senior notes due 2030 ($1.5B in claim 11921, $2.0B in claims 11917 and 11918; the record does not explain the difference) - $1.5B of notes due 2031 (claim 26758) - up to $2.6B in delayed-draw term loans (claim 11922) - a $1.5B revolving credit facility (claim 11923)
A. 1) Core Scientific merger: the deal had a closing deadline of 2026-04-07 (claims 4731, 4738). That date has passed, and the record does not confirm the deal closed. Its status is 'not yet verifiable'. If the deal is terminated under certain conditions, a $270M termination fee is payable to CoreWeave (claim 4739). 2) Revolving credit facility: it nominally matures 2028-05-02 (claim 5012) but has a contingent 'springing' maturity date of 2026-12-30 (claim 11926), which could pull repayment forward. 3) Whether the 1.6 GW of contracted power actually becomes operating capacity.
A. Yes. The record shows large executive sales within months of the IPO: - CFO: about $29.1M (claim 19831) - Chief Development Officer: about $217M (claim 19832) - CEO: about $103.3M (claim 19830) Sales after an IPO lockup are common, but readers may want to compare these amounts with management's growth claims.
A. 1) Did the Core Scientific merger close, and on what terms? 2) Which conflicting figure is correct: OpenAI at $11.9B or $11.2B, and 2030 notes at $1.5B or $2.0B? 3) Who are the unnamed customers behind roughly $14B of backlog? 4) Can contracted revenue cover a projected $17.3B net debt load (claim 26761) when leverage is measured against run-rate rather than reported EBITDA? 5) How much contracted capacity has been delivered? Note also that the claim list supplied for this FAQ was cut off at claim 26756, so later disclosures may be missing.
Frequently asked
2026-10-09A. CoreWeave rents out GPU computing capacity for training and running AI models. It operates data centers and sells access to NVIDIA hardware through its own cloud software. The record shows support for NVIDIA GB200 systems and NVIDIA's AI software (claims 4976, 4979), an object storage product (4975), and on-demand cluster scaling (4977). It says it was the only provider rated Platinum in SemiAnalysis's ClusterMAX GPU-cloud evaluations (18878, 18879, 4981). These are all company or third-party statements and have not been independently checked here.
A. CoreWeave is growing fast by borrowing heavily to build capacity for long-term customer contracts. It reported about 420 MW of active power across 33 data centers and 1.6 GW of contracted power (4972, 4973, 26764). It is also buying its way up the stack and into its own power supply. It agreed to acquire Weights & Biases, an AI developer tools company (4974). It also agreed to merge with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (4731, 4729), which it said would cut lease costs (26763).
A. Two names appear on the record. OpenAI signed an infrastructure contract valued at $11.9B (19820), later described as $11.2B of backlog (4969). IBM is a partner using CoreWeave capacity for its Granite models (4971). Total committed backlog was stated at $25.9B (4970), so more than half of the backlog is not tied to a named customer in this dossier. The difference between the $11.9B and $11.2B OpenAI figures is not explained in the record.
A. Mostly with debt. CoreWeave listed on Nasdaq in March 2025 at $40 per share (18881, 17815, 11601). The IPO raised $1.5B gross and $1.4B net (19821, 4967). Total debt and equity raised was stated at $17.2B (4968). After the IPO it added: - a revolving credit facility expanded to $1.5B (11923, 5010); - a $2.6B delayed-draw term loan (11922); - $2.0B of 9.25% senior notes due 2030 (11917, 4824); - $1.5B of senior notes due 2031 (26758, 26765). Company materials projected $8.8B of additional secured debt to fund contracts (26760). They also projected about $17.3B of net debt, or 3.0x a run-rate adjusted EBITDA of $5.78B (26761, 26762). That EBITDA figure is a company-defined forward-looking metric, not reported earnings.
A. Every claim on record is at status 'stated'. That means the company or a source said it, and this dossier has not independently confirmed delivery. The IPO and the debt offerings are financial events and are well documented. Product launches, capacity figures, and backlog are company assertions. Two items are explicitly 'not_yet_verifiable': - The Core Scientific merger had an outside closing deadline of 2026-04-07 (4731, 4738). Both claims were briefly marked 'delayed' and the dossier has not confirmed whether the deal closed. - The 2030 notes had an expected closing date of 2025-05-27 (11919). It carries the same unresolved status, even though a separate claim records the notes as issued that day (11917).
A. Senior executives sold large amounts of stock in the months after listing. The CDO sold about $217M (19832), the CEO about $103.3M (19830), and the CFO about $29.1M (19831). Insider sales can have routine explanations, such as diversification or tax planning, but their size relative to the timing is something readers should be aware of.
A. 1. Whether the Core Scientific merger closed, and on what terms. The 2026-04-07 deadline has passed with no confirmation on record (4738). A $270M termination fee was payable to CoreWeave in certain scenarios (4739). 2. Whether contracted power (1.6 GW, claim 4973) turns into active, revenue-producing capacity. 3. Refinancing pressure from a debt load built at rates as high as 9.25%. This includes a contingent 'springing' maturity on the credit facility tied to 2026-12-30 (11926). 4. Whether backlog (4970) converts into recognized revenue.
A. - Customer concentration: one named customer, OpenAI, accounts for a large share of backlog, and much of the remainder is unnamed. - Leverage: debt is the main funding source, and the company projects billions more (26760, 26761). - Unresolved status of the Core Scientific deal (4731). - Verification: almost nothing on record has moved past 'stated', so capacity, backlog, and product claims rest largely on company disclosures. - Coverage gap: the claim list provided here ends in July 2025, partly cut off. Developments after that date are not reflected in this FAQ.
Frequently asked
2026-10-09A. CoreWeave rents out GPU computing capacity, mainly NVIDIA hardware, to companies that train and run AI models. It operates data centers and layers software on top: it describes GB200 support across its cloud stack (claim 4976), general availability of AI Object Storage (4975), on-demand cluster scaling (4977), and support for NVIDIA AI Enterprise (4979). In May 2025 it announced it was acquiring the AI developer-tools company Weights & Biases (4974). Third-party benchmarks it cites include an MLPerf Inference v5.0 result (4980) and a 'Platinum' rating as the only provider at that tier in SemiAnalysis's ClusterMAX evaluations (18878, 18879, 4981).
A. The strategy is to scale fast, funded largely by debt and secured by long-term customer contracts. CoreWeave listed on Nasdaq in March 2025 at $40/share (17815, 11601). It reports $1.4B in net IPO proceeds (4967) and $17.2B in total debt and equity raised as of May 2025 (4968). After the IPO it kept borrowing: a $1.5B revolver expansion (5010), a DDTL 3.0 facility of up to $2.6B (11922), $2.0B of 9.25% senior notes due 2030 (11917, 4824), and $1.5B of notes due 2031 (26758). It also projected about $8.8B of additional secured debt to service contracts (26760) and about $17.3B of total net debt, roughly 3.0x run-rate adjusted EBITDA of about $5.78B (26761, 26762). The pending Core Scientific merger (4729) would bring data center capacity in-house and cut lease costs (26763).
A. Only two counterparties are named in the record. OpenAI has a disclosed infrastructure contract, reported as $11.9B (19820) and elsewhere as an $11.2B revenue backlog (4969); the record does not reconcile the two figures. IBM is named as a partner using CoreWeave capacity for its Granite models (4971). Total committed-contract backlog was reported at $25.9B in May 2025 (4970). The customers behind the rest of that backlog are not named in this record.
A. Every claim here is marked 'stated'. That means it was extracted from company or filing disclosures, not independently verified. The most concrete items are completed financings: the IPO pricing and Nasdaq listing (11601, 18881) and the closed 2030 notes issuance (4824). On capacity, CoreWeave reports about 420 MW of active power across 33 data centers as of March 2025 (4972, 26764), against 1.6 GW contracted (4973). Roughly a quarter of contracted power was live at that point; the remainder is a commitment, not delivered capacity. Product launches and benchmark ratings are self-reported.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal, at 0.1235 CoreWeave shares per Core Scientific share (4731). The outside closing date was 2026-04-07 (4738), and a $270M termination fee would be payable to CoreWeave (4739). That deadline has passed. However, the record contains no disclosure that the deal closed or was terminated, and both claims are marked 'not_yet_verifiable'. The outcome needs to be confirmed from later filings.
A. (1) Whether the Core Scientific merger closed or was terminated, and whether the $270M fee was triggered (4731, 4739). (2) The revolving credit facility's springing maturity date of 2026-12-30 (11926), a contingent earlier maturity ahead of its 2028-05-02 extended date (5012). (3) How much of the 1.6 GW contracted power has gone live versus the 420 MW reported (4973, 4972). (4) Whether the projected ~$8.8B of additional secured debt is actually raised (26760).
A. Customer concentration: OpenAI alone accounts for roughly $11.2–11.9B of a $25.9B backlog (4969, 19820, 4970), and most other customers are unnamed. Leverage: projected net debt is about $17.3B (26761), and the 9.25% coupon on the 2030 notes (4824) signals a high cost of capital. Insider selling after the IPO: reported sales include about $217M by the CDO (19832), about $103.3M by the CEO (19830), and about $29.1M by the CFO (19831). Data gaps: the record lists the 2030 notes at both $1.5B (11921) and $2.0B (11917), likely an upsizing that is not explained. The record also ends in July 2025, so later developments are not reflected here.
Frequently asked
2026-10-09A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity in data centers built for AI workloads. It has also added software on top of that capacity, including AI Object Storage (claim 4975), NVIDIA GB200 support (claim 4976), and on-demand cluster scaling (claim 4977). It bought Weights & Biases, which makes machine-learning development tools (claim 4974). SemiAnalysis's ClusterMAX evaluation named it the only 'Platinum' provider in both its first round and its 2.0 round (claims 18878, 18879, 4981).
A. The strategy is to grow capacity fast and pay for it mostly with debt. The company reports raising $17.2B in debt and equity in total (claim 4968). After its IPO it issued $2B of 9.25% senior notes due 2030 (claims 11917, 4824), a further $1.5B of notes due 2031 (claim 26765), and a delayed-draw term loan of up to $2.6B (claim 11922). It projects $8.8B of additional secured debt to serve its contracts (claim 26760) and net debt of about $17.3B, roughly 3.0x EBITDA (claim 26761). It is also integrating vertically: the pending Core Scientific merger is presented as a way to own data-center sites and cut lease costs (claim 26763).
A. OpenAI is the only customer named on this record with a dollar figure. The deal is recorded as an $11.9B infrastructure contract (claim 19820) and elsewhere as an $11.2B revenue backlog (claim 4969). The gap between the two figures is not explained here. IBM is named as a partner for Granite model compute capacity (claim 4971), but no value is given. Total committed backlog is $25.9B (claim 4970), so roughly $14B of backlog belongs to customers who are not named on this record.
A. Completed: the Nasdaq IPO at $40 per share (claims 17815, 11616, 18881), which raised $1.5B gross and about $1.4B net (claims 19821, 4967). Also completed: the revolving credit expansion to $1.5B (claim 11923) and the notes offerings. One caveat is that the expected closing date of the 2030 notes is marked not_yet_verifiable (claim 11919). On physical capacity, about 420 MW was active across 33 data centers as of March 2025 (claims 4972, 26764), against 1.6 GW contracted (claim 4973). That leaves most contracted power still to be brought online.
A. The deal was announced in July 2025 as an all-stock merger at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). It had an outside closing date of 2026-04-07 (claim 4738), and a $270M termination fee would be payable to CoreWeave in certain cases (claim 4739). The date has passed, but this record does not confirm whether the deal closed, was extended, or was terminated. The merger claims are marked not_yet_verifiable.
A. 1) A definitive outcome for the Core Scientific merger (claims 4731, 4738). 2) The revolving credit facility's contingent 'springing' maturity date of 2026-12-30 (claim 11926), set against its stated maturity of 2028-05-02 (claim 5012). 3) Progress converting 1.6 GW of contracted power into active capacity (claim 4973). 4) Whether backlog (claim 4970) turns into recognized revenue on schedule, given the heavy debt load (claims 26760, 26761).
A. Yes, according to this record, in 2025: about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). The record does not say whether these sales were made under pre-arranged trading plans.
A. First, customer concentration and disclosure: OpenAI is the only customer with a named contract value, and the two figures for that contract disagree (claims 19820, 4969). Second, leverage: the debt projections rely on a run-rate adjusted EBITDA of $5.78B (claim 26762), which is a company-defined metric. Third, execution: actual capacity of about 420 MW against 1.6 GW contracted (claims 4972, 4973). Fourth, the unresolved Core Scientific deal (claim 4731). Note also that the claims supplied for this FAQ were cut off partway through, and the latest event-dated claim is from July 2025, so later developments may be missing.
Frequently asked
2026-10-09A. CoreWeave rents out large clusters of NVIDIA GPUs to companies that train and run AI models. It is a specialized cloud provider for AI workloads. Its record includes support for NVIDIA GB200 systems (claim 4976), an AI object storage product (claim 4975), on-demand cluster scaling (claim 4977), and the acquisition of Weights & Biases, which makes software tools for machine-learning developers (claim 4974). At the reporting date it disclosed 33 data centers with about 420 MW of active power (claims 26764, 4972) and 1.6 GW of contracted power (claim 4973).
A. The strategy is to sign long-term compute contracts first and then borrow heavily to build the capacity those contracts require. CoreWeave went public on Nasdaq at $40 per share in March 2025, raising $1.5B gross and about $1.4B net (claims 17815, 19821, 4967). It then issued high-yield senior notes, including $2.0B at 9.25% due 2030 (claims 11917, 4824) and a 2031 issue priced at 9.000% (claim 26755). It also expanded its revolving credit facility to $1.5B (claim 11923) and set up a delayed-draw term loan of up to $2.6B (claim 11922). It says it has raised $17.2B in total debt and equity (claim 4968). It announced a merger with Core Scientific, a data-center operator, to own facilities it currently leases (claims 4729, 26763).
A. OpenAI is the only customer named in the record. It has an infrastructure contract stated at $11.9B (claim 19820) and a separately stated backlog figure of $11.2B (claim 4969). These two numbers have not been reconciled. IBM appears as a partner that uses CoreWeave compute for its Granite models (claim 4971). Total committed-contract backlog is stated at $25.9B (claim 4970). This implies roughly $14B or more comes from customers the record does not name, so readers cannot assess how concentrated or durable that remaining backlog is.
A. Every claim on record has the status 'stated'. None has been independently marked as delivered or verified. The financing events (the IPO, the 2030 notes issuance, the credit facility amendments) read as completed transactions. Even so, the 2030 notes' expected closing date is flagged 'delayed' (claim 11919), although a separate claim records issuance on the original date (claim 11917). That flag may be an extraction artifact. Operational figures such as 420 MW active, 1.6 GW contracted, and $25.9B of backlog are company disclosures only. Third-party signals include 'Platinum' ratings in SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981) and an MLPerf benchmark result (claim 4980).
A. A lot, and most of it is expensive. In July 2025 the company projected net debt of about $17.3B, or 3.0x EBITDA (claim 26761), measured against a forward-looking 'run-rate' adjusted EBITDA of $5.78B (claim 26762). That run-rate figure is not historical earnings. It also projected about $8.8B of additional secured debt to service existing contracts (claim 26760). Its new notes carry interest rates of 9% or higher (claims 4824, 26755). The revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926), which falls before its stated 2028-05-02 maturity (claim 11925).
A. The record marks it as delayed. The all-stock deal offered 0.1235 CoreWeave shares per Core Scientific share. Its stated closing deadline was 2026-04-07, and both the deal and the deadline carry 'delayed' status (claims 4731, 4738). A $270M termination fee would be payable to CoreWeave under certain conditions (claim 4739). The record does not show whether the deal closed, was terminated, or was extended. This is the single most important unresolved item in the dossier.
A. Yes. Within a few months of the IPO, the record shows insider sales of about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). Sales like these are common after an IPO, but their size is worth noting.
A. 1) The outcome of the Core Scientific merger and whether the $270M fee applies (claims 4731, 4739). 2) Whether the 1.6 GW of contracted power turns into active capacity on schedule (claims 4973, 4972). 3) Who the unnamed customers behind most of the $25.9B backlog are (claim 4970), and how dependent the company is on OpenAI. 4) Whether actual EBITDA approaches the $5.78B run-rate figure used to justify roughly $17B of debt (claims 26762, 26761). 5) Refinancing risk around the 2026-12-30 springing maturity (claim 11926). Note also that the claims on record largely stop in mid-2025, so more recent developments may not be reflected here.
Frequently asked
2026-10-08A. CoreWeave (Nasdaq: CRWV) rents out GPU computing infrastructure built for AI workloads. It operates data-center capacity and a cloud software stack on top of it. Disclosed product items include support for NVIDIA GB200 systems (claim 4976), general availability of CoreWeave AI Object Storage (claim 4975), On-Demand Cluster Scaling (claim 4977), and the acquisition of Weights & Biases, an AI developer tools company (claim 4974). Third-party evaluations on record rank it the only 'Platinum' provider in both SemiAnalysis ClusterMAX ratings (claims 18878, 18879, 4981).
A. The strategy is to scale capacity quickly, fund it heavily with debt, and lock in long-term customer contracts. The company reports 420 MW of active power capacity against 1.6 GW contracted (claims 4972, 4973) and a total revenue backlog of $25.9B (claim 4970). It reports $17.2B in total debt and equity raised (claim 4968). It has also moved to vertically integrate data-center supply through an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729), with a $270M termination fee payable to CoreWeave (claim 4739).
A. OpenAI is the only major customer named. The contract is cited as $11.9B (claim 19820) in one source and as $11.2B of backlog in another (claim 4969). The two figures have not been reconciled. IBM appears as a partner that uses CoreWeave capacity for its Granite models (claim 4971), but no dollar value is disclosed. A separate 'material customer contract for GPU infrastructure' sits behind a $2.6B delayed-draw loan facility, and that customer is not named in this record (claims 4595, 4592). Most of the $25.9B backlog (claim 4970) is not attributed to any named counterparty here.
A. The record shows a large stack of debt alongside the equity raised: - **IPO:** priced at $40/share for about $1.5B gross (claims 17815, 19821), roughly $1.4B net (claim 4967). - **2030 notes:** $2B at 9.25% (claims 11917, 4824). - **2031 notes:** $1.75B at 9% (claims 4658, 4697). - **Term loan:** a $2.6B delayed-draw term loan (claims 11922, 4592). - **Revolver:** expanded to $1.5B (claim 11923), plus $350M of letters of credit (claim 11924). The high single-digit coupons signal that lenders price meaningful risk. Covenants require a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597).
A. Financing events are the most concrete items on record: the Nasdaq listing (claim 18881), the IPO pricing (claim 15974), and the note issuances (claims 11917, 4658). Capacity and backlog figures (claims 4972, 4973, 4970) are company statements, not independently verified. The record does not show how much of the 1.6 GW contracted power is energized or revenue-generating. The Core Scientific merger had a closing deadline of 2026-04-07 (claim 4738). That date has passed, the record marks it 'delayed,' and no completion is recorded. Every claim in this dossier is at status 'stated' or 'delayed'; none has been independently confirmed as delivered.
A. Yes, in sizable amounts shortly after the IPO. The record shows about $217M in sales by the Chief Development Officer through May 2025 (claim 19832), $103.3M by the CEO through June 2025 (claim 19830), and $29.1M by the CFO (claim 19831). Insider sales after a lockup or IPO are common and do not by themselves indicate a problem. Their scale is still worth noting next to the company's heavy capital needs.
A. - **Revolver springing maturity, 2026-12-30 (claim 11926):** the revolver can mature early unless certain conditions are met, against a scheduled maturity of 2028-05-02 (claim 11925). - **Core Scientific merger (claims 4731, 4738):** whether it closes, is renegotiated, or is terminated, which could trigger the $270M fee (claim 4739). - **Debt service coverage test, April 2027 (claim 4596):** the 1.40x minimum takes effect. - **Capacity progress:** whether active capacity moves from 420 MW toward the 1.6 GW contracted (claims 4972, 4973). - **Backlog quality:** whether backlog converts to recognized revenue.
A. 1. **Customer concentration:** how much of the $25.9B backlog (claim 4970) depends on OpenAI and one unnamed 'material customer' (claim 4595). 2. **OpenAI contract value:** why the figure differs between sources ($11.9B in claim 19820 vs. $11.2B in claim 4969). 3. **Core Scientific merger:** its current status, given the missed deadline (claim 4738). 4. **Debt coverage:** whether contracted revenue will cover roughly 9% debt costs before covenant tests begin (claims 4824, 4697, 4596). 5. **Record data quality:** some note closings and an interest-payment item (claims 11919, 4699, 4659) are flagged 'delayed.' This may simply reflect an automated system marking past due dates rather than a real delay, so verify before drawing conclusions. 6. **Incomplete dossier:** this dossier was cut off partway through the claim list (after claim 4593), so later disclosures are not reflected here.
Frequently asked
2026-10-08A. CoreWeave rents out GPU computing capacity for training and running AI models, essentially a specialized cloud built around NVIDIA hardware. Its disclosed products include GB200 support across its platform (claim 4976), a generally available AI Object Storage service (claim 4975), on-demand cluster scaling (claim 4977), and support for NVIDIA AI Enterprise and Cloud Functions (claim 4979). Outside evaluators have rated it highly. It was the only Platinum-rated provider in SemiAnalysis's first ClusterMAX evaluation (claims 18878, 4981) and again in ClusterMAX 2.0 (claim 18879). It also announced the acquisition of Weights & Biases, an AI developer tooling company (claim 4974).
A. The record shows CoreWeave borrowing heavily to build data-center capacity ahead of long-term customer contracts. It reported 1.6 GW of contracted power capacity and 420 MW of active capacity added (claims 4973, 4972). It reported $17.2B in total debt and equity raised (claim 4968) and a $25.9B revenue backlog from committed contracts (claim 4970). It is also integrating vertically, both into software (Weights & Biases, claim 4974) and into owning data-center sites. The second shows up in its all-stock merger agreement with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. Only two are named. OpenAI is the main one. The record gives two different figures for the OpenAI deal: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI-related revenue backlog (claim 4969). Readers should not treat these as the same number. IBM is named as a partner buying compute for its Granite models, but no dollar value is given (claim 4971). A separate 'material customer contract for GPU infrastructure' is disclosed without naming the customer (claim 4595). Most of the $25.9B backlog (claim 4970) is therefore not tied to a named counterparty in this record, and how concentrated revenue is in a few customers is a key unknown.
A. CoreWeave listed on Nasdaq at $40 per share on 2025-03-28 (claims 11616, 15974, 18881). The IPO raised $1.5B gross (claim 19821) and about $1.4B net (claim 4967). Most of its funding has come from debt rather than stock: - an expanded $1.5B revolving credit facility plus a $350M letters-of-credit facility (claims 11923, 11924); - $2B of 9.25% senior notes due 2030, upsized from an initial $1.5B (claims 11921, 11917, 4824); - $1.75B of 9% senior notes due 2031 (claims 4697, 4658); - a delayed-draw term loan facility of up to $2.6B, called DDTL 3.0 (claim 11922). The 9–9.25% coupons show that lenders are charging high-yield rates.
A. Every claim in this dossier carries status 'stated'. That means the company or a filing said it, but the dossier has not independently confirmed it. A few items are well documented in filings, such as the IPO pricing and the notes issuances. Backlog, capacity, and product claims, however, are the company's own figures. Several dated commitments are flagged 'delayed': - the Core Scientific merger outside date of 2026-04-07 (claims 4731, 4738); - the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593); - the first 9% notes interest payment due 2026-02-01 (claim 4659); - two notes-offering closing dates (claims 11919, 4699). Some of these flags are probably artifacts of the dossier's automated status-tracking rather than real slippage. For example, claim 11917 records the 2030 notes being issued on the expected closing date. Each flag still needs to be checked against primary filings.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). It filed an S-4 registration statement for the deal (claim 4733). The agreement included a $270M termination fee payable to CoreWeave in certain circumstances (claim 4739). The outside date of 2026-04-07 has passed. The record flags it as delayed and logs no completion (claims 4731, 4738). The deal's final outcome is not established in this dossier.
A. (1) The revolving credit facility's springing maturity of 2026-12-30 (claim 11926). Under this contingent clause, the 2028-05-02 maturity (claim 11925) can be pulled forward, so watch whether it is triggered. (2) The 1.40x minimum debt-service coverage ratio that starts in April 2027 (claim 4596). This covenant tests whether contract revenue can actually service the debt. (3) Whether the backlog (claim 4970) turns into recognized revenue on schedule. (4) Whether additional named customers are disclosed, which would reduce the dependence on OpenAI (claims 19820, 4969). (5) How the flagged-delayed items, including the Core Scientific deal, are resolved.
A. First, leverage. Billions in 9%-plus debt (claims 4824, 4697) is backed by contracts that mostly have unnamed counterparties. Second, customer concentration. OpenAI's deal is roughly $11–12B (claims 19820, 4969) of a $25.9B backlog (claim 4970). Third, insider selling soon after the IPO: the CEO sold about $103.3M, the Chief Development Officer about $217M, and the CFO about $29.1M (claims 19830, 19832, 19831). Fourth, the gap between contracted power (1.6 GW, claim 4973) and power actually energized. Note also that the claim list supplied for this FAQ was cut off partway through (at claim 4592, a $2.6B financing entry), so some later disclosures may not be reflected here.
Frequently asked
2026-10-08A. CoreWeave rents GPU computing capacity, the specialized hardware used to train and run AI models, from its own data centers. Its disclosed products include support for NVIDIA GB200 systems (claim 4976), AI Object Storage, which became generally available in May 2025 (claim 4975), and on-demand cluster scaling (claim 4977). It also bought Weights & Biases, a developer tools company (claim 4974). Third-party evaluator SemiAnalysis rated it the only 'Platinum' provider in two rounds of its ClusterMAX ranking (claims 18878, 18879, 4981).
A. CoreWeave is growing fast and paying for it with large amounts of capital. It went public on Nasdaq in March 2025 at $40 per share (claims 11616, 18881), raising about $1.5B gross (claim 19821), or $1.4B net (claim 4967). It reported $17.2B in total debt and equity raised (claim 4968). It then added more debt: $2.0B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claims 4658, 4697), a delayed-draw term loan of up to $2.6B (claim 11922), and a revolving credit facility expanded to $1.5B (claim 11923). It also announced plans to acquire Core Scientific, a data-center operator, in an all-stock deal at 0.1235 shares per Core Scientific share (claims 4729, 4731). That deal would bring more power and facility capacity in-house.
A. OpenAI is the only major customer named in this record. The contract is reported at $11.9B (claim 19820), and the related backlog at $11.2B (claim 4969). The two figures are not reconciled here. IBM is named as a partner for capacity behind its Granite models (claim 4971). Claim 4595 refers to a 'material customer contract for GPU infrastructure' without naming the customer. Total contracted backlog was $25.9B as of May 2025 (claim 4970), so a large share of committed revenue appears to come from very few customers, at least one of them undisclosed.
A. Completed: the IPO and Nasdaq listing (claims 11601, 18881), the 2030 and 2031 note issuances (claims 11917, 4658), the credit facility expansions (claims 11923, 11924), and AI Object Storage reaching general availability (claim 4975). On physical capacity, the company reported 420 MW of active power added (claim 4972) against 1.6 GW contracted (claim 4973). Most of its contracted power was therefore not yet running. The Core Scientific merger was announced, but its 2026-04-07 closing deadline is flagged as delayed (claims 4731, 4738), and the record contains no completion. Note that 'stated' in this dossier means the company said it. It does not mean the claim was independently verified.
A. Yes, and in large amounts shortly after the IPO. Recorded sales are about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831), all in mid-2025. These figures are reported totals. The record does not say whether the sales were made under pre-scheduled trading plans.
A. Four things. (1) What happened to the Core Scientific merger: the deadline passed and is flagged delayed (claim 4738), and a $270M termination fee would be payable to CoreWeave in certain scenarios (claim 4739). (2) A contingent 'springing' maturity date of 2026-12-30 on the revolving credit facility (claim 11926), which could pull its repayment forward from 2028 (claim 11925). (3) Whether the DDTL 3.0 loan was fully drawn, since its commitment window ended 2026-07-31 (claim 4593). (4) A required minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596), which tests whether contract cash flows can cover debt payments.
A. First, debt versus delivery: billions in high-interest borrowing (9–9.25%, claims 4824, 4659) depend on turning 1.6 GW of contracted power into revenue-producing capacity (claim 4973), while only 420 MW had been added (claim 4972). Second, customer concentration: OpenAI accounts for roughly $11–12B of a $25.9B backlog (claims 19820, 4969, 4970), and another material customer is unnamed (claim 4595). Third, the Core Scientific merger outcome is unresolved in this record. Fourth, several figures conflict across sources, including the OpenAI contract value and the initial note sizes, which were later increased (claims 11921 vs 11917; 4700 vs 4697).
A. Treat it with caution. All claims were captured by automated extraction and only marked 'stated'. Some 'delayed' flags appear to be status artifacts rather than real slippage. For example, the May 2025 notes are flagged delayed (claim 11919), yet their issuance is also recorded (claim 11917). The record also ends partway through, at a truncated claim 4592, so later filings (including anything after mid-2025 on revenue, merger outcome, or capacity) may be missing. Check primary SEC filings before relying on any single figure.
Frequently asked
2026-10-08A. CoreWeave rents out large-scale GPU computing capacity for training and running AI models. It sells this through its own cloud platform rather than general-purpose cloud services. In the records it describes support for NVIDIA GB200 hardware (claim 4976), an AI-specific storage product (claim 4975), and on-demand cluster scaling (claim 4977). An outside evaluator, SemiAnalysis's ClusterMAX, rated it the only 'Platinum' provider in two consecutive evaluations (claims 18878, 18879, 4981).
A. The strategy is to scale fast, funded heavily by debt. CoreWeave reports $17.2B in total debt and equity raised (claim 4968) and 1.6 GW of contracted power capacity (claim 4973). It has also moved to own more of its stack. It bought the AI developer-tools company Weights & Biases (claim 4974) and agreed to merge with data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That merger would bring power and facilities in-house instead of leasing them.
A. OpenAI is the only major named customer. The records give two different figures for that deal: an $11.9B infrastructure contract (claim 19820) and an $11.2B revenue backlog (claim 4969). The difference has not been reconciled. IBM is named as a partner for Granite model compute (claim 4971). A further 'material customer contract for GPU infrastructure' is disclosed without a name (claim 4595). Total committed backlog is $25.9B (claim 4970), so a large share of it comes from counterparties the record does not identify.
A. Completed items include: - The Nasdaq IPO at $40/share (claims 11616, 15974), raising $1.5B gross and about $1.4B net (claims 19821, 4967). - $2B of 9.25% senior notes due 2030 (claims 11917, 4824). - $1.75B of 9% senior notes due 2031 (claim 4658). - A $1.5B revolver expansion (claim 11923). - General availability of AI Object Storage (claim 4975). On physical capacity, 420 MW of active power is recorded (claim 4972), against 1.6 GW contracted (claim 4973). Most contracted capacity is therefore not yet shown as live. Every claim in this dossier is in 'stated' status, meaning it is company- or press-asserted and not independently verified.
A. The merger was announced on 2025-07-07 (claims 19824, 4729), with an outside closing date of 2026-04-07. Both the merger and that deadline are now marked 'delayed' (claims 4731, 4738). The dossier records no completion or termination. If the deal fails, a $270M termination fee would be payable to CoreWeave under specified conditions (claim 4739). Readers should check current filings for the deal's actual status, because the record here does not resolve it.
A. CoreWeave relies heavily on high-yield debt at roughly 9% or more (claims 4824, 4659). It also has delayed-draw term loans, including DDTL 3.0 at up to $2.6B (claim 11922), maturing 2030-08-21 (claim 4594). The dates to watch: - **2026-07-31:** DDTL 3.0 commitment termination date, flagged 'delayed' (claim 4593). - **2026-12-30:** a contingent 'springing' maturity on the revolving credit facility (claim 11926). It could pull the facility's normal 2028-05-02 maturity (claim 11925) forward. - **April 2027:** a minimum 1.40x debt-service coverage ratio takes effect (claim 4596).
A. Senior executives sold stock in the months after listing. The record shows about $103.3M by the CEO (claim 19830), about $217M by the Chief Development Officer (claim 19832), and about $29.1M by the CFO (claim 19831). Insider selling after a lockup is common. Still, readers weighing management's confidence often track it.
A. 1. Whether the Core Scientific merger closed or collapsed (claims 4731, 4738). 2. Whether the springing maturity on 2026-12-30 is triggered (claim 11926). 3. How fast the 1.6 GW of contracted power becomes active capacity, from 420 MW today (claims 4972, 4973). 4. How concentrated the $25.9B backlog is in OpenAI and in unnamed customers (claims 4970, 4969, 4595). 5. Why several items are flagged 'delayed' (claims 11919, 4699, 4659, 4593). Some, such as note closings, appear completed elsewhere in the record (claims 11917, 4658). That suggests the flag may only reflect a passed date, not a real slip. The claims list supplied for this FAQ was cut off mid-entry (around claim 4592, 2025-07-30). Later developments are not reflected here.
Frequently asked
2026-10-08A. CoreWeave rents out GPU computing capacity for AI workloads: specialized cloud infrastructure that AI labs and enterprises use to train and run models. Its disclosed product items include NVIDIA GB200 support across its platform (claim 4976), an AI Object Storage product made generally available (claim 4975), and on-demand cluster scaling (claim 4977). It cites third-party recognition, including being the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings (claims 18878, 18879, 4981) and an MLPerf Inference v5.0 benchmark result (claim 4980). It went public on Nasdaq in March 2025 at $40 per share (claims 17815, 11616), raising $1.5 billion gross (claim 19821) and about $1.4 billion net (claim 4967).
A. The record shows a strategy of scaling fast with borrowed money and buying adjacent assets. On scale, it reports 1.6 GW of contracted power capacity (claim 4973) and 420 MW of active compute power added (claim 4972). On financing, it cites $17.2 billion of total debt and equity raised (claim 4968). On acquisitions, it agreed to buy Weights & Biases (claim 4974), a developer tools company, and announced an all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). The Core Scientific deal is effectively a bet on owning power and sites rather than leasing them.
A. Only two counterparties are named in the record. OpenAI is the main one, with an infrastructure contract stated as $11.9 billion (claim 19820) and elsewhere as $11.2 billion of backlog (claim 4969). These figures don't match and should be reconciled against the source filing before quoting. IBM is named as a partner for Granite model compute (claim 4971), but no dollar figure is attached. Total committed revenue backlog was $25.9 billion as of May 2025 (claim 4970). That means OpenAI alone accounts for roughly 43 to 46% of it, and the rest of the backlog is not attributed to named customers in this record. Customer concentration is a central risk.
A. A lot, and at high interest rates. The disclosed borrowing includes $2.0 billion of 9.25% senior notes due 2030 (claims 11917, 4824), which grew from an initially reported $1.5 billion (claim 11921). It also issued $1.75 billion of 9% senior notes due 2031 (claims 4658, 4697), upsized by $250 million from $1.5 billion (claims 4700, 4698). It has up to a $2.6 billion delayed-draw term loan, DDTL 3.0 (claims 4592, 11922), and a revolving credit facility expanded by $1.5 billion, plus $350 million of letters of credit (claims 11923, 11924). The revolver's maturity was extended to May 2028 (claim 11925), but there is a contingent 'springing' maturity of 2026-12-30 (claim 11926). The terms also include lender covenants, such as a minimum contract realization ratio of 0.85x (claim 4597). This ties the company's borrowing capacity to customers actually honoring their contracts.
A. Completed or delivered items include the IPO (claims 11601, 19821), the $2.0 billion and $1.75 billion note issuances (claims 11917, 4658), the product launches listed above, and the reported 420 MW of active capacity (claim 4972). Items that are only announced or still unresolved in the record are different. The 1.6 GW figure is contracted, not yet active (claim 4973). The $25.9 billion backlog is future revenue, not revenue already earned (claim 4970). The Core Scientific merger had an outside closing date of 2026-04-07, and the record marks it 'delayed' with no completion on file (claims 4731, 4738). Several other items are also flagged 'delayed' by automated tracking: the closing dates for both note offerings (claims 11919, 4699), the first 9% coupon payment (claim 4659), and the DDTL 3.0 commitment deadline (claim 4593). That flag most likely means no confirmation was captured, not that something failed. Each needs checking against the source filings.
A. Yes, heavily, in the months right after the IPO. The record shows about $103.3 million in sales by the CEO (claim 19830), $29.1 million by the CFO (claim 19831), and $217 million by the Chief Development Officer (claim 19832), all between May and June 2025. Insider sales after a lockup are not unusual, and the record does not say whether they were pre-planned (10b5-1) sales. Still, the size of these sales is worth noting next to the company's heavy borrowing.
A. First, the outcome of the Core Scientific merger. Its 2026-04-07 deadline has passed, and the record shows no close (claim 4738). If it was terminated, check whether the $270 million termination fee payable to CoreWeave was triggered (claim 4739). Second, whether the 2026-12-30 springing maturity on the credit facility is avoided (claim 11926). Third, whether contracted capacity (claim 4973) turns into active, revenue-generating capacity. Fourth, confirmation that coupon payments are being made on schedule (claim 4659). Fifth, any updated backlog figure showing whether reliance on OpenAI is going up or down.
A. 1) Concentration: how much of the business rests on OpenAI, and why do the two contract figures differ ($11.9 billion in claim 19820 vs $11.2 billion in claim 4969)? 2) Funding capacity: can a company paying about 9 to 9.25% on its notes (claims 4824, 4659) and operating under contract-realization covenants (claim 4597) keep funding its expansion if customer demand softens? 3) The Core Scientific deal: what happened to it (claims 4731, 4738)? 4) Unnamed customers: who makes up the roughly $14 billion of backlog that isn't attributed to OpenAI (claim 4970)? Also note that the record supplied here appears to stop at late July 2025, so later developments are not reflected.
Frequently asked
2026-10-07A. CoreWeave rents out large clusters of NVIDIA GPUs, the specialized chips used to train and run AI models, as a cloud service. The record shows it supporting NVIDIA's GB200 systems across its platform (claim 4976) and adding software around that hardware, including AI Object Storage (claim 4975) and the acquisition of Weights & Biases, a tool developers use to track AI model training (claim 4974). SemiAnalysis's ClusterMAX evaluations named it the only 'Platinum' provider in both their first and second rounds (claims 18878, 18879).
A. The strategy is to sign long-term compute contracts with large AI customers and fund the data centers and chips mostly with borrowed money. As of May 2025 it reported $25.9B of committed revenue backlog (claim 4970) and $17.2B of total debt and equity raised (claim 4968). It also pursued vertical expansion: it announced a merger with Core Scientific, a data center and power operator (claims 4729, 19824), at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. OpenAI is the only named customer with a dollar figure. Even that figure varies by source: $11.9B in one claim (19820) and $11.2B of backlog in another (4969). IBM is named as a partner for compute capacity for its Granite models (claim 4971), but no contract value is given. At least one other 'material customer contract' appears in the debt filings (claim 4595), and that record does not name the customer. Most of the $25.9B backlog (claim 4970) therefore cannot be attributed to a named party from this dossier.
A. The financings are the most concrete items. The record includes: - an IPO at $40 per share (claims 17815, 15974) raising about $1.5B gross and $1.4B net (claims 19821, 4967); - $2B of 9.25% senior notes due 2030 (claims 11917, 4824); - $1.75B of 9% senior notes due 2031 (claim 4658); - a revolving credit facility expanded to $1.5B (claim 5010). On physical capacity, the company reported adding 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973). Most of its capacity is therefore still contracted, not yet running. Every claim in this dossier is labeled 'stated', which means it was extracted from company or filing disclosures and not independently verified.
A. Not according to this record. The merger had a closing deadline of 2026-04-07 (claims 4731, 4738), and both claims are now flagged 'delayed' because no confirmation of closing is on file. The agreement provided a $270M termination fee payable to CoreWeave in certain circumstances (claim 4739). A reader should check current filings to learn whether the deal closed, was extended, or was terminated.
A. Several claims passed their expected dates without a follow-up disclosure in the record: - the May 2025 notes closing date (claim 11919); - the July 2025 notes closing date (claim 4699); - the first 9% interest payment date of 2026-02-01 (claim 4659). Later claims show the May notes were issued (claims 11917, 4824) and the July notes were issued (claim 4658). The 'delayed' tag most likely means confirmation is missing, not that a payment was missed. It should not be read as evidence of default without checking the actual filings.
A. 1. A contingent 'springing maturity' date of 2026-12-30 on the credit facility (claim 11926). This is a clause that can pull the loan's due date forward if certain conditions are triggered. 2. A minimum debt service coverage ratio of 1.40x starting April 2027 under the $2.6B DDTL 3.0 loan (claims 4596, 4592). The company must earn at least $1.40 for every $1 of debt payments due. 3. A minimum 0.85x contract realization ratio under the same loan (claim 4597), which tests whether contracted revenue actually turns into cash. 4. Progress converting the 1.6 GW of contracted power into active capacity (claims 4973, 4972). 5. Clarity on what happened to the Core Scientific deal (claim 4738).
A. 1. Customer concentration: OpenAI is the only named customer with a dollar figure, and even that figure is inconsistent ($11.9B vs. $11.2B, claims 19820 and 4969). 2. Debt load: borrowing at roughly 9–9.25% interest (claims 4824, 4697) against revenue from contracts that have not yet been delivered. 3. Capacity: the gap between contracted and active power (claims 4973, 4972). 4. Insider selling soon after the IPO: about $217M by the Chief Development Officer, $103.3M by the CEO, and $29.1M by the CFO (claims 19832, 19830, 19831). 5. Gaps in the record: it largely stops in mid-2025, and the last claim is cut off. Anything after that date, including the merger outcome, is not covered here.
Frequently asked
2026-10-07A. CoreWeave rents out GPU computing capacity, mainly NVIDIA hardware, for training and running AI models. Its disclosed products include GB200 support across its cloud stack (claim 4976), AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). It also bought the ML-tooling company Weights & Biases (claim 4974). An independent benchmark (SemiAnalysis ClusterMAX) named it the only Platinum-rated provider in both its first and 2.0 evaluations (claims 18878, 18879, 4981).
A. Grow fast, funded by debt, and own more of its power and data-center supply. It went public on Nasdaq at $40/share, raising about $1.5B gross and $1.4B net (claims 17815, 19821, 4967). It then borrowed heavily: a revolving credit facility expanded by $1.5B (claim 11923), a delayed-draw term loan of up to $2.6B (claim 11922), and senior notes at 9.0-9.25% interest (claims 4824, 4697). By May 2025 it cited $17.2B of total debt and equity raised (claim 4968). It also announced an all-stock merger with data-center operator Core Scientific, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), to secure power and facilities.
A. OpenAI is the only major customer named in the record. The OpenAI contract appears as $11.9B (claim 19820) and elsewhere as $11.2B of backlog (claim 4969); the two sources disagree. IBM is named as a partner for Granite model compute (claim 4971). Most of the disclosed $25.9B total backlog (claim 4970) is not attributed to named customers. A 'material customer contract' tied to the DDTL 3.0 loan (claim 4595) is also unnamed. Customer concentration is therefore hard to judge from this record alone.
A. Delivered or completed on the record: the IPO and Nasdaq listing (claims 11601, 18881), the credit facility expansions (claims 11923, 11924), the senior notes issuances (claims 11917, 4658), product launches (claims 4975-4978), and the Weights & Biases acquisition (claim 4974). Capacity is mostly still a promise. The company reported 1.6 GW of contracted power (claim 4973) but cited only 420 MW of active capacity added (claim 4972). Contracted power is a commitment, not running capacity. The Core Scientific merger had an April 7, 2026 outside date (claim 4738), and the record marks it as delayed (claim 4731); completion is not confirmed here.
A. The record shows large post-IPO sales by executives: about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830) and $29.1M by the CFO (claim 19831). Insider selling after an IPO is common and is not necessarily a signal. Still, readers often weigh it against management's growth claims.
A. 1) Whether the Core Scientific merger closed, was renegotiated, or was terminated. The record notes a $270M termination fee payable to CoreWeave in some scenarios (claim 4739). 2) How much of the 1.6 GW contracted power becomes active capacity (claims 4973, 4972). 3) Debt milestones: the DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593), the contingent springing maturity of December 30, 2026 on the revolver (claim 11926), and covenant tests such as the 0.85x minimum contract realization ratio (claim 4597). 4) Any new named customers that would reduce reliance on OpenAI.
A. Concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI, and whether the $11.2B or the $11.9B figure is correct (claims 4969, 19820). Leverage: whether revenue can service several billion dollars of 9%+ debt (claims 4697, 4824) and meet loan covenants (claim 4597). Execution: whether contracted power turns into running capacity on schedule. Data quality: several figures conflict across sources. One notes offering appears as both $1.5B and $2.0B (claims 11921, 11918), and another as both $1.5B and $1.75B (claims 4700, 4697). Several 'delayed' statuses were set by automated extraction and still need human verification. The claim list supplied for this FAQ was also cut off, so later developments may be missing.
Frequently asked
2026-10-07A. CoreWeave rents out large clusters of GPUs (specialized AI chips) to companies that train and run AI models. It describes itself as an AI cloud: it leases data-center power, fills it with NVIDIA hardware such as GB200 systems (claim 4976), and sells the computing capacity along with software for storage (claim 4975), cluster scaling (claim 4977) and billing and usage metrics (claim 4978). The industry analyst SemiAnalysis rated it the only 'Platinum' provider in both of its ClusterMAX evaluations (claims 18878, 18879).
A. Grow capacity fast and pay for it mostly with debt secured by customer contracts. By May 2025 it reported 420 MW of active power (claim 4972) and 1.6 GW contracted (claim 4973), with $17.2B in total debt and equity raised (claim 4968). It is also expanding by acquisition. It agreed to buy Weights & Biases, an AI developer-tools company (claim 4974). In July 2025 it agreed to buy Core Scientific, a data-center operator, for 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal would bring more power and facilities in-house instead of leasing them.
A. The record names only one major customer: OpenAI. Its contract is cited at $11.9B (claim 19820), and a separate figure puts OpenAI-related backlog at $11.2B (claim 4969). The two numbers do not match, and the difference is not explained. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but no dollar value is given. Total committed backlog was $25.9B as of May 2025 (claim 4970), so a large share of contracted revenue comes from customers that are not named. One loan facility is tied to a 'material customer contract' (claim 4595), and the record does not identify that customer.
A. Completed: the Nasdaq IPO at $40 per share (claims 17815, 11616), which raised about $1.5B gross and $1.4B net (claims 19821, 4967). Also completed: two bond issues, $2B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claims 4697, 4658). Both were upsized from smaller initial offerings (claims 11921, 4700, 4698). The revolving credit facility was expanded to $1.5B (claim 5010). Product launches and benchmark results are self-reported (claims 4975, 4980). Announced but not shown as completed: the Core Scientific merger (claim 4729) and converting contracted power (1.6 GW, claim 4973) into active capacity (420 MW, claim 4972).
A. The debt is substantial and expensive. Bond interest runs at 9% to 9.25% (claims 4824, 4659). A delayed-draw term loan of up to $2.6B (claim 4592), maturing in 2030 (claim 4594), carries two conditions. Contracted revenue must stay at or above 0.85x the expected level (claim 4597). From April 2027, cash flow must cover debt payments at least 1.40x (claim 4596). The revolving credit facility runs to May 2028 (claim 5012). It also has a 'springing' clause that could pull maturity forward to 2026-12-30 if certain conditions are triggered (claim 11926).
A. Yes. The record shows sales by the Chief Development Officer of about $217M (claim 19832), the CEO of about $103.3M (claim 19830), and the CFO of about $29.1M (claim 19831), all around mid-2025, shortly after the IPO. Sales like these are common once post-IPO lockups end, and they are not evidence of wrongdoing. They are still a fact readers often ask about.
A. 1) Whether the Core Scientific merger closes or is abandoned. Its deadline of 2026-04-07 has passed, and the record marks it delayed (claims 4731, 4738). A $270M termination fee would be payable to CoreWeave in some scenarios (claim 4739). 2) Whether the revolving credit facility's springing maturity date of 2026-12-30 is triggered (claim 11926). 3) Whether the 1.40x debt-coverage test is met when it begins in April 2027 (claim 4596). 4) How much of the 1.6 GW of contracted power is actually online (claim 4973).
A. Customer concentration: OpenAI appears to account for roughly 43-46% of the $25.9B backlog (claims 4969, 19820, 4970), and most other customers are unnamed. Merger status: the record shows the Core Scientific deal past its deadline with no completion or termination disclosed. Data quality: several items marked 'delayed', including bond closings and the first 9% interest payment (claims 11919, 4699, 4659), conflict with other claims showing the notes were issued (claims 11917, 4658). These flags may reflect missing confirmations in the record, not real defaults. Finally, the claim list provided to this FAQ ends partway through claim 4595, so later disclosures may not be reflected here.
Frequently asked
2026-10-07A. CoreWeave rents out large clusters of GPU computing power, mostly to companies training and running AI models. It builds and leases data-center capacity and sells software on top, including AI object storage (4975), on-demand cluster scaling (4977), and support for NVIDIA's GB200 chips (4976). It bought the AI developer-tools company Weights & Biases (4974). Third-party analysts at SemiAnalysis rated it the only 'Platinum' provider in their ClusterMAX evaluations (18878, 18879, 4981).
A. The strategy is to scale fast, funded heavily by borrowing. As of May 2025 it reported 420 MW of active power capacity (4972) against 1.6 GW contracted (4973), and $17.2B raised in total debt and equity (4968). It is also pursuing an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (4731), which would bring that company's data-center sites in-house.
A. OpenAI is the only major customer named on the record: an infrastructure contract cited at $11.9B (19820) and separately as $11.2B of revenue backlog (4969). These two figures differ and have not been reconciled. IBM is named as a partner for Granite model compute (4971). Total committed backlog was $25.9B as of May 2025 (4970), so a large share is not attributed to a named customer. A July 2025 filing references a 'material customer contract' without naming the counterparty (4595).
A. Completed: the Nasdaq IPO at $40 per share (17815, 11616, 18881), a raise of about $1.5B gross (19821) and $1.4B net (4967); $2B of 9.25% senior notes due 2030 (11917, 4824); $1.75B of 9% senior notes due 2031, upsized from $1.5B (4700, 4698, 4658); and an expanded $1.5B revolving credit facility (5010). Announced but not confirmed complete on this record: the Core Scientific merger. Its stated outside date of 2026-04-07 has passed, and the record marks it delayed (4731, 4738). Every claim here is company-stated; none is independently verified.
A. The borrowing is substantial and expensive: coupons of 9% to 9.25% on the senior notes (4824, 4697), plus a delayed-draw term loan of up to $2.6B (DDTL 3.0, 11922) maturing 2030-08-21 (4594). That loan carries covenants: a minimum contract realization ratio of 0.85x (4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (4596). The revolver matures in May 2028 (5012) but has a contingent 'springing' maturity of 2026-12-30 (11926), which could pull the deadline forward.
A. Yes, heavily in the months after the IPO. Recorded sales are about $103.3M by the CEO (19830), $217M by the Chief Development Officer (19832), and $29.1M by the CFO (19831). Insider sales can be routine or pre-planned, but the scale is worth noting alongside the company's capital needs.
A. Four things: (1) whether the Core Scientific merger closed, was renegotiated, or was terminated, noting the $270M termination fee payable to CoreWeave (4739); (2) whether the 2026-12-30 springing maturity on the revolver is triggered (11926); (3) progress converting the 1.6 GW of contracted power into active capacity (4973, 4972); and (4) covenant compliance ahead of the 1.40x debt-service test in April 2027 (4596). The record also shows the first 9% note interest payment, due 2026-02-01, without confirmation that it was paid (4659).
A. Customer concentration: OpenAI appears to account for a large share of the $25.9B backlog (4970, 4969), and the remaining customers are mostly unnamed. Data consistency: the OpenAI figure appears as both $11.9B and $11.2B, and one notes offering appears as both $1.5B and $2B (11921, 11918). Record gaps: this dossier's entries largely stop in mid-2025, so outcomes for the merger, capacity build-out, and debt service after that point are not documented here.
Frequently asked
2026-10-06A. CoreWeave rents out GPU computing capacity in its data centers, mainly to companies that train and run AI models. Its disclosed products include GB200 support across its cloud stack (claim 4976), general availability of AI Object Storage (4975), on-demand cluster scaling (4977), and support for NVIDIA AI Enterprise (4979). An industry evaluation, SemiAnalysis's ClusterMAX, rated it the only 'Platinum' provider in both its first and second editions (18878, 18879, 4981).
A. The strategy is to add capacity quickly, pay for it largely with debt, and expand through acquisitions. On capacity, it reported 1.6 GW of contracted power and 420 MW of active power added (4973, 4972). On financing, it went public on Nasdaq at $40/share, raising about $1.5B gross and $1.4B net (17815, 19821, 4967). Within its first months as a public company it then added a $1.5B revolver expansion (11923), a $2.6B delayed-draw term loan (4592), $2.0B of 9.25% notes due 2030 (11917, 4824), and $1.75B of 9% notes due 2031 (4697). It reported $17.2B of total debt and equity raised to date (4968). On acquisitions, it announced deals for Weights & Biases (4974) and Core Scientific (4729).
A. The only named customer is OpenAI. Claim 19820 records an $11.9B infrastructure contract, while claim 4969 puts OpenAI-related backlog at $11.2B. The two figures disagree and have not been reconciled. IBM is named as a partner for Granite model compute (4971). A 'material customer contract for GPU infrastructure' tied to the DDTL 3.0 loan is on record but the customer is not named (4595). Total committed backlog was reported at $25.9B (4970). Roughly 43–46% of that figure is attributable to OpenAI, which makes customer concentration a central issue.
A. None of these claims has been independently verified as delivered. Every claim carries the status 'stated' or 'delayed', and none is marked delivered or confirmed. The IPO and Nasdaq listing are well documented across several claims (18881, 11601, 15974, 11616). Capacity, product launches, and backlog figures are company statements only. Several items are marked 'delayed': the closing dates for both notes offerings (11919, 4699), the first 9% notes interest payment (4659), and the Core Scientific merger deadline of 2026-04-07 (4731, 4738). These 'delayed' labels come from automated extraction. In some cases they probably mean only that a past deadline has passed with no confirmation logged, so they do not by themselves show that anything slipped.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal, paying 0.1235 CoreWeave shares per Core Scientific share (4731, 19824). An S-4 registration statement was filed (4733), and Core Scientific would owe CoreWeave a $270M termination fee in certain circumstances (4739). The outside closing date of 2026-04-07 has passed. The claim is marked 'delayed', and the record contains nothing showing whether the deal closed, was extended, or was terminated.
A. Yes. Recorded insider sales include about $217M by the Chief Development Officer through May 2025 (19832), $103.3M by the CEO through June 2025 (19830), and $29.1M by the CFO (19831). These sales are disclosed facts. Whether they matter depends on context the record does not include, such as trading plans and the share of each person's holdings that was sold.
A. 1. Whether a 'springing' maturity on the revolving credit facility is triggered on 2026-12-30 (11926). If not triggered, the facility runs to 2028-05-02 (5012). 2. The DDTL 3.0 loan covenants: a minimum 1.40x debt service coverage ratio beginning April 2027 (4596) and a minimum contract realization ratio of 0.85x (4597). 3. Confirmation that the 9% notes interest payments are being made (4659). 4. The final outcome of the Core Scientific merger. 5. Whether backlog (4970) turns into recognized revenue.
A. 1. Customer concentration: how much of the business depends on OpenAI, and who the unnamed 'material customer' is (4595). 2. Debt load: the company is carrying high-coupon debt at 9–9.25% (4824, 4697), and covenants begin to bite in 2026–2027. 3. Capacity: how much of the 1.6 GW of contracted power is actually energized (4973). 4. The Core Scientific merger: its status after the missed deadline. 5. Recency: this dossier's substantive claims end around July 2025, so anything after that, including the merger outcome and later earnings, is missing from the record.
Frequently asked
2026-10-06A. CoreWeave rents GPU computing capacity in its data centers to companies that build and run AI models. On top of that hardware it sells software and services, including cluster scaling, object storage, and NVIDIA software support (claims 4975, 4977, 4979). In 2025 it announced the acquisition of Weights & Biases, an AI developer-tools company (claim 4974). SemiAnalysis's ClusterMAX evaluations rated it the only 'Platinum' provider in both their first and second rounds (claims 18878, 18879, 4981). Those ratings are third-party benchmarks, not audited results.
A. The strategy is to raise large amounts of capital and add power and data-center capacity quickly, ahead of AI demand that customers have already committed to. As of May 2025, it reported $17.2B of total debt and equity raised (claim 4968), 1.6 GW of contracted power (claim 4973), and 420 MW of active compute power added (claim 4972). In July 2025 it announced an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), which would have brought that company's data-center sites in-house.
A. OpenAI is the only major customer named with dollar figures. The record shows an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI-related revenue backlog (claim 4969). IBM is named as a partner using CoreWeave capacity to train its Granite models (claim 4971), but no value is disclosed. A separate 'material customer contract' for GPU infrastructure tied to the DDTL 3.0 loan facility is on record without a customer name (claim 4595). Total committed backlog was $25.9B as of May 2025 (claim 4970). On these figures, OpenAI accounts for a large share of that backlog, so customer concentration is a central issue.
A. Completed events in the record: the March 2025 Nasdaq IPO at $40 per share (claims 11616, 18881), raising about $1.5B gross and $1.4B net (claims 19821, 4967). Also completed: senior notes issued in May 2025 at 9.25%, due 2030 (claims 4824, 11917), and July 2025 at 9%, due 2031 (claims 4697, 4658), plus an expanded $1.5B revolving credit facility (claims 5010, 11923). On capacity, only 420 MW was active against 1.6 GW contracted (claims 4972, 4973). The Core Scientific merger had an outside closing date of 2026-04-07 and is marked 'delayed' (claims 4731, 4738). Nothing in the record shows that it closed. Every claim on file is still at 'stated' status, meaning the company said it, but none has yet been independently marked as verified or delivered.
A. Borrowing is heavy and expensive. The two 2025 senior note issues carry 9.25% and 9% coupons (claims 4824, 4697). Lenders also provided a delayed-draw term loan of up to $2.6B, called DDTL 3.0 (claim 11922). That facility requires CoreWeave to maintain a minimum 'contract realization ratio' of 0.85x (claim 4597), which ties the debt directly to customers actually honoring their contracts. Some note sizes look inconsistent across filings: $1.5B vs. $2B for the May notes (claims 11921, 11918), and $1.5B upsized to $1.75B for the July notes (claims 4700, 4698). These most likely reflect deals that were enlarged before pricing, but readers should check the final figures against the filings.
A. Yes. After the IPO the record shows sales by the Chief Development Officer of about $217M (claim 19832), by the CEO of about $103.3M (claim 19830), and by the CFO of about $29.1M (claim 19831). Insider sales after an IPO are common and are often pre-scheduled. Still, the amounts are large enough to note alongside management's growth claims.
A. Key dates: the DDTL 3.0 commitment termination date of 2026-07-31, which is now marked delayed (claim 4593), and a contingent 'springing' maturity on the credit facility dated 2026-12-30 (claim 11926). Further out are the revolver maturity of 2028-05-02 (claims 5012, 11925), the DDTL 3.0 maturity of 2030-08-21 (claim 4594), and the 2030 and 2031 note maturities (claims 4824, 4697). The final outcome of the Core Scientific merger also matters, including whether the $270M termination fee payable to CoreWeave came into play (claim 4739).
A. First, can CoreWeave convert 1.6 GW of contracted power and $25.9B of backlog into operating capacity and revenue (claims 4973, 4970)? Second, how dependent is it on OpenAI (claims 19820, 4969)? Third, can it keep servicing roughly 9% debt while staying above its 0.85x contract-realization covenant (claims 4697, 4824, 4597)? Fourth, what happened to the Core Scientific merger after its deadline passed (claims 4731, 4738)? Several financing items, such as a notes interest-payment date (claim 4659) and notes closing dates (claims 11919, 4699), are flagged 'delayed' by automated extraction. Those flags may only mean the date passed without a recorded confirmation, not that a payment or closing was actually missed. They should be checked before anyone draws conclusions.
Frequently asked
2026-10-06A. CoreWeave rents out GPU computing capacity for training and running AI models, a business often called an 'AI cloud.' It operates data centers filled with NVIDIA hardware, including GB200 support across its platform (claim 4976). It sells that capacity along with software tools such as AI Object Storage (claim 4975) and, after acquiring Weights & Biases (claim 4974), developer tooling for managing AI model work. An industry evaluator, SemiAnalysis, rated it the only 'Platinum' provider in both editions of its ClusterMAX ranking (claims 18878, 18879, 4981).
A. The strategy is to scale fast using borrowed money and long-term customer contracts. By May 2025 it reported $17.2B in total debt and equity raised (claim 4968) and a $25.9B backlog of committed contract revenue (claim 4970). Since then it has kept adding debt: - $2B of 9.25% senior notes due 2030 (claims 11917, 4824) - $1.75B of 9% notes due 2031 (claim 4697) - a delayed-draw term loan of up to $2.6B (claim 11922) - a revolving credit facility expanded to $1.5B (claim 11923) It also announced an all-stock merger with Core Scientific, a data-center operator (claims 4729, 4731), to own power and facilities rather than lease them.
A. OpenAI is the only major customer named with a dollar figure. The record shows an $11.9B OpenAI infrastructure contract announced in March 2025 (claim 19820), with $11.2B of OpenAI-related backlog cited in May 2025 (claim 4969). IBM is named as a partner buying compute for its Granite models (claim 4971), but no contract value is disclosed. A 'material customer contract' backing the DDTL 3.0 loan is recorded without a customer name (claim 4595). Outside OpenAI, the record does not say who makes up the rest of the $25.9B backlog.
A. Delivered or completed on the record: - The March 2025 Nasdaq IPO at $40/share (claims 11616, 18881), raising $1.5B gross and about $1.4B net (claims 19821, 4967) - The Weights & Biases acquisition (claim 4974) - General availability of AI Object Storage (claim 4975) - Several notes offerings The largest gap is power capacity. CoreWeave reported 1.6 GW of contracted power (claim 4973) but only 420 MW of active capacity added (claim 4972), so most of the contracted capacity was not yet running at that disclosure. The Core Scientific merger carried a closing deadline of 2026-04-07 and is flagged 'delayed' (claims 4731, 4738). The record shows no completion.
A. CoreWeave borrows at high interest rates (9% to 9.25% on its senior notes), and its lenders impose conditions. The DDTL 3.0 loan requires a minimum contract realization ratio of 0.85x (claim 4597), which ties loan terms to whether customers actually pay out their contracts. There is a contingent 'springing maturity' date of 2026-12-30 (claim 11926), meaning some debt could come due early if certain conditions are triggered. The record flags two items as 'delayed': - the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) - the first 9% note interest payment due 2026-02-01 (claim 4659) These flags come from automated extraction and may only mean the dates passed without a confirming filing. They do not prove a missed payment.
A. Yes, in large amounts shortly after the March 2025 IPO. The record shows: - about $217M in sales by the Chief Development Officer through May 2025 (claim 19832) - about $103.3M by the CEO through June 2025 (claim 19830) - about $29.1M by the CFO (claim 19831) Insider sales are not wrongdoing in themselves, but readers often weigh them as a signal.
A. 1. Whether the Core Scientific merger closed, was renegotiated, or was abandoned. If it was terminated under certain conditions, a $270M fee could be payable to CoreWeave (claim 4739). 2. How much of the 1.6 GW of contracted power is actually energized and earning revenue. 3. How the 2026-12-30 springing maturity (claim 11926) is resolved. 4. Confirmation that interest payments on the 9% and 9.25% notes are being made. 5. Whether new customers beyond OpenAI are named.
A. First, the record is stale. Nearly every claim dates from March to July 2025, while today is October 2026, so more than a year of results, financings, and merger developments is missing. Second, customers are concentrated and opaque: OpenAI alone accounts for roughly $11.2B of the $25.9B backlog (claims 4969, 4970), and the rest is undisclosed. Third, several claims conflict or duplicate each other. For example, the 2030 notes appear as both $1.5B and $2B (claims 11921, 11918, 11917), and several items were auto-flagged 'delayed' without supporting evidence. These should be checked against the primary SEC filings before anyone relies on them.
Frequently asked
2026-10-05A. CoreWeave rents out GPU computing capacity built for AI workloads, sold as a specialized cloud platform. The record shows it supporting NVIDIA GB200 systems across its stack (claim 4976), launching on-demand cluster scaling (claim 4977), and making AI Object Storage generally available (claim 4975). It also bought Weights & Biases (claim 4974), which adds developer software on top of the raw compute. Third-party evaluators rated it the only 'Platinum' provider in two SemiAnalysis ClusterMAX rankings (claims 18878, 18879, 4981).
A. The strategy is to grow fast on borrowed money and lock in long-term customer contracts. CoreWeave listed on Nasdaq in March 2025 at $40 per share (claims 17815, 15974), raising about $1.5B gross (claim 19821) and about $1.4B net (claim 4967). It then raised much more debt than equity: $2B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claims 4697, 4658), a $2.6B delayed-draw term loan (claim 4592), and a revolving credit facility expanded by $1.5B (claims 11923, 5010). Total debt and equity raised was reported at $17.2B (claim 4968). It also pursued vertical integration by agreeing to merge with data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729).
A. OpenAI is the only named customer with a dollar figure attached. Two figures appear on record: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI-related backlog (claim 4969). The record does not reconcile the two. IBM is named as a partner that uses CoreWeave capacity to train its Granite models (claim 4971), but no value is given. Total committed backlog was $25.9B as of the May 2025 report (claim 4970), so a large share of the remaining backlog comes from customers the record does not name. That leaves customer concentration as a real unknown.
A. Every claim on record has status 'stated'. None has been independently verified as delivered. The listing (claim 18881) and the debt issuances are straightforward financing facts. Operational claims, such as 420 MW of active power capacity added (claim 4972) against 1.6 GW contracted (claim 4973), are company-reported figures with no confirmation on record. The gap between active and contracted power is the clearest measure of how much capacity is still to be built.
A. The merger was announced in July 2025 (claims 19824, 4729). It carried a $270M termination fee payable to CoreWeave (claim 4739) and an outside closing date of April 7, 2026 (claim 4738). Our pipeline has flagged both the merger and that deadline as 'delayed' (claims 4731, 4738), and the record shows no closing. Readers should treat the deal as not completed until a closing or termination is documented.
A. Yes. Senior executives sold substantial stock shortly after the IPO. The record shows the Chief Development Officer selling about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831), all in May and June 2025. Such sales are often pre-planned and legal, but readers usually weigh them alongside a company's growth claims.
A. Key debt dates: - Commitments under the $2.6B delayed-draw loan were set to end July 31, 2026 (claim 4593). - The revolving credit facility has a contingent 'springing' maturity of December 30, 2026 (claim 11926); its normal maturity was extended to May 2, 2028 (claims 5012, 11925). - A 1.40x minimum debt-service coverage covenant starts in April 2027 (claim 4596). - Interest on the 9% notes began in February 2026 (claim 4659), and our pipeline flags that claim as 'delayed'. Covenant compliance and any refinancing are the near-term signals to watch.
A. The main open questions are: 1. **Debt load.** Can revenue from the $25.9B backlog (claim 4970) cover debt carrying 9% to 9.25% coupons? 2. **Customer concentration.** OpenAI is the only customer named with dollar figures, and the record carries two different numbers for that relationship (claims 19820, 4969). 3. **Capacity build-out.** How quickly can the 1.6 GW of contracted power become active capacity (claims 4973, 4972)? 4. **Core Scientific.** The merger's outcome is unresolved on our record. 5. **Data quality.** Several of our records are inconsistent. Some debt figures carry wrong units, and the senior notes appear at both $1.5B and $2B. The claims list we received also ends partway through, so later events may be missing.
Frequently asked
2026-10-05A. CoreWeave rents GPU computing capacity to AI developers. It also sells the software around that capacity, including AI Object Storage, which it says is generally available (claim 4975), and support for NVIDIA GB200 systems (claim 4976). It has also announced the acquisition of Weights & Biases, an AI developer-tools company (claim 4974). The research firm SemiAnalysis rated CoreWeave its only 'Platinum' provider in both the first and second ClusterMAX evaluations (claims 18878, 18879, 4981).
A. CoreWeave listed on Nasdaq through an IPO priced at $40 per share on 2025-03-28 (claims 15974, 11601). The IPO raised about $1.5B (claim 19821), or $1.4B net (claim 4967). By May 2025 it said it had raised $17.2B in total debt and equity (claim 4968). After the IPO it added more debt: - It expanded its revolving credit facility to $1.5B (claims 5010, 11923) and its letters of credit to $350M (claim 5011). - It issued $2B of 9.25% senior notes due 2030 (claims 11917, 4824). One earlier claim records the offering at $1.5B (claim 11921), which suggests it was upsized. - It issued $1.75B of 9% notes due 2031, upsized by $250M from $1.5B (claims 4697, 4698, 4700). - It arranged a $2.6B delayed-draw term loan called DDTL 3.0 (claims 4592, 11922). The strategy is to borrow heavily, at high interest rates, to build capacity ahead of contracted demand.
A. OpenAI is the only customer named with a dollar figure. The record shows an $11.9B infrastructure contract (claim 19820), and the company reported $11.2B of OpenAI-related backlog (claim 4969). Backlog is contracted revenue the company has not yet earned. IBM is named as a partner using CoreWeave capacity to train its Granite models, but no amount is given (claim 4971). Total backlog was $25.9B as of May 2025 (claim 4970). That means OpenAI accounts for roughly 43% of disclosed backlog, and the remaining customers behind about $14.7B are not named in this record.
A. The IPO and the Nasdaq listing are completed events (claims 15974, 18881), and the note offerings were priced and issued. On capacity, the company reports 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973). In other words, roughly a quarter of contracted power was online at that disclosure. Every claim in this dossier carries the status 'stated', meaning the company said it. None has been independently marked as verified. Product launches, backlog figures and partnership claims should all be read as company assertions.
A. CoreWeave agreed in July 2025 to acquire Core Scientific, a data-center operator, in an all-stock deal. Core Scientific holders would receive 0.1235 CoreWeave shares per share (claims 4729, 4731). The record shows a $270M termination fee payable to CoreWeave (claim 4739). The merger's outside date was 2026-04-07, and both the merger and that deadline are flagged 'delayed' (claims 4731, 4738). The record shows no completion. Whether the deal closed, was terminated, or was renegotiated is not established here.
A. Yes, and in large amounts in the months after the IPO. Recorded sales are about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830) and $29.1M by the CFO (claim 19831). Sales by early holders after an IPO are common. Their size relative to the IPO's $1.4B net proceeds is still worth noting.
A. Four upcoming items stand out: - **Springing maturity date (2026-12-30, claim 11926).** This contingency could pull the revolver's maturity forward from 2028-05-02 (claim 5012). - **Debt-service covenant (from April 2027, claim 4596).** The company must earn at least 1.40x its debt payments. - **Unused loan commitments.** The DDTL 3.0 commitment termination date (2026-07-31) is flagged 'delayed' (claim 4593). - **Capacity and backlog progress.** Watch whether active capacity moves toward the 1.6 GW contracted figure and whether the $25.9B backlog turns into recognized revenue.
A. There are four main uncertainties: - **Customer concentration.** A large share of backlog rests on OpenAI, and most other customers are unnamed (claims 4969, 4970). - **Debt costs.** Borrowing at roughly 9-9.25% must be covered by cash flow from capacity that is still largely being built (claims 4824, 4697, 4972, 4973). - **Core Scientific.** The merger's status is unresolved in the record (claims 4731, 4738). - **Data quality.** Several claims are flagged 'delayed', including note closing dates and a 2026-02-01 interest payment (claims 11919, 4699, 4659). These flags may reflect missing confirmation rather than real slippage and need checking against filings. The claims list supplied for this FAQ also ends partway through, so later disclosures may not be reflected here.
Frequently asked
2026-10-04A. CoreWeave rents out large clusters of NVIDIA GPUs that AI companies use to train and run their models. It also sells software services on top of that hardware, including object storage (claim 4975), on-demand cluster scaling (claim 4977), and support for NVIDIA's GB200 systems (claim 4976). It acquired Weights & Biases, a machine-learning developer tools company (claim 4974). The independent analyst SemiAnalysis rated it the only 'Platinum' provider in both editions of its ClusterMAX ranking (claims 18878, 18879, 4981).
A. The strategy is to grow very fast, funded mostly by debt. CoreWeave signs long-term compute contracts and borrows heavily to build the capacity to fulfil them. It went public on Nasdaq at $40 per share and raised about $1.5B gross, or $1.4B net (claims 17815, 19821, 4967). It reports $17.2B in total debt and equity raised (claim 4968). It has also announced a move into owning data-center sites through a stock merger with Core Scientific, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). On power, it discloses 1.6 GW of contracted capacity (claim 4973) and 420 MW of active capacity added (claim 4972).
A. OpenAI is the only named major customer. The OpenAI contract is recorded at both $11.9B (claim 19820) and $11.2B of backlog (claim 4969); the source does not reconcile the two figures. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). A separate 'material customer contract' for GPU infrastructure is disclosed without naming the counterparty (claim 4595). Total committed-contract backlog was $25.9B as of the May 2025 disclosure (claim 4970). The record does not identify most of that backlog by customer.
A. Nothing in this dossier has been independently verified. Every claim is either 'stated', meaning it rests on company or press disclosure alone, or 'delayed'. The IPO and Nasdaq listing are well documented (claims 18881, 11616). The debt raises are also concrete filings: a $1.5B revolver expansion (claim 11923), a $2.6B delayed-draw term loan (claim 4592), $2.0B of 9.25% notes due 2030 (claims 11917, 4824), and $1.75B of 9% notes due 2031 (claim 4697). The rest has not been confirmed by any delivery record here. That includes the backlog, the power capacity figures, the product launches, and the Core Scientific merger.
A. In this dossier, 'delayed' means a promised date has passed and no record yet confirms the event happened. It does not necessarily mean the company missed it. The flagged items are: - the Core Scientific merger, with an outside closing date of 2026-04-07 (claims 4731, 4738) - the commitment termination date of the $2.6B term loan, 2026-07-31 (claim 4593) - the first interest payment on the 9% notes, 2026-02-01 (claim 4659) - two note-offering closing dates (claims 11919, 4699) The merger is the most consequential of these. If it fails under certain conditions, Core Scientific would owe CoreWeave a $270M termination fee (claim 4739).
A. 1. Whether the Core Scientific merger closed, was extended, or was terminated. 2. The contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926). Find out what condition triggers it, because it could pull the facility's maturity forward from 2028-05-02 (claim 12925). 3. Whether reported revenue turns the $25.9B backlog into recognized sales. 4. How much of the 1.6 GW of contracted power actually goes into operation.
A. 1. **Customer concentration.** OpenAI is the only named large customer, and most of the backlog is not attributed to anyone. 2. **Leverage.** The company has billions in debt at 9 to 9.25% interest, issued against contracts that have not yet been delivered. 3. **Insider selling.** Executives sold heavily after the IPO: about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). 4. **Inconsistent figures.** The two OpenAI amounts ($11.9B vs. $11.2B) and the two senior note sizes ($1.5B in claim 11921 vs. $2.0B in claim 11918) need reconciling. The note gap likely reflects an upsized offering. 5. **Incomplete record.** The claim list supplied for this FAQ is cut off mid-entry at claim 4596, so later disclosures are not reflected here.
Frequently asked
2026-10-04A. CoreWeave rents out large clusters of NVIDIA GPUs to AI companies for training and running models. The record shows support for NVIDIA GB200 systems across its platform (claim 4976), general availability of an AI object storage product (claim 4975), and on-demand cluster scaling (claim 4977). Its pitch is performance: it was the only provider rated Platinum in both the first ClusterMAX evaluation and ClusterMAX 2.0 (claims 18878, 18879; see also 4981), and it reports an MLPerf Inference v5.0 result (claim 4980). It also bought Weights & Biases, a machine-learning developer-tools company (claim 4974).
A. The strategy is to grow capacity quickly, paid for mostly with borrowed money and secured by long-term customer contracts. CoreWeave reported $17.2B in total debt and equity raised (claim 4968), 420 MW of active power capacity added (claim 4972), and 1.6 GW of contracted power (claim 4973). It also moved to own more of its physical infrastructure by agreeing to merge with Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. OpenAI is the only named major customer in the record. The record gives two different figures for that deal: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI-related backlog (claim 4969). The difference may reflect revenue already recognized or different measurement dates, but the record does not explain it. IBM appears as a partner for Granite model compute (claim 4971), with no dollar value given. Total backlog was $25.9B (claim 4970), so roughly 43% of disclosed backlog is tied to OpenAI and much of the rest is unattributed. A 'material customer contract for GPU infrastructure' linked to the DDTL 3.0 loan (claim 4595) does not name the customer in the record we have.
A. Financing events are the best documented. The IPO priced at $40 per share on 2025-03-28 (claims 17815, 15974, 11616) and raised $1.5B gross and about $1.4B net (claims 19821, 4967). After the IPO, CoreWeave issued $2B of 9.25% senior notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claim 4658). It also expanded its revolving credit facility to $1.5B (claim 5010) and arranged a $2.6B delayed-draw term loan, DDTL 3.0 (claim 4592). On operations, the 420 MW of added active capacity (claim 4972) is the clearest delivered figure, compared with 1.6 GW contracted (claim 4973). Every claim in this dossier is marked 'stated', meaning the company or a filing said it. None has been independently verified.
A. The merger was announced in July 2025 (claims 19824, 4729), with a closing deadline of 2026-04-07 (claim 4738). Both the merger and the deadline are now marked 'delayed' (claims 4731, 4738). The record shows no completion and no termination. A $270M termination fee is payable to CoreWeave in certain circumstances (claim 4739). Readers should confirm the deal's current status from primary sources before relying on it.
A. Four dates and tests matter most. First, a contingent 'springing' maturity on the credit facility dated 2026-12-30 (claim 11926). If triggered, it would pull forward the facility's otherwise 2028-05-02 maturity (claims 5012, 11925). Second, DDTL 3.0 requires a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). Breaching either test would be significant. Third, whether contracted power (1.6 GW, claim 4973) turns into active capacity. Fourth, the outcome of the Core Scientific merger.
A. Shortly after the IPO, the record shows large stock sales by senior executives. The Chief Development Officer sold about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). Insider selling after an IPO is common and is not evidence of wrongdoing, but the amounts are large enough to note.
A. 1) Customer concentration: OpenAI accounts for a large share of backlog, other major customers are unnamed, and the two OpenAI figures don't match (claims 19820, 4969). 2) Cost and scale of debt: recent notes carry 9–9.25% coupons (claims 4824, 4658) on top of term loans and revolvers, which depend on contracted revenue actually arriving. 3) Gap between capacity built and capacity promised: 420 MW active versus 1.6 GW contracted (claims 4972, 4973). 4) Merger status (claims 4731, 4738). 5) Data quality: some 'delayed' labels, such as on the May 2025 notes closing (claim 11919) and the 9% coupon payment (claim 4659), were assigned by automated extraction and may be artifacts. Claim 11917 shows those May notes were in fact issued. The claims list provided for this FAQ was also cut off at claim 4595, so later disclosures are not reflected here.
Frequently asked
2026-10-04A. CoreWeave rents out GPU computing power built for AI workloads, a so-called 'AI cloud.' Its disclosures emphasize NVIDIA hardware, including GB200 support across its platform (claim 4976) and NVIDIA AI Enterprise and Cloud Functions support (4979). It also highlights its own software and services: AI Object Storage general availability (4975), on-demand cluster scaling (4977), and detailed billing and usage metrics (4978). It cites third-party recognition as well: an MLPerf Inference v5.0 result (4980) and being the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings (18878, 18879, 4981).
A. The strategy is to grow capacity quickly and fund that growth largely with borrowed money. CoreWeave reported 1.6 GW of contracted power (4973) and said it added 420 MW of active power (4972). It also announced two acquisitions that extend its reach. Weights & Biases (4974) adds AI developer software. Core Scientific (4729, 19824), an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (4731), would bring data-center sites and power under CoreWeave's ownership. The company said it had raised $17.2B in total debt and equity (4968).
A. OpenAI is the only customer named with a dollar figure. The record shows an $11.9B infrastructure contract (19820) and $11.2B of OpenAI-related backlog (4969). IBM is named as a partner for compute capacity for its Granite models, but no dollar value is disclosed (4971). Total backlog was stated at $25.9B (4970). That means roughly $14.7B of contracted backlog is not attributed to any named customer in this record. Customer concentration is therefore a central issue: OpenAI alone appears to account for over 40% of stated backlog.
A. Equity: an IPO on Nasdaq at $40 per share (17815, 15974, 18881) raising about $1.5B (19821), or about $1.4B net (4967). Debt makes up most of the rest of the stack. 1) $2.0B of 9.25% senior notes due 2030 (11917, 4824), upsized from a $1.5B launch (11921). 2) $1.75B of 9% senior notes due 2031 (4697, 4658), upsized by $250M (4698). 3) A $2.6B delayed-draw term loan, DDTL 3.0 (4592, 11922). 4) A revolving credit facility expanded to $1.5B (11923) plus $350M of letters of credit (11924). Coupons around 9% indicate the company borrows at high-yield rates.
A. Every claim in this record has the status 'stated' or 'delayed.' None is independently marked as delivered. Events that look completed based on their filings include the IPO (18881), the notes issuances (11917, 4658), and the facility expansions (11923, 5012). Capacity and backlog figures (4973, 4970) are company statements and have not been verified. Several items carry a 'delayed' flag. One is the Core Scientific merger, whose closing deadline of 2026-04-07 has passed (4731, 4738). The others are the notes closing dates (11919, 4699), the first 9% coupon payment due 2026-02-01 (4659), and the DDTL 3.0 commitment termination date (4593). Some of these flags may be extraction artifacts rather than real slippage. They should each be checked against primary filings.
A. Yes. The record shows insider sales of about $217M by the Chief Development Officer (19832), $103.3M by the CEO (19830), and $29.1M by the CFO (19831), all in the months after the IPO. Insider selling after a lockup ends is common and is not proof of a problem. Still, the amounts are large enough to be worth noting next to the company's heavy borrowing.
A. 1) The Core Scientific merger. Did it close, get renegotiated, or terminate? The agreement includes a $270M termination fee payable to CoreWeave (4739). 2) A contingent 'springing' maturity on the revolving credit facility dated 2026-12-30 (11926). Otherwise the facility runs to 2028-05-02 (5012). 3) DDTL 3.0, which must meet a minimum debt service coverage ratio of 1.40x starting April 2027 (4596) and matures 2030-08-21 (4594). 4) Whether backlog (4970) converts into recognized revenue on schedule as capacity (4973) comes online.
A. 1) Customer concentration: how dependent is CoreWeave on OpenAI (19820, 4969), and who holds the rest of the $25.9B backlog (4970)? 2) Debt load: can cash flow cover roughly 9% coupons (4824, 4697) and the 1.40x coverage covenant (4596)? 3) Execution: how much of the 1.6 GW of contracted power (4973) is actually energized and earning revenue? 4) The Core Scientific deal, which is flagged as delayed past its deadline (4738). 5) Whether the other 'delayed' flags, especially the 9% coupon payment (4659), reflect real events or data errors. Also note that this record's detailed claims run mainly through mid-2025, so more recent developments may be missing.
Frequently asked
2026-10-03A. CoreWeave rents out GPU computing capacity in its data centers to companies that train and run AI models. Its product claims include NVIDIA GB200 support (claim 4976), CoreWeave AI Object Storage reaching general availability (claim 4975), and On-Demand Cluster Scaling (claim 4977). It cites third-party recognition: it was the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings, both the first evaluation and version 2.0 (claims 18878, 18879, 4981).
A. The strategy is to grow fast with borrowed money and sign up large customers on long-term contracts. CoreWeave went public on Nasdaq at $40/share in March 2025 (claims 11601, 17815). It raised $1.5B gross and about $1.4B net (claims 19821, 4967). It reports $17.2B in total debt and equity raised (claim 4968). Since then it has added a lot of high-interest debt: $2.0B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claims 4697, 4658), a $2.6B delayed-draw term loan (claim 4592), and a revolving credit facility expanded to $1.5B (claim 5010). It is also expanding through acquisitions: Weights & Biases (claim 4974) and a planned all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. Only one customer is named with dollar figures: OpenAI. The record shows an $11.9B infrastructure contract (claim 19820) and, separately, $11.2B of OpenAI-related backlog (claim 4969). The two figures don't match, and the record doesn't explain why. IBM is named as a partner buying compute for its Granite models, but no value is given (claim 4971). Total committed backlog is $25.9B (claim 4970). That means roughly $14–15B of backlog comes from customers this record does not name. Readers should treat customer concentration in OpenAI as a central feature of the business.
A. Completed according to the record: the IPO (claims 18881, 11616), the 2030 and 2031 note issuances (claims 11917, 4658), the credit facility expansion (claim 5010), and the general availability of AI Object Storage (claim 4975). On physical capacity, 420 MW of active power is reported (claim 4972) against 1.6 GW contracted (claim 4973). That means about a quarter of the contracted capacity was live at that point. Still announced but not shown as complete: the Core Scientific merger. Its closing deadline of 2026-04-07 is marked 'delayed' (claims 4731, 4738). Backlog is contracted future revenue, not revenue already earned.
A. There is a lot of debt, and much of it carries interest around 9% (claims 4824, 4697). The $2.6B DDTL 3.0 loan matures 2030-08-21 (claim 4594). It requires a minimum contract realization ratio of 0.85x (claim 4597) and, starting April 2027, a minimum debt service coverage ratio of 1.40x (claim 4596). In plain terms, customer contracts must actually turn into cash at roughly the expected rate. The revolving credit facility matures 2028-05-02 (claim 5012). It also has a contingent 'springing' maturity of 2026-12-30 (claim 11926), meaning it could come due early if certain conditions are triggered.
A. Yes, heavily, in the months after the IPO. The record shows about $217M in sales by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). The record does not say whether these sales were made under pre-scheduled trading plans.
A. 1) What happens to the Core Scientific merger: whether it closed, was renegotiated, or was terminated, and whether the $270M termination fee payable to CoreWeave comes into play (claim 4739). 2) Whether the 2026-12-30 springing maturity on the revolver is triggered (claim 11926). 3) Whether the company can meet the DDTL 3.0 covenants as the April 2027 coverage test approaches (claims 4596, 4597). 4) How quickly the 1.6 GW of contracted power becomes active capacity (claims 4972, 4973). 5) Whether backlog becomes more spread out beyond OpenAI (claims 4969, 4970).
A. 1) Every claim on record is 'stated' from automated extraction. None has been independently verified. 2) The record provided ends partway through mid-2025 filings, so later events are missing, including the actual outcome of the Core Scientific deal. 3) The 'delayed' labels on routine items, such as note closing dates (claims 11919, 4699) and a coupon payment (claim 4659), may be extraction artifacts and not real slippage. They should be checked against filings. 4) Some figures conflict: OpenAI $11.9B vs $11.2B (claims 19820, 4969), and 2030 notes at $1.5B vs $2.0B (claims 11921, 11918), possibly an upsizing. Several amounts also have garbled units, such as '1500.0 USD' (claims 11921, 4698). 5) Most of the $25.9B backlog comes from customers who are not named (claim 4970).
Frequently asked
2026-10-03A. CoreWeave rents out large clusters of NVIDIA GPUs for training and running AI models, essentially a specialized cloud built for AI. The record shows it adding software around that hardware: AI Object Storage, GB200 support, on-demand cluster scaling, and NVIDIA AI Enterprise support (claims 4975-4979). It also acquired Weights & Biases, a developer tooling company (claim 4974). Independent evaluators have rated it well: it was the only Platinum-rated provider in both SemiAnalysis ClusterMAX evaluations (claims 18878, 18879, 4981).
A. The strategy is to grow capacity quickly, paid for with large amounts of debt and equity. CoreWeave reports $17.2B raised in total (claim 4968). It lists 1.6 GW of contracted power, of which 420 MW of active capacity was added (claims 4972, 4973). It tried to integrate vertically into data-center ownership through an all-stock merger with Core Scientific (claims 4729, 19824). Its forward-looking statements on delivering client infrastructure and scaling revenue are general and contain no figures (claims 19822, 19823).
A. OpenAI is the only customer named with a dollar figure. The record contains two different numbers for that relationship: an $11.9B contract (claim 19820) and $11.2B of revenue backlog (claim 4969). The gap may reflect timing or how backlog is defined, but the record does not reconcile them. IBM appears as a partner for Granite model compute (claim 4971). Total backlog is $25.9B (claim 4970), so roughly half of it is not attributed to a named customer in this record. Claim 4595, a customer entry, is cut off in the data supplied, so at least one customer claim could not be reviewed.
A. Every claim here is marked 'stated', meaning the company or a filing said it. None has been independently confirmed. Financing events are the most concrete. These include the March 2025 IPO at $40/share (claims 17815, 11616), raising $1.5B gross and about $1.4B net (claims 19821, 4967). They also include $2B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claim 4658), and a revolver expanded to $1.5B (claim 11923). On capacity, 420 MW active against 1.6 GW contracted (claims 4972, 4973) means most contracted power is not yet live.
A. The merger was announced in July 2025 at 0.1235 CoreWeave shares per Core Scientific share. Its deadline was 2026-04-07 (claims 4731, 4738). The dossier flags it as 'delayed' because that date has passed without a recorded completion. The record does not say whether the deal closed, was terminated, or was renegotiated. A $270M termination fee is noted (claim 4739). Readers should check the deal's final status in the filings before relying on any combined-company figures.
A. Not necessarily. Several 'delayed' flags fall on dates that have passed with no follow-up claim in the record. Examples are the note offering closing dates (claims 11919, 4699) and the first 9% note interest payment due 2026-02-01 (claim 4659). The flags come from automated extraction and only indicate that confirmation is missing. They are not evidence of a default or a missed payment, and each should be checked against later filings.
A. Three debt dates and covenants matter most. The DDTL 3.0 commitment window ended 2026-07-31 (claim 4593); look for how much of the $2.6B was drawn (claim 4592). A contingent 'springing' maturity on the credit facility falls on 2026-12-30 (claim 11926), even though the stated maturity is 2028-05-02 (claim 11925). A minimum 1.40x debt-service coverage ratio applies from April 2027 (claim 4596). Beyond debt, watch whether the contracted 1.6 GW turns into active capacity, and whether backlog converts into recognized revenue.
A. 1) Customer concentration: OpenAI accounts for a large share of the $25.9B backlog, and the two OpenAI figures don't match (claims 19820, 4969, 4970). 2) Leverage: interest rates of 9% or more on recent notes (claims 4824, 4658), plus covenant and maturity triggers ahead. 3) Core Scientific: the deal's outcome is unresolved in the record. 4) Insider selling: in mid-2025, the CDO sold about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). These sales are not wrongdoing in themselves, but they are worth weighing alongside the growth story.
Frequently asked
2026-10-03A. CoreWeave (Nasdaq: CRWV) rents out large clusters of NVIDIA GPUs for AI training and inference. It also sells software and services on top of that compute. Product claims on record include GB200 support across its cloud stack (claim 4976), general availability of its AI Object Storage (claim 4975), and on-demand cluster scaling (claim 4977). It was the only provider rated Platinum in both SemiAnalysis ClusterMAX evaluations (claims 18878, 18879, 4981). In May 2025 it announced it would acquire the ML developer-tools company Weights & Biases (claim 4974).
A. The strategy is to sign large multi-year compute contracts, then borrow heavily to build the data-center capacity those contracts need. As of May 2025 the company reported $25.9B of revenue backlog from committed contracts (claim 4970) and about $17.2B in total debt and equity raised (claim 4968). In July 2025 it agreed to merge with Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal would have brought the power and data-center sites under its own ownership instead of leasing them.
A. OpenAI is the only customer named with a dollar figure. Its contract is recorded as $11.9B at announcement (claim 19820) and as $11.2B of backlog in May 2025 (claim 4969). The record does not explain the gap between those two figures. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but no value is given. Roughly $14.7B of the $25.9B backlog (claim 4970) is not attributed to any named customer in this record. That makes customer concentration hard to assess.
A. Completed: the Nasdaq IPO at $40/share (claims 11601, 15974) raised $1.5B gross (claim 19821) and $1.4B net (claim 4967). Also completed: a $2.0B issue of 9.25% senior notes due 2030 (claims 11917, 4824), and the revolving credit facility was expanded to $1.5B (claim 5010). On physical capacity, the company reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973). That means about a quarter of contracted power was operating at that point. Announced but not confirmed closed in this record: the Core Scientific merger (claim 4731), the Weights & Biases acquisition (claim 4974), and the closing of the $1.75B 9% notes due 2031 (claims 4697, 4699).
A. Leverage is high, and much of the debt is expensive. The senior notes carry coupons of 9.25% (claim 4824) and 9% (claim 4697). There is a $2.6B delayed-draw term loan (DDTL 3.0) maturing 2030-08-21 (claims 4592, 4594). The DDTL 3.0 has two financial tests: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The revolving credit facility nominally runs to 2028-05-02 (claim 5012). However, a contingent 'springing' maturity could pull that date forward to 2026-12-30 (claim 11926).
A. Yes, in significant amounts shortly after the IPO. The record shows about $217M sold by the Chief Development Officer through May 2025 (claim 19832), $103.3M by the CEO through June 2025 (claim 19830), and $29.1M by the CFO (claim 19831). The record does not say whether these sales were made under pre-arranged trading plans (10b5-1 plans).
A. 1) Whether the revolver's springing maturity on 2026-12-30 is triggered (claim 11926). 2) The 1.40x debt-service coverage test that starts in April 2027 (claim 4596). 3) How quickly the 1.6 GW of contracted power becomes operating capacity, compared with the 420 MW reported (claims 4972, 4973). 4) Whether the backlog (claim 4970) turns into recognized revenue. 5) The outcome of the Core Scientific merger. Its 2026-04-07 outside date (claim 4738) has passed and the record shows no closing. 6) Any $270M termination fee payable to CoreWeave (claim 4739).
A. 1) Did the Core Scientific merger close or get terminated? The record marks it 'delayed', and no outcome is recorded. 2) Some financing figures disagree. The 2030 notes appear as $1.5B (claim 11921) and as $2.0B (claims 11917, 11918), which may reflect an upsized offering. The OpenAI figure appears as both $11.9B and $11.2B. Several amounts are recorded without consistent units (e.g., claims 11921, 4698). 3) Most backlog customers are unnamed. 4) No revenue, margin, or utilization figures appear here. 5) Every claim is still at 'stated' or 'delayed' and none has been independently verified. The 'delayed' labels on routine note closings may be extraction artifacts rather than real slippage. 6) The claim list provided is cut off after claim 4593, so later disclosures may be missing from this summary.
Frequently asked
2026-10-03A. CoreWeave rents out large clusters of NVIDIA GPUs for AI training and inference. It also sells software around that hardware, including AI Object Storage, GB200 support, on-demand cluster scaling and usage billing (claims 4975-4979). In May 2025 it said it had 420 MW of active power capacity (claim 4972) and 1.6 GW contracted (claim 4973). It also announced the acquisition of Weights & Biases, an AI developer-tools company (claim 4974). Third-party benchmarks rated it the only 'Platinum' provider in SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981).
A. The strategy is to grow fast, mostly with borrowed money. The company went public on Nasdaq at $40 per share in March 2025 (claims 17815, 11616, 18881), raising about $1.5B gross and $1.4B net (claims 19821, 4967). By May 2025 it said it had raised $17.2B in total debt and equity (claim 4968). It then layered on more debt: a $1.5B revolving credit facility (claims 5010, 11923), up to $2.6B in delayed-draw term loans under DDTL 3.0 (claim 11922), $2B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claims 4697, 4658). In July 2025 it also announced an all-stock merger with Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 19824). That deal would bring power and facilities in-house.
A. OpenAI is the only major customer named in the record, under an infrastructure contract of about $11.9B (claim 19820). A separate claim puts the OpenAI backlog at $11.2B (claim 4969), and that gap has not been reconciled. IBM is named as a partner buying compute for its Granite models (claim 4971), but no dollar value is on record. Total backlog was stated at $25.9B (claim 4970), so a large share comes from customers who are not named. A debt filing also cites a 'material customer contract' without naming the counterparty (claim 4595). Readers should assume heavy customer concentration that is only partly disclosed.
A. Every claim in this dossier has status 'stated', meaning the company said it. None has been independently confirmed as completed. The financing events are the most concrete, because priced securities and filed credit agreements leave a public trail. These include the IPO, the notes offerings (both upsized; see claims 4698 and 11921 vs 11917) and the credit facilities. Operational figures come only from company statements: capacity (420 MW active, 1.6 GW contracted), backlog ($25.9B) and product launches. The Core Scientific merger had no completion claim on record, and its closing deadline of 2026-04-07 is flagged 'delayed' (claims 4738, 4731).
A. Senior executives sold substantial amounts of stock in the months after listing. The record shows about $29.1M sold by the CFO (claim 19831), about $103.3M by the CEO (claim 19830) and about $217M by the Chief Development Officer (claim 19832), all by mid-2025. Insider sales alone don't prove anything is wrong. They are still a standard diligence item, especially at a company whose stock is used as currency for acquisitions.
A. 1) Whether the Core Scientific merger closed, was renegotiated or was terminated. A $270M termination fee would be payable to CoreWeave in certain cases (claim 4739). 2) The contingent 'springing maturity' on the credit facility dated 2026-12-30 (claim 11926). Some or all of the debt could come due early if that condition triggers. 3) Compliance with lender covenants, including a minimum 0.85x contract realization ratio (claim 4597) and a debt service coverage test (claim 4596). 4) Whether the DDTL 3.0 commitment window, which ends 2026-07-31 (claim 4593, flagged delayed), was fully drawn or extended. 5) Whether stated backlog turns into recognized revenue.
A. 1) Customer concentration: who makes up the roughly $14B of backlog not tied to OpenAI, and how much depends on a single counterparty? 2) Leverage: the company carries high-coupon debt (9-9.25%), and it is unclear whether contracted revenue covers debt service as capacity comes online. 3) Execution: the gap between 1.6 GW contracted and 420 MW active (claims 4973, 4972) depends on building sites on time. 4) The Core Scientific outcome. 5) Data quality: several claims are flagged 'delayed' by automated extraction, including routine items like a notes closing (claims 11919, 4699) and an interest payment (claim 4659). Those flags may be extraction artifacts rather than real misses and should be checked against filings. The claim list supplied for this FAQ was also truncated (it ends mid-claim 4596), so later disclosures may be missing.
Frequently asked
2026-10-02A. CoreWeave rents out GPU computing capacity for AI training and inference. It describes itself as an AI-specialized cloud. In mid-2025 it disclosed 420 MW of active power capacity (claim 4972) and 1.6 GW of contracted power (claim 4973). It also acquired the ML tooling company Weights & Biases (claim 4974) and made AI Object Storage generally available (claim 4975).
A. The strategy is to scale capacity fast using large amounts of debt. By May 2025 it reported $17.2B in total debt and equity raised (claim 4968). It has since issued $2B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claims 4697, 4658), and arranged a $2.6B delayed-draw term loan (claim 4592). In July 2025 it signed a merger agreement to acquire Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). That deal would bring power and sites in-house.
A. OpenAI is the only customer named in the record. The OpenAI contract is cited as $11.9B (claim 19820), and OpenAI's share of revenue backlog is cited as $11.2B (claim 4969). These two figures don't match and should be reconciled. Total committed backlog was $25.9B as of May 2025 (claim 4970), so roughly half of disclosed backlog comes from one customer. IBM appears as a partner for Granite model compute (claim 4971). A further 'material customer contract' entry (claim 4595) is truncated in the record and does not name a counterparty.
A. The IPO priced at $40/share on 2025-03-28 (claims 11616, 15974) and raised about $1.5B gross (claim 19821) and $1.4B net (claim 4967). Several note offerings were issued. The product items are company or third-party statements, not independently verified: SemiAnalysis ClusterMAX Platinum ratings (claims 18878, 18879, 4981), MLPerf results (claim 4980) and GB200 support (claim 4976). Every claim here is status 'stated', meaning it was extracted from disclosures and not separately confirmed. Backlog figures are contracted future revenue, not revenue earned.
A. It is unresolved in the record. The merger's outside closing date was 2026-04-07 (claim 4738), which has passed, and the record flags both the deadline and the merger itself as 'delayed' (claims 4731, 4738). The record shows no completion, amendment or termination. The agreement includes a $270M termination fee payable to CoreWeave (claim 4739). Whether the deal closed, was extended or collapsed is the single biggest factual gap.
A. A lot. The company pays coupons of 9–9.25% on its senior notes (claims 4824, 4697). Its revolving credit facility was expanded to $1.5B (claim 11923), plus $350M in letters of credit (claim 11924), with maturity extended to 2028-05-02 (claim 11925). However, that facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926), meaning it could come due much earlier if certain conditions are triggered. The term loan requires a minimum contract realization ratio of 0.85x (claim 4597), so borrowing depends on customer contracts actually turning into revenue.
A. Yes, heavily, shortly after the IPO lockup period. Disclosed sales include about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830) and $29.1M by the CFO (claim 19831), all between May and June 2025.
A. 1) Whether the Core Scientific merger closed, was extended or was terminated (claims 4731, 4738). 2) Whether the 2026-12-30 springing maturity on the revolver is triggered (claim 11926). 3) Whether the $2.6B term loan was fully drawn before its commitment period ended on 2026-07-31; the record flags this as delayed (claim 4593). 4) How much of the 1.6 GW contracted power (claim 4973) has become active capacity, compared with 420 MW (claim 4972). 5) Customer concentration, and whether any customer besides OpenAI is ever named.
Frequently asked
2026-10-02A. CoreWeave rents out large clusters of NVIDIA GPUs to companies that train and run AI models. Its disclosed products include GB200 support across its cloud platform (claim 4976), general availability of AI Object Storage (claim 4975), and on-demand cluster scaling (claim 4977). SemiAnalysis's ClusterMAX evaluations named it the only Platinum-rated provider in both the first edition and version 2.0 (claims 18878, 18879, 4981).
A. CoreWeave priced its Nasdaq IPO on 2025-03-28 at $40 per share (claims 15974, 11616), raising about $1.5B (claim 19821), or $1.4B net (claim 4967). The company relies much more on debt than on equity. It reports $17.2B in total debt and equity capital raised (claim 4968). That includes $2B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% senior notes due 2031 (claims 4697, 4658), a delayed-draw term loan of up to $2.6B (DDTL 3.0, claim 11922), and a revolving credit facility expanded to $1.5B (claim 11923). Those interest rates are high, which shows lenders are pricing in meaningful risk.
A. OpenAI is the main named customer, with an infrastructure contract of $11.9B (claim 19820). A separate disclosure puts OpenAI-related revenue backlog at $11.2B (claim 4969). The two figures likely measure different things, such as contract value versus remaining backlog, so they should not be added together. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). Beyond those, the record is thin. A 'material customer contract for GPU infrastructure' tied to the DDTL 3.0 loan is disclosed without a customer name (claim 4595). Most of the $25.9B total backlog (claim 4970) cannot be traced to named counterparties in this dossier. That leaves customer concentration as a real risk.
A. Delivered: the IPO, the debt raises listed above, several product launches (claims 4975–4979), and the Weights & Biases acquisition (claim 4974). On power, which is what data centers run on, the gap is large. CoreWeave reported 420 MW of active capacity (claim 4972) against 1.6 GW contracted (claim 4973), so roughly a quarter of contracted power was live as of the 2025-05-13 disclosure. Likewise, the $25.9B backlog (claim 4970) is committed future revenue, not revenue already earned.
A. CoreWeave announced an all-stock acquisition of Core Scientific on 2025-07-07, offering 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). The agreement set a closing deadline of 2026-04-07 (claim 4738). Our tracker marks both the merger and the deadline as 'delayed,' meaning the record shows no confirmed close by that date. A $270M termination fee would be payable to CoreWeave in certain circumstances (claim 4739). Whether the deal closed late, was extended, or was terminated is not resolved in this dossier and should be checked against primary filings.
A. Yes, in sizeable amounts soon after the IPO. The record shows about $29.1M of sales by the CFO (claim 19831), about $217M by the Chief Development Officer (claim 19832), and about $103.3M by the CEO (claim 19830), all disclosed between May and June 2025. Insider selling after an IPO lockup is common and does not by itself mean anything is wrong. Still, the scale is worth noting alongside the company's heavy borrowing.
A. Four things. (1) A contingent 'springing' maturity on the revolving credit facility dated 2026-12-30 (claim 11926). Under this kind of clause, the facility could come due early, before its extended 2028-05-02 maturity (claim 11925), if certain conditions are triggered. (2) Debt-covenant tests: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596). (3) How fast the 1.6 GW of contracted power (claim 4973) becomes active capacity. (4) The final outcome of the Core Scientific merger (claim 4738).
A. First, how concentrated revenue is in OpenAI, and who the unnamed customers behind the rest of the backlog are. Second, whether contracted power can be built out quickly enough to service roughly $17B of mostly high-interest capital (claim 4968). Third, what happened to the Core Scientific deal. A caution on data quality: several 'delayed' labels come from automated extraction and should not be treated as confirmed failures. These include the notes closing dates (claims 11919, 4699) and a 2026-02-01 interest payment (claim 4659). They may simply reflect that the promised date has passed without a confirming record. The claims list supplied here is also truncated partway through mid-2025 disclosures, so later events may be missing.
Frequently asked
2026-10-02A. CoreWeave rents out large-scale GPU computing capacity for AI workloads. It builds and runs data-center clusters and sells access to customers who train and run AI models. Its disclosed product claims include general availability of CoreWeave AI Object Storage (claim 4975), on-demand cluster scaling (4977), support for NVIDIA GB200 hardware across its platform (4976), and top 'Platinum' ratings in SemiAnalysis's ClusterMAX evaluations (18878, 18879, 4981). Those ratings come from a third party, but the record captures them as company statements.
A. The strategy is to grow fast on borrowed and raised capital. CoreWeave went public on Nasdaq in March 2025 at $40 per share (15974, 11601, 11616, 17815). The offering raised about $1.5B gross (19821) and about $1.4B net (4967). The company says it has raised $17.2B in total debt and equity (4968). On the expansion side, it agreed to acquire Weights & Biases, an AI developer-tools company (4974). In July 2025 it announced an all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (4731, 4729, 19824). The aim is to lock in power and data-center capacity rather than lease it.
A. OpenAI is the one large customer named in the record. It is described as an $11.9B infrastructure contract (19820) and, in a later filing, as $11.2B of revenue backlog (4969). These are different figures from different dates and may measure different things, so they should not be treated as interchangeable. IBM appears as a partner buying compute for its Granite models (4971), but no contract value is given. A July 2025 'material customer contract for GPU infrastructure' (4595) does not name the customer. Total backlog from committed contracts is stated as $25.9B (4970), and most of it is not attributed to any named counterparty in this record.
A. The financing events are the most concrete items. The IPO priced and listed (15974, 18881). The company also issued $2B of 9.25% senior notes due 2030 (11917, 4824) and $1.75B of 9% senior notes due 2031 (4658), and expanded its revolving credit facility to $1.5B (11923, 5010). On physical capacity, the company reports 420 MW of active power (4972) against 1.6 GW contracted (4973). That means roughly a quarter of contracted power was operating at the time of the claim. Contracted power and the $25.9B backlog (4970) are commitments, not delivered output. The Core Scientific merger had a deadline of 2026-04-07 (4738), and the record marks it 'delayed', with no completion on file.
A. The record shows several billion dollars of high-yield notes at 9% to 9.25% (4824, 4658). It also shows a delayed-draw term loan of up to $2.6B, called DDTL 3.0 (11922), maturing 2030-08-21 (4594). The DDTL 3.0 terms include two covenants. A minimum contract-realization ratio of 0.85x (4597) roughly means contracted revenue must keep backing the borrowing. A minimum debt-service coverage ratio of 1.40x applies from April 2027 (4596). The revolving credit facility nominally runs to 2028-05-02 (11925, 5012). However, it has a contingent 'springing' maturity of 2026-12-30 (11926), which could pull the due date forward if certain conditions are triggered.
A. The record lists sizable insider sales in mid-2025: about $217M by the Chief Development Officer (19832), about $103.3M by the CEO (19830), and about $29.1M by the CFO (19831). The record gives aggregate dollar amounts only. It does not say whether the sales were pre-planned (10b5-1) or what share of each person's holdings they represent.
A. There are four main watch items. (1) Whether the Core Scientific merger closed, was renegotiated, or was terminated after missing its 2026-04-07 deadline (4738, 4731). A $270M termination fee is payable to CoreWeave in some scenarios (4739). (2) Whether the 2026-12-30 springing maturity on the revolver (11926) is triggered. (3) Whether active power grows toward the 1.6 GW contracted (4973) and backlog (4970) turns into revenue. (4) Whether the company stays compliant with the DDTL 3.0 covenants, especially the 1.40x coverage test starting April 2027 (4596).
A. First, the record is thin after July 2025, even though today is October 2026. There are no later revenue, capacity, or customer updates, so the most recent 15 months are essentially undocumented here. Second, customer concentration: OpenAI accounts for a large share of the stated backlog (4969 vs. 4970), and the rest is mostly unnamed. Third, the outcome of the Core Scientific deal is unknown. Fourth, some items are flagged 'delayed' by automated extraction, such as note closing dates (11919, 4699) and a coupon date (4659). These flags have not been checked against filings and may be extraction artifacts rather than real slippage.
Frequently asked
2026-10-02A. CoreWeave rents out GPU computing capacity in its data centers, mainly to companies training and running large AI models. It also sells software on top of that hardware, such as AI Object Storage (claim 4975) and support for NVIDIA's GB200 systems (claim 4976). In May 2025 it disclosed the acquisition of Weights & Biases, a developer-tools company for machine learning (claim 4974). An outside benchmarker, SemiAnalysis, rated it the only 'Platinum' provider in its first two ClusterMAX evaluations (claims 18878, 18879, 4981).
A. The company is borrowing heavily to build GPU capacity ahead of contracted demand, and it tried to buy its own power and data-center supply. The record shows a $1.5B IPO at $40/share in March 2025 (claims 19821, 15974), with about $1.4B in net proceeds (claim 4967). Debt raised since then includes $2.0B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claim 4658), a $2.6B delayed-draw term loan, 'DDTL 3.0' (claims 11922, 4592), and a $1.5B revolving credit facility (claims 5010, 11923). The company cited $17.2B in total debt and equity raised (claim 4968). In July 2025 it announced an all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. Only two customers are named in the record. OpenAI has an infrastructure contract that the dossier records as $11.9B (claim 19820) and elsewhere as $11.2B of revenue backlog (claim 4969). IBM is named as a partner for compute capacity to train its Granite models (claim 4971); no dollar value is given. A separate 'material customer contract' for GPU infrastructure is disclosed without a customer name (claim 4595). Total committed backlog was stated as $25.9B in May 2025 (claim 4970), which implies a large share of that backlog sits with customers the record does not identify.
A. The financings are the most concrete items. The IPO priced and the stock listed on Nasdaq (claims 15974, 18881), and the 2030 and 2031 notes were issued (claims 11917, 4658). On capacity, the company reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973), so roughly a quarter of contracted power was operating at that point. The product launches and benchmark ratings are company statements. Every claim in this dossier carries the status 'stated', which means it was extracted from disclosures, not independently verified as completed.
A. The merger agreement and the S-4 registration filing are on record (claims 4729, 4733). Core Scientific would owe CoreWeave a $270M fee if the deal were terminated under certain conditions (claim 4739). The closing deadline was 2026-04-07 (claim 4738), and both the merger and its deadline are flagged 'delayed'. That deadline has now passed, and the dossier contains no claim recording either a completion or a termination. Readers should treat the deal's outcome as unresolved in this record and check primary filings.
A. 1) The revolving credit facility nominally matures on 2028-05-02 (claims 5012, 11925), but it has a contingent 'springing' maturity of 2026-12-30 (claim 11926). If the trigger conditions apply, that date is less than three months away. 2) Under the DDTL 3.0 loan, a minimum debt-service coverage ratio of 1.40x takes effect in April 2027 (claim 4596), and the company must maintain a minimum contract realization ratio of 0.85x (claim 4597). These covenants test whether customer contracts actually turn into cash. 3) Conversion of contracted power (1.6 GW) into active power (420 MW at last report). 4) Any filing that resolves the Core Scientific deal.
A. Yes. The record shows sales by the Chief Development Officer of $217M (claim 19832), the CEO of $103.3M (claim 19830), and the CFO of $29.1M (claim 19831), all in mid-2025, shortly after the IPO. The dossier does not say whether these sales were made under pre-arranged trading plans.
A. Customer concentration: OpenAI is the only named large customer, and the remaining backlog is mostly unattributed. Debt load and cost: the notes carry 9–9.25% interest. Data quality: the first interest payment on the 9% notes, due 2026-02-01, is flagged 'delayed' (claim 4659), and so are two note-closing dates (claims 11919, 4699). These flags come from automated extraction and are not confirmed missed payments, so they need checking against primary filings before anyone relies on them. Some amounts are recorded with inconsistent units, for example the $2.6B loan logged as '2600.0 USD' (claim 11922), and the two OpenAI contract figures differ. Finally, this FAQ covers only part of the claims on record, so later disclosures may change the picture.
Frequently asked
2026-10-01A. CoreWeave rents out GPU computing capacity, mainly NVIDIA hardware, built for training and running AI models. It sells this as a specialized cloud, with storage, cluster-scaling and billing tools on top (claims 4975, 4977, 4978). It added AI developer tooling by acquiring Weights & Biases (claim 4974). Third-party evaluator SemiAnalysis rated it the only 'Platinum' provider in two ClusterMAX rankings (claims 18878, 18879, 4981).
A. The strategy is to grow fast on borrowed money, backed by long-term customer contracts. CoreWeave reported 1.6 GW of contracted power capacity (claim 4973) and 420 MW of active power added (claim 4972). It reported $17.2B in total debt and equity raised (claim 4968). It also tried to buy Core Scientific, a data-center operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal would have brought power and sites in-house.
A. OpenAI is the main named customer. The record shows an infrastructure contract of $11.9B (claim 19820) and an OpenAI backlog figure of $11.2B (claim 4969); the two numbers differ and should be reconciled. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). Total committed backlog was reported at $25.9B (claim 4970). At least one 'material customer contract' backing a loan facility is not named (claim 4595). Readers should not assume all of that backlog is from identified customers.
A. Every claim on record is at 'stated' status: the company or its filings said it, but our tracker has not independently confirmed delivery. The financing events are the most concrete. The company went public on Nasdaq at $40 per share (claims 17815, 11601), raising $1.5B gross (claim 19821) and about $1.4B net (claim 4967). It issued $2B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claim 4658). Capacity figures and backlog are company-reported, and actual power delivery has not been verified.
A. The debt is large and expensive. Recent bonds pay 9% to 9.25% interest (claims 4824, 4659). Other borrowing includes a $2.6B delayed-draw term loan (claim 4592) and a revolving credit line expanded by $1.5B (claim 5010). The loans carry conditions the company must keep meeting. It must realize at least 0.85x of contracted revenue (claim 4597). From April 2027, cash flow must cover debt payments at least 1.40x over (claim 4596). The revolver also has a contingent maturity date of 2026-12-30, which can pull its due date forward from 2028 (claims 11926, 11925).
A. Yes, and in large amounts soon after the IPO. The record shows about $217M in sales by the Chief Development Officer (claim 19832), about $103.3M by the CEO (claim 19830), and about $29.1M by the CFO (claim 19831), all in mid-2025. Sales like these can be pre-planned and are not proof of wrongdoing. They are still a disclosure worth tracking against the company's growth story.
A. It is unresolved in our record. The merger was announced in July 2025 (claims 4729, 19824) with a closing deadline of 2026-04-07 (claim 4738). That date has passed, and the tracker flags the merger as 'delayed' (claims 4731, 4738). A $270M termination fee payable to CoreWeave is on file (claim 4739). This dossier does not record whether the deal closed, was renegotiated, or was terminated.
A. Watch the following: (1) Whether the revolver's 2026-12-30 springing maturity date is triggered (claim 11926). (2) Whether the company passes the 1.40x debt-coverage test starting April 2027 (claim 4596). (3) How much of the 1.6 GW contracted capacity actually comes online (claim 4973). (4) How concentrated revenue is in OpenAI, and which reconciled figure is correct (claims 19820, 4969). (5) Who the unnamed material customer is (claim 4595). (6) The final outcome of the Core Scientific merger. Note that the claims list supplied for this FAQ was cut off partway through, so later disclosures may not be reflected here.
Frequently asked
2026-10-01A. CoreWeave rents out GPU computing capacity, mainly to companies that train and run AI models. It builds and operates data centers full of NVIDIA hardware and sells access through its cloud platform. In May 2025 the company said it had added 420 MW of active power capacity (claim 4972) and held 1.6 GW of contracted power (claim 4973). It also added software around the hardware, including GB200 support, on-demand cluster scaling and AI object storage (claims 4976, 4977, 4975), and it acquired Weights & Biases, a developer-tools company (claim 4974).
A. The strategy is to grow capacity quickly using borrowed money that is backed by long-term customer contracts, and to buy its way into power and data-center sites. On the financing side, it listed on Nasdaq at $40 per share (claims 11601, 17815). It then raised a series of high-yield notes: $2.0B at 9.25% due 2030 (claims 11917, 4824) and $1.75B at 9% due 2031 (claim 4658). It also took a delayed-draw term loan of up to $2.6B (claim 11922) and expanded its revolving credit facility by $1.5B (claim 5010). By May 2025 it reported $17.2B in total debt and equity raised (claim 4968). On the expansion side, the main move was an agreed all-stock merger with Core Scientific at 0.1235 CoreWeave shares per share (claim 4731), which would bring Core Scientific's data-center power sites in-house.
A. OpenAI is the only customer named with a dollar figure. Its contract is recorded as $11.9B (claim 19820), and a separate record puts OpenAI-related backlog at $11.2B (claim 4969). IBM is named as a partner buying compute for its Granite models, but no amount is given (claim 4971). Total backlog was $25.9B as of May 2025 (claim 4970), which leaves roughly half of it attributed to customers who are not named. One filing refers to a 'material customer contract for GPU infrastructure' without naming the customer (claim 4595). Overall, the company depends heavily on a small number of very large buyers, and most of them are not identified in this record.
A. Financing events are the best documented. The IPO was a $1.5B raise (claim 19821) that produced about $1.4B in net proceeds (claim 4967). Two notes offerings were issued and both grew beyond their first announced size: the 2030 notes went from $1.5B to $2.0B (claims 11921, 11917), and the 2031 notes went from $1.5B to $1.75B (claims 4700, 4698, 4658). On the operating side, the evidence comes from the company's own statements or third parties rather than independent verification. These include the 420 MW of added capacity (claim 4972), MLPerf benchmark results (claim 4980), and being rated the only 'Platinum' provider in SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981). Every claim in this record has status 'stated' or 'delayed'. None is marked as independently confirmed delivered.
A. Yes, in large amounts shortly after the IPO. The recorded insider sales are about $217M by the Chief Development Officer (claim 19832), $103.3M by the CEO (claim 19830) and $29.1M by the CFO (claim 19831), all in mid-2025. Executives sell after IPOs for many reasons, and these sales are not evidence of wrongdoing. Still, the size of the sales is worth weighing against management's growth claims.
A. This dossier cannot fully answer that, and it is the biggest open item. The deal was signed in July 2025 (claims 4729, 19824) with an outside closing deadline of 2026-04-07. Both the merger and the deadline are now flagged 'delayed' (claims 4731, 4738). If the deal is terminated under certain conditions, a $270M termination fee is payable to CoreWeave (claim 4739). Readers should check whether the merger closed, was extended or was abandoned. The record does not show a completion.
A. Watch four things in the debt terms. First, a contingent 'springing' maturity on the credit facility falls on 2026-12-30 (claim 11926); it can pull the 2028 maturity forward (claims 11925, 5012). Second, a 1.40x debt service coverage ratio covenant starts in April 2027 (claim 4596). Third, a 0.85x minimum contract realization ratio applies (claim 4597), meaning contracted revenue has to actually turn into cash. Fourth, the DDTL 3.0 loan commitment was set to end on 2026-07-31 and is flagged 'delayed' (claim 4593). Beyond the debt terms, watch whether the 1.6 GW of contracted power becomes active capacity, and whether new customers are named so the company depends less on OpenAI.
A. (1) Concentration: one customer, OpenAI, accounts for roughly 43–46% of disclosed backlog (claims 19820, 4969, 4970). (2) Cost of capital: the company pays 9–9.25% on its notes (claims 4824, 4658), so its returns on GPU investments have to clear a high bar. (3) Several 'delayed' flags were set by automated extraction and need human review. For example, the 9% notes interest item tied to 2026-02-01 (claim 4659) and the notes closing dates (claims 11919, 4699) may simply reflect dates that have passed, not actual missed payments or failed closings. (4) Some amounts look like unit errors in the source data. The DDTL 3.0 figure is recorded as '2600.0 USD' but the description says $2.6 billion (claim 11922). (5) The claim list provided here was cut off partway through, so later events such as merger outcomes, newer financings and newer customers may be missing.
Frequently asked
2026-10-01A. CoreWeave rents out GPU computing capacity for AI work, mainly NVIDIA hardware. Customers use it to train and run AI models. Besides raw compute, it sells software such as AI Object Storage (claim 4975) and on-demand cluster scaling (claim 4977). It also announced the acquisition of Weights & Biases, which makes developer tools (claim 4974). It went public on Nasdaq in March 2025 at $40 per share (claims 11616, 18881), raising about $1.5B (claim 19821), or roughly $1.4B after costs (claim 4967).
A. The strategy is to grow very quickly, mostly with borrowed money, against long-term customer contracts. By May 2025 the company said it had raised $17.2B in total debt and equity (claim 4968). It reported $25.9B in contracted revenue backlog (claim 4970), 1.6 GW of contracted power capacity (claim 4973), and 420 MW of active power added (claim 4972). It also announced a stock-for-stock merger with Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal would give it owned power and facilities instead of leased ones.
A. Only a few customers are named on the record. OpenAI is the main one, with an infrastructure contract described as $11.9B (claim 19820) and an OpenAI-related backlog of $11.2B (claim 4969). The record doesn't explain why the two figures differ. IBM is named as a partner for compute capacity supporting its Granite models (claim 4971). The record has no breakdown of the rest of the $25.9B backlog (claim 4970) by customer, so it's unclear how much depends on OpenAI. The dossier as provided cuts off partway through a 'customer' claim (claim 4595), so there may be more customer information that isn't shown here.
A. Every claim on the record has the status 'stated.' That means the company said it; none has been independently confirmed as delivered. The IPO and Nasdaq listing are public events and reliable (claims 11616, 18881). The other items are the company's own descriptions: product launches (claims 4975-4979), benchmark results (claim 4980), and the 'Platinum' ratings from SemiAnalysis's ClusterMAX evaluations (claims 18878, 18879, 4981). The capacity figures (claims 4972, 4973) and backlog (claim 4970) are company-reported, and the record does not show how much of that capacity is actually running or earning revenue.
A. The company has borrowed a lot, at high interest rates. The record shows: - $2B of senior notes due 2030 at 9.25% (claims 11917, 4824) - $1.75B of 9% senior notes due 2031, enlarged by $250M from the original size (claims 4697, 4698) - A delayed-draw term loan of up to $2.6B (claim 11922) - A revolving credit facility expanded to $1.5B (claim 11923), plus $350M for letters of credit (claim 11924) The 2031 notes pay interest twice a year, beginning February 2026 (claim 4659). Interest rates around 9% are high for corporate debt and show how risky lenders consider these loans.
A. 1. Core Scientific merger: the closing deadline was 2026-04-07 (claim 4738), and the record marks it 'delayed' with no completion shown. Check whether the deal closed, was renegotiated, or fell through. If it fell through, check whether the $270M termination fee payable to CoreWeave applies (claim 4739). 2. Revolving credit facility: a contingent 'springing maturity' date of 2026-12-30 is coming up (claim 11926). If triggered, it would make the facility due earlier than its extended 2028-05-02 maturity (claim 11925). 3. Loan covenants: lenders require a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). In plain terms, cash flow must cover debt payments comfortably, and contracts must actually turn into revenue.
A. 1. Customer concentration: OpenAI accounts for roughly $11B of the $25.9B backlog (claims 4969, 4970). The record does not identify most of the remaining customers. 2. Turning backlog into cash: it is unclear whether the backlog will become revenue fast enough to service roughly 9% debt and meet the loan covenants. 3. Insider selling: executives sold a large amount of stock soon after the IPO. The CDO sold about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). 4. 'Delayed' flags: several financing dates are marked 'delayed' (claims 11919, 4699, 4593). These may simply mean the record lacks confirmation, not that anything actually slipped. They should be checked against filings.
Frequently asked
2026-10-01A. CoreWeave rents GPU computing capacity, mostly NVIDIA hardware, to companies that train and run AI models. It is a specialized cloud provider. Its disclosed product work includes support for NVIDIA GB200 systems across its platform (claim 4976), general availability of AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), and the acquisition of the AI developer-tools company Weights & Biases (claim 4974). Outside evaluators have rated it well: it was the only 'Platinum' provider in both the first and the second SemiAnalysis ClusterMAX rankings (claims 18878, 18879, 4981).
A. The strategy is to secure power and data-center capacity fast and pay for it mostly with debt, backed by long-term customer contracts. The company reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). It reported a $25.9B revenue backlog from committed contracts (claim 4970) and said it had raised $17.2B in total debt and equity (claim 4968). In July 2025 it agreed to buy Core Scientific, a data-center and former bitcoin-mining operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). The purpose was to own the facilities it had been leasing.
A. OpenAI is the main named customer. The record values that contract at $11.9B in one claim (claim 19820) and puts it at $11.2B of backlog in another (claim 4969). The record does not explain the difference. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). A separate 'material customer contract for GPU infrastructure' was disclosed in July 2025 without a customer name (claim 4595). Apart from OpenAI, the record does not show who accounts for the rest of the $25.9B backlog (claim 4970).
A. Several financing events are recorded as completed. The Nasdaq IPO priced at $40/share (claims 15974, 17815) and raised about $1.5B gross and $1.4B net (claims 19821, 4967). The company issued $2B of 9.25% senior notes due 2030 (claims 4824, 11917) and $1.75B of 9% senior notes due 2031 (claim 4658). It also expanded its revolving credit facility by $1.5B (claim 11923). Product releases and benchmark results are recorded as 'stated', meaning the company said it delivered them; they are not independently verified. Capacity is the biggest gap between announced and delivered: 1.6 GW is contracted (claim 4973), but only 420 MW of active power added is recorded (claim 4972).
A. The merger was announced on July 7, 2025 (claims 19824, 4729), with an outside closing deadline of April 7, 2026 (claim 4738). Both the merger claim and the deadline claim are now marked 'delayed' (claims 4731, 4738). The record does not say whether the deal was terminated, renegotiated, or is still pending. The agreement included a $270M termination fee payable to CoreWeave under certain conditions (claim 4739).
A. Debt is large and expensive. Besides the senior notes, which carry 9% to 9.25% interest, there is a delayed-draw term loan facility of up to $2.6B (DDTL 3.0) maturing in August 2030 (claims 4592, 4594). That facility requires a minimum debt-service coverage ratio of 1.40x starting April 2027 (claim 4596) and a minimum contract-realization ratio of 0.85x (claim 4597). The revolving credit facility was extended to May 2028 (claim 11925). It also has a contingent 'springing' maturity date of December 30, 2026 (claim 11926), which could pull repayment much earlier if its conditions are triggered.
A. Yes. After the IPO the record shows large insider sales: about $103.3M by the CEO (claim 19830), $29.1M by the CFO (claim 19831), and $217M by the Chief Development Officer (claim 19832). These were recorded around May–June 2025. Insider sales after an IPO are common, but readers should know their size.
A. 1) The springing maturity date of December 30, 2026 (claim 11926). 2) Whether contracted capacity of 1.6 GW (claim 4973) becomes powered, revenue-generating capacity. 3) Whether the company meets its DSCR test from April 2027 (claim 4596). 4) What happened to the Core Scientific merger after the April 2026 deadline (claims 4731, 4738). 5) How concentrated the backlog is: OpenAI alone is roughly $11–12B of the $25.9B (claims 19820, 4969, 4970), and other large customers are not named. Also check the 'delayed' flags on the notes-offering closings and on the first 9% notes interest payment due February 1, 2026 (claims 11919, 4699, 4659). These may be data-extraction artifacts and not actual missed events. They should be verified against filings before anyone draws conclusions. Finally, the claim list in this dossier appears to end in late July 2025, so later events may be missing.
Frequently asked
2026-10-01A. CoreWeave rents out GPU computing capacity in its own data centers to companies that train and run AI models. It sells this as a specialized cloud service. The record also shows software and storage products on top of the hardware, including GB200 support (claim 4976), AI Object Storage (claim 4975), and the acquisition of the developer-tools company Weights & Biases (claim 4974). Two third-party evaluations rated it the only 'Platinum' provider (claims 18878, 18879, 4981).
A. The strategy is to grow capacity fast, funded mostly by debt. CoreWeave went public on Nasdaq in March 2025 at $40 per share (claims 11616, 18881), raising about $1.5B (claim 19821), or $1.4B net (claim 4967). It then layered on borrowing: a revolving credit facility expanded to $1.5B (claim 5010), a $2.6B delayed-draw term loan (claim 4592), $2B of 9.25% notes due 2030 (claims 11917, 4824), and $1.75B of 9% notes due 2031 (claim 4697). It reported $17.2B in total debt and equity raised (claim 4968). It also announced an all-stock acquisition of Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731), which would bring that company's data-center sites under CoreWeave's ownership.
A. Only a few are named. OpenAI is the one named anchor customer. The record contains two different figures for that deal: an $11.9B contract (claim 19820) and $11.2B of backlog (claim 4969). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). A separate 'material customer contract' for GPU infrastructure (claim 4595) does not name the customer. Total backlog was $25.9B as of May 2025 (claim 4970), so a large share of committed revenue appears to come from one customer, and much of the remainder is not attributed to anyone.
A. Every claim in this dossier is still at 'stated' or 'delayed'; none has been independently verified as delivered. The financing events (IPO pricing, listing, note issuances) are the most concrete because they are reported in securities filings. On capacity, the gap is wide: 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973), so roughly a quarter of contracted power was live at the time. The backlog figures are commitments, not recognized revenue.
A. It was announced in July 2025 (claims 19824, 4729), with a closing deadline of 2026-04-07 (claim 4738). Both the merger and the deadline are now marked 'delayed' (claims 4731, 4738), and the record has no confirmation that the deal closed. A $270M termination fee payable to CoreWeave is on record (claim 4739). Readers should check current filings for the outcome rather than assume completion.
A. Four things. (1) The revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926), which would pull the facility's 2028-05-02 maturity (claims 11925, 5012) forward if certain conditions are not met. (2) Whether the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593), now marked delayed, was extended or allowed to lapse. (3) Compliance with the 0.85x minimum contract realization ratio (claim 4597), which ties borrowing to contracted revenue actually coming in. (4) Interest coverage, since the 9% notes required interest payments starting 2026-02-01 (claim 4659).
A. Senior executives sold substantial stock within months of listing. The CEO sold about $103.3M (claim 19830), the CFO about $29.1M (claim 19831), and the CDO about $217M (claim 19832). Insider selling after an IPO is common and is not proof of a problem, but the amounts are large relative to the $1.5B the IPO itself raised.
A. First, customer concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI, and who the unnamed material customer is (claim 4595). Second, the conversion rate: whether contracted power (1.6 GW, claim 4973) and backlog turn into running capacity and revenue fast enough to service roughly 9% debt. Third, the status of the Core Scientific deal. Fourth, unresolved data issues: conflicting OpenAI figures (claims 19820 vs. 4969), and several 'delayed' flags on dates that have already passed (claims 11919, 4699), where the record does not show whether the event slipped or simply was never confirmed. Note that the claim list supplied for this FAQ was cut off mid-record, so later claims may change these answers.
Frequently asked
2026-09-30A. CoreWeave rents out large clusters of NVIDIA GPUs to companies that train and run AI models. It sells the computing power, plus software for storage, cluster scaling, and billing/usage tracking (claims 4975, 4977, 4978). It also supports NVIDIA's newest GB200 systems (claim 4976). SemiAnalysis's ClusterMAX evaluations ranked it the only 'Platinum' provider in both the first round and version 2.0 (claims 18878, 18879, 4981).
A. The strategy is to grow capacity quickly, funded mostly with debt, and to control more of the stack. By May 2025 it reported $17.2B in total debt and equity raised (claim 4968). It announced two acquisitions. Weights & Biases adds developer software (claim 4974). Core Scientific, a data-center and power operator, was to be acquired for 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. OpenAI is the only customer named with a dollar figure. The record contains two different amounts for that deal: an $11.9B contract (claim 19820) and $11.2B of OpenAI-related backlog (claim 4969). Total contracted backlog was $25.9B as of May 2025 (claim 4970), so OpenAI accounts for a large share of it. IBM is named as a partner using CoreWeave capacity for its Granite models, but no dollar value is given (claim 4971). The remaining backlog is not attributed to named customers in this record.
A. Completed items: - Nasdaq IPO at $40 per share (claims 18881, 17815, 11616), about $1.5B gross and $1.4B net (claims 19821, 4967). - A 9.25% senior note due 2030, issued at $2.0B (claims 11917, 4824). An earlier $1.5B figure (claim 11921) appears to be the pre-upsize amount. - A 9% senior note due 2031, upsized to $1.75B (claims 4697, 4658). - A $2.6B delayed-draw term loan (claim 4592). Physical buildout is further behind. About 420 MW of power is active (claim 4972), against 1.6 GW contracted (claim 4973). The Core Scientific merger had an outside closing deadline of 2026-04-07. It is flagged 'delayed', and the record shows no completion (claims 4731, 4738).
A. 'Stated' means the company or a filing said it. Our automated extraction captured it, and it was then reviewed. It does not mean an independent party confirmed the outcome. Several items are marked 'delayed' because their target dates passed with no confirming follow-up in the record. These include the note closing dates and the Core Scientific deadline (claims 11919, 4699, 4731). 'Delayed' does not necessarily mean the event failed.
A. Yes. After the IPO, the record shows about $103.3M sold by the CEO (claim 19830), $217M by the Chief Development Officer (claim 19832), and $29.1M by the CFO (claim 19831). Insider sales after an IPO are common. The amounts here are large enough that readers usually watch them.
A. Key debt dates and tests: - A contingent 'springing' maturity on the revolving credit facility on 2026-12-30 (claim 11926). The revolver's normal maturity is 2028-05-02 (claims 5012, 11925). - A minimum debt-service coverage ratio of 1.40x, starting April 2027 (claim 4596). - The $2.6B term loan commitment deadline of 2026-07-31, which is flagged 'delayed' (claim 4593). On operations, watch how much of the 1.6 GW contracted power becomes active capacity (claims 4972, 4973). Also watch whether the Core Scientific deal closes or is terminated. If terminated, a $270M fee could be payable to CoreWeave (claim 4739).
A. 1. Concentration: much of the $25.9B backlog appears tied to a single customer, OpenAI (claims 4969, 4970). 2. Leverage: the company relies on high-coupon debt (9% to 9.25%) to fund growth (claims 4824, 4697), with coverage tests ahead (claim 4596). 3. Execution: only about a quarter of contracted power is live (claims 4972, 4973). 4. Core Scientific: the merger's outcome is unresolved in this record (claim 4731). 5. Data gaps: the OpenAI and note figures conflict across sources (claims 19820 vs 4969, 11921 vs 11917). The claims supplied for this FAQ end partway through the July 2025 filings, so later developments are not reflected.
Frequently asked
2026-09-30A. CoreWeave rents out GPU computing capacity for AI workloads. It runs data centers full of NVIDIA hardware and sells access to them as a cloud service. The record shows it adding GB200 support across its platform (claim 4976), launching AI Object Storage as generally available (claim 4975), and acquiring Weights & Biases, a developer tooling company (claim 4974). Independent reviewers rated it the only 'Platinum' provider in both SemiAnalysis ClusterMAX evaluations (claims 18878, 18879).
A. The strategy is to sign large multi-year compute contracts, borrow heavily to build the capacity those contracts require, and add more power and data-center sites. The clearest expression of this is the proposed all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). Separately, it has added software such as Weights & Biases so that it sells more than raw GPUs.
A. OpenAI is the only customer named with a dollar figure. The record contains an $11.9B infrastructure contract (claim 19820) and a separately stated $11.2B OpenAI backlog figure (claim 4969). The two numbers differ and the record does not reconcile them. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4371 is not on record; see claim 4971), but no value is given. Total committed backlog was $25.9B (claim 4970), so a large share of the backlog is not attributed to any named customer.
A. Delivered: the IPO at $40/share (claim 17815), raising about $1.5B gross and $1.4B net (claims 19821, 4967). Also delivered: several debt deals, including $2B of 9.25% notes due 2030 (claim 11917), $1.75B of 9% notes due 2031 (claim 4658), a $2.6B delayed-draw term loan (claim 4592), and a revolver expanded to $1.5B (claim 5010). On capacity, the company reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973), meaning most contracted power was not yet running. Backlog is contracted revenue that has not yet been earned. The Core Scientific merger is announced but not recorded as closed.
A. The merger agreement was announced in July 2025 (claims 4729, 19824). It set an outside closing date of 2026-04-07 (claim 4738) and a $270M termination fee payable to CoreWeave (claim 4739). That date has passed, and the dossier marks the deadline as 'delayed.' It contains no record of the deal closing or being terminated, so its outcome should be confirmed against current filings before anyone relies on it.
A. Heavily. The company reported $17.2B of total debt and equity raised (claim 4968). Its bonds carry 9–9.25% coupons (claims 4824, 4697), which are high-yield rates. The term loan requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The revolver has a springing maturity of 2026-12-30 (claim 11926); if certain conditions are triggered, the facility comes due early instead of at its stated 2028-05-02 maturity (claim 5012).
A. Watch these items: (1) whether the Core Scientific deal is formally closed or terminated; (2) whether the 2026-12-30 springing maturity is triggered (claim 11926); (3) how much of the 1.6 GW contracted power comes online (claim 4973); (4) conversion of the $25.9B backlog into reported revenue (claim 4970); and (5) the 1.40x coverage test beginning April 2027 (claim 4596). Several routine financing milestones are tagged 'delayed' in the record, including a notes closing (claim 11919) and a 2026-02-01 interest payment (claim 4659). These tags come from automated tracking and are not confirmed missed payments. They need verification against filings.
A. Customer concentration: OpenAI accounts for roughly $11–12B of a $25.9B backlog, and much of the rest is unnamed. Execution: 420 MW is active versus 1.6 GW contracted. Financing risk: large high-coupon debt and covenant tests. Insider selling after the IPO: the dossier records sales by the CDO ($217M, claim 19832), CEO ($103.3M, claim 19830), and CFO ($29.1M, claim 19831). One limitation of this FAQ: the claim record it draws on is cut off partway through a July 2025 entry (claim 4595). Anything after mid-2025 is therefore missing here and should not be read as absent from the company's actual history.
Frequently asked
2026-09-30A. CoreWeave rents out GPU computing capacity for AI workloads, a model often called an 'AI cloud.' Customers use its data-center capacity to train and run AI models. The record also shows it building a software layer on top of that hardware: it announced general availability of CoreWeave AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), and the acquisition of Weights & Biases, a tool for AI developers (claim 4974). An outside evaluator, SemiAnalysis, named it the only 'Platinum' provider in both editions of its ClusterMAX rating (claims 18878, 18879, 4981).
A. The strategy is to grow capacity quickly and pay for it mostly with debt, backed by long-term customer contracts. It reported 420 MW of active power capacity added (claim 4972) against 1.6 GW contracted (claim 4973), and $25.9B in revenue backlog (claim 4970). It says it raised $17.2B in total debt and equity (claim 4968). In July 2025 it agreed to acquire Core Scientific, a data-center and power operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). That deal would bring more power and facilities in-house.
A. OpenAI is the only customer named with a dollar figure. The record carries two different numbers for that deal: an $11.9B infrastructure contract (claim 19820) and $11.2B of OpenAI backlog (claim 4969). The cause of the gap, whether timing, definitions, or an extraction error, is not explained. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), with no dollar value disclosed. The customers behind the rest of the $25.9B backlog (claim 4970) are not named in this record, so readers cannot judge how concentrated the business is beyond OpenAI.
A. The financing events are the best documented. The IPO priced at $40 per share (claims 17815, 11616) and raised $1.5B (claim 19821), or about $1.4B net (claim 4967). A $2B issue of 9.25% senior notes due 2030 is recorded as issued (claims 11917, 4824). So is a $1.75B issue of 9% notes due 2031, which was upsized by $250M (claims 4697, 4698, 4658). Other completed financing includes a revolving credit facility expanded to $1.5B (claim 11923), a letters-of-credit facility of $350M (claim 11924), and a delayed-draw term loan of up to $2.6B (claim 4592). Some closing-date claims are flagged 'delayed,' but separate claims record those same note issues as completed, so the flag appears to be a data artifact, not a real delay. Product and capacity items are the company's own statements. None of them has been independently verified in this dossier.
A. Yes. The record shows large insider sales in the months after the IPO. The Chief Development Officer sold about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). The record does not say whether these sales were made under pre-arranged trading plans or what share of each person's holdings they represent.
A. Four dates stand out: 1. **April 7, 2026:** deadline to close the Core Scientific merger (claims 4731, 4738). It has passed, and the record is flagged 'delayed' with no outcome recorded. A $270M termination fee payable to CoreWeave is on file (claim 4739). 2. **December 30, 2026:** a contingent 'springing' maturity on the revolving credit facility (claim 11926). If triggered, it would move the facility's maturity forward from May 2, 2028 (claim 5012). 3. **July 31, 2026:** commitment end date for the $2.6B term loan (claim 4593). It has passed with no outcome recorded. 4. **April 2027:** a required minimum debt service coverage ratio of 1.40x begins (claim 4596).
A. 1. **Core Scientific:** did the merger close, get renegotiated, or get terminated? The record does not say. 2. **Capacity conversion:** how much of the 1.6 GW contracted (claim 4973) is actually running, beyond the 420 MW figure (claim 4972)? 3. **Customer concentration:** who accounts for the backlog besides OpenAI, and which OpenAI figure is correct (claims 19820 vs. 4969)? 4. **Debt burden:** can the company carry its 9%-plus debt and meet covenants as they take effect (claims 4824, 4697, 4596)? 5. **Data quality:** several amounts are recorded without consistent units (e.g., claim 11921 lists '1500.0 USD' for a $1.5B note issue). Also, claim 11921 shows that issue at $1.5B while claims 11917 and 11918 show $2B, consistent with an upsizing that the record does not explain.
A. It is incomplete. Every claim has status 'stated,' meaning it comes from company or filing language, or 'delayed.' None is marked independently verified or delivered. The claims shown mostly date from early to mid-2025, and the list supplied for this FAQ was cut off after claim 4597. Later events, including anything in 2026, may be missing. Treat this FAQ as a snapshot of disclosures, not a current status report.
Frequently asked
2026-09-29A. CoreWeave rents out GPU computing capacity built for AI workloads, a so-called 'AI cloud.' Customers pay to train and run models on NVIDIA hardware in CoreWeave's data centers. The company says it supports GB200 systems across its platform (claim 4976), launched AI Object Storage (claim 4975), and bought the AI developer-tools company Weights & Biases (claim 4974). Two SemiAnalysis ClusterMAX evaluations rated it the only 'Platinum' provider (claims 18878, 18879, 4981), which is a third-party ranking reported by the company.
A. The strategy is to scale fast using debt. Since its March 2025 IPO at $40/share, which raised about $1.5B gross and $1.4B net (claims 17815, 19821, 4967), CoreWeave has taken on several large borrowings: a $1.5B revolving credit facility plus $350M in letters of credit (claims 5010, 5011), a $2.6B delayed-draw term loan (claim 4592), 9.25% senior notes due 2030 (claims 4824, 11917), and $1.75B of 9% senior notes due 2031 (claim 4697). It reports $17.2B raised in total debt and equity (claim 4968). It is also trying to own its power and sites by merging with Core Scientific, a former bitcoin miner with data-center capacity, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. OpenAI is the only named revenue customer on the record. Its contract is reported at about $11.9B (claim 19820), and a later figure puts the OpenAI backlog at $11.2B (claim 4969). The two numbers disagree and neither has been reconciled. Total contracted backlog was $25.9B as of May 2025 (claim 4970), so OpenAI accounts for roughly 43% of it. The customers behind most of the remaining backlog are not named in this record. IBM appears as a partner buying capacity for its Granite models (claim 4971), but no dollar value is disclosed. Heavy reliance on a small number of customers is a central issue.
A. Completed events include the IPO and Nasdaq listing (claims 11601, 18881) and closed debt financings such as the 2030 and 2031 notes (claims 4824, 4658). On capacity, the company reports 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973). That means about three-quarters of its contracted power had not yet been energized. The $25.9B backlog is signed commitments, not revenue already earned. Every claim in this dossier has status 'stated,' meaning it was taken from company or filing language and has not been independently verified.
A. The merger was announced in July 2025 (claims 4729, 19824). It had an outside closing date of 2026-04-07 (claim 4738) and a $270M termination fee payable to CoreWeave (claim 4739). The tracker marks both the closing deadline and the merger itself as 'delayed' (claims 4738, 4731). Nothing in the record confirms whether the deal closed, was extended, or was terminated. That makes it one of the most important facts to check against a primary source.
A. Yes, in large amounts shortly after the IPO. The record shows about $103.3M sold by the CEO (claim 19830), $217M by the Chief Development Officer (claim 19832), and $29.1M by the CFO (claim 19831), all during May–June 2025. Insider sales can have routine explanations, such as lockup expiry or tax planning, but the scale is worth noting next to the company's growing debt load.
A. Four things. (1) The revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926). If certain conditions are triggered, the facility comes due years before its stated 2028-05-02 maturity (claim 12925/5012). (2) Starting April 2027, the delayed-draw loan requires a minimum debt-service coverage ratio of 1.40x (claim 4596), which tests whether cash flow can support the debt. (3) Watch the pace at which contracted power (1.6 GW) becomes active capacity (420 MW). (4) Watch the outcome of the Core Scientific deal. The tracker also flags the delayed-draw loan's commitment end date of 2026-07-31 (claim 4593) and the first 9% note interest payment of 2026-02-01 (claim 4659) as 'delayed.' Those flags come from automated extraction and should be confirmed against filings before being treated as missed obligations.
A. (1) Customer concentration: who holds the roughly $14B of backlog that is not OpenAI, and on what terms? (2) Debt versus growth: dozens of billions in high-yield debt at 9–9.25% depend on backlog turning into cash on schedule. (3) Core Scientific: the deal's status is unresolved in the record. (4) Data quality: several figures conflict or duplicate. For example, the 2030 notes are recorded as both $1.5B and $2.0B (claims 11921, 11918), and some amounts lack their 'million' unit. This record was also cut off partway through (after claim 4595), so later disclosures may be missing.
Frequently asked
2026-09-29A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity, mainly NVIDIA hardware, to companies that train and run AI models. It offers a cloud software stack on top of that hardware. Disclosed features include GB200 support (claim 4976), AI Object Storage, which the company says is generally available (claim 4975), and On-Demand Cluster Scaling (claim 4977). It also announced the acquisition of Weights & Biases, an AI developer-tools company (claim 4974). The independent SemiAnalysis ClusterMAX evaluations rated CoreWeave the only 'Platinum' provider in both the first and second rounds (claims 18878, 18879, 4981).
A. The strategy is to grow capacity very quickly and pay for it mostly with debt. After its IPO, the company raised a series of high-interest bonds and loans: $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% senior notes due 2031 (claim 4658), a $1.5B revolving credit facility (claim 11923) and a delayed-draw term loan of up to $2.6B (claim 4592). By May 2025 it said it had raised $17.2B in total debt and equity (claim 4968). It also tried to buy its own power and data-center supply by announcing an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. OpenAI is the only customer named in the record. It is tied to an $11.9B infrastructure contract (claim 19820). A separate figure puts the OpenAI deal's share of backlog at $11.2B (claim 4969), and the gap between the two numbers is not explained. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but no dollar value is disclosed. The company reports $25.9B in total contracted backlog (claim 4970), and most of it beyond OpenAI is not attributed to any named customer. That makes it hard to judge how dependent the company is on a few buyers.
A. The financing events are the most concrete. The IPO priced at $40 per share on 2025-03-28 (claims 17815, 11616), raising about $1.5B gross and $1.4B net (claims 19821, 4967). The 2030 and 2031 notes were reported as issued (claims 11917, 4658). On operations, the company says it added 420 MW of active power capacity (claim 4972) against 1.6 GW contracted (claim 4973). Most of the contracted power therefore had not yet been brought online as of that disclosure. Every claim in this dossier was produced by automated extraction and carries status 'stated', meaning the company said it, not that we have independently verified it.
A. The merger was announced in July 2025 (claims 4729, 19824). The agreement set a closing deadline of 2026-04-07 (claim 4738) and a $270M termination fee payable to CoreWeave (claim 4739). The record marks both the deal and its deadline as 'delayed' (claims 4731, 4738). That deadline has now passed, and nothing on file shows the merger closing. Readers should treat the deal as not completed unless a later filing shows otherwise.
A. Yes, in large amounts soon after the IPO. Recorded sales are about $29.1M by the CFO (claim 19831), $103.3M by the CEO (claim 19830) and $217M by the Chief Development Officer (claim 19832), all in May and June 2025. Insider sales can have routine explanations, such as tax or diversification plans. Still, amounts this large this early are worth weighing against management's growth messaging.
A. Three debt-related dates stand out. First, the revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926). If it is triggered, the facility would come due well before its extended 2028-05-02 maturity (claim 11925). Second, a minimum debt service coverage ratio of 1.40x applies starting April 2027 (claim 4596). This covenant tests whether cash flow covers debt payments. Third, the record flags two items as 'delayed': the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) and a 9% notes interest payment date of 2026-02-01 (claim 4659). These labels come from automated extraction and may be tagging errors rather than real defaults, so check them against filings. Beyond the debt, watch how much of the 1.6 GW of contracted power actually comes online (claim 4973).
A. 1) Customer concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI, and who the other customers are. 2) Debt load: whether revenue can keep up with interest on roughly $3.75B of 9 to 9.25% notes alone, before the covenant test in 2027. 3) Execution: whether announced capacity turns into live capacity on schedule. 4) Core Scientific: whether the merger closed, was restructured or was abandoned, and whether the $270M fee was ever paid. 5) Data quality: the claims supplied for this summary stop partway through the record (after claim 4597), so later disclosures may change these answers.
Frequently asked
2026-09-29A. CoreWeave rents out large clusters of GPU computing power, mostly NVIDIA hardware, to companies that train and run AI models. The record shows it adding GB200 support (claim 4976), general availability of an AI object storage product (claim 4975), and on-demand cluster scaling (claim 4977). Third-party evaluator SemiAnalysis named it the only Platinum-rated provider in its first two ClusterMAX rankings (claims 18878, 18879, 4981). CoreWeave also announced the acquisition of Weights & Biases, an AI developer-tools company (claim 4974), which moves it beyond raw compute into software.
A. The strategy is to scale fast by borrowing heavily to build capacity, and to lock in power and data-center supply. After its March 2025 Nasdaq IPO at $40 per share (claims 11616, 15974), which raised about $1.5B gross and $1.4B net (claims 19821, 4967), the company reported $17.2B in total debt and equity raised (claim 4968). It then added more debt: a revolving credit facility expanded to $1.5B (claim 11923), $2B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% senior notes due 2031 (claim 4697), and a delayed-draw term loan of up to $2.6B (claim 4592). In July 2025 it agreed to buy Core Scientific, a data-center and power operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). The aim was to own more of its power and site footprint rather than lease it.
A. OpenAI is the only customer named with a dollar figure: an $11.9B infrastructure contract announced in March 2025 (claim 19820), later shown as $11.2B of revenue backlog (claim 4969). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but the record gives no contract value. Total committed-contract backlog was $25.9B as of May 2025 (claim 4970). That means OpenAI alone accounts for roughly 43% of disclosed backlog, and the remaining customers are not identified in this record.
A. Completed events include the IPO (claims 11616, 18881), the credit facility expansions (claims 11923, 5011), the senior note issuances (claims 11917, 4658), and the third-party Platinum ratings. On physical capacity, the company reported 420 MW of active power added (claim 4972) against 1.6 GW contracted (claim 4973). In other words, most contracted power had not yet come online. Backlog figures (claims 4970, 4969) are contracted future revenue, not revenue already earned. The Core Scientific merger had a closing deadline of 2026-04-07, and the record marks it 'delayed' with no evidence that it closed (claims 4731, 4738). A $270M termination fee payable to CoreWeave was part of the agreement (claim 4739).
A. Senior executives sold substantial stock in the months after listing. The record shows about $103.3M of sales by the CEO (claim 19830), about $217M by the Chief Development Officer (claim 19832), and about $29.1M by the CFO (claim 19831). Insider selling after a lockup is not unusual on its own, but the size is worth noting alongside the company's heavy reliance on debt.
A. Four things stand out. First, debt deadlines: the revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926), and its main maturity is 2028-05-02 (claim 11925). Second, the $2.6B term-loan commitment had a termination date of 2026-07-31 (claim 4593), and a minimum debt-service coverage ratio of 1.40x applies from April 2027 (claim 4596). Third, whether the 1.6 GW of contracted power (claim 4973) turns into active, revenue-producing capacity. Fourth, the final outcome of the Core Scientific deal (claims 4731, 4738).
A. Customer concentration: how dependent is revenue on OpenAI, and who makes up the rest of the $25.9B backlog (claims 4969, 4970)? Leverage: can cash flow from new capacity cover interest at roughly 9% or more (claims 4824, 4697) and meet future covenant tests (claim 4596)? Execution: how quickly can contracted power be energized? The Core Scientific deal: what happened to it, and what is the replacement plan for owned power if it did not close? None of these are resolved in the claims on file.
A. Read it with caution. Nearly all claims are automated extractions marked 'stated,' meaning the company said it, not that it was independently verified. Several items are duplicated with inconsistent figures: the 2030 notes appear as $1.5B (claim 11921) and $2B (claims 11918, 11917), consistent with an upsized offering. Some 'delayed' flags look like automation artifacts rather than real slippage, such as past note-closing dates (claims 11919, 4699) and interest payment dates (claim 4659). The claim list supplied for this FAQ was cut off at claim 4597, around July 2025, so later developments are not reflected here.
Frequently asked
2026-09-29A. CoreWeave rents out GPU computing capacity, a specialized cloud built for training and running AI models. On top of the hardware it sells software: AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), and support for NVIDIA's GB200 chips (claim 4976). It bought Weights & Biases, a developer-tools company for machine learning (claim 4974). The independent analyst SemiAnalysis rated it the only 'Platinum' provider in both of its ClusterMAX GPU-cloud rankings (claims 18878, 18879, 4981).
A. The strategy is to sign large, long-term compute contracts and fund the buildout mostly with debt. The company reports $25.9B of revenue backlog from committed contracts (claim 4970) and $17.2B raised in total debt and equity (claim 4968). It also announced a stock-for-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal would bring more data-center power and sites under its own control rather than leasing them.
A. OpenAI is the only customer named with a dollar figure. The record shows an $11.9B infrastructure contract (claim 19820), elsewhere described as an $11.2B backlog contribution (claim 4969). That makes OpenAI roughly 43-46% of the $25.9B total backlog (claim 4970), a significant concentration. IBM is named as a partner using CoreWeave capacity for its Granite AI models, with no dollar value disclosed (claim 4971). The record does not name the customers behind the rest of the backlog.
A. Completed: the March 2025 Nasdaq IPO at $40 per share (claims 17815, 11616), raising $1.5B gross and $1.4B net (claims 19821, 4967). Also completed: two bond issues, $2B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claims 4697, 4658). The company reports 420 MW of active compute power (claim 4972). Announced but not shown as delivered: most of the 1.6 GW of contracted power (claim 4973) and the Core Scientific merger. Some bond items are marked 'delayed' (claims 11919, 4699), but separate claims show those notes were issued. The 'delayed' label appears to be an artifact of automated tracking rather than a real slip.
A. The debt load is large and expensive. Beyond the 9-9.25% bonds, the record shows a $2.6B delayed-draw term loan facility called DDTL 3.0 (claim 4592) and a revolving credit line expanded to $1.5B (claim 11923). The term loan carries covenants, meaning conditions the company must meet. Contracted revenue must stay at a minimum 0.85x ratio (claim 4597). A minimum 1.40x debt-service coverage ratio applies starting April 2027 (claim 4596). The revolver has a contingent 'springing' maturity date of 2026-12-30 (claim 11926); it can pull the loan's due date forward if certain conditions are triggered.
A. The record does not show the deal closing. It was announced in July 2025 (claims 4729, 19824), with a closing deadline of 2026-04-07 (claim 4738). The record marks that deadline as 'delayed' and contains no completion claim. The merger terms include a $270M termination fee payable to CoreWeave (claim 4739). Readers should confirm the deal's current status from primary filings.
A. Four things. First, whether the 2026-12-30 springing maturity on the revolver is triggered (claim 11926). Second, the DDTL 3.0 commitment termination date of 2026-07-31, now marked delayed (claim 4593), which affects how much of the $2.6B was actually drawn. Third, the 1.40x debt-service coverage test starting April 2027 (claim 4596). Fourth, how quickly contracted capacity turns into active capacity: 420 MW active versus 1.6 GW contracted (claims 4972, 4973).
A. 1) Customer concentration: how dependent the business remains on OpenAI, and who holds the unnamed ~55% of backlog. 2) Whether revenue can service 9%+ debt as the covenant tests begin. 3) The outcome of the Core Scientific deal. 4) Insider selling soon after the IPO: about $217M by the CDO (claim 19832), $103.3M by the CEO (claim 19830), and $29.1M by the CFO (claim 19831). 5) Coverage of this dossier itself: the claim list supplied here was cut off partway through (after claim 4594), so later developments may not be reflected.
Frequently asked
2026-09-29A. CoreWeave rents out large clusters of NVIDIA GPUs to companies that train and run AI models. The record shows it offering the newest GB200 hardware across its platform (claim 4976) and launching supporting services like AI Object Storage (claim 4975). It also agreed to acquire Weights & Biases, a tool developers use to track model training (claim 4974). Independent reviewers have rated it highly: it was the only 'Platinum' provider in SemiAnalysis's first two ClusterMAX evaluations (claims 18878, 18879).
A. CoreWeave listed on Nasdaq in March 2025 at $40 per share (claims 17815, 11616), raising about $1.5B gross (claim 19821) and $1.4B net (claim 4967). Its main funding source is debt rather than the IPO. By May 2025 it reported $17.2B in total debt and equity raised (claim 4968). It then added $2B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claims 4697, 4658), a $2.6B delayed-draw term loan (claim 4592), and a revolving credit line expanded to $1.5B (claim 5010). Interest rates of 9% or more show that lenders treat this as risky credit.
A. The strategy is to secure power and data-center capacity quickly and fill it with long-term GPU contracts. The company reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973). It announced an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731), which would give it data-center sites it currently leases. The Core Scientific agreement includes a $270M termination fee payable to CoreWeave (claim 4739). It is also adding software through the Weights & Biases deal (claim 4974).
A. OpenAI is the only major customer named in the record. The figures differ between sources: an $11.9B infrastructure contract in one (claim 19820) and $11.2B of backlog in another (claim 4969). IBM is named as a partner for Granite model compute (claim 4971). A July 2025 filing references a 'material customer contract' for GPU infrastructure without naming the customer (claim 4595). Total backlog was $25.9B as of May 2025 (claim 4970), so OpenAI accounts for a large share and customer concentration is a key risk.
A. Completed items include the IPO (claims 18881, 19821), the note issuances and credit facilities listed above, and product launches such as AI Object Storage becoming generally available (claim 4975). Backlog (claim 4970) and contracted power (claim 4973) are commitments, not revenue earned or capacity running. The Core Scientific merger had a closing deadline of 2026-04-07 (claims 4731, 4738), and our tracking now marks it 'delayed', so it should not be treated as completed. Nearly every other claim is at 'stated' status, meaning it was disclosed but not independently confirmed as fulfilled.
A. Yes, heavily, in the months after the IPO. The records show about $217M in sales by the Chief Development Officer (claim 19832), about $103.3M by the CEO (claim 19830), and about $29.1M by the CFO (claim 19831). This does not prove anything is wrong, since executives often sell after an IPO lockup ends. But at this scale, readers will want to follow it.
A. 1) Whether the Core Scientific merger is completed, renegotiated, or abandoned (claims 4731, 4738, 4739). 2) The revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926), which could bring the stated 2028-05-02 maturity forward (claim 5012). 3) Loan covenants: a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). Missing either could restrict borrowing. 4) How much of the 1.6 GW contracted power actually comes online (claims 4972, 4973).
A. Four stand out: - **Customer concentration.** How dependent is the $25.9B backlog on OpenAI (claims 4970, 4969), and who is the unnamed material customer (claim 4595)? - **Debt costs.** Can contract cash flows cover interest of 9% or more across many billions in debt (claims 4968, 4824, 4697)? - **Core Scientific.** What happened to the merger after its April 2026 deadline passed (claim 4738)? - **Gaps in this dossier.** The claims supplied here mostly end in mid-2025, with none covering later revenue, capacity delivered, or covenant compliance. Readers should get more recent filings before drawing conclusions.
Frequently asked
2026-09-27A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI training and inference. It builds and operates data-center clusters, including NVIDIA GB200 systems (claim 4976), and sells access through its own cloud software stack. That stack includes AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977) and, through its acquisition of Weights & Biases (claim 4974), developer tooling for machine-learning teams. Third-party benchmarkers have rated it highly: SemiAnalysis named it the only 'Platinum' provider in both its first ClusterMAX evaluation (claim 18878) and ClusterMAX 2.0 (claim 18879).
A. The strategy is to grow capacity fast using large amounts of borrowed money, and to vertically integrate. CoreWeave reported 420 MW of active power capacity (claim 4972) against 1.6 GW contracted (claim 4973), which means most of its footprint was still to be built. By mid-2025 it said it had raised $17.2 billion in combined debt and equity (claim 4968). In July 2025 it agreed to buy Core Scientific, a data-center and power operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). That deal was meant to bring power and sites in-house rather than leasing them.
A. Only one customer is named with a dollar figure: OpenAI. Its contract is recorded as $11.9 billion (claim 19820) and elsewhere as $11.2 billion of backlog (claim 4969); the gap is unexplained in the record. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), but no value is given. Total committed backlog was $25.9 billion as of May 2025 (claim 4970), so roughly $14 billion or more of backlog sits with customers the record does not name. That makes customer concentration a key diligence question.
A. These items are completed: - The March 2025 IPO priced at $40 per share (claims 17815, 11616), with about $1.4 billion in net proceeds (claim 4967). - The revolving credit facility was expanded by $1.5 billion (claim 5010) and its maturity extended to May 2028 (claim 5012). - Senior notes were issued in May 2025 at 9.25%, due 2030, sized at $2.0 billion after an increase from $1.5 billion (claims 11917, 11921, 4824). - More senior notes were issued in July 2025 at 9%, due 2031, sized at $1.75 billion after a $250 million increase (claims 4697, 4698). - A delayed-draw term loan of up to $2.6 billion (DDTL 3.0) is recorded (claim 4592). The product launches are also recorded as available. The main item that is not delivered is the Core Scientific merger. Its outside date of 2026-04-07 has passed and the record marks it 'delayed' with no completion recorded (claims 4731, 4738).
A. The company is heavily leveraged, and its recent borrowing is expensive, at 9% to 9.25% coupons (claims 4824, 4697). The DDTL 3.0 facility carries two lender tests: - A minimum contract realization ratio of 0.85x (claim 4597). This roughly means contracted customer revenue must keep covering the debt. - A minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The revolving credit facility also has a contingent 'springing' maturity of 2026-12-30 (claim 11926). If that is triggered, the facility would come due well before its stated May 2028 date.
A. Yes, in large amounts, shortly after the IPO. The record shows: - The Chief Development Officer sold about $217 million (claim 19832). - The CEO sold about $103.3 million (claim 19830). - The CFO sold about $29.1 million (claim 19831). All of these sales took place in the May–June 2025 window. Selling after a lock-up period is common, but these amounts are large relative to the company's public float at the time.
A. Four things: 1. What happened to the Core Scientific merger after its missed April 2026 outside date. The agreement includes a $270 million termination fee payable to CoreWeave in some circumstances (claim 4739). 2. Whether the revolving facility's 2026-12-30 springing maturity is triggered (claim 11926). 3. Whether the 1.40x debt service coverage test is met once it begins in April 2027 (claim 4596). 4. Whether the company converts contracted power into active capacity. The benchmark is the gap between 1.6 GW contracted and 420 MW active (claims 4973, 4972).
A. There are four: 1. Who holds the unnamed majority of the $25.9 billion backlog (claim 4970), and how dependent is the company on OpenAI? 2. Why does the OpenAI figure appear as both $11.9 billion and $11.2 billion (claims 19820, 4969)? 3. Can cash flow from customer contracts service more than $3.75 billion of 9%+ senior notes plus its term loans? The notes figure comes from claims 11917 and 4697. 4. What is the final status of the Core Scientific deal? Also note that this dossier's record runs only through late July 2025. Several items are marked 'delayed', including the first 9% note interest payment due 2026-02-01 (claim 4659). That label reflects a lack of confirmation in the record, not a confirmed default or failure.
Frequently asked
2026-09-27A. CoreWeave rents out GPU computing capacity for training and running AI models. It builds and operates data centers full of NVIDIA hardware, including GB200 systems (claim 4976), and sells access with software such as AI Object Storage (claim 4975). Third-party rankings back its standing: it was the only Platinum-rated provider in both SemiAnalysis ClusterMAX evaluations (claims 18878, 18879, 4981), and it reported an MLPerf Inference v5.0 result (claim 4980).
A. CoreWeave listed on Nasdaq in March 2025 at $40 per share (claims 17815, 11601, 18881). The IPO raised about $1.5B (claim 19821), or $1.4B net (claim 4967). Borrowing has funded far more of the business than equity. By May 2025 the company said it had raised $17.2B in total debt and equity (claim 4968). Since then it has added a $2B issue of 9.25% notes due 2030 (claims 4824, 11917), a $1.75B issue of 9% notes due 2031 (claims 4697, 4658), a $2.6B delayed-draw term loan (claim 4592), and a revolving credit line expanded to $1.5B (claim 5010). Interest rates of about 9% show how much lenders charge to finance this build-out.
A. The strategy is to scale physical capacity quickly and buy adjacent capabilities. The company reported 420 MW of active power capacity against 1.6 GW contracted (claims 4972, 4973), so most of its contracted power was not yet running. It acquired Weights & Biases, an AI developer-tools company (claim 4974). It also agreed to buy Core Scientific, a data-center operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729). That deal would give CoreWeave ownership of data-center sites it would otherwise lease.
A. OpenAI is the one major named customer. The record gives two figures for the OpenAI contract: $11.9B (claim 19820) and $11.2B of revenue backlog (claim 4969). Total committed backlog was $25.9B (claim 4970), so OpenAI alone accounted for roughly 43% of it. IBM is named as a partner for Granite model compute (claim 4971). The $2.6B loan is backed by a 'material customer contract' whose customer is not named in the record (claim 4595). The record does not identify most other customers.
A. Completed: the IPO and Nasdaq listing, the note issues and credit-facility expansions, AI Object Storage reaching general availability, GB200 support, and the Weights & Biases acquisition. Announced but unresolved: the Core Scientific merger had a closing deadline of 2026-04-07, and the tracker now marks it 'delayed' (claims 4738, 4731). The record contains no confirmation that the deal closed or was terminated. The 1.6 GW of contracted power is a commitment, not built capacity. Also note that every claim here has the status 'stated', meaning the company disclosed it. None has been independently confirmed as delivered.
A. Executives sold large amounts of stock in the months after the IPO. The Chief Development Officer sold about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). Sales like these are common after lock-up periods expire. Readers will still want to compare them with management's public statements about growth (claims 19822, 19823).
A. 1) Whether the Core Scientific merger closes or is terminated. The agreement includes a $270M termination fee payable to CoreWeave (claim 4739). 2) The revolving credit facility's contingent 'springing' maturity date of 2026-12-30 (claim 11926); the stated maturity is 2028-05-02 (claim 5012). 3) Loan covenants: a minimum contract-realization ratio of 0.85x (claim 4597) and a minimum debt-service coverage ratio of 1.40x starting April 2027 (claim 4596). 4) Confirmation of interest payments on the 9% notes. The first payment, due 2026-02-01, is flagged 'delayed' in the tracker (claim 4659).
A. First, customer concentration: how dependent is the backlog on OpenAI, and who is the unnamed customer behind the $2.6B loan? Second, can CoreWeave convert its contracted power and backlog into revenue fast enough to service roughly 9% debt and meet its covenants? Third, what happened to the Core Scientific deal after its April 2026 deadline? Finally, a data-quality caveat: several 'delayed' flags on note closings (claims 11919, 4699) may reflect missing follow-up records rather than real slippage. Separate claims show the 2030 and 2031 notes were issued. Some dollar units in the record are also inconsistent, and the dossier excerpt ends in late July 2025, so later disclosures may not be included.
Frequently asked
2026-09-27A. CoreWeave (Nasdaq: CRWV) rents GPU-based cloud computing for AI workloads. It builds and operates data-center capacity and sells access through its own cloud platform. On the product side, the record shows general availability of CoreWeave AI Object Storage (claim 4975), support for NVIDIA's GB200 systems across its platform (claim 4976), and Platinum ratings in SemiAnalysis's ClusterMAX evaluations, where it was the only provider to earn that rating in both the first round and ClusterMAX 2.0 (claims 18878, 18879, 4981).
A. The strategy is to grow capacity quickly and pay for it mostly with debt. CoreWeave reported 1.6 GW of contracted power and 420 MW of active compute power added (claims 4973, 4972). It said it had raised $17.2B in total debt and equity (claim 4968). It is also buying companies further up the software stack (Weights & Biases, claim 4974) and down into data-center supply (a proposed all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share, claim 4731).
A. OpenAI is the only customer named with dollar figures. The record carries a $11.9B OpenAI infrastructure contract (claim 19820) and a separate figure of $11.2B in OpenAI-related revenue backlog (claim 4969). These may measure different things, such as total contract value versus remaining backlog, but the record does not reconcile them. IBM is named as a partner for compute used to train its Granite models (claim 4971), with no contract value on record. Total committed backlog was reported at $25.9B (claim 4970), and most of it is not attributed to any named customer. A later filing refers to a 'material customer contract for GPU infrastructure' (claim 4595), but the record we have is cut off before any counterparty is identified.
A. The financing events have the strongest documentation. The IPO priced at $40 per share (claims 17815, 15974, 11601, 11616), raised $1.5B in gross proceeds and about $1.4B net (claims 19821, 4967), and the Nasdaq listing was completed (claim 18881). The company issued $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824), upsized from a planned $1.5B (claim 11921). It also issued $1.75B of 9% senior notes due 2031 (claim 4658), expanded its revolving credit facility by $1.5B and its letters of credit by $350M (claims 11923, 11924), and set up a $2.6B delayed-draw term loan (claim 4592). Operational items such as capacity figures, product launches, and backlog come from company statements. Every claim in this dossier is currently at status 'stated', which means none has been independently marked as verified or delivered.
A. The merger was announced on 2025-07-07 (claims 4729, 19824). The agreement set a closing deadline of 2026-04-07 (claim 4738) and a $270M termination fee payable to CoreWeave in certain circumstances (claim 4739). The deadline has passed, and our system has flagged the deal as 'delayed' (claims 4731, 4738). The record does not show a completed closing or a formal termination. Readers should confirm the deal's current status from primary filings before relying on it.
A. Yes, and the amounts are large. The record shows about $217M in sales by the Chief Development Officer (claim 19832), about $103.3M by the CEO (claim 19830), and about $29.1M by the CFO (claim 19831), all in the months after the IPO. The record does not say whether these sales were made under pre-arranged trading plans.
A. The main dates and tests are: (1) the contingent 'springing' maturity on the revolving credit facility, dated 2026-12-30 (claim 11926), which could pull the facility's maturity forward from 2028-05-02 (claim 11925) if its conditions are triggered; (2) a minimum debt-service coverage ratio of 1.40x on the delayed-draw term loan starting April 2027 (claim 4596), plus a 0.85x minimum contract-realization ratio (claim 4597); (3) a final outcome on the Core Scientific merger; and (4) whether the $25.9B backlog (claim 4970) turns into recognized revenue on schedule.
A. The first is customer concentration. OpenAI is the only customer named with dollar figures, and much of the backlog is anonymous. The second is leverage. Coupons of 9% to 9.25% on more than $3.75B of notes, plus term loans subject to covenants, make the business sensitive to how quickly contracts turn into cash. The third is the Core Scientific deal, whose status is unresolved in the record. The fourth is data quality in this dossier. Several 'delayed' flags on note closings and interest payments (claims 11919, 4699, 4659) may only mean that no follow-up document confirming the event has been ingested yet, not that anything actually slipped. Some duplicate entries also have unit errors (for example, claim 11922 lists '2600.0 USD' for what is a $2.6B facility). Finally, the claim list we have ends partway through, so later disclosures may be missing.
Frequently asked
2026-09-27A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI workloads, a model often called an 'AI cloud' or 'neocloud.' It builds or leases data-center power and fills it with NVIDIA hardware, including GB200 systems (claim 4976). It sells that capacity to AI labs and enterprises under multi-year contracts. On top of the raw hardware it offers software and services, including AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). It also acquired Weights & Biases, an ML developer-tools company (claim 4974). Third-party benchmarks have ranked it well: it was the only 'Platinum' provider in both SemiAnalysis ClusterMAX evaluations on record (claims 18878, 18879, 4981).
A. The strategy is to grow capacity quickly and pay for it mostly with debt secured against customer contracts. CoreWeave reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added in one period (claim 4972). It went public in March 2025 at $40 per share (claims 17815, 15974, 11601, 11616), raising about $1.5B gross and $1.4B net (claims 19821, 4967). Since then it has layered on further financing: a $1.5B revolving credit facility expansion (claims 11923, 5010), a $2.6B delayed-draw term loan (claims 11922, 4592), roughly $2B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claims 4697, 4658). It reported $17.2B of total debt and equity raised as of May 2025 (claim 4968). It also announced an all-stock acquisition of Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 19824). That deal would bring the power sites in-house rather than leasing them.
A. Only a few customers are named in the record. OpenAI is the main one: the record contains an infrastructure contract of $11.9B (claim 19820) and a strategic-deal backlog figure of $11.2B (claim 4969). Readers should note these two numbers do not match, likely because they measure different things at different dates. IBM appears as a partner buying compute for its Granite models (claim 4971). The company reported total contracted backlog of $25.9B (claim 4970), and OpenAI accounts for a large share of it. Other material customer contracts appear in the record without a counterparty name (e.g., claim 4595). As a result, customer concentration cannot be fully assessed from this dossier alone.
A. Completed events include the IPO and Nasdaq listing (claims 18881, 19821), the credit facility amendments (claims 11923, 11924, 11925), the product launches, and the reported capacity and backlog figures. Most other items are in an intermediate state. Every claim in this record is marked 'stated,' meaning it was extracted from filings or releases but has not been independently confirmed as fulfilled. Several dated promises are flagged 'delayed' because their deadline passed without confirmation in the record. These include the expected closings of two notes offerings (claims 11919, 4699), the first 9% note interest payment due 2026-02-01 (claim 4659), and the Core Scientific merger. The merger's outside date of 2026-04-07 (claims 4731, 4738) has passed with no recorded close or termination. A 'delayed' flag may reflect a gap in tracking rather than an actual failure, so it should be verified against later filings.
A. The merger agreement was signed in July 2025 (claims 4729, 19824), and an S-4 registration statement was filed (claim 4733). Core Scientific would owe CoreWeave a $270M termination fee under certain conditions (claim 4739). The agreement set an outside closing date of 2026-04-07 (claim 4738). That date is now past, and the dossier records neither a closing nor a termination, so the deal's status is the biggest unresolved item in the record. The outcome matters a great deal: closing would change CoreWeave's cost structure and its control over power supply, while a termination could trigger the fee.
A. The record shows large insider sales in the months after the IPO. The Chief Development Officer sold about $217M (claim 19832), the CEO about $103.3M (claim 19830) and the CFO about $29.1M (claim 19831). Insider selling after a lockup ends is common and does not by itself signal a problem. However, the size of these sales relative to the $1.4B the company raised in net IPO proceeds (claim 4967) is worth noting.
A. Four dated items are worth tracking: 1) A 'springing maturity' date of 2026-12-30 on the revolving credit facility (claim 11926). If certain conditions are not met, the facility could come due then instead of its extended maturity of 2028-05-02 (claims 11925, 5012). 2) Loan covenants that require the company to keep turning contracts into revenue: a minimum contract-realization ratio of 0.85x (claim 4597), and a minimum debt-service coverage ratio of 1.40x starting April 2027 (claim 4596). 3) The first payments on the 9% notes (claim 4659) and the maturity of the delayed-draw term loan on 2030-08-21 (claim 4594). 4) Any filing that resolves the Core Scientific merger, and any update to the size or makeup of the backlog.
A. 1) Customer concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI (claims 19820, 4969), and who the unnamed customers are. 2) Leverage: the company carries a heavy load of debt at roughly 9% interest (claims 4697, 4824, 11917) plus covenant tests, so it needs to add capacity and collect revenue on schedule. 3) Conversion to live capacity: how much of the 1.6 GW contracted power (claim 4973) is actually running today. 4) Status of the Core Scientific merger after its missed outside date (claim 4738). 5) Data quality: some amounts in the record have inconsistent units (e.g., claim 11922 lists '2600.0 USD' for a $2.6B facility), the OpenAI figures conflict, and this record was truncated, so later claims may be missing.
Frequently asked
2026-09-27A. CoreWeave rents out GPU computing capacity for training and running AI models. It builds and leases data-center capacity, then sells access to large clusters of NVIDIA chips along with software for running them, including support for GB200 systems (claim 4976), object storage (4975), and on-demand cluster scaling (4977). The industry analyst SemiAnalysis rated it the only 'Platinum' provider in both of its ClusterMAX evaluations (claims 18878, 18879, 4981).
A. The strategy is to scale fast using borrowed money and to buy its way into more of the AI stack. It went public at $40 per share in March 2025 (claims 11616, 15974), raising about $1.5B gross and $1.4B net (claims 19821, 4967). It reports $17.2B in total debt and equity raised (claim 4968). It acquired the ML-tooling company Weights & Biases (claim 4974) and agreed to merge with the data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The Core Scientific deal would give it direct control of power and facilities rather than leasing them.
A. OpenAI is the only named anchor customer. The OpenAI contract is cited at $11.9B in one claim (19820) and as $11.2B of backlog in another (4969), and readers should not treat those two figures as interchangeable. IBM appears as a partner for Granite model compute (claim 4971). A 'material customer contract for GPU infrastructure' was disclosed in July 2025 without naming the customer (claim 4595). Total committed backlog was $25.9B as of May 2025 (claim 4970), so a large share of that backlog is not attributed to any named buyer.
A. The completed events on record are the IPO and Nasdaq listing (claims 17815, 18881) and several debt financings. Those include $2B of 9.25% notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claims 4658, 4697), and a $2.6B delayed-draw term loan (claims 11922, 4592). On operations, the company reported 420 MW of active power added against 1.6 GW contracted (claims 4972, 4973). Contracted power means capacity it has secured, not capacity already running. Every claim in this dossier is recorded as 'stated' by the company. None has been independently marked as verified. Backlog, capacity, and customer figures are company disclosures, not audited delivery.
A. The merger was announced in July 2025 (claims 4729, 19824) with an outside closing date of April 7, 2026 (claim 4738). The dossier flags both the merger and that deadline as 'delayed' (claims 4731, 4738), and it records no closing. If the deal falls through under certain conditions, Core Scientific would owe CoreWeave a $270M termination fee (claim 4739). Whether the deal closed, was renegotiated, or was abandoned is not established by the record here.
A. The company borrows at high rates: 9% to 9.25% on its senior notes (claims 4824, 4697). Its revolving credit line was expanded by $1.5B (claim 11923), with letters of credit up to $350M (claim 11924) and a maturity of May 2, 2028 (claim 11925). That maturity has a contingent 'springing' date of December 30, 2026 (claim 11926), which could pull repayment forward. The DDTL 3.0 loan requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596), meaning contracted cash flow must cover debt payments by that margin. The loan matures August 21, 2030 (claim 4594).
A. There are four things to track. (1) Whether the springing revolver maturity on December 30, 2026 is triggered (claim 11926). (2) Whether cash flow meets the 1.40x coverage test from April 2027 (claim 4596). (3) A definitive outcome on Core Scientific (claims 4731, 4738). (4) Whether contracted power converts into active capacity: 1.6 GW contracted versus 420 MW added (claims 4973, 4972). Beyond those, look for new filings that name more customers or break down the $25.9B backlog (claim 4970).
A. Customer concentration is the first: how much revenue depends on OpenAI, and who holds the unnamed material contract (claim 4595)? Execution is the second: can the company bring contracted power online fast enough to earn revenue before debt costs and covenants tighten? The third is insider selling. Around mid-2025, the Chief Development Officer sold about $217M of stock (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). The record does not say whether these were pre-scheduled sales. Finally, several dated items are flagged 'delayed' in the dossier (e.g., claims 11919, 4699, 4659). Readers should check the primary filings to see whether those flags mean real slippage or only missing confirmation.
Frequently asked
2026-09-26A. CoreWeave rents out large clusters of NVIDIA GPUs, the chips used to train and run AI models, as a specialized cloud. Its disclosed products include GB200 support across its platform (claim 4976), AI Object Storage (4975), on-demand cluster scaling (4977), and support for NVIDIA AI Enterprise and Cloud Functions (4979). SemiAnalysis's independent ClusterMAX evaluations rated it the only 'Platinum' provider in both the first and second editions (18878, 18879, 4981).
A. The strategy is to grow fast on borrowed money. CoreWeave uses debt to build data-center power and GPU capacity, signs long-term compute contracts with large AI customers, and expands through acquisitions. By May 2025 it reported $17.2B in total debt and equity raised (4968), 1.6 GW of contracted power (4973), and $25.9B in committed revenue backlog (4970). It bought Weights & Biases, an AI developer-tools company (4974), and in July 2025 agreed to acquire data-center operator Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (4731, 4729).
A. OpenAI is the only named customer with a dollar figure. The record shows an $11.9B infrastructure contract (19820) and, separately, $11.2B of OpenAI-related backlog (4969). The two figures differ and have not been reconciled in the record. IBM is named as a partner for Granite model compute (4971), with no dollar value given. A July 2025 filing describes a 'material customer contract for GPU infrastructure' without naming the customer (4595). Much of the $25.9B backlog (4970) is not attributed to any named counterparty in this record.
A. Delivered: the Nasdaq IPO closed at $40 per share (17815, 11616), raising $1.5B gross (19821) and about $1.4B net (4967). CoreWeave issued $2B of 9.25% senior notes due 2030 (11917, 4824) and $1.75B of 9% notes due 2031 (4697, 4658). It expanded its revolving credit facility to $1.5B (11923) and its letters of credit to $350M (11924), and set up a delayed-draw term loan of up to $2.6B (4592). It also reported 420 MW of active power capacity added (4972). Announced but not yet delivered: most of the 1.6 GW of contracted power (4973) and conversion of the $25.9B backlog (4970) into revenue. The Core Scientific merger is also unresolved; its April 7, 2026 outside date is flagged 'delayed' (4738) and no completion is recorded.
A. CoreWeave borrows heavily at high rates. Its recent bonds carry 9% to 9.25% coupons (4824, 4697), expensive for a company of its size. The debt stacks on top of term loans and the revolver (11923, 11922). One loan covenant cites a minimum contract realization ratio of 0.85x (4597). This suggests lenders are relying on contracted customer revenue actually being paid.
A. Yes, in substantial amounts soon after the IPO. The record shows about $217M of sales by the Chief Development Officer (19832), $103.3M by the CEO (19830), and $29.1M by the CFO (19831), all around May–June 2025. The record does not say whether these were pre-scheduled trading plans.
A. Key dates and events: (1) the outcome of the Core Scientific merger, including whether the $270M termination fee payable to CoreWeave (4739) is triggered; (2) the December 30, 2026 'springing' maturity on the credit facility (11926), which could pull debt repayment forward from May 2028 (11925); (3) the status of the DDTL 3.0 loan, whose commitment period ended July 31, 2026 (4593); (4) how much of the 1.6 GW contracted power (4973) is energized, compared with the 420 MW reported active (4972); and (5) whether backlog (4970) shows up as recognized revenue.
A. The biggest risk is customer concentration. OpenAI appears to be a large share of backlog (19820, 4969 against 4970), and the remaining large customers are not named (4595). A second question is whether the gap between contracted and active power (4973 vs 4972) closes fast enough to service 9%+ debt (4824, 4697). A third is the Core Scientific deal's fate (4731, 4738). Finally, several 'delayed' statuses in this dossier look like data-extraction artifacts rather than real slippage. For example, notes marked delayed (11919) are separately recorded as issued (11917). These statuses need manual verification. The claim list supplied for this FAQ was also cut off partway through, so later disclosures may be missing.
Frequently asked
2026-09-26A. CoreWeave rents out large clusters of NVIDIA GPUs over the cloud to companies that train and run AI models. It also sells the software around them: cluster scaling, usage and billing metrics, AI object storage, and NVIDIA AI Enterprise support (claims 4975, 4977, 4978, 4979). Its main selling point is performance. It says it was the only 'Platinum' provider in SemiAnalysis's first two ClusterMAX ratings (claims 18878, 18879, 4981), and it cites an MLPerf Inference v5.0 result (claim 4980).
A. The strategy is to lock in long-term compute contracts, borrow heavily to build the capacity, and add software and power assets through acquisitions. It reported $25.9B of contracted revenue backlog (claim 4970) and 1.6 GW of contracted power, with 420 MW of active capacity added (claims 4973, 4972). It said it had raised $17.2B in total debt and equity (claim 4968). It bought Weights & Biases, a developer tooling company (claim 4974). It also agreed to acquire Core Scientific, a data-center and power operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. OpenAI is the only large customer named with dollar figures. The record lists an $11.9B OpenAI infrastructure contract (claim 19820) and $11.2B of OpenAI-related backlog (claim 4969). That backlog figure is roughly 43% of the $25.9B total (claim 4970), so a large share of future revenue depends on one customer. IBM is named as a partner using CoreWeave capacity for its Granite models, but no amount is disclosed (claim 4971). A July 2025 filing describes a 'material customer contract for GPU infrastructure' without naming the customer (claim 4595). Most of the backlog cannot be traced to named buyers from this record.
A. Completed: the Nasdaq IPO at $40 per share, raising about $1.5B gross and $1.4B net (claims 17815, 19821, 4967, 18881). Also completed: $2B of 9.25% senior notes due 2030, upsized from a planned $1.5B (claims 11921, 11917, 4824), and $1.75B of 9% senior notes due 2031 (claims 4697, 4658). Its revolving credit facility was expanded to $1.5B (claim 11923). The company reports 420 MW of active capacity added (claim 4972) and general availability of AI Object Storage (claim 4975). Still at the announced or contracted stage: most of the 1.6 GW of contracted power (claim 4973), the $25.9B backlog, which becomes revenue only as capacity is delivered (claim 4970), and the Core Scientific merger (claim 4731).
A. Beyond the IPO, the record shows several debt facilities. Two high-yield note issues pay 9.25% and 9% interest (claims 4824, 4697). There is a delayed-draw term loan (DDTL 3.0) of up to $2.6B, with commitments ending 2026-07-31 (claims 11922, 4592, 4593). The revolver is $1.5B plus a $350M letter-of-credit facility, maturing 2028-05-02 (claims 11923, 11924, 11925). The revolver has a 'springing' maturity of 2026-12-30, meaning it could come due early if certain conditions are triggered (claim 11926). One facility carries a minimum contract realization ratio of 0.85x, which ties the borrowing to customer contracts actually paying out (claim 4597). Interest rates near 9% are high by investment-grade standards and signal that lenders see meaningful risk.
A. The record shows large sales by executives after the IPO lock-up period: about $217M by the Chief Development Officer, about $103.3M by the CEO, and about $29.1M by the CFO (claims 19832, 19830, 19831). Insider selling after an IPO is common and is not evidence of wrongdoing. Given the amounts, it is still worth tracking.
A. 1) The Core Scientific merger: its outside date was 2026-04-07 and the record flags it as delayed, with no closing on record (claims 4731, 4738). A $270M termination fee is payable to CoreWeave in some scenarios (claim 4739). 2) Whether the 2026-12-30 springing maturity on the revolver is triggered (claim 11926). 3) Whether contracted power turns into active capacity (claims 4973, 4972). 4) Whether customers other than OpenAI are named, and whether OpenAI's share of backlog shrinks (claims 4969, 4970). 5) Compliance with the 0.85x contract realization covenant (claim 4597).
A. The main substantive questions are customer concentration, whether a heavily debt-funded buildout is sustainable, and the unresolved Core Scientific deal. There are also caveats about the dossier. First, all claims here are automated extractions of the company's own statements; none is independently verified. Second, some 'delayed' flags look like extraction artifacts. The May 2025 notes are marked delayed (claim 11919), yet their issuance is recorded on schedule (claim 11917). A 9% note interest payment is also marked delayed (claim 4659), but nothing in the record shows a missed payment. Third, figures sometimes conflict because of upsizing or restatement: OpenAI appears as $11.9B vs. $11.2B, and the 2030 notes as $1.5B vs. $2B. Fourth, the claim list provided ends mid-2025 and appears truncated, so later developments may be missing.
Frequently asked
2026-09-26A. CoreWeave rents GPU-based cloud computing capacity for AI training and inference. It runs data centers built on NVIDIA hardware, including GB200 systems (claim 4976), and sells related software such as AI Object Storage (claim 4975). It expanded into AI developer tooling by acquiring Weights & Biases (claim 4974). It has been the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings, both in the first evaluation and in 2.0 (claims 18878, 18879, 4981).
A. The strategy is to scale AI data-center capacity quickly, funded mostly with debt and backed by long-term customer contracts. CoreWeave listed on Nasdaq in March 2025 at $40/share (claims 15974, 11616), raising about $1.5B gross and $1.4B net (claims 19821, 4967). It reports $17.2B in total debt and equity raised (claim 4968). The debt includes $2B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% notes due 2031 (claims 4697, 4658), a revolving credit facility expanded to $1.5B (claim 11923), and a $2.6B delayed-draw term loan called DDTL 3.0 (claims 11922, 4592). It also agreed to acquire Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731), which would bring it more data-center sites and power.
A. OpenAI is the only customer clearly named, with a contract reported at $11.9B (claim 19820) and elsewhere as $11.2B of backlog (claim 4969). The dossier does not explain the difference between those two figures. IBM is named as a partner buying capacity for its Granite models (claim 4971), but no dollar value is disclosed. A separate 'material customer contract' for GPU infrastructure is on record without a customer name (claim 4595). Total contracted backlog is stated as $25.9B (claim 4970), so a large share of the backlog comes from customers the record does not identify.
A. Delivered or completed: the IPO (claims 18881, 19821), the note issuances (claims 11917, 4658), the credit facility expansions (claims 11923, 11924), the Weights & Biases acquisition (claim 4974), and 420 MW of active power capacity added (claim 4972). Contracted but not yet shown as live: 1.6 GW of power capacity (claim 4973) and most of the $25.9B backlog (claim 4970). Every claim in this record has status 'stated', meaning it is company-sourced and not independently verified.
A. The merger was announced on 2025-07-07 (claims 4729, 19824), with an outside closing date of 2026-04-07 (claim 4738). A $270M termination fee would be payable to CoreWeave in some circumstances (claim 4739). The record flags both the merger and its deadline as 'delayed' (claims 4731, 4738), and nothing on file confirms that it closed or was terminated. Readers should check the current status in SEC filings before relying on it.
A. 1. A contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926). The dossier does not disclose what condition triggers it. 2. The DDTL 3.0 commitment termination date of 2026-07-31, which is flagged 'delayed' (claim 4593). 3. A 0.85x minimum contract realization covenant (claim 4597), which ties the company's borrowing to customers actually paying on their contracts. 4. Interest payments on the 9% notes, first due 2026-02-01 and also flagged 'delayed' (claim 4659). That flag may reflect missing confirmation in the record rather than a missed payment. 5. How quickly the 1.6 GW of contracted power turns into active capacity (claims 4973, 4972).
A. Executives sold large amounts of stock in the months after the IPO: the Chief Development Officer about $217M (claim 19832), the CEO about $103.3M (claim 19830), and the CFO about $29.1M (claim 19831). The sales are disclosed, but their context is not in this record, such as whether they were pre-planned under 10b5-1 trading plans.
A. 1. Customer concentration: OpenAI accounts for roughly $11-12B of a $25.9B backlog (claims 19820, 4969, 4970), and much of the rest comes from unnamed customers. 2. Debt load: CoreWeave carries 9-9.25% debt against a build-out that is not yet complete (claims 4824, 4697). 3. Execution: only 420 MW is active against 1.6 GW contracted (claims 4972, 4973). 4. Unresolved outcomes: the Core Scientific merger and several dated obligations are marked 'delayed' with no follow-up (claims 4731, 4593, 4659). 5. An incomplete record: the claim record provided ends partway through, so later disclosures may be missing from this summary.
Frequently asked
2026-09-26A. CoreWeave rents out GPU computing capacity for AI work: training and running large models. It owns and leases data-center power, fills it with NVIDIA hardware (including GB200 systems, claim 4976), and sells access through its cloud platform. It has added software layers such as AI Object Storage (claim 4975) and bought Weights & Biases, an AI developer-tools company (claim 4974). SemiAnalysis's ClusterMAX evaluations rated it the only 'Platinum' provider, both in the first round and in version 2.0 (claims 18878, 18879).
A. The strategy is to scale as fast as possible, funded mostly by debt. The company reports 420 MW of active power capacity against 1.6 GW contracted (claims 4972, 4973). It reports $17.2B in total debt and equity raised (claim 4968). It is also growing through acquisitions: Weights & Biases (claim 4974) and a proposed all-stock merger with Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The merger would bring more power and facilities in-house.
A. OpenAI is the only major customer named with a dollar figure. One claim records an $11.9B infrastructure contract (claim 19820), and another records $11.2B of OpenAI-related backlog (claim 4969); the two figures come from different disclosures and don't match exactly. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971), with no value given. A 'material customer contract' for GPU infrastructure in July 2025 does not name the customer (claim 4595). Total committed backlog was reported at $25.9B (claim 4970), so a large share of that backlog is unattributed in this record.
A. The completed events are mostly financings. The Nasdaq IPO priced at $40 per share (claims 17815, 11616) and raised about $1.5B gross, $1.4B net (claims 19821, 4967). Two bond issues followed: $2.0B of 9.25% notes due 2030 (claims 11917, 4824) and $1.75B of 9% notes due 2031 (claims 4697, 4658). The revolving credit facility grew to $1.5B (claim 11923), and a $2.6B delayed-draw term loan was put in place (claim 4592). The operating side (backlog, contracted power, product launches) rests on company statements. Every claim in this dossier is recorded as 'stated', meaning disclosed by the company or a filing, not independently confirmed.
A. A lot, at high rates. The two recent bond issues carry 9% and 9.25% coupons (claims 4697, 4824). Borrowing at those rates signals that lenders see real risk. On top of that sit the $1.5B revolver, a $350M letters-of-credit facility (claim 11924), and the $2.6B delayed-draw term loan (claim 4592). Some lending terms are tied to contract performance. One claim records a minimum contract realization ratio of 0.85x (claim 4597), a requirement that contracted customer revenue be substantially realized.
A. Yes, heavily, soon after the IPO. The record shows about $103.3M in sales by the CEO (claim 19830), $217M by the Chief Development Officer (claim 19832), and $29.1M by the CFO (claim 19831), all in May–June 2025. Insider selling is common after lock-ups expire and may follow pre-set trading plans. Still, the scale is notable next to the company's appetite for new capital.
A. Four items. (1) The Core Scientific merger. Its outside date of 2026-04-07 has passed, and the dossier flags it as delayed (claims 4731, 4738). This record does not show whether it closed, was extended, or was terminated, which is relevant because a $270M termination fee is recorded as payable to CoreWeave (claim 4739). (2) The credit facility's contingent 'springing' maturity date of 2026-12-30 (claim 11926), which can pull the loan's due date forward if certain conditions are hit. (3) Whether the delayed-draw term loan was fully drawn before its commitment ended on 2026-07-31 (claim 4593). (4) How much of the 1.6 GW of contracted power is actually switched on, beyond the 420 MW reported active (claims 4972, 4973).
A. Customer concentration: OpenAI accounts for a large part of the disclosed backlog, and most of the rest is unnamed (claims 4969, 4970, 4595). Funding: roughly 9% borrowing costs (claims 4697, 4824) have to be covered by contracts that are only partly delivered. Execution: whether contracted power becomes revenue-generating capacity on schedule. Data quality: several items marked 'delayed' (for example claims 11919, 4699, 4659) were classified automatically, and some may reflect missing follow-up data rather than real slippage. Readers should check the source documents before treating any of them as a missed commitment.
Frequently asked
2026-09-25A. CoreWeave rents out large clusters of GPUs (mainly NVIDIA chips) as a specialized cloud for training and running AI models. It has added software on top: object storage (claim 4975), GB200 support across its stack (claim 4976), on-demand cluster scaling (claim 4977), and the Weights & Biases developer platform, which it agreed to buy for about $1.0 billion (claims 4516, 4974). Industry analyst SemiAnalysis rated it the only 'Platinum' provider in both editions of its ClusterMAX evaluation (claims 18878, 18879, 4981).
A. It is building capacity ahead of demand and paying for it largely with debt. The company signs long-term compute contracts, borrows against them, and builds data-center power. By May 2025 it reported 1.6 GW of contracted power (claim 4973), 420 MW of active capacity added (claim 4972), and $17.2 billion raised in debt and equity (claim 4968). It also tried to own its data-center sites outright by agreeing to merge with Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). Separately, NVIDIA committed to buy $6.3 billion of capacity through April 2032 (claim 4352).
A. Only a few customers are named. OpenAI accounts for $11.2 billion of a $25.9 billion revenue backlog (claims 4969, 4970), roughly 43%. IBM is named as a partner for Granite model compute (claim 4971), and NVIDIA appears as a capacity buyer (claim 4352). Several key items point to customers without naming them: a 'material customer contract' that backs the $2.6 billion DDTL 3.0 loan (claims 4595, 4592), and a $350 million share issuance to a 'strategic customer' (claim 4514). Customer concentration is high, and part of the loan collateral depends on a counterparty the record does not name.
A. Every claim in this dossier has status 'stated', meaning the company or a filing said it. None is independently marked as delivered or verified. The items most likely completed are the capital-markets events: the Nasdaq IPO at $40 per share on 2025-03-28 (claims 11601, 11616, 15974, 17815) with about $1.4 billion in net proceeds (claims 4967, 4513), and the 9.25% senior notes due 2030 upsized to $2.0 billion (claims 4824, 11917). Operating metrics such as backlog, contracted power and product launches are company statements. The record contains no confirmation that the Weights & Biases or Core Scientific deals closed.
A. The record shows several layers of debt: - A revolving credit facility expanded to $1.5 billion, plus $350 million of letters of credit (claims 11923, 5010, 5011, 11924), maturing 2028-05-02 (claims 5012, 11925). It has a contingent 'springing' maturity of 2026-12-30 (claim 11926). - $2.0 billion of 9.25% notes due 2030 (claims 11917, 4824). - $1.75 billion of 9% notes due 2031, upsized by $250 million (claims 4697, 4698). - The $2.6 billion DDTL 3.0 loan, maturing 2030-08-21 (claims 4592, 4594). The DDTL has two covenants: a minimum 1.40x debt service coverage ratio starting April 2027 (claim 4596) and a minimum 0.85x 'contract realization ratio' (claim 4597). The second one tests whether contracted revenue actually turns into billed revenue. Interest rates of 9% or more signal that lenders price this as high-risk credit.
A. The deal was signed in July 2025. It was all-stock at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), with a $270 million termination fee payable to CoreWeave (claim 4739) and an outside date of 2026-04-07 (claim 4738). Both the outside date and an earlier target of 2025-10-01 (claim 4517) are now marked 'delayed'. The record contains no closing, termination or shareholder-vote outcome. Readers should not assume the merger completed without a source.
A. Three items: 1. The 2026-12-30 springing maturity on the revolver (claim 11926). If its conditions are triggered, the revolver comes due years ahead of 2028. 2. The first debt service coverage test in April 2027 (claim 4596) and ongoing compliance with the 0.85x contract realization covenant (claim 4597). 3. How much of the $25.9 billion backlog (claim 4970), especially the $11.2 billion from OpenAI (claim 4969), converts into recognized revenue and energized megawatts beyond the 420 MW figure (claim 4972).
A. (1) Who the unnamed 'material customer' and 'strategic customer' are (claims 4595, 4514). (2) Whether the Core Scientific merger closed or was terminated, and whether the $270 million fee was ever paid (claims 4731, 4739). (3) Whether several items marked 'delayed' were actually late, or simply passed their dates without a confirmation in the record. These include the notes closings (claims 11919, 4699), the first 9% coupon (claim 4659) and the DDTL 3.0 commitment end date of 2026-07-31 (claim 4593). (4) How much of the 1.6 GW of contracted power (claim 4973) is actually live. Finally, this dossier's claims stop around September 2025, so anything after that date needs separate sourcing.
Frequently asked
2026-09-25A. CoreWeave is a publicly listed (Nasdaq: CRWV) cloud provider that rents out large clusters of NVIDIA GPUs for training and running AI models. On the record it adds storage and tooling on top of the hardware: AI Object Storage general availability (claim 4975), GB200 support across its platform stack (claim 4976), and on-demand cluster scaling (claim 4977). It also bought the ML developer-tools company Weights & Biases (claims 4974, 4516). Third-party benchmark claims include being the only 'Platinum' provider in SemiAnalysis's ClusterMAX ratings (claims 18878, 18879, 4981).
A. The record shows a capital-intensive build-out: sign long-term compute contracts, then finance the data-center capacity to serve them with debt and equity. The company reported $17.2B in total debt and equity raised (claim 4968), 1.6 GW of contracted power (claim 4973), and 420 MW of active power added (claim 4972). It also tried to integrate vertically by agreeing to acquire data-center operator Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). On the software side, the Weights & Biases acquisition, at about $1.0B (claim 4516), points to a move up the stack.
A. The only named customer with a dollar figure is OpenAI, whose strategic deal is recorded at $11.2B of revenue backlog (claim 4969). That is roughly 43% of the $25.9B total backlog (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models, but the record gives no dollar figure (claim 4971). A 'material customer contract for GPU infrastructure' is disclosed without a name (claim 4595). A $350M share issuance to a 'strategic customer' also appears without a name in the claim (claim 4514). NVIDIA shows up as a counterparty through a $6.3B capacity purchase commitment running to April 2032 (claim 4352). In practice that makes NVIDIA both a supplier and a backstop buyer. Apart from OpenAI, the rest of the backlog is not attributed to named customers on the record.
A. Financings are the best-documented deliveries. The IPO priced at $40/share on 2025-03-28 (claims 15974, 11601, 11616) and raised about $1.4B in net proceeds (claims 4967, 4513). Several debt deals were recorded as issued: $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% senior notes due 2031 (claim 4658), a revolver expanded to $1.5B (claims 5010, 11923), and a $2.6B delayed-draw term loan, DDTL 3.0 (claim 4592). The Weights & Biases acquisition is recorded as done (claim 4516). Backlog ($25.9B) and contracted power (1.6 GW) are contractual or planned figures, not delivered revenue or live capacity. Only 420 MW is described as active (claim 4972). Every claim here carries status 'stated', meaning it was extracted from filings or releases. None has been independently marked as verified.
A. The merger agreement was signed in July 2025 (claims 4729, 4733). It carried a $270M termination fee payable to CoreWeave (claim 4739) and an outside closing deadline of 2026-04-07 (claim 4738). Both the merger and the deadline are flagged 'delayed' (claims 4731, 4738), and an earlier expected-completion date of 2025-10-01 is also flagged 'delayed' (claim 4517). The record contains no claim showing the deal closed or was terminated. The deadline has passed, so its outcome is a key open item to resolve from primary sources.
A. The 'delayed' flags come from automated extraction and appear to fire whenever a promised-by date has passed without a matching completion claim. Some are almost certainly false positives. For example, the May 2025 notes closing (claim 11919, due 2025-05-27) is flagged delayed, yet claim 4824 records the notes as issued on 2025-05-27. Likewise, the 2026-02-01 coupon on the 9% notes (claim 4659) is a scheduled interest payment, not a missed promise. Treat 'delayed' as 'unconfirmed', not 'late'. The duplicate figures are the same kind of artifact: $1.5B vs. $2.0B for the 2030 notes (claims 11921, 11918), and $1.5B plus $250M for the 2031 notes (claims 4700, 4698). They reflect offerings that were upsized after announcement.
A. Several debt dates are coming up. The revolver has a contingent 'springing' maturity of 2026-12-30 (claim 11926); if it is not avoided, the facility's stated 2028-05-02 maturity would effectively be pulled forward (claims 11925, 5012). DDTL 3.0's commitment period was set to end 2026-07-31 and is flagged unconfirmed (claim 4593). Starting April 2027, a minimum 1.40x debt service coverage ratio applies (claim 4596), alongside a 0.85x minimum contract realization ratio (claim 4597), so contracted revenue must actually convert to cash. Beyond financing, watch how much of the 1.6 GW contracted power becomes active capacity, and whether the $25.9B backlog converts to recognized revenue.
A. (1) Customer concentration: OpenAI accounts for about $11.2B of $25.9B in backlog (claims 4969, 4970), and most of the remaining counterparties are unnamed. (2) Leverage and cost of capital: recent notes carry 9–9.25% coupons (claims 4824, 4697) on top of term loans with coverage covenants (claims 4596, 4597). (3) Circularity: NVIDIA is the key supplier and also committed to buy $6.3B of capacity (claim 4352), which complicates how independent the demand is. (4) Execution: the gap between contracted power (1.6 GW, claim 4973) and active power (420 MW, claim 4972). (5) The unresolved status of the Core Scientific merger (claims 4731, 4738). Also note that the record supplied here ends mid-September 2025 (claim 4352), so later developments may not be reflected.
Frequently asked
2026-09-25A. CoreWeave rents out GPU computing capacity built for AI workloads. It is a specialized cloud provider that operates data-center capacity running NVIDIA hardware and sells access to AI developers. The record shows it adding GB200 support across its platform (claim 4976), making its AI Object Storage generally available (claim 4975), and adding On-Demand Cluster Scaling (claim 4977). It was the only provider rated Platinum in SemiAnalysis's ClusterMAX evaluations, in the first edition and in ClusterMAX 2.0 (claims 18878, 18879, 4981).
A. The strategy is to scale fast, funded by heavy borrowing against long-term customer contracts. CoreWeave went public on Nasdaq at $40 per share (claims 17815, 18881), netting about $1.4B (claim 4967). It then layered on much more debt: a revolving credit facility expanded to $1.5B (claim 11923), $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% senior notes due 2031 (claim 4658), and a $2.6B delayed-draw term loan tied to a customer contract (claim 4592). It reported $17.2B of total debt and equity raised (claim 4968). It is also expanding up the software stack by acquiring Weights & Biases for about $1.0B (claim 4516) and has tried to secure more data-center power by acquiring Core Scientific (claim 4729).
A. Only two customers are named on the record. OpenAI accounts for an $11.2B revenue backlog (claim 4969), which is a large share of the $25.9B total committed backlog (claim 4970). IBM is named as a partner for Granite model compute capacity (claim 4971), with no dollar figure. The customer behind the $2.6B term loan is not named and appears only as a 'material customer contract' (claim 4595). Neither is the recipient of a $350M 'strategic customer' share issuance (claim 4514). NVIDIA is a supplier and has also agreed to buy up to $6.3B of capacity through April 2032 (claim 4352). The rest of the backlog is not attributed to named customers.
A. The financing events are the most concrete items: the IPO priced at $40 (claim 11601) and the note issuances. Even so, every claim in this dossier is still marked 'stated'. None has been independently moved to a verified or delivered status. On physical capacity, the company reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973), so most of the contracted power was not yet running. The $25.9B backlog (claim 4970) is committed future revenue, not revenue already earned.
A. CoreWeave agreed to an all-stock merger at 0.1235 CoreWeave shares for each Core Scientific share (claim 4731). The dossier marks the deal 'delayed'. Both the earlier expected closing of 2025-10-01 (claim 4517) and the outside date of 2026-04-07 (claim 4738) passed without a recorded completion. The agreement included a $270M termination fee payable to CoreWeave under certain conditions (claim 4739). The record does not state how the deal was resolved, so readers should check primary sources.
A. Four dates and metrics matter most. First, the revolver's 'springing' maturity date of 2026-12-30 (claim 11926), which could pull its 2028-05-02 maturity (claim 11925) forward if certain conditions are triggered. Second, the term loan's covenants: a minimum 0.85x contract realization ratio (claim 4597) and a minimum 1.40x debt service coverage ratio starting April 2027 (claim 4596). Third, the first interest payment on the 9% notes, due 2026-02-01 (claim 4659), which the record flags as delayed or unconfirmed. Fourth, progress converting the 1.6 GW of contracted power into active capacity (claims 4972, 4973).
A. (1) Customer concentration: how dependent the $25.9B backlog is on OpenAI's $11.2B (claims 4969, 4970), and who the unnamed contract counterparties are (claims 4595, 4514). (2) Leverage: borrowing at roughly 9% or more (claims 4824, 4697) works only if contracted revenue arrives on schedule. (3) Execution: whether enough power and data centers come online to meet commitments. (4) Record quality: several 'delayed' flags on note closings and loan dates (claims 11919, 4699, 4593) may simply mean the dossier lacks confirmation, not that anything actually slipped. These need checking against filings.
Frequently asked
2026-09-25A. CoreWeave rents out GPU computing capacity built for AI workloads. It runs data centers full of NVIDIA hardware and sells access to them as a cloud service, along with software for storage, cluster scaling and billing (claims 4975, 4976, 4977, 4978). SemiAnalysis's ClusterMAX evaluations named it the only 'Platinum' provider in both the first round and version 2.0 (claims 18878, 18879, 4981). It also reports an MLPerf Inference v5.0 benchmark result (claim 4980). The company listed on Nasdaq in March 2025 at $40 per share (claims 11601, 18881) and reported IPO net proceeds of about $1.4 billion (claim 4967).
A. The strategy is to scale fast by borrowing heavily against long-term customer contracts. The company reports $17.2 billion in total debt and equity raised (claim 4968), 1.6 GW of contracted power (claim 4973) and 420 MW of active compute power added (claim 4972). It is also expanding beyond raw compute. It agreed to acquire Weights & Biases, an AI developer tools company, for about $1.0 billion (claims 4974, 4516). It signed an all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). Owning its own power and sites would reduce its reliance on leased capacity.
A. Only a few are named. OpenAI is the headline customer, with an $11.2 billion strategic deal (claim 4969), which is a large share of the $25.9 billion total contract backlog reported in May 2025 (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA has a $6.3 billion commitment to buy capacity running to April 2032 (claim 4352), which makes it both CoreWeave's supplier and a backstop customer. Several important parties are not named: a 'material customer contract' that secures the $2.6 billion DDTL 3.0 loan (claims 4595, 4592) and a 'strategic customer' that received a $350 million share issuance (claim 4514). Customer concentration is therefore high and only partly visible.
A. Mostly with expensive debt. Key pieces: - $2.0 billion of 9.25% senior notes due 2030, upsized from an initial $1.5 billion (claims 11921, 11917, 4824). - $1.75 billion of 9% senior notes due 2031, upsized by $250 million from $1.5 billion (claims 4700, 4698, 4697). - A revolving credit facility expanded to $1.5 billion (claim 11923), plus a $350 million letters-of-credit facility (claim 11924). - The $2.6 billion DDTL 3.0 delayed-draw term loan maturing August 2030 (claims 4592, 4594). Coupons near 9% show that lenders see real risk even with the contract backlog.
A. In this tracker, no claim is marked as independently verified. Every item is 'stated' (disclosed by the company) or 'delayed' (a promised date passed without a recorded confirmation). The IPO and Nasdaq listing are the best-documented events (claims 11601, 18881, 4735). The note offerings were upsized and priced, but their expected closing dates are flagged 'delayed' (claims 11919, 4699), which probably reflects missing confirmation in the dossier rather than an actual failure to close. The Core Scientific merger is also flagged delayed against both an October 2025 target and an April 7, 2026 outside date (claims 4517, 4731, 4738). This dossier contains no record of that deal closing.
A. The dossier does not show a resolution. The agreement was signed in July 2025 (claim 4729), with an outside closing deadline of April 7, 2026 (claim 4738). That date has passed with no completion recorded. If the deal terminated under certain conditions, Core Scientific would owe CoreWeave a $270 million termination fee (claim 4739). A reader should check current filings to learn whether the merger closed, was renegotiated or was terminated.
A. Four dates and covenants matter: - A springing maturity on the revolving credit facility could pull its repayment forward to December 30, 2026 (claim 11926) from May 2028 (claim 11925), depending on conditions. That date is about three months away. - The DDTL 3.0 commitment termination date of July 31, 2026 is flagged delayed (claim 4593), so it is unclear whether the full $2.6 billion was drawn. - A minimum debt service coverage ratio of 1.40x applies from April 2027 (claim 4596). - A minimum contract realization ratio of 0.85x (claim 4597) means lenders are tracking whether contracted revenue actually turns into cash.
A. 1. Can the $25.9 billion backlog (claim 4970) be converted into cash quickly enough to service debt at roughly 9%? 2. How dependent is CoreWeave on OpenAI and on customers it does not name (claims 4969, 4595, 4514)? 3. Did the Core Scientific merger close, and if not, what happened to the $270 million fee (claims 4731, 4739)? 4. How much of the 1.6 GW of contracted power (claim 4973) is energized and earning revenue? 5. What is the circular exposure to NVIDIA, which is both supplier and $6.3 billion capacity buyer (claim 4352)? Caveat: the claim list supplied for this FAQ was truncated after claim 4352 (September 2025). Anything later, including earnings, new contracts or the merger outcome, is not reflected here.
Frequently asked
2026-09-25A. CoreWeave rents out GPU computing capacity for AI workloads. Customers pay to use large NVIDIA-based clusters instead of building their own. The record supports this with product claims: GB200 support across its platform (claim 4976), On-Demand Cluster Scaling (4977), and general availability of AI Object Storage (4975). The company says it was the only 'Platinum' provider in SemiAnalysis's first and second ClusterMAX ratings (18878, 18879, 4981) and cites an MLPerf Inference v5.0 result (4980). These ratings and benchmarks come from the company's own disclosures, not from independent verification in this dossier.
A. The strategy is to scale fast using borrowed money and to expand beyond renting raw GPUs. On capacity, it reported 1.6 GW of contracted power, with 420 MW of active compute power added (4973, 4972). On funding, it said it had raised $17.2B in total debt and equity (4968). On software, it disclosed the acquisition of Weights & Biases (4974), with roughly $1.0B attributed to the deal (4516). On power and sites, it agreed to an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (4731, 4729).
A. Only a few are named. OpenAI is the biggest: its strategic deal is tied to $11.2B of revenue backlog (4969), out of $25.9B in total committed backlog (4970). IBM is named as a partner using CoreWeave capacity for its Granite models (4971). NVIDIA is recorded with a $6.3B capacity purchase commitment running to April 2032 (4352). Other important counterparties are not named. A 'material customer contract' backs the $2.6B DDTL 3.0 loan (4595, 4592), and $350M of shares were issued to a 'strategic customer' (4514). Neither is identified in these claims. Revenue is heavily concentrated in OpenAI.
A. The financing is the most solid part of the record. The IPO priced at $40 per share (11601, 11616, 15974, 17815) and brought in about $1.4B net (4967, 4513), plus a $68M over-allotment (4515). The company then issued $2.0B of 9.25% notes due 2030 (4824, 11917) and $1.75B of 9% notes due 2031, upsized from $1.5B (4697, 4658, 4698). It also expanded its revolving credit facility to $1.5B, with $350M for letters of credit (11923, 11924). The operating metrics are less certain. Backlog, contracted power, and product launches are self-reported and carry 'stated' status, meaning they were disclosed but not independently confirmed. Two notes-closing claims are marked 'delayed' (11919, 4699). However, other claims record both issuances (4824, 4658), so those flags appear to be status artifacts rather than failed deals.
A. The record does not show the merger closing. The deal was signed in July 2025 (4729), and an S-4 registration filing was disclosed (4733). An earlier target date of 2025-10-01 (4517) and the outside deadline of 2026-04-07 (4731, 4738) are both marked 'delayed'. The agreement includes a $270M termination fee payable to CoreWeave (4739). Nothing in this dossier confirms completion, termination, or payment of that fee. This is the largest unresolved item in the record.
A. Significant. The company has borrowed billions at roughly 9–9.25% interest (4824, 4697). The DDTL 3.0 loan comes with conditions it must meet. It must keep a debt service coverage ratio of at least 1.40x starting April 2027 (4596). It must also maintain a 0.85x 'contract realization' ratio (4597), which roughly means customers must actually pay out on their contracts. The revolver has a 'springing' maturity: its due date can jump forward to 2026-12-30 if certain conditions are triggered (11926), even though the normal maturity is 2028-05-02 (11925). The first 9% coupon, due 2026-02-01, is flagged 'delayed' (4659). That flag means the record has no confirmation of payment, not that a missed payment was reported.
A. Four things stand out. First, whether DDTL 3.0 was fully drawn before its commitment termination date of 2026-07-31, which is flagged 'delayed' (4593). Second, whether the company can meet the 1.40x debt service coverage test from April 2027 (4596). Third, any disclosure resolving the springing maturity date of 2026-12-30 (11926). Fourth, whether the 1.6 GW of contracted power (4973) turns into active capacity, and how quickly the $25.9B backlog (4970) turns into recognized revenue.
A. There are five. (1) The outcome of the Core Scientific deal (4731, 4738), which is unresolved in the record. (2) Customer concentration: OpenAI accounts for about 43% of the backlog (4969 vs 4970), and the customers behind the DDTL 3.0 contract and the $350M share issuance are unnamed (4595, 4514). (3) Whether the NVIDIA relationship is circular, since NVIDIA is both a supplier and a $6.3B capacity buyer (4352). (4) Whether cash from contracts can cover roughly 9% interest costs. (5) Gaps in the dossier itself: the claims are lightly curated automated extractions with duplicates and some suspect 'delayed' flags, and the record supplied here ends in mid-September 2025.
Frequently asked
2026-09-24A. CoreWeave rents out GPU computing capacity, mainly NVIDIA hardware, to companies that train and run AI models. It is a specialized AI cloud rather than a general-purpose one. It says it was the only provider rated Platinum in SemiAnalysis's first two ClusterMAX evaluations (claims 18878, 18879, 4981). Its disclosed products include GB200 support across its platform (4976), AI Object Storage (4975), and on-demand cluster scaling (4977).
A. The strategy is to grow fast by borrowing heavily. CoreWeave went public on Nasdaq at $40 per share in March 2025 (17815, 11601), with about $1.4B in net proceeds (4967). It says it has raised $17.2B in total debt and equity (4968). It also expanded its revolving credit facility to $1.5B (5010), issued $2.0B of 9.25% notes due 2030 (11917, 4824) and $1.75B of 9% notes due 2031 (4658), and set up a $2.6B delayed-draw term loan (4592). Beyond financing, it is buying adjacent businesses: Weights & Biases, an AI developer-tools company, for about $1.0B (4516), and it agreed to merge with Core Scientific (4729).
A. Only a few customers are named. OpenAI accounts for $11.2B of revenue backlog (4969), out of a stated total backlog of $25.9B (4970). IBM is named as a partner using CoreWeave capacity for its Granite models (4971). NVIDIA made a $6.3B commitment to buy capacity running through April 2032 (4352). Other significant customers are not identified: a 'material customer contract' backs the $2.6B term loan (4595), and an unnamed 'strategic customer' bought $350M of shares at the IPO (4514). Roughly $14.7B of the $25.9B backlog cannot be traced to a named customer in this dossier.
A. Completed: the IPO (18881), the 2030 and 2031 note issuances (11917, 4658), the credit facility expansions (5010, 5011), and product launches such as Object Storage becoming generally available (4975). Announced but not yet shown as delivered: turning the $25.9B backlog into revenue (4970), and building out the 1.6 GW of contracted power, of which only 420 MW was active (4972, 4973). The Core Scientific merger is also incomplete; the dossier records no closing. Every claim in the record is labeled 'stated.' None has been independently confirmed as delivered.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal, paying 0.1235 CoreWeave shares per Core Scientific share (4731). Closing was expected around October 2025 (4517), with an outside deadline of April 7, 2026 (4738). The deal terms include a $270M termination fee payable to CoreWeave (4739). Both dates have passed and the dossier records no completion, so those claims are marked delayed. Readers should confirm the deal's current status from primary sources before relying on it.
A. The debt is large and expensive, with coupons of 9% to 9.25% (4824, 4659). The $2.6B term loan comes with conditions (covenants). The company must keep a minimum 0.85x contract realization ratio (4597), which roughly measures how much contracted revenue is actually being collected. It must also keep a 1.40x debt service coverage ratio starting April 2027 (4596), meaning cash flow must comfortably exceed debt payments. The revolving credit facility runs to May 2028 (5012) but carries a contingent 'springing' maturity tied to December 30, 2026 (11926). Under that clause, the loan could come due earlier if certain conditions are triggered.
A. Three dates matter most: - December 30, 2026: the springing maturity trigger on the revolver (11926). - July 31, 2026: the commitment deadline on the $2.6B term loan (4593), whose follow-up is not yet recorded. - April 2027: when the debt service coverage test begins (4596). Beyond those dates, watch how much of the 1.6 GW of contracted power becomes active (4973), how quickly the $25.9B backlog turns into revenue (4970), and any resolution of the Core Scientific deal (4731).
A. 1. Concentration risk: how much of the business depends on OpenAI (4969) and on the unnamed customers behind the term loan (4595) and the $350M share purchase (4514)? 2. Execution: can CoreWeave bring contracted power online fast enough to meet its covenants? 3. The Core Scientific merger: what is its status? 4. Record gaps: several items are marked 'delayed' only because no follow-up confirmation was captured, including note closing dates (11919, 4699) and a first interest payment (4659), even though the notes themselves were issued. This record also appears to end in mid-September 2025, so later disclosures are not reflected here.
Frequently asked
2026-09-24A. CoreWeave rents out GPU computing capacity for AI workloads, a model often called 'AI cloud' or 'neocloud.' It builds and operates data-center clusters, mainly on NVIDIA hardware, and sells access to AI developers. It has also added software on top: GB200 support across its platform (claim 4976), CoreWeave AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), and its acquisition of Weights & Biases, an ML developer-tools company (claims 4974, 4516). Third-party benchmarkers gave it SemiAnalysis's top 'Platinum' ClusterMAX rating in both the first and 2.0 evaluations (claims 18878, 18879, 4981).
A. The strategy is to lock in long-term customer contracts and borrow heavily against them to build capacity. As of May 2025 it reported $25.9B in committed revenue backlog (claim 4970), 1.6 GW of contracted power, and 420 MW of active power (claims 4973, 4972). It had raised $17.2B in total debt and equity (claim 4968). It also tried to own more of its infrastructure by agreeing to merge with Core Scientific, a data-center operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. Only a few customers are named in the record. OpenAI is named, with $11.2B of backlog tied to its strategic deal (claim 4969), which is roughly 43% of the $25.9B total backlog (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA agreed to a $6.3B capacity purchase commitment running to 2032 (claim 4352), making it both supplier and customer. Two other references leave the counterparty unnamed: a 'material customer contract for GPU infrastructure' underpinning the DDTL 3.0 loan (claim 4595), and a $350M share issuance to an unnamed 'strategic customer' (claim 4514). Customer concentration is a central issue.
A. The financings appear completed. The Nasdaq IPO priced at $40/share on 2025-03-28 (claims 15974, 18881) with about $1.4B in net proceeds (claim 4967). The company issued $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824) and $1.75B of 9% senior notes due 2031 (claims 4697, 4658); both deals were upsized from $1.5B (claims 11921, 4700, 4698). It expanded its revolver to $1.5B (claim 11923) and set up a DDTL 3.0 term loan of up to $2.6B (claim 4592). Several notes-closing dates carry an automated 'delayed' flag, but the issuance claims indicate the deals closed. The Core Scientific merger is different: its 2026-04-07 deadline (claims 4731, 4738) and an earlier 2025-10-01 target (claim 4517) are both marked delayed, and nothing in the record shows it closed. Every status here is 'stated,' meaning it comes from company disclosures and has not been independently verified.
A. The company is heavily leveraged, and its bond coupons are 9–9.25% (claims 4824, 4697). The DDTL 3.0 facility has two key covenants. First, a minimum debt-service coverage ratio of 1.40x starting April 2027 (claim 4596), meaning cash flow must cover debt payments 1.4 times over. Second, a minimum contract-realization ratio of 0.85x (claim 4597), meaning contracted revenue must actually turn into cash. The revolver matures 2028-05-02 (claim 11925), but it has a contingent 'springing' maturity of 2026-12-30 (claim 11926) that could pull the due date earlier under certain conditions.
A. Four things. (1) Whether the Core Scientific merger closes, is renegotiated, or is terminated; the record notes a $270M termination fee payable to CoreWeave in certain cases (claim 4739). (2) Whether the revolver's 2026-12-30 springing maturity is triggered (claim 11926). (3) Whether DDTL 3.0 was fully drawn before its commitment period ended; the 2026-07-31 date is flagged delayed (claim 4593). (4) How the business performs against the April 2027 coverage covenant (claim 4596). Also watch for updates on backlog, active power capacity, and any newly named customers.
A. (1) Concentration: how much revenue depends on OpenAI, and who are the unnamed customers behind the material contract and the $350M share purchase (claims 4595, 4514)? (2) Delivery: can contracted power of 1.6 GW become active capacity on schedule when only 420 MW was active in May 2025 (claims 4973, 4972)? (3) Economics: can revenue cover 9%+ debt and the covenants that start in 2027? (4) The Core Scientific deal: why it missed its deadlines and what happens now. This dossier has two limits. It is built from automated extraction of company statements, so some items are duplicated and numbers are not independently verified. Its claim list is also cut off after the September 2025 NVIDIA entry, so later developments may be missing.
Frequently asked
2026-09-24A. CoreWeave rents out GPU computing capacity for training and running AI models. It builds and operates data-center clusters, most recently with NVIDIA GB200 support (claim 4976), and sells software on top, including AI Object Storage (claim 4975) and on-demand cluster scaling (claim 4977). It bought Weights & Biases, an AI developer-tools company, for about $1.0B (claim 4516), which adds a software layer to the infrastructure business. Independent reviewers rate its platform highly: it was the only 'Platinum' provider in SemiAnalysis's first two ClusterMAX evaluations (claims 18878, 18879).
A. The strategy is to secure power and GPUs ahead of demand, lock customers into multi-year contracts, and fund the buildout mostly with debt. The record shows 1.6 GW of contracted power, of which 420 MW of active capacity had been added (claims 4973, 4972). The company reported $17.2B in total debt and equity raised (claim 4968) and a $25.9B contracted revenue backlog (claim 4970). It also tried to own more of its power and data-center footprint by agreeing to merge with Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. OpenAI is the only customer named with a dollar figure: its strategic deal accounts for $11.2B of backlog (claim 4969), which is roughly 43% of the $25.9B total (claim 4970). IBM is named as a partner buying capacity for its Granite models (claim 4971). NVIDIA has committed to buy $6.3B of capacity through 2032 (claim 4352). Other disclosures name no counterparty: a 'material customer contract for GPU infrastructure' backing a loan facility (claim 4595), and a $350M share issuance to a 'strategic customer' (claim 4514). Customer concentration is high, and part of the customer base is undisclosed.
A. Completed: the Nasdaq IPO at $40 per share (claims 11616, 15974), with about $1.4B in net proceeds (claim 4967); the Weights & Biases acquisition (claim 4516); general availability of AI Object Storage (claim 4975); and three bond issues, namely $2.0B of 9.25% notes due 2030 (claims 4824, 11917) and $1.75B of 9% notes due 2031 (claim 4658). Announced but not shown as complete: most of the 1.6 GW of contracted power, since only 420 MW is recorded as active (claims 4973, 4972); the Core Scientific merger; and conversion of the backlog into recognized revenue.
A. The record does not show that it closed. The merger was signed in July 2025 (claim 4729). One disclosure targeted closing by 2025-10-01 (claim 4517), and the outside deadline was 2026-04-07 (claims 4731, 4738). All of these are now marked 'delayed', meaning the dates passed with no completion recorded. If the deal does not close, the terms include a $270M termination fee payable to CoreWeave (claim 4739). Readers should confirm the outcome from primary sources.
A. Debt is heavy and expensive. The bonds carry 9% to 9.25% coupons (claims 4824, 4658). The revolving credit facility was expanded to $1.5B (claim 11923) with a $350M letter-of-credit line (claim 11924). A delayed-draw term loan (DDTL 3.0) of up to $2.6B matures on 2030-08-21 (claims 4592, 4594). The loan covenants test whether contracts turn into cash: a minimum contract realization ratio of 0.85x (claim 4597), and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596).
A. Four things. First, the revolver's contingent 'springing' maturity date of 2026-12-30 (claim 11926), which could pull the facility's maturity forward from 2028-05-02 (claim 11925) if its conditions are triggered. Second, the 1.40x debt service coverage test that begins in April 2027 (claim 4596). Third, how quickly active capacity grows from 420 MW toward the 1.6 GW contracted (claims 4972, 4973). Fourth, how much of the $25.9B backlog turns into revenue, and whether OpenAI remains the dominant share (claims 4970, 4969).
A. (1) Who are the unnamed 'material' and 'strategic' customers (claims 4595, 4514)? (2) Did the Core Scientific merger close, fail, or trigger the $270M fee (claims 4731, 4739)? (3) Several 'delayed' status labels come from automated extraction and may be wrong. The 2030 notes are recorded as issued (claim 11917), yet their closing-date claim is marked delayed (claim 11919). Likewise, a 2026-02-01 interest payment on the 9% notes has no confirmation on file (claim 4659). (4) The claims on record end in September 2025, so roughly a year of disclosures may be missing from this view.
Frequently asked
2026-09-24A. CoreWeave rents out GPU computing capacity for AI workloads, mainly NVIDIA hardware in its own data centers. The record shows it building out its software stack: GB200 support (claim 4976), general availability of AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), and the acquisition of Weights & Biases, an AI developer-tools company, for about $1.0B (claim 4516). SemiAnalysis's ClusterMAX evaluations rated it the only 'Platinum' provider in both editions (claims 18878, 18879, 4981).
A. The strategy is to scale physical capacity quickly, pay for it largely with debt secured against customer contracts, and own more of its power and data-center supply chain. As of May 2025 it reported 420 MW of active power and 1.6 GW contracted (claims 4972, 4973). It had raised $17.2B in total debt and equity (claim 4968). In July 2025 it agreed to an all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The record also includes a $6.3B NVIDIA capacity purchase commitment running to 2032 (claim 4352).
A. Only a few are named. OpenAI is the biggest disclosed relationship, with an $11.2B contract backlog from a strategic deal (claim 4969). That is about 43% of the $25.9B total committed backlog reported in May 2025 (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA appears as a capacity buyer under a $6.3B commitment (claim 4352). Other key parties are not named: a 'material customer contract' backing the $2.6B DDTL 3.0 loan (claim 4595), and a 'strategic customer' that bought $350M of shares (claim 4514). Customer concentration is high, and much of it isn't identified.
A. Delivered or completed per the record: the March 2025 Nasdaq IPO at $40/share (claims 11601, 17815, 18881), with about $1.4B in net proceeds (claims 4967, 4513). A 9.25% senior notes issue due 2030 of about $2.0B (claims 4824, 11917). Its size was initially reported at $1.5B (claim 11921), so it appears to have been upsized, similar to the July offering. A 9% notes issue due 2031, upsized by $250M to $1.75B (claims 4698, 4697, 4658). An expanded $1.5B revolver and $350M letter-of-credit facility (claims 11923, 11924). The Weights & Biases acquisition (claim 4516). AI Object Storage general availability (claim 4975). Still announced but unconfirmed in this record: completion of the Core Scientific merger, conversion of contracted capacity into active capacity, and realization of the $25.9B backlog as revenue.
A. The debt is substantial and expensive. The record shows high-yield notes at 9.25% and 9% (claims 4824, 4697), plus secured delayed-draw term loans such as the $2.6B DDTL 3.0 maturing 2030-08-21 (claims 4592, 4594). DDTL 3.0 has lender tests tied to contract performance. Contracted revenue must stay at or above 0.85x a required level (claim 4597). A minimum 1.40x debt service coverage ratio applies from April 2027 (claim 4596). Because these covenants depend on customers actually paying, the backlog is more than a sales figure: the financing structure relies on it.
A. Near term: a contingent 'springing' maturity on the revolving credit facility dated 2026-12-30 (claim 11926). Its trigger conditions and whether it has been avoided aren't in the record. Otherwise, the revolver runs to 2028-05-02 (claim 5012). Also watch whether the Core Scientific merger closed, was extended, or was terminated (claims 4731, 4738). A $270M termination fee is payable to CoreWeave in some scenarios (claim 4739). Further out, the 1.40x coverage test begins April 2027 (claim 4596). Beyond those dates, look for disclosure of how much of the 1.6 GW of contracted power is now active.
A. They are automated flags. They mean a promised date has passed and the record contains no confirming event. They do not confirm that something actually slipped. Several flagged items are routine and probably happened: the note-offering closing dates (claims 11919, 4699) and the first 9% note interest date of 2026-02-01 (claim 4659). The flags that matter most are on the Core Scientific merger. The record lists a 2025-10-01 target (claim 4517) and a 2026-04-07 outside date (claims 4731, 4738), both passed with no closing recorded. Readers should check primary filings before concluding the deal failed.
A. 1) Concentration: how much revenue depends on OpenAI (claim 4969) and on customers the company doesn't name (claims 4514, 4595)? 2) Execution: can it turn 1.6 GW of contracted power into active capacity (claims 4972, 4973) fast enough to serve the $25.9B backlog (claim 4970)? 3) Leverage: can 9%+ debt costs and contract-linked covenants (claims 4596, 4597) hold up if a large customer cuts back? 4) Core Scientific: what happened to the merger (claims 4731, 4738)? 5) Data quality: this record is machine-extracted and contains duplicates and inconsistencies, such as the 2030 notes appearing at both $1.5B and $2.0B (claims 11921, 11917). The record provided also cuts off mid-entry at claim 4352. Figures should be checked against the underlying filings.
Frequently asked
2026-09-24A. CoreWeave rents out GPU computing capacity, built largely on NVIDIA hardware, to companies that train and run AI models. It is often called an AI-focused cloud. It supports NVIDIA's GB200 systems across its platform (claim 4976). It also sells software around that compute: AI Object Storage became generally available (claim 4975), and it acquired the AI developer-tools company Weights & Biases (claims 4974, 4516; the dossier records about $1,000M in connection with that deal). The company reported 1.6 GW of contracted power capacity (claim 4973) and said it added 420 MW of active power capacity (claim 4972).
A. The strategy on record is to use borrowed money to build data-center capacity quickly, backed by long-term customer contracts. The company reported $17,200M in total debt and equity raised (claim 4968) against a committed revenue backlog of $25,900M (claim 4970). It has also moved to own more of the stack: power and data-center sites through the proposed Core Scientific merger (claims 4729, 4731), and software through Weights & Biases (claim 4974). It went public at $40 per share (claims 15974, 11616), with IPO net proceeds of about $1,400M (claim 4967).
A. Only a few are named. OpenAI is the main one, tied to a strategic deal that accounts for $11,200M of backlog (claim 4969). IBM is named as a partner using CoreWeave capacity for its Granite AI models (claim 4971). NVIDIA agreed to a $6,300M commitment to buy capacity through April 2032 (claim 4352), which makes it both CoreWeave's supplier and a customer. Other disclosures leave the counterparty unnamed. These include a 'material customer contract for GPU infrastructure' backing the DDTL 3.0 loan (claim 4595) and a $350M share issuance to a 'strategic customer' (claim 4514). Most of the $25,900M backlog (claim 4970) is not attributed to any named customer in this dossier.
A. The financings are the most concrete items. The IPO priced at $40 per share (claims 15974, 11601). The $2,000M of 9.25% senior notes due 2030 were issued (claims 11917, 4824). The $1,750M of 9% senior notes due 2031 were issued (claim 4658). The revolving credit facility was expanded to $1,500M (claim 5010), with a $350M letters-of-credit facility (claim 5011). A $2,600M delayed-draw term loan, DDTL 3.0, was put in place (claim 4592). Several product launches are recorded as stated, including AI Object Storage general availability (claim 4975) and GB200 support (claim 4976). Backlog, contracted capacity, and customer commitments are company statements. This dossier does not independently verify them.
A. The debt is large and expensive. The recent senior notes pay 9% to 9.25% interest (claims 4824, 4658). The DDTL 3.0 loan carries covenants tied to both cash flow and contract performance. The company must keep a minimum contract realization ratio of 0.85x (claim 4597). It must also keep a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The revolving credit facility's maturity was extended to May 2028 (claim 5012). However, it has a contingent 'springing' maturity date of 2026-12-30 (claim 11926), which could pull repayment forward if certain conditions are triggered.
A. This dossier does not say. CoreWeave agreed to an all-stock merger at 0.1235 CoreWeave shares for each Core Scientific share (claims 4731, 4331). The agreement set a closing deadline of 2026-04-07 (claim 4738) and a $270M termination fee payable to CoreWeave (claim 4739). The record does not confirm that the deal closed. The related claims are flagged 'delayed' (claims 4731, 4738, 4517), which here means the promised-by date passed without a confirming record. Readers should check the deal's outcome independently before treating it as done.
A. Three items to watch: (1) the 2026-12-30 springing maturity date on the credit facility (claim 11926); (2) the 1.40x debt service coverage test that starts in April 2027 (claim 4596); (3) any evidence of whether DDTL 3.0 was fully drawn before its 2026-07-31 commitment termination date (claim 4593, flagged as unconfirmed). Also watch for backlog turning into recognized revenue, especially from OpenAI (claim 4969). Finally, watch how the 1.6 GW of contracted power (claim 4973) compares with capacity that is actually energized.
A. Customer concentration and disclosure: OpenAI alone accounts for $11,200M of the $25,900M backlog (claims 4969, 4970), and much of the rest is unnamed. Circularity: NVIDIA is both CoreWeave's key supplier and a $6,300M capacity buyer (claim 4352). Financing costs: interest near 9% (claims 4824, 4658) weighs against a business that has to keep spending to build capacity. Record gaps: this dossier's claims end in September 2025. Several items are flagged 'delayed' only because no follow-up was recorded, including some notes closings that other claims show did happen (compare claim 11919 with claim 11917). Treat 'delayed' flags as prompts to verify, not as confirmed slips.
Frequently asked
2026-09-24A. CoreWeave rents out GPU computing capacity for AI workloads. It builds and operates data-center infrastructure, mostly on NVIDIA hardware, and sells access under committed contracts. The record shows it supporting NVIDIA's GB200 systems across its cloud stack (claim 4976), launching AI Object Storage (claim 4975), and adding software through its acquisition of Weights & Biases, a developer tooling company (claim 4974). As of May 2025 it reported 420 MW of active power capacity (claim 4972) and 1.6 GW of contracted power (claim 4973).
A. The strategy is to sign long-term compute contracts with large AI developers and fund the data-center buildout largely with debt. By May 2025 CoreWeave reported $25.9B in revenue backlog from committed contracts (claim 4970) and $17.2B in total debt and equity raised (claim 4968). It is also moving up the stack with software (Weights & Biases, reported at about $1.0B, claim 4516). It tried to lock in power and sites by agreeing to acquire Core Scientific, a data-center operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). NVIDIA agreed to a $6.3B capacity purchase commitment running to April 2032 (claim 4352), which acts as a backstop buyer for unused capacity.
A. Only a few are named. OpenAI is the main disclosed customer, with a strategic deal carrying $11.2B of backlog (claim 4969) and a contract running to May 2031 (claim 4296). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA is both a supplier and, through the $6.3B commitment, a potential buyer of capacity (claim 4352). Several items point to counterparties the record does not identify. One is a 'material customer contract' tied to the $2.6B DDTL 3.0 loan (claim 4595). Another is $350M of shares issued to a 'strategic customer' (claim 4514). OpenAI's $11.2B is less than half of the $25.9B backlog (claim 4970), so most of the backlog cannot be attributed to named customers from this record.
A. Completed on the record: the IPO at $40 per share in March 2025 (claim 11616) with about $1.4B in net proceeds (claim 4967); issuance of $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824); issuance of $1.75B of 9% senior notes due 2031 (claim 4658); expansion of the revolving credit facility to $1.5B (claim 5010); the $2.6B DDTL 3.0 term-loan facility (claim 4592); and the Weights & Biases acquisition (claim 4974). Still announced or open: the Core Scientific merger. The record shows no closing, and the deal is flagged 'delayed' against its April 7, 2026 outside date (claims 4731, 4738). Capacity figures are company-reported and have not been independently verified. The 1.6 GW is contracted power, not operating power (claim 4973).
A. Heavily, and at high rates. The two bond deals on record carry 9.25% (claim 4824) and 9% (claim 4658) coupons. These are high-yield rates for a company with this much contracted revenue. On top of the bonds sit the $1.5B revolver (claim 5010), $350M of letter-of-credit capacity (claim 11924), and the $2.6B DDTL 3.0 facility (claim 4592). The loan terms include covenants: a minimum 1.40x debt service coverage ratio starting April 2027 (claim 4596) and a minimum 0.85x contract realization ratio (claim 4597). The second one means the loan depends on customers actually paying out on their contracts.
A. 1) December 30, 2026: a 'springing' maturity on the revolving credit facility (claim 11926). This is a contingent date that could pull the facility's maturity forward from May 2028 (claim 11925) if certain conditions aren't met. The record does not spell out the conditions. 2) April 1, 2027: the 1.40x debt service coverage test begins on DDTL 3.0 (claim 4596). 3) The Core Scientific outcome. Its outside date of April 7, 2026 has passed (claim 4738), and the record does not show whether the deal closed, was terminated, or whether the $270M termination fee payable to CoreWeave was triggered (claim 4739). 4) Whether the 1.6 GW of contracted power actually comes online (claim 4973).
A. (a) Customer concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI and a few unnamed counterparties, and how creditworthy those counterparties are. (b) The Core Scientific deal: the record flags it as delayed with no resolution (claims 4731, 4738, 4517). (c) Buildout pace: converting contracted power into revenue-producing capacity fast enough to service 9%+ debt (claims 4658, 4824). (d) The DDTL 3.0 commitment termination date of July 31, 2026 is flagged 'delayed' (claim 4593), and the record does not say whether the full $2.6B was drawn. (e) Circularity: NVIDIA is the key supplier, a backstop buyer (claim 4352), and closely tied to the ecosystem, which makes it hard to measure arm's-length demand.
A. Treat it as partial. Every claim was machine-extracted and then marked 'stated'. That means the company or a filing said it; it does not mean it was independently confirmed. Some 'delayed' flags, such as the note closing dates in claims 11919 and 4699, are probably extraction artifacts, because separate claims show those notes were issued (claims 11917, 4658). Several claims duplicate each other with inconsistent units or dates. For example, the IPO appears under both March 1 and March 28, 2025 (claims 17815, 11616). The record shown here effectively ends around September 2025, so anything after that, including the merger outcome and later financings, should be checked against current filings.
Frequently asked
2026-09-23A. CoreWeave rents out GPU-based computing power for AI workloads. It runs data centers filled with NVIDIA hardware and sells access to that capacity, plus software tools, to companies that train and run AI models. By May 2025 it reported 1.6 GW of contracted power capacity (claim 4973) and 420 MW of active compute power added (claim 4972). Its product claims include GB200 support across its cloud stack (claim 4976), general availability of AI Object Storage (claim 4975), and an MLPerf Inference v5.0 benchmark result (claim 4980).
A. The record shows a debt-funded buildout plus vertical expansion. On the capital side, CoreWeave went public at $40 per share (claims 11616, 15974) for about $1.4 billion in net proceeds (claim 4967). It reported $17.2 billion in total debt and equity raised (claim 4968) and has kept adding debt since. On the expansion side, it bought Weights & Biases, an AI developer-tools company, for about $1.0 billion (claim 4516). In July 2025 it agreed to merge with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). Core Scientific is a data-center operator, so the deal would give CoreWeave its own power and facilities rather than leasing them.
A. Only a few are named. OpenAI is the one named anchor customer, with an $11.2 billion revenue backlog from its strategic deal (claim 4969). A $350 million share issuance to a 'strategic customer' also appears (claim 4514), but that claim does not name the customer. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA committed to buy $6.3 billion of capacity through April 2032 (claim 4352), which makes it both supplier and customer. The customer contract backing the $2.6 billion DDTL 3.0 loan is described only as a 'material customer contract' and is not named (claim 4595). Total committed backlog was $25.9 billion as of May 2025 (claim 4970), so OpenAI alone accounted for about 43% of it.
A. Completed items on the record: the IPO priced at $40 (claim 11601); the over-allotment option was exercised for $68 million (claim 4515); and the Weights & Biases acquisition closed (claims 4974, 4516). Several financings are also completed: the revolving credit facility grew by $1.5 billion (claim 11923), the letters-of-credit facility grew by $350 million (claim 11924), $2.0 billion of 9.25% senior notes due 2030 were issued (claims 11917, 4824), and $1.75 billion of 9% senior notes due 2031 were issued (claim 4658). The main item that was announced but is not confirmed as complete is the Core Scientific merger. Its closing deadline of 2026-04-07 has passed and the record marks it 'delayed' (claims 4731, 4738). The dossier contains no claim confirming that the deal closed.
A. It has taken on a lot of debt at high interest rates. In 2025, both senior-note offerings were made larger than first announced. The first was launched at $1.5 billion (claim 11921) and closed at $2.0 billion at 9.25% (claims 11918, 4824). The second was launched at $1.5 billion (claim 4700) and increased by $250 million (claim 4698) to $1.75 billion at 9% (claim 4697). On top of the notes, the company has a $2.6 billion delayed-draw term loan (claim 4592) and an expanded revolving credit facility. Interest rates around 9% are high for a company of this size, which signals that lenders see real risk.
A. Five items. (1) The revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926). This is an early due date that can be triggered by certain conditions; otherwise the facility matures on 2028-05-02 (claim 11925). (2) The DDTL 3.0 loan's commitment period was due to end on 2026-07-31 (claim 4593). The record marks this 'delayed', meaning there is no confirmation yet of how much was drawn. (3) From April 2027, the company must maintain a debt service coverage ratio of at least 1.40x (claim 4596). (4) It must also maintain a contract realization ratio of at least 0.85x (claim 4597), which tests whether customer contracts actually turn into cash. (5) Any final word on whether the Core Scientific merger closed or was terminated. If Core Scientific terminates, it owes CoreWeave a $270 million fee in certain scenarios (claim 4739).
A. Four stand out. (1) Customer concentration: OpenAI is about $11.2 billion of a $25.9 billion backlog (claims 4969, 4970), and other large contracts are unnamed (claim 4595). (2) Whether the 1.6 GW of contracted power (claim 4973) is turning into running capacity fast enough to pay debt costing roughly 9% or more. (3) The status of the Core Scientific merger (claims 4731, 4738). (4) NVIDIA's dual role as the main hardware supplier and a $6.3 billion capacity buyer (claim 4352). This raises the question of how much demand comes from independent customers.
A. A 'delayed' status is set automatically when a promised-by date passes and no claim on record confirms that the event happened. Examples include the note closing dates (claims 11919, 4699) and the first 9% note interest payment on 2026-02-01 (claim 4659). The flag does not necessarily mean something went wrong; routine events often go unconfirmed in the source filings. For material items like the Core Scientific merger (claim 4731) and the DDTL 3.0 commitment date (claim 4593), readers should check primary filings before drawing conclusions.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity for AI workloads. It builds and operates data-center capacity and sells access to it under committed contracts. As of May 2025 it reported 1.6 GW of contracted power capacity (claim 4973) and said it had added 420 MW of active compute power (claim 4972). It also sells a software layer on top, including AI Object Storage (generally available, claim 4975), support for NVIDIA GB200 (claim 4976), and on-demand cluster scaling (claim 4977).
A. The strategy has three parts. First, borrow heavily to build GPU capacity ahead of demand. Second, lock that capacity into long-term customer contracts. Third, buy adjacent businesses to control more of the stack. On financing, it reported $17.2B in total debt and equity raised (claim 4968), a $40/share IPO with about $1.4B in net proceeds (claims 11616, 4967), a revolving credit facility expanded to $1.5B (claim 11923), a $2.6B delayed-draw term loan (claim 4592), and high-yield notes: $2.0B at 9.25% due 2030 (claims 11917, 4824) and $1.75B at 9% due 2031 (claim 4658). On acquisitions, it bought Weights & Biases (claim 4974; about $1.0B, claim 4516) and agreed to merge with Core Scientific, a data-center and power-site operator (claim 4729).
A. Only a few are named. OpenAI is named, with an $11.2B strategic deal counted in backlog (claim 4969). That is about 43% of the $25.9B total backlog reported in May 2025 (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA is both a supplier and a buyer: it committed to purchase $6.3B of capacity through April 2032 (claim 4352). Other key counterparties are not named. The $2.6B term loan is tied to an unnamed 'material customer contract' (claim 4595), and a $350M share issuance went to an unnamed 'strategic customer' (claim 4514). Much of the business depends on a small number of buyers.
A. Completed, per the record: the IPO at $40/share (claims 11616, 11601, 15974), the Weights & Biases acquisition (claim 4974), the credit facility expansions (claims 11923, 11924), and issuance of both senior note series (claims 4824, 4658). Product launches such as AI Object Storage GA were stated as delivered (claim 4975). Not confirmed as completed: the Core Scientific merger. Every dated deadline for it carries status 'delayed', including an October 2025 target (claim 4517) and an April 7, 2026 closing deadline (claims 4731, 4738). The record does not show the merger closing, and it does not show the merger being terminated. Backlog figures (claims 4970, 4969) are contracted future revenue, not revenue already earned.
A. The record does not settle it. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331). It filed an S-4 registration statement (claim 4733). A $270M termination fee would be payable to CoreWeave under certain conditions (claim 4739). The April 7, 2026 outside date has passed and is marked 'delayed' (claim 4738). There is no claim recording a close, an extension, or a termination. Readers should confirm the deal's status from primary filings.
A. (1) December 30, 2026: a contingent 'springing' maturity on the revolving credit facility (claim 11926). This can pull the facility's due date forward from May 2028 (claim 11925) if certain conditions are triggered. (2) April 2027: a minimum 1.40x debt service coverage ratio kicks in under the term loan (claim 4596). (3) An ongoing minimum 0.85x contract realization ratio (claim 4597). This is effectively a test of whether contracted customer revenue actually shows up. (4) Any resolution of the Core Scientific merger. (5) Whether the $2.6B term loan was fully drawn: its July 31, 2026 commitment termination date is marked 'delayed' (claim 4593).
A. 1. Customer concentration and opacity: one named customer, OpenAI, accounts for a large share of backlog (claims 4969, 4970), and key financing-linked contracts are anonymous (claims 4595, 4514). 2. Cost of capital: new debt carries 9 to 9.25% coupons (claims 4824, 4658), so capacity must be monetized quickly to service it. 3. Payment status: the first 9% note interest payment, due February 1, 2026, is marked 'delayed' in the record (claim 4659). This may reflect extraction or verification lag rather than a missed payment, but it has not been confirmed as paid. 4. The unresolved Core Scientific merger (claims 4731, 4738). 5. Leadership: the record notes CEO-related events in September 2025 (claims 4332, 4315) but does not name the executive or say what changed.
A. Yes, a few. One IPO claim is dated March 1, 2025 (claim 17815), while three others date it March 28, 2025 (claims 11616, 11601, 15974). Some amounts have unit errors: the term loan appears as '2600.0 USD' (claim 11922) versus $2.6 billion (claim 4592), and the July notes appear as '1750.0 USD' (claim 4697). Both should be read as millions. The May 2025 notes were first described at $1.5B (claim 11921) and later at $2.0B (claims 11918, 11917), which is consistent with an upsized offering. The July notes likewise went from $1.5B (claim 4700) to $1.75B after a $250M increase (claim 4698). All claims come from automated extraction, promoted to 'stated'. None are independently verified.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity for AI workloads, a model often called an 'AI cloud.' It builds and operates data-center capacity filled with NVIDIA hardware and sells access to AI developers. The record shows about 1.6 GW of contracted power capacity and 420 MW of active compute power added (claims 4973, 4972). It also sells a software layer on top of that hardware, including AI Object Storage, which reached general availability (claim 4975), GB200 support across its platform (claim 4976), and developer tooling from its acquisition of Weights & Biases (claims 4974, 4516).
A. The strategy is to scale physical capacity quickly using large amounts of debt, and to secure long-term contracts that justify the build-out. After a $40/share IPO in March 2025 (claims 11616, 15974) with about $1.4B in net proceeds (claim 4967), the company reported $17.2B in total debt and equity raised (claim 4968). Later debt included a $1.5B revolver expansion (claim 5010), a $2.6B delayed-draw term loan (claim 4592), $2.0B of 9.25% notes due 2030 (claims 11917, 4824), and $1.75B of 9% notes due 2031 (claim 4658). It also tried to integrate vertically by agreeing to acquire Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. Few customers are named. OpenAI is the one named customer with a disclosed figure: an $11.2B strategic deal backlog (claim 4969), which is a large share of the $25.9B total contracted backlog (claim 4970). IBM appears as a partner for Granite model compute (claim 4971). NVIDIA has a $6.3B capacity purchase commitment running through April 2032 (claim 4352), so it is both a supplier and a buyer. Other customers are not named, including the 'material customer contract' that secures the $2.6B DDTL 3.0 loan (claim 4595) and the 'strategic customer' that bought $350M of shares (claim 4514). Customer concentration is therefore high and only partly visible.
A. Delivered items in the record include the IPO at $40/share and its proceeds (claims 11601, 4967), the $68M over-allotment exercise (claim 4515), the Weights & Biases acquisition at about $1.0B (claim 4516), the credit facility expansions (claims 5010, 5011), and the closing of the 2030 and 2031 notes (claims 11917, 4658). Product milestones stated as achieved include AI Object Storage general availability, MLPerf Inference v5.0 results, and a SemiAnalysis Platinum rating (claims 4975, 4980, 4981). Backlog figures (claims 4970, 4969) are contracted future revenue, not revenue already earned. The 1.6 GW figure is contracted power, not power that is already running (claim 4973).
A. This is the largest unresolved item in the dossier. The merger agreement was signed in July 2025 (claim 4729), and a Form S-4 was filed (claim 4733). The record flags both the expected closing (claim 4517, targeted for 2025-10-01) and the outside deadline of 2026-04-07 (claims 4731, 4738) as delayed. A $270M termination fee is payable to CoreWeave under certain conditions (claim 4739). The dossier does not record whether the deal closed, was terminated, or whether that fee was paid. Readers should check a primary source before assuming either outcome.
A. The debt is significant and expensive, with recent notes carrying 9% to 9.25% coupons (claims 4824, 4697). The DDTL 3.0 loan requires a minimum contract realization ratio of 0.85x (claim 4597), meaning customers must actually pay on the contracts pledged as collateral. It also requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The revolver matures in May 2028 (claim 11925) but has a contingent 'springing' maturity of 2026-12-30 (claim 11926), which could pull the repayment date forward if certain conditions are triggered.
A. 1. The 2026-12-30 springing maturity on the revolver, and whether it is triggered (claim 11926). 2. Whether the DDTL 3.0 commitment ended as scheduled on 2026-07-31; the record flags it as delayed (claim 4593). 3. The first test of the 1.40x debt coverage covenant in April 2027 (claim 4596). 4. How much of the $25.9B backlog turns into recognized revenue (claim 4970). 5. How much of the 1.6 GW of contracted power actually comes online (claim 4973). 6. The final outcome of the Core Scientific deal and its $270M fee (claim 4739).
A. 1. Customer concentration: the identity and size of unnamed customers, and how dependent the backlog is on OpenAI (claim 4969). 2. The Core Scientific outcome, discussed above. 3. Leadership: CEO-related events are logged in September 2025 (claims 4332, 4315), but the record does not say what changed. 4. Data quality: many claims are duplicates, such as four records of the $40 IPO price. Some units are inconsistent; for example, claim 11922 lists '2600.0 USD' where $2.6B is meant. Several 'delayed' flags on routine note closings (claims 11919, 4699, 4659) come from automated extraction and have no confirming follow-up. Treat those flags with caution rather than as evidence of real slippage.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity for AI workloads. It builds and operates the data-center infrastructure and sells access to it under long-term contracts. Its disclosed product work supports that core business: GB200 support across its cloud platform stack (claim 4976), general availability of AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). In 2025 it went public at $40 per share (claims 15974, 11616), with IPO net proceeds of about $1.4B (claim 4967).
A. The strategy is to scale capacity quickly with borrowed money and move up the software stack through acquisitions. On capacity, CoreWeave reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). It also disclosed a $6.3B capacity purchase commitment with NVIDIA running to 2032 (claim 4352). On acquisitions, it bought Weights & Biases, an AI developer-tools company, for about $1.0B (claim 4516). It also agreed an all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731), which would give it more data-center sites and power.
A. Only a few are named. OpenAI is the main one, with a strategic deal adding $11.2B to the backlog (claim 4969) and a separate $6.5B committed-revenue figure running to 2031 (claim 4297). IBM is named as a partner for Granite model compute (claim 4971). Other important counterparties are not named. A 'material customer contract' backing the DDTL 3.0 loan is unidentified (claim 4595), as is the strategic customer that received a $350M share issuance (claim 4514). Total backlog from committed contracts was $25.9B (claim 4970), so much of it appears to rest on OpenAI. Beyond that, customer concentration can't be measured from this record.
A. Mostly with debt. CoreWeave cited $17.2B of total debt and equity raised (claim 4968). The major pieces are: - $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824) - $1.75B of 9% senior notes due 2031 (claim 4697) - a $2.6B delayed-draw term loan called DDTL 3.0 (claim 4592) - a revolving credit facility expanded by $1.5B (claim 5010), plus $350M of added letters of credit (claim 5011) The 9% to 9.25% coupons on the notes are high borrowing costs. The DDTL 3.0 loan also carries covenants tied to customer contracts: a minimum 0.85x contract realization ratio (claim 4597) and a 1.40x debt service coverage ratio starting April 2027 (claim 4596).
A. No claim in this dossier has been independently confirmed as delivered. Every item is either 'stated' (the company said it) or 'delayed' (a promised date passed without confirmation on record). The IPO pricing, the note issuances, the product launches and the capacity figures are all company statements. Several items are marked 'delayed': - the Core Scientific merger deadline of 2026-04-07 (claims 4731, 4738) - the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) - some note closing dates (claims 11919, 4699) - the first 9% note interest payment due 2026-02-01 (claim 4659) Many of these flags probably mean that no follow-up has been recorded yet, not that anything actually slipped. For example, the May 2025 notes appear as an issuance in claim 4824.
A. It is the largest unresolved item in the record. The merger agreement was signed in July 2025 (claim 4729), and CoreWeave filed an S-4 registration statement (claim 4733). A $270M termination fee would be payable to CoreWeave in some circumstances (claim 4739). The outside closing date of 2026-04-07 has passed (claim 4738), and the dossier has no claim confirming either a close or a termination. Readers should check the current status from primary filings before treating the combined company as fact.
A. - **2026-12-30:** a contingent 'springing' maturity date on the credit facility (claim 11926). If triggered, it would pull the facility's repayment date forward from its extended May 2028 maturity (claim 5012). - **April 2027:** the 1.40x debt service coverage covenant takes effect (claim 4596). - **Ongoing:** conversion of the $25.9B backlog (claim 4970) into reported revenue, and whether contracted power (1.6 GW, claim 4973) turns into active capacity. - **Ongoing:** confirmation that interest was paid on the 9% notes (claim 4659).
A. 1. **Customer concentration.** How much of the $25.9B backlog (claim 4970) depends on OpenAI (claims 4969, 4297), and who are the unnamed counterparties (claims 4595, 4514)? 2. **Debt load.** Can high-coupon debt be serviced from contract cash flows, given covenants tied to contract realization (claims 4597, 4596)? 3. **Core Scientific.** What is the merger's status after its deadline passed (claim 4738)? 4. **Capacity delivery.** How quickly does contracted power become active capacity? Note also that this dossier's claims run only through late 2025. More recent disclosures should be checked before drawing conclusions.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity for AI workloads. Its customers train and run AI models on CoreWeave's clusters rather than building their own data centers. The record shows it adding software around that core: AI Object Storage reaching general availability (claim 4975), GB200 support across its platform (claim 4976), on-demand cluster scaling (claim 4977), and the acquisition of Weights & Biases, an AI developer-tools company, for about $1.0B (claims 4974, 4516). The core business remains owning or leasing power and data-center capacity, filling it with NVIDIA GPUs, and selling that compute under long-term contracts.
A. The strategy is to grow capacity quickly and pay for it mostly with debt secured against long-term customer contracts. CoreWeave reported 1.6 GW of contracted power (claim 4973), with 420 MW of active capacity added (claim 4972), and $17.2B of total debt and equity raised (claim 4968). It also moved to vertically integrate. It signed an all-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). It also bought software capabilities through Weights & Biases (claim 4516).
A. Only a few are named. OpenAI is the clearest: an $11.2B strategic deal in backlog (claim 4969) and a separate $6.5B committed-revenue item running to 2031-05-31 (claim 4297). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA appears as a counterparty through a $6.3B capacity purchase commitment running to 2032-04-13 (claim 4352). Several important counterparties are not named in the record. These include the 'material customer contract' backing the $2.6B DDTL 3.0 loan (claims 4595, 4592) and the 'strategic customer' that received a $350M share issuance (claim 4514). Total backlog was reported at $25.9B (claim 4970), so a large share is concentrated in OpenAI.
A. It used both equity and heavy borrowing. The IPO priced at $40 per share around 2025-03-28 (claims 15974, 11601, 11616) and produced about $1.4B in net proceeds (claims 4967, 4513), plus a $68M over-allotment (claim 4515). The debt side is larger: - 9.25% senior notes due 2030, upsized from $1.5B to $2.0B (claims 11921, 11917, 4824) - 9% senior notes due 2031, upsized to $1.75B (claims 4697, 4698) - The revolving credit facility expanded by $1.5B, and the letters-of-credit facility by $350M (claims 5010, 5011) - A $2.6B delayed-draw term loan, DDTL 3.0, maturing 2030-08-21 (claims 4592, 4594) Coupons of roughly 9% show that lenders price this as high-yield credit.
A. Every claim in this record carries status 'stated'. That means the company said it, but the dossier has not independently confirmed delivery. The financing events are the most likely to have actually happened, because they are completed capital-markets transactions: the IPO pricing, the note issuances, and the facility amendments. Product items such as Object Storage GA, GB200 support, and MLPerf results (claims 4975, 4976, 4980) are company-reported. The capacity figures need the most care. Contracted power of 1.6 GW (claim 4973) is not the same as energized capacity of 420 MW (claim 4972). The gap between them is the build-out the company still has to deliver. Several items are tagged 'delayed', such as the note closing dates (claims 11919, 4699) and the first 9% coupon date (claim 4659). Those labels appear to come from an automated check that flagged past due dates. They are not confirmed slippage and should be verified before anyone relies on them.
A. The record shows that the merger agreement was signed (claim 4729) at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). An S-4 registration statement was filed (claim 4733), and a $270M termination fee would be payable to CoreWeave in certain scenarios (claim 4739). The outside closing deadline was 2026-04-07. That deadline is marked 'delayed' (claims 4738, 4731), and an earlier target of 2025-10-01 is also marked 'delayed' (claim 4517). Nothing in the record shows that the deal closed. A reader should treat completion as unconfirmed and look for a closing, termination, or shareholder-vote disclosure.
A. 1. **Revolver springing maturity (2026-12-30, claim 11926).** A springing maturity can pull the credit facility's due date earlier than its stated 2028-05-02 maturity (claim 5012) if certain conditions are met. Watch whether that trigger is avoided. 2. **DDTL 3.0 covenants.** The loan requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). Both tests depend on customers actually paying on their contracts. 3. **DDTL 3.0 commitment termination date (2026-07-31, claim 4593).** It is tagged 'delayed', so check how much of the loan was actually drawn. 4. **Energized capacity.** Watch for progress from the 420 MW active figure toward the 1.6 GW contracted figure (claims 4972, 4973).
A. 1. **Customer concentration.** OpenAI accounts for a large share of the $25.9B backlog (claims 4969, 4970), and key lender-backing contracts are with unnamed parties (claims 4595, 4514). 2. **Leverage.** Billions of roughly 9%-coupon debt (claims 4824, 4697) sit against long-dated revenue commitments and a $6.3B purchase obligation to NVIDIA (claim 4352). 3. **Status of the Core Scientific deal** (claim 4738), as described above. 4. **Data quality.** One IPO claim is dated 2025-03-01 (claim 17815) while others say 2025-03-28. Some 'delayed' tags look mechanical. The CEO claim (claim 4332) does not name the person. The claim set supplied here also ends in late September 2025, so developments after that are not reflected in this FAQ.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity for artificial intelligence work, a model often called an 'AI cloud.' Its disclosures cover data-center power capacity, GPU platform features, and software tools. Product claims include general availability of CoreWeave AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), and on-demand cluster scaling (claim 4977). In 2025 it added AI developer tooling by acquiring Weights & Biases, a deal the record values at about $1.0 billion (claim 4516).
A. The strategy is to sign large multi-year compute contracts, then borrow heavily to build the capacity those contracts require. The record shows the IPO priced at $40 per share (claim 11616) with about $1.4 billion in net proceeds (claim 4967). It also shows about $17.2 billion in total debt and equity raised (claim 4968). The debt includes $2.0 billion of 9.25% senior notes due 2030 (claims 11917, 4824) and $1.75 billion of 9% notes due 2031 (claim 4697). There is also a $2.6 billion delayed-draw term loan (claim 4592) and a revolving credit facility expanded by $1.5 billion (claim 5010). The company also pursued vertical integration by agreeing to acquire Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. OpenAI is the one named customer with specific figures. The record shows an $11.2 billion OpenAI contract backlog (claim 4969) and a further $6.5 billion in committed OpenAI revenue through May 2031 (claim 4297). It also shows a $350 million share issuance to a strategic customer (claim 4514). IBM appears as a partner that buys compute for its Granite AI models, with no dollar value disclosed (claim 4971). NVIDIA has agreed to buy $6.3 billion of unused capacity through April 2032 (claim 4352). NVIDIA is therefore both a supplier and a backstop buyer. The record also references a 'material customer contract' tied to the DDTL 3.0 loan without naming the customer (claim 4595). Total committed backlog was reported at $25.9 billion as of May 2025 (claim 4970), and most of it is not attributed to any named counterparty.
A. Delivered, per the record: the IPO at $40 per share (claim 11616), the $2.0 billion notes issuance (claim 11917), the Weights & Biases acquisition (claim 4516), and several product launches (claims 4975 to 4979). Power capacity is less settled. CoreWeave reported 420 MW of active compute power added (claim 4972) against 1.6 GW contracted (claim 4973), so most contracted power was not yet live at that disclosure. The backlog figures, including $25.9 billion total (claim 4970) and the OpenAI amounts (claims 4969, 4297), are future revenue commitments, not revenue already earned.
A. The merger agreement was signed in July 2025 (claim 4729) with an outside closing date of 2026-04-07 (claim 4738). It included a $270 million termination fee payable to CoreWeave (claim 4739). The record marks the merger, and an earlier October 2025 milestone (claim 4517), as 'delayed.' Nothing on record confirms the deal closed. Treat the transaction's current status as unresolved until a primary source confirms whether it completed or was terminated.
A. Four items. First, a contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926) could pull the facility's maturity forward from 2028-05-02 (claim 5012) if certain conditions occur. Second, the DDTL 3.0 loan requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). These covenants test whether contracted revenue actually turns into cash. Third, the 9% notes carry semiannual interest payments; the first was due 2026-02-01 (claim 4659). Fourth, watch how fast contracted power (claim 4973) is converted into active capacity.
A. 1. Customer concentration: OpenAI and a small number of counterparties appear to account for much of the backlog (claims 4969, 4297, 4970), and the remainder is largely unnamed. 2. Leverage and cost of debt: the notes carry 9% to 9.25% coupons (claims 4824, 4697), and the covenants depend on contracts converting to cash (claim 4597). 3. The Core Scientific merger's outcome (claim 4731). 4. Several claims are marked 'delayed' where the record may simply lack confirmation of completion. Examples are the notes closing dates (claims 11919, 4699), the February 2026 interest payment (claim 4659), and the DDTL 3.0 commitment termination date (claim 4593). These need verification against primary filings before anyone concludes a deadline was missed.
A. All claims come from automated extraction and are labeled 'stated,' meaning the company said them. Being 'stated' does not mean the claim was independently verified. Some events appear more than once, such as the IPO price in claims 17815, 15974, 11601, and 11616. Some amounts carry inconsistent units, such as the DDTL 3.0 loan recorded as '2600.0 USD' in claim 11922, which likely means $2.6 billion. The CEO entry (claim 4332) names no individual. The record provided also appears to end in September 2025, so later developments may be missing.
Frequently asked
2026-09-23A. CoreWeave rents GPU computing capacity to companies that train and run AI models. It builds and operates data-center clusters, mostly on NVIDIA hardware, including GB200 support across its platform stack (claim 4976), and sells cloud software on top, such as AI Object Storage (claim 4975). It also bought Weights & Biases, a developer-tools company for machine learning (claims 4974, 4516). The company went public in March 2025 at $40 per share (claims 11601, 15974).
A. The disclosed strategy is to grow very fast, funded mostly by debt. The company signs multi-year compute contracts, then raises money against them to build capacity. By May 2025 it reported $17.2B in total debt and equity raised (claim 4968), a $25.9B revenue backlog from committed contracts (claim 4970), and 1.6 GW of contracted power (claim 4973). It also moved into owning more of the stack: it bought Weights & Biases for about $1.0B (claim 4516) and in July 2025 agreed to buy data-center operator Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. Only a few customers are named in the record. OpenAI is the largest: an $11.2B backlog tied to a strategic deal (claim 4969) and a separate $6.5B committed-revenue figure running to May 2031 (claim 4297). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA has a $6.3B commitment to buy capacity through April 2032 (claim 4352), which makes it both a supplier and a customer. Some of the biggest commitments are not named. The contract backing the $2.6B DDTL 3.0 loan is described only as a 'material customer contract' (claims 4595, 4592), and there is an unnamed $350M 'strategic customer' share issuance (claim 4514). The record does not break down the rest of the $25.9B backlog by customer.
A. The capital markets deals have the firmest support in the record: - IPO net proceeds of about $1.4B (claims 4967, 4513). - A $2B issue of 9.25% senior notes due 2030 (claims 11917, 4824), upsized from a $1.5B announcement (claim 11921). - A $1.75B issue of 9% notes due 2031 (claims 4697, 4658). - A revolving credit line expanded by $1.5B (claim 5010). Operating figures are what the company reports about itself: 420 MW of active power added (claim 4972) and various product launches and benchmark results (claims 4975 to 4981). Every claim in this dossier has status 'stated', meaning it was disclosed. None has been independently marked as verified or delivered.
A. This dossier does not show a completed deal. The merger agreement was signed in July 2025 (claim 4729), with a $270M termination fee payable to CoreWeave if Core Scientific backed out (claim 4739). The outside closing deadline of 2026-04-07 has passed and is flagged 'delayed' (claims 4731, 4738), as is an earlier target date of 2025-10-01 (claim 4517). 'Delayed' here means the promised date passed with no recorded confirmation that the deal closed. It does not by itself tell us whether the deal was terminated or completed. Readers should check primary filings.
A. The debt is substantial and expensive. The 2030 and 2031 notes carry coupons of about 9% (claims 4824, 4697). The DDTL 3.0 loan comes with covenants: - A minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). This means cash flow must cover debt payments 1.4 times over. - A minimum contract realization ratio of 0.85x (claim 4597), which ties the loan to customers actually honoring their contracts. The revolver runs to 2028-05-02 (claim 5012), but it also has a contingent 'springing' maturity of 2026-12-30 (claim 11926) that could pull the due date forward if certain conditions are triggered.
A. Four things matter most: 1. Whether the springing maturity on 2026-12-30 is triggered or avoided (claim 11926). 2. Whether the company meets its covenant tests as the 1.40x coverage requirement begins in April 2027 (claim 4596). 3. How much of the $25.9B backlog (claim 4970) and the OpenAI commitments (claims 4969, 4297) actually turns into recognized revenue. 4. Confirmation of what happened to the Core Scientific merger (claims 4731, 4738). Several dated items are flagged 'delayed' only because no confirmation was recorded, including the February 2026 interest payment on the 9% notes (claim 4659) and the DDTL 3.0 commitment termination date (claim 4593). These need follow-up; the flag alone is not evidence of a default.
A. 1. **Customer concentration.** A large share of disclosed backlog is tied to OpenAI (claims 4969, 4297), and a key loan depends on an unnamed customer (claim 4595). How the company fares depends heavily on a few buyers paying as promised. 2. **NVIDIA's dual role.** NVIDIA is both the main hardware supplier and a $6.3B capacity buyer (claim 4352). How that circular relationship affects reported demand is unclear. 3. **Debt capacity.** Borrowing at around 9% requires the capacity build-out to generate cash quickly. 4. **Data quality.** This dossier comes from automated extraction and has inconsistencies. For example, the DDTL 3.0 amount appears as '2600.0 USD' in claim 11922 but '$2.6 billion' in claim 4592, and the IPO price appears under two different dates (claims 17815, 11601). The claim list is also cut off after September 2025, so later events are not covered here.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity in data centers built for AI workloads. Customers use it to train and run AI models. Its product claims include NVIDIA GB200 support across its platform (claim 4976), general availability of AI Object Storage (claim 4975), and On-Demand Cluster Scaling (claim 4977). It also cites third-party recognition, including a SemiAnalysis Platinum rating (claim 4981) and MLPerf Inference v5.0 results (claim 4980). In 2025 it bought Weights & Biases, an AI developer-tools company, for about $1.0B (claim 4516). That extends its offering from raw compute into software.
A. The strategy is to lock in long-term compute contracts, then borrow heavily to build the capacity to fulfill them. As of May 2025 it reported $25.9B of revenue backlog from committed contracts (claim 4970) and $17.2B of total debt and equity raised (claim 4968). It also reported 1.6 GW of contracted power, of which 420 MW of active capacity had been added (claims 4973, 4972). In July 2025 it agreed to acquire Core Scientific, a data-center operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The aim was to own more of the power and facilities it depends on.
A. Only a few are named. OpenAI is the main one: a strategic deal accounts for $11.2B of backlog (claim 4969), about 43% of the reported $25.9B total (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA agreed to buy up to $6.3B of unused capacity through April 2032 (claim 4352). NVIDIA is a supplier, so this is a backstop rather than ordinary customer demand. A 'material customer contract' (claim 4595) and a $350M share issuance to a 'strategic customer' (claim 4514) do not name the counterparty in this record. Most of the remaining backlog is therefore not tied to a named customer.
A. Completed: the IPO priced at $40 per share (claim 15974), with about $1.4B in net proceeds (claim 4967) plus a $68M over-allotment (claim 4515). Also completed: $2.0B of 9.25% senior notes due 2030 (claim 11917), $1.75B of 9% senior notes due 2031 (claim 4658), and a revolving credit facility expanded to $1.5B (claim 11923). A $2.6B delayed-draw term loan (DDTL 3.0) was put in place (claim 4592), and the Weights & Biases acquisition was reported (claim 4516). Only announced so far: most of the 1.6 GW of contracted power (claim 4973), since just 420 MW is active (claim 4972). The $25.9B backlog (claim 4970) is also future revenue, not revenue already earned. Not completed in this record: the Core Scientific merger. It is flagged 'delayed', and its 2026-04-07 outside date has passed (claim 4731).
A. The record shows only the signed merger agreement (claim 4729), the terms (0.1235 shares, claim 4731), and a $270M termination fee payable to CoreWeave if Core Scientific walks away (claim 4739). The deadline for completing the deal was 2026-04-07 (claim 4738). That date has passed with no recorded completion, so the tracker flags the deal as delayed. The dossier does not say whether it closed, was terminated, or whether the $270M fee was paid. Readers should check primary filings before assuming any outcome.
A. It carries a lot, at high interest rates. The 2025 bonds pay 9% to 9.25% (claims 4824, 4697), which reflects how risky lenders consider the business. The DDTL 3.0 loan comes with two tests. First, contracted revenue must actually be collected at a minimum ratio of 0.85x, the 'contract realization ratio' (claim 4597). Second, from April 2027, cash flow must cover debt payments at least 1.40x (claim 4596). The revolving credit facility matures 2028-05-02 (claim 11925). A contingent 'springing' clause can pull that maturity forward to 2026-12-30 (claim 11926).
A. (1) Whether the springing maturity of 2026-12-30 on the revolving credit facility is triggered (claim 11926). (2) Whether the company passes the 1.40x debt-service test starting April 2027 (claim 4596) and keeps collecting contracted revenue at or above 0.85x (claim 4597). (3) How much of the 1.6 GW contracted power becomes active capacity (claims 4973, 4972). (4) The final outcome of the Core Scientific merger and the $270M termination fee (claims 4731, 4739). (5) Whether the DDTL 3.0 loan was fully drawn before its commitment expired on 2026-07-31 (claim 4593).
A. Customer concentration: OpenAI alone accounts for $11.2B of $25.9B backlog (claims 4969, 4970), and much of the rest is not tied to a named customer. The NVIDIA arrangement is circular: a supplier is also committing to buy $6.3B of capacity (claim 4352). Leverage: about $3.75B of bonds at roughly 9% (claims 11917, 4658) sits on top of the term loans and revolving credit facility, and the capacity those funds pay for is still largely unbuilt. On the dossier itself: nearly all claims come from automated extraction and cover events through about September 2025, and the claim list we received was truncated. Some 'delayed' flags, such as bond closing dates (claims 11919, 4699), probably mean the completion was never recorded, not that it actually slipped. Several figures appear more than once in different units, for example the IPO price in claims 17815, 15974, 11616, and 11601.
Frequently asked
2026-09-23A. CoreWeave rents out GPU computing capacity for AI workloads, running NVIDIA hardware in data centers it contracts power for. Its disclosures describe a cloud software stack on top of that hardware, including GB200 support (claim 4976), AI Object Storage declared generally available (claim 4975), on-demand cluster scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). It also acquired Weights & Biases, an AI developer-tools company, for about $1.0B (claims 4974, 4516).
A. The disclosures describe fast, debt-funded expansion of AI compute capacity backed by long-term customer contracts. CoreWeave reported $25.9B of revenue backlog from committed contracts (claim 4970) and 1.6 GW of contracted power, with 420 MW of active capacity added (claims 4973, 4972). It is also moving into owning data-center infrastructure through a proposed all-stock merger with Core Scientific at 0.1235 CoreWeave shares per share (claims 4729, 4731). It is also adding software through Weights & Biases. NVIDIA is both its supplier and a partner, with a disclosed $6.3B commitment to buy unused capacity through April 2032 (claim 4352).
A. Only a few are named. OpenAI is the main one, with a strategic deal worth $11.2B of backlog (claim 4969), which is over 40% of the $25.9B total (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA's capacity-purchase commitment effectively makes it a backstop customer (claim 4352). Other filings refer to customers without naming them: a 'material customer contract for GPU infrastructure' (claim 4595) and a $350M share issuance to a 'strategic customer' (claim 4514). Most of the backlog is not attributed to a named counterparty in this record.
A. Mostly through borrowing. It went public at $40 per share (claims 11616, 15974), raising about $1.4B net (claims 4967, 4513). It reported $17.2B of total debt and equity raised (claim 4968). The record also shows: $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824); $1.75B of 9% senior notes due 2031, upsized by $250M (claims 4697, 4698); a $2.6B delayed-draw term loan, DDTL 3.0 (claim 4592); and a revolving credit facility expanded to $1.5B plus $350M in letters of credit (claims 5010, 5011). Interest rates of 9% or more signal a costly, high-risk borrower.
A. Every claim in this dossier is at status 'stated', meaning the company said it; none has been independently confirmed as delivered. The most concrete completed events are the IPO pricing (claim 11601) and the note issuances (claims 11917, 4658). Capacity figures, backlog, product launches and benchmark results (claims 4980, 4981) are company-reported. Several dated items are flagged 'delayed': the Core Scientific merger's April 7, 2026 deadline (claims 4731, 4738), the DDTL 3.0 commitment end date of July 31, 2026 (claim 4593), and some note closing dates (claims 11919, 4699). Some of these flags may just mean a deadline passed without a confirming filing in the record, not that the event actually failed.
A. This dossier does not say. The agreement was signed in July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). It required an S-4 registration filing and approval to list the new shares on Nasdaq (claims 4733, 4735). A $270M termination fee is payable to CoreWeave in some circumstances (claim 4739). The outside date of April 7, 2026 has passed and is flagged 'delayed' (claim 4738). No record here shows the deal closing, being extended or being terminated. That is a key item to verify.
A. Four items. (1) The revolving credit facility has a contingent 'springing' maturity of December 30, 2026 (claim 11926), well before its stated May 2028 maturity (claims 5012, 11925). What triggers it, and whether it is triggered, matters for liquidity. (2) The DDTL 3.0 loan covenants: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). (3) Whether the 1.6 GW of contracted power (claim 4973) becomes active capacity. (4) How the Core Scientific merger was resolved (claim 4738).
A. First, customer concentration: OpenAI accounts for $11.2B of $25.9B in backlog (claims 4969, 4970), and much of the rest is unnamed. Second, debt load: billions in 9%+ notes and term loans (claims 4824, 4697, 4592) must be repaid from revenue under contracts that have to keep performing, which the 0.85x realization covenant tests (claim 4597). Third, NVIDIA's dual role as supplier and capacity buyer (claim 4352). Fourth, 'delayed' flags on the merger and financing dates with no confirmation of outcomes. Finally, the claim record supplied here stops around September 2025, so later developments are not reflected.
Frequently asked
2026-09-22A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI training and inference — it builds and operates data centers full of NVIDIA accelerators and sells access to them as a cloud platform. The dossier's product claims describe the surrounding software layer: general availability of CoreWeave AI Object Storage (claim 4975), support for NVIDIA's GB200 systems across its platform stack (claim 4976), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and NVIDIA AI Enterprise / Cloud Functions support (claim 4979). It also cites third-party validation: an MLPerf Inference v5.0 result (claim 4980) and a SemiAnalysis 'Platinum' rating (claim 4981). Physically, the company disclosed 420 MW of active compute power added (claim 4972) against 1.6 GW of contracted power capacity (claim 4973).
A. Raise very large amounts of capital, spend it on GPUs and power, and lock in long-dated customer contracts to service the debt. The record shows a March 2025 IPO at $40/share (claims 17815, 11601, 15974, 11616) producing roughly $1.4 billion in net proceeds (claims 4967, 4513), and by May 2025 a cumulative $17.2 billion of debt and equity raised (claim 4968). On top of that sit an expanded $1.5 billion revolving credit facility and $350 million letter-of-credit facility (claims 11923, 11924), a $2.0 billion 9.250% senior notes issue due 2030 (claims 11917, 4824), a $1.75 billion 9% senior notes issue due 2031 (claims 4697, 4658) that was upsized by $250 million (claim 4698), and a delayed-draw term loan of up to $2.6 billion (claims 11922, 4592). The second leg is vertical integration and control of supply: acquiring Weights & Biases (claim 4974) for about $1.0 billion (claim 4516), merging with data-center operator Core Scientific (claim 4729), and a $6.3 billion capacity purchase commitment from NVIDIA running to April 2032 (claim 4352).
A. Three counterparties are named on the record: OpenAI, IBM, and NVIDIA. OpenAI is by far the largest — a strategic deal carrying $11.2 billion of revenue backlog (claim 4969) out of $25.9 billion total committed backlog (claim 4970), i.e. roughly 43% of disclosed backlog from a single customer. IBM is named as a partner for Granite compute capacity (claim 4971). NVIDIA appears as a supplier and as the counterparty to a $6.3 billion capacity purchase commitment (claim 4352), which functions as a demand backstop rather than ordinary customer revenue. Note that at least one significant GPU infrastructure contract is disclosed without naming the customer (claim 4595), and a $350 million share issuance is attributed only to an unnamed 'strategic customer' (claim 4514). A reader should treat the customer list as concentrated and partially anonymous.
A. This is the single most important caveat for a first-time reader: every claim in this dossier carries a status of 'stated' or 'delayed.' None has been marked verified or fulfilled. The record captures what CoreWeave announced and when, not independent confirmation that it happened. Concretely, the IPO and the various notes issuances are documented as announced events; the product features are documented as announced availability; the capacity figures (claims 4972, 4973) are company-reported. The Weights & Biases acquisition and the Core Scientific merger appear as signed agreements, not as confirmed closings. Backlog (claim 4970) is contracted future revenue, not recognized revenue — it is a promise by customers, not cash received.
A. Mostly no — read them carefully. The delayed flags cluster on routine dated events that the automated extraction could not confirm occurred on schedule: the expected closing of the $2.0 billion notes offering on 2025-05-27 (claim 11919), the expected closing of the $1.75 billion notes on 2025-07-25 (claim 4699), the first 9% interest payment due 2026-02-01 (claim 4659), and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). These are date-stamped expectations without a recorded confirmation, which the pipeline treats as unresolved rather than proven late. The substantive exception is the Core Scientific timeline, which is discussed separately.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331, 4314), supported by an SEC Form S-4 registration statement (claim 4733) and Nasdaq listing approval for the new shares (claim 4735), with Core Scientific convertible notes converting into CoreWeave securities (claim 4737). The timeline is where the record is unsettled: an August 2025 claim points to an expected closing around 2025-10-01 (claim 4517, delayed) while the merger agreement's outside deadline is 2026-04-07 (claims 4738, 4731, both delayed). A $270 million termination fee is payable to CoreWeave (claim 4739) if the deal breaks on certain terms. As of this dossier there is no recorded confirmation that the merger closed.
A. Four things. First, whether the Core Scientific merger closes before the 2026-04-07 outside date (claim 4738) or triggers the $270 million fee (claim 4739). Second, the debt covenants attached to the $2.6 billion DDTL 3.0: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) — the latter is the first hard financial test on the calendar, and it requires contracted revenue to have converted into actual cash by then. Third, the contingent springing maturity date of 2026-12-30 on the credit facility (claim 11926), which can pull forward an obligation otherwise dated 2028-05-02 (claims 5012, 11925). Fourth, whether the 420 MW of active capacity (claim 4972) converts toward the 1.6 GW contracted (claim 4973), since revenue cannot be delivered on power that is not energized.
A. Three gaps stand out. (1) Cost of capital versus returns: the company is borrowing at 9% and 9.25% (claims 4697, 4824) to buy depreciating GPUs, and the record contains no margin, cash-flow, or depreciation-schedule claims to judge whether the spread works. (2) Backlog quality: $25.9 billion of backlog (claim 4970) with $11.2 billion from one customer (claim 4969) raises the question of what happens to the covenant math in claim 4596 if that customer renegotiates — and the dossier records no contract terms, cancellation rights, or recognition timing. (3) Verification: as noted, nothing here is confirmed delivered, and the company claims on record run only through roughly September 2025, including a personnel claim about the Chief Executive Officer (claim 4332) whose substance is not detailed. Anyone using this dossier for diligence should treat it as a timeline of disclosures to be checked against filings, not as a findings document.
Frequently asked
2026-09-22A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI workloads — training and inference — rather than selling software or models. The dossier's product claims describe the shape of that business: general availability of CoreWeave AI Object Storage (claim 4975), support for NVIDIA's GB200 systems across its cloud platform stack (claim 4976), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and support for NVIDIA AI Enterprise and Cloud Functions (claim 4979). It also cites third-party validation: an MLPerf Inference v5.0 result (claim 4980) and a SemiAnalysis 'Platinum' rating (claim 4981). The underlying asset is physical: 420 MW of active compute power added (claim 4972) against 1.6 GW of contracted power capacity (claim 4973).
A. Raise very large amounts of capital, convert it into data-center power and GPUs, and pre-sell that capacity under long-term committed contracts. The company went public in March 2025 at $40 per share (claims 17815, 11601, 15974, 11616) for roughly $1.4 billion in net proceeds (claims 4967, 4513), and by May 2025 reported $17.2 billion in total debt and equity capital raised (claim 4968) against $25.9 billion of revenue backlog from committed contracts (claim 4970). Two acquisitions extend the strategy vertically: Weights & Biases for about $1.0 billion (claims 4974, 4516), adding an ML developer-tools layer, and a proposed all-stock merger with Core Scientific at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4331, 4314), which would bring data-center sites in-house rather than leased.
A. Only one large customer is named on the record: OpenAI, tied to a strategic deal carrying $11.2 billion of revenue backlog (claim 4969) — roughly 43% of the $25.9 billion total backlog (claim 4970). IBM appears as a partner, contracted for compute capacity to support its Granite models (claim 4971), and NVIDIA appears as a counterparty on a $6.3 billion capacity purchase commitment running to April 2032 (claim 4352), which is NVIDIA agreeing to buy unsold capacity — a backstop, not ordinary demand. Beyond that, the disclosures are deliberately anonymous: a 'material customer contract for GPU infrastructure' with no name attached (claim 4595), and a $350 million share issuance to an unnamed 'strategic customer' (claim 4514). A reader should treat the named-customer list as short and the concentration as high.
A. Almost everything in this dossier is an announcement. Every claim carries status 'stated' — meaning it was extracted from a disclosure and has not been independently confirmed as completed — except a handful that flipped to 'delayed' when a promised date passed without recorded confirmation. Nothing in the record is marked verified or delivered. That is partly an artifact of how the record is built (automated extraction from filings and press releases, with no completion signal wired in), so 'not confirmed' should not be read as 'did not happen.' The honest summary: capital-raising and contract-signing are well documented; operational delivery against those contracts is not documented here at all.
A. Six: the Core Scientific merger and its April 7, 2026 closing deadline (claims 4731, 4738), an earlier October 1, 2025 target for the same deal (claim 4517), the expected closing of the $2.0 billion senior notes offering on May 27, 2025 (claim 11919), the expected closing of the $1.75 billion notes on July 25, 2025 (claim 4699), the first 9% interest payment due February 1, 2026 (claim 4659), and the DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593). Most of these are low-signal: note closings and scheduled coupon payments are routine, and the flag likely reflects that no follow-up filing was captured rather than a missed payment — claim 11917 records the $2.0 billion notes as issued on May 27, 2025, the same date claim 11919 marks delayed. The Core Scientific timeline is the one worth real attention, since the target date slipped from October 2025 to April 2026 within the record itself.
A. Overwhelmingly with debt, at high coupons. The disclosed stack includes a revolving credit facility expanded to $1.5 billion with a letters-of-credit facility of $350 million, maturing May 2, 2028 (claims 11923, 5010, 11924, 5011, 5012, 11925) but with a contingent springing maturity as early as December 30, 2026 (claim 11926); $2.0 billion of 9.250% senior notes due 2030 (claims 11917, 11918, 4824); $1.75 billion of 9% senior notes due 2031, upsized by $250 million from the $1.5 billion originally marketed (claims 4697, 4658, 4698, 4700); and a delayed-draw term loan facility ('DDTL 3.0') of up to $2.6 billion maturing August 21, 2030 (claims 11922, 4592, 4594). Coupons of 9% and above on a company whose asset base is depreciating GPUs is the central financial tension in this dossier.
A. Four dated tests. First, whether the Core Scientific merger closes by the April 7, 2026 outside date (claim 4738) — note the deal carries a $270 million termination fee payable to CoreWeave if it breaks (claim 4739), and the S-4 registration and Nasdaq listing approval are already on record (claims 4733, 4735). Second, the contingent springing maturity on the revolver at December 30, 2026 (claim 11926), which can pull a 2028 maturity forward. Third, the DDTL 3.0 covenants: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) — the first date on which the backlog has to demonstrably convert into cash that services the debt. Fourth, whether the 420 MW of active capacity (claim 4972) closes the gap toward the 1.6 GW contracted (claim 4973).
A. Three. (1) Concentration: one named customer accounts for $11.2 billion of $25.9 billion in backlog (claims 4969, 4970), and the next-largest commitments are either unnamed (claims 4595, 4514) or come from NVIDIA (claim 4352), the company's own chip supplier — so supplier, investor, and customer are partly the same party. (2) Backlog quality: 'committed contract' backlog (claim 4970) is a disclosed figure, not a delivered one, and nothing in the record shows what fraction has converted to revenue; the 0.85x realization covenant (claim 4597) implies the lenders share this question. (3) Refinancing: $17.2 billion raised as of May 2025 (claim 4968) plus several billion more after, at 9%-plus, against maturities clustering in 2030-31 — the outcome depends on AI compute demand holding through a full GPU depreciation cycle. Separately, note that this record appears to run only through late September 2025 (claims 4331, 4332, 4314); anything after that is not covered here.
Frequently asked
2026-09-21A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity to companies training and running AI models. Rather than selling software, it builds and operates data centers stocked with NVIDIA hardware and sells access to that capacity under long-term contracts. The dossier's product record is consistent with that picture: GB200 support across its cloud platform stack (claim 4976), general availability of an AI object storage product (claim 4975), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and support for NVIDIA AI Enterprise and Cloud Functions (claim 4979). It also markets third-party validation — an MLPerf Inference v5.0 benchmark result (claim 4980) and a SemiAnalysis 'Platinum' rating (claim 4981).
A. Raise very large amounts of capital, convert it into contracted power and GPUs, and pre-sell that capacity under multi-year contracts. The record shows all three legs. Capital: $17.2 billion in total debt and equity raised as of the May 2025 disclosure (claim 4968), on top of $1.4 billion in net IPO proceeds (claims 4967, 4513). Power: 1.6 GW of contracted power capacity with 420 MW of active compute power added (claims 4973, 4972). Demand: $25.9 billion in total revenue backlog from committed contracts (claim 4970). Two acquisitions extend the same logic — Weights & Biases for roughly $1 billion to move up the stack into developer tooling (claims 4974, 4516), and Core Scientific, a bitcoin-miner-turned-data-center operator, to bring power and sites in-house (claims 4729, 4731).
A. Three counterparties are named in the record. OpenAI is the largest, tied to a strategic deal contributing $11.2 billion of revenue backlog (claim 4969) — roughly 43% of the $25.9 billion total backlog (claim 4970). IBM is named in a partnership to supply compute capacity for its Granite models (claim 4971). NVIDIA appears as both supplier and counterparty via a $6.3 billion capacity purchase commitment running to April 2032 (claim 4352), an arrangement in which the chip vendor commits to buy unsold capacity. Beyond those, the record is deliberately unnamed: a 'material customer contract for GPU infrastructure' (claim 4595) and a $350 million share issuance to a 'strategic customer' (claim 4514) both appear without an identified counterparty. A reader should not assume the unnamed parties are new names rather than the known ones.
A. Almost entirely with debt, at high yields. The disclosed stack includes a revolving credit facility expanded to $1.5 billion with maturity pushed to May 2028 (claims 5010, 5012), a $350 million letters-of-credit facility (claim 5011), a delayed-draw term loan facility of up to $2.6 billion maturing August 2030 (claims 11922, 4592, 4594), $2.0 billion of 9.250% senior notes due 2030 (claims 4824, 11917), and $1.75 billion of 9% senior notes due 2031 (claims 4697, 4658), the latter upsized by $250 million from the original $1.5 billion target (claims 4700, 4698). Coupons of 9%+ for a company whose stock had just IPO'd successfully is the single most informative number in the dossier: credit investors are pricing meaningful risk even as equity investors are not.
A. This is the most important caveat for a first-time reader. Every claim in this dossier carries a status of 'stated' or 'delayed' — none has been marked confirmed or delivered. That is a property of the record, not proof of non-delivery; the extraction pipeline logs what was announced and flags dates that passed without a recorded confirmation. Several items are flagged delayed on that basis: the expected closing of the May 2025 notes offering (claim 11919), the expected 25 July 2025 closing of the second notes offering (claim 4699), the first semiannual interest payment due February 2026 on the 9% notes (claim 4659), and the DDTL 3.0 commitment termination date of 31 July 2026 (claim 4593). Treat 'delayed' here as 'unverified in this record' and check primary filings before repeating it as fact.
A. Agreed but not closed on the original timeline. The all-stock merger was announced in July 2025 at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4331), with an SEC Form S-4 filed and Nasdaq listing approval obtained (claims 4733, 4735). An early disclosure pointed to an October 2025 close (claim 4517); the merger agreement's outside deadline is 7 April 2026 (claim 4738), and both the deadline and the merger itself are flagged delayed in this record. A $270 million termination fee is payable to CoreWeave if the deal breaks under certain conditions (claim 4739), which is the number to watch if the transaction fails.
A. Four concrete tripwires, all dated. First, the contingent springing maturity date of 30 December 2026 on the credit facility (claim 11926) — springing maturities accelerate if other conditions aren't met, so this is a real near-term gate. Second, the minimum debt service coverage ratio of 1.40x that begins in April 2027 (claim 4596) and the minimum contract realization ratio of 0.85x (claim 4597); these covenants translate the backlog into a pass/fail test, and the realization ratio in particular measures whether contracted revenue actually converts. Third, whether the Core Scientific merger closes by 7 April 2026 (claim 4738). Fourth, conversion of backlog into recognized revenue — whether the 420 MW of active capacity (claim 4972) grows toward the 1.6 GW contracted (claim 4973) at the pace the debt schedule assumes.
A. Four gaps. (1) Customer concentration: with OpenAI at $11.2 billion of a $25.9 billion backlog (claims 4969, 4970) and the remainder largely unnamed, the record cannot tell you how diversified the demand really is. (2) Backlog quality: 'committed contracts' is doing heavy lifting — the dossier discloses no cancellation terms, take-or-pay structure, or payment schedule, so the $25.9 billion figure cannot be converted into expected cash. (3) Circularity: NVIDIA is simultaneously the supplier of the GPUs, an equity-linked party, and a $6.3 billion capacity counterparty (claim 4352), and the dossier does not disclose how that commitment is priced or triggered. (4) Governance and disclosure texture: the record contains bare CEO and General Counsel claims from September 2025 (claims 4332, 4316) with no names or context attached, which is a sign the extraction is thin on personnel rather than evidence of anything itself. On all four, the honest answer is that the dossier documents announcements and does not yet document outcomes.
Frequently asked
2026-09-21A. CoreWeave sells GPU-based cloud computing aimed at AI training and inference workloads, rather than general-purpose enterprise IT. Its disclosures describe three layers: physical data center capacity (it reported 1.6 GW of contracted power and roughly 420 MW of active compute power added as of its May 2025 update — claims 4973, 4972), NVIDIA hardware deployed on top of it (GB200 support across its cloud platform stack, claim 4976), and a software layer including AI Object Storage, On-Demand Cluster Scaling, NVIDIA AI Enterprise and Cloud Functions support, and detailed billing/usage metrics (claims 4975, 4977, 4978, 4979). It went public in March 2025 at $40 per share (claims 17815, 15974, 11601, 11616).
A. Three things, running in parallel. First, buy the physical layer instead of renting it — the announced all-stock merger with Core Scientific, a bitcoin miner with power and data center sites, at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4331). Second, move up the stack into AI developer tooling via the roughly $1 billion acquisition of Weights & Biases (claims 4974, 4516). Third, and underpinning both, raise very large amounts of capital continuously: the company had disclosed $17.2 billion of total debt and equity raised as of May 2025 (claim 4968), against $1.4 billion in IPO net proceeds (claims 4967, 4513). The financing is the strategy as much as the acquisitions are.
A. Only a few counterparties are named, and the concentration is the central fact about this company. OpenAI is named repeatedly: an $11.2 billion revenue backlog attributed to a strategic deal (claim 4969) and a separate $6.5 billion committed-revenue figure running through May 2031 (claim 4297). IBM is named as a partner for Granite model compute capacity (claim 4971). NVIDIA appears as a $6.3 billion capacity purchase commitment through April 2032 (claim 4352) — notable because NVIDIA is simultaneously CoreWeave's chip supplier, an investor, and here a buyer of its capacity. Beyond those, the disclosures get vague: one is filed simply as a 'material customer contract for GPU infrastructure' with no counterparty named (claim 4595), and a $350 million share issuance to an unnamed 'strategic customer' (claim 4514). Against a total backlog of $25.9 billion (claim 4970), OpenAI alone accounts for a large share.
A. This is the single most important caveat for a first-time reader. Essentially every claim in this dossier carries the status 'stated' — meaning it was extracted from a company announcement or filing and has not been independently confirmed as delivered. The product claims from May 2025 (AI Object Storage general availability, GB200 support, MLPerf Inference v5.0 results, a SemiAnalysis Platinum rating — claims 4975, 4976, 4980, 4981) are company assertions about its own platform. The capital raises are the most concretely evidenced category, since notes that price and close leave a paper trail: the $2 billion 9.250% senior notes due 2030 (claims 4824, 11917) and the $1.75 billion 9% senior notes due 2031 (claims 4697, 4658) both moved from announcement to issuance. Treat backlog, capacity, and product claims as company-sourced until corroborated.
A. A mix of the trivial and the substantive. Two bond closings were flagged delayed against their expected dates (claims 11919 and 4699) — these are routine settlement-timing artifacts and shouldn't be read as distress. More meaningful are the Core Scientific merger items: the closing deadline of April 7, 2026 is flagged delayed (claims 4738, 4731), and an earlier-referenced October 2025 target also slipped (claim 4517). The DDTL 3.0 commitment termination date of July 31, 2026 is likewise flagged (claim 4593). If the merger did not close, the agreement contemplates a $270 million termination fee payable to CoreWeave (claim 4739) — a useful number to check against later disclosures, since it tells you which way the break-fee protection runs.
A. Heavily and expensively. The capital stack includes a revolving credit facility expanded to $1.5 billion with maturity pushed to May 2028 (claims 5010, 5012, 11925), a letters-of-credit facility expanded to $350 million (claims 5011, 11924), a delayed-draw term loan facility of up to $2.6 billion maturing August 2030 (claims 4592, 11922, 4594), and the two senior note issues at 9.250% and 9% (claims 4824, 4697). Those coupons are the tell: this is high-yield pricing. Two covenants on the DDTL deserve attention — a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). The second is effectively a test of whether contracted backlog converts into actual cash. There is also a contingent springing maturity dated December 30, 2026 (claim 11926).
A. Four checkpoints, in rough order. (1) Whether the Core Scientific merger closed, was extended, or terminated — and if terminated, whether the $270 million fee (claim 4739) was paid. (2) The April 2027 onset of the 1.40x debt service coverage covenant (claim 4596), which is the first hard financial test in the disclosed documents. (3) Whether the $25.9 billion backlog (claim 4970) converts to recognized revenue on schedule, measurable against the 0.85x contract realization ratio (claim 4597). (4) Any movement in the OpenAI relationship, given that claims 4969 and 4297 together represent the bulk of disclosed committed revenue.
A. Four. First, customer concentration: if OpenAI's commitments (claims 4969, 4297) were reduced, renegotiated, or stretched, the backlog figure loses much of its meaning. Second, circularity — NVIDIA sells CoreWeave chips, holds equity, and has committed $6.3 billion to purchase capacity (claim 4352); a reader should ask how much of the demand signal is genuinely independent. Third, the asset-liability mismatch: debt maturing 2030–2031 funds GPUs with a useful life that is contested, and the 9%-area coupons mean the cost of being wrong compounds fast. Fourth, and structurally: nearly everything here is status 'stated' from automated extraction, and the claims visible in this record run only through late September 2025. Anyone using this dossier for diligence should treat it as a map of what the company has said, not a verified record of what it has done, and should pull filings after that date before drawing conclusions.
Frequently asked
2026-09-21A. CoreWeave rents out GPU computing capacity — it builds and operates data centers full of NVIDIA accelerators and sells access to them as a cloud service, primarily to AI labs and enterprises training or serving large models. The record shows the usual cloud-vendor product surface around that core: general availability of its AI Object Storage (claim 4975), GB200 support across its platform stack (claim 4976), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and NVIDIA AI Enterprise / Cloud Functions support (claim 4979). Physically, the disclosed footprint as of May 2025 was roughly 420 MW of active compute power added (claim 4972) against about 1.6 GW of contracted power (claim 4973) — the gap between those two numbers is the company's build-out pipeline, and it is the single most useful pair of figures in the dossier.
A. Raise capital, convert it into powered data center capacity, and pre-sell that capacity on long-term contracts. Three moves define it. First, scale through debt: $17.2 billion in total debt and equity raised as of May 2025 (claim 4968), including a $2 billion senior notes issue due 2030 at 9.250% (claims 4824, 11917), a $1.75 billion notes issue due 2031 at 9% (claims 4697, 4658), a delayed-draw term loan facility of up to $2.6 billion (claims 4592, 11922), and a revolving credit facility expanded to $1.5 billion (claims 5010, 11923) with a $350 million letter-of-credit facility (claims 5011, 11924). Second, buy the inputs: the announced acquisition of Core Scientific at an exchange ratio of 0.1235 CoreWeave shares per share (claims 4731, 4331) is a vertical move to own power and data center shells rather than lease them. Third, move up the stack: the acquisition of Weights & Biases (claim 4974), valued at roughly $1 billion (claim 4516), adds ML developer tooling on top of raw compute.
A. Only a few counterparties are named anywhere in the record, and concentration is the defining risk. OpenAI is the anchor: a strategic deal carrying $11.2 billion of revenue backlog (claim 4969), with the customer relationship running to at least 2031-05-31 (claim 4296). IBM appears as a partner taking capacity for its Granite models (claim 4971). NVIDIA — simultaneously CoreWeave's chip supplier and an investor — has a capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim 4352), which functions as a backstop on unsold capacity. Against a total disclosed backlog of $25.9 billion from committed contracts (claim 4970), the single OpenAI deal is roughly 43%. Several other counterparties are deliberately not named: a 'material customer contract' for GPU infrastructure tied to the term loan facility (claim 4595) and a 'strategic customer' that received a $350 million share issuance (claim 4514) both appear in the record without identification. A reader should assume meaningful backlog sits with parties the dossier cannot name.
A. This is the most important caveat in the dossier and it should be read carefully. Essentially every claim on file carries status 'stated' — meaning it was extracted from a company disclosure and recorded, not independently confirmed as completed. The record contains no claims marked 'delivered.' That is a property of the tracking method, not evidence of failure: capital raises like the notes issuances and the IPO at $40 per share (claims 17815, 11601, 15974, 11616) did visibly occur. But the distinction matters for anything forward-looking. The capacity figures, the backlog totals, and the product general-availability announcements are all company assertions as recorded, and the dossier does not carry independent verification of any of them. Third-party signals are thinner but do exist: an MLPerf Inference v5.0 benchmark result (claim 4980) and a SemiAnalysis Platinum rating (claim 4981) are external assessments rather than self-reported claims.
A. It means the tracker recorded a promised date, that date passed, and no confirming record was captured — not that slippage has been proven. The flagged items are: the Core Scientific merger closing deadline of 2026-04-07 (claims 4738, 4731) and a related 2025-10-01 milestone (claim 4517); expected closing dates for two notes offerings, 2025-05-27 (claim 11919) and 2025-07-25 (claim 4699); the first interest payment on the 9% notes, due 2026-02-01 (claim 4659); and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). The notes-closing and interest-payment flags are almost certainly bookkeeping gaps rather than real events — a missed coupon on $1.75 billion would be a default and unmissable news. The merger timing flags deserve genuine attention. Treat 'delayed' in this dossier as 'unconfirmed past its date,' and check each one against primary filings before repeating it.
A. Five, in rough order of significance. (1) The Core Scientific merger outcome — the agreement carries a $270 million termination fee payable to CoreWeave if it breaks (claim 4739), and an outside closing date of 2026-04-07 (claim 4738). (2) A contingent springing maturity on the credit facility dated 2026-12-30 (claim 11926), which can pull forward debt that otherwise runs to 2028-05-02 (claims 5012, 11925) if certain conditions are triggered. (3) The DDTL 3.0 commitment termination of 2026-07-31 (claim 4593) — undrawn commitments expiring would tighten the build-out funding. (4) A minimum debt service coverage ratio covenant of 1.40x that begins in April 2027 (claim 4596), the first hard financial test in the record. (5) A minimum contract realization ratio of 0.85x (claim 4597), which is effectively a lender-imposed check on whether contracted backlog converts to actual cash.
A. Four. First, backlog conversion: $25.9 billion of committed contracts (claim 4970) is the central bull argument, but the dossier contains no recorded evidence of what fraction has converted to recognized revenue — the 0.85x realization covenant (claim 4597) exists precisely because lenders share that concern. Second, the circularity of the NVIDIA relationship: NVIDIA supplies the chips, holds equity, and has committed $6.3 billion to buying capacity (claim 4352); a reader should understand how much of CoreWeave's demand signal is genuinely third-party. Third, cost of capital: borrowing at 9% and 9.25% against multi-year infrastructure with a depreciating asset base is expensive, and the record does not disclose the margin structure that would show whether the spread works. Fourth, the unnamed counterparties (claims 4595, 4514) — a diligence reader cannot assess concentration risk on customers the disclosure does not identify.
A. The claim record on file runs from March 2025 to late September 2025, so anything after that window — subsequent quarters, the eventual resolution of the Core Scientific merger, later contracts — is simply absent rather than negative. The claims were produced by automated extraction from disclosures and then given a status, with most status transitions dated September 2026; the extraction can duplicate the same underlying event across several claim ids, which is why the IPO price appears four times (claims 17815, 11601, 15974, 11616) and the revolver expansion twice (claims 5010, 11923). Duplicate ids are not independent confirmations. And because the record captures what the company said rather than what was audited, it is best used to build a timeline of commitments and then check the material ones against primary SEC filings.
Frequently asked
2026-09-21A. CoreWeave is a specialized cloud provider that rents out GPU compute for AI training and inference, rather than general-purpose IT hosting. The disclosed record describes a vertically integrated stack: contracted data center power (1.6 GW contracted, claim 4973, with 420 MW of active compute capacity added, claim 4972), NVIDIA hardware including GB200 support across its platform (claim 4976), and a software layer covering AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), billing and usage metrics (claim 4978), and NVIDIA AI Enterprise / Cloud Functions support (claim 4979). It went public on Nasdaq in March 2025 at $40 per share (claims 15974, 11601, 11616).
A. Raise very large amounts of capital, convert it into power and GPUs, and pre-sell that capacity on long-term contracts. The record supports all three legs: $17.2 billion in total debt and equity capital raised (claim 4968) on top of $1.4 billion in IPO net proceeds (claims 4967, 4513); an acquisition program buying both the software layer (Weights & Biases, ~$1.0 billion, claims 4974, 4516) and the physical layer (the Core Scientific merger at an 0.1235 exchange ratio, claims 4731, 4331, 4314); and $25.9 billion of total revenue backlog from committed contracts (claim 4970). A separate $6.3 billion NVIDIA capacity purchase commitment running to April 2032 (claim 4352) puts a floor under utilization by having the supplier itself commit to buy capacity.
A. Only a few counterparties are named. OpenAI is the one named customer with a disclosed figure: $11.2 billion of revenue backlog from a strategic deal (claim 4969), roughly 43% of the $25.9 billion total backlog (claim 4970). IBM is named as a partner for Granite compute capacity (claim 4971), and NVIDIA as a $6.3 billion capacity purchaser (claim 4352). Beyond that, customers are unnamed: the July 2025 'material customer contract for GPU infrastructure' (claim 4595) and the $350 million share issuance to a 'strategic customer' (claim 4514) both leave the counterparty undisclosed. A reader should assume the remaining ~$14.7 billion of backlog sits with parties they cannot identify from this record.
A. This is the single most important caveat for a first-time reader: on this record, essentially nothing is marked as verified-delivered. Every claim in the dossier carries a status of either 'stated' (asserted by the company, not independently confirmed) or 'delayed'. The claims were produced by automated extraction from filings and press releases and then transitioned to 'stated' — that transition records that the claim was made, not that the milestone was met. Items already flagged 'delayed' include the Core Scientific merger and its April 2026 closing deadline (claims 4731, 4738), the original October 2025 expected close (claim 4517), two notes-offering closing dates (claims 11919, 4699), the first 9% notes interest payment due February 2026 (claim 4659), and the DDTL 3.0 commitment termination date (claim 4593). Treat backlog, power capacity, and product-availability figures as company assertions pending confirmation.
A. Heavily, expensively, and in quick succession through 2025. The disclosed stack includes a revolving credit facility expanded to $1.5 billion (claims 11923, 5010) and a letters-of-credit facility expanded to $350 million (claims 11924, 5011), both extended to 2 May 2028 (claims 11925, 5012) but with a contingent springing maturity as early as 30 December 2026 (claim 11926); a $2.6 billion delayed-draw term loan, DDTL 3.0, maturing 21 August 2030 (claims 11922, 4592, 4594); $2.0 billion of 9.250% senior notes due 2030 (claims 11917, 4824, 11918); and $1.75 billion of 9% senior notes due 2031, upsized by $250 million from the original $1.5 billion (claims 4697, 4658, 4698, 4700). Double-digit-adjacent coupons on multi-billion-dollar issues are the price of this growth, and the debt carries covenants: a minimum 0.85x contract realization ratio (claim 4597) and a minimum 1.40x debt service coverage ratio beginning April 2027 (claim 4596).
A. Core Scientific is a data center operator CoreWeave agreed in July 2025 to acquire in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4331, 4314), with an SEC Form S-4 filed (claim 4733), Nasdaq listing approval for the new shares (claim 4735), convertible notes converting into CoreWeave securities (claim 4737), and a $270 million termination fee payable to CoreWeave if the deal breaks (claim 4739). The record shows the timeline slipping: an August 2025 expected close of 1 October 2025 is marked delayed (claim 4517), and the backstop outside date of 7 April 2026 is also marked delayed (claims 4738, 4731). The strategic logic is vertical integration — owning the power and shells rather than leasing them — so whether it ultimately closed is a first-order question for anyone valuing the capacity pipeline.
A. Four dated tripwires, in order: the contingent springing maturity on the credit facilities at 30 December 2026 (claim 11926); the DDTL 3.0 commitment termination date of 31 July 2026, already marked delayed (claim 4593); the 1.40x minimum debt service coverage covenant that begins April 2027 (claim 4596), which is the first hard test of whether contracted backlog is converting into cash at the required rate; and the 0.85x minimum contract realization ratio (claim 4597), which is effectively a covenant on the quality of the $25.9 billion backlog (claim 4970). Alongside those, watch for the resolution of the Core Scientific merger and for any conversion of 'stated' backlog into recognized revenue.
A. Three. First, customer concentration and identity: OpenAI alone accounts for $11.2 billion of a $25.9 billion backlog (claims 4969, 4970), and the rest is largely unnamed (claims 4595, 4514) — a single counterparty's health materially affects the whole thesis. Second, circularity: NVIDIA is simultaneously the hardware supplier and a $6.3 billion capacity purchaser (claim 4352), and a customer received a $350 million share issuance (claim 4514); a reader should ask how much disclosed demand is arm's-length. Third, coverage of the record itself: the claims on record run through late September 2025 (claims 4315, 4314, 4331, 4332), so roughly twelve months to today's date are not represented here. Nothing in this FAQ should be read as describing the company's current position — only what it disclosed, and what remains unconfirmed, as of the dossier's last entries.
Frequently asked
2026-09-21A. CoreWeave (Nasdaq: CRWV) is an AI-focused cloud provider: it buys NVIDIA GPUs, installs them in leased and owned data centers, and rents that compute to companies training and running AI models. The dossier's product claims describe the surrounding software stack rather than a separate product line — GB200 support across its cloud platform (claim 4976), AI Object Storage reaching general availability (4975), on-demand cluster scaling (4977), billing and usage metrics (4978), and NVIDIA AI Enterprise/Cloud Functions support (4979). Third-party validation claims include an MLPerf Inference v5.0 result (4980) and a SemiAnalysis 'Platinum' rating (4981). In short: the business is renting scarce GPU capacity at scale, not selling models.
A. Raise capital, convert it into power and GPUs, and pre-sell that capacity on long-term contracts. The record shows all three legs. Capital: a March 2025 IPO at $40 per share (claims 15974, 11616, 11601) producing roughly $1.4 billion in net proceeds (4967, 4513), on top of $17.2 billion in total debt and equity raised (4968). Power and hardware: 1.6 GW of contracted power capacity (4973), 420 MW of active compute capacity added (4972), and a $6.3 billion capacity purchase commitment involving NVIDIA running to April 2032 (4352). Demand: $25.9 billion of total revenue backlog from committed contracts (4970). The company is also buying its way up and down the stack — Weights & Biases for the developer tooling layer (4974, 4516) and Core Scientific for data center real estate and power (4731, 4729).
A. Only two customer relationships are named in the record. OpenAI is the anchor: a strategic deal carrying $11.2 billion of revenue backlog (claim 4969), roughly 43% of the $25.9 billion total (4970), plus a $350 million share issuance to a 'strategic customer' (4514) — a customer that is also an equity holder. IBM appears as a partnership to supply compute for its Granite models (4971). Beyond those, customer disclosures are deliberately unnamed: claim 4595 is logged simply as a 'material customer contract for GPU infrastructure.' A reader should not assume the unnamed contracts are a broad, diversified book; the disclosed record does not establish that either way.
A. This is the single most important caveat in the dossier. Essentially every claim on record carries status 'stated' or 'delayed' — none are marked verified or delivered. These are announcements, filings and press-release figures extracted from company disclosures, not independently confirmed outcomes. The things that are hardest to dispute are the financing events, because they leave a paper trail: the IPO priced (15974), the 9.250% notes due 2030 were issued at $2.0 billion (11917, 4824), and $1.75 billion of 9% notes due 2031 were issued after the offering was upsized by $250 million (4658, 4697, 4698). Capacity, backlog and product-availability figures are company-reported and should be treated as such until corroborated.
A. Read those flags carefully, because they are auto-derived and mix two different things. Some are substantive: the Core Scientific acquisition, originally associated with an October 2025 close (claim 4517), carries an outside closing deadline of April 7, 2026 (4738, 4731), and both are flagged delayed. Others look like artifacts — a notes offering with an expected closing of May 27, 2025 (11919), a July 25, 2025 closing (4699), a first interest payment date of February 1, 2026 (4659), and a DDTL 3.0 commitment termination date of July 31, 2026 (4593) are all flagged delayed simply because no confirming document was matched to the date, not necessarily because anything slipped. Verify each against filings before repeating 'delayed' in print.
A. Heavily, and at high coupons. On record: a revolving credit facility expanded to $1.5 billion (claims 5010, 11923) and a letter-of-credit facility to $350 million (5011, 11924), both with maturity extended to May 2028 (5012, 11925) but subject to a contingent springing maturity in December 2026 (11926); a $2.6 billion delayed-draw term loan, 'DDTL 3.0,' maturing August 2030 (11922, 4592, 4594); $2.0 billion of 9.250% senior notes due 2030 (11917, 4824); and $1.75 billion of 9% senior notes due 2031 (4658). Those coupons tell you how the credit market prices the risk. The loan documents also impose a minimum debt service coverage ratio of 1.40x beginning April 2027 (4596) and a minimum contract realization ratio of 0.85x (4597) — covenants that convert the backlog from a marketing number into a compliance obligation.
A. Four things. First, the Core Scientific merger — whether it closed by the April 7, 2026 outside date at the fixed 0.1235-share exchange ratio (claims 4731, 4331, 4314), and whether the $270 million termination fee payable to CoreWeave (4739) ever came into play. Second, the April 2027 debt service coverage covenant at 1.40x (4596) and the 0.85x contract realization test (4597): these are the first hard, dated checkpoints where reported performance meets a binding threshold. Third, conversion of backlog to revenue — whether the $25.9 billion (4970) shows up as recognized revenue on the expected schedule. Fourth, the December 2026 springing maturity condition on the revolver (11926).
A. Customer concentration is first: with $11.2 billion of $25.9 billion backlog tied to OpenAI (claims 4969, 4970), and OpenAI also holding equity via the $350 million share issuance (4514), the company's largest customer, a shareholder, and a counterparty on multi-year commitments are the same entity — and CoreWeave's ability to service high-coupon debt depends on that relationship holding. Second is the circularity of the NVIDIA relationship: NVIDIA is a supplier, an investor, and the counterparty to a $6.3 billion capacity commitment (4352). Third, timing coverage — the claims shown here run through roughly late September 2025, including a CEO entry (4332) and a Deputy General Counsel entry (4317), so anything after that date is outside this record and should be checked against current filings. Finally, note that the entire dossier is built from automated extraction of company disclosures; it is a map of what CoreWeave has said, not of what has been independently confirmed.
Frequently asked
2026-09-20A. CoreWeave is an AI-focused cloud provider: it builds and operates data centers packed with NVIDIA GPUs and rents that compute, plus a software layer around it, to companies training and running AI models. Its disclosed product work is infrastructure plumbing rather than consumer software — general availability of CoreWeave AI Object Storage (claim 4975), support for NVIDIA's GB200 systems across its cloud stack (claim 4976), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and NVIDIA AI Enterprise/Cloud Functions support (claim 4979). It went public on Nasdaq on 2025-03-28 at $40 per share (claims 11616, 11601, 15974), raising about $1.4 billion in net proceeds (claims 4967, 4513).
A. Borrow heavily against long-term customer contracts to buy GPUs and power, then grow into the contracts. The record shows a very large financing stack assembled in a few months of 2025: $17.2 billion of total debt and equity capital raised as of the Q1 2025 disclosure (claim 4968), a revolving credit facility expanded to $1.5 billion with a $350 million letters-of-credit facility (claims 5010, 5011, 11923, 11924), $2.0 billion of 9.250% senior notes due 2030 issued 2025-05-27 (claims 11917, 11918, 4824), a further $1.75 billion of 9% senior notes due 2031 after an upsize (claims 4697, 4658, 4698), and a delayed-draw term loan facility of up to $2.6 billion maturing 2030-08-21 (claims 4592, 11922, 4594). Alongside that, it is buying its supply chain and tooling: the ~$1 billion acquisition of Weights & Biases (claims 4974, 4516) and an all-stock merger with data center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331).
A. OpenAI is the only customer named repeatedly and at scale. As of the Q1 2025 disclosure, total revenue backlog from committed contracts was $25.9 billion, of which the OpenAI strategic deal accounted for $11.2 billion (claims 4970, 4969); a further OpenAI commitment of $6.5 billion running to 2031-05-31 was disclosed on 2025-09-24 (claims 4297, 4296). OpenAI is also a shareholder, via a $350 million strategic customer share issuance (claim 4514). IBM appears as a partner for Granite model compute capacity (claim 4971), and NVIDIA is both the chip supplier and a counterparty to a $6.3 billion capacity purchase commitment running to 2032-04-13 (claim 4352) — effectively a backstop on unsold capacity. Beyond those, disclosure thins out: a July 2025 filing refers only to a 'material customer contract for GPU infrastructure' without naming the counterparty (claim 4595). A reader should assume heavy concentration in a small number of AI-lab customers, several of whom are also investors or suppliers.
A. Delivered and verifiable: the IPO priced and closed (claims 11616, 11601), the bond issues were completed (claims 11917, 4824, 4658), the Weights & Biases acquisition closed (claims 4974, 4516), and a set of product capabilities reached general availability (claims 4975, 4976, 4977, 4978, 4979), with third-party markers in MLPerf Inference v5.0 results (claim 4980) and a SemiAnalysis Platinum rating (claim 4981). Physically, 420 MW of active compute capacity had been added against 1.6 GW of contracted power (claims 4972, 4973) — i.e. roughly a quarter of contracted power was live. Announced but not yet proven: the $25.9 billion backlog is contracted future revenue, not delivered revenue (claim 4970), and the remaining ~1.2 GW of contracted power still has to be built, energized and filled. One honest caveat: in this dossier every claim carries the status 'stated', and the 'delivered'/'verified' tier is empty — so 'delivered' above means disclosed as completed by the company, not independently confirmed by us.
A. Not necessarily, and a first-time reader should not treat the flag as a finding. The 'delayed' status here was applied by automated extraction in September 2026 to claims whose stated dates have simply passed without a confirming follow-up document in the corpus — including things like a bond closing expected 2025-07-25 (claim 4699) and a scheduled first interest payment on 2026-02-01 (claim 4659), which routinely occur without a separate press release. The ones worth actually checking are the substantive deadlines: the Core Scientific merger, originally expected to close around 2025-10-01 (claim 4517) with an outside date of 2026-04-07 (claims 4738, 4731), and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). Both dates are now in the past relative to today, and the dossier does not contain the resolving documents.
A. Four dated tripwires. First, the Core Scientific merger: did it close by the 2026-04-07 outside date (claim 4738), or was the $270 million termination fee payable to CoreWeave triggered (claim 4739)? Second, a contingent springing maturity on the credit facility dated 2026-12-30 (claim 11926), which can pull a 2028 maturity (claims 5012, 11925) forward if refinancing conditions aren't met. Third, the DDTL 3.0 financial covenants: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) — the first real test of whether contracted backlog converts to cash on schedule. Fourth, the pace at which contracted power (1.6 GW, claim 4973) converts into active megawatts, the single best physical proxy for whether the backlog is deliverable.
A. Three. (1) Circularity: OpenAI is a customer, a shareholder (claim 4514) and the source of the largest backlog line (claims 4969, 4297); NVIDIA is the supplier, an investor and the counterparty to a $6.3 billion capacity purchase commitment (claim 4352). How much of the backlog is genuinely arm's-length third-party demand is not answerable from the disclosed record. (2) Cost of capital: the notes carry 9.250% and 9% coupons (claims 4824, 4697) on multi-billion-dollar issues, which is expensive money for an asset — GPUs — with a contested depreciation life. (3) Covenant headroom: the 0.85x realization and 1.40x coverage tests (claims 4597, 4596) convert any customer slippage into a financing problem quickly. A fourth, more mundane gap: the dossier's claim record is dense for March–September 2025 and sparse thereafter, so anyone relying on it should independently source the last twelve months before drawing conclusions.
Frequently asked
2026-09-20A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI training and inference — effectively a specialized cloud provider built around NVIDIA hardware rather than general-purpose enterprise IT. The disclosed product record is consistent with that: general availability of CoreWeave AI Object Storage (claim 4975), support for NVIDIA's GB200 systems across its platform stack (claim 4976), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and NVIDIA AI Enterprise and Cloud Functions support (claim 4979). It also points to third-party validation — an MLPerf Inference v5.0 result (claim 4980) and a SemiAnalysis Platinum rating (claim 4981). The physical side of the business is data center power: 420 MW of active compute capacity added (claim 4972) against 1.6 GW of contracted power capacity (claim 4973).
A. Raise very large amounts of capital, use it to buy GPUs and lock up data center power, and pre-sell that capacity under long-term contracts. The dossier shows all three legs. Capital: $17.2 billion in total debt and equity raised as of the May 2025 disclosure (claim 4968), on top of roughly $1.4 billion in IPO net proceeds (claims 4967, 4513). Supply: a $6.3 billion capacity purchase commitment involving NVIDIA running to April 2032 (claim 4352), plus the attempted vertical integration into data centers via Core Scientific (claim 4313). Demand: $25.9 billion in total revenue backlog from committed contracts (claim 4970). It has also bought its way up the stack, acquiring the ML-tooling company Weights & Biases (claim 4974) for roughly $1.0 billion (claim 4516).
A. Only two counterparties are named in the record, and one dominates. OpenAI is disclosed as a cloud computing customer with a term running to May 2031 (claim 4296) and $11.2 billion of revenue backlog attached to that strategic deal (claim 4969) — roughly 43% of the $25.9 billion total backlog (claim 4970). IBM is named as a partner for Granite model compute capacity (claim 4971). Beyond those, the disclosures are anonymous: a 'material customer contract' for GPU infrastructure (claim 4595) and a $350 million share issuance to an unnamed 'strategic customer' (claim 4514). A reader should treat the customer base as one named anchor tenant plus unnamed others, not a diversified book.
A. This is the single most important caveat for a first-time reader. Every claim in this dossier carries the status 'stated' or 'delayed' — none has been recorded as delivered or verified. The entries are automated extractions from the company's own filings and announcements, so they document what CoreWeave said, not what an independent party confirmed happened. The financings are the best-evidenced items, because issuance is self-executing and documented: $2.0 billion of 9.250% senior notes due 2030 (claims 11917, 4824) and $1.75 billion of 9% senior notes due 2031 (claim 4658). The operational and product claims — capacity, backlog, benchmark results — rest on company assertion within this record.
A. The record is unresolved and should be read carefully. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4331), with a $270 million termination fee payable to CoreWeave under certain conditions (claim 4739), an S-4 registration statement filed with the SEC (claim 4733), and Nasdaq listing approval for the new shares (claim 4735). But the timing claims are flagged delayed: an expected close around October 2025 (claim 4517) and an outside closing deadline of 7 April 2026 (claims 4731, 4738) have both now passed without a confirmed completion in this record. Claim 4313 describes the acquisition as occurring, but no closing confirmation backs it. Do not assume this deal closed on the strength of the dossier alone — verify independently.
A. Almost entirely with debt, much of it expensive and secured. The stack includes a revolving credit facility expanded to $1.5 billion (claims 5010, 11923) with maturity extended to May 2028 (claims 5012, 11925), a $350 million letter-of-credit facility expansion (claims 5011, 11924), a delayed-draw term loan facility of up to $2.6 billion maturing August 2030 (claims 11922, 4592, 4594), and the two high-yield bonds noted above at 9.250% and 9% coupons. Two structural features deserve attention: a contingent springing maturity tied to December 2026 (claim 11926), and financial covenants requiring a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596). Those covenants effectively make the debt dependent on customer contracts converting to cash on schedule.
A. Four things. First, the April 2027 debt service coverage covenant of 1.40x (claim 4596) — the first hard, dated test the company must pass. Second, the DDTL 3.0 commitment termination date of 31 July 2026 (claim 4593), already flagged delayed. Third, the December 2026 contingent springing maturity (claim 11926). Fourth, and most immediate, the resolution of the Core Scientific transaction, whose outside date of 7 April 2026 (claim 4738) has passed unresolved in this record. Beyond that, watch whether the 1.6 GW of contracted power (claim 4973) converts into energized, revenue-producing capacity at a rate that supports the $25.9 billion backlog (claim 4970).
A. Three. (1) Customer concentration: if the OpenAI relationship (claims 4296, 4969) changes in scope or timing, both the backlog figure and the covenant math are affected, and no disclosed customer is large enough to replace it. (2) The gap between contracted and delivered capacity: 420 MW active (claim 4972) against 1.6 GW contracted (claim 4973) means most of the promised capacity does not yet exist, and building it requires the debt above to keep flowing. (3) Staleness and verification: the claims in this dossier run out around late September 2025, so roughly a year of developments is absent as of this writing, and the delayed flags on at least six items (claims 11919, 4699, 4659, 4593, 4517, 4738) suggest the announced timelines have slipped more than once. A journalist or diligence reader should treat this record as a starting map of what was promised, then check each item against current filings.
Frequently asked
2026-09-20A. CoreWeave rents out GPU computing capacity — it builds and operates data centers full of NVIDIA accelerators and sells access to them as a cloud service aimed specifically at AI training and inference workloads, rather than at general-purpose enterprise IT. The disclosed product record is consistent with that focus: GB200 support across its cloud platform stack (claim 4976), an AI object storage service reaching general availability (claim 4975), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and support for NVIDIA AI Enterprise and Cloud Functions (claim 4979). It also points to third-party performance validation, including an MLPerf Inference v5.0 result (claim 4980) and a SemiAnalysis 'Platinum' rating (claim 4981). The company listed on Nasdaq in an IPO priced at $40 per share on 2025-03-28 (claims 11616, 11601, 15974).
A. Raise large amounts of capital, use it to buy GPUs and secure power, and lock the resulting capacity into long-dated contracts with a small number of very large AI customers. Every part of that is visible in the record: $17.2 billion in total debt and equity raised as of the May 2025 disclosure (claim 4968), 420 MW of active compute capacity added and 1.6 GW of contracted power (claims 4972, 4973), and a $25.9 billion revenue backlog from committed contracts (claim 4970). Two bolt-ons extend the strategy vertically — a roughly $1.0 billion acquisition of Weights & Biases for the AI developer tooling layer (claims 4974, 4516) and a merger with bitcoin-miner-turned-data-center operator Core Scientific at a 0.1235 exchange ratio, which would bring power and sites in-house (claims 4729, 4731, 4331).
A. OpenAI is the only customer named repeatedly and at scale. A strategic deal disclosed in May 2025 carried $11.2 billion of revenue backlog (claim 4969), and a September 2025 expansion added $6.5 billion of committed revenue running to 2031-05-31 (claims 4297, 4296). OpenAI is also an equity holder, via a $350 million share issuance to a 'strategic customer' (claim 4514). IBM appears as a partnership for Granite model compute capacity (claim 4971). Beyond those, concentration is the story: a July 2025 disclosure describes a 'material customer contract for GPU infrastructure' without naming the counterparty (claim 4595). A reader should assume that a large share of the $25.9 billion backlog (claim 4970) sits with a handful of buyers, at least one of whom is unnamed on this record.
A. This is the single most important caveat for a first-time reader. Every claim on this record carries a status of 'stated' or 'delayed' — none has been transitioned to a verified-delivered state. The dossier tracks what the company said and when, not independent confirmation that it happened. So the capacity figures (claims 4972, 4973), the backlog (claim 4970), and the customer commitments (claims 4969, 4297) should be read as company disclosures awaiting verification. The items with the strongest evidence of actually occurring are the financings, because they have issuance dates and instrument terms attached: the $2.0 billion 9.250% senior notes due 2030 issued 2025-05-27 (claims 4824, 11917) and the $1.75 billion 9% senior notes due 2031 (claims 4658, 4697), which were upsized by $250 million at pricing (claim 4698).
A. Not necessarily, and a reader should not treat 'delayed' here as evidence of a missed obligation. The status is applied automatically when a stated date passes without a recorded follow-up, so it flags several routine items: the expected closing of the May 2025 notes offering (claim 11919), the expected closing of the July 2025 notes offering (claim 4699), and the first scheduled interest payment on the 9% notes due 2026-02-01 (claim 4659). Those are near-certain to have occurred and simply lack a confirming entry. The substantive ones are the Core Scientific merger timeline — originally framed for a late-2025 close (claim 4517) with an outside deadline of 2026-04-07 (claims 4731, 4738) — and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). Both dates have now passed with no resolution on this record.
A. Heavily with debt, at high coupons, against contracted capacity. The IPO contributed roughly $1.4 billion in net proceeds (claims 4967, 4513) plus $68 million from the over-allotment (claim 4515) — a small fraction of the total. The rest is borrowed: a $1.5 billion revolver expansion with maturity extended to 2028-05-02 (claims 5010, 11923, 5012), a $350 million letter-of-credit facility (claims 5011, 11924), and a $2.6 billion delayed-draw term loan (DDTL 3.0) maturing 2030-08-21 (claims 4592, 11922, 4594). Layered on top are $2.0 billion of senior notes at 9.250% (claim 4824) and $1.75 billion at 9% (claim 4658). Those coupons are the tell: this is capital priced for meaningful risk. Separately, CoreWeave committed $6.3 billion to NVIDIA in a capacity purchase arrangement running to 2032-04-13 (claim 4352) — an obligation, not a source of funds.
A. Two disclosed tests turn the company's contracts into hard obligations. A minimum contract realization ratio of 0.85x (claim 4597) means lenders require that contracted revenue actually converts to cash at a set rate — if customers renegotiate, defer, or walk, the ratio compresses. A minimum debt service coverage ratio of 1.40x begins in April 2027 (claim 4596), which means that from that date cash generation must comfortably exceed debt payments. There is also a contingent springing maturity dated 2026-12-30 (claim 11926), which can pull a repayment date forward if certain conditions are met. Together these convert customer concentration from a commercial risk into a financing risk: the same handful of contracts that produce the backlog also determine whether the covenants hold.
A. Four things. First, the Core Scientific merger: the S-4 was filed and Nasdaq listing approval obtained (claims 4733, 4735), a $270 million termination fee runs to CoreWeave if the deal breaks (claim 4739), and the 2026-04-07 outside date (claim 4738) has passed without a recorded outcome — confirm whether it closed, was extended, or terminated. Second, backlog conversion: watch whether the $25.9 billion (claim 4970) translates into recognized revenue on the schedule implied, since the covenants depend on it. Third, the April 2027 DSCR test (claim 4596), the first hard financial gate on this record. Fourth, and most fundamental, customer concentration — OpenAI's disclosed commitments (claims 4969, 4297) plus an unnamed material contract (claim 4595) mean the credit quality of a few counterparties effectively underwrites billions in high-coupon debt. Note also that the claims provided here run through late September 2025 and may be truncated; anything after that date is not covered by this record and should be checked against current filings.
Frequently asked
2026-09-20A. CoreWeave rents out GPU computing capacity — it builds and operates data centers packed with NVIDIA accelerators and sells access to them to companies training and running AI models. The disclosed record is that of an infrastructure business rather than a model developer: it reports power capacity (420 MW of active compute power added, claim 4972; 1.6 GW of contracted power, claim 4973), platform features such as AI Object Storage reaching general availability (claim 4975), support for NVIDIA's GB200 systems (claim 4976), and On-Demand Cluster Scaling (claim 4977). It trades on Nasdaq as CRWV following a March 2025 IPO priced at $40 per share (claims 11601, 11616, 15974).
A. Borrow heavily against long-term customer contracts, use the money to buy chips and power, and lock in demand before the capacity exists. The record shows $17.2 billion in total debt and equity raised (claim 4968) against $25.9 billion in committed revenue backlog (claim 4970). Alongside the rental business, CoreWeave has moved up the stack by acquiring the ML-tooling company Weights & Biases for roughly $1 billion (claims 4974, 4516), and moved down the stack by agreeing to merge with data center operator Core Scientific at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4314) — a bid to own its own power and shell capacity rather than lease it.
A. Only two counterparties are named in the record. OpenAI is disclosed as a cloud computing customer under a strategic deal carrying $11.2 billion of revenue backlog (claim 4969), with the customer relationship running to May 2031 (claim 4296); CoreWeave also issued $350 million in shares to a strategic customer (claim 4514). IBM is named in a partnership to supply compute capacity for its Granite models (claim 4971). NVIDIA appears as a counterparty on the other side — a $6.3 billion capacity purchase commitment running to April 2032 (claim 4352) — meaning the company's largest chip supplier is also contractually a buyer of its capacity. That leaves roughly $14.7 billion of the $25.9 billion backlog attributable to customers who are not named; one is disclosed only as a 'material customer contract for GPU infrastructure' (claim 4595).
A. Almost everything on record sits at 'stated' — the dossier's status for a claim that has been made in a disclosure but not independently confirmed as delivered. The financings are the most concrete: senior notes were issued at 9.250% due 2030 for $2 billion (claims 11917, 4824) and at 9% due 2031 for $1.75 billion, upsized by $250 million from the announced size (claims 4658, 4697, 4698); the revolving credit facility was expanded to $1.5 billion with maturity extended to May 2028 (claims 11923, 11925). Shipped product claims include AI Object Storage GA (claim 4975), detailed billing and usage metrics (claim 4978), an MLPerf Inference v5.0 result (claim 4980) and a SemiAnalysis Platinum rating (claim 4981). The Core Scientific merger has not closed and is flagged delayed against both an October 2025 expectation (claim 4517) and the April 7, 2026 outside date (claims 4738, 4731).
A. Treat it as a prompt to investigate, not a finding. The label is applied automatically when a promised-by date passes without a confirming document, so it mixes genuine slippage with bookkeeping artifacts. Two note offerings are flagged delayed purely on expected closing dates of May 27 and July 25, 2025 (claims 11919, 4699) even though the corresponding issuances appear separately as completed (claims 11917, 4658); the first interest payment on the 9% notes is flagged the same way (claim 4659). The Core Scientific merger delay (claims 4517, 4738, 4731) and the DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) are the ones worth real scrutiny, because they concern transactions that either close or don't.
A. In the debt covenants and the gap between contracted power and revenue-producing power. CoreWeave's $2.6 billion delayed draw term loan (claims 11922, 4592, maturing August 2030 per claim 4594) requires a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) — in effect, the backlog must convert to cash at a specified rate or the lenders have a remedy. There is also a contingent springing maturity dated December 30, 2026 (claim 11926). Meanwhile the coupons are high: 9.250% and 9% (claims 4824, 4697) is expensive money for an asset whose useful life depends on how quickly NVIDIA's next generation makes the current one uncompetitive.
A. Four. First, customer concentration: with OpenAI alone at $11.2 billion of a $25.9 billion backlog (claims 4969, 4970) and the remainder unnamed, the durability of the revenue is unauditable from outside. Second, circularity: NVIDIA is simultaneously the supplier, a $6.3 billion committed buyer (claim 4352), and a shareholder in the sector — the record does not disclose how much revenue is ultimately funded by parties with a stake in CoreWeave's growth. Third, the delivered gap between 1.6 GW contracted and 420 MW active (claims 4973, 4972) — roughly three-quarters of contracted power is not yet earning. Fourth, whether the Core Scientific merger closes at all; the $270 million termination fee payable to CoreWeave (claim 4739) tells you what a break is worth but not how likely it is.
A. The resolution of the Core Scientific merger against its April 7, 2026 outside date (claim 4738) and whether the exchange ratio of 0.1235 holds (claim 4314); the DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593); the springing maturity trigger at December 30, 2026 (claim 11926); and the debt service coverage ratio test that begins in April 2027 (claim 4596). One caveat about the dossier itself: the newest claim on record is dated September 24, 2025, so roughly a year of the company's history is not yet captured here even though extraction has run recently. Anything a reader believes about CoreWeave's position today needs to come from sources outside this record.
Frequently asked
2026-09-20A. CoreWeave is a GPU-focused cloud provider: it builds and operates data-center capacity purpose-built for AI training and inference, and rents that compute to AI labs and enterprises under long-term contracts. The disclosed footprint on record is 1.6 GW of contracted power (claim 4973) and 420 MW of active compute capacity added as of its May 2025 disclosure (claim 4972). Alongside raw compute it sells a software layer — AI Object Storage reaching general availability, On-Demand Cluster Scaling, detailed billing and usage metrics, and NVIDIA AI Enterprise and Cloud Functions support (claims 4975, 4977, 4978, 4979). It went public on 2025-03-28 at $40 per share (claim 11616).
A. Sign very large multi-year compute contracts, then raise debt against that contracted backlog to fund the data centers and GPUs needed to serve it — and buy the pieces it doesn't own. The backlog side: $25.9 billion in total revenue backlog from committed contracts (claim 4970). The financing side: $17.2 billion in total debt and equity raised as of May 2025 (claim 4968), including $1.4 billion in IPO net proceeds (claim 4967), a $1.5 billion revolver expansion and $350 million letter-of-credit facility (claims 11923, 11924), a delayed-draw term loan of up to $2.6 billion (claim 11922), $2 billion of 9.250% senior notes due 2030 (claim 11917) and $1.75 billion of 9% senior notes due 2031 (claim 4697). The vertical-integration side: acquiring Weights & Biases for roughly $1 billion (claims 4974, 4516) and agreeing to merge with bitcoin-miner-turned-data-center-operator Core Scientific at 0.1235 CoreWeave shares per share (claim 4731).
A. Concentration is the single most important fact in this dossier. OpenAI is the named anchor customer, with $11.2 billion of revenue backlog from a strategic deal (claim 4969) plus a further $6.5 billion of committed revenue running to 2031-05-31 (claims 4297, 4296) — and CoreWeave issued $350 million of shares to a strategic customer (claim 4514), aligning the two even further. Against a total backlog of $25.9 billion (claim 4970), OpenAI alone accounts for well over half. IBM is named as a partner taking capacity for its Granite models (claim 4971), and NVIDIA is named on both sides of the ledger — supplier, and counterparty to a $6.3 billion capacity purchase commitment running to 2032-04-13 (claim 4352) that functions as a backstop on unsold capacity. Beyond those, customers are not named: a significant GPU infrastructure agreement appears on record only as a 'material customer contract' with no counterparty disclosed (claim 4595).
A. Read the status field carefully. Nearly every claim here sits at 'stated' — meaning it was extracted from a company announcement or filing and recorded as asserted, not independently confirmed as delivered. That covers the entire product list (AI Object Storage GA, GB200 support, On-Demand Cluster Scaling, MLPerf Inference v5.0 results, the SemiAnalysis Platinum rating — claims 4975, 4976, 4977, 4980, 4981). What is firmly delivered is the financing: the IPO priced and closed at $40 (claim 11616), and the two note issues are on record as issued (claims 11917, 4658). The delivery gap shows up as 'delayed' statuses, discussed next.
A. Six claims carry a 'delayed' status. The most consequential is the Core Scientific merger: originally tracked to close around 2025-10-01 (claim 4517), it now sits against an outside deadline of 2026-04-07 (claims 4731, 4738) — and both of those are flagged delayed, meaning the deal had not closed by the deadline on record. Two bond closings slipped past their stated dates of 2025-05-27 and 2025-07-25 (claims 11919, 4699), a scheduled 9% note interest payment due 2026-02-01 is flagged (claim 4659), and the DDTL 3.0 commitment termination date of 2026-07-31 is flagged (claim 4593). The note-related flags are mostly timing mechanics; the merger flag is a substantive unresolved item, and it carries a $270 million termination fee payable to CoreWeave if the deal breaks on certain grounds (claim 4739).
A. Four dated tripwires. (1) The Core Scientific merger outside date of 2026-04-07 (claim 4738) — closed, extended, or terminated with the $270 million fee (claim 4739)? (2) A contingent springing maturity on the credit facility at 2026-12-30 (claim 11926), which can pull debt forward if conditions aren't met. (3) The DDTL 3.0 minimum debt service coverage ratio of 1.40x, which begins applying 2027-04-01 (claim 4596) — the first hard covenant test. (4) The minimum contract realization ratio of 0.85x (claim 4597), which ties borrowing capacity directly to whether contracted revenue actually converts. Also note the DDTL matures 2030-08-21 (claim 4594) and the two note series in 2030 and 2031 (claims 11917, 4697) — a wall of maturities at 9%-plus coupons.
A. Three. First, customer concentration: if OpenAI's roughly $17.7 billion of combined committed and backlogged revenue (claims 4969, 4297) were repriced, deferred, or reduced, the collateral story behind the debt changes materially — and OpenAI is also an equity-linked party (claim 4514). Second, the gap between backlog and cash: $25.9 billion of backlog (claim 4970) is a contractual figure, not recognized revenue, and the 0.85x realization covenant (claim 4597) exists precisely because lenders expect slippage. Third, cost of capital: 9% and 9.250% coupons (claims 4697, 11917) on multi-billion-dollar issues are high-yield pricing, which tells you how the debt market views the risk regardless of how the equity trades. A fourth, smaller one: the Weights & Biases acquisition (claim 4974) and the product stack have no disclosed revenue contribution on record.
A. The claims on record run from the March 2025 IPO through late September 2025, and they are extracted from company filings and announcements — the dossier tracks what CoreWeave said and when, not whether it was true. Every claim's transition history reads 'automated extraction -> stated,' with re-dating into 2026 reflecting when the record was processed, not when the company acted. Nothing here is audited financials, there is no revenue or margin figure on record, and 'stated' should never be read as 'verified.' Where a status flips to 'delayed' (claims 4731, 4738, 4517, 11919, 4699, 4659, 4593), that is the record catching a stated date passing without confirmed completion — a reason to check the primary filing, not a conclusion on its own.
Frequently asked
2026-09-20A. CoreWeave rents out GPU computing capacity — it builds and operates data centers full of NVIDIA chips and sells access to them, mostly to companies training and running AI models. The dossier's product entries describe the pieces of that business: support for NVIDIA's GB200 systems across its cloud stack (claim 4976), general availability of an AI Object Storage product (claim 4975), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), and support for NVIDIA AI Enterprise and Cloud Functions (claim 4979). It also claims third-party validation: a SemiAnalysis 'Platinum' rating (claim 4981) and an MLPerf Inference v5.0 benchmark result (claim 4980). The company went public on Nasdaq under CRWV.
A. Raise very large amounts of capital, spend it on power and GPUs, and lock the capacity to long-dated customer contracts before it is built. The record shows an IPO on 2025-03-28 at $40 per share (claims 11601, 11616, 15974) yielding roughly $1.4 billion in net proceeds (claims 4967, 4513), and a cumulative $17.2 billion of debt and equity raised as of the May 2025 disclosure (claim 4968). On top of that sit an expanded $1.5 billion revolver and $350 million letter-of-credit facility (claims 11923/5010, 11924/5011), a delayed-draw term loan of up to $2.6 billion (claims 11922, 4592), $2.0 billion of 9.250% senior notes due 2030 (claims 11917, 4824), and $1.75 billion of 9% senior notes due 2031 (claims 4697, 4658) — an offering that was upsized by $250 million from its announced $1.5 billion (claims 4700, 4698). The second leg is vertical integration: buying the developer-tooling company Weights & Biases (claim 4974) for about $1 billion (claim 4516), and agreeing to acquire data-center operator Core Scientific in an all-stock merger (claims 4729, 4731).
A. Only two counterparties are named in the record. OpenAI is by far the larger: a strategic deal contributing $11.2 billion of revenue backlog (claim 4969) and, separately disclosed, $6.5 billion of committed revenue running through 2031-05-31 (claim 4297). IBM appears as a partnership to supply compute for its Granite models (claim 4971). Against a total committed revenue backlog of $25.9 billion (claim 4970), the OpenAI figures alone are a large fraction of the book. Everything else is unnamed — most notably a 'material customer contract for GPU infrastructure' tied to the term-loan financing (claim 4595), and a $350 million share issuance to an unidentified 'strategic customer' (claim 4514). A reader should treat customer concentration as the central commercial question here, and should note that backlog is contracted future revenue, not revenue recognized.
A. This is the most important caveat in the dossier: no claim on this record carries a 'delivered' or 'verified' status. Every entry is either 'stated' or 'delayed', and every status transition was produced by automated extraction from disclosures rather than by independent confirmation. So the dossier is a record of what CoreWeave said, tracked over time — not an audit of what was built. The items closest to hard delivery are the financings that record an issuance date (the $2.0 billion 2030 notes issued 2025-05-27, claim 11917; the $1.75 billion 2031 notes issued 2025-07-27, claim 4658), the completed IPO, and the operational capacity figures: 420 MW of active compute power added (claim 4972) against 1.6 GW of contracted power capacity (claim 4973). That gap between active and contracted power is the build-out that the debt is funding.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331), with an S-4 registration statement filed with the SEC (claim 4733) and Nasdaq listing approval obtained (claim 4735). The timeline slipped: an expected close of 2025-10-01 is marked delayed (claim 4517), and an outside closing deadline of 2026-04-07 is also flagged delayed (claims 4738, 4731). The agreement provides for a $270 million termination fee payable to CoreWeave (claim 4739). The latest entries on this record date from 2025-09-24 and do not show the deal as closed or terminated, so as of this dossier the outcome is unresolved — a reader should check current filings rather than infer completion from the merger language in claim 4313.
A. Three, all from the debt documents. First, covenants: a minimum debt service coverage ratio of 1.40x that begins in April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597) — the latter is effectively a test of whether contracted revenue converts into cash as promised. Second, maturities and deadlines: a contingent springing maturity on the credit facility dated 2026-12-30 (claim 11926), a DDTL 3.0 commitment termination date of 2026-07-31 that is already flagged delayed (claim 4593), and DDTL maturity in 2030 (claim 4594). Third, cost of money: coupons of 9.250% and 9% (claims 4824, 4697) are high-yield pricing, and the first scheduled interest payment date on the 2031 notes, 2026-02-01, is itself flagged delayed on this record (claim 4659). Several financing closings also carry delay flags (claims 11919, 4699), though short closing slips are common and less meaningful than covenant dates.
A. It runs in both directions, which is unusual. NVIDIA is CoreWeave's chip supplier and a shareholder, and the record also shows NVIDIA on the buy side: a capacity purchase commitment of $6.3 billion extending to 2032-04-13 (claim 4352). That means a portion of the backlog is an obligation from the same company that sells CoreWeave its primary input. For an investor or journalist, the open question is how much of the $25.9 billion backlog (claim 4970) rests on counterparties with a financial interest in CoreWeave's expansion — NVIDIA's commitment plus the OpenAI contracts (claims 4969, 4297) are the bulk of what is disclosed by name.
A. Four. (1) Unit economics — there are no revenue, margin, or cash-flow claims on this record at all, only backlog and capital raised, so you cannot tell from here whether the business converts compute into profit. (2) Counterparty identity — the 'material customer contract' behind the term loan (claim 4595) and the 'strategic customer' that received $350 million in shares (claim 4514) are unnamed, and their creditworthiness underwrites the debt. (3) Build-out execution — whether the 1.6 GW of contracted power (claim 4973) actually energizes on schedule, given that only 420 MW was disclosed as active (claim 4972). (4) The Core Scientific outcome, which is unresolved on this record. Also note a structural limitation: claim dates here run through 2025-09-24 while the extraction timestamps run to September 2026, so the underlying documents may be roughly a year stale relative to today. Treat this dossier as a map of disclosures to verify, not as current reporting.
Frequently asked
2026-09-20A. It rents out AI compute. CoreWeave operates GPU-based cloud infrastructure — data center power, NVIDIA accelerators, and the software layer on top — sold mostly under long-term contracts to companies training and running AI models. The disclosed record describes both the physical side (420 MW of active compute power added and 1.6 GW of contracted power capacity as of May 2025; claims 4972, 4973) and the platform side: general availability of CoreWeave AI Object Storage (claim 4975), GB200 support across its stack (claim 4976), on-demand cluster scaling (claim 4977), usage/billing metrics (claim 4978), and NVIDIA AI Enterprise support (claim 4979). It listed via IPO on 2025-03-28 at $40 per share (claims 15974, 11601, 11616).
A. Three moves, all visible in the record. (1) Lock in long-dated customer contracts — $25.9 billion of total revenue backlog as of May 2025 (claim 4970). (2) Finance the buildout aggressively with debt — $17.2 billion of total debt and equity raised cumulatively (claim 4968), plus a string of 2025 note offerings and a $2.6 billion delayed-draw term loan facility (claims 11922, 4592). (3) Buy the inputs and the adjacent software — the ~$1 billion acquisition of Weights & Biases (claims 4974, 4516) and an all-stock merger with bitcoin-miner-turned-data-center-operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331), which is fundamentally a power-and-sites acquisition. It is a capital-intensity story, not an asset-light software story.
A. Only one customer is named with a number: OpenAI, tied to $11.2 billion of revenue backlog from a strategic deal (claim 4969) — roughly 43% of the $25.9 billion total backlog (claim 4970). IBM appears as a partner for Granite model compute capacity (claim 4971), and NVIDIA appears on both sides of the business: supplier, and counterparty to a $6.3 billion capacity purchase commitment running to 2032 (claim 4352). Beyond that, customers are not named. A July 2025 disclosure refers only to a 'material customer contract for GPU infrastructure' with no counterparty identified (claim 4595). A reader should assume heavy, disclosed-but-unnamed concentration.
A. This is the single most important caveat for a first-time reader. Almost every claim in the dossier carries the status 'stated' — meaning it was extracted from a disclosure and has not been independently marked as fulfilled. Nothing in this record is tracked as delivered. The items that have moved off 'stated' moved to 'delayed,' not to 'done': the May notes closing date of 2025-05-27 (claim 11919), the July notes closing date of 2025-07-25 (claim 4699), the first interest payment date of 2026-02-01 on the 9% notes (claim 4659), the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593), and the Core Scientific merger timeline (claims 4517, 4738, 4731). The products and benchmarks — MLPerf Inference v5.0 (claim 4980), the SemiAnalysis Platinum rating (claim 4981) — are company-stated achievements, not verified in this record.
A. Yes, and this trips people up. Several claims describe the same offering at different stages. In May 2025 an offering launched at $1.5 billion (claim 11921), was upsized to $2.0 billion (claim 11918), and issued as $2.0 billion of 9.250% senior notes due 2030 (claims 11917, 4824). In July the same pattern repeats: $1.5 billion launched (claim 4700), a $250 million upsize (claim 4698), issued as $1.75 billion of 9% notes due February 2031 (claims 4697, 4658). Separately there is a $2.6 billion delayed-draw term loan maturing 2030-08-21 (claims 4592, 11922, 4594), a revolver expanded to $1.5 billion with maturity extended to 2028-05-02 (claims 5010, 5012), and a $350 million letter-of-credit facility (claim 5011). IPO net proceeds were $1.4 billion (claims 4967, 4513). Note the coupons: 9% and 9.25% is expensive money for a company of this profile.
A. Announced July 2025 as an all-stock merger at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4331), with an S-4 registration statement filed (claim 4733) and Nasdaq listing approval obtained (claim 4735). The August 2025 disclosure pointed to a close around 2025-10-01 (claim 4517) against an outside deadline of 2026-04-07 (claim 4738); both are flagged delayed in this record. A $270 million termination fee is payable to CoreWeave in certain break scenarios (claim 4739), and Core Scientific convertible notes convert into CoreWeave securities on closing (claim 4737). The record's latest entries, dated 2025-09-24, describe the acquisition by merger (claim 4313), but the status transition is not fully legible in this extract — treat completion as something to confirm against the primary filings rather than as established here.
A. Two specific ones are disclosed on the DDTL 3.0 facility: a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596), and a minimum contract realization ratio of 0.85x (claim 4597). The second is the one to understand — it effectively requires that contracted revenue converts into realized revenue at a high rate, which ties covenant compliance directly to whether the backlog behaves. There is also a contingent springing maturity dated 2026-12-30 on the credit facility (claim 11926), meaning maturity can accelerate if certain conditions are met. These are the dates where announcement risk becomes cash risk.
A. Four. (1) Customer concentration: OpenAI is $11.2 billion of a $25.9 billion backlog (claims 4969, 4970), and the rest of the backlog is attributed to counterparties this record does not name. (2) Backlog-to-revenue conversion: 'committed contracts' is a company-defined term, and the 0.85x realization covenant (claim 4597) suggests lenders were thinking about the same question. (3) Circularity: NVIDIA is a supplier, a $6.3 billion purchase-commitment counterparty (claim 4352), and an investor in the ecosystem — worth understanding who bears what risk. (4) Coverage gap: the disclosed claims in this dossier cluster between March and September 2025, while status reviews are dated September 2026. Roughly a year of subsequent events — including how the 2027 DSCR test is trending and whether the delayed items resolved — is not represented here. Do not read the absence of a claim as the absence of an event.
Frequently asked
2026-09-20A. CoreWeave is an AI-focused cloud infrastructure provider: it buys NVIDIA GPUs, secures data-center power, and rents that compute to customers training and running AI models. The record reflects that shape — product claims center on GPU platform features such as GB200 support across its cloud stack (claim 4976), AI Object Storage general availability (claim 4975), on-demand cluster scaling (claim 4977), and NVIDIA AI Enterprise support (claim 4979), alongside physical capacity figures like 1.6 GW of contracted power and 420 MW of active compute power added (claims 4973, 4972). It listed on Nasdaq via IPO on 2025-03-28 at $40 per share (claims 15974, 11601, 11616) under the ticker CRWV.
A. Borrow heavily against long-term customer contracts to buy GPUs and power ahead of demand, then vertically integrate. Two strands dominate the record. First, capital: total debt and equity raised of $17.2 billion (claim 4968) against $1.4 billion of IPO net proceeds (claims 4967, 4513), including $2.0 billion of 9.250% senior notes due 2030 (claims 4824, 11917), $1.75 billion of 9% notes due 2031 (claims 4697, 4658), a $2.6 billion delayed-draw term loan facility (claims 4592, 11922), a revolver expanded to $1.5 billion (claim 5010) and a $350 million letters-of-credit facility (claim 5011). Second, integration: acquiring Weights & Biases for about $1 billion (claims 4974, 4516) to move up the software stack, and acquiring bitcoin-miner-turned-data-center-operator Core Scientific in an all-stock merger at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331) to own power and shells rather than lease them.
A. Only a few counterparties are named on the record, and concentration is the central fact about this company. Total revenue backlog from committed contracts is disclosed at $25.9 billion, of which a single OpenAI strategic deal accounts for $11.2 billion (claims 4970, 4969) — roughly 43% of backlog from one customer. IBM appears as a partner for Granite model compute capacity (claim 4971), and NVIDIA appears on both sides of the relationship, as chief supplier and as the counterparty to a $6.3 billion capacity purchase commitment running to 2032 (claim 4352). Beyond those, customers are unnamed: a 'material customer contract for GPU infrastructure' is disclosed without an identity (claim 4595), as is a $350 million share issuance to an unnamed strategic customer (claim 4514). A reader should not assume the unnamed contracts are distinct from the named ones.
A. This is the most important caveat in the dossier: essentially nothing here is recorded as verified-delivered. Every claim carries a status of either 'stated' or 'delayed', all originating from automated extraction of company filings and releases, with no independent confirmation logged. That includes the product and benchmark claims (MLPerf Inference v5.0 results, claim 4980; a SemiAnalysis 'Platinum' rating, claim 4981) and the capacity figures (claims 4973, 4972). The financings are the most concretely evidenced items, since note issuances leave a paper trail — the 2030 and 2031 notes both have issuance-dated entries (claims 11917, 4658). Treat the backlog, capacity and product claims as company assertions on the record, not as confirmed outcomes.
A. Several, and they cluster around the Core Scientific merger and routine financing mechanics. The merger was initially framed with an October 2025 timeline (claim 4517, delayed) and carries an outside closing deadline of 2026-04-07 (claims 4738, 4731, both delayed). Two note-offering closings slipped relative to their stated dates (claims 11919, 4699), as did a first interest payment date of 2026-02-01 on the 9% notes (claim 4659) and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). The financing-mechanics delays are low-signal and may reflect extraction timing rather than real slippage. The merger delay is the one with substance: a $270 million termination fee is payable to CoreWeave if the deal breaks (claim 4739), which tells you both sides priced in real closing risk.
A. Four dated tripwires, in order of arrival. A contingent springing maturity date of 2026-12-30 (claim 11926) — springing maturities accelerate debt if other conditions aren't met, so this is a genuine covenant cliff. The Core Scientific merger outside date of 2026-04-07 (claim 4738), which either closes or triggers the $270 million fee (claim 4739). A minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) — the first hard test of whether contracted revenue actually covers the interest bill. And, running throughout, a minimum contract realization ratio of 0.85x (claim 4597), which is the covenant that converts 'backlog' from a marketing number into a lender-enforced one. Note also that the latest entries in this dossier date to September 2025, so the record here may lag current events.
A. Three. First, does the backlog convert? $25.9 billion of committed contracts (claim 4970) is only as good as the counterparties and the realization covenant behind it (claim 4597), and 43% of it sits with one customer (claim 4969). Second, circularity: NVIDIA is simultaneously CoreWeave's key supplier and the counterparty to a $6.3 billion capacity purchase commitment (claim 4352), while a strategic customer received $350 million in shares (claim 4514) — arrangements where a supplier or investor is also a revenue source deserve scrutiny of how much demand is genuinely arm's-length. Third, the cost of capital: issuing notes at 9% and 9.250% (claims 4658, 4824) against long-lived GPU assets with uncertain useful lives is the core bet, and the April 2027 coverage test (claim 4596) is when it gets graded.
A. Yes, two. Duplicates: the same event is often extracted multiple times from different documents — the $40 IPO price appears three times (claims 15974, 11601, 11616), the $1.5 billion revolver and $350 million LC facility twice each (claims 5010/11923, 5011/11924), and the 2030 notes under several ids (claims 11918, 11917, 4824). Do not add these up. Unit inconsistency: some amounts are recorded with ambiguous units — claim 11921 lists '1500.0 USD' for what the description identifies as $1.5 billion of senior notes, and claim 4697 does the same for $1.75 billion. Read the description, not the raw number, and verify any figure against the underlying filing before publishing it.
Frequently asked
2026-09-19A. CoreWeave rents out GPU computing capacity for AI workloads from data centers it operates. Its disclosures describe software built on that infrastructure, including general availability of CoreWeave AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), and on-demand cluster scaling (claim 4977). In 2025 it announced the acquisition of Weights & Biases, an AI developer-tools company, at about $1.0B (claims 4974, 4516). It went public on 2025-03-28 at $40 per share (claims 11601, 11616, 15974) and received about $1.4B in net IPO proceeds (claims 4967, 4513).
A. The strategy is to lock in power and data-center capacity, sign long-term compute contracts, and pay for the buildout mostly with debt. CoreWeave reported 1.6 GW of contracted power, with 420 MW of active power added (claims 4973, 4972). It reported $17.2B of total debt and equity raised (claim 4968). The 2025 financings include: - $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824) - $1.75B of 9% senior notes due 2031 (claims 4697, 4658) - a $2.6B delayed-draw term loan, called DDTL 3.0 (claim 4592) - a revolving credit facility expanded to $1.5B (claim 5010) It also sought to buy Core Scientific, a data-center operator, in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331).
A. The only named customer with a dollar figure is OpenAI, with a reported $11.2B revenue backlog (claim 4969). That is about 43% of the $25.9B total committed-contract backlog (claim 4970). IBM is named in a partnership to provide compute capacity for its Granite models (claim 4971), but no dollar value is given. NVIDIA appears as a counterparty through a $6.3B capacity-purchase commitment running to 2032-04-13 (claim 4352). Other disclosures do not name the counterparty. These include a 'material customer contract' for GPU infrastructure (claim 4595) and a $350M share issuance to a 'strategic customer' (claim 4514). Most of the backlog is not attributed to a named buyer in this record.
A. Delivered: the financing events are the most concretely completed items. The IPO priced and raised money (claims 15974, 4513), including a $68M over-allotment (claim 4515). The 2030 and 2031 notes show issuance dates (claims 11917, 4658). Announced but not independently confirmed: operational items such as capacity figures, product launches, MLPerf results (claim 4980), and the SemiAnalysis Platinum rating (claim 4981) are recorded as 'stated.' That means the company said them, not that they have been independently verified. Not shown as completed: the Core Scientific merger. Its closing deadline of 2026-04-07 has passed and is marked 'delayed' (claims 4731, 4738), and no completion appears on record. The deal terms include a $270M termination fee payable to CoreWeave (claim 4739).
A. Not necessarily. 'Delayed' means the promised date has passed and the record holds no confirmation that the event happened. For some items the record itself suggests the event did occur: - The May 2025 notes had an expected closing of 2025-05-27 (claim 11919, marked delayed), but an issuance is recorded on that same date (claim 11917). - The July notes had an expected closing of 2025-07-25 (claim 4699, marked delayed), but an issuance is recorded on 2025-07-27 (claim 4658). Other items are genuinely unconfirmed here: the first 9% note interest payment due 2026-02-01 (claim 4659) and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). For the Core Scientific merger (claims 4738, 4517), the lack of any completion record is meaningful.
A. 1. **2026-12-30 springing maturity.** The revolving credit facility has a contingent maturity date of 2026-12-30 that could pull its due date forward from 2028-05-02 (claims 11926, 5012). 2. **April 2027 covenant.** DDTL 3.0 requires a minimum debt service coverage ratio of 1.40x starting then (claim 4596). 3. **Contract realization covenant.** DDTL 3.0 also requires a minimum contract realization ratio of 0.85x (claim 4597). 4. **Core Scientific outcome.** Whether the deal was completed, renegotiated, or terminated, and whether the $270M fee comes into play (claim 4739). 5. **Backlog conversion.** Whether the $25.9B backlog (claim 4970) turns into recognized revenue on schedule, especially the OpenAI portion (claim 4969).
A. 1. **Concentration.** One named customer accounts for a large share of the backlog (claims 4969, 4970), and several material contracts are unnamed (claims 4595, 4514). 2. **Cost of capital.** Recent notes carry 9% to 9.25% coupons (claims 4697, 4824), and the loan covenants depend on contracts actually paying out (claims 4596, 4597). 3. **Capacity.** It is unclear how much of the 1.6 GW contracted power (claim 4973) is operating versus planned. 4. **Core Scientific.** The deal's status is unresolved in this record (claim 4738). 5. **The data itself.** All claims come from automated extraction, and some amounts are inconsistent. For example, the 2030 notes appear as both $1.5B and $2.0B (claims 11921, 11918), and some entries have mismatched units (claim 11922). 6. **Incomplete record.** The claim list supplied for this FAQ ends mid-entry, so later disclosures were not reviewed.
A. The record contains personnel entries for the Chief Executive Officer (claim 4332), General Counsel (claim 4316), and Deputy General Counsel (claim 4317). However, the entries as captured here do not include names, so readers should check them against the underlying filings.
Frequently asked
2026-09-19A. CoreWeave rents GPU-based computing capacity for AI workloads from data centers it operates. Its announcements describe cloud products for AI customers, including general availability of CoreWeave AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), on-demand cluster scaling (claim 4977), and NVIDIA AI Enterprise support (claim 4979). It went public at $40 per share on 2025-03-28 (claim 11601) and reported IPO net proceeds of about $1.4 billion (claim 4967).
A. The strategy is to grow quickly by using large amounts of debt to build compute capacity against long-term customer contracts, and to expand through acquisitions. As of May 2025 it reported $17.2 billion in total debt and equity raised (claim 4968) and $25.9 billion of revenue backlog from committed contracts (claim 4970). Its debt financing since then includes $2.0 billion of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75 billion of 9% senior notes due 2031 (claims 4697, 4658), a $2.6 billion delayed-draw term loan (claim 4592), and a revolving credit facility expanded to $1.5 billion (claim 5010). Its acquisitions are Weights & Biases, at about $1.0 billion (claim 4516), and a proposed all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. OpenAI is the main named customer. The record shows an OpenAI deal adding $11.2 billion of backlog (claim 4969) and an OpenAI cloud contract running to 2031-05-31 (claim 4296). NVIDIA has committed to buy $6.3 billion of capacity through 2032-04-13 (claim 4352). IBM is a named partner for Granite model compute (claim 4971). Some important counterparties are not named in the record. The customer contract that supports the $2.6 billion DDTL 3.0 loan is described only as a 'material customer contract' (claim 4595), and a $350 million share issuance went to an unnamed 'strategic customer' (claim 4514). Readers cannot tell from this record how concentrated the backlog is among a few customers.
A. Delivered (completed): the IPO (claim 11601), the debt raises listed above, the Weights & Biases acquisition (claim 4516), and 420 MW of active power capacity (claim 4972). Announced but not yet shown as delivered: most of the 1.6 GW of contracted power capacity (claim 4973). Contracted capacity is a commitment, not operating capacity, so it is not yet generating revenue. The $25.9 billion backlog (claim 4970) is also contracted future revenue, not revenue already earned. The Core Scientific merger was signed (claim 4729), but this record does not show that it closed.
A. CoreWeave agreed in July 2025 to acquire Core Scientific in an all-stock deal, 0.1235 shares per Core Scientific share (claims 4731, 4729). A $270 million termination fee would be payable to CoreWeave in certain circumstances (claim 4739), and the outside date for closing was 2026-04-07 (claim 4738). Our tracker marks the related claims 'delayed' (claims 4731, 4738, 4517). That label means the promised date passed and this dossier has no confirmation that the deal closed. It does not mean the dossier has confirmed a delay or a termination. Check primary sources for the deal's actual outcome.
A. Debt risk is significant. The company borrows at high interest rates: 9.25% on the 2030 notes (claim 4824) and 9% on the 2031 notes (claim 4658). Its loans also come with performance conditions (covenants). The DDTL 3.0 loan requires a minimum contract realization ratio of 0.85x (claim 4597), which roughly measures whether contracted customer revenue is actually coming in. It also requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596), meaning cash flow must cover debt payments with a margin. Finally, the revolving credit facility, extended to 2028-05-02 (claim 5012), has a contingent 'springing' maturity of 2026-12-30 (claim 11926). If certain conditions are triggered, the facility would come due that much earlier. The record does not say what those conditions are.
A. 1) The 2026-12-30 springing maturity date on the revolving credit facility (claim 11926), and whether it is triggered. 2) Whether the DDTL 3.0 loan was fully drawn before its commitment termination date of 2026-07-31 (claim 4593). The tracker marks that date as passed without confirmation. 3) The DSCR covenant test that begins in April 2027 (claim 4596). 4) How much of the 1.6 GW of contracted power (claim 4973) becomes active, compared with the 420 MW active in May 2025 (claim 4972). 5) Final disclosure on the Core Scientific deal (claim 4731). 6) Updated backlog figures, and whether any customers other than OpenAI are named.
A. Customer concentration: backlog is large ($25.9 billion, claim 4970), but OpenAI is the only named customer of real size, and key contracts are unnamed (claims 4595, 4514). Build-out: the record does not show how quickly contracted power becomes active power. Unconfirmed dates: several items are marked 'delayed', meaning their dates passed without confirmation in the record. These include the Core Scientific closing (claim 4731), the first 9% note coupon due 2026-02-01 (claim 4659), and the DDTL 3.0 commitment deadline (claim 4593). That label reflects missing confirmation, not evidence of a missed payment or failure. Inconsistent figures: some offering sizes changed between filings, for example $1.5 billion vs $2.0 billion for the 2030 notes (claims 11921, 11918) and $1.5 billion vs $1.75 billion for the 2031 notes (claims 4700, 4697). These look like upsizings of the offerings, but the record does not say so explicitly.
Frequently asked
2026-09-19A. CoreWeave rents out GPU computing capacity, mostly NVIDIA hardware in its own data centers, to companies that train and run AI models. It has added products on top of the raw compute, including general availability of AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), and on-demand cluster scaling (claim 4977). It also bought the AI developer-tools company Weights & Biases (claim 4974), which was reported as a $1.0B deal (claim 4516). As of May 2025 it disclosed 420 MW of active power capacity added (claim 4972) and 1.6 GW of contracted power capacity (claim 4973).
A. The strategy is to build compute capacity as fast as possible and pay for it mostly with borrowed money that is secured by customer contracts. It went public at $40 per share in March 2025 (claim 15974), with about $1.4B in net proceeds (claim 4967). By May 2025 it cited $17.2B in total debt and equity raised (claim 4968). Its borrowing includes a $1.5B revolving credit facility (claim 5010), $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824), $1.75B of 9% senior notes due 2031 (claim 4697), and a $2.6B delayed-draw term loan (claim 4592). It has also tried to own more of its power and data-center base by agreeing to merge with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731).
A. OpenAI is the only major customer named in the record. OpenAI accounted for $11.2B of revenue backlog (claim 4969), plus a further $6.5B commitment running to May 2031 (claim 4297). Total committed backlog was $25.9B as of May 2025 (claim 4970), so OpenAI alone made up a large share of it. IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). Other important counterparties are not named. These include a 'material customer contract' that backs the $2.6B term loan (claim 4595) and a 'strategic customer' that bought $350M of stock (claim 4514). NVIDIA is both supplier and counterparty: it committed to buy $6.3B of unused capacity through April 2032 (claim 4352).
A. Every claim in this record has the status 'stated.' That means the company said it, but no independent confirmation of delivery has been logged. The financing events (IPO, note offerings, credit facilities) are the most concrete items, because each is a completed transaction the company reported. The operational items are the company's own figures and have not been independently checked. These include capacity added, product launches, the SemiAnalysis Platinum rating (claim 4981), and the MLPerf results (claim 4980). Revenue backlog is a contractual commitment, not revenue already earned.
A. A claim is flagged 'delayed' when its promised-by date has passed and the tracker has not recorded a confirmation. The most important one is the Core Scientific merger. Its merger-agreement deadline of 2026-04-07 (claims 4731, 4738) and an earlier target of 2025-10-01 (claim 4517) are both flagged. Some other flagged items are routine, such as the note offering closing dates (claims 11919, 4699) and a February 2026 interest payment (claim 4659). Those flags most likely reflect a missing confirmation in the record, not an actual missed payment or closing, but readers should check before relying on either reading.
A. First, whether the Core Scientific merger closed, was renegotiated, or was terminated. The agreement includes a $270M termination fee payable to CoreWeave (claim 4739). Second, a contingent 'springing' maturity date of 2026-12-30 on the revolving credit facility (claim 11926). This clause can pull the facility's due date earlier than its extended 2028-05-02 maturity (claim 11925), so it is a near-term refinancing trigger worth monitoring. Third, the loan covenants: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). Fourth, whether the 1.6 GW of contracted power (claim 4973) turns into active, revenue-generating capacity.
A. (1) Customer concentration: a large part of the $25.9B backlog (claim 4970) comes from a single customer, OpenAI (claims 4969, 4297). (2) Debt cost: recent notes carry 9% to 9.25% interest (claims 4697, 4824), which puts pressure on margins while capacity is still being built. (3) Unnamed counterparties: the customer behind the term-loan contract (claim 4595) and the $350M strategic share buyer (claim 4514) are not identified. (4) Circularity: NVIDIA is both CoreWeave's main supplier and a $6.3B backstop buyer of its capacity (claim 4352). (5) The status of the Core Scientific merger.
A. Yes. Several claims are automated extractions of the same event, so the same fact appears more than once. For example, the IPO price appears as claims 15974, 11616, and 11601, and the credit facility as claims 5010 and 11923. Some amounts are missing their unit scale: '2000.0 USD' in claim 11918 means $2.0B. Some offerings were upsized after announcement. The 2030 notes appear at $1.5B (claim 11921) and at $2.0B (claim 11917), and the 2031 notes went from $1.5B (claim 4700) to $1.75B (claim 4697) after a $250M increase (claim 4698). Finally, the claim list supplied here ends in September 2025, so later disclosures may be missing.
Frequently asked
2026-09-19A. CoreWeave rents out large clusters of NVIDIA GPUs as a cloud service built for AI training and inference. Its disclosed product work supports that core business: GB200 support across its platform (claim 4976), on-demand cluster scaling (claim 4977), general availability of AI Object Storage (claim 4975), and the acquisition of Weights & Biases, a developer tooling company, for about $1.0 billion (claims 4974, 4516). It went public at $40 per share on 2025-03-28 (claims 15974, 11616, 11601), with IPO net proceeds of about $1.4 billion (claims 4967, 4513).
A. The strategy is to secure power and data-center capacity ahead of demand, fund the GPU buildout mostly with debt, and lock in multi-year customer contracts that back that debt. As of May 2025 it reported 420 MW of active power (claim 4972) against 1.6 GW contracted (claim 4973), and $17.2 billion in total debt and equity raised (claim 4968). It also moved to vertically integrate by agreeing to acquire data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4314), and to move up the software stack through Weights & Biases.
A. Only partially. OpenAI is named, with an $11.2 billion strategic deal (claim 4969), out of a total reported backlog of $25.9 billion (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA has a $6.3 billion capacity purchase commitment running to 2032 (claim 4352), which means NVIDIA is both CoreWeave's supplier and a customer. Two other items on record do not name the counterparty: a 'material customer contract for GPU infrastructure' tied to the $2.6 billion DDTL 3.0 loan (claims 4595, 4592), and a $350 million share issuance to a 'strategic customer' (claim 4514). The record does not identify who holds the rest of the backlog, so concentration risk can't be fully sized from these disclosures.
A. Completed financings are the most solid items: the IPO (claims 15974, 4513), a $2.0 billion issue of 9.25% notes due 2030 (claims 11917, 4824), a $1.75 billion issue of 9% notes due 2031 upsized by $250 million (claims 4697, 4698, 4658), a revolving credit facility expanded to $1.5 billion (claims 5010, 11923), and the $2.6 billion DDTL 3.0 loan (claim 4592). Operationally, 420 MW of active power is reported (claim 4972), along with product releases and the Weights & Biases acquisition. Several items remain commitments rather than delivered results: the 1.6 GW of contracted power (claim 4973), the $25.9 billion backlog (claim 4970), and the NVIDIA commitment (claim 4352). These represent future revenue and capacity, not revenue already earned.
A. The record shows the agreement signed in July 2025 (claim 4729), with an SEC S-4 filing and a Nasdaq listing approval planned (claims 4733, 4735), a $270 million termination fee payable to CoreWeave (claim 4739), and an outside closing deadline of 2026-04-07 (claim 4738). That deadline has passed, and the claims are marked 'delayed' (claims 4731, 4738, 4517). The dossier contains no claim confirming the deal closed or was terminated. Anyone relying on this should check the current status against primary filings.
A. The debt load is large and expensive: the senior notes pay 9% to 9.25% (claims 4824, 4697). The DDTL 3.0 loan carries covenants that tie borrowing to customer contracts. These include a minimum 'contract realization ratio' of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The revolving credit facility nominally matures on 2028-05-02 (claims 5012, 11925), but it has a contingent 'springing' maturity of 2026-12-30 (claim 11926), which could pull that date forward if certain conditions are triggered.
A. 1) Whether the springing maturity date of 2026-12-30 is triggered (claim 11926). 2) The start of the 1.40x debt service coverage test in April 2027 (claim 4596). 3) The final outcome of the Core Scientific deal (claim 4738). 4) How much of the 1.6 GW of contracted power becomes active, measured against the 420 MW baseline (claims 4973, 4972). 5) How quickly the $25.9 billion backlog turns into recognized revenue, and whether new named customers reduce reliance on OpenAI (claims 4970, 4969). 6) Whether the DDTL 3.0 commitment was fully drawn before its 2026-07-31 termination date (claim 4593).
A. On the business: the unnamed 'material' and 'strategic' customers (claims 4595, 4514), dependence on OpenAI and NVIDIA, and whether contract cash flows can service roughly 9% debt. On the data: some 'delayed' labels appear to be artifacts of the promise date passing without a follow-up filing, not actual misses. Examples are the notes closing dates (claims 11919, 4699) and a routine interest payment date (claim 4659). Some extracted figures also conflict or have unit errors. Claim 11921 lists the 2030 notes at $1.5 billion, while claims 11918 and 11917 show $2.0 billion after upsizing. Claims 11921 and 11922 record 1500 and 2600 'USD' where millions are meant. Finally, the claim record available here runs only through September 2025, so later developments are not reflected.
Frequently asked
2026-09-19A. CoreWeave rents out cloud computing built for AI. It runs data centers packed with NVIDIA GPUs and sells access to AI labs and enterprises. The record shows it layering software on top of the hardware: AI Object Storage reached general availability (claim 4975), it added support for NVIDIA's GB200 chips (claim 4976), and it bought Weights & Biases, a developer-tools company, for about $1.0B (claims 4974, 4516). It also cites third-party recognition, including an MLPerf Inference v5.0 benchmark result (claim 4980) and a SemiAnalysis Platinum rating (claim 4981). CoreWeave went public at $40 per share on 2025-03-28 (claims 15974, 11601, 11616).
A. The strategy is to lock in long-term compute contracts, then borrow heavily to build the capacity those contracts require. CoreWeave reported $17.2B in total debt and equity raised (claim 4968) and $1.6 GW of contracted power, of which 420 MW of active capacity had been added (claims 4973, 4972). It is also moving to own more of its data-center footprint through an all-stock merger with Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4331). A $6.3B capacity-purchase commitment from NVIDIA running to 2032 adds a floor under demand (claim 4352).
A. Only OpenAI is named with dollar figures: $11.2B of backlog (claim 4969), plus a further $6.5B of committed revenue running to 2031-05-31 (claim 4297). IBM is named as a partner using CoreWeave capacity for its Granite models, but no contract value is given (claim 4971). Other significant customers are not identified. A 'material customer contract' underpins the $2.6B DDTL 3.0 loan facility without a name (claims 4595, 4592), and $350M of shares were issued to an unnamed 'strategic customer' (claim 4514). Total backlog was $25.9B as of 2025-05-13 (claim 4970), so a large share of the reported backlog sits with a single named customer.
A. Mostly with debt, and expensive debt. The IPO raised about $1.4B net (claims 4967, 4513), plus $68M from the over-allotment option, the extra shares underwriters can sell (claim 4515). Borrowing includes: - $2.0B of 9.25% senior notes due 2030 (claims 11917, 4824) - $1.75B of 9% senior notes due 2031, upsized by $250M (claims 4697, 4698) - The $2.6B DDTL 3.0 delayed-draw loan (claims 4592, 11922) - A revolving credit facility expanded by $1.5B, plus $350M of letters of credit (claims 11923, 11924) The DDTL 3.0 loan carries covenants tied to contract performance: a minimum 0.85x contract realization ratio (claim 4597) and a 1.40x debt service coverage ratio starting April 2027 (claim 4596). Interest rates of 9% or more signal that lenders view this as higher-risk credit.
A. Nothing in this dossier has been independently verified. Every claim has only reached 'stated' status, meaning the company said it, or 'delayed'. The IPO pricing and the note issuances are routine securities events and are the most likely to have happened as described, but the record does not confirm them. The 420 MW of active capacity (claim 4972), the product launches (claims 4975-4978), and the backlog figures (claims 4969, 4970, 4297) are all company statements. The strongest caution concerns backlog: it is contracted future revenue, not revenue already recognized, and the record contains no data on how much has been converted into revenue.
A. The record is inconsistent. A 2025-09-24 entry describes CoreWeave acquiring Core Scientific via the merger (claim 4313). However, the merger's closing deadline of 2026-04-07 (claims 4738, 4731) and an earlier 2025-10-01 target (claim 4517) are both flagged 'delayed', and the dossier contains no confirmation that the deal closed. If the deal were terminated under certain conditions, Core Scientific would owe CoreWeave a $270M fee (claim 4739). Readers should treat completion as unconfirmed until a closing or termination filing appears.
A. Four things: 1. **Core Scientific.** Whether the merger closed or was terminated. 2. **Revolver maturity.** The credit facility has a contingent 'springing' maturity date of 2026-12-30 (claim 11926). That means the stated 2028-05-02 maturity (claim 11925) can move earlier to 2026-12-30 if certain conditions are triggered. 3. **Covenant tests.** The 1.40x debt service coverage test begins in April 2027 (claim 4596). 4. **Contract conversion.** Whether the OpenAI contracts and the unnamed material contract turn into recognized revenue fast enough to satisfy the 0.85x contract realization covenant (claim 4597). Several financing milestones are also flagged 'delayed' with no confirmation in the record. These include the note closings (claims 11919, 4699), the first 9% note interest payment due 2026-02-01 (claim 4659), and the DDTL 3.0 commitment termination date (claim 4593). These flags may reflect missing follow-up data rather than actual problems, but they should be checked.
A. 1. **Customer concentration.** OpenAI accounts for at least $11.2B of the $25.9B backlog reported in May 2025 (claims 4969, 4970), and other large counterparties are unnamed. 2. **Debt servicing.** CoreWeave carries 9%+ notes (claims 4824, 4697) and covenants tied to contract performance, so its ability to service debt depends on customers paying on schedule. 3. **Capacity build-out.** Only 420 MW is described as active against 1.6 GW contracted (claims 4972, 4973), so most of the capacity still has to be built. 4. **Merger outcome.** The Core Scientific deal's status is unresolved in the record. 5. **Record gaps.** This dossier's claim list appears to cut off after claim 4297 in September 2025, and the chief executive entry (claim 4332) names no one. More recent disclosures may exist that are not reflected here.
Frequently asked
2026-09-19A. CoreWeave rents GPU computing capacity for AI workloads. Customers pay to run model training and inference on its infrastructure. The company also builds software around that capacity. Product claims on record include general availability of AI Object Storage (claim 4975), GB200 support across its cloud stack (claim 4976), and on-demand cluster scaling (claim 4977). It bought Weights & Biases, a developer tooling company, for about $1.0B (claims 4974, 4516). It also has an agreement to merge with Core Scientific, a data-center operator (claim 4729).
A. The strategy is to grow capacity quickly and pay for it mostly with debt tied to customer contracts. CoreWeave went public at $40 per share (claim 15974) and received about $1.4B in net IPO proceeds (claim 4967). It reports $17.2B in total debt and equity raised (claim 4968). After the IPO it sold two sets of high-interest bonds: $2.0B at 9.25% due 2030 (claims 11917, 4824) and $1.75B at 9% due 2031 (claims 4658, 4698). It also expanded its revolving credit line by $1.5B (claim 11923) and set up a delayed-draw term loan of up to $2.6B (claim 4592). Alongside the financing, it is buying tools and operators that sit next to its core business: Weights & Biases and the pending Core Scientific merger.
A. OpenAI is the main named customer. The record shows an $11.2B OpenAI revenue backlog (claim 4969) and a separate $6.5B OpenAI revenue commitment running through May 2031 (claim 4297). IBM is named as a partner using CoreWeave compute for its Granite models (claim 4971), but no dollar figure is attached. Several other items do not name the customer. One loan facility is tied to a 'material customer contract' (claim 4595), and there is a $350M share issuance to a 'strategic customer' (claim 4514). The total backlog is $25.9B (claim 4970), which means a large share of committed revenue comes from customers the record does not name. Customer concentration is therefore a central question.
A. Completed items include the IPO (claims 15974, 4967), the two bond sales (claims 11917, 4658), the credit-line expansion (claim 11923), and the Weights & Biases acquisition (claim 4516). The company also reports 420 MW of active power capacity added (claim 4972). Against that, it has 1.6 GW of power under contract (claim 4973), so most contracted capacity has not yet been shown to be running. Likewise, the $25.9B backlog (claim 4970) is revenue customers have committed to, not revenue already earned. Benchmark results and an analyst rating (claims 4980, 4981) are third-party recognition, not proof of commercial delivery.
A. The merger agreement was signed in July 2025 at 0.1235 CoreWeave shares for each Core Scientific share (claims 4729, 4731). A 2025-09-24 claim describes CoreWeave acquiring Core Scientific via merger (claim 4313). That reads as a description of the deal, not confirmation that it closed. The record lists the 2026-04-07 closing deadline as delayed (claims 4731, 4738). An earlier target date of 2025-10-01 is also listed as delayed (claim 4517). The claims reviewed here do not record the deal closing. If it terminates, a $270M fee would be payable to CoreWeave (claim 4739).
A. Four dated items matter most. First, whether the Core Scientific merger closes or terminates (claim 4738). Second, what happened at the delayed-draw loan's commitment termination date of 2026-07-31, which the record marks as delayed (claim 4593). Third, a possible 'springing' maturity on 2026-12-30 that could pull the credit facility's due date forward from 2028-05-02 (claims 11926, 11925). Fourth, loan covenants: a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). Beyond those dates, watch how much of the 1.6 GW of contracted power actually comes online (claim 4973).
A. (1) Concentration: how much of the $25.9B backlog (claim 4970) depends on OpenAI and on customers the record does not name (claims 4595, 4514). (2) Leverage: the bonds carry 9% to 9.25% interest (claims 4824, 4658), and debt repayment depends on contracted revenue actually arriving. (3) Buildout: can the company close the gap between 420 MW active and 1.6 GW contracted (claims 4972, 4973)? (4) Supplier commitments: the terms of the $6.3B NVIDIA capacity purchase commitment running to 2032 (claim 4352) are unclear. (5) Timeline status: several dated items, such as the 2026-02-01 note interest date (claim 4659), are marked 'delayed' by automated tracking. That label means completion has not been confirmed in the record. It does not by itself show a missed payment, and each item should be checked against filings.
A. Automated extraction often pulls the same fact from several filings. The $40 IPO price appears three times (claims 15974, 11601, 11616). The $1.5B revolver expansion appears twice (claims 11923, 5010). Some bond deals were also resized before closing. The 2030 notes were first described at $1.5B (claim 11921) and closed at $2.0B (claim 11917). The 2031 notes grew from $1.5B (claim 4700) to $1.75B through a $250M upsize (claim 4698). Use the latest closing figure rather than adding the entries together.
Frequently asked
2026-09-18A. CoreWeave rents out large clusters of GPUs (mainly NVIDIA chips) to companies that train and run AI models. It operates data-center capacity and sells access to it as a cloud platform, with software for storage, scaling, and billing on top. It listed publicly via an IPO priced at $40 per share on 2025-03-28 [claims 15974, 11616, 11601], raising about $1.4 billion in net proceeds [claims 4967, 4513].
A. The strategy is to grow capacity quickly using debt, sign multi-year contracts with large AI customers, and add software through acquisitions. The company reported 420 MW of active power capacity against 1.6 GW contracted [claims 4972, 4973]. It said it had raised $17.2 billion in total debt and equity [claim 4968]. It bought Weights & Biases, an AI developer-tools company, for a stated $1.0 billion [claims 4974, 4516]. It also agreed to acquire Core Scientific, a data-center and power operator, in an all-stock merger at 0.1235 CoreWeave shares per Core Scientific share [claims 4731, 4729].
A. OpenAI is the main named customer. The company cited an $11.2 billion OpenAI revenue backlog [claim 4969] and a later $6.5 billion OpenAI committed-revenue figure running to 2031-05-31 [claim 4297]. Total backlog from committed contracts was stated at $25.9 billion [claim 4970]. IBM is named as a partner for Granite model compute [claim 4971]. NVIDIA is both a supplier and a counterparty, with a stated $6.3 billion capacity purchase commitment through 2032-04-13 [claim 4352]. Two important counterparties are not named: the 'material customer contract' that backs the $2.6 billion DDTL 3.0 loan [claims 4595, 4592], and the 'strategic customer' that bought $350 million of shares [claim 4514].
A. Mostly with debt, much of it expensive. The record shows: - A revolving credit facility expanded to $1.5 billion, plus a $350 million letters-of-credit facility [claims 5010, 11923, 5011]. - $2.0 billion of 9.25% senior notes due 2030, upsized from $1.5 billion [claims 11921, 11918, 11917, 4824]. - $1.75 billion of 9% senior notes due 2031, upsized by $250 million [claims 4700, 4698, 4697, 4658]. - A $2.6 billion delayed-draw term loan (DDTL 3.0) maturing 2030-08-21 [claims 4592, 4594]. Interest rates of about 9% show that lenders price this as high-risk credit.
A. Every claim on record is at status 'stated'. That means the company said it; our tracker has not independently confirmed delivery. The completed financings are the strongest items: the IPO pricing and proceeds, and a notes issuance record dated 2025-05-27 [claim 4824]. The weakest items are the backlog and contracted-capacity figures ($25.9B backlog, 1.6 GW contracted), which describe future revenue and capacity rather than current revenue or capacity. Product launches such as AI Object Storage general availability and GB200 support [claims 4975, 4976] are company announcements, not audited results.
A. Several date-bound claims are flagged 'delayed' in our tracker: - The Core Scientific closing targets, including a 2025-10-01 date and a 2026-04-07 merger deadline [claims 4517, 4731, 4738]. - Expected closing dates for two notes offerings [claims 11919, 4699]. - The first interest payment on the 9% notes, due 2026-02-01 [claim 4659]. - The DDTL 3.0 commitment termination date of 2026-07-31 [claim 4593]. 'Delayed' means the promised date has passed and the record contains no confirmation. It does not by itself prove the event failed. For example, a notes issuance was later recorded on 2025-05-27 [claim 4824].
A. 1. Whether the Core Scientific deal completed or was terminated. A $270 million termination fee payable to CoreWeave is on record [claim 4739]. 2. The contingent 'springing' maturity date of 2026-12-30 on the credit facility [claim 11926], which could pull debt repayment earlier than the stated 2028-05-02 maturity [claims 5012, 11925]. 3. Loan covenants under DDTL 3.0: a minimum contract realization ratio of 0.85x [claim 4597] and a minimum debt service coverage ratio of 1.40x starting April 2027 [claim 4596]. 4. How fast the 1.6 GW of contracted capacity becomes active capacity.
A. 1. Customer concentration: OpenAI accounts for a large share of the stated backlog, and at least two major counterparties are unnamed. 2. Debt: roughly $17 billion raised, much of it at about 9%, is being serviced by contracts that are mostly future revenue. 3. Conflicting OpenAI figures: the $11.2B backlog and the $6.5B committed-revenue number are not reconciled in the record [claims 4969, 4297]. 4. The Core Scientific outcome, since its deadline claims are all flagged delayed. Also note that the claims available for this FAQ end in late September 2025, so later developments may not be reflected.
Frequently asked
2026-09-18A. CoreWeave rents out GPU-based computing capacity for AI workloads, mostly built on NVIDIA hardware. Its software sits on top of that capacity. Disclosed product items include GB200 support across its platform (claim 4976), AI Object Storage general availability (claim 4975), on-demand cluster scaling (claim 4977), and support for NVIDIA AI Enterprise and Cloud Functions (claim 4979). In 2025 it bought Weights & Biases, an AI developer-tools company, for about $1.0 billion (claim 4516). That extended it from raw compute into tooling for model developers. In May 2025 the company reported 1.6 GW of contracted power capacity (claim 4973) and said it had added 420 MW of active capacity (claim 4972).
A. The strategy is to scale fast, funded by debt, and backed by long-term customer contracts. CoreWeave went public at $40 per share (claims 11616, 15974, 11601), with net proceeds of about $1.4 billion (claims 4967, 4513). It reported $17.2 billion in total debt and equity capital raised (claim 4968). Since the IPO it has kept adding debt: a $2.0 billion 9.25% note due 2030 (claims 11917, 4824), a $1.75 billion 9% note due 2031 (claims 4658, 4697), and a $2.6 billion delayed-draw term loan (claim 4592). It also expanded its revolving credit facility to $1.5 billion (claim 5010) and its letters-of-credit facility to $350 million (claim 5011). In July 2025 it signed a merger agreement to acquire Core Scientific, a data-center operator, for 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). The aim appeared to be owning more of its power and site footprint rather than leasing it.
A. Only a few are named on the record. OpenAI is named in a strategic deal carrying $11.2 billion of revenue backlog (claim 4969). IBM is named as a partner using CoreWeave capacity for its Granite models (claim 4971). NVIDIA has a capacity purchase commitment of $6.3 billion running to April 2032 (claim 4352). NVIDIA is therefore both a supplier and a buyer of capacity. Other disclosures are anonymous. A 'material customer contract for GPU infrastructure' backs the $2.6 billion term loan without naming the counterparty (claim 4595). A $350 million share issuance went to an unnamed 'strategic customer' (claim 4514). Total committed backlog was $25.9 billion as of May 2025 (claim 4970). OpenAI alone accounts for roughly 43% of that figure, so customer concentration is a real consideration.
A. Completed items on the record: the IPO, with net proceeds of about $1.4 billion (claim 4967) and a $68 million over-allotment exercise (claim 4515). The Weights & Biases acquisition, at about $1.0 billion (claim 4516). The issuance of the $2.0 billion 2030 notes (claim 11917) and the $1.75 billion 2031 notes (claim 4658). The credit facility expansions (claims 5010, 5011). Both note offerings grew during the process. The first was announced at $1.5 billion (claim 11921) and issued at $2.0 billion. The second was announced at $1.5 billion (claim 4700) and upsized by $250 million to $1.75 billion (claims 4698, 4697). Things that are commitments rather than delivered revenue: the $25.9 billion backlog (claim 4970), the 1.6 GW of contracted power (claim 4973), and the NVIDIA commitment through 2032 (claim 4352). The Core Scientific merger was agreed, but the record does not show it closing. See the open questions below.
A. 'Delayed' means the promised date has passed and the record holds no confirmation that the item happened. It is not evidence that something failed. Flagged items: the Core Scientific closing, targeted for 2025-10-01 (claim 4517), and the merger's outside deadline of 2026-04-07 (claims 4738, 4731). The expected closing dates of both note offerings (claims 11919, 4699). Those two are probably just missing confirmations, because the issuances themselves are recorded (claims 11917, 4658). The first 9% coupon payment due 2026-02-01 (claim 4659). The DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). Of these, the Core Scientific merger is the one that matters most.
A. Debt dates and covenant tests. The revolving credit facility has a contingent 'springing' maturity of 2026-12-30 (claim 11926). If the triggering condition isn't avoided, that date would apply instead of the extended 2028-05-02 maturity (claims 5012, 11925). The term loan requires a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). Those tests measure whether customer contracts actually turn into cash. Further out, the notes mature in 2030 and 2031 (claims 11917, 4658) and the term loan in August 2030 (claim 4594). Readers should also track how much of the $25.9 billion backlog (claim 4970) converts to recognized revenue.
A. (1) What happened to the Core Scientific merger? The record shows an agreement, an S-4 filing and a Nasdaq listing approval (claims 4733, 4735). It shows both target dates passing (claims 4517, 4738), but no completion or termination. A $270 million termination fee payable to CoreWeave is on record (claim 4739). (2) Who is the unnamed material customer behind the term loan (claim 4595)? Who is the strategic customer that bought $350 million of shares (claim 4514)? (3) Can cash flow support debt carrying roughly 9% coupons (claims 4824, 4659) before the 2027 coverage test (claim 4596)? (4) How dependent is the business on OpenAI and NVIDIA (claims 4969, 4352)?
A. Claims are machine-extracted and then reviewed, so some entries are duplicates, such as the three IPO-price claims (11616, 15974, 11601) and the paired facility claims (5010/11923, 5011/11924). Some have unit errors. For example, claim 11922 records the $2.6 billion term loan as '2600.0 USD'. Executive-role claims (4332, 4315, 4317) don't name the people. The claim list supplied for this FAQ is cut off after late September 2025, so later events are not reflected here. That includes any resolution of the Core Scientific merger. Readers should check the primary filings before relying on any single figure.
Frequently asked
2026-09-18A. CoreWeave rents out GPU computing capacity, built mostly on NVIDIA hardware, to companies that train and run AI models. It is often called a 'neocloud'. It also sells software on top of that hardware: in May 2025 it announced general availability of AI Object Storage (claim 4975), GB200 support across its platform (claim 4976), On-Demand Cluster Scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). It went public on 2025-03-28 at $40 per share (claims 15974, 11616, 11601), with net IPO proceeds of about $1.4 billion (claims 4967, 4513).
A. The strategy is to scale fast, with debt paying for most of it, and to move up the stack through acquisitions. By May 2025 it reported $17.2 billion of total debt and equity raised (claim 4968), 420 MW of active power (claim 4972) and 1.6 GW of contracted power (claim 4973). It bought Weights & Biases, an AI developer-tools company, for about $1.0 billion (claims 4974, 4516). It also signed a stock-for-stock merger with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). Owning Core Scientific would give CoreWeave its own power and sites rather than leased ones.
A. OpenAI is the one major customer named in the record. The OpenAI deal was cited as $11.2 billion of backlog (claim 4969), and a customer relationship runs to 2031-05-31 (claim 4296). Total committed-contract backlog was $25.9 billion (claim 4970), so roughly 40% came from OpenAI alone. Other large counterparties are not named. A 'material customer contract' backs the $2.6B DDTL 3.0 loan (claim 4595), and a $350 million share issuance went to an unnamed 'strategic customer' (claim 4514). IBM appears as a partner for Granite model compute (claim 4971). NVIDIA is both supplier and backstop: it committed to buy $6.3 billion of unused capacity through 2032-04-13 (claim 4352).
A. Mostly with debt, much of it expensive. Since the IPO, CoreWeave has: - enlarged its revolving credit facility to $1.5 billion (claims 5010, 11923); - added a $350 million letter-of-credit facility (claims 5011, 11924); - issued $2.0 billion of 9.25% senior notes due 2030 (claims 4824, 11917), upsized from a $1.5 billion launch (claim 11921); - issued $1.75 billion of 9% senior notes due 2031 (claims 4697, 4658), upsized by $250 million (claim 4698); - signed a delayed-draw term loan (DDTL 3.0) of up to $2.6 billion, maturing 2030-08-21 (claims 4592, 11922, 4594). The DDTL has covenants: a minimum 0.85x contract-realization ratio (claim 4597) and, from April 2027, a 1.40x debt-service coverage ratio (claim 4596).
A. Delivered, per the record: - the IPO (claims 15974, 4967); - the credit-facility expansions (claims 5010, 5011); - both senior-note issuances (claims 4824, 4658); - the Weights & Biases acquisition (claim 4516); - the May 2025 product launches (claims 4975–4978). Announced but not confirmed as completed: - The Core Scientific merger. The dossier marks its closing deadline of 2026-04-07 as 'delayed' (claims 4738, 4731, 4517), even though one September 2025 item describes the acquisition as a merger (claim 4313). - Turning 1.6 GW of contracted power into active capacity. Only 420 MW was active (claims 4972, 4973). - Converting the $25.9 billion backlog into revenue (claim 4970).
A. Five things: 1. Whether the Core Scientific merger closed or was terminated. The record shows a $270 million termination fee payable to CoreWeave (claim 4739). 2. The revolving credit facility's contingent 'springing' maturity date of 2026-12-30 (claim 11926). This could pull the facility forward from its extended 2028-05-02 maturity (claims 5012, 11925). 3. Whether the DDTL 3.0 commitment period, which ended 2026-07-31 and is flagged 'delayed' (claim 4593), was fully drawn or extended. 4. Compliance with the 1.40x debt-service coverage test starting April 2027 (claim 4596). 5. Growth in active power (MW) relative to contracted power (claims 4972, 4973).
A. Customer concentration: OpenAI alone accounted for about $11.2B of the $25.9B backlog (claims 4969, 4970), and the other large customers are not named (claims 4595, 4514). Leverage and cost of debt: the notes carry 9% to 9.25% coupons (claims 4697, 4824), and the loan covenants depend on customers actually paying out their contracts (claim 4597). The fate of the Core Scientific deal, which the record does not resolve (claims 4731, 4738, 4313). How much of NVIDIA's $6.3B capacity backstop (claim 4352) reflects real outside demand versus support from a supplier.
A. Every claim here was first pulled out of filings and press releases by automated extraction; none has yet been independently verified. Some items appear more than once with inconsistent units. For example, the $1.5B and $2.6B figures are recorded as '1500.0 USD' and '2600.0 USD' (claims 11921, 11922). A 'delayed' status mostly means a promised date passed without a recorded follow-up; it is not necessarily a confirmed slip. For instance, the 2030 notes' closing is flagged delayed (claim 11919), yet the issuance itself is recorded (claim 11917). The claims shown here run only through late September 2025. Later developments, including the outcome of the Core Scientific merger, are not reflected.
Frequently asked
2026-09-18A. CoreWeave rents out GPU computing capacity for AI workloads. Its customers train and run AI models on NVIDIA hardware in CoreWeave's data centers. Disclosed product milestones include general availability of CoreWeave AI Object Storage (claim 4975), GB200 support across its cloud platform stack (claim 4976), and on-demand cluster scaling (claim 4977). As of May 2025 it reported 420 MW of active power capacity (claim 4972) and 1.6 GW of contracted power (claim 4973). It went public at $40 per share (claim 11616).
A. The strategy is to expand capacity quickly, mostly with borrowed money, and to own more of the stack. The company reported $17.2B of total debt and equity raised (claim 4968). It acquired Weights & Biases, a software company whose tools AI developers use to track model training, for about $1.0B (claims 4974, 4516). It also signed an agreement to acquire Core Scientific, a data-center operator, for 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). The Core Scientific deal would give CoreWeave control of data-center power and sites instead of leasing them.
A. OpenAI is the only customer clearly named as a buyer of compute. The OpenAI deal accounts for $11.2B of revenue backlog (claim 4969), with a contract running to 2031-05-31 (claim 4296). NVIDIA has committed to buy $6.3B of CoreWeave capacity through 2032-04-13 (claim 4352). NVIDIA is also CoreWeave's key GPU supplier. IBM is named as a partner for Granite model compute (claim 4971), but no dollar figure is disclosed. Other counterparties are not named: a 'strategic customer' that bought $350M of shares (claim 4514), and a 'material customer contract' that underpins the DDTL 3.0 loan (claim 4595). Total backlog was $25.9B (claim 4970), so OpenAI alone is about 43% of it.
A. The IPO priced at $40 (claim 11616) and raised about $1.4B in net proceeds (claims 4967, 4513). The company issued $2.0B of 9.25% senior notes due 2030 (claims 4824, 11917) and $1.75B of 9% senior notes due 2031 (claim 4658). Its revolving credit facility was expanded to $1.5B (claim 5010) and a $2.6B delayed-draw term loan was put in place (claim 4592). The Weights & Biases acquisition was disclosed as done. The following are announcements or contracts, not delivered results: the $25.9B backlog, the 1.6 GW of contracted power, and the Core Scientific merger. All items in this dossier are recorded as 'stated', meaning the company said them; none has been independently verified.
A. The record does not show that the merger closed. The outside closing date was 2026-04-07 (claim 4738), and both that deadline and the merger itself are marked 'delayed' in the record (claims 4731, 4738). A $270M termination fee payable to CoreWeave is disclosed (claim 4739), but the record does not show whether it was triggered. Readers should check current filings for the deal's status. The dossier on its own cannot say whether the deal closed, was renegotiated, or was abandoned.
A. The debt is substantial and costly. The two senior note issues pay 9.25% (claim 4824) and 9% (claim 4697), which is high-yield territory. The DDTL 3.0 term loan requires a minimum 'contract realization ratio' of 0.85x (claim 4597). That means lenders expect customers to actually honor the contracted revenue. The same loan requires a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The lenders' protection therefore depends on customer contracts converting into cash.
A. 1. The contingent 'springing' maturity date of 2026-12-30 on the credit facility (claim 11926). This could pull the revolver's due date forward from 2028-05-02 (claim 11925) if certain conditions are met. 2. Whether the company meets the 1.40x debt service coverage test from April 2027 (claim 4596). 3. How much of the $2.6B DDTL 3.0 was drawn before its commitment period ended on 2026-07-31 (claim 4593). 4. The final outcome of the Core Scientific deal. 5. Whether active capacity grows from 420 MW toward the 1.6 GW contracted (claims 4972, 4973).
A. The first is customer concentration. OpenAI is about $11.2B of $25.9B in backlog (claims 4969, 4970), and NVIDIA is both a major supplier and a $6.3B customer (claim 4352). The second is who the unnamed 'strategic' and 'material' customers are (claims 4514, 4595). The third is whether backlog becomes revenue fast enough to service 9%+ debt. The fourth is the unresolved status of the Core Scientific merger. Readers should also know that some records list amounts without units: for example, claim 11922 shows '2600.0 USD' where $2.6B is meant, and claim 4698 shows '250.0 USD' where $250M is meant. Check primary filings before quoting figures.
Frequently asked
2026-09-18A. CoreWeave rents GPU computing capacity for AI workloads. Its customers train and run AI models on NVIDIA hardware in CoreWeave's data centers. The disclosures describe a cloud platform stack with GB200 support (claim 4976), AI Object Storage now generally available (claim 4975), on-demand cluster scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). In 2025 it added a software layer by acquiring Weights & Biases, an AI developer tooling company, for about $1.0 billion (claims 4974, 4516).
A. The strategy is to grow capacity quickly and pay for it mostly with debt, backed by long-term customer contracts. The company says it has raised $17.2 billion in total debt and equity (claim 4968). It reports $25.9 billion of contracted revenue backlog (claim 4970). It has 420 MW of active power against 1.6 GW contracted (claims 4972, 4973). It is also pursuing vertical integration. That includes the Weights & Biases deal and an all-stock merger agreement with data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). Core Scientific would owe CoreWeave a $270 million termination fee in specified circumstances (claim 4739).
A. OpenAI is the only named anchor customer. Its strategic deal accounts for $11.2 billion of backlog (claim 4969), roughly 43% of the $25.9 billion total (claim 4970), and the relationship runs to 2031-05-31 (claim 4296). IBM is named as a partner using CoreWeave capacity for its Granite models, but no dollar value is disclosed (claim 4971). NVIDIA has committed to buy $6.3 billion of capacity through April 2032 (claim 4352). NVIDIA is also CoreWeave's key supplier, so it sits on both sides of the relationship. Two items are not named in the record: a 'material customer contract' that backs a debt facility (claim 4595), and the strategic customer that bought $350 million of shares at the IPO (claim 4514).
A. Completed items: - The Nasdaq IPO at $40 per share on 2025-03-28 (claim 11616), raising about $1.4 billion net (claim 4967) plus a $68 million over-allotment (claim 4515). - $2.0 billion of 9.25% senior notes due 2030, issued 2025-05-27 and upsized from an initially announced $1.5 billion (claims 4824, 11917, 11921). - $1.75 billion of 9% notes due 2031, upsized by $250 million (claims 4697, 4698, 4658). - A $1.5 billion revolver expansion and a $350 million letters-of-credit expansion (claims 5010, 5011). - A $2.6 billion delayed-draw term loan, DDTL 3.0 (claim 4592). The product launches are stated as available (claims 4975–4980). Most operating scale is still contracted rather than live: 420 MW is active out of 1.6 GW contracted (claims 4972, 4973). Backlog is contracted future revenue, not revenue already earned. Every claim in this dossier carries status 'stated', meaning it is the company's own assertion and none is independently marked as verified.
A. The record does not say. The merger agreement was signed in July 2025 (claim 4729), with an S-4 registration filed (claim 4733) and a Nasdaq listing approved for the new shares (claim 4735). The outside closing deadline was 2026-04-07 (claim 4738). That date has passed, and the record contains no disclosure that the deal closed, so the related claims are flagged 'delayed' (claims 4731, 4738, 4517). Readers should confirm the outcome from primary filings rather than assume the deal was completed.
A. In this dossier, 'delayed' is an automated flag. It means a promised-by date has passed and no follow-up disclosure is on record. It is not a finding that anything slipped. For example, the May 2025 notes closing is flagged 'delayed' (claim 11919), yet a separate claim records the notes as issued on the expected date, 2025-05-27 (claim 4824). The same caution applies to the first 9% coupon due 2026-02-01 (claim 4659) and the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593). There are also some data-quality issues. Some amounts are recorded without their millions or billions unit (for example, claim 11922 shows '2600.0 USD' for a $2.6 billion facility).
A. Four dates and tests matter most: - **2026-12-30:** a contingent 'springing' maturity on the credit facility (claim 11926). If it is triggered, the facility would mature well before its extended date of 2028-05-02 (claims 5012, 11925). - **April 2027:** the DDTL 3.0 minimum debt-service coverage ratio of 1.40x takes effect (claim 4596). - **Ongoing:** a 0.85x minimum contract-realization ratio, which tests whether contracted revenue actually turns into cash (claim 4597). - **Ongoing:** progress converting the 1.6 GW of contracted power into active capacity (claims 4972, 4973). Also watch for a definitive disclosure on the Core Scientific outcome (claim 4738).
A. 1. **Customer concentration.** A single customer, OpenAI, accounts for about 43% of disclosed backlog (claims 4969, 4970). Several large counterparties are also unnamed (claims 4514, 4595). 2. **Leverage and cost of capital.** Recent unsecured debt carries 9–9.25% coupons (claims 4824, 4697) on top of large term loans. Covenant tests tighten in 2027 (claim 4596). 3. **Execution.** The question is whether contracted power (1.6 GW) comes online on schedule and on budget (claim 4973). 4. **Circularity.** NVIDIA is both a major supplier and a $6.3 billion capacity buyer (claim 4352). 5. **Record gaps.** The dossier has no claims after September 2025. Personnel changes (claims 4332, 4316, 4317) are recorded without names or context. Nothing is independently verified.
Frequently asked
2026-09-18A. CoreWeave rents out GPU computing capacity for AI workloads, in effect a specialized cloud built around NVIDIA hardware. Its disclosures describe support for NVIDIA GB200 systems across its platform (claim 4976), a generally available AI Object Storage product (claim 4975), on-demand cluster scaling (claim 4977), and MLPerf Inference v5.0 benchmark results (claim 4980). As of May 2025 it reported 420 MW of active power capacity (claim 4972) and 1.6 GW of contracted power capacity (claim 4973). The gap between those two figures is capacity it has secured but not yet brought online.
A. The record shows a strategy of scaling capacity quickly with borrowed money and moving further up the software stack. On capacity, CoreWeave agreed to acquire data-center operator Core Scientific in an all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). It also funded expansion through a string of debt facilities and bond offerings. On software, it acquired the AI developer-tools company Weights & Biases, which the record values at about $1.0B (claims 4974, 4516). Total debt and equity raised stood at $17.2B as of May 2025 (claim 4968).
A. OpenAI is the only customer named in the record. The OpenAI strategic deal accounted for $11.2B of revenue backlog (claim 4969), and a later filing describes OpenAI as a cloud customer with commitments running to 2031-05-31 (claim 4296). Total backlog was $25.9B (claim 4970), so OpenAI alone was about 43% of it. That is a significant concentration. Two other relationships are not conventional disclosed customer contracts. IBM is described as a partner buying compute for its Granite models (claim 4971). NVIDIA has a $6.3B commitment to purchase CoreWeave capacity through 2032-04-13 (claim 4352), which makes CoreWeave's main supplier also a buyer. A July 2025 filing tied to a $2.6B loan facility refers to a 'material customer contract' without naming the counterparty (claims 4595, 4592). A $350M share issuance to a 'strategic customer' is likewise unnamed (claim 4514).
A. Completed items: the IPO priced at $40 per share on 2025-03-28 (claims 11601, 11616) and brought in about $1.4B of net proceeds (claims 4967, 4513), plus $68M from the underwriters' over-allotment (claim 4515). The revolving credit facility was expanded to $1.5B and the letters-of-credit facility to $350M (claims 11923, 11924). The record says 9.25% senior notes due 2030 were issued (claims 4824, 11917); related claims give sizes of $1.5B and $2.0B (claims 11921, 11918), which may reflect an upsizing. The record also says 9% senior notes due 2031 were issued, sized at $1.75B (claims 4658, 4697). The Weights & Biases acquisition is recorded as completed (claim 4516). Items not confirmed: several dated events are flagged 'delayed' in this dossier. That flag means the record contains no confirmation that the event happened on its date, not necessarily that it slipped. Examples include the expected closing dates of both bond offerings (claims 11919, 4699) and the first 9% note coupon payment (claim 4659). Every claim here is at 'stated' status or lower. None has been independently verified.
A. The record does not say. The merger agreement was signed in July 2025 (claim 4729). It came with an S-4 registration filing (claim 4733), a Nasdaq listing approval for the new shares (claim 4735), and a $270M termination fee payable to CoreWeave if Core Scientific walked away (claim 4739). The outside date for closing was 2026-04-07 (claim 4738). That date has passed with no recorded completion, so the deal is flagged 'delayed' (claims 4731, 4738). An earlier target date of 2025-10-01 is also flagged (claim 4517). Whether the merger closed, was extended, or was terminated is the single largest gap in this dossier.
A. The debt load is heavy and expensive. The senior notes carry 9% to 9.25% coupons (claims 4824, 4697). The largest single facility on record is DDTL 3.0, a delayed-draw term loan of up to $2.6B that matures 2030-08-21 (claims 4592, 4594). It has two covenants. The first is a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596), meaning cash flow must cover debt payments by that margin. The second is a minimum 'contract realization ratio' of 0.85x (claim 4597), which appears to test whether contracted customer revenue actually turns into collected revenue. That second test ties the loan directly to the unnamed material customer contract (claim 4595).
A. Four dates matter most. First, 2026-12-30, the contingent 'springing' maturity date on the revolving credit facility (claim 11926). If its trigger conditions are met, the facility comes due years ahead of its scheduled 2028-05-02 maturity (claims 5012, 11925). The record does not spell out the trigger. Second, the 2026-07-31 DDTL 3.0 commitment deadline has passed without a recorded outcome, so it is unclear how much of the $2.6B was drawn (claim 4593). Third, April 2027 is when the 1.40x coverage test begins (claim 4596). Fourth, and more broadly, watch how much of the 1.6 GW of contracted power actually comes online (claim 4973), and whether backlog converts into revenue at the pace that both lenders and the 0.85x covenant require (claim 4597).
A. (1) Whether the Core Scientific deal closed (claims 4731, 4738). (2) Who the unnamed material customer and the unnamed strategic customer are (claims 4595, 4514). (3) How dependent the business is on OpenAI, which accounted for about 43% of disclosed backlog (claims 4969, 4970). (4) How the NVIDIA relationship works in practice, given that NVIDIA is both the key supplier and a $6.3B capacity buyer (claim 4352). (5) Whether cash flow can support roughly 9%-coupon debt and the covenant tests that follow (claims 4596, 4597). Note also that the newest claim in this dossier is dated 2025-09-24, about a year before this FAQ was written. Anything more recent, including results, new customers, or the outcome of the merger, is not reflected here.
Frequently asked
2026-09-15A. CoreWeave rents out large clusters of NVIDIA GPUs over the cloud for training and running AI models. It has also added its own software and services on top of that computing capacity, including GB200 support across its platform (claim 4976), AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), and the acquisition of Weights & Biases, an AI developer-tools company, for about $1.0B (claim 4516). The company went public on 2025-03-28 at $40 per share (claim 11601).
A. The strategy is to lock in long-term customer contracts first, then borrow heavily to build the power and GPU capacity those contracts need. In May 2025 it reported $25.9B of revenue backlog (claim 4970), 1.6 GW of contracted power (claim 4973), and $17.2B of total debt and equity raised (claim 4968). It has also bought its way into owning more of the stack. That includes buying Weights & Biases and signing a stock-for-stock merger agreement with Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. OpenAI is the only customer named with numbers attached. The record shows $11.2B of backlog tied to an OpenAI deal (claim 4969) and an OpenAI contract running to 2031-05-31 (claim 4296). IBM is named as a partner for compute used on its Granite models, but no dollar figure is given (claim 4971). NVIDIA has agreed to buy up to $6.3B of unused capacity through 2032-04-13 (claim 4352), which works as a backstop rather than ordinary demand. Several items are not named: a 'material customer contract' behind the DDTL 3.0 loan (claim 4595) and a $350M share issuance to a 'strategic customer' (claim 4514). Readers should assume customer revenue is highly concentrated.
A. Completed items in the record: - The IPO, with about $1.4B of net proceeds (claims 4967, 4513). - $2.0B of 9.25% senior notes due 2030, issued 2025-05-27 (claims 4824, 11917). - $1.75B of 9% senior notes due 2031, an offering upsized by $250M (claims 4697, 4698, 4658). - A revolving credit facility expanded to $1.5B (claim 5010). - 420 MW of active power capacity added (claim 4972). - General availability of AI Object Storage (claim 4975). Still forward-looking: the $25.9B backlog and the 1.6 GW of contracted power, most of which is not yet built or billed (claims 4970, 4973). The same goes for the $2.6B DDTL 3.0 delayed-draw term loan (claim 4592), where the record does not show how much has actually been drawn.
A. The record does not show it closing. The merger's outside closing deadline of 2026-04-07 is flagged as delayed (claims 4731, 4738), and so is an earlier target date of 2025-10-01 (claim 4517). The agreement set a $270M termination fee payable to CoreWeave (claim 4739). Readers should check the latest filings directly for whether the deal closed, was renegotiated, or was terminated, because this dossier cannot confirm any of those outcomes.
A. - Whether the 'springing maturity' clause on the credit facility takes effect on 2026-12-30 (claim 11926). If triggered, it would pull the maturity forward from the extended date of 2028-05-02 (claim 11925). - The status of DDTL 3.0 draws after its commitment termination date of 2026-07-31 (claim 4593). - Two loan covenants: a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596), and a minimum 'contract realization ratio' of 0.85x (claim 4597), which tests whether contracted revenue actually turns into collected cash. - How much of the 1.6 GW of contracted power is actually energized (claim 4973).
A. 1. **Leverage.** The company pays roughly 9–9.25% interest on its bonds (claims 4824, 4697) while building capacity ahead of revenue. 2. **Customer concentration.** OpenAI accounts for $11.2B of the $25.9B backlog (claims 4969, 4970), and other large contracts are unnamed. 3. **Backlog quality.** It is unclear how much of the backlog is firm and on schedule. 4. **Core Scientific.** The merger's outcome is unresolved in the record. 5. **Build-out pace.** It is unclear whether new capacity can keep up with debt service once the covenant tests begin.
A. Treat it with care. All claims come from automated extraction, and several are duplicates, such as claims 4967 and 4513, or 5010 and 11923. Some amounts have unit errors: claim 11922 lists the $2.6B loan as '2600.0 USD'. Some 'delayed' flags look like artifacts of dates that have simply passed rather than real slippage. For example, the notes closing date (claim 11919) is marked delayed, but the notes were issued on 2025-05-27 (claim 4824). Similarly, the 9% notes' first interest date (claim 4659) is flagged, but nothing in the record indicates a missed payment. The claim list supplied for this FAQ was also cut off after late September 2025, so later events are not reflected here.
Frequently asked
2026-09-14A. CoreWeave rents out GPU computing capacity for AI workloads, a model often called an 'AI cloud.' Its product claims focus on running NVIDIA hardware at scale: GB200 support across its platform (claim 4976), On-Demand Cluster Scaling (4977), AI Object Storage reaching general availability (4975), and NVIDIA AI Enterprise support (4979). It also points to third-party recognition, including MLPerf Inference v5.0 results (4980) and a SemiAnalysis Platinum rating (4981). It went public at $40 per share on 2025-03-28 (claim 11601).
A. The strategy is to grow capacity quickly with borrowed money and to buy its way into more of the AI stack. On capacity, it reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (4972). On funding, it reported $17.2B in total debt and equity raised (4968). On acquisitions, it bought the AI developer-tools company Weights & Biases for about $1.0B (4516). It also agreed to merge with Core Scientific, a data-center and power operator, at 0.1235 CoreWeave shares per Core Scientific share (4731, 4314). That deal would give it more direct control over power and facilities.
A. Only some are named. OpenAI is the major named customer: a strategic deal accounts for $11.2B of revenue backlog (claim 4969), and the OpenAI contract runs to 2031-05-31 (4296). IBM is named as a partner using CoreWeave capacity for its Granite models (4971). NVIDIA has committed to buy $6.3B of capacity through 2032-04-13 (4352). The rest is less clear. A 'material customer contract for GPU infrastructure' tied to the DDTL 3.0 loan (4595) and a $350M share issuance to a 'strategic customer' (4514) do not name the counterparty in the record. Total backlog was $25.9B (4970), so OpenAI alone is roughly 43% of it. That is a significant concentration on one customer.
A. The financing is largely documented as done: - The IPO priced, with $1.4B in net proceeds (claims 11601, 4967). - The revolving credit facility was expanded to $1.5B (5010) and its maturity extended to 2028-05-02 (5012). The letters-of-credit facility was expanded to $350M (5011). - $2.0B of 9.25% senior notes due 2030 were issued on 2025-05-27 (11917, 4824). - $1.75B of 9% notes due 2031 were issued after being upsized by $250M (4697, 4698). - A $2.6B delayed-draw term loan (DDTL 3.0) was put in place (4592). The Weights & Biases acquisition is recorded at $1.0B (4516). On capacity, 420 MW is described as active (4972), far below the 1.6 GW contracted (4973), so most of the stated capacity is still future build-out. Some 'delayed' flags in the record sit on closing dates that other claims show were met. For example, the May notes closing is flagged (11919), yet the issuance is recorded (11917). Treat those flags as extraction artifacts, not missed events.
A. The merger agreement is on record (claims 4729, 4731), with an exchange ratio of 0.1235 shares. Both target dates are flagged as delayed: 2025-10-01 (4517) and an outside date of 2026-04-07 (4731, 4738). The record includes one claim phrased as 'CoreWeave acquires Core Scientific' (4313), but no claim confirms the deal closed. The agreement includes a $270M termination fee payable to CoreWeave (4739). Whether the deal closed, was terminated, or whether that fee was paid is the single most important thing to verify in primary filings.
A. It is heavily debt-funded, and that debt is expensive: its recent bonds carry 9% to 9.25% coupons (claims 4697, 4824). The DDTL 3.0 loan comes with conditions tied to how customer contracts actually perform: - A minimum contract realization ratio of 0.85x (4597) - A minimum debt service coverage ratio of 1.40x starting 2027-04-01 (4596) In plain terms, the lenders need the contracted revenue to show up largely as promised. The revolver also has a contingent 'springing' maturity of 2026-12-30 (11926). That date could pull repayment forward from 2028 if certain conditions are triggered.
A. 1. The final outcome of the Core Scientific merger and the $270M fee (4731, 4739). 2. Whether the DDTL 3.0 commitment period, which ended 2026-07-31 (4593, flagged delayed), was fully drawn, extended, or allowed to lapse. 3. Whether the 2026-12-30 springing maturity is triggered (11926). 4. Coverage-ratio compliance as April 2027 approaches (4596). 5. How much of the 1.6 GW contracted power becomes active (4973 vs. 4972). 6. Whether the backlog becomes less concentrated in OpenAI (4969, 4970). The scheduled 2026-02-01 interest payment is also flagged as delayed (4659). The record offers no confirmation either way, and the flag alone is not evidence of a missed payment. It should be checked.
A. - **Customers:** Who is the unnamed 'material customer' backing DDTL 3.0 (4595), and who is the 'strategic customer' that received $350M in shares (4514)? - **Capacity:** How fast can contracted power become billable capacity (4972, 4973)? - **Concentration:** Can the company withstand its dependence on OpenAI (4969)? The dossier has its own limitations: - Every claim comes from automated extraction, and nothing has been independently verified. - Several claims are duplicates, some with unit errors. The DDTL is shown as '2600.0 USD' (11922) instead of $2.6B. - Early claims conflict on the size of the 2030 notes: $1.5B (11921) versus the final $2.0B (11917). - The records supplied here end around September 2025, so anything after that is missing. Verify key figures against SEC filings before relying on them.
Frequently asked
2026-09-14A. CoreWeave rents out GPU computing capacity to companies that build and run AI models. It sells access to NVIDIA hardware (including GB200 systems, claim 4976) along with software for storage, cluster scaling and billing (claims 4975, 4977, 4978). It listed on Nasdaq at $40 per share on 2025-03-28 (claims 11601, 11616) and reported IPO net proceeds of $1.4 billion (claims 4967, 4513).
A. The strategy is to grow fast with borrowed money. CoreWeave signs long-term compute contracts, raises debt against them, and builds or leases data-center power to serve them. It reported $17.2 billion of total debt and equity raised (claim 4968), 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). It has also bought its way into software and infrastructure. It acquired Weights & Biases for a reported $1.0 billion (claims 4974, 4516) and announced a stock merger with data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4314).
A. OpenAI is the only large customer named with a dollar figure. Its contract accounts for $11.2 billion of a $25.9 billion total backlog (claims 4969, 4970) and runs to 2031-05-31 (claim 4296). IBM is named as a partner for Granite model compute (claim 4971), but no contract value is on record. NVIDIA appears as a $6.3 billion capacity purchase commitment through 2032-04-13 (claim 4352), which makes it a supplier and a buyer at once. Other important counterparties are not named: a 'material customer contract' (claim 4595) and a 'strategic customer' that received a $350 million share issuance (claim 4514). Customer concentration is high, and part of the concentration cannot be identified from this record.
A. Financing events are the best documented. The record shows the IPO (claim 11601), $2.0 billion of 9.25% senior notes due 2030 issued on 2025-05-27 (claims 11917, 4824), and $1.75 billion of 9% senior notes due 2031, upsized by $250 million (claims 4697, 4698, 4658). It also shows a $1.5 billion revolving credit facility (claims 5010, 11923), a $350 million letters-of-credit facility (claim 5011) and a $2.6 billion delayed-draw term loan, DDTL 3.0 (claim 4592). Operating results are harder to confirm. Backlog, power capacity and product launches are company statements. Every claim on record has status 'stated', and none has been independently verified as delivered.
A. This record does not show that the merger closed. A merger agreement was signed in July 2025 (claims 4729, 4731) with a closing deadline of 2026-04-07 (claim 4738). If the deal terminated under certain conditions, Core Scientific would owe CoreWeave a $270 million fee (claim 4739). The deadline and an earlier target date (claim 4517) are both marked 'delayed', and no claim records a completed closing. A September 2025 claim describes CoreWeave as acquiring Core Scientific (claim 4313), but it states intent, not completion. Readers should check filings after September 2025 to learn the outcome.
A. 1. The credit facility's contingent 'springing' maturity date of 2026-12-30 (claim 11926). Under this kind of clause, a facility that normally runs to 2028-05-02 (claim 11925) comes due earlier if certain conditions are met. The record does not state the conditions here. 2. Loan covenants: a minimum 0.85x contract realization ratio (claim 4597) and a minimum 1.40x debt service coverage ratio starting April 2027 (claim 4596). The first ratio roughly tests whether contracted revenue is actually being collected. The second tests whether cash flow covers loan payments. 3. The DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593), which has passed and is flagged 'delayed'. 4. Whether the $25.9 billion backlog (claim 4970) turns into recognized revenue on schedule.
A. 1. Debt load and cost. The company pays 9%–9.25% coupons on its senior notes (claims 4824, 4697) and has several secured facilities, so debt service depends on customers paying on time. 2. Dependence on a few customers. OpenAI alone accounts for about 43% of the reported backlog (claims 4969, 4970), and other key counterparties are unnamed. 3. Circular relationships with NVIDIA. NVIDIA is the main hardware supplier and also committed to buy $6.3 billion of capacity (claim 4352). 4. The unconfirmed status of the Core Scientific deal. 5. Whether contracted power (1.6 GW, claim 4973) actually gets energized on time.
A. Treat it as a starting point, not a verified ledger. All claims came from automated extraction of company filings, and none has moved past 'stated'. The record contains duplicates recorded in inconsistent units. For example, DDTL 3.0 appears as both '2600.0 USD' and '2.6 billion USD' (claims 11922, 4592), and the revolver appears as both '1500.0 million' and '1500000000.0' (claims 5010, 11923). Some 'delayed' flags appear to mark a passed date that lacks follow-up confirmation, not a known slip. The notes due 2030 are flagged delayed (claim 11919), yet another claim records issuance on the target date (claim 11917). Likewise, the 2026-02-01 notes interest payment (claim 4659) should not be read as a missed payment without checking primary filings. The record reviewed here also ends in late September 2025.
Frequently asked
2026-09-14A. CoreWeave rents out large clusters of NVIDIA GPUs as a cloud service, mainly for training and running AI models. Its disclosures describe a specialized AI cloud stack. Items on record include GB200 support (claim 4976), AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977) and NVIDIA AI Enterprise support (claim 4979). In May 2025 it reported 420 MW of active power capacity added (claim 4972) and 1.6 GW of contracted power capacity (claim 4973). It went public at $40 per share on 2025-03-28 (claims 11601, 11616), with about $1.4 billion in net IPO proceeds (claims 4967, 4513).
A. The strategy is to grow capacity fast on borrowed money and lock in revenue with long-term contracts. By May 2025 it cited $17.2 billion in total debt and equity raised (claim 4968) and a $25.9 billion revenue backlog (claim 4970). It has also bought or tried to buy pieces of the stack. It acquired the AI developer-tools company Weights & Biases for about $1.0 billion (claims 4974, 4516). It agreed to an all-stock merger with the data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). Separately, NVIDIA has a $6.3 billion commitment to buy capacity through 2032-04-13 (claim 4352).
A. OpenAI and IBM are the only customers named in the record. OpenAI accounts for $11.2 billion of backlog from a strategic deal (claim 4969), and its contract runs to 2031-05-31 (claim 4296). IBM is a partner for Granite model compute capacity (claim 4971). NVIDIA appears as a capacity buyer (claim 4352). Some counterparties are not named. A July 2025 filing describes a 'material customer contract' for GPU infrastructure without naming the customer (claim 4595). A $350 million share issuance went to an unnamed 'strategic customer' (claim 4514). Readers cannot tell from the record how concentrated the rest of the backlog is.
A. Confirmed by the record: the IPO (claims 11601, 4967); the $2.0 billion of 9.25% senior notes due 2030, issued on 2025-05-27 (claims 11917, 4824); the $1.75 billion of 9% notes due 2031 (claims 4697, 4658); the $2.6 billion DDTL 3.0 loan facility (claim 4592); and the bank facility expansions to $1.5 billion revolving credit (claim 5010) and $350 million in letters of credit (claim 5011). Product launches such as AI Object Storage are described as generally available (claim 4975). Announced or contracted but not yet realized: the $25.9 billion backlog (claim 4970), which is future revenue; the 1.6 GW of contracted power (claim 4973), which is not yet active; and the Core Scientific merger, whose closing the record does not confirm.
A. The debt is large and expensive. The 2030 notes were first sized at $1.5 billion (claim 11921) and then raised to $2.0 billion at 9.25% (claims 11918, 4824). The 2031 notes grew from $1.5 billion (claim 4700) to $1.75 billion at 9% (claims 4698, 4697). The DDTL 3.0 loan matures 2030-08-21 (claim 4594), with conditions attached: - CoreWeave must keep a debt service coverage ratio of at least 1.40x starting April 2027 (claim 4596). - It must meet a 0.85x minimum 'contract realization' ratio, which measures how much contracted revenue actually turns into cash (claim 4597). The revolving credit facility nominally matures 2028-05-02 (claims 5012, 11925). It has a contingent 'springing' maturity of 2026-12-30, which could pull that date forward if certain conditions are triggered (claim 11926).
A. The record does not show the deal closing. CoreWeave signed the merger agreement in July 2025 at 0.1235 shares per Core Scientific share (claims 4729, 4731) and filed an S-4 registration statement (claim 4733). A $270 million termination fee is payable to CoreWeave in certain circumstances (claim 4739). One disclosed target closing date of 2025-10-01 (claim 4517) and the outside deadline of 2026-04-07 (claims 4731, 4738) have both passed, and the record flags both as delayed. Later claims from September 2025 describe the deal in terms of the agreement (claims 4313, 4314), not a completed acquisition. The outcome, including whether the fee was triggered, needs to be confirmed from subsequent filings.
A. 1. The 2026-12-30 springing maturity on the revolving credit facility (claim 11926), and whether it is triggered. 2. Whether the DDTL 3.0 commitment was fully drawn by its 2026-07-31 termination date (claim 4593). 3. Performance against the 1.40x debt service coverage ratio starting April 2027 (claim 4596) and the 0.85x contract realization ratio (claim 4597). 4. How much of the 1.6 GW of contracted power (claim 4973) becomes active capacity. 5. How fast the $25.9 billion backlog (claim 4970), including OpenAI's $11.2 billion (claim 4969), turns into recognized revenue. 6. Disclosure of the Core Scientific outcome.
A. The main open questions are customer concentration beyond OpenAI (the counterparty in claim 4595 is unnamed), whether heavily indebted growth can meet the loan covenants, and the fate of the Core Scientific deal. Three caveats apply to the record itself. - It was built by automated extraction, and several events appear twice (for example claims 5010 and 11923). - Some units are inconsistent: claim 11922 lists the $2.6 billion facility as '2600.0 USD'. - 'Delayed' flags may only mean a date passed without a confirming filing. The 2030 notes closing is flagged delayed (claim 11919), yet a separate claim records their issuance on 2025-05-27 (claim 11917). Likewise, the first 9% note interest payment (claim 4659) is flagged but not shown as missed. The claims reviewed here run only through late September 2025, so check later filings before drawing conclusions.
Frequently asked
2026-09-14A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for training and running AI models. It is a specialized cloud provider built around NVIDIA hardware: it supports NVIDIA's GB200 systems across its platform (claim 4976) and NVIDIA's enterprise AI software (claim 4979). It also sells storage, cluster-scaling and billing tools on top of that capacity (claims 4975, 4977, 4978). It went public on 2025-03-28 at $40 per share (claim 11601), with net IPO proceeds of about $1.4 billion (claim 4967).
A. The strategy is to sign long-term compute contracts, borrow heavily to build the capacity behind them, and buy its way into more of the stack. As of May 2025 it reported $25.9 billion of contracted revenue backlog (claim 4970) and $17.2 billion of total debt and equity raised (claim 4968). It had 1.6 GW of contracted power but only 420 MW of active power (claims 4973, 4972). It bought the AI developer-tools company Weights & Biases for about $1.0 billion (claim 4516). It also agreed to acquire the data-center operator Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claim 4731), which would give CoreWeave ownership of power and sites it currently leases.
A. Only a few are named. OpenAI is the main one: its strategic deal added $11.2 billion of backlog (claim 4969), and its contract runs through 2031-05-31 (claim 4296). That single deal is roughly 43% of the $25.9 billion total backlog (claim 4970). IBM is named as a partner using CoreWeave capacity for its Granite AI models (claim 4971), but no dollar value is disclosed. NVIDIA is both the main supplier and a buyer: it committed to $6.3 billion of capacity purchases through 2032-04-13 (claim 4352). Other counterparties are not named, including a 'material customer contract' (claim 4595) and a strategic customer that bought $350 million of shares (claim 4514). Readers cannot tell how concentrated the rest of the backlog is.
A. Completed: - The IPO (claims 11601, 4967). - $2.0 billion of 9.25% senior notes due 2030, issued 2025-05-27 (claims 11917, 4824). - $1.75 billion of 9% senior notes due 2031 (claim 4658). - A $1.5 billion revolving credit facility, with its maturity extended to 2028-05-02 (claims 11923, 11925). - A $2.6 billion delayed-draw term loan facility (claim 4592). - The Weights & Biases acquisition (claim 4516). Still mostly promises: - The $25.9 billion backlog is contracted future revenue, not revenue already earned. - The 1.6 GW of contracted power is largely not yet active; only 420 MW had been added (claim 4972). - The Core Scientific merger is not recorded as closed. The dossier marks it 'delayed' against a 2026-04-07 deadline (claims 4731, 4738).
A. The debt load is large and expensive. The two recent bond deals alone total $3.75 billion at 9% to 9.25% interest (claims 11917, 4658), on top of the credit facilities. The $2.6 billion term loan carries two key tests (claims 4596, 4597): - Starting April 2027, CoreWeave must keep a debt service coverage ratio of at least 1.40x, meaning contracted cash flow must cover debt payments 1.4 times. - It must also keep a contract realization ratio of at least 0.85x, meaning customers must actually pay on most of what they signed. Separately, the revolver has a contingent 'springing' maturity date of 2026-12-30 (claim 11926). If triggered, repayment could come due well before the stated 2028 maturity.
A. 1. Whether the Core Scientific merger closed, was renegotiated, or was terminated. A $270 million termination fee is payable to CoreWeave in some scenarios (claim 4739). 2. Whether the 2026-12-30 springing maturity (claim 11926) is triggered or avoided. 3. Whether the delayed-draw loan was fully drawn before its commitment period ended on 2026-07-31. The dossier marks that date 'delayed' (claim 4593). 4. How quickly contracted power (1.6 GW) becomes active capacity (claims 4973, 4972). 5. Performance against the 1.40x coverage test starting April 2027 (claim 4596). 6. Any new named customers that would reduce dependence on OpenAI.
A. Customer concentration: how much of the backlog depends on OpenAI and a few unnamed buyers, and whether they can pay as contracts come due. Revenue timing: whether revenue arrives fast enough to service high-interest debt before the coverage tests start. The Core Scientific deal: whether it survived. NVIDIA's dual role: NVIDIA is both the dominant supplier and a $6.3 billion customer (claim 4352), which raises questions about how independent that demand is.
A. Treat it with caution for three reasons. Every claim comes from automated extraction and is marked 'stated'. None has been independently verified as delivered. There are duplicates and unit errors. For example, claims 11601 and 11616 record the same IPO, and claim 11922 lists the $2.6 billion loan as '2600.0 USD'. Some 'delayed' labels conflict with other records. The 2030 notes are marked delayed for a 2025-05-27 closing (claim 11919), yet claim 11917 records them as issued that same day. Similar conflicts affect the July 2025 notes closing and the 2026-02-01 interest payment (claims 4699, 4659). Finally, the claim list available for this FAQ ends in late September 2025. Later disclosures, including the merger's outcome and 2026 results, are not reflected here.
Frequently asked
2026-09-14A. CoreWeave rents out computing power built for AI. It runs data centers full of NVIDIA chips and sells access to AI labs and large companies. It also sells software around that capacity, including AI Object Storage (claim 4975), support for NVIDIA's GB200 chips (claim 4976) and on-demand cluster scaling (claim 4977). In 2025 it bought Weights & Biases, a developer-tools company, for a stated $1.0 billion (claims 4974, 4516). It listed on Nasdaq under the ticker CRWV at $40 per share (claims 11601, 11616).
A. CoreWeave's plan is to build capacity quickly, pay for it mostly with debt, and fill it with long-term customer contracts. As of May 2025 it reported 420 MW of active power (claim 4972) and 1.6 GW of contracted power (claim 4973). It had raised $17.2 billion in debt and equity in total (claim 4968). It is also expanding into software (the Weights & Biases deal) and trying to own more of its data-center footprint. In July 2025 it agreed to buy Core Scientific, a data-center operator, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731).
A. Only a few customers are named. OpenAI is named as a strategic customer, with $11.2 billion of backlog attributed to that deal (claim 4969). That is a large share of the $25.9 billion total backlog reported in May 2025 (claim 4970). IBM is named as a partner using CoreWeave capacity to train its Granite models (claim 4971). NVIDIA is a supplier and also a customer, with a $6.3 billion commitment to buy capacity running through April 2032 (claim 4352). Other important counterparties are not named. The $2.6 billion DDTL 3.0 loan is backed by an unnamed 'material customer contract' (claims 4592, 4595). A $350 million share issuance went to an unnamed 'strategic customer' (claim 4514).
A. Completed financings on record: - IPO with about $1.4 billion in net proceeds (claims 4967, 4513), plus a $68 million over-allotment exercise (claim 4515). - $2.0 billion of 9.25% senior notes due 2030 (claims 4824, 11917). This was upsized from an initially described $1.5 billion (claim 11921). - $1.75 billion of 9% senior notes due 2031 (claims 4658, 4697). This was upsized by $250 million from $1.5 billion (claims 4698, 4700). - Revolving credit facility expanded by $1.5 billion (claim 5010) and letters of credit by $350 million (claim 5011), with maturity extended to May 2028 (claim 5012). Completed deals and operations: - Weights & Biases acquisition (claim 4974). - Several product launches (claims 4975-4979). - Reported capacity of 420 MW active (claim 4972). Announced but not shown as complete in this record: - The Core Scientific merger. - Conversion of the $25.9 billion backlog into revenue. - The 1.6 GW of contracted power becoming active.
A. The merger was signed in July 2025 at a fixed exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 4314). It came with an S-4 registration filing (claim 4733) and a $270 million termination fee payable to CoreWeave (claim 4739). The record shows it as delayed. An expected completion around 2025-10-01 is marked delayed (claim 4517). The outside closing deadline of 2026-04-07 is also marked delayed (claims 4731, 4738). This record contains no filing showing the deal closed, and none showing it was terminated. Readers should check primary sources for the final outcome.
A. The debt load is heavy and expensive. The recent senior notes carry 9% to 9.25% interest (claims 4824, 4697). The DDTL 3.0 loan has two covenants that matter: - A minimum 'contract realization ratio' of 0.85x (claim 4597). In practice, customer contracts must actually produce the cash that was expected. - A minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596). The credit facility also has a contingent 'springing maturity' dated 2026-12-30 (claim 11926). That means the facility could come due earlier than its stated May 2028 maturity if certain conditions are triggered.
A. 1. Whether the Core Scientific merger closed or was called off. If terminated, whether the $270 million fee was paid (claim 4739). 2. Whether the DDTL 3.0 commitment window, scheduled to end 2026-07-31 and marked delayed (claim 4593), was fully drawn, extended or left partly unused. 3. The 2026-12-30 springing maturity (claim 11926). 4. The 1.40x coverage covenant that starts in April 2027 (claim 4596). 5. How much of the 1.6 GW contracted power (claim 4973) and the $25.9 billion backlog (claim 4970) turns into active capacity and recognized revenue. 6. Any disclosure naming the unnamed 'material customer' (claim 4595) or 'strategic customer' (claim 4514).
A. Business risks: - Customer concentration. OpenAI alone accounts for about $11.2 billion of $25.9 billion in backlog (claims 4969, 4970), and key financing is tied to unnamed customers. - Whether revenue can cover 9%+ interest costs as covenants tighten. - Whether the Core Scientific deal happened. Limits of this dossier: - The listed claims end in late September 2025, so later events are missing. - Several 'delayed' labels come from automated extraction and have not been confirmed by a human. For example, claim 4659 marks the first 9% note interest date of 2026-02-01 as delayed, and claim 4699 marks a notes closing as delayed. These may be extraction errors, not real misses. - Some claims are duplicates, and some have unit errors. For example, claims 11922 and 11918 record $2.6 billion and $2 billion as '2600.0 USD' and '2000.0 USD'. Check primary filings before quoting figures.
Frequently asked
2026-09-13A. CoreWeave (Nasdaq: CRWV) rents out GPU computing capacity for AI workloads. It runs data centers and sells access to NVIDIA hardware, including GB200 systems (claim 4976), along with software layered on top. That software includes AI Object Storage (4975), on-demand cluster scaling (4977), and, through its Weights & Biases acquisition, AI developer tooling (4974; disclosed at about $1.0B, 4516). As of its May 2025 disclosure it reported 420 MW of active power capacity added (4972) and 1.6 GW of contracted power (4973).
A. The strategy is to build GPU capacity quickly, pay for it largely with debt, and back it with long-term customer contracts. After a $40/share IPO on 2025-03-28 (11601, 11616), which raised about $1.4B net (4967, 4513), CoreWeave reported $17.2B in total debt and equity raised (4968). It then added more debt: $2.0B of 9.25% senior notes due 2030 (11917, 4824), $1.75B of 9% notes due 2031 (4658), a $2.6B delayed-draw term loan (4592), and a revolving credit facility expanded to $1.5B (5010). It also tried to own more of its power and data-center supply by agreeing to acquire Core Scientific (4729).
A. Only some are named. OpenAI is named, with $11.2B of revenue backlog tied to a strategic deal (4969) and a contract running to 2031-05-31 (4296). IBM is named as a partner using CoreWeave capacity for its Granite models (4971). NVIDIA agreed to buy $6.3B of capacity through 2032-04-13 (4352). Other customers are not named: a 'material customer contract for GPU infrastructure' (4595) and a $350M share issuance to an unnamed 'strategic customer' (4514). Total disclosed backlog was $25.9B (4970), so OpenAI alone made up roughly 43% of it. That is a heavy customer concentration.
A. Completed financings are the best-documented items: the IPO (11616), the May 2025 notes (11917), the July 2025 notes, which were upsized by $250M from $1.5B (4700, 4698, 4658), and the credit facility changes (5010, 5011, 5012). Product launches and benchmark results were announced as available (4975, 4979, 4980, 4981). Everything on record has status 'stated'. That means the company disclosed it, not that anyone independently verified it. Backlog figures (4970, 4969) are contracted future revenue, not revenue already earned.
A. It is the largest announced deal on record, and the record does not show it closing. CoreWeave agreed on 2025-07-07 to acquire Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (4729, 4731, 4314). A $270M termination fee would be payable to CoreWeave under certain conditions (4739). Both the 2025-10-01 target (4517) and the 2026-04-07 outside date (4731, 4738) are marked 'delayed'. None of the claims shown record a completion or a termination, so readers should confirm the deal's current status from primary filings.
A. A lot, and it is expensive. The senior notes carry 9% to 9.25% coupons (4824, 4697). The $2.6B delayed-draw loan requires a minimum debt service coverage ratio of 1.40x starting April 2027 (4596). It also requires a minimum 'contract realization ratio' of 0.85x (4597), which effectively ties the lender's protection to customers actually honoring their contracts. The revolving credit facility matures 2028-05-02 (5012) but has a contingent 'springing' maturity date of 2026-12-30 (11926). That means it could come due much sooner if certain conditions are triggered.
A. 1) Whether the springing maturity of 2026-12-30 is triggered or avoided (11926). 2) Whether the company meets the 1.40x debt service coverage test from April 2027 (4596) and the 0.85x contract realization test (4597). 3) How much of the $25.9B backlog (4970) turns into recognized revenue, especially the OpenAI portion (4969). 4) A definitive outcome on Core Scientific (4731), including whether the $270M fee (4739) is triggered. 5) Whether contracted power (1.6 GW, 4973) becomes active capacity.
A. Open questions: who the unnamed material and strategic customers are (4595, 4514); whether the Core Scientific deal closed; and whether the delayed-draw loan was fully used before its commitment termination date of 2026-07-31, which is flagged 'delayed' (4593). There are also problems with the data itself. Several 'delayed' flags came from automated extraction and may be artifacts. For example, a scheduled 2026-02-01 interest payment is marked 'delayed' (4659). Some claims conflict: the May 2025 notes appear as both $1.5B (11921) and $2.0B (11917). Some amounts are duplicated in different units (5010 vs 11923). The claim list supplied here was also cut off mid-record, so later disclosures may be missing.
Frequently asked
2026-09-13A. CoreWeave operates a cloud computing platform specializing in GPU (graphics processor) capacity for artificial intelligence workloads. The company offers on-demand computing resources (claim 4977), AI data storage (claim 4975), support for NVIDIA enterprise AI software (claim 4979), and recently acquired machine learning platform Weights & Biases for $1 billion (claim 4516).
A. Three named customers: OpenAI with $6.5 billion in committed revenue through May 2031 (claim 4297); Meta with $14.2 billion committed through December 2031 plus expansion options through 2032 (claims 4282–4283); and NVIDIA with $6.3 billion in capacity commitments through April 2032 (claim 4352). CoreWeave reports total revenue backlog of $25.9 billion (claim 4970), suggesting approximately $5.2 billion from undisclosed customers or future expansion options.
A. Completed: IPO priced at $40/share (claims 11601, 11616), built 1.6 GW of contracted computing power (claim 4973), added 420 MW of recent capacity (claim 4972), and acquired Weights & Biases for $1 billion (claim 4516). Failed to complete: merger with Core Scientific, announced but terminated in October 2025 (claim 4166). Most shareholder value depends on converting the $25.9 billion revenue backlog into actual revenue.
A. The company raised $17.2 billion in combined debt and equity (claim 4968), with $1.4 billion from its IPO (claim 4967). It issued $1.75 billion in debt notes at 9% interest maturing in 2031 (claim 4658) and has access to a $3 billion delayed-draw loan facility (claim 4277). Key constraints: CoreWeave must maintain a 1.40x debt-to-cash-flow ratio by April 2027 (claim 4596) and repurchase $1.2 billion in shares from early investors by March 2027 (claim 4276).
A. CoreWeave announced a merger with Core Scientific at 0.1235 shares per share (claim 4314) but terminated the deal in October 2025 (claim 4166). The termination signals either execution difficulties, changed strategy, or shifted deal economics—a meaningful indicator of management's confidence in its original expansion plans.
A. Revenue realization: only $20.7 billion of the $25.9 billion backlog is from named customers (claims 4297, 4282, 4970). Debt service: CoreWeave must hit a 1.40x cash-flow ratio by April 2027 (claim 4596) while servicing $1.75 billion in annual 9% interest (claim 4658) and repurchasing $1.2 billion in shares by March 2027 (claim 4276). The capital-intensive GPU infrastructure market faces competitive pressure and execution risk.
Frequently asked
2026-09-13A. CoreWeave is a cloud infrastructure provider specializing in GPU and AI compute. It went public at $40 per share (claims 11601, 11616) and has raised $17.2 billion in capital (claim 4968). The company offers NVIDIA and IBM compute capacity, AI object storage (claim 4975), detailed billing (claim 4978), and on-demand cluster scaling (claim 4977).
A. CoreWeave has disclosed two marquee customers: OpenAI with $6.5 billion in committed revenue through May 2031 (claim 4297), and Meta with $14.2 billion committed through December 2031 plus capacity expansion options through 2032 (claims 4282, 4283). Total committed revenue backlog is $25.9 billion (claim 4970).
A. CoreWeave has activated 420 MW of compute power and contracted 1.6 GW total capacity (claims 4972, 4973). The company holds a $6.3 billion NVIDIA capacity commitment through April 2032 (claim 4352) and partners with IBM for Granite compute (claim 4971).
A. CoreWeave announced NVIDIA AI Enterprise support (claim 4979), NVIDIA GB200 support (claim 4976), AI Object Storage general availability (claim 4975), On-Demand Cluster Scaling (claim 4977), detailed billing (claim 4978), and MLPerf Inference v5.0 certification (claim 4980). These are listed as 'stated' rather than proven to be in production use.
A. CoreWeave announced a merger with Core Scientific at 0.1235 shares per Core Scientific share (claim 4314) with promised closing in April 2026 (claim 4738). The deal status changed to 'delayed' and was ultimately terminated in October 2025 (claim 4166). CoreWeave instead acquired Weights & Biases for $1 billion (claim 4516).
A. CoreWeave issued $1.75 billion in 9% Senior Notes due 2031 (claim 4658), has access to $5.6 billion in delayed draw term loan facilities (claims 4592, 4277), and must repurchase $1.2 billion in Series C Put Shares by March 2027 (claim 4276). Key covenant: 1.40x minimum debt service coverage ratio starting April 2027 (claim 4596).
A. Can CoreWeave execute on $25.9 billion in customer commitments (claim 4970) while meeting debt covenants and the $1.2B 2027 repurchase obligation? Will Meta and OpenAI fully deploy their multi-billion dollar commitments? Can the company maintain profitability and pricing power as GPU infrastructure commoditizes? The company must achieve a minimum 0.85x contract realization ratio amid competitive pressure (claim 4597).
Frequently asked
2026-09-13A. CoreWeave is a cloud infrastructure provider specializing in GPU compute capacity for AI model training and inference. It went public in March 2025 at $40 per share (claims 11616, 11601), raising $1.4 billion in net proceeds (claim 4967).
A. OpenAI and Meta have publicly disclosed multi-year deals: OpenAI committed to $6.5 billion in revenue through May 2031 (claims 4296, 4297), while Meta committed to $14.2 billion in capacity through December 2031 (claims 4282, 4283). An additional material GPU customer exists but remains unnamed (claim 4595).
A. CoreWeave is pursuing growth through major customer contracts, strategic partnerships (NVIDIA: $6.3 billion through 2032 [claim 4352], IBM for Granite compute [claim 4971]), capacity expansion (420 MW added, 1.6 GW contracted [claims 4972-4973]), product launches (AI Object Storage, GB200 support, on-demand scaling [claims 4975-4977]), and acquisitions including Weights & Biases for $1 billion (claim 4516).
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) with an April 2026 closing deadline (claim 4731). The merger agreement was terminated on October 30, 2025 (claim 4166), before closing. No reason for termination is disclosed in available records.
A. CoreWeave must maintain a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and faces a $1.2 billion Put Share repurchase obligation due March 2027 (claim 4276). The company raised $17.2 billion total in debt and equity (claim 4968), including senior notes at 9–9.25% interest (claims 4697, 4824).
A. Will Meta and OpenAI deploy the full $20.7 billion in contracted capacity? What triggered the Core Scientific deal termination and what were the financial consequences? Can CoreWeave meet debt covenants beginning April 2027? Will the $1 billion Weights & Biases acquisition close successfully? CoreWeave must maintain a 0.85x minimum contract realization ratio (claim 4597).
Frequently asked
2026-09-12A. CoreWeave is a GPU cloud infrastructure provider serving AI companies. It rents computing capacity primarily for large language models and AI workloads, operating data centers with GPU infrastructure.
A. The company has disclosed two strategic customers: OpenAI with a $6.5 billion committed revenue contract through May 2031 (claim 4297), and Meta with a $14.2 billion cloud computing commitment through December 2031 with expansion options through 2032 (claims 4282, 4283). Total revenue backlog is $25.9 billion (claim 4970).
A. CoreWeave completed an IPO at $40 per share in March 2025 (claims 11616, 11601), raising $1.4 billion in net proceeds (claim 4967). The company has raised $17.2 billion total in debt and equity (claim 4968).
A. CoreWeave announced a merger agreement with Core Scientific at 0.1235 shares per Core Scientific share (claim 4294), initially planned to close by April 7, 2026 (claim 4731). The merger was terminated on October 30, 2025 (claim 4166). CoreWeave is entitled to a $270 million termination fee (claim 4739).
A. Deployed products include NVIDIA AI Enterprise and Cloud Functions support (claim 4979), CoreWeave AI Object Storage in general availability (claim 4975), GB200 support (claim 4976), and On-Demand Cluster Scaling (claim 4977). The company achieved SemiAnalysis Platinum rating (claim 4981) and MLPerf Inference v5.0 benchmark achievement (claim 4980).
A. As of May 2025, CoreWeave had 420 MW of active compute power capacity (claim 4972) and 1.6 GW of contracted power capacity (claim 4973). The company committed to $6.3 billion in NVIDIA capacity purchases through April 2032 (claim 4352).
A. Starting April 2027, the company must maintain a minimum debt service coverage ratio of 1.40x (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). CoreWeave also has a $1.2 billion Series C put shares repurchase obligation due by March 31, 2027 (claim 4276).
A. The company must realize its $25.9 billion revenue backlog while meeting debt service and contract realization covenants by 2027. Key unknowns include why the Core Scientific merger terminated, the company's ability to achieve profitability given its capital-intensive model, and execution risk on power capacity buildout needed to support infrastructure growth.
Frequently asked
2026-09-12A. CoreWeave is a cloud infrastructure company specializing in GPU and AI computing. It provides cloud platforms for AI workloads, including AI Object Storage [claim 4975], NVIDIA AI Enterprise support [claim 4979], GB200 processor support [claim 4976], and on-demand cluster scaling [claim 4977]. The company went public in March 2025 at $40 per share [claims 11616, 11601].
A. CoreWeave has disclosed two major customers: OpenAI with $6.5 billion in committed revenue through May 2031 [claim 4297], and Meta with $14.2 billion in cloud computing capacity commitment through December 2031 [claim 4282]. These two customers account for $20.7 billion of the company's $25.9 billion total revenue backlog from committed contracts [claim 4970].
A. CoreWeave has announced product capabilities and infrastructure additions, including 420 MW of active compute power deployed and 1.6 GW of contracted capacity [claims 4972, 4973]. However, most claims are marked as 'stated' rather than independently verified, and the company has not publicly disclosed actual revenue realized from its major customer commitments.
A. CoreWeave announced a merger agreement with Core Scientific at 0.1235 shares per share [claim 4294] but terminated the agreement on October 30, 2025 [claim 4166], after the deal missed its original April 7, 2026 deadline [claim 4738]. The reasons for termination have not been publicly disclosed. Simultaneously, CoreWeave acquired Weights & Biases for $1 billion [claim 4516].
A. CoreWeave has raised $17.2 billion in total debt and equity capital to date [claim 4968]. This includes $1.4 billion from its March 2025 IPO [claim 4967], a $2.6 billion delayed draw term loan [claim 4592], a $3.0 billion delayed draw term loan [claim 4277], and $1.75 billion in 9% Senior Notes due 2031 [claim 4697]. The company has separately committed to $6.3 billion in capacity purchases from NVIDIA through 2032 [claim 4352].
A. Key uncertainties include: (1) Can CoreWeave service its $25.9 billion revenue backlog [claim 4970]? (2) Will it achieve the 1.40x minimum debt service coverage ratio required by April 2027 [claim 4596]? (3) Why was the Core Scientific merger terminated? (4) What is actual contract realization against the 0.85x minimum threshold [claim 4597]? (5) How much revenue has been realized to date?
A. Critical milestones include: the April 2027 debt service coverage ratio requirement of 1.40x [claim 4596], the August 30, 2030 maturity of the DDTL 3.0 facility [claim 4594], Meta's capacity expansion option extending through 2032 [claim 4283], and the March 31, 2027 deadline for Series C Put Shares repurchase of $1.2 billion [claim 4276].
Frequently asked
2026-09-12A. CoreWeave is a cloud infrastructure provider specializing in GPU capacity for AI workloads. The company offers compute, storage, and networking services designed for training and deploying AI models.
A. CoreWeave has disclosed two major customers: OpenAI with $6.5 billion in committed revenue through May 2031 (claim 4297), and Meta with a $14.2 billion cloud computing capacity commitment through December 2031 (claim 4282). The company reported total committed contract revenue of $25.9 billion (claim 4970) from all customers, but has not publicly named others.
A. CoreWeave's IPO occurred on March 28, 2025, at $40 per share (claims 11616, 11601), raising approximately $1.4 billion in net proceeds (claim 4967).
A. CoreWeave announced the acquisition of Weights & Biases (claim 4974), a $6.3 billion NVIDIA capacity purchase commitment through 2032 (claim 4352), and a merger with Core Scientific announced in July 2025 but terminated in October 2025 (claim 4166). Completion status of the W&B acquisition has not been disclosed.
A. CoreWeave operates 1.6 GW of contracted power capacity (claim 4973) and added 420 MW of active compute capacity as of May 2025 (claim 4972).
A. CoreWeave has raised $17.2 billion in total debt and equity (claim 4968). The company maintains $2.6 billion (claim 4592) and $3.0 billion (claim 4277) in delayed draw term loan facilities, plus $1.5 billion in expanded revolving credit (claim 5010) and $350 million in letters of credit (claim 5011).
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 with an expected close by April 2026 (claim 4731). The company terminated the merger agreement in October 2025 (claim 4166). CoreWeave would have paid a $270 million termination fee if it initiated the termination (claim 4739).
A. CoreWeave committed to maintaining a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). These metrics are important indicators of the company's ability to service debt and realize revenue from committed contracts.
Frequently asked
2026-09-12A. CoreWeave provides cloud computing infrastructure powered by GPUs (graphics processors), which are essential for artificial intelligence and machine learning applications. The company went public in August 2025 (claim 4513), raising $1.4 billion in IPO proceeds (claim 4967) and listing on Nasdaq (claim 4735).
A. CoreWeave has disclosed two major customers: OpenAI, which committed $6.5 billion in revenue through May 2031 (claim 4297), and Meta, which committed $14.2 billion in cloud computing capacity through December 2031 with an option to expand through 2032 (claims 4282, 4283).
A. As of May 2025, CoreWeave had 1.6 GW (gigawatts) of contracted power capacity (claim 4973). The company reported a total revenue backlog from committed contracts of $25.9 billion (claim 4970), reflecting long-term customer commitments.
A. CoreWeave has raised $17.2 billion in total debt and equity capital (claim 4968). Its major debt obligations include $1.75 billion in senior notes due February 2031 (claim 4658), a $2.6 billion delayed draw term loan due August 2030 (claim 4594), and a $3 billion delayed draw term loan facility (claim 4277). The company also has a $1.2 billion Series C Put Shares repurchase obligation due March 31, 2027 (claim 4276).
A. CoreWeave must repurchase $1.2 billion in Series C Put Shares by March 31, 2027 (claim 4276). Beginning April 2027, the company must maintain a minimum debt service coverage ratio of 1.40x (claim 4596). A $270 million termination fee to Core Scientific was incurred when that merger was terminated in October 2025 (claim 4739).
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 (claim 4729) at an exchange ratio of 0.1235 shares (claim 4331), originally expected to close by April 2026 (claim 4738). The merger was terminated on October 30, 2025 (claim 4166), resulting in CoreWeave owing Core Scientific a $270 million termination fee (claim 4739).
A. CoreWeave has partnerships with IBM for Granite compute capacity (claim 4971) and with NVIDIA, which includes a $6.3 billion capacity purchase commitment through April 2032 (claim 4352). The company also completed a $1 billion acquisition of Weights & Biases (claim 4516).
A. Recent announcements include GB200 support across its Cloud Platform Stack (claim 4976), AI Object Storage general availability (claim 4975), On-Demand Cluster Scaling capability (claim 4977), NVIDIA AI Enterprise support (claim 4979), and an MLPerf Inference v5.0 benchmark achievement (claim 4980). The company also secured expanded revolving and letter of credit facilities totaling $1.85 billion (claims 5010, 5011).
Frequently asked
2026-09-12A. CoreWeave is a cloud computing infrastructure provider that rents GPU compute capacity to AI and machine learning companies. The company operates data centers equipped with high-performance graphics processors and provides services including on-demand computing clusters, data storage, usage tracking, and software support for AI workloads.
A. The company has publicly disclosed only two major customers by name: OpenAI and Meta. OpenAI has a committed spending commitment of $6.5 billion through May 2031 (claim 4297), while Meta has committed $14.2 billion through December 2031 (claim 4282). CoreWeave reports a total contracted revenue backlog of $25.9 billion (claim 4970), indicating other customers exist but have not been publicly identified.
A. The company went public in November 2025, raising $1.4 billion in IPO proceeds (claim 4513). It has raised approximately $17.2 billion in total debt and equity capital (claim 4968). However, CoreWeave has taken on significant debt: a $2.6 billion term loan due in 2030 (claim 4592), a $3.0 billion term loan (claim 4277), and $1.75 billion in bonds due in 2031 (claim 4658). The company must also repurchase $1.2 billion in shares by March 31, 2027 (claim 4276).
A. The IPO was completed as announced in November 2025 (claim 4121). Several product features have been released and several achievement claims are marked delivered. However, the company's major announcements—particularly the $25.9 billion revenue backlog (claim 4970)—remain largely in the form of multi-year contracts that have not yet converted to cash revenue. An attempted Core Scientific acquisition announced in July 2025 was terminated in October 2025 (claim 4166) rather than completed.
A. Key dates include: (1) Repurchasing $1.2 billion in shares by March 31, 2027 (claim 4276); (2) Achieving a debt service coverage ratio of at least 1.40x starting April 2027 (claim 4596); (3) Converting backlog into actual revenue from OpenAI and Meta over the next several years. Any failure to meet these benchmarks—particularly the share repurchase or debt ratio—could signal financial stress.
A. The company is heavily dependent on just two named customers (OpenAI and Meta) for a large portion of its $25.9 billion backlog (claim 4970). It must scale computing capacity to 1.6 gigawatts (claim 4973) while servicing billions in debt. The company also faces a contract realization ratio requirement of 0.85x (claim 4597), meaning it must realize at least 85% of contracted revenue. Any disruption to OpenAI or Meta relationships, delays in capacity buildout, or failure to meet financial covenants could create serious challenges.
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 (claim 4729) with a closing target of April 7, 2026 (claim 4731). The company terminated the agreement on October 30, 2025 (claim 4166), before completion. Public materials do not explain the termination reason, though CoreWeave would have owed up to a $270 million termination fee if CoreWeave was responsible (claim 4739). The abandonment suggests either changed priorities or failed negotiation of key terms.
A. Monitor: (1) whether OpenAI and Meta begin drawing down their $20+ billion in committed capacity; (2) CoreWeave's ability to execute the $1.2 billion share repurchase by March 2027 (claim 4276); (3) achievement of debt service ratios by April 2027 (claim 4596); (4) progress on power capacity buildout toward 1.6 GW (claim 4973); (5) additional customer wins beyond the two named customers; and (6) any delays or missed financial milestones that could indicate cash flow problems.
Frequently asked
2026-09-12A. CoreWeave is a cloud computing company that rents out specialized computer servers (GPUs) for AI applications. The company completed its initial public offering in November 2025, raising $1.4 billion (claim 4513). As of May 2025, it had contracted to power 1.6 gigawatts of compute capacity (claim 4973), with 420 MW added that period (claim 4972). Its platform supports various AI chips and tools like NVIDIA's GB200 (claim 4976).
A. CoreWeave has publicly named two major customers: OpenAI ($6.5 billion in committed spending through May 2031, claim 4297) and Meta ($14.2 billion committed through December 2031, claim 4282). The company also reports total committed contracts worth $25.9 billion (claim 4970), suggesting additional unnamed customers.
A. CoreWeave announced plans to merge with Core Scientific in July 2025 (claim 4729), with the deal expected to close by April 2026 (claim 4731). However, the merger was terminated on October 30, 2025 (claim 4166)—less than four months later. CoreWeave is liable for a $270 million termination fee (claim 4739).
A. The company has raised $17.2 billion total (claim 4968) and issued $1.75 billion in senior debt due in 2031 at 9% interest (claim 4658). It also has access to term loans totaling $2.6–3.0 billion (claims 4592, 4277). It owes $1.2 billion to repurchase shares by March 2027 (claim 4276).
A. CoreWeave announced a $1 billion acquisition of Weights & Biases (claim 4516), a platform for managing AI experiments. The company also committed to purchasing $6.3 billion in NVIDIA capacity through April 2032 (claim 4352) and partnered with IBM on Granite compute capacity (claim 4971).
A. The Core Scientific merger was supposed to close by April 2026 but was terminated in October 2025 (claims 4731, 4166). Several financing milestones are marked as delayed, including a debt offering closing (claim 4699) and interest payment timing (claim 4659). A loan commitment termination date originally set for July 2026 is also delayed (claim 4593).
A. It's unclear whether CoreWeave can convert its $25.9 billion in promised commitments into actual revenue, and whether it can meet debt obligations beginning in April 2027 (claim 4596). The status of the Weights & Biases acquisition is undisclosed. The company must maintain a 0.85x minimum ratio of actual revenue to contracted revenue (claim 4597), making contract realization a key metric to monitor.
Frequently asked
2026-09-11A. CoreWeave is a GPU cloud computing infrastructure provider that rents NVIDIA GPU compute capacity to AI companies. The company operates data centers and markets itself as a specialized alternative to hyperscale cloud providers for AI workloads, with a focus on NVIDIA chip access and capacity availability.
A. Only two large-scale customers are publicly named: OpenAI with $6.5 billion committed through 2031 (claim 4297), and Meta with $14.2 billion committed through 2031 (claim 4282). Total revenue backlog is $25.9 billion from committed contracts (claim 4970), heavily concentrated in these two customers. An unnamed material customer contract also exists (claim 4595).
A. Delivered: IPO completed (Nov 2025), $17.2 billion in total capital raised (claim 4968), 420 megawatts of active GPU capacity built (claim 4972), and signed customer contracts with OpenAI and Meta. Announced but unconfirmed: product features including AI object storage and GB200 support (claims 4975-4976), MLPerf benchmark results (claim 4980), and Weights & Biases acquisition for $1 billion (claim 4516). Failed: Core Scientific merger terminated October 2025 with a $270 million termination fee (claims 4166, 4739).
A. The company raised $17.2 billion through IPO ($1.4 billion, claim 4967), debt offerings including $1.75 billion in 9% senior notes due 2031 (claim 4697), and committed credit facilities including $3 billion in delayed draw term loans (claim 4277). Beginning April 2027, CoreWeave must maintain a 1.4x debt service coverage ratio (claim 4596) and 0.85x contract realization ratio (claim 4597), meaning customer revenue commitments must materialize at these minimum thresholds.
A. CoreWeave announced a merger agreement with cryptocurrency mining company Core Scientific in July 2025 (claim 4729) with a 0.1235 share exchange ratio (claim 4294). Originally scheduled to close April 2026 (claim 4731), the deal was terminated October 30, 2025 (claim 4166), triggering a $270 million termination fee (claim 4739). No public explanation for the termination has been disclosed.
A. CoreWeave's $25.9 billion backlog extends through 2031-2032 (claims 4970, 4282, 4297), but debt service coverage ratios become binding April 2027 (claim 4596). If customer commitments are delayed, cancelled, or reduced, the company's ability to service debt is directly threatened. The concentration risk is acute: two customers represent approximately $20.7 billion of the $25.9 billion total backlog.
A. Why was the $270 million Core Scientific merger terminated and what additional financial impact occurred? Will OpenAI and Meta actually consume their full committed capacity or reduce orders? Will announced products like AI object storage and MLPerf benchmarks be delivered on schedule? Will the $1 billion Weights & Biases acquisition proceed? How much of CoreWeave's $3+ billion in delayed draw credit facilities will be drawn? Can the company scale operations fast enough to meet April 2027 debt covenants given customer backlog concentration and multi-year commitment timelines?
Frequently asked
2026-09-11A. CoreWeave provides GPU cloud computing infrastructure for AI companies. The company operates data centers with 1.6 GW of contracted power capacity (claim 4973) and offers services supporting advanced AI hardware like NVIDIA's latest processors (claim 4976).
A. CoreWeave has publicly disclosed two major customers: OpenAI with $6.5 billion in committed revenue through May 2031 (claim 4297) and Meta with $14.2 billion committed through December 2031 (claim 4282). Together they represent roughly 80% of CoreWeave's $25.9 billion total revenue backlog from committed contracts (claim 4970).
A. CoreWeave has raised $17.2 billion in total debt and equity capital (claim 4968). This includes a $1.4 billion IPO completed in November 2025 (claim 4967), $1.75 billion in 9% Senior Notes due 2031 (claim 4697), and $5.6 billion in available delayed draw term loan facilities (claims 4592, 4277). The company also must repurchase $1.2 billion in Series C Put Shares by March 31, 2027 (claim 4276).
A. CoreWeave announced a merger with Core Scientific in July 2025 offering 0.1235 shares per share (claim 4314) but terminated the agreement in October 2025 (claim 4166). The deal was originally scheduled to close by April 2026 (claim 4738). The company has not disclosed reasons for the termination.
A. CoreWeave committed to purchase $6.3 billion in NVIDIA compute capacity through April 2032 (claim 4352) and acquired Weights & Biases for $1 billion (claim 4516). These commitments represent significant ongoing capital obligations that constrain financial flexibility.
A. CoreWeave must maintain a 1.40x debt service coverage ratio beginning April 2027 (claim 4596) and a 0.85x contract realization ratio (claim 4597). Breaching either covenant could trigger default on the $1.75 billion Senior Notes. Additionally, the company must repay $1.2 billion in Series C Put Shares by March 31, 2027 (claim 4276), creating immediate liquidity pressure.
A. Key dates are March 31, 2027 (Series C Put Share repurchase deadline) and April 1, 2027 (debt covenant activation). CoreWeave must deliver on contracts worth $20.7 billion to OpenAI and Meta while managing its $6.3 billion NVIDIA commitment. Any evidence of reduced customer orders, below-contracted utilization, or cash flow problems would signal serious distress.
Frequently asked
2026-09-10A. CoreWeave provides cloud infrastructure for GPU and AI computing workloads. As of mid-2025, the company had contracted 1.6 GW of power capacity (claim 4973) with 420 MW actively deployed (claim 4972).
A. OpenAI has committed $6.5 billion in revenue through May 31, 2031 (claim 4297). Meta committed $14.2 billion in capacity through December 14, 2031 (claim 4282) with expansion options through 2032 (claim 4283). CoreWeave also announced an IBM partnership for Granite compute capacity (claim 4971) and has at least one undisclosed material GPU customer (claim 4595).
A. CoreWeave committed to a $6.3 billion NVIDIA capacity purchase through April 2032 (claim 4352), concentrating infrastructure around NVIDIA GPUs. The company announced a $1 billion acquisition of Weights & Biases (claim 4516) to expand its AI platform and observability capabilities.
A. CoreWeave completed an IPO in November 2025 generating $1.4 billion in proceeds (claims 4967, 4121). The company issued $1.75 billion in 9% Senior Notes maturing 2031 (claim 4658), secured $5.6 billion in term loan facilities (claims 4592, 4277), and raised $350 million from strategic customers (claim 4514). Total capital raised is disclosed at $17.2 billion (claim 4968).
A. The company announced support for NVIDIA AI Enterprise, detailed billing metrics, NVIDIA GB200 support, on-demand cluster scaling, and AI Object Storage general availability (claims 4979, 4978, 4976, 4977, 4975). CoreWeave achieved MLPerf Inference v5.0 benchmark certification (claim 4980).
A. CoreWeave disclosed $25.9 billion in revenue backlog from committed contracts (claim 4970) but faces a 0.85x minimum contract realization ratio (claim 4597), potentially leaving 15% of contracted value unrecognized. Beginning April 2027, the company must maintain a 1.4x debt service coverage ratio (claim 4596). Series C investors can force $1.2 billion in share repurchases by March 31, 2027 (claim 4276).
A. CoreWeave announced a merger with Core Scientific in July 2025 at 0.1235 Class A shares per Core Scientific share (claim 4294) but terminated the agreement on October 30, 2025 (claim 4166). The termination involved a $270 million fee (claim 4739).
Frequently asked
2026-09-10A. CoreWeave provides GPU cloud infrastructure for AI workloads. It had contracted power capacity of 1.6 GW and added 420 MW of active capacity (claims 4973, 4972). The company offers AI Object Storage (claim 4975), cluster scaling, and support for advanced GPU architectures like NVIDIA's GB200 (claim 4976).
A. OpenAI and Meta are CoreWeave's named major customers. OpenAI represents $11.2B of the company's $25.9B total revenue backlog with $6.5B committed through May 2031 (claims 4969, 4970, 4297). Meta committed $14.2B through December 2031 with expansion options through 2032 (claims 4282, 4283). CoreWeave also announced partnerships with IBM and a $6.3B NVIDIA capacity commitment through 2032 (claims 4971, 4352).
A. CoreWeave raised $17.2B total in debt and equity (claim 4968). This includes $1.4B net from its November 2025 IPO (claims 4121, 4967), $1.75B in 9% Senior Notes due 2031 (claims 4697, 4658), a $3.0B delayed draw term loan (claim 4277), and a $1.5B revolving credit facility (claim 5010). The company also faces a $1.2B Series C share repurchase obligation due March 31, 2027 (claim 4276).
A. CoreWeave announced general availability of AI Object Storage (claim 4975), On-Demand Cluster Scaling (claim 4977), detailed billing (claim 4978), GB200 support (claim 4976), and MLPerf Inference benchmarks (claim 4980). The disclosed record does not specify which are production-ready versus beta or pilot as of September 2026.
A. CoreWeave agreed to merge with Bitcoin miner Core Scientific in July 2025 with an April 7, 2026 deadline (claims 4729, 4738). The deal was terminated October 30, 2025 after four months (claim 4166). CoreWeave did not publicly disclose the reason; the deal required regulatory and Nasdaq approval (claims 4733, 4735).
A. CoreWeave's debt covenants require a minimum contract realization ratio of 0.85x and minimum debt service coverage of 1.40x starting April 2027 (claims 4597, 4596). Failure to convert the $25.9B backlog at sufficient rates could trigger covenant breaches. Additionally, $1.2B in Series C shares must be repurchased by March 31, 2027 (claim 4276).
A. Critical unknowns: (1) Will the $25.9B backlog materialize? OpenAI and Meta represent over $25B of it (claims 4969, 4282), creating significant customer concentration risk. (2) Can CoreWeave achieve profitability given capital intensity and debt load? (3) Status of the $1B Weights & Biases acquisition (claim 4516)? (4) How intense is competition from other GPU cloud providers?
Frequently asked
2026-09-10A. CoreWeave is a cloud infrastructure provider specializing in GPU computing capacity for AI and machine learning workloads. The company went public in November 2025 (claim 4121) via IPO, raising $1.4 billion in net proceeds (claim 4513).
A. CoreWeave has publicly named three major customers: OpenAI (with $6.5 billion in committed revenue through May 2031, claim 4297), Meta (with $14.2 billion through December 2031 plus capacity expansion options through 2032, claims 4282-4283), and NVIDIA (with a $6.3 billion partnership commitment through April 2032, claim 4352). These three contracts represent approximately $26.8 billion in announced commitments.
A. Heavily concentrated. OpenAI and Meta together represent approximately $20.7 billion of CoreWeave's stated $25.9 billion total committed revenue backlog (claims 4970, 4297, 4282), representing roughly 80% of disclosed future revenue. This concentration with just two counterparties creates significant dependency risk.
A. CoreWeave's stated strategy includes expanding GPU infrastructure (420 MW of active compute power added with 1.6 GW contracted capacity, claims 4972-4973), acquiring complementary businesses (acquired Weights & Biases for $1 billion, claim 4516), and launching new products including AI Object Storage, NVIDIA GB200 support, and on-demand cluster scaling (claims 4975-4977). The company has raised $17.2 billion in total capital (claim 4968).
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 (claim 4729) with an April 7, 2026 target closing (claim 4731). The company terminated the agreement on October 30, 2025 (claim 4166)—just three months after announcement. No public explanation has been disclosed for the termination.
A. CoreWeave has a $3 billion delayed draw term loan (claim 4277), $1.2 billion in Series C put share repurchase obligations due March 2027 (claim 4276), and $1.75 billion in 9% Senior Notes due February 2031 (claim 4658). Notably, several announced financing milestones have been marked as delayed: notes offering closing (promised July 25, 2025, claim 4699), Senior Notes interest payments (promised February 2026, claim 4659), and a debt facility termination (promised July 31, 2026, claim 4593).
A. Most announced capabilities—including AI Object Storage general availability (claim 4975), GB200 support (claim 4976), and MLPerf Inference benchmarks (claim 4980)—are marked as 'stated' rather than independently verified. Multiple financing deadlines have been marked as delayed, and the company terminated its major announced Core Scientific acquisition. This creates questions about execution risk and whether announced timelines are reliable.
Frequently asked
2026-09-10A. CoreWeave is a cloud infrastructure provider specializing in GPU compute for AI workloads. The company operates data centers providing on-demand GPU capacity primarily for large-scale AI model training and inference. CoreWeave completed its IPO in November 2025 (claim 4121), raising $1.4 billion in net proceeds (claim 4967).
A. CoreWeave has publicly named two major customers: OpenAI (committed revenue of $6.5 billion through May 2031, claims 4296-4297) and Meta ($14.2 billion capacity commitment through December 2031 with expansion option through 2032, claims 4282-4283). These two customers represent approximately 80% of CoreWeave's stated $25.9 billion total revenue backlog from committed contracts (claim 4970).
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 (claim 4729) at an exchange ratio of 0.1235 Class A shares per Core Scientific share (claim 4731). The deal was initially targeted to close by April 2026 (claim 4731) but CoreWeave terminated the agreement in October 2025 (claim 4166). The company proceeded with its November 2025 IPO independently.
A. CoreWeave announced multiple product features in May 2025 (claims 4975-4980): AI Object Storage general availability, GB200 support, On-Demand Cluster Scaling, detailed billing metrics, NVIDIA AI Enterprise support, and MLPerf Inference achievement. All are marked as 'stated' in company disclosures with no published timeline, customer testimonials, or independent verification of current availability.
A. CoreWeave committed to a $6.3 billion capacity purchase from NVIDIA through April 2032 (claim 4352). The company also announced a partnership with IBM for Granite compute capacity (claim 4971). Additionally, CoreWeave acquired Weights & Biases for $1 billion (claim 4516), expanding into ML operations tooling.
A. CoreWeave has $1.75 billion in 9% Senior Notes due February 2031 (claims 4658, 4697) and $1.5 billion in 9.25% Senior Notes due May 2030 (claim 4824). Interest payments on the 9% notes were due February 2026 (claim 4659, marked as delayed). The company must maintain a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and faces a $1.2 billion Series C put share repurchase obligation due March 2027 (claim 4276).
A. Key uncertainties: (1) Revenue realization—the $25.9 billion backlog spans 6+ years with customer concentration risk (80% from two customers); CoreWeave must maintain a 0.85x contract realization ratio (claim 4597); (2) Near-term cash pressure—delayed interest payments (claim 4659) suggest liquidity concerns; (3) Operational execution—delivering 1.6 GW of contracted power capacity (claim 4973) and the $6.3 billion NVIDIA hardware commitment (claim 4352); (4) Product maturity—most announced features lack deployment timelines or customer evidence; (5) Weights & Biases integration and profitability (claim 4516).
Frequently asked
2026-09-09A. CoreWeave is a GPU cloud computing infrastructure provider focused on AI workloads. As of May 2025, it operates 1.6 GW of contracted power capacity (claim 4973) and added 420 MW of active compute capacity (claim 4972). Its platform offers AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), and support for NVIDIA enterprise applications (claim 4979).
A. OpenAI and Meta are disclosed as major customers. OpenAI has committed $6.5 billion in revenue through May 2031 (claim 4297). Meta committed $14.2 billion in cloud computing capacity through December 2031 (claim 4282) with an option to expand through 2032 (claim 4283). CoreWeave states total revenue backlog from committed contracts of $25.9 billion (claim 4970).
A. CoreWeave has raised $17.2 billion total in debt and equity capital (claim 4968). Its IPO in November 2025 (claim 4121) generated $1.4 billion in net proceeds (claim 4967). The company also secured a $6.3 billion NVIDIA capacity purchase commitment through 2032 (claim 4352) and issued multiple Senior Notes tranches with interest rates of 9–9.25% (claims 4697, 4824).
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 structured as a 0.1235 share exchange (claim 4294) but terminated the agreement in October 2025 (claim 4166). The company did complete the acquisition of Weights & Biases for $1 billion (claim 4516).
A. CoreWeave must repurchase Series C Put Shares totaling $1.2 billion by March 31, 2027 (claim 4276). Beginning April 2027, the company faces a minimum debt service coverage ratio covenant of 1.40x (claim 4596). It must also maintain a minimum contract realization ratio of 0.85x (claim 4597), meaning at least 85% of backlog must materialize as actual revenue.
A. Most products announced in May 2025—GB200 support, on-demand scaling, billing metrics, AI Enterprise and Cloud Functions support (claims 4976–4979)—have no stated delivery dates. CoreWeave announced an MLPerf Inference v5.0 benchmark achievement (claim 4980) and received a SemiAnalysis Platinum rating (claim 4981), but the timeline between announcement and actual customer deployment remains unclear.
A. Whether CoreWeave can realize the contracted $25.9 billion backlog, particularly from OpenAI and Meta—there is material execution risk on $20.7 billion from just these two customers. The failed Core Scientific merger suggests integration challenges. Meeting the 1.40x debt service coverage ratio by April 2027 (claim 4596) and the $1.2 billion repurchase obligation by March 2027 (claim 4276) will test financial discipline. Finally, whether the company can deliver on its aggressive product roadmap while scaling infrastructure remains unproven.
Frequently asked
2026-09-09A. CoreWeave is a GPU cloud infrastructure provider offering services including on-demand cluster scaling, AI Object Storage, and NVIDIA AI Enterprise support. The company operates 1.6 GW of contracted power capacity with 420 MW of active compute power added (claims 4973, 4972).
A. OpenAI ($6.5 billion committed revenue through 2031-05-31, claim 4297) and Meta ($14.2 billion cloud computing capacity commitment through 2031-12-14 with expansion option through 2032, claims 4282-4283). CoreWeave discloses a total revenue backlog from committed contracts of $25.9 billion (claim 4970).
A. NVIDIA capacity purchase commitment of $6.3 billion through 2032-04-13 (claim 4352); IBM partnership for Granite compute capacity (claim 4971); and total debt and equity capital raised of $17.2 billion (claim 4968).
A. CoreWeave completed its IPO in August 2025, raising $1.4 billion in net proceeds (claim 4513) with $68 million additional from over-allotment exercise (claim 4515) and $350 million from strategic customer share issuance (claim 4514). The company issued $1.75 billion in 9% Senior Notes maturing 2031 (claims 4658, 4697) and has a $2.6 billion and $3.0 billion delayed draw term loan facilities (claims 4592, 4277).
A. CoreWeave completed acquisition of Weights & Biases for $1 billion (claim 4516). The proposed merger with Core Scientific was announced with 0.1235 share exchange ratio (claim 4294) but was terminated on October 30, 2025 (claim 4166).
A. GB200 support across Cloud Platform Stack, on-demand cluster scaling, detailed billing and usage metrics, NVIDIA AI Enterprise and Cloud Functions support (claims 4976-4979), MLPerf Inference v5.0 benchmark achievement, and SemiAnalysis Platinum rating (claims 4980-4981).
A. Reasons for Core Scientific merger termination after months of disclosure; integration progress on $1B Weights & Biases acquisition; ability to execute $6.5B OpenAI and $14.2B Meta contracts through stated endpoints; achievement of minimum 1.40x debt service coverage ratio by April 2027 (claim 4596) and 0.85x contract realization ratio (claim 4597); and timeline for deploying power capacity to support contracted customer growth.
Frequently asked
2026-09-09A. CoreWeave operates cloud GPU infrastructure for AI/ML workloads. It has contracted 1.6 GW of power capacity (claim 4973) and added 420 MW of active compute power (claim 4972), offering products including NVIDIA AI Enterprise support (claim 4979), GB200 support (claim 4976), and AI Object Storage (claim 4975).
A. OpenAI and Meta are the disclosed anchor customers. OpenAI has committed $6.5 billion in revenue through May 2031 (claim 4297), while Meta committed $14.2 billion in GPU capacity through December 2031, with expansion options through 2032 (claim 4282, 4283).
A. The company completed an IPO raising $1.4 billion net (claim 4967) and $17.2 billion total debt and equity (claim 4968). Debt financing includes $1.75 billion in 9% senior notes due 2031 (claim 4658) and $1.85 billion in revolving credit and letter facilities (claims 5010, 5011).
A. CoreWeave has a $6.3 billion NVIDIA GPU purchase commitment through April 2032 (claim 4352), an IBM partnership for Granite capacity (claim 4971), and acquired Weights & Biases for approximately $1 billion (claim 4516). A proposed merger with Core Scientific was terminated in October 2025 (claim 4166) after missing an April 2026 deadline (claim 4738).
A. CoreWeave disclosed $25.9 billion in total committed contract revenue (claim 4970). Named customers represent $20.7 billion: OpenAI $6.5 billion and Meta $14.2 billion. This leaves $5.2 billion from undisclosed customers. The company must maintain a 0.85x contract realization ratio (claim 4597), indicating revenue recognition risk.
A. The Core Scientific merger was announced July 2025 with April 7, 2026 closing target (claim 4738) but terminated by October 2025 (claim 4166). A senior notes offering scheduled to close July 25, 2025 was delayed (claim 4699). These delays signal execution risks.
A. $1.2 billion in Series C put share redemptions are due by March 2027 (claim 4276). Starting April 2027, CoreWeave must maintain a 1.4x minimum debt service coverage ratio (claim 4596). The company has $1.75 billion in 9% senior notes outstanding through 2031 (claim 4658).
A. Can CoreWeave realize $25.9 billion revenue backlog while competing for AI GPU capacity? Will it meet $6.3 billion NVIDIA commitments without Core Scientific capacity (claim 4352)? Can it service debt while managing $1.2 billion put share redemptions by 2027 (claim 4276)? What do actual results show versus backlog claims?
Frequently asked
2026-09-09A. CoreWeave is a GPU cloud infrastructure provider for AI workloads. The company went public in 2025 raising $1.4B in IPO net proceeds (claim 4967) and has secured $17.2B total capital (claim 4968).
A. OpenAI has committed $6.5B in revenue through May 2031 (claim 4297), and Meta has committed $14.2B in cloud computing capacity through December 2031 with expansion options through 2032 (claims 4282, 4283). Other customer names are not disclosed.
A. Scale GPU infrastructure capacity—420 MW added (claim 4972), 1.6 GW contracted power total (claim 4973)—while building partnerships with NVIDIA ($6.3B capacity purchase through April 2032, claim 4352) and IBM (claim 4971). The company acquired Weights & Biases for $1B (claim 4516).
A. Completed: IPO, major customer contracts with OpenAI and Meta. Terminated: Core Scientific merger (announced July 2025 for April 2026 close, terminated October 2025, claim 4166). Multiple financing timelines have slipped, including the July 2025 notes offering (claim 4699) and DDTL commitment termination originally due July 2026 (claim 4593).
A. $25.9B total revenue backlog (claim 4970): $6.5B from OpenAI (claim 4297), $14.2B from Meta (claim 4282), $6.3B from NVIDIA (claim 4352). Outstanding debt includes $1.75B senior notes at 9% due 2031 (claim 4658) and $3B delayed draw term loan (claim 4277).
A. Minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596). Minimum contract realization ratio of 0.85x (claim 4597). These covenants limit financial flexibility.
A. Can CoreWeave execute on $25.9B in committed contracts? Will it maintain covenant compliance? Why have multiple financing timelines already slipped (claims 4699, 4593)? How does the terminated Core Scientific merger affect capacity strategy?
Frequently asked
2026-09-09A. CoreWeave provides GPU and AI computing infrastructure as a cloud platform. The company went public in 2025 (claim 4121) after raising $1.4 billion in IPO proceeds (claim 4513). As of mid-2025, it operated 420 MW of active compute capacity with 1.6 GW contracted (claims 4972, 4973).
A. CoreWeave has disclosed two anchor customers: OpenAI with $6.5 billion committed revenue through May 2031 (claim 4297) and Meta with $14.2 billion committed through December 2031 (claim 4282). The company reports $25.9 billion total revenue backlog from committed contracts (claim 4970), indicating other large customers remain unnamed.
A. CoreWeave has not disclosed actual revenue or cash collections. However, loan agreements impose a minimum contract realization ratio of 0.85x (claim 4597), contractually acknowledging that up to 15% of committed backlog may not be realized as actual revenue.
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 (claim 4729) scheduled to close by April 2026 (claims 4731, 4738). The company terminated the merger in October 2025 (claim 4166). No explanation for the termination has been disclosed.
A. CoreWeave faces $1.2 billion in Series C Put Shares repurchase obligations due March 31, 2027 (claim 4276). Starting April 2027, the company must maintain a minimum debt service coverage ratio of 1.40x (claim 4596). These represent near-term liquidity and earnings pressure points.
A. CoreWeave is pursuing multiple expansion paths: $3.0 billion in delayed draw term loans for facility development (claim 4277), a $6.3 billion multi-year GPU commitment from NVIDIA through April 2032 (claim 4352), and an IBM partnership for Granite compute capacity (claim 4971). The company also issued $1.75 billion in Senior Notes due 2031 at 9% interest (claim 4658).
A. OpenAI and Meta represent approximately $20.7 billion of CoreWeave's $25.9 billion revenue backlog (claims 4297, 4282, 4970)—roughly 80% concentration. Single-customer concentration this high creates material risk if either customer reduces capacity commitments or redirects computing spend.
A. Key unknowns include: (1) actual realized revenue versus backlog commitments, (2) path and timing to profitability, (3) reason for Core Scientific merger termination and whether it signals execution challenges, (4) progress on W&B acquisition (announced for $1 billion, claim 4516), and (5) competitive response from larger cloud providers entering GPU infrastructure.
Frequently asked
2026-09-09A. CoreWeave is a cloud computing infrastructure company specializing in GPU capacity for AI and machine learning workloads. It provides GPU clusters, AI object storage, and specialized compute platforms. The company has contracted 1.6 GW of power capacity (claim 4973) and added 420 MW of active compute capacity (claim 4972).
A. CoreWeave has publicly disclosed three major customers: OpenAI ($6.5 billion committed revenue through May 2031, claim 4297), Meta ($14.2 billion cloud computing commitment through December 2031 with expansion options, claim 4282), and NVIDIA ($6.3 billion capacity purchase commitment through April 2032, claim 4352). The company also references one material GPU infrastructure customer it has not named (claim 4595).
A. CoreWeave claims $25.9 billion in total revenue backlog from committed contracts (claim 4970), with OpenAI representing $11.2 billion of that (claim 4969). However, CoreWeave is subject to a 0.85x minimum contract realization ratio covenant (claim 4597), meaning not all committed contracts may be fulfilled.
A. CoreWeave completed its IPO in November 2025 (claim 4121), raising $1.4 billion in net proceeds (claim 4513). Combined with other financing rounds, the company has raised $17.2 billion in total debt and equity capital (claim 4968). However, it also carries a $1.2 billion Series C put share repurchase obligation due by March 2027 (claim 4276).
A. CoreWeave acquired Weights & Biases for $1 billion (claim 4516). It also announced and then terminated a merger with Core Scientific in October 2025 (claim 4166), which was originally planned at a 0.1235 share exchange ratio (claim 4314). The termination may trigger a $270 million termination fee payable to CoreWeave (claim 4739).
A. CoreWeave must maintain a 1.40x minimum debt service coverage ratio beginning April 2027 (claim 4596) and meet a 0.85x contract realization ratio (claim 4597). The company has $1.75 billion in 9% senior notes due February 2031 (claim 4658) plus additional term loan facilities totaling several billion. It also must repurchase $1.2 billion in Series C put shares by March 2027 (claim 4276).
A. Key uncertainties include whether CoreWeave will realize its $25.9 billion revenue backlog given the 0.85x realization covenant; whether it will meet its April 2027 debt covenants amid high leverage; the strategic implications of terminating the Core Scientific merger; and whether multi-year partnerships with OpenAI and Meta through 2031-2032 will proceed at announced scale.
Frequently asked
2026-09-08A. CoreWeave is a cloud infrastructure company providing GPU compute capacity for AI and machine learning workloads. It offers on-demand cluster scaling (claim 4977), detailed billing metrics (claim 4978), support for NVIDIA AI Enterprise (claim 4979), and AI Object Storage (claim 4975).
A. Two customers are named: OpenAI with $6.5B in committed revenue through 2031-05-31 (claim 4297), and Meta with $14.2B in committed capacity through 2031-12-14 plus an expansion option through 2032 (claim 4282). The company reports $25.9B total revenue backlog (claim 4970), indicating substantial unnamed customers.
A. The company has 1.6 GW of contracted power capacity (claim 4973) and added 420 MW of active compute recently (claim 4972). It committed to a $6.3B NVIDIA capacity purchase through 2032 (claim 4352), secured $3.0B in delayed draw term loans (claim 4277), and expanded credit facilities by $1.85B combined (claims 5010, 5011).
A. It completed its IPO with $1.4B in proceeds and Nasdaq listing approval (claims 4121, 4735). It acquired Weights & Biases for $1B (claim 4516). However, the announced merger with Core Scientific was terminated on 2025-10-30 (claim 4166), after initially being promised for 2026-04-07.
A. Claim 4969 from May 2025 states $11.2B OpenAI backlog, while claim 4297 from September 2025 reports $6.5B committed revenue—a significant reduction with no public explanation provided.
A. CoreWeave must achieve 1.4x debt service coverage by April 2027 (claim 4596) and realize at least 85% of contracted revenue (claim 4597). It has a $1.2B Series C Put repurchase obligation due by 2027-03-31 (claim 4276). Several promised capabilities like MLPerf benchmarks (claim 4980) and AI Object Storage (claim 4975) remain stated but unverified.
A. CoreWeave announced the merger in July 2025 (claim 4729), delayed the promised April 2026 closing (claim 4738), and terminated the agreement in October 2025 (claim 4166). No reason for termination is disclosed.
Frequently asked
2026-09-08A. CoreWeave provides cloud computing infrastructure for AI companies, primarily GPU compute capacity and storage. Recent products include AI Object Storage (claim 4975), NVIDIA GB200 chip support (claim 4976), and auto-scaling capabilities (claim 4977).
A. CoreWeave has publicly disclosed two marquee customers: OpenAI, which committed $6.5 billion in spending through May 2031 (claim 4297), and Meta, with a $14.2 billion capacity commitment through December 2031 (claim 4282). Other customers remain undisclosed.
A. The company has raised $17.2 billion in total debt and equity capital (claim 4968). This includes $1.4 billion from its August 2025 IPO (claim 4513), $350 million in strategic customer share purchases (claim 4514), and various debt facilities including $1.5 billion revolving credit and term loans totaling $5.6 billion.
A. CoreWeave acquired Weights & Biases, a machine learning software company, for $1 billion (claim 4516). It announced a merger with mining firm Core Scientific in July 2025 at 0.1235 shares per share (claim 4331), but terminated the deal in October 2025 (claim 4166).
A. CoreWeave reports $25.9 billion in committed revenue from customer contracts (claim 4970). However, lenders require the company to deliver on at least 85% of these commitments (claim 4597), implying potential revenue shortfalls.
A. NVIDIA committed to purchasing $6.3 billion of CoreWeave capacity through April 2032 (claim 4352). CoreWeave also has a partnership with IBM for Granite AI compute (claim 4971) and strategic relationships with OpenAI and Meta.
A. CoreWeave must repurchase $1.2 billion in Series C shares by March 2027 (claim 4276) and achieve a 1.4x debt service coverage ratio by April 2027 (claim 4596). These targets will indicate whether the company can convert its $25.9 billion contract backlog into profitable operations.
Frequently asked
2026-09-07A. CoreWeave is a GPU and AI infrastructure cloud provider that rents compute capacity to AI companies. The company provides cloud services for AI workloads with stated support for NVIDIA hardware, enterprise tools like NVIDIA AI Enterprise (claim 4979), and benchmark achievement (claim 4980).
A. CoreWeave has disclosed two major long-term customers: OpenAI with $6.5 billion committed revenue through May 2031 (claim 4297), and Meta with $14.2 billion capacity commitment through December 2031 (claim 4282). The company also announced an IBM partnership for Granite compute capacity (claim 4971). Beyond these three, named customers are not publicly disclosed.
A. CoreWeave has raised $17.2 billion in total debt and equity (claim 4968). Financing includes $1.4 billion from an IPO (claim 4967), approximately $3.25 billion in Senior Notes offerings (claims 4700, 4697), and various credit facilities including $2.6 billion and $3.0 billion delayed draw term loans (claims 4592, 4277).
A. CoreWeave completed its IPO (claim 4121) and added 420 MW of active compute capacity (claim 4972). The company acquired Weights & Biases for $1 billion (claim 4516). Most product features—AI Object Storage (claim 4975), On-Demand Cluster Scaling (claim 4977), GB200 support (claim 4976), benchmark achievement (claim 4980)—remain in 'stated' status, meaning announced but not independently verified as delivered.
A. Expand capacity to 1.6 GW contracted power (claim 4973), develop cloud products and services, and secure long-term customer commitments. CoreWeave signed a $6.3 billion NVIDIA capacity purchase commitment through April 2032 (claim 4352). The company also promised detailed billing metrics (claim 4978) and support for enterprise AI tools.
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) but terminated the agreement in October 2025 (claim 4166). The disclosed claims do not specify the reason for termination, only that Core Scientific owed CoreWeave a $270 million termination fee (claim 4739).
A. CoreWeave must maintain a debt service coverage ratio of at least 1.40x beginning April 2027 (claim 4596) and a contract realization ratio of 0.85x (claim 4597). The company has a $25.9 billion revenue backlog (claim 4970) that must be realized. A $1.2 billion Series C put share repurchase obligation is due by March 2027 (claim 4276), and a DDTL facility commitment termination date was delayed (claim 4593).
A. How much of the $25.9 billion revenue backlog will actually be realized, and at what pace? Will the company meet debt service and contract realization covenants by 2027? Which announced products and NVIDIA/IBM partnerships have actually shipped? Why was the Core Scientific merger terminated, and what are the implications for CoreWeave's mining and capacity strategy?
Frequently asked
2026-09-07A. CoreWeave is a cloud infrastructure provider renting GPU computing capacity to AI companies. It operates data centers with high-performance chips for AI model training and inference.
A. Two major named customers: OpenAI ($6.5 billion committed through May 2031, claim 4297) and Meta ($14.2 billion through December 2031, claim 4282). Total committed contracts worth $25.9 billion (claim 4970) suggests other substantial customers are not named.
A. Completed IPO in November 2025 (claim 4121), raised $17.2 billion capital (claim 4968), built 1.6 GW of operational compute power (claim 4973). Most announced products from May-August 2025—GB200 support, AI Object Storage, Weights & Biases acquisition ($1B, claim 4516)—remain only announced with no confirmed delivery.
A. CoreWeave announced merger with Core Scientific in July 2025 but terminated it October 2025 (claim 4166). Core Scientific paid $270 million termination fee (claim 4739), delaying CoreWeave's infrastructure expansion.
A. $1.2 billion Series C Put repurchase due March 31, 2027 (claim 4276). April 2027 brings new requirement: maintain 1.40x debt service coverage ratio (claim 4596). Total debt includes $3 billion delayed-draw term loan (claim 4277).
A. Loan covenants require minimum 0.85x contract realization (claim 4597)—CoreWeave expects to collect only 85% of $25.9 billion in contracts, or ~$22 billion, accounting for pricing pressure, delayed deployments, or cancellations.
A. NVIDIA committed $6.3 billion in capacity purchases through April 2032 (claim 4352). IBM provides Granite compute capacity (claim 4971). These partnerships enable infrastructure scaling needed for OpenAI and Meta.
A. CoreWeave must execute on three fronts: deliver announced products, maintain $6.5B+ OpenAI and $14.2B Meta relationships through 2031-2032, and manage Series C repurchase and April 2027 debt service requirements. The failed Core Scientific merger already delayed infrastructure buildout.
Frequently asked
2026-09-07A. CoreWeave is a GPU and AI cloud infrastructure provider. As of May 2025, it operates 1.6 GW of contracted power capacity (claim 4973) and provides cloud computing infrastructure for AI workloads, with products including AI Object Storage, cluster scaling, and billing analytics (claims 4975-4978).
A. OpenAI is a named customer with $6.5 billion in committed revenue backlog through May 2031 (claim 4297), and Meta has committed $14.2 billion for cloud computing capacity through December 2031 (claim 4282). Total committed contract revenue is $25.9 billion (claim 4970). CoreWeave also has a partnership with IBM for compute capacity (claim 4971).
A. Total debt and equity capital raised is $17.2 billion (claim 4968). The IPO in May 2025 generated $1.4 billion in net proceeds (claim 4967). Additional funding includes a $1.75 billion senior notes offering at 9% due 2031 (claim 4697), delayed draw term loans totaling $5.6 billion (claims 4592, 4277), and a $1 billion acquisition of Weights & Biases (claim 4516).
A. In May 2025, CoreWeave announced AI Object Storage, GB200 support, On-Demand Cluster Scaling, detailed billing metrics, and NVIDIA Enterprise support (claims 4975-4979). All remain in 'stated' status—extracted from company announcements but without independent confirmation of delivery. Achievement of MLPerf benchmarks (claim 4980) and SemiAnalysis Platinum rating (claim 4981) are similarly unverified.
A. CoreWeave announced a merger with Core Scientific in July 2025 at 0.1235 Class A shares per Core Scientific share (claim 4294). The merger agreement was terminated on October 30, 2025 (claim 4166), though CoreWeave did not disclose public reasons for termination.
A. CoreWeave must repurchase $1.2 billion in Series C Put Shares by March 31, 2027 (claim 4276). Beginning April 2027, it must maintain a debt service coverage ratio of at least 1.4x (claim 4596). A $2.6 billion delayed draw term loan matures August 21, 2030 (claim 4594).
A. CoreWeave has $25.9 billion in committed customer contracts (claim 4970) but also committed $6.3 billion in NVIDIA capacity purchases through April 2032 (claim 4352). The central question is whether it can build sufficient infrastructure, fulfill both commitments, and remain profitable while meeting debt service ratios (1.4x starting April 2027, claim 4596) on $17.2 billion in total capital raised.
A. Senior Notes interest payments were delayed past their February 1, 2026 due date (claim 4659). The DDTL commitment termination date of July 31, 2026 was also delayed (claim 4593). These suggest potential liquidity or execution constraints, though CoreWeave has not publicly disclosed root causes.
Frequently asked
2026-09-07A. CoreWeave operates GPU and AI cloud infrastructure. It has 1.6 GW of contracted power capacity (claim 4973), added 420 MW of active compute capacity (claim 4972), and provides cloud services including NVIDIA GB200 support, on-demand cluster scaling, and AI Object Storage (claims 4975-4977).
A. Three customers are explicitly disclosed: OpenAI committed $6.5 billion through May 2031 (claim 4297), Meta committed $14.2 billion through December 2031 with expansion option through 2032 (claims 4282-4283), and NVIDIA committed $6.3 billion through April 2032 (claim 4352). Total disclosed revenue backlog from committed contracts is $25.9 billion (claim 4970).
A. CoreWeave completed its IPO in August 2025 raising $1.4 billion net (claims 4513, 4967) and listed on Nasdaq (claim 4735). Total disclosed capital raised is $17.2 billion in debt and equity (claim 4968). Outstanding debt includes $1.75 billion in 9% Senior Notes due 2031 (claims 4697, 4658), a $3 billion delayed draw term loan (claim 4277), and various credit facilities (claims 5010-5012).
A. CoreWeave announced a $1 billion acquisition of Weights & Biases in August 2025 (claims 4974, 4516), though the claims do not confirm completion status. It announced a merger with Core Scientific in July 2025 (claim 4729) but terminated that agreement on October 30, 2025 (claim 4166).
A. As of September 2026, Senior Notes interest payments promised by February 2026 remain delayed (claim 4659). The DDTL 3.0 commitment termination, promised by July 31, 2026, is delayed (claim 4593). Beginning April 2027, CoreWeave must maintain a 1.40x minimum debt service coverage ratio (claim 4596). A $1.2 billion Series C Put Shares repurchase is due by March 31, 2027 (claim 4276).
A. Multiple capabilities were announced in May 2025 including GB200 support, on-demand scaling, billing metrics, and AI Object Storage (claims 4972, 4975-4981). However, the claims do not confirm whether these are now generally available, in beta, or under development. The 420 MW capacity addition status is similarly unclear.
A. Will CoreWeave realize its $25.9 billion backlog with only three major named customers (claim 4970)? Has the Weights & Biases acquisition closed? Why were debt interest payments delayed despite the recent IPO success (claim 4659)? Can the company meet its April 2027 debt service covenant? Why was the Core Scientific merger terminated? What explains the gap between announced products and confirmed delivery?
Frequently asked
2026-09-07A. CoreWeave is a cloud infrastructure provider specializing in GPU compute capacity for AI workloads. The company operates data centers with contracted power capacity of 1.6 GW (claim 4973) and has added 420 MW of active compute power (claim 4972).
A. OpenAI is CoreWeave's largest disclosed customer with $6.5 billion in committed revenue through May 2031 (claim 4297). Meta committed $14.2 billion for cloud computing capacity through December 2031 with expansion options (claim 4282). These two customers account for $20.7 billion of CoreWeave's stated $25.9 billion total revenue backlog from committed contracts (claim 4970).
A. CoreWeave raised $1.4 billion net proceeds from its IPO (claim 4513) and has issued $1.75 billion in 9% Senior Notes due 2031 (claim 4658). The company also has a $3.0 billion delayed draw term loan facility (claim 4277) and a $2.6 billion delayed draw term loan facility (claim 4592). Total disclosed capital raised is stated as $17.2 billion (claim 4968).
A. CoreWeave acquired Weights & Biases for $1 billion (claim 4516). A proposed merger with Core Scientific at 0.1235 shares per Core Scientific share (claim 4331) was terminated in October 2025 (claim 4166). CoreWeave continues operating as an independent public company following the termination.
A. CoreWeave must maintain a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and a minimum contract realization ratio of 0.85x (claim 4597). The company has a $1.2 billion Series C Put Shares repurchase obligation due by March 2027 (claim 4276). Success depends on converting its $25.9 billion revenue backlog into realized revenue.
A. NVIDIA committed to purchasing $6.3 billion in capacity through April 2032 (claim 4352). CoreWeave partnered with IBM for Granite compute capacity (claim 4971). These commitments supplement the major customer deals with OpenAI and Meta.
A. CoreWeave has contracted 1.6 GW of power capacity but has only $25.9 billion in committed revenue backlog (claim 4970). The company must execute against this backlog while managing $17.2 billion in raised capital and servicing substantial debt, with no disclosed customers beyond OpenAI and Meta in the backlog breakdown.
Frequently asked
2026-09-06A. CoreWeave provides cloud infrastructure for AI computing, offering GPU compute capacity and services including on-demand cluster scaling (claim 4977), AI Object Storage (claim 4975), and NVIDIA AI Enterprise integration (claim 4979). The company serves customers training and deploying large AI models.
A. OpenAI ($6.5 billion committed revenue through May 2031, claim 4297) and Meta ($14.2 billion cloud capacity commitment through December 2031 with expansion options, claim 4282). CoreWeave reported $25.9 billion in total revenue backlog from committed contracts (claim 4970).
A. Expand GPU compute capacity to 1.6 GW of contracted power (claim 4973), secure major vendor partnerships like NVIDIA's $6.3 billion capacity purchase through 2032 (claim 4352), acquire AI software companies including Weights & Biases for $1 billion (claim 4516), and achieve public markets liquidity through IPO (completed November 2025, claim 4121).
A. CoreWeave announced a merger with Core Scientific at 0.1235 shares per share (claim 4313) with promised closure by April 2026 (claim 4731), but terminated the agreement in October 2025 (claim 4166). Instead, CoreWeave completed its IPO in November 2025, raising $1.4 billion in net proceeds (claim 4967).
A. A $1.2 billion Series C Put Shares repurchase due March 31, 2027 (claim 4276), requirement to achieve 1.40x minimum debt service coverage ratio by April 2027 (claim 4596), and multiple senior notes outstanding including $1.75 billion at 9% interest due 2031 (claim 4658). A $2.6 billion delayed draw term loan matures August 2030 (claim 4594).
A. CoreWeave announced in May 2025: AI Object Storage general availability (claim 4975), GB200 GPU support (claim 4976), NVIDIA AI Enterprise integration (claim 4979), and MLPerf Inference v5.0 performance achievement (claim 4980). Key partnerships include IBM for Granite compute capacity (claim 4971) and NVIDIA's multi-year capacity agreement (claim 4352).
A. Can CoreWeave execute on its $25.9 billion revenue backlog (claim 4970)? Will it complete the $1 billion Weights & Biases acquisition (claim 4516)? Have announced product features shipped as promised? Can it meet the $1.2 billion buyback obligation and debt service coverage requirements by 2027–2028 (claims 4276, 4596)?
Frequently asked
2026-09-06A. CoreWeave provides cloud infrastructure for AI, primarily GPU compute capacity. As of May 2025, it operated 1.6 GW of contracted power capacity (claim 4973) and had added 420 MW of active compute (claim 4972).
A. OpenAI and Meta are the only named customers. OpenAI committed $6.5 billion through May 2031 (claim 4297) with additional strategic backlog of $11.2 billion (claim 4969). Meta committed $14.2 billion through December 2031, with expansion options through 2032 (claims 4282-4283). CoreWeave reported $25.9 billion in total revenue backlog (claim 4970).
A. Secure long-term customer deals, expand capacity, and acquire complementary services. Key actions: $6.3 billion NVIDIA capacity agreement through April 2032 (claim 4352), IBM partnership (claim 4971), Weights & Biases acquisition for $1 billion (claim 4516), and IPO completion raising $1.4 billion (claims 4513, 4121).
A. In May 2025, CoreWeave announced multiple product capabilities—AI Object Storage, GB200 support, on-demand scaling, enhanced billing (claims 4975-4981)—but disclosed claims don't specify customer adoption or revenue impact. Backlog realization depends on these features driving customer value.
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) but terminated it on October 30, 2025 (claim 4166). No reason is disclosed; this suggests a significant strategic reversal.
A. CoreWeave faces a $1.2 billion put share repurchase deadline of March 31, 2027 (claim 4276), and must maintain a 1.4x debt service coverage ratio beginning April 2027 (claim 4596). The company raised $17.2 billion total to date (claim 4968).
A. Extreme customer concentration with no diversified customer base disclosed beyond OpenAI and Meta. These two customers represent the substantial majority of the $25.9 billion backlog (claim 4970). CoreWeave must prove it can diversify and execute on its commitments while meeting 2027 debt covenants.
Frequently asked
2026-09-06A. CoreWeave is a cloud infrastructure company specializing in AI and GPU computing. The company operates data centers with 1.6 GW of contracted power capacity (claim 4973) and provides services including GPU compute, storage (claim 4975), and detailed billing analytics (claim 4978). Major partnerships include deals with NVIDIA ($6.3 billion commitment through 2032, claim 4352) and IBM (claim 4971).
A. OpenAI and Meta are the only named customers with disclosed commitments: OpenAI committed $6.5 billion in cloud computing revenue through May 2031 (claims 4296–4297), and Meta committed $14.2 billion in GPU capacity through December 2031 with expansion options (claims 4282–4283). CoreWeave claims $25.9 billion in total revenue backlog from committed contracts (claim 4970), but the remaining customers are unnamed.
A. CoreWeave completed an IPO in 2025 raising $1.4 billion in net proceeds (claim 4513). The company announced a $1 billion acquisition of Weights & Biases (claim 4516). It announced a merger with Core Scientific in July 2025 (claim 4729) with expected closing by April 2026 (claim 4738), but terminated that agreement in October 2025 (claim 4166).
A. CoreWeave announced support for NVIDIA GB200 GPUs (claim 4976), NVIDIA AI Enterprise (claim 4979), on-demand cluster scaling (claim 4977), and storage services (claim 4975). All of these are recorded as 'stated' claims as of September 2026—meaning they were announced but their actual delivery or verification status is unclear from the disclosed record.
A. CoreWeave must repurchase $1.2 billion in Series C put shares by March 2027 (claim 4276). Beginning April 2027, the company must maintain a 1.4x debt service coverage ratio (claim 4596). A $2.6 billion delayed draw term loan commitment has a termination deadline of July 2026 (claim 4593).
A. CoreWeave announced the merger in July 2025 (claim 4729) with expected closing by April 2026 (claim 4738), but terminated it in October 2025 (claim 4166). The reversal suggests either a failed negotiation or changed strategy. The claims do not explain the reason, leaving significant uncertainty about the company's data center expansion plans.
A. Whether customers will fully realize their $25.9 billion revenue commitments (claim 4970); whether announced products will actually be delivered and perform as promised; whether CoreWeave can meet its 2027 debt service covenants and Series C repurchase obligations without customer revenue; and what the Core Scientific termination reveals about constraints on the company's growth strategy.
Frequently asked
2026-09-06A. CoreWeave provides cloud infrastructure optimized for AI workloads, with a focus on GPU compute capacity. The company operates data centers and offers services including AI Object Storage, on-demand cluster scaling, and detailed billing metrics (claims 4975-4978). It has built 1.6 GW of contracted power capacity (claim 4973) and added 420 MW of active compute power (claim 4972).
A. CoreWeave has publicly named two major customers: OpenAI, with $6.5 billion in committed revenue through May 2031 (claim 4297), and Meta, with a $14.2 billion capacity commitment through December 2031 plus expansion options through 2032 (claim 4282). Total disclosed backlog from committed contracts is $25.9 billion (claim 4970).
A. In May 2025, CoreWeave announced multiple product features—AI Object Storage, GB200 support, cluster scaling, and NVIDIA Enterprise support (claims 4975-4979)—all recorded as 'stated' with no confirmation of delivery or customer deployment. Similarly, it announced acquiring Weights & Biases for $1 billion (claim 4516) but has not confirmed closure.
A. Total capital raised is $17.2 billion (claim 4968), including $1.4 billion from IPO (claim 4967), $1.5 billion revolving credit facility (claim 5010), $5.6 billion in delayed draw term loans (claims 4592, 4277), and $3.25 billion in senior notes (claims 4700, 4658, 4697). Additional commitment: $6.3 billion NVIDIA capacity purchase through 2032 (claim 4352).
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) with an April 2026 closing deadline (claim 4738). The merger agreement was terminated on October 30, 2025 (claim 4166). CoreWeave is obligated to pay a $270 million termination fee (claim 4739).
A. Major unknowns include: (1) how much of the $25.9 billion backlog converts to actual revenue; (2) whether announced May 2025 products have shipped; (3) status of the $1 billion Weights & Biases acquisition; (4) debt servicing ability during rapid expansion; (5) whether CoreWeave meets its 1.40x debt service coverage ratio by April 2027 (claim 4596); and (6) reason for the Core Scientific termination.
A. Track: (1) shipping of announced May 2025 features; (2) revenue realization from the $25.9 billion backlog (claim 4970); (3) Weights & Biases acquisition closure; (4) quarterly financial results and debt covenant progress toward April 2027 (claim 4596); (5) capacity utilization rates; and (6) new major customer announcements or expanded commitments beyond OpenAI and Meta.
Frequently asked
2026-09-06A. CoreWeave is a GPU cloud infrastructure provider that rents compute capacity for AI and machine learning workloads. It went public in August 2025 (claim 4513) and offers services including NVIDIA AI Enterprise support (claim 4979), on-demand cluster scaling (claim 4977), and AI object storage (claim 4975).
A. OpenAI is committed to $6.5 billion in revenue through May 2031 (claim 4297), and Meta committed $14.2 billion through December 2031 (claim 4282). NVIDIA is also a strategic partner with a $6.3 billion capacity purchase commitment through April 2032 (claim 4352). These are the only named customers in the disclosed record.
A. The company has a $25.9 billion total revenue backlog from committed contracts (claim 4970), but the actual cash received or revenue recognized to date is not specified in the available claims. The backlog represents contracted future obligations.
A. CoreWeave acquired Weights & Biases for $1 billion (claim 4516). It announced a merger with Core Scientific in July 2025 with a 0.1235 share exchange ratio (claim 4331), but terminated that agreement in October 2025 (claim 4166). It also agreed to pay Core Scientific a $270 million termination fee (claim 4739).
A. The company raised $17.2 billion in total debt and equity capital (claim 4968), including $1.4 billion net proceeds from its IPO (claim 4967). It has secured a $3 billion delayed draw term loan facility (claim 4277), a $2.6 billion facility (claim 4592), and a $1.5 billion revolving credit facility (claim 5010). It also issued senior notes at 9% interest (claim 4697). Starting April 2027, it must maintain a 1.40x debt service coverage ratio (claim 4596).
A. The company has contracted power capacity of 1.6 GW (claim 4973) and added 420 MW of active compute capacity (claim 4972). It also has an IBM partnership for Granite compute capacity (claim 4971).
A. The Core Scientific merger, originally promised by October 2025 (claim 4517), was terminated instead. A delayed draw term loan commitment termination date originally promised for July 2026 is now delayed (claim 4593). A senior notes offering expected to close July 25, 2025 was delayed (claim 4699), as were the first interest payments originally due February 2026 (claim 4659).
A. Key metrics to track: (1) actual revenue realization against the $25.9 billion backlog and how much comes from OpenAI and Meta; (2) whether CoreWeave meets the 1.40x debt service coverage ratio required starting April 2027 (claim 4596); (3) execution of the $3 billion delayed draw term loan (claim 4277); (4) expansion of the 1.6 GW contracted power capacity (claim 4973); and (5) margin performance and customer concentration risk given that two customers represent most of the disclosed backlog.
Frequently asked
2026-09-06A. A GPU cloud infrastructure provider that rents computing capacity for AI workloads. CoreWeave went public in November 2025 (claim 4121), raising $1.4B in IPO proceeds (claim 4967).
A. OpenAI ($6.5B committed revenue through May 2031, claim 4297) and Meta ($14.2B computing capacity commitment through December 2031, claim 4282). CoreWeave also has a $6.3B NVIDIA capacity purchase commitment (claim 4352).
A. $25.9B from committed customer contracts (claim 4970). However, CoreWeave has a stated minimum contract realization ratio of 0.85x (claim 4597), meaning not all contracted revenue may ultimately be recognized.
A. CoreWeave's planned merger with Core Scientific, announced July 2025 (claim 4729), was terminated on October 30, 2025 (claim 4166). CoreWeave must pay Core Scientific a $270M termination fee (claim 4739).
A. Platform capabilities include On-Demand Cluster Scaling (claim 4977), NVIDIA GB200 support (claim 4976), and AI Object Storage (claim 4975). The company achieved MLPerf Inference v5.0 benchmark results (claim 4980).
A. $1.75B in Senior Notes at 9% interest due February 2031 (claim 4658). CoreWeave also has delayed draw term loan facilities totaling $5.6B. Starting April 2027, the company must maintain a 1.40x debt service coverage ratio (claim 4596).
A. Executing on $25.9B of customer commitments; maintaining debt covenants starting April 2027; sourcing sufficient power and GPU capacity to expand beyond 1.6 GW contracted capacity (claim 4973); and successfully integrating the $1B Weights & Biases acquisition (claim 4516).
Frequently asked
2026-09-06A. CoreWeave is an AI infrastructure company providing cloud-based GPU computing capacity for large language models and AI applications. Its platform supports NVIDIA GPUs including GB200 (claim 4976), offers AI Object Storage (claim 4975), On-Demand Cluster Scaling (claim 4977), and detailed billing and usage metrics (claim 4978).
A. CoreWeave went public via IPO in August 2025, raising $1.4 billion (claim 4513). Its strategy centers on securing long-term customer commitments—particularly with major AI labs—and expanding GPU capacity through NVIDIA partnerships ($6.3 billion commitment through April 2032, claim 4352) and debt financing. The company acquired Weights & Biases for $1 billion (claim 4516) to add ML development tooling to its platform.
A. CoreWeave has publicly named two major customers: OpenAI with $6.5 billion in committed revenue through May 2031 (claim 4297) and Meta with $14.2 billion in cloud computing capacity commitment through December 2031 (claim 4282). The company also disclosed a 'material customer contract' on July 30, 2025 (claim 4595), but has not publicly named this customer.
A. Completed: IPO in August 2025 (claim 4513), Weights & Biases acquisition (claim 4516), and termination of its merger with Core Scientific on October 30, 2025 (claim 4166). Announced but unclear if delivered: Many product features from May 2025—GB200 support, AI Object Storage general availability, On-Demand Cluster Scaling (claims 4976, 4975, 4977)—are marked as 'stated' rather than confirmed delivered.
A. CoreWeave must complete a $1.2 billion Series C Put Share repurchase by March 31, 2027 (claim 4276). Beginning April 2027, it must maintain a debt service coverage ratio of at least 1.40x (claim 4596). Customer commitments from OpenAI and Meta extend through 2031-2032, so execution on those contracts will be critical to the company's viability.
A. Whether CoreWeave can realize 85% of its $25.9 billion total revenue backlog from committed contracts (claims 4597, 4970). An interest payment on its 9% Senior Notes was due February 1, 2026 and is marked as delayed (claim 4659)—now over seven months overdue. The delayed draw term loan commitment termination date (originally July 31, 2026) has also been delayed (claim 4593), suggesting potential execution challenges.
Frequently asked
2026-09-06A. CoreWeave provides cloud computing infrastructure for AI workloads, specializing in GPU capacity. It went public in August 2025, raising $1.4 billion (claim 4513). The company operates data centers with 1.6 GW of contracted power capacity and 420 MW currently online (claims 4972-4973).
A. Only two major customers are publicly disclosed. OpenAI committed $6.5 billion in revenue through May 2031 (claim 4297). Meta committed $14.2 billion in computing capacity through December 2031, with an expansion option through 2032 (claims 4282-4283). CoreWeave reports $25.9 billion in total revenue backlog from committed contracts (claim 4970), but does not name the other customers.
A. CoreWeave has raised substantial debt since its IPO. It issued $1.75 billion in Senior Notes due February 2031 at 9% interest (claim 4658), plus $1.5 billion in additional Senior Notes (claim 4700). Two delayed draw term loans total $5.6 billion (claims 4592, 4277). The company has a $1.2 billion Series C put share repurchase obligation due March 31, 2027 (claim 4276), and must maintain a 1.40x debt service coverage ratio beginning April 2027 (claim 4596).
A. CoreWeave terminated its planned merger with Core Scientific in October 2025 (claim 4166), despite targeting an April 2026 closing (claims 4731-4738). No public reason was stated. The company announced a $1 billion Weights & Biases acquisition (claim 4516) with no stated closing deadline. CoreWeave also signed a $6.3 billion NVIDIA capacity purchase agreement extending through April 2032 (claim 4352).
A. CoreWeave has contracted for 1.6 GW of power but has only 420 MW active online, leaving a 74% deployment gap (claims 4972-4973). No explanation for this shortfall has been publicly disclosed. This gap is material because CoreWeave's ability to serve customers and meet financial covenants depends on bringing this capacity online.
A. CoreWeave was scheduled to pay Senior Notes interest by February 2026, but this payment is flagged as delayed in company disclosures (claim 4659). The company must maintain a minimum 0.85x contract realization ratio (claim 4597), potentially forfeiting 15% of its $25.9 billion backlog if customer drawdowns fall short. Additionally, CoreWeave faces significant customer concentration: OpenAI ($6.5 billion) and Meta ($14.2 billion) represent approximately 80% of disclosed committed revenue (claims 4297, 4282, 4970).
A. CoreWeave announced multiple product features in May 2025, including GB200 support, NVIDIA AI Enterprise support, MLPerf benchmarking, SemiAnalysis Platinum rating, on-demand cluster scaling, and detailed billing metrics (claims 4976-4981, 4977-4978). However, all are marked as "stated" in CoreWeave's disclosures rather than "completed" or "delivered," suggesting they may not yet be production-ready or widely deployed. Independent verification of these capabilities is not available.
Frequently asked
2026-09-06A. CoreWeave is a GPU cloud infrastructure provider specializing in artificial intelligence and machine learning workloads. The company rents access to high-end graphics processing units (GPUs) to companies building AI systems. CoreWeave went public in November 2025 (claim 4121), raising $1.4 billion in IPO net proceeds (claim 4967).
A. OpenAI is the largest disclosed customer, with a committed revenue deal worth $6.5 billion through May 2031 (claim 4297). Meta is another major customer with a $14.2 billion cloud computing commitment through December 2031 (claim 4282). Despite naming these two, CoreWeave reports $25.9 billion in total revenue backlog from committed contracts (claim 4970), indicating most customers remain unnamed.
A. Completed: the IPO in November 2025 (claim 4121), acquisition of machine learning platform Weights & Biases for $1 billion (claim 4516), and multiple debt offerings. Not completed: CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) but terminated the deal in October 2025 (claim 4166).
A. CoreWeave has raised $17.2 billion in total debt and equity capital (claim 4968), including $1.4 billion from its IPO (claim 4967) and a $3 billion delayed-draw term loan facility (claim 4277). However, the company faces a $1.2 billion obligation to repurchase Series C Put Shares by March 2027 (claim 4276), which will reduce available capital.
A. CoreWeave reports 1.6 GW of contracted power capacity and 420 MW of newly added active compute power capacity (claims 4973, 4972). The company also committed to a $6.3 billion NVIDIA capacity purchase through April 2032 (claim 4352), indicating ongoing plans to expand infrastructure.
A. CoreWeave must repurchase $1.2 billion in Series C Put Shares by March 2027 (claim 4276). Starting April 2027, the company must maintain a minimum debt service coverage ratio of 1.40x (claim 4596), meaning it must generate sufficient cash flow to cover its debt payments. These deadlines will reveal whether the company can convert its revenue backlog into actual profitability.
A. The biggest open question is whether the $25.9 billion revenue backlog (claim 4970) represents durable, profitable revenue or if it reflects signed but potentially cancellable contracts. The failed Core Scientific merger raised questions about execution capability. Also unclear: how CoreWeave will compete long-term against established cloud providers entering the AI GPU market.
Frequently asked
2026-09-05A. CoreWeave rents computing power (specifically GPUs and specialized processors) to AI companies that need massive capacity for training and running AI models. OpenAI and Meta are its two largest named customers.
A. CoreWeave claims a $25.9 billion backlog from committed customer contracts (claim 4970). Its two largest disclosed customers are Meta ($14.2 billion through 2031, claim 4282) and OpenAI ($6.5 billion through 2031, claim 4297). Most other customers are not named.
A. CoreWeave raised $17.2 billion total (claim 4968), including $1.4 billion from its November 2025 IPO (claim 4967). Major obligations include $1.75 billion in 9% senior notes due 2031 (claim 4658), plus $1.2 billion in preferred share buybacks due by March 2027 (claim 4276).
A. CoreWeave is pursuing expansion through partnerships: a $6.3 billion equipment commitment from NVIDIA through 2032 (claim 4352), a compute partnership with IBM (claim 4971), and the $1 billion acquisition of software platform Weights & Biases (claim 4516). The company has contracted 1.6 GW of electrical capacity (claim 4973) to power data centers.
A. CoreWeave announced several features in May 2025: AI object storage, support for newer GPU models, auto-scaling capabilities, and improved billing tools (claims 4975-4978). However, the dossier does not disclose whether these features are being used by customers or how much revenue they generate.
A. CoreWeave announced a merger with mining company Core Scientific in July 2025, initially scheduled to close by April 2026 (claim 4731). CoreWeave terminated the deal in October 2025 (claim 4166) before it closed, without explaining why.
A. CoreWeave must achieve a 1.4x debt service coverage ratio by April 2027 (claim 4596) and owes $1.2 billion for preferred share buybacks by March 2027 (claim 4276). Customer contracts must deliver at least 85% of promised capacity (claim 4597). CoreWeave missed several financing deadlines in mid-2025 (claims 4593, 4699), indicating execution challenges.
A. Key unknowns include whether Meta and OpenAI will actually deploy the full committed capacity, whether CoreWeave can profitably deliver services, why the Core Scientific deal was terminated, and whether the Weights & Biases acquisition will create value. CoreWeave has not disclosed actual revenue, profitability, or how much capacity customers have deployed to date.
Frequently asked
2026-09-05A. CoreWeave is a cloud computing company that rents GPU infrastructure to AI companies. It had 420 MW of active compute capacity and 1.6 GW contracted as of mid-2025 (claim 4972, 4973).
A. OpenAI ($6.5 billion commitment through May 2031, claim 4297) and Meta ($14.2 billion through December 2031, claim 4282) are CoreWeave's disclosed major customers. The company also has NVIDIA ($6.3 billion through 2032, claim 4352) and IBM partnerships (claim 4971).
A. CoreWeave has raised $17.2 billion in total debt and equity (claim 4968), including $1.4 billion from its 2025 IPO (claim 4513).
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) with expected close by April 2026, but terminated the agreement on October 30, 2025 (claim 4166). No reason for termination was disclosed.
A. CoreWeave announced a $1 billion acquisition of Weights & Biases (claim 4516) and several product launches including GB200 support (claim 4976), AI Object Storage (claim 4975), and On-Demand Cluster Scaling (claim 4977), though customer adoption and delivery status remain unclear.
A. CoreWeave must maintain a 1.40x debt service coverage ratio starting April 2027 (claim 4596) and has a $1.2 billion Series C share repurchase obligation due by March 2027 (claim 4276).
A. Whether CoreWeave will convert its $25.9 billion in customer revenue backlogs (claim 4970) into actual delivered revenue, especially given it must meet strict financial covenants starting April 2027 and repay $1.2 billion by March 2027.
Frequently asked
2026-09-05A. CoreWeave provides GPU infrastructure and cloud computing capacity for AI workloads. It operates data centers with GPU clusters that companies like OpenAI and Meta use to train and run large language models and other AI applications.
A. OpenAI is the disclosed strategic customer with $11.2 billion in revenue backlog (claim 4969) and $6.5 billion in committed revenue through May 2031 (claim 4297). Meta committed $14.2 billion for cloud computing capacity through December 2031 (claim 4282). CoreWeave has $25.9 billion in total revenue backlog from committed contracts (claim 4970).
A. CoreWeave completed an IPO in November 2025 with $1.4 billion in net proceeds (claim 4121) and raised $68 million from the over-allotment option (claim 4515). Total capital raised across all rounds is $17.2 billion (claim 4968). The company also issued $1.75 billion in 9% Senior Notes due February 2031 (claim 4658) and secured $2.6 billion and $3.0 billion in delayed draw term loan facilities (claims 4592, 4277).
A. CoreWeave announced a merger agreement with Core Scientific in July 2025 with a 0.1235 share exchange ratio (claim 4729) but terminated the merger agreement on October 30, 2025 (claim 4166). The stated reason for termination is not disclosed in available claims.
A. CoreWeave has 1.6 GW of contracted power capacity (claim 4973) and has added 420 MW of active compute power capacity (claim 4972). Announced products include AI Object Storage general availability, GB200 GPU support, on-demand cluster scaling, and MLPerf Inference v5.0 benchmark achievement (claims 4975-4981).
A. CoreWeave must achieve a minimum debt service coverage ratio of 1.4x beginning April 2027 (claim 4596) and maintain a minimum contract realization ratio of 0.85x (claim 4597). The company has a $1.2 billion Series C Put Shares repurchase obligation due March 31, 2027 (claim 4276), and delayed payment of first interest on Senior Notes from February 2026 (claim 4659).
A. Whether CoreWeave can execute on its massive customer commitments ($6.5B+ from OpenAI and $14.2B from Meta, both through 2031) while building out the required infrastructure. How it will repay the $1.2B Series C obligation in March 2027 without affecting liquidity. Whether it will successfully deploy and profitably utilize the $2.6-3.0B in delayed draw term loans to expand capacity. And why the Core Scientific merger was terminated after announcement.
Frequently asked
2026-09-05A. CoreWeave is a cloud infrastructure provider specializing in GPU computing capacity for AI and machine learning workloads. As of May 2025, the company operated contracted power capacity of 1.6 GW and added 420 MW of active compute capacity (claims 4972, 4973).
A. CoreWeave pursues rapid capacity expansion, direct partnerships with major AI companies, and strategic acquisitions. The company completed an IPO in May 2025 raising $1.4B (claim 4967), signed a $6.3B GPU purchase commitment with NVIDIA through 2032 (claim 4352), and acquired Weights & Biases for $1B (claim 4516).
A. Only two major customers are publicly named: OpenAI ($11.2B strategic deal backlog, with $6.5B committed revenue through May 2031, claims 4969, 4297) and Meta ($14.2B commitment through December 2031, claim 4282). Beyond these, the company discloses total committed contract revenue of $25.9B (claim 4970), but remaining customers are not named.
A. Delivered: IPO completion ($1.4B net proceeds, claim 4967), product launches including AI Object Storage GA and GB200 support (claims 4975, 4976), and Weights & Biases acquisition announcement (claim 4516). Not completed: Core Scientific merger, announced July 2025 with April 2026 target (claim 4738), was terminated October 2025 (claim 4166) without public explanation.
A. CoreWeave has raised $17.2B in total debt and equity capital (claim 4968). Key sources include the IPO ($1.4B, claim 4967), $1.75B in 9% Senior Notes due 2031 (claim 4658), and a $2.6B delayed draw term loan facility (claim 4592). The company must maintain minimum debt service coverage of 1.40x starting April 2027 (claim 4596).
A. Revenue realization from $25.9B contract backlog (claim 4970). Achieving contracted 1.6 GW power capacity (claim 4973). Weights & Biases integration and value creation. Debt covenant compliance starting April 2027 (claim 4596). Fulfillment of the NVIDIA $6.3B GPU purchase commitment through 2032 (claim 4352).
A. Can CoreWeave realize its $25.9B contract backlog (claim 4970) as promised, or is customer demand softer than disclosed? Why was the Core Scientific merger terminated just months before a scheduled April 2026 close (claim 4166)? Will Weights & Biases integration create value or prove distracting? Can the company meet debt covenants while scaling infrastructure? Is OpenAI's $11.2B backlog durable through 2031?
Frequently asked
2026-09-05A. CoreWeave operates GPU cloud infrastructure for AI workloads, providing on-demand compute capacity through data centers. The company raised $1.4 billion in its May 2025 IPO (claim 4967) and has contracted 1.6 GW of power capacity (claim 4973) with 420 MW of active compute power recently added (claim 4972).
A. OpenAI and Meta. OpenAI represents $11.2 billion of CoreWeave's $25.9 billion revenue backlog (claim 4969) with a separately committed $6.5 billion through May 2031 (claim 4297). Meta committed $14.2 billion for cloud computing through December 2031 (claim 4282). CoreWeave also has an unnamed material customer contract (claim 4595) and IBM partnership (claim 4971).
A. CoreWeave reports $25.9 billion in revenue backlog from committed contracts (claim 4970), but these are contract commitments, not revenue earned. The company must maintain a minimum 0.85x contract realization ratio (claim 4597)—meaning a built-in expectation that some backlog won't convert. CoreWeave must also achieve 1.4x debt service coverage by April 2027 (claim 4596).
A. CoreWeave announced the merger in July 2025 (claim 4729) with an April 2026 deadline (claim 4738), but terminated it on October 30, 2025 (claim 4166), collecting a $270 million termination fee (claim 4739). CoreWeave instead pursued a $1 billion acquisition of Weights & Biases (claim 4516).
A. CoreWeave has contracted 1.6 GW of power capacity (claim 4973) and added 420 MW of active compute (claim 4972). The company claims NVIDIA AI Enterprise support (claim 4979), GB200 support (claim 4976), and AI Object Storage general availability (claim 4975). All are company-stated claims without independent verification of availability or customer adoption.
A. Two customers—OpenAI and Meta—account for approximately $25.4 billion of CoreWeave's $25.9 billion total backlog. Any material reduction in either customer's commitment, usage, or renewal would dramatically compress CoreWeave's revenue expectations. Both contracts extend through 2031 (claims 4297, 4282), but commitment execution risk remains high.
A. CoreWeave raised $17.2 billion total capital (claim 4968) but has issued $1.75 billion in 9% Senior Notes due 2031 (claim 4697) plus $2.6 billion and $3 billion delayed-draw facilities (claims 4592, 4277). The company must achieve 1.4x debt service coverage by April 2027 (claim 4596). Most financing claims are stated without verification of actual deployment or cash flow generation.
Frequently asked
2026-09-05A. CoreWeave provides cloud infrastructure for AI and GPU computing. The company operates data centers with contracted power capacity of 1.6 GW (claim 4973) and offers services including on-demand GPU clusters, AI object storage, and billing tools for AI workloads. It went public in August 2025, raising $1.4 billion in IPO proceeds (claim 4513).
A. OpenAI and Meta are the disclosed named customers. OpenAI has a committed revenue contract through May 2031 worth $6.5 billion (claim 4297). Meta made a $14.2 billion cloud computing capacity commitment through December 2031 (claim 4282). NVIDIA is a strategic partner with a $6.3 billion capacity purchase commitment through April 2032 (claim 4352).
A. In May 2025, CoreWeave announced an $11.2 billion OpenAI revenue backlog (claim 4969). By September 2025, this was refined to a committed contract worth $6.5 billion (claim 4297). The difference may reflect how "backlog" versus "committed" contracts are counted, but the company has not publicly explained the $4.7 billion variance.
A. CoreWeave announced plans to acquire Weights & Biases for approximately $1 billion (claim 4516) and announced a merger with Core Scientific at an exchange ratio of 0.1235 shares per Core Scientific share (claim 4314). However, the Core Scientific merger was terminated on October 30, 2025 (claim 4166). The Weights & Biases acquisition status is not clarified in the record.
A. CoreWeave announced achieving MLPerf Inference v5.0 benchmark status (claim 4980), NVIDIA AI Enterprise support (claim 4979), NVIDIA GB200 support (claim 4976), on-demand cluster scaling capability (claim 4977), AI Object Storage general availability (claim 4975), and detailed billing metrics (claim 4978)—all stated as of May 2025—but has not disclosed which are actually in production or revenue-generating.
A. Multiple financing milestones are marked as delayed in the record: a senior notes offering expected to close July 25, 2025 (claim 4699), an interest payment on senior notes due February 1, 2026 (claim 4659), and termination of a delayed-draw term loan facility scheduled for July 31, 2026 (claim 4593). These delays suggest CoreWeave may be managing complex capital structures under pressure.
A. Key milestones to monitor: whether the $6.5 billion OpenAI commitment delivers promised capacity on schedule through May 2031; whether Meta's $14.2 billion commitment holds through December 2031; the status and terms of the Weights & Biases acquisition; resolution of the company's various delayed financing obligations; and whether CoreWeave meets minimum debt service coverage ratios beginning April 2027 (claim 4596).
A. The largest uncertainty is whether CoreWeave can realize its $25.9 billion total revenue backlog from committed contracts (claim 4970) profitably. Regulatory covenants require 85% contract realization (claim 4597), but CoreWeave's heavy capital requirements, delayed financing milestones, and the terminated Core Scientific merger suggest execution risk. The company has not disclosed unit economics or actual utilization rates.
Frequently asked
2026-09-05A. CoreWeave is a cloud computing infrastructure provider specializing in GPU-based compute capacity for AI and machine learning workloads. The company offers managed cloud services including storage, networking, and software tools (claims 4976–4981).
A. CoreWeave has disclosed two major named customers: OpenAI committed $6.5 billion through 2031-05-31 (claim 4297), and Meta committed $14.2 billion through 2031-12-14 with expansion options through 2032 (claims 4282–4283). Total revenue backlog from committed contracts is $25.9 billion (claim 4970), indicating material unnamed customers.
A. CoreWeave raised $17.2 billion in total debt and equity capital (claim 4968), including $1.4 billion net IPO proceeds (claim 4967), and issued $1.75 billion in 9% Senior Notes (claim 4697). However, some financing activities have experienced delays (claims 4699, 4659).
A. CoreWeave is expanding compute capacity—contracting 1.6 GW of total power capacity (claim 4973) and adding 420 MW of active capacity (claim 4972)—while deepening partnerships: $6.3 billion NVIDIA capacity purchase through 2032 (claim 4352), IBM Granite partnership (claim 4971). The company terminated a Core Scientific merger (claim 4166) and announced a $1 billion Weights & Biases acquisition (claim 4516).
A. CoreWeave completed its IPO and deployed product features: GB200 support, NVIDIA AI Enterprise support, On-Demand Cluster Scaling, and AI Object Storage general availability (claims 4975–4981). However, the announced Core Scientific merger was terminated in October 2025 (claim 4166), and multiple facility and financing timelines have been delayed (claims 4593, 4699, 4659).
A. Can CoreWeave deliver on $25.9 billion in customer revenue backlogs (claim 4970) while building contracted capacity? Why was the Core Scientific merger terminated? Will it meet the 1.4x debt service coverage ratio covenant by April 2027 (claim 4596)? What is the status of the Weights & Biases acquisition? Prior execution delays raise concerns about delivery capability.
A. Monitor fulfillment of the OpenAI ($6.5B through 2031, claim 4297) and Meta ($14.2B through 2031, claim 4282) commitments. Track the 1.6 GW power buildout, debt covenant compliance by April 2027, and updates on Weights & Biases integration. Watch for a $1.2 billion Series C Put Shares repurchase obligation due 2027-03-31 (claim 4276). Given prior delays, execution transparency is essential.
Frequently asked
2026-09-05A. CoreWeave is a GPU infrastructure provider that rents compute capacity for AI and machine learning workloads. It operates data centers with specialized graphics processing units leased to tech companies training and running large AI models.
A. CoreWeave's two largest disclosed customers are OpenAI, with $6.5 billion in committed revenue through May 2031 (claim 4297), and Meta, with $14.2 billion in capacity commitment through December 2031 (claim 4282). The company's total revenue backlog from all committed contracts is $25.9 billion (claim 4970).
A. CoreWeave has raised $17.2 billion in total debt and equity capital (claim 4968), including $1.4 billion from its IPO (claim 4967), plus additional billions in debt financing through senior notes and delayed-draw term loan facilities issued in 2025.
A. CoreWeave announced a merger agreement in July 2025 (claim 4729) with an initial closing deadline of April 7, 2026 (claim 4731), but terminated the agreement in October 2025 (claim 4166). CoreWeave is entitled to receive a $270 million termination fee (claim 4739).
A. CoreWeave has a $6.3 billion capacity purchase commitment from NVIDIA through April 2032 (claim 4352) and a partnership with IBM for Granite compute capacity (claim 4971). The company is also pursuing a $1 billion acquisition of Weights & Biases (claim 4516).
A. CoreWeave launched AI Object Storage in general availability (claim 4975), GB200 GPU support (claim 4976), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), NVIDIA AI Enterprise support (claim 4979), and achieved MLPerf Inference v5.0 benchmark results (claim 4980).
A. CoreWeave must maintain a minimum debt service coverage ratio of 1.40x and minimum contract realization ratio of 0.85x beginning April 2027 (claims 4596, 4597), suggesting not all contracted revenue may be realized. The company faces a $1.2 billion Series C Put Shares repurchase obligation due by March 2027 (claim 4276). It has also issued $1.75 billion in 9% Senior Notes due February 2031 (claim 4658), and must convert its $25.9 billion revenue backlog into actual delivery.
Frequently asked
2026-09-05A. CoreWeave is an AI infrastructure company that rents GPU computing capacity and data center resources to AI companies. It operates facilities designed specifically for training and running AI models, and offers products like CoreWeave AI Object Storage. Its announced partnerships include IBM for compute capacity (claim 4971) and a $6.3 billion capacity purchase commitment with NVIDIA through 2032 (claim 4352).
A. CoreWeave has disclosed two major customers: OpenAI, with a $6.5 billion committed revenue contract through May 2031 (claim 4297), and Meta, with a $14.2 billion computing capacity commitment through December 2031 (claim 4282). The company claims $25.9 billion in total revenue backlog from committed contracts (claim 4970), meaning ~80% comes from these two customers.
A. CoreWeave raised approximately $17.2 billion in total debt and equity (claim 4968), including $1.4 billion in IPO proceeds (claim 4967), $1.75 billion in Senior Notes at 9% due 2031 (claim 4697), and two delayed draw term loan facilities of $2.6 billion and $3 billion (claims 4592, 4277). It also acquired Weights and Biases for $1 billion (claim 4516).
A. Most announced products and partnerships remain in 'stated' status with unclear delivery. The company attempted a merger with Core Scientific announced in July 2025 (claim 4729), originally scheduled to close by April 2026 (claim 4731), but terminated the deal in October 2025 (claim 4166). Its contracted power capacity stands at 1.6 GW (claim 4973) as of the last update.
A. CoreWeave must maintain a debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and a contract realization ratio of 0.85x (claim 4597)—both suggest lenders are concerned about whether announced backlog converts to actual revenue. The company also faces a $1.2 billion obligation to repurchase Series C shares by March 2027 (claim 4276).
A. The company's $25.9 billion revenue backlog (claim 4970) depends heavily on realizing contracts with just two customers who account for ~$20.7 billion. No other named customers are disclosed. Additionally, most announced products (Object Storage, scaling capabilities, AI frameworks support) lack confirmation of actual availability, and the failed Core Scientific merger raises questions about capacity expansion plans.
Frequently asked
2026-09-05A. CoreWeave operates GPU data centers and provides cloud computing services to AI companies. It rents GPU capacity to customers like OpenAI and Meta for training and running large language models.
A. OpenAI and Meta are the only major customers named. OpenAI committed $6.5 billion in revenue through May 2031 (claim 4297), and Meta committed $14.2 billion through December 2031 (claim 4282). Together they represent most of CoreWeave's stated revenue.
A. CoreWeave is growing GPU capacity through partnerships and capital raises. It committed to purchasing $6.3 billion in NVIDIA GPUs through April 2032 (claim 4352) and has contracted 1.6 GW of power capacity (claim 4973) to support expansion.
A. CoreWeave announced product features in May 2025 including on-demand cluster scaling, billing metrics, and NVIDIA support (claims 4977-4979). As of September 2026, none have confirmed delivery dates, making it unclear what has shipped versus what remains promised.
A. CoreWeave announced a merger with Core Scientific in July 2025 with an April 2026 closing deadline (claims 4729, 4738). The deal missed its deadline and was terminated by October 2025 (claim 4166), marking a major strategic setback.
A. CoreWeave must repurchase $1.2 billion in Series C shares by March 2027 (claim 4276) and must maintain a 1.4x debt service coverage ratio starting April 2027 (claim 4596). The company also committed $6.3 billion to NVIDIA through 2032 (claim 4352).
A. CoreWeave has $25.9 billion in committed revenue backlog (claim 4970), but it is heavily concentrated in two customers. If OpenAI or Meta reduce orders, CoreWeave would struggle to service its debt and meet its financial covenants.
Frequently asked
2026-09-05A. CoreWeave is a cloud infrastructure provider that rents GPU computing capacity to AI companies. It builds and operates data centers equipped with GPUs to serve artificial intelligence workloads.
A. OpenAI is CoreWeave's largest named customer, with $6.5 billion in committed revenue through May 2031 (claim 4297). Meta committed $14.2 billion for cloud computing capacity through December 2031 (claim 4282). CoreWeave reports total revenue backlog of $25.9 billion from committed contracts (claim 4970), but most customers remain unnamed in public filings.
A. CoreWeave completed an IPO in 2025, raising $1.4 billion in net proceeds (claim 4967). Total capital raised is $17.2 billion (claim 4968), including $350 million from strategic customer share sales (claim 4514).
A. May 2025 announcements: AI Object Storage, NVIDIA AI Enterprise support, MLPerf benchmarks, GB200 GPU support, and on-demand cluster scaling (claims 4975-4980). Infrastructure: 420 MW of active compute capacity and 1.6 GW of contracted power (claims 4972-4973). Also acquired Weights & Biases for $1 billion (claim 4516).
A. CoreWeave announced a merger with Core Scientific in July 2025, initially targeted to close by April 2026 (claim 4731), but terminated the agreement in October 2025 (claim 4166).
A. Must achieve 1.40x debt service coverage ratio by April 2027 (claim 4596) and maintain 0.85x contract realization ratio (claim 4597). Must repurchase $1.2 billion in Series C Put Shares by March 2027 (claim 4276). The core execution risk is converting $25.9 billion in backlog into actual revenue.
A. NVIDIA: $6.3 billion capacity purchase commitment through April 2032 (claim 4352). IBM: partnership for Granite compute capacity (claim 4971). These partnerships secure the GPUs and chips CoreWeave needs to serve customers.
Frequently asked
2026-09-05A. CoreWeave is a cloud infrastructure provider specializing in GPU compute for AI applications. It offers on-demand cluster scaling (claim 4977), AI object storage (claim 4975), and detailed usage metrics (claim 4978).
A. CoreWeave has disclosed only two significant customers: OpenAI with $6.5 billion committed revenue through May 2031 (claim 4297), and Meta with $14.2 billion in capacity commitment through December 2031 (claim 4282). Together they represent roughly 80% of CoreWeave's $25.9 billion total disclosed revenue backlog (claim 4970).
A. As of May 2025, CoreWeave reported 420 MW of active compute capacity added (claim 4972) and 1.6 GW of contracted total capacity (claim 4973). The company completed its IPO in November 2025 (claim 4121), raising $1.4 billion (claim 4513).
A. CoreWeave announced capabilities recorded as 'stated' claims rather than independently verified: NVIDIA AI Enterprise support (claim 4979), GB200 support (claim 4976), MLPerf benchmark achievement (claim 4980), and object storage general availability (claim 4975). Production readiness of these features is unconfirmed.
A. CoreWeave is pursuing partnerships worth $6.3 billion with NVIDIA through April 2032 (claim 4352) and an IBM partnership for compute capacity (claim 4971). It acquired Weights & Biases for $1 billion (claim 4516). An announced merger with Core Scientific (July 2025, claim 4729) was terminated in October 2025 (claim 4166).
A. CoreWeave must repurchase $1.2 billion in Series C Put Shares by March 2027 (claim 4276). Starting April 2027, it must maintain a debt service coverage ratio of 1.40x (claim 4596). The company assumes a 0.85x minimum contract realization ratio (claim 4597), meaning customer spending must materialize to meet these obligations.
A. CoreWeave is entirely dependent on two customers—OpenAI and Meta account for nearly all of its $25.9 billion revenue backlog (claim 4970). Loss of either commitment jeopardizes the April 2027 debt covenant (1.40x coverage, claim 4596) and the March 2027 Series C repurchase obligation ($1.2 billion, claim 4276).
A. Watch whether CoreWeave meets the March 2027 Series C repurchase ($1.2 billion, claim 4276) and April 2027 debt service coverage ratio (claim 4596). Track OpenAI and Meta contract realization—whether they actually spend at committed rates (claims 4297 and 4282). Monitor whether announced products achieve production readiness and market validation.
Frequently asked
2026-09-05A. CoreWeave is a cloud infrastructure provider that supplies GPU and compute capacity for AI workloads. The company operates data centers with 1.6 GW of contracted power capacity (claim 4973) and offers products including on-demand cluster scaling, AI object storage, and support for processors like NVIDIA's GB200 (claims 4976–4978).
A. Two major customers are publicly disclosed: OpenAI, with $11.2 billion in strategic deal revenue backlog and $6.5 billion in committed revenue through May 2031 (claims 4969, 4297); and Meta, with $14.2 billion in cloud computing capacity commitment through December 2031 plus an expansion option through 2032 (claim 4282). CoreWeave claims total revenue backlog of $25.9 billion (claim 4970).
A. Delivered: IPO completed November 2025 ($1.4 billion net proceeds, claim 4967) and $1.75 billion in 9% Senior Notes due 2031 (claim 4658). Terminated: Core Scientific merger was announced July 2025 but terminated October 2025 (claim 4166). Still pending: $1 billion Weights & Biases acquisition (claim 4516). Most product features announced remain in 'stated' phase, not yet confirmed as delivered.
A. Expand compute capacity (recently added 420 MW, claim 4972) through partnerships including IBM and an NVIDIA capacity purchase commitment of $6.3 billion through April 2032 (claims 4971, 4352). Fund growth via debt and equity offerings ($17.2 billion raised to date, claim 4968). Acquire complementary capabilities, notably Weights & Biases for $1 billion (claim 4516). Roll out new product features across the platform.
A. Can CoreWeave realize its $25.9 billion contracted backlog on schedule, especially the $11.2 billion OpenAI and $14.2 billion Meta deals? Will the Weights & Biases acquisition close? Will the company meet debt covenants—specifically a 0.85x minimum contract realization ratio (claim 4597) and a 1.4x debt service coverage ratio beginning April 2027 (claim 4596)? What does the terminated Core Scientific deal suggest about M&A execution risk?
Frequently asked
2026-09-05A. CoreWeave operates a GPU cloud infrastructure platform for AI workloads. The company provides NVIDIA GPU compute capacity to customers running large language models and machine learning applications. As of May 2025, CoreWeave had contracted 1.6 GW of power capacity with 420 MW of active compute added (claims 4973, 4972).
A. CoreWeave has named two megacustomers: OpenAI committed to $6.5 billion in revenue through May 2031 (claim 4297), and Meta committed to $14.2 billion in cloud computing capacity through December 2031 (claim 4282). Total reported revenue backlog is $25.9 billion (claim 4970), indicating most customers are not publicly disclosed.
A. CoreWeave has raised $17.2 billion in total debt and equity (claim 4968). This includes $1.4 billion from an IPO completed in late 2025 (claim 4967), $1.75 billion in 9% Senior Notes (claim 4658), and at least $5.6 billion in delayed-draw term loan facilities maturing through 2030 (claims 4592, 4277). The company also secured a $6.3 billion NVIDIA capacity purchase commitment through April 2032 (claim 4352).
A. CoreWeave announced a $1 billion acquisition of Weights & Biases (claim 4516) and a merger with Core Scientific at 0.1235 shares per share, promised to close by April 2026 (claim 4731). The Core Scientific merger was terminated on October 30, 2025 (claim 4166). The W&B acquisition status beyond announcement is not updated in current records.
A. CoreWeave announced general availability of AI Object Storage (claim 4975), on-demand cluster scaling (claim 4977), detailed billing and usage metrics (claim 4978), GB200 GPU support (claim 4976), NVIDIA Enterprise support (claim 4979), MLPerf Inference v5.0 benchmark achievement (claim 4980), and received a SemiAnalysis Platinum rating (claim 4981). All are disclosed as of May 2025; current operational status is not tracked.
A. CoreWeave carries ~$5+ billion in debt and faces strict covenants beginning April 2027: minimum 1.40x debt service coverage ratio (claim 4596) and 0.85x contract realization ratio (claim 4597). Customer concentration is high: OpenAI and Meta represent $20.7 billion of the $25.9 billion revenue backlog. Several financing milestones slipped, including senior note offering closings (claim 4699) and interest payment commencement dates (claim 4659).
A. Key milestones: (1) April 2027 debt service covenant compliance, proving revenue backlog converts to cash; (2) achievement of 0.85x contract realization ratio; (3) OpenAI and Meta contract performance through 2031-2032; (4) debt maturities including Senior Notes due May 2030 and DDTL facility due August 2030 (claims 4824, 4594); (5) execution of $6.3 billion NVIDIA capacity expansion through April 2032 (claim 4352).
Frequently asked
2026-09-05A. CoreWeave provides cloud computing infrastructure for AI workloads, specializing in GPU capacity. It operates 1.6 GW of contracted power capacity (claim 4973) and offers cloud services including AI Object Storage and on-demand cluster scaling.
A. Named customers are OpenAI ($6.5 billion committed revenue through May 2031, claim 4297) and Meta ($14.2 billion capacity commitment through December 2031, claim 4282). CoreWeave discloses $25.9 billion in total revenue backlog from committed contracts (claim 4970).
A. The company completed its IPO (claim 4121) and raised $1.4 billion in net proceeds (claim 4513). It acquired Weights & Biases for $1 billion (claim 4516). However, a major announced merger with Core Scientific (announced July 2025) was terminated by October 2025 (claim 4166), indicating execution risks.
A. CoreWeave is expanding capacity through major partnerships: a $6.3 billion NVIDIA capacity commitment through April 2032 (claim 4352) and partnerships with IBM. The company is funding expansion through debt issuance ($1.75 billion in Senior Notes due 2031, claim 4658) and equity raises.
A. CoreWeave must repurchase $1.2 billion in Series C Put Shares by March 2027 (claim 4276). Beginning April 2027, the company must maintain a debt service coverage ratio of 1.40x (claim 4596) and a contract realization ratio of 0.85x (claim 4597).
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) with closing expected by April 2026 (claim 4731). The deal was terminated by October 2025 (claim 4166). The reason is not disclosed, raising questions about execution capability and deal economics.
A. The company hasn't disclosed how much of its $25.9 billion revenue backlog (claim 4970) has been realized or is on track. Key uncertainties: whether multi-billion-dollar customer commitments will materialize as contracted, why the Core Scientific deal failed, and whether the company can scale profitably while meeting debt covenants from 2027 onward.
Frequently asked
2026-09-05A. CoreWeave operates GPU-intensive cloud infrastructure for AI applications. The company rents compute capacity to companies training large language models. As of May 2025, it disclosed contracted power capacity of 1.6 GW (claim 4973).
A. CoreWeave named three significant customers: OpenAI ($6.5 billion committed revenue through May 2031, claim 4297), Meta ($14.2 billion capacity commitment through December 2031, claim 4282), and NVIDIA ($6.3 billion through April 2032, claim 4352). Total backlog is $25.9 billion, though most customers remain confidential (claim 4970).
A. The IPO closed in November 2025 with $1.4 billion in net proceeds (claim 4121). Total debt and equity raised as of May 2025 was $17.2 billion (claim 4968), including $1.75 billion in senior notes and a $3 billion delayed draw term loan (claims 4658, 4277).
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) but terminated the agreement in October 2025 without public explanation (claim 4166). The company did complete its acquisition of Weights & Biases for $1 billion (claim 4516).
A. CoreWeave disclosed $25.9 billion in contracted backlog (claim 4970) but has not reported actual revenue. This gap matters because the company must maintain a 1.40x debt service coverage ratio by April 2027 (claim 4596) and repurchase $1.2 billion in preferred shares by March 31, 2027 (claim 4276).
A. CoreWeave announced on-demand cluster scaling, detailed billing, NVIDIA AI Enterprise support, and GB200 GPU support in May 2025 (claims 4977-4976). However, no delivery dates or shipping confirmation has been disclosed—these remain announced but undelivered.
A. Three critical tests ahead: (1) generating revenue to meet debt covenants and a $1.2 billion shareholder repurchase by March-April 2027 (claims 4596, 4276); (2) actually building and operating the power infrastructure needed to fulfill $25.9 billion in customer commitments (claim 4970); and (3) the unexplained termination of the Core Scientific merger and what it reveals about CoreWeave's operations or finances (claim 4166).
Frequently asked
2026-09-05A. CoreWeave is a GPU cloud infrastructure provider specializing in AI workloads. It operates 1.6 GW of contracted power capacity with 420 MW of recently added active compute power (claims 4973, 4972).
A. OpenAI and Meta are the named major customers. OpenAI has $6.5 billion in committed revenue through May 2031 (claim 4297). Meta committed $14.2 billion in cloud computing capacity through December 2031, with expansion options through 2032 (claims 4282, 4283). Total committed customer contracts represent $25.9 billion in backlog (claim 4970).
A. CoreWeave completed its IPO in November 2025, raising $1.4 billion in net proceeds (claim 4513). It acquired Weights & Biases for $1 billion (claim 4516). It terminated its merger agreement with Core Scientific in October 2025 (claim 4166).
A. CoreWeave raised $1.4 billion from its IPO (claim 4513), issued $1.75 billion in 9% senior notes due 2031 (claim 4658), and has $2.6 billion in delayed draw term loan facilities (claim 4592). It also committed to a $6.3 billion NVIDIA capacity purchase partnership through April 2032 (claim 4352).
A. CoreWeave announced support for NVIDIA's GB200 GPU, on-demand cluster scaling, detailed billing metrics, and AI Object Storage availability (claims 4976, 4977, 4978, 4975). It also received MLPerf Inference v5.0 benchmark achievement and SemiAnalysis Platinum rating (claims 4980, 4981).
A. CoreWeave has a $1.2 billion Series C put share repurchase obligation due by March 2027 (claim 4276). Beginning April 2027, it must maintain a minimum 1.4x debt service coverage ratio (claim 4596). The central question is whether the company can execute on $25.9 billion in committed customer contracts to service this debt.
Frequently asked
2026-09-05A. CoreWeave is a GPU cloud infrastructure company providing computing power for AI model training and inference. The company went public in November 2025 (claim 4121) after raising approximately $17.2 billion in total capital (claim 4968).
A. CoreWeave has disclosed two major customers: OpenAI with a $6.5 billion committed revenue contract through May 2031 (claim 4297), and Meta with a $14.2 billion cloud computing commitment through December 2031 (claim 4282). Together, these represent most of the company's $25.9 billion total revenue backlog (claim 4970).
A. CoreWeave is expanding GPU capacity through major vendor partnerships. The company has committed to $6.3 billion in NVIDIA computing capacity purchases through 2032 (claim 4352), has contracted 1.6 GW of power capacity (claim 4973), and has deployed 420 MW of active compute (claim 4972). It also acquired Weights & Biases for $1 billion to bundle model management services with its infrastructure offerings (claim 4516).
A. Delivered: IPO completion (November 2025, claim 4121), $1.75 billion in Senior Notes issuance (claim 4658), and Weights & Biases acquisition (claim 4516). Announced but not proven at scale: on-demand cluster scaling, AI Object Storage, GB200 GPU support, and detailed billing capabilities (claims 4975-4981). Multiple announced milestone dates have slipped, including notes offering closings and loan commitment deadlines (claims 4593, 4699, 4659).
A. CoreWeave announced a merger with Core Scientific in July 2025 with an April 2026 closing target (claim 4731), but terminated the agreement in October 2025 (claim 4166), requiring a $270 million termination fee payment to Core Scientific (claim 4739). This suggests a shift away from acquisition-based capacity expansion.
A. CoreWeave must repurchase $1.2 billion in Series C Put Shares by March 31, 2027 (claim 4276). Starting April 2027, it faces debt covenants requiring a minimum 1.40x debt service coverage ratio and 0.85x contract realization ratio (claims 4596, 4597). The company has issued $1.75 billion in Senior Notes (claim 4658) and has $3 billion in available delayed draw term loans (claim 4277).
A. Can CoreWeave build sufficient compute capacity to serve its $20.7 billion in OpenAI and Meta commitments (claims 4297, 4282)? Multiple announced deadlines have slipped, raising questions about execution capability. Can it meet its April 2027 debt service covenants? And how will it manage the $1.2 billion Series C Put repurchase obligation due March 2027 (claim 4276) while investing in capacity expansion?
Frequently asked
2026-09-05A. CoreWeave is a cloud infrastructure provider specializing in AI and GPU computing for machine learning workloads. It operates data centers with 1.6 GW of contracted power capacity (claim 4973) and has added 420 MW of active compute power (claim 4972).
A. CoreWeave has disclosed two major named customers: OpenAI with $6.5 billion in committed revenue through May 2031 (claim 4297) and Meta with a $14.2 billion computing capacity commitment through December 2031 (claim 4282). Total disclosed revenue backlog from all committed contracts is $25.9 billion (claim 4970).
A. Yes, CoreWeave completed its IPO in November 2025 (claim 4121), raising $1.4 billion in net proceeds (claim 4967) plus $350 million in strategic customer share investments (claim 4514). It is listed on Nasdaq Global Select Market (claim 4735).
A. CoreWeave announced a merger with Core Scientific in July 2025 (claim 4729) with an exchange ratio of 0.1235 shares per share (claim 4294), originally expected to close by April 2026 (claim 4731). The merger agreement was terminated in October 2025 (claim 4166).
A. CoreWeave must maintain a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596) and a contract realization ratio of at least 0.85x (claim 4597), meaning it must actually deliver at least 85% of its committed contracts.
A. CoreWeave has a $6.3 billion capacity purchase commitment from NVIDIA through April 2032 (claim 4352) and a partnership with IBM for compute capacity (claim 4971). The company acquired Weights & Biases for $1 billion (claim 4516).
A. Whether CoreWeave can realize the 0.85x contract realization ratio required by its debt covenants (claim 4597). The company has $25.9 billion in committed backlog (claim 4970) but faces the execution risk of delivering on these contracts, particularly following the failed Core Scientific merger that was expected to expand capacity.
Frequently asked
2026-09-02A. CoreWeave is a provider of AI Cloud infrastructure, offering NVIDIA GPU computing resources, Spectrum-X Ethernet networking infrastructure (claim 1236), and AI Object Storage (claim 1244). The company operates a global data center portfolio (claim 156) serving AI and machine learning workloads.
A. Meta represents the largest customer with a $21 billion payment commitment through 2032 (claim 2124). Other named major customers include Microsoft and OpenAI (claim 648), Hudson River Trading under a multiyear agreement (claim 1234), and Applied Digital with $11 billion in Polaris Forge 1 lease revenue (claim 371).
A. CoreWeave is pursuing aggressive capacity expansion with $35 billion in planned capital expenditure for 2026 (claim 369) and has committed to a 360 MW compute facility in Indonesia's Greater Jakarta region by end of 2028 (claim 155). Management reports that near-term capacity is sold out (claim 1494) and has secured $25 billion in new customer commitments (claim 1303).
A. Q2 2026 revenue was $2.6 billion (claim 1492), with full-year 2026 revenue guidance of $12.8 billion (claim 1825). The company reports a $104 billion revenue backlog (claim 1493). However, backlog figures from the same period were withdrawn by auditors and reissued, raising credibility questions.
A. No. The company reported a TTM net loss of $1.6 billion (claim 643) and Q2 2026 adjusted loss per share of $1.03 (claim 1823), with operating and net losses widening (claim 1495). Q2 2026 adjusted EBITDA was positive at $1.5 billion (claim 1669), but the company is not achieving profitability on a net income basis.
A. Long-term debt stands at $30 billion (claim 1525). Major facilities include $3.0 billion convertible notes due 2032 (claim 2126), $1.25 billion senior notes due 2031 (claim 2125), $2.75 billion in additional senior notes (claims 2056, 2057), an $8.5 billion delayed draw term loan (claim 2137), and a $3.1 billion DDTL 5.0 facility maturing 2031 (claim 1319). Debt agreements require 1.15x and 1.35x debt service coverage ratios (claims 2141, 1324).
A. Critical uncertainties include: (1) profitability path given $30 billion debt against negative $1.6 billion TTM net income; (2) conversion of $104 billion backlog to revenue while maintaining margins; (3) execution on $35 billion capex plan and 360 MW Indonesia deployment; (4) covenant compliance under current loss levels; and (5) backlog credibility after recent auditor withdrawals and restatements.
whats_missing
What we aren't being told
2026-10-19The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), and then an OpenAI backlog of $11.2 billion on 2025-05-13 (claim #4969). What has not been said is why the two figures differ by $700 million. It is unclear whether some revenue was already recognized, the contract was re-scoped, or the figures are measured differently. The contract term, the annual revenue recognition schedule, and any termination or take-or-pay protections have also not been stated.
The company disclosed total revenue backlog of $25.9 billion from committed contracts on 2025-05-13 (claim #4970). What has not been said is who holds the roughly $14.7 billion that is not attributed to OpenAI (claim #4969). The company has not named those counterparties or disclosed the share held by its largest non-OpenAI customer. It has also not said what weighted-average contract duration sits behind the backlog figure.
The company disclosed roughly 420 MW of active power across 33 data centers on 2025-05-18 (claim #29785). On 2025-05-13 it also disclosed 1.6 GW of contracted power (claims #4972, #4973) and more than 250,000 GPUs online (claim #29786). What has not been said is where the 33 sites and the contracted-but-not-active 1.2 GW are physically located. The company has also not disclosed their utility interconnection status or their expected energization dates. It is not stated whether the MW figures are critical IT load or gross facility power, or how much of the 1.6 GW is owned rather than leased from colocation partners.
The company disclosed an expected $8.9 billion of secured debt to service contracts on 2025-05-18 (claim #29783). On the same date it disclosed a DDTL 3.0 facility of up to $2.6 billion (claim #11922) and $505 million of DDTL-2 borrowings (claim #29781). What has not been said is the draw schedule, the interest rates, the amortization terms, and the specific contracts or GPU collateral pledged under each facility. The company has also not said how this secured stack ranks against the 9.250% senior notes due 2030 (claims #29421, #29422).
The company disclosed an extension of its revolving credit facility to 2028-05-02 on 2025-05-05 (claim #5012). On the same date it disclosed a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is the exact condition that triggers the earlier date, and whether that condition has been cured or remains live. The RCF was drawn by an additional $444 million and partly repaid with $450 million of notes proceeds (claims #29780, #29778), so the current outstanding balance as of that trigger date also matters and has not been given.
The company disclosed CFO stock sales of $29.1 million on 2025-05-20 (claim #19831) and CDO stock sales of $217 million on 2025-05-31 (claim #19832). These came within weeks of the IPO and while it was issuing 9.250% notes (claim #29433). What has not been said is whether the sales were made under Rule 10b5-1 plans, when any such plans were adopted, and what lock-up waivers or carve-outs allowed them. Separately, the Weights & Biases acquisition (claims #4974, #29787) was announced without a purchase price or cash-versus-stock mix. The run-rate Adj. EBITDA of $5.17 billion (claim #29784) was given without the period or methodology used to annualize it.
What we aren't being told
2026-10-19The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then an OpenAI backlog of $11.2 billion on 2025-05-13 (claim #4969). What has not been said is what accounts for the roughly $700 million difference: revenue already recognized, a re-scoping, or a definitional change. The company also has not disclosed the contract's term length, delivery schedule, or termination and take-or-pay provisions.
The company disclosed total committed backlog of $25.9 billion on 2025-05-13 (claim #4970), of which OpenAI is about $11.2 billion (claim #4969). What has not been said is who holds the remaining roughly $14.7 billion. How concentrated is it in one or two unnamed hyperscaler or lab counterparties, and what is the weighted-average remaining duration?
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power on 2025-05-13 and 2025-05-18 (claims #4972, #29785, #4973). What has not been said is where those sites are, which are owned versus leased from colocation partners, and what interconnection or utility agreements back the 1.6 GW. It is also unclear what "contracted" means here, whether signed leases, utility allocations, or letters of intent, and on what energization timeline.
The company disclosed a revolver maturity extension to 2028-05-02 alongside a contingent springing maturity of 2026-12-30 (claims #5012, #11926). What has not been said is what condition triggers the springing date, which is now about ten weeks away. Has that condition been cured, refinanced, or waived?
The company disclosed a $1.5 billion notes offering upsized to $2.0 billion at 9.250% (claims #29774, #29433), a $2.6 billion DDTL 3.0 (claim #11922), and $8.9 billion of projected secured debt to service contracts (claim #29783). What has not been said is which customer contracts and GPU collateral sit behind DDTL 3.0 and the $8.9 billion. The pricing on those facilities and the expected draw cadence have also not been disclosed. And why did the company repay $450 million of revolver from notes proceeds (claim #29778) while disclosing an additional $444 million revolver draw in the same filing window (claim #29780)?
The company disclosed CFO insider sales of $29.1 million on 2025-05-20 and CDO insider sales of $217 million on 2025-05-31 (claims #19831, #19832), roughly two months after the $40 IPO (claim #11616). What has not been said is whether these sales ran under 10b5-1 plans or lock-up waivers, when any such plans were adopted, and how they square with executive compensation and retention disclosures. Separately, the Weights & Biases acquisition (claims #4974, #29787) has been announced with no disclosed purchase price, consideration mix, or expected revenue contribution.
What we aren't being told
2026-10-18The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then on 2025-05-13 cited $11.2 billion of OpenAI-related backlog (claim #4969) within total committed backlog of $25.9 billion (claim #4970). What has not been said is why the two OpenAI figures differ by $700 million, and who holds the remaining roughly $14.7 billion of backlog. Which named customers account for it, and what is the top-customer concentration percentage?
The company disclosed 1.6 GW of contracted power on 2025-05-13 (claim #4973) against about 420 MW active across 33 data centers (claims #4972 and #29785). What has not been said is where the remaining roughly 1.2 GW is located, including site addresses, utility or interconnection counterparties, and queue status. Nor has it said on what schedule that capacity is expected to energize, and whether those sites are owned, leased, or third-party colocation.
The company disclosed a revolving credit facility extended to 2028-05-02 (claim #5012), alongside a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what condition triggers the springing date, and whether that condition has been cured or refinanced. With that date about ten weeks away, this is the most time-sensitive gap in the record.
The company disclosed the DDTL 3.0 facility as "up to $2.6 billion" on 2025-05-18 (claim #11922, recorded with an ambiguous 2600.0 USD unit) and projected $8.9 billion of secured debt to service contracts (claim #29783). What has not been said is how much of DDTL 3.0 has actually been drawn and at what interest rate. It also has not said which contracts or customers collateralize the $8.9 billion, or over what period that debt is expected to be incurred. A related question: why was the unsecured notes offering upsized from $1.5 billion (claim #29774) to $2.0 billion at 9.250% (claim #29433), and how was the extra $500 million deployed?
The company disclosed CFO insider stock sales of $29.1 million on 2025-05-20 (claim #19831) and CDO insider sales of $217 million by 2025-05-31 (claim #19832), within about two months of a $40-per-share IPO (claim #11616). What has not been said is whether these sales were made under Rule 10b5-1 plans, or what lockup terms or carve-outs permitted them. It also has not given the executives' total compensation and remaining holdings for context.
The company disclosed a run-rate adjusted EBITDA of $5.17 billion (claim #29784) and the acquisition of Weights & Biases (claims #4974 and #29787). What has not been said is the period, contract base, and methodology behind the run-rate figure, or how it reconciles to GAAP. The company has also not disclosed the Weights & Biases purchase price, how it was paid (cash or stock), or that business's revenue contribution.
What we aren't being told
2026-10-18The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then on 2025-05-13 reported OpenAI-related backlog of $11.2 billion, cited as claim #4969, inside a $25.9 billion total backlog, cited as claim #4970. What has not been said is what explains the roughly $0.7 billion difference between the two OpenAI figures (revenue already recognized, a re-scoped contract, or different measurement bases), what the delivery ramp and term look like, and who the counterparties are behind the remaining roughly $14.7 billion of backlog, which leaves customer concentration unquantified.
The company disclosed 420 MW of active power, described once as capacity added, cited as claim #4972, and once as total active power across 33 data centers, cited as claim #29785, alongside 1.6 GW of contracted power, cited as claim #4973. What has not been said is which reading is correct, where the 33 data centers are, how much of the 1.6 GW is owned versus leased, and when the contracted power is scheduled to energize. The company has also given no interconnection or utility detail for the roughly 1.18 GW gap between active and contracted capacity.
The company disclosed a revolving credit facility expanded to $1.5 billion with a 2028-05-02 maturity, cited as claims #11923 and #5012, but also a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what condition triggers the springing date, and whether that condition has been cured or refinanced now that the date is about ten weeks away.
The company disclosed a $1.5 billion senior notes offering, cited as claims #29774 and #29777 and characterized as unsecured, that priced upsized at $2.0 billion at 9.250% due 2030, cited as claim #29433. It separately projected $8.9 billion of secured debt to service contracts, cited as claim #29783, and a DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922. What has not been said is the pricing, collateral package and specific customer contracts backing DDTL 3.0, how much of the $8.9 billion is already drawn, and the blended cost of debt against the stated $5.17 billion run-rate Adjusted EBITDA, cited as claim #29784. The company has also not given the period or definitional basis for that EBITDA figure.
The company disclosed CFO stock sales of $29.1 million on 2025-05-20, cited as claim #19831, and Chief Development Officer sales of $217 million by 2025-05-31, cited as claim #19832, within about two months of the $40 IPO, cited as claim #15974. What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, what lockup terms or early-release provisions allowed them, and what portion of each executive's holdings they represent.
The company disclosed the acquisition of Weights & Biases, cited as claims #4974 and #29787. What has not been said is the purchase price, the cash-versus-stock mix, and how much of the recently raised capital, cited as claim #4968 at $17.2 billion total, was used to fund it.
What we aren't being told
2026-10-18The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13 (claim #4970) and attributed $11.2 billion of it to OpenAI (claim #4969); what has not been said is who holds the remaining roughly $14.7 billion. Which customers make up that balance, how concentrated is it, and what are the contract durations and termination rights behind it? A related question: why does the OpenAI contract value of $11.9 billion announced on 2025-03-10 (claim #19820) differ from the $11.2 billion OpenAI backlog figure (claim #4969), and is the gap revenue already recognized or a change in contract terms?
The company disclosed 1.6 GW of contracted power on 2025-05-13 (claim #4973) alongside about 420 MW of active power across 33 data centers (claims #4972 and #29785); what has not been said is where the remaining roughly 1.2 GW sits and when it comes online. Claim #4972 describes 420 MW as capacity 'added' while claim #29785 presents it as total active power, so which is it? For the uncommissioned capacity, what are the site locations, the interconnection status with utilities, and the quarter-by-quarter energization schedule?
The company disclosed a revolving credit facility amendment on 2025-05-05 with a contingent springing maturity of 2026-12-30 (claim #11926), alongside a stated maturity extension to 2028-05-02 (claim #5012); what has not been said is what triggers the springing date. With that date now about ten weeks away, which conditions would accelerate maturity (for example, a refinancing or liquidity test tied to other debt), have they been satisfied or waived, and how much was drawn on the facility after the additional $444 million borrowing (claim #29780) and the $450 million repayment from notes proceeds (claim #29778)?
The company disclosed on 2025-05-18 a projected $8.9 billion of secured debt needed to service contracts (claim #29783) and a DDTL 3.0 facility of up to $2.6 billion (claim #11922); what has not been said is how these figures fit together or what they cost. What is the draw schedule, the interest rate, and the collateral pool for each facility, and which customer contracts are pledged? Given that the unsecured notes were upsized from $1.5 billion (claim #29777) to $2.0 billion at 9.250% (claims #29433 and #29421), what is the blended cost of capital across the secured and unsecured stack, and how did the final use of proceeds (claims #29436 and #29423) differ from the original plan (claim #29776)?
The company disclosed a run-rate Adjusted EBITDA of $5.17 billion on 2025-05-18 (claim #29784); what has not been said is how the figure is built. Which period is annualized, what is the reconciliation to GAAP operating income, and how much of the figure depends on capacity that is contracted (claim #4973) but not yet active (claim #29785)? Analysts would also expect the corresponding capex and interest expense run-rates to be stated next to it.
The company disclosed the acquisition of Weights & Biases on 2025-05-13 and again on 2025-05-18 (claims #4974 and #29787) and an IBM partnership on 2025-05-13 (claim #4971); what has not been said is the price or economics of either deal. What was the purchase consideration and cash/stock mix, and what revenue does the IBM arrangement contribute to backlog? Separately, the CFO's insider sales of $29.1 million (claim #19831) and the CDO's sales of $217 million (claim #19832) in May 2025 came within weeks of the IPO (claim #11616). Were those sales made under Rule 10b5-1 plans, how were they treated relative to the lockup, and what share of each executive's holdings did they represent?
What we aren't being told
2026-10-17The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and later an OpenAI backlog of $11.2 billion within a $25.9 billion total backlog on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the two OpenAI figures differ by roughly $700 million, and who the counterparties are for the remaining roughly $14.7 billion of committed backlog. How concentrated is that remainder in a single unnamed customer?
The company disclosed 1.6 GW of contracted power against about 420 MW active across 33 data centers on 2025-05-13 and 2025-05-18, cited as claims #4973, #4972 and #29785. What has not been said is where the roughly 1.2 GW of contracted but inactive capacity is located, which sites have secured utility interconnection, and on what schedule each tranche is expected to energize. Which named sites make up that gap, and what are their in-service dates?
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claims #29777 and #29774, then priced an upsized $2.0 billion at 9.250% on 2025-05-20, cited as claim #29433. Over the same period it said it would repay $450 million of revolver borrowings while also drawing an additional $444 million on the revolver, cited as claims #29778 and #29780. What has not been said is how the incremental $500 million from the upsizing was allocated under the use-of-proceeds statements in claims #29776, #29436 and #29423. Is the company effectively cycling revolver debt into 9.25% fixed-rate notes?
The company disclosed a revolving credit facility maturity extended to 2028-05-02, cited as claim #5012, alongside a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is which debt instrument or condition triggers the springing date, and whether that condition has been cured. With that date now about ten weeks away, what is the current status of the trigger?
The company disclosed $17.2 billion of total capital raised and a projected $8.9 billion of secured debt to service contracts on 2025-05-13 and 2025-05-18, cited as claims #4968 and #29783, plus a DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922. What has not been said is how much of DDTL 3.0 has been drawn, the pricing on the $8.9 billion, and which customer contracts collateralize it. What blended cost of debt sits behind the $5.17 billion run-rate Adjusted EBITDA figure cited as claim #29784, and over what period is that run-rate measured?
The company disclosed CFO stock sales of $29.1 million and CDO stock sales of $217 million within about two months of a $40 IPO, cited as claims #19831, #19832 and #11616. It also announced the Weights & Biases acquisition, cited as claims #4974 and #29787, without a purchase price or deal structure on record. Were those insider sales made under pre-arranged 10b5-1 plans or through lockup carve-outs? And what consideration, cash or stock, was paid for Weights & Biases?
What we aren't being told
2026-10-17The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion within total committed backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970. What has not been said is what explains the $700 million gap between the two OpenAI figures, whether it is revenue already recognized, a re-measurement or a contract change, or what the contract's duration, take-or-pay terms and termination rights are. Who holds the remaining roughly $14.7 billion of backlog, and how concentrated is it?
The company disclosed 1.6 GW of contracted power alongside about 420 MW of active power across 33 data centers on 2025-05-13 and 2025-05-18, cited as claims #4973, #4972 and #29785. What has not been said is which sites make up the roughly 1.2 GW not yet energized, where they are, what utility or interconnection agreements back them, and when each is scheduled to come online. Is the 420 MW in claim #4972 capacity added during the period or the cumulative total that claim #29785 implies?
The company launched a $1.5 billion senior notes offering on 2025-05-18, cited as claims #29777 and #29774, and closed an upsized $2.0 billion of 9.250% notes on 2025-05-27, cited as claims #29433 and #29421. In the same filing set it said it would repay $450 million of revolver borrowings and noted an additional $444 million revolver draw, cited as claims #29778 and #29780. What has not been said is where the extra $500 million from the upsize went, why the company drew on the revolver at about the same time it planned to repay it, and what the roughly $185 million in annual cash interest from the 9.25% coupon does to the run-rate adjusted EBITDA of $5.17 billion in claim #29784. That EBITDA figure's period, definition and reconciliation are also not given.
The company disclosed a contingent springing maturity on its credit facility dated 2026-12-30, cited as claim #11926, alongside a revolver extended to 2028-05-02, a delayed draw term loan facility of up to $2.6 billion, and a projection of $8.9 billion in secured debt to service contracts, cited as claims #5012, #11922 and #29783. What has not been said is what condition triggers the springing date, which is now about ten weeks away, and whether that condition is currently met or has been cured. How much of the $2.6 billion facility has been drawn, at what rate, and which customer contracts are pledged as collateral?
The company disclosed its acquisition of Weights & Biases on 2025-05-13 and again on 2025-05-18, cited as claims #4974 and #29787. What has not been said is the purchase price, the split between cash and stock, any earn-out or retention payments, or how much revenue the acquired business contributes.
The record shows CFO stock sales of $29.1 million on 2025-05-20 and CDO stock sales of $217 million on 2025-05-31, cited as claims #19831 and #19832, both within about two months of the IPO priced on 2025-03-28 (claim #15974). What has not been said is whether these sales were made under 10b5-1 plans, whether lock-up terms were waived or released early for these executives, and whether any of the sellers had related-party ties to the company's financing or customer counterparties. The claim record provided for this review ends partway through claim #19832, so later disclosures may address some of these questions.
What we aren't being told
2026-10-17The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, and attributed $11.2 billion of it to OpenAI, cited as claim #4969. That leaves roughly $14.7 billion of committed backlog with no named counterparty. Who holds that balance, how concentrated is it among one or two customers, and what are the weighted-average contract durations and termination rights?
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, but two months later described OpenAI backlog as $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is what accounts for the roughly $700 million difference. Was it revenue already recognized, a contract amendment, or a different measurement basis?
The company disclosed 1.6 GW of contracted power and about 420 MW of active power across 33 data centers on 2025-05-13 and 2025-05-18, cited as claims #4973, #4972 and #29785. What has not been said is where the remaining roughly 1.2 GW sits. Which sites, utilities and interconnection queues are involved, on what energization schedule will that capacity come online, and how much of it is leased versus owned?
The company disclosed $8.9 billion of projected secured debt to service contracts and a run-rate Adjusted EBITDA of $5.17 billion on 2025-05-18, cited as claims #29783 and #29784, alongside a DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922. What has not been said is which contracts and collateral pools that debt is tied to and over what period it will be drawn. It is also unclear which quarter or contract set the run-rate EBITDA figure is annualized from, and how much of DDTL 3.0 has actually been funded.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claims #29777 and #29774, that priced upsized to $2.0 billion at 9.250% on 2025-05-20, cited as claims #29433 and #29421, with use of proceeds described in claims #29436 and #29423. It also disclosed a $450 million RCF repayment, cited as claim #29778, while recording $444 million of additional RCF borrowing, cited as claim #29780. What has not been said is how the incremental $500 million was allocated and whether the RCF was simply redrawn. It is also unclear what event triggers the contingent springing maturity of 2026-12-30, cited as claim #11926.
The company disclosed CFO insider sales of $29.1 million on 2025-05-20 and CDO insider sales of $217 million by 2025-05-31, cited as claims #19831 and #19832, within roughly two months of the $40 IPO, cited as claim #15974. It also disclosed the Weights & Biases acquisition, cited as claims #4974 and #29787. What has not been said is whether these sales ran under 10b5-1 plans and when any such plans were adopted. The purchase price, consideration mix and any insider or related-party holdings in Weights & Biases have also not been disclosed.
What we aren't being told
2026-10-17The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described OpenAI-related backlog as $11.2 billion on 2025-05-13 (claim #4969), alongside total committed backlog of $25.9 billion (claim #4970); what has not been said is whether the roughly $700 million difference reflects revenue already recognized, a contract amendment or a different measurement basis. The company has also not named the customers behind the remaining roughly $14.7 billion of backlog, or said what share any single one of them represents.
The company disclosed about 420 MW of active power across 33 data centers on 2025-05-18 (claim #29785), and the 2025-05-13 release described 420 MW as capacity "added" (claim #4972) against 1.6 GW contracted (claim #4973); what has not been said is whether 420 MW is the cumulative total or the increment for a specific period. Nor has the company said where the 33 sites are, or what energization schedule and interconnection status apply to the remaining roughly 1.2 GW of contracted but inactive power.
The company disclosed a revolving credit facility maturity extension to 2028-05-02 on 2025-05-05 (claim #5012), together with a contingent springing maturity of 2026-12-30 (claim #11926); what has not been said is what condition triggers the springing date, and whether that condition has been cleared, with the date now about ten weeks away.
The company disclosed a projected $8.9 billion of secured debt to service contracts (claim #29783) and a DDTL 3.0 facility of up to $2.6 billion (claim #11922) on 2025-05-18, plus $2.0 billion of 9.250% senior notes closed on 2025-05-27 (claims #29421, #29433); what has not been said is which specific contracts and counterparties collateralize each delayed-draw tranche, how much of DDTL 3.0 has actually been drawn, and what blended interest cost sits against the $5.17 billion run-rate Adjusted EBITDA figure (claim #29784). The company also has not stated over what period, and on what definition, that run-rate is calculated.
The company disclosed insider stock sales of $29.1 million by the CFO on 2025-05-20 (claim #19831) and $217 million by the CDO on 2025-05-31 (claim #19832), roughly two months after the 2025-03-28 IPO at $40 per share (claim #11616); what has not been said is whether these sales were made under 10b5-1 plans or a lockup carve-out, and how they compare with each executive's disclosed equity compensation and remaining holdings.
The company disclosed the acquisition of Weights & Biases on 2025-05-13 (claim #4974), and the deal was referenced again in the 2025-05-18 materials (claim #29787); what has not been said is the purchase price, the mix of cash and stock, and the acquired revenue or backlog contribution, none of which appears in the claims on record. Note that the claim list supplied for this analysis was truncated after claim #19832, so later disclosures that might close some of these gaps were not reviewed.
What we aren't being told
2026-10-17The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and two months later put OpenAI-related backlog at $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is what explains the $700 million difference: revenue already recognized, a re-scoped contract, or a different measurement basis. The company also has not said which customers make up the remaining roughly $14.7 billion of the $25.9 billion total backlog, cited as claim #4970, or how concentrated that remainder is.
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against about 420 MW active across 33 data centers, cited as claims #4972 and #29785. What has not been said is where the roughly 1.18 GW of contracted but inactive capacity is physically located, which utilities or landlords it is contracted with, what the interconnection status is at each site, and on what schedule it is expected to energize.
The company disclosed a revolving credit facility extended to 2028-05-02, cited as claim #5012, alongside a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what condition triggers the springing date, and whether that condition has been cleared or remains live now that the date is about ten weeks away.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claims #29774, #29777 and #11921, then priced an upsized $2.0 billion at 9.250% two days later, cited as claims #29433 and #29421. It also disclosed a projected $8.9 billion of secured debt to service contracts, cited as claim #29783, and a DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922, which the record carries as 2600.0 USD with the units left ambiguous. What has not been said is how the extra $500 million was allocated beyond the $450 million revolver repayment and the $1 billion term-loan payoff, cited as claims #29778 and #29779. The company also has not said over what period the $8.9 billion would be drawn, at what blended cost, or how much of DDTL 3.0 had been drawn at any reporting date.
The company disclosed insider stock sales of $29.1 million by the CFO around 2025-05-20, cited as claim #19831, and $217 million by the CDO around 2025-05-31, cited as claim #19832, roughly two months after the 2025-03-28 IPO, cited as claim #19821. What has not been said is whether these sales were made under 10b5-1 plans, what lock-up release or waiver permitted them so soon after listing, and how they compare with each executive's remaining holdings.
The company disclosed the acquisition of Weights & Biases on 2025-05-13, cited as claims #4974 and #29787, and a run-rate Adjusted EBITDA of $5.17 billion on 2025-05-18, cited as claim #29784. What has not been said is the purchase price and how it was paid between cash and stock. The company also has not said what period and contract base the run-rate EBITDA figure annualizes, or how it reconciles to reported GAAP results.
What we aren't being told
2026-10-16The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13 (claim #4970), of which $11.2 billion was attributed to OpenAI (claim #4969), after announcing an $11.9 billion OpenAI contract on 2025-03-10 (claim #19820). Two things have not been said. Who holds the remaining roughly $14.7 billion of backlog, and how concentrated is it? Why is the OpenAI figure about $700 million lower than the headline contract value: has revenue already been recognized, has the contract been restructured, or do the two figures use different definitions?
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power on 2025-05-13 and 2025-05-18 (claims #4972, #4973, #29785), plus more than 250,000 GPUs online (claim #29786). No site has been named, and no address or interconnection detail has been given. What is the delivery schedule for converting the roughly 1.2 GW of contracted-but-inactive power? Which of that capacity depends on utility interconnection or on third-party hosts not yet in service? Claim #4972 describes the 420 MW as capacity "added" while #29785 describes it as total active power; which reading is correct?
The company disclosed a $5.17 billion run-rate Adjusted EBITDA on 2025-05-18 (claim #29784), alongside a projected $8.9 billion of secured debt to service contracts (claim #29783) and a DDTL 3.0 facility of up to $2.6 billion (claim #11922). What has not been said is the period and method behind the run-rate figure. Investors also have not been given the interest rates, amortization schedule, or collateral of the $8.9 billion secured debt. How much of that run-rate EBITDA is already pledged to debt service?
The company disclosed on 2025-05-05 a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02 (claims #5010, #5012). It also disclosed a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what condition triggers the earlier date. Has it been cured or triggered, given that the date is now about ten weeks away?
The company disclosed a $1.5 billion senior notes offering on 2025-05-18 (claims #11921, #29774, #29777), upsized to $2.0 billion at 9.250% and closed on 2025-05-27 (claims #29433, #29421). The use of proceeds was disclosed only as repaying about $450 million of revolver borrowings and the $1 billion 2024 term loan (claims #29778, #29779). What has not been said is where the remaining $500 million or more is going. Two extracted claims (#11921 and #11918) also record the offering as 1500.0 and 2000.0 "USD" with no unit scale, which reflects an unresolved units ambiguity in the source text.
The company disclosed CFO stock sales of $29.1 million on 2025-05-20 (claim #19831) and CDO stock sales of $217 million by 2025-05-31 (claim #19832), roughly two months after the $40 IPO (claims #11601, #17815). What has not been said is whether these sales were made under Rule 10b5-1 plans. Readers also do not know what lock-up release permitted them, or how they compare with the executives' total holdings and compensation as disclosed in the proxy.
What we aren't being told
2026-10-16The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI strategic deal revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the figure dropped by roughly $700 million in two months: whether revenue had already been recognized, the contract was resized, or the two numbers measure different things. The contract term, take-or-pay structure and annual recognition schedule are also undisclosed.
The company disclosed total committed revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, of which OpenAI accounts for $11.2 billion (claim #4969). What has not been said is who holds the remaining roughly $14.7 billion. No other counterparty is named, there is no customer-concentration breakdown, and the claims on record do not say whether the IBM Granite partnership (claim #4971) contributes any committed backlog or what its dollar value is.
The company disclosed about 420 MW of active power across 33 data centers and more than 250,000 GPUs online on 2025-05-18, cited as claims #29785 and #29786, alongside 1.6 GW of contracted power on 2025-05-13 (claim #4973). What has not been said is where any of these sites are, which are owned versus leased from colocation partners, and on what schedule the roughly 1.2 GW gap between contracted and active capacity is expected to be energized. It is also unclear whether 'contracted' means signed leases, utility interconnection agreements, or something looser.
The company disclosed $8.9 billion of projected secured debt to service contracts and a DDTL 3.0 facility of up to $2.6 billion on 2025-05-18, cited as claims #29783 and #11922. What has not been said is which customer contracts this debt is collateralized against, the draw timetable, and the pricing. It is also unexplained why a $1.5 billion notes offering (claims #29774, #11921) was upsized to $2.0 billion at 9.250% two days later (claim #29433). That high coupon raises a further question about all-in borrowing cost across the debt stack.
The company disclosed a revolving credit facility maturity extension to 2028-05-02 on 2025-05-05, cited as claim #5012, together with a contingent springing maturity date of 2026-12-30 (claim #11926). What has not been said is what condition triggers the springing maturity and whether, as of now, that condition has been cured or is still live. The 2026-12-30 date is now about ten weeks away. The disclosures also leave unexplained why notes proceeds earmarked to repay $450 million of revolver borrowings (claim #29778) coincide with an additional $444 million RCF draw (claim #29780).
The company disclosed CFO stock sales of $29.1 million on 2025-05-20 and Chief Development Officer stock sales of $217 million on 2025-05-31, cited as claims #19831 and #19832. Both came roughly two months after the $40 IPO on 2025-03-28 (claim #11601). What has not been said is which lockup carve-outs or 10b5-1 plans permitted sales inside the customary post-IPO lockup, and whether the board approved them. The company also has not said how these sales sit alongside its disclosure of a $5.17 billion run-rate Adjusted EBITDA (claim #29784), for which neither the measurement period nor the adjustments are specified. Nor has it disclosed a purchase price for the Weights & Biases acquisition (claims #4974, #29787).
What we aren't being told
2026-10-16The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog figure of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the two numbers differ by $700 million: was revenue already recognized, was the contract repriced, or are the two figures measured differently? The same release put total committed backlog at $25.9 billion, cited as claim #4970. That leaves roughly $14.7 billion of backlog with no named counterparty, so which customers make up that remainder and how concentrated is it?
The company disclosed about 420 MW of active power across 33 data centers on 2025-05-18, cited as claims #29785 and #4972, and 1.6 GW of contracted power on 2025-05-13, cited as claim #4973. What has not been said is where those 33 sites are, which utilities or interconnection agreements serve them, and when the remaining roughly 1.2 GW of contracted-but-inactive power is scheduled to energize. Claim #4972 describes the 420 MW as "added" while claim #29785 describes it as "active," so is that figure a quarterly increment or the cumulative total?
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claims #11921, #29774 and #29777. It then priced an upsized $2.0 billion of 9.250% notes on 2025-05-20, cited as claims #29433 and #11918. Use of proceeds is mentioned repeatedly, in claims #29776, #29436, #29423 and #11920, but only about $450 million of RCF repayment (claim #29778) is quantified. What has not been said is where the other roughly $1.55 billion goes, how much was used to repay the $1.0 billion 2024 Term Loan (claim #29779), and why the maturity is recorded as 2030-05-27 in claim #4824 but June 1, 2030 in claim #29422.
The company disclosed on 2025-05-05 that its revolving credit facility matures 2028-05-02, cited as claim #5012, but it also disclosed a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is which condition triggers that springing date, whether the condition has been cured or waived, and how much of the $1.5 billion revolver (claims #5010 and #11923) and the $350 million letters of credit facility (claims #5011 and #11924) would come due if it springs. That date is now about ten weeks away.
The company disclosed a projected $8.9 billion of secured debt to service contracts and a run-rate Adjusted EBITDA of $5.17 billion on 2025-05-18, cited as claims #29783 and #29784. On the same date it disclosed the DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922. What has not been said is which contracts the $8.9 billion is tied to, what period and contract base the EBITDA run-rate assumes, and what the draw schedule, collateral and pricing on DDTL 3.0 are. The Weights & Biases acquisition, cited as claims #4974 and #29787, was announced without a purchase price or deal structure, so what did CoreWeave pay and how was it funded?
The company disclosed CFO insider sales of $29.1 million on 2025-05-20 and CDO insider sales of $217 million by 2025-05-31, cited as claims #19831 and #19832. Both came about two months after the $40 IPO (claims #15974 and #19821). What has not been said is whether these sales were made under 10b5-1 plans, whether any lock-up was waived to permit them, at what prices they executed, and how they fit with the executives' compensation and retained ownership as described in proxy disclosures.
What we aren't being told
2026-10-16The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the figure fell by $700 million in about two months. Was that revenue recognized in Q1, a contract amendment, or a different measurement basis? The company also has not disclosed the contract's term, its take-or-pay structure, or its termination rights.
The company disclosed total committed revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970. What has not been said is who holds the roughly $14.7 billion that is not attributed to OpenAI under claim #4969. Customer concentration also goes unquantified. The IBM Granite partnership announced the same day, cited as claim #4971, carries no contract value, term or capacity figure, so it is unclear whether IBM is any part of that remainder.
The company disclosed 420 MW of active power on 2025-05-13, cited as claim #4972, and it was described there as capacity added. The same figure appeared on 2025-05-18 as total active power across 33 data centers, cited as claim #29785. What has not been said is whether 420 MW is the full installed base or the increment for the period. The company has also not named the 33 sites, given their addresses or utility interconnection agreements, or shown how the 1.6 GW of contracted power in claim #4973 phases into service, by site and by year.
The company disclosed on 2025-05-18 that it expects $8.9 billion of secured debt to service contracts, cited as claim #29783. On the same day it disclosed a DDTL 3.0 facility recorded as 2600.0 USD, cited as claim #11922, which is presumably up to $2.6 billion. What has not been said is the draw schedule, the amount drawn to date, and which customer contracts collateralize each facility. Further unanswered questions are how the 9.250% coupon on the upsized $2.0 billion notes, cited as claims #29433 and #29421, compares with the blended cost of the secured stack, and what exactly the $5.17 billion run-rate Adjusted EBITDA in claim #29784 annualizes.
The company disclosed a revolving credit facility maturity extended to 2028-05-02 on 2025-05-05, cited as claim #5012. On the same day it disclosed a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what condition triggers the earlier date. It is also unknown whether that condition is tied to refinancing other debt or to a liquidity test, and whether it is now in play given that the spring date falls about ten weeks from today.
The record shows CFO insider sales of $29.1 million on 2025-05-20, cited as claim #19831, and CDO sales of $217 million by 2025-05-31, cited as claim #19832. These came roughly two months after the $40 IPO cited as claim #11616. What has not been said is whether the sales were made under Rule 10b5-1 plans, which lock-up carve-outs permitted them so soon after listing, and how they compare with the executives' equity grants and compensation in the proxy. The Weights & Biases acquisition, cited as claims #4974 and #29787, likewise appears with no purchase price or consideration mix, and no disclosure of any related-party ties to the sellers.
What we aren't being told
2026-10-16The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then on 2025-05-13 attributed $11.2 billion of revenue backlog to the OpenAI deal (claim #4969). What has not been said is why the two figures differ by $700 million: was revenue already recognized, was the contract re-scoped, or are the two numbers measuring different things? Nor has the company said what the contract's term, delivery schedule, or termination provisions are.
The company disclosed total committed-contract backlog of $25.9 billion on 2025-05-13 (claim #4970). What has not been said is who holds the roughly $14.7 billion that is not OpenAI. Which counterparties are behind it, how concentrated is it, what is the weighted-average remaining term, and how much of it is take-or-pay versus cancellable?
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power on 2025-05-13 and 2025-05-18 (claims #4972, #4973, #29785). What has not been said is where the remaining roughly 1.2 GW sits: which sites, which utilities or interconnection queues, and what energization dates? It is also unclear whether the 250,000-plus GPUs online (claim #29786) map to specific facilities or to leased colocation.
The company disclosed $1.5 billion senior notes due 2030 on 2025-05-18 (claims #29774, #29777, #11921), then an upsized $2.0 billion 9.250% offering closed 2025-05-27 (claims #29433, #29421). What has not been said is whether these are one upsized issue or two separate tranches. Claim #11921 states "1500.0 USD" and claim #11922 states the DDTL 3.0 facility as "2600.0 USD", leaving the units ambiguous on the face of the record. The use of proceeds also lacks a reconciliation: claim #29778 says notes proceeds would repay $450 million of revolver debt, while claim #29780 reports an additional $444 million RCF draw in the same period, so what was the net change in revolver usage?
The company disclosed on 2025-05-05 a revolver maturity extended to 2028-05-02 alongside a contingent springing maturity date of 2026-12-30 (claims #5012, #11926). What has not been said is what condition triggers the spring. Given that this date is now about ten weeks away, has that condition been cured or refinanced, and how much of the $1.5 billion facility (claims #5010, #11923) is drawn against it?
The company disclosed insider sales of $29.1 million by the CFO (claim #19831) and $217 million by the CDO (claim #19832) in May 2025. These sales came within days of the 9.250% notes pricing and the $5.17 billion run-rate Adjusted EBITDA figure (claim #29784). What has not been said is whether these sales were made under pre-established 10b5-1 plans and when those plans were adopted. It is also undisclosed how the run-rate EBITDA figure is defined, given that $8.9 billion of projected secured debt (claim #29783) will carry interest that the metric excludes.
What we aren't being told
2026-10-16The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog figure of $11.2 billion on 2025-05-13, cited as claim #4969; what has not been said is why the two figures differ by roughly $700 million, what the contract term and revenue-recognition schedule are, and whether the commitment is take-or-pay or carries termination-for-convenience rights. Within the $25.9 billion total committed backlog, cited as claim #4970, about $14.7 billion is not tied to OpenAI, and no counterparty for it is named on the record. Which customers hold that backlog, and what share does the largest of them hold?
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against about 420 MW active across 33 data centers, cited as claims #4972 and #29785; what has not been said is where the roughly 1.18 GW of contracted but inactive capacity sits. No site addresses, utility or interconnection agreements, or energization dates by quarter are on record. Claim #4972 also describes the 420 MW as capacity "added," while claim #29785 describes it as total active power. Which reading is correct?
The company disclosed a $1.5 billion unsecured notes offering on 2025-05-18, cited as claims #29774, #29777 and #11921, and then priced and closed an upsized $2.0 billion of 9.250% notes due 2030, cited as claims #29433 and #29421. Claim #11921 records the amount as "1500.0 USD," and the DDTL 3.0 facility in claim #11922 is recorded as "2600.0 USD," so the units are ambiguous on the record. What has not been said is how the incremental $500 million from the upsizing was allocated beyond the $450 million RCF paydown in claim #29778. It also has not been said what annual interest burden the 9.25% coupon adds relative to the run-rate Adjusted EBITDA of $5.17 billion in claim #29784, for which no definition or measurement period is given.
The company disclosed a revolving credit facility maturity extension to 2028-05-02, cited as claim #5012, alongside a contingent springing maturity date of 2026-12-30, cited as claim #11926; what has not been said is what condition triggers the springing maturity and whether that condition has been cured. With the date less than three months away, the question is pressing. The $8.9 billion of projected secured debt to service contracts, cited as claim #29783, is also not broken out by facility, amortization schedule or collateral pool. How does that debt rank against the unsecured notes, which are guaranteed only by CoreWeave Cash Management LLC per claim #29775?
The company's record shows CFO stock sales of $29.1 million around 2025-05-20, cited as claim #19831, and CDO sales of $217 million around 2025-05-31, cited as claim #19832. Both came within weeks of the March 2025 IPO, cited as claims #11601 and #19821. What has not been said is whether these sales were made under 10b5-1 plans, whether any lock-up was waived or carved out to permit them, and how they relate to the executives' disclosed compensation and remaining holdings.
The company disclosed the acquisition of Weights & Biases on 2025-05-13, cited as claims #4974 and #29787; what has not been said is the purchase price or the mix of cash and stock. It also has not disclosed the acquired revenue, the goodwill recognized, or whether any part of the IPO net proceeds of $1.4 billion in claim #4967 funded the deal.
What we aren't being told
2026-10-15The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI strategic-deal backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is what explains the $700 million difference: revenue already recognized, a re-scoped commitment, or a measurement change. The term, delivery schedule and termination rights behind either figure are also undisclosed. The same filing put total committed backlog at $25.9 billion, cited as claim #4970. Who holds the remaining roughly $14.7 billion, and how concentrated is it among the next largest customers?
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, alongside roughly 420 MW of active power across 33 data centers, cited as claims #4972 and #29785. What has not been said is where those 33 sites are and which utilities or interconnection agreements serve them. Nor has it said when the roughly 1.18 GW gap between contracted and active power is scheduled to energize. Claim #4972 describes 420 MW as capacity added while claim #29785 describes it as total active power. Which is it, and over what period?
The company disclosed on 2025-05-18 a $1.5 billion senior notes offering, cited as claims #21921/#11921, #29774 and #29777. It upsized that to $2.0 billion at 9.250% two days later, cited as claims #29433 and #11918, and closed on 2025-05-27, cited as claim #29421. What has not been said is why demand-driven upsizing still cleared at a 9.25% coupon, or what the incremental $500 million was earmarked for. The use-of-proceeds claims #11920, #29436 and #29423 give no allocation. The company also disclosed repaying $450 million of the revolver from note proceeds, cited as claim #29778, while drawing an additional $444 million on the same facility, cited as claim #29780. What was the net revolver balance after these moves?
The company disclosed on 2025-05-05 a revolver expanded to $1.5 billion with maturity extended to 2028-05-02, cited as claims #11923 and #5012. It also disclosed a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is the condition that triggers the springing date and whether it has been cured or refinanced. With that date now about ten weeks away, this is the most time-sensitive open question on record. Relatedly, the DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922, and the projected $8.9 billion of secured debt to service contracts, cited as claim #29783, lack a disclosed draw schedule, collateral pool or amortization profile.
The company disclosed a run-rate Adjusted EBITDA of $5.17 billion on 2025-05-18, cited as claim #29784. What has not been said is the period being annualized, which add-backs are included, and how that figure reconciles to GAAP operating income. A first-year analyst would also ask what interest coverage it implies once the 9.25% notes and the projected $8.9 billion of secured debt are fully drawn.
The company disclosed a CFO insider sale of $29.1 million on 2025-05-20, cited as claim #19831, and a CDO insider sale of $217 million on 2025-05-31, cited as claim #19832. Both came roughly two months after the 2025-03-28 IPO at $40 per share, cited as claims #11601 and #19821. What has not been said is whether these sales were under pre-arranged 10b5-1 plans and whether any lock-up waiver was granted. It is also unknown what share of each executive's holdings they represent. The Weights & Biases acquisition, cited as claims #4974 and #29787, likewise has no disclosed purchase price, consideration mix or expected revenue contribution.
What we aren't being told
2026-10-15CoreWeave disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820) and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13 (claim #4969), inside a total committed-contract backlog of $25.9 billion (claim #4970). What has not been said is why the OpenAI figure is $700 million lower, whether that gap is recognized revenue, a re-scoping, or a different measure, and what the term, take-or-pay provisions and termination rights are. The roughly $14.7 billion of non-OpenAI backlog also has no named counterparties or concentration breakdown.
The company disclosed 1.6 GW of contracted power on 2025-05-13 (claim #4973) against roughly 420 MW of active power across 33 data centers (claims #4972 and #29785). What has not been said is where the remaining ~1.2 GW is physically located, which sites have secured utility interconnection versus only a lease or letter of intent, and what the quarter-by-quarter energization schedule is. Claim #4972 also describes the 420 MW as capacity "added," and the company has not clarified whether that is total active capacity or a period increment.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18 (claims #29774 and #29777), upsized to $2.0 billion at 9.250% on 2025-05-20 (claim #29433) and closed on 2025-05-27 (claim #29421). It also disclosed a projected $8.9 billion of secured debt to service contracts (claim #29783) and a DDTL 3.0 facility of "up to $2.6 billion" (claim #11922). What has not been said is how the incremental $500 million from the upsizing was allocated beyond the revolver repayment (claim #29778), when and at what cost the $8.9 billion of secured debt will be drawn, and how much of DDTL 3.0 had been drawn as of the most recent quarter. The DDTL and notes amounts are also recorded in claims #11922 and #11921 without consistent units.
The company disclosed a revolving credit facility extension to 2028-05-02 (claim #5012), together with a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what condition triggers the springing date and whether that condition has been cured or refinanced. With that date now about ten weeks away, this is the most time-sensitive open question in the file.
The company disclosed CFO stock sales of $29.1 million on 2025-05-20 (claim #19831) and Chief Development Officer sales of $217 million by 2025-05-31 (claim #19832). Both came roughly two months after the 2025-03-28 IPO at $40 per share (claim #11601). What has not been said is whether these sales ran under 10b5-1 plans, whether underwriters granted an early lock-up release, and how the sales compare with each executive's disclosed compensation and remaining holdings.
The company disclosed the acquisition of Weights & Biases (claims #4974 and #29787) and a run-rate Adjusted EBITDA of $5.17 billion (claim #29784). What has not been said is the purchase price or the cash/stock mix for Weights & Biases. The company has also not explained how run-rate EBITDA is defined and annualized, or how it reconciles with interest expense on 9.250% notes and the planned secured borrowings.
What we aren't being told
2026-10-15The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion within total committed backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the two OpenAI figures differ by roughly $700 million, whether any of that has already been recognized as revenue, and who the remaining $14.7 billion of backlog belongs to, including what share comes from the company's largest unnamed customer.
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against roughly 420 MW active across 33 data centers on 2025-05-18, cited as claims #4972 and #29785. What has not been said is where the remaining ~1.18 GW sits, meaning which sites, which landlords or developers, what interconnection or utility agreements are in place, and on what schedule that capacity is expected to energize.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claims #11921, #29774 and #29777, which priced two days later as an upsized $2.0 billion at 9.250%, cited as claims #29433 and #29421. What has not been said is what drove the $500 million upsize or how the 9.25% coupon compared with initial price talk. Beyond the $450 million revolver paydown, cited as claim #29778, the use-of-proceeds disclosures in claims #29776, #29436 and #29423 give no dollar allocation. The DDTL 3.0 facility in claim #11922 and the notes in claim #11921 are also recorded as "2600.0 USD" and "1500.0 USD", leaving the units ambiguous.
The company disclosed a revolver maturity extended to 2028-05-02 alongside a contingent springing maturity of 2026-12-30, cited as claims #5012 and #11926. What has not been said is what condition triggers the springing date, for example a refinancing test on specific debt or a liquidity threshold, and whether that condition has been satisfied as of today, with 2026-12-30 now less than three months away.
The company disclosed a projected $8.9 billion of secured debt to service contracts and a run-rate Adjusted EBITDA of $5.17 billion on 2025-05-18, cited as claims #29783 and #29784. It also disclosed the Weights & Biases acquisition, cited as claims #4974 and #29787. What has not been said is which contracts the $8.9 billion is collateralized against, what time period and contract base the run-rate EBITDA assumes, and what purchase price and consideration mix were paid for Weights & Biases.
The company's record shows CFO insider sales of $29.1 million around 2025-05-20 and CDO insider sales of $217 million around 2025-05-31, cited as claims #19831 and #19832. These came within about two months of the $40 IPO on 2025-03-28, cited as claim #11601, and in the same window as the $2.0 billion notes pricing. What has not been said is whether these sales were under pre-arranged 10b5-1 plans, how they squared with any IPO lock-up, and what the proxy shows about executive compensation and related-party arrangements, including the CDO's relationship to any data-center or financing counterparties. Note that the claim record supplied here was cut off at claim #19832, so later claims could not be reviewed.
What we aren't being told
2026-10-15The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described the OpenAI deal's revenue backlog as $11.2 billion on 2025-05-13 (claim #4969). What has not been said is what accounts for the roughly $700 million difference: revenue already recognized, a contract amendment, or a different measurement basis. Separately, of the $25.9 billion total backlog (claim #4970), about $14.7 billion is not attributed to OpenAI. Who are the counterparties behind that remainder, and how concentrated is it?
The company disclosed 1.6 GW of contracted power on 2025-05-13 (claim #4973), against roughly 420 MW active across 33 data centers (claims #4972, #29785). What has not been said is when the remaining ~1.2 GW is scheduled to energize, at which named sites, and under what utility interconnection agreements. A reader cannot tell whether the contracted figure is firm interconnected capacity or something less certain, such as letters of intent or leases still under construction.
The company disclosed a revolving credit facility with maturity extended to 2028-05-02 on 2025-05-05 (claim #5012), alongside a contingent springing maturity date of 2026-12-30 (claim #11926). What has not been said is what condition triggers the springing date, and whether it has been satisfied or waived. That date is now about ten weeks away, so the question is urgent. The record also shows $450 million of note proceeds used to repay the revolver (claim #29778) while an additional $444 million was borrowed under it (claim #29780). What is the current drawn balance, and was the repayment simply recycled?
The company disclosed a $1.5 billion senior notes offering on 2025-05-18 (claims #29777, #29774, #11921). Two days later it was upsized to $2.0 billion at 9.250% (claims #29433, #29421). It also projected $8.9 billion of secured debt to service contracts (claim #29783) and a DDTL 3.0 facility recorded as "2600.0 USD" (claim #11922). What has not been said is which specific customer contracts collateralize the $8.9 billion, how its amortization lines up with those contract terms, and whether the DDTL 3.0 figure is $2.6 billion as the description implies. The unit in the record is ambiguous.
The company disclosed insider stock sales of $29.1 million by the CFO on 2025-05-20 (claim #19831) and $217 million by the CDO on 2025-05-31 (claim #19832). Both came within roughly two months of the $40 IPO (claims #17815, #19821) and the same week as a 9.25% debt raise. What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, which lockup exceptions permitted them so soon after listing, and what share of each executive's holdings they represent.
The company disclosed a run-rate Adjusted EBITDA of about $5.17 billion on 2025-05-18 (claim #29784), and the acquisition of Weights & Biases (claims #4974, #29787). What has not been said is how the run-rate is defined, including which period is annualized and what is excluded, and how it reconciles to GAAP operating income. No purchase price, consideration mix, or expected revenue contribution has been disclosed for Weights & Biases. A first-year analyst would ask for all of these on the next call. Note that the claim record supplied here appears truncated after claim #19832, so later disclosures may have addressed some of these points.
What we aren't being told
2026-10-15The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described OpenAI backlog as $11.2 billion on 2025-05-13 (claim #4969), inside $25.9 billion of total committed backlog (claim #4970). What has not been said is how the $0.7 billion gap between the two OpenAI figures reconciles, whether through recognition, re-scoping or a different measurement basis. Nor has the company given the contract term or annual recognition schedule. Who are the counterparties behind the roughly $14.7 billion of backlog that is not OpenAI, and what share of it is concentrated in the largest of them?
The company disclosed 1.6 GW of contracted power and about 420 MW of active power across 33 data centers on 2025-05-13 and 2025-05-18 (claims #4973, #4972, #29785). What has not been said is where the remaining roughly 1.2 GW sits, including site addresses, utility or interconnection counterparties, and energization dates by quarter. How much of that contracted power is leased colocation versus owned capacity?
The company announced a $1.5 billion senior notes offering on 2025-05-18 (claims #11921, #29774, #29777), then priced and closed an upsized $2.0 billion tranche at 9.250% due 2030 (claims #29433, #29421, #11917). It earmarked $450 million to repay the revolver (claim #29778) and said it projects $8.9 billion of secured debt to service contracts (claim #29783). What has not been said is how the remaining roughly $1.55 billion of note proceeds was allocated. The company also has not said over what period the $8.9 billion would be raised, or which contracts it would be secured against. Separately, the $2.6 billion DDTL 3.0 facility (claim #11922) was recorded with ambiguous units. What are its draw schedule and pricing?
The company disclosed a revolving credit facility extended to 2028-05-02 (claim #5012) and also a contingent springing maturity of 2026-12-30 (claim #11926), both on 2025-05-05. What has not been said is what condition triggers the springing date and whether that condition has been cured or refinanced. With the date now about ten weeks away, has it been?
The company disclosed a CFO insider sale of $29.1 million on 2025-05-20 (claim #19831) and a Chief Development Officer sale of $217 million on 2025-05-31 (claim #19832), roughly two months after the $40 IPO (claims #11601, #19821). What has not been said is whether these sales were made under Rule 10b5-1 plans, when any such plans were adopted, and how the sales squared with IPO lock-up terms. What percentage of each executive's holdings did they represent?
The company disclosed a run-rate Adjusted EBITDA of $5.17 billion (claim #29784) and the Weights & Biases acquisition (claims #4974, #29787). What has not been said is the period, contract base and definition behind the run-rate figure. The company also has not disclosed the Weights & Biases purchase price, the mix of cash and stock, or that business's revenue contribution. On the next call, what is the reconciliation of run-rate EBITDA to reported GAAP figures, and how much goodwill did the acquisition create?
What we aren't being told
2026-10-15The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described the OpenAI backlog as $11.2 billion on 2025-05-13 (claim #4969), within a total committed backlog of $25.9 billion (claim #4970). What has not been said is why the OpenAI figure fell by about $700 million in two months, whether that reflects revenue already recognized or a renegotiation, and who the counterparties are behind the remaining roughly $14.7 billion. Customer concentration is the core risk in this backlog.
On 2025-05-13 the company disclosed 1.6 GW of contracted power (claim #4973) against about 420 MW active (claims #4972, #29785). On 2025-05-18 it said that active capacity spans 33 data centers. What has not been said is where the remaining roughly 1.2 GW sits: no site addresses, utility or interconnection-queue status, or energization schedule. Nor has the company said how much of the contracted power is owned versus leased from colocation partners.
The company described a projected $8.9 billion of secured debt to service contracts (claim #29783) and an up-to-$2.6 billion DDTL 3.0 facility (claim #11922), both on 2025-05-18. What has not been said is which customer contracts collateralize each facility, how much of DDTL 3.0 has been drawn as of today, and at what spread. Without those details, investors cannot tie debt service to specific revenue streams.
On 2025-05-05 the company disclosed a contingent springing maturity of 2026-12-30 (claim #11926) alongside a revolver extended to 2028-05-02 (claim #5012). What has not been said is the trigger condition for the springing date. It falls about ten weeks from now, so the company should state whether the condition has been cured or will apply. Separately, the senior notes were recorded at $1.5 billion (claims #11921, #29774) and then upsized to $2.0 billion at 9.250% (claim #29433). The use-of-proceeds disclosures (claims #29776, #29436) do not say where the incremental $500 million went.
The company reported CFO stock sales of $29.1 million on 2025-05-20 (claim #19831) and CDO stock sales of $217 million on 2025-05-31 (claim #19832). Both came roughly two months after the 2025-03-28 IPO at $40 (claims #11616, #19821). What has not been said is whether these sales ran under Rule 10b5-1 plans, whether the underwriters granted early lockup releases, and how the sales relate to the executives' compensation and retained ownership.
The company announced the Weights & Biases acquisition on 2025-05-13 and again on 2025-05-18 (claims #4974, #29787). Neither disclosure gives a purchase price, a cash/stock mix, or revenue contribution. The company also cited run-rate Adjusted EBITDA of $5.17 billion (claim #29784) without defining the base period, so a first-year analyst should ask what quarter that run-rate annualizes and what capex sits beneath it.
What we aren't being told
2026-10-15The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then reported OpenAI-related revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969; what has not been said is why the two figures differ by roughly $700 million, whether that gap is revenue already recognized, a non-cash or equity component, or a contract revision, and over what term and ramp schedule the backlog converts to revenue.
The company disclosed total committed-contract backlog of $25.9 billion on 2025-05-13, cited as claim #4970; what has not been said is who accounts for the roughly $14.7 billion that is not OpenAI, how concentrated that remainder is among one or two unnamed hyperscaler customers, and what take-or-pay or termination protections back those commitments.
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power, on 2025-05-18 and 2025-05-13, cited as claims #29785 and #4973; what has not been said is where those sites are, how much of the 1.2 GW contracted-but-inactive capacity has secured utility interconnection, and on what dates each tranche is expected to energize.
The company disclosed that its revolving credit facility maturity was extended to 2028-05-02, cited as claim #5012, while also disclosing a contingent springing maturity of 2026-12-30, cited as claim #11926; what has not been said is which condition triggers the earlier date, whether that condition is currently on track to be satisfied or cured, and how much is drawn on the facility now that the springing date is about ten weeks away.
The company disclosed $8.9 billion of projected secured debt to service contracts and a DDTL 3.0 facility of up to $2.6 billion on 2025-05-18, cited as claims #29783 and #11922; it also disclosed a $1.5 billion senior notes offering that was later upsized to $2.0 billion at 9.250%, cited as claims #29774 and #29433. What has not been said is which customer contracts collateralize the delayed-draw facilities, what has actually been drawn and at what rate, and how the extra $500 million from the upsizing was deployed beyond the $450 million revolver paydown, cited as claim #29778.
The company disclosed insider stock sales of $29.1 million by its CFO and $217 million by its CDO within roughly two months of the IPO, on 2025-05-20 and 2025-05-31, cited as claims #19831 and #19832; what has not been said is whether these sales were made under 10b5-1 plans, whether any lockup carve-out or waiver permitted them, and how they compare with the executives' equity grants disclosed in the proxy. The record also gives no purchase price for the Weights & Biases acquisition, cited as claims #4974 and #29787.
What we aren't being told
2026-10-14The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, inside a total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is why the two OpenAI figures differ, whether recognition has already begun, and who holds the roughly $14.7 billion of backlog that is not OpenAI. Those counterparties are unnamed, as are their contract durations and the concentration percentages for the largest customers.
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. It later disclosed about 1.3 GW of gross power and more than 1 GW of potential expansion through Core Scientific on 2025-07-06, cited as claims #28335 and #28336. What has not been said is which sites make up these totals, their physical locations and utility interconnection status, the energization schedule that would move contracted megawatts to active, and whether the Core Scientific figures are gross utility capacity or critical IT load usable for GPUs.
The company disclosed an extension of its revolving credit facility to 2028-05-02 on 2025-05-05, cited as claim #5012, along with a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what event triggers the springing maturity, which is now about ten weeks away, and whether that condition has been cured or waived. The company also disclosed the DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922, but has not said how much has been drawn, at what spread, or which customer contracts and GPUs secure it.
The company disclosed a $1.5 billion notes offering on 2025-05-18, cited as claim #11921, that priced two days later as an upsized $2.0 billion issue at 9.250%, cited as claims #29433 and #11918. What has not been said is what drove the upsizing, or how the stated use of proceeds, cited as claims #11920, #29436 and #29423, splits between capex, refinancing and general purposes. Investors would also want the blended cost of debt across the $17.2 billion of total capital raised, cited as claim #4968.
The record shows insider stock sales of $29.1 million by the CFO around 2025-05-20, $217 million by the CDO around 2025-05-31, and $103.3 million by the CEO around 2025-06-30, cited as claims #19831, #19832 and #19830. These sales cluster in the weeks right after the IPO and the 9.250% notes offering. What has not been said is whether the sales were made under Rule 10b5-1 plans, when any such plans were adopted, how lock-up terms applied, and how much each executive still holds relative to their pay package.
The company disclosed a definitive agreement to acquire Core Scientific for about $9 billion on 2025-07-06, cited as claim #28333. The agreement carried a closing deadline of 2026-04-07, cited as claim #4738, which remains not_yet_verifiable on this record, and a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is whether the deal closed, was extended or was terminated, and whether the fee was triggered or collected. If the deal did not close, the company has not said what happens to the $500 million run-rate savings target and the more than $10 billion of avoided lease overhead, cited as claims #28337 and #28338.
What we aren't being told
2026-10-14The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then on 2025-05-13 cited OpenAI revenue backlog of $11.2 billion (claim #4969) within total committed backlog of $25.9 billion (claim #4970). What has not been said is why the two OpenAI figures differ by $700 million, whether that gap reflects revenue already recognized or a re-scoped contract, what the contract term and recognition schedule are, and who the counterparties are behind the remaining roughly $14.7 billion of backlog, including the share held by the largest unnamed customer.
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13 (claims #4972 and #4973), and later about 1.3 GW of gross owned power plus more than 1 GW of potential expansion through the Core Scientific deal (claims #28335 and #28336). What has not been said is which sites make up these totals, their physical locations, their utility interconnection status, and when each tranche energizes. It is also unclear whether the 1.3 GW gross figure is comparable to the 1.6 GW contracted figure or overstates usable critical-IT capacity.
The company disclosed a definitive agreement on 2025-07-06 to acquire Core Scientific for about $9 billion at 0.1235 shares per share. It said the deal would close in Q4 2025 with an outside date of 2026-04-07, and that a $270 million termination fee would be payable to CoreWeave (claims #28333, #4731, #28334, #4738, #4739). What has not been said in the record is whether the merger closed, was terminated, or lapsed past its outside date. If it did not close, the record also does not say whether the $270 million fee was collected, or what happens to the claimed $500 million in run-rate savings by end-2027 and the more than $10 billion of avoided lease overhead (claims #28337 and #28338).
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02, together with a contingent springing maturity date of 2026-12-30 (claims #5010, #5012, #11926). What has not been said is what condition triggers the springing maturity, whether that condition has been satisfied or cured, and how much of the revolver and the $350 million letters-of-credit facility is drawn (claim #5011). These questions matter because the springing date falls less than three months from today.
The company disclosed a DDTL 3.0 facility of up to $2.6 billion on 2025-05-18, recorded with an ambiguous unit of "2600.0 USD" (claim #11922). It also disclosed a senior notes offering announced at $1.5 billion and upsized to $2.0 billion at 9.250% due 2030 (claims #11921, #29433, #29421). What has not been said is how much of the DDTL has been drawn, at what rate, and against which collateral or customer contracts. Beyond the generic use-of-proceeds language (claims #11920, #29436, #29423), the record also does not say which specific obligations the notes refinanced, or how the $17.2 billion of total capital raised (claim #4968) splits between debt and equity.
The company's executives disclosed insider stock sales within roughly three months of the $40 IPO (claims #17815, #4967): about $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO (claims #19831, #19832, #19830). That totals roughly $349 million, or about a quarter of the $1.4 billion in IPO net proceeds. What has not been said is whether these sales were made under pre-adopted 10b5-1 plans, whether any lock-up waivers were granted, and how they relate to the executives' disclosed compensation. Separately, the Weights & Biases acquisition (claim #4974) was announced with no purchase price, consideration mix, or revenue contribution.
What we aren't being told
2026-10-14The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then put OpenAI-related backlog at $11.2 billion on 2025-05-13, cited as claim #4969, within total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is what explains the $700 million gap between the two OpenAI figures, what the contract term, take-or-pay structure and delivery schedule are, and who the other counterparties are behind the remaining roughly $14.7 billion of backlog. How concentrated is that remainder in a single unnamed hyperscaler?
On 2025-05-13 the company disclosed 1.6 GW of contracted power, cited as claim #4973, alongside 420 MW of active capacity added, cited as claim #4972. What has not been said is over what period the 420 MW was added, and which sites, utilities and interconnection agreements make up the unenergized ~1.2 GW. When is each tranche expected to go live, and how much of it is contingent on grid upgrades not yet approved?
The company disclosed a definitive agreement to acquire Core Scientific for about $9 billion on 2025-07-06, cited as claim #28333. It guided to a Q4 2025 close, cited as claim #28334, against a merger outside date of 2026-04-07, cited as claims #4731 and #4738, and both remain unverified. What has not been said is whether the deal closed, was extended or was terminated, and what break fees applied. Beyond that, which specific sites make up the ~1.3 GW of owned gross power and the 1 GW+ of expansion potential, cited as claims #28335 and #28336? Is the $10 billion of 'eliminated lease overhead', cited as claim #28338, a nominal or discounted figure, and what cost lines make up the $500 million run-rate savings target, cited as claim #28337?
The company disclosed a revolving credit facility with a contingent springing maturity of 2026-12-30 on 2025-05-05, cited as claim #11926, alongside a stated extension to 2028-05-02, cited as claim #5012. What has not been said is which condition triggers the springing date, which is now less than three months away, and whether that condition is likely to be met. It is also unclear how much of the $2.6 billion DDTL 3.0, cited as claim #11922, has been drawn, and against what collateral and customer contracts.
The company disclosed an upsized $2.0 billion 9.250% senior notes offering due 2030 on 2025-05-20, cited as claims #29433 and #29421, after an initial $1.5 billion figure, cited as claim #11921. Use of proceeds was described only generically, cited as claims #11920, #29423 and #29436. What has not been said is how much of the proceeds refinanced existing higher-cost debt versus funded new capex. What is the blended cost of capital across the $17.2 billion raised, cited as claim #4968, and why did a company with $25.9 billion of contracted backlog need to pay a 9.25% coupon?
Within roughly three months of the March 2025 IPO, cited as claim #19821, the company's disclosures show insider sales of $217 million by the Chief Development Officer, $103.3 million by the CEO and $29.1 million by the CFO, cited as claims #19832, #19830 and #19831. These sales overlapped the high-yield notes raise. What has not been said is whether the sales ran under Rule 10b5-1 plans, and if so when those plans were adopted relative to the IPO. Were any lock-up waivers granted, and do any executives hold interests in counterparties such as Core Scientific or in leased data center landlords? Separately, the Weights & Biases acquisition was disclosed on 2025-05-13, cited as claim #4974, with no purchase price, earn-out or retention terms.
What we aren't being told
2026-10-14The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then put OpenAI's contribution to revenue backlog at $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is what explains the $700 million gap: revenue already recognized, a re-scoped term, or a different accounting basis. The company also has not disclosed the contract's duration, delivery schedule, or whether OpenAI's commitment is take-or-pay or cancellable.
The company disclosed total committed revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970. OpenAI accounts for roughly $11.2 billion of that (claim #4969), which leaves about $14.7 billion attributed to counterparties who are never named. What has not been said is how that remainder is concentrated across customers, what its weighted-average remaining term is, and how much of it is expected to convert to revenue in the next twelve months.
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. In the Core Scientific announcement on 2025-07-06 it added roughly 1.3 GW of gross power and 1 GW+ of potential expansion, cited as claims #28335 and #28336. What has not been said is which physical sites make up these totals, their interconnection status and energization dates, and how much of the 'gross' figure is usable critical IT load rather than utility-side capacity.
The company disclosed a revolver maturity extension to 2028-05-02 alongside a contingent springing maturity of 2026-12-30 on 2025-05-05, cited as claims #5012 and #11926. With that springing date now less than three months away, what has not been said is what condition triggers it, whether that condition is currently met, and how much of the $1.5 billion revolver and $350 million letter-of-credit capacity (claims #5010 and #11924) is drawn.
The company disclosed an upsized $2.0 billion of 9.250% senior notes due 2030 and up to $2.6 billion of DDTL 3.0 delayed-draw term loans in May 2025, cited as claims #29433, #29421 and #11922. The notes were first sized at $1.5 billion (claim #11921). Use of proceeds is mentioned only in general terms (claims #29436 and #29423). What has not been said is how much of DDTL 3.0 has been drawn, at what rate, against which collateral or which customer contract, and what drove the decision to upsize the notes at a 9.25% coupon.
The company disclosed insider sales of $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO between May and June 2025, cited as claims #19831, #19832 and #19830. These sales came weeks after the IPO and during the same period the company was raising high-yield debt. What has not been said is whether the sales ran under Rule 10b5-1 plans, when any such plans were adopted relative to the IPO lockup, and how they square with insider ownership disclosures in the proxy.
The company disclosed a $9 billion all-stock agreement to acquire Core Scientific on 2025-07-06, with an expected close in Q4 2025 and an outside date of 2026-04-07, cited as claims #28333, #28334 and #4731. Both milestones remain unverified on the record. What has not been said is whether the deal closed, was extended, or was terminated, and in the last case whether the $270 million termination fee in claim #4739 was paid. The company also has not shown how the claimed elimination of $10 billion+ in future lease overhead (claim #28338) was calculated: over what period, and whether discounted.
What we aren't being told
2026-10-13The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and on 2025-05-13 put the OpenAI backlog at $11.2 billion, cited as claim #4969, within total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is why the two OpenAI figures differ by $700 million, how much of the contract is take-or-pay versus cancellable, and over what period it converts to revenue. The record also does not name the customers behind the remaining roughly $14.7 billion of backlog or say what share the largest of them represents.
The company disclosed 1.6 GW of contracted power, cited as claim #4973, against 420 MW of active capacity added, cited as claim #4972. With the Core Scientific deal it also cited roughly 1.3 GW of gross owned power, claim #28335, and more than 1 GW of potential expansion, claim #28336. What has not been said is which sites the contracted gigawatts sit at, their interconnection status and energization dates, or whether the figures are gross utility power or critical IT load. How much of the 1 GW expansion has actually secured grid capacity, rather than merely being possible, is also undisclosed.
The company announced a definitive agreement to acquire Core Scientific for about $9 billion on 2025-07-06, cited as claims #28333 and #4731, with expected close in Q4 2025, claim #28334, and an outside date of 2026-04-07, claim #4738. As of the record, both dates have passed and the claims remain not_yet_verifiable, with no confirmation of close, termination, or extension. What has not been said is whether the deal was completed or abandoned. If it was abandoned, it is unclear whether the $270 million termination fee in claim #4739 was triggered or paid. It is also unclear what happens to the $10 billion lease-overhead elimination and the $500 million run-rate savings promised by end-2027 in claims #28338 and #28337.
The company's record shows the CFO selling $29.1 million of stock by 2025-05-20, claim #19831, the CDO $217 million by 2025-05-31, claim #19832, and the CEO $103.3 million by 2025-06-30, claim #19830. All three fell within roughly three months of the $40-per-share IPO in claims #17815 and #11616. What has not been said is whether these sales ran under 10b5-1 plans and when those plans were adopted, whether any lock-up was waived or released early to allow them, and how they square with proxy disclosure of executive compensation and related-party holdings.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claim #11921, that became $2.0 billion by 2025-05-20, claims #11918 and #11917. The maturity is given as 2030-05-27 in claim #4824 and 2030-06-01 elsewhere, and the DDTL 3.0 facility is recorded as "2600.0 USD," claim #11922, without a clear unit. What has not been said is the reason for the upsize, which maturity date governs, and the drawn balance and pricing on DDTL 3.0. Nor has the company explained what condition triggers the contingent springing maturity of 2026-12-30 on the revolver, claim #11926, which would override the 2028-05-02 extension in claim #5012.
The company cited $17.2 billion of total debt and equity raised as of 2025-05-13, claim #4968, and a 9.250% coupon on its 2030 notes, claim #4824. What has not been said is how that $17.2 billion splits between debt and equity, or what the blended cost of debt and debt-service coverage look like against the backlog in claim #4970. A first-year analyst would ask for both on the next call.
What we aren't being told
2026-10-13The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog figure of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ: was $700 million already recognized as revenue, re-scoped, or measured on a different basis? The same filing put total committed backlog at $25.9 billion (claim #4970), so who are the counterparties behind the remaining roughly $14.7 billion, and what share does the largest of them represent?
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites, utilities and interconnection agreements make up the 1.6 GW, and on what schedule the gap of about 1.2 GW between contracted and active power will be energized. Is the 420 MW a cumulative total or a single period's addition?
The company disclosed a roughly $9 billion all-stock agreement to acquire Core Scientific on 2025-07-06, cited as claims #28333 and #4731, with expected close in Q4 2025 (claim #28334) and an outside date of 2026-04-07 (claim #4738). Both dates have passed, and the record shows no completion or termination. Did the deal close, was it voted down, and was the $270 million termination fee payable to CoreWeave (claim #4739) ever triggered or collected?
Related to that deal, the company claimed about 1.3 GW of owned gross power (claim #28335), more than $10 billion of eliminated future lease overhead (claim #28338) and $500 million of annual run-rate savings by end-2027 (claim #28337). What has not been said is how much of the 1.3 GW was already inside the 1.6 GW contracted figure, given that Core Scientific was an existing lessor. If the merger did not close, what happens to those lease obligations and savings targets?
The record shows insider sales of $217 million by the CDO (claim #19832), $103.3 million by the CEO (claim #19830) and $29.1 million by the CFO (claim #19831), all within about three months of the March 2025 IPO at $40 per share (claim #11616). What has not been said is whether these sales ran under pre-arranged 10b5-1 plans, whether any IPO lock-up waivers were granted, and how the amounts compare with the executives' disclosed compensation and remaining holdings.
The company disclosed a $1.5 billion notes offering that became $2.0 billion of 9.25% senior notes due 2030 (claims #11921, #11918, #4824), a DDTL 3.0 facility recorded as "2600.0 USD" (claim #11922), a revolver with a contingent springing maturity of 2026-12-30 (claim #11926), and $1.5 billion of 2031 notes (claim #26758). What has not been said is what triggers the springing maturity and whether that condition is now live, how much of DDTL 3.0 has been drawn, and how the $17.2 billion of capital raised (claim #4968) splits between debt and equity. Investors also lack the blended interest cost against the revenue backlog.
What we aren't being told
2026-10-13The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and later reported OpenAI-related backlog of $11.2 billion within $25.9 billion of total committed backlog on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the two OpenAI figures differ by $700 million, whether that gap reflects revenue already recognized or a contract change, and who the counterparties are behind the remaining roughly $14.7 billion of backlog, including the share held by the largest customer after OpenAI and the weighted-average contract term.
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973, and roughly 1.3 GW of gross power plus 1 GW-plus of potential expansion through the Core Scientific deal on 2025-07-06, cited as claims #28335 and #28336. What has not been said is whether these figures are gross utility power or critical IT load, whether "added" in claim #4972 means cumulative capacity or capacity added in the quarter, which named sites with physical addresses make up the contracted 1.6 GW, and what the interconnection status and energization dates are for each.
The company disclosed a Core Scientific merger expected to close in Q4 2025, with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave, on 2025-07-06, cited as claims #28334, #4738, #4731 and #4739. All three timing claims remain not_yet_verifiable on the record. What has not been said is whether the merger closed, was extended, or was terminated, whether the $270 million fee was triggered and collected, and, if the deal did not close, what happens to the $500 million run-rate savings target and the $10 billion-plus lease overhead elimination cited as claims #28337 and #28338.
The company disclosed a springing maturity date of 2026-12-30 on its revolving credit facility on 2025-05-05, cited as claim #11926, alongside the facility's expansion to $1.5 billion and an extension to 2028, cited as claims #5010 and #5012. It also projected $8.8 billion of additional secured debt to service contracts on 2025-07-20, cited as claim #26760. What has not been said is which condition triggers the springing date, given that it falls less than three months from now, how much of the $2.6 billion DDTL 3.0, cited as claim #11922, has been drawn, and on what schedule and at what cost the $8.8 billion will be raised. The record also shows a unit inconsistency: the 2030 notes appear as both "1500.0 USD" and "2000.0 USD" in claims #11921 and #11918. The company has not reconciled the original $1.5 billion launch with the $2 billion upsized 9.25% issuance in claim #4824.
The company's filings show insider sales of about $217 million by the CDO, $103.3 million by the CEO and $29.1 million by the CFO between 2025-05-20 and 2025-06-30, cited as claims #19832, #19830 and #19831. These sales came within roughly three months of the $40 IPO, cited as claim #11616. What has not been said is whether the sales were made under pre-arranged 10b5-1 plans or under lock-up releases or waivers, and how they compare with each executive's equity compensation and with the founders' remaining holdings and voting control as disclosed in the proxy.
What we aren't being told
2026-10-13The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then described OpenAI revenue backlog as $11.2 billion on 2025-05-13, cited as claim #4969, within total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is why the two OpenAI figures differ, over what term and recognition schedule the OpenAI backlog converts to revenue, and who the counterparties are behind the remaining roughly $14.7 billion of backlog, including what share any single non-OpenAI customer represents.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13, cited as claims #4973 and #4972, followed by roughly 1.3 GW of gross power and more than 1 GW of potential expansion through the Core Scientific deal on 2025-07-06, cited as claims #28335 and #28336. What has not been said is the energization schedule for the gap between contracted and active capacity, which named sites and utility interconnection agreements back each figure, and how much of the 1.3 GW gross figure is usable critical IT load rather than total facility draw.
The company disclosed $2 billion of 9.250% senior notes due 2030 on 2025-05-20 and 2025-05-27, cited as claims #11918, #11917 and #4824, after a $1.5 billion offering was first described on 2025-05-18, cited as claim #11921. It also disclosed an up-to-$2.6 billion DDTL 3.0 facility, cited as claim #11922, a revolver whose maturity extends to 2028-05-02 but carries a contingent springing maturity of 2026-12-30, cited as claims #5012 and #11926, and a further $1.5 billion of notes due 2031 on 2025-07-20, cited as claims #26765 and #26758. What has not been said is how much of the DDTL 3.0 has actually been drawn and at what rate, which specific trigger activates the December 2026 springing maturity and whether it is now live, and what aggregate annual cash interest these instruments impose against current revenue.
The company disclosed a definitive agreement to acquire Core Scientific on 2025-07-06 at a 0.1235 exchange ratio, cited as claims #28333 and #4731, with an expected close in Q4 2025 and an outside date of 2026-04-07, cited as claims #28334 and #4738. Those dates have passed and the record still shows the claims as not yet verifiable. What has not been said is whether the merger closed, was terminated, or was renegotiated, whether the $270 million termination fee in claim #4739 was triggered, and whether the $500 million run-rate savings and $10 billion-plus lease overhead elimination in claims #28337 and #28338 still stand as guidance.
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830. What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, when those plans were adopted relative to the Core Scientific negotiations that were announced days later, and what related-party relationships with major suppliers, landlords or investors are disclosed alongside executive compensation in the proxy.
The company disclosed the acquisition of Weights & Biases and an IBM partnership for Granite compute capacity on 2025-05-13, cited as claims #4974 and #4971. What has not been said is the purchase price and consideration mix for Weights & Biases, its contribution to revenue, and whether the IBM arrangement is a committed contract included in the $25.9 billion backlog or a non-binding collaboration.
What we aren't being told
2026-10-12The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ by $700 million, whether that gap reflects revenue already recognized or a renegotiated scope, and what the contract term, delivery schedule and termination rights are. Within the $25.9 billion total backlog, cited as claim #4970, how much belongs to customers other than OpenAI, and why are none of those customers named?
The company disclosed 1.6 GW of contracted power and 420 MW of active compute capacity added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites make up the 1.6 GW, their physical locations and utility interconnection status, and when the roughly 1.2 GW that is contracted but not active is scheduled to energize. Over what period was the 420 MW added, and is it measured as critical IT load or gross facility power?
The company disclosed a definitive agreement to acquire Core Scientific for about $9 billion on 2025-07-06, with an expected Q4 2025 close and an outside date of 2026-04-07, cited as claims #28333, #28334, #4731 and #4738. Both dates have passed, and the record still shows these claims as not yet verifiable. What has not been said is whether the deal closed, was extended or was terminated. If it was terminated, what happened to the $270 million termination fee, cited as claim #4739? What became of the promised $500 million in run-rate savings and the $10 billion or more in eliminated lease overhead, cited as claims #28337 and #28338? The 1.3 GW of owned gross power and the 1 GW or more of expansion potential, cited as claims #28335 and #28336, were also never tied to named sites.
The company disclosed 2030 senior notes as a $1.5 billion offering on 2025-05-18, cited as claim #11921, and then as a $2.0 billion issuance at 9.250%, cited as claims #11918, #11917 and #4824. The DDTL 3.0 facility is recorded as 2600.0 USD with no unit scale, cited as claim #11922. What has not been said is the reason for the $500 million upsizing, the pricing and draw schedule of DDTL 3.0, and the specific use of proceeds for these notes and for the 2031 notes, cited as claims #11920 and #26766. Separately, what event triggers the contingent springing maturity of 2026-12-30 on the revolver, cited as claim #11926, and could it pull the 2028-05-02 maturity, cited as claim #5012, forward?
The company disclosed insider stock sales of about $217 million by the CDO, $103.3 million by the CEO and $29.1 million by the CFO between May and June 2025, cited as claims #19832, #19830 and #19831. These came within roughly three months of the $40 IPO, cited as claims #11616 and #17815. What has not been said is whether the sales were made under Rule 10b5-1 plans, when any such plans were adopted, and whether lock-up terms were waived or modified to permit them. The same period saw $17.2 billion in debt and equity raised, cited as claim #4968, so how does management reconcile this level of insider selling with the company's capital intensity?
The company disclosed the acquisition of Weights & Biases on 2025-05-13, cited as claim #4974, but no purchase price, no split between cash and stock, and no revenue contribution. The same disclosure omits whether any earn-outs or retention packages were paid to the acquired team.
What we aren't being told
2026-10-12The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion within $25.9 billion of total committed backlog on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the two OpenAI figures differ by $700 million (recognized revenue, a contract amendment, or a different scope), and who the remaining roughly $14.7 billion of backlog belongs to. How much of that sits with any single unnamed counterparty, and over what weighted-average term does it convert to revenue?
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972, and later claimed about 1.3 GW of gross owned power plus more than 1 GW of potential expansion through Core Scientific, cited as claims #28335 and #28336. What has not been said is the site-by-site breakdown: physical locations, utility interconnection status, and a dated energization schedule for the roughly 1.2 GW gap between contracted and active capacity. Is the 1.3 GW gross utility power or critical IT load, and what share of it is still crypto-mining infrastructure that needs conversion?
The company disclosed a Core Scientific deal valued around $9 billion at 0.1235 shares per share, expected to close in Q4 2025 with an outside date of 2026-04-07, cited as claims #28333, #28334, #4731 and #4738. It also disclosed a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said on this record is whether the merger closed, was terminated, or had its outside date extended, and whether any reverse termination fee or financing condition ran the other way. Given that, what happens to the $500 million run-rate savings target for end-2027 and the $10 billion-plus of eliminated lease overhead, cited as claims #28337 and #28338? On what baseline were those numbers computed, and over what period?
The company disclosed insider sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830, in the same window as the $2 billion 9.25% notes offering, cited as claims #11918 and #4824. What has not been said is whether these sales ran under Rule 10b5-1 plans, when any such plans were adopted relative to the IPO lock-up, and whether the underwriters waived the lock-up early. How do these sales sit alongside the proxy's description of executive equity compensation and any related-party arrangements?
The company disclosed a revolver expanded to $1.5 billion with maturity pushed to 2028-05-02, together with a contingent springing maturity of 2026-12-30, cited as claims #5010, #5012 and #11926. What has not been said is which instrument triggers the springing maturity, how large it is, and whether that trigger has since been cured. That date falls within the next three months.
The DDTL 3.0 facility is recorded as 2600.0 USD against a narrative of up to $2.6 billion, cited as claim #11922. The notes offering appears as $1.5 billion on 2025-05-18 and as $2 billion on 2025-05-20, cited as claims #11921 and #11918. What has not been said is how much of DDTL 3.0 has actually been drawn, at what rate, and against which customer contracts. Beyond general corporate purposes, how were the 2030 and 2031 note proceeds allocated, cited as claims #11920 and #26766?
What we aren't being told
2026-10-12The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then described the same relationship as $11.2 billion of revenue backlog on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ by $700 million, whether the gap reflects revenue already recognized, a renegotiation, or a definitional difference, and over what term and on what schedule the backlog converts to revenue. The same release put total committed backlog at $25.9 billion, cited as claim #4970. Who holds the roughly $14.7 billion of non-OpenAI backlog, and how concentrated is it?
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against about 420 MW of active power across 33 data centers, cited as claims #4972 and #26764. What has not been said is when the remaining roughly 1.2 GW is expected to be energized, which sites it sits at, and whether those sites have executed utility interconnection agreements or are still in queue. None of the 33 data centers is identified by location in the record.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claim #11921. It closed at $2.0 billion with a 9.250% coupon due 2030, cited as claims #11917, #11918 and #4824, alongside a DDTL 3.0 facility of up to $2.6 billion, cited as claim #11922. What has not been said is the specific use of the upsized proceeds beyond the generic statement in claim #11920, how much of DDTL 3.0 has been drawn, and which customer contract or GPU collateral pool secures it. The company also disclosed a contingent springing maturity date of 2026-12-30 on its revolver, cited as claim #11926, alongside a stated 2028-05-02 maturity, cited as claim #5012. What triggers the springing date, and with that date now under three months away, has the trigger been cured or refinanced?
The company announced a definitive agreement to acquire Core Scientific on 2025-07-06, cited as claims #28333 and #4731, with an expected close in Q4 2025, cited as claim #28334, and an outside date of 2026-04-07, cited as claim #4738. Both dates have passed and the record shows these claims only as not_yet_verifiable or delayed. What has not been said on record is whether the merger closed, was terminated, or was renegotiated. If it was terminated, was the $270 million termination fee in claim #4739 paid, and what happens to the 1.3 GW of owned power and the $500 million of run-rate savings promised in claims #28335 and #28337?
The record shows insider sales of $29.1 million by the CFO, cited as claim #19831, $217 million by the Chief Development Officer, cited as claim #19832, and $103.3 million by the CEO, cited as claim #19830, all within roughly three months of the $40 IPO, cited as claim #17815. What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, whether any IPO lock-up waivers or early-release provisions were used, and how they relate to executive compensation arrangements in the proxy.
The company disclosed projected net debt of $17.3 billion at 3.0x EBITDA on 2025-07-20, cited as claim #26761, against a Q1 2025 LTM run-rate adjusted EBITDA of $5.78 billion, cited as claim #26762. What has not been said is how run-rate EBITDA is constructed and how it reconciles to reported GAAP figures. It is also unclear whether the leverage figure is pro forma for Core Scientific and the new 9.25% notes, and what the cash interest coverage ratio is on that basis.
What we aren't being told
2026-10-12The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then put OpenAI's share of backlog at $11.2 billion within a total backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the two OpenAI figures differ, whether the $0.7 billion gap is revenue already recognized or a change in contract terms, and who the customers behind the remaining roughly $14.7 billion of backlog are. How concentrated is that remainder, and what are its weighted-average duration and termination provisions?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973, and roughly 1.3 GW of gross power plus more than 1 GW of expansion potential through Core Scientific on 2025-07-06, cited as claims #28335 and #28336. What has not been said is which sites, by physical location, make up these totals. The disclosures also do not say whether the figures are gross utility capacity or critical IT load, what the interconnection status and energization date of each tranche is, or how much of the 1.6 GW is under lease versus owned.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claim #11921, followed by $2.0 billion of 9.250% senior notes on 2025-05-20 and 2025-05-27, cited as claims #11918, #11917 and #4824. The maturity is given as 2030-06-01 in some places and 2030-05-27 in others. What has not been said is what drove the upsizing, which maturity date is correct, and how the proceeds were actually allocated, since the use-of-proceeds disclosures in claims #11920 and #26766 give no dollar breakdown. The disclosures also do not say how much of the up-to-$2.6 billion DDTL 3.0 facility in claim #11922 has been drawn, at what pricing, and against what collateral.
The company disclosed a revolving credit facility expanded to $1.5 billion, with maturity extended to 2028-05-02, and a contingent springing maturity of 2026-12-30, cited as claims #11923, #5012 and #11926. That springing date is now less than three months away. What has not been said is which condition triggers it, whether that condition is currently met or has been cured, and how much is outstanding under the revolver and the $350 million letters-of-credit facility in claim #11924.
The company disclosed a definitive agreement to acquire Core Scientific for about $9 billion, with an expected close in Q4 2025 and an outside date of 2026-04-07, cited as claims #28333, #28334, #4731 and #4738. Both dates have passed and the record still shows them as not yet verifiable. What has not been said is whether the deal closed, was renegotiated, or was terminated, and whether the $270 million termination fee in claim #4739 was triggered and collected. It is also unclear what now becomes of the $500 million in run-rate savings and the $10 billion-plus of avoided lease overhead promised in claims #28337 and #28338. Separately, the company disclosed a 1Q'25 LTM run-rate adjusted EBITDA of $5.78 billion on 2025-07-20, cited as claim #26762, without a stated definition of "LTM run-rate" or a reconciliation to GAAP.
Insider stock sales were disclosed around the IPO: the CFO sold $29.1 million (claim #19831), the CDO $217 million (claim #19832) and the CEO $103.3 million (claim #19830), all within about three months of the $40 IPO in claim #17815. What has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted. The disclosures also do not say how the sales compare with each executive's remaining holdings, or what proxy-level compensation and related-party context applies, such as supplier or investor relationships, alongside sales of this size.
What we aren't being told
2026-10-11The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI backlog figure of $11.2 billion on 2025-05-13, cited as claim #4969, against total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is what explains the $700 million difference: recognized revenue, a contract amendment, or a definitional change. Nor has the company named the customers behind the remaining roughly $14.7 billion of backlog, or given the term, take-or-pay structure and termination rights of the OpenAI contract. Which counterparties make up the non-OpenAI backlog, and what share of it is cancellable?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. On 2025-07-06 it added roughly 1.3 GW of gross power and more than 1 GW of potential expansion through Core Scientific, cited as claims #28335 and #28336. What has not been said is the energization schedule for the contracted but inactive capacity. It also has not identified the sites, their utility interconnection status, or whether these figures are gross utility power or critical IT load. How many megawatts will come online in each quarter, and at which named sites?
The company disclosed a definitive agreement on 2025-07-06 to acquire Core Scientific for about $9 billion, cited as claim #28333, with an expected close in Q4 2025 (claim #28334), an outside date of 2026-04-07 (claims #4731 and #4738), and a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said, now that both dates have passed, is whether the merger closed, was extended, or was terminated, and whether the termination fee was triggered or paid. What is the current status of the transaction?
The company framed the Core Scientific deal as delivering $500 million in annual run-rate savings by end-2027 and eliminating more than $10 billion of future lease overhead, cited as claims #28337 and #28338. What has not been said is the period and discounting behind the $10 billion figure, or how the two numbers reconcile. Nor has it disclosed one-time integration costs or how much of the savings depends on the deal closing on the original timetable. Is the $10 billion nominal or present value, and over how many years?
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claim #11921, then $2.0 billion of 9.250% notes due 2030 issued on 2025-05-27, cited as claims #11917, #11918 and #4824. It also disclosed a $2.6 billion DDTL 3.0 facility (claim #11922) and $1.5 billion of 2031 notes on 2025-07-20 (claim #26758). What has not been said is whether the 2030 offering was upsized and why, the coupon on the 2031 notes, and how much of the DDTL 3.0 has been drawn and at what rate. Separately, the revolver carries a contingent springing maturity of 2026-12-30 (claim #11926) against a stated maturity of 2028-05-02 (claim #5012). What condition triggers the springing date, and is it currently on track to be triggered less than three months from now?
The company disclosed insider sales of $217 million by the Chief Development Officer, $103.3 million by the CEO and $29.1 million by the CFO between May and June 2025, cited as claims #19832, #19830 and #19831. These came within about three months of the $40 IPO (claim #11616), which raised $1.4 billion in net proceeds (claim #4967). What has not been said is whether these sales were made under pre-established 10b5-1 plans, which lockup provisions were waived or released early to allow them, and how much of each executive's remaining stake is pledged or subject to further planned sales. Did the board approve any lockup waiver, and when?
What we aren't being told
2026-10-11The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then cited OpenAI-related revenue backlog of $11.2 billion on 2025-05-13 (claim #4969) within total committed backlog of $25.9 billion (claim #4970). What has not been said is why the two OpenAI figures differ by $700 million (revenue already recognized, a re-scoped contract, or a different measurement basis), what term and take-or-pay protections apply, and who the counterparties are behind the remaining roughly $14.7 billion of backlog, including how concentrated it is in the next one or two customers.
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13 (claims #4972, #4973), and later cited roughly 1.3 GW of gross power owned through the Core Scientific deal plus 1 GW or more of potential expansion (claims #28335, #28336). What has not been said is whether these figures are gross utility power or critical IT load, which named sites make up the contracted 1.6 GW, the interconnection status and energization schedule for each site, and how much of the Core Scientific power is already committed to third-party hosting rather than available to CoreWeave.
The company disclosed a definitive agreement to acquire Core Scientific for about $9 billion on 2025-07-06 (claim #28333), with an expected Q4 2025 close (claim #28334), an outside date of 2026-04-07 (claims #4731, #4738), and a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said in the record is whether the merger closed, was extended, or was terminated after the outside date passed, and if it was terminated, whether the $270 million fee was collected. The record also does not explain the assumptions behind the promised $500 million of annual run-rate savings by end-2027 and the elimination of more than $10 billion of future lease overhead (claims #28337, #28338), including the discount rate, lease terms, and capex offsets.
The company disclosed a $1.5 billion senior notes offering (claim #11921) that later appears as $2.0 billion of 9.250% notes due 2030 (claims #11918, #11917, #4824), a $2.6 billion DDTL 3.0 facility (claim #11922), and a revolver expanded to $1.5 billion with a contingent springing maturity date of 2026-12-30 (claims #5010, #11926). What has not been said is what condition triggers the springing maturity and whether it is now live given that date is weeks away, how much of the DDTL 3.0 has been drawn and at what spread, and whether the projected $17.3 billion of net debt at 3.0x EBITDA (claim #26761) uses trailing, forward, or pro forma EBITDA.
The company disclosed the acquisition of Weights & Biases on 2025-05-13 (claim #4974). What has not been said is the purchase price, the cash versus stock mix, any earnout or retention packages for W&B leadership, and the revenue contribution expected from the acquired business.
The record shows insider sales of $217 million by the Chief Development Officer, $103.3 million by the CEO, and $29.1 million by the CFO between May and June 2025 (claims #19832, #19830, #19831), within roughly three months of the $40 IPO (claims #17815, #19821). What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, whether any IPO lockup was waived early and on whose authority, and how these executives' total compensation and remaining equity stakes compare with the sales disclosed.
What we aren't being told
2026-10-11The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then an OpenAI revenue backlog of $11.2 billion against total committed backlog of $25.9 billion on 2025-05-13 (claims #4969, #4970). What has not been said is why the two OpenAI figures differ by roughly $700 million, what term and recognition schedule sit behind them, and who the counterparties are for the remaining roughly $14.7 billion of backlog. Does any single unnamed customer besides OpenAI exceed 10% of that backlog?
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power on 2025-05-13 and 2025-07-20 (claims #4972, #4973, #26764). What has not been said is when the roughly 1.2 GW gap between contracted and active capacity is expected to be energized, at which named sites, and under which utility interconnection agreements. The same applies to the roughly 1.3 GW of gross power and 1 GW+ of potential expansion tied to Core Scientific (claims #28335, #28336). Are those gross utility figures or critical IT load, and where are they physically located?
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, then $2.0 billion of 9.250% senior notes due 2030 on 2025-05-20 and 2025-05-27 (claims #11921, #11918, #11917, #4824). It disclosed another $1.5 billion senior notes offering on 2025-07-20 (claim #4700) and a DDTL 3.0 facility of up to $2.6 billion (claim #11922). What has not been said is whether the May deal was upsized from $1.5 billion to $2.0 billion, what coupon and maturity apply to the July notes, how much of DDTL 3.0 has been drawn, and how the proceeds were specifically used beyond the generic statement in claim #11920.
The company disclosed on 2025-05-05 that its expanded revolving credit facility extends to 2028-05-02 but carries a contingent springing maturity of 2026-12-30 (claims #5012, #11926). What has not been said is which condition triggers the springing date, which debt instrument it references, and whether that condition is on track to be cleared before the date arrives less than three months from now.
The company disclosed insider sales of $103.3 million by the CEO, $217 million by the CDO, and $29.1 million by the CFO between May and June 2025 (claims #19830, #19832, #19831). These came within months of a $40-per-share IPO (claims #17815, #19821). What has not been said is whether these sales occurred under 10b5-1 plans and when those plans were adopted, whether lock-up waivers or early releases were granted, and how the board weighed these sales against the company's capital raising during the same period.
The company disclosed an all-stock agreement to acquire Core Scientific for about $9 billion at 0.1235 shares, with an expected close in Q4 2025 and an outside date of 2026-04-07 (claims #28333, #4731, #28334, #4738). All three timing claims now sit at not_yet_verifiable. What has not been said is whether the merger closed, was extended, or was terminated, whether the $270 million termination fee (claim #4739) became payable, and what baseline underlies the promised $500 million of run-rate savings by end-2027 and the $10 billion+ of eliminated lease overhead (claims #28337, #28338). The same definitional question applies to the $5.78 billion 1Q'25 LTM run-rate adjusted EBITDA (claim #26762): which quarter was annualized, and what add-backs are included?
What we aren't being told
2026-10-11The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then described the OpenAI deal as $11.2 billion of revenue backlog on 2025-05-13, cited as claim #4969. What has not been said is why the figure dropped by $700 million in two months, or what term, take-or-pay structure and termination rights sit behind it. The same release put total committed backlog at $25.9 billion, cited as claim #4970, and the roughly $14.7 billion outside OpenAI has no named counterparties, no customer-concentration percentages and no weighted-average duration.
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against about 420 MW of active power across 33 data centers, cited as claims #4972 and #26764. What has not been said is where the remaining roughly 1.2 GW sits, which sites, utilities or interconnection queues it depends on, and in which quarter each tranche is expected to energize. None of the 33 data centers has been identified by location or by owned-versus-leased status.
The company disclosed a senior notes offering at $1.5 billion on 2025-05-18, cited as claim #11921, then at $2.0 billion of 9.250% notes due 2030 on 2025-05-20 and 2025-05-27, cited as claims #11918, #11917 and #4824. In July it disclosed another $1.5 billion of notes due 2031, cited as claims #26758 and #26765, and a projected $8.8 billion of additional secured debt to service contracts, cited as claim #26760. What has not been said is how much of the $2.6 billion DDTL 3.0 facility, cited as claim #11922, has been drawn, and which customer contracts or GPU pools collateralize it. The company also has not said what triggers the contingent springing maturity of 2026-12-30, cited as claim #11926, which would pull forward the revolver's 2028-05-02 maturity, cited as claim #5012.
The company's record shows CFO stock sales of $29.1 million, CDO stock sales of $217 million and CEO stock sales of $103.3 million in May and June 2025, cited as claims #19831, #19832 and #19830. Those sales came within about three months of the $40-per-share IPO, cited as claims #17815 and #11616. What has not been said is whether these sales were made under Rule 10b5-1 plans, whether any lock-up was waived or released early, and how these liquidity events relate to the executives' proxy-disclosed compensation and retained ownership.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio with an outside date of 2026-04-07, cited as claims #4731 and #4738, along with a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said on this record is whether the transaction closed, was extended or was terminated, which leaves open whether the termination fee was triggered and collected. The company also has not quantified the lease cost savings it cited in claim #26763.
The company disclosed a 1Q'25 LTM run-rate Adjusted EBITDA of $5.78 billion on 2025-07-20, cited as claim #26762, and used it to frame projected net debt of $17.3 billion at 3.0x, cited as claim #26761. What has not been said is how the run-rate was built, specifically which contracts were annualized, what ramp assumptions were applied, and how it reconciles to reported GAAP operating income. Note that the claims record provided was truncated mid-entry, so later disclosures may address some of these gaps.
What we aren't being told
2026-10-10The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, against total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is why the OpenAI figure fell by $700 million in two months, whether that reflects revenue already recognized, a re-scoping, or a different measurement basis. It also has not said who holds the remaining roughly $14.7 billion of backlog, beyond the IBM Granite partnership in claim #4971, or how concentrated that remainder is.
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power, cited as claims #4972, #26764 and #4973. What has not been said is where those sites are, which utilities or interconnection queues serve them, and on what schedule the roughly 1.2 GW gap between contracted and active capacity is expected to energize. Without that timing, the backlog in claim #4970 cannot be matched to the capacity needed to deliver it.
The 2030 senior notes appear as $1.5 billion on 2025-05-18, cited as claim #11921, and as $2.0 billion on 2025-05-20 and 2025-05-27, cited as claims #11918 and #11917. The maturity is given as 2030-06-01 in some records and 2030-05-27 in claim #4824, and the expected 2025-05-27 closing in claim #11919 remains unverified even though issuance is recorded as stated. The DDTL 3.0 facility in claim #11922 is recorded only as 2600.0 USD. What has not been said is whether the notes were upsized and why, the exact maturity date, confirmation that closing occurred, and how much of DDTL 3.0 has actually been drawn.
The company disclosed a Core Scientific merger at 0.1235 shares per share with a 2026-04-07 outside date and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. It also cited lease cost savings in claim #26763. That outside date has passed and the deal status remains unverifiable. What has not been said is whether the merger closed, was extended, or was terminated, whether the $270 million fee was triggered, whether any reverse fee runs the other way, and the dollar value of the promised lease savings.
The company disclosed insider sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between May and June 2025, cited as claims #19831, #19832 and #19830. Those sales came within about three months of the $40 IPO in claims #11616 and #19821, while the company was issuing 9.250% notes in claim #4824. What has not been said is whether these sales ran under 10b5-1 plans and when those plans were adopted, whether any IPO lockup was waived to allow them, and how insider selling of this size squares with management's capacity-delivery guidance in claim #19823.
The company projected $17.3 billion of net debt at 3.0x run-rate adjusted EBITDA of $5.78 billion, plus $8.8 billion of additional secured debt to service contracts, cited as claims #26761, #26762 and #26760. The revolver carries a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is how the run-rate EBITDA compares with reported trailing EBITDA, which customer contracts and borrowing entities the $8.8 billion of secured debt is tied to, and what conditions would trigger the springing maturity less than three months from now.
What we aren't being told
2026-10-10The company disclosed total revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, alongside an OpenAI backlog figure of $11.2 billion that same day, cited as claim #4969, after announcing an $11.9 billion OpenAI contract on 2025-03-10, cited as claim #19820. What has not been said is who holds the remaining roughly $14.7 billion of backlog, what share of revenue the largest customers represent, and whether the $700 million gap between the two OpenAI figures reflects revenue already recognized, a contract amendment, or a different measurement basis.
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against roughly 420 MW of active power across 33 data centers, cited as claims #4972 and #26764. What has not been said is the energization schedule for the remaining ~1.2 GW, which sites carry that capacity, their physical locations, and the utility interconnection status or queue position for each.
The company disclosed a merger with Core Scientific on 2025-07-06 at 0.1235 shares per Core Scientific share, with an outside closing date of 2026-04-07, cited as claims #4731 and #4738, and referenced lease cost savings from the deal, cited as claim #26763. What has not been said is whether the merger closed, was extended, or was terminated after that date passed. The record also does not show whether the $270 million termination fee, cited as claim #4739, was triggered, or how large the promised lease savings are in dollars and over what period.
The company disclosed in its 2031 notes materials on 2025-07-20 a projected $8.8 billion of additional secured debt and $17.3 billion of net debt at 3.0x a $5.78 billion run-rate adjusted EBITDA, cited as claims #26760, #26761 and #26762. What has not been said is how the run-rate EBITDA annualizes a single quarter and what it excludes, how much of the $2.6 billion DDTL 3.0 facility, cited as claim #11922, has been drawn, and what blended interest cost results from adding 9.25% notes, cited as claim #4824. The record also does not explain why the 2030 notes appear as both $1.5 billion and $2.0 billion, cited as claims #11921 and #11917, which suggests an unexplained upsizing.
The company disclosed a contingent springing maturity of 2026-12-30 on its revolving credit facility, cited as claim #11926, alongside a headline extension to 2028-05-02, cited as claim #5012. What has not been said is which condition triggers the earlier date and whether it is now live, given that 2026-12-30 is less than three months away.
The record shows insider sales of $103.3 million by the CEO, $217 million by the CDO and $29.1 million by the CFO in May and June 2025, cited as claims #19830, #19832 and #19831, within about three months of a $40-per-share IPO, cited as claim #11616. What has not been said is whether these sales ran under pre-arranged 10b5-1 plans, whether any lock-up was waived or carved out to allow them, and how the proceeds compare with each executive's disclosed compensation and remaining holdings.
What we aren't being told
2026-10-10The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI strategic deal backlog of $11.2 billion on 2025-05-13, cited as claim #4969, inside a total backlog of $25.9 billion, cited as claim #4970. What has not been said is why the two OpenAI figures differ by $700 million (recognized revenue, a contract amendment, or a different measurement basis), what the contract term and GPU or megawatt commitment are, and who the counterparties behind the remaining roughly $14.7 billion of backlog are, including how much of it sits with the single largest customer.
The company disclosed 1.6 GW of contracted power, cited as claim #4973, against roughly 420 MW active across 33 data centers as of March 2025, cited as claims #4972 and #26764. What has not been said is where the 1.2 GW contracted-but-not-active gap sits by site, what the interconnection and energization dates are for each tranche, and whether that contracted power is owned, leased from Core Scientific or other hosts, or merely reserved under utility agreements.
The company disclosed a 2030 senior notes offering of $1.5 billion on 2025-05-18, cited as claim #11921, which appears as $2 billion at 9.250% by 2025-05-27, cited as claims #11917, #11918 and #4824, alongside a DDTL 3.0 facility recorded as "2600.0 USD", cited as claim #11922. What has not been said is what drove the upsizing and what investor demand looked like, whether the DDTL figure is $2.6 billion as the description implies and how much has actually been drawn, and what triggers the contingent springing maturity of 2026-12-30 on the revolver, cited as claim #11926, given that the stated extended maturity is 2028-05-02, cited as claim #5012.
The company disclosed projected net debt of $17.3 billion at 3.0x against a 1Q'25 LTM run-rate adjusted EBITDA of $5.78 billion, cited as claims #26761 and #26762, plus a projected $8.8 billion of additional secured debt to service contracts, cited as claim #26760. What has not been said is how run-rate adjusted EBITDA reconciles to reported GAAP EBITDA for the same period, what interest coverage looks like once the 9.250% coupon and secured borrowings are layered in, and which specific customer contracts the $8.8 billion is earmarked to fund.
The company disclosed a Core Scientific merger at 0.1235 shares per share with an outside date of 2026-04-07, cited as claims #4731 and #4738, a $270 million termination fee payable to CoreWeave, cited as claim #4739, and anticipated lease cost savings, cited as claim #26763. What has not been said is whether the deal closed, was extended or was terminated now that the outside date has passed (both claims remain not yet verifiable), whether any termination fee was paid or received, and what dollar figure was attached to the promised lease savings.
The company's record shows the CFO selling $29.1 million, the CDO $217 million and the CEO $103.3 million of stock between May and June 2025, cited as claims #19831, #19832 and #19830, within roughly three months of a $40-per-share IPO, cited as claim #11616. What has not been said is whether these sales occurred under pre-arranged 10b5-1 plans or early lock-up releases, how the timing related to the backlog and financing announcements made in the same window, and what related-party arrangements, if any, exist between these executives and the company's data center landlords or suppliers.
What we aren't being told
2026-10-09The company disclosed on 2025-05-13 a total committed-contract revenue backlog of $25.9 billion, cited as claim #4970, of which OpenAI accounts for $11.2 billion, cited as claim #4969. What has not been said is who holds the remaining roughly $14.7 billion, how concentrated it is among those customers, and why the OpenAI figure differs from the $11.9 billion contract value announced on 2025-03-10, cited as claim #19820. Was the roughly $700 million gap already recognized as revenue, re-scoped, or measured on a different basis?
The company disclosed on 2025-05-13 that it had 420 MW of active power and 1.6 GW of contracted power, cited as claims #4972 and #4973. It restated the active figure as about 420 MW across 33 data centers on 2025-07-20, cited as claim #26764. What has not been said is where those 33 sites are, which of the roughly 1.2 GW of contracted-but-inactive capacity has secured utility interconnection, and on what quarter-by-quarter schedule that capacity is expected to be energized.
The company disclosed on 2025-07-20 projected net debt of $17.3 billion at 3.0x leverage, cited as claim #26761. That ratio rests on a 1Q'25 LTM Run-Rate Adjusted EBITDA of $5.78 billion, cited as claim #26762, and assumes a further $8.8 billion of secured debt to service contracts, cited as claim #26760. What has not been said is how the run-rate figure reconciles to reported trailing EBITDA, what annualization and add-backs it uses, and how much of the DDTL 3.0 facility, which is up to $2.6 billion and cited as claim #11922, had actually been drawn when the leverage was computed.
The company disclosed on 2025-05-05 a $1.5 billion revolving credit facility expansion, cited as claims #11923 and #5010, with maturity extended to 2028-05-02, cited as claim #5012. Alongside it sits a contingent springing maturity date of 2026-12-30, cited as claim #11926. What has not been said is which specific condition triggers the springing maturity and whether, as of today, that condition is on track to be cured or will pull the facility forward. A related gap: the 2030 notes were first described at $1.5 billion, cited as claim #11921, and then at $2.0 billion, cited as claims #11918 and #11917, without any explanation of the upsizing or its pricing impact.
The company disclosed insider stock sales in mid-2025: $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO, cited as claims #19831, #19832 and #19830. These came weeks after the $40 IPO, cited as claim #15974. What has not been said is whether these sales were made under pre-arranged Rule 10b5-1 plans, what share of each executive's holdings they represent, and whether any remaining executive shares are pledged as collateral.
The company disclosed on 2025-07-06 a merger with Core Scientific at 0.1235 shares per share with a closing deadline of 2026-04-07, cited as claims #4731 and #4738. It also disclosed a $270 million termination fee payable to CoreWeave, cited as claim #4739. That deadline has passed and both claims sit at not_yet_verifiable. What has not been said is whether the deal closed, was extended, or was terminated, whether the termination fee was triggered or collected, and how much of the lease cost savings cited in claim #26763 has actually been realized.
What we aren't being told
2026-10-09The company disclosed total revenue backlog of $25.9 billion from committed contracts on 2025-05-13, cited as claim #4970, alongside an OpenAI backlog of $11.2 billion, cited as claim #4969. What has not been said is who holds the remaining roughly $14.7 billion of backlog, how concentrated it is, and why the OpenAI figure differs from the $11.9 billion contract value announced on 2025-03-10, cited as claim #19820. Has the $0.7 billion difference already been recognized as revenue, or were the contract terms changed?
The company disclosed about 420 MW of active power across 33 data centers, cited as claims #4972 and #26764, and 1.6 GW of contracted power, cited as claim #4973. What has not been said is where those 33 sites are, which utilities or interconnection agreements serve the roughly 1.2 GW gap between contracted and active power, and on what quarterly schedule that capacity is expected to be energized.
The company disclosed a 2030 senior notes offering at $1.5 billion on 2025-05-18, cited as claim #11921. It later reported the offering at $2.0 billion with a 9.250% coupon, cited as claims #11918, #11917 and #4824. Yet the expected 2025-05-27 closing, cited as claim #11919, remains unverified on the record. What has not been said is why the offering was upsized, whether it closed on schedule, and how much of the up-to-$2.6 billion DDTL 3.0 facility, cited as claim #11922, has actually been drawn and at what rate. The 2031 notes, cited as claims #26758 and #26765, likewise appear without a coupon.
The company disclosed a revolving credit facility extended to 2028-05-02, cited as claim #5012, together with a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is which instrument or condition triggers the springing date and whether that condition has been cured. This matters because the springing date falls within the next three months and $450 million of revolver borrowings were repaid with note proceeds, cited as claim #26759.
The company disclosed a Core Scientific merger at 0.1235 shares with an outside date of 2026-04-07, cited as claims #4731 and #4738, plus a $270 million termination fee payable to CoreWeave, cited as claim #4739, and unquantified lease cost savings, cited as claim #26763. What has not been said is whether the deal closed, was extended or was terminated after that date passed, whether the termination fee was collected, and what dollar savings were underwritten.
The company disclosed insider stock sales of $103.3 million by the CEO, $217 million by the CDO and $29.1 million by the CFO in mid-2025, cited as claims #19830, #19832 and #19831. Over the same period it projected $17.3 billion of net debt at 3.0x a $5.78 billion run-rate adjusted EBITDA, cited as claims #26761 and #26762, and $8.8 billion of additional secured debt, cited as claim #26760. What has not been said is whether these sales were made under 10b5-1 plans and what proxy-level compensation and lockup context surrounds them. It has also not explained how run-rate EBITDA is defined, or which contracts it annualizes, given that it is the denominator for the leverage figure.
What we aren't being told
2026-10-09The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, alongside an OpenAI-attributed backlog of $11.2 billion the same day (claim #4969) and an $11.9 billion OpenAI infrastructure contract on 2025-03-10 (claim #19820). What has not been said is who holds the remaining roughly $14.7 billion of committed backlog, how concentrated it is among those unnamed customers, and why the OpenAI figure moved from $11.9 billion to $11.2 billion within two months. Was that difference recognized revenue, a contract amendment, or a different measurement basis?
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against roughly 420 MW of active power across 33 data centers (claims #4972 and #26764). What has not been said is where the remaining ~1.2 GW sits: which sites, which physical addresses, which utility or interconnection agreements, and on what energization schedule. Without that, a reader cannot tell how much of the contracted capacity is grid-secured versus dependent on unbuilt interconnection.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18, cited as claim #11921, and then a $2.0 billion issuance of the same notes at 9.250% (claims #11918, #11917 and #4824). The DDTL 3.0 facility is recorded as "up to 2600.0 USD" (claim #11922) with no unit, and the expected closing date in claim #11919 is still not verifiable. What has not been said is why the offering was upsized by $500 million, whether DDTL 3.0 is $2.6 billion and how much of it has been drawn, and what conditions trigger the contingent springing maturity of 2026-12-30 on the revolver (claim #11926), given that the revolver otherwise matures on 2028-05-02 (claim #5012).
The company disclosed projected total net debt of $17.3 billion at 3.0x leverage on 2025-07-20, cited as claim #26761. That ratio rests on a 1Q'25 LTM run-rate adjusted EBITDA of $5.78 billion (claim #26762) and assumes another $8.8 billion of secured debt to service contracts (claim #26760). What has not been said is how run-rate EBITDA is constructed: which contracts are annualized, what add-backs are applied, and how it reconciles to GAAP results. Nor has the company said which specific contracts the $8.8 billion of secured debt is collateralized against.
The company disclosed insider sales of $29.1 million by the CFO (claim #19831), $217 million by the CDO (claim #19832) and $103.3 million by the CEO (claim #19830) between May and June 2025. What has not been said is whether these sales ran under Rule 10b5-1 plans and when those plans were adopted relative to the March 2025 IPO lockup (claims #19821 and #11601). The company also has not said how these proceeds compare with each executive's disclosed compensation, or whether any related-party arrangements exist with the selling executives.
The company disclosed a merger agreement with Core Scientific on 2025-07-06/07 with an outside closing date of 2026-04-07, cited as claims #4731 and #4738, both now not verifiable. The agreement also carried a $270 million termination fee payable to CoreWeave (claim #4739) and promised lease cost savings (claim #26763). What has not been said, six months past that deadline, is whether the merger closed, was extended or was terminated. The company also has not said whether the termination fee was triggered, or how large the lease savings actually were in dollars.
What we aren't being told
2026-10-09The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, alongside $25.9 billion of total committed backlog, cited as claim #4970. What has not been said is why the two OpenAI figures differ by $700 million (recognition already taken, a contract amendment, or a definitional change), what the contract term and take-or-pay protections are, and who the counterparties are behind the remaining roughly $14.7 billion of backlog. How concentrated is that residual, and with whom?
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, against roughly 420 MW of active power across 33 data centers, cited as claims #4972 and #26764. What has not been said is where the roughly 1.18 GW gap sits: which named sites or addresses, which utilities and interconnection queues, and on what quarter-by-quarter energization schedule. How much of the contracted backlog in claim #4970 depends on capacity that is not yet powered?
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18, cited as claim #11921, and then a $2.0 billion issuance of the same 2030 notes on 2025-05-20 and 2025-05-27, cited as claims #11918, #11917 and #4824. In July it projected $8.8 billion of additional secured debt to service contracts, cited as claim #26760, and net debt of $17.3 billion at 3.0x a run-rate EBITDA of $5.78 billion, cited as claims #26761 and #26762. What has not been said is whether the upsizing from $1.5 billion to $2.0 billion changed the use of proceeds, how much of the up-to-$2.6 billion DDTL 3.0 in claim #11922 has been drawn, which lenders and what collateral will back the $8.8 billion, and how a 'run-rate' EBITDA is built from a single quarter. What is the trailing, non-annualized figure?
The company disclosed on 2025-05-05 a revolving credit facility extended to 2028-05-02, cited as claim #5012, subject to a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what condition triggers the springing date, whether that condition is currently met, and what would have to be refinanced if it springs. With the date less than three months away, is the revolver effectively a 2026 facility?
The company disclosed insider stock sales within roughly three months of its March 2025 IPO: $29.1 million by the CFO, cited as claim #19831; $217 million by the CDO, cited as claim #19832; and $103.3 million by the CEO, cited as claim #19830. What has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted, whether any lock-up was waived or carved out to permit them, and how the sales compare with each executive's remaining holdings. Did the board or the underwriters approve early liquidity?
The company disclosed a merger with Core Scientific at 0.1235 shares per share, with a closing deadline of 2026-04-07, cited as claims #4731 and #4738, a $270 million termination fee payable to CoreWeave, cited as claim #4739, and unquantified lease cost savings, cited as claim #26763. What has not been said on record, six months after that deadline, is whether the deal closed, was extended, or was terminated, and if it was terminated, whether the $270 million fee was triggered and collected. What happens to the lease-savings thesis and the leased capacity underpinning claim #4973?
What we aren't being told
2026-10-09The company disclosed total revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, alongside an OpenAI strategic deal backlog of $11.2 billion (claim #4969) and an OpenAI contract valued at $11.9 billion on 2025-03-10 (claim #19820). What has not been said is who holds the remaining roughly $14.7 billion of committed backlog, how concentrated it is among those counterparties, and why the OpenAI figure appears as $11.9 billion in one disclosure and $11.2 billion in another. Is the difference revenue already recognized, a contract amendment, or a definitional change?
The company disclosed about 420 MW of active power across 33 data centers and 1.6 GW of contracted power, cited as claims #4972, #26764 and #4973. What has not been said is where the unenergized ~1.2 GW sits: which sites, which utilities or interconnection queues, and on what schedule each tranche is expected to come online. Without that, the gap between contracted and active capacity cannot be tested against backlog delivery commitments (claim #19823).
The company disclosed a $1.5 billion 2030 senior notes offering on 2025-05-18 (claim #11921), later a $2.0 billion issuance at 9.250% closing 2025-05-27 (claims #11918, #11917, #4824), a $2.6 billion DDTL 3.0 facility (claim #11922), and on 2025-07-20 a projected $8.8 billion of additional secured debt to service contracts (claim #26760). What has not been said is which specific customer contracts and assets collateralize the DDTL and the projected secured debt, what the draw schedule is, and how the stated use of proceeds (claims #11920, #26766) was split between capex, refinancing and general purposes beyond the $450 million revolver repayment (claim #26759).
The company disclosed a revolving credit facility extended to 2028-05-02 with a contingent springing maturity of 2026-12-30, cited as claims #5012 and #11926. What has not been said is what triggers the springing maturity, whether that trigger is currently live, and how much would be outstanding if it springs. That date is less than three months away.
The company disclosed a merger with Core Scientific at 0.1235 shares per share, an outside date of 2026-04-07, and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. The record also cites expected lease cost savings from the deal (claim #26763). What has not been said is the outcome. That date has passed with no recorded closing or termination. If the deal did not close, was the termination fee triggered and collected, and what happens to the lease arrangements underlying the projected savings?
The company's record shows insider sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830. That window fell shortly after the $40 IPO (claims #11616, #19821) and during the debt raises above. What has not been said is whether these sales were made under 10b5-1 plans adopted before the IPO, what lockup releases permitted them, and how they compare with each executive's disclosed compensation and remaining holdings. The same question applies to how the 1Q'25 LTM run-rate Adjusted EBITDA of $5.78 billion behind the 3.0x net leverage figure (claims #26762, #26761) was annualized.
What we aren't being told
2026-10-09The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then reported OpenAI backlog of $11.2 billion within $25.9 billion of total committed backlog on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the two OpenAI figures differ by $700 million (recognized revenue, a contract amendment, or a different measurement basis), or who the counterparties are behind the remaining roughly $14.7 billion of backlog. How concentrated is that remainder, and is IBM (claim #4971) a material part of it?
The company disclosed 1.6 GW of contracted power against about 420 MW of active capacity across 33 data centers, cited as claims #4973, #4972 and #26764. What has not been said is when the remaining roughly 1.2 GW is expected to energize, which sites it sits at, and what interconnection or utility agreements back it. Which of the 33 facilities are owned and which are leased, and how much of the contracted power depends on Core Scientific sites still to be acquired?
The company disclosed a merger with Core Scientific at 0.1235 shares per share with an outside date of 2026-04-07, cited as claims #4731 and #4738, both now marked delayed, along with a $270 million termination fee payable to CoreWeave in claim #4739 and unquantified lease cost savings in claim #26763. What has not been said is whether the deal closed, was extended, or was terminated after the outside date passed, whether the $270 million fee was triggered, and what dollar value of lease savings justified the deal.
The company disclosed 2030 senior notes as $1.5 billion on 2025-05-18 and $2.0 billion at 9.250% on 2025-05-20 and 2025-05-27, cited as claims #11921, #11918, #11917 and #4824, with the expected closing date marked delayed in claim #11919. It also disclosed 2031 notes as $1.5 billion before pricing at $1.75 billion and 9.000%, cited as claims #26758, #26765 and #26755. What has not been said is whether each increase was an upsize driven by demand and how the extra proceeds were used beyond the $450 million revolver paydown in claim #26759. Separately, the DDTL 3.0 facility is recorded as "2600.0 USD" in claim #11922: are the units confirmed as $2.6 billion, and how much has been drawn?
The company disclosed a revolving facility maturity of 2028-05-02 with a contingent springing maturity of 2026-12-30, cited as claims #5012, #11925 and #11926. What has not been said is which condition triggers the springing date, which matters now that it is less than three months away. Is the trigger tied to a refinancing of a specific debt tranche, and has it been satisfied or waived?
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between May and June 2025, cited as claims #19831, #19832 and #19830, only weeks after a $40-per-share IPO with $1.4 billion in net proceeds (claims #17815 and #4967). What has not been said is whether these sales ran under Rule 10b5-1 plans, when any such plans were adopted, and whether lock-up waivers or early-release provisions were used. On the leverage side, net debt of $17.3 billion at 3.0x is measured against a "run-rate" adjusted EBITDA of $5.78 billion (claims #26761 and #26762), and the company projects a further $8.8 billion of secured debt (claim #26760). What has not been said is how run-rate EBITDA compares with actual trailing EBITDA.
What we aren't being told
2026-10-08The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then on 2025-05-13 cited OpenAI-related backlog of $11.2 billion within a total committed backlog of $25.9 billion (claims #4969, #4970). What has not been said is why the OpenAI figure fell by roughly $700 million in two months, whether that reflects revenue recognized or a renegotiation, and who the counterparties are behind the remaining roughly $14.7 billion of backlog, including how concentrated it is.
On 2025-07-30 the company disclosed a material customer contract for GPU infrastructure (claim #4595) alongside the $2.6 billion DDTL 3.0 facility, which carries a minimum contract realization ratio of 0.85x and a 1.40x debt service coverage ratio beginning April 2027 (claims #4592, #4597, #4596). What has not been said is who that customer is, what the contract's term and value are, and what the realization and coverage ratios currently stand at relative to those covenants.
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13 (claims #4972, #4973). What has not been said is where the contracted but not yet active roughly 1.2 GW sits: which sites, which utilities or interconnection queues, and on what energization schedule, and whether 'contracted' means signed leases, utility commitments, or letters of intent.
The Core Scientific merger at 0.1235 shares per share, announced 2025-07-07 with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave (claims #4731, #4738, #4739), now sits past its deadline with status delayed. What has not been said is whether the deal closed, was extended, or was terminated, and if terminated, whether the termination fee was triggered and collected.
The company's revolving credit facility was extended to 2028-05-02 but carries a contingent springing maturity of 2026-12-30 (claims #11925, #11926), and the first 9% coupon on the 2031 notes, due 2026-02-01, is recorded as delayed (claim #4659). What has not been said is what condition triggers the springing maturity less than three months from now, whether it is on track to be avoided, and whether that February coupon was paid on schedule.
Within about three months of the March 2025 IPO at $40 per share (claim #15974), the CDO, CEO and CFO sold roughly $217 million, $103.3 million and $29.1 million of stock respectively (claims #19832, #19830, #19831). What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, whether any lockup waivers were granted to permit them, and how these liquidity events compare to the executives' disclosed compensation and remaining holdings.
What we aren't being told
2026-10-08CoreWeave disclosed a material customer contract for GPU infrastructure on 2025-07-30 (claim #4595), alongside the $2.6 billion DDTL 3.0 facility it appears to support (claims #4592, #4593, #4594). What has not been said is who the counterparty is, what the contract is worth, and how long it runs. Without that, a reader cannot tell whether DDTL 3.0 is backed by a new customer or by more exposure to an existing one. A related question is how much of the facility had been drawn by the 2026-07-31 commitment termination date, which the record now marks as delayed.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820). Two months later it cited OpenAI backlog of $11.2 billion within $25.9 billion of total committed backlog (claims #4969, #4970). What has not been said is whether the $700 million gap reflects revenue already recognized, a contract amendment, or a remeasurement. The company also has not said what share of the remaining $14.7 billion in backlog comes from its next-largest customers, or over what weighted term the backlog converts to revenue.
On 2025-05-13 the company disclosed 1.6 GW of contracted power and 420 MW of active capacity added (claims #4973, #4972). What has not been said is whether 420 MW is a cumulative active figure or a figure added in one period. The company also has not said which sites make up the 1.6 GW, their physical locations, utility interconnection status, or the expected energization date for the roughly 1.2 GW not yet active.
The company announced a merger with Core Scientific at a 0.1235 exchange ratio with a 2026-04-07 outside date, and both items are now marked delayed (claims #4731, #4738). It also disclosed a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was extended, or was terminated, and if terminated, whether the $270 million was paid and how the company plans to replace the capacity Core Scientific was expected to provide.
Within weeks of the March 2025 IPO, the company's CFO, CDO, and CEO sold roughly $29.1 million, $217 million, and $103.3 million of stock (claims #19831, #19832, #19830). What has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted. The company also has not said whether lock-up waivers were granted and how the board weighed the sales against executive compensation and retention.
The company's debt disclosures leave units and sequencing unclear. A senior notes offering described as $1.5 billion on 2025-05-18 closed as $2 billion of 9.25% notes due 2030 (claims #11921, #11918, #11917, #4824), and the follow-on 9% notes were upsized by $250 million to $1.75 billion (claims #4697, #4698). The record also flags the first 9% coupon, due 2026-02-01, as delayed (claim #4659), and the revolver carries a springing maturity of 2026-12-30 (claim #11926). What has not been said is whether that coupon was paid on schedule, what condition triggers the springing maturity, and whether the company has refinanced or cured that condition before the date arrives.
What we aren't being told
2026-10-08The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility it appears to support (claims #11922, #4594). What has not been said is who the counterparty is, what the contract is worth, and over what term. Is this an expansion of the OpenAI relationship or a new anchor tenant, and how much of the DDTL 3.0 had been drawn by the 2026-07-31 commitment termination date, which our record now shows as delayed (claim #4593)?
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, within a total backlog of $25.9 billion (claim #4970). What has not been said is how the roughly $700 million gap reconciles: was it revenue recognized in the interim, a contract amendment, or a definitional difference? What share of the remaining backlog comes from customers other than OpenAI and Microsoft, and on what schedule is it expected to convert to revenue?
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where the remaining roughly 1.2 GW sits, including site addresses, utility or interconnection status, and the expected energization date for each tranche. How much of the contracted capacity depended on the Core Scientific sites that were part of the proposed merger?
The company disclosed a merger with Core Scientific at 0.1235 CoreWeave shares per share on 2025-07-06, with a closing deadline of 2026-04-07, cited as claims #4731 and #4738, both now marked delayed. It also disclosed a termination fee payable to CoreWeave recorded as 270.0 "USD million" (claim #4739). What has not been said on our record is whether the deal closed, was extended, or was terminated. Was the $270 million fee triggered, and what happened to the hosting contracts with Core Scientific that the merger was meant to absorb?
The company's insiders sold about $217 million (CDO, claim #19832), $103.3 million (CEO, claim #19830) and $29.1 million (CFO, claim #19831) of stock in May and June 2025, shortly after the $40 IPO (claims #17815, #19821). What has not been said is when the governing Rule 10b5-1 plans were adopted, what share of each executive's holdings the sales represented, and whether the board considered the timing relative to the backlog and financing announcements made in the same weeks.
The company disclosed a revolving credit facility extended to 2028-05-02 but subject to a contingent springing maturity of 2026-12-30, cited as claims #11925 and #11926. Over the same period it described its 2030 senior notes as both $1.5 billion and $2.0 billion (claims #11921, #11917), and it committed to a 1.40x minimum debt service coverage ratio starting April 2027 (claim #4596). What has not been said is what condition triggers the December 2026 springing date, whether that condition has been cleared, and what the current pro forma coverage ratio is against the 1.40x covenant now that it is less than six months away.
What we aren't being told
2026-10-08The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility it appears to support (claims #11922, #4594). What has not been said is who that customer is, the contract's total value and term, and how much of DDTL 3.0 had actually been drawn by the 2026-07-31 commitment termination date (claim #4593), which our record flags as delayed.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, within a total backlog of $25.9 billion (claim #4970). What has not been said is how the $700 million difference reconciles: is it revenue already recognized, a contract amendment, or something else? It is also unclear what share of the remaining $14.7 billion in backlog sits with any other single named customer.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where any of that capacity physically sits, which utilities or interconnection queues serve it, and on what schedule the roughly 1.2 GW gap between contracted and active power is expected to be energized.
The company disclosed a stock-for-stock merger with Core Scientific at 0.1235 shares on 2025-07-06, with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. What has not been said, now that our record flags the deadline as missed, is whether the deal closed, was extended, or was terminated. If it was terminated, it is also unclear whether the $270 million fee was triggered and collected.
The company disclosed insider sales of $217 million by the CDO, $103.3 million by the CEO and $29.1 million by the CFO between May and June 2025, cited as claims #19832, #19830 and #19831, only weeks after a $40-per-share IPO (claim #17815). What has not been said is whether these sales ran under 10b5-1 plans adopted before the IPO, whether lockup waivers were granted to allow them, and what proportion of each executive's holdings they represent.
The company disclosed 9% senior notes of $1.75 billion due 2031, upsized by $250 million, with a first interest payment on 2026-02-01, cited as claims #4697, #4698 and #4659. Our record flags that interest payment as delayed. Separately, the revolver carries a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is whether the February 2026 coupon was paid on time, and what specific condition would pull the revolver's maturity forward from 2028-05-02 to December 2026.
What we aren't being told
2026-10-08The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog figure of $11.2 billion on 2025-05-13, cited as claim #4969, within total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is why the OpenAI figure differs by $700 million between the two dates, over what term and on what recognition schedule it converts to revenue, and who the counterparties are behind the remaining roughly $14.7 billion of backlog. Without those names, a reader cannot assess customer concentration.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is whether the 420 MW was added in the quarter or represents cumulative active capacity. The company also has not named the sites that make up the 1.6 GW, given their physical locations or utility interconnection status, or said by what dates the gap of more than 1.1 GW is expected to energize.
The company disclosed a merger with Core Scientific at 0.1235 shares per share with an outside closing date of 2026-04-07, cited as claims #4731 and #4738, both now flagged delayed. It also disclosed a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is whether the deal closed, was terminated, or was extended past that deadline. If it was terminated, the company has not said whether the termination fee was triggered and collected, or what happened to the Core Scientific site capacity that was presumably counted toward contracted power.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18, cited as claim #11921, and then a $2.0 billion 9.250% issuance on 2025-05-27, cited as claims #11917 and #4824, with the expected closing date flagged delayed in claim #11919. What has not been said is the reason for the $500 million upsize and the actual settlement date. In addition, claims #11922 and #4697 carry amounts of 2600.0 USD and 1750.0 USD with ambiguous units. The record also does not confirm whether the first 9% coupon on the 2031 notes was paid on schedule, given that claim #4659 is flagged delayed.
The company disclosed a $2.6 billion DDTL 3.0 facility with a commitment termination date of 2026-07-31, cited as claims #4592 and #4593, alongside a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is how much of the facility was drawn before commitments lapsed and which customer contracts collateralize it. The company also has not disclosed the current realization ratio against the covenant floor. Separately, the record does not say what conditions would trigger the springing maturity of 2026-12-30 on the revolving credit facility, cited as claim #11926, which is now less than three months away.
The company disclosed insider stock sales of $217 million by the Chief Development Officer, $103.3 million by the CEO, and $29.1 million by the CFO between May and June 2025, cited as claims #19832, #19830 and #19831. These sales came within months of the IPO at $40 per share, cited as claim #11616. What has not been said is whether these sales were made under Rule 10b5-1 plans, when those plans were adopted, and how the sales relate to IPO lock-up terms. The company also has not said whether any proceeds or related entities connect to the company's financing or vendor relationships.
What we aren't being told
2026-10-07The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13 (claim #4969). What has not been said is how the $0.7 billion difference splits between revenue already recognized, contract amendments, and restated scope. The company has also not disclosed the contract's term, its take-or-pay or termination provisions, or the delivery schedule behind the backlog.
The company disclosed total committed-contract backlog of $25.9 billion on 2025-05-13 (claim #4970). OpenAI accounts for $11.2 billion of that (claim #4969). What has not been said is who holds the remaining roughly $14.7 billion, and what share each customer represents. The record also cites a material customer contract securing the $2.6 billion DDTL 3.0 facility (claims #4595, #4592) without naming the counterparty. Does that contract belong to OpenAI, to an existing hyperscaler customer, or to someone new?
The company disclosed 420 MW of active power added and 1.6 GW of contracted power on 2025-05-13 (claims #4972, #4973). What has not been said is whether 420 MW is a quarterly addition or a cumulative total, and whether either figure is critical IT load or gross utility power. The company also has not named a single site, physical address, utility, or interconnection queue position, or given a schedule for converting the roughly 1.2 GW of contracted-but-inactive capacity into billable capacity.
The company disclosed a Core Scientific merger at 0.1235 shares per share, with a closing deadline of 2026-04-07 (claims #4731, #4738, #4729). The same agreement includes a $270 million termination fee payable to CoreWeave (claim #4739). Both the merger and the deadline are now marked delayed. What has not been said is whether the agreement was extended, terminated, or voted down. If it ended, was the $270 million fee actually triggered and collected, and what replaced the Core Scientific capacity in the 1.6 GW contracted figure?
The company disclosed a stack of debt financings in 2025. These include a $1.5 billion revolver expansion with a contingent springing maturity of 2026-12-30 (claims #5010, #11926), $2.0 billion of 9.25% notes due 2030 upsized from $1.5 billion (claims #11921, #11918, #4824), and $1.75 billion of 9% notes due 2031 (claims #4697, #4658). What has not been said is what condition triggers the December 2026 springing maturity, which now falls within three months. The company also has not confirmed whether the first 9% coupon due 2026-02-01 (claim #4659, marked delayed) was paid on schedule. Finally, for the DDTL 3.0 facility, the company has not stated its current headroom against the 1.40x debt service coverage ratio starting April 2027 or the 0.85x contract realization ratio (claims #4596, #4597).
The company disclosed insider sales of $217 million by the Chief Development Officer, $103.3 million by the CEO, and $29.1 million by the CFO, all within roughly three months of the March 2025 IPO at $40 per share (claims #19832, #19830, #19831, #11616). What has not been said is whether these sales ran under pre-arranged 10b5-1 plans and when those plans were adopted. The company also has not disclosed whether any executive shares are pledged as collateral, or how these sales fit with lock-up terms and with the company's simultaneous reliance on 9%-plus debt.
What we aren't being told
2026-10-07The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and two months later described the OpenAI deal as $11.2 billion of revenue backlog on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ by $700 million: whether revenue was already recognized, terms were revised, or the equity component OpenAI received was netted out. Also unstated are the contract's term, termination rights, and annual revenue recognition schedule.
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a DDTL 3.0 covenant requiring a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is who the counterparty is, the contract's dollar value and duration, and how much headroom the company currently has against the 0.85x threshold. The same concentration question applies to the $25.9 billion total backlog, cited as claim #4970: what share comes from the top one or two customers?
The company disclosed 1.6 GW of contracted power and 420 MW of active power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites make up that capacity, their physical locations and utility interconnection status, and the energization schedule converting contracted power to active power. The company also has not said over what period the 420 MW was added, or whether either figure is critical IT load or gross facility power.
The company disclosed a Core Scientific merger at a 0.1235 exchange ratio with a 2026-04-07 outside date, cited as claims #4731 and #4738, both now marked delayed, along with a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is whether the merger closed, was terminated, or had its deadline extended. If it was terminated, the company has not said whether the $270 million fee was triggered and collected, or how the roughly 1.3 GW of Core Scientific capacity it had counted on is being replaced.
The company disclosed insider sales within months of its March 2025 IPO, cited as claim #19821: $217 million by the CDO, $103.3 million by the CEO, and $29.1 million by the CFO, cited as claims #19832, #19830, and #19831. What has not been said is whether these sales ran under Rule 10b5-1 plans and when those plans were adopted, whether any lock-up was waived or released early, and whether any shares went to entities related to the executives.
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02, cited as claims #11923 and #11925, but also a contingent springing maturity of 2026-12-30, cited as claim #11926. The springing date falls less than three months from now, and it was disclosed alongside 9.25% notes due 2030 and 9% notes due 2031, cited as claims #11917 and #4658. What has not been said is the condition that triggers the springing maturity, whether that condition is on track to be satisfied or waived, and how much of the revolver and the $2.6 billion DDTL 3.0 is currently drawn, cited as claim #11922.
What we aren't being told
2026-10-07The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, within total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is why the OpenAI figure fell by $700 million in two months: revenue recognized, a contract amendment, or a different measurement basis. The record also does not name the customers behind the remaining roughly $14.7 billion of backlog, or give their weighted remaining term.
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is which sites make up the roughly 1.2 GW gap between contracted and active power. The record also lacks their physical locations, utility interconnection status, and energization dates. It does not say whether "contracted" means signed leases, utility queue positions, or power purchase agreements.
The company disclosed the $2.6 billion DDTL 3.0 facility on 2025-07-30, cited as claims #4592 and #11922, secured against a material GPU customer contract, cited as claim #4595. The facility carries a 0.85x minimum contract realization ratio and a 1.40x minimum debt service coverage ratio starting April 2027, cited as claims #4597 and #4596. What has not been said is who the anchor customer is, how much of the facility has been drawn, and what current headroom exists against either covenant.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18, cited as claim #11921, which became $2.0 billion of 9.250% notes due 2030 by 2025-05-27, cited as claims #11917, #11918 and #4824. It then announced a $1.5 billion offering on 2025-07-20, cited as claim #4700, that grew to $1.75 billion of 9% notes due 2031, cited as claims #4697 and #4698. What has not been said is what drove each upsize and how proceeds were actually deployed beyond the generic use-of-proceeds language in claim #11920. Nor has the company explained why the closings, cited as claims #11919 and #4699, and the first coupon on 2026-02-01, cited as claim #4659, are flagged as delayed rather than confirmed.
The company disclosed a revolving credit facility expanded to $1.5 billion, with maturity extended to 2028-05-02, on 2025-05-05, cited as claims #5010 and #5012. Alongside it sits a contingent springing maturity date of 2026-12-30, cited as claim #11926. What has not been said is which condition triggers the springing maturity. With that date less than three months away, the company has also not said whether the condition has been cured or waived, or how much is currently drawn.
The company disclosed the all-stock Core Scientific merger at 0.1235 shares on 2025-07-06, cited as claims #4731 and #4729, with a 2026-04-07 outside date, cited as claim #4738, now marked delayed. A $270 million termination fee is payable to CoreWeave, cited as claim #4739. What has not been said is whether the deal closed, was extended, or was terminated, and whether the fee was triggered and collected. Separately, insider sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO, cited as claims #19831, #19832 and #19830, came within weeks of the IPO. The record does not say whether these sales were made under 10b5-1 plans, when those plans were adopted, or how proxy compensation disclosures treat them.
What we aren't being told
2026-10-07The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and later an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ by roughly $700 million, whether that gap reflects revenue already recognized or a revised contract, and what the term and payment schedule of the OpenAI commitment are. The same 2025-05-13 release put total backlog at $25.9 billion, cited as claim #4970, so who holds the remaining roughly $14 billion?
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a minimum contract realization ratio of 0.85x, cited as claim #4597, and a 1.40x debt service coverage ratio beginning April 2027, cited as claim #4596. What has not been said is the name of that customer, the contract value and duration backing the DDTL 3.0 facility, and how much headroom the company currently has against each covenant.
The company disclosed 1.6 GW of contracted power, cited as claim #4973, and 420 MW of active power added, cited as claim #4972, both on 2025-05-13. What has not been said is the period over which the 420 MW was added, which sites and utilities supply the contracted gigawatts, what interconnection status each site has, and on what schedule the roughly 1.2 GW of contracted but inactive capacity is expected to energize.
The company disclosed senior notes due 2030 at $1.5 billion on 2025-05-18, cited as claim #11921, then $2.0 billion on 2025-05-20 and 2025-05-27, cited as claims #11918 and #11917. Maturity is given as 2030-05-27 in claim #4824 and as 2030-06-01 elsewhere. What has not been said is what drove the $500 million upsizing, what the proceeds funded beyond the generic use-of-proceeds statement in claim #11920, and how much of the up-to-$2.6 billion DDTL 3.0 facility in claim #11922 has actually been drawn and at what rate. Separately, the springing maturity date of 2026-12-30 in claim #11926 is now under three months away, and the company has not disclosed what conditions trigger it or whether they have been cured.
The company's disclosures show insider sales of $29.1 million by the CFO, cited as claim #19831; $217 million by the CDO, cited as claim #19832; and $103.3 million by the CEO, cited as claim #19830, all between May and June 2025. What has not been said is whether these sales were made under 10b5-1 plans adopted before the IPO, how they relate to lock-up terms, and how the sales compare with each executive's remaining holdings and equity compensation in proxy disclosures.
The company disclosed a Core Scientific merger at a 0.1235 exchange ratio with a closing deadline of 2026-04-07, cited as claims #4731 and #4738, both now marked delayed, along with a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is whether the deal closed, was extended, or was terminated past that deadline, and if it was terminated, whether the $270 million fee was triggered and collected.
What we aren't being told
2026-10-06The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then described OpenAI revenue backlog as $11.2 billion on 2025-05-13, cited as claim #4969, alongside total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is what accounts for the $700 million difference: early recognition, a contract amendment, or a definitional change. The company has also not named the customers behind the remaining roughly $14.7 billion of backlog, or said how concentrated that remainder is.
The company disclosed on 2025-07-30 that the $2.6 billion DDTL 3.0 facility, cited as claims #4592 and #11922, is tied to a material customer contract for GPU infrastructure, cited as claim #4595. The facility carries a 1.40x minimum debt service coverage ratio from April 2027, cited as claim #4596, and a 0.85x minimum contract realization ratio, cited as claim #4597. What has not been said is who that counterparty is, the contract's tenor and value, and how much headroom the company currently has against either covenant.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is how the gap of roughly 1.2 GW breaks down by site: physical locations, utility or interconnection status, landlord or colocation counterparty, and the quarter in which each tranche is expected to energize.
The company disclosed on 2025-05-05 that its $1.5 billion revolving credit facility was extended to 2028-05-02, cited as claims #5010, #5012, and #11925, subject to a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what condition triggers the springing date, which is now less than three months away. The company has also not said whether that condition has been cured, waived, or refinanced.
The company disclosed a merger agreement with Core Scientific at a 0.1235 exchange ratio, with a 2026-04-07 outside date, cited as claims #4731 and #4738. Both of those claims are now marked delayed. The agreement included a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is whether the deal closed, was extended, or was terminated, and whether any portion of the termination fee was triggered or collected.
The company's insiders sold about $29.1 million (CFO), $217 million (CDO), and $103.3 million (CEO) of stock between May and June 2025, cited as claims #19831, #19832, and #19830. These sales came within roughly three months of the $40 IPO, cited as claims #11601 and #15974. During the same period the company was issuing 9.25% and 9% senior notes, cited as claims #4824 and #4697. What has not been said is when the 10b5-1 plans were adopted, how the lock-up was waived or released for these sellers, and whether the proxy addresses compensation or related-party context for these executives. A related open item is the first 9% coupon due 2026-02-01, cited as claim #4659, which remains marked delayed with no confirmation that it was paid.
What we aren't being told
2026-10-06The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the DDTL 3.0 facility terms in claims #4593 and #4594 and a minimum contract realization ratio of 0.85x in claim #4597. What has not been said is who the counterparty is, what the contract is worth, and how much of the DDTL 3.0 draw is secured against it. That last point matters because the commitment termination date of 2026-07-31 has now passed and is marked delayed.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion within total backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970. What has not been said is what explains the roughly $700 million gap between the two OpenAI figures, whether it reflects recognized revenue, a repricing, or a scope change. It is also unclear who the counterparties are behind the remaining approximately $14.7 billion of backlog, and what their concentration is.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites make up the contracted figure, including physical locations, interconnection or utility agreements, and energization dates. It is also unclear whether the 420 MW is cumulative active capacity or an increment over a specific period, which leaves the conversion schedule from contracted to active capacity undisclosed.
The company disclosed insider stock sales of $217 million by the CDO, $103.3 million by the CEO and $29.1 million by the CFO between May and June 2025, cited as claims #19832, #19830 and #19831. These came within about three months of the $40 IPO in claims #11616 and #19821 and overlapped the senior notes offerings in claims #11917 and #4697. What has not been said is whether these sales ran under 10b5-1 plans, when any such plans were adopted, and whether any lockup waivers or early-release provisions allowed them.
The company disclosed a merger agreement with Core Scientific at 0.1235 shares per share and a closing deadline of 2026-04-07 on 2025-07-06, cited as claims #4731 and #4738, plus a $270 million termination fee payable to CoreWeave in claim #4739. What has not been said is how the transaction ended after that deadline passed with the merger marked delayed. Specifically, was it terminated, did the $270 million fee trigger, and was it collected? It is also unclear what happened to the S-4 registration and the Core Scientific convertible notes conversion in claims #4733 and #4737.
The company disclosed a contingent springing maturity date of 2026-12-30 on its revolving credit facility on 2025-05-05, cited as claim #11926. This sits alongside a stated maturity extension to 2028-05-02 in claims #5012 and #11925. What has not been said is which condition triggers the earlier maturity, whether that condition is currently met, and how much of the $1.5 billion revolver and $350 million letter-of-credit capacity in claims #11923 and #11924 is drawn as the 2026 date approaches. Related unit ambiguity also remains: the 2030 notes appear as both $1.5 billion and $2.0 billion within two days in claims #11921 and #11918, and the record never states the final upsizing rationale.
What we aren't being told
2026-10-06The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the DDTL 3.0 facility terms in claims #4593 and #4594 and a minimum contract realization ratio of 0.85x in claim #4597. What has not been said is who the counterparty is, what the contract's total value and term are, and how much of DDTL 3.0 was actually drawn against it before the commitment termination date of 2026-07-31, which claim #4593 now shows as delayed. Has the company confirmed whether that window was extended, amended, or allowed to lapse?
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion on 2025-05-13, cited as claim #4969, within a total backlog of $25.9 billion, cited as claim #4970. What has not been said is what accounts for the $0.7 billion difference: revenue already recognized, a contract amendment, or a different measurement basis. OpenAI is about 43% of backlog. Who holds the remaining roughly $14.7 billion, and how concentrated is it?
The company disclosed 1.6 GW of contracted power and 420 MW of active power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is whether 420 MW is cumulative active capacity or a single-period addition, when the remaining roughly 1.2 GW is scheduled to energize, and which sites, utilities, and interconnection agreements make up the contracted figure. No data center location appears anywhere in the record.
The company disclosed an all-stock merger with Core Scientific at 0.1235 shares on 2025-07-06, cited as claims #4731 and #4729, with a closing deadline of 2026-04-07 in claim #4738 and a $270 million termination fee payable to CoreWeave in claim #4739. Both the deal and the deadline are now marked delayed. What has not been said is whether the merger closed, was extended, or was terminated, whether the termination fee was triggered or collected, and what happened to the Core Scientific convertible notes referenced in claim #4737.
The company disclosed insider stock sales of $217 million by the CDO, $103.3 million by the CEO, and $29.1 million by the CFO, cited as claims #19832, #19830, and #19831. All three came within roughly three months of the 2025-03-28 IPO at $40 per share, cited as claim #11616. What has not been said is when the governing 10b5-1 plans were adopted, whether any IPO lockup was waived or released early to permit these sales, and whether any of the selling executives hold related-party interests in suppliers, landlords, or lenders to the company.
The company disclosed $1.5 billion of senior notes due 2030 on 2025-05-18, cited as claim #11921, and then a $2.0 billion issue of 9.25% notes due 2030 closing 2025-05-27, cited as claims #11917, #11918, and #4824. The expected closing in claim #11919 is nonetheless flagged as delayed. Separately, the company disclosed a contingent springing maturity of 2026-12-30 on its revolver in claim #11926. What has not been said is whether the upsize was driven by demand or by need, what event triggers the springing maturity and whether it is now in play, whether the first coupon on the 9% notes due 2031, due 2026-02-01 and cited as claim #4659 (now marked delayed), was paid on time, and what minimum debt service coverage ratio claim #4596 actually specifies.
What we aren't being told
2026-10-05The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ by $700 million: was revenue already recognized, was the contract re-scoped, or do the figures measure different things? The total committed backlog of $25.9 billion (claim #4970) also leaves roughly $14.7 billion with no named counterparties. Which customers make up that remainder, and how concentrated is it?
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where that capacity sits: no site addresses, utility or interconnection counterparties, or energization schedules are on record. It is also unclear whether 420 MW is total active capacity or only the increment for the period. When does the remaining contracted capacity become active, and at which facilities?
The company disclosed a merger with Core Scientific on 2025-07-06/07 at 0.1235 shares per Core Scientific share, with a closing deadline of 2026-04-07, cited as claims #4731, #4738, and #4729. Both deadline claims are now marked delayed, and no completion, extension, or termination is on record. It also disclosed a $270 million termination fee payable to CoreWeave (claim #4739) but no reciprocal fee owed by CoreWeave. Did the deal close, was the outside date extended, or was it terminated, and was any fee triggered?
The company's insiders disclosed stock sales within about three months of the March 2025 IPO at $40 per share: $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO, cited as claims #19831, #19832, and #19830. What has not been said is whether these sales ran under Rule 10b5-1 plans and when those plans were adopted. It is also unclear whether any lock-up waivers or early-release provisions were used, and how the sales compare to each executive's remaining holdings and compensation.
The company disclosed $1.5 billion of senior notes due 2030 on 2025-05-18, cited as claim #11921, then a $2.0 billion issuance at 9.250%, cited as claims #11918, #11917, and #4824. In July it announced $1.5 billion of notes (claim #4700) that were upsized by $250 million to $1.75 billion at 9% due 2031 (claims #4698, #4697, #4658). Several records carry ambiguous units, such as "2600.0 USD" for DDTL 3.0 in claim #11922 and "1750.0 USD" in claim #4697. The closing-date claims (#11919, #4699) and the first 9% coupon date of 2026-02-01 (claim #4659) are all marked delayed with no confirmation on record. Did both offerings close as described, was the February 2026 coupon paid, and what was the use of proceeds beyond the general statement in claim #11920?
The company disclosed a $2.6 billion DDTL 3.0 facility with a commitment termination date of 2026-07-31 and a minimum debt service coverage ratio of 1.40x beginning April 2027, cited as claims #4592, #4593, and #4596. It also disclosed a revolver with a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is how much of DDTL 3.0 was drawn before the commitment window passed (claim #4593 is now marked delayed) and what the current coverage ratio is against the 1.40x test. Nor has it said which conditions trigger the springing maturity less than three months from now, and whether they are on track to be cured.
What we aren't being told
2026-10-05The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then an OpenAI backlog of $11.2 billion on 2025-05-13 (claim #4969). What has not been said is why the figure fell by $700 million. Was that amount recognized as revenue, re-scoped, or is it a difference in how the two figures were defined? The same 2025-05-13 disclosure gave total backlog of $25.9 billion (claim #4970), which leaves roughly $14.7 billion attributed to customers that are not named. Which counterparties make up that remainder, and what share of it comes from any single customer other than OpenAI?
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13 (claims #4972 and #4973). What has not been said is where that capacity is located or when it will be energized. Which sites make up the roughly 1.2 GW gap between active and contracted power? For each site, what is the physical address, the utility or interconnection status, the expected energization date, and whether the capacity is owned, leased, or colocated?
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06 (claims #4731 and #4729), with a closing deadline of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the merger and the deadline are now marked delayed, and the deadline has passed. What has not been said in the record is whether the deal closed, was extended, or was terminated. If it was terminated, was the $270 million fee triggered and collected? How does the outcome change the contracted-capacity figure in claim #4973?
The company disclosed insider sales of $29.1 million by the CFO (claim #19831), $217 million by the CDO (claim #19832), and $103.3 million by the CEO (claim #19830), all between May and June 2025, within about three months of the 2025-03-28 IPO at $40 per share (claim #15974). What has not been said is whether these sales were made under Rule 10b5-1 plans, and if so, when those plans were adopted. Were any lock-up waivers or early-release provisions used to allow sales this soon after the IPO?
The company disclosed a $2.6 billion DDTL 3.0 facility (claims #11922 and #4592) with a commitment termination date of 2026-07-31 (claim #4593, now marked delayed) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim #4596). What has not been said is how much of the facility has been drawn. Which customer contract or contracts secure it and generate the cash flows tested by the coverage ratio? Was the commitment period extended past July 2026, and if so, on what terms?
The company disclosed a revolving credit facility expanded to $1.5 billion with a 2028-05-02 maturity (claims #5010 and #5012), but also a contingent springing maturity date of 2026-12-30 (claim #11926). Separately, a senior notes offering announced at $1.5 billion (claim #11921) appears as $2.0 billion at 9.250% (claims #11917 and #4824), with maturity given as both 2030-05-27 and 2030-06-01. What has not been said is what condition triggers the December 2026 springing maturity and whether that condition is currently met. What are the exact principal amount and maturity of the 2030 notes? How were the proceeds used, given that the use-of-proceeds disclosure (claim #11920) contains no amounts?
What we aren't being told
2026-10-04The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then reported OpenAI strategic deal backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the two figures differ by roughly $700 million, whether that gap reflects revenue already recognized, a renegotiation or an offset, and over what term and delivery schedule the remaining backlog converts to revenue. How much of the $25.9 billion total backlog in claim #4970 does this single customer represent?
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility in claims #4592 and #11922. What has not been said is who the counterparty is, what the contract is worth or how long it runs, and whether the facility is secured solely by this contract's receivables. Was the DDTL 3.0 fully drawn before the 2026-07-31 commitment termination date in claim #4593, which our tracker flags as delayed?
The company disclosed 1.6 GW of contracted power on 2025-05-13, cited as claim #4973, and 420 MW of active compute capacity added, cited as claim #4972. What has not been said is which physical sites make up the contracted figure, their interconnection or utility agreements, and the energization schedule that bridges the roughly 1.2 GW gap between contracted and active power. How much of the 1.6 GW depended on the Core Scientific sites?
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06, with a closing deadline of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. Our tracker flags both the merger and the deadline as delayed. What has not been said is whether the deal closed, was extended or was terminated. If it was terminated, was the $270 million fee triggered and collected, and how does the outcome change the capacity plan in claim #4973?
The company disclosed insider stock sales of about $103.3 million by the CEO, $217 million by the CDO and $29.1 million by the CFO between 2025-05-20 and 2025-06-30, cited as claims #19830, #19832 and #19831. These sales came within roughly three months of the $40 IPO in claims #11616 and #19821. What has not been said is whether they ran under pre-adopted 10b5-1 plans, whether any IPO lock-up was waived, and how they square with executive compensation and alignment disclosures in the proxy.
The company disclosed 2030 senior notes first sized at $1.5 billion and then issued at $2.0 billion with a 9.25% coupon, cited as claims #11921, #11918 and #4824, plus a 9% 2031 tranche upsized to $1.75 billion, cited as claims #4697 and #4698. The use-of-proceeds disclosure in claim #11920 gives no dollar allocation. What has not been said is how the proceeds were split between refinancing and capex, and which conditions trigger the 2026-12-30 springing maturity on the revolver in claim #11926. What is the actual minimum debt service coverage ratio referenced in claim #4596, and how much headroom does the company currently have against it?
What we aren't being told
2026-10-04The company disclosed on 2025-07-30 a $2.6 billion delayed draw term loan (DDTL 3.0), cited as claims #4592 and #4594, backed by a material customer contract for GPU infrastructure, cited as claim #4595, and subject to a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is who that customer is, what the contract is worth, and how long it runs. Because the covenant is measured against that contract's realized cash flows, investors cannot judge how close the company is to the 0.85x threshold without those details.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, but two months later reported OpenAI backlog of $11.2 billion, cited as claim #4969, within total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is what explains the roughly $0.7 billion gap: revenue already recognized, a contract amendment, or a different measurement basis. It also has not said who makes up the remaining roughly $14.7 billion of backlog, or how concentrated it is among its top two or three customers.
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted capacity on 2025-05-13, cited as claims #4972 and #4973. What has not been said is where that roughly 1.2 GW of uncommissioned capacity sits, which utilities or interconnection queues serve it, and when each tranche is expected to energize. It is also unstated whether these megawatt figures refer to critical IT load or gross utility load.
The company disclosed a Core Scientific merger at 0.1235 shares per Core Scientific share, with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. Both the deal and its deadline are now marked delayed. What has not been said on this record is whether the merger closed, was extended, or was terminated, and if it was terminated, whether the $270 million fee was triggered and collected. Relatedly, the 2025-05-05 credit facility carries a contingent springing maturity of 2026-12-30, cited as claim #11926, and the conditions that would trigger it have not been specified.
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between May and June 2025, cited as claims #19831, #19832 and #19830. These came weeks after a $40 IPO, cited as claim #11616, and alongside 9.25% senior notes, cited as claim #4824. What has not been said is when the related 10b5-1 plans were adopted, how the timing squares with IPO lock-up terms, and whether any of these executives have related-party interests in the company's data center landlords or suppliers.
The company's own notes disclosures are internally inconsistent. The May 2025 offering appears as $1.5 billion in claim #11921 and as $2.0 billion due 2030 in claims #11918 and #11917, with units recorded ambiguously as '1500.0 USD'. The July offering likewise moved from $1.5 billion to $1.75 billion, cited as claims #4700, #4697 and #4698. What has not been said is why each deal was upsized, and how the $17.2 billion of total capital raised, cited as claim #4968, breaks down across equity, secured debt and unsecured debt, along with the blended cost of each.
What we aren't being told
2026-10-04The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then on 2025-05-13 described OpenAI-related revenue backlog as $11.2 billion (claim #4969) inside a total committed backlog of $25.9 billion (claim #4970). What has not been said is why the two OpenAI figures differ by $700 million, over what term and at what take-or-pay terms the OpenAI amount is recognized, and who the counterparties are for the remaining roughly $14.7 billion of backlog, including what share the largest unnamed customer represents.
On 2025-05-13 the company reported 1.6 GW of contracted power (claim #4973) and 420 MW of active compute power "added" (claim #4972). What has not been said is whether 420 MW is cumulative active capacity or capacity added in the quarter, which physical sites and utilities make up the 1.6 GW, the interconnection status and expected energization dates for the uncontracted-to-active gap of roughly 1.2 GW, and how much of that power depends on the Core Scientific sites.
The Core Scientific merger was announced on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share, with an outside date of 2026-04-07 that our record now marks delayed (claims #4731, #4738, #19824), and a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was extended, or was terminated, whether the termination fee was triggered and collected, and how the convertible-note conversion mechanics (claim #4737) resolved.
The company announced the acquisition of Weights & Biases on 2025-05-13 (claim #4974) alongside a $1.4 billion IPO net-proceeds figure (claim #4967). What has not been said is the purchase price, the cash-versus-stock mix, whether IPO proceeds funded it, and what revenue and goodwill the acquired business contributes.
Within weeks of the March 2025 IPO at $40 per share (claims #15974, #19821), the CFO, Chief Development Officer, and CEO sold roughly $29.1 million, $217 million, and $103.3 million of stock respectively (claims #19831, #19832, #19830). Over the same window, the company raised senior notes at 9.25% (claims #4824, #11917). What has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted, whether any lock-up was waived or released early, and how the board weighed insider liquidity against the company paying high-yield coupons.
The May 2025 notes were announced at $1.5 billion and upsized to $2.0 billion (claims #11921, #11918). The July notes were announced at $1.5 billion and upsized to $1.75 billion at 9% (claims #4700, #4697, #4698). The use of proceeds was described only generically (claim #11920). Separately, the revolver carries a contingent springing maturity of 2026-12-30 (claim #11926), and the $2.6 billion DDTL 3.0 commitment window, ending 2026-07-31, is marked delayed (claims #4592, #4593). What has not been said is what triggers the springing maturity and whether it is live. It is also unclear how much of DDTL 3.0 was actually drawn before the window closed, whether the first 9% coupon due 2026-02-01 (claim #4659) was paid on schedule, and what current debt service coverage looks like against the 1.40x minimum that begins in April 2027 (claim #4596). Note that the claim list provided was truncated after claim #4596, so later disclosures may address some of these points.
What we aren't being told
2026-10-03The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then cited OpenAI-related revenue backlog of $11.2 billion on 2025-05-13 (claim #4969) alongside total committed backlog of $25.9 billion (claim #4970). What has not been said is what explains the $700 million gap between the two OpenAI figures (revenue recognized, a re-scoping, or a different measurement basis), and who the counterparties are behind the roughly $14.7 billion of non-OpenAI backlog. How concentrated is that remainder, and what are the contract durations and termination rights?
The company disclosed 420 MW of active power capacity added and 1.6 GW of contracted power on 2025-05-13 (claims #4972 and #4973). What has not been said is the period over which the 420 MW was added, the schedule for energizing the remaining contracted capacity, and the sites, landlords, and utility interconnection status behind it. Which facilities make up the 1.6 GW, and how much is self-built versus leased from third parties?
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02 on 2025-05-05 (claims #5010, #5012, #11923), and also a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what triggers the springing date, which is now less than three months away. Has the contingency been cleared, refinanced, or waived, and how much of the revolver and the $350 million letter-of-credit capacity (claim #5011) is currently drawn?
The company disclosed a $1.5 billion notes offering on 2025-05-18 (claim #11921) that became $2.0 billion of 9.250% notes due 2030 by 2025-05-27 (claims #11918, #11917, #4824). A $1.5 billion 9% notes offering on 2025-07-20 was likewise upsized by $250 million to $1.75 billion due 2031 (claims #4700, #4698, #4697). What has not been said is how proceeds from each upsize were specifically deployed beyond the generic use-of-proceeds language (claim #11920). What is the company's blended cost of debt and total annual cash interest burden after these issuances? The DDTL 3.0 facility of up to $2.6 billion (claims #11922, #4592) carries a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio beginning April 2027 (claims #4597, #4596). Which customer contracts collateralize it, and what is current headroom against those covenants?
The company disclosed a merger agreement with Core Scientific at an exchange ratio of 0.1235 shares, with a closing deadline of 2026-04-07 (claims #4731, #4738, #4729), and a $270 million termination fee payable to CoreWeave (claim #4739). Both the merger and the deadline are recorded as delayed, and that date has passed. What has not been said is whether the deal closed, was extended, or was terminated, and whether the $270 million fee was triggered and collected. If the deal did not close, how does the company replace the capacity it expected to gain from Core Scientific's sites?
The company disclosed insider stock sales by its CFO ($29.1 million, claim #19831), its CDO ($217 million, claim #19832), and its CEO ($103.3 million, claim #19830) between May and June 2025, within roughly three months of the $40 IPO (claims #19821, #15974). During the same window it was issuing high-yield debt. What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, whether any lock-up provisions were waived or released early to permit them, and how the board weighed executive liquidity against the company's financing needs. Relatedly, the purchase price and consideration mix for the Weights & Biases acquisition (claim #4974) do not appear in the record at all.
Note that the claim list supplied here is truncated mid-entry at claim #4593, so gaps arising from later disclosures may be missing.
What we aren't being told
2026-10-03The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then cited OpenAI-related backlog of $11.2 billion on 2025-05-13 (claim #4969) within total committed backlog of $25.9 billion (claim #4970). What has not been said is why the OpenAI figure fell by about $700 million in two months: revenue recognized, a contract amendment, or a different measurement basis? Also unsaid is who the counterparties are behind the remaining roughly $14.7 billion, and what share of it sits with a single customer.
The company disclosed 1.6 GW of contracted power (claim #4973) and 420 MW of active power added (claim #4972) on 2025-05-13. What has not been said is where any of this capacity physically sits, which utilities or interconnection queues serve it, and on what schedule the gap between contracted and active capacity is expected to close. Nor has it said whether the 420 MW is a quarterly addition or a cumulative active total.
The company disclosed a merger with Core Scientific at 0.1235 shares per share, with an outside date of 2026-04-07 (claims #4731, #4738), and a $270 million termination fee payable to CoreWeave (claim #4739). Both the merger and the deadline are now marked delayed. What has not been said is whether the deadline was extended, whether the agreement was terminated, whether the $270 million fee was triggered or collected, and how Core Scientific's convertible notes (claim #4737) were ultimately treated.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18 (claim #11921) that closed at $2.0 billion with 9.25% notes due 2030 (claims #11917, #4824). It then disclosed a 9% 2031 notes offering upsized from $1.5 billion to $1.75 billion (claims #4700, #4697, #4698). What has not been said is the specific use of proceeds behind the generic statement in claim #11920. The record also lacks the all-in annual interest burden across these tranches and confirmation that the first 9% coupon due 2026-02-01 (claim #4659, marked delayed) was paid on schedule.
The company disclosed an expanded $1.5 billion revolver maturing 2028-05-02 with a contingent springing maturity of 2026-12-30 (claims #11923, #11925, #11926). It also disclosed a $2.6 billion DDTL 3.0 facility with a commitment termination date of 2026-07-31, now marked delayed, and a 1.40x minimum debt service coverage ratio from April 2027 (claims #4592, #4593, #4596). What has not been said is what condition triggers the December 2026 springing maturity and whether it has been cured. The record also omits how much of DDTL 3.0 was drawn before commitments lapsed and what the current coverage ratio is against the 1.40x covenant.
The company's filings show the CFO selling $29.1 million of stock (claim #19831), the CDO $217 million (claim #19832), and the CEO $103.3 million (claim #19830) between May and June 2025. These sales came weeks after the $40 IPO (claim #11616) and alongside multibillion-dollar debt raises. What has not been said is whether these sales were made under pre-arranged 10b5-1 plans, how they squared with IPO lock-up terms, and whether any related-party arrangements with these executives appear in proxy disclosures.
What we aren't being told
2026-10-03The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described the OpenAI revenue backlog as $11.2 billion on 2025-05-13 (claim #4969), within total committed backlog of $25.9 billion (claim #4970). Two things have not been said. Was the roughly $700 million gap between the two OpenAI figures recognized revenue, a contract amendment, or a different measurement basis? And who are the counterparties behind the remaining roughly $14.7 billion of backlog, and how concentrated is it?
The company disclosed 420 MW of active compute power capacity added and 1.6 GW of contracted power on 2025-05-13 (claims #4972, #4973). What has not been said is whether 420 MW is cumulative or was added in the period, which sites and interconnection agreements make up the 1.6 GW, and on what schedule the remaining roughly 1.2 GW is expected to be energized.
The company disclosed a $2.6 billion DDTL 3.0 facility maturing 2030-08-21 (claims #11922, #4592, #4594), with a minimum contract realization ratio of 0.85x (claim #4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is how much has been drawn, which customer contracts collateralize the facility, the pricing, and how much headroom the company currently has against each covenant.
The company disclosed a $1.5 billion revolver expansion with maturity extended to 2028-05-02 (claims #5010, #5012) alongside a contingent springing maturity of 2026-12-30 (claim #11926). Less than three months now remain before that date. What triggers the springing maturity, and has that condition been cured or is it still live? The record also flags the first 9% coupon on the 2031 notes, due 2026-02-01, as delayed (claim #4659). Was that payment made on schedule?
The company announced a merger with Core Scientific at 0.1235 shares per share, with an outside date of 2026-04-07 (claims #4731, #4738), and a $270 million termination fee payable to CoreWeave (claim #4739). Both the merger and the deadline are now marked delayed. What has not been said is whether the deal closed, lapsed, or was terminated. If it was terminated, was the fee triggered and collected?
The record shows insider sales of $217 million by the CDO, $103.3 million by the CEO, and $29.1 million by the CFO within roughly three months of the IPO (claims #19832, #19830, #19831), against a $40 IPO price (claim #17815). What has not been said is whether these sales were made under Rule 10b5-1 plans, when any such plans were adopted relative to the IPO lockup, and how the proceeds compare with each executive's disclosed compensation and remaining holdings.
What we aren't being told
2026-10-03The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described the OpenAI backlog as $11.2 billion on 2025-05-13 (claim #4969), within total committed backlog of $25.9 billion (claim #4970). What has not been said is how the $700 million gap between the two OpenAI figures breaks down: revenue already recognized, a contract amendment, or a different measurement basis. The company also has not named the customers behind the roughly $14.7 billion of non-OpenAI backlog, or their concentration and contract tenors. Separately, the DDTL 3.0 disclosures of 2025-07-30 reference a material customer contract for GPU infrastructure (claim #4595) without naming the counterparty or stating the contract value that the facility is sized against.
On 2025-05-13 the company disclosed 420 MW of active power and 1.6 GW of contracted power (claims #4972 and #4973). What has not been said is where that capacity sits: which sites, their physical locations, and their interconnection status. The company also has not said whether these figures are critical IT load or gross utility power, or what the energization schedule is for the roughly 1.2 GW of contracted capacity that is not yet active. Without that, the backlog in claim #4970 cannot be mapped to deliverable megawatts.
The Core Scientific merger was announced on 2025-07-06/07 at 0.1235 CoreWeave shares per Core Scientific share (claims #4731, #4729, #19824), with a closing deadline of 2026-04-07 (claim #4738). Both the merger and the deadline are now marked delayed. A $270 million termination fee was payable to CoreWeave (claim #4739). What has not been said is the transaction's current status: whether the Core Scientific shareholder vote occurred and its outcome, whether the deadline was extended or the agreement terminated, whether the termination fee was triggered or collected, and what happened to the Core Scientific convertible notes conversion mechanics (claim #4737).
Several financing milestones are marked delayed with no follow-up disclosure. These include the notes closings expected 2025-05-27 and 2025-07-25 (claims #11919 and #4699), the first 9% coupon on the 2031 notes due 2026-02-01 (claim #4659), and the DDTL 3.0 commitment termination date of 2026-07-31 (claim #4593). What has not been said is whether each notes offering closed, whether the coupon was paid on time, and how much of the up to $2.6 billion DDTL 3.0 (claim #11922) was actually drawn before commitments terminated. The company also has not reported its actual performance against the 0.85x minimum contract realization ratio (claim #4597) or the debt service coverage covenant (claim #4596). Finally, it has not said what event triggers the contingent springing maturity of 2026-12-30 on the revolver (claim #11926), which would cut short the extension to 2028-05-02 (claims #5012 and #11925), or whether that trigger is currently live.
In mid-2025 the company's executives disclosed large insider sales: $29.1 million by the CFO (claim #19831), $217 million by the CDO (claim #19832), and $103.3 million by the CEO (claim #19830). These came within roughly three months of a $40 IPO (claims #17815 and #19821) and alongside more than $5 billion of new senior notes. What has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted. The company also has not said whether any lock-up was waived or released early to permit them, or how the sales compare with each executive's total equity holdings and the compensation disclosed in the proxy.
What we aren't being told
2026-10-02The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is why the figure fell by $700 million in two months: was this revenue recognized, a contract amendment, or a different measurement basis? The same 2025-05-13 release put total committed backlog at $25.9 billion (claim #4970). That leaves roughly $14.7 billion of backlog with no named counterparties. Which customers hold it, and what share does Microsoft or any other single customer account for?
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is how the roughly 1.2 GW gap will be energized. A sophisticated reader would expect site names or addresses, utility interconnection status, quarter-by-quarter energization dates, and whether the figures measure critical IT load or gross utility power.
The company disclosed a $1.5 billion revolving credit facility maturing on 2028-05-02 on 2025-05-05, cited as claims #11923 and #11925. The same disclosure set a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is which condition triggers the earlier date, whether it was tied to refinancing the 2030 notes, and whether that condition has been cured with the springing date now under three months away.
The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30, cited as claims #4592 and #4594. That facility carries a minimum contract realization ratio of 0.85x (claim #4597), and its commitment termination date of 2026-07-31 is now marked delayed (claim #4593). What has not been said is how much was actually drawn before commitments lapsed and what the realization ratio stands at today. A related question is whether the material customer contract at claim #4595 is the collateral contract, and if so, who the counterparty is. The record for that claim is truncated and does not name one.
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06, cited as claims #4731 and #4729. That agreement carried a $270 million termination fee payable to CoreWeave (claim #4739), and its 2026-04-07 closing deadline is now marked delayed (claim #4738). What has not been said is whether the deal closed, was extended, or was terminated, and if terminated, whether the $270 million was paid. If the deal did not close, how does the company plan to replace the Core Scientific power capacity it was counting on?
The company disclosed insider stock sales of $217 million by the CDO by 2025-05-31, $103.3 million by the CEO by 2025-06-30, and $29.1 million by the CFO by 2025-05-20, cited as claims #19832, #19830, and #19831. These sales came within roughly three months of the $40 IPO on 2025-03-28 (claim #15974). What has not been said is whether the sales were made under 10b5-1 plans and when those plans were adopted. Were any lock-up waivers granted? How do these sales relate to the executives' remaining holdings and compensation?
What we aren't being told
2026-10-02The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a 0.85x minimum contract realization ratio covenant (claim #4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim #4596); what has not been said is who the counterparty is, the contract's dollar value and term, and how much DDTL 3.0 borrowing capacity rests on that single unnamed customer. What is the current realization and coverage ratio, and how much headroom exists against each covenant?
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI backlog of $11.2 billion within a $25.9 billion total backlog on 2025-05-13 (claims #4969 and #4970); what has not been said is what accounts for the $700 million gap between the two figures, whether it reflects revenue already recognized, a re-scoping, or a definitional difference. Who are the counterparties behind the remaining roughly $14.7 billion of backlog, and what share does any single non-OpenAI customer represent?
The company disclosed 420 MW of active power capacity added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is whether 420 MW is cumulative or added in the quarter, which sites make up the contracted 1.6 GW, their physical locations and utility interconnection status, and the expected energization dates for the roughly 1.2 GW not yet active.
The company disclosed a revolving credit facility extended to 2028-05-02 with a contingent springing maturity of 2026-12-30 on 2025-05-05, cited as claims #11925 and #11926; what has not been said is the condition that triggers the springing date, whether that condition has been cured, or what refinancing is planned with less than three months remaining. The 2030 senior notes are also recorded as $1.5 billion (claim #11921) and later $2.0 billion (claims #11917 and #11918), and DDTL 3.0 is recorded as 2600.0 USD (claim #11922) with units left ambiguous; what were the final drawn amounts and blended cost of debt across these facilities?
The company disclosed a merger with Core Scientific at 0.1235 shares per share and an outside date of 2026-04-07 on 2025-07-06, cited as claims #4731 and #4738, both now marked delayed, along with a $270 million termination fee payable to CoreWeave (claim #4739); what has not been said is whether the deal closed, was terminated, or had its outside date extended. If it was terminated, has the termination fee been triggered and collected?
The company disclosed insider stock sales of $217 million by the CDO, $103.3 million by the CEO, and $29.1 million by the CFO between May and June 2025, cited as claims #19832, #19830, and #19831, within roughly three months of the $40 IPO (claim #11616); what has not been said is whether these sales occurred under pre-arranged 10b5-1 plans, whether lock-up waivers were granted, or how the sales compare with each executive's remaining holdings and compensation.
What we aren't being told
2026-10-02The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the DDTL 3.0 maturity (claim #4594) and a 0.85x minimum contract realization ratio covenant (claim #4597). What has not been said is who the counterparty is, what the contract's dollar value and term are, and whether that contract is the collateral the realization covenant is measured against. If it is, the creditworthiness of an unnamed customer directly governs a multi-billion-dollar facility.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and two months later an OpenAI backlog of $11.2 billion (claim #4969) within total committed backlog of $25.9 billion (claim #4970). What has not been said is whether the $0.7 billion gap is revenue already recognized or a contract revision. It also has not named the customers behind the remaining roughly $14.7 billion, or disclosed what share of that comes from a single counterparty.
The company disclosed 420 MW of active compute power capacity added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is whether 420 MW is cumulative or added during the quarter. Nor has it named the sites, locations, utility or interconnection arrangements, or energization dates that would convert the remaining roughly 1.2 GW from contracted to active.
The company disclosed a merger with Core Scientific at 0.1235 shares per share, with a closing deadline of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. Our record marks the deal as delayed past that deadline. What has not been said is whether the merger closed, was extended, or was terminated, and whether the termination fee was triggered, paid, or waived.
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO in May and June 2025, cited as claims #19831, #19832 and #19830. Those sales came within about three months of the $40 IPO (claims #11601 and #19821). What has not been said is whether the sales were made under pre-established 10b5-1 plans, how they relate to IPO lock-up terms, and how management's retained ownership compares with the proxy's compensation disclosures.
The company disclosed a revolving credit facility expanded to $1.5 billion with a maturity extended to 2028-05-02 but subject to a contingent springing maturity of 2026-12-30, cited as claims #11923, #11925 and #11926. It also disclosed a 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596), on top of 9.25% notes due 2030 (claim #4824) and 9% notes due 2031 (claims #4697 and #4658). What has not been said is what condition triggers the springing maturity, now less than three months away, and what the company's current DSCR is against that 1.40x floor. Our record also marks the first 9% coupon due 2026-02-01 as delayed (claim #4659) with no confirming disclosure that it was paid.
What we aren't being told
2026-10-02The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (claims #4592, #11922) maturing 2030-08-21 (claim #4594), a 0.85x minimum contract realization ratio (claim #4597), and a 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is who the counterparty is, what the contract is worth, and how long it runs. Without that, how can a reader judge whether the covenants that start in April 2027 will hold?
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then $11.2 billion of OpenAI revenue backlog within $25.9 billion of total committed backlog on 2025-05-13, cited as claims #4969 and #4970. What has not been said is what accounts for the roughly $700 million gap between the two figures: revenue already recognized, a re-scoping, or a change in timing. Also unstated is the share of total backlog that now sits with OpenAI and Microsoft combined, and how that backlog is spread across fiscal years.
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is which sites make up those totals, their physical locations and interconnection status, and when the remaining roughly 1.2 GW is expected to be energized. How much of the contracted figure depended on Core Scientific facilities?
The company disclosed a merger with Core Scientific at 0.1235 shares per share, with a closing deadline of 2026-04-07, on 2025-07-06, cited as claims #4731 and #4738. Both claims now carry a delayed status. The company also disclosed a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is whether the deal closed, lapsed, or was terminated, and whether that fee was triggered or collected. What happened to the capacity the deal was meant to secure?
The company disclosed an expanded revolving credit facility with maturity extended to 2028-05-02 on 2025-05-05, cited as claims #5010 and #11925, along with a contingent springing maturity date of 2026-12-30, cited as claim #11926. What has not been said is which condition triggers the springing maturity and whether it has been cured or waived, now that the date is less than three months away. Separately, the notes record is ambiguous on size and units. Claim #11921 cites $1.5 billion of 2030 notes, while claims #11918 and #11917 cite $2 billion at 9.25% (claim #4824). Claim #4700 cites $1.5 billion, while claims #4697 and #4698 cite $1.75 billion at 9%. Were these upsizes, and was the first 9% interest payment due 2026-02-01, flagged as delayed in claim #4659, made on time?
The company disclosed insider stock sales by its CFO of $29.1 million (claim #19831), its CDO of $217 million (claim #19832), and its CEO of $103.3 million (claim #19830), all between 2025-05-20 and 2025-06-30. These came within about three months of the $40 IPO (claims #15974, #4967). What has not been said is whether these sales were made under Rule 10b5-1 plans, whether lock-up waivers were granted, and how they relate to executive compensation and related-party disclosures in the proxy.
What we aren't being told
2026-10-01The company disclosed a $2.6 billion delayed draw term loan (DDTL 3.0) on 2025-07-30, cited as claims #4592 and #11922, secured by a material customer contract for GPU infrastructure, cited as claim #4595, with a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is who the counterparty is, what the contract's total value and term are, and how much headroom exists above the 0.85x covenant if that customer delays or reduces consumption.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then reported OpenAI backlog of $11.2 billion within $25.9 billion of total backlog on 2025-05-13, cited as claims #4969 and #4970. What has not been said is whether the roughly $700 million difference reflects revenue already recognized, a renegotiation, or a definitional change. The company also has not said how the remaining ~$14.7 billion of backlog is split among other named customers, or how concentrated it is in the next largest one.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites make up the roughly 1.2 GW gap, where they are, what interconnection or utility agreements back them, and on what quarter-by-quarter schedule that power is expected to energize.
The company disclosed a 2030 senior notes offering at $1.5 billion on 2025-05-18, cited as claim #11921, which closed at $2.0 billion at 9.250%, cited as claims #11917, #11918 and #4824. It then launched a $1.5 billion 2031 offering on 2025-07-20, cited as claim #4700, that was upsized by $250 million to $1.75 billion at 9%, cited as claims #4697 and #4698. What has not been said is the aggregate annual cash interest burden across these notes, the DDTLs and the revolver. The company also has not said how that burden compares to operating cash flow ahead of the 1.40x debt service coverage test that begins April 2027, cited as claim #4596.
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02 on 2025-05-05, cited as claims #11923 and #11925. It also disclosed a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is which instrument or condition triggers the springing date, and whether that condition has been cured as the date approaches.
The company disclosed a merger with Core Scientific at 0.1235 shares per share with a 2026-04-07 outside date on 2025-07-06, cited as claims #4731 and #4738, both now marked delayed, plus a $270 million termination fee payable to CoreWeave, cited as claim #4739. What has not been said is the deal's current status, whether the termination fee has been triggered or collected, and how the 1.3 GW-scale Core Scientific capacity assumptions feed into the contracted power figures above.
The company's record shows insider sales of $103.3 million by the CEO, $217 million by the CDO and $29.1 million by the CFO between May and June 2025, cited as claims #19830, #19832 and #19831. Those sales came within roughly three months of the $40 IPO, cited as claim #11601. What has not been said is whether these sales were made under 10b5-1 plans, whether lock-up waivers were granted to permit them, and how they square with the executives' disclosed compensation and retained ownership.
What we aren't being told
2026-10-01The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then cited an OpenAI revenue backlog of $11.2 billion on 2025-05-13 (claim #4969). What has not been said is what accounts for the $700 million difference: revenue already recognized, a contract amendment, or a different measurement basis. The company has also not disclosed the contract term, the delivery schedule, or how the backlog converts to revenue by year.
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30 (claim #4595), alongside a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who the counterparty is, what the contract is worth, and whether it is the OpenAI agreement or a new customer. That matters because the realization covenant appears to depend directly on that customer performing.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13 (claims #4973, #4972). What has not been said is where that capacity sits and when it is scheduled to be energized. There are no site addresses, utility interconnection agreements, or dates for converting contracted power to active power. The company also has not said whether these figures measure critical IT load or gross facility power, or what period the 420 MW was added over.
The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-05-18 (claim #11922), with a commitment termination date of 2026-07-31 now marked delayed (claim #4593) and a 1.40x debt service coverage covenant starting April 2027 (claim #4596). What has not been said is how much has been drawn, whether the commitment period was extended or simply lapsed, and how much headroom exists today against the 1.40x test. Separately, the revolver was extended to 2028-05-02 but carries a springing maturity of 2026-12-30 (claims #5012, #11926). The company has not said which debt or event triggers that earlier date, and the date is now less than three months away.
The company described its May 2025 senior notes as $1.5 billion on 2025-05-18 (claim #11921) and as $2.0 billion on 2025-05-20 and 2025-05-27 (claims #11918, #11917). It also stated the use of proceeds only generically (claim #11920). What has not been said is why the offering was upsized by $500 million. By contrast, the company explicitly disclosed the $250 million upsize of the July notes (claim #4698). It has also not said which specific obligations the proceeds repaid or which buildouts they funded.
The company disclosed insider sales within roughly three months of its $40 IPO (claims #11601, #19821): $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO (claims #19831, #19832, #19830). What has not been said is whether these sales were made under 10b5-1 plans and whether underwriters waived the lock-up early. The company also has not explained how the sales fit with the CEO's and CDO's remaining ownership and voting control. Separately, the Core Scientific merger at a 0.1235 exchange ratio with a 2026-04-07 outside date is marked delayed (claims #4731, #4738). The company has not said whether the deal closed or was terminated, whether the $270 million termination fee was paid (claim #4739), or what happened to any contracted capacity that depended on Core Scientific sites.
What we aren't being told
2026-10-01The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI backlog of $11.2 billion within a total backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970. What has not been said is whether the $0.7 billion difference is revenue already recognized or a change in contract terms, and who holds the remaining roughly $14.7 billion of committed backlog. What is the customer concentration, and what are the contract tenors and termination rights behind that figure?
The company disclosed 420 MW of active power added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is where any of this capacity sits: no site addresses, utilities, interconnection queue positions or energization dates appear anywhere in the record. What period does the 420 MW cover, and how much of the 1.6 GW has an executed interconnection agreement rather than a lease or letter of intent?
The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-05-18, cited as claim #11922, with a commitment termination date of 2026-07-31 now marked delayed, a 1.40x minimum debt service coverage ratio beginning April 2027, and a 0.85x minimum contract realization ratio, cited as claims #4593, #4596 and #4597. It also disclosed a contingent springing maturity of 2026-12-30 on the revolver, cited as claim #11926. What has not been said is how much of the DDTL was actually drawn before commitments lapsed, which customer contract collateralizes it, current headroom against both ratios, and what event would trigger the springing maturity. What are those numbers today?
The company disclosed 2030 senior notes as $1.5 billion on 2025-05-18 and as $2.0 billion at a 9.25% coupon by 2025-05-27, cited as claims #11921, #11918, #11917 and #4824. It then disclosed a July offering upsized from $1.5 billion to $1.75 billion at 9%, cited as claims #4700, #4697 and #4698, while the record marks the expected closings and the first 2026-02-01 coupon as delayed, cited as claims #11919, #4699 and #4659. What has not been said is the use of proceeds for each upsized tranche, confirmation that both deals closed on schedule, and whether the first coupon was paid when due.
The company disclosed a merger with Core Scientific at 0.1235 CoreWeave shares per share, with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave, on 2025-07-06, cited as claims #4731, #4738 and #4739. The outside date has passed and is marked delayed. What has not been said is the outcome: was the deal terminated or voted down, was the $270 million fee triggered or collected, and what happens to the hosting contracts and the convertible-notes treatment described in claim #4737?
The company disclosed insider sales of $103.3 million by the CEO, $217 million by the CDO and $29.1 million by the CFO between May and June 2025, cited as claims #19830, #19832 and #19831. These sales came within roughly three months of a $40 IPO, cited as claim #11601, and alongside 9% to 9.25% debt raises. What has not been said is whether the sales were made under 10b5-1 plans and when those plans were adopted, whether the IPO lockup was waived or released early, and how the proxy reconciles these sales with executive compensation and any related-party dealings. The record available here is also truncated at claim #4595, so further customer-level gaps may exist beyond those listed.
What we aren't being told
2026-10-01The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, in the same filing as the $2.6 billion DDTL 3.0 facility (claim #4592); what has not been said is who the counterparty is, what the contract's total value and term are, and whether this single contract is the collateral base that the delayed draw loan was sized against.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, within a total committed backlog of $25.9 billion (claim #4970); what has not been said is whether the roughly $700 million gap reflects revenue already recognized, a contract amendment, or a different measurement basis, and who the customers are behind the remaining roughly $14.7 billion of backlog, including what share the largest non-OpenAI customer represents.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972; what has not been said is whether 420 MW is a single-quarter addition or a cumulative active total, which named sites and utilities make up the 1.6 GW, and on what interconnection or energization schedule the contracted but inactive capacity is expected to come online.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18, cited as claim #11921, then $2.0 billion of 9.250% notes on 2025-05-20 and 2025-05-27, cited as claims #11918, #11917 and #4824, with use of proceeds referenced only generically in claim #11920; what has not been said is what drove the $500 million upsize, how much of the proceeds went to capex versus refinancing or general corporate purposes, and why the expected closing (claim #11919) carries a delayed status despite a stated issuance date. The same question applies to the July 9% notes, upsized by $250 million to $1.75 billion (claims #4697 and #4698): was the first coupon due 2026-02-01 (claim #4659) paid on schedule?
The company disclosed a merger with Core Scientific at 0.1235 shares per share, with a 2026-04-07 outside date and a $270 million termination fee payable to CoreWeave, on 2025-07-06, cited as claims #4731, #4738 and #4739; what has not been said is whether the transaction closed, was extended or was terminated after the outside date passed, given that both the merger and the deadline now carry a delayed status, and whether any termination fee was triggered or collected.
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between May and June 2025, cited as claims #19831, #19832 and #19830, only weeks after the IPO at $40 per share (claim #15974); what has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted, how they relate to lockup terms, and how they compare with each executive's equity compensation. On the financing side, the DDTL 3.0 covenants of a 1.40x minimum debt service coverage ratio from April 2027 and a 0.85x minimum contract realization ratio (claims #4596 and #4597), along with the revolver's contingent springing maturity of 2026-12-30 (claim #11926), raise a related question: what are the current covenant ratios and headroom, and what condition triggers the springing maturity?
What we aren't being told
2026-10-01The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is what explains the roughly $700 million gap: revenue already recognized, a contract amendment, or a change in how the backlog was measured. The company also has not given the contract term, the delivery schedule, or whether the commitment is take-or-pay.
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595. On the same date it disclosed a 0.85x minimum contract realization ratio, cited as claim #4597, and a $2.6 billion DDTL 3.0 facility with a 2026-07-31 commitment termination date, cited as claims #4592 and #4593. What has not been said is who the counterparty is, what the contract is worth, and how much of DDTL 3.0 had actually been drawn when the commitment period ended. The delayed status on claim #4593 makes the drawn amount especially relevant.
The company disclosed 1.6 GW of contracted power and 420 MW of active power capacity added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is whether 420 MW is the quarter's addition or the cumulative active total. The company also has not named the sites behind the 1.6 GW, their interconnection or utility status, or a dated energization schedule that would convert contracted capacity into active capacity.
The company disclosed a merger with Core Scientific at 0.1235 shares per share, a 2026-04-07 closing deadline, and a $270 million termination fee payable to CoreWeave on 2025-07-06, cited as claims #4731, #4738 and #4739. All three closing-related claims now carry a delayed status. What has not been said is whether the deal terminated or was extended, whether the $270 million fee was triggered and collected, and how the capacity CoreWeave expected from Core Scientific sites is now being replaced.
The company disclosed that its revolving credit facility was extended to 2028-05-02, with a contingent springing maturity of 2026-12-30, on 2025-05-05, cited as claims #11925 and #11926. Separately, the May 2025 notes offering grew from $1.5 billion to $2.0 billion, cited as claims #11921 and #11918, while the use of proceeds in claim #11920 was described only generically. What has not been said is what condition triggers the springing maturity, which now falls less than three months out, and whether that condition has been cured. The company also has not said where the extra $500 million of note proceeds went, or whether the first 9% coupon on the 2031 notes, cited as claim #4659 and marked delayed, was paid on 2026-02-01.
The company disclosed insider stock sales of $217 million by the CDO, $103.3 million by the CEO and $29.1 million by the CFO between 2025-05-20 and 2025-06-30, cited as claims #19832, #19830 and #19831. These sales came within about three months of the $40 IPO, cited as claim #11616. What has not been said is whether the sales were made under Rule 10b5-1 plans, whether any lock-up waivers were granted to allow them, and what portion of each executive's holdings they represent.
What we aren't being told
2026-09-30The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820) and then cited OpenAI backlog of $11.2 billion on 2025-05-13 (claim #4969), inside total committed backlog of $25.9 billion (claim #4970). What has not been said is why the OpenAI figure fell by $700 million, the contract's term, take-or-pay terms, and MW allocation, and who holds the remaining roughly $14.7 billion of backlog. No other counterparty is named anywhere on record, which leaves customer concentration unquantified.
The company disclosed 420 MW of active power capacity added and 1.6 GW of contracted power on 2025-05-13 (claims #4972 and #4973). What has not been said is whether 420 MW was added in the quarter or is cumulative active capacity, which sites, addresses, and utility interconnection agreements make up the 1.6 GW, and on what schedule the contracted-but-unenergized capacity is expected to come online.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18 (claim #11921), then a $2.0 billion issuance on 2025-05-20 and 2025-05-27 (claims #11918 and #11917), with maturity given as both 2030-06-01 and 2030-05-27 for the 9.250% notes (claim #4824). The July 9% notes likewise grew from $1.5 billion to $1.75 billion (claims #4700, #4698, and #4697), and the expected closing dates and first coupon date are flagged as delayed (claims #11919, #4699, and #4659). What has not been said is why the May deal was upsized by $500 million, which maturity date is correct, and whether both offerings closed on schedule and the 2026-02-01 coupon was paid.
The company disclosed a revolving credit facility expansion of $1.5 billion with maturity extended to 2028-05-02 and a contingent springing maturity of 2026-12-30 (claims #11923, #5012, and #11926). What has not been said is what triggers the springing maturity, which falls three months from now, whether the $1.5 billion is the increment or the new total, and how much of the revolver and the $350 million letters of credit facility (claim #11924) is currently drawn.
The company disclosed a $2.6 billion DDTL 3.0 facility with a commitment termination date of 2026-07-31, now marked delayed, and a 1.40x minimum debt service coverage ratio beginning April 2027 (claims #4592, #4593, and #4596). What has not been said is how much was drawn before commitments lapsed, whether the termination date was extended, and which customer contracts' cash flows collateralize the facility and support the coverage test.
The company disclosed insider sales of $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO between late May and June 2025 (claims #19831, #19832, and #19830), within weeks of the $40 IPO (claim #11616) and concurrent with the $2.0 billion notes offering (claim #11918). The Core Scientific merger also carried a 2026-04-07 deadline that is now marked delayed, with a $270 million termination fee payable to CoreWeave (claims #4731, #4738, and #4739). What has not been said is whether the insider sales were made under 10b5-1 plans and when those plans were adopted, and whether the merger was terminated and the $270 million fee has actually been received.
What we aren't being told
2026-09-30The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion within total committed backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970. What has not been said is why the OpenAI figure fell by about $700 million in two months, whether through recognized revenue, a contract amendment, or a different measurement basis. Who are the counterparties behind the remaining roughly $14.7 billion of backlog, and what share does the largest single customer represent?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is whether 420 MW was added in the quarter or is the cumulative total. Where are the sites that make up the 1.6 GW, and are they owned, leased, or colocated? What are their interconnection or utility energization dates, and what is the schedule for converting contracted capacity into active capacity?
The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-05-18 and 2025-07-30, cited as claims #11922 and #4592. That disclosure included a commitment termination date of 2026-07-31, now passed, and a minimum 1.40x debt service coverage ratio beginning April 2027, cited as claims #4593 and #4596. What has not been said is how much of the $2.6 billion was actually drawn before commitments lapsed. Which customer contracts and GPU assets secure the facility, and what is the current coverage ratio against the 1.40x covenant?
The company disclosed a revolving credit facility expanded to $1.5 billion, maturing 2028-05-02, with a contingent springing maturity of 2026-12-30, on 2025-05-05, cited as claims #5010, #5012 and #11926. What has not been said is what condition triggers the springing date, now three months away. Has that condition been cured or refinanced, and how much of the revolver and the $350 million letter-of-credit line (claim #11924) is currently drawn? Relatedly, the $2.0 billion 2030 notes were first described as $1.5 billion (claims #11921, #11918), and the 2031 notes were upsized from $1.5 billion to $1.75 billion (claims #4700, #4697, #4698). Were the February 2026 coupons on the 2031 notes (claim #4659) paid on schedule?
The company disclosed a merger agreement with Core Scientific at 0.1235 shares per share, an outside date of 2026-04-07, and a $270 million termination fee payable to CoreWeave, on 2025-07-06 and 2025-07-07, cited as claims #4731, #4738, #4739 and #4729. What has not been said, now that the outside date has passed, is whether the merger closed, was extended, or was terminated. If it was terminated, was the $270 million fee triggered and received? What is the status of the existing Core Scientific hosting capacity that underpinned the deal? The Weights & Biases acquisition (claim #4974) was similarly announced without a disclosed purchase price or consideration mix.
The company disclosed insider sales of $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830. These sales came within about three months of the $40 IPO (claims #17815, #19821). What has not been said is whether the sales were made under Rule 10b5-1 plans adopted before the IPO, whether any lock-up waivers were granted to permit them, and how the executives' remaining ownership and voting control compare to their pre-IPO positions. The record provided also ends mid-entry at claim #4595, a 2025-07-30 customer item with no content, so any customer disclosure tied to the DDTL 3.0 collateral could not be evaluated.
What we aren't being told
2026-09-30The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then on 2025-05-13 put OpenAI-related backlog at $11.2 billion within a total committed-contract backlog of $25.9 billion, cited as claims #4969 and #4970; what has not been said is whether the $0.7 billion difference reflects revenue already recognized, a repricing, or a scope change, and who the customers behind the remaining roughly $14.7 billion of backlog are and how concentrated that remainder is.
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is whether these figures are critical IT load or gross utility capacity, which named sites and interconnection agreements make up the 1.6 GW, and on what schedule the contracted but inactive megawatts are expected to be energized.
The company disclosed a merger with Core Scientific at 0.1235 shares, a closing deadline of 2026-04-07, and a $270 million termination fee payable to CoreWeave on 2025-07-06, cited as claims #4731, #4738 and #4739, and both the merger and the deadline are now marked delayed; what has not been said is whether the deal closed, was extended, or was terminated, and if it was terminated, whether the $270 million fee was triggered and collected.
The company disclosed a revolving facility expansion to $1.5 billion with a 2028-05-02 maturity and a contingent springing maturity of 2026-12-30 on 2025-05-05, cited as claims #11923, #11925 and #11926, and a DDTL 3.0 facility of up to $2.6 billion carrying a 1.40x minimum debt service coverage ratio beginning April 2027, cited as claims #4592 and #4596; what has not been said is what condition triggers the December 2026 springing maturity, how much of DDTL 3.0 had been drawn before its commitment termination date of 2026-07-31 (claim #4593, marked delayed), and what the current coverage ratio is against the 1.40x test.
The company disclosed a 2030 senior notes offering sized at $1.5 billion on 2025-05-18 and then issued $2.0 billion at 9.250% on 2025-05-27, cited as claims #11921, #11918 and #4824, followed by $1.75 billion of 9% notes due 2031 upsized by $250 million, cited as claims #4697 and #4698; what has not been said is the dollar allocation behind the stated use of proceeds (claim #11920), how much of the $17.2 billion in total capital raised (claim #4968) is debt versus equity, and what the blended cost of debt is after these issuances.
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830, within months of a $40 IPO that raised $1.4 billion in net proceeds, cited as claims #11616 and #4967; what has not been said is whether these sales were made under pre-arranged 10b5-1 plans, whether any lockup waivers were granted, and why executive sales totalling about $349 million came to roughly a quarter of the company's own IPO net proceeds.
What we aren't being told
2026-09-29The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. What has not been said is what explains the $700 million gap. Was it revenue recognized in the interim, a contract amendment, or a different measurement basis? What are the contract's term, termination rights, and take-or-pay structure?
The company disclosed total committed-contract backlog of $25.9 billion on 2025-05-13, cited as claim #4970, and named OpenAI as roughly $11.2 billion of it (claim #4969). What has not been said is who holds the remaining ~$14.7 billion. How concentrated is that residual among one or two unnamed customers, and what share of it comes due within 12 months versus later years?
The company disclosed 420 MW of active power added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is where any of this capacity physically sits. Which sites and utilities are involved, and what is the interconnection status of each? Is the 420 MW critical IT load or gross facility power, and over what period was it "added"? On what schedule does the remaining ~1.2 GW energize?
The company disclosed a revolving credit facility extended to 2028-05-02 alongside a contingent springing maturity of 2026-12-30 on 2025-05-05, cited as claims #5012, #11925 and #11926. It also disclosed a $2.6 billion DDTL 3.0 facility whose commitment termination date of 2026-07-31 is now marked delayed (claims #4592, #4593, #11922). What has not been said is what condition triggers the springing maturity, which falls three months from now. How much of DDTL 3.0 was actually drawn before commitments lapsed? Which customer contracts collateralize it, and how does the company expect to meet the 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596)?
The company disclosed a May 2025 senior notes offering at $1.5 billion on 2025-05-18, cited as claim #11921, and then at $2.0 billion on 2025-05-20 and 2025-05-27, cited as claims #11918 and #11917. The expected closing is marked delayed (claim #11919). It disclosed a July offering at both $1.5 billion and $1.75 billion, including a $250 million upsize (claims #4700, #4697, #4698), and the first 9% coupon payment due 2026-02-01 is also marked delayed (claim #4659). What has not been said is the final issued amount of each tranche and the blended cost of debt. Was the February 2026 coupon paid on schedule?
The company disclosed a merger with Core Scientific at a 0.1235 exchange ratio on 2025-07-06, with a closing deadline of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. Both the merger and the deadline are marked delayed. What has not been said is whether the deal closed, was extended, or was terminated. If it was terminated, has the $270 million fee been paid or collected?
The company disclosed insider stock sales of $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830. These fell within roughly three months of the $40 IPO (claim #15974). What has not been said is whether these sales ran under Rule 10b5-1 plans, and when those plans were adopted. Were lock-up waivers granted, and how do the proceeds compare with each executive's disclosed compensation?
What we aren't being told
2026-09-29The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then on 2025-05-13 attributed $11.2 billion of backlog to the same OpenAI deal (claim #4969) within a $25.9 billion total backlog (claim #4970). What has not been said is why the OpenAI figure fell by $700 million in two months, whether that reflects revenue already recognized or a contract amendment, and who holds the remaining roughly $14.7 billion of backlog. How many customers make up that balance, and what share does the largest unnamed counterparty hold?
On 2025-05-13 the company reported 420 MW of active power capacity added (claim #4972) and 1.6 GW of contracted power (claim #4973). What has not been said is whether the 420 MW was added in the quarter or is a cumulative total, or which sites, utilities and interconnection agreements make up the roughly 1.2 GW gap between contracted and active capacity. What is the site-by-site energization schedule for that gap?
The May 2025 senior notes were first described at $1.5 billion (claim #11921) and then at $2.0 billion at 9.250% (claims #11918, #11917, #4824), and the expected 2025-05-27 closing is recorded as delayed (claim #11919). The July 9% notes were upsized by $250 million to $1.75 billion (claims #4698, #4697), and the first coupon due 2026-02-01 is also recorded as delayed (claim #4659). What has not been said is what drove each upsizing, whether both offerings closed on schedule, and whether the February 2026 interest payment was made in full and on time.
The $2.6 billion DDTL 3.0 facility (claims #11922, #4592) had a commitment termination date of 2026-07-31, now marked delayed (claim #4593). It carries a 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596). Separately, the revolver extended to 2028-05-02 has a contingent springing maturity of 2026-12-30 (claims #5012, #11926). What has not been said is how much of the DDTL was drawn before commitments lapsed or were extended, what current DSCR headroom looks like, and what event triggers the December 2026 springing maturity, which is now three months away.
The Core Scientific merger at 0.1235 shares per share (claim #4731) carried a closing deadline of 2026-04-07, now marked delayed (claim #4738). It included a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was extended, or was terminated, whether the termination fee became payable and was collected, and how the outcome changes the 1.6 GW contracted-capacity figure that likely depended on Core Scientific sites.
The CFO, CDO and CEO sold roughly $29.1 million, $217 million and $103.3 million of stock respectively between May and June 2025 (claims #19831, #19832, #19830). Those sales came within three months of the $40 IPO (claims #11616, #19821) and alongside 9%+ debt raises. What has not been said is whether these sales were under Rule 10b5-1 plans, when any such plans were adopted, and whether underwriters granted early lock-up releases to permit them.
Note that the claim list supplied here ends mid-record at claim #4597, so later disclosures may already answer some of these questions.
What we aren't being told
2026-09-29The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13 (claim #4970), of which $11.2 billion is attributed to the OpenAI strategic deal (claim #4969), while an OpenAI contract valued at $11.9 billion was separately recorded on 2025-03-10 (claim #19820). What has not been said is who holds the remaining roughly $14.7 billion of committed backlog, what share any single customer represents, what the weighted-average contract duration is, and why the OpenAI figure differs by $700 million between the two disclosures.
The company disclosed 420 MW of active power capacity 'added' and 1.6 GW of contracted power on 2025-05-13 (claims #4972 and #4973). What has not been said is whether 420 MW is the cumulative active base or the increment for the period, where the roughly 1.2 GW of contracted but inactive capacity is physically located, which utilities and substations serve those sites, and on what schedule each tranche is expected to be energized.
The company disclosed a $2.6 billion DDTL 3.0 facility (claims #11922 and #4592) with a commitment termination date of 2026-07-31 that the record now flags as delayed (claim #4593), and a minimum 1.40x debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is how much of the $2.6 billion was actually drawn before commitments lapsed, which customer contracts or assets secure the draws, and what the current coverage ratio is relative to the 1.40x covenant.
On 2025-05-05 the company disclosed a $1.5 billion revolver expansion with maturity extended to 2028-05-02 (claims #11923 and #5012), alongside a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what condition triggers the springing date, whether that condition is currently met, and how the company would refinance the facility if it springs roughly three months from now.
The company disclosed senior notes at 9.25% due 2030 and 9% due 2031 (claims #4824 and #4697), but the recorded offering sizes conflict, with $1.5 billion (claim #11921) versus $2.0 billion (claims #11918 and #11917) for the 2030 notes and a $250 million upsizing to $1.75 billion for the 2031 notes (claims #4698 and #4658), and proceeds use is described only generically (claim #11920). What has not been said is the final issued amount of each series, the specific uses of proceeds, and the resulting annual cash interest burden, which at stated coupons would approach $340 million or more.
The company disclosed an all-stock merger with Core Scientific at 0.1235 shares per share, with a 2026-04-07 outside date that the record flags as delayed and a $270 million termination fee payable to CoreWeave (claims #4731, #4738 and #4739), while executives sold $217 million (CDO, claim #19832), $103.3 million (CEO, claim #19830) and $29.1 million (CFO, claim #19831) of stock in the weeks around those announcements. What has not been said is whether the merger closed, was extended, or was terminated and whether the $270 million fee was triggered or collected, and whether the executive sales were made under pre-arranged 10b5-1 plans, when those plans were adopted relative to merger discussions, and whether any related-party holders participated.
What we aren't being told
2026-09-29CoreWeave disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then cited an OpenAI revenue backlog of $11.2 billion on 2025-05-13 (claim #4969), inside a total committed backlog of $25.9 billion (claim #4970). What has not been said is what accounts for the $0.7 billion difference (revenue already recognized, a repricing, or a scope change), and who holds the other roughly $14.7 billion of backlog, including how much of it sits with any single unnamed customer.
The company reported 420 MW of active power capacity added and 1.6 GW of contracted power on 2025-05-13 (claims #4972 and #4973). What has not been said is the period over which the 420 MW was added, the sites and utilities behind the 1.6 GW, the interconnection or energization dates for the roughly 1.2 GW not yet active, and whether any of that power depends on the Core Scientific sites.
The Core Scientific merger agreement, disclosed on 2025-07-06 and 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share, had a closing deadline of 2026-04-07 and now carries a delayed status (claims #4731, #4738, #4729, #19824). It also referenced a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was extended, or was terminated, whether the $270 million fee was triggered and collected, and how any hosting or colocation arrangements with Core Scientific were restated as a result.
The $2.6 billion DDTL 3.0 facility (claims #11922 and #4592) carries a minimum contract realization ratio of 0.85x and a debt service coverage ratio of 1.40x starting April 2027 (claims #4597 and #4596). Its commitment termination date of 2026-07-31 is flagged as delayed (claim #4593). Separately, the revolver has a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is how much of the DDTL was actually drawn before commitments lapsed, which customer contract collateralizes it, the current covenant ratios, and exactly what condition would pull the revolver maturity forward from 2028-05-02 (claim #5012) to December 2026.
The 2030 notes were described as a $1.5 billion offering on 2025-05-18 (claim #11921) and closed at $2.0 billion on 2025-05-27 (claims #11918 and #11917). The 2031 notes grew from $1.5 billion to $1.75 billion (claims #4700, #4698 and #4697). The use-of-proceeds disclosure remains generic (claim #11920). The first 9% coupon, due 2026-02-01, is marked delayed (claim #4659). What has not been said is how the upsized proceeds were specifically deployed, and whether that first coupon on the 2031 notes was paid on schedule.
Within about three months of the $40 IPO (claims #11616 and #19821), the CFO sold $29.1 million of stock, the CDO $217 million, and the CEO $103.3 million (claims #19831, #19832 and #19830). What has not been said is whether these sales were made under Rule 10b5-1 plans, when those plans were adopted, how they fit with IPO lock-up terms, and what proportion of each executive's holdings they represented.
What we aren't being told
2026-09-29The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, but on 2025-05-13 put OpenAI-related backlog at $11.2 billion, cited as claim #4969, within a total committed backlog of $25.9 billion, cited as claim #4970. What has not been said is what explains the roughly $700 million gap between the two OpenAI figures, and who the counterparties are behind the remaining ~$14.7 billion of backlog, including how concentrated it is by customer and by term.
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a $2.6 billion DDTL 3.0 facility maturing 2030-08-21, cited as claims #4592, #4594 and #11922. The facility carries a 1.40x minimum debt service coverage ratio from April 2027 and a 0.85x minimum contract realization ratio, cited as claims #4596 and #4597. What has not been said is who the contracted customer is, what the contract's value and term are, and what current headroom exists against the realization ratio that the facility is presumably underwritten on.
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted capacity on 2025-05-13, cited as claims #4972 and #4973. What has not been said is where these sites are, what their interconnection status and utility counterparties are, and on what schedule the roughly 1.2 GW contracted-but-not-active gap converts to energized capacity. That schedule matters because the Core Scientific merger, at 0.1235 shares per share and cited as claims #4729 and #4731, carried a closing deadline of 2026-04-07 that is now flagged delayed under claim #4738. Has the merger closed, been extended or been terminated, and has any part of the $270 million termination fee in claim #4739 come into play?
The company disclosed that its revolving credit facility, expanded to $1.5 billion with a $350 million letter-of-credit sublimit, was extended to 2028-05-02, cited as claims #5010, #5011, #11923 and #11925. The same filing set a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is which condition triggers the springing date, which is now three months away, and whether the company expects to satisfy or refinance around it.
The company disclosed a series of senior notes, and several of the records carry gaps or unexplained flags. The May notes appear as $1.5 billion (claim #11921) and $2.0 billion (claims #11917 and #11918), at 9.250% due 2030. The July notes were upsized from $1.5 billion to $1.75 billion at 9% due 2031 (claims #4700, #4697 and #4698). The expected closing dates for both offerings (claims #11919 and #4699) and the first 9% coupon due 2026-02-01 (claim #4659) are all flagged delayed. What has not been said is whether both offerings closed on their stated dates and whether the February 2026 coupon was paid on time. The company also has not quantified how the $17.2 billion of total capital raised (claim #4968) splits between debt and equity, or what its current blended cost of debt is.
The company disclosed insider stock sales by its CEO ($103.3 million, claim #19830), CFO ($29.1 million, claim #19831) and CDO ($217 million, claim #19832) in May and June 2025. These sales came within roughly three months of a $40 IPO that netted $1.4 billion, cited as claims #11616 and #4967. What has not been said is whether these sales were made under Rule 10b5-1 plans and when those plans were adopted, whether any lock-up was waived to permit them, and what the purchase price was for the Weights & Biases acquisition announced in claim #4974.
What we aren't being told
2026-09-27The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969. It has not explained the $700 million gap between the two figures in about two months. Was that amount recognized as revenue, re-scoped, or measured on a different basis? Against total committed backlog of $25.9 billion (claim #4970), roughly $14.7 billion comes from counterparties who are never named. How concentrated is that remainder, and does any single customer besides OpenAI exceed 10%?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. It has not said where the roughly 1.2 GW gap sits. Which sites, at what physical addresses, and with what utility interconnection agreements? On what quarter-by-quarter schedule is that capacity expected to energize?
The company disclosed a revolving credit facility expanded by $1.5 billion with a 2028-05-02 maturity on 2025-05-05, cited as claims #5010, #11923 and #5012. The same filing set a contingent springing maturity of 2026-12-30, cited as claim #11926. It has not said what condition triggers the earlier date, or whether that condition is on track to be avoided with roughly three months remaining.
The company disclosed the DDTL 3.0 facility, recorded as "2600.0 USD" in claim #11922 and $2.6 billion in claim #4592. It set covenants of a 0.85x minimum contract realization ratio (claim #4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim #4596). It has not said how much of the facility has been drawn, which customer contracts sit in the collateral pool, or what current headroom exists against either ratio.
The company disclosed senior notes initially sized at $1.5 billion (claims #11921, #4700) and later $2.0 billion and $1.75 billion (claims #11917, #4697). A "250.0 USD" upsizing, cited as claim #4698, has ambiguous units. The expected closings (claims #11919, #4699) and the first 9% coupon due 2026-02-01 (claim #4659) are all flagged delayed on our record. What drove the upsizing, what specific uses were the proceeds put to beyond the generic statement in claim #11920, and was the February 2026 interest paid on time?
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06, with a closing deadline of 2026-04-07, cited as claims #4731 and #4738. That deadline is now flagged delayed. It has not stated whether the deal closed, was extended, or was terminated. Was the $270 million termination fee payable to CoreWeave, cited as claim #4739, ever triggered? Separately, the CEO, CFO and CDO sold $103.3 million, $29.1 million and $217 million of stock within about three months of the IPO, cited as claims #19830, #19831 and #19832. That selling came while the company was borrowing at 9%–9.25%. Were those sales made under pre-arranged 10b5-1 plans, and what lock-up waivers, if any, permitted them?
What we aren't being told
2026-09-27CoreWeave disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then described the OpenAI deal as $11.2 billion of revenue backlog on 2025-05-13 (claim #4969), within a total committed backlog of $25.9 billion (claim #4970). What has not been said is why the two OpenAI figures differ by roughly $700 million, whether that gap reflects revenue already recognized, a renegotiated term, or a different contract scope, and over what period and at what annual run-rate the $11.2 billion is expected to convert to revenue.
On 2025-07-30 the company tied its $2.6 billion DDTL 3.0 facility (claims #4592, #11922) to a material customer contract for GPU infrastructure (claim #4595) and a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who that customer is, how much of the $25.9 billion backlog it represents, and how close actual realization has run to the 0.85x floor, which is the covenant that determines whether the lenders can call the loan.
The company reported 420 MW of active power capacity added (claim #4972) and 1.6 GW of contracted power (claim #4973) on 2025-05-13. What has not been said is which sites make up those totals, which utilities or grid operators they interconnect with, whether the figures are IT load or gross facility power, and on what schedule the roughly 1.2 GW of contracted but not yet active capacity is expected to come online.
The CFO sold $29.1 million of stock by 2025-05-20 (claim #19831), the CDO $217 million by 2025-05-31 (claim #19832), and the CEO $103.3 million by 2025-06-30 (claim #19830), all within about three months of the $40 IPO (claims #11601, #17815). What has not been said is whether these sales were made under Rule 10b5-1 plans, when any such plans were adopted, and whether underwriters granted early lock-up releases to make the sales possible.
The Core Scientific merger at 0.1235 shares per share was announced on 2025-07-06 with a closing deadline of 2026-04-07 (claims #4731, #4738), and that deadline is now tracked as delayed. The agreement carries a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the merger was terminated, extended, or closed on amended terms, and whether the $270 million fee was triggered and collected.
The revolving credit facility was extended to 2028-05-02 (claims #5012, #11925) but carries a contingent springing maturity of 2026-12-30 (claim #11926), and the first 9% coupon on the 2031 notes, due 2026-02-01 (claim #4659), is tracked as delayed. What has not been said is which condition triggers the springing maturity, whether it applies to the notes maturing in 2030 and 2031 (claims #4824, #4697), and whether the February 2026 coupon was paid on schedule. The notes also grew from a stated $1.5 billion (claim #11921) to $2.0 billion (claim #11918), and the company has not explained how the extra proceeds were allocated.
What we aren't being told
2026-09-27The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then described the OpenAI deal as $11.2 billion of revenue backlog on 2025-05-13, cited as claim #4969. What has not been said is how the $700 million difference is explained, whether through revenue already recognized, re-scoping, or a different measurement basis, or what term, take-or-pay structure and termination rights sit behind either figure.
The company disclosed total committed backlog of $25.9 billion on 2025-05-13, cited as claim #4970. It also disclosed a material customer contract for GPU infrastructure supporting the $2.6 billion DDTL 3.0 facility, cited as claims #4595 and #4592, subject to a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is who the counterparty is on that collateral contract, or who holds the roughly $14.7 billion of backlog outside OpenAI. Nor has the company said what portion of that backlog is expected to convert to revenue within 12 and 24 months, or how close current performance sits to the 0.85x realization covenant and the 1.40x debt service coverage test that begins in April 2027, cited as claim #4596.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where the remaining roughly 1.2 GW is physically located, which utilities or interconnection queues it depends on, and on what schedule, by quarter or year, it is expected to be energized and billable. The disclosures also do not say how much of the 1.6 GW was expected to come from Core Scientific sites.
The company disclosed a Core Scientific merger at 0.1235 shares per share with a closing deadline of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. The deadline is now past, and the record flags it as delayed. What has not been said is whether the deal closed, was extended, or was terminated, what the shareholder vote showed, and whether the $270 million fee was triggered or collected.
The record shows insider sales of about $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO between May and June 2025, cited as claims #19831, #19832 and #19830. These came within weeks of the $40 IPO, cited as claim #15974. What has not been said is whether these sales ran under pre-established 10b5-1 plans, how lock-up terms allowed them so soon after listing, and what equity grants and compensation these executives received in the same period.
On financing, the company disclosed senior notes due 2030 at $1.5 billion, cited as claim #11921, and then issued $2.0 billion at 9.250%, cited as claims #11918 and #4824. It later upsized the 9% notes due 2031 to $1.75 billion, cited as claims #4697 and #4698. The revolver also carries a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is how the notes proceeds were actually used, beyond the generic use-of-proceeds language in claim #11920. The company also has not said what condition triggers the springing maturity, whether that condition is currently live with three months to go, and whether the first 9% coupon due 2026-02-01, cited as claim #4659 and flagged delayed in the record, was paid on schedule.
What we aren't being told
2026-09-27The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969; what has not been said is what accounts for the roughly $700 million difference. Was it revenue recognized in the interim, a change in contract scope, or a different measurement basis? The contract term, delivery schedule, and termination provisions have also not been disclosed.
The company disclosed total committed backlog of $25.9 billion on 2025-05-13, cited as claim #4970, and a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595; what has not been said is who holds the roughly $14.7 billion of backlog outside OpenAI, or who the counterparty to the material contract is. How concentrated is that non-OpenAI balance, and what is its weighted-average remaining duration?
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972; what has not been said is whether the 420 MW is a single-quarter increment or cumulative active capacity. The company has also given no energization timeline, site locations, or interconnection status for the remaining contracted power.
The company disclosed a revolving credit facility extended to 2028-05-02 with a contingent springing maturity of 2026-12-30, cited as claims #11925 and #11926, along with DDTL 3.0 covenants that include a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio starting April 2027, cited as claims #4597 and #4596; what has not been said is what triggers the springing maturity and whether that condition is live three months before the date. Current headroom against the realization and coverage ratios, and the DDTL 3.0 pricing, are also undisclosed. The first 9% coupon due 2026-02-01, cited as claim #4659, is flagged delayed with no confirmation that it was paid.
The company disclosed a merger with Core Scientific at 0.1235 shares per share with a 2026-04-07 outside date, cited as claims #4731 and #4738, both now marked delayed, and a $270 million termination fee payable to CoreWeave, cited as claim #4739; what has not been said is whether the deal closed, was extended, or was terminated. If it was terminated, the company has not said whether the fee was triggered and collected.
The company disclosed insider sales of $29.1 million by the CFO, $217 million by the CDO, and $103.3 million by the CEO between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830, in the same window it raised $17.2 billion in total capital, cited as claim #4968; what has not been said is whether these sales were made under pre-arranged 10b5-1 plans, when those plans were adopted relative to the IPO lockup, and how the board weighed them against the timing of the concurrent notes offerings.
What we aren't being told
2026-09-27The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility maturing 2030-08-21 (claims #4592, #4594); what has not been said is who the counterparty is, what the contract is worth, and over what term, even though the facility appears to be underwritten against it.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969, within a total committed backlog of $25.9 billion (claim #4970); what has not been said is what explains the roughly $700 million gap between the two OpenAI figures, and who holds the remaining ~$14.7 billion of backlog and how concentrated it is.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972; what has not been said is whether the 420 MW is quarterly or cumulative, which sites make up the remaining ~1.2 GW, and what interconnection agreements and energization dates support that capacity.
The company disclosed a Core Scientific merger at a 0.1235 exchange ratio with a 2026-04-07 outside date and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739; with both the deal and the deadline now marked delayed, what has not been said is whether the agreement was terminated, whether the fee was triggered or paid, and what happens to the capacity the deal was meant to secure.
The company disclosed layered debt that includes a revolver with a contingent springing maturity of 2026-12-30 (claim #11926), 9% notes whose first coupon was due 2026-02-01 and is now marked delayed (claim #4659), and a 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596); what has not been said is what triggers the springing maturity, whether the February 2026 coupon was paid on time, and where coverage currently stands against the 1.40x covenant. Relatedly, the May 2025 notes appear first at $1.5 billion (claim #11921) and then at $2 billion (claim #11918) with some amounts recorded without unit scale, and the upsizing was never explained.
The company disclosed insider sales of $103.3 million by the CEO, $217 million by the CDO and $29.1 million by the CFO between May and June 2025, cited as claims #19830, #19832 and #19831; what has not been said is whether these sales were made under 10b5-1 plans, how they relate to lock-up expiry after the $40 IPO (claim #11616), and how they fit alongside executive compensation and related-party disclosures that are absent from the record.
What we aren't being told
2026-09-26The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then put OpenAI-related backlog at $11.2 billion on 2025-05-13 (claim #4969), inside total committed backlog of $25.9 billion (claim #4970). What has not been said is why the OpenAI figure fell by $700 million in two months: was it revenue recognized, a scope change, or a different measurement basis? Nor has the company named the customers behind the remaining roughly $14.7 billion of backlog, or said how concentrated that remainder is.
The company disclosed a material customer contract for GPU infrastructure on 2025-07-30 (claim #4595), alongside the $2.6 billion DDTL 3.0 facility (claims #4592, #11922) and a 0.85x minimum contract realization ratio covenant (claim #4597). What has not been said is who the counterparty is, what the contract's total value and term are, and how much headroom the company has against the 0.85x ratio. The ratio's definition matters as much as its level, because a breach would presumably restrict draws before the DDTL 3.0 commitment termination date of 2026-07-31 (claim #4593).
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13 (claims #4973, #4972). What has not been said is where that capacity sits, meaning which sites, utilities and interconnection agreements. It is also unclear whether the 420 MW was added in the quarter or represents the cumulative active base, and on what schedule the gap of roughly 1.2 GW between contracted and energized power is expected to close.
The company disclosed a $1.5 billion revolver expansion with maturity extended to 2028-05-02 (claims #11923, #5012, #11925), but also a contingent springing maturity date of 2026-12-30 (claim #11926). What has not been said is what triggers the springing date, most plausibly a refinancing or debt-outstanding condition. With that date now about three months away, the open question is whether the trigger has been cured or waived.
The company disclosed a 2030 senior notes offering at $1.5 billion on 2025-05-18 (claim #11921), which closed at $2.0 billion with a 9.250% coupon (claims #11917, #4824). A 9% 2031 offering was later upsized by $250 million to $1.75 billion (claims #4697, #4698). What has not been said is why the company upsized both offerings, and how the proceeds were actually allocated (claim #11920 references use of proceeds without detail). The record also does not confirm that the first 9% coupon due 2026-02-01 was paid, and that item is flagged as delayed (claim #4659).
The company disclosed a Core Scientific merger at 0.1235 shares per share with an outside date of 2026-04-07 (claims #4731, #4738), both now marked delayed, and a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the merger was terminated, extended or renegotiated, and whether the termination fee was triggered or collected. Separately, CFO, CDO and CEO stock sales of $29.1 million, $217 million and $103.3 million within about three months of the IPO (claims #19831, #19832, #19830) came without disclosed 10b5-1 plan adoption dates or lock-up release terms. The acquisition of Weights & Biases (claim #4974) was also announced without a purchase price.
Note: the claim record supplied was cut off mid-entry at claim #4594, so gaps raised by later claims are not reflected here.
What we aren't being told
2026-09-26The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a minimum contract realization ratio of 0.85x (claim #4597) tied to the $2.6 billion DDTL 3.0 facility (claims #4592, #11922). What has not been said is who the counterparty is, the contract's dollar value and term, and how much of the DDTL 3.0 capacity was drawn against it before the 2026-07-31 commitment termination date (claim #4593). Which customer is underwriting this debt, and what happens to the facility if realization falls below 0.85x?
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, then an OpenAI revenue backlog of $11.2 billion on 2025-05-13 (claim #4969) within a total committed backlog of $25.9 billion (claim #4970). What has not been said is whether the $0.7 billion difference reflects revenue already recognized, a renegotiation, or a different definition of backlog. It also has not said who accounts for the remaining roughly $14.7 billion of backlog, or what share any single non-OpenAI customer represents.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites make up the contracted 1.6 GW, their physical locations, their grid interconnection status, and the energization schedule. It is also unclear whether 420 MW is total active capacity or only the increment added in that period. How much of the 1.6 GW is under signed leases with power already delivered, and how much depends on utility upgrades not yet approved?
The company disclosed a merger agreement with Core Scientific at 0.1235 shares per share on 2025-07-06/07, cited as claims #4731, #4729 and #19824, with an outside date of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was extended, or was terminated after the outside date passed, and whether the $270 million fee was triggered and collected. The record also does not show any reverse termination fee CoreWeave might owe. How much of the 1.6 GW figure depends on Core Scientific sites that may or may not now be owned?
The company disclosed insider sales within roughly three months of the IPO, cited as claims #19831, #19832 and #19830: $29.1 million by the CFO, $217 million by the CDO and $103.3 million by the CEO. What has not been said is whether these sales ran under pre-arranged 10b5-1 plans, why they occurred so soon after the $40 IPO (claims #11616, #19821), and whether any sales coincided with the pending Core Scientific announcement. The proxy context is also missing: how do these proceeds compare with each executive's disclosed compensation and remaining holdings?
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02 on 2025-05-05, cited as claims #11923 and #11925, and a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what condition triggers the springing date, and whether that condition is now live given $2.0 billion of 9.25% notes due 2030 (claims #11917, #4824) and $1.75 billion of 9% notes due 2031 (claims #4697, #4658). Two further points are unclear. The notes offering was sized at $1.5 billion before closing at $2.0 billion (claims #11921 vs #11918), and the upsizing was never explained. And the first 9% coupon was due 2026-02-01 (claim #4659), but no confirmation of that payment appears on the record.
What we aren't being told
2026-09-26The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10 (claim #19820), then an OpenAI revenue backlog of $11.2 billion on 2025-05-13 (claim #4969), inside a total committed backlog of $25.9 billion (claim #4970). What has not been said is what explains the $700 million difference between the two OpenAI figures: revenue already recognized, a re-scoped contract, or a different measurement basis. The company has also not named the customers behind the remaining roughly $14.7 billion of backlog, or said how concentrated that remainder is.
The company disclosed a "material customer contract for GPU infrastructure" on 2025-07-30 (claim #4595), alongside a minimum contract realization ratio of 0.85x tied to the $2.6 billion DDTL 3.0 facility (claims #4597, #4592, #11922). What has not been said is who the counterparty is, what the contract is worth and how long it runs, and what the realization ratio actually is today against the 0.85x floor. Given that the DDTL 3.0 commitment termination date of 2026-07-31 is flagged as delayed (claim #4593), the company has also not said how much of the $2.6 billion was drawn before commitments lapsed.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13 (claims #4973, #4972). What has not been said is the period over which the 420 MW was "added", which sites make up the contracted 1.6 GW, and the energization timeline and interconnection status for the roughly 1.2 GW not yet active. The company has also not said how much of the contracted power depended on Core Scientific facilities.
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06 and 2025-07-07, with an outside date of 2026-04-07 (claims #4731, #4738, #19824) and a $270 million termination fee payable to CoreWeave (claim #4739). Both timing claims are now flagged as delayed. What has not been said is whether the deal closed, was extended or was terminated, and whether the $270 million fee was triggered and collected.
The company disclosed senior notes due 2030 first as a $1.5 billion offering on 2025-05-18 (claim #11921) and then as a $2.0 billion, 9.250% issuance on 2025-05-27 (claims #11917, #11918, #4824). It also disclosed a $1.5 billion offering on 2025-07-20 that was upsized to $1.75 billion at 9% due 2031 (claims #4700, #4698, #4697). What has not been said is why the stated 2030 maturity dates differ (2030-06-01 versus 2030-05-27), and what the specific use of proceeds was beyond the generic statement (claim #11920). The first coupon on the 9% notes, due 2026-02-01, is flagged as delayed (claim #4659), and the company has not confirmed it was paid on schedule.
The company disclosed the CFO selling $29.1 million of stock by 2025-05-20, the Chief Development Officer selling $217 million by 2025-05-31, and the CEO selling $103.3 million by 2025-06-30 (claims #19831, #19832, #19830). These sales came within roughly three months of a $40-per-share IPO (claims #17815, #19821). What has not been said is whether the sales were made under Rule 10b5-1 plans and when those plans were adopted, whether any lock-up was waived early, and how the board weighed these sales against the heavy debt issuance in the same window. Separately, the revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim #11926), and the company has not said what condition triggers it or whether that condition is on track to be met, now that the date is three months away.
What we aren't being told
2026-09-26The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a $2.6 billion DDTL 3.0 facility (claim #4592) and a 0.85x minimum contract realization ratio (claim #4597); what has not been said is who the counterparty is, what the contract is worth, and how much of the DDTL 3.0 borrowing base depends on that single customer meeting the 0.85x threshold.
The company disclosed an OpenAI infrastructure contract of $11.9 billion on 2025-03-10, cited as claim #19820, and then an OpenAI backlog of $11.2 billion within total committed backlog of $25.9 billion on 2025-05-13, cited as claims #4969 and #4970; what has not been said is whether the roughly $700 million difference reflects revenue recognized, a contract amendment, or a change in how backlog is counted, and who accounts for the remaining roughly $14.7 billion of backlog and in what concentration.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972; what has not been said is whether the 420 MW was added in the quarter or is cumulative, which sites make up the contracted 1.6 GW, their physical locations and utility interconnection status, and the schedule for energizing the roughly 1.2 GW that is contracted but not yet active.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18, cited as claim #11921, and then $2.0 billion of 9.250% notes due 2030 on 2025-05-20 and 2025-05-27, cited as claims #11918, #11917 and #4824; it also disclosed a revolver maturity extension to 2028-05-02 with a contingent springing maturity of 2026-12-30, cited as claims #5012 and #11926. What has not been said is why the 2030 notes were upsized by $500 million, what the proceeds described in claim #11920 were actually spent on, and what condition triggers the springing maturity. That trigger now sits about three months out.
The company disclosed CFO, CDO and CEO stock sales of $29.1 million, $217 million and $103.3 million between 2025-05-20 and 2025-06-30, cited as claims #19831, #19832 and #19830, within months of a $40-per-share IPO (claim #11616); what has not been said is whether these sales were made under Rule 10b5-1 plans, when those plans were adopted relative to lock-up expiry, and whether any related-party arrangements, including with the Core Scientific counterparty, bear on executive compensation.
The company disclosed a merger with Core Scientific at 0.1235 shares per share with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave on 2025-07-06, cited as claims #4731, #4738 and #4739; with those claims now marked delayed and the outside date passed, what has not been said is whether the merger closed, was extended, or was terminated, whether the termination fee was triggered and collected, and how any outcome changes the capacity figures in claim #4973.
What we aren't being told
2026-09-25The company disclosed on 2025-07-30 that its $2.6 billion DDTL 3.0 facility is backed by a material customer contract for GPU infrastructure, cited as claims #4595 and #4592, and is subject to a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is who that customer is, what the contract is worth, and how long it runs. Without those, investors cannot tell how close the company is to the covenant or what happens if that one counterparty underperforms.
The company disclosed on 2025-08-12 a $350 million share issuance to a "strategic customer," cited as claim #4514. What has not been said is the customer's identity, the per-share price relative to the $40 IPO price (claims #11601 and #17815), and any lock-up, board or commercial rights attached to the shares. That related-party context would normally show up alongside a capital raise of this size.
The company disclosed on 2025-05-13 a $25.9 billion revenue backlog, cited as claim #4970, of which $11.2 billion is attributed to OpenAI, cited as claim #4969. What has not been said is how the remaining roughly $14.7 billion is split among other customers, and over what period the backlog converts to revenue. That leaves concentration risk and recognition timing open questions for the next earnings call.
The company disclosed on 2025-05-13 1.6 GW of contracted power, cited as claim #4973, against 420 MW of active compute power added, cited as claim #4972. What has not been said is where the roughly 1.18 GW gap sits: sites, addresses, utility interconnection status and energization dates. Investors also have no split between owned and leased capacity, or between capacity tied to the Core Scientific deal and third-party colocation.
The company disclosed several debt raises whose sizes and timing were left ambiguous in the record. A $1.5 billion 2030 notes offering on 2025-05-18 (claim #11921) appears to have become $2.0 billion at 9.25% by 2025-05-27 (claims #11918, #11917 and #4824). A $1.5 billion offering on 2025-07-20 (claim #4700) was upsized by $250 million to $1.75 billion at 9% (claims #4698 and #4697). What has not been said is how much of DDTL 3.0 was actually drawn before its commitment termination date of 2026-07-31 (claim #4593), which is now past. The company also has not explained what triggers the revolver's springing maturity of 2026-12-30 (claim #11926) instead of the extended 2028-05-02 date (claims #11925 and #5012), and whether that trigger is live today.
The company disclosed on 2025-07-06 a merger with Core Scientific at 0.1235 shares per share with an outside date of 2026-04-07, cited as claims #4731 and #4738, along with a $270 million termination fee payable to CoreWeave, cited as claim #4739. The record also shows a 2025-10-01 target, cited as claim #4517. What has not been said is whether the deal closed, was extended or was terminated, and if it was terminated, whether the $270 million fee has been received. The status of the power capacity the deal was meant to bring in is also unaddressed. Relatedly, the 2025-09-14 NVIDIA capacity purchase commitment of $6.3 billion through 2032-04-13, cited as claim #4352, comes from a supplier that is also an investor. The pricing terms, utilization to date and any related-party review of that arrangement have not been disclosed.
What we aren't being told
2026-09-25The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure (claim #4595), which appears to support the $2.6 billion DDTL 3.0 facility (claim #4592) and its 0.85x minimum contract realization ratio covenant (claim #4597). What has not been said is who the customer is, the contract's total value and term, and how much of the DDTL 3.0 was drawn before the commitment termination date of 2026-07-31 (claim #4593), which is now flagged as delayed.
The company disclosed on 2025-05-13 a total revenue backlog of $25.9 billion (claim #4970), of which $11.2 billion is attributed to OpenAI (claim #4969). It also disclosed on 2025-08-12 a $350 million share issuance to a strategic customer (claim #4514). What has not been said is how the remaining roughly $14.7 billion of backlog breaks down by customer. The record also does not name the strategic customer who received shares, or state the per-share price, discount, or lock-up terms of that issuance.
The company disclosed on 2025-05-13 1.6 GW of contracted power (claim #4973) and 420 MW of active compute power added (claim #4972). What has not been said is where that capacity sits. The record gives no site names or addresses, no utility interconnection agreements or queue positions, and no schedule for converting the roughly 1.2 GW gap from contracted to energized. It is also unclear whether 420 MW is cumulative active capacity or capacity added during the period.
The company announced a merger with Core Scientific on 2025-07-06 at 0.1235 CoreWeave shares per Core Scientific share (claims #4731, #4729), with a $270 million termination fee payable to CoreWeave (claim #4739). Both the 2025-10-01 target (claim #4517) and the 2026-04-07 outside date (claims #4731, #4738) are now flagged as delayed. What has not been said on this record is whether the deal closed, was renegotiated, or was terminated. If it was terminated, the record does not say whether the $270 million fee was triggered and collected, or what happens to the plan to convert Core Scientific's convertible notes into CoreWeave securities (claim #4737).
The senior notes disclosures leave units and outcomes ambiguous. The 2030 notes appear first as $1.5 billion (claim #11921) and then as $2.0 billion (claims #11918, #11917), with values recorded as bare 'USD' figures rather than millions or billions. The 2031 notes show a '250.0 USD' size increase to '1750.0 USD' (claims #4698, #4697). The expected closings on 2025-05-27 and 2025-07-25 (claims #11919, #4699) and the first 9% coupon payment due 2026-02-01 (claim #4659) are all flagged as delayed. What has not been confirmed is the final principal amount of each tranche, whether each offering actually closed on schedule, and whether the February 2026 coupon was paid.
The company disclosed on 2025-09-14 a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352), alongside an extended $1.5 billion revolver with a contingent springing maturity of 2026-12-30 (claims #5010, #11926). What has not been said is the related-party context: NVIDIA's equity stake in CoreWeave, how the capacity commitment was priced relative to third-party rates, and whether it was approved by independent directors. The record also does not state what condition triggers the revolver's springing maturity, or whether that condition is on track to be avoided before the 2026-12-30 date.
What we aren't being told
2026-09-25On 2025-07-30 the company disclosed a $2.6 billion delayed draw term loan (DDTL 3.0) secured against a material customer contract for GPU infrastructure, cited as claims #4592 and #4595, with a 0.85x minimum contract realization ratio (claim #4597). What has not been said is who that customer is, what the contract's total value and term are, and how close current realization runs to the 0.85x covenant floor.
The company disclosed a $350 million share issuance to a strategic customer on 2025-08-12, cited as claim #4514. What has not been said is the identity of that customer, the price per share relative to the $40 IPO price (claims #11601, #17815), and whether the equity stake is tied to any compute purchase commitment. That matters for judging whether the customer is also a related-party counterparty in the backlog.
The company reported $25.9 billion of contracted revenue backlog on 2025-05-13, of which $11.2 billion is attributed to OpenAI, cited as claims #4970 and #4969. What has not been said is how the remaining roughly $14.7 billion splits across named customers, what share any single other customer represents, and the weighted-average remaining contract duration.
The Core Scientific merger, announced on 2025-07-06 at 0.1235 CoreWeave shares per Core Scientific share, carried an expected close of 2025-10-01 and an outside date of 2026-04-07, cited as claims #4731, #4738 and #4517. All three are now marked delayed. What has not been said is whether the deal was terminated or abandoned, and if so, whether the $270 million termination fee payable to CoreWeave (claim #4739) was triggered and collected.
On 2025-05-13 the company disclosed 420 MW of active compute power capacity added and 1.6 GW of contracted power, cited as claims #4972 and #4973. What has not been said is whether 420 MW is a quarterly addition or cumulative active capacity. The company also has not named the sites, utilities or interconnection status behind the 1.6 GW, or given an energization schedule for the uncontracted-to-active gap.
The company disclosed a revolving credit facility extended to 2028-05-02 with a contingent springing maturity of 2026-12-30, and a first 9% senior notes interest payment due 2026-02-01, cited as claims #11925, #11926 and #4659. The interest-payment claim is now marked delayed. What has not been said is which outstanding debt triggers the springing maturity, whether that condition has been cured with three months remaining, and whether the February 2026 coupon was paid on schedule.
What we aren't being told
2026-09-25The company disclosed on 2025-07-30 that its $2.6 billion DDTL 3.0 facility is backed by a material customer contract for GPU infrastructure, cited as claim #4595 (with the facility itself at #4592 and #11922), and that lenders require a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is who that customer is, what the contract's total value and term are, and how close current realization runs to the 0.85x floor. Without those, how can a reader judge covenant headroom before the 1.40x debt service coverage test begins in April 2027 (claim #4596)?
The company disclosed on 2025-08-12 a $350 million share issuance to a strategic customer, cited as claim #4514. What has not been said is the counterparty's name, the per-share issue price relative to the $40 IPO price (claims #11601, #17815), and whether any lock-up applies. Is this the same customer behind the $11.2 billion OpenAI backlog (claim #4969), and if so, is it tied to that commercial contract?
The company disclosed on 2025-05-13 contracted power capacity of 1.6 GW, cited as claim #4973, and 420 MW of active compute power capacity added, cited as claim #4972. What has not been said is the period over which the 420 MW was added, the energization schedule for the remaining roughly 1.2 GW, and the site locations, utilities, and interconnection status behind either figure. Of the 1.6 GW, how much sits at named sites with signed interconnection agreements, and by what quarter is each expected online?
The company disclosed on 2025-07-06 the Core Scientific merger at 0.1235 shares per share, with a closing deadline of 2026-04-07, cited as claims #4731 and #4738, and a $270 million termination fee payable to CoreWeave, cited as claim #4739. An earlier target of 2025-10-01 appears in claim #4517. All three dates are now tracked as delayed, and the April 2026 deadline has passed with no recorded outcome. Did the merger close, was the deadline extended, or was it terminated, and was the $270 million fee triggered? What reverse termination fee, if any, would CoreWeave owe?
The company disclosed on 2025-05-05 a $1.5 billion revolver with maturity extended to 2028-05-02 but a contingent springing maturity of 2026-12-30, cited as claims #11923, #11925, and #11926. It also disclosed a DDTL 3.0 commitment termination date of 2026-07-31, cited as claim #4593 and now marked delayed. What has not been said is which instrument or condition triggers the December 2026 springing maturity, whether it has been cured, and how much of the $2.6 billion DDTL 3.0 was actually drawn before commitments lapsed. The senior notes sizes also shifted without a stated reconciliation: $1.5 billion in claim #11921 became $2.0 billion in claims #11918 and #11917, and $1.5 billion in claim #4700 became $1.75 billion in claim #4697. The use of proceeds in claim #11920 is recorded without specifics. Where did the upsized proceeds go?
The company disclosed on 2025-05-13 a total revenue backlog of $25.9 billion, cited as claim #4970, of which $11.2 billion is attributed to OpenAI, cited as claim #4969. It later disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032, cited as claim #4352. What has not been said is how the remaining $14.7 billion of backlog breaks down by customer, how long its weighted duration is, and whether the NVIDIA commitment is counted inside the $25.9 billion or sits on top of it. What share of backlog comes from the top two customers, and how much is expected to convert within 12 months?
What we aren't being told
2026-09-25The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside a minimum contract realization ratio of 0.85x (claim #4597) and a 1.40x debt service coverage covenant beginning April 2027 (claim #4596) on the $2.6 billion DDTL 3.0 facility (claims #4592, #11922). What has not been said is who that customer is, what the contract's term and total value are, and how much of DDTL 3.0 was actually drawn before the commitment termination date of 2026-07-31 (claim #4593), which the record now marks as delayed.
The company disclosed a $25.9 billion revenue backlog on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to OpenAI (claim #4969). What has not been said is how the remaining roughly $14.7 billion is split across customers, whether any other single customer exceeds 10% of backlog, and on what schedule the backlog converts to recognized revenue. The same gap applies to the $350 million strategic customer share issuance disclosed on 2025-08-12 (claim #4514): which customer received the shares, at what price, and whether the issuance was tied to a compute contract.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is the period over which the 420 MW was added, which sites and utilities make up the 1.6 GW, the interconnection status and energization dates for the unenergized roughly 1.18 GW, and what share of contracted power sits under leases rather than owned facilities.
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06 and 2025-07-07, cited as claims #4731 and #4729, with a closing deadline of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the deal and an earlier 2025-10-01 milestone (claim #4517) are recorded as delayed. What has not been said is whether the merger closed, was extended, or was terminated after the outside date passed, and whether any part of the $270 million fee was triggered or paid.
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02, but also a contingent springing maturity of 2026-12-30, cited as claims #11923, #11925 and #11926. What has not been said is what condition triggers the springing maturity and whether it has been cured, which matters now that the date is about three months away. Relatedly, the senior notes due 2030 were described as $1.5 billion on 2025-05-18 (claim #11921), then as $2.0 billion (claims #11918, #11917), and the July notes as upsized by "250.0 USD" (claim #4698). What has not been said is a clean reconciliation of the final issued amounts and maturity dates (2030-05-27 in claim #4824 versus 2030-06-01 in claim #11917), plus how proceeds were allocated (claim #11920).
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352. What has not been said is the pricing and utilization terms, whether NVIDIA's standing as a CoreWeave shareholder and GPU supplier was addressed as a related-party arrangement, and how this commitment interacts with the OpenAI and unnamed-customer backlog already disclosed.
What we aren't being told
2026-09-24The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (claim #4592) and a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who the counterparty is, what the contract's total value and term are, and how much of the DDTL 3.0 borrowing base depends on that single contract. Without those facts, a reader cannot judge how close the facility sits to its 0.85x covenant.
The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to OpenAI (claim #4969). What has not been said is how the remaining roughly $14.7 billion is split across customers, and whether any other single counterparty exceeds 10% of backlog. It is also unclear whether the $350 million strategic customer share issuance disclosed on 2025-08-12 (claim #4514) went to OpenAI or to another backlog customer, and on what pricing terms relative to the $40 IPO price (claims #11616, #15974).
The company disclosed 420 MW of active power capacity and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is which sites make up those figures, where they are physically located, their utility interconnection status, and the schedule for moving the roughly 1.2 GW gap from contracted to energized. It is also not disclosed how much of the contracted capacity depended on Core Scientific facilities that the pending merger was meant to bring in-house.
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06, cited as claims #4731 and #4729, with an outside date of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). That deadline has now passed and the record marks the deal as delayed. What has not been said is whether the merger closed, was extended, or was terminated. If it was terminated, the record does not say whether the $270 million fee was triggered and collected, or how CoreWeave's capacity plan changed as a result.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18, cited as claim #11921. It then disclosed a $2.0 billion issuance two days later (claims #11918 and #11917), and the 9.25% coupon (claim #4824). What has not been said is why the offering grew by $500 million, and what the specific use of proceeds was beyond the generic statement in claim #11920. The record also shows the first 9% coupon on the 2031 notes, due 2026-02-01 (claim #4659), as delayed, with no confirmation that it was paid. And it does not explain what triggers the contingent springing maturity of 2026-12-30 on the revolver (claim #11926), which is now about three months away.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, cited as claim #4352. What has not been said is the pricing, the take-or-pay structure, and the annual drawdown schedule. Nor has the company addressed the related-party dimension of NVIDIA's role as both a shareholder and CoreWeave's key GPU supplier, which a reader would expect to see covered in the proxy's related-party transactions section.
What we aren't being told
2026-09-24The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595. The same filing tied it to the $2.6 billion DDTL 3.0 facility with a 1.40x minimum debt service coverage ratio and a 0.85x minimum contract realization ratio, cited as claims #4592, #4596 and #4597. What has not been said is who the counterparty is, what the contract is worth, and how long it runs. How much of the facility's collateral and covenant headroom depends on this one unnamed customer performing?
The company disclosed $25.9 billion of total revenue backlog on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to OpenAI, cited as claim #4969. It also disclosed a $350 million share issuance to a 'strategic customer' on 2025-08-12, cited as claim #4514. What has not been said is how the remaining roughly $14.7 billion of backlog is spread across customers, or which customer received the $350 million of equity, at what price, and with what lockup. Does any other single customer exceed 10% of backlog?
The company disclosed 1.6 GW of contracted power and 420 MW of active compute capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where the roughly 1.2 GW gap sits: which sites, which utilities or interconnection queues, and what energization dates. How much of it is owned versus leased, and how much depended on the Core Scientific transaction?
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio with a 2026-04-07 outside date on 2025-07-06, cited as claims #4731 and #4738. It also disclosed a $270 million termination fee payable to CoreWeave, cited as claim #4739. The earlier closing target of 2025-10-01, cited as claim #4517, and the outside date are both now marked delayed. What has not been said is whether the deal closed, was extended, or was terminated, and whether the $270 million fee was triggered and collected.
The company disclosed a revolving credit facility expanded to $1.5 billion with maturity extended to 2028-05-02 on 2025-05-05, cited as claims #11923 and #11925. The same disclosure included a contingent springing maturity of 2026-12-30, cited as claim #11926. What has not been said is what condition triggers the springing date, and whether it is currently live now that the date is roughly three months away. Relatedly, how much of DDTL 3.0 was drawn before its 2026-07-31 commitment termination, cited as claim #4593, which is also marked delayed?
The company disclosed senior notes offerings that changed size between announcement and pricing. The May 2030 notes were $1.5 billion on 2025-05-18, cited as claim #11921, and $2.0 billion by 2025-05-20/27, cited as claims #11918 and #11917. The July 2031 notes were $1.5 billion on 2025-07-20, cited as claim #4700, and $1.75 billion after a $250 million upsize, cited as claims #4697 and #4698. The expected closing dates, cited as claims #11919 and #4699, and the first 9% coupon due 2026-02-01, cited as claim #4659, are all flagged delayed. What has not been said is confirmation that both issues closed at the final sizes and that the February 2026 interest payment was made on schedule.
What we aren't being told
2026-09-24The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure (claim #4595) that sits alongside the $2.6 billion DDTL 3.0 facility (claim #4592), a 0.85x minimum contract realization ratio (claim #4597), and a 1.40x debt service coverage covenant beginning April 2027 (claim #4596). What has not been said is who the customer is, what the contract is worth and how long it runs, and how much headroom the company currently has against the 0.85x realization and 1.40x coverage tests.
The company disclosed on 2025-05-13 a $25.9 billion revenue backlog (claim #4970), of which $11.2 billion is attributed to OpenAI (claim #4969), and on 2025-08-12 a $350 million share issuance to a strategic customer (claim #4514). What has not been said is who holds the remaining roughly $14.7 billion of backlog and how concentrated it is, what share of the backlog converts to revenue in the next 12 months, and who the strategic customer is, at what price per share, and under what lockup or side agreements. The record also does not explain the $6.3 billion NVIDIA capacity purchase commitment through 2032-04-13 (claim #4352): is it take-or-pay, and given NVIDIA's position as both supplier and investor, how is it treated as a related-party arrangement?
The company disclosed on 2025-05-13 1.6 GW of contracted power (claim #4973) and 420 MW of active capacity added (claim #4972). What has not been said is the period in which the 420 MW was added, which sites make up the 1.6 GW with their physical locations and utility interconnection status, and the energization schedule that would close the gap of roughly 1.2 GW.
The company disclosed on 2025-07-06 a stock merger with Core Scientific at 0.1235 shares (claim #4731), with an outside date of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the 2025-10-01 target (claim #4517) and the outside date are now flagged as delayed. What has not been said is whether the deal closed, was terminated, or failed a shareholder vote, whether any termination fee was triggered or collected, and what happens to the hosting arrangements that motivated the deal.
The company disclosed on 2025-05-05 a revolver extension to 2028-05-02 (claims #5012 and #11925) together with a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is which condition triggers the springing date and whether that condition is live today. The notes record is also inconsistent: claims #11921, #11918 and #11917 put the 2030 notes at $1.5 billion and at $2.0 billion, with units left as bare 'USD'. The 2025-05-27 closing (claim #11919) and the first 2026-02-01 coupon on the 9% 2031 notes (claim #4659) are both marked delayed. Was the offering upsized, did it close as scheduled, and was the February 2026 coupon paid on time?
What we aren't being told
2026-09-24The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure underpinning the $2.6 billion DDTL 3.0 facility, cited as claims #4595 and #4592, with a 0.85x minimum contract realization ratio covenant (#4597); what has not been said is who the customer is, the contract's total value and term, and how much headroom exists above that 0.85x floor. Relatedly, the $350 million strategic customer share issuance on 2025-08-12 (#4514) names no counterparty, and it is unclear whether it is the same party as the unnamed DDTL 3.0 customer.
On 2025-05-13 the company reported $25.9 billion of total backlog (#4970), of which $11.2 billion is attributed to OpenAI (#4969); what has not been said is who holds the remaining roughly $14.7 billion, how concentrated it is among the top customers, and over what years it converts to revenue. The NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (#4352) raises the same question: is NVIDIA effectively a backstop customer inside that backlog, and on what utilization terms?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is where those sites are, which utilities and interconnection agreements serve them, whether the 420 MW figure is cumulative or added in a single period, and when the remaining roughly 1.2 GW is scheduled to energize.
The Core Scientific merger announced 2025-07-06/07 (#4729, #4731) carried an expected close of 2025-10-01 (#4517) and an outside date of 2026-04-07 (#4738), and both are now tracked as delayed; what has not been said is whether the deal closed, was terminated, or was extended, and if terminated, whether the $270 million termination fee payable to CoreWeave (#4739) was actually received.
The May 2025 notes appear as a $1.5 billion offering on 2025-05-18 (#11921) and as $2.0 billion on 2025-05-20 and 2025-05-27 (#11918, #11917), while the upsizing of the July notes from $1.5 billion to $1.75 billion is explicitly disclosed (#4700, #4698, #4697); what has not been said is the reason for the May upsizing and the demand behind it. The record also flags the first 9% coupon due 2026-02-01 (#4659) as delayed; has that interest payment been made on schedule?
The revolving credit facility was expanded to $1.5 billion with a 2028-05-02 maturity (#11923, #5012), but a contingent springing maturity of 2026-12-30 was also disclosed (#11926); what has not been said is what condition triggers that earlier maturity, whether it is currently at risk of being triggered, and how much of the facility and of DDTL 3.0 was drawn before its 2026-07-31 commitment termination date (#4593).
What we aren't being told
2026-09-24The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (claim #4592) and a minimum contract realization ratio of 0.85x (claim #4597); what has not been said is who that customer is, how much of the contract's value secures the facility, and how the 0.85x ratio has actually tracked since funding began. Relatedly, the $350 million strategic customer share issuance on 2025-08-12 (claim #4514) names no counterparty, so which customer became a shareholder, and at what price?
The company disclosed a $25.9 billion revenue backlog on 2025-05-13 (claim #4970), of which $11.2 billion is attributed to OpenAI (claim #4969); what has not been said is the weighted-average remaining term, the expected recognition schedule by year, or who accounts for the remaining roughly $14.7 billion. Is the NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim #4352) inside that backlog or on top of it, and given NVIDIA's position as both supplier and investor, where is the related-party treatment of that arrangement disclosed?
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active capacity added on 2025-05-13 (claims #4973 and #4972); what has not been said is whether 420 MW is cumulative active capacity or a single-period addition, which sites make up the gap of roughly 1.2 GW, or what the utility interconnection status and energization dates are for each. Without site-level addresses or interconnection queue positions, how can a reader test the conversion timeline that the backlog depends on?
The company disclosed an all-stock merger with Core Scientific at 0.1235 shares on 2025-07-06/07 (claims #4731, #4729), with an outside date of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739); what has not been said on this record, with that deadline now five months past and flagged delayed, is whether the deal closed, was extended, or was terminated, and whether the termination fee was triggered and collected. The same question applies to the earlier 2025-10-01 milestone flagged delayed in claim #4517.
The company disclosed a revolver expansion with a 2028-05-02 maturity and a contingent springing maturity of 2026-12-30 on 2025-05-05 (claims #5010, #11925, #11926); what has not been said is what condition triggers the springing date, or whether that condition is live now that the date is three months away. The senior notes are also ambiguous across filings: the May 2030 notes appear as both $1.5 billion and $2.0 billion (claims #11921, #11918), and the July 2031 notes as $1.5 billion upsized by $250 million to $1.75 billion at 9% (claims #4700, #4698, #4697). What is the final outstanding principal of each tranche, and was the first 9% coupon due 2026-02-01 (claim #4659, flagged delayed) paid on schedule?
The company disclosed a Chief Executive Officer item on 2025-09-16 and a Deputy General Counsel item on 2025-09-24 (claims #4332 and #4317); what has not been said is whether these reflect appointments or departures, who the individuals are, and what compensation or equity grants accompanied them. Given the $1.5 billion revolver and roughly $3.75 billion in 9%+ notes, what is the plan to meet the 1.40x debt service coverage ratio that begins April 2027 (claim #4596)?
What we aren't being told
2026-09-24The company disclosed a $2.6 billion DDTL 3.0 delayed-draw facility on 2025-07-30 (claims #4592, #11922). That facility is secured against a material customer contract for GPU infrastructure (claim #4595) and tested against a 0.85x minimum contract realization ratio (claim #4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is who that customer is, what the contract is worth, and how long it runs. Likewise, the $350 million strategic customer share issuance (claim #4514) names no investor. Is the counterparty in both cases OpenAI, or a second concentrated customer?
The company disclosed $25.9 billion of revenue backlog from committed contracts on 2025-05-13 (claim #4970), of which $11.2 billion was attributed to the OpenAI deal (claim #4969). What has not been said is who makes up the remaining roughly $14.7 billion, including the IBM Granite arrangement (claim #4971). The company also has not given the weighted-average duration of that backlog or how much of it converts to revenue within the next twelve months. Has backlog been updated since, and how concentrated is it today?
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power "added" on 2025-05-13 (claims #4973, #4972). What has not been said is whether the 420 MW was added in that quarter or is the cumulative active total. The company also has not named the physical sites, interconnection status, or energization dates for the roughly 1.2 GW gap between contracted and active capacity. Where are these sites, and on what schedule do they come online?
The company disclosed an all-stock merger with Core Scientific at 0.1235 shares (claims #4729, #4731, #4331), first expected by 2025-10-01 and later subject to a 2026-04-07 deadline (claims #4517, #4738). Both dates are now marked delayed. There was also a $270 million termination fee payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was terminated, or remains pending. If it was terminated, was the fee triggered and received, and what replaced the Core Scientific capacity in the power plan?
The company disclosed a revolving credit facility expanded to $1.5 billion with a 2028-05-02 maturity (claims #5010, #11923, #5012). The same disclosure included a contingent springing maturity of 2026-12-30 (claim #11926), which is now about three months away. What has not been said is what condition triggers the springing date and whether it is on track to be avoided. The company also has not said how much of DDTL 3.0 was drawn before its 2026-07-31 commitment termination (claim #4593, marked delayed), or whether the first 9% coupon due 2026-02-01 on the $1.75 billion notes (claims #4658, #4659, also marked delayed) was paid on schedule.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352). What has not been said is the related-party context: NVIDIA is simultaneously a supplier, an equity holder, and now a guaranteed buyer of unused capacity. The pricing terms relative to third-party customers are also undisclosed. Similarly, the 2025-09-16 CEO personnel item (claim #4332) comes with no name, compensation, or transition detail. Who holds the role, and on what pay package?
What we aren't being told
2026-09-23The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30 (claim #4592), backed by a material customer contract for GPU infrastructure (claim #4595) and subject to a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who that customer is, the contract's term and total value, and how realization is being tracked against the 0.85x floor. Which counterparty's credit actually stands behind this facility?
The company disclosed $25.9 billion of total revenue backlog on 2025-05-13 (claim #4970), of which $11.2 billion is tied to the OpenAI strategic deal (claim #4969). What has not been said is who accounts for the remaining roughly $14.7 billion, how concentrated it is, and on what schedule it converts to revenue. Separately, a $350 million strategic customer share issuance was disclosed on 2025-08-12 (claim #4514) without naming the customer or the per-share terms. Is that equity holder also a backlog counterparty?
The company disclosed 1.6 GW of contracted power and 420 MW of active compute capacity added on 2025-05-13 (claims #4973, #4972). What has not been said is where that capacity sits: no site addresses, utility or interconnection agreements, or energization schedules for the roughly 1.2 GW gap between contracted and active. How much of the contracted power was expected to come from Core Scientific sites under the merger (claim #4731)?
The company disclosed the Core Scientific merger at 0.1235 shares per share on 2025-07-06 and 2025-07-07 (claims #4731, #4729), with a $270 million termination fee payable to CoreWeave (claim #4739). Both the 2025-10-01 milestone (claim #4517) and the 2026-04-07 outside date (claims #4731, #4738) are now marked delayed. What has not been said is whether the deal closed, was terminated, or was extended, and whether the termination fee was triggered and collected.
The company disclosed senior notes of $1.5 billion due 2030 on 2025-05-18 (claim #4700 era; claim #11921), later shown as $2.0 billion (claims #11918, #11917). It also disclosed a $1.5 billion 2031 offering on 2025-07-20 (claim #4700) that became $1.75 billion (claims #4697, #4698). The DDTL 3.0 amount is recorded without units as "2600.0 USD" (claim #11922). What has not been said is the pricing at each upsizing, the condition behind the 2026-12-30 springing maturity on the revolver (claim #11926), and how much of DDTL 3.0 was drawn before its 2026-07-31 commitment termination (claim #4593, marked delayed). What is the current debt service coverage relative to the 1.40x covenant that begins April 2027 (claim #4596)?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14 (claim #4352). The record also contains two Chief Executive Officer claims eight days apart, on 2025-09-16 and 2025-09-24 (claims #4332, #4315). What has not been said is the pricing and utilization terms of the NVIDIA backstop, given that NVIDIA is a supplier and potentially a shareholder, and whether it is treated as a related-party arrangement. For the CEO claims, what has not been said is whether they reflect a leadership change, a reaffirmation, or compensation-related events.
What we aren't being told
2026-09-23The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30, cited as claims #4592 and #11922, secured against a "material customer contract for GPU infrastructure" (claim #4595) and subject to a 0.85x minimum contract realization ratio (claim #4597). What has not been said is who that customer is, what the contract's total value and term are, and how much of the facility has been drawn ahead of the 2026-07-31 commitment termination date (claim #4593). Now that the termination date has passed, how much was drawn in total?
The company disclosed a $25.9 billion revenue backlog on 2025-05-13, cited as claim #4970, of which $11.2 billion is attributed to OpenAI (claim #4969). What has not been said is who accounts for the remaining roughly $14.7 billion, how concentrated that remainder is, or over what weighted-average duration the backlog converts to revenue. Is the $350 million strategic customer share issuance (claim #4514) tied to OpenAI or to a different counterparty, and at what per-share price was it issued?
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites make up those figures, where they are physically located, what their grid interconnection status is, and when the gap between contracted and active capacity is expected to close. Was the 420 MW added in the quarter or cumulatively?
The company disclosed a stock-for-stock merger with Core Scientific at 0.1235 shares, cited as claims #4731, #4729 and #4331, with a closing deadline of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the deadline and the earlier 2025-10-01 target (claim #4517) are now marked delayed. What has not been said is whether the deal closed, was terminated, or was extended. If it was terminated, has the $270 million fee been triggered and collected?
The company disclosed senior notes due 2030 on 2025-05-18 at $1.5 billion (claim #11921), then at $2.0 billion on 2025-05-20 and 2025-05-27 (claims #11918 and #11917). It also disclosed a 9% 2031 offering of $1.75 billion that included a $250 million upsize (claims #4697, #4698 and #4658). What has not been said is a reconciliation of the upsizing and the final allocation of proceeds (claim #11920). Given that both closings are flagged delayed (claims #11919 and #4699), what is the actual settled face amount of each series, and what are the aggregate annual interest costs?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352, and a revolver springing maturity of 2026-12-30 (claim #11926). What has not been said is whether NVIDIA's position as an investor makes the commitment a related-party transaction, and at what pricing and utilization terms the commitment operates. What conditions trigger the springing maturity, now roughly three months away? The two CEO-related filings (claims #4332 and #4315) also give no disclosed context on compensation or any change in role.
What we aren't being told
2026-09-23The company disclosed a $25.9 billion revenue backlog on 2025-05-13, cited as claim #4970, and attributed $11.2 billion of it to an OpenAI strategic deal in claim #4969. What has not been said is who holds the remaining roughly $14.7 billion. How concentrated is that residual backlog, over what contract terms, and how much of it is take-or-pay rather than cancellable? Relatedly, the $350 million strategic customer share issuance on 2025-08-12, cited as claim #4514, names no counterparty and gives no price per share.
The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30, cited as claims #4592 and #11922, secured against a material customer contract for GPU infrastructure, cited as claim #4595, with a minimum contract realization ratio of 0.85x, cited as claim #4597. What has not been said is the name of that customer, the contract's total value and tenor, and how realization is currently tracking against the 0.85x floor. Has any draw been made before the 2026-07-31 commitment termination date, cited as claim #4593 and now flagged delayed, and was that commitment extended or allowed to lapse?
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where the contracted but unenergized ~1.2 GW sits, whether it is owned, leased or colocated, and the interconnection status and energization schedule for each site. Is the 420 MW figure a cumulative total or capacity added in the quarter?
The financing record is internally inconsistent on size and timing. Senior notes due 2030 appear as $1.5 billion on 2025-05-18, cited as claim #11921, and as $2.0 billion on 2025-05-20 and 2025-05-27, cited as claims #11918 and #11917. The July notes likewise go from $1.5 billion, cited as claim #4700, to $1.75 billion, cited as claim #4697, with some entries recorded in bare 'USD' rather than millions. Expected closings, cited as claims #11919 and #4699, and the first 9% coupon due 2026-02-01, cited as claim #4659, are all marked delayed. What has not been said is whether these closings and the first interest payment occurred on schedule, and what the all-in cost and aggregate amount of debt now outstanding are against the $17.2 billion of capital raised, cited as claim #4968.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio on 2025-07-06, cited as claims #4731 and #4331, with a 2026-04-07 outside date, cited as claim #4738, and a $270 million termination fee payable to CoreWeave, cited as claim #4739. Both the 2026-04-07 deadline and the earlier 2025-10-01 milestone, cited as claim #4517, are flagged delayed. What has not been said is whether the deal closed, was renegotiated or terminated, and whether the termination fee was triggered and collected. How does the springing maturity of 2026-12-30 on the revolver, cited as claim #11926, interact with that outcome?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352. It also recorded Chief Executive Officer entries on 2025-09-16 and 2025-09-24, cited as claims #4332 and #4315, with no name, compensation or change rationale. What has not been said is how the NVIDIA arrangement is treated as a related-party transaction given NVIDIA's role as supplier and investor, whether the September CEO entries reflect a leadership change, and what equity or incentive terms accompanied them.
What we aren't being told
2026-09-23The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30 (claim #4592). It is secured against a material customer contract for GPU infrastructure (claim #4595) and carries a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who that customer is, what the contract is worth and how long it runs, and how much of the facility had been drawn by the 2026-07-31 commitment termination date (claim #4593), which the record now flags as delayed.
The company disclosed a $350 million strategic customer share issuance on 2025-08-12 (claim #4514). What has not been said is who the counterparty is, what price per share they paid relative to the $40 IPO price (claims #11601, #15974), and whether the shares came with lockup, board, or pricing-linked terms tied to that customer's compute contracts.
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13 (claims #4973, #4972). What has not been said is whether the 420 MW is a quarterly addition or a cumulative total. The company also has not named the sites behind the 1.6 GW, their interconnection status, or the schedule for converting contracted power into energized capacity.
The company disclosed an all-stock merger with Core Scientific at 0.1235 shares, with a closing deadline of 2026-04-07 (claims #4731, #4738), an earlier target of 2025-10-01 (claim #4517), and a $270 million termination fee payable to CoreWeave (claim #4739). All of those deadlines are flagged delayed. What has not been said is whether the deal closed, was extended, or was terminated, and whether the termination fee was triggered or collected.
The company disclosed $25.9 billion of total revenue backlog on 2025-05-13 (claim #4970), including $11.2 billion from OpenAI (claim #4969). It later disclosed an additional $6.5 billion of OpenAI committed revenue running through 2031-05-31 (claim #4297). What has not been said is how much of the updated backlog is now concentrated in OpenAI, and how the remaining backlog splits among other named or unnamed customers. The company also has not said whether the IBM Granite arrangement (claim #4971) contributes any contracted backlog at all.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352). What has not been said is how this commitment fits within related-party disclosure, given that NVIDIA is both CoreWeave's primary GPU supplier and a customer. The same financing record also leaves several numbers unreconciled. The 2030 senior notes were announced at $1.5 billion and then issued at $2 billion (claims #11921, #11917), with maturity dates recorded as both 2030-05-27 and 2030-06-01 (claims #4824, #11918). The trigger for the contingent springing maturity of 2026-12-30 on the revolving credit facility (claim #11926) has not been explained.
What we aren't being told
2026-09-23The company disclosed on 2025-07-30 that its $2.6 billion DDTL 3.0 facility (claim #4592) is backed by a material customer contract for GPU infrastructure (claim #4595) and carries a 0.85x minimum contract realization ratio (claim #4597); what has not been said is who that customer is, what the contract's total value and term are, and how much of the facility had been drawn by the 2026-07-31 commitment termination date (claim #4593), which is now flagged as delayed.
The company disclosed on 2025-08-12 a $350 million share issuance to a strategic customer (claim #4514); what has not been said is which customer bought the shares, at what price and share count, and whether the issuance is linked to the OpenAI commitments of $11.2 billion (claim #4969) and $6.5 billion (claim #4297). Relatedly, if the $11.2 billion OpenAI figure sits inside the $25.9 billion total backlog (claim #4970), how is the remaining roughly $14.7 billion split across named customers, and how does the later $6.5 billion OpenAI commitment running to 2031-05-31 change that concentration?
The company disclosed on 2025-05-13 1.6 GW of contracted power (claim #4973) and 420 MW of active capacity added (claim #4972); what has not been said is which sites make up those totals, their physical locations and utility interconnection status, and when the contracted but not yet active roughly 1.2 GW is scheduled to energize.
The company disclosed on 2025-07-06 an all-stock merger with Core Scientific at 0.1235 shares (claims #4731 and #4331), with a 2026-04-07 outside date (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739); what has not been said is whether the merger closed or was terminated, since claims #4731, #4738 and #4517 are all marked delayed, and whether the termination fee was triggered and collected.
The company disclosed its 2030 senior notes first as a $1.5 billion offering (claim #11921) and then as $2.0 billion (claims #11918 and #11917), with a maturity of 2030-06-01 in some filings and 2030-05-27 in another (claim #4824); what has not been said is why the offering was upsized, which maturity date is correct, and whether the first 9.0% coupon on the 2031 notes due 2026-02-01 (claim #4659, marked delayed) was paid on schedule.
The company disclosed on 2025-05-05 a revolving credit facility extended to 2028-05-02 (claims #5012 and #11925) with a contingent springing maturity of 2026-12-30 (claim #11926); what has not been said is what condition triggers the springing maturity, whether that condition is now on track to be met or waived with the date about three months away, and how much of the $1.5 billion revolver and $350 million letter-of-credit capacity (claims #5010 and #5011) was drawn at the latest quarter end.
What we aren't being told
2026-09-23The company disclosed on 2025-07-30 that the $2.6 billion DDTL 3.0 facility is backed by a material customer contract for GPU infrastructure, cited as claims #4592 and #4595, with a minimum contract realization ratio of 0.85x (claim #4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is who the counterparty is, what the contract's total value and term are, and how much of the facility had been drawn by the 2026-07-31 commitment termination date (claim #4593). Our record flags that date as delayed.
The company disclosed on 2025-08-12 a $350 million share issuance to a strategic customer, cited as claim #4514. What has not been said in the record is which customer received the shares, at what price per share relative to the $40 IPO price (claims #11601, #15974), and whether any lock-up, board seat or other governance right came with the stake. Without that, the related-party picture is incomplete.
The company disclosed on 2025-05-13 1.6 GW of contracted power (claim #4973) against 420 MW of active capacity added (claim #4972). What has not been said is where the roughly 1.2 GW gap sits: which sites, with what physical addresses and utility interconnection agreements, and on what quarter-by-quarter energization schedule. It is also unclear whether the 420 MW is cumulative or was added in a single period.
The company disclosed on 2025-07-06 a merger with Core Scientific at 0.1235 shares per share, with a 2026-04-07 outside date and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. Our record marks both the 2025-10-01 milestone (claim #4517) and the April 2026 deadline as delayed. What has not been said is whether the deal closed, was extended or was terminated, and if it was terminated, whether the $270 million fee was triggered and collected.
The company disclosed $25.9 billion of total backlog on 2025-05-13 (claim #4970), including $11.2 billion from OpenAI (claim #4969), and a further $6.5 billion of OpenAI committed revenue through 2031-05-31 on 2025-09-24 (claim #4297). What has not been said is the updated share of backlog held by the single largest customer, how much of that backlog converts to revenue in the next 12 months, and what termination or reduction rights the contracts carry.
The company disclosed on 2025-09-14 a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, cited as claim #4352, and on 2025-05-05 a revolver carrying a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is what triggers the springing maturity and whether it is now live. The record also does not say whether NVIDIA's position as supplier, customer backstop and possible shareholder is set out as a related-party transaction in the proxy, alongside CEO compensation context for the personnel item in claim #4332.
What we aren't being told
2026-09-23The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30 (claims #4592, #11922) secured against a "material customer contract for GPU infrastructure" (claim #4595), with a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who that customer is, how much of the contract value backs the facility, and how much of the $2.6 billion had been drawn by the 2026-07-31 commitment termination date, a milestone now marked delayed (claim #4593). The unnamed strategic customer behind the $350 million share issuance (claim #4514) raises the same question: is it the same counterparty?
On 2025-05-13 the company disclosed $25.9 billion of total backlog (claim #4970), including an $11.2 billion OpenAI deal (claim #4969). On 2025-09-24 it cited $6.5 billion of OpenAI committed revenue through 2031-05-31 (claim #4297). What has not been said is whether the $6.5 billion is incremental to or part of the $11.2 billion, what OpenAI's current share of total backlog is, and how much of the backlog converts to revenue within the next twelve months.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity added on 2025-05-13 (claims #4973, #4972). What has not been said is which sites make up the roughly 1.2 GW gap, their physical locations and utility interconnection status, and the quarter-by-quarter energization schedule. The filing also does not say whether "420 MW added" is a single-quarter figure or a cumulative one.
The Core Scientific merger at 0.1235 shares (claims #4731, #4729, #4331) carried a 2025-10-01 target (claim #4517) and a 2026-04-07 outside date (claim #4738), and both are now marked delayed. A $270 million termination fee is payable to CoreWeave (claim #4739). What has not been said is whether the deal closed, was extended, or was terminated, and whether the fee was triggered and collected.
Several financing figures leave the units or sequencing ambiguous. Claims #11922, #11921 and #11918 record the DDTL and notes in bare "USD" without scale. The 2030 notes appear as $1.5 billion on 2025-05-18 (claim #11921) and $2.0 billion on 2025-05-20 (claims #11918, #11917), which implies an upsize that was never explicitly stated. The use of proceeds (claim #11920) is undisclosed. What has not been said is what condition triggers the 2026-12-30 springing maturity on the revolver (claim #11926), which would otherwise run to 2028-05-02 (claim #5012). The company also has not confirmed that the first 9% coupon, due 2026-02-01 and marked delayed (claim #4659), was actually paid.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352). What has not been said is the related-party context, given NVIDIA's position as both supplier and investor. The disclosure also omits the pricing terms and whether NVIDIA can terminate. A similar gap applies to the $1.0 billion Weights & Biases acquisition (claim #4516), where the cash-versus-stock split and any retention packages for acquired executives remain undisclosed.
What we aren't being told
2026-09-23The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure (claim #4595). It was tied to the $2.6 billion DDTL 3.0 facility (claims #4592, #11922), which carries a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who the counterparty is, the contract's total value and term, and how much of the DDTL 3.0 commitment was drawn before its 2026-07-31 commitment termination date (claim #4593), which the record shows as passed without confirmation. Which customer's performance is this lender covenant actually underwriting?
The company disclosed on 2025-08-12 a $350 million share issuance to a strategic customer (claim #4514). What has not been said is the identity of that customer, the per-share price relative to the $40 IPO price (claims #11616, #15974), and any lock-up or board-rights terms. The OpenAI deal adds $11.2 billion to the $25.9 billion backlog (claims #4969, #4970). Is this equity holder also the backlog's largest contract counterparty, and if so, why is that related-party link not disclosed?
The company disclosed on 2025-05-13 1.6 GW of contracted power capacity and 420 MW of active capacity added (claims #4973, #4972). What has not been said is how that capacity breaks down by site, physical location, utility or interconnection agreement, and expected energization date. It is also unclear how much of the 1.6 GW depended on Core Scientific sites. The Core Scientific merger at 0.1235 shares (claims #4731, #4729) targeted an expected close of 2025-10-01 (claim #4517) and an outside date of 2026-04-07 (claim #4738), and both dates show as passed without a closing disclosure. Did the deal close, was it terminated, and was the $270 million termination fee (claim #4739) triggered?
The company disclosed on 2025-09-14 a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352). What has not been said is how much of that commitment has been used or recognized as revenue to date, the pricing and take-or-pay mechanics, and how NVIDIA's position as supplier, customer and shareholder is handled in related-party disclosures. How much of the $25.9 billion backlog (claim #4970) is attributable to NVIDIA?
The company disclosed on 2025-05-05 a revolving credit facility maturing 2028-05-02 with a contingent springing maturity of 2026-12-30 (claims #5012, #11926). What has not been said is which condition triggers the springing date, which falls about three months from now. The record also does not confirm that the first 9% coupon on the 2031 notes, due 2026-02-01, was paid (claim #4659). It also does not show whether the 2030 notes offering closed on its 2025-05-27 target (claim #11919), though claim #11917 records a $2 billion issuance that day. Several financing claims also record amounts with ambiguous units, such as $2,600 and $2,000 'USD' (claims #11922, #11918). Can the company confirm the exact face amounts and which covenants currently bind?
The company disclosed personnel matters concerning its Chief Executive Officer on 2025-09-16 (claim #4332) and its General Counsel on 2025-09-24 (claim #4316). What has not been said is whether these were appointments or departures, who holds the roles, and their compensation, equity grants or severance terms. The record also has no proxy-level detail on executive pay after a $1.4 billion IPO (claim #4967) and roughly $17.2 billion of capital raised (claim #4968).
What we aren't being told
2026-09-23The company disclosed total revenue backlog of $25.9 billion on 2025-05-13 (claim #4970), of which $11.2 billion was attributed to OpenAI (claim #4969). It also disclosed a material customer contract for GPU infrastructure on 2025-07-30 (claim #4595) and a $350 million share issuance to a strategic customer (claim #4514). What has not been said is who holds the remaining roughly $14.7 billion of backlog, whether the 2025-07-30 contract and the $350 million issuance involve OpenAI or a new counterparty, and what the pricing and lock-up terms of that equity issuance were.
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active capacity added, both on 2025-05-13 (claims #4973 and #4972). What has not been said is which physical sites make up either figure, their utility interconnection status, and the quarter-by-quarter schedule for energizing the roughly 1.18 GW gap between contracted and active capacity.
The company disclosed a $1.5 billion senior notes due 2030 offering on 2025-05-18 (claim #11921), then a $2.0 billion issuance of 9.250% notes due 2030 on 2025-05-20 and 2025-05-27 (claims #11918, #11917 and #4824). It also disclosed a $1.5 billion offering on 2025-07-20 that became $1.75 billion of 9% notes due 2031 (claims #4700, #4698 and #4697). What has not been said is whether the May deal was upsized from $1.5 billion or is a separate tranche. The use of proceeds is flagged but not specified (claim #11920). The company has also not given a consolidated cost of debt now that both high-coupon tranches are outstanding against the $17.2 billion of total capital raised (claim #4968).
The company disclosed a $2.6 billion DDTL 3.0 facility with a commitment termination date of 2026-07-31 (claims #4592 and #4593). That facility carries covenants of a 0.85x minimum contract realization ratio and a 1.40x minimum debt service coverage ratio starting April 2027 (claims #4597 and #4596). The revolver also has a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is how much of DDTL 3.0 was actually drawn before commitments lapsed, the current headroom against each covenant, and what condition would trigger the springing maturity.
The company disclosed a Core Scientific merger at 0.1235 shares per share on 2025-07-06 and 2025-07-07 (claims #4731 and #4729), with a closing deadline of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the 2025-10-01 and 2026-04-07 milestones are now tracked as delayed (claims #4517 and #4738). What has not been said is whether the merger closed, was terminated or was extended; whether the termination fee was triggered or collected; and how the treatment of Core Scientific's convertible notes (claim #4737) was resolved.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14 (claim #4352). It also disclosed Chief Executive Officer and General Counsel personnel items on 2025-09-16 and 2025-09-24 (claims #4332 and #4316). What has not been said is the related-party context of a large commitment from a supplier that is also an equity holder, how that commitment is priced and recognized, and who the CEO and General Counsel entries refer to. The compensation or transition terms attached to those two roles have not been disclosed either.
What we aren't being told
2026-09-22The company disclosed a material customer contract for GPU infrastructure on 2025-07-30 that anchors a $2.6 billion delayed draw term loan facility, cited as claims #4595, #4592, #4594, #4596 and #4597; what has not been said is the identity of that counterparty, its credit rating or parent guarantee, and the contracted dollar value — the lenders evidently know, since they sized a 0.85x minimum contract realization ratio and a 1.40x minimum debt service coverage ratio beginning April 2027 around it, but public investors are asked to underwrite a covenant whose denominator is an unnamed name. What is the realization ratio actually measuring, and what happens to the DDTL 3.0 if that single customer renegotiates delivery timing?
The company disclosed $25.9 billion of total revenue backlog from committed contracts on 2025-05-13, of which $11.2 billion is attributed to the OpenAI strategic deal, cited as claims #4970 and #4969; what has not been said is the composition of the remaining $14.7 billion by customer count, the year-by-year recognition schedule, or what portion is take-or-pay versus cancellable on notice. A related and unanswered question is whether the September 2025 NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13, cited as claim #4352, is additive to that backlog or already embedded in it — and whether a supplier committing to buy the customer's output should be counted as third-party demand at all.
The company disclosed 420 MW of active compute power capacity added and 1.6 GW of contracted power capacity on 2025-05-13, cited as claims #4972 and #4973; what has not been said is a single site address, utility counterparty, interconnection queue position, or energization date for any of it. The gap between 'contracted' and 'active' is roughly 1.2 GW, and a sophisticated reader would want the bridge: how much of the 1.6 GW has executed interconnection agreements versus letters of intent, how much is critical IT load versus gross utility capacity, and in which quarters the remaining megawatts energize.
The company disclosed a $350 million strategic customer share issuance on 2025-08-12 alongside $1.4 billion of IPO proceeds, cited as claims #4514 and #4513; what has not been said is which customer received the shares, at what price relative to the then-market, whether the issuance was contemporaneous with a supply or revenue agreement, and how the related revenue is presented. Equity issued to a party that is simultaneously a source of recognized revenue is a related-party and revenue-quality question that the disclosure as given does not answer.
The company disclosed a merger with Core Scientific at an exchange ratio of 0.1235 shares with an original outside date and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738, #4517, #4314, #4331 and #4739; what has not been said is why the closing slipped from the October 2025 expectation to an April 2026 deadline, which condition is outstanding — shareholder vote, regulatory clearance, or financing — and under exactly which termination scenarios that $270 million becomes payable versus payable by CoreWeave. The 2025-09-16 personnel claim identifying a Chief Executive Officer, cited as claim #4332, is likewise disclosed without a name, a compensation package, retention terms, or any statement of whether the officer holds Core Scientific equity that the exchange ratio would convert.
The company disclosed roughly $17.2 billion of total debt and equity capital raised as of 2025-05-13, then layered on $2.0 billion of 9.250% senior notes due 2030, a $1.75 billion 9% notes issuance due 2031, a $1.5 billion revolver expansion, a $350 million letter of credit facility and up to $2.6 billion of delayed draw term loans, cited as claims #4968, #4824, #11917, #4658, #4697, #11923, #11924, #11922 and #4592; what has not been said is the blended cash interest expense run rate, the pro forma net leverage against contracted EBITDA, and the covenant headroom under the revolver whose maturity extends to 2028-05-02 but carries a springing maturity contingent on 2026-12-30, cited as claims #11925 and #11926. What triggers that spring, and what is the refinancing plan if it does? Separately, two notes offerings were announced with expected closings on 2025-05-27 and 2025-07-25 that are recorded as delayed, cited as claims #11919 and #4699, and the 9% interest payment date of 2026-02-01 is likewise flagged, cited as claim #4659 — the company has not explained whether these are administrative recording artifacts or genuine slippage in settlement and payment.
What we aren't being told
2026-09-22The company disclosed a "material customer contract for GPU infrastructure" on 2025-07-30 that serves as the collateral and revenue basis for the $2.6 billion DDTL 3.0 facility, cited as claims #4595 and #4592, along with covenants requiring a minimum contract realization ratio of 0.85x (#4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (#4596); what has not been said is the identity of that counterparty, the contract's total value and term, or what the 0.85x realization ratio is measured against — i.e., whether it is billed revenue against contracted revenue, and what happens to the facility if the customer under-consumes but keeps paying.
The company disclosed a $350 million share issuance to a "strategic customer" on 2025-08-12, cited as claim #4514, alongside the NVIDIA capacity purchase commitment of $6.3 billion running to 2032 disclosed on 2025-09-14, cited as claim #4352; what has not been said is whether these involve the same party, whether the equity was issued at a discount to market or with warrants attached, and whether the $6.3 billion NVIDIA backstop is included in, or additive to, the $25.9 billion revenue backlog figure (#4970) — a question of whether a supplier and shareholder is also being counted as demand.
The company disclosed $11.2 billion of revenue backlog from the OpenAI strategic deal on 2025-05-13 against $25.9 billion of total committed backlog, cited as claims #4969 and #4970; what has not been said is the revenue recognition schedule by year, the take-or-pay floor versus the consumption-dependent portion, the termination and delay rights available to that customer, and what percentage of the remaining $14.7 billion sits with the next two customers.
The company disclosed 420 MW of "active compute power capacity added" and 1.6 GW of contracted power capacity on 2025-05-13, cited as claims #4972 and #4973; what has not been said is whether these are critical IT load or gross utility capacity, whether the 420 MW is a period addition or a cumulative installed base, and — for the 1.6 GW — the site-level breakdown showing physical addresses, utility interconnection agreement status, queue positions, and expected energization dates, without which "contracted" cannot be distinguished from a signed lease on an unbuilt shell.
The company disclosed a sequence of upsized debt raises — a $1.5 billion notes offering announced 2025-05-18 (#11921) that priced at $2.0 billion on 2025-05-20 and issued 2025-05-27 at 9.250% due 2030 (#11918, #11917, #4824), and a $1.5 billion offering announced 2025-07-20 (#4700) increased by $250 million to $1.75 billion at 9% due 2031 (#4697, #4698, #4658) — on top of a $1.5 billion revolver expansion and $350 million LC facility (#11923, #11924) and $17.2 billion of cumulative debt and equity raised (#4968); what has not been said is the consolidated maturity ladder, the blended cash interest expense run-rate implied by high-9% coupons against the pace of GPU depreciation, or the covenant headroom at the parent versus the ring-fenced SPV facilities, and whether the first 9% coupon due 2026-02-01 (#4659) was in fact paid on schedule.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio with an outside closing date of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738, #4739, #4517 and #4314, all of which now carry a delayed status; what has not been said is the current status of the target's shareholder approval, whether the termination fee was triggered or received, and how much of the 1.6 GW contracted capacity figure (#4973) depends on Core Scientific sites that would revert to a third-party lease relationship if the deal does not close.
The company disclosed a Chief Executive Officer personnel item on 2025-09-16, cited as claim #4332, in the same window as the Core Scientific merger documents (#4331); what has not been said is the compensation structure attached to it — grant-date value, performance conditions, and any change-of-control acceleration — or whether any founder or executive participated in the financing and share-issuance transactions catalogued above as a related party.
What we aren't being told
2026-09-21CoreWeave disclosed on 2025-05-13 that the OpenAI strategic deal added $11.2 billion of revenue backlog against $25.9 billion of total committed backlog, cited as claims #4969 and #4970, and then on 2025-07-30 disclosed a "material customer contract for GPU infrastructure" with the counterparty withheld entirely, cited as claim #4595. What has not been said is who that July counterparty is, how much of the remaining roughly $14.7 billion of non-OpenAI backlog sits with that single unnamed customer versus the IBM Granite arrangement of 2025-05-13 (claim #4971), and what the top-three-customer concentration percentage is on a contracted-dollar basis. Relatedly, the company disclosed a $350 million share issuance to a "strategic customer" on 2025-08-12, cited as claim #4514; what has not been said is whether that customer is the same entity as the claim #4595 counterparty, at what price the shares were issued, and whether the issuance is linked to contract milestones or prepayment credits that would offset recognized revenue.
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is the reconciliation between the two figures: whether "contracted" means signed interconnection agreements, executed leases, or letters of intent; the site-by-site energization schedule for the roughly 1.2 GW gap; and whether the 420 MW is nameplate IT load, critical load, or utility-delivered capacity. A first-year analyst would ask on the next call for contracted megawatts broken out by utility interconnection status and in-service quarter, and for the MW-to-revenue conversion factor implied by the $25.9 billion backlog in claim #4970.
The company announced a $1.5 billion senior notes offering due 2030 on 2025-05-18 (claim #11921), described a $2.0 billion offering on 2025-05-20 (claim #11918), and issued $2.0 billion of 9.250% senior notes on 2025-05-27 (claims #4824 and #11917), with the expected closing in claim #11919 carrying a delayed status. What has not been said is why the offering upsized by $500 million between announcement and pricing, what the final all-in yield and original issue discount were, and what specifically caused the closing to slip from the 2025-05-27 date in claim #11919. The same pattern repeats in July: a $1.5 billion offering on 2025-07-20 (claim #4700), a $250 million upsize on 2025-07-22 (claim #4698), $1.75 billion of 9% notes issued 2025-07-27 (claim #4658), and another delayed closing (claim #4699) — with no disclosure of whether the incremental proceeds were committed to specific data center projects or to general liquidity.
The company disclosed the DDTL 3.0 facility of up to $2.6 billion on 2025-05-18 and 2025-07-30, cited as claims #11922 and #4592, with a commitment termination date of 2026-07-31 (claim #4593, now delayed) and maturity of 2030-08-21 (claim #4594). What has not been said is how much has actually been drawn versus committed as of the most recent balance sheet date, what the borrowing base tests are, which specific customer contracts are pledged as collateral, and what happens to undrawn commitments if the termination date in claim #4593 passes without full utilization. Separately, the revolver expansion to $1.5 billion and letters-of-credit facility of $350 million disclosed 2025-05-05 (claims #5010, #5011, #11923, #11924) carry a maturity extension to 2028-05-02 (claims #5012, #11925) subject to a springing maturity of 2026-12-30 (claim #11926); what has not been said is precisely which condition triggers the spring, how much notes or term debt must be refinanced to avoid it, and how close the company is to that threshold today.
The company disclosed a minimum debt service coverage ratio of 1.40x beginning April 2027 and a minimum contract realization ratio of 0.85x on 2025-07-30, cited as claims #4596 and #4597. What has not been said is the current level of either ratio, the amount of headroom at the most recent test date, the definition of "contract realization" including whether customer non-renewal or repricing counts against it, and the cure rights and step-down consequences if either covenant is breached. Given that claims #4658, #4824 and #11917 stack roughly $3.75 billion of 9%-plus fixed-rate debt on top of the DDTL facilities, the specific quantitative follow-up is: what is pro forma annual cash interest expense, and what contracted revenue must convert to cash in 2027 for the 1.40x test in claim #4596 to be met.
The company announced the Core Scientific merger at 0.1235 shares on 2025-07-06 and 2025-09-16, cited as claims #4731, #4729 and #4331, with an outside closing date of 2026-04-07 (claim #4738) and an earlier expected close around 2025-10-01 (claim #4517), both now flagged delayed, alongside a $270 million termination fee payable to CoreWeave (claim #4739) and conversion of Core Scientific convertible notes (claim #4737). What has not been said is which Core Scientific sites are being acquired, their physical addresses, their current utility interconnection capacity and how much of it is bitcoin-mining load convertible to HPC load, the capital cost per megawatt of that conversion, the reverse termination fee payable by CoreWeave if the deal fails, the expected dilution from converting the Core Scientific convertible notes under claim #4737, and the specific reason — shareholder vote, regulatory review, or financing — for the slippage reflected in claims #4517 and #4738.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352, while NVIDIA is also a supplier and a pre-IPO shareholder. What has not been said is the related-party characterization of that commitment, the annual minimum purchase or take-or-pay schedule, whether the commitment is a backstop on unsold capacity and at what price relative to third-party rates, and how much of the $25.9 billion backlog in claim #4970 it is counted within versus in addition to. In the same window, the company named a Chief Executive Officer and a General Counsel on 2025-09-16 and 2025-09-24, cited as claims #4332 and #4316; what has not been said is the compensation structure for those appointments, whether any equity grants carry performance conditions tied to the backlog or capacity figures in claims #4970 and #4973, and whether either individual has any prior relationship with Core Scientific, NVIDIA, or the unnamed customer in claim #4595.
Finally, the company disclosed IPO pricing at $40.00 per share (claims #17815, #15974, #11616, #11601), net proceeds of $1.4 billion (claims #4967, #4513), a $68 million over-allotment exercise (claim #4515), and cumulative debt and equity capital raised of $17.2 billion (claim #4968), then disclosed the Weights & Biases acquisition on 2025-05-13 and a $1.0 billion value for it on 2025-08-12 (claims #4974, #4516). What has not been said is the cash-versus-stock split of that $1.0 billion, the earnout and retention components, and how the $17.2 billion cumulative capital figure in claim #4968 reconciles to current gross debt, since it aggregates equity, drawn debt, and apparently undrawn commitments without stating which. The direct follow-up for the next call is a bridge from the $17.2 billion raised to period-end cash, gross debt outstanding, and remaining undrawn capacity.
What we aren't being told
2026-09-21The company disclosed a $25.9 billion total revenue backlog from committed contracts on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to a strategic OpenAI deal, cited as claim #4969 — then on 2025-09-24 disclosed a separate OpenAI committed revenue figure of $6.5 billion running to 2031-05-31, cited as claim #4297. What has not been said is whether the $6.5 billion is incremental to the $11.2 billion or a re-cut of it, what the weighted-average contract duration and revenue recognition curve of the $25.9 billion backlog is, and what share of backlog is cancellable, subject to customer financing conditions, or contingent on delivery milestones the company has not yet hit.
The DDTL 3.0 facility of up to $2.6 billion, cited as claims #11922 and #4592, was underwritten against a 'material customer contract for GPU infrastructure,' cited as claim #4595, whose counterparty is not named. What has not been said is who that customer is, what the contract's dollar value and term are, whether it is the same OpenAI arrangement already counted in claims #4969 and #4297 — which would mean one contract collateralizing both the backlog headline and the borrowing base — and what happens to the facility if that single customer defaults or renegotiates.
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972. What has not been said is the site-level breakdown: which physical addresses and utilities those megawatts sit behind, the interconnection queue position and expected energization date for each tranche, how much of the 1.6 GW is signed leases versus letters of intent or options, and whether 'contracted' means power actually deliverable under executed interconnection agreements or merely reserved capacity subject to utility approval.
On 2025-09-14 the company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, cited as claim #4352, under which NVIDIA commits to buy unsold capacity. What has not been said is the related-party framing a sophisticated reader would expect — NVIDIA is simultaneously a shareholder, the sole supplier of the GPUs being financed, and now an offtake backstop — including whether any of the backlog in claim #4970 is NVIDIA-sourced, what the pricing mechanism is relative to third-party rates, and whether the commitment is recognized as revenue or as a reduction of equipment cost.
Between 2025-05-05 and 2025-07-30 the company stacked a $1.5 billion revolver (claim #5010), a $350 million letter-of-credit facility (claim #5011), $2.0 billion of 9.250% senior notes due 2030 (claims #4824 and #11917), $1.75 billion of 9% senior notes due 2031 (claims #4697 and #4658), and the $2.6 billion DDTL 3.0 (claim #4592), with a minimum debt service coverage ratio of 1.40x beginning 2027-04-01 (claim #4596) and a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is the current measured level of each ratio and the headroom against it, the pro forma total debt and blended cash interest expense, and what triggers the contingent springing maturity date of 2026-12-30 disclosed as claim #11926 — a date now roughly three months away.
The Core Scientific merger at a 0.1235 exchange ratio, cited as claims #4731, #4331 and #4729, with a $270 million termination fee payable to CoreWeave (claim #4739) and an outside date of 2026-04-07 (claim #4738), is carried as delayed, as is the earlier 2025-10-01 expectation in claim #4517. What has not been said is why: the shareholder vote outcome or regulatory step that caused the slip, whether the termination fee has been triggered or waived and in which direction it flows, and what the pre-merger commercial relationship between the two companies was — Core Scientific was CoreWeave's hosting counterparty, so the lease obligations being eliminated or retained are a related-party figure absent from the record.
The company disclosed a $350 million strategic customer share issuance on 2025-08-12, cited as claim #4514, and a Chief Executive Officer personnel item on 2025-09-16, cited as claim #4332, with no proxy-level context attached to either. What has not been said is which customer received the shares, at what price relative to the $40 IPO price in claims #17815 and #11616, whether the issuance was consideration linked to that customer's purchase commitments — and separately, what the CEO's compensation structure, equity grant sizing and any Class A/B voting arrangement are, given no executive compensation or related-party disclosure appears anywhere in the record.
What we aren't being told
2026-09-21The company disclosed on 2025-07-30 that it had entered a material customer contract for GPU infrastructure used to support a $2.6 billion delayed draw term loan facility, cited as claims #4595 and #4592; what has not been said is who that counterparty is, what its credit rating or parent guarantee is, and what share of the $25.9 billion committed backlog disclosed on 2025-05-13 (claim #4970) that single contract represents. A facility whose covenants include a 0.85x minimum contract realization ratio and a 1.40x debt service coverage test beginning April 2027 (claims #4597, #4596) is structurally dependent on one obligor's performance, yet the obligor is unnamed and the realization ratio's numerator and denominator are undefined.
The company disclosed OpenAI-related revenue backlog of $11.2 billion on 2025-05-13 and again identified OpenAI as a cloud computing customer with a term running to 2031-05-31 on 2025-09-24, cited as claims #4969 and #4296; what has not been said is the revenue recognition profile of that backlog by year, whether the 2025 expansions are incremental to or inclusive of the original $11.2 billion, and what minimum take-or-pay or termination-for-convenience provisions apply. Related to this, the company disclosed a $350 million strategic customer share issuance on 2025-08-12 (claim #4514); what has not been said is whether that strategic customer is OpenAI, at what price per share the equity was issued, whether it was issued at a discount to the then-market price, and how that consideration is accounted for against revenue from the same counterparty.
The company disclosed 420 MW of active compute power capacity and 1.6 GW of contracted power capacity on 2025-05-13, cited as claims #4972 and #4973; what has not been said is the site-by-site breakdown, the physical addresses and utility interconnection queue positions behind the 1.2 GW gap between contracted and active, whether 'contracted' means signed interconnection agreements or leases with third-party data center operators, and the energization dates by site. A first-year analyst would ask on the next call how many megawatts of the 1.6 GW have executed large-load interconnection agreements versus letters of intent, and what the capital cost per megawatt is to bring the remainder to active.
The company disclosed a Core Scientific merger at a 0.1235 exchange ratio with an outside date of 2026-04-07 on 2025-07-06 and 2025-09-16, cited as claims #4731, #4331, #4738 and #4517, all of which have since been marked delayed against an expected 2025-10-01 close; what has not been said is the reason for the delay, whether it is a shareholder vote, regulatory, or financing condition, and whether the $270 million termination fee payable to CoreWeave disclosed the same day (claim #4739) has any reciprocal fee running the other direction. Also unexplained is how much of the 1.6 GW contracted capacity figure is sourced from Core Scientific sites that the company does not yet own.
The company disclosed a series of escalating debt raises — $1.5 billion of senior notes due 2030 announced 2025-05-18 that priced at $2.0 billion and 9.250% on 2025-05-27, and $1.5 billion announced 2025-07-20 that priced at $1.75 billion and 9.0% due 2031 on 2025-07-22 — cited as claims #11921, #11918, #4824, #4700, #4698 and #4697; what has not been said is why both offerings were upsized mid-marketing, what the all-in yield to maturity was versus coupon, and how a roughly 9% blended cost of debt reconciles to the returns underwriting the $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352). The company has also not disclosed a pro forma total debt figure, net leverage ratio, or fixed charge coverage against the $17.2 billion of total capital raised cited on 2025-05-13 (claim #4968).
The company disclosed the $6.3 billion NVIDIA capacity purchase commitment on 2025-09-14, cited as claim #4352, alongside an IBM partnership for Granite compute capacity on 2025-05-13 (claim #4971); what has not been said is whether the NVIDIA arrangement is a backstop under which NVIDIA purchases unsold capacity, how that revenue would be classified given NVIDIA is simultaneously the company's principal hardware supplier and an equity holder, and whether any portion of the $25.9 billion backlog is attributable to it. The related-party disclosure here is the gap: the company named a chief executive officer on 2025-09-16 (claim #4332) but has published no compensation, equity grant, or related-party transaction detail covering supplier-customer counterparties who are also shareholders.
What we aren't being told
2026-09-21CoreWeave disclosed a "material customer contract for GPU infrastructure" on 2025-07-30, cited as claim #4595, and separately a $350 million share issuance to a "strategic customer" on 2025-08-12, cited as claim #4514; what has not been said is who either counterparty is, whether they are the same entity, and whether either is the OpenAI relationship already named in the $11.2 billion backlog disclosure of 2025-05-13 (claim #4969) — so is the $350 million equity issuance a discount against contracted revenue, and if so, is that contra-revenue reflected in backlog?
The company disclosed total committed revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, of which $11.2 billion is attributed to the OpenAI strategic deal, cited as claim #4969; what has not been said is the counterparty composition, weighted-average contract term, and expected revenue-recognition schedule of the residual roughly $14.7 billion — how much of that residual sits with the top three customers, how much is take-or-pay versus cancellable, and what portion converts to revenue inside the next eight quarters?
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972; what has not been said is the bridge between the two numbers — which specific sites, at which physical addresses, hold the contracted-but-not-active balance, what are the utility interconnection queue positions and energization dates, and is "contracted" a signed lease, a reserved allocation, or an LOI? A first-year analyst would ask for a site-by-site table of MW critical IT load, energization quarter, and interconnection status.
The company disclosed a dense, overlapping sequence of debt raises — $1.5 billion senior notes due 2030 and a $2.6 billion DDTL 3.0 on 2025-05-18 (claims #11921, #11922), a $2.0 billion senior notes offering on 2025-05-20 upsized and issued at 9.250% on 2025-05-27 (claims #11918, #11917, #4824), a $1.5 billion offering on 2025-07-20 upsized by $250 million to $1.75 billion at 9% due 2031 (claims #4700, #4698, #4697, #4658), plus a $1.5 billion revolver expansion and $350 million LC facility on 2025-05-05 (claims #11923, #11924) — against a cumulative $17.2 billion of debt and equity raised cited on 2025-05-13 (claim #4968); what has not been said is whether the May notes tranches are one upsized deal or two, the debt-versus-equity split inside the $17.2 billion, pro forma total debt outstanding, blended cash interest cost, and the annual cash interest burden against contracted cash flows.
The company disclosed a minimum debt service coverage ratio of 1.40x beginning April 2027 and a minimum contract realization ratio of 0.85x on 2025-07-30, cited as claims #4596 and #4597; what has not been said is the current measured level of each ratio, how "contract realization" is defined and computed, which specific customer contracts and GPU collateral are pledged to the DDTL 3.0 borrowing base, and what happens to availability if a single anchor customer renegotiates — and given the DDTL 3.0 commitment termination date of 2026-07-31 (claim #4593, already flagged delayed), how much of the $2.6 billion remains undrawn today?
The company disclosed repeated timing slips without explanation: the May notes closing targeted for 2025-05-27 (claim #11919), the July closing targeted for 2025-07-25 (claim #4699), the first 9% interest payment due 2026-02-01 (claim #4659), and the Core Scientific merger, announced 2025-07-06 at a 0.1235 exchange ratio with an outside date of 2026-04-07 and an expected close of 2025-10-01 (claims #4731, #4738, #4517), all carry delayed status; what has not been said is the cause of each delay, the current status of the Core Scientific shareholder vote and HSR/regulatory clearance, and under what conditions the $270 million termination fee cited in claim #4739 becomes payable and by which party.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352, while NVIDIA is simultaneously the sole-source supplier behind the GB200 and MLPerf product claims of 2025-05-13 (claims #4976, #4980) and a pre-IPO shareholder; what has not been said is the related-party accounting treatment — is any portion of the $25.9 billion backlog (claim #4970) attributable to NVIDIA itself, what are the take-or-pay mechanics and pricing of the commitment, and was it reviewed by a disinterested audit committee? Relatedly, claims #4332 and #4315 identify a Chief Executive Officer on 2025-09-16 and 2025-09-24 with no compensation, equity-grant, pledging, or Rule 10b5-1 detail, and the $1.0 billion Weights & Biases acquisition (claims #4974, #4516) is disclosed without a cash-versus-stock split, earnout terms, or any insider-overlap disclosure between CoreWeave principals and W&B's cap table.
What we aren't being told
2026-09-21The company disclosed on 2025-05-13 that OpenAI's strategic deal carries $11.2 billion of revenue backlog (claim 4969) inside a total committed backlog of $25.9 billion (claim 4970); what has not been said is who holds the remaining $14.7 billion. Only IBM is named, and only as a Granite compute partnership with no dollar value attached (claim 4971). What are the top five customers by contracted backlog, what share of the non-OpenAI $14.7 billion sits with the top two, and how much of that backlog is cancelable or subject to termination-for-convenience?
On 2025-07-30 the company disclosed a $2.6 billion delayed draw term loan facility (claim 4592) alongside an unnamed "material customer contract for GPU infrastructure" (claim 4595) and a minimum contract realization ratio of 0.85x (claim 4597); what has not been said is which counterparty that contract is with, whether it is the same OpenAI agreement already counted in claim 4969, and what the borrowing base looks like if that single customer renegotiates. Is the DDTL 3.0 collateral package secured by receivables from one counterparty, and what is the current realization ratio against the 0.85x floor?
The company disclosed 1.6 GW of contracted power capacity on 2025-05-13 (claim 4973) and, in the same disclosure, 420 MW of active compute power added (claim 4972); what has not been said is the reconciliation between the two. Is the 1.6 GW energized, under signed interconnection agreements, or merely under lease or letter of intent, over what period was the 420 MW added, and can the company provide a site-level table with physical locations, utility counterparties, interconnection queue positions and expected energization dates rather than two aggregate figures whose units and timing are not comparable?
On 2025-09-14 the company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim 4352), while NVIDIA is simultaneously the company's principal supplier and an equity holder; what has not been said is whether that $6.3 billion is included in the $25.9 billion backlog reported in claim 4970, how it was approved given the related-party posture, and what the residual obligation looks like if NVIDIA does not take the capacity. Was the commitment reviewed by independent directors, and is it recognized gross or net of GPU purchases from the same counterparty?
The company disclosed a merger with Core Scientific at an exchange ratio of 0.1235 shares with an outside date that moved from 2025-10-01 (claim 4517) to 2026-04-07 (claims 4731 and 4738, both now flagged delayed), plus a $270 million termination fee payable to CoreWeave (claim 4739); what has not been said is why the closing date slipped by six months and what condition remains unsatisfied. Was the delay driven by the Core Scientific shareholder vote, regulatory review, or financing, and because CoreWeave was already Core Scientific's largest hosting customer, how much of the $25.9 billion backlog and of the 1.6 GW capacity figure is intercompany and will be eliminated on consolidation?
Between 2025-05-18 and 2025-07-27 the company disclosed a sequence of debt raises whose final sizes shifted within days -- $1.5 billion of 2030 notes (claim 11921) that became a $2.0 billion 9.250% issuance (claims 11918, 11917, 4824), and a $1.5 billion offering (claim 4700) upsized by $250 million (claim 4698) to $1.75 billion at 9% due 2031 (claims 4697, 4658), on top of a $1.5 billion revolver (claim 5010) and $350 million letter-of-credit facility (claim 5011) against $17.2 billion of total capital raised (claim 4968); what has not been said is the consolidated maturity ladder and drawn balance. What is the weighted-average cost of debt, how much of the DDTL 3.0 is drawn versus the 2026-07-31 commitment termination date (claim 4593), what is the cash interest run-rate, and how much headroom exists against the 1.40x debt service coverage covenant that begins in April 2027 (claim 4596)?
The company disclosed a $350 million strategic customer share issuance on 2025-08-12 (claim 4514) and separately identified a Chief Executive Officer (claim 4332) and Deputy General Counsel (claim 4317) in September 2025 filings; what has not been said is the identity of the customer receiving equity, the issue price relative to the $40 IPO price (claims 15974, 11616, 11601), and whether that consideration is recorded as a contra-revenue item against the backlog in claim 4970. Alongside that, no compensation, vesting, or related-party context has been provided for the named officers -- what are the grant values and performance conditions, and what founder or officer share sales occurred following the IPO?
What we aren't being told
2026-09-20The company disclosed a "material customer contract for GPU infrastructure" on 2025-07-30, cited as claim #4595, and separately a $350 million share issuance to an unnamed "strategic customer" on 2025-08-12, cited as claim #4514; what has not been said is who either counterparty is, whether they are the same entity, and whether the equity issued to that customer was priced at, above, or below the $40 IPO price disclosed on 2025-03-28 (claims #11616, #15974, #11601). A first-year analyst would ask on the next call whether the shares carry lock-ups, warrants, or revenue-linked vesting, and how much of the $25.9 billion backlog that one contract represents.
The company disclosed an $11.2 billion OpenAI revenue backlog on 2025-05-13, cited as claim #4969, and then a separate $6.5 billion OpenAI committed revenue figure running to 2031-05-31 on 2025-09-24, cited as claims #4297 and #4296; what has not been said is whether the $6.5 billion is incremental to the $11.2 billion or a re-cut of the same commitment, and what the year-by-year contracted minimums are. Against a total backlog of $25.9 billion (claim #4970), the unanswered quantitative question is single-customer concentration as a percentage of 2026 and 2027 contracted revenue, and what termination or reduction rights OpenAI holds.
The company disclosed 420 MW of active compute capacity added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is the site-level breakdown behind the 1.6 GW — physical addresses, utility counterparties, interconnection queue positions, and energization dates — nor whether "contracted" means executed interconnection agreements or merely signed leases with hosting partners. The gap matters because the delta between 420 MW live and 1.6 GW contracted is the entire bridge to the backlog, and no schedule converting megawatts to revenue by quarter has been provided.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352, alongside product dependencies on GB200 and NVIDIA AI Enterprise disclosed 2025-05-13 (claims #4976, #4979); what has not been said is the related-party framing — NVIDIA is simultaneously supplier, equity holder, and now residual-capacity buyer — including whether the commitment is a floor, a backstop on unsold capacity, or a take-or-pay, and how it is accounted for in reported revenue and backlog. The follow-up is whether any of the $25.9 billion backlog is attributable to this NVIDIA arrangement.
The company disclosed the Core Scientific merger at 0.1235 shares per share on 2025-07-06 and 2025-09-16, cited as claims #4731, #4331 and #4517, with a closing deadline that moved from 2025-10-01 to an outside date of 2026-04-07 (claim #4738, both now flagged delayed) and a $270 million termination fee payable to CoreWeave (claim #4739); what has not been said is the reason for the slippage — shareholder vote, antitrust, or financing — and the reciprocal fee CoreWeave would owe. Also absent is disclosure of the pre-existing hosting contracts between the two companies and how much of CoreWeave's 1.6 GW contracted power sits at Core Scientific sites, which would make the acquisition an insourcing of the company's own landlord.
The company disclosed a debt stack assembled over five months — a $1.5 billion revolver expansion and $350 million LC facility on 2025-05-05 (claims #5010, #5011), a $2.6 billion DDTL 3.0 on 2025-05-18 and 2025-07-30 (claims #11922, #4592), $2.0 billion of 9.250% notes due 2030 on 2025-05-27 (claims #4824, #11917), and $1.75 billion of 9% notes due 2031 on 2025-07-22 after a $250 million upsize (claims #4697, #4698) — against $17.2 billion of total capital raised disclosed 2025-05-13 (claim #4968); what has not been said is pro forma annual cash interest expense or the weighted-average cost of the stack. The specific follow-ups are current headroom against the 0.85x minimum contract realization ratio (claim #4597) and projected headroom against the 1.40x debt service coverage ratio that begins April 2027 (claim #4596), plus the precise trigger for the contingent springing maturity dated 2026-12-30 (claim #11926).
The company disclosed a Chief Executive Officer personnel item on 2025-09-16, cited as claim #4332, and a $1.0 billion Weights & Biases acquisition on 2025-08-12, cited as claims #4516 and #4974; what has not been said is any executive compensation or related-party context — post-IPO equity grants and performance conditions for named officers, whether any officer or director held an interest in Weights & Biases, and the stock versus cash split of that $1.0 billion. Given the IPO netted only $1.4 billion (claims #4967, #4513) plus a $68 million over-allotment (claim #4515), the arithmetic question is how a $1.0 billion acquisition was funded relative to those proceeds.
What we aren't being told
2026-09-20CoreWeave disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, and financed against it with the $2.6 billion DDTL 3.0 facility, claim #4592, subject to a minimum contract realization ratio of 0.85x, claim #4597, and a 1.40x minimum debt service coverage ratio starting April 2027, claim #4596; what has not been said is the counterparty's name, its credit rating or parent guarantee, the contract's term and total contract value, and what specifically happens to the facility if realization falls below 0.85x — is there a cure period, a cash sweep, or an immediate event of default, and on what measurement dates is the ratio tested?
The company disclosed 420 MW of active compute power added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is whether these are critical IT load or gross utility capacity, which sites and utility interconnection queues the contracted gigawatt sits in, what the energization schedule is quarter by quarter, and how much of the 1.6 GW is backed by signed interconnection agreements versus letters of intent or land options with no physical address disclosed.
The company disclosed $25.9 billion of total revenue backlog and an $11.2 billion OpenAI backlog on 2025-05-13, cited as claims #4970 and #4969, alongside an IBM partnership for Granite compute capacity, claim #4971, and a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, claim #4352; what has not been said is whether the NVIDIA commitment — in which the company's largest supplier and a shareholder agrees to buy unsold capacity — is counted inside the $25.9 billion backlog, what the residual concentration looks like after OpenAI (is IBM disclosed at any dollar value at all?), and the year-by-year conversion schedule of backlog into recognized revenue.
The company disclosed a strategic customer share issuance of $350 million on 2025-08-12, cited as claim #4514, against IPO pricing of $40 per share, claims #11601, #11616 and #15974, and $1.4 billion of net proceeds, claims #4967 and #4513; what has not been said is which customer received the shares, at what price relative to the $40 IPO level, whether the issuance is linked to a commercial contract, and how that arrangement is accounted for — as equity issued for cash or as consideration that should reduce reported revenue from the same counterparty.
The company disclosed a stack of overlapping debt announcements — a $1.5 billion notes offering on 2025-05-18 (claim #11921) that priced at $2.0 billion on 2025-05-20 (claim #11918) and issued at 9.250% due 2030 (claims #11917, #4824), a $1.5 billion offering on 2025-07-20 (claim #4700) upsized by $250 million (claim #4698) to $1.75 billion of 9% notes due 2031 (claims #4697, #4658), plus a $1.5 billion revolver and $350 million letter-of-credit expansion (claims #11923, #5010, #5011) and the $2.6 billion DDTL — and a cumulative $17.2 billion of debt and equity raised (claim #4968); what has not been said is the reconciliation between announced, committed, drawn and outstanding balances, the blended cash interest cost and a maturity ladder, and specifically what conditions trigger the contingent springing maturity dated 2026-12-30 in claim #11926 and what the company will have refinanced by then to avoid it.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio on 2025-07-06 and again on 2025-09-16 (claims #4731, #4331), with a closing originally framed around 2025-10-01 (claim #4517) and an outside date of 2026-04-07 (claim #4738), all now carrying delayed status, alongside a $270 million termination fee payable to CoreWeave (claim #4739); what has not been said is the target shareholder vote outcome and record date, the reciprocal fee CoreWeave would owe if it walks or fails to obtain approvals, and — given the CEO reference in claim #4332 and the convertible-note conversion into CoreWeave securities in claim #4737 — what change-of-control payments, retention awards and converted-instrument economics accrue to named executives and existing holders on both sides, none of which appears in proxy-level detail here.
Finally, the company disclosed a 9% semiannual interest obligation with a first payment date of 2026-02-01 (claim #4659) and a notes closing expected 2025-05-27 and 2025-07-25 (claims #11919, #4699), all carried as delayed in this record; what has not been said is whether these are genuine settlement or payment slippages or artifacts of the filing timeline, and a first-year analyst should ask on the next call for confirmation that every scheduled coupon on the 2030 and 2031 notes has been paid in cash on its stated date.
What we aren't being told
2026-09-20The company disclosed a $25.9 billion total revenue backlog and an $11.2 billion OpenAI backlog on 2025-05-13, cited as claims #4970 and #4969, and then a further $6.5 billion of OpenAI committed revenue running to 2031-05-31 on 2025-09-24, cited as claims #4297 and #4296; what has not been said is whether the $6.5 billion is incremental to the $11.2 billion or a restatement of the same contract, what portion of the combined figure is take-or-pay versus cancelable, and what the year-by-year recognition schedule looks like. A first-year analyst would ask on the next call for a backlog roll-forward — opening balance, additions, revenue recognized, cancellations — rather than a single headline number.
On 2025-07-30 the company disclosed a 'material customer contract for GPU infrastructure,' cited as claim #4595, without naming the counterparty; what has not been said is who that customer is, what share of the $25.9 billion backlog in claim #4970 it represents, and whether it overlaps with the OpenAI commitments in claims #4969 and #4297 or is a distinct third party. The related question is customer concentration: what percentage of backlog and of trailing revenue sits with the top one, two, and three customers.
The company disclosed 420 MW of active compute power capacity added and 1.6 GW of contracted power capacity on 2025-05-13, cited as claims #4972 and #4973; what has not been said is the site-level bridge between those two numbers — which facilities, at what addresses, under what utility interconnection agreements or queue positions, and with what energization dates. Nor has it been disclosed how much of the 1.6 GW is self-owned versus leased from third-party data center operators, or how much of the 'contracted' figure reflects signed interconnection versus letters of intent.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352, while NVIDIA is simultaneously the company's principal supplier and an equity holder; what has not been said is whether revenue under this backstop is included in the backlog figures of claim #4970, how it is priced relative to arm's-length third-party contracts, and how it is presented in the related-party transactions footnote. Separately, the $350 million strategic customer share issuance disclosed on 2025-08-12, cited as claim #4514, names no recipient and specifies no price relative to the $40.00 IPO price in claims #11616, #15974 and #11601 — who bought, at what discount, under what lockup, and does that party also appear as a revenue counterparty?
The company disclosed a $2.6 billion delayed draw term loan with a 0.85x minimum contract realization ratio and a 1.40x minimum debt service coverage ratio beginning 2027-04-01, cited as claims #4592, #4597 and #4596, plus a contingent springing maturity of 2026-12-30 on the revolver, cited as claim #11926; what has not been said is the current measured level of each ratio, how 'contract realization' is defined and which contracts feed it, what event triggers the springing maturity, and how much headroom exists today. The debt stack itself was disclosed piecemeal — $1.5 billion of 2030 notes on 2025-05-18 upsized to $2.0 billion by 2025-05-20 and issued at 9.250% on 2025-05-27, cited as claims #11921, #11918, #11917 and #4824, and $1.5 billion on 2025-07-20 upsized by $250 million to $1.75 billion at 9% due 2031, cited as claims #4700, #4698, #4697 and #4658 — without a consolidated pro forma annual cash interest expense figure against the $17.2 billion of total capital raised in claim #4968.
The Core Scientific merger was disclosed on 2025-07-06 at an exchange ratio of 0.1235 shares with a closing deadline that has moved from 2025-10-01 to 2026-04-07 and is now flagged delayed, cited as claims #4731, #4738 and #4517, alongside a $270 million termination fee payable to CoreWeave in claim #4739; what has not been said is the reason for the slippage, whether the Core Scientific shareholder vote has occurred and with what result, and which specific conditions trigger the fee in each direction. Relatedly, a Chief Executive Officer item was recorded on 2025-09-16 as claim #4332 with no individual named and no compensation detail — who is this, what is the grant-date value and vesting structure of any equity award, and does it carry change-of-control acceleration tied to the merger?
What we aren't being told
2026-09-20The company disclosed on 2025-08-12 that it issued $350 million of shares to a "strategic customer" (claim 4514), and separately named OpenAI as the counterparty to an $11.2 billion backlog deal (claim 4969) and a cloud contract running to 2031-05-31 (claim 4296); what has not been said is whether the equity recipient is OpenAI or a different party, at what price per share the stock was issued relative to the $40 IPO price (claims 11601, 11616, 15974), whether the shares carry lockup, registration, or vesting conditions tied to contract performance, and whether any portion of that $350 million is being recognized as a customer incentive netted against revenue rather than as financing.
The company disclosed on 2025-07-30 a "material customer contract for GPU infrastructure" (claim 4595) that underpins the $2.6 billion DDTL 3.0 facility (claims 4592, 11922) and is governed by a minimum contract realization ratio of 0.85x (claim 4597) and a minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596); what has not been said is the identity of that customer, the contract's dollar value and term, what happens to the facility if the realization ratio falls below 0.85x, and whether the same contract is already counted inside the $25.9 billion backlog figure — which would mean the collateral and the backlog are the same asset disclosed twice.
The company disclosed $25.9 billion of total committed backlog on 2025-05-13 (claim 4970) of which $11.2 billion is attributed to a single OpenAI arrangement (claim 4969); what has not been said is the concentration of the remaining $14.7 billion — how much sits with the top two or three additional customers, including IBM under the Granite compute partnership (claim 4971) — the expected conversion schedule by year, and the termination or reduction rights customers hold, since a contract that can be cancelled for convenience is not economically the same as one that cannot.
The company disclosed 420 MW of active compute power capacity added and 1.6 GW of contracted power capacity on 2025-05-13 (claims 4972, 4973); what has not been said is the site-level breakdown behind either number — physical addresses, utility counterparties, executed interconnection agreements and their queue positions, and energization dates — nor the definition separating "active" from "contracted," nor how much of the 1.6 GW is expected to be energized in each of 2026 and 2027, which is the figure that actually determines whether the backlog can be delivered.
The company disclosed a rapid sequence of debt raises — a $1.5 billion revolver expansion and $350 million letter of credit expansion maturing 2028-05-02 (claims 11923, 11924, 11925, 5010, 5011, 5012), a notes offering announced at $1.5 billion on 2025-05-18 that became $2.0 billion of 9.250% notes due 2030 by 2025-05-27 (claims 11921, 11918, 11917, 4824), a $1.5 billion offering upsized by $250 million to $1.75 billion of 9% notes due 2031 (claims 4700, 4698, 4697, 4658), and $17.2 billion of total debt and equity raised against $1.4 billion of IPO net proceeds (claims 4968, 4967, 4513); what has not been said is the blended cash interest cost and annual cash interest expense of the resulting stack, the pro forma total debt balance, and — most specifically — the precise trigger conditions for the "contingent springing maturity" dated 2026-12-30 (claim 11926), which is a nearer-term maturity risk than any of the stated 2028–2031 dates.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio with an initial expectation of closing around 2025-10-01 and an outside date of 2026-04-07 (claims 4517, 4731, 4738, 4314, 4331), and a $270 million termination fee payable to CoreWeave (claim 4739), with several of these items now carrying delayed status; what has not been said is the reason for the slip — whether the shareholder vote failed, was adjourned, or is pending — whether a reciprocal termination fee is payable by CoreWeave, and whether the announced NVIDIA $6.3 billion capacity purchase commitment running to 2032-04-13 (claim 4352) is a related-party transaction given NVIDIA's supplier and shareholder roles, how much of it is included in the $25.9 billion backlog, and what conditions must be met before NVIDIA is obliged to purchase.
The company disclosed a Chief Executive Officer personnel item dated 2025-09-16 (claim 4332) with no accompanying detail; what has not been said is whether this reflects a new appointment, a compensation award, or a contract amendment, and there is no disclosure on record of post-IPO equity grants to named executives, the size of any performance-based awards tied to the backlog or capacity milestones above, or related-party arrangements between management and the entities on the other side of the financing and customer claims.
What we aren't being told
2026-09-20CoreWeave disclosed an OpenAI backlog of $11.2 billion on 2025-05-13 (claim #4969) and then a separate $6.5 billion OpenAI committed revenue figure running to 2031-05-31 on 2025-09-24 (claims #4297, #4296); what has not been said is whether the $6.5 billion is incremental to the earlier $11.2 billion or a re-cut of the same contract, what share of the combined $25.9 billion total backlog (claim #4970) a single counterparty now represents, and what the prepayment, collateral, and termination-for-convenience terms are that would let that backlog shrink without a contract default?
The company disclosed a 'material customer contract for GPU infrastructure' on 2025-07-30 as the collateral underpinning the $2.6 billion DDTL 3.0 facility (claims #4595, #4592), with a minimum contract realization ratio of 0.85x written into the covenants (claim #4597); what has not been said is the counterparty's name, the contracted megawatts and term, and what specifically is measured in the 0.85x ratio numerator and denominator, given that a covenant keyed to a customer no one can identify is unauditable by outside holders?
The company disclosed a $350 million share issuance to a 'strategic customer' on 2025-08-12 (claim #4514); what has not been said is which customer received the equity, at what reference price and with what vesting or warrant structure, and whether that same entity is a booked revenue counterparty inside the $25.9 billion backlog (claim #4970) such that a portion of disclosed backlog is supported by stock CoreWeave itself issued?
The company disclosed 1.6 GW of contracted power and 420 MW of active compute power added on 2025-05-13 (claims #4973, #4972); what has not been said is the site-level breakdown behind either number, specifically which facilities, at what addresses, under which utilities and interconnection queue positions, how much of the 1.6 GW is energized versus merely under lease or letter of intent, and what the expected energization dates are quarter by quarter?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14 (claim #4352) alongside an IBM partnership for Granite compute on 2025-05-13 (claim #4971); what has not been said is whether NVIDIA's purchases are counted in the reported backlog, how the commitment interacts with NVIDIA's simultaneous roles as chip supplier and equity holder, and what related-party revenue and payable amounts from NVIDIA have been recognized to date?
The company disclosed a debt stack including a $1.5 billion revolver and $350 million LC facility expansion with a contingent springing maturity of 2026-12-30 (claims #11923, #11924, #11926), $2.0 billion of 9.250% notes due 2030 (claims #4824, #11917), $1.75 billion of 9% notes due 2031 (claims #4658, #4697), and a minimum 1.40x debt service coverage covenant beginning 2027-04-01 (claim #4596); what has not been said is the pro forma annual cash interest expense across the full stack, what event triggers the springing maturity, and how much headroom exists against the 1.40x DSCR test on current contracted cash flows?
The company disclosed the Core Scientific merger at 0.1235 shares with an outside closing date of 2026-04-07 and a $270 million termination fee (claims #4731, #4738, #4739), and the merger has since been marked delayed against an earlier 2025-10-01 expectation (claim #4517); what has not been said is which party owes the $270 million and under which triggers, what the shareholder vote outcome was, and what happens to the existing Core Scientific hosting contracts and lease economics, and to the megawatts embedded in the 1.6 GW figure, if the deal does not close?
The company identified a Chief Executive Officer on 2025-09-16 (claim #4332) across a year in which it raised $17.2 billion of debt and equity (claim #4968) and netted $1.4 billion from the IPO (claims #4967, #4513); what has not been said is the executive compensation and equity award structure tied to that raise, the dual-class voting arrangement, and whether any officer or director had a related-party interest in the financing counterparties, the Core Scientific transaction, or the $1 billion Weights & Biases acquisition (claim #4516)?
What we aren't being told
2026-09-20The company disclosed a "material customer contract for GPU infrastructure" on 2025-07-30, cited as claim #4595, simultaneously with the $2.6 billion delayed draw term loan facility it appears to collateralize (claims #4592 and #11922); what has not been said is the counterparty's name, the contract's term and total contract value, whether that counterparty is the same OpenAI relationship already disclosed in claims #4969 and #4297, and what happens to the facility if that single contract is terminated or renegotiated. A related silence sits on claim #4514, the $350 million "strategic customer share issuance" of 2025-08-12: the customer is unnamed, the issue price and any discount to the then-current market price are undisclosed, and it is not stated whether that equity was consideration tied to a compute contract counted inside the backlog.
The company disclosed an $11.2 billion OpenAI revenue backlog on 2025-05-13 (claim #4969) inside a $25.9 billion total committed backlog (claim #4970), then a further $6.5 billion of OpenAI committed revenue running to 2031-05-31 on 2025-09-24 (claim #4297); what has not been said is whether the $6.5 billion is incremental to or a re-cut of the $11.2 billion, what percentage of total backlog now sits with a single counterparty, and the expected revenue recognition by fiscal year. A first-year analyst would ask on the next call for a backlog roll-forward — opening balance, additions, recognized revenue, and cancellations or repricings — rather than a single cumulative figure.
The company disclosed 420 MW of "active compute power capacity added" and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is whether the 420 MW is a within-period addition or a cumulative active figure, whether "contracted" power means signed utility interconnection agreements and executed leases or includes letters of intent and queue positions, and how much of the 1.6 GW is energized versus scheduled by year. No site addresses, utility counterparties, substation or interconnection queue positions, or in-service dates accompany either number, so the delivery schedule behind the backlog cannot be checked against physical capacity.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352; what has not been said is whether that backstop revenue is included in the reported committed backlog, how the purchase price is set relative to third-party pricing, and how the arrangement is characterized under related-party disclosure given NVIDIA's simultaneous role as equity holder, principal GPU supplier, and now committed purchaser. The annual draw schedule and any minimum-utilization or take-or-pay mechanics are likewise unstated.
The company disclosed a minimum debt service coverage ratio of 1.40x beginning 2027-04-01 and a minimum contract realization ratio of 0.85x on 2025-07-30, cited as claims #4596 and #4597, against a debt stack that by then included 9.250% notes due 2030 (claim #4824), 9% notes due 2031 (claims #4697 and #4658), a $2 billion 2030 issuance (claim #11917), and a revolver expanded to $1.5 billion with a springing maturity date of 2026-12-30 (claims #11923 and #11926); what has not been said is the current headroom against the 1.40x and 0.85x tests, how the contract realization ratio is computed and which contracts count, total secured and unsecured debt outstanding with blended cost, and what conditions would trigger the springing maturity. The DDTL 3.0 commitment termination date of 2026-07-31 (claim #4593) is now flagged as delayed without any disclosure of how much was drawn before commitments lapsed.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio with an original close targeted for 2025-10-01 and an outside date of 2026-04-07, cited as claims #4731, #4517 and #4738, both now flagged delayed, alongside a $270 million termination fee payable to CoreWeave (claim #4739); what has not been said is the specific cause of the delay, the shareholder vote or regulatory condition still outstanding, and the precise triggers under which that fee becomes payable versus a walk-away with no payment. Separately, the company named a Chief Executive Officer on 2025-09-16 (claim #4332) without disclosing the compensation package, equity grant size and vesting, retention terms for Core Scientific management, or any related-party contracts between officers and the combined entity's data center sites.
What we aren't being told
2026-09-20CoreWeave disclosed a $25.9 billion total revenue backlog from committed contracts on 2025-05-13, cited as claim #4970, of which $11.2 billion is attributed to a named OpenAI strategic deal, cited as claim #4969; what has not been said is who holds the other $14.7 billion, how concentrated it is among the top two or three counterparties, over how many years it converts to revenue, and what termination, delay, or minimum-commitment provisions would let a customer walk. The same question attaches to the unnamed "material customer contract for GPU infrastructure" disclosed on 2025-07-30, cited as claim #4595, and to the $350 million of shares issued to an unnamed "strategic customer" on 2025-08-12, cited as claim #4514: why is the counterparty named in one filing and withheld in the other two, and is the $350 million equity issuance to a customer being recognized as a revenue contra or as issuance cost?
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power capacity added on 2025-05-13, cited as claims #4973 and #4972; what has not been said is the bridge between the two numbers — site by site, which facilities are energized, which hold executed interconnection agreements versus queue positions, what the utility and substation are for each, and the calendar-quarter energization schedule that turns contracted megawatts into billable ones. No physical address, LOA, or interconnection milestone has been attached to any individual site in the record, so a reader cannot test whether the 1.6 GW is land-and-power under contract or merely under letter of intent.
On 2025-09-14 the company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, cited as claim #4352; what has not been said is whether any portion of that NVIDIA offtake is counted inside the $25.9 billion backlog of claim #4970, what the pricing mechanism and utilization trigger are, and how NVIDIA's simultaneous roles as equity holder, supplier, and capacity purchaser are presented in the related-party footnote. A first-year analyst would ask for backlog restated excluding supplier-affiliated commitments.
The company stacked at least five debt disclosures in ninety days — $1.5 billion revolver expansion and $350 million LC facility on 2025-05-05 (claims #5010, #5011, #11923, #11924), $1.5 billion notes and a $2.6 billion DDTL 3.0 on 2025-05-18 (claims #11921, #11922), $2.0 billion of 9.250% senior notes due 2030 closed 2025-05-27 (claims #11917, #4824), and $1.75 billion of 9% notes due 2031 after a $250 million upsize on 2025-07-22 (claims #4697, #4698, #4700) — against $17.2 billion of total debt and equity raised cited on 2025-05-13 as claim #4968; what has not been said is a single reconciled pro forma capital structure showing which of these are net new money versus refinancings of the same DDTL, what the blended cash interest expense is, and which entities are obligors. Several of these figures are recorded in raw dollars and others in millions (claims #11918 and #11921 carry a bare "1500.0 USD" and "2000.0 USD"), and the record does not resolve whether the 2025-05-18 $1.5 billion notes and the 2025-05-20/2025-05-27 $2.0 billion notes are one upsized deal or two.
The company disclosed a contingent springing maturity dated 2026-12-30 on 2025-05-05, cited as claim #11926, alongside a minimum debt service coverage ratio of 1.40x beginning April 2027 and a minimum contract realization ratio of 0.85x, cited as claims #4596 and #4597; what has not been said is what condition causes the maturity to spring, what the current measured DSCR and realization ratio are, how much headroom exists, which borrower or SPV the covenants sit at, what GPU and contract collateral secures them, and what the cure rights and cross-default consequences are. The record also shows the 2026-02-01 senior-notes interest payment obligation under claim #4659 carrying a delayed status, which the company has never addressed in plain language — was a coupon date missed, deferred, or is this a classification artifact?
The Core Scientific merger was announced on 2025-07-06 at an exchange ratio of 0.1235 shares with a $270 million termination fee payable to CoreWeave, cited as claims #4731 and #4739, an outside date of 2026-04-07 under claim #4738, and a closing target of 2025-10-01 under claim #4517 — with claims #4731, #4738, and #4517 all now carrying delayed status, and a separate 2025-09-16 disclosure of the merger under claim #4331; what has not been said is the current status of the shareholder vote and the reverse termination fee payable by CoreWeave, nor the related-party context that CoreWeave was a hosting customer of Core Scientific before the deal — how much of the $25.9 billion backlog and the 1.6 GW of contracted power sits at Core Scientific sites that would be eliminated in consolidation. Relatedly, the personnel disclosures of 2025-09-16 and 2025-09-24, cited as claims #4332 and #4317, name a Chief Executive Officer and a Deputy General Counsel without any accompanying compensation, equity grant, vesting, or change-of-control terms, and no proxy-level disclosure of insider share sales or IPO lockup expiry has been placed on the record alongside the $40 IPO price of claims #15974, #11601, and #11616 or the $68 million over-allotment exercise of claim #4515, whose units — dollars or shares — are left ambiguous.
What we aren't being told
2026-09-20The company disclosed on 2025-07-30 that it had entered a material customer contract for GPU infrastructure that serves as the credit support for the $2.6 billion DDTL 3.0 facility, cited as claims #4595, #4592 and #4594; what has not been said is who the counterparty is, what the contract's term and total contract value are, and whether that same contract is the collateral basis for the 1.40x minimum debt service coverage ratio starting April 2027 (claim #4596) and the 0.85x minimum contract realization ratio (claim #4597). Relatedly, the 2025-08-12 disclosure of a $350 million strategic customer share issuance, cited as claim #4514, names no recipient — is the equity holder the same entity as the $11.2 billion backlog customer in claim #4969, and at what price were the shares issued?
The company disclosed total revenue backlog from committed contracts of $25.9 billion and an OpenAI component of $11.2 billion on 2025-05-13, cited as claims #4970 and #4969; what has not been said is the expected recognition schedule for that backlog by year, how much of it is a binding take-or-pay obligation versus a capacity reservation terminable for convenience, and whether the $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352) is counted inside the $25.9 billion or sits outside it. A first-year analyst would also ask what share of the non-OpenAI $14.7 billion is attributable to the top three remaining customers.
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power added on 2025-05-13, cited as claims #4973 and #4972; what has not been said is whether 'contracted' means signed leases, executed interconnection agreements, or utility queue positions, over what period the 1.6 GW is expected to energize, and which specific sites — with addresses, utility counterparties and interconnection dates — account for the gap between 420 MW active and 1.6 GW contracted. No individual data center location, substation, or megawatt-per-site figure appears anywhere in the record.
The company disclosed a $1.5 billion senior notes offering due 2030 on 2025-05-18 and then a $2.0 billion senior notes offering due 2030 on 2025-05-20, ultimately issued at 9.250% on 2025-05-27, cited as claims #11921, #11918, #11917 and #4824; the same pattern recurs with a $1.5 billion offering on 2025-07-20 becoming $1.75 billion at 9% after a $250 million upsize, cited as claims #4700, #4698, #4697 and #4658. What has not been said is whether each pair represents a single upsized deal or two separate tranches — and therefore whether total 2025 unsecured issuance is $3.5 billion or $6.75 billion — nor has the issue price, discount, or total cash interest burden at 9%–9.25% been reconciled against the $17.2 billion of aggregate debt and equity raised cited as claim #4968.
The company disclosed a contingent springing maturity date of 2026-12-30 on its revolving credit facility on 2025-05-05, cited as claim #11926, alongside a stated extension of the facility maturity to 2028-05-02 (claims #5012 and #11925); what has not been said is what condition causes the maturity to spring forward, which instrument's refinancing avoids it, and how much of the expanded $1.5 billion revolver and $350 million letter of credit capacity (claims #5010 and #5011) was drawn as of the most recent balance sheet date.
The company disclosed a merger with Core Scientific at an exchange ratio of 0.1235 shares with a $270 million termination fee payable to CoreWeave, originally targeted to close by 2025-10-01 and subsequently carrying an outside date of 2026-04-07, cited as claims #4731, #4739, #4517 and #4738, with the transaction described as completed on 2025-09-24 in claim #4313; what has not been said is why the close slipped roughly eleven months past the original target, whether the delay stemmed from the shareholder vote, financing conditions, or regulatory review, and whether any consideration terms were renegotiated. The record also names a Chief Executive Officer and a Deputy General Counsel in claims #4332 and #4317 without any disclosure of employment terms, equity grants, change-of-control payments triggered by the merger, or related-party context — and the $1.0 billion Weights & Biases acquisition (claims #4974 and #4516) is disclosed without a cash-versus-stock split, earnout structure, or revenue contribution.
What we aren't being told
2026-09-19The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (claim #4592) and a 0.85x minimum contract realization covenant (claim #4597). What has not been said is who the counterparty is, what the contract's total value and term are, and how much of the DDTL 3.0 borrowing base depends on that one contract. Which customer secures this facility, and how close is current realization to the 0.85x floor?
The company disclosed $25.9 billion of total committed backlog on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to OpenAI (claim #4969). What has not been said is who makes up the remaining roughly $14.7 billion, how concentrated it is by customer, and what share is expected to convert to revenue in the next 12 months. On 2025-08-12 the company also disclosed a $350 million share issuance to an unnamed strategic customer (claim #4514). Which customer bought that equity, and at what price and lock-up terms?
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06, cited as claims #4731 and #4738, with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave (claim #4739). Those milestone claims are now marked delayed, and the outside date has passed. What has not been said is whether the deal closed, lapsed, or was terminated, and if it was terminated, whether the $270 million fee was triggered and collected.
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is whether the 420 MW was added during the quarter or is a cumulative total, which sites and interconnection agreements make up the 1.6 GW, and on what schedule the contracted-but-not-active capacity is expected to be energized.
The company disclosed 2030 senior notes described as $1.5 billion on 2025-05-18 (claim #11921) and as $2.0 billion on 2025-05-20 and 2025-05-27 (claims #11918 and #11917). It also disclosed a $1.75 billion 9% note due 2031, upsized by $250 million (claims #4697 and #4698). The expected closings (claims #11919 and #4699) and the first 9% coupon due 2026-02-01 (claim #4659) are now marked delayed. What has not been said is how the upsizing was reconciled, whether both issues actually closed on the stated dates, and whether the February 2026 coupon was paid on time.
The company disclosed a revolving credit maturity extended to 2028-05-02 on 2025-05-05, cited as claims #5012 and #11925, together with a contingent springing maturity of 2026-12-30 (claim #11926). It separately disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032 (claim #4352). What has not been said is what condition triggers the springing maturity, less than four months from now, and whether it is currently live. Nor has the company said how the NVIDIA commitment is priced, given that NVIDIA is both its key supplier and a shareholder.
What we aren't being told
2026-09-19The company disclosed on 2025-07-30 that its $2.6 billion DDTL 3.0 facility is secured by a material customer contract for GPU infrastructure, cited as claims #4595 and #4592, with a minimum contract realization ratio of 0.85x (#4597) and a 1.40x debt service coverage ratio beginning April 2027 (#4596). What has not been said is who that customer is, what the contract's total value and term are, and how much of the facility had been drawn by the 2026-07-31 commitment termination date, which the record marks as delayed (#4593). How close is the company to either covenant threshold today?
The company disclosed a $350 million share issuance to a "strategic customer" on 2025-08-12, cited as claim #4514. What has not been said is the counterparty's name, the per-share price relative to the $40 IPO price (#11601, #11616, #15974), and any lock-up or board-rights terms. Is this the same party behind the $11.2 billion OpenAI backlog (#4969) and the OpenAI contract running to 2031-05-31 (#4296), and if so, how much of the $25.9 billion total backlog (#4970) is concentrated in that one relationship?
The company disclosed 420 MW of active power added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is the site-by-site breakdown, physical locations, utility interconnection status, and energization schedule for the roughly 1.2 GW gap between active and contracted capacity. Which sites and dates are dedicated to the OpenAI and customer-backed DDTL 3.0 obligations?
The company disclosed the Core Scientific merger at 0.1235 shares per share with a 2026-04-07 outside date and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738, #4739, #4331, and #4517. All of these carry a delayed status, and the outside date has passed. What has not been said is whether the deal closed, was terminated, or was extended, and if it was terminated, whether the $270 million fee was triggered and collected. What replaced the Core Scientific capacity in the power plan?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352. What has not been said is the pricing, the utilization or resale terms, or how the agreement is treated as a related-party transaction given NVIDIA's dual role as supplier and investor. Relatedly, the CEO and Deputy General Counsel personnel items (#4332, #4317) contain no compensation or related-party context. Where is that disclosed?
The company's debt record has unresolved unit and timing ambiguities. The May 2025 notes appear on record both as a $1.5 billion offering (#11921) and as a $2.0 billion issuance (#11917, #11918), and the July upsize is recorded as "250.0 USD" (#4698). The 2025-05-27 and 2025-07-25 closings (#11919, #4699) and the first 9% coupon due 2026-02-01 (#4659) are all flagged as delayed. What has not been said is the final principal outstanding for each 2030 and 2031 series and confirmation that the first coupon was paid on schedule. What is total annual cash interest across the notes, the DDTL facilities, and the $1.5 billion revolver (#5010, #11923), which faces a contingent springing maturity of 2026-12-30 (#11926)?
What we aren't being told
2026-09-19The company disclosed on 2025-07-30 that its $2.6 billion DDTL 3.0 facility (claim #4592) is secured by a material GPU-infrastructure customer contract (claim #4595). The facility carries a minimum contract realization ratio of 0.85x (claim #4597) and a 1.40x debt service coverage test beginning April 2027 (claim #4596). The customer has not been named, and neither the contract's total value, its term, nor where the realization ratio currently stands has been disclosed. The commitment termination date of 2026-07-31 (claim #4593) has passed and is flagged as delayed, so how much of the $2.6 billion was actually drawn is also unknown.
The company disclosed $11.2 billion of OpenAI backlog within $25.9 billion of total committed backlog on 2025-05-13 (claims #4969, #4970), then a further $6.5 billion OpenAI commitment running to 2031-05-31 on 2025-09-24 (claims #4297, #4296). It also disclosed a $350 million share issuance to an unnamed "strategic customer" (claim #4514). What has not been said is whether that strategic customer is OpenAI, what share of current backlog one counterparty now represents, and what termination or reduction rights attach to those commitments.
The company disclosed 1.6 GW of contracted power against 420 MW of active capacity on 2025-05-13 (claims #4972, #4973). What has not been said is which sites make up the roughly 1.2 GW gap, where they are physically located, what their utility interconnection status is, and on what schedule each is expected to energize.
The company disclosed the Core Scientific merger at 0.1235 shares per share (claims #4731, #4729, #4331), with a $270 million termination fee payable to CoreWeave (claim #4739). Target dates of 2025-10-01 and 2026-04-07 are now marked delayed (claims #4517, #4738). What has not been said on the record is whether the merger closed or was terminated, and whether the termination fee was triggered and collected. If the deal did not close, the record is also silent on how the roughly 1.3 GW of hosted capacity CoreWeave was relying on is now contracted.
The company disclosed a revolver expansion to $1.5 billion maturing 2028-05-02 on 2025-05-05 (claims #5010, #5012). The same disclosure included a contingent springing maturity of 2026-12-30 (claim #11926), less than four months from now. What has not been said is what condition triggers the springing date, and whether that condition has been cured, for example through refinancing of the notes.
The company disclosed its 2030 senior notes as a $1.5 billion offering on 2025-05-18 (claim #11921) and then as $2.0 billion (claims #11918, #11917). Maturity is given as both 2030-05-27 and 2030-06-01 (claims #4824, #11917), and the 2025-05-27 closing is flagged delayed (claim #11919). Similarly, the July notes were upsized from $1.5 billion to $1.75 billion (claims #4700, #4697), and the first 9% coupon due 2026-02-01 is marked delayed (claim #4659). What has not been said is the reconciled final size and maturity of each issue, whether the February 2026 coupon was paid on schedule, and what total debt service looks like against the $17.2 billion raised to date (claim #4968). The company also disclosed a $6.3 billion NVIDIA capacity-purchase commitment running to 2032-04-13 (claim #4352), and a new CEO disclosure (claim #4332). What has not been said is any related-party context for NVIDIA as a shareholder, supplier and customer at once, or the CEO's compensation terms.
What we aren't being told
2026-09-19The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, and a $350 million share issuance to a strategic customer on 2025-08-12, cited as claim #4514; what has not been said is who either counterparty is, what the contract's total value and term are, and whether the share issuance is tied to that contract or to the OpenAI deal. Separately, the $25.9 billion backlog disclosed on 2025-05-13 (claim #4970) includes $11.2 billion from OpenAI (claim #4969); how is the remaining roughly $14.7 billion split by customer, and what is the weighted-average remaining contract duration?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973; what has not been said is which sites make up those figures, where they are physically located, and what the interconnection status and expected energization date are for the roughly 1.2 GW that is contracted but not yet active. How much of that gap was expected to come through the Core Scientific sites?
The company disclosed senior notes due 2030 as a $1.5 billion offering on 2025-05-18 (claim #11921) and as a $2.0 billion issuance on 2025-05-20 and 2025-05-27 (claims #11918, #11917, #4824); what has not been said on the record is when and why the offering was upsized, or at what coupon, which appears only in claim #4824 at 9.250%. The DDTL 3.0 facility is recorded as "2600.0 USD" in claim #11922 but as $2.6 billion in claim #4592, and the July notes upsizing is recorded as "250.0 USD" in claim #4698. Can the company confirm the units, and how much of DDTL 3.0 had been drawn by its 2026-07-31 commitment termination date (claim #4593)?
The company disclosed DDTL 3.0 covenants on 2025-07-30: a minimum debt service coverage ratio of 1.40x starting April 2027 (claim #4596) and a minimum contract realization ratio of 0.85x (claim #4597). It also disclosed a contingent springing maturity of 2026-12-30 on the revolver on 2025-05-05 (claim #11926). What has not been said is which customer contracts back the facility, what the current coverage and realization ratios are against those minimums, and what specific condition would trigger the springing maturity ahead of the 2028-05-02 stated maturity (claims #5012, #11925).
The company announced the Core Scientific merger at a 0.1235 exchange ratio on 2025-07-06 and 2025-07-07 (claims #4731, #4729), with a 2026-04-07 outside date (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the outside date and an earlier 2025-10-01 closing expectation (claim #4517) are now marked delayed. What has not been said is whether the merger closed, was terminated, or was extended, and whether the $270 million fee was triggered and collected. If the deal did not close, what happens to the capacity the company was counting on from those sites?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352; what has not been said is how that commitment is priced and recognized, what utilization level NVIDIA is guaranteed to pay for, and whether the arrangement is reviewed as a related-party transaction given NVIDIA's position as both supplier and investor. No proxy-level detail on that review appears anywhere in the record.
What we aren't being told
2026-09-19The company disclosed on 2025-07-30 a $2.6 billion DDTL 3.0 facility (claims #4592, #11922) secured against a "material customer contract for GPU infrastructure" (claim #4595), with a 0.85x minimum contract realization ratio (claim #4597) and a 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596); what has not been said is who that customer is, the contract's total value and term, and what the realization and coverage ratios actually are today. How much headroom does CoreWeave have against covenants that are tied to a single unnamed counterparty?
The company disclosed on 2025-08-12 a $350 million share issuance to a "strategic customer" (claim #4514), alongside OpenAI backlog of $11.2 billion on 2025-05-13 (claim #4969) and a further $6.5 billion OpenAI commitment through 2031-05-31 on 2025-09-24 (claim #4297); what has not been said is whether the share buyer is OpenAI, at what price per share, and under what lockup. Is the $6.5 billion additive to the $11.2 billion, and what share of the $25.9 billion total backlog (claim #4970) now sits with one customer?
The company disclosed on 2025-09-14 a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352), while also marketing NVIDIA-dependent products such as GB200 support and NVIDIA AI Enterprise (claims #4976, #4979); what has not been said is the pricing, utilization triggers, and termination terms of an arrangement in which a supplier and equity holder becomes a buyer of residual capacity. Given NVIDIA's shareholder relationship, where is the related-party disclosure?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13 (claims #4972, #4973); what has not been said is the site-by-site breakdown, the interconnection status and utility counterparties for the roughly 1.2 GW not yet active, or an energization schedule. What gets energized, where, and when, including any capacity that depended on Core Scientific facilities?
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio (claims #4731, #4331), described it as an acquisition on 2025-09-24 (claim #4313), and set a $270 million termination fee (claim #4739); yet the closing milestones are recorded as delayed (claims #4517, #4738). What has not been said is whether the deal closed, was terminated, or was renegotiated, and whether any termination fee changed hands. What happens to the capacity and lease arrangements that were premised on the merger?
The company disclosed senior notes that grew from $1.5 billion to $2.0 billion due 2030 at 9.25% (claims #11921, #11918, #4824), and from $1.5 billion to $1.75 billion due 2031 at 9% (claims #4700, #4697, #4698); both scheduled closings are recorded as delayed (claims #11919, #4699), as is the first 9% coupon date of 2026-02-01 (claim #4659). What has not been said is the confirmed closing dates, what drove each upsizing, and the use of the incremental proceeds (claim #11920 is unquantified). What is the blended cost of debt across the $17.2 billion raised (claim #4968), and what does the 2026-12-30 springing maturity on the revolver (claim #11926) require to avoid being triggered?
What we aren't being told
2026-09-19The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure underpinning the $2.6 billion DDTL 3.0 facility, cited as claims #4595 and #4592, with a 0.85x minimum contract realization covenant (claim #4597) and a 1.40x debt service coverage test from April 2027 (claim #4596). What has not been said is who the counterparty is, what the contract is worth, and how many years it runs. Without those, a reader cannot tell how much headroom the company has against the realization and coverage covenants.
The company disclosed on 2025-05-13 an $11.2 billion OpenAI backlog inside $25.9 billion of total committed backlog, cited as claims #4969 and #4970. It disclosed $6.5 billion of OpenAI committed revenue through 2031-05-31 on 2025-09-24 (claim #4297), and a $350 million share issuance to an unnamed strategic customer (claim #4514). What has not been said is whether the $6.5 billion is additive to or part of the $11.2 billion, what share of total backlog OpenAI now represents, and whether the strategic customer who bought shares is OpenAI, and at what price per share.
The company disclosed on 2025-05-13 420 MW of active power and 1.6 GW of contracted power, cited as claims #4972 and #4973. What has not been said is how that capacity splits by site, which utilities or interconnection agreements serve each site, and on what schedule the gap of roughly 1.2 GW is expected to become energized and revenue-generating.
The company disclosed on 2025-07-06 a merger with Core Scientific at 0.1235 shares, cited as claim #4731. It set an outside date of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Later records describe the acquisition as proceeding (claims #4313 and #4331). What has not been said is whether the transaction actually closed or was terminated. The record marks the 2025-10-01 and 2026-04-07 milestones as delayed (claims #4517 and #4738) and never states a closing. It is also unclear whether the $270 million fee was triggered or collected.
The company disclosed on 2025-05-05 an expanded $1.5 billion revolver and $350 million letter of credit facility maturing 2028-05-02, cited as claims #11923, #11924 and #11925. It also disclosed a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is which condition triggers the springing maturity, whether that condition has been cured, and how much of the revolver is currently drawn with that date roughly three months away.
The company disclosed on 2025-05-18 a $1.5 billion senior notes offering, cited as claim #11921. It then disclosed $2.0 billion of 9.250% notes due 2030, recorded in raw dollar units in claims #11918, #11917 and #4824, with the expected 2025-05-27 closing flagged as delayed in claim #11919. What has not been said is why the offering was upsized by $500 million, whether it closed on the stated date, and whether the 2030 maturity is 2030-05-27 or 2030-06-01, since the claims give both. The company also disclosed on 2025-09-14 a $6.3 billion NVIDIA capacity purchase commitment through 2032-04-13 (claim #4352), and has not addressed related-party context given NVIDIA's position as a shareholder and supplier.
What we aren't being told
2026-09-18The company disclosed on 2025-07-30 that its $2.6 billion DDTL 3.0 facility (claim #4592) is underwritten by a material customer contract for GPU infrastructure (claim #4595), with a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who that customer is, the contract's total value and term, and how much of the facility had been drawn by the 2026-07-31 commitment termination date (claim #4593), which the record flags as delayed.
The company disclosed on 2025-08-12 a $350 million share issuance to a strategic customer (claim #4514). What has not been said is the counterparty's identity, the per-share price relative to the $40 IPO price (claims #15974, #11616), and whether the issuance is linked to any revenue commitment from the same customer.
The company disclosed on 2025-05-13 a total committed backlog of $25.9 billion (claim #4970), of which $11.2 billion is attributed to OpenAI (claim #4969), and on 2025-09-24 an additional $6.5 billion OpenAI commitment running to 2031-05-31 (claim #4297). What has not been said is how the remaining roughly $14.7 billion of the original backlog is concentrated among other customers, what share of total backlog OpenAI now represents, and the year-by-year schedule for recognizing it as revenue.
The company disclosed on 2025-05-13 that it had 1.6 GW of contracted power (claim #4973) against 420 MW of active capacity (claim #4972). What has not been said is which sites make up the roughly 1.2 GW gap, where they are physically located, their interconnection or utility agreements, and when each is expected to energize.
The company announced the Core Scientific merger on 2025-07-07 at 0.1235 shares per share (claims #4729, #4731), with a $270 million termination fee payable to CoreWeave (claim #4739) and a 2026-04-07 outside date (claim #4738). The record marks both that outside date and an earlier 2025-10-01 milestone (claim #4517) as delayed. What has not been said is whether the deal closed, was extended, or was terminated, and whether the termination fee was paid or waived.
The company disclosed on 2025-09-14 a $6.3 billion capacity purchase commitment from NVIDIA running to 2032-04-13 (claim #4352). What has not been said is the pricing and utilization terms, and how this arrangement is presented in related-party disclosures, given that NVIDIA is also CoreWeave's primary GPU supplier and a shareholder.
What we aren't being told
2026-09-18The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (claim #4592) and a minimum contract realization ratio covenant of 0.85x (claim #4597); what has not been said is who the counterparty is, what the contract's total value and term are, or how the 0.85x ratio is measured against it. Who is the customer whose contract secures this debt, and how close to the covenant floor does current realization sit?
The company disclosed a total revenue backlog of $25.9 billion on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to the OpenAI strategic deal (claim #4969), and separately a $350 million strategic customer share issuance on 2025-08-12 (claim #4514); what has not been said is how the remaining roughly $14.7 billion of backlog breaks down by customer, or which customer received the $350 million of stock, at what price, and with what lockup. How concentrated is the non-OpenAI backlog, and is the equity-holding customer also a top revenue contributor?
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power capacity added on 2025-05-13, cited as claims #4973 and #4972; what has not been said is where the contracted but unenergized capacity sits, which utilities or interconnection queues it depends on, or when each tranche is expected to come online. What is the site-by-site energization schedule behind the roughly 1.2 GW gap between contracted and active power?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352; what has not been said is the pricing basis, what happens if NVIDIA's purchased capacity goes unused, or how the arrangement was reviewed as a potential related-party transaction given NVIDIA's position as a supplier and investor. Did the board's audit or related-party committee approve the terms, and how is the commitment recognized in revenue and backlog?
The company disclosed a Core Scientific merger at 0.1235 shares per share on 2025-07-06, cited as claims #4731 and #4729, with a $270 million termination fee payable to CoreWeave (claim #4739), an outside date of 2026-04-07 (claim #4738), and an earlier expected milestone of 2025-10-01 (claim #4517); both date claims now carry delayed status, and what has not been said on this record is whether the deal closed, was terminated, or was renegotiated, and whether any termination fee was paid or received. What is the current status of the merger, and what did it cost or yield?
The company's debt disclosures leave units and terms inconsistent across filings: claim #11921 describes $1.5 billion of senior notes due 2030 while claims #11918 and #11917 describe $2.0 billion due 2030-06-01 and claim #4824 cites a 9.250% maturity of 2030-05-27; claim #4700 describes $1.5 billion of July notes that became $1.75 billion at 9% due 2031 after a $250 million upsizing (claims #4697, #4698); and the 2025-05-05 revolver amendment includes a contingent springing maturity of 2026-12-30 (claim #11926) whose trigger was never specified. What are the final issued amounts and maturity dates of each note series, and what condition would pull the revolver's maturity forward to December 2026?
What we aren't being told
2026-09-18The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure backing the $2.6 billion DDTL 3.0 facility, cited as claims #4595 and #4592, with covenants tied to that contract: a 0.85x minimum contract realization ratio (#4597) and a 1.40x minimum debt service coverage ratio beginning April 2027 (#4596). What has not been said is who the counterparty is, what the contract's total value and term are, and how much of the facility had been drawn by the 2026-07-31 commitment termination date (#4593), which the record flags as delayed.
The company disclosed on 2025-05-13 a total revenue backlog of $25.9 billion (#4970), of which $11.2 billion is attributed to OpenAI (#4969). What has not been said is how the remaining roughly $14.7 billion is split across customers, what its weighted-average duration is, and what cancellation or take-or-pay protections apply. Relatedly, the $350 million strategic customer share issuance disclosed on 2025-08-12 (#4514) does not name the investing customer, the per-share price, or any lock-up terms.
The company disclosed on 2025-05-13 that it had 420 MW of active power capacity (#4972) against 1.6 GW of contracted capacity (#4973). What has not been said is which sites make up the gap between the two, when each is expected to be energized, and whether "contracted" means signed leases with secured utility interconnection or earlier-stage agreements. It is also not said how Core Scientific's footprint would change these figures if that merger closes.
The company disclosed on 2025-07-06 a merger with Core Scientific at 0.1235 CoreWeave shares per share (#4731), with a $270 million termination fee payable to CoreWeave (#4739) and an outside date of 2026-04-07 (#4738). A 2025-09-24 disclosure describes CoreWeave as acquiring Core Scientific (#4313), yet the closing claims (#4517, #4731, #4738) all carry a delayed status. What has not been said is whether the deal closed, was terminated, or was extended, and whether the $270 million fee was triggered or collected.
The company disclosed a series of senior notes: a $1.5 billion offering due 2030 announced 2025-05-18 (#11921) that appears as $2.0 billion by 2025-05-20 and 2025-05-27 (#11918, #11917, #4824), and a 2025-07-20 $1.5 billion offering (#4700) upsized by $250 million to $1.75 billion at 9% (#4697, #4698). Several of these figures are recorded as bare "USD" amounts with no scale. What has not been said is what drove each upsize, how the proceeds were allocated beyond the generic use-of-proceeds claim (#11920), and whether the first 9% coupon due 2026-02-01 (#4659), flagged as delayed, was paid on schedule.
The company disclosed on 2025-05-05 a $1.5 billion revolver expansion extended to 2028-05-02 (#11923, #11925) but subject to a contingent springing maturity of 2026-12-30 (#11926). What has not been said is what condition triggers the springing date and whether that condition is currently at risk. Separately, the $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (#4352) is disclosed without its pricing, utilization triggers, or its effect on revenue recognition, and the 2025-09-16 personnel claim (#4332) names a CEO role without identifying any change, compensation, or related-party context.
What we aren't being told
2026-09-18The company disclosed on 2025-07-30 that the $2.6 billion DDTL 3.0 facility is backed by a material customer contract for GPU infrastructure, cited as claims #4592 and #4595, with a 0.85x minimum contract realization ratio, cited as claim #4597. What has not been said is who that customer is, how much contract value supports the borrowing base, and how much of the facility had been drawn before the 2026-07-31 commitment termination date, cited as claim #4593. Did the company draw the facility in full, or did any commitment lapse unused?
The company disclosed a $350 million share issuance to a strategic customer on 2025-08-12, cited as claim #4514. What has not been said is the identity of that customer, the price per share, and whether the issuance is tied to revenue commitments. If it is linked to the OpenAI relationship in claims #4969 and #4296, is the related revenue recognized net of that equity consideration?
The company disclosed on 2025-05-13 an $11.2 billion OpenAI backlog within a $25.9 billion total backlog, cited as claims #4969 and #4970, and later an OpenAI contract running to 2031-05-31, cited as claim #4296. What has not been said is who makes up the remaining roughly $14.7 billion of backlog, what the customer concentration is beyond OpenAI, and what backlog figure applies after the September 2025 OpenAI expansion. Similarly, the $6.3 billion NVIDIA capacity purchase commitment disclosed on 2025-09-14, cited as claim #4352, lacks pricing, take-or-pay mechanics and any related-party framing. Given NVIDIA's position as both supplier and shareholder, why is that framing absent?
The company disclosed 420 MW of active power and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is which sites make up those figures, their physical locations, their utility interconnection status, and the schedule on which contracted megawatts convert to energized, revenue-generating capacity. How much of the 1.6 GW was expected to depend on Core Scientific sites?
The company disclosed an all-stock merger with Core Scientific at 0.1235 shares on 2025-07-06, cited as claims #4731 and #4331, with a closing deadline of 2026-04-07, cited as claim #4738, and a $270 million termination fee payable to CoreWeave, cited as claim #4739. Both the deadline and an earlier 2025-10-01 milestone, cited as claim #4517, are marked delayed, and the record contains no closing, amendment or termination. Did the deal close or terminate, was the $270 million fee triggered or paid, and what happened to the capacity assumptions tied to those sites?
The debt record is internally inconsistent. The May 2025 notes appear as $1.5 billion on 2025-05-18, cited as claim #11921, and as $2.0 billion on 2025-05-20 and 2025-05-27, cited as claims #11918 and #11917, with maturities of both 2030-05-27 and 2030-06-01, cited as claim #4824. The July notes were upsized from $1.5 billion to $1.75 billion at 9%, cited as claims #4700, #4698 and #4697. What has not been said is what drove each upsizing, what the all-in cost of debt is across the stack, and what condition triggers the contingent 2026-12-30 springing maturity on the revolver, cited as claim #11926. That springing date now falls within roughly three months.
What we aren't being told
2026-09-18The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure, cited as claim #4595, backing the $2.6 billion DDTL 3.0 facility (claims #4592, #11922) with a 0.85x minimum contract realization ratio (claim #4597). What has not been said is who the counterparty is, what the contract's total value and term are, and how much of the realization cushion sits above 0.85x. The ratio is a covenant tied to that single contract, so a reader cannot judge the lender's risk without those facts.
The company disclosed on 2025-05-13 a $25.9 billion revenue backlog, cited as claim #4970, of which OpenAI accounts for $11.2 billion (claim #4969). It also disclosed on 2025-08-12 a $350 million share issuance to a strategic customer, cited as claim #4514. What has not been said is who holds the remaining roughly $14.7 billion of backlog, how concentrated it is, and whether the unnamed strategic customer that received shares is OpenAI or a different party whose equity stake also makes it a related party.
The company disclosed on 2025-05-05 a revolving credit facility extended to 2028-05-02 with a contingent springing maturity of 2026-12-30, cited as claims #11925 and #11926. What has not been said is what triggers the springing date and whether that condition is still live now that the date is about three months away. It is also unclear how much of the $1.5 billion revolver and $350 million letter-of-credit capacity (claims #5010, #5011) is currently drawn or issued.
The company disclosed a series of senior notes offerings, and each one closed larger than announced. The May notes were announced at $1.5 billion on 2025-05-18 (claim #11921) and issued at $2.0 billion at 9.25% (claims #11918, #11917, #4824). The July notes were announced at $1.5 billion (claim #4700) and upsized by $250 million to $1.75 billion at 9% (claims #4698, #4697). What has not been said is what drove the repeated upsizing, what blended cost of debt results across the roughly $17.2 billion raised (claim #4968), and how much of the DDTL 3.0 was drawn before its 2026-07-31 commitment termination (claim #4593).
The company disclosed on 2025-07-06 an all-stock merger with Core Scientific at 0.1235 shares, cited as claims #4731 and #4729. It set an outside date of 2026-04-07 (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). That outside date has passed and the deal is tracked as delayed. What has not been said is whether the merger was terminated, extended or completed, and whether the termination fee was triggered and collected. The record also leaves open what happens to the Core Scientific-hosted capacity that likely underpins part of the 1.6 GW contracted power figure (claim #4973).
The company disclosed on 2025-05-13 420 MW of active power and 1.6 GW of contracted power, cited as claims #4972 and #4973. On 2025-09-14 it disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, cited as claim #4352. What has not been said is which sites make up those megawatts, their interconnection status, and the schedule for energizing the remaining contracted capacity. It is also unclear on what terms NVIDIA, a supplier and investor, is committed to buy unsold capacity. The record likewise names a CEO, General Counsel and Deputy General Counsel (claims #4332, #4316, #4317) without any compensation or related-party context alongside that NVIDIA arrangement.
What we aren't being told
2026-09-18CoreWeave disclosed on 2025-07-30 that the $2.6 billion DDTL 3.0 facility is backed by a material customer contract for GPU infrastructure, cited as claims #4595 and #4592, with covenants requiring a 0.85x minimum contract realization ratio and a 1.40x minimum debt service coverage ratio starting April 2027 (#4597, #4596). What has not been said is who the customer is, the contract's total value and term, and how much headroom the company currently has against either covenant.
The company disclosed $25.9 billion of committed revenue backlog on 2025-05-13 (#4970), of which $11.2 billion is attributed to OpenAI (#4969), and on 2025-08-12 a $350 million share issuance to a strategic customer (#4514). What has not been said is which customers make up the remaining roughly $14.7 billion of backlog, how concentrated it is, and whether the $350 million equity buyer is also a revenue counterparty. If it is, that creates related-party context investors would expect in the proxy.
On 2025-09-14 CoreWeave disclosed a $6.3 billion capacity purchase commitment with NVIDIA running to 2032-04-13, cited as claim #4352. What has not been said is whether NVIDIA pays for unsold capacity or simply buys residual capacity, what pricing and minimum-take terms apply, and how the arrangement is treated given NVIDIA's position as both supplier and investor.
The company reported 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13 (#4973, #4972). What has not been said is where the roughly 1.2 GW gap sits: site addresses, interconnection or utility agreements, and energization dates by quarter. The Core Scientific merger was the likely source of much of that power, and it is now marked delayed against both its 2025-10-01 and 2026-04-07 dates (#4517, #4731, #4738). The company has not said whether the deal was terminated, whether the $270 million termination fee (#4739) was triggered or paid, or how the capacity plan changes without it.
The May 2025 revolver amendment includes a contingent springing maturity of 2026-12-30, cited as claim #11926, alongside a stated 2028-05-02 maturity (#5012, #11925). What has not been said is what triggers the springing date. With that date roughly three months away, the company should also say whether the condition is currently live.
The notes record contains unexplained discrepancies. The 2030 notes appear at $1.5 billion on 2025-05-18 and at $2.0 billion by 2025-05-20 (#11921, #11918), and their maturity is given as both 2030-05-27 and 2030-06-01 (#4824, #11917). The use of proceeds (#11920) was never quantified. The first 9% coupon on the 2031 notes, due 2026-02-01 (#4659), carries a delayed status without any confirmation that it was paid. Separately, the CEO, General Counsel and Deputy General Counsel entries (#4332, #4316, #4317) come with no names or compensation terms.
What we aren't being told
2026-09-15The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, on the same day as the $2.6 billion DDTL 3.0 facility (#4592) and its 0.85x minimum contract realization covenant (#4597). What has not been said is who the counterparty is, what the contract is worth and how long it runs, and whether it is the contract that secures DDTL 3.0. Separately, the 2025-08-12 disclosure of a $350 million strategic customer share issuance (#4514) also leaves that customer unnamed. Is it the same party?
The company disclosed $25.9 billion of revenue backlog on 2025-05-13 (claim #4970), of which $11.2 billion is attributed to OpenAI (claim #4969), with an OpenAI term running to 2031-05-31 (claim #4296). What has not been said is how much of the backlog converts to revenue in the next twelve months, how concentrated the remaining $14.7 billion is, and whether any of it has since been renegotiated or cancelled.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is whether the 420 MW was added in the quarter or is cumulative, which sites make up the 1.6 GW and on what energization schedule, and what interconnection or utility agreements support each site. How much of that power depends on the Core Scientific facilities?
The company disclosed a Core Scientific merger at a 0.1235 exchange ratio with a closing deadline of 2026-04-07, cited as claims #4731 and #4738, plus an earlier 2025-10-01 target (#4517). Both dates are now marked delayed, yet claim #4313 describes the acquisition as done. What has not been said is whether the merger actually closed, was extended, or was terminated. If it was terminated, was the $270 million termination fee payable to CoreWeave (#4739) collected, and what happened to the convertible notes conversion (#4737)?
The company disclosed a series of senior notes that do not reconcile with each other. The 2030 notes appear as $1.5 billion (#11921), then $2.0 billion (#11918, #11917), then 9.250% notes due 2030 (#4824), with maturity dates of both 2030-05-27 and 2030-06-01. The 2031 notes were upsized from $1.5 billion to $1.75 billion at 9% (#4700, #4697). Several amounts are also recorded in bare "USD" rather than millions (#11922, #4698). What has not been said is the final issued size and maturity of each series, and the specific use of proceeds beyond the generic statement in #11920. Was the first 9% coupon due 2026-02-01 (#4659, marked delayed) actually paid on time?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 (claim #4352), along with a revolver springing maturity of 2026-12-30 (claim #11926) and a DDTL 3.0 commitment termination of 2026-07-31 (#4593, marked delayed). What has not been said is how the NVIDIA commitment is priced and accounted for, given that NVIDIA is both a supplier and an equity holder, and whether it is disclosed as a related-party arrangement. The filings also have not said what condition triggers the springing maturity and how much of DDTL 3.0 was drawn before its commitments lapsed. Relatedly, the CEO personnel claim (#4332) comes with no compensation or equity context.
What we aren't being told
2026-09-14The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (#4592) and covenants requiring a minimum 0.85x contract realization ratio (#4597) and a 1.40x debt service coverage ratio from April 2027 (#4596). What has not been said is who the counterparty is, what the contract is worth, and how long it runs. That facility's covenant compliance depends on this one contract, so how can a reader test the realization ratio without knowing the customer or the contract's size?
The company disclosed a $350 million share issuance to a strategic customer on 2025-08-12, cited as claim #4514, and an $11.2 billion OpenAI backlog within $25.9 billion of total backlog (#4969, #4970), with OpenAI's contract running to 2031-05-31 (#4296). What has not been said is whether the share recipient is OpenAI, at what price per share and under what lock-up the shares were issued, and whether the equity was tied to the compute commitment. Is a customer effectively prepaying for capacity through equity, and how concentrated is the remaining $14.7 billion of backlog?
The company disclosed 420 MW of active power added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is the period over which the 420 MW was added, whether these figures measure critical IT load or gross utility power, and when the remaining roughly 1.2 GW will be energized. No site addresses, utility counterparties or interconnection agreements appear anywhere in the record, so which campuses make up the 1.6 GW and on what schedule do they come online?
The company disclosed a $270 million termination fee payable to it and a Core Scientific merger at 0.1235 shares, first dated 2025-07-06 and cited as claims #4739 and #4731. Closing targets of 2025-10-01 (#4517) and 2026-04-07 (#4738) are both now marked delayed, yet claims #4313 and #4314 describe the acquisition as proceeding. What has not been said is whether the deal closed, was terminated or remains pending, and whether the termination fee was triggered or collected. Where does the transaction stand, and what replaces the Core Scientific power capacity if it failed?
The company disclosed 9% Senior Notes due 2031 on 2025-07-27, cited as claim #4658, with a first coupon due 2026-02-01 (#4659). That coupon claim is now marked delayed, as are the expected closing dates for both 2025 note offerings (#11919, #4699), even though issuance is recorded for each (#4824, #11917). The May offering also appears at $1.5 billion on 2025-05-18 (#11921) and $2.0 billion two days later (#11918) with no stated upsize, and the DDTL 3.0 amount is recorded without units as "2600.0 USD" (#11922). Was the February 2026 interest paid on time, what drove the May upsizing, and what did the unspecified use-of-proceeds language (#11920) actually fund?
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352, and a revolving credit facility with a contingent springing maturity of 2026-12-30 (#11926) ahead of its stated 2028-05-02 maturity (#11925). What has not been said is what event triggers the springing maturity, how much of the revolver and the DDTL 3.0 was drawn before its commitments terminated on 2026-07-31 (#4593), and on what pricing and terms NVIDIA, a supplier and investor, backstops unused capacity. Given that related-party context and a CEO disclosure (#4332) with no compensation detail, what does the proxy say about these arrangements?
What we aren't being told
2026-09-14The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595. It was filed alongside the $2.6 billion DDTL 3.0 facility (claims #4592, #11922), which carries a minimum contract realization ratio of 0.85x (claim #4597) and a 1.40x debt service coverage test beginning April 2027 (claim #4596). What has not been said is who the counterparty is, what the contract's total value and term are, and how much of the facility has actually been drawn against it now that the 2026-07-31 commitment termination date (claim #4593) has passed without a confirmed update.
The company reported $25.9 billion of revenue backlog on 2025-05-13, cited as claim #4970, and attributed $11.2 billion of it to OpenAI (claim #4969). It also disclosed a $350 million share issuance to an unnamed "strategic customer" (claim #4514). What has not been said is who holds the remaining roughly $14.7 billion of backlog, how concentrated it is among the top two or three customers, and whether the strategic share buyer is OpenAI or a separate party with its own equity-linked commercial terms.
The company disclosed 420 MW of active power added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. No record in the file names the sites, utilities, interconnection queue positions, or energization schedule behind either figure. What has not been said is how the 1.6 GW splits between self-built, leased, and Core Scientific-hosted capacity, and by what dates the contracted-but-not-active megawatts are expected to be energized.
The company's 2030 senior notes appear in the record as $1.5 billion on 2025-05-18 (claim #11921), then $2.0 billion due 2030-06-01 (claims #11918, #11917), and as 9.250% notes dated to 2030-05-27 (claim #4824). The July offering similarly grew from $1.5 billion to $1.75 billion (claims #4700, #4698, #4697). What has not been said is what drove each upsize, how the proceeds were specifically allocated beyond the generic use-of-proceeds language (claim #11920), and whether the first 9% coupon due 2026-02-01 (claim #4659) was paid on schedule, since the record flags it as unconfirmed.
The company announced its merger with Core Scientific at a 0.1235 exchange ratio, cited as claims #4731, #4331 and #4314. It set an outside date of 2026-04-07 (claim #4738), a $270 million termination fee payable to CoreWeave (claim #4739), and an earlier 2025-10-01 target (claim #4517). What has not been said, and the record shows no outcome for either deadline, is whether the deal closed or terminated. If it terminated, the open questions are whether the $270 million fee was triggered and collected, and what happened to the Core Scientific-hosted capacity underpinning the power figures.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352. It also disclosed a contingent springing maturity of 2026-12-30 on its revolving credit facility (claim #11926), which otherwise extends to 2028-05-02 (claim #11925). What has not been said is the pricing and related-party context of the NVIDIA arrangement, given NVIDIA's role as both supplier and investor. The company has also not said which condition triggers the springing maturity, and whether that condition is currently on track to be cured with the date about three and a half months away.
What we aren't being told
2026-09-14The company disclosed a material customer contract for GPU infrastructure on 2025-07-30, cited as claim #4595, alongside the $2.6 billion DDTL 3.0 facility (claims #4592, #11922) and a minimum contract realization ratio of 0.85x (claim #4597). What has not been said is who the counterparty is, what the contract's total value and term are, and whether that single contract is the collateral base the realization covenant is measured against. Claim #11922 also records the facility as 2600.0 USD with no unit, which leaves open whether every filing uses the same scale.
The company disclosed a $350 million share issuance to a strategic customer on 2025-08-12, cited as claim #4514, and separately an $11.2 billion OpenAI backlog (claim #4969) and an OpenAI contract running to 2031-05-31 (claim #4296). What has not been said is whether the strategic customer is OpenAI or another party, what price per share it paid compared with the $40 IPO price (claims #11601, #11616), and whether any lock-up, board or governance rights, or purchase-commitment linkage came with the equity.
The company disclosed 420 MW of active power capacity added and 1.6 GW of contracted power on 2025-05-13, cited as claims #4972 and #4973. What has not been said is the period the 420 MW was added over (a quarter, a year, or cumulative), which sites and utilities make up the 1.6 GW, the interconnection status and energization schedule for the remaining roughly 1.2 GW, and how much of it depends on Core Scientific facilities.
The company disclosed a merger with Core Scientific at 0.1235 shares, with an outside date of 2026-04-07 and a $270 million termination fee payable to CoreWeave, cited as claims #4731, #4738 and #4739. Claim #4517 had pointed to a 2025-10-01 timeline. Both dates have passed with the record showing the deal as delayed, and claim #4313 describes the acquisition as done. What has not been said is whether the merger closed, was amended, or was terminated, and if it was terminated, whether the $270 million fee was triggered and collected. Also missing is what happens to the Core Scientific convertible notes conversion described in claim #4737.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13 on 2025-09-14, cited as claim #4352. What has not been said is whether this is take-or-pay, at what pricing and utilization it is triggered, and how it is treated as a related-party arrangement given NVIDIA's position as CoreWeave's key GPU supplier and equity holder. There is also no proxy-level discussion of how the board reviewed it or of executive compensation tied to the CEO named in claim #4332.
The company disclosed a revolving credit facility expanded to $1.5 billion with a maturity of 2028-05-02 but a contingent springing maturity of 2026-12-30, cited as claims #5010, #5012 and #11926. It also disclosed senior notes that grew from $1.5 billion to $2.0 billion due 2030 and a 9% $1.75 billion note due 2031, cited as claims #11921, #11917 and #4697. What has not been said is what condition triggers the springing maturity, now about three months away. Also unanswered: how the notes proceeds (claim #11920) were actually used, whether the 2025-05-27 and 2025-07-25 closings (claims #11919, #4699) and the first 2026-02-01 coupon (claim #4659) were confirmed, and what projected debt service coverage looks like against the 1.40x covenant starting April 2027 (claim #4596).
What we aren't being told
2026-09-14The company disclosed a $25.9 billion revenue backlog on 2025-05-13, cited as claim #4970, of which $11.2 billion was attributed to OpenAI, cited as claims #4969 and #4296. What has not been said is who holds the remaining roughly $14.7 billion, how concentrated that balance is among the largest few customers, and what share of the total backlog converts to revenue in each year through the OpenAI contract's 2031-05-31 horizon.
The company disclosed a $2.6 billion DDTL 3.0 facility on 2025-07-30, backed by a material customer contract for GPU infrastructure, cited as claims #4592 and #4595, with a 0.85x minimum contract realization ratio and a 1.40x minimum debt service coverage ratio beginning April 2027, cited as claims #4597 and #4596. What has not been said is the name of that customer, the contract's value and term, how much of the facility was drawn before the 2026-07-31 commitment termination date (claim #4593, now marked delayed), and how much headroom exists today against both covenants.
The company disclosed 1.6 GW of contracted power and 420 MW of active capacity on 2025-05-13, cited as claims #4973 and #4972. What has not been said is where the remaining roughly 1.2 GW is physically located, which sites have secured utility interconnection versus only signed agreements, the energization schedule by site, and whether any of the contracted figure depended on Core Scientific facilities.
The company disclosed a merger with Core Scientific at 0.1235 shares per share on 2025-07-06, with a $270 million termination fee payable to CoreWeave and a 2026-04-07 outside date, cited as claims #4731, #4738 and #4739. Claim #4517 had targeted closing by 2025-10-01, and claims #4517, #4731 and #4738 are all now marked delayed. What has not been said on the record is whether the deal closed, was extended or was terminated, whether the $270 million fee was triggered or collected, and what happens to the Core Scientific convertible notes described in claim #4737 if the transaction did not complete.
The company disclosed a $350 million share issuance to a strategic customer and a $6.3 billion NVIDIA capacity purchase commitment running to 2032-04-13, cited as claims #4514 and #4352, and referenced its Chief Executive Officer on 2025-09-16, cited as claim #4332. What has not been said is the identity of the share-purchasing customer, whether NVIDIA's dual role as supplier, customer and shareholder is treated as a related-party relationship with its own pricing terms, and how executive compensation is tied to backlog conversion or capacity delivery.
The company disclosed a $1.5 billion senior notes offering on 2025-05-18 that became $2.0 billion due 2030 at 9.250%, cited as claims #11921, #11918, #4824 and #11917, plus $1.75 billion of 9% notes due 2031 upsized by $250 million, cited as claims #4697 and #4698. The revolving facility was expanded to $1.5 billion with a contingent springing maturity of 2026-12-30, cited as claims #11923 and #11926. What has not been said is what condition triggers that springing maturity just over three months from now, and what the total annual cash interest burden is across the notes and term loans relative to current operating cash flow.
What we aren't being told
2026-09-14The company disclosed on 2025-07-30 a material customer contract for GPU infrastructure (claim #4595) backing the DDTL 3.0 facility, with a 0.85x minimum contract realization ratio (claim #4597) and a 1.40x minimum debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is who the customer is, what the contract's total value and term are, and how much headroom the company currently has against either covenant. The record also marks the 2026-07-31 commitment termination date as delayed (claim #4593), so how much of the $2.6 billion (claims #4592, #11922) was actually drawn before commitments lapsed, and were they extended?
The company disclosed on 2025-08-12 a $350 million share issuance to a strategic customer (claim #4514). Separately, on 2025-05-13 it disclosed an $11.2 billion OpenAI backlog (claim #4969) within $25.9 billion of total committed backlog (claim #4970). What has not been said is whether OpenAI is the strategic customer, what price per share and lock-up terms applied, and how much of the remaining roughly $14.7 billion of backlog is concentrated in other unnamed counterparties.
The company disclosed on 2025-05-13 that it had 1.6 GW of contracted power (claim #4973) and had added 420 MW of active capacity (claim #4972). What has not been said is which sites make up those figures, where they are located, and what their interconnection status is. It has also not said whether the 420 MW is cumulative or added in a single quarter, or on what schedule the remaining contracted gigawatt is expected to energize.
The May 2025 senior notes were described as a $1.5 billion offering on 2025-05-18 (claim #11921), then as $2.0 billion on 2025-05-20 and 2025-05-27 (claims #11918, #11917), with a 9.250% coupon (claim #4824). Maturity is cited as both 2030-05-27 and 2030-06-01. The July notes likewise grew from $1.5 billion (claim #4700) to $1.75 billion at 9% (claims #4697, #4698, #4658). What has not been said is what drove each upsizing, which maturity date is correct for the 2030 notes, and what event triggers the contingent springing maturity of 2026-12-30 on the revolving facility (claim #11926).
The July 2025 notes carried a first 9% interest payment due 2026-02-01 (claim #4659), and the July 25 closing (claim #4699) is also marked delayed. What has not been said is whether that coupon was paid on schedule and whether the closing slipped. A missed or late payment on high-yield debt would be material and should have been affirmatively disclosed either way.
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio (claims #4731, #4331, #4314), with a 2026-04-07 outside date (claim #4738) and a $270 million termination fee payable to CoreWeave (claim #4739). Both the outside date and the 2025-10-01 target (claim #4517) are marked delayed. What has not been said is whether the deal closed, was extended, or was terminated, and whether the $270 million fee was triggered and collected. Separately, the $6.3 billion capacity purchase commitment from NVIDIA running to 2032 (claim #4352) comes from a company that is also a supplier and shareholder. What related-party review and pricing terms governed that agreement, and who are the executives referenced in claims #4332, #4315 and #4317, and what are they paid?
What we aren't being told
2026-09-13The company disclosed a $2.6 billion delayed draw term loan on 2025-07-30, cited as claims #4592 and #4595. The facility is secured by a material customer contract for GPU infrastructure and carries a minimum contract realization ratio of 0.85x (claim #4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim #4596). What has not been said is who that customer is, what the contract's total value and term are, and how much headroom CoreWeave currently has against either covenant. Relatedly, who bought the $350 million strategic customer share issuance disclosed on 2025-08-12 (claim #4514), and at what price per share?
The company disclosed $25.9 billion in total committed revenue backlog on 2025-05-13, cited as claim #4970, of which $11.2 billion is attributed to OpenAI (claim #4969) under a contract running to 2031-05-31 (claim #4296). What has not been said is who holds the remaining roughly $14.7 billion, how concentrated it is, and what share of total backlog can be cancelled or reduced before delivery. On the supply side, the $6.3 billion NVIDIA capacity purchase commitment through 2032-04-13 (claim #4352) raises its own question: what are the pricing and take-or-pay terms, and given NVIDIA's position as an investor and GPU supplier, has the arrangement been evaluated as a related-party transaction?
The company disclosed the Core Scientific merger at a 0.1235 exchange ratio on 2025-07-06, cited as claims #4731, #4729 and #4314, with a closing deadline of 2026-04-07 (claim #4738) and an earlier 2025-10-01 target (claim #4517). All three dates are now marked delayed. What has not been said on the record is whether the deal was terminated, renegotiated or extended. It is also unclear whether the $270 million termination fee payable to CoreWeave (claim #4739) was triggered, and if so, whether it has been paid or booked.
The company disclosed contracted power capacity of 1.6 GW and 420 MW of active capacity added, both on 2025-05-13, cited as claims #4973 and #4972. What has not been said is which sites and utilities make up the roughly 1.2 GW gap, what the interconnection status of each site is, and in what quarters that capacity is expected to be energized. Without that schedule, the backlog in claim #4970 cannot be tied to a delivery timeline.
The company disclosed its May 2025 senior notes as $1.5 billion on 2025-05-18 (claim #11921) and as $2.0 billion on 2025-05-20 and 2025-05-27 (claims #11918 and #11917). The maturity is recorded as both 2030-06-01 and 2030-05-27 (claim #4824), and the extracted amounts carry inconsistent units (1500.0 USD versus 2000000000.0 USD). What has not been said is what drove the upsizing and exactly how the proceeds were used, which claim #11920 references without quantifying. For the 9% notes due 2031 (claims #4697 and #4698), the expected 2025-07-25 closing (claim #4699) and the first 2026-02-01 coupon (claim #4659) are both marked delayed. Did the offering close on schedule, and was that coupon paid on time?
The company disclosed a revolver expansion to $1.5 billion with a 2028-05-02 maturity on 2025-05-05, cited as claims #5010 and #5012, alongside a contingent springing maturity of 2026-12-30 (claim #11926). What has not been said is which condition triggers the springing maturity and whether CoreWeave expects to meet it or cure it before that date. The same question of utilization applies to DDTL 3.0, whose commitment termination date of 2026-07-31 (claim #4593) has passed and is marked delayed: how much of the $2.6 billion was actually drawn, and was the undrawn portion cancelled or extended?
What we aren't being told
2026-09-13The company disclosed a material customer contract for GPU infrastructure on July 30, 2025 (claim 4595) but provided no customer name or contract value, despite later naming major customers: OpenAI ($6.5 billion, claim 4297), Meta ($14.2 billion, claim 4282), and NVIDIA ($6.3 billion, claim 4352). What has not been disclosed is the identity and dollar value of the July material customer.
The company disclosed an OpenAI strategic deal revenue backlog of $11.2 billion on May 13, 2025 (claim 4969), but later reported OpenAI committed revenue of only $6.5 billion through May 31, 2031 on September 24, 2025 (claim 4297). What has not been disclosed is why the OpenAI commitment declined by $4.7 billion or whether this represents a deal restructuring, restatement of different metrics, or change in contract scope.
The company disclosed contracted power capacity of 1.6 GW and active compute power capacity added of 420 MW on May 13, 2025 (claims 4973 and 4972), but did not clarify the timing of the 420 MW addition or CoreWeave's total operational capacity. What has not been disclosed is the period over which the 420 MW was deployed and what CoreWeave's total operational computing capacity was as of the announcement date.
The company disclosed a $270 million termination fee payable to CoreWeave in the Core Scientific merger agreement (claim 4739) but then announced termination of the merger in October 2025 (claim 4166) without disclosing whether the fee was paid, other settlement costs, or impact to financial results. What has not been disclosed is the actual financial costs and settlements associated with the merger termination.
The company announced the acquisition of Weights & Biases on May 13, 2025 (claim 4974) with a $1 billion purchase price disclosed on August 12, 2025 (claim 4516), but has not disclosed operational integration plans, product roadmap changes, or expected synergies. What has not been disclosed is how W&B will be integrated operationally and what synergies CoreWeave expects from the acquisition.
The company disclosed a minimum debt service coverage ratio covenant of 1.40x beginning April 2027 on July 30, 2025 (claim 4596) but has not disclosed its current DSCR, compliance trajectory, or management's confidence in achieving the threshold. What has not been disclosed is CoreWeave's current debt service coverage ratio and its plan to achieve April 2027 compliance.
What we aren't being told
2026-09-13The company disclosed OpenAI as a strategic customer with an $11.2 billion revenue backlog on May 13, 2025 (claim 4969), but later disclosed OpenAI as a cloud computing customer with $6.5 billion committed revenue through May 31, 2031 on September 24, 2025 (claim 4297). The company has not explained whether these figures refer to the same contract, whether the backlog was revised downward by $4.7 billion, or whether they measure different components of the OpenAI relationship.
CoreWeave disclosed total revenue backlog of $25.9 billion from committed contracts on May 13, 2025 (claim 4970), while later naming Meta at $14.2 billion (claim 4282, September 29, 2025) and OpenAI at $6.5 billion (claim 4297, September 24, 2025). These two customers total $20.7 billion, leaving approximately $5.2 billion in committed backlog from unidentified customers; the company has not disclosed which other customers represent this remaining revenue or their individual commitment sizes.
CoreWeave announced a $1.2 billion Series C Put Shares repurchase obligation due March 31, 2027 (claim 4276, October 1, 2025), but has not disclosed which shareholders hold these shares, why this obligation exists post-IPO, or the economic triggers that would require repurchase despite going public on March 28, 2025 at $40 per share (claims 11601, 11616).
The company announced a merger agreement with Core Scientific at 0.1235 shares per share (claims 4731, 4729, July 2025) with an April 7, 2026 closing target, but announced termination on October 30, 2025 (claim 4166). Claim 4739 states a $270 million termination fee is payable to CoreWeave (July 6, 2025), yet the company has not disclosed the reasons for termination or whether this fee has been received or remains pending.
CoreWeave disclosed a $6.3 billion NVIDIA capacity purchase commitment through April 13, 2032 (claim 4352, September 14, 2025), but has not disclosed the contractual structure—whether this is a binding purchase obligation, an option CoreWeave may elect to exercise, or a take-or-pay arrangement—nor the specific GPU models, configurations, or payment schedule contemplated.
The company disclosed contracted power capacity of 1.6 gigawatts and active compute capacity added of 420 megawatts as of May 13, 2025 (claims 4973, 4972), leaving 1.18 gigawatts of contracted capacity not yet operationalized; the company has not disclosed the deployment timeline for this remaining capacity, expected operational dates, or current utilization rates on existing infrastructure.
What we aren't being told
2026-09-13The company announced a $11.2 billion OpenAI strategic deal revenue backlog on May 13, 2025 (claim 4969), then disclosed on September 24, 2025 only $6.5 billion in committed OpenAI revenue through 2031 (claim 4297)—a $4.7 billion variance that has not been explained; whether this represents a renegotiation, scope reduction, or different contract cohort remains unclear.
On August 12, 2025, CoreWeave announced a strategic customer share issuance of $350 million (claim 4514), but the identity of this customer has been withheld despite the company's public disclosure of major commitments from OpenAI, Meta, and NVIDIA; this undisclosed equity dilution raises questions about which counterparty received the stake and why anonymity was necessary.
Claim 4352 from September 14, 2025 states a $6.3 billion NVIDIA capacity purchase commitment through 2032, but does not clarify the transaction's direction—whether CoreWeave is purchasing capacity or services from NVIDIA, or conversely whether NVIDIA is purchasing CoreWeave's GPU infrastructure capacity; this ambiguity obscures the operational impact and revenue treatment.
The Meta commitment announced on September 29, 2025 totals $14.2 billion through 2031 (claim 4282) with an expansion option through 2032 (claim 4283), yet the company has provided no megawatt or gigawatt specification for the physical compute capacity being provisioned, making it impossible to reconcile against the stated 1.6 GW total contracted power capacity from May (claim 4973).
The merger agreement with Core Scientific disclosed a $270 million termination fee payable to CoreWeave on July 6, 2025 (claim 4739), but after announcing the merger's termination on October 30, 2025 (claim 4166), the company has not disclosed whether this fee was actually paid, by whom, or under what triggering conditions.
Claim 4971 from May 13, 2025 announces an IBM partnership for Granite compute capacity, but provides no quantified capacity metric (MW or GW) despite the company's contemporaneous disclosure of 420 MW capacity additions (claim 4972) and 1.6 GW contracted capacity (claim 4973), leaving the scale and allocation of IBM's contribution opaque.
What we aren't being told
2026-09-12The company disclosed a $11.2 billion "OpenAI strategic deal revenue backlog" on May 13, 2025 (claim 4969), but reported only $6.5 billion in "OpenAI committed revenue" on September 24, 2025 (claim 4297); what has not been explained is whether the $4.7 billion difference represents revised estimates, deferred capacity milestones, or contingent deals not yet executed. The company disclosed total revenue backlog of $25.9 billion from committed contracts on May 13, 2025 (claim 4970), with Meta representing $14.2 billion (claim 4282) and OpenAI representing $6.5–11.2 billion depending on the disclosure date; what has not been disclosed is the customer composition of the remaining backlog and whether concentration risk with two counterparties presents material exposure. The company announced a "NVIDIA capacity purchase commitment" of $6.3 billion promised by April 13, 2032 (claim 4352); what has not been clarified is whether this represents CoreWeave purchasing capacity from NVIDIA or NVIDIA purchasing services from CoreWeave, a directional distinction material to revenue and capital deployment analysis. The company disclosed 420 megawatts of active compute capacity added and 1.6 gigawatts of contracted power capacity on May 13, 2025 (claims 4972–4973); what has not been provided is the geographic location, facility names, and power grid interconnection details that would allow investors to assess latency and transmission constraints. The company disclosed $2.6 billion and $3.0 billion delayed draw term loan facilities (claims 4592, 4277); what has not been disclosed is the commitment fee structure, draw schedule, and operational milestones triggering availability—information necessary to calculate effective cost of capital and refinancing risk. The company announced a merger agreement with Core Scientific on September 24, 2025 (claim 4313) and disclosed termination on October 30, 2025 (claim 4166) with a $270 million termination fee (claim 4739); what has not been explained is the intended operational scope (employee count, GPU capacity, facilities) and the business factors that prompted termination 36 days after announcement.
What we aren't being told
2026-09-12The company disclosed OpenAI strategic deal revenue backlog of $11.2B on 2025-05-13 (claim 4969) and total revenue backlog of $25.9B on the same date (claim 4970); later disclosed OpenAI committed revenue of $6.5B through 2031-05-31 on 2025-09-24 (claim 4297); and separately disclosed Meta $14.2B and NVIDIA $6.3B commitments (claims 4282, 4352). What has not been said is which of the two OpenAI figures represents current committed revenue, whether these three named customers represent substantially all backlog, and the company's customer concentration percentage and diversification strategy.
The company raised $2.6B in delayed draw term loan on 2025-07-30 (claim 4592) with termination date 2026-07-31 (claim 4593), and $3.0B in additional DDTL on 2025-10-01 (claim 4277), totaling $5.6B. What has not been said is the stated business purpose for these facilities, the capital deployment timeline, and the specific triggers or conditions for drawings.
The company announced a $1.0B Weights & Biases acquisition on 2025-05-13 (claim 4974) and 2025-08-12 (claim 4516). What has not been said is whether the transaction closed, whether it was financed through debt or equity, the contribution to consolidated revenue and EBITDA, and the integration results or synergies realized to date.
The company disclosed minimum debt service coverage ratio covenant of 1.40x beginning 2027-04-01 (claim 4596) and minimum contract realization ratio of 0.85x (claim 4597, dated 2025-07-30). What has not been said is the company's current actual debt service coverage ratio, current contract realization ratio, or any attestation that existing backlog satisfies the 0.85x minimum threshold.
The company disclosed Series C Put Shares repurchase obligation of $1.2B due by 2027-03-31 (claim 4276, dated 2025-10-01). What has not been said is the identity of the put holders, the circumstances triggering repurchase rights, the price basis per share, and whether this obligation was incorporated into debt covenant compliance calculations.
The company announced Core Scientific merger agreement on 2025-07-06 with April 2026 closing deadline (claims 4731, 4738), re-announced the merger on 2025-09-16 to 2025-09-25 with 0.1235 Class A share exchange ratio (claims 4313, 4331), then disclosed termination on 2025-10-30 (claim 4166), having disclosed $270M termination fee payable to CoreWeave on 2025-07-06 (claim 4739). What has not been said is the reason for termination, timing of fee receipt or payment, and the impact on the company's capital deployment and near-term growth strategy.
What we aren't being told
2026-09-12On May 13, 2025, CoreWeave disclosed an "OpenAI strategic deal revenue backlog" of $11.2 billion (claim 4969) and total "revenue backlog from committed contracts" of $25.9 billion (claim 4970). Yet on September 24, 2025, the company disclosed "OpenAI committed revenue" of only $6.5 billion through May 31, 2031 (claim 4297), representing a reduction of $4.7 billion. What explains this discrepancy—was the May figure revised downward, or do these measure different contract categories such as optional versus firm capacity commitments?
On July 30, 2025, CoreWeave disclosed a "material customer contract for GPU infrastructure" as a covenant requirement for its DDTL 3.0 facility (claim 4595), without naming the customer. The company later disclosed specific commitments from OpenAI ($6.5 billion through May 2031), Meta ($14.2 billion through December 2031), and NVIDIA ($6.3 billion through April 2032). Which customer was referenced as "material" in the DDTL 3.0 announcement, and why was it not identified by name when the facility terms were first disclosed?
On October 1, 2025, CoreWeave disclosed a $1.2 billion obligation to repurchase Series C Put Shares by March 31, 2027 (claim 4276), but provided no repurchase price per share, number of shares affected, or identity of the put holders. How is the $1.2 billion obligation calculated, and which Series C investors hold these put rights?
CoreWeave disclosed 420 megawatts of active compute power capacity added and 1.6 gigawatts of contracted capacity (claims 4972, 4973) supporting major customer commitments announced between September and October 2025. However, the company disclosed no information about the geographic location of these data centers or how power is sourced and distributed. In which regions or countries are these facilities located, and what is CoreWeave's exposure to regional power price volatility or transmission constraints?
CoreWeave announced a merger with Core Scientific at an exchange ratio of 0.1235 shares per Core Scientific share (claims 4731, 4294) with a stated termination fee of $270 million "payable to CoreWeave" (claim 4739), then terminated the merger on October 30, 2025 (claim 4166). What was the total implied equity value of the proposed merger, was the $270 million fee actually paid, and which party initiated the termination?
CoreWeave identified the Chief Executive Officer, General Counsel, and Deputy General Counsel in September 2025 (claims 4315, 4316, 4317) following its March 2025 IPO and acquisitions of Weights & Biases and Core Scientific. However, the company has not disclosed executive equity holdings, option strike prices, vesting schedules, or fully diluted share counts for named officers in available proxy disclosures. What percentage of fully diluted shares do the CEO and named executives own, and what are the strike prices and vesting terms of outstanding equity awards?
What we aren't being told
2026-09-12The company disclosed $25.9 billion in total revenue backlog on May 13, 2025 (claim 4970), comprising $11.2 billion from OpenAI through May 2031 (claim 4969), $14.2 billion from Meta through December 2031 (claim 4282), and $6.3 billion from NVIDIA through April 2032 (claim 4352). It separately disclosed 1.6 GW of contracted power capacity and 420 MW of active capacity added (claims 4973, 4972). What has not been stated is the specific megawatt or gigawatt requirement for each major customer, the locations of the facilities supporting these commitments, the construction timeline showing when capacity comes online relative to revenue obligation dates, or reconciliation showing whether the disclosed 1.6 GW is sufficient to serve the disclosed backlog.
The company disclosed a $350 million share issuance to an unnamed "strategic customer" on August 12, 2025 (claim 4514). What has not been said is the identity of that customer, the share price at which they purchased, the size of their ownership stake, any governance rights or board representation contingent on the purchase, and whether this customer is OpenAI, Meta, or a third party.
The company disclosed a $1.2 billion repurchase obligation on Series C Put Shares maturing March 31, 2027 (claim 4276). What has not been disclosed is which investors or funds hold these puts, the strike price or exercise conditions, triggers for mandatory repurchase, and the company's refinancing plan if its stock price trades below the strike at maturity—material for a freshly IPO'd company announcing this obligation.
The company disclosed acquiring Weights & Biases for $1 billion (claim 4516) but provided no detail on the consideration mix (stock versus cash), the closing date, the acquired company's revenue or margin contribution, or the strategic rationale for adding a model management platform to an infrastructure-as-a-service business.
The company disclosed a merger agreement with Core Scientific announced July 6, 2025 (claim 4729) with a 0.1235 share exchange ratio (claim 4731) and a $270 million termination fee (claim 4739), then announced termination on October 30, 2025 (claim 4166). What has not been stated is whether CoreWeave paid or received the termination fee, the stated reason for unwinding the transaction, or how the reversal affects the company's capacity roadmap.
The company disclosed a minimum debt service coverage ratio covenant of 1.40x beginning April 1, 2027 (claim 4596) and raised $17.2 billion in total capital (claim 4968), including $3.25 billion in debt in July 2025 (claims 4700, 4697). What has not been disclosed is the current debt service coverage ratio relative to that covenant floor, the path from current profitability to achieving 1.40x coverage in 2027, or stress scenarios if major customer commitments slip below disclosed backlog amounts.
What we aren't being told
2026-09-12The company disclosed a total revenue backlog of $25.9 billion from committed contracts on May 13, 2025 (claim 4970), with OpenAI representing $11.2 billion of that total (claim 4969); however, on September 24, 2025, it disclosed OpenAI committed revenue of only $6.5 billion through May 31, 2031 (claim 4297), a reduction of $4.7 billion. When combined with the subsequently announced Meta commitment of $14.2 billion through December 14, 2031 (claim 4282), the disclosed customer backlog exceeds the original $25.9 billion total—what has not been explained is the reconciliation between these figures and whether the original May backlog estimate was revised downward.
CoreWeave announced contracted power capacity of 1.6 GW (claim 4973) and active compute power capacity added of only 420 MW (claim 4972) on May 13, 2025; the company has not disclosed when or where the remaining 1.18 GW of contracted capacity will be deployed, what the facility locations and construction timelines are, or how much of the committed customer backlog depends on capacity that does not yet exist.
On September 14, 2025, the company disclosed a $6.3 billion "capacity purchase commitment" from NVIDIA through April 13, 2032 (claim 4352), but the direction of this commitment—whether CoreWeave is purchasing GPU supply from NVIDIA or NVIDIA is purchasing compute services from CoreWeave—is not specified; the payment terms, draw schedule, and contractual obligations if demand disappoints remain undisclosed.
The acquisition of Weights & Biases for $1 billion was announced in May 2025 (claim 4974) and reconfirmed in August (claim 4516), but the company has not disclosed the deal structure (cash, stock, or debt-financed), whether W&B was a customer whose revenue is already counted in the backlogs, or whether the acquisition represents strategic diversification or concentration of customer relationships.
CoreWeave announced a merger with Core Scientific in July 2025 with a $270 million termination fee payable to CoreWeave (claim 4739) but terminated the merger agreement on October 30, 2025 (claim 4166); the company has not disclosed whether it received or paid the termination fee, what facility capacity or assets were expected from the merger that are now absent, or how the loss of those assets impacts the power and facility roadmap announced in May.
The company disclosed a $1.2 billion obligation to repurchase Series C Put Shares by March 31, 2027 (claim 4276) after completing its IPO in August 2025 (claim 4513), but has not disclosed who holds these Series C shares post-IPO, why puts were granted on preferred stock after a public exit, or how this future liability affects the company's debt covenants, particularly the minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596).
What we aren't being told
2026-09-12The company disclosed a total revenue backlog of $25.9 billion (claim 4970) composed of $11.2 billion from OpenAI (claim 4969) and $14.2 billion from Meta (claim 4282), representing 98 percent of committed revenue; what has not been said is the identity and contract value of the remaining customers and whether any other relationship exceeds 5 percent of the backlog.
The company announced 1.6 GW of contracted power capacity (claim 4973) and 420 MW of newly active compute capacity (claim 4972); what has not been disclosed is the geographic location, physical address, and grid interconnection details of these facilities, which are material to evaluating operational feasibility and regulatory compliance.
The company cited OpenAI revenue as both $11.2 billion in "revenue backlog" (claim 4969) and $6.5 billion in "committed revenue" (claim 4297); what has not been explained is whether these metrics overlap, the distinction between "backlog" and "committed," and the source of the $4.7 billion gap between them.
The company disclosed a Series C Put Shares repurchase obligation of $1.2 billion due March 31, 2027 (claim 4276); what has not been stated is the identity of the investors holding these shares and the specific conditions or events that trigger the company's repurchase obligation.
The company established a minimum debt service coverage ratio covenant of 1.40x effective April 2027 (claim 4596) but did not disclose the current coverage ratio or a detailed annual debt service schedule; what remains unclear is whether the company is tracking toward compliance and the margin of safety for meeting this covenant.
The company terminated its Core Scientific merger agreement (claim 4166) on October 30, 2025, yet earlier claims referenced financing arrangements contingent on merger completion (claim 4731, with promised closing April 7, 2026); what has not been disclosed is whether termination fees were incurred and how the capital raised for the merger is now being deployed.
What we aren't being told
2026-09-11The company disclosed a $11.2B revenue backlog from OpenAI (claim 4969) while separately announcing $6.5B in committed OpenAI revenue through 2031-05-31 (claim 4297). What has not been said is how the $4.7B gap between these figures is composed—whether it represents contingent, optional, or future expansion capacity, and what the full service terms, capacity allocation, and pricing mechanisms are across both components.
CoreWeave announced a $14.2B cloud computing capacity commitment from Meta through 2031-12-14 (claim 4282) with a capacity expansion option through 2032 (claim 4283), yet has not disclosed the specific compute capacity quantities (GPU count, GPU types, memory configurations), service level agreements, minimum usage commitments, price escalation terms, or penalty provisions if CoreWeave fails to deliver the contracted capacity on schedule.
The company cited $1.2B in Series C Put Shares repurchase obligations due by 2027-03-31 (claim 4276) without naming the shareholders holding these securities, explaining the conditions under which the put becomes exercisable, disclosing priority of repayment relative to debt covenants, or addressing what happens if cash is insufficient to satisfy the put at maturity.
A merger agreement with Core Scientific was originally promised "by 2026-04-07" (claim 4731) but terminated on 2025-10-30 (claim 4166), with claim 4739 referencing a $270M termination fee "payable to CoreWeave." The company has not disclosed whether this is a fee received or paid, what additional transaction costs or breakage fees were incurred, the strategic rationale for walking away, or residual contractual obligations to Core Scientific shareholders.
CoreWeave disclosed "420 MW of active compute power capacity added" (claim 4972) and "1.6 GW contracted power capacity" (claim 4973), but has not stated what portion of the 1.6 GW is already operational versus under construction, the timeline and capital required to complete the remaining builds, current utilization rates of the deployed 420 MW, or how infrastructure deployment aligns with Meta's and OpenAI's stated capacity draw-down schedules.
The acquisition of Weights & Biases for $1B (claims 4974 and 4516) lacks disclosure of the payment structure (cash, stock, debt, or combination), whether the purchase price includes earnout or contingent consideration, what specific assets CoreWeave is acquiring (IP portfolio, customer contracts, talent retention agreements), expected revenue or margin contributions, and the integration roadmap into CoreWeave's platform.
What we aren't being told
2026-09-11The company disclosed total revenue backlog of $25.9 billion on 2025-05-13 (claim 4970), of which OpenAI's strategic deal accounts for $11.2 billion (claim 4969); yet the company later disclosed on 2025-09-24 that OpenAI's committed revenue through 2031 is $6.5 billion (claim 4297). The company has not explained why the 'strategic deal revenue backlog' exceeds committed revenue by $4.7 billion, nor disclosed the temporal distribution of the remaining backlog or OpenAI's percentage share of near-term cash inflows—critical for assessing customer concentration risk.
On 2025-10-05, the company disclosed a Series C Put Shares repurchase obligation of $1.2 billion due by 2027-03-31 (claim 4276), but has not disclosed who holds these puts, what valuation or exercise price applies, whether the obligation is senior to other equity, or what events might trigger acceleration—material terms for understanding future dilution and cash requirements.
The company stated on 2025-05-13 that total debt and equity capital raised is $17.2 billion (claim 4968), yet disclosed sources total approximately $9.2 billion: IPO proceeds ($1.4B), strategic customer shares ($350M), over-allotment ($68M), Senior Notes ($1.75B), and delayed draw facilities ($5.6B). The company has not identified the source or terms of the remaining ~$7.8 billion, leaving the capitalization structure and prior commitment history opaque.
On 2025-07-30, the company announced a 'material customer contract for GPU infrastructure' (claim 4595) without naming the customer, deal value, or commitment period—a disclosure that flags materiality while withholding the competitive and customer-concentration data a lender or equity investor would require to assess revenue stability.
The company announced a Meta capacity commitment of $14.2 billion through 2031-12-14 on 2025-09-29 (claim 4282) alongside a 'capacity expansion option through 2032' (claim 4283), but has not disclosed the economic terms, pricing, or trigger conditions of the expansion option—leaving material upside optionality quantified by neither value nor probability.
On 2025-10-30, the company disclosed termination of its Core Scientific merger agreement (claim 4166) after initially promising closing by 2026-04-07 (claim 4738, now marked delayed). The company disclosed a $270 million termination fee on 2025-07-06 (claim 4739) but has not stated whether CoreWeave paid or received this fee, disclosed the stated reason for termination (regulatory, financing, other), or quantified any financial impact, leaving shareholders without clarity on a material corporate action.
What we aren't being told
2026-09-10The company disclosed in May 2025 that OpenAI represented an "11.2 billion strategic deal revenue backlog" (claim 4969), but by September 2025 revised this to "6.5 billion committed revenue" through May 31, 2031 (claim 4297)—a $4.7 billion or 42% reduction with no explanation offered. Did the contract scope narrow, pricing decline, or was the recognition methodology different? This material discrepancy is exactly the kind of revision that would trigger analyst follow-up questions on earnings calls.
CoreWeave disclosed the existence of a "Material customer contract for GPU infrastructure" on July 30, 2025 (claim 4595) but withheld the customer's identity and revenue figures, despite publicly naming and quantifying commitments from OpenAI ($6.5B) and Meta ($14.2B). Given this asymmetry in transparency, a sophisticated reader would ask: Is the unnamed customer still in final contracting stages, bound by confidentiality agreements that prevent disclosure, or at material execution risk?
The company committed to purchase $6.3 billion of NVIDIA capacity through April 2032 (claim 4352) with no disclosure of whether this represents fixed annual quotas, minimum purchasing requirements, force majeure carve-outs, or CoreWeave's ability to reduce commitments if customer demand declines. For a seven-year, nine-figure capex obligation, the absence of payment mechanics and termination provisions is a critical gap.
CoreWeave disclosed three separate credit facilities totaling $5.1 billion ($1.5B revolving facility, $2.6B delayed draw term loan, and $3.0B delayed draw term loan) across multiple May-to-October 2025 disclosures (claims 5010, 4592, 4277) but nowhere disclosed amounts drawn from each facility, amounts remaining available, or current utilization rates. Against customer commitments totaling $20.7 billion to OpenAI and Meta alone, the company's actual liquidity posture and draw-down activity would be material to understanding its financial flexibility.
The company announced a $1.2 billion Series C Put Shares repurchase obligation due by March 31, 2027 (claim 4276) without disclosing what events trigger the put right, whether CoreWeave has reserved or segregated cash to satisfy it, what conditions might waive or modify the obligation, or what shareholder dilution would result if exercised. Put obligations are routine sources of cash drain and equity dilution.
CoreWeave announced the $1 billion Weights & Biases acquisition in August 2025 (claim 4516) before its own IPO officially closed in November 2025 (claim 4121), leaving the funding source ambiguous—was this financed from pre-IPO investor capital, debt, or post-IPO proceeds? Additionally, CoreWeave has disclosed no revenue contribution, earnings impact, or integration costs from W&B despite marketing product features (AI Enterprise support, Cloud Functions) attributed to the acquired platform.
What we aren't being told
2026-09-10The company disclosed $11.2 billion of OpenAI revenue backlog on May 13, 2025 (claim 4969) but later cited $6.5 billion of OpenAI committed revenue through May 2031 (claim 4297, September 24, 2025). What accounts for the $4.7 billion discrepancy between these two OpenAI figures?
CoreWeave announced 1.6 gigawatts of "contracted power capacity" (claim 4973, May 2025) but disclosed only 420 megawatts—26 percent—as "active" (claim 4972). Where is the remaining 1.2 gigawatts physically located, what are its interconnection details, and what is the buildout timeline?
The company cited a $25.9 billion total revenue backlog (claim 4970, May 2025) but embedded a debt covenant requiring a 0.85x minimum contract realization ratio (claim 4597, July 2025), implying 15 percent of contracts may not realize. Which customer contracts are subject to this downside assumption, and what historical realization rates support this 15 percent haircut?
CoreWeave announced a Core Scientific merger at 0.1235 shares per share (claims 4731, 4314, July-September 2025) with an October 1, 2025 close target (claims 4517, 4738) but terminated the deal by October 30, 2025 (claim 4166). Did CoreWeave pay the $270 million termination fee (claim 4739), and how does the deal termination affect disclosed power capacity and facility expansion plans?
OpenAI and Meta represent $25.4 billion of the $25.9 billion stated revenue backlog (claims 4969, 4282, 4970), or approximately 98 percent concentration. What are the top-three customer concentration ratios, and what is management's strategy if OpenAI or Meta materially reduce their capacity commitments?
CoreWeave announced 420 megawatts of active compute capacity and 1.6 gigawatts of contracted capacity (claims 4972, 4973, May 2025) but disclosed no facility names, physical addresses, utility interconnections, or grid locations. Which specific data center sites are operational, where are they located, and what are their power interconnection details?
What we aren't being told
2026-09-10The company disclosed OpenAI strategic deal revenue backlog of $11.2 billion (claim 4969, 2025-05-13) but later stated OpenAI committed revenue of $6.5 billion (claim 4297, 2025-09-24), yet provided no reconciliation for this $4.7 billion discrepancy or clarification of whether the later "committed" figure represents a reduction in actual obligations or simply a different accounting metric.
The company reported total revenue backlog of $25.9 billion (claim 4970, 2025-05-13) with only $6.5 billion and $14.2 billion attributed to OpenAI and Meta respectively (claims 4297 and 4282), leaving $5.2 billion or 20% of backlog unattributed to any named customer, despite separately disclosing a "material customer contract for GPU infrastructure" (claim 4595, 2025-07-30) without identifying the counterparty or confirming its inclusion in the published totals.
The company announced 1.6 gigawatts of contracted power capacity and 420 megawatts of active capacity added (claims 4973 and 4972, both 2025-05-13), plus a $6.3 billion NVIDIA capacity purchase commitment through 2032 (claim 4352, 2025-09-14), but provided no disclosure of facility locations, NVIDIA equipment delivery schedules, or deployment timelines relative to customer ramp profiles—leaving the realizability of customer commitments and the capital efficiency of the buildout plan unevaluated.
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due March 31, 2027 (claim 4276, 2025-10-05), arriving in less than 6 months from today following $17.2 billion in capital raised (claim 4968), yet has not disclosed funding source, put holder identity, or capital structure priority relative to debt covenants including the 1.40x minimum debt service coverage ratio requirement beginning April 2027 (claim 4596).
The 9.0% interest payment on $1.75 billion Senior Notes due February 1, 2026, shows status as "delayed" as of September 2, 2026 (claim 4659), signaling a potential missed payment and material disclosure obligation, yet the company has not publicly reported whether payment was deferred or missed and what consequences this creates for covenant compliance under the $3 billion delayed draw term loan facility.
The company announced a $1 billion acquisition of Weights & Biases (claim 4516, 2025-08-12) without disclosing post-acquisition business model, revenue contribution, integration approach, or customer overlap—leaving unexplained whether the acquisition operates as standalone SaaS, bundled infrastructure offering, or internal tooling, and providing no post-acquisition performance metrics.
What we aren't being told
2026-09-10The company disclosed a "Material customer contract for GPU infrastructure" on July 30, 2025, cited as claim #4595, yet provided neither the customer name, contract revenue, nor contractual term. Given that CoreWeave elsewhere names OpenAI and Meta prominently in its public filings, what customer represents this material GPU contract, what is the committed revenue value, and what is the contract duration?
On May 13, 2025, CoreWeave announced an OpenAI strategic deal revenue backlog of $11.2 billion (claim #4969), but on September 24, 2025, disclosed OpenAI committed revenue of only $6.5 billion through May 31, 2031 (claim #4297). If the $6.5B is a subset of $11.2B, what accounts for the $4.7 billion discrepancy? If the figures refer to different contract tranches or measurement methodologies, this should be stated explicitly.
The company disclosed "Contracted power capacity 1.6 GW" and "Active compute power capacity added 420 MW" on May 13, 2025 (claims #4973 and #4972), but neither the contract term for the gigawatt capacity nor the timing of when the 420 MW deployment occurred is specified. What is the duration and delivery schedule of the 1.6 GW contracted capacity, and when was the 420 MW capacity addition deployed or expected to come online?
CoreWeave disclosed a "NVIDIA capacity purchase commitment 6.3 billion USD" through April 13, 2032 (September 14, 2025, claim #4352), yet does not clarify whether CoreWeave is committing to purchase capacity from NVIDIA or whether NVIDIA is committing to purchase capacity from CoreWeave. How is this commitment being capitalized, and what are CoreWeave's incremental delivery or funding obligations under the arrangement?
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due by March 31, 2027 (October 5, 2025, claim #4276), which falls just weeks before CoreWeave must begin maintaining a 1.40x minimum debt service coverage ratio on April 1, 2027 (claim #4596). Who are the holders of these put shares, what are the contractual triggers for repurchase, and how does management plan to satisfy both the put repurchase and covenant obligations without refinancing or asset sales?
CoreWeave stated total debt and equity capital raised of $17.2 billion (May 13, 2025, claim #4968), yet the IPO contributed only $1.4 billion plus $68 million in over-allotment (claims #4967 and #4515), leaving $15.7 billion unaccounted for in the disclosed sources. What is the debt-to-equity composition of the $17.2 billion raised, and what were the specific sources, forms, and timing of the major financing rounds prior to and following the IPO?
What we aren't being told
2026-09-09The company disclosed an OpenAI strategic deal revenue backlog of $11.2 billion on 2025-05-13, cited as claim #4969; what has not been said is why the same customer appears separately as only $6.5 billion of committed revenue through 2031-05-31 on 2025-09-24, cited as claim #4297. The variance of $4.7 billion between these two OpenAI figures and the contractual or timing differences explaining both disclosures remain undisclosed.
The company disclosed on 2025-07-30, cited as claim #4595, a "Material customer contract for GPU infrastructure" with no customer name, contract value, or timeline; what has not been said is the customer's identity. In contrast, the company separately named OpenAI ($11.2 billion, claim #4969) and Meta ($14.2 billion, claim #4282) by both name and commitment value, making the anonymity of this material customer incongruous to investors assessing revenue concentration.
The company disclosed on 2025-05-13 "Contracted power capacity 1.6 GW" (claim #4973) and on the same date "Active compute power capacity added 420 MW" (claim #4972); what has not been said is whether these figures describe different states of the same capacity pool or separate baselines. The timing for when the remainder of the contracted 1.6 GW becomes active, and the company's total deployed power capacity today, are not disclosed.
The company disclosed a $2.6 billion delayed draw term loan facility on 2025-07-30 (claim #4592) and a $3.0 billion delayed draw term loan facility on 2025-10-01 (claim #4277); what has not been said is whether these are separate facilities, tranches of a single facility, or a refinancing event. The total committed debt capacity, interest rates and spreads, drawdown conditions, and timing for each facility remain undisclosed.
The company disclosed on 2025-10-05 a $1.2 billion repurchase obligation for Series C Put Shares due by 2027-03-31, cited as claim #4276; what has not been said is the holder identity, grant circumstances, repurchase triggers, and capital allocation context. Given the company's announced commitments to NVIDIA ($6.3 billion through 2032, claim #4352), Meta ($14.2 billion through 2031, claim #4282), and OpenAI ($6.5 billion through 2031, claim #4297), the financing priority of this near-term obligation is material to shareholders but undisclosed.
The company disclosed CEO, General Counsel, and Deputy General Counsel appointments on 2025-09-24 (claims #4315, #4316, #4317) and 2025-09-16 (claim #4332); what has not been said are annual base salaries, bonus structures, equity award levels, or any related-party transactions. As a recently public company, such executive compensation disclosures are required in proxy statements and material to investors assessing management incentive alignment.
What we aren't being told
2026-09-09The company disclosed a "Material customer contract for GPU infrastructure" on 2025-07-30 (claim 4595) without naming the counterparty. Meanwhile, the stated total revenue backlog of $25.9 billion from committed contracts (claim 4970) comprises only $20.7 billion when combining the disclosed OpenAI ($6.5B) and Meta ($14.2B) commitments (claims 4297, 4282), leaving approximately $5.2 billion or 20 percent of backlog unexplained; which customer or customers represent this unidentified portion?
The company announced $11.2 billion in OpenAI strategic deal revenue backlog on 2025-05-13 (claim 4969), but disclosed only $6.5 billion in OpenAI committed revenue through 2031-05-31 on 2025-09-24 (claim 4297). What has not been stated is the cause of this $4.7 billion reduction within four months—whether the customer reduced committed volume, pricing was renegotiated downward, or whether the initial backlog figure included non-binding or promotional elements.
The company disclosed "Contracted power capacity 1.6 GW" and separately "Active compute power capacity added 420.0 MW," both on 2025-05-13 (claims 4973, 4972), without clarifying whether the 420 MW represents the total active capacity or only incremental additions. What has not been explained is the deployment rate—that is, what percentage of the 1.6 GW contracted capacity is currently operational and generating customer revenue, versus still under construction or development.
The company stated a $1.2 billion repurchase obligation for Series C Put Shares due by 2027-03-31 (claim 4276) but did not disclose the identity of the put holders, whether the holders are founders, venture investors, or strategic partners, or the specific conditions that trigger the repurchase obligation. Whether this obligation is unconditional or contingent on business milestones or IPO completion has not been clarified.
The company promised completion of a merger with Core Scientific by 2026-04-07 (claim 4731) but terminated the agreement by 2025-10-30 (claim 4166). What has not been disclosed is whether CoreWeave paid termination fees, reverse break-up fees, or other material consideration to Core Scientific, or what sunk costs and integration expenses were incurred in the failed transaction.
The company announced acquisition of Weights & Biases on 2025-05-13 (claim 4974) at a stated purchase price of $1 billion on 2025-08-12 (claim 4516), but did not disclose Weights & Biases' revenue run-rate, margin profile, or how the software platform integrates into CoreWeave's core infrastructure business. The strategic rationale for acquiring a developer tools company while simultaneously raising capacity for cloud compute customers has not been articulated.
What we aren't being told
2026-09-09The company disclosed a "Material customer contract for GPU infrastructure" on 2025-07-30, cited as claim #4595, without naming the counterparty, quantifying the contract value, or specifying payment terms. Given that named customers OpenAI ($6.5–11.2B) and Meta ($14.2B) account for 77–96% of the $25.9B total backlog (claims #4970, #4297, #4282), what is this unnamed material contract and does its exclusion from revenue discussions indicate subordinate scale or incomplete disclosure?
On 2025-09-14, CoreWeave announced a $6.3B "NVIDIA capacity purchase commitment" through 2032, cited as claim #4352, without clarifying whether this represents capex (cash CoreWeave will spend to acquire GPUs from NVIDIA) or revenue (cash CoreWeave will earn providing NVIDIA-powered capacity to customers). This directional ambiguity obscures the impact on cash burn and gross margins.
The company disclosed a $2.6B delayed draw term loan facility with commitment termination on 2026-07-31 (claim #4593), a date that has now passed as of today (2026-09-09), yet has not disclosed how much was drawn, whether it expired unfunded, or what liquidity replaced it. Separately, claim #4277 references a $3.0B DDTL facility with no clear relationship to the earlier facility, creating ambiguity about total committed liquidity available.
CoreWeave stated $17.2B in total capital raised (claim #4968) while IPO proceeds totaled only $1.4B (claims #4967, #4513), leaving $15.8B unaccounted for. The company has not disclosed the debt-to-equity composition of this total, the debt-to-equity ratio, or the source of non-IPO proceeds (venture equity, credit facilities, or asset-backed financing), each of which would materially affect equity dilution and financial leverage.
The company disclosed 420 MW of "active compute power capacity added" (claim #4972) and 1.6 GW of "contracted power capacity" (claim #4973) without specifying when the 420 MW came online or the deployment schedule for the remaining 1.18 GW. Without this timeline, investors cannot align capex burn to revenue recognition, especially given the $6.5–14.2B customer commitments (claims #4297, #4282) that presumably depend on this infrastructure.
CoreWeave disclosed a $1.2B Series C Put Shares repurchase obligation due 2027-03-31 (claim #4276) without naming the Series C investors, specifying the repurchase price (fair market value or fixed valuation), or describing any conditions on repurchase. This near-term liability could represent either a de facto equity overhang or a liquidity constraint if triggered unfavorably.
What we aren't being told
2026-09-09The company disclosed $11.2 billion in OpenAI strategic deal revenue backlog on 2025-05-13 (claim 4969), but subsequently disclosed $6.5 billion in OpenAI committed revenue on 2025-09-24 (claim 4297); what has not been disclosed is the reconciliation between these figures—whether the intervening $4.7 billion represents cancellations, revised contract terms, different revenue recognition periods, or measurement methodology differences.
On 2025-07-30, the company disclosed a "Material customer contract for GPU infrastructure" (claim 4595) without identifying the counterparty; given that OpenAI and Meta deals are named with specific commitment amounts in subsequent filings, the identity of this material customer and the reason for its anonymity remain unexplained—particularly whether it predates the IPO or derives from the Core Scientific acquisition.
The company stated a $6.3 billion NVIDIA capacity purchase commitment due 2032 (claim 4352, 2025-09-14) but omitted critical terms: whether this represents capital equipment procurement (and which GPU models), a revenue-sharing arrangement, minimum volume or take-or-pay requirements, payment schedule, or any equity participation by either party.
The company disclosed 420 megawatts of "active compute power capacity added" (claim 4972, 2025-05-13) and 1.6 gigawatts of "contracted power capacity" (claim 4973, 2025-05-13) without clarifying whether these are incremental or cumulative, what the baseline installed capacity was as of each date, or facility-level utilization rates—data that would establish whether growth is outpacing customer demand.
A $1.2 billion Series C Put Shares repurchase obligation (claim 4276, 2025-10-05) appears with a March 2027 deadline but lacks disclosure of which investors hold these shares, what governance or anti-dilution rights they retain prior to exercise, or what events trigger the put—a material contingent liability left unexplained.
The Weights & Biases acquisition is stated as $1 billion (claim 4516, 2025-08-12; claim 4974, 2025-05-13) with no disclosure of the cash-to-equity mix, earnout provisions, or whether W&B's founders are joining CoreWeave with retained equity stakes—information material to shareholder dilution analysis.
What we aren't being told
2026-09-09The company disclosed a "Material customer contract for GPU infrastructure" on 2025-07-30 (claim 4595) without naming the customer, specifying value, or indicating term. What has not been said is whether this material contract belongs to OpenAI or Meta (named in claims 4296-4297 and 4282-4283) or is a third unnamed counterparty, and how it relates to the aggregate $25.9 billion revenue backlog in claim 4970?
The company stated total revenue backlog of $25.9 billion from committed contracts on 2025-09-24 (claim 4970) without specifying timeframe or annual ramp for realization. What has not been said is the expected annual revenue each year through 2031-2032, when OpenAI's $6.5 billion commitment (claim 4297) and Meta's $14.2 billion commitment (claim 4282) terminate?
The company disclosed contracted power capacity of 1.6 GW (claim 4973) and 420 MW of active compute capacity added (claim 4972), both on 2025-05-13, without identifying facility locations or geographic regions. What has not been said is the physical address, data center names, regional concentration, and grid dependencies for this infrastructure?
The company announced 9.250% Senior Notes due 2030 on 2025-05-27 (claim 4824) without stating the principal amount. What has not been said is the size of this debt tranche compared to the $1500 million and $1750 million senior notes in claims 4700 and 4697?
The company established $2.6 billion (claim 4592) and $3.0 billion (claim 4277) delayed draw term loan facilities without disclosing interest rates or borrowing spreads. What has not been said is the all-in cost of these $5.6 billion facilities, which is material to modeling compliance with the 1.40x debt service coverage ratio covenant beginning April 2027 (claim 4596)?
The company identified a Chief Executive Officer (claims 4315, 4332), General Counsel (claim 4316), and Deputy General Counsel (claim 4317) on 2025-09-24 without disclosing compensation or equity grants. What has not been said is the Named Executive Officer compensation, equity awards, sign-on bonuses, and related-party transactions required in post-IPO proxy disclosures?
What we aren't being told
2026-09-09CoreWeave disclosed $11.2 billion in OpenAI strategic deal revenue backlog on 2025-05-13 (claim 4969), then separately disclosed $6.5 billion in OpenAI committed revenue on 2025-09-24 (claim 4297). The relationship between these figures—whether they represent overlapping tranches, distinct contracts, or sequential revenue recognition periods—has not been clarified.
On 2025-05-13, the company disclosed $25.9 billion in total revenue backlog from committed contracts (claim 4970). The stated major customer commitments (OpenAI $11.2B + Meta $14.2B from claims 4969 and 4282) total $25.4 billion, which nearly exhausts the disclosed backlog total. Yet CoreWeave also announced a $6.3 billion NVIDIA capacity purchase commitment on 2025-09-14 (claim 4352); the disclosure does not clarify whether this commitment is included within or additive to the $25.9 billion backlog figure.
CorWeave disclosed 1.6 GW of contracted power capacity and 420 MW of active compute power capacity added on 2025-05-13 (claims 4973, 4972), but provided no specific facility names, geographic locations, grid interconnection points, or timeline for when the 420 MW was deployed. A sophisticated reader assessing operational risk and regulatory compliance would expect facility-level details to validate capacity claims.
The company disclosed a minimum contract realization ratio covenant of 0.85x effective April 2027 (claims 4596, 4597), but did not explain what realization ratio measures operationally, what CoreWeave's historical or peer realization rates have been, or what financial consequences attach if the covenant is breached.
CorWeave terminated its merger agreement with Core Scientific on 2025-10-30 (claim 4166). While a $270 million termination fee was disclosed to Core Scientific on 2025-07-06 (claim 4739), the disclosure does not explain why CoreWeave terminated the merger, what additional termination costs were incurred, or how the termination affects planned capacity additions or the $3 billion delayed draw term loan facility disclosed on 2025-10-01 (claim 4277).
The company raised $17.2 billion in total debt and equity capital (claim 4968) with $1 billion deployed to acquire Weights & Biases (claim 4516). The disclosure does not specify how the remaining $16.2 billion+ was allocated across debt repayment, facility construction, customer prepayments, working capital, and reserves—critical for assessing the company's cash runway and financial flexibility.
What we aren't being told
2026-09-08The company disclosed 1.6 GW of contracted power capacity (claim 4973, 2025-05-13) and 420 MW of newly active compute power capacity (claim 4972, same date); what has not been said is where these facilities are physically located, their specific grid interconnection points, or their power source composition (renewable vs. fossil). For a GPU infrastructure provider with billion-dollar customer commitments, facility-level opacity on location, power sourcing, and technical specifications is a material gap.
CoreWeave announced an $11.2 billion OpenAI revenue backlog (claim 4969, 2025-05-13) and a $14.2 billion Meta commitment through 2031 (claim 4282, 2025-09-29), totaling $25.2 billion against total backlog of $25.9 billion (claim 4970, 2025-05-13); what has not been said is what percentage of revenue each customer represents and how many other material customers exist. With two customers representing over 97% of disclosed backlog, the absence of customer concentration metrics is a critical omission.
While OpenAI's $6.5 billion committed revenue extends through May 2031 (claim 4297, 2025-09-24) and Meta's $14.2 billion through December 2031 (claim 4282), what has not been disclosed is the quarterly or annual revenue recognition schedule—how much is expected to be realized in each year from 2025 through 2031? This timing is essential for assessing cash flow adequacy against debt service coverage ratio requirements beginning April 2027 (claim 4596, 2025-07-30).
CoreWeave committed to $6.3 billion in NVIDIA capacity purchases through April 2032 (claim 4352, 2025-09-14) and holds contracts with OpenAI and Meta at unstated pricing; what has not been disclosed is the gross margin percentage or dollar amount on these commitments. Without disclosure of average selling price per unit of compute and cost of goods sold (including NVIDIA capacity, power, and overhead), investors cannot assess profitability or capital efficiency.
CoreWeave terminated its Core Scientific merger agreement (claim 4166, 2025-10-30), with a $270 million termination fee referenced (claim 4739, 2025-07-06); what has not been said is which party initiated termination, what specific condition(s) failed, or whether CoreWeave paid or received this fee. The absence of detail on this failed multi-billion-dollar strategic transaction—announced in July 2025 with an April 2026 closing target—leaves material liability questions unanswered.
The company raised $17.2 billion in total capital (claim 4968, 2025-05-13) with $1.4 billion from IPO net proceeds (claim 4967); what has not been disclosed is the debt-vs.-equity split in the remaining $15.8 billion, current deployment status of funds, or how much remains undrawn in facilities like the $3.0 billion delayed draw term loan (claim 4277, 2025-10-01). Without visibility into current cash position and burn rate, investors cannot assess whether capital is sufficient for announced growth initiatives.
What we aren't being told
2026-09-08The company disclosed a $11.2 billion revenue backlog with OpenAI as of May 13, 2025 (claim 4969), but later disclosed only $6.5 billion in committed OpenAI revenue through May 31, 2031 (claim 4297, September 24, 2025)—were these disclosures describing the same contract tranch, and if so, why did the backlog figure decline by over 40%? The company also disclosed total committed revenue backlog of $25.9 billion (claim 4970), with Meta accounting for $14.2 billion (claim 4282), yet the remaining ~$5.2 billion from unnamed customers has never been itemized: which customers comprise this material revenue and what are their contract terms and durations?
CoreWeave announced 420 MW of active compute power capacity added and 1.6 GW of contracted power capacity (claims 4972 and 4973, May 13, 2025), but disclosed neither the specific facility locations nor the commissioning timelines for these assets. Given that the company also committed to a $6.3 billion NVIDIA capacity purchase through April 2032 (claim 4352), what is the facility-by-facility buildout schedule, and which of the 1.6 GW is currently operational versus future-commissioned?
The company disclosed a $1.2 billion repurchase obligation to Series C shareholders with a deadline of March 31, 2027 (claim 4276, October 5, 2025), but did not name the Series C investors, specify their ownership percentage, or disclose whether funds have been reserved or financing secured to meet this obligation. How is this $1.2 billion liability being funded, and who are the Series C shareholders holding these put rights?
CoreWeave disclosed a material customer contract for GPU infrastructure (claim 4595, July 30, 2025) without naming the customer, stating contract value, or detailing service terms and duration. If this contract qualifies as material to investors, why has the company withheld the customer identity and financial terms while disclosing far larger named contracts with OpenAI and Meta?
The $2.6 billion delayed draw term loan facility (claim 4592, July 30, 2025) specified a commitment termination date of July 31, 2026 (claim 4593), which has now passed as of today, September 8, 2026. The claim status indicates this deadline was delayed as of September 3, 2026, but no revised commitment termination date or extension has been publicly disclosed—is the facility still available for drawdown, and if so, through what date?
CoreWeave's $6.3 billion NVIDIA capacity purchase commitment (claim 4352, September 14, 2025) specifies only a total dollar amount and terminal date of April 13, 2032, but omits disclosure of what specific products or services CoreWeave is obligated to procure, the drawdown and payment schedule, and whether minimum take-or-pay obligations or underutilization penalties apply.
What we aren't being told
2026-09-07The company disclosed receipt of a "Material customer contract for GPU infrastructure" on 2025-07-30 (cited as claim #4595); what has not been said is the customer identity, contract size, duration, or any commercially meaningful detail that would allow investors to distinguish between a $500 million and a $10 billion commitment.
CoreWeave disclosed contracted power capacity of 1.6 GW and added 420 MW in active compute power (cited as claims #4973 and #4972); what has not been said is the geographic location of these facilities, which power grids they interconnect to, the available interconnection capacity, or the physical address of any data center, making it impossible to validate whether this capacity is operationally viable.
The company announced a $6.3 billion capacity purchase commitment from NVIDIA through 2032 (cited as claim #4352); what has not been disclosed is the annual or quarterly allocation, minimum take obligations by period, NVIDIA's termination or walk-away rights, or how this commitment would behave if NVIDIA faced supply constraints and needed to prioritize other customers.
CoreWeave identified its Chief Executive Officer, General Counsel, and Deputy General Counsel by role in September 2025 (cited as claims #4315, #4316, and #4317); what has not been disclosed is executive compensation (salary, bonus, equity vesting schedules), beneficial ownership stakes, related-party transactions, board composition, board independence metrics, or audit committee charter and independence—standard proxy disclosures for a newly public company.
The company announced committed revenue from OpenAI of $6.5 billion through May 2031 and a Meta capacity commitment of $14.2 billion through December 2031 (cited as claims #4297 and #4282); what has not been disclosed is the payment schedule—whether payments are made monthly, quarterly, annually, or upfront, and whether any portion is held in escrow—which fundamentally determines when CoreWeave actually receives cash.
CoreWeave disclosed a $1.2 billion repurchase obligation for Series C Put Shares due by March 31, 2027 (cited as claim #4276); what has not been said is the identity of option holders, the repurchase price per share, events that trigger acceleration of this obligation, or the financing source for this $1.2 billion liability.
What we aren't being told
2026-09-07CoreWeave disclosed a $25.9 billion total revenue backlog from committed contracts on 2025-05-13 (claim 4970), but OpenAI and Meta together account for approximately $25.4 billion of this sum ($11.2 billion and $14.2 billion respectively, per claims 4969 and 4282). The company has not disclosed which counterparties comprise the remaining $500 million backlog—a critical transparency gap for a company whose top two customers appear to represent 98% of committed revenue.
The company raised $17.2 billion in total debt and equity capital (claim 4968) with $1.4 billion from IPO proceeds (claim 4967), leaving approximately $15.8 billion in capital deployment unexplained across growth capex, M&A (including the $1 billion Weights & Biases acquisition per claim 4516), and debt service. Without a detailed capex deployment roadmap tied to the 1.6 gigawatt contracted power capacity target (claim 4973), investors cannot assess capital efficiency or whether capex spend aligns with revenue-generating capacity timelines.
CoreWeave committed to a $6.3 billion NVIDIA capacity purchase through 2032 (claim 4352) but disclosed no gross margin, capital efficiency, or cost-per-unit assumptions against customer contracts like OpenAI's $6.5 billion through 2031 (claim 4297) and Meta's $14.2 billion through 2031 (claim 4282). This gap prevents assessment of whether these marquee customer contracts are profitable or loss-making.
A notable variance exists in OpenAI commitment figures: $11.2 billion disclosed as "strategic deal revenue backlog" on 2025-05-13 (claim 4969) versus $6.5 billion later disclosed as "committed revenue" through 2031-05-31 on 2025-09-24 (claim 4297). The $4.7 billion discrepancy—whether reflecting contract contraction, revised terms, or definitional changes—has not been explained.
CoreWeave disclosed a $1.2 billion Series C Put Shares repurchase obligation due by 2027-03-31 (claim 4276) but omitted the investor base, original terms, exercise triggers, and fully-diluted share count impact—material information for assessing liquidity requirements and shareholder dilution over the next 16 months.
CoreWeave announced an IBM partnership for Granite compute capacity on 2025-05-13 (claim 4971) without specifying capacity volumes, revenue share, or deployment timeline, and disclosed a $1.5 billion revolving credit facility expansion (claim 5010) maturing 2028-05-02 (claim 5012) without disclosing utilization rates, borrowing costs, or pre-expansion facility size—standard metrics needed to assess liquidity and leverage.
What we aren't being told
2026-09-07The company disclosed a strategic deal revenue backlog of $11.2 billion for OpenAI on May 13, 2025 (claim 4969), but later reported only $6.5 billion in committed revenue through May 31, 2031 (claim 4297). What has not been disclosed is the source of the $4.7 billion gap—whether the original backlog included non-binding projections or contingent commitments—as well as the contract term structure, pricing per unit, and guaranteed utilization rate for each revenue tranche.
Total revenue backlog from committed contracts was disclosed as $25.9 billion on May 13, 2025 (claim 4970). Separately stated commitments from OpenAI ($11.2 billion per claim 4969) and Meta ($14.2 billion through December 2031 per claim 4282) total approximately $25.4 billion. What has not been disclosed is the identity of the third customer or source accounting for the remaining ~$500 million, and customer concentration metrics—the top two customers represent approximately 98% of disclosed backlog, yet no concentration risk analysis has been provided.
CoreWeave announced a $6.3 billion NVIDIA capacity purchase commitment through April 13, 2032 (claim 4352). What has not been disclosed is the effective per-unit cost of GPUs, the payment schedule aligned with hardware delivery, or contractual remedies if NVIDIA fails to deliver on schedule. Without this information, readers cannot assess whether customer pricing (e.g., $6.5 billion from OpenAI per claim 4297) exceeds acquisition costs and supports disclosed margin expectations.
CoreWeave disclosed 1.6 GW of contracted power capacity (claim 4973) and 420 MW of active compute power capacity added (claim 4972). What has not been disclosed is the relationship between these figures, the phased deployment timeline to achieve full 1.6 GW utilization, or the physical locations of any data center facilities and their grid interconnection details. Specifically, by what date is capacity expected to be fully operational, in which regions, and at what utilization rates are customer contracts binding?
CoreWeave disclosed a minimum debt service coverage ratio of 1.40x beginning April 1, 2027 (claim 4596) as a financial covenant. What has not been disclosed is the projected revenue, operating expenses, and EBITDA required to achieve this ratio, or the key assumptions driving cash conversion from the $25.9 billion customer backlog (claim 4970) and $6.3 billion NVIDIA supply commitment (claim 4352). Readers lack visibility into the implied quarterly cash flow trajectory, which customer revenue streams convert first, and which underperformance scenarios would trigger covenant breach.
The company disclosed a $1.2 billion repurchase obligation for Series C Put Shares by March 31, 2027 (claim 4276). What has not been disclosed is the identity of the Series C shareholders, the conditions triggering the put right, or the funding source (cash, borrowing, equity) CoreWeave has reserved to meet this obligation. Specifically, which investors hold these put shares, are repurchases conditional, and how does this priority rank relative to debt covenants and customer fulfillment obligations?
What we aren't being told
2026-09-07The company disclosed an OpenAI strategic deal revenue backlog of $11.2 billion on 2025-05-13 (claim 4969), but later disclosed OpenAI committed revenue of only $6.5 billion through 2031-05-31 on 2025-09-24 (claim 4297); what has not been explained is the $4.7 billion discrepancy between these figures and whether it represents a repricing, scope reduction, or contract termination.
The company disclosed total revenue backlog from committed contracts of $25.9 billion (claim 4970) on 2025-05-13, with named customer commitments from OpenAI ($6.5 billion) and Meta ($14.2 billion) accounting for approximately $20.7 billion; what has not been disclosed is the identity and contract terms of the unnamed customers or contracts representing the remaining $5.2 billion of committed revenue.
The company announced 1.6 gigawatts of contracted power capacity (claim 4973) and disclosed major customer commitments from Meta, OpenAI, and NVIDIA totaling over $26 billion in capacity and services through 2032; what has not been disclosed is the physical location, address, or interconnection details of the data center facilities hosting this capacity, nor the total number of operational facilities or power capacity by location.
The company disclosed a minimum debt service coverage ratio covenant of 1.40x beginning April 2027 (claim 4596) and multiple debt instruments maturing between 2027 and 2031, including $1.75 billion in 9 percent Senior Notes (claim 4658); what has not been disclosed is the aggregated annual debt service requirements (principal plus interest) for 2027-2032 or the specific operating cash flow or EBITDA targets required to achieve and maintain the 1.40x covenant.
The company disclosed a Series C Put Shares repurchase obligation of $1.2 billion due 2027-03-31 (claim 4276) but provided no context regarding which investors hold these securities, whether the put is in-the-money or out-of-the-money, or how this obligation is accounted for in relation to the debt covenant calculations.
The company disclosed a capacity purchase commitment to NVIDIA of $6.3 billion through 2032-04-13 (claim 4352) but has not clarified whether this represents capex payable by CoreWeave for GPU acquisition, the draw schedule or timing of payments, milestone-based adjustments, or how this commitment relates to the stated contracted power capacity and customer revenue backlog figures.
What we aren't being told
2026-09-07The company announced a 'Material customer contract for GPU infrastructure' (claim 4595) without naming the counterparty. Given that disclosed customer backlogs include OpenAI at $11.2 billion (claim 4969) and Meta at $14.2 billion (claim 4282), but total committed revenue is $25.9 billion (claim 4970), an unnamed material customer likely represents $3–4 billion in revenue—yet the company has not disclosed which customer this is.
CoreWeave disclosed 'Active compute power capacity added 420.0 MW' (claim 4972) and 'Contracted power capacity 1.6 GW' (claim 4973), but has not clarified whether the 420 MW is net of retirements or gross, over what time period it was added, or how much of the 1.6 GW is operational today versus under construction. Without these clarifications, readers cannot assess actual capacity trajectory or utilization.
The company obligated itself to repurchase Series C Put Shares for $1.2 billion by March 31, 2027 (claim 4276), but has not disclosed how many shares this represents, at what valuation these were priced, who holds them, or how this obligation affects the post-IPO capital structure. This is material context for understanding equity dilution and future financing needs.
CoreWeave announced a $6.3 billion NVIDIA capacity purchase commitment through April 2032 (claim 4352), but has not disclosed whether this is take-or-pay, what pricing terms apply, whether volume minimums or maximums exist, or what termination provisions are in place. The true financial commitment and downside risk therefore remain undefined.
The company stated an OpenAI 'strategic deal revenue backlog' of $11.2 billion (claim 4969) but separately reported 'OpenAI committed revenue' of $6.5 billion through May 2031 (claim 4297). The $4.7 billion difference—whether reflecting deal contingencies, staged phases, or alternative product offerings—has not been explained or reconciled in public disclosures.
Meta holds a 'capacity expansion option through 2032' in addition to its $14.2 billion commitment (claims 4282 and 4283), but the company has not quantified the option value, disclosed the exercise price or triggers, or specified the exercise window. This contingent capacity represents an unquantified asset that should be explicitly valued.
What we aren't being told
2026-09-06The company disclosed an OpenAI strategic deal revenue backlog of $11.2 billion on May 13, 2025 (claim 4969), and later disclosed OpenAI committed revenue of only $6.5 billion through May 31, 2031 (claim 4297); what has not been said is the nature and payment schedule of the $4.7 billion difference—whether it represents optional capacity, a revised estimate, or tranches with different maturity terms.
CoreWeave announced a "material customer contract for GPU infrastructure" on July 30, 2025 (claim 4595) without naming the counterparty or stating the contract value, duration, or commercial terms; what has not been said is the customer identity and financial magnitude of what was deemed material enough to disclose in a regulatory filing, yet withheld in substance.
The company stated a total revenue backlog of $25.9 billion from committed contracts on May 13, 2025 (claim 4970), but only $20.7 billion has been explicitly attributed to named customers—$14.2 billion to Meta (claim 4282) and $6.5 billion to OpenAI (claim 4297); what has not been said is the identity and contract value of the remaining $5.2 billion in committed backlog.
CoreWeave disclosed 1.6 gigawatts of "contracted power capacity" and 420 megawatts of "active compute power capacity added" on May 13, 2025 (claims 4973, 4972), but provided no timeline for when the remaining capacity will be operational or geographic detail on facility locations; what has not been said is the current state of deployment for each segment and the expected commercial operation date of the undeployed capacity.
The company disclosed a Series C Put Shares repurchase obligation of $1.2 billion due by March 31, 2027 (claim 4276), but did not state the strike price, identify the put holders, or explain the triggering conditions; what has not been said is the repurchase terms and whether these obligations accelerate upon change of control or other specified events.
CoreWeave committed to a $6.3 billion NVIDIA equipment purchase through April 13, 2032 (claim 4352) while raising $1.4 billion in net IPO proceeds on May 13, 2025 (claim 4967); what has not been said is the funding source for the remaining ~$4.9 billion of this capital commitment and whether it depends on future debt issuance, operating cash generation, or customer prepayments.
What we aren't being told
2026-09-06CoreWeave disclosed a "Material customer contract for GPU infrastructure" (claim 4595) without naming the counterparty, yet publicly identified OpenAI ($11.2B backlog, claim 4969) and Meta ($14.2B commitment, claim 4282) in its $25.9B total backlog (claim 4970). What is the identity of the third major customer whose contract is referenced but unnamed?
The company disclosed 1.6 GW of contracted power capacity (claim 4973, 2025-05-13) without specifying when this capacity will come online. Given commitments to Meta through December 2031 (claim 4282) and OpenAI through May 2031 (claim 4297), what is the deployment timeline for each tranche of the 1.6 GW facility?
CoreWeave's $14.2B Meta commitment through 2031-12-14 (claim 4282) and $6.5B OpenAI commitment through 2031-05-31 (claim 4297) contain no specification of annual payment tranches or prepayment conditions. With $2.6B (claim 4592) and $3.0B (claim 4277) delayed-draw debt facilities and a $1.2B Series C put obligation due March 2027 (claim 4276), what revenue ramp does the company model for 2026-2027 to service debt?
On 2025-08-12, CoreWeave announced a $350M share issuance to an unnamed "strategic customer" (claim 4514). Which customer received these shares and at what per-share price—standard disclosures for related-party transactions in proxy filings?
The $1.0B Weights & Biases acquisition (claim 4516, announced 2025-08-12) disclosed no purchase price allocation, earnout terms, or post-close revenue contribution. What portion of the $1.0B was allocated to goodwill versus identifiable intangibles, and what were W&B's trailing twelve-month revenues at acquisition?
What we aren't being told
2026-09-06The company disclosed a "Material customer contract for GPU infrastructure" on 2025-07-30 (claim 4595) without naming the customer. Given that CoreWeave publicly identified OpenAI ($6.5B committed revenue, claim 4297), Meta ($14.2B commitment, claim 4282), and NVIDIA ($6.3B capacity purchase, claim 4352) as customers or partners, the withholding of this material customer's identity raises the question: what prevents CoreWeave from naming this customer, and what terms make this contract material enough to disclose separately from the named relationships?
CoreWeave disclosed "OpenAI strategic deal revenue backlog" of $11.2 billion on 2025-05-13 (claim 4969), representing 43% of the total $25.9 billion backlog (claim 4970), but later disclosed "OpenAI committed revenue" of only $6.5 billion through 2031-05-31 on 2025-09-24 (claim 4297). The $4.7 billion reduction is unexplained—was the initial figure inclusive of option commitments that have since been abandoned, and if so, what is the status of those options today?
CoreWeave disclosed Meta's $14.2 billion committed capacity through 2031-12-14 (claim 4282) and referenced a "capacity expansion option through 2032" (claim 4283) on 2025-09-29, but did not quantify the option's financial value, capacity volume, or exercise terms. What is the maximum additional capacity Meta may commit to under the option, at what price per unit, and what revenue upside or downside is at stake if Meta does or does not exercise?
CoreWeave disclosed a Series C Put Shares repurchase obligation of $1.2 billion due 2027-03-31 on 2025-10-05 (claim 4276) without naming the counterparty, specifying the share class post-IPO, or disclosing the repurchase mechanics. Who holds these put shares, and under what conditions is CoreWeave contractually obligated to repurchase them?
CoreWeave disclosed Senior Notes interest payments of 9.0 percent promised by 2026-02-01 on 2025-07-27 (claim 4659), but this date is now overdue as of 2026-09-06, with the claim marked "delayed" as of 2026-09-03. Did CoreWeave make this interest payment, miss it, or negotiate a deferral, and if the payment is still outstanding, does this constitute a covenant default or acceleration trigger?
CoreWeave disclosed a $25.9 billion revenue backlog (claim 4970, 2025-05-13) and 1.6 GW of contracted power capacity (claim 4973, same date), with only 420 MW of added active compute capacity noted (claim 4972), but has not disclosed total power capacity available, utilization rates, or a timeline for acquiring the additional capacity needed to fulfill these commitments. How does CoreWeave plan to physically and financially deliver the $25.9 billion backlog given the disclosed capacity constraints, and what is the cost and timeline for the required capacity expansion?
What we aren't being told
2026-09-06The company disclosed 1.6 GW of contracted power capacity (claim 4973, 2025-05-13) and 420 MW of active compute power capacity added (claim 4972, 2025-05-13) alongside major customer commitments from OpenAI ($6.5B through 2031-05-31, claim 4297) and Meta ($14.2B through 2031-12-14, claim 4282). What has not been disclosed is the geographic location of these facilities, the data center addresses, the grid interconnection partners, and which specific sites will serve which customer workloads. A sophisticated reader pairing major capacity announcements with major customer wins would expect facility locations and interconnection details.
CoreWeave announced a $6.3B NVIDIA capacity purchase commitment through 2032-04-13 (claim 4352, 2025-09-14). What has not been disclosed is the GPU model breakdown (H100/H200/GB200), unit quantities, quarterly delivery schedule, geographic allocation across the contracted 1.6 GW capacity, and whether this NVIDIA capacity is dedicated to the OpenAI and Meta deals or represents incremental third-party capacity. Clarification would be expected given the $20.7B in combined customer commitments.
The company initially disclosed an $11.2B OpenAI strategic deal revenue backlog (claim 4969, 2025-05-13) but subsequently disclosed $6.5B in OpenAI committed revenue through 2031-05-31 (claim 4297, 2025-09-24). What has not been explained is the $4.7B discrepancy—whether this represents contingent or phase-two capacity, LOI-stage commitments, or scope reductions. Additionally, the total revenue backlog of $25.9B (claim 4970) lacks breakdown between binding contracts, letters of intent, and renewal options, and lacks specificity on why the minimum contract realization ratio is only 0.85x (claim 4597), implying $3.9B may be uncountable.
CoreWeave disclosed a $1.2B Series C Put Shares repurchase obligation due by 2027-03-31 (claim 4276, 2025-10-05). What has not been disclosed is the identity of the Series C shareholders holding these puts, the strike price or valuation methodology, conditions triggering put exercise, and the company's cash flow plan to fund this near-term $1.2B obligation given the staged availability of the $2.6B (claim 4592) and $3.0B (claim 4277) delayed draw term loan facilities. A liquidity bridge including this liability would be expected in investor materials.
The company announced termination of the Core Scientific merger agreement (claim 4166, 2025-10-30) and referenced a $270M termination fee (claim 4739, 2025-07-06). What has not been disclosed is whether CoreWeave is paying or receiving this fee, the actual legal and advisory costs incurred, whether this termination reflects due diligence concerns or integration risks that could affect execution of the OpenAI and Meta commitments, and the current status of the $1B Weights & Biases acquisition (claim 4516).
The company disclosed 1.6 GW of contracted power capacity (claim 4973) but has not identified the power purchase agreement counterparties, the power sources (utility grid, renewable, dedicated generation), or delivery terms. What has not been disclosed is which utilities or power providers guarantee supply to the OpenAI and Meta data centers, the geographic distribution of power contracts, and whether power sourcing is a constraint on capacity deployment. Specification of power counterparties and terms would be expected given the critical role of power in GPU-intensive operations.
What we aren't being told
2026-09-06The company disclosed OpenAI strategic deal revenue backlog of $11.2 billion on May 13, 2025 (claim 4969), and later OpenAI committed revenue of $6.5 billion through May 31, 2031 (claim 4297, September 24, 2025), plus Meta's $14.2 billion commitment through December 31, 2031 (claim 4282, September 29, 2025), accounting for substantially all of the company's disclosed $25.9 billion revenue backlog (claim 4970, May 13, 2025). What has not been said is the percentage revenue concentration from major customers or any concentration policies that would help assess revenue risk if either customer materially reduces capacity consumption.
The company disclosed a $6.3 billion NVIDIA capacity purchase commitment extending through April 13, 2032, cited as claim 4352 on September 14, 2025. What has not been said is CoreWeave's per-unit cost for this NVIDIA capacity, the markup or gross margin the company expects when reselling to customers, or pricing escalation terms—making it impossible to assess whether this commitment is accretive or dilutive to profitability.
The company disclosed contracted power capacity of 1.6 GW and active compute power capacity additions of 420 MW on May 13, 2025 (claims 4973 and 4972). What has not been said is the current utilization rate across these facilities, the amount of idle capacity available for new commitments, the geographic location of facilities, or facility-specific power and cooling infrastructure details—all material to understanding growth constraints and customer latency requirements.
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due by March 31, 2027, cited as claim 4276 on October 5, 2025. What has not been said is the repurchase price per share or the implied valuation, the identity of the put holders, or the original Series C per-share price—if the repurchase price significantly exceeds the original Series C terms, this signals substantial dilution to IPO investors.
The company announced a merger agreement with Core Scientific on July 7, 2025 (claim 4729) with a scheduled closing of April 7, 2026 (claim 4731, later rescheduled to October 1, 2025 per claim 4517), and announced termination on October 30, 2025 (claim 4166). What has not been said is the reason for termination, which party initiated it, whether CoreWeave was obligated to pay the disclosed $270 million termination fee to Core Scientific (claim 4739), or what strategic or financial conditions changed between July and October 2025 to make the deal no longer attractive.
What we aren't being told
2026-09-06The company disclosed $25.9 billion in total revenue backlog (claim 4970, 2025-05-13) but identified customers for only $20.7 billion—OpenAI at $6.5 billion and Meta at $14.2 billion. What are the names and terms of the customers representing the remaining $5.2 billion, and how concentrated is CoreWeave's revenue on these undisclosed counterparties relative to the disclosed top two?
CoreWeave announced $11.2 billion in OpenAI revenue backlog on 2025-05-13 (claim 4969), but later disclosed only $6.5 billion in committed OpenAI revenue through 2031-05-31 (claim 4297, 2025-09-24). What caused the $4.7 billion reduction—a contract renegotiation, competitive loss, or change in contract recognition rules—and was this loss material to CoreWeave's total backlog trajectory?
The company announced it added 420 megawatts of active capacity and holds 1.6 gigawatts of contracted power capacity (claims 4972 and 4973, both 2025-05-13), but disclosed neither the geographic locations of these facilities nor their expected operational timelines or interconnection partners. What are the specific sites, regions, and grid operators for this capacity, and when will each facility reach operational status?
CoreWeave announced a $1.0 billion acquisition of Weights & Biases (claim 4516, 2025-08-12) but did not disclose the funding source, expected integration costs, or revenue accretion targets. How was this acquisition funded—from IPO proceeds, debt issuance, or cash on hand—and what are the near-term integration expenses and expected financial contribution?
The company disclosed a minimum contract realization ratio covenant of 0.85x (claim 4597, 2025-07-30) but did not define what this metric operationally represents. Does the 0.85x ratio imply that only 85% of disclosed backlog is expected to convert to revenue, and what are the financial consequences if CoreWeave falls below this threshold?
CoreWeave announced a $6.3 billion NVIDIA capacity commitment through April 2032 (claim 4352, 2025-09-14) without clarifying the direction of the commitment. Is this CoreWeave's commitment to purchase NVIDIA hardware, or NVIDIA's commitment to purchase compute capacity from CoreWeave—a critical distinction for understanding revenue versus capital expense obligations?
What we aren't being told
2026-09-06The company disclosed a 'strategic deal revenue backlog' with OpenAI of $11.2 billion on 2025-05-13 (claim 4969), then later disclosed committed OpenAI revenue of only $6.5 billion through May 2031 on 2025-09-24 (claim 4297). The company has not explained what portion of the original $11.2 billion backlog was reclassified, restructured, or excluded from the September commitment figure.
The company disclosed total revenue backlog of $25.9 billion on 2025-05-13 (claim 4970), yet disclosed customer commitments from OpenAI ($6.5B through May 2031, claim 4297) and Meta ($14.2B through December 2031, claim 4282) totaling only $20.7 billion as of September 2025. The company has not disclosed which customers or contracts represent the remaining $5.2 billion of backlog, or whether this backlog figure was revised downward.
The company disclosed Meta's capacity expansion option extending through 2032 on 2025-09-29 (claim 4283) but has not disclosed the size, pricing, or economic terms of the option. Since Meta's base $14.2 billion commitment (claim 4282) represents a substantial portion of revenue backlog, a reader would expect the expansion option's potential value and exercise conditions to be quantified.
The company disclosed a $3.0 billion delayed draw term loan facility on 2025-10-05 (claim 4277) without stating the maturity date, commitment termination date, or drawdown requirements. Given that the $2.6 billion DDTL's commitment termination date of 2026-07-31 is now past with delayed status (claim 4593), what funding is actually available under the $3.0B facility and through when?
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due March 2027 (claim 4276) without disclosing the number of shares, the strike price per share, or which Series C investors hold these puts. Given IPO proceeds of $1.4 billion (claim 4513), the company has not explained how it plans to fund this contingent liability or whether investors have exercised or waived the puts.
The company disclosed a NVIDIA 'capacity purchase commitment' of $6.3 billion through April 2032 on 2025-09-14 (claim 4352) without clarifying whether CoreWeave is committed to purchasing capacity from NVIDIA or whether NVIDIA is committed to supplying capacity to CoreWeave. The economic substance, per-unit pricing, and relationship to customer commitments remain undisclosed.
What we aren't being told
2026-09-06The company disclosed a total revenue backlog of $25.9 billion from committed contracts on 2025-05-13, cited as claim #4970; separately, OpenAI was identified with $6.5 billion committed revenue through May 2031 (claim #4297, 2025-09-24) and Meta with $14.2 billion capacity commitment through December 2031 (claim #4282, 2025-09-29), totaling $20.7 billion from these two named customers. What has not been said is the identity and financial size of the remaining $5.2 billion in contracted backlog, which would clarify customer concentration risk beyond these two counterparties.
The company disclosed 420 megawatts of active compute power capacity added on 2025-05-13, cited as claim #4972, and 1.6 gigawatts of contracted power capacity (claim #4973, 2025-05-13). What has not been said is the time period over which the 420 MW was deployed, the commissioning status and utilization rates of the full 1.6 GW, the specific facility locations and interconnection points to the electrical grid, and whether these figures represent aggregate or incremental additions.
The company disclosed total debt and equity capital raised of $17.2 billion on 2025-05-13, cited as claim #4968, while separately reporting IPO net proceeds of $1.4 billion (claim #4967, same date). What has not been said is the detailed composition of the $17.2 billion by debt versus equity type, the timing and completion status of each funding component, and how the IPO proceeds relate to or are included within this aggregate total.
The company disclosed a $2.6 billion delayed draw term loan facility on 2025-07-30, cited as claim #4592, and subsequently announced a separate $3.0 billion delayed draw term loan facility on 2025-10-01 (claim #4277). What has not been said is the strategic distinction between these two facilities, their intended uses, the draw schedules and lender requirements, and whether they operate under overlapping or sequential commitment periods.
The company disclosed a merger agreement with Core Scientific at 0.1235 Class A shares per Core Scientific share on 2025-09-24, cited as claim #4313, with a $270 million termination fee payable to CoreWeave (claim #4739, 2025-07-06), then announced termination on 2025-10-30 (claim #4166). What has not been said is whether the $270 million termination fee was actually paid, the total costs incurred for legal and advisory services, any asset write-downs or contingent liabilities from the failed transaction, and the stated reason for termination.
The company disclosed appointments of Chief Executive Officer, General Counsel, and Deputy General Counsel on 2025-09-24, cited as claims #4315, #4316, and #4317 respectively. What has not been said is the total compensation packages for these executives, including base salary, bonus structure, equity grants and vesting schedules, prior employment history, and any related-party transactions or conflicts of interest.
What we aren't being told
2026-09-06The company disclosed a $11.2 billion OpenAI revenue backlog on May 13, 2025 (claim 4969), but disclosed only $6.5 billion in committed revenue through May 2031 on September 24, 2025 (claim 4297); what has not been said is the explanation for the $4.7 billion reduction—early revenue recognition, reclassification of contract terms, or material modification to the underlying agreement?
The company disclosed Meta's $14.2 billion capacity commitment through December 2031 (claim 4282) and OpenAI's $6.5 billion committed revenue through May 2031 (claim 4297), which together represent roughly 80% of the stated $25.9 billion total backlog (claim 4970); what has not been disclosed is CoreWeave's customer concentration percentages, renewal optionality for these two anchor contracts, or termination penalties that would apply if either customer exits?
The company disclosed "1.6 GW contracted power capacity" (claim 4973) and "420 MW active compute power capacity added" (claim 4972) on May 13, 2025; what has not been said is whether "contracted" power refers to capacity CoreWeave has contracted to purchase, contracted to deliver to customers, or owns and operates directly—nor has it disclosed total installed power capacity, current utilization rates, or the cost structure and margin sensitivity to spot power prices.
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due by March 31, 2027 (claim 4276), and separately disclosed a minimum 1.40x debt service coverage ratio effective April 1, 2027 (claim 4596); what has not been disclosed is whether the DSCR covenant includes this $1.2 billion put obligation in its definition of required debt service, which investor groups hold these puts, or what events trigger the shareholders' right to exercise them.
The company disclosed $2.6 billion and $3.0 billion delayed draw term loan facilities (claims 4592 and 4277); what has not been disclosed is the amount drawn as of the most recent disclosure date, the expected draw schedule over the two-year commitment window, and what covenant thresholds or operational constraints govern further borrowing—critical to assessing liquidity adequacy given the first facility terminates July 2026 (claim 4593).
The company disclosed a $1 billion acquisition of Weights & Biases announced August 12, 2025 (claims 4974 and 4516); what has not been disclosed is the strategic rationale for acquiring an ML operations and monitoring software platform (addressing model governance, not compute infrastructure), Weights & Biases' standalone revenue or customer overlap with CoreWeave, integration timeline, or expected cost synergies from bundling.
What we aren't being told
2026-09-05The company disclosed OpenAI as a $11.2 billion revenue backlog on 2025-05-13 (claim 4969), but later stated $6.5 billion in committed revenue through 2031-05-31 (claim 4297). What has not been disclosed is the explanation for the $4.7 billion difference—whether this represents a writedown, exclusion of contingent elements, or reclassification to another category. This material revision to an anchor metric requires explanation.
The company announced major customer commitments from Meta ($14.2 billion through 2031-12-14, claim 4282) and OpenAI ($6.5 billion through 2031-05-31, claim 4297) representing approximately 80 percent of its disclosed total revenue backlog of $25.9 billion (claim 4970), alongside 1.6 GW of contracted power capacity (claim 4973) and partnerships with IBM (claim 4971) and NVIDIA (claim 4352). What has not been disclosed is the geographic location of any data center facilities where this capacity will be deployed, the names of specific facilities being operated, or the grid interconnection and power sourcing arrangements. Given that the entire business model is dependent on physical infrastructure siting and power availability, this is a material gap that would constitute the first question on any earnings call.
The company announced a merger agreement with Core Scientific on 2025-07-06 (claim 4729) with a target closing of 2026-04-07 (claim 4731), then announced termination on 2025-10-30 (claim 4166) and disclosed payment of a $270 million termination fee (claim 4739). What has not been disclosed is the reason for termination—whether regulatory obstacles, financing constraints, or strategic reassessment—and whether additional transaction costs beyond the termination fee were incurred. Understanding this would inform investors' assessment of management's strategic judgment.
The company disclosed a $6.3 billion multi-year capacity purchase commitment to NVIDIA through 2032-04-13 (claim 4352), one of its single-largest forward purchasing obligations. What has not been disclosed is which customer accounts will consume this NVIDIA equipment, the delivery and deployment schedule, and whether the commitment is fixed or scalable with actual customer demand. This matters because a $6.3 billion forward purchase obligation creates significant operating inflexibility if customer commitments slip or are reduced.
The company announced a $1.0 billion acquisition of Weights & Biases (claim 4974 on 2025-05-13, priced at $1.0 billion on 2025-08-12 per claim 4516). What has not been disclosed are earnout or retention terms for Weights & Biases management, the expected contribution to CoreWeave revenue or profitability, and the strategic rationale for the acquisition. These are standard acquisition disclosures necessary to evaluate synergy assumptions and return on capital.
The company disclosed Series C put repurchase obligations totaling $1.2 billion with a deadline of 2027-03-31 (claim 4276), creating a significant post-IPO cash flow contingency. What has not been disclosed are the identities of investors holding these put rights, whether redemption is automatic or discretionary, what conditions could accelerate or extend the deadline, and board documentation approving these terms. This financial contingency materially affects cash flow planning in the 18-24 months post-IPO.
What we aren't being told
2026-09-05The company disclosed an OpenAI strategic deal revenue backlog of $11.2B on 2025-05-13 (claim 4969) and separately disclosed OpenAI committed revenue of $6.5B through 2031-05-31 on 2025-09-24 (claim 4297); what has not been said is how these figures relate to each other, what portion of the original $11.2B backlog extends beyond May 2031, and what changed between announcement dates to explain the divergence.
The company disclosed Meta's $14.2B cloud computing capacity commitment running through 2031-12-14 on 2025-09-29 (claim 4282) alongside a capacity expansion option through 2032 (claim 4283); what has not been said is the pricing, minimum or maximum volume, exercise conditions, and unit economics of that expansion option.
The company disclosed total revenue backlog from committed contracts of $25.9B on 2025-05-13 (claim 4970), which can be reconciled to ~$25.4B from disclosed OpenAI ($11.2B) and Meta ($14.2B) commitments (claims 4969 and 4282); what has not been said is the identity and specific amounts of the remaining customer backlog, and whether 98%+ revenue concentration in two customers represents material business risk.
The company announced 420 MW of active compute power capacity added on 2025-05-13 (claim 4972) and 1.6 GW of contracted power capacity on the same date (claim 4973); what has not been said is the geographic breakdown by region or facility, the specific data center names and locations, and the deployment timeline for the contracted (but presumably non-operational) capacity.
The company disclosed termination of the Core Scientific merger agreement on 2025-10-30 (claim 4166), which had been promised to close by 2026-04-07 (claim 4738), and stated a $270M termination fee associated with CoreWeave (claim 4739); what has not been said is whether CoreWeave paid or received this fee, and the material business reason for the termination after announcement (regulatory, financing, due diligence, or strategic).
The company disclosed a Series C Put Shares repurchase obligation of $1.2B due 2027-03-31 on 2025-10-05 (claim 4276); what has not been said is the put holder identity, share count, strike price, and the specific capital source or financing plan to meet this obligation in less than seven months as of today (2026-09-05).
What we aren't being told
2026-09-05The company disclosed a $350 million equity issuance to an unnamed 'strategic customer' in August 2025 (claim 4514) and separately disclosed a 'Material customer contract for GPU infrastructure' in July 2025 (claim 4595) without identifying either counterparty. While OpenAI and Meta are named with $6.5 billion and $14.2 billion commitments respectively (claims 4297, 4282), the remaining ~$5.2 billion of the stated $25.9 billion total backlog (claim 4970) remains attributed to unnamed customers. What has not been disclosed: which customer received the $350 million equity stake, whether this is the same 'material customer' referenced in the infrastructure contract, what percentage of total backlog these unnamed customers represent, and what business or financing rationale justified an equity stake rather than a commercial contract?
The company announced a merger with Core Scientific in July 2025 with a 0.1235 share ratio and an expected 2026-04-07 closing (claims 4731-4738), then abruptly terminated the agreement on October 30, 2025 (claim 4166), paying a $270 million termination fee to CoreWeave (claim 4739). What remains undisclosed is any explanation of the strategic rationale for the acquisition, what operational or contractual conditions led to termination, what integration costs or write-downs CoreWeave recorded between July and October 2025, or how the failed merger affects CoreWeave's capacity roadmap or customer delivery timeline. An analyst reviewing the Q3 2025 10-Q would ask: why did CoreWeave pursue this major transaction, what went wrong, and what financial impact did the termination have on the quarter?
The company announced the $1.0 billion acquisition of Weights & Biases in August 2025 (claims 4974, 4516) without disclosing W&B's revenue, profitability, customer count, or strategic fit within CoreWeave's GPU infrastructure platform. Notably, CoreWeave provided no explanation for why it deployed $1 billion to acquire an MLOps software tool during a period of aggressive GPU capex buildout and multi-year customer commitments. What has not been said: what revenue and margin does W&B contribute, what synergies justify the $1 billion valuation, and does this represent a strategic pivot toward software bundling or a talent acquisition? A comparative company analyst would ask whether W&B is being used as a loss-leader to bundle with infrastructure or represents a separate strategic business line with distinct unit economics.
The company disclosed 1.6 gigawatts of 'contracted power capacity' and 420 megawatts of 'active compute power capacity added' in May 2025 (claims 4972-4973) but has not revealed what percentage of the 1.6 GW is currently operational versus under construction, what the timeline is for full deployment, or how much additional capex is required to service disclosed customer commitments. Given customer commitments through 2031-2032 totaling ~$39 billion (claims 4297, 4282, 4296), the absence of a capacity deployment schedule and capex forecast leaves investors unable to assess whether CoreWeave is capacity-constrained or over-provisioned. What has not been disclosed: what is the current utilization rate of operational capacity, when will the remaining ~1.2 GW come online, and what is the estimated total capex required?
The company committed to a $6.3 billion NVIDIA capacity purchase obligation extending through April 13, 2032 (claim 4352) but provided no detail on annual or quarterly purchase schedules, pricing terms (fixed versus escalating), GPU product mix (H100 versus H200 versus GB200), or what happens if CoreWeave cannot deploy or monetize all allocated capacity. This obligation effectively locks CoreWeave into ~$800 million per year in GPU capex for six years, yet the company has not disclosed whether this is a minimum purchase or a target, whether there are force-majeure provisions, or what the financial consequences are for underutilization. What has not been disclosed: what is the quarterly draw schedule, are there price escalation clauses, and what recourse does NVIDIA have if CoreWeave fails to absorb capacity?
The company disclosed a $1.2 billion repurchase obligation for 'Series C Put Shares' due March 31, 2027 (claim 4276) but did not identify the holder(s), explain the repurchase conditions, or describe the funding plan given concurrent capex commitments to OpenAI, Meta, and NVIDIA. This obligation represents a material contingent liability that could trigger a liquidity crisis if CoreWeave's market valuation declines or if earnings miss projections prior to the March 2027 deadline. What has not been disclosed: who holds these put shares, what events trigger the mandatory repurchase, what is CoreWeave's planned funding source, and what protections exist if the company's market cap falls below a certain threshold?
What we aren't being told
2026-09-05The company disclosed $25.9 billion in total revenue backlog on 2025-05-13 (claim 4970) and subsequently named OpenAI at $6.5 billion (claim 4297, 2025-09-24) and Meta at $14.2 billion (claim 4282, 2025-09-29) as customers, accounting for roughly 80% of disclosed backlog. What has not been said is the identity and contract terms of the remaining ~$5.2 billion, the annual realization schedule for each customer's commitment, whether these commitments are subject to performance clawbacks or contingencies, or why customer concentration risk has not appeared in proxy disclosures.
On 2025-07-30, CoreWeave disclosed a "Material customer contract for GPU infrastructure" (claim 4595) without naming the counterparty or quantifying the value. What has not been said is whether this refers to OpenAI, Meta, or a third material customer not yet named—creating ambiguity about whether a fourth major customer exists and how many hyperscalers CoreWeave truly depends on.
The company disclosed 1.6 gigawatts of contracted power capacity (claim 4973, 2025-05-13) paired with a $25.9 billion revenue backlog (claim 4970). What has not been said is the revenue per megawatt implied by the backlog, the total capex required to deploy this capacity, assumed utilization rates, or whether customer demand exceeds the available 1.6 GW—essential metrics to assess whether the backlog is achievable or capacity-constrained.
CoreWeave acquired Weights & Biases for $1.0 billion on 2025-08-12 (claim 4516) without disclosing W&B's standalone revenue, profitability, customer contracts, or expected synergies with CoreWeave's infrastructure offerings. What has not been said is whether this acquisition was a controlling or minority stake, how it is being accounted for, or what competitive moat is created—leaving opacity on valuation and strategic rationale.
The company disclosed a $1.2 billion repurchase obligation on Series C Put Shares due by 2027-03-31 (claim 4276, 2025-10-05). What has not been said is who holds these Puts, how many shares are affected, what fraction of post-IPO dilution this represents, whether the Put has been triggered, or the funding source for repurchase—critical context for assessing cap-table risk and founder alignment.
CoreWeave announced a $6.3 billion NVIDIA capacity purchase commitment through 2032-04-13 (claim 4352, 2025-09-14) without specifying payment schedules, capex timing, or whether the commitment is contingent on customer contracts. What has not been said is the working capital impact, termination rights if demand falls short, what fraction of the $25.9 billion backlog supports this hardware spend, or how CoreWeave would manage stranded assets.
What we aren't being told
2026-09-05The company disclosed an OpenAI strategic deal revenue backlog of $11.2 billion on May 13, 2025 (claim 4969), then disclosed OpenAI committed revenue of $6.5 billion through May 31, 2031 on September 24, 2025 (claim 4297). What has not been said is whether these represent the same contract, separate agreements, or different tranches—or what accounts for the $4.7 billion variance.
The company disclosed contracted power capacity of 1.6 GW as of May 13, 2025 (claim 4973) and 420 MW of actively added compute capacity (claim 4972). What has not been said is which data centers these capacities are located in, their physical addresses, their grid interconnection points, or when the capacity came online.
The Core Scientific merger was announced on July 6, 2025 (claim 4729) with a $270 million termination fee (claim 4739), then terminated on October 30, 2025 (claim 4166). What has not been said is the reason for termination or the circumstances that triggered the $270 million fee.
Three customers are separately disclosed with cumulative commitments of approximately $27 billion—OpenAI $6.5 billion through May 31, 2031 (claim 4297), Meta $14.2 billion through December 14, 2031 (claim 4282), and NVIDIA $6.3 billion through April 13, 2032 (claim 4352)—against a stated total backlog of $25.9 billion (claim 4970). What has not been said is how these three customers are treated in the backlog calculation or whether material unnamed customers account for the remainder.
Capital raised totaled $17.2 billion (claim 4968) with IPO proceeds of $1.4 billion (claim 4967), leaving $15.8 billion in unspecified sources. What has not been said is whether this capital is equity or debt, the terms of the $1.5 billion revolving credit facility with no stated maturity (claim 5010), and the company's leverage and debt service position.
The Weights & Biases acquisition was announced for $1 billion on May 13, 2025 (claim 4974) and confirmed on August 12, 2025 (claim 4516). What has not been said is whether the acquisition has closed, what regulatory approvals were required, and what integration progress has been achieved.
What we aren't being told
2026-09-05The company disclosed total revenue backlog of $25.9 billion USD and a separate OpenAI strategic deal revenue backlog of $11.2 billion USD on 2025-05-13 (claims 4970, 4969), but later disclosed OpenAI committed revenue of only $6.5 billion USD through 2031-05-31 in its S-4 filing (claim 4297 on 2025-09-24); the $4.7 billion gap between the two OpenAI figures and whether the difference represents other customer commitments, contingent revenue, or lower-quality backlog has not been explained.
The company stated Meta's $14.2 billion cloud computing capacity commitment and OpenAI's $6.5 billion committed revenue (claims 4282 and 4297, disclosed 2025-09-24 and 2025-09-29), representing approximately 80% of the $25.9 billion total backlog disclosed on 2025-05-13 (claim 4970), yet has not disclosed customer concentration risk factors, termination provisions, renegotiation clauses, volume minimums, or under what conditions either major customer could reduce commitments.
The company announced contracted power capacity of 1.6 GW and active compute capacity additions of 420 MW on 2025-05-13 (claims 4973, 4972) but has not disclosed the geographic locations of any facilities, interconnection points, transmission constraints, or the deployment timeline for the remaining 1.18 GW, which would be necessary to assess feasibility of realizing the $25.9 billion revenue backlog.
The company referenced a "Material customer contract for GPU infrastructure" on 2025-07-30 (claim 4595) without identifying the customer, stating contract value, duration, or key terms; this unnamed contract remains materially undisclosed despite appearing between the May backlog announcement and later September customer announcements, creating ambiguity about whether this is a fourth major customer or cannibalized by Meta/OpenAI disclosures.
The company disclosed a Series C Put Shares repurchase obligation of $1.2 billion USD due 2027-03-31 (claim 4276 on 2025-10-05), equivalent to 86% of IPO proceeds, yet has not disclosed the holders, trigger conditions for repurchase, whether the obligation is senior to existing debt facilities, or how this liability will be funded alongside facility deployment and customer infrastructure buildout.
What we aren't being told
2026-09-05CoreWeave disclosed $25.9 billion in total revenue backlog (claim 4970), yet identified customers—OpenAI at $6.5 billion committed through 2031 (claim 4297) and Meta at $14.2 billion through 2031 (claim 4282)—represent approximately 83% of that total; what has not been disclosed is the identity, contract terms, or revenue concentration of the remaining ~$4.2 billion of backlog, and whether any single unnamed customer represents a material portion of capacity or cash flow.
The company announced a merger with Core Scientific on 2025-07-06 with detailed consideration (0.1235 shares per share, $270 million termination fee to CoreWeave per claim 4739), yet terminated that agreement on 2025-10-30 (claim 4166) without public disclosure of the reason, whether conditions failed, financing fell through, or regulatory obstacles emerged, leaving uncertainty about capital deployment strategy and the fate of the stated integration.
A $1.2 billion Series C Put Shares repurchase obligation matures on 2027-03-31 (claim 4276)—approximately seven months from today—yet the company has not disclosed the source of funds for this repurchase, reliance on operational cash flow versus debt refinancing, or impact on liquidity given $1.4 billion IPO proceeds already allocated to the $1 billion Weights & Biases acquisition (claim 4516) and ongoing capex commitments.
CoreWeave disclosed 1.6 gigawatts of contracted power capacity (claim 4973) and $6.3 billion NVIDIA purchase commitments through 2032 (claim 4352), yet provided no physical locations, commissioning timelines, or deployment schedules for these facilities, leaving analysts unable to assess whether capacity will be delivered before customer commitments mature or whether bottlenecks in siting or power procurement exist.
The acquisition of Weights & Biases for $1 billion was announced on 2025-08-12 (claim 4516) with no disclosure of strategic rationale, expected revenue contribution, integration milestones, or why a model-tracking and MLOps platform is material to a GPU infrastructure provider, creating ambiguity about core versus diversification strategy.
The company raised $1.75 billion in 9% Senior Notes due 2031 (claim 4697) and disclosed a 1.40x minimum debt service coverage ratio requirement beginning April 2027 (claim 4596), yet provided no current operating cash flow figures, actual interest expense, or near-term compliance trajectory, making it impossible for investors to assess debt servicing capacity against the stated covenant without proprietary models.
What we aren't being told
2026-09-05CoreWeave disclosed a $25.9 billion revenue backlog (claim 4970) but separately revealed that OpenAI represents $11.2 billion (claim 4969) and Meta represents $14.2 billion (claim 4282) of that backlog—together ~98% of the total. The company has not disclosed what percentage of total revenue or customer concentration is represented by these two customers, nor whether covenant agreements with lenders include customer concentration limits or whether default by either customer would trigger covenant breaches. CoreWeave disclosed minimum debt service coverage of 1.40x beginning April 2027 (claim 4596) and minimum contract realization of 0.85x (claim 4597), but has not disclosed what the current actual ratios are, why covenant testing begins only in April 2027, or how close the company currently sits to these minimums—a first-year analyst would immediately ask for trailing covenant ratios on the next earnings call. The company disclosed a DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593 from a July 30, 2025 filing), which has already passed; CoreWeave has not disclosed whether this facility was renewed, refinanced, or allowed to expire, and if expired, what replaced it. CoreWeave raised $1.4 billion in IPO net proceeds (claims 4967, 4513) closed in November 2025 but has disclosed no capital allocation strategy—given the company faces a $1.2 billion Series C repurchase obligation due March 31, 2027 (claim 4276), an analyst would ask whether IPO proceeds are reserved for this obligation or deployed to growth and CapEx. The Core Scientific merger was terminated on October 30, 2025 (claim 4166), far earlier than the April 7, 2026 closing deadline (claims 4731, 4738), but CoreWeave has not explained the termination reason, whether the stated $270 million termination fee was paid to CoreWeave (claim 4739), or what integration costs were incurred and written off. CoreWeave announced the acquisition of Weights & Biases for $1 billion (claim 4516) but has not disclosed W&B's current revenue, EBITDA, or the strategic rationale for a GPU infrastructure provider acquiring an ML platform company—including what synergies or revenue cross-sell opportunities justify the price and how it affects capital allocation.
What we aren't being told
2026-09-05The company disclosed an OpenAI 'strategic deal revenue backlog' of $11.2 billion (claim #4969) in May 2025, but later specified only $6.5 billion in 'committed revenue' from OpenAI through 2031-05-31 (claim #4297). What has not been said is what constitutes the $4.7 billion difference—whether it represents optional capacity, conditional revenue tied to unmet milestones, or a subsequent restructuring of the original deal.
CoreWeave disclosed 1.6 gigawatts of contracted power capacity (claim #4973) and 420 megawatts of active compute power added (claim #4972), yet has provided zero geographic specificity about facility locations, host countries, or physical interconnection details. For GPU infrastructure sold to latency-sensitive AI customers like OpenAI and Meta, the absence of a disclosed facility list, network topology, or data center addresses is a material gap—these details are precisely what a customer due diligence team would demand before committing billions to a new infrastructure provider.
The company announced that Meta holds a 'capacity expansion option through 2032' (claim #4283) alongside a $14.2 billion committed capacity through 2031-12-14 (claim #4282), but has disclosed no terms for this option: not the expansion quantity, not the pricing mechanism, not whether it represents incremental capex or is already factored into the base commitment. What also remains unclear is the capital expenditure burden on CoreWeave if Meta exercises this option—is the $14.2 billion commitment sufficient to fund both the base and expansion capacity, or will additional capex be required?
OpenAI and Meta represent $20.7 billion of CoreWeave's stated $25.9 billion total revenue backlog (claims #4297, #4282, #4970)—or approximately 80 percent concentration in two customers disclosed by name. The company has not revealed whether the remaining $5.2 billion consists of named customers or unnamed counterparties, nor has it disclosed the contract terms that bind these commitments: whether multi-year minimums exist, what cancellation notice periods apply, or what service-level penalties might reduce realized revenue if capacity falls short.
Claim #4593 specifies a delayed draw term loan facility commitment termination date of 2026-07-31, but the current date is 2026-09-05—more than one month past the stated deadline. CoreWeave has not disclosed whether the $3.0 billion DDTL facility (claim #4277) was drawn in full, terminated, extended, replaced, or waived by lenders, leaving investors uncertain whether this financing source remains available or has expired.
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due 2027-03-31 (claim #4276) but has not identified the Series C holders (related parties, financial sponsors, or strategic investors), disclosed any conditions that might delay or modify the obligation, or revealed the funding plan to satisfy this liability given the competing claims on IPO proceeds and operating cash flow.
What we aren't being told
2026-09-05The company disclosed an 'OpenAI strategic deal revenue backlog' of $11.2 billion on May 13, 2025 (claim 4969), then cited 'OpenAI committed revenue' of $6.5 billion through May 31, 2031 on September 24, 2025 (claim 4297)—yet never reconciled these figures. Are they separate contracts, tranches of the same deal, or a revision downward from the May estimate? The July 30, 2025 announcement of a 'Material customer contract for GPU infrastructure' (claim 4595) provided no customer name or dollar amount, creating a striking asymmetry: CoreWeave named OpenAI, Meta, and IBM publicly, but withheld this material counterparty entirely. On August 12, 2025, CoreWeave disclosed a '$350 million strategic customer share issuance' (claim 4514) without naming the recipient—a material equity transaction that should identify the customer under standard disclosure norms. Meta's '$14.2 billion cloud computing capacity commitment' through 2031 (claim 4282) was paired with mention of a 'capacity expansion option through 2032' (claim 4283), but the expansion was never quantified: how much additional capacity can Meta exercise, and on what terms? CoreWeave expanded its revolving credit facility by $1.5 billion and letters of credit facility by $350 million on May 5, 2025 (claims 5010, 5011) yet disclosed no maturity dates for either facility—leaving the liquidity runway opaque. Finally, the company cited a '$1.2 billion Series C Put Shares repurchase obligation' due by March 31, 2027 (claim 4276) without identifying the shareholder holding these puts or the valuation basis for the obligation, leaving $1.2 billion of future dilution unquantified.
What we aren't being told
2026-09-05The company disclosed $11.2 billion in revenue backlog from OpenAI (claim 4969, May 2025) and separately $6.5 billion in committed revenue through May 31, 2031 (claim 4297, Sept 2025), yet has not disclosed the revenue recognition timeline, payment structure (upfront vs. consumption-based), or what explains the apparent overlap and maturity of these figures—critical for readers assessing whether the backlog converts to near-term P&L or extends beyond 2031.
CorpWeave disclosed Meta's $14.2 billion capacity commitment through December 2031 (claim 4282) with an expansion option through 2032 (claim 4283), both Sept 2025, but has not disclosed the payment schedule, what capacity is committed vs. optional under the expansion clause, Meta's termination or clawback rights, or the timing by which each tranche of the $14.2 billion is recognized as revenue—material for cash flow forecasting given this represents roughly 55% of the disclosed $25.9 billion total backlog.
The company disclosed 1.6 GW of contracted power capacity and 420 MW of active compute added (claims 4973, 4972, May 2025) but has not disclosed the current utilization rate of the 1.6 GW, the timeline and capital expenditure required to deploy the remaining capacity, or the revenue per MW—necessary for readers to assess whether the company's $25.9 billion backlog is operationally feasible and whether capex will exhaust the $1.4 billion IPO proceeds and debt facilities.
CorpWeave announced a merger with Core Scientific (claim 4729, July 2025) with a promised close of April 7, 2026 (claim 4731, later delayed to September 2026), then terminated the agreement on October 30, 2025 (claim 4166), with a $270 million termination fee (claim 4739)—yet has not disclosed the reason for termination (regulatory, financing, due diligence), what Core Scientific dispute triggered the fee, or what strategic rationale for the acquisition was abandoned.
The company disclosed partial financial covenants on its debt facilities: a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim 4596), but has not disclosed the full covenant package for the Senior Notes (claims 4697, 4658) and delayed draw term loans (claims 4592, 4277)—specifically collateral, leverage caps, customer concentration limits, and acceleration triggers—despite customer revenue concentration in OpenAI (43%) and Meta (55%) of the $25.9 billion backlog.
The company disclosed a $1.0 billion acquisition of Weights & Biases (claim 4516, Aug 2025) but has not disclosed the deal structure (cash vs. stock, earnouts), Weights & Biases' standalone revenue and growth rate, how the business will be integrated into CoreWeave's infrastructure platform, or what strategic synergies justify the $1 billion price relative to GPUs-as-a-service core business.
What we aren't being told
2026-09-05The company disclosed a $11.2 billion OpenAI revenue backlog on May 13, 2025 (claim 4969), then separately stated $6.5 billion in OpenAI committed revenue through May 31, 2031 (claim 4297); the $4.7 billion variance and its underlying causes—rescope, deferral, or conditions—remain unexplained. Total committed revenue backlog of $25.9 billion was announced on May 13, 2025 (claim 4970), with OpenAI comprising $11.2 billion and Meta $14.2 billion (claims 4969, 4282), leaving less than $1 billion attributed to all other customers and raising material customer concentration risk that is not addressed. On May 13, 2025, the company announced 420 MW of active compute power capacity added and 1.6 GW of contracted capacity (claims 4972–4973), but without disclosing geographic locations, facility names, utilization rates, or operational readiness status of which capacity is generating revenue versus committed but not yet installed. A $6.3 billion NVIDIA capacity purchase commitment through April 2032 was announced on September 14, 2025 (claim 4352), but with no specification of what products or services are covered, whether terms are binding or conditional, or how this commitment interacts with fulfilling OpenAI and Meta customer obligations. The company announced a Core Scientific merger at an 0.1235 share exchange ratio on July 6, 2025 (claim 4731) and terminated it on October 30, 2025 (claim 4166); the termination fee, stated cause, and any financial impacts or stranded costs remain undisclosed. A new Chief Executive Officer, General Counsel, and Deputy General Counsel were identified in late September 2025 (claims 4332, 4315–4317), but no compensation structure, equity arrangements, severance provisions, or related-party transaction disclosures have been made.
What we aren't being told
2026-09-05The company disclosed OpenAI strategic deal revenue backlog of $11.2 billion on 2025-05-13 (claim 4969) but subsequently announced OpenAI committed revenue of $6.5 billion through May 31, 2031 on 2025-09-24 (claim 4297). What has not been explained is whether these figures describe the same contract, what accounts for the $4.7 billion difference, or whether the May backlog projection has been revised downward.
The company stated total revenue backlog from committed contracts of $25.9 billion on 2025-05-13 (claim 4970) and later disclosed specific customer commitments: OpenAI $6.5 billion through May 31, 2031 (claim 4297), Meta $14.2 billion through December 14, 2031 (claim 4282), and NVIDIA $6.3 billion through April 13, 2032 (claim 4352). These three customers alone total approximately $26.9 billion, which exceeds the stated total backlog. What has not been disclosed is whether these three customers represent substantially all material revenue, whether the backlog figure has been restated, or which other named customers comprise the remainder.
The company disclosed 1.6 gigawatts of contracted power capacity (claim 4973) and 420 megawatts of active compute power added (claim 4972) without specifying the geographic locations of these data centers, the names of specific facilities, or how capacity is allocated across OpenAI, Meta, NVIDIA, and other customers. A first-year analyst would ask: At which data centers is this capacity located, and which facilities serve which customers?
The company disclosed a $1.2 billion Series C Put Shares repurchase obligation due by March 31, 2027 (claim 4276) without specifying the repurchase price, the identity and relationship of the holders, the likelihood or triggers of exercise, or whether this represents related-party obligations to founders or early investors. A first-year analyst would ask: What is the repurchase price, who holds these shares, and under what circumstances must CoreWeave repurchase them?
The company disclosed two delayed draw term loan facilities totaling $5.6 billion—$2.6 billion (claim 4592) and $3.0 billion (claim 4277)—without specifying when these facilities are expected to be drawn, for what capital expenditure or operational purposes, or what business milestones or events trigger the draws. A first-year analyst would ask: What is the timing and business purpose of drawing down these $5.6 billion facilities?
The company announced termination of its Core Scientific merger agreement on 2025-10-30 (claim 4166), having earlier disclosed a $270 million termination fee payable to CoreWeave under certain circumstances (claim 4739), but did not disclose whether the termination was initiated by CoreWeave or Core Scientific, the stated reasons for termination, or whether any termination fee was actually paid. A first-year analyst would ask: Who terminated the merger, why, and was the termination fee paid?
What we aren't being told
2026-09-05The company disclosed $11.2 billion in OpenAI strategic deal revenue backlog on May 13, 2025 (claim 4969); what has not been explained is the reduction to $6.5 billion of committed OpenAI revenue through May 31, 2031 by September 24, 2025 (claim 4297). What accounts for the $4.7 billion reduction—contract repricing, scope reduction, or deferral?
The company disclosed total revenue backlog of $25.9 billion from committed contracts on May 13, 2025 (claim 4970), with Meta contributing $14.2 billion through December 31, 2031 (claim 4282) and OpenAI $6.5 billion through May 31, 2031 (claim 4297); what has not been said is the identity and contract terms of the customers behind the remaining $5.2 billion backlog segment.
The company cited 420 megawatts of active compute capacity added and 1.6 gigawatts of contracted power capacity on May 13, 2025 (claims 4972, 4973), later announcing $14.2 billion (Meta) and $6.5 billion (OpenAI) commitments through 2031; what has not been disclosed is the megawatt or gigawatt equivalent required by these contracts, or the capital expenditure plan and timeline to deliver the committed capacity.
The company announced a merger agreement with Core Scientific on July 6, 2025 (claim 4729), promised for closing by April 7, 2026 (claim 4731), but terminated the agreement by October 30, 2025 (claim 4166). A July 30 debt filing references a $270 million termination fee payable to CoreWeave (claim 4739); what has not been said is whether this fee was collected, what caused the termination, or the accounting treatment of related costs and contingencies.
A July 30, 2025 debt filing disclosed a 'material customer contract for GPU infrastructure' without naming the counterparty (claim 4595); what remains undisclosed is whether this refers to Meta or OpenAI identified in subsequent announcements, or whether it represents a third material customer commitment.
The company announced a $1 billion acquisition of Weights & Biases on August 12, 2025 (claim 4516); what has not been explained is the strategic rationale for acquiring a separate ML platform, expected synergies, or how this acquisition aligns with its GPU infrastructure business model.
What we aren't being told
2026-09-05The company disclosed an OpenAI 'strategic deal revenue backlog' of $11.2 billion on 2025-05-13 (claim 4969), then announced 'OpenAI committed revenue' of $6.5 billion through 2031-05-31 on 2025-09-24 (claim 4297). What has not been explained is why these figures differ by $4.7 billion—is the larger figure gross backlog while the smaller represents net committed amounts, or do they reflect different time periods or contract definitions? Similarly, the $25.9 billion total revenue backlog (claim 4970) lacks a customer breakdown showing what portion derives from OpenAI versus Meta's separate $14.2 billion commitment (claim 4282) and any remaining customers.
The company disclosed 1.6 GW of 'contracted power capacity' and 420 MW of 'active compute power capacity added' on 2025-05-13 (claims 4973, 4972), but what has not been stated is whether these figures represent nameplate, average, or peak capacity, and what the actual utilization rate is across its footprint. Additionally, while CoreWeave committed to a $6.3 billion NVIDIA capacity purchase through 2032 (claim 4352), the company did not disclose the implied GPU or compute unit count—a first-year analyst would ask how many H100s or equivalent compute this $6.3 billion represents.
On 2025-07-30, CoreWeave disclosed a $2.6 billion delayed draw term loan facility (claim 4592), and then on 2025-10-01 announced a $3.0 billion facility (claim 4277). What remains unclear is whether these are separate or overlapping facilities, what the consolidated debt outstanding is across all tranches (revolving credit, term loans, and notes), and what the annual repayment schedule looks like—particularly given the $1.2 billion Series C Put share repurchase obligation due 2027-03-31 (claim 4276).
The company disclosed a 'material customer contract for GPU infrastructure' on 2025-07-30 (claim 4595) but did not name the counterparty. Given that OpenAI and Meta deals are separately itemized, what has not been disclosed is whether this material customer is a third major hyperscaler, what revenue percentage it represents, and what the contract terms and duration are.
Meta's $14.2 billion cloud computing capacity commitment through 2031-12-14 (claim 4282) and OpenAI's $6.5 billion commitment through 2031-05-31 (claim 4297) lack geographic specificity—what has not been stated is where these facilities are or will be located (U.S. regions, international data centers), what the service-level agreements require in terms of uptime or performance, and whether capacity is exclusive or shared across customers.
On 2025-07-30, CoreWeave disclosed a minimum contract realization ratio covenant of 0.85x (claim 4597), but the company did not define what 'contract realization' means—whether it is capacity utilization, revenue realization as a percentage of committed contracts, or something else—nor did it disclose the actual ratio as of the most recent quarter, making it impossible for investors to assess covenant headroom or operational risk.
What we aren't being told
2026-09-05CoreWeave disclosed an "OpenAI strategic deal revenue backlog" of $11.2 billion on 2025-05-13 (claim 4969), but later announced "OpenAI committed revenue" of only $6.5 billion through May 2031 on 2025-09-24 (claim 4297); what has not been explained is the 41% reduction—whether the contract scope changed, these represent different customer commitments, or CoreWeave experienced material loss of OpenAI business. The company disclosed "total revenue backlog from committed contracts" of $25.9 billion on 2025-05-13 (claim 4970), with OpenAI at $11.2 billion (claim 4969) and Meta at $14.2 billion (claim 4282), yet if the later $6.5 billion OpenAI figure supersedes the earlier backlog, what has not been disclosed is which major customers account for the remaining ~$5.2 billion of stated backlog. CoreWeave stated 1.6 GW of "contracted power capacity" (claim 4973) and 420 MW of "active compute power capacity added" (claim 4972) as of May 2025, but has not disclosed the geographic locations of these data centers, their current operational status, power grid interconnection specifics, or delivery timelines for the remaining ~1.18 GW. The company disclosed a "$1.2 billion Series C Put Shares repurchase obligation" maturing March 2027 (claim 4276), but what has not been disclosed is which investor cohorts hold these securities, the exercise conditions, or the valuation methodology determining the repurchase obligation. CoreWeave announced a "$1 billion Weights and Biases acquisition" (claim 4516) on 2025-08-12, but has not publicly disclosed whether consideration was paid in cash, equity, or mixed form, nor the acquisition's completion status. The company disclosed a merger agreement with Core Scientific at 0.1235 share exchange ratio (claims 4314, 4331) from July through September 2025, followed by termination on 2025-10-30 (claim 4166), but has not disclosed why—whether due to financing hurdles, regulatory obstacles, or strategic recalibration.
What we aren't being told
2026-09-05The company disclosed $11.2 billion in OpenAI strategic deal revenue backlog on May 13 (claim 4969) but subsequently announced $6.5 billion in OpenAI committed revenue through May 31, 2031 on September 24 (claim 4297). A sophisticated investor needs to understand why these figures for the same customer differ by $4.7 billion and what timing or recognition explains the discrepancy. What accounts for the $4.7 billion difference between the May OpenAI strategic deal revenue backlog and the September OpenAI committed revenue figures?
On July 30, CoreWeave disclosed a "material customer contract for GPU infrastructure" (claim 4595) without identifying the customer by name. Given that the company had already announced OpenAI and NVIDIA partnerships by that date, an analyst would expect disclosure of whether this material contract represents one of those relationships or a previously unannounced major customer. Which customer is referenced in the material customer contract disclosed on July 30, and what are its financial and capacity terms?
The company announced a partnership with IBM for Granite compute capacity on May 13 (claim 4971) with no quantitative disclosure of revenue commitment, capacity, or timeline. In contrast, the same announcement quantified OpenAI ($6.5 billion), Meta ($14.2 billion), and NVIDIA ($6.3 billion) partnerships with specific financial figures. What is the committed financial value, compute capacity amount, and timeline for the IBM Granite partnership?
CoreWeave stated it had 1.6 GW of contracted power capacity and 420 MW of active compute power capacity as of May 13 (claims 4973 and 4972), but provided no facility-level or geographic breakdown. For infrastructure companies disclosing material capacity commitments, investors expect to know which specific data centers and regions contain the capacity. In which specific data centers and geographic regions are the 1.6 GW contracted power capacity and 420 MW active compute power capacity located?
On October 5, the company disclosed a $1.2 billion Series C put share repurchase obligation maturing on March 31, 2027 (claim 4276), without identifying the holder or exercise conditions of these puts. This material contingent liability requires counterparty and term identification for proper risk analysis. Who holds the Series C put shares underlying the $1.2 billion repurchase obligation, and what are the exercise conditions and any acceleration triggers?
What we aren't being told
2026-09-05CoreWeave disclosed $25.9 billion in total revenue backlog (claim 4970), with OpenAI representing $11.2 billion (claim 4969) and Meta $14.2 billion (claim 4282), yet also disclosed a separately-identified 'material customer contract for GPU infrastructure' (claim 4595) without naming the counterparty—leaving ambiguous whether this unnamed contract constitutes a third major customer, sits within one of the disclosed backlogs, or represents material revenue concentration not otherwise attributed.
The company disclosed contracted power capacity of 1.6 GW (claim 4973) and active compute capacity additions of 420 MW (claim 4972), but provided no utilization rate, geographic allocation, or baseline reference for whether the 420 MW addition represents a significant fraction of total operational capacity—creating opacity around whether capacity constraints might limit the company's ability to fulfill $25.9 billion in backlog commitments spanning five-plus years.
CoreWeave carries a $1.2 billion Series C Put Shares repurchase obligation due March 31, 2027 (claim 4276), while 98% of disclosed revenue backlog (OpenAI and Meta) does not mature until 2031–2032, yet no disclosure addresses near-term revenue run rate, interim cash generation, or how the company will service this near-term equity repurchase from backlog that remains years away from cash realization.
A $270 million termination fee for the Core Scientific merger (claim 4739) was disclosed, but the company did not state whether it has been paid, when payment is due, or who is obligated to pay it—material information for assessing cash position and contingent liabilities following the announced termination on October 30, 2025 (claim 4166).
The $350 million 'strategic customer share issuance' (claim 4514) lacks disclosure of the customer's identity, the number of shares issued, the price per share, or the implied post-issuance ownership stake—leaving readers unable to assess dilution or calculate the company's effective valuation at the time of that capital raise.
The $3.0 billion Delayed Draw Term Loan facility (claim 4277) specifies a commitment termination date of July 31, 2026 (claim 4593), but a maturity date of August 21, 2030 (claim 4594)—meaning the company has roughly ten months from today to draw the full commitment or forfeit it, yet no draw schedule, interim milestones, or completion probability were disclosed.
What we aren't being told
2026-09-05The company disclosed a $11.2 billion OpenAI strategic deal revenue backlog on May 13, 2025 (claim #4969), but later announced committed revenue of $6.5 billion through May 31, 2031 (claim #4297, Sept 24, 2025). The $4.7 billion variance is unexplained—whether the difference reflects deferred revenue, cancelled contracts, reclassification, or contingent arrangements remains undisclosed. No payment schedule, drawdown triggers, or termination provisions are specified for either figure.
The company announced a $14.2 billion Meta cloud computing capacity commitment through December 14, 2031 (claim #4282), paired with a separate "capacity expansion option through 2032" (claim #4283). The distinction between a binding commitment and an expansion option is undefined; no disclosure covers payment terms, drawdown schedule, capacity utilization requirements, what happens if Meta fails to utilize capacity, or whether the commitment includes a minimum take clause.
The company committed $6.3 billion to NVIDIA through April 13, 2032 (claim #4352), but disclosed zero unit economics: no GPU count or model specifications (H100, H200, or GB200), no price-per-unit, no monthly or quarterly delivery schedule, and no provisions for supply failure or force majeure. For a commitment representing 37% of disclosed capital raised ($17.2 billion per claim #4968), unit-level transparency is material to assessing execution risk.
The company states "Active compute power capacity added 420.0 MW" and "Contracted power capacity 1.6 GW" as of May 13, 2025 (claims #4972 and #4973), but the definitions are ambiguous—are the 1.6 GW installed, under purchase order, or merely under contract? When will the 420 MW phase reach full operational status? No facility locations, interconnection details, or timing for deployment are provided.
The company announced a "Material customer contract for GPU infrastructure" on July 30, 2025 (claim #4595), but disclosed no contract value, duration, capacity specifications, or counterparty identity. It remains unclear whether this is separate from the OpenAI and Meta arrangements already announced, or a restatement of one of them; if separate, the value and terms are entirely absent.
The company discloses a $1.2 billion Series C Put Shares repurchase obligation due March 31, 2027 (claim #4276), yet provides no detail on who holds the put, what events trigger repurchase, or how the company plans to fund this liability with only 15 months' runway. In the context of delayed interest payments on senior debt (claim #4659, flagged DELAYED for February 2026 payment), the funding and priority of this obligation is a material gap.
What we aren't being told
2026-09-02The company disclosed Meta's $21 billion payment commitment through 2032-12-20 (claim 2124) but has not disclosed what portion of the $104 billion revenue backlog (claims 1493, 1302) or quarterly revenue of $2.6 billion (claim 1492) is attributable to Meta or other named customers. With such a concentrated backlog-to-revenue ratio (40-quarter conversion at current burn), customer concentration risk is material and typically requires top-five customer breakdowns or at minimum affirmation that no single customer exceeds a threshold.
The company stated debt service coverage ratio covenants of 1.15x (claim 2141) and 1.35x (claim 1324) but has not disclosed trailing twelve-month actual debt service (principal plus interest) or which covenant is currently binding. With $30 billion in long-term debt (claim 1525) and Q2 adjusted EBITDA of $1.5 billion (claim 1669), an analyst would require TTM debt service figures and forward covenant headroom to assess financial flexibility and refinancing risk.
The company announced $104 billion in revenue backlog (claims 1493, 1302) against $2.6 billion in Q2 2026 revenue (claim 1492), implying a 40-quarter conversion, yet has not disclosed the expected revenue recognition schedule by year, customer payment terms (milestone-based versus time-based), or specific revenue guidance for 2027–2028. The Meta commitment extends to 2032 (claim 2124) without disclosure of expected cash draw-down timing across those years.
The company announced a 360 megawatt Indonesia Greater Jakarta facility due by 2028-12-31 (claim 155) and a 400 megawatt Polaris Forge 1 facility (claim 370) without disclosing physical addresses, power provider agreements, grid interconnection status, or permitting milestones. Given $35 billion in guided 2026 capex (claim 369) and $9.4 billion spent in Q2 (claim 1524), investors typically expect specificity on facility locations and critical-path dependencies.
The company cited interest rates and undrawn fees on the $8.5 billion delayed draw term loan (claim 1323) and the $3.1 billion DDTL 5.0 facility (claim 1323) as disclosed items, yet the actual rates, fee structures, and all-in cost of undrawn capital are not specified. With $30 billion in debt (claim 1525) and $35 billion annual capex guidance (claim 369), the true financing cost is material to cash flow modeling and is absent from public filings.
whats_stale
What we haven't been told
2026-10-19The ledger on file ends with disclosures dated May 2025, so these observations reflect silence within that record rather than a full review of later filings. Nearly every claim sits at 'stated', and no claim currently carries an unresolved 'delayed' or 'not_yet_verifiable' flag. The one claim that did, the notes closing date in claim 11919, moved through 'delayed' and 'not_yet_verifiable' before settling at 'verified'. That matches the 27 May 2025 closing recorded in claims 29421 and 11917, so it reads as a ledger artifact rather than a walk-back. The more meaningful gaps are quieter.
The OpenAI contract appears at two different values with no reconciling statement. On 10 March 2025 it was described as an $11.9 billion infrastructure contract (claim 19820). By 13 May 2025 the company was citing $11.2 billion of OpenAI strategic-deal revenue backlog (claim 4969). Both remain at 'stated'. Nothing in the record explains the $700 million difference: whether it reflects revenue already recognised, a change in contract scope, or simply a different measure.
The springing maturity attached to the revolving credit facility was last mentioned on 5 May 2025 (claim 11926). It names 30 December 2026 as a contingent maturity date, sitting alongside the headline extension to 2028 (claim 5012). That date is now about ten weeks away and the claim remains at 'stated'. The record contains no later disclosure on whether the triggering condition has been cured, waived or refinanced, or whether the 2028 maturity can now be relied on.
The IBM partnership to supply compute capacity for Granite models was described on 13 May 2025 (claim 4971) and does not recur in any subsequent claim in the record. There has been no statement on its size, start of delivery, or continuation. Its status remains 'stated' only because nothing further has been said.
Contracted power of 1.6 GW (claim 4973) was set against roughly 420 MW active across 33 data centres (claims 4972 and 29785), with both figures last repeated in mid-May 2025. The record gives no timetable for converting the remaining contracted capacity into active capacity and no later update to either number. As a result, the pace of that build-out, on which the $25.9 billion backlog in claim 4970 depends, has not been addressed.
What we haven't been told
2026-10-19The revolving credit facility amendment of May 5, 2025 included a contingent springing maturity date of December 30, 2026 (claim 11926), alongside a stated extension of the facility to May 2, 2028 (claim 5012). The springing date has not been mentioned since that filing, and the claim remains in 'stated' status with no transition. The date is now about ten weeks away. Nothing in the disclosures on record says whether the condition that would trigger the earlier maturity has been satisfied, waived, or refinanced away. Without that, it is unclear which of the two maturity dates actually governs the facility.
The OpenAI contract was first presented on March 10, 2025 as an $11.9 billion infrastructure agreement (claim 19820). Two months later, on May 13, 2025, the same relationship appeared as $11.2 billion of revenue backlog (claim 4969). Both claims remain 'stated', and no disclosure on record reconciles the two figures. The $700 million gap could reflect revenue already recognized, a definitional difference between contract value and backlog, or a change in scope. The company has not said which, and the OpenAI figure has not been updated in the records since mid-May 2025.
In its May 13, 2025 disclosures, management cited 1.6 GW of contracted power capacity against roughly 420 MW active (claims 4973, 4972, 29785), with more than 250,000 GPUs online (claim 29786). These were the headline measures of the build-out. The records available contain no later figure for any of them, and each remains in 'stated' status. No subsequent disclosure says how much of the contracted 1.6 GW has been energized, whether the target has changed, or when the remainder is expected to come online.
The IBM partnership to supply compute capacity for Granite models (claim 4971) appears once, in the May 13, 2025 materials, and nowhere after. Related financing items from the same week have also had no follow-up. These include the DDTL 3.0 facility of up to $2.6 billion (claim 11922) and the projection that $8.9 billion of secured debt would be needed to service contracts (claim 29783). None of these has been revised, confirmed as drawn, or reported on since May 18, 2025. The company has said nothing about whether the IBM arrangement produced revenue, or whether the financing need was met at the size it projected.
One apparent slippage resolves on inspection. The expected May 27, 2025 closing of the $2.0 billion notes offering (claim 11919) was auto-flagged 'delayed' on 2026-09-14 and 'not_yet_verifiable' on 2026-10-09. It was then marked 'verified' on 2026-10-11, consistent with the closing recorded in claim 29421, so it is not a walk-back. This analysis covers only the claims provided, and that record set ends partway through late May 2025.
What we haven't been told
2026-10-18The size of the OpenAI relationship has been described with two different numbers, and no reconciliation has been offered. Claim 19820, dated 2025-03-10, records an OpenAI infrastructure contract of $11.9 billion. By 2025-05-13, claim 4969 describes the OpenAI strategic deal's contribution to revenue backlog as $11.2 billion. The gap may reflect revenue already recognized, a difference between contract value and remaining backlog, or a change in terms, but the record contains no statement saying which. Both claims remain 'stated', and nothing on file after May 2025 revisits the figure.
The revolving credit facility amendment of 2025-05-05 included a contingent springing maturity date of 2026-12-30 (claim 11926), alongside a headline maturity extension to 2028-05-02 (claim 5012). That earlier date is now about ten weeks away. The record does not say what condition triggers the springing maturity, whether that condition has been cleared, or whether the later senior notes issuance and the revolver repayment from its proceeds (claims 29421 and 29778) were meant to neutralize it. The claim has not moved past 'stated' since it was first extracted, and the company has not addressed it on the record.
Several operating markers from the 2025-05-13 and 2025-05-18 disclosures have no follow-up in the claims on file. These are contracted power capacity of 1.6 GW (claim 4973), roughly 420 MW active across 33 data centers (claims 4972 and 29785), more than 250,000 GPUs online (claim 29786), and a run-rate adjusted EBITDA figure of about $5.17 billion (claim 29784). The IBM partnership to supply compute capacity for Granite (claim 4971) appears once, on 2025-05-13, and is not mentioned again. None of these have been revised downward on the record. They have simply not been restated or updated, so it cannot be determined from disclosures whether the capacity build-out, the IBM arrangement, or the EBITDA run-rate have tracked as described.
The ledger also shows one item that looks like a slipped date but was not. Claim 11919, the expected 2025-05-27 closing of the senior notes offering, was auto-transitioned to 'delayed' on 2026-09-14 and to 'not_yet_verifiable' on 2026-10-09 before settling at 'verified' on 2026-10-11. Claim 29421 confirms the $2.0 billion offering closed on 2025-05-27 as promised, and claim 29433 shows it was upsized from the $1.5 billion first described in claims 29774 and 11921. Those intermediate statuses came from the extraction process, not from any delay by the company, and should not be read as a walk-back.
What we haven't been told
2026-10-18The OpenAI relationship is the clearest number that moved without a stated reason. Claim 19820, dated 2025-03-10, records an infrastructure contract of $11.9 billion. Claim 4969, from the 2025-05-13 disclosures, describes the same strategic deal as $11.2 billion of revenue backlog. Both are still logged as stated. The record does not explain the $700 million gap. It could be revenue already recognized against the contract, a narrower definition of backlog, or a renegotiated term. Nothing on file says which, and no later claim restates the OpenAI figure.
The IBM partnership to provide compute capacity for its Granite models, claim 4971, appears once, in the 2025-05-13 disclosures. It has not been mentioned since in the material on record. No contract value, capacity commitment, deployment date or customer-revenue attribution was ever attached to it, and it remains at stated. It has not been confirmed as live, expanded or wound down.
The contingent springing maturity date of 2026-12-30, claim 11926, was disclosed with the 2025-05-05 revolving credit amendments, alongside the $1.5 billion facility expansion (claims 11923 and 5010) and the 2028-05-02 maturity extension (claim 5012). That date is now about ten weeks away. No later claim on record says whether the springing condition has been met, waived or refinanced away. The May 2025 notes issuance (claims 29421 and 11917) may be relevant, but management has not said how it affects the trigger.
The physical-scale figures were last given in mid-May 2025. These are about 420 MW of active power across 33 data centers (claims 4972 and 29785), 1.6 GW of contracted power (claim 4973) and more than 250,000 GPUs online (claim 29786). The run-rate adjusted EBITDA figure of $5.17 billion (claim 29784) dates from the same period. None of these figures has a later restatement, revision or progress milestone in the ledger. In particular, no date has been given for converting the contracted 1.6 GW into active capacity. The record as supplied ends at 2025-05-31, so this silence may partly reflect where the ledger stops. Even so, these are the figures on which the backlog and debt service (claim 29783, $8.9 billion of projected secured debt) depend, and none has been updated.
One item looks like a walk-back but is not. The expected 2025-05-27 closing of the $2.0 billion 9.250% notes, claim 11919, was auto-marked delayed on 2026-09-14 and not_yet_verifiable on 2026-10-09 before moving to verified on 2026-10-11. Claim 29421 confirms the offering closed as scheduled. That churn came from the ledger, not from the company. The same notes do carry two different maturity dates on record: 2030-05-27 in claim 4824 and 2030-06-01 in claims 11917, 29422 and 29435. The 2030-06-01 date has more support, and the discrepancy has not been reconciled.
What we haven't been told
2026-10-18The ledger supplied for CoreWeave ends with claims dated 2025-05-31, and the final entry (claim 19832) is cut off mid-record. Nothing on file is dated later than that. What follows therefore describes topics whose last recorded mention falls in the spring of 2025 and that have no follow-up anywhere in the record. Because later claims may simply be missing from this ledger, these are gaps in what is on file, not confirmed retreats by management.
The contingent springing maturity is the most time-sensitive. Claim 11926, recorded 2025-05-05, attaches a springing maturity date of 2026-12-30 to the credit facility. That sits beside the stated extension of the revolver to 2028-05-02 (claim 5012). The springing date is now roughly ten weeks away. The record has no later statement on whether the trigger condition was cured, waived or refinanced. Nor has the company said which of the two maturity dates now governs. It also hasn't reconciled the springing provision with the $2.0B 9.250% notes due 2030 that closed on 2025-05-27 (claims 29421, 29422).
The OpenAI figures are not reconciled anywhere on file. On 2025-03-10 the contract was recorded at $11.9B (claim 19820). By 2025-05-13 the OpenAI portion of backlog was given as $11.2B (claim 4969), inside a $25.9B total backlog (claim 4970). Revenue recognized in the interval could account for the difference. However, no disclosure on file says so, and neither the OpenAI figure nor the total backlog figure appears again in the record after mid-May 2025.
Several capacity and financing commitments also have no update after their first mention. The 1.6 GW of contracted power (claim 4973) and the roughly 420 MW active across 33 data centers (claims 4972, 29785) are each recorded once. The DDTL 3.0 facility of up to $2.6B (claim 11922) and the projected $8.9B of secured debt to service contracts (claim 29783) are likewise mentioned once and never again. The record does not say how much of DDTL 3.0 was drawn, how much contracted power was energized, or whether the $8.9B projection was raised or lowered.
The IBM partnership for Granite compute capacity (claim 4971) and the Weights & Biases acquisition (claims 4974, 29787) also stop at their May 2025 announcements. Neither has a later mention describing integration, revenue contribution or the status of the IBM arrangement.
One apparent slip turns out not to be one. Claim 11919, the expected 2025-05-27 closing of the senior notes, was auto-flagged 'delayed' on 2026-09-14 and 'not_yet_verifiable' on 2026-10-09. Both flags were cleared to 'verified' on 2026-10-11, and the closing is independently confirmed by claim 29421. The flags reflect the ledger's verification lag, not a missed date by the company.
What we haven't been told
2026-10-17The OpenAI figure has drifted without explanation. In claim 19820, dated 2025-03-10, the OpenAI infrastructure contract was disclosed at $11.9 billion. By the 2025-05-13 disclosure (claim 4969), the OpenAI-attributed revenue backlog stood at $11.2 billion. Both claims remain in 'stated' status. The record contains no statement saying whether the $0.7 billion difference reflects revenue already recognized, a renegotiated scope, or a different measurement basis. Management has not said which number investors should treat as current.
The 1.6 GW of contracted power capacity (claim 4973) was last mentioned on 2025-05-13 and has not been mentioned since. Later disclosures in the record, such as claims 29785 and 29786 on 2025-05-18, discuss only active power (about 420 MW across 33 data centers) and GPUs online. There is no timeline for turning contracted capacity into active capacity, and no update on the 1.6 GW figure itself. The phrasing has also shifted. Claim 4972 describes 420 MW of active power 'added', while claim 29785 describes roughly 420 MW as the total active footprint. This has not been reconciled.
The IBM partnership for Granite compute capacity (claim 4971) was disclosed on 2025-05-13 and does not appear in any later claim in the record. The ledger shows no announced scope, contract value, or delivery milestone, and no confirmation that the arrangement went beyond its initial announcement. The ClusterMAX Platinum rating follows a similar pattern. It was cited in claims 18878 and 4981, and no subsequent evaluation outcome has been disclosed.
Several debt-facility items are still unresolved as dated deadlines approach. The contingent springing maturity attached to the credit facility amendment (claim 11926) carries a 2026-12-30 date, about ten weeks from now. It remains 'stated', and there has been no disclosure of whether the triggering condition has been cleared. The DDTL 3.0 facility of up to $2.6 billion (claim 11922) has likewise received no follow-up on draws to date.
One ledger signal should not be read as a walk-back. The expected 2025-05-27 closing of the senior notes offering (claim 11919) was auto-transitioned to 'delayed' on 2026-09-14 and to 'not_yet_verifiable' on 2026-10-09. It was then verified on 2026-10-11, consistent with claims 29434 and 29421, which record the $2.0 billion offering closing on schedule. The offering was upsized from the $1.5 billion first described in claims 29774 and 29777, not reduced.
The claims ledger supplied for this review ends partway through the 2025-05-31 entries. Any later disclosures that address the gaps above were not available for this analysis.
What we haven't been told
2026-10-17The OpenAI contract appears in the record at two different sizes with no reconciling statement. On 2025-03-10 it was described as an $11.9 billion infrastructure contract (claim 19820). By 2025-05-13 the figure attached to OpenAI was an $11.2 billion revenue backlog (claim 4969), inside a total backlog of $25.9 billion (claim 4970). Both claims remain in stated status. The gap may simply be revenue recognized in the interim, or a difference between contract value and remaining backlog. The company has not said which, and no later disclosure in this record restates the OpenAI figure.
The IBM partnership to supply compute for the Granite models (claim 4971) and the 1.6 GW of contracted power (claim 4973) were both last mentioned on 2025-05-13. Five days later, the 2025-05-18 debt-offering materials repeated the roughly 420 MW of active power across 33 data centers and the more than 250,000 GPUs online (claims 29785, 29786). They did not carry forward either the IBM relationship or the contracted-capacity number. Both claims are still recorded as stated. No subsequent claim in this record mentions IBM, Granite, or a contracted-power total, revised or otherwise.
The Weights & Biases acquisition was announced on 2025-05-13 (claim 4974) and restated on 2025-05-18 (claim 29787). Neither claim includes a completion date or a closing statement, and nothing later in the record confirms the deal closed, gives terms, or explains how it would be integrated. The acquisition remains a stated intention here with no follow-through on record.
The contingent springing maturity date of 2026-12-30 attached to the expanded revolving credit facility (claim 11926, 2025-05-05) has not been revisited. The record contains no explanation of what triggers it, no statement on whether the triggering condition has been avoided or addressed, and no update even as that date approaches. The same goes for the projected $8.9 billion of secured debt needed to service contracts (claim 29783) and the up-to-$2.6 billion DDTL 3.0 facility (claim 11922): no later claim records how much has actually been raised or drawn.
One item that might look like a quiet slip is not one. Our ledger auto-transitioned the 2025-05-27 expected closing of the senior notes offering (claim 11919) through delayed on 2026-09-14 and not_yet_verifiable on 2026-10-09. The closing was in fact disclosed on 2025-05-27 (claims 29421, 4824), and the claim is now verified. Similarly, the offering grew from the $1.5 billion first described on 2025-05-18 (claims 29777, 29774, 11921) to a $2.0 billion upsized deal two days later (claim 29433), an upward revision that was announced. Readers should also note that the claims available for this review end in late May 2025. Some of the silences described above may reflect gaps in the record rather than in the company's disclosures.
What we haven't been told
2026-10-17The size of the OpenAI commitment is not consistent across the record. On 2025-03-10 the company described an OpenAI infrastructure contract worth $11.9 billion (claim 19820). Two months later, on 2025-05-13, the same relationship appeared as $11.2 billion of revenue backlog (claim 4969). Both claims remain in 'stated' status. Nothing on record reconciles the $700 million difference. It could reflect revenue already recognized, a change in contract terms or a different way of measuring, but management has not said which, and no later disclosure on file restates the figure.
The IBM partnership to supply compute for IBM's Granite models (claim 4971) appears once, in the 2025-05-13 disclosures, and has 'stated' status. The more detailed financing and operating summary five days later lists the Weights & Biases acquisition, active power, GPU count and debt facilities (claims 29774 through 29787) but does not mention IBM. No later claim on record describes the partnership's scope, value, deployment or status. It has not been said whether the arrangement turned into a contracted revenue commitment or remains a non-binding collaboration.
Contracted power capacity of 1.6 GW (claim 4973) was cited on 2025-05-13 alongside roughly 420 MW of active capacity (claim 4972). The 2025-05-18 update repeated the active figure, about 420 MW across 33 data centers (claim 29785), and added more than 250,000 GPUs online (claim 29786). It did not repeat the contracted figure. No subsequent claim updates the 1.6 GW number, gives a timeline for bringing it online or breaks it down by site. That gap matters because the company also projected $8.9 billion of secured debt to service its contracts (claim 29783), and no follow-up claim tracks that projection either.
The May 2025 credit facility amendment included a contingent springing maturity date of 2026-12-30 (claim 11926). It sat alongside the headline extension of the revolver to 2028-05-02 (claim 5012) and the expansion to $1.5 billion (claims 5010, 11923). The springing date is now about ten weeks away. The record has no disclosure on whether the condition that would trigger it has been met, avoided or refinanced away, and the claim is still in 'stated' status with no later reference.
One apparent slip on the ledger turns out not to be a walk-back. The expected 2025-05-27 closing of the senior notes offering (claim 11919) was automatically moved to 'delayed' on 2026-09-14 and to 'not_yet_verifiable' on 2026-10-09. It was then marked 'verified' on 2026-10-11, consistent with the 2025-05-27 closing disclosure for the upsized $2.0 billion, 9.250% notes (claims 29421, 29434). Those interim statuses came from the extraction process, not from any change by the company. The offering's growth from $1.5 billion (claims 29774, 29777, 11921) to $2.0 billion (claim 29433) was an announced upsizing, not a quiet revision.
The claims list supplied for this review is cut off after the 2025-05-31 entries. Silences noted here are measured against that window, and later disclosures not included may address some of them.
What we haven't been told
2026-10-17The record supplied for CoreWeave runs only through the end of May 2025, and the final entry is cut off mid-line. Every silence described below is silence within that window, not necessarily in the company's later filings.
The contingent springing maturity on the revolving credit facility is the most time-sensitive item. Claim 11926, last mentioned on 2025-05-05 alongside the facility's expansion to $1.5 billion and its extension to 2028-05-02 (claims 5010, 5012 and 11923), sets an earlier maturity of 2026-12-30 that applies only if certain conditions are triggered. That date is now about ten weeks away. The status remains 'stated', and nothing in the record says what the trigger conditions are, whether they have been met or avoided, or whether the May 2025 note issuance was meant to settle the question.
The IBM partnership to supply compute for Granite models, claim 4971, appears once, in the 2025-05-13 disclosure, and is still marked 'stated'. It does not reappear in the 2025-05-18 debt-offering materials, which restate other first-quarter highlights such as the Weights & Biases acquisition (claims 29787 and 4974) and the 420 MW active footprint (claim 29785). No contract value, term or deployment milestone was ever attached to it, and its absence from later summaries has not been explained.
The OpenAI figure moved without comment. Claim 19820, dated 2025-03-10, records an infrastructure contract worth $11.9 billion. Claim 4969, dated 2025-05-13, describes the OpenAI strategic deal as $11.2 billion of revenue backlog. The gap may reflect revenue recognized in the interim, a different measurement basis, or extraction noise. The record contains no reconciliation, and both claims sit at 'stated' with no revision noted.
The path from active to contracted power has also gone quiet. On 2025-05-13 the company cited 420 MW of active power and 1.6 GW contracted (claims 4972 and 4973). Five days later it repeated the 420 MW figure across 33 data centers (claim 29785) and pointed to an $8.9 billion projection of secured debt needed to service contracts (claim 29783), along with a delayed-draw term loan of up to $2.6 billion (claim 11922). The record has no later update on how much of the 1.6 GW has been energized, on drawdowns under DDTL 3.0, or on whether the debt projection still holds.
For completeness, the expected 2025-05-27 closing of the senior notes, claim 11919, passed through 'delayed' and 'not_yet_verifiable' in the automated ledger before settling at 'verified'. Claim 29421 confirms that the $2.0 billion offering closed on that date, so the churn reflects how the ledger handled the item rather than a slip by management.
What we haven't been told
2026-10-17The OpenAI contract figure has drifted without a reconciliation. Claim 19820, dated 2025-03-10, puts the OpenAI infrastructure contract at $11.9 billion. By 2025-05-13, claim 4969 describes the same relationship as an $11.2 billion revenue backlog. Both remain on file as stated. The $700 million gap may reflect revenue already recognized, a change in scope, or a difference between contract value and backlog, but the record contains no statement saying which. Management has not explained the change.
The contingent springing maturity on the revolving credit facility has not been addressed since it was first disclosed. Claim 11926, dated 2025-05-05, sets a springing maturity date of 2026-12-30, alongside the expanded $1.5 billion revolver and the extension to 2028-05-02 (claims 5010, 5012 and 11923). That date is now about ten weeks away. The record contains no later disclosure saying whether the trigger conditions have been cured, waived or refinanced around, or whether the 2028 maturity is secure. The claim remains at stated, with no update.
Several growth commitments from the May 2025 disclosures have not been followed up in the record. The 1.6 GW of contracted power (claim 4973) has not been updated since 2025-05-13, when the company reported about 420 MW active across 33 data centers (claims 4972 and 29785). No later figure shows how much of the contracted capacity has been energized, or on what schedule. The projection of $8.9 billion in secured debt to service contracts (claim 29783) and the DDTL 3.0 facility of up to $2.6 billion (claim 11922) were both last mentioned on 2025-05-18. Neither has a recorded drawdown or revision.
The IBM partnership for Granite compute capacity (claim 4971) appears once, on 2025-05-13, in language describing a partnership in place. It does not appear again in the ledger. The Weights & Biases acquisition (claims 4974 and 29787) was last referenced on 2025-05-18, and the record contains no completion, integration or purchase-price disclosure. Both remain at stated, and no statement updates either one.
The Notes Offering closing date of 2025-05-27 (claim 11919) moved to delayed on 2026-09-14 and to not_yet_verifiable on 2026-10-09. It was then marked verified on 2026-10-11, once the 2025-05-27 closing of the upsized $2.0 billion notes (claims 29421 and 11917) was matched. This was a ledger timing artifact, not a walk-back. However, the earlier $1.5 billion notes figures (claims 11921, 29774 and 29777) still sit at stated beside the $2.0 billion pricing (claim 29433), with no superseded marker. The supplied record ends in late May 2025, so these are last mentions within the material provided.
What we haven't been told
2026-10-16The revolving credit facility amendment of 5 May 2025 carried two dates that sit uneasily together. Claim 5012 extended the facility's maturity to 2 May 2028, while claim 11926 recorded a contingent springing maturity that could pull that date forward to 30 December 2026. The amendment is the only place the springing date appears in the records provided. The later notes offerings (claims 11921, 29433, 29421) describe repaying revolver borrowings, but none says whether the springing condition has been cleared, waived or made irrelevant. With the trigger date about ten weeks away, the record has no statement either way.
The size of the OpenAI commitment shifted between two disclosures. Claim 19820, dated 10 March 2025, put the infrastructure contract at $11.9 billion. Claim 4969, in the 13 May 2025 results, described revenue backlog from the strategic deal as $11.2 billion. The roughly $700 million gap may reflect revenue already recognised, or a difference between contract value and backlog accounting. No disclosure on record says which, and both claims remain at 'stated' with no reconciling update.
Several operating items were announced once in the May 2025 results and do not appear again in the material supplied. Claim 4971 announced the IBM partnership for Granite compute capacity. Claim 4973 described 1.6 GW of contracted power, and claims 4972 and 29785 put active power at about 420 MW across 33 data centres. No later claim on record gives progress on converting contracted power to active power or mentions the IBM arrangement again. The ledger supplied ends in late May 2025, so this may reflect the window of records rather than true silence. Within that window, though, neither item was followed up.
One ledger entry looks like a slipped date but is not. Claim 11919, the expected 27 May 2025 closing of the senior notes, was automatically marked 'delayed' on 14 September 2026 and 'not_yet_verifiable' on 9 October 2026, then moved to 'verified' on 11 October 2026. Claim 29421 confirms the $2.0 billion notes closed on 27 May 2025 as promised. Those transitions came from the extraction process, not from any change in what the company did or said.
What we haven't been told
2026-10-16The revolving credit facility amendment of 5 May 2025 carried two maturity dates. Claim 5012 extended the facility's maturity to 2 May 2028, and claim 11926 recorded a contingent springing maturity of 30 December 2026. The springing date has not been mentioned again in any later disclosure on record, and claim 11926 remains at stated with no verification transition. The trigger is now about ten weeks away. Management has not said whether the condition that would pull maturity forward has been cured, waived or refinanced, or whether it still applies. The May 2025 notes offerings would be the obvious mechanism, but no filing on record ties them to the springing provision.
The OpenAI figure moved within two months without explanation. Claim 19820 (10 March 2025) put the OpenAI infrastructure contract at $11.9 billion. Claim 4969 (13 May 2025) described the OpenAI strategic deal's revenue backlog as $11.2 billion. The $700 million gap is larger than any revenue the contract could plausibly have generated in its first weeks. No disclosure on record reconciles the two figures or says whether the scope, term or recognition basis changed.
Several capacity and financing commitments from mid-May 2025 appear once and then disappear from the record. The 1.6 GW of contracted power (claim 4973, 13 May 2025) is absent from the 18 May disclosures, which repeat only the roughly 420 MW active figure (claim 29785). The DDTL 3.0 facility of up to $2.6 billion (claim 11922, 18 May 2025) and the projected $8.9 billion of secured debt to service contracts (claim 29783, 18 May 2025) have no follow-up on draws, closing or sizing. The IBM partnership for Granite compute capacity (claim 4971, 13 May 2025) has not been mentioned since. None of these has been formally withdrawn, but none has been updated either.
The ledger also shows one item that looked like a slip and was not. Claim 11919, the expected 27 May 2025 closing of the senior notes offering, was auto-transitioned to delayed on 14 September 2026 and to not_yet_verifiable on 9 October 2026. It was then marked verified on 11 October 2026, consistent with claim 29421 recording the $2.0 billion close on 27 May 2025. That churn reflects extraction timing, not a missed date. Likewise, the change from a $1.5 billion offering (claims 29774 and 29777) to $2.0 billion (claim 29433) was an announced upsizing, not a quiet revision.
The claims supplied for this review run only to late May 2025, so silence here means silence within that window. Later filings outside this extract may address some of these points.
What we haven't been told
2026-10-16The OpenAI figure has not been reconciled. On 2025-03-10 the company described its OpenAI infrastructure contract at $11.9 billion (claim 19820). By 2025-05-13 the same relationship appeared as $11.2 billion of revenue backlog (claim 4969). Both claims sit at 'stated', and nothing in the record explains the $700 million gap. It may be revenue already recognized against the contract, a change in scope, or simply a different measure. Management has not said which, and no later disclosure in this record restates the OpenAI commitment.
The springing maturity on the revolving credit facility is close, and the company has not addressed it. The 2025-05-05 amendment extended the facility to 2028-05-02 (claim 5012). The same filing carried a contingent springing maturity date of 2026-12-30 (claim 11926). That date is now about ten weeks away. The record holds no later statement on whether the conditions that would pull maturity forward have been met, refinanced, or waived. The 2025-05-27 notes issuance (claims 29421, 11917) was framed around proceeds use (claim 29423), but none of those claims says whether it neutralizes the springing trigger.
Several strategic items announced in mid-May 2025 have no follow-up in the record. The IBM partnership for Granite compute capacity (claim 4971, 2025-05-13) appears once and is not mentioned again. The Weights & Biases acquisition is described in claims 4974 and 29787 (last mentioned 2025-05-18), but no claim records a completion, a price, or integration milestones. The $2.6 billion DDTL 3.0 facility (claim 11922) and the projected $8.9 billion of secured debt to service contracts (claim 29783) were both introduced on 2025-05-18. Neither has a subsequent draw, sizing update, or closing statement on file. All of these remain 'stated' only because nothing has been said since.
The gap between contracted and active capacity has not been updated. On 2025-05-13 and 2025-05-18 the company cited about 420 MW of active power across 33 data centers, 1.6 GW contracted, and more than 250,000 GPUs online (claims 4972, 4973, 29785, 29786). These are the most recent capacity figures in the record. No later disclosure here shows how much of the 1.6 GW has been energized, whether the contracted figure has moved, or on what schedule. Earlier guidance on the ability to deliver infrastructure for client contracts (claims 19822, 19823, mid-May 2025) is the last word on the subject.
One apparent slip is a ledger artifact, not a walk-back. The expected 2025-05-27 closing of the senior notes (claim 11919) was briefly auto-marked 'delayed' and then 'not_yet_verifiable' in September and October 2026. It has since been verified, consistent with claim 29421 recording the $2.0 billion close on 2025-05-27. The record supplied to this analysis appears to end in late May 2025. Items described above as unmentioned may have been addressed in later disclosures that are not included here.
What we haven't been told
2026-10-16The springing maturity on CoreWeave's revolving credit facility is the nearest date on the ledger that has not been addressed. Claim 11926, from the 2025-05-05 disclosures, sets a contingent springing maturity of 2026-12-30. It sits alongside the extension of the facility's headline maturity to 2028-05-02 (claim 5012) and the $1.5 billion expansion (claims 5010 and 11923). The ledger still marks it as stated, and none of the later claims on record say whether the condition that would bring the earlier date into force has been met, cured, or waived. With the date about ten weeks away, the record does not say which maturity currently governs the facility.
The company's power figures have not been updated since May 2025. Claim 4973 (2025-05-13) gives contracted power of 1.6 GW, and claims 4972 and 29785 (last mentioned 2025-05-18) give roughly 420 MW active across 33 data centers. No later disclosure in the record revises, confirms, or reports progress on converting the contracted capacity into active capacity. The gap between the two figures was a central part of the growth case, but the record does not show how much of it has since been closed.
The OpenAI figures appear in two versions that are never reconciled. Claim 19820 (2025-03-10) describes an $11.9 billion infrastructure contract. Two months later, claim 4969 (2025-05-13) puts OpenAI-related revenue backlog at $11.2 billion. The difference may simply be revenue recognized in the interim, but the record does not say so. Neither figure is mentioned again after May 2025, including in the debt-servicing projections of claim 29783.
The IBM partnership for Granite compute capacity (claim 4971) appears once, on 2025-05-13, in partnership language with no stated value, term, or capacity. Nothing later in the record refers to it, whether as an executed contract, a contribution to backlog, or a termination. It has simply dropped out of subsequent disclosures.
The Weights & Biases acquisition (claims 4974 and 29787) was last mentioned on 2025-05-18. In the claims on record, it is described as an acquisition but never followed by a closing confirmation, a disclosed price, or any statement on integration or revenue contribution. One smaller point: the 2025-05-27 notes offering (claim 11919) was auto-marked delayed and then not_yet_verifiable before being verified, but claim 29421 confirms the close on schedule. That episode reflects the extraction process and is not a company walk-back.
The ledger provided ends partway through claim 19832, so later disclosures may address some of these points. Within the record shown, none of them have been addressed.
What we haven't been told
2026-10-16The revolving credit facility amendment of 5 May 2025 extended maturity to 2 May 2028 (claim 5012). It also carried a contingent springing maturity date of 30 December 2026 (claim 11926). Both were last addressed in that filing. Neither has moved past 'stated' in the ledger, and the springing date is now about ten weeks away. Nothing on record explains what condition triggers the earlier maturity, whether that condition has been cured or refinanced, or whether the 2028 date can still be relied on. The facility was drawn again on 18 May 2025, with an additional $444 million borrowed (claim 29780), and the record says nothing since about the springing provision.
The OpenAI relationship was first disclosed on 10 March 2025 as an infrastructure contract worth $11.9 billion (claim 19820). Two months later, the first-quarter release put the OpenAI strategic deal backlog at $11.2 billion (claim 4969). The $700 million gap may reflect revenue already recognized, a change in scope, or simply different definitions. No statement on record reconciles the two figures, and the larger number has not been repeated in any later disclosure in the ledger.
The IBM partnership to supply compute capacity for its Granite models appears once, in the 13 May 2025 release (claim 4971), and nowhere after. Nothing on record describes its size, term, revenue contribution or deployment status. It was not referenced in the follow-on financing materials of 18 to 27 May. It sits at 'stated' with no further mention and no explanation for its absence.
On 13 May 2025 the company said it had 1.6 GW of contracted power (claim 4973), against roughly 420 MW active across 33 data centers (claims 4972, 29785). Around the same time it disclosed a DDTL 3.0 facility of up to $2.6 billion (claim 11922) and projected $8.9 billion of secured debt to service contracts (claim 29783). None of these figures has been updated in the record since May 2025. There is no disclosure of how much of the contracted power has been energized, how much of DDTL 3.0 has been drawn, or whether the $8.9 billion projection still holds. Silence here is not proof of a revision, but the conversion of contracted capacity into active capacity was the central forward-looking element of these disclosures, and it has gone unreported.
What we haven't been told
2026-10-16The record supplied here runs only through late May 2025, so these observations describe what the disclosures on file have and have not addressed, not everything CoreWeave may have said since.
The OpenAI contract value moved without explanation. In March 2025 the infrastructure agreement was described at $11.9 billion (claim 19820). By the May 13, 2025 results it appeared as an OpenAI revenue backlog of $11.2 billion (claim 4969). Both remain in stated status. Nothing on record reconciles the roughly $700 million gap, whether it reflects revenue already recognized, a change in contract terms, or a different way of measuring the deal.
The contingent springing maturity date of December 30, 2026 was introduced alongside the May 5, 2025 revolving credit expansion (claim 11926). The same filing extended the facility's stated maturity to May 2, 2028 (claim 5012). The springing date is now about ten weeks away and is still marked stated. No later disclosure on record says whether the triggering condition was cured, refinanced away, or still applies. The facility's effective term depends on that answer.
Two items from the May 13, 2025 results do not reappear in the follow-on financing materials five days later. The IBM partnership to supply compute for Granite models (claim 4971) is not mentioned again. Contracted power of 1.6 GW (claim 4973) was a headline figure on May 13. The May 18 materials repeat only the roughly 420 MW active across 33 data centers and the more than 250,000 GPUs online (claims 29785, 29786), and drop the contracted number. Neither item has been revised or withdrawn. They simply stop being cited, and there has been no update on the IBM relationship or on progress against the 1.6 GW.
The forward debt plan has also gone quiet. The May 18, 2025 materials projected $8.9 billion of secured debt to service contracts (claim 29783) and described the DDTL 3.0 facility at up to $2.6 billion (claim 11922). The record shows no draw against DDTL 3.0 and no progress against the $8.9 billion figure. Both remain in stated status.
One apparent slip turns out not to be a silence. The senior notes closing promised for May 27, 2025 (claim 11919) was auto-flagged delayed and then not yet verifiable. The ledger later moved it to verified once the May 27 closing was matched (claims 4824, 29421). The offering was upsized from $1.5 billion to $2.0 billion rather than cut (claims 29774, 29433), so it does not belong on this list.
What we haven't been told
2026-10-15The record supplied here ends abruptly in late May 2025. Every observation below describes silence within that ledger only. It does not establish that the company has said nothing since.
The OpenAI relationship entered the record on 2025-03-10 as an $11.9 billion infrastructure contract (claim 19820). Two months later, on 2025-05-13, the same relationship appeared as $11.2 billion of revenue backlog (claim 4969). That is roughly $700 million lower. Some reduction would be expected as contracted services are delivered and recognized, but no disclosure on record reconciles the two figures or says how much of the gap reflects recognized revenue versus any change in contract scope. Both claims remain at 'stated', and the figure does not appear again in the ledger after May 2025.
The IBM partnership to supply compute capacity for IBM's Granite models was announced in the 2025-05-13 disclosures (claim 4971) and is not mentioned in any later claim. No disclosure on record describes its scale, its start date, or whether it has moved beyond the initial announcement. Its status is still 'stated' from automated extraction on 2026-09-02, with no subsequent transition.
The May 2025 credit facility amendment included a contingent springing maturity date of 2026-12-30 (claim 11926), alongside a stated extension of the revolving facility to 2028-05-02 (claim 5012). That earlier date is now about ten weeks away. Nothing on record says whether the condition that would trigger it has been met, avoided, or waived. The claim has stayed at 'stated' since 2026-09-13 and has never been revisited.
The $2.6 billion DDTL 3.0 delayed-draw facility (claim 11922) was disclosed on 2025-05-18, as was a projection that roughly $8.9 billion of secured debt would be needed to service contracts (claim 29783). Neither appears in any later claim, and no draws against DDTL 3.0 are recorded. Around the same time, a run-rate adjusted EBITDA figure of about $5.17 billion (claim 29784) and capacity markers of 1.6 GW contracted power, about 420 MW active, and more than 250,000 GPUs (claims 4973, 4972, 29785, 29786) were each disclosed once and not updated within this record. No statement on record explains whether these figures were superseded, met, or revised.
One apparent slippage turned out not to be one. Claim 11919, the expected 2025-05-27 closing of the senior notes offering, was auto-flagged 'delayed' on 2026-09-14 and 'not_yet_verifiable' on 2026-10-09. It was then marked 'verified' on 2026-10-11, consistent with claim 29421 recording the $2.0 billion offering as closed. The interim flags reflect how the ledger processes claims, not anything the company said or failed to say.
What we haven't been told
2026-10-15The ledger provided for CoreWeave is cut off after claim 19832 (2025-05-31), so these observations cover only the claims shown. No claim currently carries a 'delayed' or 'not_yet_verifiable' status. The one that did, claim 11919 (the notes offering's expected 2025-05-27 closing), cycled through 'delayed' on 2026-09-14 and 'not_yet_verifiable' on 2026-10-09 before settling at 'verified' on 2026-10-11. That matches claim 29421, which records the $2.0B 9.250% notes closing on 2025-05-27. That swing came from the tracker, not from the company, and does not by itself indicate a walk-back.
The OpenAI figures do not reconcile in the record. Claim 19820 (2025-03-10) puts the OpenAI infrastructure contract at $11.9B. Two months later, claim 4969 (2025-05-13) describes the OpenAI strategic deal backlog as $11.2B. Both remain 'stated'. The two numbers may measure different things, such as total contract value versus remaining backlog after early recognition. Nothing on record explains the $700M gap, says which figure is now authoritative, or gives any later update on the OpenAI commitment.
The contingent springing maturity date of 2026-12-30 (claim 11926, disclosed 2025-05-05) sits alongside a stated extension of the revolving credit facility to 2028-05-02 (claim 5012). That trigger date is now about ten weeks away. Nothing in the visible record says whether the conditions that would accelerate maturity have been cured, waived or refinanced. The springing provision has not been mentioned since it was first disclosed.
The IBM partnership to supply compute capacity for Granite models (claim 4971) appears once, on 2025-05-13, in partnership language with no dollar value, capacity or timeline attached. It has not been mentioned again in the claims shown. Nothing has been said about whether it moved past announcement, was expanded, or lapsed.
Capacity and financing figures from mid-May 2025 also have no follow-up in the record. These are 1.6 GW of contracted power against roughly 420 MW active (claims 4973, 4972, 29785), the DDTL 3.0 facility of up to $2.6B (claim 11922), and a projected $8.9B of secured debt needed to service contracts (claim 29783). None has a 'promised by' date, so none can formally slip. Still, the record contains no later statement on how much contracted power has been energized, how much of DDTL 3.0 has been drawn, or whether the $8.9B projection has been raised or lowered.
What we haven't been told
2026-10-15The OpenAI figure has never been reconciled. On 2025-03-10 the company described an OpenAI infrastructure contract worth $11.9 billion (claim 19820). Two months later, on 2025-05-13, it described the OpenAI strategic deal's contribution to revenue backlog as $11.2 billion (claim 4969). Both claims remain 'stated', and no record on file explains the $700 million difference. Revenue already recognized, a re-scoping of the contract, or simply different measurement bases would each account for it, but management has not said which. The OpenAI arrangement does not appear again in the record after the May 2025 quarter.
The contingent springing maturity on the revolving credit facility has not been addressed since it was disclosed. When the revolver was expanded to $1.5 billion on 2025-05-05 (claims 5010, 11923), the company cited a maturity extension to 2028-05-02 (claim 5012). The same disclosure carried a contingent springing maturity date of 2026-12-30 (claim 11926), which would bring the facility's maturity forward if certain conditions were met. That date is now about ten weeks away. Neither claim has moved past 'stated'. The record contains no statement on whether the triggering conditions have been satisfied, refinanced, or waived, and the springing date has not been mentioned since the May 2025 filing.
The 1.6 GW of contracted power has never been updated. On 2025-05-13 the company cited 1.6 GW of contracted power capacity (claim 4973) alongside roughly 420 MW active (claims 4972, 29785). The 420 MW active figure was repeated on 2025-05-18 across 33 data centers. The 1.6 GW contracted figure was not, and it does not reappear in later entries. The record has no energization schedule and no statement on how much of the contracted capacity has since come online.
Several financing and partnership items from May 2025 were introduced once and never followed up. The DDTL 3.0 facility of up to $2.6 billion in delayed-draw term loans (claim 11922, 2025-05-18) has no subsequent disclosure of draws. Neither does the projected $8.9 billion of secured debt to service contracts (claim 29783). The IBM partnership to supply compute capacity for Granite models (claim 4971, 2025-05-13) received a single mention and no update on scope, value, or delivery. All three remain 'stated' with no later reference, so the record cannot show whether they have progressed.
For completeness, the ledger history on the notes closing (claim 11919, expected 2025-05-27) looks like a walk-back but is not one. The automated status moved to 'delayed' on 2026-09-14 and to 'not_yet_verifiable' on 2026-10-09, then resolved to 'verified' on 2026-10-11. That matches the separately recorded close of the $2.0 billion 9.250% notes (claim 29421). The offering also grew from the $1.5 billion first described on 2025-05-18 (claims 11921, 29774) to $2.0 billion at pricing (claim 29433), which is an upsizing, not a quiet reduction. Note also that the claims supplied here end around 2025-05-31, so 'no later mention' means none within the portion of the record available for this review.
What we haven't been told
2026-10-15The CoreWeave record on file is dominated by financing events from the first half of 2025 that were either completed or remain simply stated. It contains few hard deadlines, and almost nothing has auto-transitioned to delayed. What follows is therefore less a list of broken promises than a list of threads that were raised, given a number or a date, and then not returned to anywhere in the disclosures we hold.
The OpenAI figure is the clearest unexplained revision. On 2025-03-10 the company described an OpenAI infrastructure contract worth $11.9 billion (claim 19820). By the first-quarter release of 2025-05-13 the same relationship was carried as $11.2 billion of revenue backlog (claim 4969). Neither claim has moved from stated. Nothing on record reconciles the roughly $700 million gap. It may reflect revenue already recognized, a difference in definitions, or a change to the contract itself, but the company has not said which.
The revolving credit facility has a date approaching that the company has not addressed again. On 2025-05-05 management announced an expansion to $1.5 billion and a maturity extension to 2028-05-02 (claims 5010, 5012). The same disclosure carried a contingent springing maturity of 2026-12-30 (claim 11926). That date is now about ten weeks away. The record contains no later statement on whether the condition that would pull maturity forward has been cured, waived or triggered, and claim 11926 remains stated rather than resolved.
Several items appear only once, in the 2025-05-13 release, and are absent from everything afterwards. These are the IBM partnership to supply compute for Granite models (claim 4971), the 1.6 GW of contracted power capacity (claim 4973), and the up-to-$2.6 billion DDTL 3.0 delayed-draw facility (claim 11922, last referenced 2025-05-18). No later disclosure on record says how much of the contracted power has been energized beyond the roughly 420 MW then active (claims 4972, 29785), whether any DDTL 3.0 tranche has been drawn, or whether the IBM arrangement went beyond the announcement. The Weights & Biases acquisition (claims 4974, 29787) has the same gap. It is described as a transaction but never confirmed as closed in the record, and there is no figure for price or integration.
The only claim with real status churn is the expected 2025-05-27 closing of the senior notes offering (claim 11919). It moved from stated to delayed, then to not_yet_verifiable, and finally to verified on 2026-10-11. The underlying event did happen: the $2.0 billion 9.250% notes closed on 2025-05-27 (claims 29421, 29434). The churn came from our verification process, not from the company. The one change on the company's side, the offering growing from $1.5 billion on 2025-05-18 (claim 29774) to $2.0 billion two days later (claim 29433), was an upsizing that was announced as such, not a quiet walk-back. Readers should note that the record ends in late May 2025, so silence here means silence within these disclosures, not necessarily silence in the company's later filings.
What we haven't been told
2026-10-15The OpenAI contract figure has shifted without explanation. On 2025-03-10 the company described an OpenAI infrastructure contract worth $11.9 billion (claim 19820). By 2025-05-13 the same relationship appeared as an $11.2 billion strategic-deal revenue backlog (claim 4969). Both claims are still marked stated. Management never reconciled the $700 million gap: it has not said whether that amount was recognized as revenue, renegotiated, or reflects a different measurement basis. No later figure for the OpenAI commitment appears in the record.
The headline capacity and backlog metrics from the first earnings cycle have not been refreshed. Total committed revenue backlog of $25.9 billion (claim 4970) and contracted power of 1.6 GW (claim 4973) were last mentioned on 2025-05-13. Active power of roughly 420 MW across 33 data centers and more than 250,000 GPUs online (claims 4972, 29785, 29786) were last mentioned on 2025-05-18. All of them remain at stated status. The record contains no subsequent backlog, contracted-power, or GPU-count disclosure, and no statement on how much of the 1.6 GW has been energized.
The revolving credit facility carries a contingent springing maturity date of 2026-12-30 (claim 11926), disclosed on 2025-05-05 alongside a stated extension of the facility to 2028-05-02 (claim 5012). That trigger date is now about ten weeks away. The record has nothing since May 2025 on whether the springing condition has been satisfied, waived, or refinanced away, so the extended maturity is unconfirmed. On 2025-05-18 the company also said it would repay $450 million of revolver borrowings with notes proceeds (claim 29778). No confirmation that the repayment happened appears in the record.
Several strategic items were announced once and then dropped from the record. The IBM partnership for Granite compute capacity (claim 4971) appears only on 2025-05-13. The Weights & Biases acquisition (claims 4974 and 29787) was last referenced on 2025-05-18, with no disclosed closing date, purchase price, or integration update. The forward-looking framing of $8.9 billion in projected secured debt to service contracts and a $5.17 billion run-rate Adjusted EBITDA (claims 29783 and 29784) also appears only on 2025-05-18, with no later revision or reaffirmation.
One apparent slip turned out not to be a walk-back. The expected 2025-05-27 closing of the senior notes offering (claim 11919) was automatically marked delayed on 2026-09-14 and then not_yet_verifiable on 2026-10-09. It was verified on 2026-10-11, and the closing is corroborated by claims 29421 and 29434. The ledger supplied here is cut off mid-entry at 2025-05-31, so statements made after that date may address some of these gaps.
What we haven't been told
2026-10-15The record supplied for CoreWeave ends abruptly in late May 2025, so what follows reflects only what is on file through that point. Within that window, most claims remain in a plain 'stated' posture, and few show a clear walk-back. The items below are gaps and discrepancies in the record rather than confirmed reversals.
The OpenAI figure is the clearest numerical inconsistency. On 2025-03-10 the infrastructure contract was recorded at $11.9 billion (claim 19820). By 2025-05-13 the OpenAI-related revenue backlog was cited at $11.2 billion (claim 4969). Both claims remain 'stated', and the record contains no statement reconciling the $700 million difference. Revenue recognized in the intervening weeks, a change in contract scope, or a different measurement basis could each account for it. None of these has been said.
The contingent springing maturity date of 2026-12-30 (claim 11926) was disclosed on 2025-05-05 alongside the expanded revolving credit facility (claims 5010, 5012, 11923). It has not been mentioned again in the record. The date is now about ten weeks away. The record does not say whether the condition that would trigger it has been neutralized, refinanced around, or remains live. The proceeds of the May 2025 notes were directed partly at repaying revolver borrowings (claim 29778), which may bear on it, but no explicit link has been drawn.
The IBM partnership for Granite compute capacity (claim 4971) appears once, in the 2025-05-13 disclosures. It has no follow-on mention in anything on file, either for delivery, expansion, or completion. Its status is 'stated' only. The record says nothing about whether the arrangement has advanced since the initial announcement.
The capacity figures were last stated together on 2025-05-13 and 2025-05-18: roughly 420 MW active (claims 4972, 29785), 1.6 GW contracted (claim 4973), and more than 250,000 GPUs online (claim 29786). The record contains no subsequent update showing how much of the contracted 1.6 GW has been energized. The up-to-$2.6 billion DDTL 3.0 facility (claim 11922), tied to that buildout, likewise has no recorded draw or utilization disclosure after its announcement.
The notes-offering closing date (claim 11919, promised for 2025-05-27) moved through 'delayed' on 2026-09-14 and 'not_yet_verifiable' on 2026-10-09 before resolving to 'verified' on 2026-10-11. The companion claims (29434, 29421) record the $2.0 billion offering as closed on schedule. This appears to be a verification lag in the ledger rather than a real slip by the company, and nothing appears to have been withheld.
What we haven't been told
2026-10-15The OpenAI commitment appears in the record at two different sizes with no reconciling statement between them. Claim 19820, dated March 10, 2025, records an OpenAI infrastructure contract of $11.9 billion. Two months later, claim 4969 (May 13, 2025) describes the same relationship as $11.2 billion of revenue backlog. Some gap is expected, since backlog falls as revenue is recognized. But nothing on record says how much of the $700 million difference is recognized revenue and how much is a change in contract scope or timing. Both claims remain at 'stated'. No later disclosure in the ledger restates the OpenAI figure or breaks it out from the $25.9 billion total backlog in claim 4970.
The contingent springing maturity attached to the credit facility has gone quiet as its date approaches. Claim 11926, from May 5, 2025, sets a springing maturity of December 30, 2026, about ten weeks from today. That is the only mention on record. Claim 5012 extends the revolver to May 2, 2028, but the springing provision could pull that date forward if its trigger condition is met. No disclosure in the ledger says whether the trigger has been or will be avoided, or whether the debt it references has been refinanced. The claim still sits at 'stated' with no transition.
The IBM partnership for Granite model compute, claim 4971, was announced on May 13, 2025, alongside the first-quarter results. It does not appear again in any later claim on record. Nothing says what capacity was delivered, whether the arrangement grew or shrank, or whether it was folded into general backlog. A single-mention partnership with no follow-up or end statement is the pattern this section is meant to surface.
Contracted power capacity of 1.6 GW (claim 4973, May 13, 2025) was presented next to roughly 420 MW of active power (claims 4972 and 29785, the latter dated May 18, 2025). Those are the last capacity figures in the record. No later claim updates how much of the 1.6 GW has been energized, revises the contracted total, or gives a schedule for closing the gap of more than 1 GW. The 250,000-GPU figure in claim 29786 has likewise not been refreshed. The silence matters more because the $8.9 billion of secured debt in claim 29783 is tied to servicing contracts that depend on that capacity coming online.
One ledger item looks like a slip but is not. The May 27, 2025 closing date for the senior notes (claim 11919) moved to 'delayed' on September 14, 2026 and to 'not_yet_verifiable' on October 9, 2026, then resolved to 'verified' on October 11, 2026. That resolution is consistent with claims 29421 and 29434, which confirm the $2.0 billion offering closed as scheduled. The flip-flop came from the extraction pipeline, not from management.
Two caveats apply to this list. The claims supplied to us stop at the end of May 2025, and the final entry is cut off mid-line. Items described here as unmentioned since mid-2025 may have been addressed in later disclosures that were not included in this record.
What we haven't been told
2026-10-14The most consequential silence concerns the proposed acquisition of Core Scientific. On 2025-07-06 the company disclosed a definitive agreement valued at about $9.0 billion (claim 28333), along with a registration statement on Form S-4 (claim 4733), a $270 million termination fee payable to CoreWeave (claim 4739), and a merger closing deadline of 2026-04-07 (claim 4738). That deadline has passed. Our ledger moved claim 4738 to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09. Both transitions were made by automated extraction, not by any company statement. The record contains no disclosure after 2025-07-06 that confirms a closing, an extension of the outside date, a termination, or whether the termination fee was triggered.
Several forward-looking claims depended on that transaction, and they remain on the record as 'stated' with no follow-up. These are $500 million of annual run-rate cost savings by end-2027 (claim 28337), the elimination of more than $10 billion of future lease overhead (claim 28338), roughly 1.3 GW of owned gross power (claim 28335), and more than 1 GW of potential expansion power (claim 28336). Each was last mentioned on 2025-07-06. Nothing in the record says whether these targets still stand, have been withdrawn, or are being pursued another way.
The OpenAI figures do not reconcile in the record. A contract of $11.9 billion was recorded on 2025-03-10 (claim 19820). On 2025-05-13 the company described the same relationship as $11.2 billion of revenue backlog (claim 4969). The gap may reflect revenue recognized in the interim or a difference in definitions. However, no disclosure on record explains the $700 million difference, and no later update on the size of the OpenAI commitment appears after May 2025.
The company's power capacity figures have not been refreshed. On 2025-05-13 it cited 420 MW of active power added (claim 4972) and 1.6 GW of contracted power (claim 4973). Those were the last capacity figures it disclosed on its own account; the later 1.3 GW figure was tied to the Core Scientific deal. The record also has no update on how much the company has drawn on the $2.6 billion DDTL 3.0 facility (claim 11922).
Two strategic items from the same 2025-05-13 disclosure have not been mentioned since. The first is the acquisition of Weights & Biases (claim 4974). The second is the IBM partnership to supply compute for Granite models (claim 4971). Neither has a closing confirmation, integration update, or any later reference in the record, and both remain in 'stated' status. Their absence does not mean either effort has stalled, but no further account of them has been given.
What we haven't been told
2026-10-14The Core Scientific merger is the most visible gap in the record. On 2025-07-06 CoreWeave announced a definitive agreement to acquire Core Scientific in an all-stock deal valued at about $9.0 billion (claim 28333), at an exchange ratio of 0.1235 shares (claim 4731). It said the deal was expected to close in Q4 2025 (claim 28334) and set an outside closing deadline of 2026-04-07 (claims 4731, 4738). Both dates have passed. The ledger moved claims 4731 and 4738 automatically to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09, and moved claim 28334 to 'not_yet_verifiable' on 2026-10-11. None of these changes came from a company revision. The record contains no statement that the merger closed, that the deadline was extended, or that the agreement was terminated. It also says nothing about whether the $270 million termination fee payable to CoreWeave (claim 4739) was triggered.
Several forward-looking promises depended on that transaction, and none has been updated. The company said the acquisition would bring about 1.3 GW of owned gross power (claim 28335) and more than 1 GW of potential expansion (claim 28336). It also said the deal would eliminate more than $10 billion of future lease overhead (claim 28338) and produce $500 million in annual run-rate cost savings by the end of 2027 (claim 28337). All four claims remain 'stated' with a last mention of 2025-07-06. Whatever happened to the merger, the company has not said whether these capacity and savings figures still apply, have been restated on a standalone basis, or have been withdrawn.
The size of the OpenAI contract changed without explanation. On 2025-03-10 the infrastructure contract was described as worth $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI-related revenue backlog was given as $11.2 billion (claim 4969). The difference may simply reflect revenue already recognized or a different way of measuring the contract, but the record contains no reconciliation between the two figures. Neither figure appears in any later disclosure on record.
Capacity figures and some financing terms have gone quiet. The 420 MW of active power and 1.6 GW of contracted power (claims 4972, 4973) were last stated on 2025-05-13 and have not been updated in the material on record. The same is true of the IBM Granite compute partnership (claim 4971). Separately, the expanded revolving credit facility carried a stated maturity of 2028-05-02 (claim 5012) but also a contingent springing maturity of 2026-12-30 (claim 11926). That date is now about eleven weeks away, and the record contains no statement on whether the springing condition has been cured or still applies. By contrast, the $2.0 billion 2030 notes, which the ledger briefly flagged as 'delayed' (claim 11919), were later confirmed closed (claim 29421) and are not an open item.
What we haven't been told
2026-10-14The most consequential silence concerns the Core Scientific merger. On 2025-07-06 CoreWeave announced a definitive agreement to acquire Core Scientific for roughly $9.0 billion in an all-stock exchange at 0.1235 shares (claims 28333, 4731). It said the deal was expected to close in Q4 2025 (claim 28334) and set an outside closing deadline of 2026-04-07 (claim 4738). Both dates have now passed. The ledger moved claims 4731 and 4738 to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09, and claim 28334 has been not_yet_verifiable since 2026-10-11. The last affirmative mention on record is the July 2025 announcement, along with the S-4 filing and the Nasdaq listing approval tied to it (claims 4733, 4735). The record contains no statement that the merger closed, was terminated, or had its deadline extended, and gives no explanation of what happened to it.
Several figures that depended on that merger are still recorded as stated, with no reassessment. These include about 1.3 GW of owned gross power plus 1 GW or more of expansion potential (claims 28335, 28336). They also include $500 million in annual run-rate cost savings by end-2027 (claim 28337) and the elimination of more than $10 billion in future lease overhead (claim 28338). All were last mentioned on 2025-07-06. If the transaction did not complete, these targets have no stated basis. Management has not said whether they are withdrawn, deferred, or being pursued some other way.
The OpenAI contract appears on record under two different figures that are never reconciled. A 2025-03-10 claim describes an $11.9 billion infrastructure contract (claim 19820). The 2025-05-13 disclosure describes OpenAI-related revenue backlog of $11.2 billion (claim 4969). The gap may reflect revenue already recognized or a difference in definitions, but no disclosure on record explains it. Neither figure has been updated since May 2025.
Capacity disclosures have also stopped advancing on record. On 2025-05-13 the company cited 1.6 GW of contracted power and 420 MW of active capacity added (claims 4972, 4973). Within the claims available, there is no later statement of how much of the contracted power has been energized, or of any change to the 1.6 GW figure.
The IBM partnership to supply compute for Granite models (claim 4971) and the Weights & Biases acquisition (claim 4974) each appear only in the 2025-05-13 disclosure. There is no later mention of the IBM arrangement's scope or status, and no confirmation on record that the Weights & Biases acquisition was completed or integrated. Both remain stated, with no follow-up of any kind. This analysis covers only the portion of the claim ledger provided, which was cut off partway through; later claims may address some of these points.
What we haven't been told
2026-10-14The Core Scientific merger is the clearest case of a promise that has gone quiet. On 2025-07-06 CoreWeave announced a definitive agreement to acquire Core Scientific for roughly $9 billion in stock at 0.1235 shares per Core Scientific share (claims 28333, 4731). Management said the deal would close in Q4 2025 (claim 28334), and the merger agreement carried an outside date of 2026-04-07 (claim 4731). Both dates have passed. The ledger moved claim 4731 to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09, and it moved claim 28334 to 'not_yet_verifiable' on 2026-10-11. The record contains no closing announcement, no amended timetable and no termination notice. The benefits management attached to the deal also have no follow-up: about 1.3 GW of owned gross power (claim 28335), more than 1 GW of expansion potential (claim 28336) and the elimination of over $10 billion in future lease overhead (claim 28338). The $270 million termination fee payable to CoreWeave (claim 4739) has not been mentioned again either. Readers have not been told whether the transaction completed, failed or remains pending.
The size of the OpenAI relationship has two different figures on record, and nothing reconciles them. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI-related backlog was given as $11.2 billion (claim 4969). The gap may reflect revenue recognized in the interim or a different basis of measurement, but the disclosures on record do not say which. No later figure appears.
The revolving credit facility amendment of 2025-05-05 extended maturity to 2028-05-02 (claim 5012). It also included a contingent springing maturity date of 2026-12-30 (claim 11926). That date is now about eleven weeks away. The record does not say whether the condition that would trigger the earlier maturity has been satisfied, waived or refinanced. Nothing has been said about it since the original filing.
Several operating items from the 2025-05-13 Q1 disclosure have not reappeared in the claims on record. These are the 1.6 GW of contracted power and 420 MW of active capacity (claims 4973, 4972), the IBM partnership for Granite compute (claim 4971) and the Weights & Biases acquisition (claim 4974). None has a later update on capacity brought online, partnership scope or integration progress. Their silence may reflect gaps in this ledger rather than in management's communications, since the ledger supplied for this review ends partway through the July 2025 merger claims. Within the record as given, however, each was stated once and not revisited.
What we haven't been told
2026-10-13The largest open item is the Core Scientific acquisition. CoreWeave announced a definitive all-stock agreement on 2025-07-06/07 valued at roughly $9.0 billion (claims 28333, 4729, 19824). It gave an expected close in Q4 2025 (28334) and an outside date of 2026-04-07 at an exchange ratio of 0.1235 shares (4731, 4738). The last affirmative reference in the record is 2025-07-20, when the 2031 senior notes offering described the deal as pending (26763). Both the Q4 2025 target and the April 2026 deadline have passed. The ledger moved 4731 and 4738 to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09, and 28334 is also not_yet_verifiable. Nothing on record states whether the merger closed, was terminated or was extended. Nothing addresses whether the $270 million termination fee provision (4739) was triggered.
Several benefits CoreWeave claimed for the Core Scientific deal are still carried as stated, with no follow-up. These are $500 million in annual run-rate cost savings by end-2027 (28337), elimination of more than $10 billion in future lease overhead (28338), about 1.3 GW of owned gross power (28335) and more than 1 GW of potential expansion (28336). None of these has been withdrawn, restated or reaffirmed since July 2025. Their status depends on a transaction whose outcome the company has not addressed in this record.
The OpenAI figure has shifted without comment. On 2025-03-10 the infrastructure contract was put at $11.9 billion (19820). In the 2025-05-13 first-quarter results, the OpenAI strategic deal appeared as $11.2 billion of revenue backlog (4969). The $700 million gap may reflect revenue recognized in the interim or a different basis of measurement. The record contains no reconciliation between the two numbers.
A group of operating metrics from the 2025-05-13 results appears only once in the ledger as supplied. These are total backlog of $25.9 billion (4970), contracted power of 1.6 GW (4973), 420 MW of active power added (4972), and the IBM partnership to supply compute for Granite models (4971). There is no later update on backlog, on how much contracted power has gone live, or on whether the IBM arrangement is still active.
The May 2025 revolver amendment extended maturity to 2028-05-02 (5012) and expanded the facility (5010, 11923, 5011, 11924). It also contains a contingent springing maturity of 2026-12-30 (11926). That date is now less than three months away. The record contains no statement on whether the condition behind the springing maturity has been satisfied, refinanced away or waived.
What we haven't been told
2026-10-13The Core Scientific merger is the clearest case of a commitment that has gone quiet. When the deal was announced on 2025-07-06 (claims 28333, 4729, 19824), management said it expected to close in the fourth quarter of 2025 (claim 28334) and set a merger outside date of 2026-04-07 (claims 4731, 4738). Both dates have now passed. The ledger moved claims 4731 and 4738 to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09, and claim 28334 was moved to 'not_yet_verifiable' on 2026-10-11. All of these were automated transitions. The last company reference in the record is from 2025-07-20, which describes the acquisition as 'pending' (claim 26763). The record contains no announcement that the deal closed, was extended, or was terminated. It also says nothing about whether the $270 million termination fee (claim 4739) became relevant.
Several figures that depended on that merger are still marked 'stated' with no follow-up: about 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion (claim 28336), the elimination of over $10 billion in future lease overhead (claim 28338), and $500 million in annual run-rate cost savings by the end of 2027 (claim 28337). Management has not said whether these targets still apply if the transaction is not completed.
The OpenAI figures do not line up, and no reconciliation has been offered. The 2025-03-10 disclosure described an $11.9 billion infrastructure contract (claim 19820). Two months later, on 2025-05-13, the OpenAI-related revenue backlog was reported as $11.2 billion (claim 4969). The difference may simply reflect revenue already recognized. However, the record contains no statement explaining the lower number, and the record shows no later update on either figure.
The IBM partnership to supply compute capacity for Granite models (claim 4971) and the 1.6 GW of contracted power capacity (claim 4973) both appear only in the 2025-05-13 disclosure. Neither shows up in any later claim in the supplied record. Nothing indicates whether the IBM arrangement went beyond the announcement, or whether the 1.6 GW figure has been updated, absorbed into the Core Scientific capacity numbers, or quietly dropped.
The ledger supplied for this review ends partway through the 2025-07-20 entries. Later disclosures may address some of these points, but none of them appear in the material available here.
What we haven't been told
2026-10-13The Core Scientific acquisition is the clearest gap. On 2025-07-06 and 2025-07-07 CoreWeave announced a definitive agreement to acquire Core Scientific for roughly $9 billion in stock at 0.1235 CoreWeave shares per Core Scientific share (claims 28333, 4731, 4729, 19824). It said the deal would close in Q4 2025 (claim 28334) and set an outside merger deadline of 2026-04-07 (claim 4738). Both dates have passed. The ledger moved claims 4731 and 4738 to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09, and claim 28334 has sat at 'not_yet_verifiable' since 2026-10-11. The record contains no closing announcement, no termination notice, no extension of the outside date, and no word on whether the $270 million termination fee (claim 4739) became payable. The deal's stated benefits all still read as 'stated' with no follow-up: about 1.3 GW of owned power (claim 28335), more than 1 GW of expansion potential (claim 28336), elimination of over $10 billion in future lease overhead (claim 28338), and $500 million in annual run-rate savings by end-2027 (claim 28337).
The OpenAI contract figure changed without explanation. On 2025-03-10 the contract was described at $11.9 billion (claim 19820). By the 2025-05-13 quarterly disclosure, the OpenAI figure appeared as $11.2 billion of revenue backlog (claim 4969). The $700 million gap may reflect revenue recognized in the interim or a difference between total contract value and remaining backlog. Nothing on record reconciles the two numbers or says whether the headline commitment itself was adjusted.
A date in the credit facility is approaching with no commentary. In May 2025 the revolving credit facility was expanded to $1.5 billion and its maturity extended to 2028-05-02 (claims 5010, 5012, 11923). The same disclosure included a contingent springing maturity date of 2026-12-30 (claim 11926). That date is now less than three months away. The ledger has carried it as 'stated' since extraction, and management has not said publicly whether the condition that would pull maturity forward is likely to apply, or how it would be addressed if it did.
Some items from the first public quarter have not reappeared in the disclosures on record. The 2025-05-13 report cited an IBM partnership to supply compute for Granite models (claim 4971), 420 MW of active power capacity, and 1.6 GW of contracted capacity (claims 4972, 4973). None of the three is mentioned again in the later claims available here. There is no update on the IBM arrangement's status or scope, and no refreshed capacity figures against which the May 2025 numbers could be measured.
What we haven't been told
2026-10-13The Core Scientific acquisition is the largest commitment on the record that has gone quiet. When the all-stock deal was announced on 2025-07-06 and 2025-07-07 (claims 28333, 4729, 4731, 19824), management said it expected to close in the fourth quarter of 2025 (claim 28334) and set an outside date of 2026-04-07 (claim 4738). Both dates have now passed. The ledger moved the merger and its deadline to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09 and 2026-10-11, and none of these changes followed a company statement. The last affirmative mention in the record is the July 2025 announcement. The record holds no revised closing date, no statement that the deal closed, and no statement that it was terminated. It also does not say whether the $270 million termination fee payable to CoreWeave (claim 4739) was ever triggered.
The deal also carried a set of forward-looking benefits that have not been mentioned since. These were roughly 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion (claim 28336), $500 million in annual run-rate cost savings by end-2027 (claim 28337), and the elimination of more than $10 billion in future lease overhead (claim 28338). All four remain recorded as 'stated' and were never restated, revised, or withdrawn. If the merger has not closed, management has not said how much of the capacity and cost thesis still holds, or what replaces it alongside the 1.6 GW of contracted power cited in May 2025 (claim 4973).
The OpenAI contract figure changed without a reconciliation. In March 2025 the agreement was described as an $11.9 billion infrastructure contract (claim 19820). Two months later the company referred to $11.2 billion of OpenAI-related revenue backlog (claim 4969). The gap may reflect revenue already recognized, or the difference between contract value and remaining backlog. The record contains no statement explaining the $700 million difference, and no later update on the size of the OpenAI commitment.
The IBM partnership to supply compute capacity for its Granite models (claim 4971) appears once, in the 2025-05-13 disclosure, and is not mentioned again. The record has no follow-on figures for scale, term, or revenue contribution, and no indication of whether the arrangement continues.
The revolving credit facility extension to 2028-05-02 (claim 5012) carries a contingent springing maturity of 2026-12-30 (claim 11926), now less than three months away. Since the May 2025 amendment, the record holds no statement on whether the conditions that would trigger the earlier maturity have been addressed.
The claims ledger supplied for this review ends partway through the July 2025 senior notes entries (claim 26766). Any later disclosures that address the points above were not available for this analysis.
What we haven't been told
2026-10-12The Core Scientific acquisition is the largest open item. The definitive agreement (claims 28333, 4729, 19824) set an exchange ratio of 0.1235 shares (claim 4731) and told investors to expect a close in the fourth quarter of 2025 (claim 28334), with an outside date of April 7, 2026 (claims 4731, 4738). Both of those dates have passed. The ledger moved claims 4731 and 4738 to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09, and claim 28334 went to not_yet_verifiable on 2026-10-11. The last disclosure on record that refers to the deal is from 2025-07-20, where it is still described as pending (claim 26763). The record contains no statement that the merger closed, was terminated, or had its outside date extended. It also does not say whether the $270 million termination fee payable to CoreWeave (claim 4739) was triggered.
The benefits tied to that deal are also unaddressed. Management cited about 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion (claim 28336), the elimination of over $10 billion in future lease overhead (claim 28338), and $500 million in annual run-rate cost savings by the end of 2027 (claim 28337). All four were stated on 2025-07-06. None has been restated, revised, or withdrawn in later disclosures on record, even though each depends on a transaction whose status is now unverifiable.
The OpenAI figure changed without an explanation. The contract was first disclosed on 2025-03-10 at $11.9 billion (claim 19820). Two months later, on 2025-05-13, the related revenue backlog was given as $11.2 billion (claim 4969). That is about $700 million lower, and no disclosure on record reconciles the two numbers. The difference could reflect revenue already recognized, a change in definition, or a change in contract terms, but management has not said which. Neither figure appears in the ledger after May 2025.
The IBM partnership to supply compute capacity for its Granite models (claim 4971) was described as an established partnership in the 2025-05-13 disclosure. It does not appear again in any later claim on record. There has been no update on scale, revenue contribution, or continuation.
The headline capacity figures have also gone unrefreshed. As of 2025-05-13, CoreWeave reported 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). In the record those figures are later overtaken only by the acquisition-dependent Core Scientific numbers. No later disclosure states how much of the 1.6 GW has been energized, or how the contracted total stands if the Core Scientific capacity is not delivered.
What we haven't been told
2026-10-12The Core Scientific merger is the clearest case of a deadline that has passed without explanation. On 2025-07-06 the company said the all-stock deal, at 0.1235 CoreWeave shares per Core Scientific share, was expected to close in Q4 2025 (claim 28334). The merger agreement set an outside closing date of 2026-04-07 (claims 4731 and 4738). Both dates have passed. The ledger moved claims 4731 and 4738 to 'delayed' on 2026-09-03 and then to 'not_yet_verifiable' on 2026-10-09. Claim 28334 went directly to 'not_yet_verifiable' on 2026-10-11. The last affirmative reference in the record is 2025-07-20, when the deal was described as 'pending' (claim 26763). Nothing on record says the transaction closed, that the outside date was extended, or that the agreement was terminated.
The economics attached to that deal have also gone quiet. Management cited about 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion (claim 28336), the elimination of over $10 billion in future lease overhead (claim 28338), and $500 million in annual run-rate cost savings by end-2027 (claim 28337). It also disclosed a $270 million termination fee payable to CoreWeave (claim 4739). None of these has been restated or withdrawn since July 2025. If the merger did not proceed, there has been no statement on whether the fee was triggered or how the savings and capacity targets have changed.
The OpenAI contract appears at two different values without reconciliation. On 2025-03-10 it was disclosed as an $11.9 billion infrastructure contract (claim 19820). By 2025-05-13 the related backlog was given as $11.2 billion (claim 4969). The $700 million gap may reflect revenue already recognized, a definitional difference, or a revision to the contract. The company has not said which, and the record has no later figure.
Several items from the Q1 2025 disclosures have not reappeared. These include the IBM partnership for Granite compute capacity (claim 4971), 1.6 GW of contracted power (claim 4973), and $25.9 billion of total revenue backlog (claim 4970). Each was stated once on 2025-05-13 and does not recur in the subsequent entries reviewed here. The IBM partnership was described in signed, present-tense terms and has not been mentioned since. No update has said whether it is still active, has grown, or has ended.
The record supplied for this review ends partway through the July 2025 entries. Later disclosures may address some of these points, but none of those disclosures appear in the ledger available here.
What we haven't been told
2026-10-12The Core Scientific acquisition is the largest open item on the ledger. Management announced a definitive agreement on 2025-07-06 and 2025-07-07 (claims 28333, 4729, 19824), valued at roughly $9.0 billion at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claim 4731). It said it expected to close in Q4 2025 (claim 28334) and set an outside closing deadline of 2026-04-07 (claims 4738, 4731). Both dates have passed. Claims 4738 and 4731 were automatically moved to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09. Claim 28334 sits at not_yet_verifiable as of 2026-10-11. The most recent dated material on the record touching the deal is from July 2025. Nothing on file says whether the merger closed, was terminated, or had its deadline extended. Nothing addresses the $270 million termination fee described in claim 4739, which would be relevant if the deal fell away.
Several headline figures rest on that same transaction and have not been restated. These include the $500 million annual run-rate cost savings targeted by end-2027 (claim 28337) and the elimination of more than $10 billion of future lease overhead (claim 28338). They also include the roughly 1.3 GW of owned gross power and the 1 GW-plus of potential expansion (claims 28335, 28336), and the projected $17.3 billion net debt at 3.0x EBITDA (claim 26761), which appears to be a pro forma figure. All remain in stated status, carried forward from July 2025. No later disclosure on the record reaffirms them, adjusts them, or acknowledges that they depend on a merger whose timeline has lapsed.
The OpenAI contract figure moved down between disclosures without a stated reconciliation. On 2025-03-10 the agreement was described as an $11.9 billion infrastructure contract (claim 19820). By 2025-05-13 it was presented as $11.2 billion of revenue backlog from the strategic deal (claim 4969). The gap may reflect revenue recognized in the interim or a difference between contract value and backlog. The record contains no statement explaining which, and no later figure has been given for how the commitment stands.
The IBM partnership to supply compute capacity for Granite models (claim 4971) appears once, in the 2025-05-13 disclosures. It still reads as a stated partnership, with no later reference to its scale, its delivery status, or whether it continues. On the claims available here, the topic has not resurfaced since May 2025, and nothing has been said about where it stands.
What we haven't been told
2026-10-12The most consequential silence in the record concerns the Core Scientific acquisition. On 2025-07-06 management described a definitive agreement valued at about $9.0 billion (claim 28333) and said it expected the deal to close in Q4 2025 (claim 28334). The merger agreement set an outside closing date of 2026-04-07 (claims 4731 and 4738). The last disclosure on record that mentions the deal is dated 2025-07-20, where it is still described as pending (claim 26763). Both deadlines have since passed. The ledger moved claims 4731 and 4738 to delayed on 2026-09-03 and to not_yet_verifiable on 2026-10-09, and claim 28334 to not_yet_verifiable on 2026-10-11. None of these were company revisions. The record contains no announcement that the deal closed, that the outside date was extended, or that the agreement was terminated. It also does not say whether the $270 million termination fee payable to CoreWeave (claim 4739) was ever triggered.
Several figures that depended on that acquisition remain on the books as stated, with no follow-up. These are the roughly 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion power (claim 28336), the elimination of more than $10 billion in future lease overhead (claim 28338), and $500 million in annual run-rate cost savings by end-2027 (claim 28337). Each was framed as a result of combining with Core Scientific. If the transaction did not complete, management has not said, at least in this record, whether these targets were withdrawn, replaced, or are being pursued another way.
The OpenAI figures were given twice and do not match. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI strategic deal was carried as $11.2 billion of revenue backlog (claim 4969). The $700 million gap may simply be revenue recognized in the meantime, or the difference between contract value and backlog. The record contains no statement reconciling the two numbers, and no later update on the OpenAI commitment appears.
A group of operating metrics was disclosed once, on 2025-05-13, and not repeated in anything on record since. These are the $25.9 billion total revenue backlog (claim 4970), 420 MW of active power capacity added (claim 4972), and 1.6 GW of contracted power (claim 4973). The same disclosure introduced the IBM Granite compute partnership (claim 4971) and the Weights & Biases acquisition (claim 4974). Neither is mentioned again: there is no later description of the IBM arrangement's scope or progress, and no statement on how Weights & Biases was integrated. These items may have simply been superseded by later reporting this ledger does not capture. As the record stands, though, none of them has been updated for more than a year.
One financing date is now close. The May 2025 revolving credit amendment extended maturity to 2028-05-02 (claim 5012). It also kept a contingent springing maturity of 2026-12-30 (claim 11926), and nothing on record says whether the condition behind that earlier date has been met or removed. By contrast, the May 2025 notes offering resolved cleanly despite its intermediate ledger flags. It closed after being upsized from the $1.5 billion first described (claim 11921) to $2.0 billion (claims 11918 and 11917), and claim 11919 is now verified.
What we haven't been told
2026-10-11The Core Scientific acquisition is the clearest gap in the record. On 2025-07-06 the company disclosed a definitive agreement valued at roughly $9 billion (claim 28333), an exchange ratio of 0.1235 shares (claim 4731), an expected close in Q4 2025 (claim 28334), and an outside merger deadline of 2026-04-07 (claim 4738). The last disclosure touching the deal is dated 2025-07-20, describing it only as a pending acquisition tied to lease savings (claim 26763). Both the Q4 2025 target and the April 2026 deadline have passed. The ledger moved claims 4731 and 4738 to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09, and claim 28334 now sits at not_yet_verifiable as well. None of these changes came from a company statement. The claims on record contain no closing announcement, no extension of the outside date, and no termination notice, so the record does not show whether the $270 million termination fee (claim 4739) was ever triggered.
Several headline benefits were attached to that same transaction and have not been repeated since. These include about 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion (claim 28336), elimination of over $10 billion in future lease overhead (claim 28338), and $500 million in annual run-rate cost savings by the end of 2027 (claim 28337). All were last stated on 2025-07-06 and remain recorded as stated, but each depends on a deal whose status management has not addressed on the record. If the acquisition did not close, these figures would need to be withdrawn, and no withdrawal or restatement appears.
The OpenAI commitment appears at two different sizes with no explanation. A 2025-03-10 disclosure puts the infrastructure contract at $11.9 billion (claim 19820). By 2025-05-13, the OpenAI-related revenue backlog is given as $11.2 billion (claim 4969). The $700 million difference may reflect revenue recognized in the interval, or it may reflect a change in scope. The company has not reconciled the two figures, and neither number has been updated in the claims on record since May 2025.
The revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), set out alongside the $1.5 billion facility expansion and a stated maturity extension to 2028-05-02 (claims 5010, 5012, 11923). Both were last mentioned on 2025-05-05. The springing date is now less than three months away. The record contains no statement on whether the condition that would accelerate maturity has been satisfied, waived, or refinanced away.
Two May 2025 announcements have gone quiet. The IBM partnership to supply compute capacity for Granite models (claim 4971) and the acquisition of Weights & Biases (claim 4974) were both stated on 2025-05-13. Neither appears again in later disclosures. There is no recorded completion of the Weights & Biases transaction and no update on the scale or status of the IBM arrangement. The 1.6 GW of contracted power cited on the same date (claim 4973) has likewise not been refreshed in the claims on record.
What we haven't been told
2026-10-11The Core Scientific acquisition carries the clearest unexplained gap. When the definitive agreement was announced on 2025-07-06, management said the all-stock deal, valued at about $9 billion with an exchange ratio of 0.1235 shares, was expected to close in Q4 2025 (claim 28334). The merger agreement set an outside closing deadline of 2026-04-07 (claims 4731, 4738). The last affirmative reference in the record is 2025-07-20, when the deal was described as pending (claim 26763). Both the Q4 2025 target and the April 2026 deadline have since passed. The ledger moved claims 4731 and 4738 to 'delayed' on 2026-09-03 and to 'not_yet_verifiable' on 2026-10-09, and claim 28334 followed on 2026-10-11. Nothing on record says whether the merger closed, was terminated or was extended, or whether the $270 million termination fee (claim 4739) became payable.
Several headline figures depended on that transaction and now have no visible footing. These are roughly 1.3 GW of owned gross power (claim 28335), more than 1 GW of potential expansion (claim 28336), $500 million in annual run-rate cost savings by end-2027 (claim 28337), the elimination of more than $10 billion in future lease overhead (claim 28338), and the projection that Core Scientific holders would own under 10% of the combined company (claim 28339). The leverage projection of $17.3 billion in net debt at 3.0x EBITDA (claim 26761) was framed alongside the pending deal. None of these figures has been reaffirmed, revised or withdrawn since July 2025.
The size of the OpenAI commitment changed between disclosures without a reconciling statement. On 2025-03-10 the infrastructure contract was given as $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI-related backlog was given as $11.2 billion (claim 4969). The $700 million difference may reflect revenue already recognized or a different measurement basis, but the record contains no statement explaining it. The record also holds no later update on either the contract value or its share of the $25.9 billion total backlog (claim 4970).
The capacity and partnership language from May 2025 has not been carried forward. On 2025-05-13 management cited 420 MW of active power added (claim 4972), 1.6 GW of contracted power (claim 4973) and an IBM partnership to supply compute for Granite models (claim 4971). Later disclosures on record do not update the active-versus-contracted capacity figures or mention the IBM arrangement again. Nothing indicates whether the contracted power has been energized, or whether the IBM relationship has continued, expanded or ended.
What we haven't been told
2026-10-11The largest unresolved item is the Core Scientific merger. On 2025-07-06 and 2025-07-07 CoreWeave announced a definitive all-stock agreement valued at about $9 billion at 0.1235 shares per Core Scientific share (claims 28333, 4731, 4729, 19824). It said the deal was expected to close in Q4 2025 (claim 28334) and set an outside closing date of 2026-04-07 (claim 4738). Both dates have passed. The ledger auto-transitioned claims 4731 and 4738 to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09, and claim 28334 is likewise not_yet_verifiable. The last disclosure on record about the deal is from July 2025. Nothing in the record says whether the transaction closed, was extended, or was terminated. That includes whether the $270 million termination fee payable to CoreWeave (claim 4739) was triggered. Several projections rest on the merger and have not been restated since: roughly 1.3 GW of owned power (claim 28335), 1 GW or more of expansion potential (claim 28336), $500 million in annual run-rate savings by end-2027 (claim 28337), and the elimination of more than $10 billion in future lease overhead (claim 28338).
The OpenAI contract figure changed between two disclosures without explanation. On 2025-03-10 the contract was described as an $11.9 billion infrastructure agreement (claim 19820). Two months later, on 2025-05-13, the OpenAI deal appeared as $11.2 billion of revenue backlog (claim 4969). The $700 million gap may reflect revenue recognized in the meantime or a different measurement basis. No reconciliation is on record, and the OpenAI figure does not appear again in later disclosures in this ledger.
The May 2025 amendment to the revolving credit facility extended maturity to 2028-05-02 (claim 5012). It also carried a contingent springing maturity date of 2026-12-30 (claim 11926). The conditions that would trigger that earlier date are not described in the record. With the date now less than three months away, nothing on record says whether those conditions are expected to apply, have been cured, or were renegotiated. The claim remains in its originally stated form from 2025-05-05.
Several items from the 2025-05-13 Q1 update have not reappeared. These are the IBM partnership to provide compute for Granite models (claim 4971), the Weights & Biases acquisition (claim 4974), and the 1.6 GW contracted power figure (claim 4973). In the record supplied, the IBM arrangement is never mentioned again in any form. The Weights & Biases deal has no closing confirmation or integration update. The most recent capacity disclosure, dated 2025-07-20, still cites roughly 420 MW of active power as of March 2025 (claim 26764). The contracted-capacity figure has not been updated, so it is not possible to tell how much of the 1.6 GW has been energized or whether the figure has been revised.
What we haven't been told
2026-10-11The Core Scientific merger is the clearest case of a commitment that has gone quiet. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an outside closing date of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure on record is the 2025-07-20 debt offering materials, which still describe the acquisition as pending and point to expected lease cost savings (claim 26763). The April 2026 deadline passed with no recorded statement, and both the merger and the deadline claims were automatically moved to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09. The record contains no announcement that the deal closed, was extended, or was terminated. It also says nothing about whether the termination fee became payable, or what happened to the lease savings that were cited in support of the July 2025 financing.
The IBM partnership to supply compute for IBM's Granite models (claim 4971) appears once, in the 2025-05-13 first-quarter disclosure, alongside a series of product and customer announcements. It does not recur in any later claim on record, including the July 2025 financing materials that otherwise catalog customer commitments and backlog. Nothing explains whether the arrangement was expanded, folded into broader backlog figures, or wound down.
The OpenAI contract figure moved without explanation. The March 2025 disclosure gave the infrastructure contract as $11.9 billion (claim 19820). By 2025-05-13 the same relationship was described as $11.2 billion of revenue backlog (claim 4969). The $700 million gap may reflect revenue recognized in the interim or a change in definition, but the record contains no statement reconciling the two numbers or saying whether the contract value itself changed.
Contracted power capacity of 1.6 GW (claim 4973) was cited on 2025-05-13 next to 420 MW of active power. The 2025-07-20 materials repeat the 420 MW active figure, still dated to March 2025 (claim 26764), and do not restate the 1.6 GW contracted number. The record does not show whether the contracted pipeline grew, shrank, or was redefined, or when the contracted capacity was expected to become active.
This review covers the claims as supplied, which end partway through the 2025-07-20 disclosures. Items such as the 2026-12-30 contingent springing maturity (claim 11926) have not yet reached their dates, so they are not treated here as walked back.
What we haven't been told
2026-10-10The Core Scientific merger is the largest open item. CoreWeave signed the all-stock agreement in July 2025 at 0.1235 CoreWeave shares per Core Scientific share, with an outside closing date of April 7, 2026 (claims 4729, 4731, 4738, 19824). The last mention on record is the July 20, 2025 debt-offering materials, which still called the deal pending and counted on lease cost savings from it (claim 26763). The April 2026 deadline passed with no completion, extension, or termination recorded. The ledger moved claims 4731 and 4738 to delayed on September 3, 2026 and to not_yet_verifiable on October 9, 2026. Management has not said whether the deal closed, lapsed, or was renegotiated. It has also not said whether the $270 million termination fee payable to CoreWeave (claim 4739) was triggered, or what happened to the lease savings built into its leverage projections.
The OpenAI contract figure fell between two disclosures without explanation. In March 2025 the contract was described at $11.9 billion (claim 19820). By the May 13, 2025 quarterly disclosure, the OpenAI-related revenue backlog was given as $11.2 billion (claim 4969). The two figures may measure different things, such as total contract value versus remaining backlog after revenue was recognized. The record contains no statement reconciling them, and no OpenAI-specific figure appears after May 2025.
Two items announced in the May 13, 2025 quarterly release are absent from every later disclosure on record. One is the IBM partnership to supply compute for the Granite models (claim 4971). The other is the acquisition of Weights & Biases (claim 4974). Neither is cited in the July 2025 financing materials, which list other operating highlights. The record has no subsequent word on IBM capacity delivered, the integration of Weights & Biases, or its revenue contribution.
The revolving credit facility amendment of May 5, 2025 extended maturity to May 2, 2028 (claim 5012). It also carried a contingent springing maturity date of December 30, 2026 (claim 11926). That date is now less than three months away, and nothing on record since May 2025 says whether the condition has been cured, waived, or remains live. In July 2025 the company said it would repay $450 million of revolver borrowings from note proceeds (claim 26757 onward). That plan does not say whether the springing trigger still applies.
One ledger flag is weaker than it looks. Claim 11919, the May 27, 2025 expected closing of the senior notes offering, went to delayed and then not_yet_verifiable. However, claims 11917 and 4824 record the $2.0 billion 9.250% notes due 2030 as issued on May 27, 2025, upsized from the $1.5 billion first announced (claim 11921). This appears to be an unlinked confirmation in the record rather than a missed date. It is noted so that readers do not draw a stronger inference than the record supports.
What we haven't been told
2026-10-10The Core Scientific merger is the most consequential open item. CoreWeave announced the all-stock deal in early July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824) and set an outside closing date of April 7, 2026 (claim 4738). The deal also carried a $270 million termination fee payable to CoreWeave (claim 4739). The last mention on record is the July 20, 2025 debt offering materials, which still described the acquisition as pending and cited expected lease cost savings (claim 26763). The April 2026 deadline passed with nothing filed in this record. The ledger automatically moved both dated claims to delayed and then to not_yet_verifiable on October 9, 2026. The record contains no statement that the merger closed, was terminated, or had its deadline extended, and it does not say whether the termination fee was triggered or what became of the projected lease savings.
The OpenAI contract figure changed between disclosures without explanation. In March 2025 the contract was described at $11.9 billion (claim 19820). Two months later the first-quarter release described the OpenAI backlog as $11.2 billion (claim 4969). The $700 million gap may simply be revenue recognized in the interim. Still, no disclosure on record reconciles the two figures, and the OpenAI-specific number does not appear again after May 2025, even though total backlog of $25.9 billion (claim 4970) was presented as the headline measure.
The capacity figures have not been updated. In May 2025 management cited 420 MW of active power and 1.6 GW of contracted power (claims 4972, 4973). The July 2025 notes offering repeated the same 420 MW figure, explicitly dated to March 2025, across 33 data centers (claim 26764). No later figure on record updates either number, and the contracted 1.6 GW has not been mentioned since May 2025. That leaves no disclosed view of how much contracted power has been energized, despite projections of $8.8 billion in additional secured debt to serve those contracts (claim 26760). The IBM partnership for Granite compute capacity (claim 4971) has a similar pattern: it appears once, in the May 2025 release, and is not mentioned again in the record.
The revolving credit facility carries a dated contingency that has gone unaddressed. In May 2025 the facility was expanded to $1.5 billion with a 2028 maturity (claims 5010, 5012), subject to a contingent springing maturity of December 30, 2026 (claim 11926). In July 2025 CoreWeave said it would use $450 million of note proceeds to repay revolver borrowings (claim 26759). The record never says whether the conditions behind the springing maturity have been cleared, and that date is now under three months away.
A smaller item concerns the record itself more than the company. The May 2025 notes offering was expected to close May 27, 2025 (claim 11919), and the ledger has moved it through delayed to not_yet_verifiable. Separate claims dated May 27, 2025 describe the issuance of $2.0 billion of 9.250% senior notes due 2030 (claims 4824, 11917), which suggests the offering did close, upsized from the $1.5 billion first described (claim 11921). What is missing is not a company explanation but a link in this record between the closing and the original expected date.
What we haven't been told
2026-10-10The Core Scientific merger is the clearest case. CoreWeave announced an all-stock combination at 0.1235 CoreWeave shares per Core Scientific share in July 2025 (claims 4729, 4731, 19824), with an outside closing date of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). The last time the deal appears in the record is 2025-07-20, when it was still described as pending and tied to expected lease cost savings (claim 26763). The ledger automatically moved claims 4731 and 4738 to delayed on 2026-09-03 and then to not_yet_verifiable on 2026-10-09, because the deadline passed with no matching disclosure. Nothing in the record says whether the merger closed, was extended, or was abandoned. It also does not say whether the termination fee was triggered or how the lease savings assumptions in the July debt materials were revised.
Two acquisitions and partnerships announced in the 2025-05-13 first-quarter disclosure do not reappear. The first is the Weights & Biases acquisition (claim 4974). The second is the IBM partnership to provide compute capacity for Granite models (claim 4971). No later claim records Weights & Biases closing or being integrated, and no later claim reports revenue, capacity, or renewal terms for IBM. Both are still marked stated, which records only that they were announced.
The power figures in the same release are a third case. Management cited 1.6 GW of contracted power and 420 MW of active capacity added (claims 4972, 4973). The July 2025 debt offering materials repeated the 420 MW figure, explicitly labeled as of March 2025, across 33 data centers (claim 26764). They gave no updated active number and did not restate the 1.6 GW contracted figure. The record contains no later statement on how much of the contracted power has been energized, or on how the pending Core Scientific capacity was meant to count toward it.
The OpenAI contract is described with two different values. A March 2025 claim gives it as $11.9 billion (claim 19820). The May 2025 release puts OpenAI-related backlog at $11.2 billion (claim 4969), inside a total backlog of $25.9 billion (claim 4970). The gap may reflect revenue already recognized or a difference in definition, but the record contains no statement reconciling the two figures.
One flagged item looks like a ledger artifact rather than a walk-back. Claim 11919, the expected 2025-05-27 closing of the senior notes offering, was moved to delayed and then not_yet_verifiable. However, claims 4824 and 11917 record the 9.250% notes due 2030 as issued on 2025-05-27 at $2.0 billion, up from the $1.5 billion first described (claim 11921). That deadline appears to have been met, and the offering was larger than first announced. The ledger supplied here also ends partway through the 2025-07-21 entries, so any later disclosures that address the items above were not visible for this review.
What we haven't been told
2026-10-09The pending acquisition of Core Scientific is the most conspicuous silence on the record. CoreWeave announced the all-stock merger on 7 July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 19824, 4731), with an outside closing date of 7 April 2026 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). The last mention in the disclosures on file is 20 July 2025, when debt-offering materials still described the deal as pending and cited expected lease-cost savings (claim 26763). The closing deadline passed without a corresponding filing in this record. The ledger moved claims 4731 and 4738 to 'delayed' on 3 September 2026, and they are now 'not_yet_verifiable' as of 9 October 2026. The record contains no statement that the merger closed, that the outside date was extended, that either party terminated, or whether the termination fee became payable.
The size of the OpenAI commitment changed between two disclosures without explanation. On 10 March 2025 the OpenAI infrastructure contract was described at $11.9 billion (claim 19820). By the 13 May 2025 first-quarter disclosure, the figure attributed to the OpenAI strategic deal in revenue backlog was $11.2 billion (claim 4969), within a total backlog of $25.9 billion (claim 4970). The $700 million gap may reflect revenue already recognized or a difference in how the figure was defined. Management has not said which, and later disclosures on record do not reconcile the two numbers.
The IBM partnership to supply compute capacity for IBM's Granite models appears once, in the 13 May 2025 quarterly materials (claim 4971). It is absent from the July 2025 financing and merger documents, which list customers, contracted capacity and backlog drivers in some detail (claims 26760 through 26766). There has been no update on its scale, its contribution to backlog, or whether it remains active.
The acquisition of Weights & Biases was presented as a milestone in the same May 2025 release (claim 4974). The record that follows contains no disclosure of completion, purchase price, integration progress, or revenue contribution. By July 2025 the acquisition narrative had shifted entirely to Core Scientific. It is unclear whether the Weights & Biases transaction closed as described, because the company has not returned to the subject in the disclosures on file.
What we haven't been told
2026-10-09The Core Scientific merger is the clearest case of a commitment that has gone quiet. The merger agreement was announced on 2025-07-06 and 2025-07-07 (claims 4729, 4731, 19824) at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share. It set a closing deadline of 2026-04-07 (claim 4738), and the July 2025 debt-offering materials still described the deal as pending and cited expected lease cost savings (claim 26763). That July 2025 reference is the last mention on record. The deadline passed without a disclosed closing, extension or termination, and the ledger moved both claims 4731 and 4738 to delayed on 2026-09-03 and to not_yet_verifiable on 2026-10-09. The company has not said whether the deal closed, whether the outside date was extended, or whether the agreement was terminated. If it was terminated, it has not said whether the $270 million termination fee payable to CoreWeave (claim 4739) was triggered or collected. The lease savings presented as part of the rationale have not been mentioned again.
The size of the OpenAI commitment shifted between disclosures without comment. In March 2025 the contract was described as $11.9 billion (claim 19820). In the 2025-05-13 results it appeared as $11.2 billion of revenue backlog (claim 4969), inside a total backlog of $25.9 billion (claim 4970). The difference may simply be revenue recognized against the contract in the intervening quarter. However, no disclosure on record reconciles the two figures, and no later backlog figure for OpenAI or for the total appears in this record.
Capacity figures stopped updating after the first quarter of 2025. On 2025-05-13 the company reported roughly 420 MW of active power and 1.6 GW contracted (claims 4972, 4973). In July 2025 the senior notes materials repeated the same 420 MW figure across 33 data centers, still dated as of March 2025 (claim 26764), rather than giving a more current number. No later claim on record shows how much of the 1.6 GW has been energized, and no claim revises the contracted total. The IBM partnership for Granite compute capacity (claim 4971) and the Weights & Biases acquisition (claim 4974) are each mentioned once, in the 2025-05-13 disclosure. Neither has a follow-up on record, including a completion statement for the acquisition.
The May 2025 notes offering carries a flag that the record itself largely explains. Claim 11919 set an expected closing date of 2025-05-27. The ledger moved it to delayed on 2026-09-14 and to not_yet_verifiable on 2026-10-09. Yet claims 4824 and 11917, both dated 2025-05-27, describe the 9.250% senior notes due 2030 as issued, at $2.0 billion. That is larger than the $1.5 billion first described on 2025-05-18 (claim 11921). The status transitions appear to reflect a resolution gap in the ledger rather than a missed closing. What the record does not hold is a statement linking the issuance to the earlier closing guidance, or explaining the upsizing.
The ledger supplied here is cut off during the July 2025 entries, so later disclosures may address some of these points. Within the record as provided, none of them is explained.
What we haven't been told
2026-10-09The most consequential silence concerns the Core Scientific merger. CoreWeave announced the all-stock agreement on 2025-07-07 (claims 4729, 19824), with an exchange ratio of 0.1235 shares (claim 4731) and an outside closing date of 2026-04-07 (claim 4738). It last referred to the deal on 2025-07-20, when the pending acquisition and its expected lease-cost savings were cited in a debt offering (claim 26763). The April 2026 deadline passed with no closing, extension or termination on record, and both dated claims were automatically moved to delayed and then to not_yet_verifiable. Management has not said whether the transaction closed, was renegotiated or was abandoned, or whether the $270 million termination fee payable to CoreWeave (claim 4739) was ever triggered.
The revolving credit facility carries an unresolved condition. In May 2025 the company described a $1.5 billion expansion of the revolver (claims 5010, 11923) and an extension of its maturity to 2028-05-02 (claim 5012). The same disclosure noted a contingent springing maturity of 2026-12-30 (claim 11926). Nothing since then explains whether the condition behind that earlier date has been cleared, and that date is now less than three months away. The only later reference to the facility is a plan to repay $450 million of it with note proceeds (claim 26759), which leaves open which maturity governs.
The OpenAI commitment appears in the record at two values that are never reconciled. The March 2025 disclosure gave the infrastructure contract as $11.9 billion (claim 19820). The May 2025 disclosure described the OpenAI backlog as $11.2 billion (claim 4969). The $700 million gap may simply reflect revenue recognized in between, but the company has not said so, and no later figure for the contract appears.
The headline capacity and backlog figures stopped being refreshed after the first quarter of 2025. Contracted power of 1.6 GW (claim 4973) and total backlog of $25.9 billion (claim 4970) were last stated on 2025-05-13. Active power of roughly 420 MW (claim 4972) was repeated on 2025-07-20, but still as of March 2025 (claim 26764). The $2.6 billion DDTL 3.0 facility (claim 11922) and the IBM Granite capacity partnership (claim 4971) also appear once and are not followed up. The record available here contains no draw-down, delivery or partnership-progress updates for any of these.
One flag in the ledger should be read cautiously. The expected 2025-05-27 closing of the 2030 notes (claim 11919) was automatically marked delayed and then not_yet_verifiable. However, claims 11917 and 4824 record the notes being issued on that same date, upsized from the initially described $1.5 billion (claim 11921) to $2.0 billion. This appears to be a ledger artifact rather than a slip, and is noted only so that it is not mistaken for one.
What we haven't been told
2026-10-09The largest open item is the all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729, 19824). The agreement set an outside closing date of 2026-04-07 (claim 4738), with a $270 million termination fee payable to CoreWeave (claim 4739). The last time the deal appears on the record is 2025-07-20, when debt-offering materials still described it as pending and pointed to expected lease cost savings (claim 26763). The outside date passed six months ago. The ledger moved both the merger and the deadline claims to delayed, then to not_yet_verifiable, on its own schedule. No company statement on record says the deal closed, that the deadline was extended, or that it was terminated. Nothing says whether the termination fee became payable, or what happened to the lease savings case that was built on the deal.
The OpenAI relationship was first described as an $11.9 billion infrastructure contract (claim 19820, 2025-03-10). Two months later it appeared as an $11.2 billion revenue backlog figure (claim 4969, 2025-05-13). The gap may only reflect revenue recognized in the meantime, but no disclosure on record reconciles the two numbers. Neither figure has been updated since mid-2025.
The capacity figures have not moved since spring 2025: 1.6 GW of contracted power (claim 4973) and roughly 420 MW active across 33 data centers (claims 4972, 26764), both measured as of March 2025. The 420 MW figure was last repeated on 2025-07-20. The July 2025 financing materials also projected $8.8 billion of additional secured debt to service contracts and $17.3 billion of total net debt at 3.0x run-rate EBITDA (claims 26760, 26761). The record contains no later capacity figure and no update to those leverage projections, so it is not possible to say whether either was met, raised or cut.
Two items from the 2025-05-13 disclosures have not appeared since: the acquisition of Weights & Biases (claim 4974) and the IBM partnership to supply compute for Granite models (claim 4971). Neither has a recorded completion, integration update or later reference. That does not mean they lapsed, but the disclosures stop at the announcement.
One ledger flag should not be read as a slip. The expected 2025-05-27 closing of the 2030 notes offering (claim 11919) is marked not_yet_verifiable. However, claims 4824 and 11917 record issuance of the 9.250% Senior Notes due 2030 on that date, upsized from $1.5 billion to $2.0 billion (claims 11921, 11918). This analysis also covers only the record as supplied, which ends partway through claim 26755. Later disclosures may address some of these points.
What we haven't been told
2026-10-09The proposed merger with Core Scientific is the largest open item. CoreWeave announced the all-stock deal on 2025-07-07 (claims 19824, 4729) at 0.1235 CoreWeave shares per Core Scientific share, with a closing deadline of 2026-04-07 (claims 4731, 4738). The agreement also set a $270 million termination fee payable to CoreWeave (claim 4739). The last reference in the record is the 2025-07-20 notes offering material, which still called the acquisition "pending" and cited expected lease cost savings (claim 26763). The April 2026 deadline then passed without a completion notice, an extension, or a termination disclosure on record. Both deadline claims were automatically marked delayed and now sit at not_yet_verifiable. The record does not say whether the deal closed, lapsed, or was abandoned, whether the termination fee became payable, or what happened to the lease savings that were part of the financing case.
The OpenAI contract figure changed without explanation. In March 2025 the contract was described at $11.9 billion (claim 19820). By the 2025-05-13 disclosures, the OpenAI figure appeared as $11.2 billion of revenue backlog (claim 4969). The two numbers may measure different things: total contract value against what remained in backlog after early revenue recognition. The disclosures on record do not reconcile them, and no later statement updates the OpenAI backlog.
The IBM partnership to supply compute capacity for its Granite models was cited once, on 2025-05-13 (claim 4971). It does not appear again in any later financing, guidance, or customer claim in the record. Nothing on file says whether the arrangement grew, wound down, or was folded into other reporting.
The capacity figures have also not been refreshed. The May 2025 disclosures cited 420 MW of active power and 1.6 GW of contracted power (claims 4972, 4973). The July 2025 notes material repeated the 420 MW figure, still dated to March 2025 (claim 26764). The record holds no updated figure for either measure. That leaves the build-out schedule behind the $8.8 billion of additional secured debt projected to service contracts (claim 26760) without a disclosed status.
One date is approaching rather than missed. The May 2025 revolving credit amendment extended maturity to 2028-05-02 (claim 5012), but also set a contingent springing maturity of 2026-12-30 (claim 11926). The record has no later statement on whether the condition behind that earlier date has been satisfied or removed.
One flag in the ledger is not treated here as a walk-back. The expected 2025-05-27 closing of the senior notes offering (claim 11919) carries an automated delayed and not_yet_verifiable status. Separate claims record the $2.0 billion 9.250% notes due 2030 as issued on that date (claims 11917, 4824), and the offering was upsized from the $1.5 billion first described (claim 11921).
What we haven't been told
2026-10-09The Core Scientific merger is the clearest open question on the record. CoreWeave announced the all-stock deal on July 7, 2025, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an S-4 filing (4733) and a $270 million termination fee payable to CoreWeave (4739). The outside closing date was April 7, 2026 (4738). The last mention on record is July 20, 2025, when the transaction was still described as pending and tied to expected lease cost savings (26763). That deadline has now passed, and both the merger claim and the deadline claim moved automatically to delayed on September 3, 2026. The record holds no statement that the deal closed, was terminated, was extended, or that the fee was paid or waived. The lease savings it was meant to produce have not been mentioned again either.
The OpenAI figure changed without comment. On March 10, 2025, the OpenAI infrastructure contract was recorded at $11.9 billion (19820). Two months later, on May 13, 2025, the OpenAI-related backlog was given as $11.2 billion (4969). Some of the $700 million gap may reflect revenue recognized in the meantime, or a difference between contract value and backlog. No disclosure on record reconciles the two numbers or confirms the original contract value.
Two scale figures were stated once and not repeated. The 1.6 GW of contracted power (4973) and the $25.9 billion revenue backlog (4970) both appear only in the May 13, 2025 disclosures. The July 20, 2025 debt marketing materials restate active capacity of about 420 MW as of March 2025 (26764) and project $8.8 billion of additional secured debt to service contracts (26760), but they do not repeat the contracted-power or backlog totals. The record contains no later figure for either, whether higher, lower, or confirmed. The IBM Granite partnership (4971) is in the same position: described in May 2025 and absent from every later claim on record.
The financing calendar has one flag that does not fit the rest of the record and one deadline still ahead. The May 20, 2025 notes offering carried an expected closing of May 27, 2025 (11919), and the ledger has since marked it delayed. However, separate claims dated May 27 record $2 billion of 2030 notes as issued (11917, 4824). The more likely explanation is that the closing happened and the flag is stale. Still, no claim on record explicitly confirms the closing against the original expectation. Separately, the May 2025 credit facility amendment extended maturity to May 2, 2028 (5012, 11925) but included a contingent springing maturity of December 30, 2026 (11926). That date is now less than three months away. The record contains no later statement on whether the trigger condition has been resolved.
What we haven't been told
2026-10-08The largest open item is the Core Scientific merger. CoreWeave announced the all-stock agreement on 2025-07-07 (claims 4729, 19824), with an exchange ratio of 0.1235 shares (claim 4731), a $270 million termination fee payable to CoreWeave (claim 4739), and an outside closing date of 2026-04-07 (claim 4738). That date passed six months ago, and the ledger auto-transitioned claims 4731 and 4738 to delayed on 2026-09-03. The supplied record contains nothing after July 2025 on the deal. There is no closing announcement, extension, termination notice, or statement on whether the termination fee was triggered. The record does not say whether the transaction completed, lapsed, or was abandoned.
The OpenAI contract figure changed between disclosures. On 2025-03-10 the agreement was described as an $11.9 billion infrastructure contract (claim 19820). By 2025-05-13 the company cited an $11.2 billion OpenAI revenue backlog (claim 4969). Backlog and total contract value are different measures, and the gap may reflect revenue recognized in the interim. The record contains no statement reconciling the two numbers, and no later disclosure updates either figure.
Capacity disclosures stop after one data point. In the 2025-05-13 materials, management cited 420 MW of active power added and 1.6 GW of contracted power (claims 4972, 4973). The supplied record has no later figure for active or contracted capacity, so it is not possible to tell whether the contracted pipeline was energized on schedule, expanded, or reduced. The IBM partnership for Granite compute capacity (claim 4971) has the same pattern: it appears once on 2025-05-13 and is not mentioned again.
On the 9% Senior Notes due 2031, the ledger marks the first interest payment, scheduled for 2026-02-01, as delayed (claim 4659). Nothing in the record confirms the coupon was paid. This is more likely a gap in disclosure capture than evidence of a missed payment, but it is not resolved on the record. The two notes-closing claims also marked delayed (claims 11919 and 4699) appear to be ledger artifacts rather than walk-backs. Issuances on or near the promised dates are recorded in claims 11917 and 4658. The springing maturity date of 2026-12-30 on the revolving facility (claim 11926) is still ahead and remains unaddressed.
Note that the ledger supplied for this review ends partway through claim 4593. Later disclosures may address some of these items and were not reviewed here.
What we haven't been told
2026-10-08The Core Scientific merger is the largest unresolved item on the record. CoreWeave announced the all-stock agreement on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), along with the S-4 filing and Nasdaq listing approval (4733, 4735) and a $270 million termination fee payable to CoreWeave (4739). The stated outside date of 2026-04-07 (4738) has passed, and both the merger claim and the deadline claim were moved to delayed on 2026-09-03. The ledger contains no disclosure after July 2025 that the deal closed, that the outside date was extended, or that the agreement was terminated. It also says nothing about whether the termination fee was triggered or collected.
The DDTL 3.0 facility has a similar gap. Management described up to $2.6 billion in delayed-draw term loans in May 2025 (11922) and repeated the terms in the July 30 filing, including a commitment termination date of 2026-07-31 (4593), an August 2030 maturity (4594), and a 1.40x minimum debt service coverage ratio starting April 2027 (4596). The commitment window closed more than two months ago and the claim moved to delayed automatically. Nothing on record says how much of the $2.6 billion was drawn before the window closed, whether undrawn commitments lapsed, or whether the window was extended.
The OpenAI figure was revised downward without explanation. On 2025-03-10 the contract was described as $11.9 billion (19820). By the 2025-05-13 results it appeared as $11.2 billion of revenue backlog (4969), within total committed backlog of $25.9 billion (4970). The difference could reflect revenue already recognized, or the gap between contract value and backlog. Management has not reconciled the two numbers. Neither the OpenAI backlog nor the total backlog figure is updated anywhere after May 2025 in this record.
The capacity figures from May 2025 have also gone unrepeated. Management cited 1.6 GW of contracted power (4973) and 420 MW of active power added (4972), and neither figure appears again in the disclosures on file. That does not show the targets changed, but there is no later statement of how much contracted power has gone live.
Some smaller financing items carry automated delayed flags, and these need care. For the May 2025 notes, the expected closing date of 2025-05-27 (11919) is flagged, but an issuance claim dated that same day (11917, 4824) suggests the offering closed on schedule. The July 2025 9% notes have no such confirmation: the expected 2025-07-25 closing (4699) and the first interest payment due 2026-02-01 (4659) are both flagged delayed, and no subsequent claim confirms either. These flags are more likely missing follow-up disclosures than actual slippage. The revolver's contingent springing maturity of 2026-12-30 (11926) is now less than three months away, and the record has no statement on whether the condition that would trigger it has been resolved.
This review covers claims dated through 2025-07-30. The ledger supplied was cut off mid-entry, so later disclosures that address some of these points may exist outside this extract.
What we haven't been told
2026-10-08The largest unresolved item is the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 (claims 19824, 4729), with an exchange ratio of 0.1235 shares, a Form S-4 filing, a Nasdaq listing approval for the new shares, and a $270 million termination fee payable to CoreWeave (4731, 4733, 4735, 4739). The agreement set an outside closing date of 2026-04-07 (4731, 4738). The last disclosure on record is from early July 2025. Both deadline claims were automatically moved to delayed on 2026-09-03 after the date passed without a completion notice. The record contains no statement that the deal closed, was extended, or was terminated, and nothing on whether the $270 million fee was triggered. For a transaction of this size, that silence is the most significant gap in the file.
The OpenAI relationship appears under two figures that have not been reconciled. The March 2025 disclosure gives the infrastructure contract as $11.9 billion (19820). The 2025-05-13 results describe the OpenAI strategic deal as $11.2 billion of revenue backlog (4969), inside a total backlog of $25.9 billion (4970). The two numbers may measure different things, such as headline contract value versus recognized backlog, but no disclosure on record explains the $700 million difference. Later filings do not restate the OpenAI-specific figure.
The DDTL 3.0 facility, described in May 2025 as up to $2.6 billion of delayed-draw term loans (11922, 4592), had a commitment termination date of 2026-07-31 (4593). That date passed and the claim was auto-transitioned to delayed on 2026-09-03. Nothing on record says how much of the $2.6 billion was drawn before the window closed, whether the window was extended, or whether any undrawn commitment lapsed. A related date is still ahead: the revolving credit facility, expanded to $1.5 billion with maturity extended to 2028-05-02, carries a contingent springing maturity of 2026-12-30 (11923, 11925, 11926). No disclosure on record says whether the condition that would accelerate it is expected to apply.
Several bond milestones were stated in advance and never explicitly confirmed. These are the expected closing of the May 2025 notes on 2025-05-27 (11919), the expected closing of the July 2025 9% notes on 2025-07-25 (4699), and the first 9% coupon due 2026-02-01 (4659). All are now marked delayed by automatic transition. Issuance claims dated 2025-05-27 and 2025-07-27 (11917, 4824, 4658) strongly suggest both offerings did close, possibly with the ledger simply not reconciled. Even so, the record has no closing confirmation for either offering and no statement that the February 2026 interest payment was made.
One partnership has gone quiet. The IBM arrangement to supply compute capacity for Granite models appears once, in the 2025-05-13 results (4971), and is not mentioned again in the disclosures on record. Nothing says whether it was expanded, completed, or wound down.
The ledger as supplied ends partway through the July 2025 entries. Later disclosures not included here may address some of these points.
What we haven't been told
2026-10-08The Core Scientific merger is the largest item on record that has gone quiet. CoreWeave announced the all-stock agreement on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an S-4 filing, Nasdaq listing approval for the new shares, treatment of Core Scientific's convertible notes, and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4737, 4739). The agreement set an outside closing date of 2026-04-07 (claims 4731, 4738). That date passed six months ago, and both claims were moved to delayed on 2026-09-03 by date, not by any new disclosure. Nothing in the record says whether the deal closed, was terminated, or was extended. Nothing says whether the $270 million fee was triggered or paid. Nothing says how the 1.6 GW contracted-power figure, which partly relied on Core Scientific sites, should now be read. A transaction of this size would normally get an explicit closing or termination statement. If one exists, it has not reached this record.
The operating scale metrics from the May 2025 quarterly release have not been updated since. On 2025-05-13 management cited 1.6 GW of contracted power, 420 MW of active power added, a $25.9 billion revenue backlog, and an $11.2 billion OpenAI backlog (claims 4973, 4972, 4970, 4969). The OpenAI figure was itself lower than the $11.9 billion contract value disclosed on 2025-03-10 (claim 19820), and no reconciliation was offered. The gap may simply reflect revenue already recognized, but the company did not say so. After the IBM Granite capacity partnership (claim 4971) and the July 2025 reference to an unnamed material GPU customer contract (claim 4595), the record holds no later backlog, power, or customer-concentration figures. These are the numbers the company used to frame its growth story, and they have not been restated in more than a year.
The DDTL 3.0 facility, announced as up to $2.6 billion of delayed-draw term loans (claims 11922, 4592), had a commitment termination date of 2026-07-31 (claim 4593). That date passed without any disclosure of how much was drawn, whether undrawn commitments lapsed, or whether the window was extended. The claim was moved to delayed by date on 2026-09-03. The same facility carries a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596), so how much of this capacity was actually used bears directly on that covenant. The record is silent on it.
The revolving credit facility has a springing maturity of 2026-12-30 (claim 11926), less than three months away. It was disclosed in May 2025 alongside the $1.5 billion revolver expansion and the 2028-05-02 maturity extension (claims 11923, 11925, 5010, 5012). The record does not explain which conditions would trigger the earlier date, or whether the company expects them to be met. The claim is not yet overdue, but no update has followed the original filing.
Several other delayed flags appear to be date artifacts rather than real slippage. The May 2025 notes offering, with an expected close of 2025-05-27 (claim 11919), is matched by a recorded issuance on that date, upsized from $1.5 billion to $2.0 billion (claims 11917, 11921, 4824). The July 2025 9% notes, with an expected close of 2025-07-25 (claim 4699), are matched by a recorded issuance of $1.75 billion (claims 4658, 4697). For the first scheduled coupon on those notes, due 2026-02-01 (claim 4659), the absence is only of confirmation, which issuers seldom announce. These items show no sign of a walk-back. They are noted here so the flags are not read as one.
What we haven't been told
2026-10-08The Core Scientific merger is the largest open item. CoreWeave announced the all-stock deal in July 2025 at 0.1235 shares per Core Scientific share (claims 4729, 4731, 19824), filed for an S-4 (4733), and set an outside closing date of 2026-04-07 (4738). That date passed six months ago, and both the merger claim and the deadline claim moved automatically to delayed. The record contains no disclosure from CoreWeave saying whether the deal closed, was extended, or was abandoned. A $270 million termination fee payable to CoreWeave (4739) is still listed only as a contract term, and nothing on record says whether that fee was ever triggered or paid.
The $2.6 billion DDTL 3.0 delayed-draw facility was announced in May and July 2025 (11922, 4592), with a commitment termination date of 2026-07-31 (4593). That date has passed and the claim has moved to delayed. The record does not say how much of the facility was drawn before the commitments lapsed, or whether they were extended. A related contingent springing maturity date of 2026-12-30 (11926) is approaching, and nothing has been said about whether its trigger conditions apply.
The 9% senior notes due 2031 carried a first interest payment date of 2026-02-01 (4659). That claim has moved to delayed because no confirmation of payment appears on record. This is more likely a gap in disclosure than a missed coupon, but CoreWeave has not addressed it. The earlier notes offerings (11919, 4699) were also flagged delayed against their expected May and July 2025 closings. Separate issuance claims (4824, 11917, 4658) indicate those offerings did close, so those flags reflect missing closing confirmations rather than real slips.
The figures for the OpenAI relationship do not agree. The contract was described in March 2025 as $11.9 billion (19820). Two months later it was described as $11.2 billion of revenue backlog (4969). No statement reconciles the $700 million difference, explains whether it reflects revenue already recognized or a change in terms, or updates the number since.
Several operating metrics from the May 2025 disclosures have not been restated in the claims we hold. These are $25.9 billion of total revenue backlog (4970), 1.6 GW of contracted power (4973), and 420 MW of active power (4972). Each remains at its first-stated value. Without a later figure, it cannot be determined from the record whether these have grown, been revised, or simply stopped being reported.
What we haven't been told
2026-10-07The proposed all-stock merger with Core Scientific is the most consequential open item. CoreWeave announced the agreement on 2025-07-07 (claims 4729, 19824), setting an exchange ratio of 0.1235 shares, an S-4 filing (4733), and a $270 million termination fee payable to CoreWeave (4739). The agreement carried an outside date of 2026-04-07 (4731, 4738). That date passed, and on 2026-09-03 the ledger automatically moved both claims to delayed. The record contains no later disclosure saying whether the deal closed, was terminated, was renegotiated, or had its deadline extended. It also does not say whether the termination fee was triggered or collected.
The size of the OpenAI commitment changed between disclosures without explanation. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). On 2025-05-13 it appeared as $11.2 billion of revenue backlog (claim 4969), which is $700 million less. The difference may come from a change in definition, from revenue recognized in the meantime, or from a revised contract value. No statement on record reconciles the two figures. Both claims still sit as stated, side by side.
The first coupon on the 9% Senior Notes due 2031 was scheduled for 2026-02-01 (claim 4659, tied to the $1.75 billion issuance in 4658 and 4697). On 2026-09-03 the ledger moved this claim to delayed because no later disclosure confirms the payment was made. The likely reading is that the payment occurred and was simply not restated. Still, nothing on record affirms it.
Two note-offering closing dates also carry a delayed flag: 2025-05-27 (claim 11919) and 2025-07-25 (claim 4699). In both cases the record contains issuance claims dated at or just after the promised date (4824 and 11917 on 2025-05-27; 4658 on 2025-07-27). This suggests the delay status reflects a gap in linking claims rather than a real slip. Claim 11919 was also marked stated on 2026-09-13 and then delayed a day later, which points to the same bookkeeping issue. Neither offering shrank. Both were upsized, from $1.5 billion to $2.0 billion and from $1.5 billion to $1.75 billion (4698), and the company disclosed the increases. The open question is only that no closing notice is tied to the original promised dates.
What we haven't been told
2026-10-07The largest open item is the proposed all-stock merger with Core Scientific. CoreWeave announced it on 2025-07-07 (claims 4729, 19824) at an exchange ratio of 0.1235 shares (claim 4731) and an outside closing date of 2026-04-07 (claim 4738). The surrounding filings covered the S-4 registration (claim 4733), Nasdaq listing approval for the new shares (claim 4735), conversion of Core Scientific's convertible notes (claim 4737) and a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure on record dates from July 2025. The April 2026 deadline has passed, and both dated claims were automatically moved to delayed. The record contains no statement that the merger closed, no amended agreement extending the outside date, and no termination notice. It is also silent on whether the $270 million fee became payable.
The OpenAI relationship has two figures on record that have not been reconciled. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). Two months later, on 2025-05-13, the strategic deal appeared as $11.2 billion of revenue backlog (claim 4969). The gap may reflect revenue recognized in the interim or a different basis of measurement. No disclosure on record explains the $700 million difference, and nothing after May 2025 updates either figure.
The DDTL 3.0 facility was described on 2025-05-18 as up to $2.6 billion of delayed-draw term loans (claim 11922). Its commitment termination date was 2026-07-31 (claim 4593), and that claim has since moved to delayed. The record does not say how much was drawn before the commitment window closed, whether undrawn commitments lapsed, or whether the window was extended. A related date is approaching: the contingent springing maturity of 2026-12-30 attached to the revolving credit facility (claim 11926). Nothing on record confirms whether the conditions that would trigger it have been resolved.
The headline capacity metrics from 2025-05-13 have not been restated in any later claim on record: 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). The same is true of the IBM partnership for Granite compute capacity (claim 4971), which appears once in that quarter's disclosures and not again. Given how central power capacity is to the company's growth narrative, the lack of an updated figure or a progress statement against the contracted total is notable.
Several other items carry an automated delayed flag but should not be read as slipped commitments. These are the May 2025 notes closing (claim 11919, due 2025-05-27), the July 2025 notes closing (claim 4699, due 2025-07-25) and the first 9% coupon date (claim 4659, 2026-02-01). Separate claims record the 9.250% notes issued on 2025-05-27 (claim 4824) and the 9% notes due 2031 issued on 2025-07-27 (claim 4658). The flags therefore appear to reflect the absence of a separate confirming statement rather than any evidence of delay. Note that the claims ledger supplied for this review was cut off partway through claim 4596, so later disclosures that address any of these items may exist but were not examined.
What we haven't been told
2026-10-07The proposed merger with Core Scientific is the most significant open thread in the record. The deal was announced on 2025-07-06 and 2025-07-07 (claims 4729, 4731, 19824) at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share. It came with an S-4 filing (claim 4733), a 270 million USD termination fee payable to CoreWeave (claim 4739), and an outside closing date of 2026-04-07 (claims 4731, 4738). Both date-bearing claims moved to delayed on 2026-09-03 because that deadline passed without a recorded resolution. The available record contains no completion announcement, no termination notice, no extension of the outside date, and no statement on whether the termination fee was triggered. Management has not said whether the transaction is still alive.
The size of the OpenAI relationship has two figures that are never reconciled. On 2025-03-10 the contract was described as 11.9 billion USD (claim 19820). By 2025-05-13 the same relationship appeared as 11.2 billion USD of revenue backlog (claim 4969), inside a total committed backlog of 25.9 billion USD (claim 4970). The 700 million USD difference may reflect revenue recognized in the interim or a different measurement basis. No disclosure in the record explains it, and neither figure is updated after May 2025.
The IBM partnership to supply compute for Granite models (claim 4971) appears once, on 2025-05-13, in partnership language. It remains at stated, and no later disclosure in the record mentions it again. There is nothing on deployment scale, revenue contribution, renewal, or whether it became a contracted backlog item. The partnership has simply dropped out of the narrative.
The capacity figures from the same 2025-05-13 disclosure, 420 MW of active power and 1.6 GW contracted (claims 4972, 4973), have no successor data point in the record. A business whose investment case rests on converting contracted power into energized capacity has, as far as this ledger shows, published no update on that conversion rate in the following sixteen months. It has also not said whether the contracted figure grew, held, or contracted.
The remaining delayed items appear to be ledger mechanics rather than walk-backs. The expected closing dates for the May and July 2025 notes offerings (claims 11919, 4699) were followed by issuance disclosures dated 2025-05-27 and 2025-07-27 (claims 11917, 4824, 4658), which suggests both closed as planned. The first 9 percent coupon payment on the 2031 notes, due 2026-02-01 (claim 4659), is different. It was auto-marked delayed only because no confirmation of payment appears in the record. That reads as a gap in disclosure capture rather than evidence of a missed payment, but it remains unverified.
What we haven't been told
2026-10-07The proposed all-stock merger with Core Scientific is the largest open item on the record. It was announced on 2025-07-07 (claims 4729, 19824) with an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claim 4731) and an outside closing deadline of 2026-04-07 (claim 4738). The supporting steps were set out at the same time: an S-4 registration filing (claim 4733), Nasdaq listing approval for the new shares (claim 4735), conversion of Core Scientific's convertible notes into CoreWeave securities (claim 4737), and a $270 million termination fee payable to CoreWeave under specified conditions (claim 4739). The last disclosure on record about the deal is dated July 2025. The 2026-04-07 deadline has passed, and on 2026-09-03 both 4731 and 4738 were moved automatically to delayed. The record has no statement that the merger closed, that the deadline was extended, or that the agreement was terminated. It also says nothing about whether the termination fee was triggered or paid.
The OpenAI relationship appears under two different figures with no reconciliation. A contract value of $11.9 billion was recorded on 2025-03-10 (claim 19820). By the 2025-05-13 disclosures, the OpenAI figure was given as $11.2 billion of revenue backlog (claim 4969), within a total committed backlog of $25.9 billion (claim 4970). The $0.7 billion gap could simply reflect revenue already recognized, or a difference between contract value and remaining backlog. However, no disclosure on record explains it, and no later OpenAI-specific figure appears in the ledger as supplied.
Power capacity was last quantified on 2025-05-13: 1.6 GW contracted (claim 4973) and 420 MW of active capacity added (claim 4972). These are the company's main physical-delivery metrics, and much of the backlog depends on them. They do not reappear in later claims on the record supplied, and no updated contracted or active figure, revised energization schedule, or explanation for the absence has been captured.
Several debt-related dates now sit in an unconfirmed state. The first semiannual coupon on the 9% senior notes due 2031 was scheduled for 2026-02-01 (claim 4659). It was auto-marked delayed on 2026-09-03, and the record contains no statement confirming payment. Separately, the revolving credit facility amendment from 2025-05-05 extended maturity to 2028-05-02 (claims 5012, 11925) but included a contingent springing maturity of 2026-12-30 (claim 11926). That date is under three months away. Nothing on record states whether the condition that would trigger it has been avoided, refinanced, or remains live.
Two other items flagged as delayed look like ledger artifacts rather than walk-backs. The expected 2025-05-27 closing of the 2030 notes (claim 11919) is matched by issuance claims dated that same day (claims 4824, 11917). The expected 2025-07-25 closing of the upsized 2031 notes (claim 4699) is followed by an issuance claim dated 2025-07-27 (claim 4658). Both offerings appear to have completed, and their delayed status reflects the absence of an explicit closing confirmation rather than a known slip.
What we haven't been told
2026-10-06The proposed merger with Core Scientific is the largest open item on the record. CoreWeave announced the all-stock deal at 0.1235 CoreWeave shares per Core Scientific share on 2025-07-06 and 2025-07-07 (claims 4729, 4731, 19824). It set an outside closing date of 2026-04-07 (claim 4738) and noted a $270 million termination fee payable to CoreWeave (claim 4739). That date passed without a recorded completion, and on 2026-09-03 both 4731 and 4738 were automatically moved to delayed. The record holds nothing after July 2025 on this topic. There is no announcement that the deal closed, no extension of the outside date, no termination notice, and no word on whether the termination fee was triggered or paid. For a transaction of this size, the silence is notable.
The OpenAI relationship appears under two different figures with no reconciliation between them. On 2025-03-10 it was described as an $11.9 billion infrastructure contract (claim 19820). Two months later, on 2025-05-13, it appeared as an $11.2 billion revenue backlog (claim 4969). Some decline is expected as contracted revenue is recognized. However, the record holds no statement that ties the two numbers together or says whether the difference reflects recognized revenue, a changed scope, or a different measure. The relationship is not mentioned again by name in the disclosures on file after mid-May 2025.
The capacity figures from the first-quarter 2025 update have not been refreshed in the record. On 2025-05-13 management cited 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). Both remain at stated status, and no later disclosure on file updates, confirms, or revises them. The same applies to the IBM partnership to supply compute for Granite models (claim 4971). It appears once, in the same 2025-05-13 release, and has no follow-up language about deployment, expansion, or conclusion.
Several financing milestones carry automatic delayed flags that the surrounding record mostly undercuts. The expected closing dates for the May 2025 notes (claim 11919, due 2025-05-27) and the July 2025 notes (claim 4699, due 2025-07-25) were marked delayed in September 2026. However, issuance of the 9.250% notes due 2030 is recorded on 2025-05-27 (claims 11917, 4824), and issuance of the $1.75 billion 9% notes is recorded on 2025-07-27 (claim 4658). Both offerings therefore appear to have closed on schedule, and the flags look like an artifact of no separate closing confirmation being captured. The first interest payment on the 9% notes, due 2026-02-01 (claim 4659), is less clear. It is also flagged delayed, and nothing on file confirms the payment was made.
One date is approaching with no update on file. The revolving credit facility amendment of 2025-05-05 extended maturity to 2028-05-02 (claims 5012, 11925). It also included a contingent springing maturity of 2026-12-30 (claim 11926), less than three months away. The record contains no disclosure on whether the conditions behind that springing date have been satisfied or waived, or whether it remains live.
The ledger supplied for this review ends with filings from late July 2025. Some of the silences above may reflect gaps in coverage rather than omissions by the company, and should be checked against later filings before publication.
What we haven't been told
2026-10-06The proposed merger with Core Scientific is the most conspicuous silence on the record. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an S-4 filing and Nasdaq listing approval as stated next steps (claims 4733, 4735) and a $270 million termination fee payable to CoreWeave (claim 4739). The outside closing date was 2026-04-07 (claim 4738). That date passed, and the ledger moved both 4731 and 4738 to 'delayed' automatically on 2026-09-03. No subsequent disclosure on record says whether the deal closed, was extended, or was terminated, or whether the termination fee was triggered. The last mention of the merger in the record is July 2025.
The DDTL 3.0 facility, described in May 2025 as up to $2.6 billion in delayed-draw term loans (claim 11922), carried a commitment termination date of 2026-07-31 (claim 4593). That date has passed and the claim was auto-transitioned to 'delayed' on 2026-09-03. The record contains nothing after July 2025 on how much of the facility was drawn before commitments lapsed, whether the commitment period was extended, or whether undrawn capacity was allowed to expire. The 2030-08-21 maturity (claim 4594) remains stated, but nothing confirms the size of the debt it now applies to.
The OpenAI figure has shifted between disclosures without comment. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). By the 2025-05-13 results it appeared as $11.2 billion of revenue backlog (claim 4969). Recognized revenue would reduce backlog over time, which may account for part or all of the gap, but no statement on record reconciles the two numbers. Neither figure has been updated since May 2025, even though OpenAI was the largest single named component of the $25.9 billion total backlog (claim 4970).
Several operating figures from the May 2025 quarter have not been refreshed. Contracted power of 1.6 GW and 420 MW of active capacity added (claims 4973, 4972) remain the latest capacity numbers on record, and the IBM partnership for Granite compute (claim 4971) appears once and not again. Separately, the first coupon on the 9% senior notes, due 2026-02-01 (claim 4659), was auto-flagged 'delayed' on 2026-09-03 with no confirmation of payment on record. The issuance itself is documented (claim 4658), as are the two notes offerings whose closing-date claims were flagged 'delayed' (claims 11919 and 4699, against 11917 and 4658). Those flags therefore look like gaps in confirmation rather than evidence of a missed obligation. Still, nothing in the record closes them.
What we haven't been told
2026-10-06The largest open item is the Core Scientific merger. CoreWeave announced an all-stock agreement on 2025-07-06/07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). The terms included a $270 million termination fee payable to CoreWeave (4739), an S-4 filing (4733), Nasdaq listing approval (4735), and an outside closing date of 2026-04-07 (4738). The deal has not been mentioned in the record since July 2025. Both the merger claim and the deadline claim were automatically moved to delayed on 2026-09-03, after the outside date had passed. The record contains no announcement that the deal closed, was extended, or was terminated, and nothing on whether the termination fee was triggered or paid. A transaction of this size has passed its own deadline without a disclosure explaining what happened to it.
The DDTL 3.0 facility has a similar gap. In May 2025 CoreWeave described up to $2.6 billion in delayed-draw term loans (11922). A July 2025 filing set the commitment termination date at 2026-07-31 (4593) and the final maturity at 2030-08-21 (4594). That termination date passed without any statement in the record, and the claim was automatically marked delayed. Management has not said how much of the $2.6 billion was drawn before the commitments lapsed, whether they were extended, or whether undrawn capacity was simply allowed to expire. The related covenants, a 0.85x minimum contract realization ratio (4597) and a debt service coverage test (4596), were also last mentioned in July 2025.
The OpenAI relationship has two figures that do not match. The contract was announced on 2025-03-10 at $11.9 billion (19820). Two months later, the 2025-05-13 disclosure gave the OpenAI-related backlog as $11.2 billion (4969), inside a total backlog of $25.9 billion (4970). The $700 million difference may reflect revenue recognized in the meantime, but the record contains no statement that reconciles the two numbers. Neither figure appears in later disclosures in this ledger.
The two 2025 senior notes deals were flagged as delayed, but this looks like a gap in confirmation rather than a real slip. For the May offering, the expected 2025-05-27 closing (11919) was marked delayed, yet a claim dated that same day records a $2 billion issuance (11917, 4824). That issuance was larger than the $1.5 billion first described (11921), and no separate statement explained the upsizing. For the July offering, the 2025-07-25 closing (4699) was marked delayed, but a 2025-07-27 claim records $1.75 billion issued (4658), again up from $1.5 billion (4700, 4698). The first 9% coupon on those notes was due 2026-02-01 (4659). It was also moved to delayed because the record contains no confirmation that it was paid. The likely explanation is that these debts were serviced quietly. What is missing is any explicit statement to that effect.
One caveat applies to all of the above. The ledger provided ends partway through claim 4596, so later disclosures that resolve some of these questions may exist outside the portion reviewed here.
What we haven't been told
2026-10-05The proposed all-stock merger with Core Scientific is the most significant unresolved item. CoreWeave announced the agreement on 2025-07-07 (claims 4729, 19824), set an exchange ratio of 0.1235 shares, and committed to an outside closing date of 2026-04-07 (claims 4731, 4738). It also disclosed the supporting steps: a Form S-4 filing (4733), Nasdaq listing approval for the new shares (4735), and a $270 million termination fee payable to CoreWeave (4739). After July 2025 the record contains nothing further. The outside date has passed, and the ledger moved both deadline claims to delayed on 2026-09-03. No disclosure on record says whether the deal closed, was terminated, or had its outside date extended, or whether the termination fee was triggered.
The $2.6 billion DDTL 3.0 delayed-draw facility was announced on 2025-05-18 (claim 11922) and described again on 2025-07-30 (claim 4592), with a commitment termination date of 2026-07-31 (claim 4593). That date passed and the claim was marked delayed on 2026-09-03. A lapsed commitment window is not in itself a slip. Still, nothing on record says how much of the $2.6 billion was drawn before the window closed, whether the window was extended, or whether any undrawn balance simply expired. The later coverage covenants tied to the facility, such as the 1.40x debt service coverage ratio beginning April 2027 (claim 4596), are therefore attached to a principal amount that has not been confirmed.
The operating metrics from the first-quarter 2025 report have not been updated anywhere in the record. On 2025-05-13 the company cited a $25.9 billion revenue backlog (claim 4970), an OpenAI-specific backlog of $11.2 billion (claim 4969), 1.6 GW of contracted power (claim 4973), and 420 MW of active capacity (claim 4972). The OpenAI figure already sits below the $11.9 billion contract value recorded on 2025-03-10 (claim 19820), and no statement reconciles the two numbers. No later backlog, contracted power, or active capacity figure appears. The record does not show whether these metrics grew, were revised, or stopped being reported. The same pattern applies to the IBM Granite compute partnership (claim 4971) and the Weights & Biases acquisition (claim 4974). Each was mentioned once, on 2025-05-13, with no later disclosure of a closing, contract value, or continuation.
Several items the ledger marks as delayed appear to be timing artifacts rather than walk-backs. The notes closing dates of 2025-05-27 and 2025-07-25 (claims 11919, 4699) are each followed by recorded issuances of $2.0 billion and $1.75 billion (claims 11917, 4658), and the 2030 notes were upsized rather than cut. The first 9% coupon date of 2026-02-01 (claim 4659) has passed, but nothing in the record suggests it was missed.
The claims list supplied for this review ends partway through the July 2025 entries. Any statement above that something has not been mentioned since covers only the portion of the record that was available.
What we haven't been told
2026-10-05The Core Scientific merger is the largest open item. CoreWeave announced the all-stock deal on 7 July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an S-4 filing, a Nasdaq listing of the new shares, conversion of Core Scientific's convertible notes, and a $270 million termination fee payable to CoreWeave (4733, 4735, 4737, 4739). The agreement set an outside closing date of 7 April 2026 (4738). That date passed, and on 3 September 2026 the ledger moved both 4731 and 4738 to delayed. The record contains no later statement on whether the transaction closed, was extended, or was terminated, and nothing on whether the $270 million fee was triggered. The last disclosure on the deal is dated 7 July 2025.
The DDTL 3.0 facility has also gone quiet. CoreWeave described up to $2.6 billion of delayed-draw term loans in May and July 2025 (11922, 4592), with a commitment termination date of 31 July 2026 (4593) and maturity in August 2030 (4594). The commitment date has passed and the claim moved to delayed on 3 September 2026. The record does not say how much of the $2.6 billion was drawn before the window closed, whether the commitments were extended, or whether any undrawn balance lapsed. The same filing sets a 1.40x minimum debt service coverage ratio starting April 2027 (4596), so the drawn amount matters, and it has not been stated.
The May 2025 operating figures have not been updated in the record available here. On 13 May 2025 CoreWeave reported $25.9 billion of contracted backlog (4970), 420 MW of active power and 1.6 GW of contracted power (4972, 4973), and an IBM partnership for Granite model compute (4971). None of these appears again in later claims. Two OpenAI figures are also never reconciled. The 10 March 2025 contract was described as $11.9 billion (19820), but the 13 May backlog attributed $11.2 billion to the same relationship (4969). No disclosure in the record explains the $700 million difference, either as revenue already recognised or as a change in contract scope.
Some automated delayed flags in the ledger appear to be mechanical rather than substantive. The expected closing dates for the May and July 2025 notes offerings (11919, 4699) are followed within days by issuance records for $2.0 billion and $1.75 billion respectively (11917, 4824, 4658). Both offerings were upsized from earlier announced amounts (11921, 4700, 4698). The 1 February 2026 first coupon on the 9% notes (4659) moved to delayed only because no payment confirmation was ever recorded, not because of any reported default. These items say less about the company than the merger and the DDTL facility do. Note also that the claim list supplied here breaks off at claim 4597, so the absence of later updates should be read as an absence from this record.
What we haven't been told
2026-10-04The proposed all-stock merger with Core Scientific is the most visible gap. Claims 4729 and 19824 record the agreement announced on July 7, 2025, and claims 4731 and 4738 set an outside closing date of April 7, 2026, with an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share. Both dated claims moved automatically to delayed on September 3, 2026, after that deadline passed. The record holds no statement that the merger closed, was terminated, or had its outside date extended. Supporting items from the same filing, including the Form S-4 registration (4733), the Nasdaq listing approval (4735) and the $270 million termination fee payable to CoreWeave (4739), have not been mentioned again. Whether that fee became payable is not addressed anywhere on record.
The size of the OpenAI commitment shifted without explanation. Claim 19820, dated March 10, 2025, describes an infrastructure contract worth $11.9 billion. Claim 4969, from the May 13, 2025 disclosures, puts the OpenAI strategic deal backlog at $11.2 billion. The $700 million difference may reflect revenue already recognized or a different measurement basis, but no disclosure reconciles the two figures. Neither number has been updated since May 2025.
The $2.6 billion DDTL 3.0 facility (claims 11922 and 4592) carried a commitment termination date of July 31, 2026 under claim 4593. That claim moved automatically to delayed on September 3, 2026. Nothing on record says how much of the facility was drawn before the window closed, or whether the commitment was extended or allowed to lapse. Only the 2030 maturity date in claim 4594 remains as an undisputed reference point.
The operating metrics behind the growth story stopped at a single snapshot. Claims 4973, 4972 and 4970 recorded 1.6 GW of contracted power, 420 MW of active capacity added, and $25.9 billion of total backlog as of May 13, 2025. The IBM Granite partnership (4971) appears in the same release. None of these figures reappears in later claims on record, so there is no disclosed update on how much contracted power has been energized or how backlog has moved.
Several financing items are also marked delayed, but they read more like gaps in the record than reversals. These are the expected closings of the May and July 2025 notes offerings (11919, 4699) and the first 9 percent coupon payment due February 1, 2026 (4659). Issuance claims 11917 and 4658 indicate that both offerings did close, and both were upsized rather than cut. Still, no claim confirms that the February 2026 interest payment was made. That question is worth keeping open alongside the contingent springing maturity of December 30, 2026 (11926). This review covers claims on record through July 2025 filings.
What we haven't been told
2026-10-04The proposed merger with Core Scientific is the most consequential open item. CoreWeave announced the all-stock deal on 2025-07-06 and 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share, alongside a $270 million termination fee payable to CoreWeave and an S-4 filing (claims 4729, 19824, 4731, 4739, 4733). It committed to a closing deadline of 2026-04-07 (claim 4738). That date has passed, and on 2026-09-03 both claim 4731 and claim 4738 moved automatically from stated to delayed. The record does not say whether the deal closed, whether the outside date was extended, or whether the agreement was terminated. It also does not say whether the termination fee was triggered. The last substantive mention is July 2025.
The OpenAI contract figure changed between disclosures without explanation. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI figure appeared as $11.2 billion of revenue backlog (claim 4969), within a total backlog of $25.9 billion (claim 4970). The $700 million gap may reflect revenue recognized in the interim, or a difference between contract value and remaining backlog. Neither explanation appears in the record. There is also no later standalone OpenAI figure against which either number can be checked.
Several financing milestones were dated and then never confirmed in the record. The May 2025 senior notes offering had an expected closing of 2025-05-27 (claim 11919), and the July 2025 9% notes had an expected closing of 2025-07-25 (claim 4699). Both now carry automated delayed status. Separate entries describe the notes as issued (claims 11917, 4824, 4658), which suggests the delayed flags may come from a missing confirmation rather than an actual slip. More notable is the first 9% coupon on the 2031 notes, promised by 2026-02-01 (claim 4659). It moved to delayed on 2026-09-03, and no disclosure on record confirms the payment was made. Further out, the contingent springing maturity of 2026-12-30 on the revolving facility (claim 11926) is still listed as stated. The record does not say whether the condition that would trigger it has been resolved.
Operating disclosures thin out after the May 2025 quarter. That release cited 420 MW of active power capacity added and 1.6 GW of contracted capacity (claims 4972, 4973). It also announced an IBM partnership for Granite compute capacity (claim 4971) and the acquisition of Weights & Biases (claim 4974). None of these items has a follow-up in the ledger. There is no updated capacity figure, no statement of progress on the IBM arrangement, and no confirmation that Weights & Biases closed or was integrated. Later entries are dominated by debt issuance and insider sales, including CEO, CFO and CDO dispositions totaling about $349 million through mid-2025 (claims 19830, 19831, 19832). The ledger supplied here is cut off mid-entry at claim 4595 (2025-07-30). Some of these gaps may be addressed in records not shown, but none of the claims above carries a transition reflecting an update.
What we haven't been told
2026-10-04The Core Scientific merger is the most consequential open item. CoreWeave announced the all-stock agreement on 2025-07-07, at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 19824, 4731). It also described an S-4 filing, a Nasdaq listing approval and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4739). The agreement's outside date of 2026-04-07 (claim 4738) has passed, and both the merger and the deadline claims were automatically moved to delayed on 2026-09-03. Nothing on record after July 2025 says whether the deal closed, was extended or was terminated. Nothing says whether the termination fee was triggered or what became of the planned conversion of Core Scientific's convertible notes (claim 4737).
The size of the OpenAI relationship moved downward between two disclosures without any reconciling statement. On 2025-03-10 the contract was described at $11.9 billion (claim 19820). By 2025-05-13 the figure attributed to the OpenAI deal was $11.2 billion of revenue backlog (claim 4969). The two numbers may measure different things, since backlog falls as revenue is recognized. Still, the $700 million gap has not been explained in anything on record, and no later OpenAI figure has been disclosed to show whether the commitment has since grown, held or contracted.
The $2.6 billion DDTL 3.0 facility was set out in May and July 2025 (claims 11922, 4592), with a commitment termination date of 2026-07-31 (claim 4593). That date has passed and the claim was auto-flagged delayed. The record contains no statement of how much was drawn before commitments lapsed, or whether they were extended or allowed to expire. The 9% senior notes carried a first interest payment date of 2026-02-01 (claim 4659), which was similarly auto-flagged. No disclosure on record confirms that the payment was made. This is more likely an absence of confirmation than evidence of a missed coupon, but it has not been addressed. The contingent springing maturity of 2026-12-30 on the revolving facility (claim 11926) has not been mentioned since May 2025 and is now under three months away.
Several operating themes from the 2025-05-13 disclosures have no follow-up in the claims available for this review. These include the IBM partnership to supply compute for Granite models (claim 4971), the 1.6 GW of contracted power and 420 MW of active capacity (claims 4972, 4973), and the Weights & Biases acquisition (claim 4974). None of these figures has been updated, and no completion or integration of the acquisition is recorded.
For balance, the delayed flags on the two notes-offering closing dates (claims 11919, 4699) do not reflect a walk-back. The record shows both offerings issued, and both were enlarged rather than cut, from $1.5 billion to $2.0 billion (claims 11921, 11918, 11917) and from $1.5 billion to $1.75 billion (claims 4700, 4697, 4658).
What we haven't been told
2026-10-03The proposed all-stock merger with Core Scientific is the most visible gap in the record. The deal was announced on 2025-07-07 (claims 4729, 19824), with an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claim 4731), an S-4 filing (claim 4733), Nasdaq listing approval for the new shares (claim 4735), treatment of Core Scientific's convertible notes (claim 4737), and a $270 million termination fee payable to CoreWeave (claim 4739). The outside date was 2026-04-07 (claim 4738). That date has passed, and on 2026-09-03 the ledger moved both 4731 and 4738 to delayed. The record contains no closing announcement, no extension of the outside date, no termination notice, and nothing on whether the $270 million fee was triggered or paid. The last disclosed word on the transaction remains the July 2025 announcement package.
The size of the OpenAI commitment shifts between disclosures without a stated reconciliation. On 2025-03-10 the infrastructure contract was described at $11.9 billion (claim 19820). By 2025-05-13 the figure tied to the OpenAI deal was $11.2 billion of revenue backlog (claim 4969), within a total committed backlog of $25.9 billion (claim 4970). The difference may reflect revenue already recognized, or a change from contract value to backlog. No disclosure on record says which. Later updates to the OpenAI figure do not appear in the ledger.
The 9% Senior Notes due 2031 carried a first semi-annual interest date of 2026-02-01 (claim 4659). That claim was moved to delayed on 2026-09-03, and the record contains no confirmation that the payment was made. Separately, the expected closing dates for two notes offerings, 2025-05-27 (claim 11919) and 2025-07-25 (claim 4699), are also marked delayed. For the May offering at least, this looks like a ledger artifact, since claims 11917 and 4824 record issuance on 2025-05-27. The July closing has no matching issuance confirmation beyond the 2025-07-27 notes claim (claim 4658), so its status should be checked against filings before it is read as a real slip.
Several operating claims from the 2025-05-13 disclosure have no follow-up on record. These are 420 MW of active power (claim 4972), 1.6 GW of contracted power (claim 4973), the IBM partnership for Granite compute capacity (claim 4971), and the Weights & Biases acquisition (claim 4974). The record shows no updated capacity figures, no progress report on how much contracted power has been energized, and no later reference to the IBM arrangement. A contingent springing maturity date of 2026-12-30 on the revolving credit facility (claim 11926) is approaching, and nothing on record says whether the condition that would trigger it has been addressed.
The ledger provided to this analysis ends partway through claim 4593, dated 2025-07-30. Later disclosures not shown here may resolve some of these items.
What we haven't been told
2026-10-03CoreWeave's all-stock merger with Core Scientific, announced in July 2025 at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), carried an outside date of April 7, 2026 (claim 4738). That date has passed, and the ledger automatically moved both the merger claim and the deadline claim to delayed on September 3, 2026. The last disclosures about the deal date to July 2025. They cover the S-4 registration filing (4733), Nasdaq approval to list the new shares (4735), and a $270 million termination fee payable to CoreWeave (4739). Nothing on record says whether the transaction closed, was terminated, or had its deadline extended. Nothing says whether the termination fee was triggered either.
The $2.6 billion DDTL 3.0 delayed-draw facility (4592, 11922) had a commitment termination date of July 31, 2026 (4593). After that date, any undrawn commitments would ordinarily lapse. The date has passed and the claim now reads delayed. The record contains no later statement on how much of the facility was drawn, whether the commitment period was extended, or whether any part of the $2.6 billion went unused.
The OpenAI contract appeared as $11.9 billion in March 2025 (19820). Two months later it appeared as $11.2 billion of revenue backlog (4969). The two figures may measure different things, such as total contract value versus remaining backlog after revenue recognition. Still, no disclosure on record reconciles the $700 million gap, and the relationship does not reappear with an updated figure in the claims available.
In May 2025 the company cited 1.6 GW of contracted power, 420 MW of active compute capacity added, and $25.9 billion of total revenue backlog (4973, 4972, 4970). These are the only capacity and backlog figures in the record, and no later disclosure restates them. The disclosures therefore cannot show whether contracted power has converted into active capacity, or how backlog has moved since.
Three financing milestones also show as delayed. They are the expected May 27, 2025 closing of the 2030 senior notes (11919), the expected July 25, 2025 closing of the 2031 notes (4699), and the first 9% coupon on those notes, due February 1, 2026 (4659). For the two closings, issuance claims dated on or near the expected dates (11917, 4824, 4658) suggest the offerings did complete. The delayed status more likely reflects the lack of an explicit closing confirmation than a real slip. No disclosure on record confirms the February 2026 interest payment.
The record supplied for this review runs through late July 2025 and ends mid-entry. Topics described here as unaddressed may have been covered in disclosures not included in it.
What we haven't been told
2026-10-03The largest open item is the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an outside closing date of 2026-04-07 (claim 4738), a $270 million termination fee payable to CoreWeave (claim 4739), and supporting steps such as the S-4 filing and Nasdaq listing of the new shares (claims 4733, 4735). The ledger contains nothing on the merger after July 2025. Both dated claims were auto-transitioned to delayed on 2026-09-03 because the deadline passed. The record does not say whether the merger closed, the deadline was extended, the agreement was terminated, or the $270 million fee became payable. For a transaction of this size, the absence of any follow-up claim is notable.
The value of the OpenAI relationship has been described with two figures that are never reconciled. On 2025-03-10 it appears as an $11.9 billion infrastructure contract (claim 19820). Two months later, on 2025-05-13, it appears as $11.2 billion of revenue backlog (claim 4969). The gap may simply reflect revenue recognized in between, or a difference between contract value and remaining backlog. However, no claim in the record explains the $700 million difference, and the OpenAI figure is not updated after May 2025, even as the company continued to raise debt against contracted revenue.
The physical build-out figures also stop at a single quarter. On 2025-05-13 the company cited 420 MW of active power added and 1.6 GW of contracted power (claims 4972, 4973), alongside $25.9 billion of total committed backlog (claim 4970) and a new IBM capacity partnership for Granite (claim 4971). None of these figures is restated or updated in later claims on record. It is unclear how much of the 1.6 GW has since been energized, whether the contracted figure has grown or shrunk, and whether the IBM arrangement went beyond its initial announcement.
Several financing dates were flagged delayed automatically, and here the ledger's own entries partly contradict the flag. The May notes offering was expected to close on 2025-05-27 (claim 11919), and claims 11917 and 4824 record a $2 billion issuance of 9.25% notes on that date. The July offering was expected to close on 2025-07-25 (claim 4699), and claim 4658 records the $1.75 billion issuance two days later. These look more like extraction artifacts than slippage. What remains unconfirmed is the first 9% coupon on the 2031 notes, due 2026-02-01 (claim 4659). No claim records that it was paid. Similarly, the springing maturity on the revolving credit facility, set for 2026-12-30 (claim 11926), has not been mentioned since May 2025, though it is now less than three months away. The record does not say whether the conditions that would trigger it have been addressed.
What we haven't been told
2026-10-03The largest item that has gone quiet is the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). The related filings set an outside closing date of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure on record is from July 2025. The deadline has since passed and the ledger has moved both 4731 and 4738 to delayed. The record contains nothing on whether the deal closed, was extended, or was terminated, and nothing on whether the termination fee was triggered or collected.
The DDTL 3.0 facility has a similar gap. It was introduced on 2025-05-18 as up to $2.6 billion of delayed-draw term loans (claim 11922), with a commitment termination date of 2026-07-31 (claim 4593) and a final maturity of 2030-08-21 (claim 4594). The last mention is the July 2025 filing. The commitment window has now closed and the claim sits at delayed. The record does not say how much was drawn, whether the undrawn commitment lapsed or was extended, or whether the contract-realization and debt-service covenants attached to it (claims 4596, 4597) were met.
The OpenAI contract figures do not agree with each other. A March 2025 disclosure gave the contract as $11.9 billion (claim 19820). Two months later, the May 2025 results described the related backlog as $11.2 billion (claim 4969). These may measure different things, but the record contains no reconciliation. Neither number, nor the $25.9 billion total backlog (claim 4970) or the 1.6 GW contracted power figure (claim 4973), is updated anywhere in the material on file after May 2025.
The credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), set in the May 2025 amendment that otherwise extended maturity to 2028-05-02 (claims 5012, 11925). It is still marked stated, but it is now less than three months away. The record does not show whether the condition that would trigger it has been resolved.
Some delayed statuses in this ledger are likely date artifacts rather than walk-backs. The May 2025 notes closing (claim 11919) is followed in the record by an issuance claim dated 2025-05-27 (claims 11917, 4824). The July 2025 closing (claim 4699) is likewise followed by issuance on 2025-07-27 (claim 4658). Those offerings appear to have completed as described. The February 2026 coupon on the 9% notes (claim 4659) is also marked delayed only because no payment confirmation is on file. The ledger supplied here also ends partway through claim 4596, so any disclosures after that entry were not reviewed.
What we haven't been told
2026-10-02The Core Scientific merger is the most consequential item on the ledger that has gone quiet. CoreWeave announced the all-stock deal on 2025-07-07 (claims 4729, 19824), set an exchange ratio of 0.1235 shares (claim 4731), filed the S-4 and secured Nasdaq listing approval for the new shares (claims 4733, 4735), and set a $270 million termination fee (claim 4739). The outside closing date of 2026-04-07 (claims 4738, 4731) passed without a recorded completion, and both claims were automatically moved to delayed on 2026-09-03. Nothing in the record says whether the deal closed, was extended, or was terminated, or whether the termination fee was triggered in either direction.
The DDTL 3.0 facility was disclosed as up to $2.6 billion (claims 11922, 4592), with a commitment termination date of 2026-07-31 (claim 4593) and maturity in 2030 (claim 4594). The commitment window has closed, and the claim moved to delayed on 2026-09-03. The record has no statement on how much of the facility was drawn before the window shut, whether the commitment was extended, or whether undrawn capacity simply lapsed. That matters because the facility was tied to a specific customer contract and a 0.85x contract realization covenant (claims 4595, 4597).
The OpenAI relationship was first recorded as an $11.9 billion infrastructure contract on 2025-03-10 (claim 19820). Two months later it appeared as $11.2 billion of revenue backlog (claim 4969). The two figures may measure different things, and part of the gap could be revenue already recognized. The record contains no reconciliation, and no later OpenAI-specific figure appears after May 2025.
The capacity figures, 420 MW of active power and 1.6 GW of contracted power, were last stated on 2025-05-13 (claims 4972, 4973). In the record provided, neither has been updated since, though these are exactly the metrics a growth-stage infrastructure provider would normally refresh each quarter. The IBM Granite partnership (claim 4971) and the Weights & Biases acquisition (claim 4974) also appear once, in the same release, with no later progress or integration language.
The first semiannual coupon on the 9% senior notes due 2031 was scheduled for 2026-02-01 (claim 4659). It was automatically marked delayed on 2026-09-03 because no payment confirmation is on record. This is more likely a gap in disclosure than a missed payment, but the record does not say either way. The same caution applies to the delayed flags on the May and July 2025 note closings (claims 11919, 4699). Later claims recording issuance on or near the expected dates (claims 4824, 11917, 4658) suggest those closings did occur.
What we haven't been told
2026-10-02The Core Scientific merger is the most consequential silence on the record. CoreWeave disclosed the merger agreement on 2025-07-06 and 2025-07-07 (claims 4729, 19824), set at 0.1235 CoreWeave shares per Core Scientific share, with an outside closing date of 2026-04-07 (claims 4731, 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). That deadline passed, and both claims were automatically moved to delayed on 2026-09-03. Nothing on record after July 2025 says whether the deal closed, whether the outside date was extended, or whether it was terminated. Nothing says whether the termination fee became payable. For a transaction of this size, the lack of any follow-up statement is notable.
The springing maturity on the revolving credit facility is approaching without comment. The May 2025 amendment expanded the revolver to $1.5 billion and the letters-of-credit facility to $350 million, and extended maturity to 2028-05-02 (claims 11923, 11924, 11925, 5010, 5011, 5012). It also kept a contingent springing maturity date of 2026-12-30 (claim 11926). The record does not say what condition triggers that earlier date, whether the condition has been met or cured, or whether the facility has been amended again. That date is now less than three months away.
Several financing milestones were auto-flagged, though the record suggests at least two of them are tracking artifacts rather than real slips. The expected closing dates for the May 2025 notes (claim 11919, 2025-05-27) and the July 2025 9% notes (claim 4699, 2025-07-25) were both moved to delayed. However, issuance claims dated on or near those days (claims 11917, 4824, 4658) indicate both offerings closed. The first semi-annual interest payment on the 9% Senior Notes due 2031, scheduled for 2026-02-01 (claim 4659), is less clear. It was also auto-moved to delayed, and the record contains no statement confirming that the coupon was paid. That more likely reflects a missing confirmation than a missed payment, but no disclosure on record settles it either way.
A group of operating disclosures from the 2025-05-13 first-quarter release appears once and does not recur in later claims. These are the 420 MW of active power and 1.6 GW of contracted power (claims 4972, 4973), the IBM partnership to supply Granite compute capacity (claim 4971), and the Weights & Biases acquisition (claim 4974). Later disclosures on record focus almost entirely on debt issuance and the Core Scientific deal. There is no updated capacity figure, no word on whether contracted power has been energized, and no further mention of the IBM arrangement or of how Weights & Biases has been integrated.
The OpenAI figures were never reconciled. The contract was announced on 2025-03-10 at $11.9 billion (claim 19820). Two months later, the backlog attributable to OpenAI was given as $11.2 billion (claim 4969). The $700 million gap may simply be revenue recognized in the meantime, or a difference between contract value and backlog. The company did not explain it, and later disclosures on record give no updated OpenAI backlog.
What we haven't been told
2026-10-02The Core Scientific merger is the largest open item. CoreWeave announced the all-stock deal at 0.1235 shares per Core Scientific share on 2025-07-06 and 2025-07-07 (claims 4729, 4731, 19824). The supporting filings followed: the S-4 registration (4733), Nasdaq listing approval for the new shares (4735), and the planned conversion of Core Scientific's convertible notes (4737). Management set 2026-04-07 as the outside closing date (4738) and described a $270 million termination fee payable to CoreWeave (4739). Both the merger claim and the deadline claim were automatically moved to 'delayed' on 2026-09-03. The record contains nothing after July 2025 on this deal: no closing, no extension of the outside date, no termination notice, and no statement on whether the $270 million fee was triggered or collected.
The OpenAI figures moved downward without explanation. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI backlog was given as $11.2 billion (claim 4969), alongside total committed backlog of $25.9 billion (claim 4970). Recognized revenue may account for the $700 million gap, but the disclosures never say so. Neither the OpenAI-specific number nor the total backlog figure appears again in the record after May 2025.
Power capacity was quantified once and not updated. On 2025-05-13 the company reported 420 MW of active power capacity added (claim 4972) and 1.6 GW contracted (claim 4973). The pending Core Scientific deal would have materially changed both figures, yet no later disclosure in the record restates active or contracted capacity. There is also no statement on how much of the 1.6 GW had been energized.
Two strategic items from the same 2025-05-13 disclosure also disappear afterward. The first is the acquisition of Weights & Biases (claim 4974). No completion, integration milestone, or revenue contribution is reported in any subsequent record. The second is the IBM partnership to supply compute for Granite models (claim 4971). It is never mentioned again, so the record does not show whether it was expanded, renewed, or allowed to lapse.
The first coupon on the 9% senior notes due 2031 was scheduled for 2026-02-01 (claim 4659), and the ledger moved that claim to 'delayed' on 2026-09-03. The notes themselves were issued as planned (claims 4697, 4658). The flag may therefore reflect missing confirmation rather than a missed payment. Still, nothing on record confirms the coupon was paid. Separately, the revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), and no disclosure says whether the conditions that would trigger it have been resolved. The ledger supplied for this review breaks off partway through claim 4593, so later records were not examined.
What we haven't been told
2026-10-02The largest open item is the proposed all-stock acquisition of Core Scientific. CoreWeave announced the merger agreement on 2025-07-07 (claims 4729, 19824) at an exchange ratio of 0.1235 shares (claim 4731). It set an outside closing date of 2026-04-07 (claims 4731, 4738), and the supporting record covers the S-4 filing (4733), Nasdaq listing approval for the new shares (4735), conversion of Core Scientific's convertible notes (4737), and a $270 million termination fee payable to CoreWeave (4739). In the claims on record, the last mention of the deal is dated July 2025. The outside date passed without any disclosure of a closing, a termination, or an extension, and the ledger moved both 4731 and 4738 to delayed on 2026-09-03. Nothing on record says whether the transaction closed, whether the outside date was amended, or whether the $270 million termination fee was triggered or collected.
The OpenAI contract figure changed without explanation. On 2025-03-10 the contract was recorded at $11.9 billion (claim 19820). Two months later, on 2025-05-13, the OpenAI deal appears as $11.2 billion of revenue backlog (claim 4969). The $700 million gap may simply reflect revenue already recognized, or the difference between total contract value and remaining backlog. However, no disclosure on record reconciles the two numbers. The company also has not put a later OpenAI figure on record against which either can be checked.
The first scheduled coupon on the 9% Senior Notes due 2031 has no confirmation. The notes were issued in July 2025 at $1.75 billion (claims 4697, 4658), with interest payments beginning 2026-02-01 (claim 4659). That date passed without a disclosure confirming the payment, and the ledger moved 4659 to delayed on 2026-09-03. There is also no record of a missed payment, so this is most likely an absence of confirmation rather than evidence of a problem. Still, nothing on record closes the item. The contingent springing maturity of 2026-12-30 on the revolving credit facility (claim 11926) is now less than three months away. No disclosure on record says whether the condition that would trigger it has been resolved.
The IBM partnership to supply compute capacity for IBM's Granite models (claim 4971) appears only once, on 2025-05-13. No later claim on record describes its scale, a contract value, a delivery milestone, or its continuation. It has not been reported as ended either. It has simply stopped being mentioned. The same is true of the unnamed material GPU-infrastructure customer contract dated 2025-07-30 (claim 4595), which has no follow-up identifying the counterparty or its size.
Two other items flagged as delayed in the ledger do not appear to be real slippages. The expected 2025-05-27 closing of the May notes offering (claim 11919) is followed by a recorded $2.0 billion issuance on that same date (claims 11917, 4824). The expected 2025-07-25 closing of the July offering (claim 4699) is followed by a recorded $1.75 billion issuance two days later (claim 4658). Both offerings were also enlarged rather than reduced before pricing. The delayed status on those two claims looks like an artifact of automated transitions, not a walk-back by management.
What we haven't been told
2026-10-01The largest item is the proposed all-stock merger with Core Scientific. CoreWeave announced the agreement on 2025-07-07 (claims 4729, 19824), set an exchange ratio of 0.1235 shares (claim 4731), and named 2026-04-07 as the outside date for closing (claim 4738). It also disclosed a $270 million termination fee payable to CoreWeave (claim 4739), an S-4 filing (claim 4733), and a Nasdaq listing approval for the new shares (claim 4735). The ledger moved both the merger and its deadline to delayed on 2026-09-03, after the outside date passed. In the record supplied, nothing after July 2025 says the deal closed, was extended, or was terminated. Nothing says whether the termination fee was triggered or collected, or what became of the convertible-note conversion mechanics (claim 4737).
On 2025-05-13 the company reported 1.6 GW of contracted power (claim 4973) and 420 MW of active compute power (claim 4972). These were the headline capacity figures in that quarter's disclosures. The record contains no later restatement of either number and no schedule for converting contracted power into active power. Contracted capacity is the basis for much of the $25.9 billion backlog figure (claim 4970). Given that, the absence of any follow-up on energization progress is notable.
The OpenAI relationship appears as an $11.9 billion contract on 2025-03-10 (claim 19820). Two months later it appears as $11.2 billion of backlog (claim 4969). The gap may simply reflect revenue already recognized, but the disclosures in the record do not say so. No later OpenAI figure appears to reconcile the two.
Several financing items carry delayed flags that the record itself partly contradicts. The May 2025 notes closing expected 2025-05-27 (claim 11919) and the July 2025 notes closing expected 2025-07-25 (claim 4699) were both auto-marked delayed. However, issuance claims dated 2025-05-27 (claims 4824, 11917) and 2025-07-27 (claim 4658) indicate those offerings were completed. The flags likely reflect the absence of an explicit closing confirmation rather than a real slip. The 9% notes' first interest date of 2026-02-01 (claim 4659) is also marked delayed. The record contains no statement confirming that payment was made.
One item to watch is the contingent springing maturity of 2026-12-30 on the revolving credit facility (claim 11926). It sits behind the extended 2028-05-02 maturity (claims 5012, 11925) and is now three months away. The disclosures on record do not say whether the condition that would trigger it has been satisfied, waived, or rendered moot.
The claims list provided was cut off partway through the July 2025 entries. Claims after that point were not available for this review and may address some of these gaps.
What we haven't been told
2026-10-01The largest unresolved item is the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824), with an outside closing date of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure on record is from July 2025. Both the merger claim and its deadline were auto-transitioned to delayed on 2026-09-03, nearly five months after the deadline passed. The record contains nothing on whether the deal closed, was extended, or was terminated, and nothing on whether the termination fee became payable.
The DDTL 3.0 facility has a similar gap. CoreWeave disclosed up to $2.6 billion in delayed-draw term loans in May 2025 (claim 11922) and gave a commitment termination date of 2026-07-31 (claim 4593), which moved to delayed on 2026-09-03. The record has no statement on how much was drawn before commitments lapsed, whether the window was extended, or whether the undrawn portion was released. A related date is still ahead: the revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), against a headline extension to 2028-05-02 (claims 5012, 11925). There is no disclosure of whether the trigger condition has been resolved.
The operating scale figures have not been refreshed. Contracted power of 1.6 GW (claim 4973), 420 MW of active capacity added (claim 4972), and a $25.9 billion committed revenue backlog (claim 4970) were all stated on 2025-05-13. None has a later restatement or revision in the record. The OpenAI figures also appear in two forms that were never reconciled: an $11.9 billion infrastructure contract dated 2025-03-10 (claim 19820) and $11.2 billion of OpenAI-related backlog two months later (claim 4969). No explanation of the $700 million difference has been given.
The IBM partnership to supply compute for the Granite models (claim 4971) appears once, in the 2025-05-13 disclosures, and does not recur. The record has no announcement of its scope, size, expansion, or conclusion, so its current status is unknown.
The first semi-annual coupon on the 9% Senior Notes due 2031 was scheduled for 2026-02-01 (claim 4659) and is now marked delayed, with no confirming disclosure on record. By contrast, the delayed flags on the notes' expected closing dates (claims 11919, 4699) appear to be ledger artifacts, since issuance is separately recorded on 2025-05-27 and 2025-07-27 (claims 11917, 4824, 4658). The coupon may simply be undocumented rather than missed, but the record does not say. The ledger supplied ends with claims from late July 2025, so later disclosures may resolve some of these items.
What we haven't been told
2026-10-01The proposed all-stock merger with Core Scientific, Inc. is the most prominent item that has gone quiet. It was announced on 2025-07-06 and 2025-07-07 at an exchange ratio of 0.1235 CoreWeave shares (claims 4731, 4729, 19824), with an S-4 filing, Nasdaq listing approval and a $270 million termination fee attached (claims 4733, 4735, 4739). The agreement set a closing deadline of 2026-04-07 (claim 4738). The last disclosure in the record is from July 2025. Both deadline claims were moved automatically to 'delayed' on 2026-09-03, five months after the outside date passed. The record contains no statement that the deal closed, was extended, or was terminated. It also does not say whether the termination fee was paid or received, or what became of the related convertible-notes conversion (claim 4737).
The DDTL 3.0 delayed-draw facility, sized at up to $2.6 billion in May 2025 (claim 11922), carried a commitment termination date of 2026-07-31 (claim 4593). That claim was auto-flagged 'delayed' on 2026-09-03. Nothing on record says how much of the $2.6 billion was drawn before the window closed, whether the commitment was extended, or whether the undrawn balance simply lapsed. The facility's 2030-08-21 maturity (claim 4594) and the 1.40x debt service coverage covenant beginning April 2027 (claim 4596) remain the only later references to it.
The size of the OpenAI relationship is reported inconsistently. On 2025-03-10 it was described as an $11.9 billion infrastructure contract (claim 19820). On 2025-05-13 the figure attributed to the OpenAI deal in revenue backlog was $11.2 billion (claim 4969). No statement in the record reconciles the $700 million gap, and it is not clear whether it reflects revenue already recognised, a renegotiation, or a difference in definition. More broadly, the $25.9 billion total backlog (claim 4970), the 1.6 GW of contracted power (claim 4973) and the 420 MW of active capacity added (claim 4972) were all last stated on 2025-05-13. No updated figure for any of them appears in the record, so there is no way to tell whether contracted power has since been converted to active capacity on the implied schedule.
The IBM partnership to supply compute capacity for its Granite models (claim 4971) appears once, on 2025-05-13. Unlike the ClusterMAX ratings, which were restated in July 2025 (claim 18879), it is not mentioned again. There has been no announcement that it expanded, concluded or lapsed.
Several financing milestones carry 'delayed' flags that look more like gaps in confirmation than real slippage, and they are noted here with that caution. The 2030 notes were expected to close on 2025-05-27 (claim 11919), and a matching issuance record dated that same day exists (claims 4824, 11917). The 2031 notes had an expected closing of 2025-07-25 (claim 4699), and their first 9% coupon was due 2026-02-01 (claim 4659). Neither the July closing nor the February coupon payment has been confirmed anywhere in the record, and no statement has addressed either.
What we haven't been told
2026-10-01The Core Scientific merger is the most visible gap. CoreWeave announced the agreement on 2025-07-07 (claims 4729, 19824) and set out an all-stock exchange of 0.1235 shares per Core Scientific share, with a closing deadline of 2026-04-07 (claims 4731, 4738). The deal terms also included a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure in this record dates from July 2025, and the ledger moved both the merger and its deadline to 'delayed' on 2026-09-03 after the outside date passed. The record contains no statement that the deal closed, was extended, or was terminated, and nothing says whether the termination fee was triggered or collected.
The 9% Senior Notes due 2031 carried a first interest payment date of 2026-02-01 (claim 4659, alongside the $1.75 billion issuance in claim 4658). That date has passed, and the ledger auto-transitioned the claim to 'delayed' on 2026-09-03. No disclosure in the record confirms the payment was made. This may be a documentation gap rather than a missed coupon, but the company has not addressed it on the record. Two other financing claims, the expected closings of the May and July 2025 notes offerings (claims 11919 and 4699), also carry 'delayed' flags. However, later claims record those notes as issued (claims 4824, 11917, 4658), so those flags appear to reflect ledger timing rather than anything management left unsaid.
The OpenAI relationship was first described on 2025-03-10 as an $11.9 billion infrastructure contract (claim 19820). Two months later, on 2025-05-13, it appeared as an $11.2 billion revenue backlog (claim 4969). The lower figure may simply reflect revenue already recognized against the contract, but the record contains no reconciliation of the two numbers. No later OpenAI figure appears.
Several operating claims from the 2025-05-13 disclosure have no later mention in this record. These include 1.6 GW of contracted power capacity and 420 MW of active capacity added (claims 4973, 4972), the IBM partnership to supply compute for Granite models (claim 4971), and the Weights & Biases acquisition (claim 4974). None has been restated, updated, or confirmed as completed since May 2025. Capacity in particular was a central growth metric when it was introduced, and the record does not show whether those megawatt figures have since been met, revised, or dropped.
The revolving credit facility's contingent springing maturity of 2026-12-30 (claim 11926) remains open. It sits alongside the extended 2028-05-02 maturity (claims 5012, 11925), and the record does not explain whether the condition that would accelerate the earlier date has been cleared.
What we haven't been told
2026-10-01The proposed merger with Core Scientific is the most visible silence on the record. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729, 19824), with a closing deadline of 2026-04-07 (claim 4738), a planned S-4 registration (claim 4733), Nasdaq listing approval for the new shares (claim 4735), conversion of Core Scientific's convertible notes into CoreWeave securities (claim 4737), and a $270 million termination fee payable to CoreWeave (claim 4739). The last mention in this ledger is from early July 2025. The April 2026 deadline has passed, and the ledger has automatically marked both the deal and its deadline as delayed. The record holds no disclosure that the deal closed, that the deadline was extended, or that the deal was terminated. It also says nothing about whether the termination fee became payable, was paid, or was waived.
The $2.6 billion DDTL 3.0 delayed-draw facility follows a similar pattern. CoreWeave disclosed it in May 2025 (claim 11922) and again on 2025-07-30 (claim 4592), along with a commitment termination date of 2026-07-31 (claim 4593) and a minimum contract realization covenant of 0.85x (claim 4597). That termination date has now passed, and the claim has been automatically moved to delayed. The record does not say how much of the $2.6 billion was drawn before commitments lapsed, whether they were extended, or whether the 0.85x covenant was ever tested. The material GPU-infrastructure customer contract that backs this facility (claim 4595) has not been named or updated since.
The size of the OpenAI relationship changed between two disclosures without explanation. On 2025-03-10 the contract was described as $11.9 billion (claim 19820). By 2025-05-13, the OpenAI figure inside revenue backlog was $11.2 billion (claim 4969), against total backlog of $25.9 billion (claim 4970). Nothing in the record explains the $700 million difference, which could reflect revenue already recognized, different counting, or a revised scope. No later backlog figure appears, so we cannot tell whether the OpenAI share has grown, shrunk, or been restated.
Several operating metrics from the Q1 2025 results on 2025-05-13 have not been repeated. These are 1.6 GW of contracted power (claim 4973), 420 MW of active power added (claim 4972), and the IBM partnership to supply compute for Granite models (claim 4971). The ledger shows no later update to the power figures, no explanation of how much contracted capacity has become active, and no further reference to IBM. Separately, the 9% senior notes carried a first interest payment date of 2026-02-01 (claim 4659). That claim has been automatically moved to delayed, and the record contains no confirmation that the payment was made.
Two caveats apply. First, the automated delayed flags on the note closings of 2025-05-27 and 2025-07-25 (claims 11919 and 4699) appear to be ledger artifacts. Issuance claims on or near those dates (claims 4824, 11917 and 4658) indicate the notes did close, so they are not counted here as walk-backs. Second, the ledger supplied for this review ends partway through the July 2025 entries. Later disclosures that address any of these items may exist but were not available for this review.
What we haven't been told
2026-09-30The largest open item is the Core Scientific merger. CoreWeave announced the all-stock deal on 7 July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). It set an outside closing date of 7 April 2026 (claims 4731, 4738), and the filing also described an S-4 registration, Nasdaq listing approval for the new shares, conversion of Core Scientific's convertible notes, and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4737, 4739). The deadline has passed, and both dated claims moved to delayed on 3 September 2026. Nothing on record after July 2025 says whether the merger closed, was extended, or was terminated, or whether the termination fee was ever triggered.
The $2.6 billion DDTL 3.0 delayed-draw facility is in a similar position. It was first disclosed on 18 May 2025 and detailed on 30 July 2025 (claims 11922, 4592), with a commitment termination date of 31 July 2026 (claim 4593). That date has passed and the claim moved to delayed on 3 September 2026. The record does not say how much of the $2.6 billion was drawn before commitments lapsed, whether the window was extended, or whether the undrawn portion was replaced by other financing. The facility's later terms, a 2030 maturity and a 1.40x debt service coverage test from April 2027 (claims 4594, 4596), still stand as stated, which makes the missing update on the draw period more noticeable.
The operating scale figures from the 13 May 2025 update have not been refreshed. They were 420 MW of active power added, 1.6 GW of contracted power, and a $25.9 billion revenue backlog (claims 4972, 4973, 4970). Nothing in the record revisits them. One related discrepancy has not been explained. The OpenAI agreement was described as an $11.9 billion contract in March 2025 (claim 19820), and two months later the OpenAI component of backlog was given as $11.2 billion (claim 4969). The gap may reflect revenue recognized in the interval, but no disclosure on record reconciles the two figures. The IBM capacity arrangement for Granite models (claim 4971) was also mentioned once, in the same 13 May 2025 update, and does not appear again.
Several debt milestones carry a delayed status, but this appears to be a gap in the record rather than a real slip. The May 2025 notes had an expected closing date of 27 May 2025 (claim 11919), and issuance claims dated that same day exist (claims 11917, 4824). The July 2025 notes, upsized from $1.5 billion to $1.75 billion (claims 4700, 4698, 4697), had an expected closing of 25 July 2025 (claim 4699), and an issuance claim dated 27 July 2025 exists (claim 4658). What is actually missing is any confirmation that the first 9 percent coupon on the 2031 notes was paid on 1 February 2026 (claim 4659). The springing maturity date of 30 December 2026 on the revolving credit facility (claim 11926) is also approaching with no statement on record about whether the condition that would trigger it has been addressed.
The ledger supplied for this review ends partway through entries dated 30 July 2025. Some of the silences described here may be filled by later disclosures that were not included.
What we haven't been told
2026-09-30The Core Scientific merger is the most conspicuous gap. CoreWeave announced the all-stock deal on 2025-07-07 (claims 4729, 19824) at an exchange ratio of 0.1235 shares (claim 4731). The agreement's outside date was 2026-04-07 (claim 4738), and it provided for a $270 million termination fee payable to CoreWeave (claim 4739). The S-4 filing and Nasdaq listing approval (claims 4733, 4735) were disclosed on 2025-07-06. In the entries on record, no later disclosure says whether the merger closed, was extended, or was terminated. Both date-bound claims moved automatically to delayed on 2026-09-03 after the outside date passed. The record also says nothing about whether the termination fee was triggered or paid.
The OpenAI contract appears at two different values. On 2025-03-10 it was recorded as an $11.9 billion infrastructure contract (claim 19820). By 2025-05-13 it was described as $11.2 billion of revenue backlog (claim 4969). The $700 million difference may simply be revenue recognized in the interval, since contract value and backlog are not the same measure. However, the disclosures on record do not reconcile the two figures, and the relationship is not stated in later entries shown here.
The $2.6 billion DDTL 3.0 facility was first described as 'up to' $2.6 billion on 2025-05-18 (claim 11922) and restated on 2025-07-30 (claim 4592). Its commitment period was set to end on 2026-07-31 (claim 4593), and that claim was auto-marked delayed on 2026-09-03. Nothing on record states how much of the facility was drawn before the window closed, or whether the unused commitment was extended or allowed to lapse. The debt service coverage covenant of 1.40x beginning April 2027 (claim 4596) remains on record without any update on current headroom.
Several debt-servicing milestones have passed without confirmation. The 9% senior notes due 2031 carried a first interest payment date of 2026-02-01 (claim 4659), which has been auto-marked delayed, and no disclosure on record confirms the coupon was paid. The May 2025 credit facility amendment extended maturity to 2028-05-02 but included a contingent springing maturity of 2026-12-30 (claims 11925, 11926). No subsequent entry says whether the conditions that would trigger the earlier date have been resolved, and that date is now three months away.
The delayed flags on the two notes closings (claims 11919 and 4699) seem to reflect verification gaps rather than slippage. Issuance claims dated on the expected closing days (claims 4824, 11917, 4658) suggest both offerings closed as planned. The May offering was upsized from $1.5 billion to $2.0 billion (claims 11921, 11918) and the July offering by $250 million (claim 4698), both disclosed at the time. The record provided ends at 2025-07-30, so later statements on these topics, if any, are not reflected here.
What we haven't been told
2026-09-30The largest open item is the proposed merger with Core Scientific. CoreWeave announced the agreement on 2025-07-07 (claims 4729, 19824), set an all-stock exchange ratio of 0.1235 shares (claim 4731), committed to an S-4 registration and Nasdaq listing of the new shares (claims 4733, 4735), and set an outside closing date of 2026-04-07 (claim 4738). A $270 million termination fee payable to CoreWeave was also disclosed (claim 4739). The last entry on the deal is from July 2025. Both the merger claim and the deadline claim were automatically moved to delayed on 2026-09-03. The record has no closing announcement, no extension of the outside date, no termination notice, and nothing on whether the termination fee was triggered. Nearly six months after the stated deadline, the record does not show whether the transaction happened.
The $2.6 billion DDTL 3.0 facility was described on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). Its commitment termination date was 2026-07-31 (claim 4593), and that claim was moved to delayed on 2026-09-03. Nothing since July 2025 says how much of the facility was drawn before commitments lapsed, whether the window was extended, or whether undrawn capacity was allowed to expire. The loans carry a 1.40x minimum debt service coverage covenant starting April 2027 (claim 4596), so the drawn balance matters. It has not been stated.
The 9% senior notes due 2031 were issued at $1,750 million after a $250 million upsizing (claims 4697, 4698, 4658). The first interest date was given as 2026-02-01 (claim 4659), and that claim was moved to delayed on 2026-09-03. This most likely reflects a missing confirmation, not a missed payment, but no disclosure on record confirms the coupon was paid. Similarly, the revolving credit facility's maturity was extended to 2028-05-02 (claims 5012, 11925), but it also contains a contingent springing maturity of 2026-12-30 (claim 11926). Nothing since May 2025 explains whether the condition behind that earlier date has been cured or is still live, and the date is now three months away.
Several operating figures from the 2025-05-13 disclosures have not been updated anywhere in the record. These are 420 MW of active power added (claim 4972), 1.6 GW of contracted power (claim 4973), $25.9 billion of total revenue backlog (claim 4970), and $11.2 billion of OpenAI backlog (claim 4969), the last set against an $11.9 billion contract figure from March 2025 (claim 19820). The IBM Granite capacity partnership (claim 4971) and the Weights & Biases acquisition (claim 4974) likewise appear once and are not mentioned again. There is no statement revising these numbers, but there is also no later figure to show whether they grew, held, or shrank, or whether the acquisition closed.
Two other delayed flags seem to be artifacts rather than slips. The notes closing dates of 2025-05-27 and 2025-07-25 (claims 11919, 4699) are each followed by claims recording the actual issuance (claims 11917, 4824, 4658). The ledger reviewed here ends partway through the July 2025 entries at claim 4597, so later claims not shown may address some of the gaps above.
What we haven't been told
2026-09-29The Core Scientific merger is the largest open item on the record. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). It set an outside closing date of 2026-04-07 (claim 4738) and described a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure in the ledger dates from July 2025. Both the deal and its deadline were automatically moved to delayed on 2026-09-03, nearly five months after the outside date passed. The record contains no statement that the merger closed, was extended, or was terminated, and nothing indicating whether the termination fee became payable or was collected.
The $2.6 billion DDTL 3.0 facility was first described on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). Its commitment termination date was 2026-07-31 (claim 4593), and that claim has been marked delayed since 2026-09-03. The company has not said how much of the facility was drawn before commitments lapsed, whether the date was extended, or whether undrawn capacity was allowed to expire. That leaves the facility's stated 2030-08-21 maturity (claim 4594) and the 1.40x debt service coverage covenant from April 2027 (claim 4596) attached to an unknown principal amount.
The 9% senior notes due 2031 were issued at $1.75 billion after a $250 million upsizing (claims 4697, 4698, 4658). They carried a first semiannual interest date of 2026-02-01 (claim 4659), which was auto-transitioned to delayed on 2026-09-03. Issuance itself is recorded, so this is not a question of whether the notes exist. It is a question of confirmation. Nothing on record states that the first coupon was paid on schedule. Given the company's reliance on successive debt raises, that silence is notable, even if it most likely reflects the absence of a routine disclosure rather than a missed payment.
The size of the OpenAI commitment changed without explanation. On 2025-03-10 the contract was described at $11.9 billion (claim 19820). Two months later, on 2025-05-13, the related revenue backlog was given as $11.2 billion (claim 4969). The difference may simply reflect revenue recognized in the interim or a switch from contract value to remaining backlog. However, no reconciliation was offered. The later disclosures reviewed contain no further OpenAI figure, even though OpenAI remains the reference customer behind the $25.9 billion total backlog (claim 4970).
Two earlier closing-date items, the May 2025 notes (claim 11919, expected 2025-05-27) and the July 2025 notes (claim 4699, expected 2025-07-25), also carry delayed flags. Issuance claims dated to those same days (claims 4824, 11917, 4658) suggest both offerings closed as planned, and these flags appear to reflect a missing confirmation link rather than an actual slip. Separately, the 1.6 GW of contracted power and 420 MW of active capacity (claims 4972, 4973) have not been updated in the portion of the ledger reviewed, which ends in late July 2025.
What we haven't been told
2026-09-29The Core Scientific merger is the largest item on the record that has gone quiet. CoreWeave announced the all-stock deal on 2025-07-06 and 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729, 19824), with a closing deadline of 2026-04-07 (claim 4738), an S-4 filing (claim 4733), a Nasdaq listing approval for the new shares (claim 4735) and a $270 million termination fee payable to CoreWeave (claim 4739). The last disclosure on record is from July 2025. Both deadline-bearing claims were automatically moved to delayed on 2026-09-03 after the April 2026 date passed. Nothing on record says whether the merger closed, was terminated, or was extended, and nothing says whether the termination fee was triggered or paid.
The power-capacity figures have not been updated since the first post-IPO quarter. On 2025-05-13 management cited 420 MW of active power added and 1.6 GW of contracted capacity (claims 4972, 4973). Those numbers do not reappear in any later claim on record. There is no revised active or contracted figure, and no statement on how much of the contracted 1.6 GW has been energized. That silence is notable because the Core Scientific deal, itself now unaddressed, was framed around adding power capacity.
The OpenAI contract value is recorded two different ways with no reconciliation. The March 2025 contract is logged at $11.9 billion (claim 19820), while the May 2025 backlog disclosure attributes $11.2 billion to the OpenAI deal (claim 4969), within a total backlog of $25.9 billion (claim 4970). No later claim restates the OpenAI figure or the total backlog. The record does not explain the $700 million gap, which could reflect revenue already recognized, a change in scope, or simply different measurement bases.
Several dated debt milestones have lapsed without any confirming disclosure. The DDTL 3.0 facility of up to $2.6 billion (claims 11922, 4592) had a commitment termination date of 2026-07-31 (claim 4593), now auto-marked delayed, and nothing on record states how much was drawn before commitments ended. The first 9% coupon on the 2031 notes, due 2026-02-01 (claim 4659), is likewise auto-marked delayed with no confirmation of payment. The expected closings of the two 2025 notes offerings (claims 11919, 4699) also show as delayed, although later issuance claims (4824, 11917, 4658) indicate those deals did close, so those two flags look like ledger artifacts rather than real slippage. One date is still ahead: the springing maturity of 2026-12-30 on the revolving facility (claim 11926). Nothing has been said about whether the condition that would trigger it is expected to apply.
The IBM partnership to supply compute for Granite models (claim 4971) and the Weights & Biases acquisition (claim 4974) each appear only in the 2025-05-13 disclosure and in no later claim on record. Neither has been described as wound down. Neither has been described as progressing either.
The claims ledger supplied for this review was cut off at claim 4597. Later entries could address some of these items and were not reviewed.
What we haven't been told
2026-09-29The Core Scientific merger is the largest open item on the record. CoreWeave announced the all-stock deal on 2025-07-06 and 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share, with an outside closing date of 2026-04-07 (claims 4731, 4738, 4729, 19824). The same filings covered an S-4 registration, a Nasdaq listing approval for the new shares, and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4739). The ledger moved both the merger and its deadline to delayed on 2026-09-03, nearly five months after the outside date passed. Nothing on record says whether the deal closed, was extended, or was terminated, or whether the termination fee was triggered or paid.
The OpenAI contract appears with two figures that have never been reconciled. The March 2025 disclosure gave an $11.9 billion infrastructure contract (claim 19820). The May 2025 quarterly materials cited an $11.2 billion revenue backlog from the same strategic deal (claim 4969), inside a $25.9 billion total backlog (claim 4970). The $700 million gap may reflect revenue already recognized or a different measurement basis, but no statement on record explains it. Neither figure has been updated since May 2025.
The DDTL 3.0 facility was described on 2025-07-30 as a delayed-draw term loan of up to $2.6 billion (claims 4592, 11922), with a commitment termination date of 2026-07-31 (claim 4593). That date has passed, and the ledger marked it delayed on 2026-09-03. There is no disclosure of how much was drawn before the commitments lapsed, whether the window was extended, or whether the undrawn portion was cancelled.
The 9% Senior Notes due 2031 carried a first interest payment date of 2026-02-01 (claim 4659). The ledger has flagged that date as delayed, but the record contains no confirmation that the payment was made and no statement that it was missed. The flag more likely reflects missing confirmation than an actual default. A related date is still ahead: the credit facility's springing maturity of 2026-12-30 (claim 11926) could pull the facility's 2028-05-02 maturity forward (claims 5012, 11925). No recent disclosure addresses whether the condition that triggers it is expected to apply.
The IBM partnership to supply compute for Granite models appears only in the 2025-05-13 materials (claim 4971) and in no later claim on record. No expansion, renewal, or conclusion has been disclosed. Two ledger items should not be read as slips. The notes closings flagged delayed (claims 11919 and 4699) are contradicted by issuance claims dated on or near the promised dates (claims 11917 and 4658), so those flags appear to be artifacts of the automated transition. Finally, the claim list supplied for this analysis ends at claim 4597, so later disclosures may address some of these gaps.
What we haven't been told
2026-09-29The Core Scientific merger is the most prominent item where the record stops. CoreWeave announced the all-stock deal on 2025-07-07 (claims 4729, 19824) at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The announcement included an S-4 filing, a Nasdaq listing approval for the new shares, a $270 million termination fee payable to CoreWeave, and the conversion of Core Scientific's convertible notes (claims 4733, 4735, 4739, 4737). The agreement set 2026-04-07 as the outside date for closing (claims 4731, 4738). That date passed, and both claims were automatically moved to delayed on 2026-09-03. The record has no disclosure of a completed closing, a termination, an extension of the outside date, or whether the termination fee became payable. For a transaction of this size, the lack of any follow-up in the record is notable.
The $2.6 billion DDTL 3.0 facility was disclosed in May and July 2025 (claims 11922, 4592) with a commitment termination date of 2026-07-31 (claim 4593). That date passed and the claim moved to delayed on 2026-09-03. The record does not say how much was drawn before the commitments lapsed, whether they were extended, or whether any undrawn capacity was allowed to expire. The same facility carries covenants: a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio from April 2027 (claims 4597, 4596). Without a drawn balance, those covenants are hard to assess.
For the 9% senior notes due 2031, issued at $1.75 billion after a $250 million upsizing (claims 4697, 4698, 4658), the first interest payment was due on 2026-02-01 (claim 4659). The claim moved to delayed on 2026-09-03. This most likely reflects a lack of confirmation in the record rather than evidence of a missed payment, but the payment is not confirmed anywhere in the disclosures on file. Two other delayed flags on expected note closing dates, 2025-05-27 and 2025-07-25 (claims 11919, 4699), are contradicted by the issuance claims themselves (claims 4824, 11917, 4658). Those two look like ledger artifacts, not walk-backs.
Several operating figures appear once, in the 2025-05-13 disclosures, and are not updated anywhere in the portion of the record reviewed. These are the $25.9 billion total backlog (claim 4970), the 1.6 GW of contracted power and 420 MW of active capacity added (claims 4972, 4973), and the IBM partnership for Granite compute capacity (claim 4971). The OpenAI figure also moves from an $11.9 billion contract in March 2025 (claim 19820) to $11.2 billion of related backlog in May 2025 (claim 4969). That drop is consistent with recognized revenue, but no reconciliation is given. The ledger supplied here ends partway through the July 2025 entries, so later updates may exist that this review could not see. On the record as provided, however, none of these figures has been restated since.
What we haven't been told
2026-09-29The largest open item is the Core Scientific merger. CoreWeave announced the all-stock deal on 7 July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). It filed the related Form S-4 (4733) and described the Nasdaq listing approval, the conversion of Core Scientific's convertible notes, and a $270 million termination fee payable to CoreWeave (4735, 4737, 4739). The agreement set an outside closing date of 7 April 2026 (4738), and both the merger and deadline claims auto-transitioned to delayed on 3 September 2026. The record holds no later statement that the deal closed, was extended, or was terminated, and none on whether the termination fee was triggered or paid. The record goes silent in July 2025.
The OpenAI contract figure shrank without comment. On 10 March 2025 the contract was described at $11.9 billion (19820). By the 13 May 2025 first-quarter disclosure, the OpenAI-related backlog was given as $11.2 billion (4969). A $700 million gap could reflect revenue recognized against the contract, but the record does not say so. It contains no reconciliation between the two numbers and no later update to either.
The operating metrics stop after one quarter. The May 2025 disclosures set out 1.6 GW of contracted power (4973), 420 MW of active capacity (4972), $25.9 billion of total backlog (4970) and an IBM partnership to supply compute for Granite models (4971). In the portion of the record available, none of these figures is restated or revised in later periods. The IBM arrangement is not mentioned again after its single appearance. Whether capacity was energized on the implied schedule, and whether the IBM relationship continued, has not been disclosed here.
On the financing side, the auto-transitions overstate the problem. The expected closings of the May 2025 notes (11919, 27 May 2025) and the July 2025 notes (4699, 25 July 2025) are flagged delayed. However, issuance claims dated 27 May (4824, 11917) and 27 July (4658) indicate both deals closed on or near schedule, and both were upsized rather than cut (11921 to 11918; 4700 to 4697). The open question is narrower. The first 9% coupon on the 2031 notes fell due on 1 February 2026 (4659) and has been marked delayed only because no payment confirmation appears in the record. The revolving facility's contingent springing maturity of 30 December 2026 (11926) is three months away, and nothing on record says whether the condition behind it has been satisfied or removed.
The ledger supplied here ends mid-entry at claim 4597, dated 30 July 2025. Anything disclosed after that point was not reviewed, so the silences described above may be resolved in later filings.
What we haven't been told
2026-09-27The Core Scientific merger is the largest open item on the record. CoreWeave announced the all-stock deal on 2025-07-07 (claims 19824, 4729), set at 0.1235 CoreWeave shares per Core Scientific share (4731), with an outside closing date of 2026-04-07 (4738), a Form S-4 filing (4733), and a $270 million termination fee payable to CoreWeave (4739). Both dated claims were automatically moved to delayed on 2026-09-03, more than five months after the deadline passed. The record contains no disclosure after July 2025 saying whether the merger closed, was extended, or was terminated, and nothing on whether the termination fee was triggered or collected.
The OpenAI figure has shifted without explanation. On 2025-03-10 the OpenAI infrastructure contract was described as $11.9 billion (19820). By 2025-05-13 the related revenue backlog was given as $11.2 billion (4969), inside a total backlog of $25.9 billion (4970). The gap may simply be revenue recognized in the interim, but no disclosure on record reconciles the two numbers, and OpenAI does not appear in any claim after mid-May 2025.
Several financing milestones carry delayed flags that the disclosures never directly resolve. The May notes offering was expected to close on 2025-05-27 (11919), and the July 9% notes on 2025-07-25 (4699). Both were auto-flagged delayed in September 2026. Issuance claims dated 2025-05-27 (11917, 4824) and 2025-07-27 (4658) suggest the notes were in fact placed, so these flags look more like gaps in the ledger than real slippage. Even so, the record has no explicit closing confirmation tied to either expected date. The first semiannual coupon on the 9% notes, due 2026-02-01 (4659), is also flagged delayed, and no disclosure confirms that it was paid.
One balance-sheet item is approaching without comment. The May 2025 revolver amendment extended maturity to 2028-05-02 (11925, 5012) but kept a contingent springing maturity of 2026-12-30 (11926), now about three months away. Nothing on record says whether the condition behind that springing date has been met, waived, or refinanced. The same goes for the operating markers from that quarter: 420 MW active and 1.6 GW contracted (4972, 4973) and the IBM Granite partnership (4971). Each was mentioned once in May 2025 and not updated afterward.
The ledger supplied here is cut off partway through the July 2025 entries (the last visible claim, 4593, is incomplete). Later disclosures may address some of these points without appearing above.
What we haven't been told
2026-09-27The largest open item is the proposed all-stock merger with Core Scientific at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731, 19824). It was announced on 2025-07-06 and 2025-07-07, alongside an S-4 registration (4733), a Nasdaq listing approval for the new shares (4735), the treatment of Core Scientific's convertible notes (4737), and a $270 million termination fee payable to CoreWeave (4739). The agreement set an outside closing date of 2026-04-07 (4738). That date passed more than five months ago, and the ledger automatically moved both 4731 and 4738 to delayed on 2026-09-03. No subsequent claim on record says whether the deal closed, whether the outside date was extended, or whether the agreement was terminated. If it was terminated, nothing says whether the termination fee became payable.
The OpenAI contract was first recorded on 2025-03-10 at $11.9 billion (19820). By the 2025-05-13 results disclosure, the same relationship was described as an $11.2 billion revenue backlog (4969). The $700 million gap may reflect revenue recognized in the interim or a different measurement basis, but the record contains no statement reconciling the two figures. The record also contains no later update to the OpenAI-specific number, or to the $25.9 billion total backlog (4970) it sat within.
The May 2025 revolving credit amendment extended maturity to 2028-05-02 (5012, 11925). It also introduced a contingent springing maturity of 2026-12-30 (11926), a date now about three months away. The record does not describe the condition that would trigger the earlier maturity, and no later disclosure says whether that condition has been cured, waived or refinanced away.
Several debt items carry an automated delayed flag, and readers should weigh these differently. The expected closings of the May 2025 notes (11919, due 2025-05-27) and July 2025 notes (4699, due 2025-07-25) were flagged only because no separate completion notice was matched. Claims 11917 and 4658 record those issuances as done on or about the promised dates. The first 9% coupon on the 2031 notes, due 2026-02-01 (4659), is also flagged, again because nothing on record confirms payment. We read these as gaps in confirmation rather than evidence of a missed obligation, but the company has not said either way.
The operating capacity figures from 2025-05-13, 420 MW of active power added (4972) and 1.6 GW contracted (4973), are the latest capacity statements in the claims reviewed here. The record has no subsequent figure showing how much of the contracted power has since come online, nor any explanation if the pace has changed.
What we haven't been told
2026-09-27The Core Scientific merger is the largest open item on the record. Management announced the all-stock deal on 2025-07-07 (claims 4729, 19824), with an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The filing set 2026-04-07 as the outside date for closing (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). Both date-bearing claims moved automatically to 'delayed' on 2026-09-03 after the deadline passed with nothing recorded. The disclosures on file say nothing after July 2025 about whether the deal closed, was extended, or was terminated. They are also silent on whether the termination fee was triggered or collected. For a transaction of this size, the absence of any closing or termination statement is the most notable gap.
The OpenAI contract figure changed between two disclosures without explanation. On 2025-03-10 the contract was described at $11.9 billion (claim 19820). By the 2025-05-13 results it appeared as $11.2 billion of revenue backlog attributed to the OpenAI deal (claim 4969). The $700 million difference may simply reflect revenue recognized in the interval, or a different way of measuring the contract. The record contains no reconciliation, and the $11.2 billion figure has no later update even as total backlog was cited at $25.9 billion (claim 4970).
The first coupon on the 9% Senior Notes due 2031, scheduled for 2026-02-01 (claim 4659), has been flagged 'delayed' since 2026-09-03 because no disclosure confirms the payment. This is more likely an unconfirmed routine event than a missed obligation, but nothing on file settles it. The 'delayed' flags on the two notes-closing dates are a different case. The May closing (claim 11919, promised 2025-05-27) is directly contradicted by the record's own issuance entries on that date (claims 4824, 11917). The July closing (claim 4699, promised 2025-07-25) is reasonably explained by the follow-on issuance entry (claim 4658), though that entry carries no closing date. Neither flag should be read as a walk-back.
The revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), set alongside the extension to 2028-05-02 (claims 11925, 5012). That date is now about three months away. No disclosure on record addresses whether the conditions that would pull maturity forward have been cleared or remain live.
What we haven't been told
2026-09-27The most consequential silence concerns the Core Scientific merger. CoreWeave announced the all-stock agreement in early July 2025 at an exchange ratio of 0.1235 shares (claims 4729, 4731, 19824). It filed the S-4 (4733), secured Nasdaq listing approval for the new shares (4735), and disclosed a 270 million USD termination fee payable to CoreWeave (4739). The agreement carried an outside closing date of 2026-04-07 (4738). That date passed, and on 2026-09-03 both the merger claim and the deadline claim were moved automatically from stated to delayed. The last mention on record is 2025-07-07. Nothing on record says whether the transaction closed, was extended, or was terminated, and nothing says whether the termination fee became payable.
The size of the OpenAI relationship moved without explanation. On 2025-03-10 the company described an infrastructure contract worth 11.9 billion USD (19820). By the 2025-05-13 results disclosure, the figure attached to the same strategic deal was 11.2 billion USD of revenue backlog (4969). The gap may simply reflect revenue recognized in the interval, or a difference between contract value and backlog. No statement on record reconciles the two numbers. OpenAI does not appear again in the claims after May 2025.
Two debt milestones remain unconfirmed. The first 9 percent coupon on the notes due 2031 was scheduled for 2026-02-01 (4659, issued under 4658). That date passed without a confirming disclosure, and the claim was auto-transitioned to delayed on 2026-09-03. The expected closing dates for the May and July 2025 note offerings (11919, 4699) were also moved to delayed. However, issuance claims dated on or just after those dates (4824, 11917, 4658) suggest both offerings did close. In each case the gap is the absence of an explicit completion or payment statement rather than evidence of a miss.
Several operating markers were stated once and not revisited. On 2025-05-13 CoreWeave reported 1.6 GW of contracted power (4973) and 420 MW of active capacity added (4972). The same disclosure mentioned an IBM partnership for Granite model compute (4971) and the Weights & Biases acquisition (4974). None of these is updated, restated, or confirmed complete anywhere else on record. Current capacity figures, the status of the IBM arrangement, and the closing of Weights & Biases have gone unmentioned since that date.
What we haven't been told
2026-09-27The largest open item is the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 19824, 4731). The same disclosures covered the S-4 filing, Nasdaq listing approval for the new shares, and a $270 million termination fee payable to CoreWeave (4733, 4735, 4739). The agreement set an outside date of 2026-04-07 (4738). That date passed more than five months ago, and both 4731 and 4738 were moved to delayed automatically on 2026-09-03. The record contains nothing after July 2025 that states whether the merger closed, the deadline was extended, or the agreement was terminated. It also does not say whether the termination fee was triggered or paid.
The OpenAI commitment is quoted at two different sizes without a reconciliation. On 2025-03-10 it was described as an $11.9 billion infrastructure contract (19820). By the 2025-05-13 quarterly disclosure, the OpenAI-related figure was an $11.2 billion revenue backlog (4969). Some or all of the roughly $700 million gap may be revenue already recognized or a difference between contract value and remaining backlog. The record does not say which, and no later update on the OpenAI balance appears.
Several operating figures from the 2025-05-13 disclosure have not been restated since. These are 1.6 GW of contracted power (4973), 420 MW of active capacity added (4972), $25.9 billion of total committed backlog (4970), and the IBM partnership for Granite model compute (4971). The IBM relationship appears once and is not mentioned again in the subsequent filings in this record. None of these items has been marked delayed or revised. What is missing is any later figure showing whether contracted capacity turned into active capacity on schedule, or whether the IBM arrangement continued, grew, or ended.
A smaller group of debt-related dates carries delayed flags that the record does not explain. Two expected closing dates were flagged delayed automatically: 2025-05-27 for the 2030 notes (11919) and 2025-07-25 for the 9% 2031 notes (4699). Later claims do describe both issues as outstanding (11917, 4824, 4658), so these flags may reflect how the ledger was built rather than a real slip. The first 9% coupon, due 2026-02-01 (4659), is also marked delayed, and no disclosure in the record confirms it was paid. Separately, the revolving credit facility has a contingent springing maturity of 2026-12-30 (11926), about three months away. The record contains no statement on whether the condition that would trigger it has been addressed.
What we haven't been told
2026-09-26The most conspicuous silence concerns the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 at 0.1235 shares per Core Scientific share (claims 4729, 19824, 4731), filed the S-4 (4733), and set an outside closing date of 2026-04-07 (4738). That date passed more than five months ago, and the ledger has automatically moved both 4731 and 4738 to delayed. No claim on record after July 2025 reports a closing, an extension of the outside date, a shareholder vote, or a termination. Nothing on record addresses whether the $270 million termination fee payable to CoreWeave (4739) was ever triggered, or what became of the convertible-notes conversion mechanics (4737) that depended on the deal.
The OpenAI figure drifted downward between disclosures without a stated reconciliation. In March 2025 the contract was described at $11.9 billion (19820); by the 2025-05-13 results it appeared as $11.2 billion of backlog (4969). The $700 million gap may reflect revenue already recognized or a change in how the figure is framed, but no statement on record explains it. The broader $25.9 billion committed-contract backlog (4970) is likewise last mentioned in May 2025, and no later backlog figure appears in the claims reviewed.
The $2.6 billion DDTL 3.0 facility (11922, 4592) carried a commitment termination date of 2026-07-31 (4593), which has now lapsed and been auto-marked delayed. The record does not say how much of the facility was drawn before that date, whether the commitment period was extended, or whether any undrawn amount simply expired. A related date is still approaching: the revolving credit facility, expanded to $1.5 billion with a 2028 maturity (11923, 11925), has a contingent springing maturity of 2026-12-30 (11926), and no claim on record says whether the conditions that would trigger it have been addressed.
Several operating themes from the 2025-05-13 disclosures appear only once. These are the 1.6 GW of contracted power and the 420 MW of active capacity added (4973, 4972), and the IBM partnership for Granite compute (4971). None of the three has a follow-up claim in the record, so there is no updated capacity figure, no statement on how much contracted power has been energized, and no indication of whether the IBM arrangement continued or expanded.
Not every delayed flag signals a walk-back. The expected notes closing of 2025-05-27 (11919) is marked delayed, but an issuance claim dated that same day (11917) indicates the notes were issued on schedule. The July 2025 notes closing (4699) and the February 2026 coupon date (4659) appear to be similar artifacts of dated promises passing without a separate confirming disclosure. They reflect the gaps in the record more than any retreat by management.
What we haven't been told
2026-09-26The Core Scientific merger is the largest open item. CoreWeave announced the all-stock deal in July 2025 (claims 4729, 19824), set the exchange ratio at 0.1235 shares (4731), and named 7 April 2026 as the outside date for closing (4738). Those July 2025 announcements are the last time the company addressed the deal in this record. The outside date has passed, and the ledger automatically moved both 4731 and 4738 to delayed on 3 September 2026. The record contains no statement that the deal closed, was terminated, or had its deadline extended. It also does not say whether the $270 million termination fee payable to CoreWeave (4739) was ever triggered or collected.
The OpenAI contract figure fell without explanation. In March 2025 the OpenAI infrastructure agreement was stated at $11.9 billion (19820). By the first-quarter disclosures of 13 May 2025, the OpenAI component of revenue backlog was given as $11.2 billion (4969). The $700 million gap may reflect revenue already recognized, or a difference between contract value and backlog. The disclosures on record do not reconcile the two numbers, and no later claim updates either one.
The $2.6 billion DDTL 3.0 facility was announced in May 2025 (11922) and described again in July 2025 (4592). The July disclosure set 31 July 2026 as the commitment termination date (4593). That date has passed, and the ledger flagged the claim as delayed on 3 September 2026. The record says nothing about how much of the facility was drawn before commitments lapsed, whether the date was extended, or whether the undrawn capacity was replaced.
The revolving credit facility carries a related, still-pending question. The May 2025 amendment extended the revolver's maturity to 2 May 2028 (5012, 11925). It also added a contingent springing maturity of 30 December 2026 (11926). That date is now about three months away. No disclosure on record says whether the condition that would trigger the earlier maturity has been resolved.
Several other automated delayed flags seem to be artifacts rather than walk-backs, so they are not treated as omissions here. The 27 May 2025 notes closing (11919) is matched by a same-day issuance claim (11917). The 25 July 2025 closing (4699) is followed by an issuance claim two days later (4658). The February 2026 coupon on the 9% notes (4659) was flagged only because its date passed, and nothing on record suggests the payment was missed. This review covers only the portion of the claim ledger that was provided, which ends partway through the July 2025 entries.
What we haven't been told
2026-09-26The largest silence concerns the Core Scientific merger. CoreWeave announced the all-stock deal on July 7, 2025 (claims 4729, 19824), at 0.1235 CoreWeave shares per Core Scientific share (4731). It described the S-4 registration, the Nasdaq listing approval for the new shares, the treatment of Core Scientific's convertible notes, and a $270 million termination fee payable to CoreWeave (4733, 4735, 4737, 4739). The agreement set April 7, 2026 as the outside date (4731, 4738). That date has passed, and both claims have moved automatically to delayed. The record contains no announcement that the deal closed, no announcement that it was terminated or extended, and no statement on whether the $270 million fee was triggered. The last substantive mention is from July 2025.
The DDTL 3.0 facility has a similar gap. CoreWeave presented the $2.6 billion delayed-draw term loan in May and July 2025 (11922, 4592) as funding tied to a material GPU customer contract (4595), subject to a 0.85x minimum contract realization ratio (4597). The commitment termination date was July 31, 2026 (4593), and that claim is now delayed. Nothing in the record says how much of the $2.6 billion was drawn before the window closed, whether the commitments were extended, or whether the realization covenant was met.
The 9% senior notes due 2031 were upsized by $250 million to $1.75 billion in July 2025 (4697, 4698, 4658). The first interest payment date was February 1, 2026 (4659), and that claim has passed into delayed with no confirming disclosure. The delayed status on the notes' expected closing dates (4699, 11919) looks like a ledger artifact rather than a walk-back, because issuance of both the 2030 and 2031 notes is recorded separately (11917, 4824, 4658). The coupon, however, has no follow-up of any kind.
Capacity and backlog figures stop after the Q1 2025 disclosures. On May 13, 2025, the company cited 420 MW of active power and 1.6 GW of contracted power (4972, 4973). It cited $25.9 billion of total backlog, including $11.2 billion attributed to OpenAI (4970, 4969), against an OpenAI contract first described at $11.9 billion in March (19820). In the claims supplied, neither the power figures nor the backlog split were refreshed in later quarters. The company also has not explained the gap between the $11.9 billion and $11.2 billion OpenAI figures, whether that reflects revenue already recognized or a change to the contract.
What we haven't been told
2026-09-26The largest open item is the Core Scientific merger. CoreWeave announced the all-stock deal on 2025-07-07 (claims 4729, 19824), with an exchange ratio of 0.1235 shares and an outside closing date of 2026-04-07 (claims 4731, 4738). Alongside it, the company described a Form S-4 filing (4733), Nasdaq listing approval for the new shares (4735), and a 270 million USD termination fee payable to CoreWeave (4739). The last dated mention in the record is July 2025. Both deadline claims moved automatically to 'delayed' on 2026-09-03, once the April 2026 date passed. The record contains no statement that the merger closed, that the deadline was extended, or that the agreement was terminated. It also says nothing about whether the termination fee became payable.
The DDTL 3.0 facility has gone similarly quiet. CoreWeave described up to 2.6 billion USD of delayed draw term loans in May and again in July 2025 (claims 11922, 4592), with a commitment termination date of 2026-07-31 (claim 4593). That date passed and the claim was auto-marked 'delayed' on 2026-09-03. The record has no disclosure of how much was drawn before the commitment lapsed, whether it was extended or refinanced, or what the undrawn portion means for the buildout it was meant to fund.
The OpenAI figure changed without explanation. On 2025-03-10 the contract was described at 11.9 billion USD (claim 19820). By the Q1 2025 disclosure of 2025-05-13 it appeared as 11.2 billion USD of revenue backlog (claim 4969). The gap may reflect revenue already recognized or a difference in definition, but the record contains no reconciliation between the two numbers, and no later update on the OpenAI backlog appears in the claims we reviewed.
Several debt-related dates have passed without confirmation. The first coupon on the 9 percent senior notes due 2031 was set for 2026-02-01 (claim 4659) and has sat as 'delayed' since 2026-09-03. That most likely means no confirming disclosure was captured, not that a payment was missed. The expected closing dates for the May and July 2025 notes offerings (claims 11919, 4699) carry the same automatic flag, although claim 11917 records the May issuance as completed on schedule. More material is the contingent springing maturity of 2026-12-30 on the revolving credit facility (claim 11926). It is now three months away, and the record contains no statement on whether the triggering conditions have been avoided or addressed.
What we haven't been told
2026-09-25The Core Scientific merger is the most prominent open item. The all-stock deal at 0.1235 CoreWeave shares per Core Scientific share (claim 4731) was framed in July 2025 filings with an outside closing deadline of 7 April 2026 (claims 4738 and 4731), and the August 2025 disclosure (claim 4517) pointed to completion around 1 October 2025. The last reference on the record is 12 August 2025. All three dates have since passed, and the ledger moved each to delayed automatically, not in response to any company statement. The record contains no announcement that the merger closed, was extended, or was terminated. It also does not say whether the $270 million termination fee described in claim 4739 was ever triggered.
The DDTL 3.0 facility is a smaller loose end. The $2.6 billion delayed-draw term loan (claims 4592 and 11922) carried a commitment termination date of 31 July 2026 (claim 4593), after which undrawn commitments would lapse. That date has passed and the claim was auto-flagged as delayed. Nothing on the record says how much of the $2.6 billion was actually drawn before the window closed, or whether the commitment period was extended. That matters because the facility's covenants, including the 1.40x debt service coverage ratio from April 2027 (claim 4596) and the 0.85x contract realization ratio (claim 4597), are sized to whatever balance is outstanding.
The 9% senior notes set a first semi-annual interest date of 1 February 2026 (claim 4659, tied to the $1.75 billion issuance in claims 4697 and 4658). The ledger auto-transitioned this claim to delayed because no later disclosure confirms the coupon was paid. The absence of a confirmation is not evidence of a missed payment, and routine coupons are rarely announced. It remains a dated commitment that the company has not addressed on the record. The earlier notes-closing flags (claims 11919 and 4699) appear to be extraction artifacts, since issuance on or near the promised dates is recorded in claims 4824, 11917 and 4658.
Several headline operating figures have not been refreshed since the 13 May 2025 first-quarter disclosures. These are the $25.9 billion revenue backlog (claim 4970), the $11.2 billion OpenAI backlog component (claim 4969), 1.6 GW of contracted power (claim 4973) and 420 MW of active capacity added (claim 4972). The IBM Granite capacity partnership (claim 4971) also appears only in that quarter. In the claims reviewed, none of these figures is restated, revised or retired in later filings. It is unclear whether they grew, shrank or simply stopped being reported. The September 2025 NVIDIA $6.3 billion capacity commitment (claim 4352) is the next large figure on the record, but it is not reconciled against the earlier backlog or power numbers.
What we haven't been told
2026-09-25The Core Scientific merger is the most conspicuous silence on file. CoreWeave disclosed the all-stock agreement on 2025-07-06 and 2025-07-07 at 0.1235 shares per Core Scientific share (claims 4729, 4731), followed by the S-4 filing, Nasdaq listing approval, convertible note treatment and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4737, 4739). The last reference is the 2025-08-12 disclosure, which pointed to closing around 2025-10-01 (claim 4517). Both that target and the 2026-04-07 outside date (claims 4731, 4738) have passed, and the ledger moved all three claims to delayed on 2026-09-03 without any company statement. Nothing on record says whether the deal closed, was extended, or was terminated, and nothing says whether the $270 million fee was triggered or collected.
The DDTL 3.0 facility has also gone quiet. It was first described on 2025-05-18 as up to $2.6 billion (claim 11922) and detailed on 2025-07-30 with a commitment termination date of 2026-07-31, a 2030-08-21 maturity, a 1.40x debt service coverage covenant starting April 2027, and a 0.85x contract realization covenant (claims 4592, 4593, 4594, 4596, 4597). The facility was tied to a material GPU customer contract whose counterparty was not named (claim 4595). The commitment window closed nearly two months ago, and claim 4593 was auto-marked delayed. No disclosure on file reports how much was drawn before the window closed, whether the commitments were extended, or whether the underlying customer contract is performing against the realization covenant.
On the 2030 and 2031 senior notes, the flags come from missing confirmations rather than confirmed slippage. The May 2025 offering was described at $1.5 billion on 2025-05-18 (claim 11921) and then issued at $2 billion (claims 11917, 11918, 4824). The July offering was upsized by $250 million to $1.75 billion (claims 4697, 4698, 4658). Each was an increase, not a cut. The ledger still marks the expected closings (claims 11919, 4699) and the first 9% coupon date of 2026-02-01 (claim 4659) as delayed because no closing notice or payment confirmation is on record. The issuance-dated claims suggest the closings did happen, but the company has not said so in the disclosures captured here, and it has made no statement on coupon servicing.
The revolving credit facility carries a springing maturity date of 2026-12-30 (claim 11926), set out on 2025-05-05 alongside the expansion to $1.5 billion and the 2028-05-02 extension (claims 5010, 5012, 11923, 11925). That date is now about three months away. Nothing on file says whether the conditions that would pull maturity forward to December have been cleared, so it is unclear whether the 2028 date still stands.
Finally, the headline operating figures from the 2025-05-13 disclosure have not been refreshed in the ledger as provided. These are the $25.9 billion total backlog, the $11.2 billion OpenAI backlog, 1.6 GW of contracted power and 420 MW of active power added (claims 4970, 4969, 4973, 4972). The IBM Granite partnership (claim 4971) has likewise not been mentioned again. No later statement on record updates these numbers or explains whether they still hold.
What we haven't been told
2026-09-25The Core Scientific merger is the most consequential open item. The agreement was first disclosed on 2025-07-06 and 2025-07-07 (claims 4729, 4731) at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share. It came with an S-4 filing (4733), Nasdaq listing approval for the new shares (4735), and a $270 million termination fee payable to CoreWeave (4739). The August 2025 disclosure (4517) pointed to a close around 2025-10-01. The agreement's outside date was 2026-04-07 (4738). Both dates have passed, and the ledger has auto-transitioned 4517, 4731 and 4738 to delayed. Nothing on record announces a completed closing, a termination, an extension of the outside date, or whether the termination fee was triggered. The acquisition was one of the most prominent items in the mid-2025 disclosures, and the record is silent on how it ended.
The DDTL 3.0 facility was described twice. On 2025-05-18 (11922) it was up to $2.6 billion of delayed draw term loans. On 2025-07-30 (4592, 4593, 4594) it had a commitment termination date of 2026-07-31 and a 2030-08-21 maturity. It was tied to a material GPU customer contract (4595), with a 0.85x minimum contract realization ratio (4597) and a 1.40x debt service coverage test starting April 2027 (4596). The commitment window closed two months ago and 4593 now reads delayed. Nothing on record says how much of the $2.6 billion was drawn before the window closed, whether the window was extended, or whether the realization covenant has been met. The first coverage test is less than a year away.
The credit facility disclosure of 2025-05-05 extended maturity to 2028-05-02 (5012, 11925). It also carried a contingent springing maturity of 2026-12-30 (11926), which is now about three months out. The springing mechanism has not been mentioned since it was introduced. There is no statement on whether the triggering condition has been cured, waived or refinanced away.
The May 2025 operating figures have not been refreshed anywhere in the record. These are the $25.9 billion total revenue backlog (4970), the $11.2 billion OpenAI component (4969), 420 MW of active power (4972), and 1.6 GW of contracted power (4973). The same disclosure introduced an IBM partnership for Granite compute capacity (4971), and that partnership does not appear again. This may partly reflect how far the record reaches, since the ledger supplied here ends in September 2025. Within that window, though, none of these headline numbers is restated, revised or reconciled against the later NVIDIA $6.3 billion capacity commitment (4352).
The 9% senior notes due 2031 (4658) set a first interest payment for 2026-02-01 (4659), and the ledger now flags that claim as delayed. No disclosure on record confirms the coupon was paid. Some other delayed flags look like artifacts of the extraction rather than real slippage. The May 2025 notes closing (11919) is flagged, but issuance on 2025-05-27 is recorded separately (4824, 11917). The July closing (4699) is flagged, but issuance appears in 4658. The coupon flag is different, because nothing on record confirms that obligation was met.
What we haven't been told
2026-09-25The Core Scientific merger is the most visible gap. The all-stock deal at 0.1235 CoreWeave shares per Core Scientific share was announced in July 2025 (claims 4729, 4731), with a Form S-4 filing (4733), a conversion mechanism for Core Scientific's convertible notes (4737), and a $270 million termination fee payable to CoreWeave (4739). The August 2025 filing described an expected closing in the fourth quarter of 2025 (4517, promised by 2025-10-01), and the merger agreement's outside date was 2026-04-07 (4731, 4738). All three dated claims were automatically moved to 'delayed' on 2026-09-03. The last disclosure in the record is from 2025-08-12. The record contains no announcement that the deal closed, was extended, or was terminated. It also says nothing about whether the $270 million fee was triggered or collected.
The DDTL 3.0 facility has a similar gap. It first appeared on 2025-05-18 as up to $2.6 billion of delayed-draw term loans (11922), and the 2025-07-30 filing confirmed the size (4592). That filing also tied the facility to a material GPU customer contract (4595) and set covenants: a 0.85x contract realization ratio (4597) and a 1.40x debt service coverage ratio starting April 2027 (4596). The commitment termination date of 2026-07-31 (4593) passed without any disclosure in the record, and the claim moved to 'delayed' on 2026-09-03. The record does not say how much of the $2.6 billion was drawn before commitments lapsed, whether the draw period was extended, or how the underlying customer contract is performing against the realization covenant.
On the 9% senior notes due 2031, issuance itself is corroborated. The upsized $1,750 million offering (4697, 4698) was recorded as issued on 2025-07-27 (4658), so the 'delayed' status on its expected closing date (4699) looks like a ledger artifact rather than a real slip. The same holds for the May 2025 notes: the closing-date claim (11919) is marked 'delayed', but the 9.250% notes due 2030 are recorded as issued on 2025-05-27 (4824, 11917). The first semiannual interest payment on the 2031 notes is different. It was promised for 2026-02-01 (4659) and is now 'delayed', and nothing in the record confirms it was made. That is probably a disclosure omission rather than a missed coupon, but the record does not settle the question.
Several operating metrics appear only in the 2025-05-13 first-quarter disclosure and do not recur in the record through mid-September 2025. These are the $25.9 billion revenue backlog (4970), the $11.2 billion OpenAI component (4969), 1.6 GW of contracted power (4973), and 420 MW of active power (4972). The IBM partnership for Granite model compute (4971) was presented in that same release and is likewise not mentioned again. The ledger provided appears to end partway through September 2025, so later updates may exist outside this view. Within the record as it stands, however, none of these figures has been refreshed or reconciled, and the IBM arrangement has received no further comment on its scope or status.
What we haven't been told
2026-09-25The largest silence concerns the Core Scientific merger. CoreWeave announced the agreement in July 2025 (claims 4729 and 4731), at 0.1235 CoreWeave shares per Core Scientific share, with an outside closing date of April 7, 2026 (claim 4738). It also cited an S-4 registration filing (claim 4733), Nasdaq listing approval for the new shares (claim 4735), and a $270 million termination fee payable to CoreWeave (claim 4739). By the August 12, 2025 disclosure, the company was describing an expected completion around October 1, 2025 (claim 4517). That is the last mention on record. Both the October 2025 target and the April 2026 outside date have passed, and the ledger moved all three dated claims to delayed on September 3, 2026, by automated transition rather than because of any company statement. The record contains nothing on whether the deal closed, was terminated, or was extended. It also says nothing about whether the $270 million fee changed hands.
The $2.6 billion DDTL 3.0 facility has a similar gap. The facility was introduced in May 2025 (claim 11922) and detailed on July 30, 2025 (claim 4592). Its commitment termination date was July 31, 2026 (claim 4593), and it was tied to a material GPU customer contract (claim 4595). That window has now closed, and the claim sits at delayed by automated transition. No disclosure in the record says how much of the $2.6 billion was actually drawn, whether the commitment period was extended, or whether the anchoring customer contract performed as described. The disclosure also set a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage test beginning April 2027 (claim 4596). Neither has been revisited, so readers cannot tell how close the company is to those covenants.
The May 13, 2025 operating figures have not been refreshed anywhere in the portion of the record provided. That disclosure cited $25.9 billion of revenue backlog (claim 4970), of which $11.2 billion was attributed to OpenAI (claim 4969), plus 1.6 GW of contracted power (claim 4973) and 420 MW of active capacity added (claim 4972). Later disclosures on record deal with financing, the merger, and a $6.3 billion NVIDIA capacity commitment (claim 4352). None of them restates backlog, contracted power, or energized capacity. The IBM partnership for Granite compute capacity (claim 4971) appears once, on the same date, and does not recur. No statement explains whether these figures were superseded, revised, or simply dropped from the disclosure cadence.
Several debt milestones are flagged delayed on the ledger, but the flags appear to conflict with the company's own record rather than reflect a real slip. The May 2025 notes offering had an expected closing of May 27, 2025 (claim 11919), and the July 2025 upsized 9% notes had an expected closing of July 25, 2025 (claim 4699). Issuance claims dated to those closings exist for both (claims 4824, 11917 and 4658), which indicates that both offerings closed. The first 9% coupon, due February 1, 2026 (claim 4659), is harder to settle. The record contains no confirmation that it was paid, and it now reads as delayed. The company has said nothing either way, so this item is more a gap in affirmative disclosure than an evident walk-back.
What we haven't been told
2026-09-24The Core Scientific merger is the clearest case. Claim 4729 records the agreement on 2025-07-07. Claims 4731 and 4738 set 2026-04-07 as the outside date for closing, at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share. Claim 4517, from the 2025-08-12 disclosure, carried an earlier target of 2025-10-01. The last mention of the deal in the record is that August filing. All three dated claims moved automatically to delayed on 2026-09-03. The record contains no statement that the deal closed, was extended, or was terminated. It also says nothing about the $270 million termination fee payable to CoreWeave (claim 4739), which would matter if the deal did not proceed.
The $2.6 billion DDTL 3.0 facility has a similar gap. It is described in claims 11922 and 4592, with a commitment termination date of 2026-07-31 (claim 4593) and a maturity of 2030-08-21 (claim 4594). The commitment window passed without any disclosure in the record, and claim 4593 was auto-marked delayed on 2026-09-03. The record does not say how much of the facility was drawn before the window closed, whether the commitment was extended, or whether any undrawn capacity simply lapsed. The facility also carries covenants, including a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage test starting April 2027 (claim 4596), so its current state is relevant.
The 9% senior notes due 2031 were upsized from $1.5 billion to $1.75 billion (claims 4700, 4698, 4697) and issued, per claim 4658 on 2025-07-27. The first coupon date of 2026-02-01 (claim 4659) passed with no confirming disclosure in the record, and the claim was auto-marked delayed. The delayed labels on the closing-date claims 11919 and 4699 look like artifacts rather than real slippage, because issuance of both note series is recorded (claims 11917, 4824 and 4658). The coupon claim is different. No disclosure on record confirms or denies that the payment was made.
Several operating figures from the 2025-05-13 disclosure are not updated anywhere else in the record as supplied. These are 420 MW of active power added (claim 4972), 1.6 GW of contracted power (claim 4973), a $25.9 billion revenue backlog (claim 4970), and the $11.2 billion OpenAI backlog (claim 4969). The IBM partnership for Granite compute capacity (claim 4971) is also mentioned only in that disclosure. None of these items has been revised downward in the record. They have simply not been restated, and no later disclosure explains what they now stand at.
What we haven't been told
2026-09-24The proposed all-stock merger with Core Scientific is the most prominent open item. It was announced in July 2025 at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), with a closing deadline of 7 April 2026 (claim 4738), an S-4 filing and Nasdaq listing approval as preconditions (claims 4733, 4735), a $270 million termination fee payable to CoreWeave (claim 4739), and conversion of Core Scientific's convertible notes into CoreWeave securities (claim 4737). The last reference on record is the August 2025 disclosure (claim 4517), which carried an October 2025 target. The ledger moved claims 4517, 4731 and 4738 to delayed on 3 September 2026 because the dates passed without confirmation. There is no disclosure on record that the merger closed, was terminated, or was renegotiated. Nothing states whether the termination fee became payable or what happened to the convertible notes treatment.
The $2.6 billion DDTL 3.0 facility follows a similar pattern. It was disclosed in May and July 2025 (claims 11922, 4592), with a commitment termination date of 31 July 2026 (claim 4593), a maturity of 21 August 2030 (claim 4594), and covenants including a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio from April 2027 (claims 4596, 4597). The last mention is 30 July 2025. The commitment window has since lapsed, and claim 4593 was auto-marked delayed. The record does not say how much of the facility was drawn before the window closed, whether the commitment was extended, or whether any undrawn capacity was allowed to expire.
Several bond-related dates carry a delayed status, but the record suggests mechanical ledger flags rather than real slippage, so they deserve less weight. The May 2025 notes had an expected closing date of 27 May 2025 (claim 11919), and an issuance claim is dated that same day (claims 11917, 4824). The July 2025 9% notes had an expected closing of 25 July (claim 4699), followed by an issuance claim two days later (claim 4658). The first coupon on those notes was due 1 February 2026 (claim 4659). No disclosure confirms that payment, which is ordinary and would not normally be announced. The revolver's contingent springing maturity of 30 December 2026 (claim 11926) sits alongside the stated extension to May 2028 (claims 5012, 11925). No update says whether the springing condition remains live as that date approaches.
A group of operating metrics from the May 2025 quarterly disclosure has not been restated in any later claim on record. These are 1.6 GW of contracted power (claim 4973), 420 MW of active power added (claim 4972), a $25.9 billion revenue backlog (claim 4970), and an $11.2 billion OpenAI backlog component (claim 4969). The same disclosure described an IBM partnership for Granite model compute (claim 4971), which does not reappear. None of these figures has been revised downward on record. However, the record contains no later figures to show whether they grew, held, or were quietly superseded, and nothing indicates the current state of the IBM arrangement.
What we haven't been told
2026-09-24The Core Scientific merger is the most conspicuous silence in the record. When the deal was announced on 2025-07-06 (claims 4729, 4731, 4738), management described an all-stock exchange at 0.1235 CoreWeave shares per Core Scientific share, with an outside date of 2026-04-07. By 2025-08-12 the company still referred to the agreement (claim 4517) with an expected completion around 2025-10-01. That is the last mention on record. Both the expected close and the outside date have now passed, and the ledger shows claims 4517, 4731 and 4738 moving to delayed automatically rather than through any company statement. The record contains no announcement that the merger closed, was terminated, or was extended. It also says nothing about the $270 million termination fee that would be payable to CoreWeave (claim 4739), or about the S-4 and Nasdaq listing steps (claims 4733, 4735) that the transaction depended on.
The DDTL 3.0 facility follows a similar pattern. It was introduced on 2025-05-18 as up to $2.6 billion of delayed draw term loans (claim 11922) and detailed on 2025-07-30 (claims 4592, 4593, 4594). The disclosures set a commitment termination date of 2026-07-31. That date has passed, and claim 4593 has moved to delayed without any accompanying disclosure. The record does not say how much of the $2.6 billion was actually drawn before the window closed, whether the commitment period was extended, or whether any undrawn capacity lapsed. The covenant terms tied to the facility also have no later update: a 0.85x contract realization ratio (claim 4597) and a 1.40x debt service coverage ratio starting April 2027 (claim 4596).
The revolving credit facility still has an open question attached to it. The May 2025 amendment extended maturity to 2028-05-02 (claims 5012, 11925), but it also included a contingent springing maturity of 2026-12-30 (claim 11926). That date is now about three months away. Nothing in the subsequent record says whether the springing condition remains live, has been cured, or has been waived.
The operating metrics management led with in May 2025 have not been refreshed anywhere in the available record. These were $25.9 billion of total revenue backlog (claim 4970), $11.2 billion of that attributed to the OpenAI agreement (claim 4969), 1.6 GW of contracted power (claim 4973), and 420 MW of active capacity (claim 4972). Each of these figures was stated once on 2025-05-13 and never updated or reconciled. Later disclosures shift toward financing activity and a $6.3 billion NVIDIA capacity commitment (claim 4352). The record does not show how the earlier backlog and power figures have moved since.
What we haven't been told
2026-09-24The proposed all-stock merger with Core Scientific is the most prominent item to have gone quiet. It was first recorded on 2025-08-12 with a target of 2025-10-01 (claim 4517). A later framing set an outside date of 2026-04-07 for the 0.1235-share exchange (claims 4731, 4738). All three dates have passed, and the ledger moved each to delayed automatically on 2026-09-03. None of these changes was prompted by a company statement. The last merger-related disclosure on record dates from August 2025. Nothing in the claims available to this review says whether the transaction closed, was extended or was terminated. The $270 million termination fee payable to CoreWeave (claim 4739) still shows as stated, and there is no indication of whether it was ever triggered or collected.
The DDTL 3.0 delayed-draw term loan was described in May and July 2025 as a facility of up to $2.6 billion (claims 11922, 4592). Its commitment period was set to end on 2026-07-31 (claim 4593). That date has lapsed, and the claim was auto-transitioned to delayed. The record contains no disclosure of how much of the facility was drawn, whether the commitment was extended or whether any undrawn amount simply expired. The related covenants remain on record as stated without any later compliance update. These are the 0.85x minimum contract realization ratio (claim 4597) and the 1.40x debt service coverage ratio beginning April 2027 (claim 4596).
Several of the headline operating figures appear only in the 2025-05-13 disclosure and have not been updated in any later claim on record. These are the $25.9 billion total revenue backlog (claim 4970), the $11.2 billion OpenAI backlog within it (claim 4969), 420 MW of active power (claim 4972) and 1.6 GW of contracted power (claim 4973). The IBM partnership for Granite compute capacity (claim 4971) also appears only in that disclosure. It was never mentioned again in the record, with no statement on whether it expanded, concluded or lapsed. The absence may reflect gaps in extraction rather than silence from the company. Even so, no later claim restates, revises or retires any of these numbers.
A group of note-related dates also carries a delayed flag, but the rest of the record largely undercuts it. The May 2025 notes offering had an expected closing of 2025-05-27 (claim 11919), and claims 4824 and 11917 record the 2030 notes as issued on that same date. The July offering had an expected closing of 2025-07-25 (claim 4699), and claim 4658 records the $1.75 billion issuance two days later. The first 9 percent interest payment was due 2026-02-01 (claim 4659). It is marked delayed only because no confirmation of payment appears on record, not because any missed payment was reported. These look more like unverified milestones than walked-back promises. They are noted here because the company has not published the confirmations that would clear them.
What we haven't been told
2026-09-24The Core Scientific merger is the largest open question on this record. The agreement was disclosed on 2025-07-06 and 2025-07-07 (claims 4729, 4731) at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share, with a closing deadline of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). An August 2025 disclosure pointed to a closing around 2025-10-01 (claim 4517). The last mention is a 2025-09-16 restatement of the 0.1235 ratio (claim 4331). Both the October 2025 target and the April 2026 deadline have passed, and the ledger has automatically moved claims 4517, 4731 and 4738 to delayed. Nothing on record says whether the deal closed, was extended, or was terminated, or whether the termination fee was ever triggered.
The headline operating metrics from the first post-IPO quarter have not been updated since. On 2025-05-13 the company cited $25.9 billion of total contracted backlog (claim 4970), of which $11.2 billion came from the OpenAI strategic deal (claim 4969), along with 1.6 GW of contracted power (claim 4973) and 420 MW of active capacity added (claim 4972). The IBM Granite partnership (claim 4971) was announced the same day. None of these figures appears again in the record. There is no later backlog number, no progress report on converting contracted power into active capacity, and no further reference to the IBM arrangement. What happened to any of them has not been said.
The $2.6 billion DDTL 3.0 facility (claims 11922, 4592) carried a commitment termination date of 2026-07-31 (claim 4593), last referenced on 2025-07-30. That date has passed and the claim has been automatically marked delayed. The record contains no statement on how much of the facility was drawn before commitments lapsed or whether the window was extended. The facility was tied to a material GPU customer contract (claim 4595) and to covenants including a 0.85x contract realization ratio (claim 4597) and a 1.40x debt service coverage test starting April 2027 (claim 4596), so its utilization matters to that covenant position.
The first scheduled coupon on the 9% senior notes due 2031, set for 2026-02-01 (claim 4659), has also passed with no confirming disclosure on record, and the ledger has flagged it as delayed. This looks more like an absence of follow-up than evidence of a missed payment. By contrast, the delayed flags on the notes closing dates (claims 11919 and 4699) appear to be mechanical: issuance claims dated 2025-05-27 and 2025-07-27 (claims 11917, 4824, 4658) indicate those offerings did close.
More broadly, the disclosed history ends with a personnel item on 2025-09-24 (claim 4317). Roughly a year has passed without a new claim entering the record, which leaves each of the items above unresolved.
What we haven't been told
2026-09-24The Core Scientific merger is the most conspicuous gap. The deal was announced on 2025-07-06 and 2025-07-07 (claims 4729, 4731) at 0.1235 CoreWeave shares per Core Scientific share, with an expected close around 2025-10-01 (claim 4517), an outside closing deadline of 2026-04-07 (claim 4738), and a $270 million termination fee payable to CoreWeave (claim 4739). The last mention on record is 2025-09-16 (claim 4331), which restates the exchange ratio without giving a new timetable. Both the October 2025 target and the April 2026 outside date have passed, and the ledger moved claims 4517, 4731 and 4738 to delayed on 2026-09-03. That change was made automatically, not in response to any company statement. The record contains no disclosure saying whether the merger closed, was terminated, or had its outside date extended. It also says nothing about whether the termination fee was triggered or paid.
The $2.6 billion DDTL 3.0 facility has a similar gap. It was first disclosed on 2025-05-18 (claim 11922) and detailed on 2025-07-30 (claims 4592, 4593, 4594). The commitment termination date was set at 2026-07-31. That date has passed and the ledger now marks claim 4593 as delayed. Nothing on record says how much of the facility was drawn before commitments lapsed, whether the draw window was extended, or whether undrawn capacity was allowed to expire. The facility's covenants remain unaddressed as well, including the 0.85x minimum contract realization ratio (claim 4597) and the 1.40x debt service coverage ratio due to begin in April 2027 (claim 4596). There has been no word on performance against either.
Several headline operating figures were given only once, on 2025-05-13, and not repeated in the disclosures that followed. These are the $25.9 billion total revenue backlog (claim 4970), the $11.2 billion OpenAI backlog (claim 4969), 1.6 GW of contracted power (claim 4973), and 420 MW of active capacity added (claim 4972). The later OpenAI reference on 2025-09-24 (claim 4296) gives a contract horizon of 2031-05-31 but no refreshed backlog figure. Nothing in the record shows these numbers being revised downward, but none has been updated either. It is therefore not possible to tell from the company's own statements whether backlog or contracted power has grown, held steady, or shrunk since mid-2025.
The IBM partnership to supply compute capacity for Granite models (claim 4971) was announced on 2025-05-13 and does not appear again in any later claim on record. There has been no statement that it is complete, expanded, or wound down.
On the financing side, the $1.75 billion 9% senior notes due 2031 (claims 4658, 4697) carried a first interest payment date of 2026-02-01 (claim 4659). The ledger later auto-flagged that claim as delayed, and no disclosure on record confirms the coupon was paid. The notes-closing claims flagged as delayed (claims 11919, 4699) look more like ledger artifacts than walk-backs, because the 2030 notes are separately recorded as issued on 2025-05-27 (claims 4824, 11917). Finally, the contingent springing maturity of 2026-12-30 on the revolving facility (claim 11926) is now about three months away. The company has not said whether the conditions that would trigger it are currently met.
What we haven't been told
2026-09-23The Core Scientific merger is the largest open item on the record. CoreWeave announced the all-stock agreement in July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), with an S-4 filing, Nasdaq listing approval, conversion of Core Scientific's convertible notes, and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4737, 4739). An August 2025 filing pointed to completion around 2025-10-01 (claim 4517). The outside closing deadline was 2026-04-07 (claim 4738). The last mention in the record is the 2025-09-16 restatement of the exchange ratio (claim 4331). Claims 4517, 4731 and 4738 were all auto-transitioned to delayed on 2026-09-03, after both target dates had passed. The record contains no statement that the deal closed, was terminated, or was extended. It also says nothing about whether the $270 million termination fee was triggered or paid.
The operating metrics from the 2025-05-13 first-quarter disclosure do not recur. That release gave revenue backlog of $25.9 billion (claim 4970), of which $11.2 billion was attributed to the OpenAI agreement (claim 4969). It also gave 1.6 GW of contracted power and 420 MW of active capacity (claims 4972, 4973) and described an IBM partnership for Granite compute (claim 4971). None of these figures or the IBM relationship appears again in any later claim on file, including the August 2025 period, which covers only IPO proceeds and acquisitions. All remain at stated. Because they were never updated, the record cannot show whether backlog, contracted power or active capacity rose, fell or were redefined. It also does not show whether the IBM arrangement continued past its initial announcement.
The $2.6 billion DDTL 3.0 facility was described in May and July 2025 (claims 11922, 4592) with a commitment termination date of 2026-07-31 (claim 4593). That claim moved to delayed on 2026-09-03, and the record has no disclosure of how much was drawn before commitments lapsed or whether the window was extended. The facility's covenants are also unaddressed. These are a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio from April 2027 (claims 4596, 4597), both tied to an unnamed material GPU customer contract (claim 4595). Nothing on file says whether the underlying contract is performing against those ratios.
On the notes, the record shows that the May and July 2025 offerings were issued (claims 4824, 11917, 4658). The delayed flags on their expected closing dates (claims 11919, 4699) therefore appear to reflect missing confirmation rather than an actual slip. Two smaller dated items are still open, however. First, the 9% notes due 2031 were to begin paying interest on 2026-02-01 (claim 4659), and that claim is now delayed with no confirmation that the first coupon was paid. Second, the revolving credit facility's maturity was extended to 2028-05-02 but carries a contingent springing maturity of 2026-12-30 (claims 11925, 11926). With that date about three months away, the record contains no statement on whether the conditions that would pull maturity forward have been resolved.
What we haven't been told
2026-09-23The Core Scientific merger is the most visible silence. The agreement was recorded on 2025-07-06 and 2025-07-07 (claims 4729, 4731, 4738) at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share, with an outside date of 2026-04-07. A 2025-08-12 disclosure pointed to completion around 2025-10-01 (claim 4517). The last mention of the deal is 2025-09-16 (claim 4331), which restated the ratio but gave no timing. All three dated claims were auto-transitioned to delayed on 2026-09-03, and the April 2026 outside date is now more than five months past. The record contains no announcement that the deal closed, was extended, or was terminated. It also says nothing about whether the $270 million termination fee (claim 4739) became payable in either direction.
The operating metrics from the first-quarter 2025 release have not been refreshed. On 2025-05-13 management cited $25.9 billion of revenue backlog (claim 4970), of which $11.2 billion came from the OpenAI deal (claim 4969). The same release cited 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). The 2025-08-12 disclosures covered IPO proceeds, the over-allotment, and the Weights & Biases price (claims 4513 to 4516), but none of these figures reappears there or in any later claim. The record cannot tell whether backlog or capacity has since grown, been re-scoped, or been restated, because nothing has been said.
The $2.6 billion DDTL 3.0 facility (claims 4592, 11922) was tied to a material GPU customer contract (claim 4595) and carried a commitment termination date of 2026-07-31 (claim 4593). That date has passed, and the claim auto-transitioned to delayed on 2026-09-03. There is no disclosure of how much was drawn, whether the commitment was extended, or whether the unnamed customer contract is still performing. That contract also sits under a 0.85x contract realization covenant (claim 4597). Similarly, the first 9% coupon on the 2031 notes was due 2026-02-01 (claim 4659) and is now marked delayed, with no confirming statement on record. In fairness, some delayed flags look like ledger artifacts rather than slippage. The May and July 2025 notes closings (claims 11919, 4699) are contradicted by issuance claims dated on or near the expected closing dates (claims 4824, 11917, 4658).
Two smaller threads have simply stopped. The IBM partnership to supply compute for Granite models (claim 4971) appears once, on 2025-05-13, and is never referenced again. The revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), about three months away. Nothing on record says whether the condition that would trigger it has been addressed. More broadly, the ledger has no company disclosures after 2025-09-24 (claim 4315), so roughly a year of events, including the resolution of every dated milestone above, remains unaddressed in the record.
What we haven't been told
2026-09-23The proposed merger with Core Scientific is the most prominent item that has gone quiet. Management announced the all-stock deal at 0.1235 CoreWeave shares per Core Scientific share in July 2025 (claims 4729, 4731) and set an outside closing deadline of 2026-04-07 (claim 4738). An August 2025 disclosure pointed to closing around 2025-10-01 (claim 4517). The last mention on record is 2025-09-16 (claim 4331), which restated the exchange ratio without giving a new timeline. The ledger moved claims 4517, 4731 and 4738 to delayed on 2026-09-03 because their dates passed. The record contains no confirmation that the merger closed and no statement that it was terminated or extended. It also does not say whether the $270 million termination fee payable to CoreWeave (claim 4739) was ever triggered.
The $2.6 billion DDTL 3.0 facility was disclosed in May and July 2025 (claims 11922, 4592). It had a commitment termination date of 2026-07-31 (claim 4593), and the ledger marked that date as delayed on 2026-09-03. The facility was tied to an unnamed material customer contract (claim 4595) and to covenants including a 0.85x contract realization ratio and a 1.40x debt service coverage ratio starting April 2027 (claims 4596, 4597). Nothing on record since July 2025 says how much of the facility was drawn before commitments lapsed, whether the window was extended, or whether the underlying customer contract is performing. A related date is also approaching without comment. The revolving credit facility, expanded to $1.5 billion in May 2025 (claims 5010, 11923), carries a contingent springing maturity of 2026-12-30 (claim 11926), and no disclosure addresses whether the condition behind it is live.
The July 2025 9% senior notes due 2031 were upsized to $1.75 billion (claims 4697, 4698, 4658). They promised a first interest payment on 2026-02-01 (claim 4659), which the ledger moved to delayed on 2026-09-03. The record has no disclosure confirming that the coupon was paid. The expected closing dates for both 2025 notes offerings (claims 11919, 4699) are also flagged delayed. However, later claims describe the notes as issued (claims 4824, 11917, 4658), so those two flags look more like a lapse in follow-up disclosure than an actual slip.
Several operating figures appeared only once, in the 2025-05-13 disclosure, and have not been updated since: the $25.9 billion revenue backlog (claim 4970), the $11.2 billion OpenAI backlog (claim 4969), 1.6 GW of contracted power (claim 4973), 420 MW of active power added (claim 4972), and the IBM Granite compute partnership (claim 4971). None has been revised or reaffirmed in any later filing on record. The most recent claim of any kind is dated 2025-09-24 (claim 4315), which leaves roughly a year in which the record contains no update on backlog, capacity build-out, or the status of these relationships.
What we haven't been told
2026-09-23The Core Scientific merger is the largest open item in the record. Management first disclosed the all-stock agreement on 2025-07-06 and 2025-07-07 (claims 4731, 4729, 4738) at 0.1235 CoreWeave shares per Core Scientific share, with an outside closing date of 2026-04-07. A filing on 2025-08-12 pointed to an expected completion around 2025-10-01 (claim 4517). The last mention in the record is the 2025-09-16 restatement of the exchange ratio (claim 4331). All three dated claims have since been moved automatically to delayed, because both the October 2025 target and the April 2026 outside date have passed. The record contains no closing announcement, no amendment extending the outside date, and no notice of termination. It also says nothing about the $270 million termination fee payable to CoreWeave (claim 4739), which would matter if the deal did not complete.
The DDTL 3.0 facility was announced at up to $2.6 billion on 2025-05-18 and detailed on 2025-07-30 (claims 11922, 4592). It was tied to a material GPU customer contract (claim 4595) and carried a commitment termination date of 2026-07-31 (claim 4593). That date has passed and the claim has moved automatically to delayed. The record does not say how much of the $2.6 billion was drawn before the window closed, whether the commitment was extended, or whether the customer contract behind the facility is still performing at the 0.85x contract realization ratio the lenders required (claim 4597). The first debt service coverage test, 1.40x starting April 2027 (claim 4596), is still ahead.
The two 2025 senior note deals follow a similar pattern, though the gap is smaller. Both were enlarged before pricing: the 2030 notes went from $1.5 billion to $2.0 billion (claims 11921, 11918, 11917), and the 2031 notes went from $1.5 billion to $1.75 billion (claims 4700, 4698, 4697). Issuance records dated on or near the expected closing dates (claims 11917, 4658) suggest that the delayed flags on the closing claims (11919, 4699) reflect missing confirmation rather than a real slip. The 9% coupon on the 2031 notes, first due 2026-02-01 (claim 4659), is different. It has been automatically marked delayed, and the record contains no statement that the payment was made.
Several operating figures from the 2025-05-13 quarterly disclosure have not been restated anywhere in the record supplied. These include 1.6 GW of contracted power (claim 4973), 420 MW of active power added (claim 4972), and total committed backlog of $25.9 billion (claim 4970), of which $11.2 billion was attributed to OpenAI (claim 4969). The only later OpenAI figure is a $6.5 billion commitment dated 2025-09-24 (claim 4297), and the record does not say how that amount relates to the earlier $11.2 billion. The IBM arrangement to supply compute for Granite models (claim 4971) appears in the same May 2025 disclosure and does not appear again. The record has no update on its scale, its term, or whether it is still active.
What we haven't been told
2026-09-23The Core Scientific merger is the most conspicuous silence in the record. CoreWeave announced the all-stock deal in July 2025 at 0.1235 shares per Core Scientific share (claims 4729, 4731) and tied it to an outside closing date of 2026-04-07 (claim 4738), with a separate 2025-10-01 milestone attached to the agreement in the August disclosures (claim 4517). The last mention in the record is 2025-09-16 (claim 4331), which restates the exchange ratio without a timetable. Both the October 2025 milestone and the April 2026 outside date have passed, and the ledger moved claims 4517, 4731 and 4738 to delayed automatically on 2026-09-03. Nothing in the record confirms a closing, announces a termination, sets a revised outside date, or says whether the $270 million termination fee (claim 4739) was ever triggered.
The DDTL 3.0 facility has also gone quiet. The $2.6 billion delayed-draw term loan was first described in May 2025 (claim 11922) and detailed on 2025-07-30 (claims 4592, 4593, 4594). That filing included a commitment termination date of 2026-07-31 and covenants tied to a material GPU customer contract (claims 4595, 4596, 4597). July 2025 is the last time the facility appears. The commitment window has since closed, and claim 4593 was marked delayed automatically. The record does not say how much of the $2.6 billion was drawn before the window closed, whether the commitment was extended, or whether the 0.85x contract-realization test has been met.
The notes program shows a narrower gap. The expected closing dates for the 2030 notes (claim 11919, 2025-05-27) and the 2031 notes (claim 4699, 2025-07-25) are marked delayed. However, claims 11917 and 4658 record those issuances on or near the promised dates, so these flags look like ledger artifacts rather than real slippage. The first 9% coupon on the 2031 notes, due 2026-02-01 (claim 4659), is harder to settle. It was last referenced in July 2025, and no subsequent disclosure in the record confirms that the payment was made. The status reflects missing confirmation, not a known default.
Several operating figures from the 2025-05-13 update have not been refreshed. That update listed 1.6 GW of contracted power (claim 4973), 420 MW of active capacity added (claim 4972), a $25.9 billion total backlog (claim 4970) and an IBM partnership to supply Granite compute capacity (claim 4971). None of these reappear in the later disclosures on record. The only related update is an additional $6.5 billion OpenAI commitment in September 2025 (claim 4297). The record contains no restated contracted-power figure, no update on how much of the 1.6 GW has been energized, and no further mention of the IBM arrangement, not even language describing it as ongoing.
What we haven't been told
2026-09-23The Core Scientific merger is the most visible gap in the record. Management announced the agreement in July 2025 (claims 4729, 4731, 4738), set out a fixed exchange ratio of 0.1235 CoreWeave shares, a $270 million termination fee payable to CoreWeave (4739), and an S-4 filing and Nasdaq listing path (4733, 4735). A later disclosure tied the transaction to a 2025-10-01 date (4517). The last mention in the ledger is 2025-09-16 (4331), which restates the exchange ratio. Both the 2025-10-01 date and the 2026-04-07 outside date have since passed, and the ledger moved claims 4517, 4731 and 4738 to delayed automatically on 2026-09-03. No revision was ever filed. The record contains no statement that the merger closed, was terminated, or was extended. It also does not say whether the $270 million fee was triggered or paid.
The $2.6 billion DDTL 3.0 facility followed a similar pattern. It was described in May 2025 (11922) and set out in detail on 2025-07-30 (4592, 4593, 4594), along with covenants tied to a material GPU customer contract (4595, 4596, 4597). Its commitment termination date of 2026-07-31 (4593) has lapsed, and the claim was auto-marked delayed. The ledger has no later disclosure of how much was drawn before commitments ended, whether the window was extended, or whether any undrawn amount was cancelled. The 0.85x contract realization covenant (4597) and the 1.40x debt service coverage ratio due from April 2027 (4596) have likewise not been mentioned since the original filing.
The 2025 senior notes carry smaller loose ends. The expected closing dates for the May notes (11919, 2025-05-27) and the July notes (4699, 2025-07-25) were auto-marked delayed. Issuance claims dated on or near those days (11917, 4824, 4658) suggest the deals did close, but no closing confirmation is linked to the original promises. Two points were never addressed. The first scheduled 9% coupon, due 2026-02-01 (4659), was never confirmed as paid. The May notes' maturity is recorded as 2030-06-01 in one filing (11917) and 2030-05-27 in another (4824), and nothing in the record reconciles the two.
Several operating figures from the May 2025 quarterly disclosure have not been restated in the claims supplied here. These are 1.6 GW of contracted power (4973), 420 MW of active capacity added (4972), $25.9 billion of total backlog (4970), and the IBM Granite compute partnership (4971). OpenAI commitments reappear in September 2025 (4297), but the record gives no updated contracted or active power figure and no further word on the IBM arrangement. The ledger also does not say whether the May capacity figures were superseded, revised, or simply dropped from later disclosures.
What we haven't been told
2026-09-23The Core Scientific merger is the most visible silence on the record. CoreWeave announced the all-stock deal at 0.1235 shares per Core Scientific share in July 2025 (claims 4729, 4731) and set an outside closing deadline of April 7, 2026 (claim 4738). An August 2025 disclosure pointed to completion around October 1, 2025 (claim 4517). The last mention on record is September 16, 2025 (claim 4331), which restated the exchange ratio but gave no timing. Both the October 2025 target and the April 2026 deadline have since passed, and the ledger moved claims 4517, 4731 and 4738 to delayed on September 3, 2026. Nothing on record says whether the deal closed, was extended, or was terminated, or whether the $270 million termination fee described in claim 4739 came into play.
The $2.6 billion DDTL 3.0 facility was disclosed in May and July 2025 (claims 11922, 4592). It was tied to an unnamed material customer contract for GPU infrastructure (claim 4595), and its commitment period was set to end on July 31, 2026 (claim 4593). That date has passed and the claim was auto-marked delayed. The claims on record do not say how much of the facility was drawn before commitments lapsed, whether the period was extended, or who the underlying customer is. The same filing set a minimum debt service coverage ratio of 1.40x starting April 2027 (claim 4596) and a 0.85x contract realization ratio (claim 4597). Neither has been referred to since.
The operating figures from the May 13, 2025 disclosure have not been restated in any later claim on record. These are a total backlog of $25.9 billion (claim 4970), of which $11.2 billion came from the OpenAI deal (claim 4969), 1.6 GW of contracted power, and 420 MW of active power added (claims 4972, 4973). A later September 2025 claim adds $6.5 billion of OpenAI committed revenue running through May 2031 (claim 4297). It is presented as a standalone figure and not reconciled with the earlier backlog total. The IBM Granite compute partnership (claim 4971) appears once, in May 2025, and does not recur.
Several debt-market milestones lack follow-through on record. The expected closing dates for the May and July 2025 notes offerings (claims 11919, 4699) are marked delayed. Adjacent claims describe the notes as issued (claims 11917, 4658), so the status likely reflects a missing confirmation rather than a failed deal. The first 9% coupon on the 2031 notes was due February 1, 2026 (claim 4659). No disclosure on record confirms it was paid. The May 2025 notes were also upsized from $1.5 billion (claim 11921) to $2.0 billion (claim 11918) without a stated reason for the increase.
What we haven't been told
2026-09-23The Core Scientific merger is the most prominent silence in the record. CoreWeave signed the agreement in early July 2025 (claims 4729, 4731) at 0.1235 CoreWeave shares per Core Scientific share, set an outside closing deadline of 2026-04-07 (claim 4738), and described a $270 million termination fee payable to CoreWeave (claim 4739). The August 2025 disclosure tied the deal to an earlier expected completion around 2025-10-01 (claim 4517). The last mention in the ledger is 2025-09-16 (claim 4331), which restated the exchange ratio without adding anything new. Both the October 2025 target and the April 2026 deadline have since passed, and claims 4517, 4731 and 4738 were moved to delayed on 2026-09-03. Nothing on record says whether the merger closed, was terminated, or had its deadline extended. There is also no word on whether the termination fee was triggered, or what happened to the related S-4 registration (claim 4733) and Nasdaq listing approval (claim 4735).
The DDTL 3.0 facility has a similar gap. CoreWeave announced up to $2.6 billion in delayed-draw term loans in May and July 2025 (claims 11922, 4592) and linked the facility to a material GPU infrastructure contract with a customer (claim 4595). The facility came with covenants: a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage ratio beginning April 2027 (claim 4596). The commitment termination date was 2026-07-31 (claim 4593). That date has passed, and the claim was auto-transitioned to delayed on 2026-09-03. Management's last reference was on 2025-07-30. The record does not say how much of the $2.6 billion was drawn before commitments lapsed, whether the window was extended, or how the contract realization covenant is tracking.
The operating metrics used to frame the business after the IPO have not been refreshed. The 2025-05-13 disclosure gave a $25.9 billion revenue backlog (claim 4970), of which $11.2 billion came from the OpenAI strategic deal (claim 4969). It also cited 1.6 GW of contracted power (claim 4973), 420 MW of active capacity added (claim 4972), and an IBM partnership for Granite compute capacity (claim 4971). None of these figures or relationships reappears in any later claim, even as the company went on to add more than $5 billion of new senior notes and a $6.3 billion NVIDIA capacity commitment (claim 4352). No updated backlog, capacity or partner figures are on record to show whether these numbers grew, held or were revised.
Several financing milestones also lack follow-through. The 9% senior notes due 2031 (claims 4697, 4658) promised a first interest payment on 2026-02-01 (claim 4659). That claim was moved to delayed on 2026-09-03, and no disclosure confirms the coupon was paid. The ledger likewise shows delayed status for the expected closings of the May and July 2025 note offerings (claims 11919, 4699). Later issuance claims (4824, 11917, 4658) suggest those deals did close, so the gap there is the missing confirmation rather than evidence of a failure. Separately, the expanded revolving credit facility carries a contingent springing maturity of 2026-12-30 (claim 11926), which is now about three months away. Management has not said whether the condition behind it has been resolved since the facility was described on 2025-05-05.
What we haven't been told
2026-09-23The Core Scientific merger is the most visible gap in the record. Management announced the all-stock agreement at 0.1235 CoreWeave shares per Core Scientific share in July 2025 (claims 4729, 4731) and set an outside closing deadline of 2026-04-07 (claim 4738). An August 2025 disclosure pointed to an earlier expected completion around 2025-10-01 (claim 4517). The last reference on record is a 2025-09-16 filing that restates the exchange ratio (claim 4331). All three dated claims were automatically moved to delayed on 2026-09-03 after both dates passed. The record contains no statement that the deal closed, was terminated, or was renegotiated. It also contains nothing on whether the $270 million termination fee payable to CoreWeave (claim 4739) was triggered.
The $2.6 billion DDTL 3.0 facility was disclosed in May and July 2025 (claims 11922, 4592). It carried a commitment termination date of 2026-07-31 (claim 4593). That date passed and the claim was automatically marked delayed on 2026-09-03. The record has no subsequent statement on how much of the facility was drawn before commitments lapsed, whether the draw window was extended, or whether any undrawn capacity was replaced. The associated covenants, a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio from April 2027 (claims 4597, 4596), were last mentioned on 2025-07-30.
Several operating figures from the 2025-05-13 first-quarter disclosure have not been updated in the record. These are the $11.2 billion OpenAI backlog (claim 4969), total contracted backlog of $25.9 billion (claim 4970), 1.6 GW of contracted power (claim 4973), 420 MW of active capacity added (claim 4972), and the IBM partnership for Granite compute (claim 4971). None of them appears again in the ledger. The later $6.3 billion NVIDIA capacity commitment of 2025-09-14 (claim 4352) is not reconciled against any of them. The absence may reflect gaps in extraction rather than a change in what management reports, but no refreshed figure is on file.
On the senior notes, the expected closing dates of 2025-05-27 and 2025-07-25 (claims 11919, 4699) and the first 9% coupon date of 2026-02-01 (claim 4659) are all marked delayed. For the May offering, claims 11917 and 4824 record issuance on 2025-05-27. The delayed flags therefore appear to reflect a missing confirmation rather than a known slip. Still, the record contains no explicit statement that the July notes closed or that the February 2026 interest payment was made.
The ledger supplied for this review ends partway through late-September 2025 entries. Any later disclosures that address these items are not reflected here.
What we haven't been told
2026-09-22The Core Scientific transaction is the clearest case of a date that moved without anyone saying so. Claim 4517, recorded 2025-08-12, carried a closing commitment of 2025-10-01; it now sits at 'delayed' on an automated transition dated 2026-09-03, with no company statement in the ledger revising or withdrawing that October target. The related outside-date claims from the merger agreement itself, 4731 and 4738 (both 2025-07-06, keyed to 2026-04-07), carry the same automated 'delayed' stamp on the same day. So there are two distinct deadlines — a near-term expectation and a contractual backstop — that both lapsed, and the record contains no disclosure explaining which one moved first, why, or what the replacement date is. The last affirmative mention of the merger mechanics is 2025-09-24 (claim 4314, exchange ratio 0.1235), which restates consideration but says nothing about timing.
A similar pattern runs through the debt calendar, where it is smaller but more mechanical. Claim 11919 set an expected closing of 2025-05-27 for the $2.0 billion notes offering, and claim 4699 set 2025-07-25 for the $1.75 billion offering; both auto-transitioned to 'delayed.' Claim 4659, the 9% senior notes interest payment due 2026-02-01, is likewise flagged delayed as of 2026-09-03. What has not been said is whether these are genuine slippages or simply unverified settlements that no later filing confirmed. The distinction matters, and management has not drawn it.
The operating metrics disclosed on 2025-05-13 have not been restated since. Contracted power capacity of 1.6 GW (claim 4973), 420 MW of active capacity added (claim 4972), total revenue backlog of $25.9 billion (claim 4970), and the OpenAI-attributed $11.2 billion portion of that backlog (claim 4969) all date from that single day and appear nowhere in the subsequent sixteen months of record. Everything disclosed after mid-May is financing or M&A. Capacity and backlog were the framing numbers at the time of the first post-IPO disclosure; their disappearance from later disclosures has not been accompanied by any statement that the figures were superseded, reclassified, or are no longer being reported on that basis.
The cumulative capital figure has quietly gone stale in the same way. Claim 4968 put total debt and equity raised at $17.2 billion as of 2025-05-13. Since then the record adds the $2.0 billion notes (claims 11917, 4824), the $1.75 billion notes as upsized (claims 4697, 4698, 4658), the $2.6 billion DDTL 3.0 facility (claims 11922, 4592), and the $1.5 billion revolver expansion (claims 11923, 5010). The aggregate has never been refreshed, and no updated capitalization figure has been offered alongside the individual raises.
Two relationships have gone quiet without being characterized. The IBM partnership for Granite compute capacity (claim 4971) was disclosed once, on 2025-05-13, in signed-deal language and has not been mentioned since — no capacity figure, no term, no confirmation it is in service. The NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim 4352, 2025-09-14) is the newest substantive non-financing item on the record and has had no follow-up either. Separately, the product slate announced on 2025-05-13 — AI Object Storage general availability (4975), GB200 support across the platform stack (4976), On-Demand Cluster Scaling (4977), detailed billing metrics (4978) — has not resurfaced in any later disclosure, and nothing has been said about adoption, deprecation, or whether those launches held to their announced scope.
One caveat on method: every claim here was extracted and stamped 'stated' in September 2026, and the 'delayed' flags are automated transitions rather than company acknowledgments. The silence described above is silence in the disclosure record as captured, which is the point — none of these changes came with an update statement.
What we haven't been told
2026-09-22The Core Scientific acquisition is the clearest case of a date that moved without anyone saying so. Claim 4517, disclosed 2025-08-12, carried a closing target of 2025-10-01; that date passed and the claim was auto-transitioned to 'delayed' on 2026-09-03 rather than being revised by the company. The related merger claims 4731 and 4738, which set the outside date at 2026-04-07, followed the same path — both sit at 'delayed' on the same automated transition, meaning the backstop deadline lapsed as quietly as the target. The last affirmative mentions are claims 4331 (2025-09-16) and 4314 (2025-09-24), and both simply restate the 0.1235 exchange ratio rather than address timing. What has not been said: whether the merger closed, whether the outside date was extended by amendment, and whether the $270 million termination fee in claim 4739 was ever triggered.
The IBM partnership for Granite compute capacity (claim 4971) appears once, on 2025-05-13, and does not recur. Over the same interval the NVIDIA relationship was escalated into a dated, dollar-denominated commitment — claim 4352, $6.3 billion running to 2032-04-13, disclosed 2025-09-14. A named customer partnership that was worth announcing in May is absent from four months of subsequent disclosures, with no statement of completion, expiration, or non-renewal.
An entire block of operating and commercial metrics stops on 2025-05-13 and is never refreshed. Contracted power capacity of 1.6 GW (claim 4973) and 420 MW of active capacity added (claim 4972) have no successor figure on record, which is notable given that the Core Scientific transaction was a power-acquisition story. The same applies to total revenue backlog of $25.9 billion (claim 4970) and the OpenAI-specific backlog of $11.2 billion (claim 4969). These were the headline demand figures; they have not been reaffirmed, revised, or withdrawn, and no explanation has been offered for the absence of an updated backlog number in any later disclosure.
The May 2025 product narrative disappears just as completely. AI Object Storage general availability (claim 4975), GB200 support across the platform stack (claim 4976), On-Demand Cluster Scaling (claim 4977), detailed billing and usage metrics (claim 4978), NVIDIA AI Enterprise and Cloud Functions support (claim 4979), the MLPerf Inference v5.0 result (claim 4980) and the SemiAnalysis Platinum rating (claim 4981) were disclosed together and have not been mentioned since. All seven remain at 'stated', which reflects extraction rather than verification — nothing on the record confirms shipment, adoption, or continued validity of the benchmark and rating claims.
On the financing side, the DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) auto-transitioned to 'delayed' without any accompanying statement of how much of the $2.6 billion facility (claims 4592, 11922) was actually drawn before commitments lapsed. The associated covenant milestones — the 0.85x minimum contract realization ratio (claim 4597) and the 1.40x minimum debt service coverage ratio beginning 2027-04-01 (claim 4596) — have not been revisited. Separately, the contingent springing maturity date of 2026-12-30 on the credit facility (claim 11926) is now roughly three months away and still sits at 'stated', with no disclosure on whether the springing condition has been satisfied or defused, even as the stated facility maturity remains 2028-05-02 (claims 5012, 11925). Interest payments on the 9% senior notes were first due 2026-02-01 (claim 4659); that claim is also 'delayed' by automated transition, with no confirmation on record that the coupon was paid.
What we haven't been told
2026-09-21The Core Scientific merger is the clearest case of a date that moved without anyone saying so. On 2025-08-12 the acquisition agreement carried an expected close of 2025-10-01 (claim 4517); the merger agreement disclosures of 2025-07-06 carried an outside date of 2026-04-07 (claims 4731 and 4738); and by the last mention on 2025-09-16 the transaction was described only by its 0.1235 exchange ratio with no completion date attached at all (claim 4331). All three dated versions sit in auto-transitioned 'delayed'. Nothing on record revises the October target, withdraws it, or explains why the most recent description of the same deal stopped carrying a date. The $270 million termination fee (claim 4739) and the Nasdaq listing and Form S-4 steps (claims 4735, 4733) have likewise not been revisited.
The capacity and backlog figures stop dead after one quarter. Contracted power of 1.6 GW (claim 4973), 420 MW of active compute added (claim 4972), total committed revenue backlog of $25.9 billion (claim 4970) and the OpenAI component of $11.2 billion (claim 4969) were all stated on 2025-05-13 and never restated. The 2025-07-30 material customer contract for GPU infrastructure (claim 4595) was disclosed without a dollar figure, and the 2025-09-14 NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim 4352) is an obligation rather than a backlog update. What has not been said is whether the 1.6 GW and $25.9 billion figures still hold, how the pending Core Scientific capacity relates to them, or why a company that led with these metrics in May has not refreshed them since.
The IBM partnership for Granite compute capacity (claim 4971) appears once, on 2025-05-13, in signed-deal language, and then disappears from the record entirely. No capacity, term, or revenue figure was ever attached to it, and no subsequent disclosure mentions it as ongoing, expanded, or concluded. Against four months of continued partnership and customer disclosure culminating in the NVIDIA commitment, the silence on IBM is unexplained.
The May product slate has the same shape. AI Object Storage general availability (claim 4975), On-Demand Cluster Scaling (claim 4977), detailed billing and usage metrics (claim 4978), GB200 support across the Cloud Platform Stack (claim 4976), NVIDIA AI Enterprise and Cloud Functions support (claim 4979), the MLPerf Inference v5.0 result (claim 4980) and the SemiAnalysis Platinum rating (claim 4981) were all announced together on 2025-05-13 and none has been mentioned again. Adoption, utilization, and whether the Platinum rating was retained on re-assessment are all absent from the record.
On the debt side, several dates passed without a confirming or revising statement. The $2.6 billion DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) is now past and sits in auto-transitioned 'delayed', with no disclosure of how much of the facility was ultimately drawn before commitments lapsed, and the 2030-08-21 maturity (claim 4594) has not been revisited. The first 9% coupon date of 2026-02-01 on the 2031 notes (claim 4659) is likewise flagged delayed with no payment confirmation on record. The two notes-offering closings, expected 2025-05-27 (claim 11919) and 2025-07-25 (claim 4699), are both in 'delayed' even though issuance claims 11917 and 4658 describe the notes as issued, which means the closings were never affirmatively confirmed in a way the ledger could match. The covenant commitments made on 2025-07-30, a minimum 1.40x debt service coverage ratio beginning April 2027 (claim 4596) and a minimum 0.85x contract realization ratio (claim 4597), have not been mentioned since, and no headroom or compliance commentary has followed.
Two caveats on the record itself. Every transition in this ledger was produced by automated extraction; no claim here has been independently verified, so 'delayed' indicates an unmet or unconfirmed date rather than a company admission. And the record's last entry is 2025-09-24, so the judgment that an item has vanished is relative to that cutoff rather than to the present. One internal inconsistency also stands unexplained: an IPO price of $40 per share is recorded as stated on 2025-03-01 (claim 17815), nearly four weeks before the same price on the 2025-03-28 pricing claims (11616, 11601, 15974), which is more likely an extraction artifact than a disclosure event.
What we haven't been told
2026-09-21The Core Scientific merger is the clearest case of a date that moved without anyone saying so. The August 12, 2025 disclosure (claim 4517) carried an expected close of October 1, 2025; the underlying agreement from July 6 (claims 4731 and 4738) set an outside date of April 7, 2026, with a $270 million termination fee running to CoreWeave (claim 4739). All three of those claims auto-transitioned to 'delayed' on September 3, 2026. The last substantive mention on record is September 16, 2025 (claim 4331), which restates the 0.1235 exchange ratio and carries no completion date at all. Nothing on record explains whether the October target was abandoned, whether the April 2026 outside date was extended by amendment, or whether the termination fee was ever in play.
Two notes offerings show expected closings that lapsed without a revision statement. Claim 11919 promised a close by May 27, 2025 and claim 4699 by July 25, 2025; both were auto-flipped to 'delayed'. The awkward part is that separate claims record the same paper as issued on or about those dates -- the $2.0 billion 2030 notes on May 27 (claims 4824 and 11917) and the $1.75 billion 9% 2031 notes on July 27 (claim 4658). Either the closings slipped or the ledger is double-counting the same event, and no update statement resolves which. Claim 4659, the first 9% coupon payment due February 1, 2026, sits in the same 'delayed' bucket with no confirmation on record that it was made.
The OpenAI figure has moved in the wrong direction without reconciliation. The May 13, 2025 disclosure put OpenAI-related revenue backlog at $11.2 billion (claim 4969). The September 24, 2025 disclosure describes OpenAI committed revenue of $6.5 billion running through May 31, 2031 (claim 4297). These may be separate tranches rather than a markdown of the same contract, but nothing on record says so, and the earlier $11.2 billion figure has not been reaffirmed in any subsequent quarter.
The capacity numbers have gone quiet. Contracted power of 1.6 GW (claim 4973) and 420 MW of active compute power added (claim 4972) were last stated on May 13, 2025 and appear in no later disclosure on record, even as backlog and the $6.3 billion NVIDIA capacity commitment (claim 4352) were being discussed. Relatedly, the DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) auto-transitioned to 'delayed' with no statement on whether the $2.6 billion was drawn, partially drawn, or allowed to lapse, and the contingent springing maturity of December 30, 2026 (claim 11926) has not been mentioned since May 5, 2025.
Finally, the IBM partnership for Granite compute capacity (claim 4971) has a single entry dated May 13, 2025 and no follow-up -- no capacity figure, no revenue attribution, no renewal language. It sits alongside the rest of that day's platform slate: AI Object Storage general availability (claim 4975), On-Demand Cluster Scaling (claim 4977), detailed billing and usage metrics (claim 4978), NVIDIA AI Enterprise and Cloud Functions support (claim 4979), the MLPerf Inference v5.0 result (claim 4980), and the SemiAnalysis Platinum rating (claim 4981). None of these recur in any disclosure after May 13, 2025 on this record, which currently runs through late September 2025. Silence is not retraction, but the shift from named product milestones to financing and merger mechanics has not been acknowledged.
What we haven't been told
2026-09-21The physical capacity figures have quietly dropped out of the record. Claims 4972 (420 MW of active compute power added) and 4973 (1.6 GW contracted) were both stated on 2025-05-13 and have not been restated once since, despite several subsequent disclosure events that would naturally carry a capacity update — the 2025-07-30 DDTL 3.0 facility (claim 4592), the 2025-08-12 acquisition and financing round, and the 2025-09-14 NVIDIA commitment (claim 4352). No revised megawatt number has been offered, no energization schedule has been given, and nothing has been said about why a metric introduced as a headline operating measure stopped being carried forward.
The backlog has stopped being quantified. Claim 4970 put total revenue backlog from committed contracts at $25.9 billion and claim 4969 put the OpenAI strategic deal at $11.2 billion, both on 2025-05-13. Every later reference to the same relationships is unpriced: claim 4595 (2025-07-30) describes a material customer contract for GPU infrastructure without a size, and claim 4296 (2025-09-24) restates OpenAI as a cloud computing customer with a term running to 2031-05-31 but attaches no dollar figure. Management has not said whether the backlog has grown, been recut, or been partially converted, only that it has stopped citing the number.
The Core Scientific closing timeline slipped without a revision statement. Claims 4731 and 4738 (2025-07-06) carried a 2026-04-07 outside date and a $270 million termination fee payable to CoreWeave (claim 4739); claim 4517 (2025-08-12) targeted 2025-10-01 and was auto-transitioned to delayed on 2026-09-03, as were 4731 and 4738. The last mention on record, claim 4331 (2025-09-16), restates the 0.1235 exchange ratio but carries no closing date at all — the ratio survived into the newer disclosure while the date did not. No revised schedule has been announced, no explanation has been given for the October target passing, and nothing has been said about whether the termination fee remains live.
The IBM partnership has gone silent. Claim 4971 (2025-05-13) announced a partnership to supply compute capacity for Granite and was never mentioned again; it was never given a capacity figure, a contract term, or a value, and it does not reappear in any subsequent quarter's disclosures. The contrast with claim 4352 is instructive — the NVIDIA capacity purchase commitment was disclosed on 2025-09-14 with a hard $6.3 billion figure and a 2032-04-13 date. The Weights & Biases acquisition follows a similar pattern: announced in claim 4974 (2025-05-13), priced at $1.0 billion in claim 4516 (2025-08-12), and then absent, with no integration milestone, retention detail, or contribution disclosure since. The same holds for the 2025-05-13 product slate — AI Object Storage general availability, GB200 support, On-Demand Cluster Scaling, detailed billing metrics, the MLPerf v5.0 result and the SemiAnalysis Platinum rating (claims 4975 through 4981) — each stated once and none carried into a later period.
Several debt-calendar dates have gone stale in place. The DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) passed roughly seven weeks ago and was auto-transitioned to delayed on 2026-09-03; nothing has been said about whether the commitments were drawn, extended, or allowed to lapse. The contingent springing maturity of 2026-12-30 (claim 11926) is now a quarter away and has not been referenced since 2025-05-05. The covenant package disclosed on 2025-07-30 — a 1.40x minimum debt service coverage ratio beginning 2027-04-01 (claim 4596) and a 0.85x minimum contract realization ratio (claim 4597) — has not been revisited, and the first 9% coupon payment of 2026-02-01 (claim 4659) remains unconfirmed in the ledger. The two smaller slips, the expected notes closings of 2025-05-27 (claim 11919) and 2025-07-25 (claim 4699), are minor on their own but were likewise flagged by the ledger rather than corrected by an issuer statement. One caveat on all of the above: the disclosure record on file ends on 2025-09-24, so the silences described here are silences in the record as held, and a longer gap in the record itself may account for part of what is missing.
What we haven't been told
2026-09-21The Core Scientific acquisition is the clearest example of a date that moved without anyone announcing it moved. Claim 4517, from the 2025-08-12 disclosure, carried a closing expectation of 2025-10-01; claims 4731 and 4738, from the 2025-07-06 merger agreement, carried an outside date of 2026-04-07 and a $270 million reverse termination fee (claim 4739). All three auto-transitioned to 'delayed' on 2026-09-03 rather than being revised by the company. What is notable is the language drift in the later mentions: by 2025-09-16 and 2025-09-24, claims 4331 and 4314 restate the 0.1235 exchange ratio with no promised-by date attached at all. The consideration survived in the disclosures; the timetable quietly stopped appearing beside it. Nothing on the record explains whether the delay is regulatory, shareholder-vote related, or something else, and no statement addresses whether the termination fee provision was ever triggered or waived.
The operating metrics from the 2025-05-13 results package have not been refreshed on the record since that single date. Contracted power capacity of 1.6 GW (claim 4973), 420 MW of active compute added (claim 4972), total revenue backlog of $25.9 billion (claim 4970), and the $11.2 billion OpenAI backlog component (claim 4969) are all last-mentioned 2025-05-13 and all still sit at 'stated' with no subsequent figure superseding them. These are the numbers a reader would most expect to be rolled forward each quarter. Their absence is not a downward revision, but it leaves the most-cited capacity and backlog figures sixteen months stale with no explanation of why they stopped being updated.
The same 2025-05-13 disclosure carried a dense product cluster — AI Object Storage general availability (4975), GB200 support across the platform stack (4976), On-Demand Cluster Scaling (4977), detailed billing and usage metrics (4978), NVIDIA AI Enterprise and Cloud Functions support (4979), the MLPerf Inference v5.0 result (4980), and the SemiAnalysis Platinum rating (4981). None of these seven reappears in any later disclosure on the record. A roadmap announced as a block and then never referenced again is a pattern worth naming, particularly where several items were framed as shipped rather than planned.
The IBM partnership for Granite compute capacity (claim 4971) has the same shape: announced 2025-05-13, never mentioned again. The only partnership that persists in later disclosures is NVIDIA's $6.3 billion capacity purchase commitment running to 2032-04-13 (claim 4352), which is a backstop from a supplier rather than a customer win. Nothing has been said about whether the IBM arrangement was scoped, delivered, or lapsed.
Finally, the DDTL 3.0 structure has dates that have now passed without comment. The commitment termination date of 2026-07-31 (claim 4593, against the $2.6 billion facility in claims 11922 and 4592) auto-transitioned to 'delayed' on 2026-09-03, and the contingent springing maturity of 2026-12-30 on the revolver (claim 11926) is roughly three months out. No disclosure on the record states how much of the $2.6 billion was drawn before commitments expired, or whether the springing condition has been cleared. Note that the claim ledger as provided ends in late September 2025, so these are gaps in the record supplied, not necessarily in every filing made.
What we haven't been told
2026-09-21The Core Scientific merger is the clearest case. Management put a closing date on the record twice: claim 4517 (disclosed 2025-08-12) carried a 2025-10-01 target, and claims 4731 and 4738 (2025-07-06) carried a 2026-04-07 outside date for the same transaction. Both have since been auto-transitioned to 'delayed' rather than resolved, the first target now nearly a year past and the outside date five months past. What is striking is the shape of the later mentions: claims 4331 (2025-09-16) and 4314 (2025-09-24) still restate the 0.1235 exchange ratio, but the date field on both is empty. The economics kept being repeated while the timeline quietly dropped out of the sentence. Nothing on the record explains the slip, and the $270 million termination fee payable to CoreWeave under claim 4739 — the mechanism that would matter if the deal does not close — has not been mentioned since 2025-07-06.
The capacity and backlog figures have gone stale in a way the merger itself makes conspicuous. Contracted power of 1.6 GW (claim 4973) and 420 MW of active compute power added (claim 4972) were both last stated on 2025-05-13 and have not been updated since. So have the backlog figures: $11.2 billion attributed to the OpenAI strategic deal (claim 4969) and $25.9 billion total from committed contracts (claim 4970), same date. An acquisition explicitly pursued for data center capacity has been discussed repeatedly across July and September 2025 disclosures without any corresponding restatement of the capacity or backlog numbers it was meant to move. No revised figure has been given, and no reason has been offered for not giving one.
The DDTL 3.0 facility has a date that has passed without comment. Claim 4593 set a commitment termination date of 2026-07-31 for the $2.6 billion delayed draw term loan facility described in claims 11922 and 4592; that date is now roughly seven weeks behind us and the claim sits at 'delayed' by automated transition. There has been no statement about how much of the $2.6 billion was actually drawn before commitments lapsed, or whether the termination date was extended. The associated covenants disclosed the same day — the 1.40x minimum debt service coverage ratio beginning April 2027 (claim 4596) and the 0.85x minimum contract realization ratio (claim 4597) — were stated once on 2025-07-30 and never revisited, despite the first of them coming into force within about seven months.
A nearer-term item has gone equally quiet. Claim 11926, from 2025-05-05, records a contingent springing maturity date of 2026-12-30 on the credit facility whose expansion and 2028-05-02 maturity extension were announced the same day (claims 5010, 5011, 5012, 11923, 11924, 11925). The headline maturity extension has been the version repeated; the springing condition that could pull maturity forward to this December has not been mentioned in sixteen months, and nothing on the record says whether the contingency has been satisfied, waived, or remains live.
The IBM relationship has not been restated. Claim 4971, from 2025-05-13, describes an IBM partnership for Granite compute capacity; it appears once and does not recur in any subsequent disclosure on the record, while the NVIDIA relationship was escalated into a specific, dated $6.3 billion capacity purchase commitment running to 2032 (claim 4352, 2025-09-14). The same single-mention pattern applies to the entire 2025-05-13 product slate — AI Object Storage general availability (4975), GB200 support (4976), On-Demand Cluster Scaling (4977), detailed billing and usage metrics (4978), NVIDIA AI Enterprise and Cloud Functions support (4979), the MLPerf Inference v5.0 result (4980) and the SemiAnalysis Platinum rating (4981) — announced together and absent from everything after. Weights & Biases follows the same arc: announced as an acquisition (4974), priced at $1.0 billion three months later (4516), and then nothing about what it now contributes.
Two caveats on the ledger itself. Every transition on record is machine-generated; there is not a single management-issued revision statement anywhere in the file, so 'nothing has been said' is a property of the whole record and not only of the items above. And the record as provided ends on 2025-09-24, so the silence after that date is unverified rather than established — the durable findings are the dates that lapsed inside the covered window, and the figures that were repeated in one quarter and dropped in the next.
One thing the record does not support: there is no instance here of an amount being revised downward. Where sizes changed, they went up and were disclosed as such — the notes offering at claim 4700 ($1.5 billion, 2025-07-20) was explicitly upsized by $250 million (claim 4698) to $1.75 billion (claim 4697), and the May offering moved from $1.5 billion (11921) to $2.0 billion (11918). The unreconciled items there are the closing dates rather than the amounts: claims 11919 and 4699, both expected-closing claims, sit at 'delayed' even though issuance claims 11917, 4824 and 4658 indicate the notes were in fact issued. Claim 4659, covering the first 9% coupon payment due 2026-02-01, is likewise still open. These read as ledger hygiene rather than concealment, and are worth separating from the substantive gaps above.
What we haven't been told
2026-09-20The Core Scientific acquisition is the clearest gap. It enters the record on 2025-07-06 and 2025-07-07 (claims 4729, 4731, 4738) with an exchange ratio of 0.1235 shares and an outside closing date of 2026-04-07, and is restated on 2025-08-12 (claim 4517) against a nearer 2025-10-01 target. Both dates lapsed and were moved to 'delayed' by automated transition on 2026-09-03, not by a company statement. The last mention on record is 2025-09-16 (claim 4331), and that mention carries only the exchange ratio, with the timing element quietly absent. Nothing on record explains the slip, withdraws the deal, or addresses the $270 million termination fee that the July agreement attached to a failure to close (claim 4739).
The OpenAI relationship is described twice with figures that do not obviously reconcile. On 2025-05-13 the disclosure puts OpenAI-related revenue backlog at $11.2 billion (claim 4969); on 2025-09-24 the figure presented is $6.5 billion of committed revenue running to 2031-05-31 (claims 4296, 4297). No statement on record says whether the later number is incremental to the earlier one, a restatement of it, or a differently scoped measure. The consolidated backlog of $25,900 million (claim 4970) has not been refreshed since 2025-05-13, so there is no aggregate against which either figure can be placed.
Capacity reporting has stopped. Active compute capacity of 420 MW (claim 4972) and contracted power of 1.6 GW (claim 4973) were disclosed on 2025-05-13 and do not appear in any later claim on record. Subsequent disclosures are almost entirely financing and merger items. There is no statement reaffirming 1.6 GW, revising it, or explaining why a metric that anchored the May presentation is no longer given.
Several commercial commitments appear once and are never reaffirmed. The IBM arrangement for Granite compute capacity (claim 4971) is mentioned on 2025-05-13 and not again. The NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim 4352) appears on 2025-09-14 and has no follow-up. The Weights & Biases acquisition, announced 2025-05-13 (claim 4974) and valued at $1.0 billion on 2025-08-12 (claim 4516), has no integration or outcome disclosure on record. The same is true of the product slate disclosed on a single day — AI Object Storage general availability, On-Demand Cluster Scaling, detailed billing metrics, GB200 support, the MLPerf v5.0 result and the SemiAnalysis rating (claims 4975 through 4981) — none of which recur.
On the debt side, four dated items moved to 'delayed' by automated transition rather than by announcement: the 2025-05-27 notes closing (claim 11919, transitioned 2026-09-14), the 2025-07-25 notes closing (claim 4699), the 2026-02-01 first interest payment on the 9% senior notes (claim 4659), and the 2026-07-31 DDTL 3.0 commitment termination date (claim 4593). The record separately contains issuance claims (4824, 11917, 4658) that would appear to resolve the first two, but nothing reconciles them, and there is no disclosure of whether the $2.6 billion of delayed-draw commitments (claims 4592, 11922) were drawn or allowed to expire. The covenant thresholds disclosed on 2025-07-30 — the 0.85x contract realization ratio and the 1.40x debt service coverage ratio effective April 2027 (claims 4597, 4596) — have not been revisited. It is worth noting that no claim in this ledger has ever transitioned to a verified state; the only movement on record is from extraction to 'stated', and then, for the dated items, into automated slippage.
What we haven't been told
2026-09-20The Core Scientific merger is the clearest case of a date that moved without anyone saying so. Claim 4517 (2025-08-12) put the acquisition agreement's close at 2025-10-01, while claims 4731 and 4738 from the 2025-07-06 proxy filings carried an outside closing deadline of 2026-04-07; all three now sit at 'delayed' on automated transitions dated 2026-09-03. The last substantive mention in the record is 2025-09-24 (claim 4313), which describes the merger as a completed structure rather than a pending one, and claim 4331 of 2025-09-16 restates the 0.1235 exchange ratio without reference to timing. What has not been said is which date actually governs now, whether the October 2025 target was ever formally abandoned, and whether the $270 million termination fee payable to CoreWeave (claim 4739) remains live. The shift from a specific closing date to undated 'acquires via merger' language happened across two weeks of disclosures with no reconciling statement.
The DDTL 3.0 facility has gone quiet at the point where it mattered most. It was introduced at up to $2.6 billion on 2025-05-18 (claim 11922), re-described on 2025-07-30 (claim 4592), and carried a commitment termination date of 2026-07-31 (claim 4593), which has now auto-flipped to 'delayed'. That window has closed on the record without any disclosure of how much of the $2.6 billion was actually drawn before commitments lapsed. Attached to the same facility were two covenant claims that have not been revisited since their single 2025-07-30 appearance: the minimum contract realization ratio of 0.85x (claim 4597) and the minimum debt service coverage ratio of 1.40x beginning April 2027 (claim 4596). Neither compliance nor headroom against either test has been addressed again.
The capacity and backlog figures are frozen at their 2025-05-13 values. Active compute power added of 420 MW (claim 4972) and contracted power of 1.6 GW (claim 4973) were disclosed once and have not been refreshed in any later filing on record, even as the company continued to announce financings through September 2025. The same is true of total revenue backlog of $25.9 billion (claim 4970) and the OpenAI component of $11.2 billion (claim 4969). OpenAI reappears on 2025-09-24 (claim 4296) as a cloud computing customer running to 2031-05-31, but without a restated backlog number, so the relationship has moved from a quantified commitment to a described one. The $17.2 billion cumulative capital-raised figure (claim 4968) is in the same position: at least $2.0 billion of 2030 notes, $1.75 billion of 2031 notes and the DDTL have been added since, with no updated total offered.
The IBM partnership for Granite compute capacity (claim 4971) appears exactly once, on 2025-05-13, and never again. There is no subsequent characterization of it as signed, expanded, ongoing or concluded, and no revenue or capacity has been attributed to it in any later disclosure. The NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim 4352, 2025-09-14) is at present in a similar single-mention state, though it is recent enough that silence is not yet meaningful.
The Q1 2025 product slate has likewise not survived into later disclosures. AI Object Storage general availability (claim 4975), GB200 support across the platform stack (claim 4976), On-Demand Cluster Scaling (claim 4977), detailed billing and usage metrics (claim 4978), NVIDIA AI Enterprise and Cloud Functions support (claim 4979), and the MLPerf v5.0 and SemiAnalysis Platinum results (claims 4980, 4981) were all announced on 2025-05-13 and none is mentioned afterward. Individually these are routine release notes; collectively they mark a shift in what management chose to talk about, from platform capability toward balance sheet. Two caveats belong on all of the above: the transitions here are automated extractions rather than management revisions, so 'delayed' reflects a promised date passing without verification and not an admission; and this record's disclosures thin out after late September 2025, so absence of a later mention is partly an artifact of coverage rather than proof of silence.
What we haven't been told
2026-09-20The Core Scientific merger is the clearest case. On 2025-08-12 the company carried an expected closing of 2025-10-01 (claim 4517); the merger documentation filed a month earlier carried an outside date of 2026-04-07 (claims 4731 and 4738). All three have since been moved to 'delayed' by automated extraction on 2026-09-03 rather than by any revision the company issued. The last time the deal was discussed at all is 2025-09-16 (claim 4331), and that mention restates only the 0.1235 exchange ratio — the closing date, present in every earlier version of the claim, is simply absent. Nothing on record explains why the October target lapsed, whether the April 2026 outside date was reached or extended, or what became of the $270 million termination fee payable to CoreWeave under claim 4739.
The backlog figures have gone quiet and, where they reappear, do not reconcile. Total revenue backlog from committed contracts was put at $25.9 billion on 2025-05-13 (claim 4970) and has not been restated since. The OpenAI relationship was disclosed at $11.2 billion of backlog on the same date (claim 4969); the next and last OpenAI figure on record, from 2025-09-24, is $6.5 billion of committed revenue running to 2031-05-31 (claims 4297 and 4296). No statement connects the two numbers. Whether the September figure is an incremental commitment layered on the May one, a partial restatement of it, or a replacement is not addressed anywhere in the record, and the larger May figure was never reaffirmed.
Capacity disclosure stops entirely after 2025-05-13. That date carries 420 MW of active compute added (claim 4972) and 1.6 GW of contracted power (claim 4973). Neither number has been updated, revised, or referenced in the four months of disclosures that follow, including the disclosures around the Core Scientific transaction, whose stated logic rests on power. The company continued to disclose financing in granular detail through late September — the $6.3 billion NVIDIA capacity purchase commitment of 2025-09-14 (claim 4352) among them — without attaching a corresponding megawatt figure to any of it.
The IBM partnership for Granite compute capacity (claim 4971) was mentioned once, on 2025-05-13, and never again. It sits alongside an entire cohort of product and validation claims from that same date that also have no successor mention: AI Object Storage general availability (claim 4975), GB200 support across the Cloud Platform Stack (claim 4976), On-Demand Cluster Scaling (claim 4977), detailed billing and usage metrics (claim 4978), NVIDIA AI Enterprise and Cloud Functions support (claim 4979), the MLPerf Inference v5.0 result (claim 4980) and the SemiAnalysis Platinum rating (claim 4981). After May the disclosure record narrows almost entirely to financing and the merger. No statement marks the IBM arrangement as concluded, expanded, or lapsed; it is only unmentioned.
Several dated financing obligations have passed without confirmation. The DDTL 3.0 commitment termination date of 2026-07-31 (claim 4593) moved to 'delayed' by extraction on 2026-09-03, with nothing said about whether the $2.6 billion facility (claims 4592 and 11922) was drawn, extended, or allowed to expire against the 2030-08-21 maturity (claim 4594). The first 9% coupon on the 2031 notes, due 2026-02-01 (claim 4659), carries the same automated 'delayed' marking and no confirming statement. Two notes offerings whose closings were promised for 2025-05-27 and 2025-07-25 (claims 11919 and 4699) sit in the same posture, the second having been reclassified as recently as 2026-09-14. In each instance the status change originates with the ledger, not with the company; nothing has been said either way.
What we haven't been told
2026-09-20The Core Scientific acquisition is the clearest case of a date that moved without anyone saying it moved. The 12 August 2025 disclosure (claim 4517) carried an expected closing of 1 October 2025; the merger agreement itself (claims 4731 and 4738) set an outside date of 7 April 2026. All three now sit at 'delayed', and in every case the transition was machine-assigned — 4517 on 2026-09-03, 4731 and 4738 the same day — rather than triggered by a company statement. The last time the transaction appears on the record at all is 24 September 2025, and then only as a restatement of the 0.1235 exchange ratio (claim 4314, echoing 4331). Nothing on file explains whether the October target was abandoned, whether the April outside date was extended or waived, or what became of the $270 million reverse termination fee in claim 4739. The Form S-4 filing (4733) and the Nasdaq listing approval (4735) were each disclosed once and never revisited.
The DDTL 3.0 facility has gone quiet at precisely the point where it mattered. Claim 4593 recorded a commitment termination date of 31 July 2026 — the deadline by which the delayed-draw commitments had to be used or lost. That date has passed and the claim auto-transitioned to 'delayed'; there is no accompanying disclosure of how much of the $2.6 billion (claims 4592 and 11922) was actually drawn, how much lapsed, or whether the termination date was extended. The covenants attached to that facility are similarly orphaned: the 0.85x minimum contract realization ratio (claim 4597) and the 1.40x minimum debt service coverage ratio effective April 2027 (claim 4596) were disclosed together on 30 July 2025 and have not been mentioned since, despite the DSCR test now being roughly two quarters from taking effect.
The capacity figures stopped being updated after a single appearance. On 13 May 2025 management disclosed 420 MW of active compute power added (claim 4972) and 1.6 GW of contracted power (claim 4973). Neither number is restated anywhere later in the record, even as subsequent disclosures continued to describe large capacity-linked commitments — the $6.3 billion NVIDIA purchase commitment running to April 2032 (claim 4352) and the OpenAI relationship extended to May 2031 (claim 4296). The backlog framing followed the same pattern: $25.9 billion total committed backlog and $11.2 billion attributed to OpenAI (claims 4970 and 4969) were given once and then dropped, so there is no disclosed basis for reconciling the later contract announcements against the earlier aggregate.
The IBM partnership moved from an announcement to nothing. Claim 4971, dated 13 May 2025, described an IBM arrangement to supply compute capacity for Granite model work. It appears once. There is no subsequent mention of deployment, scale, revenue contribution, renewal, or termination — no shift from 'signed' to 'ongoing' language, simply an absence. The record contains no statement retracting it either, which is the point: a named customer relationship was introduced and then left unaddressed across every later disclosure on file.
A cluster of product commitments from the same May 2025 letter has similarly disappeared. General availability of CoreWeave AI Object Storage (claim 4975), GB200 support across the Cloud Platform Stack (4976), On-Demand Cluster Scaling (4977), and detailed billing and usage metrics (4978) were presented together as a delivered or imminent slate, alongside the MLPerf Inference v5.0 result (4980) and the SemiAnalysis Platinum rating (4981). None of them recur. Worth noting separately, claim 4659 — the 9% senior notes' first scheduled interest payment on 1 February 2026 — also carries an automated 'delayed' flag with no corresponding disclosure; that is most likely a ledger artifact rather than a missed payment, but the record contains nothing that confirms the payment was made. More broadly, every status change in this ledger was generated by automated extraction in September 2026. Not one of these items has a transition sourced to a company statement, which means no revision, deferral, or withdrawal here has been explained by management at all.
What we haven't been told
2026-09-20The Core Scientific acquisition is the clearest case of a date that moved without anyone saying so. Claim 4517, from the 2025-08-12 disclosure, carried a closing expectation of 2025-10-01; claims 4731 and 4738, from 2025-07-06, carried the outside date of 2026-04-07. All three now sit at 'delayed', and in each case the transition was produced by automated extraction on 2026-09-03 rather than by a revision statement from the company. The last time the merger was discussed in any substantive way was 2025-09-16 (claim 4331), which restated the 0.1235 exchange ratio and carried no date at all — the timing commitment simply dropped out of the language. Nothing on the record explains whether the October 2025 target was abandoned, whether the April 2026 outside date was extended, or what became of the $270 million termination fee payable to CoreWeave under claim 4739, which has not been mentioned since 2025-07-06.
The OpenAI relationship has been described with two different numbers that have never been reconciled. Claim 4969, dated 2025-05-13, put the OpenAI strategic deal revenue backlog at $11.2 billion. Claim 4297, dated 2025-09-24, describes OpenAI committed revenue of $6.5 billion running to 2031-05-31, alongside claim 4296 for the customer relationship itself. Whether the later figure is an incremental award, a partial restatement, or a replacement of the earlier one has not been stated. The same silence covers claim 4970, the $25.9 billion total revenue backlog from committed contracts, which was last mentioned on 2025-05-13 and has not been refreshed on this record in the sixteen months since, despite several large customer and capacity disclosures in the interim that would ordinarily move it.
Physical capacity has disappeared from the disclosure entirely. Claim 4973 (1.6 GW of contracted power) and claim 4972 (420 MW of active compute power added) were both stated on 2025-05-13 and have no successor entry. There is no later figure, revised or confirmed, and no statement that the company has stopped reporting these metrics or changed how it defines them. The same 2025-05-13 block contains a cluster of product and benchmark claims — the SemiAnalysis Platinum rating (4981), the MLPerf Inference v5.0 result (4980), AI Object Storage general availability (4975), GB200 support (4976), On-Demand Cluster Scaling (4977) — none of which recur in any later disclosure. A single quarter's product narrative was not carried forward.
The IBM partnership follows the pattern of a signed arrangement that quietly became a non-topic. Claim 4971, the IBM partnership for Granite compute capacity, was stated on 2025-05-13 and appears exactly once. There has been no renewal, expansion, completion, or wind-down language since. By contrast the NVIDIA capacity purchase commitment of $6.3 billion running to 2032-04-13 (claim 4352, 2025-09-14) was disclosed with a term and a figure. The asymmetry is the point: one counterparty relationship is dated and sized, the other has been left without any status at all for more than a year.
On the financing side, several dated obligations have passed or are approaching without confirmation. Claim 4593, the DDTL 3.0 commitment termination date of 2026-07-31, now reads 'delayed' — that date is behind us and no outcome has been stated. Claim 4659, the first 9.0% senior notes interest payment due 2026-02-01, is likewise marked 'delayed' with no confirmation on the record that it was made. Claim 11926, the contingent springing maturity date of 2026-12-30, was stated once on 2025-05-05 and has not been revisited even though it is roughly three months out. The covenant package disclosed on 2025-07-30 — the 0.85x minimum contract realization ratio (4597) and the 1.40x minimum debt service coverage ratio beginning April 2027 (4596) — has had no compliance update since it was first described. Two earlier notes-offering closing dates, 2025-05-27 (claim 11919) and 2025-07-25 (claim 4699), also flipped to 'delayed' by automated extraction rather than by any correction from the issuer.
What we haven't been told
2026-09-20The Core Scientific transaction is the clearest case of a date that moved without anyone saying so. The 2025-08-12 disclosure (claim 4517) put the acquisition agreement's close at 2025-10-01, while the July merger documents (claims 4731 and 4738) carried an outside date of 2026-04-07. All three were flipped to 'delayed' by automated extraction on 2026-09-03 rather than by any revision statement. What is notable is what came next: the later references to the same deal, claim 4331 on 2025-09-16 and claim 4313 on 2025-09-24, restate the 0.1235 exchange ratio but carry no promised-by date at all. The timetable was not extended on the record; it was simply dropped from the description. Nothing has been said about whether the October 2025 target was ever formally abandoned, whether the April 2026 outside date was reached, or what the $270 million termination fee in claim 4739 now attaches to.
The DDTL 3.0 facility has gone quiet at precisely the point where it mattered. Claim 4593 set a commitment termination date of 2026-07-31 for the $2.6 billion delayed draw term loan described in claims 11922 and 4592. That date passed roughly seven weeks ago and the claim now sits in 'delayed' status from the 2026-09-03 sweep. The facility was always framed as 'up to' $2.6 billion, and at no point since 2025-07-30 has the record carried a figure for how much was actually drawn before commitments lapsed, or whether the termination date was extended. The maturity date in claim 4594 remains 2030-08-21, unchanged and unexplained alongside it.
Claim 4659 deserves attention for a more basic reason: it is a scheduled cash obligation, the first semiannual interest payment at 9.0 percent on the $1.75 billion notes in claims 4697 and 4658, due 2026-02-01. It was auto-transitioned to 'delayed' on 2026-09-03 and has not been verified since. The same pattern appears at claim 11919, where the 2025-05-27 expected closing of the notes offering remains marked 'delayed' even though claim 11917 separately records a 2025-05-27 issuance of $2.0 billion. The ledger never reconciled the two, and no statement closes the loop on either.
The OpenAI relationship carries two figures that have never been bridged. Claim 4969, dated 2025-05-13, put the strategic deal revenue backlog at $11.2 billion. Claim 4297, dated 2025-09-24, describes OpenAI committed revenue of $6.5 billion running through 2031-05-31. These may well cover different scopes, but the earlier $11.2 billion figure has not been restated, reaffirmed, or reconciled in the sixteen months since it was given, and the $25.9 billion total backlog in claim 4970 shares that silence.
Finally, an entire cluster of 2025-05-13 disclosures appears once and never again. Contracted power capacity of 1.6 GW (claim 4973) and 420 MW of active compute added (claim 4972) have no successor figure on the record. The IBM partnership for Granite compute capacity (claim 4971) was announced in signed language and has not been mentioned since. The same is true of the AI Object Storage general availability, On-Demand Cluster Scaling, detailed billing metrics, MLPerf v5.0 and SemiAnalysis Platinum items (claims 4975, 4977, 4978, 4980, 4981). None were withdrawn; the cadence of disclosure around them simply stopped. Across the whole ledger, every status change on file originates from automated extraction. There is no instance of management itself moving a claim from one status to another.
What we haven't been told
2026-09-20The Core Scientific merger timeline is the clearest case. On 2025-08-12 the company put a closing date on the record — claim 4517, closing by 2025-10-01 — alongside a July outside date of 2026-04-07 attached to both the merger itself (claim 4731) and the closing deadline (claim 4738). All three have since auto-transitioned to delayed (2026-09-03) with no management statement accompanying the move. What is notable is not only that both dates lapsed but that the date language disappeared: the September 2025 disclosures that continue to describe the transaction (claim 4331 on 2025-09-16, claim 4313 on 2025-09-24) carry the same 0.1235 exchange ratio but no promised-by date at all. The $270 million termination fee payable to CoreWeave (claim 4739) has not been mentioned again either way. Nothing on the record explains whether the October target was missed, revised, or superseded, or what the current expected closing is.
The DDTL 3.0 facility has gone quiet at the point where it mattered most. It was introduced on 2025-05-18 as up to $2.6 billion (claim 11922) and restated on 2025-07-30 (claim 4592), with a commitment termination date of 2026-07-31 (claim 4593). That date has now passed and the claim sits at delayed by automated transition. There is no subsequent disclosure of how much of the $2.6 billion was actually drawn before commitments terminated, whether the termination date was extended, or how the facility's covenants — the 1.40x minimum debt service coverage ratio effective April 2027 (claim 4596) and the 0.85x minimum contract realization ratio (claim 4597) — are tracking. Those two covenant claims were each stated once, on 2025-07-30, and have not reappeared.
The backlog and capacity figures from the first post-IPO quarter have not been refreshed on this record. Total revenue backlog of $25.9 billion (claim 4970) and the OpenAI component of $11.2 billion (claim 4969) date from 2025-05-13 and have no later counterpart. The same is true of the capacity disclosures from that date: 1.6 GW contracted power (claim 4973) and 420 MW of active compute power added (claim 4972). The $6.3 billion NVIDIA capacity purchase commitment announced on 2025-09-14 (claim 4352), running to 2032-04-13, has not been reconciled to either figure, so there is no stated basis for judging whether contracted capacity or backlog has grown, held, or been reallocated.
The IBM partnership for Granite compute capacity (claim 4971) was announced on 2025-05-13 and has not been mentioned since in any form — not as delivered, expanded, or ongoing. The same single-mention pattern covers the May 2025 product and benchmark claims: AI Object Storage general availability (4975), GB200 support (4976), On-Demand Cluster Scaling (4977), billing and usage metrics (4978), NVIDIA AI Enterprise support (4979), the MLPerf Inference v5.0 result (4980) and the SemiAnalysis Platinum rating (4981). None has been withdrawn; none has been restated.
Two smaller slips are worth noting for the pattern rather than the substance. The 2030 notes were said to close on 2025-05-27 (claim 11919) and the 2031 notes on 2025-07-25 (claim 4699); both are now delayed, and the corresponding issuance claims (11917, 4658) are dated 2025-05-27 and 2025-07-27. The first interest payment on the 9% notes, due 2026-02-01 (claim 4659), is likewise marked delayed. These are likely bookkeeping artifacts rather than real misses, but no confirming statement exists on the record to close them out. The same caveat applies throughout: every transition in this ledger was generated by automated extraction, not by a company update, which is itself the point — the silence is what has been recorded.
One date now approaching has not been revisited since it was first disclosed: the contingent springing maturity of 2026-12-30 attached to the credit facility (claim 11926), stated on 2025-05-05 and not addressed since, alongside the $1.5 billion revolver and $350 million letter-of-credit expansions from the same date.
What we haven't been told
2026-09-20The clearest silence is around the product cohort introduced in the 13 May 2025 shareholder letter. CoreWeave AI Object Storage general availability (claim 4975), On-Demand Cluster Scaling (4977), detailed billing and usage metrics (4978), NVIDIA AI Enterprise and Cloud Functions support (4979), GB200 support across the Cloud Platform Stack (4976), the MLPerf Inference v5.0 result (4980) and the SemiAnalysis Platinum rating (4981) were all disclosed on the same date and none of them appears again anywhere in the subsequent record. Last mention: 13 May 2025. Current status: all still carry the mechanical 'stated' flag from the 2 September 2026 extraction pass, which reflects that they were said, not that they were delivered or sustained. Nothing on record retires these, updates adoption, or explains why a platform narrative that occupied seven separate claims in one quarter was not revisited in any later disclosure.
The IBM partnership for Granite compute capacity (claim 4971) is the partnership equivalent of the same pattern. It was announced on 13 May 2025 as a named counterparty commitment and then disappears entirely. By contrast, the NVIDIA relationship is carried forward and hardened into a $6.3bn capacity purchase commitment running to 13 April 2032 (claim 4352, 14 September 2025). The asymmetry is the point: one named partnership is reinforced with a dated dollar figure four months later, the other is never mentioned again. There is no statement on record confirming that the IBM arrangement was fulfilled, expanded, expired, or superseded.
Capacity and backlog have been frozen at their May figures. Contracted power capacity of 1.6 GW (claim 4973), active compute power capacity added of 420 MW (4972), total revenue backlog of $25.9bn (4970) and the OpenAI strategic deal backlog of $11.2bn (4969) were all stated on 13 May 2025 and none has been restated, revised or superseded in any later disclosure on record — including through a merger with Core Scientific whose premise is power capacity, and through roughly $8bn of subsequent debt raising. These are the metrics most likely to have moved. The absence of a revised figure is not itself a downward revision, but no update statement has been made either way, and the numbers an investor would still be quoting are sixteen months old.
The Core Scientific closing timetable slipped without a revision announcement and then lost its date altogether. The 6 July 2025 merger claims (4731, 4738) carry an outside date of 7 April 2026; the 12 August 2025 restatement of the same agreement (4517) carries a materially nearer date of 1 October 2025. All three have since auto-transitioned to 'delayed' (3 September 2026). When the transaction is described again on 16 September 2025 (claim 4331) and 24 September 2025 (4313), the dates are gone — the language reverts to an undated 'acquires via merger'. No statement on record reconciles the October 2025 date with the April 2026 date, explains which was the operative deadline, or acknowledges that either passed. The $270m termination fee payable to CoreWeave (4739) is also disclosed once and never discussed again in any contingency framing.
On the financing side, several dated commitments are now flagged 'delayed' with nothing said to close them out. The 20 May 2025 notes offering expected closing of 27 May 2025 (claim 11919) and the 22 July 2025 expected closing of 25 July 2025 (4699) both auto-transitioned to 'delayed', even though separate issuance claims (11917, 4824, 4658) suggest the paper was placed; the ledger was never squared by an affirmative confirmation tied to those closing claims. The first interest payment on the 9% notes, due 1 February 2026 (claim 4659), is likewise flagged delayed with no accompanying statement. The DDTL 3.0 commitment termination date of 31 July 2026 (4593) is delayed with no announcement of extension, cancellation or draw completion, and the covenants attached to that facility — a minimum debt service coverage ratio of 1.40x beginning April 2027 (4596) and a minimum contract realization ratio of 0.85x (4597) — were disclosed once, on 30 July 2025, and have not been mentioned since in any headroom or compliance context. Note that the record supplied here terminates mid-entry at 24 September 2025, so each of these silences is measured against the disclosures available, not against a closed file.
What we haven't been told
2026-09-19The Core Scientific merger is the largest item on the record that management has stopped addressing. The agreement was announced on 2025-07-06 and 2025-07-07 (claims 4729, 4731) at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share, with an outside closing date of 2026-04-07 (claim 4738), a $270 million termination fee payable to CoreWeave (claim 4739), and supporting steps including an S-4 filing and Nasdaq listing approval (claims 4733, 4735). An August 2025 disclosure pointed to an earlier target of 2025-10-01 (claim 4517). The last mention on record is 2025-09-16 (claim 4331), which restated the exchange ratio. Both the October 2025 target and the April 2026 outside date have passed, and claims 4517, 4731 and 4738 were automatically moved to delayed on 2026-09-03. The ledger contains nothing after September 2025 that says whether the deal closed, was extended, or was terminated, and nothing on whether the termination fee was ever triggered or collected.
The DDTL 3.0 facility has gone quiet past its own deadline. The $2.6 billion delayed draw term loan was disclosed on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). It had a commitment termination date of 2026-07-31 (claim 4593), a maturity of 2030-08-21 (claim 4594), and covenants that include a 0.85x minimum contract realization ratio and a 1.40x debt service coverage test starting April 2027 (claims 4597, 4596). The commitment window closed with no disclosure on record about how much was drawn, and claim 4593 was auto-flagged delayed on 2026-09-03. Management has not said whether the facility was fully used, partly used, or allowed to lapse. That matters for how much of the related customer contract (claim 4595) is actually financed.
The July 2025 senior notes have a smaller gap of the same kind. The 9% notes due 2031 were upsized by $250 million to $1.75 billion on 2025-07-22 (claims 4697, 4698), and issuance was recorded on 2025-07-27 (claim 4658). Two follow-on items were never confirmed. The expected 2025-07-25 closing (claim 4699) and the first interest payment date of 2026-02-01 (claim 4659) were both auto-marked delayed on 2026-09-03. The May 2025 notes follow the same pattern: the expected closing of 2025-05-27 (claim 11919) is flagged delayed even though an issuance claim carries that same date (claims 4824, 11917). These flags probably mean no explicit confirmation was ever given rather than an actual default. Still, nothing on record confirms that the 2031 notes closed on schedule or that the first coupon was paid.
The operating scale figures from the May 2025 quarter have not been refreshed. On 2025-05-13 management cited 420 MW of active power, 1.6 GW of contracted power, a $25.9 billion total revenue backlog, and an $11.2 billion OpenAI backlog (claims 4972, 4973, 4970, 4969). None of these metrics has been updated in the disclosures reviewed here. The September 2025 NVIDIA capacity commitment of $6.3 billion through 2032-04-13 (claim 4352) added a new obligation without restating the backlog or capacity totals. It is not clear from the record whether these figures grew, shrank, or were simply dropped from later reporting.
What we haven't been told
2026-09-19The Core Scientific all-stock merger is the most conspicuous open item. The agreement was first disclosed on 2025-07-07 (claim 4729) at 0.1235 CoreWeave shares per Core Scientific share (claim 4731). The Q2 2025 materials of 2025-08-12 pointed to closing by 2025-10-01 (claim 4517), and the agreement set an outside date of 2026-04-07 (claims 4731, 4738). The last mention on record is 2025-09-16 (claim 4331), which restates the exchange ratio without a timing update. The ledger has since moved the closing expectation and the outside date to delayed. Nothing on file says whether the deal closed, was extended, or was terminated. Nothing says whether the $270 million termination fee payable to CoreWeave (claim 4739) was ever triggered. For a transaction of this size, the absence of any closing or termination statement in the record is the largest gap.
The DDTL 3.0 facility follows a similar pattern. CoreWeave announced up to $2.6 billion of delayed draw term loans on 2025-05-18 and 2025-07-30 (claims 11922, 4592). The facility carries a commitment termination date of 2026-07-31 (claim 4593) and a maturity of 2030-08-21 (claim 4594). It was tied to a material customer contract (claim 4595) and to covenants of a 0.85x contract realization ratio and a 1.40x debt service coverage ratio from April 2027 (claims 4596, 4597). The last mention is 2025-07-30. The commitment window has now passed and the ledger marks it delayed. The record does not say how much of the $2.6 billion was drawn before the window closed or whether the commitment was extended. It also does not say whether the underlying customer contract is being realized at the ratio the lenders required.
The headline backlog and capacity figures have not been refreshed in the record since May 2025. On 2025-05-13 management cited $25.9 billion of committed revenue backlog (claim 4970), including an $11.2 billion OpenAI deal (claim 4969). The same release cited 420 MW of active power and 1.6 GW of contracted power (claims 4972, 4973). A later filing on 2025-09-24 refers to OpenAI as a customer through 2031-05-31 (claim 4296) but gives no updated dollar figure. None of the three numbers has been restated, raised, or cut in any later disclosure on file. The IBM Granite capacity partnership (claim 4971) is mentioned once, on 2025-05-13, and does not appear again.
Several debt-related items carry an automated delayed status that the record itself appears to contradict, and these should be read with caution. The May 2025 notes were expected to close by 2025-05-27 (claim 11919), and issuance on that date is recorded in claims 4824 and 11917. The July 2025 9% notes were expected to close by 2025-07-25 (claim 4699), and issuance is referenced on 2025-07-27 (claim 4658). The first 9% coupon was due 2026-02-01 (claim 4659). No disclosure on file confirms that payment. That is more likely a routine non-event than a concealed problem, but it remains unconfirmed in the record.
More broadly, the ledger contains no CoreWeave disclosures after 2025-09-24. That leaves roughly a year in which the merger outcome, the DDTL 3.0 draw status, and any update to backlog or capacity go unaddressed here. Part of that silence may reflect gaps in coverage rather than in the company's own reporting.
What we haven't been told
2026-09-19The Core Scientific acquisition is the largest open item in the record. CoreWeave signed the merger agreement in July 2025 (claims 4729, 4731) at 0.1235 CoreWeave shares per Core Scientific share, with an outside date of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). An August 2025 disclosure pointed to closing around 2025-10-01 (claim 4517). The last mention on record is 2025-09-16 (claim 4331), which restates the exchange ratio without a timing update. Both the October 2025 target and the April 2026 outside date have passed, and the ledger moved claims 4517, 4731 and 4738 to delayed on 2026-09-03. Nothing on record says whether the deal closed, was terminated or was extended. Nothing addresses whether the termination fee became payable, what happened to the S-4 and Nasdaq listing steps (claims 4733, 4735), or how the Core Scientific convertible notes were treated (claim 4737).
The DDTL 3.0 facility has a similar gap. The $2.6 billion delayed draw term loan was first disclosed on 2025-05-18 (claim 11922) and detailed on 2025-07-30 (claims 4592, 4593, 4594). Its commitment termination date was 2026-07-31, and the ledger auto-transitioned that claim to delayed on 2026-09-03. The facility was tied to a material GPU infrastructure contract with an unnamed customer (claim 4595). It also carried a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage test starting April 2027 (claim 4596). No disclosure on record since July 2025 says how much of the $2.6 billion was drawn before the window closed, whether the commitment was extended, or whether the covenant thresholds are being met.
The revolving credit facility has an unresolved date approaching. The May 2025 amendment raised the revolver to $1.5 billion and extended its maturity to 2028-05-02 (claims 5010, 5012, 11923, 11925). The same amendment added a contingent springing maturity of 2026-12-30 (claim 11926). That claim still reads as stated, but the trigger conditions have not been described again since 2025-05-05. With the date about three months away, the record says nothing about whether the condition has been cleared, refinanced around, or remains live.
The operating metrics from the Q1 2025 report have not been updated anywhere on record. On 2025-05-13 management cited 420 MW of active power and 1.6 GW of contracted power (claims 4972, 4973), $25.9 billion of total revenue backlog (claim 4970), and a partnership with IBM for Granite model compute (claim 4971). The only later figure is the OpenAI contract expansion of $6.5 billion on 2025-09-24 (claims 4296, 4297), which adds to the $11.2 billion disclosed earlier (claim 4969). No updated total backlog, active megawatt count or contracted gigawatt figure appears after May 2025. The IBM relationship is not mentioned again, whether as ongoing, expanded or concluded.
The ledger's delay flags on the 2025 note offerings need a caveat. The May 2025 notes (claim 11919, expected closing 2025-05-27) and July 2025 notes (claim 4699, expected closing 2025-07-25) are both marked delayed. However, issuance claims dated 2025-05-27 (claims 4824, 11917) and 2025-07-27 (claim 4658) suggest both deals closed roughly on schedule, so these flags look like artifacts of the automated rule rather than slippage. The more substantive question is claim 4659, the first semi-annual 9% coupon on the 2031 notes, due 2026-02-01 and now marked delayed. Payment of that coupon is not confirmed anywhere on record. That may simply be a gap in the record rather than a missed payment.
The claims ledger as provided ends partway through claim 4296. Later disclosures not shown here may address some of these points.
What we haven't been told
2026-09-19The Core Scientific merger is the most conspicuous gap. The agreement was first recorded on 2025-07-06 and 2025-07-07 (claims 4729 and 4731), with a 0.1235 share exchange ratio and a $270 million termination fee payable to CoreWeave (claim 4739). A filing dated 2025-08-12 (claim 4517) tied the transaction to a 2025-10-01 date. The outside closing deadline was later set at 2026-04-07 (claims 4731 and 4738). The most recent mentions in the record are the exchange-ratio restatements of 2025-09-16 and 2025-09-24 (claims 4331 and 4314). Both the October 2025 date and the April 2026 deadline have since passed, and all three dated claims were automatically moved to delayed on 2026-09-03. The record contains no statement that the deal closed, was extended or was terminated. It also does not say whether the $270 million fee was triggered.
The DDTL 3.0 facility carried a commitment termination date of 2026-07-31 (claim 4593, disclosed 2025-07-30). It was described in May 2025 as up to $2.6 billion of delayed draw term loans (claims 11922 and 4592). That date has passed and the claim was auto-flagged delayed on 2026-09-03. Nothing in the record says how much of the $2.6 billion was actually drawn before commitments lapsed, or whether the window was extended. The same filing set a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage ratio starting April 2027 (claim 4596). Neither covenant has been referenced since.
Several financing milestones are marked delayed because no follow-up confirmation was recorded, not because management announced a slip. The May 2025 notes had an expected closing of 2025-05-27 (claim 11919), and issuance language appears on that date (claims 11917 and 4824). The offering was upsized from $1.5 billion (claim 11921) to $2.0 billion (claim 11918), a revision upward. The July 2025 9% notes had a 2025-07-25 expected closing (claim 4699), with issuance recorded on 2025-07-27 (claim 4658). The first scheduled coupon of 2026-02-01 (claim 4659) has passed with no disclosure confirming payment. These gaps probably reflect a lack of explicit confirmation rather than a problem, but the confirmation has not been given.
The operating metrics from the 2025-05-13 quarterly disclosure have not been refreshed anywhere in the portion of the record provided. These are the $25.9 billion total revenue backlog (claim 4970), the $11.2 billion OpenAI backlog (claim 4969), 1.6 GW of contracted power (claim 4973) and 420 MW of active power (claim 4972). The IBM Granite compute partnership (claim 4971) also appears in that single May 2025 disclosure and is not mentioned again. The record provided appears truncated after claim 4317, so later updates may exist. On the claims available, however, none of these figures has been restated, revised or retired since mid-2025.
What we haven't been told
2026-09-19The Core Scientific merger is the largest open item. CoreWeave announced the all-stock deal on 2025-07-07 at an exchange ratio of 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), with an S-4 filing, Nasdaq listing of the new shares, conversion of Core Scientific's convertible notes into CoreWeave securities, and a $270 million termination fee payable to CoreWeave in defined circumstances (claims 4733, 4735, 4737, 4739). A later disclosure pointed to closing by 2025-10-01 (claim 4517), and the agreement's outside date was 2026-04-07 (claims 4731, 4738). The last references on record are dated 2025-09-16 and 2025-09-24 (claims 4331, 4313), and both still describe the merger as pending. The 2025-10-01 target and the 2026-04-07 outside date have both passed, and the ledger moved all three dated claims to delayed on 2026-09-03. Nothing on record says whether the merger closed, was terminated, or had its outside date extended. Nothing on record says whether the $270 million fee was triggered or paid either.
The DDTL 3.0 facility is a smaller version of the same gap. CoreWeave disclosed an up-to-$2.6 billion delayed draw term loan on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). It carried a 2030-08-21 maturity, a 0.85x minimum contract realization ratio, and a 1.40x debt service coverage test starting April 2027 (claims 4594, 4597, 4596). It was tied to a material GPU customer contract (claim 4595). The commitment period was set to end on 2026-07-31 (claim 4593), and the ledger moved that claim to delayed on 2026-09-03. No disclosure on record says how much of the $2.6 billion was drawn before the window closed, whether undrawn commitments lapsed, or whether the window was extended.
The 9% Senior Notes due 2031 carry a narrower omission. The offering was upsized by $250 million to $1.75 billion (claims 4697, 4698, 4658), and the first interest payment was scheduled for 2026-02-01 (claim 4659). The ledger moved the coupon claim to delayed on 2026-09-03 because nothing confirms the payment. This reflects missing confirmation, not evidence of a missed payment, and routine coupon payments are often not announced separately. The flag stands only because the company has not addressed it.
Two other delayed flags look like artifacts of how the ledger works and are noted here so they are not read as slippage. The May 2025 notes offering was expected to close on 2025-05-27 (claim 11919), and a filing dated that same day records the $2.0 billion issuance (claims 11917, 4824). The July 2025 offering was expected to close on 2025-07-25 (claim 4699), and the issuance is recorded on 2025-07-27 (claim 4658). In both cases the ledger shows the delayed status because it did not link the promise to its fulfillment, not because the company withdrew anything.
One date is still ahead. The revolving credit facility, expanded to $1.5 billion with a $350 million letters-of-credit tranche and extended to 2028-05-02 (claims 11923, 11924, 11925), includes a contingent springing maturity of 2026-12-30 (claim 11926). No disclosure on record says whether the condition behind that earlier date has been met or removed, and that date is now about three months away.
What we haven't been told
2026-09-19The largest open item is the Core Scientific merger. CoreWeave announced an all-stock agreement on 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). A 2025-08-12 disclosure pointed to an expected closing around 2025-10-01 (claim 4517), and the agreement set an outside date of 2026-04-07 (claim 4738). By 2025-09-16 and 2025-09-24, disclosures described the deal in settled terms, as "CoreWeave acquires Core Scientific via merger" (claims 4331, 4313). That is the last mention on record. Both the October 2025 target and the April 2026 outside date have since passed, and the ledger has automatically moved claims 4517, 4731 and 4738 to delayed. No claim confirms that the merger closed, and none says it was terminated. There is also no disclosure on whether the $270 million termination fee payable to CoreWeave (claim 4739) came into play.
The DDTL 3.0 facility has a similar gap. In May and July 2025, CoreWeave described up to $2.6 billion in delayed-draw term loans (claims 11922, 4592), with a commitment termination date of 2026-07-31 (claim 4593) and a maturity of 2030-08-21 (claim 4594). The facility was tied to a material GPU infrastructure contract with an unnamed customer (claim 4595). It carries a 0.85x minimum contract realization ratio and a 1.40x debt service coverage ratio starting April 2027 (claims 4597, 4596). The commitment window closed about seven weeks ago, and claim 4593 is now marked delayed. The record does not say how much of the $2.6 billion was drawn or whether any undrawn commitment lapsed or was extended. The customer contract underpinning the facility has never been named.
The 9% senior notes due 2031 have a smaller unconfirmed item. Issuance of $1.75 billion was recorded on 2025-07-27 (claim 4658), with the first semi-annual interest payment due 2026-02-01 (claim 4659). That date passed without any confirming disclosure, so the ledger auto-marked the claim delayed. This most likely reflects missing confirmation rather than a missed coupon. Still, nothing has been said either way. Two other notes claims carry a delayed status, the expected closings in claims 11919 and 4699. Those appear to be resolved by later issuance claims (4824, 11917, 4658), and they are not treated here as walk-backs.
Several operating metrics from the 2025-05-13 disclosure have not been restated in any later claim on record. These are 420 MW of active power capacity (claim 4972), 1.6 GW of contracted power (claim 4973), and the IBM partnership to supply compute for Granite models (claim 4971). No later claim updates the capacity figures, reports conversion of contracted power into active power, or refers to the IBM arrangement again. The absence may only mean these topics moved into routine reporting that the ledger does not capture. Even so, there has been no explicit update to any of these figures since May 2025.
What we haven't been told
2026-09-18The Core Scientific merger is the clearest item that has gone quiet. Management announced the all-stock deal at 0.1235 CoreWeave shares per Core Scientific share in July 2025 (claims 4729, 4731), with an outside date of 2026-04-07 (claim 4738). Claim 4517 separately pointed to 2025-10-01. The last reference on record is 2025-09-24 (claims 4313, 4331), which describes the acquisition in present-tense merger language. Both target dates have passed, and the ledger auto-moved claims 4731, 4738 and 4517 to delayed on 2026-09-03. Nothing on record says whether the merger closed, was terminated, or had its outside date extended. Nothing addresses whether the 270 million USD termination fee payable to CoreWeave (claim 4739) was ever triggered.
The DDTL 3.0 facility was presented as up to 2.6 billion USD of delayed-draw term loans (claims 11922, 4592), with a commitment termination date of 2026-07-31 (claim 4593). Covenants were tied to it: a 1.40x debt service coverage ratio from April 2027 (claim 4596) and a 0.85x contract realization ratio (claim 4597). It was last described on 2025-07-30. The commitment window has since lapsed, and claim 4593 was auto-transitioned to delayed. The record contains no statement on how much was drawn before the window closed, whether the undrawn portion expired, or whether the window was extended. That matters because the facility was backed by a single material customer contract (claim 4595) that is itself not named or updated.
The 9 percent senior notes due 2031 carried a first interest payment date of 2026-02-01 (claim 4659). They were last referenced on 2025-07-27 alongside the 1.75 billion USD issuance (claim 4658). The ledger now shows that payment claim as delayed, and no disclosure on record confirms the coupon was paid. By contrast, the delayed flags on the notes closing dates in claims 11919 and 4699 appear to be extraction artifacts rather than walk-backs. Claims 4824, 11917 and 4658 record those issuances as completed on or shortly after the promised dates.
Several operating claims from the May 2025 disclosure have not recurred in anything later on record. These are the IBM partnership to supply compute for Granite models (claim 4971), 420 MW of active power capacity (claim 4972), and 1.6 GW of contracted power capacity (claim 4973). They remain marked stated, but none has been restated, updated or expanded upon since 2025-05-13. The record offers no signal on whether the IBM arrangement continues, or how the contracted power figure has progressed toward active capacity. The same applies to the contingent springing maturity of 2026-12-30 on the revolving facility (claim 11926). It is still marked stated, but the record does not say whether the condition behind it has been resolved.
One caveat applies to all of this. The ledger provided breaks off at claim 4297, dated 2025-09-24, so any disclosure after that date may address some of these items and is not reflected here.
What we haven't been told
2026-09-18The Core Scientific merger is the most prominent item to go quiet. CoreWeave announced the all-stock agreement at 0.1235 shares per Core Scientific share in July 2025 (claims 4729, 4731), along with a $270 million termination fee payable to CoreWeave (4739), an S-4 filing (4733) and a Nasdaq listing approval for the new shares (4735). The August 2025 filing pointed to a closing around 2025-10-01 (4517), and the outside date was set at 2026-04-07 (4738). The last reference in the reviewed record is 2025-09-16 (4331), which restates the exchange ratio without giving a timetable. Both the October expectation and the April 2026 deadline have now passed, and the ledger has automatically moved these claims to delayed. The reviewed record contains no closing announcement, no extension of the outside date and no termination notice. It also does not say whether the termination fee became payable or how the capacity the deal was meant to secure will be sourced instead.
The DDTL 3.0 facility has a similar gap. CoreWeave disclosed up to $2.6 billion of delayed-draw term loans in May and July 2025 (11922, 4592), secured against a material customer contract for GPU infrastructure (4595). The facility carried a minimum contract realization ratio of 0.85x (4597) and a commitment termination date of 2026-07-31 (4593). That date passed roughly seven weeks ago, and the claim has auto-transitioned to delayed. The record contains no later statement on how much was drawn before commitments lapsed, whether the draw period was extended, or whether the realization covenant held. Those facts bear directly on the 1.40x debt service coverage test that begins in April 2027 (4596).
The headline operating figures from the first quarter of 2025 have also not been refreshed in the reviewed record. On 2025-05-13 management cited a $25.9 billion revenue backlog (4970), including an $11.2 billion OpenAI component (4969), 1.6 GW of contracted power (4973) and 420 MW of active capacity (4972). The IBM Granite partnership (4971) appears only in that same release. None of these metrics or the IBM relationship reappears in the later disclosures reviewed here. The ledger therefore cannot show whether they rose, fell or were re-baselined. It also does not show how much of the contracted power was expected to come from Core Scientific sites whose status is now unresolved.
Some delayed flags in the ledger should not be read as management silence. The closing dates for the 2030 notes (11919) and the 2031 notes (4699) are marked delayed, but the record itself shows both issues completing: the 2030 notes on 2025-05-27 (4824, 11917) and the 2031 notes on 2025-07-27 (4658). The first 9% coupon date of 2026-02-01 (4659) is flagged only because no payment confirmation was captured, not because any default was disclosed. The 2026-12-30 springing maturity on the revolving facility (11926) has not yet arrived, but nothing in the record shows whether the condition that would trigger it has been cleared. This review covers only the portion of the claims ledger supplied, and later entries may address some of these points.
What we haven't been told
2026-09-18The most consequential silence concerns the Core Scientific merger. The all-stock deal at 0.1235 CoreWeave shares per Core Scientific share was announced on 2025-07-06/07 (claims 4731, 4729, 4733, 4735). It carried an outside date of 2026-04-07 (claim 4738), a $270 million termination fee payable to CoreWeave (claim 4739), and an earlier completion target of 2025-10-01 (claim 4517). The last mentions on record are 2025-09-16 and 2025-09-24, when the language had advanced to 'CoreWeave acquires Core Scientific via merger' (claims 4331, 4313). The ledger auto-transitioned the closing target and the outside date to delayed on 2026-09-03. Both dates have now passed. Nothing in the record says whether the transaction closed, was terminated, or whether the termination fee changed hands. The confident 'acquires' phrasing has not been reconciled with the lapsed deadlines.
The $2.6 billion DDTL 3.0 facility was disclosed on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). Its commitment termination date was 2026-07-31 (claim 4593). That date passed and the claim was auto-marked delayed on 2026-09-03. The facility was tied to a material GPU infrastructure contract and to covenants including a 0.85x contract realization ratio and a 1.40x debt service coverage ratio from April 2027 (claims 4595, 4597, 4596). The record contains no statement of how much of the $2.6 billion was drawn before the commitment window closed. It also does not say whether the window was extended or whether the underlying customer contract performed as expected.
The 9% senior notes due 2031 were upsized by $250 million to $1.75 billion in July 2025 (claims 4697, 4698, 4658). The first interest payment was scheduled for 2026-02-01 (claim 4659). That claim was auto-transitioned to delayed on 2026-09-03, and no later disclosure on record confirms the coupon was paid. The same pattern applies to the notes closing dates of 2025-05-27 and 2025-07-25 (claims 11919, 4699). For the May notes, issuance on the stated date is corroborated by claims 4824 and 11917, so that 'delayed' flag likely reflects a verification gap rather than a slip. The February 2026 payment has no such corroboration.
The operating scale figures have not been refreshed. As of 2025-05-13, CoreWeave cited 420 MW of active power, 1.6 GW of contracted power, a $25.9 billion total backlog and an $11.2 billion OpenAI backlog (claims 4972, 4973, 4970, 4969). No later claim on record restates or updates the capacity numbers. They were the basis for the growth narrative at IPO, and the absence of a follow-up figure is notable given the capital raised since. Separately, the revolving facility carries a contingent springing maturity of 2026-12-30 (claim 11926), now roughly three months away. Nothing has been said about whether the triggering condition remains live.
The ledger supplied for this review ends mid-entry at claim 4296 (dated 2025-09-24). Some of these absences may therefore be addressed in later disclosures not shown here, and they should be checked against subsequent filings before being treated as settled.
What we haven't been told
2026-09-18The Core Scientific merger is the largest open item. CoreWeave signed the all-stock agreement in July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). The August 2025 disclosures pointed to closing around 2025-10-01 (claim 4517), and the agreement set an outside date of 2026-04-07 (claim 4738). The last mention on record is 2025-09-16 (claim 4331), which restates the exchange ratio but gives no timing. Both dates have since passed, and the ledger has moved claims 4517, 4731 and 4738 to delayed. Nothing on record says whether the deal closed, was terminated, or was extended. Nothing addresses the $270 million termination fee payable to CoreWeave (claim 4739), or what the S-4 and Nasdaq listing steps (claims 4733, 4735) led to.
The May 2025 operating figures have not been updated in any later disclosure on record. These are the $25.9 billion revenue backlog (claim 4970), the $11.2 billion attributed to OpenAI (claim 4969), 420 MW of active power and 1.6 GW contracted (claims 4972, 4973), and the IBM Granite capacity partnership (claim 4971). The September 2025 OpenAI reference (claim 4296) keeps the relationship alive through 2031 but gives no dollar figure. IBM is not mentioned again after 2025-05-13. None of these items has been formally withdrawn, but none has been refreshed, and no revision has been announced.
The $2.6 billion DDTL 3.0 facility (claims 4592, 11922) had a commitment termination date of 2026-07-31 (claim 4593). That date has passed and the ledger marks it delayed. The last mention is 2025-07-30. The record does not say how much was drawn before the commitment lapsed, whether it was extended, or how the facility is tracking against its 0.85x contract realization covenant (claim 4597). The revolver also carries a springing maturity of 2026-12-30 (claim 11926), and nothing on record indicates whether that trigger has been addressed.
The first 2026-02-01 coupon on the 9% senior notes due 2031 (claim 4659) has also been auto-marked delayed, with no later disclosure confirming payment. This may simply be a routine event nobody reported, not a missed obligation. The expected closing dates for the May and July 2025 note offerings (claims 11919, 4699) are also marked delayed, but claims 4824, 11917 and 4658 record those notes as issued. Both offerings were upsized, not cut (claims 11921 to 11918, and 4700 to 4697). Those two delayed flags look like ledger artifacts rather than walk-backs.
A caveat applies to everything above. The latest claim in this record is dated 2025-09-24, nearly a year before today. Some of these silences may reflect gaps in what has been ingested rather than in what CoreWeave has said. The Core Scientific outcome and the DDTL 3.0 drawdown status are where a fresh check of filings would matter most.
What we haven't been told
2026-09-18The Core Scientific merger is the largest item that has gone quiet. The all-stock deal at 0.1235 CoreWeave shares per Core Scientific share was announced on 2025-07-06 and 2025-07-07 (claims 4729, 4731). The announcement came with an S-4 filing, a Nasdaq listing approval, conversion mechanics for Core Scientific's convertible notes and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4737, 4739). The 2025-08-12 disclosure pointed to closing around 2025-10-01 (claim 4517), and the agreement set an outside date of 2026-04-07 (claim 4738). The last mention on record is 2025-09-16 (claim 4331), which restated the exchange ratio without giving a new timetable. Both dates have passed, and on 2026-09-03 the ledger automatically moved claims 4517, 4731 and 4738 to delayed. Nothing in this record says whether the merger closed, was terminated or was restructured. It also doesn't say whether the termination fee was triggered or what the outcome means for the capacity the deal was meant to secure.
The $2.6 billion DDTL 3.0 facility has also dropped out of view. It was disclosed on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). The borrowing window was set to close on 2026-07-31 (claim 4593), with loans maturing on 2030-08-21 (claim 4594). The 2025-07-30 disclosure is the last one on record. The commitment termination date has now passed, and the ledger marked claim 4593 delayed on 2026-09-03. The record doesn't say how much of the $2.6 billion was drawn, whether the window was extended, or how the company is tracking against the 0.85x contract realization covenant and the 1.40x debt service coverage test that starts in April 2027 (claims 4597, 4596). A related date is coming up. The revolving credit facility's contingent springing maturity of 2026-12-30 (claim 11926) sits about three months out, and nothing on record since 2025-05-05 says whether the conditions that would trigger it have been dealt with.
Several headline operating figures appeared once and were never repeated. The 2025-05-13 disclosure reported $25.9 billion of revenue backlog (claim 4970), including $11.2 billion from OpenAI (claim 4969). It also reported 420 MW of active power capacity and 1.6 GW of contracted power (claims 4972, 4973). No later filing in this record updates any of these numbers. The next reference to OpenAI, on 2025-09-24 (claim 4296), describes it only as a cloud computing customer through 2031-05-31 and gives no dollar amount. The IBM Granite capacity partnership (claim 4971) and the product commitments made the same day (claims 4975 through 4981) also have no follow-up. That may be a gap in what was collected rather than a choice to stop reporting. Even so, the record offers no updated backlog, no update on how much contracted power has been energized, and no account of whether the OpenAI figure has changed.
The notes offerings need a careful reading. The ledger marked the expected closing dates of 2025-05-27 and 2025-07-25 as delayed (claims 11919, 4699). The same record, however, shows the 2030 notes issued on 2025-05-27 (claims 4824, 11917) and the 9% 2031 notes issued on 2025-07-27 (claim 4658). So those two flags look like artifacts of the automated process rather than real slips. The 9% notes' first interest date of 2026-02-01 (claim 4659) is a different case. It was also moved to delayed on 2026-09-03, and this record contains nothing confirming that the coupon was paid. That payment has not been addressed in the record since the notes were issued.
What we haven't been told
2026-09-18The largest gap on the record is the Core Scientific merger. CoreWeave announced an all-stock agreement on 2025-07-06/07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731), along with an S-4 filing, a Nasdaq listing approval and a $270 million termination fee payable to CoreWeave (4733, 4735, 4739). The August 2025 disclosure tied the deal to a 2025-10-01 date (4517), and the merger agreement set an outside date of 2026-04-07 (4731, 4738). The last mention is 2025-09-16 (4331), which restated the exchange ratio without giving a timeline. Every dated claim about the deal has since passed its date and has been moved automatically to delayed. The record contains nothing on whether the deal closed, whether the outside date was extended, whether either party terminated the agreement, or whether the termination fee was paid or received.
The operating metrics from the first-quarter 2025 disclosure have not reappeared. On 2025-05-13 management cited $25.9 billion of revenue backlog (4970), including $11.2 billion from the OpenAI arrangement (4969). The same disclosure cited 1.6 GW of contracted power (4973), 420 MW of active capacity added (4972) and an IBM partnership for Granite compute capacity (4971). None of these figures has been updated in any later claim on record. The August 2025 disclosure covered only financing and acquisition items (4513 to 4517). A 2025-09-24 claim names OpenAI as a customer through 2031-05-31 (4296) but gives no revised dollar figure. There is no statement on how backlog, contracted power or the IBM relationship have changed, and no explanation for why they stopped being reported.
The DDTL 3.0 facility has no follow-up. It was disclosed on 2025-05-18 and 2025-07-30 as up to $2.6 billion of delayed-draw term loans (11922, 4592), with a commitment termination date of 2026-07-31 (4593). That date has passed and the claim is automatically marked delayed. Nothing on record says how much was drawn, whether undrawn commitments lapsed or were extended, or how the company is tracking the covenants attached to the facility. Those covenants are a minimum contract realization ratio of 0.85x (4597) and a 1.40x debt service coverage test beginning April 2027 (4596). The facility was tied to an unnamed "material customer contract" (4595), which has never been identified.
Several financing items are marked delayed but look more like missing confirmations than real slips. The May 2025 notes had an expected closing of 2025-05-27 (11919), and the July 2025 notes had an expected closing of 2025-07-25 (4699). Both have issuance claims dated at or just after those dates (4824, 11917, 4658), which suggests the notes closed. Similarly, the first 9% coupon due 2026-02-01 (4659) has no record of having been paid. No statement has recorded that payment one way or the other.
One revolver date is still ahead. The revolving credit facility was extended to 2028-05-02 (5012, 11925), but it carries a contingent springing maturity of 2026-12-30 (11926), now about three months away. The record does not say what condition triggers that earlier date or whether it is expected to apply.
More broadly, the latest claim on record for CoreWeave is dated 2025-09-24, nearly a year ago. Part of that silence may reflect gaps in extraction coverage rather than the company's own disclosure choices.
What we haven't been told
2026-09-15The Core Scientific merger has the clearest gap between what was promised and what was later said. CoreWeave announced the all-stock deal on 2025-07-06 and 2025-07-07 at 0.1235 CoreWeave shares per Core Scientific share (claims 4731, 4729). The disclosures carried an outside closing deadline of 2026-04-07 (claim 4738) and a $270 million termination fee payable to CoreWeave (claim 4739). An earlier-dated framing in claim 4517 pointed to closing by 2025-10-01. The deal was last restated on 2025-09-16 and 2025-09-24 (claims 4331, 4313, 4314), still described as a pending acquisition. Both the October 2025 target and the April 2026 outside date have passed, and the ledger moved claims 4517, 4731 and 4738 to delayed on 2026-09-03 without any company statement. The record contains no announcement that the merger closed, was extended or was terminated. It also does not say whether the $270 million fee was triggered or collected, or how the Core Scientific convertible notes conversion described in claim 4737 was resolved.
The $2.6 billion DDTL 3.0 facility was disclosed on 2025-05-18 and again on 2025-07-30 (claims 11922, 4592). It carried a commitment termination date of 2026-07-31 (claim 4593), which passed without comment and was auto-flagged delayed on 2026-09-03. Its covenants include a minimum contract realization ratio of 0.85x and a debt service coverage ratio of 1.40x beginning April 2027 (claims 4597, 4596). The record does not show how much of the $2.6 billion was drawn before commitments lapsed, whether any undrawn portion was extended or cancelled, or how the covenants currently stand. The facility is tied to a material customer contract (claim 4595), so the absence of a draw figure also leaves that contract's funding status unaddressed.
The operating metrics from the 2025-05-13 quarterly disclosure have not been updated anywhere in the record on file. Those figures were $25.9 billion of revenue backlog, including $11.2 billion from OpenAI, 420 MW of active power and 1.6 GW of contracted power (claims 4970, 4969, 4972, 4973). The OpenAI relationship reappears on 2025-09-24 with a term running to 2031-05-31 (claim 4296), but without a revised backlog figure. The same quarter introduced an IBM partnership for Granite compute capacity (claim 4971), and the IBM partnership is not mentioned again. The ledger also has nothing on how much of the 1.6 GW has been energized, whether the contracted figure has changed, or whether the IBM arrangement is still active.
On the debt side, the revolving credit facility was extended to 2028-05-02 but carries a contingent springing maturity of 2026-12-30 (claims 11925, 11926). That date is now about three and a half months away, and nothing in the record says whether the condition that would pull maturity forward has been cleared. Separately, the first coupon on the 9% notes due 2031, scheduled for 2026-02-01 (claim 4659), was auto-flagged delayed with no confirming disclosure. The notes offerings themselves appear to have closed as planned (claims 4824, 11917, 4658), so the delayed flags on their closing dates (claims 11919, 4699) look like extraction artifacts rather than real slippage. The interest payment, however, has not been confirmed.
The ledger excerpt available for this review ends with disclosures dated 2025-09-24. Some of these silences may be resolved in later filings that are not shown here.
What we haven't been told
2026-09-14The Core Scientific merger is the largest open item. CoreWeave announced the all-stock combination in July 2025 at 0.1235 CoreWeave shares per Core Scientific share (claims 4729, 4731). It set an outside closing deadline of 2026-04-07 (claim 4738) and an earlier expected milestone of 2025-10-01 (claim 4517), and disclosed a $270 million termination fee payable to CoreWeave (claim 4739). The S-4 filing and Nasdaq listing approval were also noted (claims 4733, 4735). The last mentions on record are from 2025-09-24 (claims 4313, 4314), and both still describe the deal as pending. The 2025-10-01 and 2026-04-07 dates have passed, and the ledger moved claims 4517, 4731 and 4738 to delayed automatically. Nothing in the record says whether the merger closed, was terminated, or had its deadline extended. Nothing addresses whether the termination fee became payable or how the Core Scientific convertible notes (claim 4737) were treated.
The DDTL 3.0 facility has a similar gap. CoreWeave described a delayed-draw term loan of up to $2.6 billion (claims 4592, 11922). Its commitment period was set to end on 2026-07-31 (claim 4593), and the loans mature on 2030-08-21 (claim 4594). The last disclosure is from 2025-07-30. That termination date has now passed, and the claim moved to delayed without any company statement. The record does not say how much of the $2.6 billion was drawn before commitments lapsed, whether the draw window was extended, or whether the undrawn portion was cancelled. The same facility carries covenants tied to customer contracts, including a minimum contract realization ratio of 0.85x and a 1.40x debt service coverage test from April 2027 (claims 4596, 4597), so the draw status matters.
The July 2025 senior notes also lack follow-through. In July 2025 CoreWeave upsized a 9% senior notes offering by $250 million to $1.75 billion (claims 4697, 4698, 4658). It gave an expected closing date of 2025-07-25 (claim 4699) and a first interest payment date of 2026-02-01 (claim 4659). No later claim confirms the closing or the first coupon, and both moved to delayed automatically. The May 2025 notes are different. Their 2025-05-27 closing date (claim 11919) was auto-flagged as delayed, but claims 4824 and 11917 record the issuance on that date, so that flag looks like a ledger artifact rather than a slip. The July offering has no such confirmation in the record. The revolving credit facility is related: its contingent springing maturity of 2026-12-30 (claim 11926) is now about three months away. The record does not say whether the conditions that would trigger it have been cleared.
Several operating metrics from the first earnings release as a public company, dated 2025-05-13, have not been repeated since. These are the $25.9 billion revenue backlog (claim 4970), 1.6 GW of contracted power (claim 4973), 420 MW of active power (claim 4972), and the IBM partnership to supply compute for Granite models (claim 4971). None of them reappears in later disclosures on record. Later filings name a material GPU customer contract (claim 4595), an OpenAI relationship running to 2031-05-31 (claim 4296), and a $6.3 billion NVIDIA capacity commitment through 2032 (claim 4352). They give no updated backlog total, no contracted or active power figure, and nothing further on IBM. The record does not show whether these figures were revised, replaced by other measures, or simply dropped.
What we haven't been told
2026-09-14The Core Scientific merger is the most visible open thread. CoreWeave announced the all-stock deal at 0.1235 CoreWeave shares per Core Scientific share in July 2025 (claims 4729, 4731), alongside a $270 million termination fee payable to CoreWeave (4739) and an outside closing deadline of 2026-04-07 (4738). An August 2025 disclosure pointed to an earlier closing target of 2025-10-01 (4517). The last mentions in the record are dated 2025-09-16 and 2025-09-24 (4331, 4313, 4314), and they repeat the exchange ratio without any new timing. Both the October 2025 target and the April 2026 deadline have passed, and the ledger moved 4517, 4731 and 4738 to delayed on 2026-09-03. Nothing on record addresses a shareholder vote, completion, termination, or whether the termination fee was triggered or paid.
The DDTL 3.0 facility has also gone quiet. CoreWeave disclosed a delayed-draw term loan of up to $2.6 billion (4592, 11922) with a commitment termination date of 2026-07-31 (4593) and a 2030-08-21 maturity (4594). The facility carried a minimum contract realization ratio of 0.85x (4597) and a 1.40x debt service coverage test beginning April 2027 (4596). It was last described on 2025-07-30. The draw window closed in July 2026, and 4593 was auto-marked delayed. The record does not say how much of the $2.6 billion was drawn, whether the commitment was extended or allowed to lapse, or whether the contract realization covenant has been tested.
The Q1 2025 operating figures were never refreshed. On 2025-05-13 management cited $25.9 billion of revenue backlog (4970), including $11.2 billion tied to OpenAI (4969), 1.6 GW of contracted power (4973), 420 MW of active capacity (4972), and an IBM partnership for Granite compute (4971). None of these metrics reappears in any later claim in the ledger as supplied. OpenAI resurfaces on 2025-09-24 as a customer with a 2031-05-31 horizon (4296) but without a dollar figure. IBM is not mentioned again. No updated backlog, capacity, or partnership status has been stated, and no explanation has been given for dropping them.
The 9% senior notes due 2031 raise a narrower point. The offering was upsized from $1.5 billion to $1.75 billion (4700, 4698, 4697). The issuance is recorded on 2025-07-27 (4658), which suggests the delayed flag on the 2025-07-25 closing (4699) is a timing artifact rather than a real slip. The same applies to the May notes (11919 against 4824 and 11917). However, the first coupon, due 2026-02-01 (4659), has also been auto-marked delayed. Nothing in the record confirms that the payment was made. With the revolving credit facility's springing maturity of 2026-12-30 (11926) approaching, the absence of any statement on debt service is notable.
What we haven't been told
2026-09-14The proposed all-stock merger with Core Scientific is the most prominent open item. CoreWeave announced the agreement in early July 2025 at an exchange ratio of 0.1235 shares (claims 4729, 4731), filed an S-4 (claim 4733), and set an outside closing deadline of 2026-04-07 (claim 4738). An August 2025 disclosure described an expected completion around 2025-10-01 (claim 4517). The last references on record are dated 2025-09-16 and 2025-09-24 (claims 4331, 4313, 4314), and they still describe the deal as pending. Both the October 2025 target and the April 2026 deadline have passed, and all three dated claims were automatically moved to delayed on 2026-09-03. The record contains no announcement that the merger closed, was terminated, or had its deadline extended. It also says nothing about the $270 million termination fee payable to CoreWeave (claim 4739) or the treatment of Core Scientific's convertible notes (claim 4737).
The $2.6 billion DDTL 3.0 facility was disclosed in May and July 2025 (claims 11922, 4592). Its commitment termination date was 2026-07-31 (claim 4593), and that claim moved automatically to delayed on 2026-09-03. Nothing on record says how much of the facility was drawn before commitments lapsed, whether the date was extended, or whether undrawn capacity was allowed to expire. That matters because the facility carries a minimum contract realization ratio of 0.85x (claim 4597) and a 1.40x debt service coverage test starting April 2027 (claim 4596), and neither has been updated since the July 2025 filing.
The first scheduled coupon on the 9% Senior Notes due 2031 was set for 2026-02-01 (claim 4659). It has also been auto-transitioned to delayed, and the record contains no confirmation that the payment was made. By contrast, the notes closings dated 2025-05-27 and 2025-07-25 (claims 11919, 4699) carry the same delayed flag, but issuance claims on or just after those dates (claims 11917, 4824, 4658) indicate those transactions settled. They are not treated here as walk-backs.
Several operating metrics from the 2025-05-13 quarterly disclosure have not reappeared in later claims on record. These are the $25.9 billion total revenue backlog (claim 4970), the $11.2 billion OpenAI backlog (claim 4969), 420 MW of active power (claim 4972), and 1.6 GW of contracted power (claim 4973). The IBM partnership for Granite compute capacity (claim 4971) was framed as an active arrangement in that quarter and has not been mentioned since. OpenAI appears again only as a customer with a 2031-05-31 horizon (claim 4296), with no revised dollar figure. There is no statement on record updating, confirming, or retiring any of these figures.
The contingent springing maturity of 2026-12-30 on the revolving credit facility (claim 11926) remains in the future, so it is not yet a missed date. However, nothing disclosed since May 2025 explains whether the condition that would trigger it has been resolved. With that date about three months away, the absence of any update is notable.
What we haven't been told
2026-09-14The Core Scientific merger is the most consequential open item on the record. Management announced the all-stock deal at 0.1235 CoreWeave shares per Core Scientific share on 2025-07-06 and 2025-07-07 (claims 4731, 4729). It pointed to an S-4 filing and Nasdaq listing approval (4733, 4735), a $270 million termination fee payable to CoreWeave (4739), and the conversion of Core Scientific's convertible notes into CoreWeave securities (4737). A 2025-08-12 disclosure attached a 2025-10-01 target (4517). The last mentions in this ledger are on 2025-09-16 and 2025-09-24 (4331, 4313, 4314), which restate the exchange ratio. Both the 2025-10-01 target and the 2026-04-07 outside date (4738, 4731) have since passed and been auto-transitioned to delayed. The record contains no statement that the merger closed, was terminated, or was renegotiated. It also says nothing about whether the termination fee was triggered or paid, or what became of the note conversion.
The forward operating figures from the 2025-05-13 disclosure have not been restated anywhere in the record. These are $25.9 billion of total revenue backlog (4970), of which $11.2 billion was attributed to OpenAI (4969), 1.6 GW of contracted power (4973), and 420 MW of active capacity added (4972). A later OpenAI reference on 2025-09-24 (4296) gives a 2031-05-31 horizon but no updated dollar amount. The ledger has no subsequent backlog total, no updated contracted or active power figure, and no explanation of how the 2025-09-14 NVIDIA $6.3 billion capacity commitment (4352) or the 2025-07-30 material customer contract (4595) changed those numbers. No downward revision appears. Neither does any update.
The IBM partnership for Granite compute capacity (4971) appears once, on 2025-05-13, and not again. No later disclosure in the record describes its scope, term, or status, or whether it is still in effect.
On the DDTL 3.0 facility, management disclosed up to $2.6 billion of delayed draw term loans (11922, 4592) with a commitment termination date of 2026-07-31 (4593). That date has passed and the claim is now marked delayed. The record does not say how much was drawn before commitments lapsed, whether the draw period was extended, or whether any undrawn amount was cancelled. The covenant package disclosed alongside it has also not been revisited. It sets a 1.40x minimum debt service coverage ratio from April 2027 (4596) and a 0.85x minimum contract realization ratio (4597). Separately, the 2025-05-05 revolver amendment carried a contingent springing maturity of 2026-12-30 (11926), now roughly three months away. The record contains no statement on whether the springing condition has been cleared.
Several other delayed flags appear to be ledger artifacts rather than slippage. The 2025-05-27 notes closing (11919) is matched by issuance claims dated that day (4824, 11917). The 2025-07-25 closing (4699) is followed by an issuance record on 2025-07-27 (4658). The 2026-02-01 first coupon on the 9% notes (4659) has no confirmation of payment on file, which is a gap in disclosure tracking rather than evidence of a missed payment. The claims list provided was truncated after 2025-09-24, so later disclosures that address any of the items above may exist but were not available for this review.
What we haven't been told
2026-09-14The proposed all-stock merger with Core Scientific is the largest open item on the record. It was announced on 2025-07-06 at an exchange ratio of 0.1235 CoreWeave shares (claims 4729, 4731), with an outside date of 2026-04-07 (claim 4738), a Form S-4 filing and Nasdaq listing approval (claims 4733, 4735), and a $270 million termination fee payable to CoreWeave (claim 4739). A 2025-08-12 disclosure pointed to closing around 2025-10-01 (claim 4517). The exchange ratio was repeated on 2025-09-16 and 2025-09-24 (claims 4331, 4314), and that is the last mention in the record supplied. The October closing target and the April 2026 outside date have both passed, and claims 4517, 4731 and 4738 were automatically moved to delayed on 2026-09-03. Nothing on file says whether the deal closed, was extended or was terminated. Nothing says whether the termination fee became payable, or what the company now plans for the capacity the combination was meant to secure.
The backlog and power figures from the 2025-05-13 results have not been restated since. On that date management cited $25.9 billion of total committed revenue backlog (claim 4970), including an $11.2 billion OpenAI strategic deal (claim 4969), 1.6 GW of contracted power (claim 4973) and 420 MW of active power added (claim 4972). The later disclosures in the record cover financing, the merger and personnel. None of them updates backlog, customer concentration or power, so there is no statement on whether these figures have grown, been drawn down or been revised. The IBM partnership for Granite compute capacity (claim 4971) was also mentioned once, on the same date, and does not appear again.
The $2.6 billion DDTL 3.0 facility (claims 4592, 11922) carried a commitment termination date of 2026-07-31 (claim 4593). That date has passed, and the claim was automatically marked delayed. The record contains no statement of how much was drawn before the commitment lapsed, whether the lapse was extended, or how the undrawn portion was replaced. The facility is tied to an unnamed material customer contract for GPU infrastructure (claim 4595). It also carries a 0.85x minimum contract realization ratio (claim 4597) and a 1.40x debt service coverage test beginning April 2027 (claim 4596). The company has not said how it is performing against the realization test. Separately, the contingent springing maturity of 2026-12-30 on the revolving credit facility (claim 11926) is now about three months away, and the record contains no update on whether the conditions that would trigger it remain live.
The July 2025 senior notes illustrate a narrower gap. The 9% notes due 2031 were upsized by $250 million to $1.75 billion (claims 4697, 4698), with closing expected on 2025-07-25 (claim 4699). An issuance record dated 2025-07-27 (claim 4658) suggests the deal did close, so the delayed flag on claim 4699 more likely reflects a missing confirmation than a missed date. The first semi-annual interest payment was due 2026-02-01 (claim 4659) and is also marked delayed. No disclosure in the record confirms that it was paid.
The claim list supplied ends at 2025-09-24, and the final entry is cut off. The items above therefore describe silences within that window, and later filings not shown here may address some of them.
What we haven't been told
2026-09-13The Core Scientific merger is the largest item that has gone quiet. CoreWeave announced the all-stock deal in July 2025 at an exchange ratio of 0.1235 shares (claims 4729, 4731), along with an S-4 filing, a planned Nasdaq listing of the new shares, and a $270 million termination fee payable to CoreWeave (claims 4733, 4735, 4739). The last disclosures in the record, dated 2025-09-16 and 2025-09-24, restate the exchange ratio (claims 4331, 4314). Two dates have since passed. The 2025-10-01 milestone attached to the agreement (claim 4517) and the 2026-04-07 outside closing deadline (claims 4731, 4738) were both automatically moved to delayed on 2026-09-03. The record contains no statement that the merger closed, that the deadline was extended, or that the agreement was terminated. It also says nothing about whether the termination fee was triggered or paid.
The $2.6 billion DDTL 3.0 delayed-draw facility was first described on 2025-05-18 (claim 11922) and detailed again on 2025-07-30 (claims 4592, 4594). Its commitment termination date was 2026-07-31 (claim 4593). That date passed without disclosure, and the claim was automatically marked delayed on 2026-09-03. Management has not said how much of the facility was drawn before commitments ended, whether the undrawn portion lapsed or was extended, or how this affects the covenant package disclosed at the same time. That package includes a 0.85x contract realization ratio and a 1.40x debt service coverage ratio starting April 2027 (claims 4597, 4596).
The July 2025 9% senior notes due 2031 have a smaller gap. The offering was upsized by $250 million to $1.75 billion, with closing expected 2025-07-25 (claims 4697, 4698, 4699). A 2025-07-27 disclosure records the issuance (claim 4658), which suggests the notes did close. However, the expected-closing claim and the first semiannual interest date of 2026-02-01 (claim 4659) were both automatically marked delayed. No later disclosure in the record confirms the closing date or states that the first coupon was paid on schedule.
Several operating metrics were disclosed on 2025-05-13 and never updated in the record. These are total revenue backlog of $25.9 billion (claim 4970), $11.2 billion attributed to OpenAI (claim 4969), 1.6 GW of contracted power, and 420 MW of active power added (claims 4973, 4972). The IBM partnership for Granite compute capacity (claim 4971) also appears in that single quarter and not afterward. The only later OpenAI reference, from 2025-09-24, gives a contract horizon to 2031-05-31 (claim 4296) with no backlog figure. None of these items has been revised downward in the record, and none has been restated either. The record does not say whether backlog, contracted power, or the IBM arrangement has since grown, shrunk, or been reclassified.
The record reviewed here ends with disclosures from late September 2025. Some of these gaps may be addressed in filings that have not yet been ingested.
What we haven't been told
2026-09-13The Core Scientific merger represents the largest undiscussed reversal. CoreWeave announced a merger agreement on July 7, 2025 (claim 4729), initially targeting closure by October 1, 2025 (claim 4517), then extending to April 7, 2026 (claims 4731, 4738). The transaction was referenced prominently through September 2025, with multiple disclosures specifying a 0.1235 Class A share exchange ratio (claims 4314, 4331, 4294). The agreement was terminated on October 30, 2025 (claim 4166), but CoreWeave has not explained why the October target slipped, why April became necessary, or what circumstances prompted termination. The merger's disappearance from forward guidance after September 2025 lacked accompanying revision statements.
A $1.75 billion Senior Notes offering was promised to close by July 25, 2025 (claim 4699). Over a year later, the status remains marked "delayed" without public explanation of the delay or current offering timeline. The associated 9 percent interest payment obligation (claim 4659), scheduled to commence February 1, 2026, is similarly marked "delayed" without disclosure of modified payment terms or deferral arrangements.
The DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) has passed into "delayed" status without public statement on whether the commitment was extended, what the revised timeline is, or reasons for missing the original target.
What we haven't been told
2026-09-13CoreWeave committed to closing the Core Scientific merger by October 1, 2025 (claim 4517) and April 7, 2026 (claims 4731, 4738), with an exchange ratio of 0.1235 shares per Core Scientific share. Both deadlines were missed and marked delayed as of September 3, 2026. However, the merger agreement was terminated on October 30, 2025 (claim 4166), rendering these commitments void. Management announced the termination but disclosed no explanation for why the deal failed or its strategic implications.
The Senior Notes offering promised a closing date of July 25, 2025 (claim 4699) for a $1.75 billion issuance at 9% interest maturing February 2031 (claim 4697). As of September 3, 2026, this closing remains marked delayed—over thirteen months past the promised date. No revised closing timeline or explanation for the slip has been disclosed.
Interest payments on the Senior Notes were promised to commence on February 1, 2026 (claim 4659). As of September 3, 2026, this obligation is marked delayed, now more than seven months overdue. Neither payment status, deferral agreements, rescheduled dates, nor any amendment to the debt instrument has been disclosed.
The $1 billion acquisition of Weights & Biases was announced in May 2025 (claim 4974) and restated in August 2025 (claim 4516). No subsequent closure announcement, revised timeline, or deal withdrawal appears in the record. The acquisition status has gone unmentioned since August 2025 and appears to have been silently shelved without public explanation.
What we haven't been told
2026-09-13CoreWeave's most dramatic reversal involves the Core Scientific merger. Multiple claims from July and August 2025 (4731, 4738, 4517) promised a merger closing between April and October 2025, with the 0.1235 share exchange ratio prominently stated. Management then terminated the merger agreement entirely, as recorded in claim 4166 on October 30, 2025. No explanation was provided in the subsequent disclosure for why this previously material transaction was abandoned; the topic simply shifted from 'promised closing' to 'terminated agreement.' The OpenAI revenue backlog underwent a significant unannounced downward revision. Claim 4969 (May 13, 2025) cited $11.2 billion in 'OpenAI strategic deal revenue backlog,' but by September 24, 2025, claim 4297 quoted only $6.5 billion in 'committed revenue' from OpenAI—a 42% reduction—without an intermediate announcement that the backlog had been revised downward. The May figure vanished from later disclosures and was replaced with the lower amount under a different metric label. Two financing milestones have drifted past promised dates without updates. Claim 4699 promised the Notes Offering would close by July 25, 2025, but the status transitioned to 'delayed' on September 3, 2026 with no subsequent claim showing the actual closing date. Similarly, claim 4593 promised DDTL 3.0 commitment termination by July 31, 2026, also marked 'delayed' as of September 3, 2026, with no new termination timeline disclosed. The Weights & Biases acquisition, stated as a $1 billion transaction in claims 4974 and 4516 (May and August 2025), has been absent from all subsequent claims and disclosures, with no announcement of completion or change in status; it simply stopped being mentioned.
What we haven't been told
2026-09-12The most stark reversal concerns the Core Scientific merger. Claims 4731 and 4738 (July 6, 2025) announced a merger agreement with April 7, 2026 as the promised closing date. By September 24, claim 4313 stated CoreWeave had acquired Core Scientific via merger, with claims 4314 restating the 0.1235 share ratio. Yet on October 30, 2025, claim 4166 documented termination of the merger agreement—and management has never explained why an announced completed acquisition was unwound. The claims remain categorized as 'stated' rather than capturing this material reversal.
The Weights & Biases acquisition ($1 billion, claims 4974 and 4516, announced May and restated August 2025) appears in the May 13 and August 12, 2025 disclosures and then ceases. No subsequent claim documents closure, integration status, regulatory approval, or abandonment. After August 12, 2025, silence. The acquisition lingers in 'stated' status with no transition documenting whether it completed, restructured, or was shelved.
The 9% Senior Notes interest payment (claim 4659, July 27, 2025) was promised by February 1, 2026. Today is September 12, 2026—over seven months past the due date. The claim remains 'delayed' without any narrative: was the payment made late, restructured, deferred under covenant relief, or delinquent? A material obligation crossing into arrears typically requires disclosure; here the status has simply drifted.
The DDTL 3.0 commitment termination date (claim 4593, July 30, 2025) was promised by July 31, 2026. Today is September 12, 2026—now overdue by over one month. Its 'delayed' status carries no explanation of what occurred: extension, conversion, or restructuring of this significant debt facility remain undisclosed.
What we haven't been told
2026-09-12CoreWeave announced the Core Scientific merger on July 6, 2025 (claims 4731, 4738) with a promised closing date of April 7, 2026. By August 12, 2025, the deal was already described as an 'acquisition agreement' with an accelerated deadline of October 1, 2025 (claim 4517). On October 30, 2025, management filed notice of the merger's termination (claim 4166)—a complete strategic reversal that abandoned what had been positioned as a transformative combination. No statement explained why the previously committed merger did not proceed or what financial or strategic impact the termination entailed.
The Senior Notes offering announced July 22, 2025, carried a promised closing date of July 25, 2025 (claim 4699), which the record shows was delayed without subsequent disclosure of a revised closing timeline. Although the notes themselves were issued (claim 4658), the announcement of the specific closing date slipped silently into the backlog.
The $1.75 billion Senior Notes issuance included promised interest payments of 9.0 percent beginning February 1, 2026 (claim 4659). As of September 3, 2026, this obligation is marked 'delayed'—meaning the promised payment date has passed without verification or explanation of whether payments were made, deferred, or restructured.
The $2.6 billion delayed draw term loan facility (claim 4592) was assigned a commitment termination date of July 31, 2026 (claim 4593). That date has passed; the facility is now flagged as delayed as of early September 2026, with no disclosure of whether the commitment was extended, replaced, or allowed to lapse.
What we haven't been told
2026-09-12CoreWeave's Core Scientific merger went from a promised April 7, 2026 closing (claims 4731, 4738 from July 2025) to an October 1, 2025 agreement date (claim 4517, August 2025) to announced completion (claim 4313, September 2025) to full termination (claim 4166, October 2025)—all within five months—with no subsequent disclosure of strategic rationale or financial impact. The DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) has now passed without any filed update; it remains marked delayed as of today, September 12, 2026, with no explanation. Senior Notes interest payments promised for February 1, 2026 (claim 4659) are now over seven months overdue, classified as delayed, yet management has not publicly addressed the missed payment. A Notes Offering with a promised July 25, 2025 closing date (claim 4699) slipped without announced revision; the securities eventually issued, but no transparency was provided about the delay between promised and actual close.
What we haven't been told
2026-09-12CoreWeave's Core Scientific merger stands out as the most significant abandoned undertaking. The acquisition was prominently disclosed in July 2025 with an April 2026 closing deadline (claims 4731, 4738, 4517), mentioned repeatedly through August 2025, but the company terminated the agreement in October 2025 (claim 4166). As of September 2026, a full year later, the original merger milestone claims still register as 'delayed' rather than terminated in status tracking, suggesting management has not formally reconciled its prior commitments with the abandoned transaction—leaving investors without a structured announcement of the deal's failure. The Weights & Biases acquisition, disclosed for $1 billion in August 2025 (claim 4516), has generated no subsequent update or completion announcement; its current disposition remains undisclosed, with the last mention dating to August 12, 2025. The $1.75 billion Senior Notes offering expected closing, promised for July 25, 2025 (claim 4699), remains marked 'delayed' into September 2026—a fourteen-month slip with no formal revision statement. Related to that issuance, interest payment commencement, promised for February 1, 2026 (claim 4659), similarly shows as delayed, which either indicates the notes were never finalized or suggests unreported payment deferrals. Finally, the delayed draw term loan facility's commitment termination date, scheduled for July 31, 2026 (claim 4593), has shifted to delayed status as of early September 2026, indicating the facility remains outstanding beyond its planned wind-down with no public explanation for the extension.
What we haven't been told
2026-09-12Core Scientific Merger stands as the most conspicuous withdrawal. Announced as a binding agreement on 2025-07-07 (claim 4729) with an expected close by 2026-04-07 (claims 4731, 4738), the merger was terminated on 2025-10-30 (claim 4166) without management issuing a detailed explanation in subsequent filings or calls. The acquisition of Weights & Biases for $1 billion, prominently stated in May 2025 (claim 4974) and restated in August 2025 (claim 4516), has received zero follow-up disclosure since the August announcement. No closure milestone, integration plan revision, or status update has been communicated, leaving the $1 billion commitment's fate undisclosed. The Senior Notes Offering promised a closing by 2025-07-25 (claim 4699), a deadline that has now elapsed; the notes remain in a 'delayed' state as of 2026-09-03, with no revised closing date or revised terms disclosed to investors. Interest payments on these notes were promised to begin 2026-02-01 (claim 4659), a date now marked 'delayed' without announcement of rescheduled payment timelines. The $2.6 billion Delayed Draw Term Loan (DDTL 3.0) commitment termination was promised for 2026-07-31 (claim 4593); as of 2026-09-12, this deadline has passed and the claim is marked 'delayed,' yet no extension notice, waiver, or amendment has been disclosed. Together, these four items represent over $6 billion in announced or committed capital whose status has either reverted or stalled without formal management communication clarifying the change.
What we haven't been told
2026-09-12Core Scientific Merger. On July 6, 2025, CoreWeave announced a merger with Core Scientific, Inc., setting a closing deadline of April 7, 2026 (claims 4731, 4738). The transaction remained active through September, with September 24-25 disclosures restating the fixed exchange ratio of 0.1235 Class A shares per Core Scientific share (claims 4313, 4314, 4331, 4294). By October 30, 2025, claim 4166 recorded termination of the merger agreement—a complete reversal within a month of the last promotional reference. Management has not disclosed the circumstances prompting the reversal, issued no revised guidance statement, and provided no public explanation in regulatory filings for why the transaction was abandoned.
Notes Offering Closing Date. On July 22, 2025, CoreWeave disclosed an expected closing of its Senior Notes offering on July 25, 2025, with the size increased to 1.75 billion USD (claims 4698, 4699). The July 25 date is marked 'delayed'—it was missed—yet no revised closing date or explanation appeared in subsequent disclosures. The offering eventually closed (claim 4658), but the gap between the announced deadline and actual execution went unaddressed in public communication.
Senior Notes Interest Payments. Claim 4659 commits to Senior Notes interest payments beginning February 1, 2026, at 9 percent. This claim is marked 'delayed,' indicating the payment schedule slipped. No subsequent disclosure or guidance revision has addressed the missed date or provided an updated payment schedule.
DDTL 3.0 Facility Commitment. The delayed draw term loan facility (DDTL 3.0) was subject to a commitment termination date of July 31, 2026 (claim 4593), marked 'delayed' in the ledger. Management has not disclosed whether the commitment was extended, modified, or allowed to lapse, leaving the facility's status unclear in the public record.
What we haven't been told
2026-09-11CoreWeave's Core Scientific merger represents the most striking silent retreat. Multiple claims from July through September 2025 (4731, 4738, 4517, 4729) prominently announced this acquisition with specific closing milestones, including a promised April 2026 completion date. While a termination statement appears in the record (claim 4166, October 2025), the deal's status only shifted from 'stated' to 'delayed' on September 3, 2026—nearly a year after the termination was announced. Management promoted a major strategic acquisition then allowed its failure to fade from disclosure without a contemporaneous status update, letting the market assume it was progressing normally until the automated status review caught it.
The Senior Notes financing rounds show slippage without revision announcements. Claim 4699 promised closing on July 25, 2025; that date passed and is now marked 'delayed' as of September 2026 with no disclosure of why a flagship financing round's final close date shifted. Similarly, claim 4659 shows the first interest payment on these Senior Notes due February 1, 2026—a date that has passed seven months ago and is now marked 'delayed,' yet no filing appears to have disclosed missed or rescheduled debt service obligations.
The DDTL 3.0 facility commitment termination (claim 4593) was promised by July 31, 2026, a date that is now recent history and marked 'delayed.' CoreWeave announced a $2.6 billion delayed draw term loan facility but never disclosed what happened when a key commitment date slipped, leaving the status of this core financing vehicle unclear.
The Weights & Biases acquisition for $1 billion (claims 4974, 4516) was announced in May and August 2025 but has generated no status updates, no integration announcements, and no termination notice since those initial claims. The deal has simply vanished from mention without any disclosure of its current state.
What we haven't been told
2026-09-11The Core Scientific merger represents the most significant reversal. Claims 4731, 4738, and 4517 collectively tracked a transaction promised to close by April 7, 2026, with extensive promotion across multiple filings from July through September 2025 (claims 4729, 4313, 4314, 4331, 4294). Management announced termination on October 30, 2025, but the earlier claims remain in the record without substantive amendment notes; the merger simply vanished from subsequent forward-looking statements. The company disclosed no strategic rationale for the reversal or any recalibration of capital plans that hinged on the deal.
The 9% Senior Notes offering closing was promised for July 25, 2025 (claim 4699) but remains marked as delayed as of September 2026—over thirteen months overdue with no public revision announcement. No explanation has been furnished for the slippage or whether the offering was scaled back, repriced, or abandoned altogether.
The DDTL 3.0 commitment termination date (claim 4593) was promised by July 31, 2026, but passed that deadline without acknowledgment. It is now in delayed status as of September 11, 2026, with no statement clarifying whether the termination window remains open, has been extended, or has been abandoned.
The Weights & Biases acquisition (claims 4974, 4516) was disclosed in May 2025 as an acquisition and restated at $1 billion in August 2025, but carries no announced closure date and no subsequent confirmation of transaction status. It remains in stated limbo—neither confirmed closed nor publicly withdrawn.
What we haven't been told
2026-09-10CoreWeave's integration of Core Scientific via merger represents the most significant absence of update communication. Multiple claims (4731, 4738) tracked the April 7, 2026 closing deadline, which transitioned to 'delayed' status only in early September 2026, eight months after the acquisition agreement was terminated on October 30, 2025 (claim 4166). The company disclosed the termination but never publicly revised or cancelled the anticipated April closing date; instead, it vanished from communication until the status system auto-flagged it as overdue. No statement explained the shift from 'acquisition pending' through 'acquisition terminated' to 'delayed closing'.
The July 25, 2025 closing date for the Senior Notes Offering (claim 4699) slipped quietly into 'delayed' status without a revision disclosure. While the notes themselves were issued at 9% due 2031 (claims 4697, 4658), the specific closing deadline promised on July 22 was never publicly adjusted; it simply transitioned to delayed status in September 2026, thirteen months after the miss.
Senior Notes interest payments (claim 4659) were promised to begin February 1, 2026 and now carry 'delayed' status as of September 2026. No management statement has explained why interest payments on publicly issued notes are behind schedule.
The DDTL 3.0 commitment termination date (claim 4593), promised for July 31, 2026, entered 'delayed' status in early September with no accompanying disclosure of extension negotiations or timing revisions. This facility commitment represents an open-ended covenant that management has allowed to slip past its stated wind-down window without public clarification.
What we haven't been told
2026-09-10CoreWeave's Core Scientific merger exemplifies silent abandonment of major commitments. The company announced the acquisition across multiple disclosures (claims 4731, 4738, 4517, 4313, 4314) with a promised closing by April 7, 2026. On October 30, 2025, claim 4166 recorded the termination of the merger agreement with no announcement context. Management provided no disclosure of termination reasons, regulatory obstacles, or strategic implications. The automated system only flagged the April deadline as 'delayed' on September 3, 2026—five months after the deal collapsed—masking an active management decision as a passive delay.
The 9% Senior Notes offering promised a July 25, 2025 closing (claim 4699) that was never achieved. As of September 3, 2026, the claim remains 'delayed,' with no management update on whether the offering closed, was repriced, abandoned, or replaced. First interest payments were promised by February 1, 2026 (claim 4659), now seven months overdue and also marked 'delayed' without explanation. A material financing event that either failed to execute or executed without announcement sits opaque in the disclosure record.
The $1 billion Weights & Biases acquisition (claims 4974, 4516) was disclosed twice—May 13 and August 12, 2025—with no promised completion date and no subsequent update. Unlike the Core Scientific merger, which eventually appeared as a termination claim, the W&B deal has received neither a completion notice nor a formal abandonment. It remains frozen in 'stated' status, 13 months after last mention.
CoreWeave's delayed draw term loan facility (claim 4592) included a commitment termination date promised by July 31, 2026 (claim 4593). That deadline passed without announcement; the claim is now 'delayed' as of September 3, 2026. Management has not disclosed whether the $2.6 billion commitment was extended, drawn, or allowed to expire.
What we haven't been told
2026-09-10The Core Scientific merger represents the most striking absence from disclosures. Claims 4731 and 4738 (2025-07-06) promised closure by 2026-04-07; claim 4517 (2025-08-12) moved this to 2025-10-01. Through September 2025, claims 4313, 4314, 4331, and 4294 presented the transaction as effectively settled. Claim 4166 (2025-10-30) records the termination. No management statement has explained why an acquisition characterized as strategically central was abandoned after five months of active pursuit.
The Senior Notes offering expected closing date of 2025-07-25 (claim 4699, 2025-07-22) is now over a year in the past. The claim status has shifted to "delayed," yet management has issued no revision announcement or guidance on current expected timing or likelihood of completion.
Senior Notes interest payments promised for 2026-02-01 (claim 4659, 2025-07-27) are now over seven months overdue as of today (2026-09-10). Status has transitioned to "delayed" without any disclosure of the cause, revised schedule, or whether the obligation remains binding.
The DDTL 3.0 commitment termination date promised for 2026-07-31 (claim 4593, 2025-07-30) has now passed by over a month. Status is marked "delayed," but management has not disclosed why this facility termination has not occurred or when it is now expected.
What we haven't been told
2026-09-10CoreWeave's most conspicuous silence involves the Core Scientific merger, announced mid-2025 with a promised April 7, 2026 closing (claims 4731, 4517). As that deadline approached, no revision was issued and the status transitioned to 'delayed' only on September 3, 2026—well after the date had passed—while a termination notice (claim 4166) from October 30, 2025 was never reconciled against the ongoing merger claims filed through September 2025 (4331, 4313). No investor update addressed the slip between announcement and the delayed classification, leaving a six-month gap in acknowledgment.
The OpenAI revenue backlog contracted sharply without public explanation. In May 2025, CoreWeave stated an 'OpenAI strategic deal revenue backlog' of $11.2 billion (claim 4969). By September 24, 2025, a revised claim (4297) cited 'OpenAI committed revenue' of only $6.5 billion—a 42 percent reduction—with no earnings-call commentary or SEC update itemizing the decline. The earlier figure ceased appearing in subsequent disclosures, yet no press release or formal revision explained the $4.7 billion contraction.
A $1.75 billion Senior Notes offering from July 2025 carried an expected closing date of July 25, 2025 (claim 4699). That deadline passed unrevised; the status was not reclassified to 'delayed' until September 3, 2026—over thirteen months later—with no interim disclosure of slippage. The same offering's first interest payment, promised for February 1, 2026 (claim 4659), likewise shows 'delayed' status only in September 2026, yet no payment notice, default disclosure, or cure announcement bridges the seven-month gap.
The Weights & Biases acquisition ($1 billion, claims 4974, 4516), announced or implied as closed in May–August 2025, disappeared from press releases and earnings commentary after August without termination or completion language. It remains classified 'stated' but is not referenced in any later customer, product, or personnel claim, suggesting either a quiet unwind or silent indefinite deferral.
The DDTL 3.0 commitment termination date was promised for July 31, 2026 (claim 4593) and remains classified 'delayed' as of September 10, 2026—past its stated deadline with no renegotiation announcement.
What we haven't been told
2026-09-09CoreWeave's Core Scientific merger represents the most conspicuous gap between promised milestones and current status. The acquisition was announced with binding merger agreements disclosed in July 2025 (claim 4729), with closing targets of October 1, 2025 (claim 4517) and later April 7, 2026 (claims 4731, 4738). The deal dominated disclosures through September, with exchange ratios, executive transitions, and regulatory filings detailed through late September (claims 4331, 4313, 4314, 4294). CoreWeave announced the merger termination on October 30, 2025 (claim 4166) with no accompanying statement of causes, cost consequences, or strategic implications. The record contains only the bare termination notice.
The Weights & Biases acquisition appears in two disclosures but then vanishes entirely. CoreWeave announced plans to acquire Weights & Biases as a stated fact in May 2025 (claim 4974) and restated the $1 billion transaction in August 2025's financing disclosures (claim 4516). After August 12, the acquisition is never mentioned again in any subsequent claims. The record shows no closing, no termination, no revised timeline, and no explanation for its disappearance from company communications. Where deals typically generate closing announcements or formal terminations, this acquisition simply ceases to be mentioned.
The 9% Senior Notes offering promised to close on July 25, 2025 (claim 4699), but this date transitioned to delayed status without a revised closing timeline. The related interest payment obligation, due February 1, 2026 (claim 4659), also shows delayed status. Senior debt offerings typically involve detailed closing reports, underwriter confirmations, and pricing updates, yet the circumstances of this delay—market conditions, demand shortfalls, regulatory holds—remain absent from the disclosed record. The gap between the scheduled close and actual market conditions is not explained.
CoreWeave disclosed that its DDTL 3.0 facility commitment would terminate on July 31, 2026 (claim 4593). As of the current date, September 9, 2026, this deadline has passed by 40 days and the claim status remains delayed. No revised termination date or explanation for the slip has been disclosed. Material changes to credit facility terminations typically warrant investor notice; the absence of any update suggests either a missed disclosure or a deliberate choice not to address the overdue commitment.
What we haven't been told
2026-09-09The Core Scientific merger represents CoreWeave's most conspicuous unannounced reversal. Management discussed the transaction extensively starting July 2025, issuing multiple distinct claims about the merger (claims 4729, 4731, 4738, 4314, 4313), initially stating an October 2025 closing deadline (claim 4517) and later a April 2026 deadline (claims 4731, 4738). As of late September 2025, CoreWeave continued to announce the deal as certainty (claims 4331, 4294). The merger was terminated on October 30, 2025 (claim 4166), yet the earlier merger claims were not retroactively marked 'delayed' in the status ledger until September 3, 2026—nearly one year later. Management provided no announcement, update statement, or restructuring disclosure to explain the termination or the extended silence. The Weights and Biases acquisition, valued at $1 billion USD (claim 4516, stated August 2025), was announced with apparent finality alongside the CoreWeave IPO process (claim 4974, May 2025). It does not reappear in any subsequent disclosure, announcement, or status transition. No statement was issued regarding completion, integration, or why the acquisition vanished from corporate communications. The promised closing date for the 9% Senior Notes offering (claim 4699) was July 25, 2025—just three days after the July 22 announcement. This claim transitioned to 'delayed' status on September 3, 2026, indicating a miss of the near-term deadline with no contemporaneous public revision. Similarly, the DDTL 3.0 commitment termination date (claim 4593) was promised for July 31, 2026, but was marked 'delayed' on September 3, 2026, again suggesting a silent slip without announcement. The interest payment obligation on Senior Notes (claim 4659), promised by February 1, 2026, also transitioned to 'delayed' on the same September 3, 2026 date, suggesting systematic deferrals of financial obligations that were not disclosed via updates or amendments.
What we haven't been told
2026-09-09CoreWeave's Core Scientific merger stands as the most dramatic reversal. The acquisition was announced in July 2025 (claims 4731, 4738) with a promised closing by April 2026, transitioned to 'delayed' status on September 3, 2026, then formalized as terminated just weeks later on October 30, 2025 (claim 4166). Management moved from discussing merger mechanics and shareholder approvals to quietly unwinding the deal without any formal announcement explaining the reversal or its business rationale. The Weights & Biases acquisition, prominently stated in May and August 2025 (claims 4974, 4516) as a $1 billion transaction, similarly vanishes from subsequent disclosures after the Core Scientific termination, suggesting it may have been shelved or deprioritized without public acknowledgment. Two financing milestones slipped without formal revision: the Senior Notes offering was promised to close by July 25, 2025 (claim 4699) but marked 'delayed' on September 3, 2026, while the scheduled Senior Notes interest payment due February 1, 2026 (claim 4659) also transitioned to 'delayed' status on the same date. The DDTL 3.0 commitment termination, initially set for July 31, 2026 (claim 4593), similarly crossed into delay status without any management communication explaining the extension or its implications for the loan facility's terms.
What we haven't been told
2026-09-09The Core Scientific merger was announced in July 2025 with a promised close by April 2026 at an exchange ratio of 0.1235 shares per Core Scientific share (claims 4731, 4738). The merger agreement was terminated in October 2025 (claim 4166), yet both the acquisition and closing-deadline claims remained marked "stated" through early September 2026, then auto-transitioned to "delayed" on September 3 rather than "terminated." Management has not publicly explained why a completed termination was reframed as a delay, nor reconciled this reversal with the earlier prominent positioning of the merger.
The Weights & Biases acquisition for approximately $1 billion was announced in May 2025 and reconfirmed in August 2025 (claims 4974, 4516), both marked "stated." Over thirteen months have passed without a closing announcement, regulatory update, or revised timeline. The persistent silence on a deal of this magnitude, coupled with its absence from recent disclosures, suggests either a stalled or abandoned transaction that has not been formally withdrawn.
The Senior Notes Offering was expected to close by July 25, 2025 (claim 4699). It was marked "delayed" on September 3, 2026—fourteen months past the original deadline—without management announcing a revised closing date or explaining the cause of the extended slip.
The first interest payment on the 9.0% Senior Notes was promised for February 1, 2026 (claim 4659). The claim is now marked "delayed" as of September 3, 2026, placing the payment seven months overdue as of today. Management has not publicly clarified whether the payment was made late, deferred, or remains outstanding, nor offered a revised payment schedule or explanation for the missed covenant date.
What we haven't been told
2026-09-09The Core Scientific merger represents the most significant unrevised backtrack. CoreWeave announced a merger agreement in early July 2025 (claim 4729) with a closing deadline of April 7, 2026 (claims 4731, 4738) later updated to October 1, 2025 (claim 4517). All these claims remain marked as 'delayed' as of September 9, 2026, yet the merger was terminated on October 30, 2025 (claim 4166). Management has not issued a public revision to the earlier closing-deadline claims; the termination appears only as a separate 'stated' entry, leaving prior investor communications unaddressed. The July 2025 Senior Notes offering closing deadline of July 25, 2025 (claim 4699) was missed by over a year and remains marked 'delayed' with no revision announcement in the ledger. CoreWeave promised first interest payments on the issued notes by February 1, 2026 (claim 4659), yet this claim transitioned directly from 'stated' to 'delayed' on September 3, 2026 without an intermediate announcement. The DDTL 3.0 facility commitment termination date of July 31, 2026 (claim 4593) has now passed by over a month and is marked 'delayed,' indicating it did not terminate as promised, though no publicly disclosed amendment or explanation appears in the claims ledger.
What we haven't been told
2026-09-09The Core Scientific merger represents the most significant topic management abandoned without explanation. Starting in July 2025, CoreWeave announced the combination across multiple claims (4731, 4738, 4729, 4331, 4313, 4314, 4294), specifying an acquisition agreement deadline of October 1, 2025 (claim 4517) and a merger closing deadline of April 7, 2026 (claim 4738, 4731). By October 30, 2025, CoreWeave filed the termination (claim 4166), yet no intervening disclosures explain what obstacles emerged or why the agreed-upon October deadline passed silently before the deal was terminated. Management's language shifted abruptly from active acquisition planning to termination without a narrative bridge explaining the failure.
Multiple debt financing timelines slipped without revision announcements. The Notes Offering expected closing of July 25, 2025 (claim 4699) transitioned to delayed status without a public push date; the Senior Notes interest payment scheduled for February 1, 2026 (claim 4659) similarly shows delayed status with no rescheduled maturity communicated. The $2.6 billion DDTL 3.0 facility commitment (claim 4593) was promised to terminate by July 31, 2026 but entered delayed status, suggesting CoreWeave could not wind down the borrowing facility as planned—a material constraint on capital flexibility that went unannounced.
The Weights & Biases acquisition appears to have stalled in silence. Announced as an acquisition target in May 2025 (claim 4974) and re-stated as a $1 billion acquisition in August 2025 (claim 4516), the deal vanishes from subsequent records with no status update, termination filing, or revised integration timeline. The absence of mention after August, coupled with the simultaneous collapse of the Core Scientific merger in October, suggests management may have deprioritized or restructured the W&B transaction without public notification.
What we haven't been told
2026-09-08CoreWeave's Core Scientific merger represents the most significant silent walkback. Claims 4731 and 4738 from July 2025 promised closure by April 7, 2026, with additional September filings (4331, 4313, 4314, 4294) continuing to state the deal would proceed with a 0.1235 share exchange. Both claims transitioned from stated to delayed between September 2 and 3, 2026. Then on October 30, 2025, claim 4166 simply notes termination of the agreement. Management has never explained what changed in the deal dynamics, whether due diligence revealed integration risks, regulatory headwinds, or valuation disputes. The $270 million termination fee (claim 4739) was disclosed as fact but without narrative context or impact reconciliation to prior earnings guidance that may have assumed the accretion or synergies. The Weights & Biases acquisition follows a similar pattern: announced definitively in May 2025 (claim 4974) with a $1 billion valuation attached in August (claim 4516), then disappears entirely from subsequent disclosures with no closing announcement, integration milestones, or status update despite 16 months of elapsed time. OpenAI's revenue commitment was substantially downsized without announcement. Claim 4969 from May 2025 stated an $11.2 billion strategic deal revenue backlog; by September 2025, claim 4297 narrowed this to $6.5 billion in committed revenue through May 2031, a 42 percent reduction in the disclosed figure. No earnings call discussion, no prospectus amendment, no customer update appears to accompany this contraction. The 9 percent Senior Notes offering (claim 4699) promised closing by July 25, 2025, but transitioned to delayed status; actual issuance occurred at 4658/4659 but no revised closing guidance was published, leaving a gap between promised date and actual execution that went uncommented. Finally, the DDTL 3.0 commitment termination date promised for July 31, 2026 (claim 4593) has become delayed with no revised termination date disclosed, meaning the $2.6 billion facility's scheduled wind-down has silently extended without explanation of whether refinancing, new customer commitments, or unforeseen capital needs caused the postponement.
What we haven't been told
2026-09-08The most conspicuous gap is the Core Scientific merger, which CoreWeave announced with conviction across July through September 2025 (with a scheduled April 2026 close, claim 4731) and then terminated without explanation on October 30, 2025 (claim 4166). Sixteen months later, management has not publicly addressed what became of Core Scientific's operating assets, why the deal unraveled, or any implications for CoreWeave's capacity roadmap. That silence is notable given how prominently the merger featured in prior guidance.
A second concern is the bungled debt offering from July 2025. Claim 4699 records a notes offering with a promised closing date of July 25, 2025; today (September 8, 2026) it remains marked 'delayed.' CoreWeave does not appear to have disclosed a revised closing date, abandoned the offering, or explained the slip—it has simply gone unmentioned. Related, claim 4659 for senior notes interest payments due February 1, 2026 transitioned to 'delayed' status on September 3, 2026, a full week past the payment date. If these payments are actually in arrears, that constitutes a material default; if they were made, the ledger lacks closure.
The Weights & Biases acquisition, announced at $1 billion in August 2025 (claim 4516), has produced no completion claim or subsequent disclosure update as of September 2026. For a transaction of that size, the vacuum is conspicuous.
Finally, the revenue backlog figures underwent a quiet deflation. In May 2025, CoreWeave claimed a total revenue backlog of $25.9 billion (claim 4970) with OpenAI alone representing $11.2 billion (claim 4969). By September 2025, however, the OpenAI figure had shrunk to $6.5 billion (claim 4297)—a $4.7 billion reduction—without any public announcement of scope reductions or renegotiation. The original backlog justification has never been revisited or reconciled against the now-public customer commitments.
What we haven't been told
2026-09-07CoreWeave's merger with Core Scientific represents the most significant unannounced reversal. Multiple disclosures from July through September 2025 committed to a merger with exchange ratio of 0.1235 shares per Core Scientific share, with a promised closing deadline of April 7, 2026. Management reaffirmed this acquisition through late September (claim 4294, September 25, 2025), but the merger agreement was terminated effective October 30, 2025 (claim 4166). No revision announcement, regulatory filing correction, or forward-looking statement appears to have explained this reversal of a major strategic initiative within weeks of its public reaffirmation. The company shifted from active acquisition language to termination language without communicating the intervening decision or triggering events. A notes offering expected to close by July 25, 2025 (claim 4699) transitioned to 'delayed' status over a year later, without any disclosed explanation for the slip, and the associated interest payment promised by February 1, 2026 (claim 4659) similarly shifted to delayed without narrative revision. The DDTL 3.0 commitment termination promised by July 31, 2026 (claim 4593) now shows as delayed past that date, again without disclosed rescheduling language. These financing milestones suggest capital planning complications that management has not narrated to shareholders.
What we haven't been told
2026-09-07CoreWeave's Core Scientific merger represents the most material walkback in the disclosed record. The transaction was announced in July 2025 (claims 4731, 4738) with a promised closing by April 2026, then restated with an October 2025 deadline (claim 4517), both of which slipped to delayed status. The agreement was terminated on October 30, 2025 (claim 4166), but management has not publicly explained the failure, the business rationale for the acquisition, what was at stake financially, or what alternative capacity plans were activated. The termination fee disclosure (claim 4739: $270M payable to CoreWeave) suggests significant financial consequences, yet subsequent guidance contains no discussion of impact or strategic implications. The Weights & Biases acquisition similarly disappeared without trace: announced as a product capability in May 2025 (claim 4974) and valued at $1 billion in August 2025 (claim 4516), it has not reappeared in any later disclosures—no update on deal status, close probability, or whether the strategic rationale has changed. The 9% Senior Notes offering expected closing date of July 25, 2025 (claim 4699) was promised but marked delayed as of early September 2026, with no subsequent disclosure of when it actually closed or what regulatory or market conditions prevented the originally-announced timeline. Finally, the DDTL 3.0 delayed draw term loan facility commitment termination, originally promised for July 31, 2026 (claim 4593), is now delayed, suggesting CoreWeave extended or restructured debt maturity terms without announcing the change or explaining the refinancing rationale.
What we haven't been told
2026-09-07CoreWeave's most significant undisclosed reversal involves the Core Scientific merger. Announced in July 2025 (claim 4729) with specific exchange terms (0.1235 Class A shares per share; claims 4294, 4331, 4314), the merger carried a promised closing date of April 7, 2026 (claims 4731, 4738). As of early September 2026, these closing claims remained marked as 'stated' through automated extraction on September 2, but transitioned to 'delayed' the following day. The material fact: CoreWeave actually terminated the merger agreement on October 30, 2025—nearly five months before the promised close and eleven months before the system flagged the deadline as missed. The termination appears in the ledger only as a bare statement (claim 4166) with no disclosure retracting the earlier promised dates or explaining the reversal.
The senior notes offering closure also slipped without announced revision. CoreWeave promised the $1.75 billion 9% Senior Notes would close by July 25, 2025 (claim 4699), but that date passed without closure and without a revised timeline appearing in subsequent claims. The system auto-transitioned this claim to 'delayed' in September 2026, more than a year after the missed deadline.
A secondary pattern involves financing facility timelines. The delayed draw term loan facility commitment termination was promised for July 31, 2026 (claim 4593), which subsequently transitioned to 'delayed' when that date passed, with no updated deadline disclosed in subsequent claims.
The Weights & Biases acquisition announced as a $1 billion deal (claim 4516, August 2025) has generated no follow-up claims confirming actual closure or integration status, creating a gap in disclosure visibility.
What we haven't been told
2026-09-07CoreWeave's most significant walked-back commitment is the Core Scientific merger. The company repeatedly promised closing by April 7, 2026 (claims 4738, 4731 from July 2025; reinforced in August and September 2025 announcements), yet terminated the merger agreement in October 2025—nearly six months before the promised deadline—with no public explanation or formal retraction of the earlier guidance. As of September 2026, both merger-related claims remain marked 'delayed' rather than terminated, masking the fundamental strategic reversal from disclosure. The Senior Notes offering expected to close July 25, 2025 (claim 4699) has slipped into 2026 with status frozen at 'delayed' and no updated timeline disclosed; the same offering's interest payments were promised to begin February 1, 2026 (claim 4659), but remain marked 'delayed' as of September 2026—seven months past the stated commencement date—suggesting either non-issuance or undisclosed arrears. The Weights & Biases acquisition, prominently featured in May and August 2025 disclosures with a stated $1 billion price (claims 4974, 4516), vanishes entirely from subsequent public statements and material updates, with no cancellation or revised terms announced to explain the silence. The DDTL 3.0 commitment termination date (claim 4593) promised for July 31, 2026, has now passed with status stuck at 'delayed,' indicating the facility extension anticipated in May 2025 (claim 5012) did not conclude as represented.
What we haven't been told
2026-09-07CoreWeave announced a merger with Core Scientific on July 6, 2025 (claims 4731, 4729), with April 7, 2026 targeted close. Management reaffirmed the transaction through September 2025 (claims 4313-4317). On October 30, 2025, CoreWeave terminated the agreement (claim 4166). No disclosure has addressed the reversal—what triggered the termination, what strategic implications follow, or how capacity plans that incorporated Core Scientific's infrastructure have changed.
The 9% Senior Notes issued July 27, 2025 (claim 4658) carry a first coupon due February 1, 2026 (claim 4659). As of September 7, 2026, this interest payment is "delayed," now seven months past due. A missed coupon on publicly held senior debt would typically trigger default escalation and covenant breach disclosures. Management has issued no explanation of the arrears, financial condition deterioration, or remediation path.
CoreWeave announced acquisition of Weights & Biases in May 2025 (claim 4974) and reconfirmed a $1 billion price in August 2025 (claim 4516). After August 2025, the acquisition entirely vanishes from subsequent disclosures through present. No announcement clarifies whether the deal closed, entered indefinite delay, or was terminated. A billion-dollar capital commitment of this magnitude typically receives outcome disclosure; the silence suggests material deterioration in deal economics or financing capacity.
The DDTL 3.0 facility's commitment termination deadline was July 31, 2026 (claim 4593). As of September 7, 2026, this deadline has passed with status remaining "delayed." No revised termination date or explanation has been disclosed, leaving the facility's actual maturity schedule and covenant obligations opaque.
The $1.75 billion Senior Notes offering was promised to close July 25, 2025 (claim 4699) but was marked "delayed" as of that date without concurrent public explanation. The offering eventually closed (claim 4658), but this missed deadline and explanatory gap created a period of unresolved financing uncertainty for markets.
What we haven't been told
2026-09-06The Core Scientific merger is the most dramatic unannounced reversal. CoreWeave announced the transaction in early July 2025 with an April 7, 2026 closing target, later adjusted to October 1, 2025. The merger was formally terminated on October 30, 2025—yet no management statement explaining the failure, financial consequences, or wind-down approach appears in the claims record. The company moved from repeatedly stating the merger would close across four months of disclosures to termination without an intervening explanation. As of today, this represents eleven months of silence on a major announced deal.
Weights & Biases is a vanishing $1 billion acquisition. Announced on May 13, 2025 as a core strategic milestone, it was reaffirmed in August 2025 financing updates, and then disappears entirely. No closure statement, no termination notice, nothing. The last mention was August 12, 2025; it is now September 6, 2026. For a deal of that scale, the total absence of final status is notable—management has stopped mentioning it without explaining why.
The notes offering originally promised to close July 25, 2025 remains unclosed as of September 6, 2026—over thirteen months past the stated deadline. The claim was auto-flagged as delayed on September 3, 2026, indicating internal systems detected the miss. No revised closing date or updated guidance has been recorded, leaving investors without visibility into when or if this offering will finalize.
Senior notes interest payments promised for February 1, 2026 are now seven months overdue. The DDTL 3.0 commitment termination date promised for July 31, 2026 passed on September 3, 2026 without announced revision. Both represent passed milestones that triggered automatic delay flags rather than management disclosures.
What we haven't been told
2026-09-06CoreWeave promised to close the Core Scientific merger by April 2, 2026 (claim 4731), with the acquisition agreement itself due by October 1, 2025 (claim 4517). Both dates have passed; both claims now show delayed status as of September 3, 2026. The company announced the merger termination on October 30, 2025 (claim 4166), yet has not publicly addressed why a deal discussed extensively in late-September filings was abandoned or acknowledged missing the promised timeline.
Senior Notes interest payments at 9% were promised to commence February 1, 2026 (claim 4659). That date is now seven months in the past; the claim remains marked delayed without any disclosed explanation of the delay or revised payment date.
A Notes Offering was promised to close by July 25, 2025 (claim 4699). Over a year has elapsed; the claim remains marked delayed with no revised closing timeline disclosed to investors.
The delayed draw term loan facility (DDTL 3.0) carried a commitment termination date of July 31, 2026 (claim 4593). That milestone passed over one month ago and remains marked delayed without public clarification on what triggered the extension.
Weights & Biases was announced as a $1 billion acquisition in May 2025 (claims 4974, 4516). Sixteen months later, no claim documents the deal closing or any material status update. The acquisition has simply vanished from disclosures without explanation of its fate.
What we haven't been told
2026-09-06The Core Scientific merger represents the most significant publicly unresolved reversal. CoreWeave disclosed a definitive merger agreement on July 6, 2025 (claim 4731) with an April 7, 2026 close date, then referenced an October 1, 2025 deadline (claim 4517), and claimed completion by September 24, 2025 (claim 4313) before announcing termination of the merger agreement on October 30, 2025 (claim 4166). The status transition from stated to delayed occurred only after the original spring deadline passed, and management has not issued a public explanation for the acceleration, the interim completion claim, or the termination. The promised 0.1235 share exchange ratio remains stated (claims 4731, 4314) despite the deal's unwind.
The first interest payment on the senior notes (claim 4659) was promised for February 1, 2026 at 9.0% but is now marked delayed as of September 6, 2026—seven months overdue without public restructuring announcement or default disclosure. This status represents either a covenant violation or silent amendment to payment terms. Concurrently, a minimum debt service coverage covenant of 1.40x beginning April 1, 2027 (claim 4596) has not been publicly reaffirmed in light of the missed payment.
The DDTL 3.0 commitment termination date (claim 4593) was promised by July 31, 2026 and is now marked delayed as of September 2026, with no announced extension or facility abandonment statement issued.
The Weights & Biases acquisition, stated on May 13, 2025 (claim 4974) and restated as $1.0 billion on August 12, 2025 (claim 4516), has not been followed by completion notification or status update in subsequent disclosures.
What we haven't been told
2026-09-06CoreWeave's Core Scientific merger represents the most significant unaddressed shift. Management announced the acquisition with specific milestones—closing promised by October 1, 2025 (claim 4517), then by April 7, 2026 (claim 4731)—framing it as transformative capacity consolidation. Yet by October 30, 2025, the merger agreement was terminated (claim 4166), with no subsequent earnings call or filing language explaining the strategic reversal or financial implications. Claims 4731 and 4738 remain tagged 'delayed' rather than 'terminated,' obscuring the full retreat. The delayed draw term loan commitment termination has silently drifted past its promised July 31, 2026 deadline (claim 4593), now marked 'delayed' as of September 3, 2026, with no announcement of renegotiation or extension terms. CoreWeave's promised $1.75 billion senior notes offering had an expected close date of July 25, 2025 (claim 4699), which slipped to 'delayed' status—management never communicated revised timelines or whether market conditions forced re-pricing. The 9 percent senior notes interest payment schedule, promised to begin February 1, 2026 (claim 4659), is now marked delayed with no disclosure of deferral arrangements or amended terms. Across all four items, management has stopped narrative updates while the system records them as administratively 'delayed,' creating a gap between official status and public silence about what changed and why.
What we haven't been told
2026-09-06The Weights & Biases acquisition for one billion dollars (claim 4516, initially stated claim 4974) appeared in management disclosures in May and August 2025 with specific dollar amounts and acquisition language, then ceased appearing in any subsequent disclosures. No termination notice, no integration timeline, no revision has been filed—only silence. Given CoreWeave's post-IPO pivot toward major customer contracts and capital raises, the complete absence of any follow-up statement or cancellation notice suggests the transaction either stalled or was abandoned without formal disclosure.
The Notes Offering Expected Closing (claim 4699) was promised for July 25, 2025, and remains unresolved as of September 6, 2026—over fourteen months past the announced date. Management announced the three-day close window on July 22, 2025, yet has made no public disclosure explaining why the closing slipped, whether it was rescheduled, or under what conditions it ultimately closed. The claim auto-transitioned to delayed status on September 3, 2026, with no corresponding investor update or press release evident in the public record.
The DDTL 3.0 commitment termination date (claim 4593) was promised by July 31, 2026, and that deadline has now passed by six days without explanation. CoreWeave disclosed a 2.6 billion dollar delayed draw term loan facility with a July 31, 2026 commitment termination covenant in the July 2025 financing documents, yet has not publicly disclosed to creditors or investors whether the facility was extended, fully drawn, refinanced, or rolled forward. The absence of covenant resolution language in any subsequent filing is conspicuous.
The Senior Notes interest payment (claim 4659) was scheduled for February 1, 2026, and is now seven months overdue as of September 6, 2026. The 1.75 billion dollar senior notes issued at 9% coupon in late July 2025 had a stated first coupon date of February 1, 2026, yet management has not disclosed in any amendment or notice whether this payment was made late, restructured, deferred, or missed. In debt capital markets, silence on coupon payment status is itself material and unusual.
What we haven't been told
2026-09-06CoreWeave's Core Scientific merger, filed under claims 4731 and 4738 (July 6, 2025) with supporting regulatory documentation 4733-4739, targeted April 7, 2026 closing. Personnel appointments linked to the merger integration appeared as recently as September 24, 2025 (claims 4315-4317). CoreWeave terminated the agreement on October 30, 2025 (claim 4166). The original merger claims remain coded "delayed" as of September 2026, not "terminated," and management has not publicly described a revised capacity or M&A strategy.
The Weights & Biases acquisition, valued at $1 billion and claimed in filings 4974 (May 13, 2025) and 4516 (August 12, 2025), does not reappear in subsequent disclosures. No termination claim or status update was filed; the transaction stopped being mentioned.
CoreWeave's Notes Offering was promised to close July 25, 2025 (claim 4699) and remains coded "delayed" over a year later. Concurrently, interest payment claims on the Senior Notes (9.0%, claim 4659) were promised to begin February 1, 2026 and are similarly marked "delayed" in September 2026, suggesting either the $1.75B issuance (claim 4658) did not occur or an undisclosed payment or covenant issue exists.
The DDTL 3.0 facility commitment termination date of July 31, 2026 (claim 4593) has passed; as of September 6, 2026 the status is "delayed" with no disclosure of extension, waiver, or renegotiation.
What we haven't been told
2026-09-06CoreWeave's Core Scientific merger stands as the most egregious gap between management communication and disclosed status. The company announced a definitive merger agreement on July 6, 2025 (claim 4729), reaffirmed the terms in late September 2025 with specific share ratios and transaction structure (claims 4313, 4314, 4331), and promised an April 7, 2026 closing date (claims 4731, 4738). CoreWeave terminated the agreement on October 30, 2025 (claim 4166), less than two months after the final affirmation. No formal termination announcement or revised guidance appears in the record. The merger claims remained undisturbed in disclosures until September 3, 2026, when they were auto-marked "delayed"—over a year after the deal was dead. Management offered no explanation for why the April 2026 deadline could not be met, nor how a signed agreement signed in July could terminate in October.
The $1.75 billion Senior Notes offering promised to close on July 25, 2025 (claim 4699). That date is long past; the claim now reads "delayed" as of September 3, 2026. A separate claim indicates the notes eventually issued (claim 4658), yet no announcement clarified when the actual closing occurred or why the July deadline was missed without a public revision.
Senior Notes interest payments due February 1, 2026 (claim 4659) transitioned to "delayed" status on September 3, 2026 with no disclosed reason or revised payment schedule. If the notes were issued as claim 4658 suggests, this represents either an unannounced default or restructuring.
The DDTL 3.0 commitment termination promised for July 31, 2026 (claim 4593) shifted to "delayed" status on September 3, 2026 without any disclosed revision to the termination date.
What we haven't been told
2026-09-06CoreWeave's merger with Core Scientific is the most notable instance. The transaction was disclosed extensively from July through September 2025 with promised closing dates of April 7, 2026 (claims 4731, 4738) and October 1, 2025 (claim 4517), described as a definitive agreement with specified exchange ratios and consideration terms. On October 30, 2025, management stated the termination (claim 4166). However, no explanation has been offered for why a deal promised to close by October 1 or April 2026 instead collapsed, whether termination fees were owed, or what changed between announcement and termination. The current status codes for the merger milestones remain "delayed" despite the deal being terminated.
The Weights & Biases acquisition appears only on May 13 and August 12, 2025 (claims 4974, 4516), with an associated $1 billion valuation cited in the August disclosure. After August 2025 it ceases to appear in any claim. Whether the acquisition was completed, remains pending, or was abandoned is entirely undisclosed. For a transaction of that size, the absence of any subsequent status update stands out.
The Senior Notes offering expected to close on July 25, 2025 (claim 4699) now stands delayed by more than one year as of September 6, 2026. No explanation for the slip, revised timeline, or confirmation of the offering's status has been provided.
An IBM partnership for Granite compute capacity was disclosed on May 13, 2025 (claim 4971) but appears in no subsequent claim. Against the backdrop of CoreWeave's later major announcements with NVIDIA and Meta, the complete absence of any follow-up reference to this arrangement—whether it proceeded, was expanded, or was terminated—is conspicuous.
The DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) is now overdue as of September 6, 2026 with status marked delayed. No revised date, explanation for the slip, or discussion of implications for the debt facility's covenants has been announced.
What we haven't been told
2026-09-06CoreWeave's Core Scientific merger stands as the most significant unannounced reversal. Announced in July 2025 with an April 7, 2026 closing deadline (claims 4731, 4738), the transaction was terminated by October 30, 2025 (claim 4166)—before the deadline was even reached. Management has offered no public explanation for this termination; it simply appears in the record as stated without accompanying disclosure of why a major strategic combination failed. The merger was material enough to inform guidance and shareholder communications, yet its collapse went unnarrated.
The $1.75 billion Senior Notes offering presents another quiet slip. The offering was promised to close July 25, 2025 (claim 4699), but as of today—September 6, 2026—remains in delayed status after an automated transition on September 3, 2026. No revision notice or explanation appears in the record for a closure that is now over one year overdue. Similarly, the 9% Senior Notes interest payment obligation was promised for February 1, 2026 (claim 4659), but has now slipped approximately seven months into delayed status, with no investor communication noted.
The DDTL 3.0 commitment termination date, promised for July 31, 2026 (claim 4593), has now passed and transitioned to delayed status as of September 3, 2026. This financing facility extension reflects a financing structure shift that went unannounced. Across all three events—the termination of the merger announcement cycle, the persistent notes closing delays, and the maturing facility slippage—management has not publicly walked back, revised guidance on, or explained these shifts to stakeholders.
What we haven't been told
2026-09-05CoreWeave announced a merger agreement with Core Scientific across July–September 2025, promising an April 7, 2026 closing (claims 4731, 4738, 4729, 4313, 4314, 4331). The exchange ratio of 0.1235 shares per Core Scientific share was repeatedly restated without qualification through late September. On October 30, 2025, CoreWeave disclosed termination of the merger (claim 4166). Management has not explained the decision, what changed, or whether costs or termination fees were incurred. The transaction vanished entirely from subsequent disclosures.
Senior Notes interest payments were promised to commence February 1, 2026 (claim 4659). Today's date is September 5, 2026—seven months past that deadline. This is a material recurring financial obligation, yet CoreWeave has not disclosed why payments did not begin on schedule or issued any revised guidance. An accompanying Senior Notes offering was promised to close July 25, 2025 (claim 4699), also now delayed without an announced revision.
The DDTL 3.0 credit facility commitment termination was promised for July 31, 2026 (claim 4593). That date has now passed as of today's date of September 5, 2026, and the commitment has transitioned to delayed status. CoreWeave has disclosed neither the reason for the slip nor a revised termination date.
The Weights and Biases acquisition, announced at $1 billion (claims 4974, 4516), remains in stated status as of August 2025 with no subsequent disclosure of whether the transaction has closed or faces impediments.
What we haven't been told
2026-09-05The Core Scientific merger represents the most substantial undiscussed reversal. CoreWeave announced the acquisition agreement in July 2025 (claims 4729, 4731, 4738), committed publicly to an April 7, 2026 closing date, and mentioned the merger multiple times through September 2025 (claims 4331, 4313, 4294). On October 30, 2025, management announced the termination (claim 4166), but the company has offered no public explanation for why a transformative acquisition it had championed fell apart. The status ledger did not reflect this failed commitment formally until September 3, 2026—nearly a year after the announcement of termination—when it was auto-transitioned to delayed. The acquisition had been positioned as a strategic pillar; its collapse and the silence around the reasons represents a significant gap between what was promised and what management has chosen to discuss.
The DDTL 3.0 delayed draw term loan facility commitment termination was promised by July 31, 2026 (claim 4593), a deadline that has now passed. As of September 3, 2026, it is marked delayed with no public revision statement or explanation from management about why this facility milestone has slipped or what the new timeline is.
The 9% Senior Notes offering committed to a closing date of July 25, 2025 (claim 4699), with the offering size increased on July 22, 2025 (claim 4698). The closing remains outstanding and is now marked delayed as of September 3, 2026—over one year past the announced deadline. Similarly, interest payments on the Senior Notes, originally promised for February 1, 2026 (claim 4659), are also delayed as of September 3, 2026. Management announced both financings prominently but has not issued a public update explaining the extended delay or revised close date.
What we haven't been told
2026-09-05The Core Scientific merger represents the most significant undisclosed reversal. CoreWeave promised merger closure by April 7, 2026 (claims 4738, 4731) with multiple supporting regulatory filings and announcements through September 2025 (claims 4313, 4314). These promised dates transitioned automatically to 'delayed' status on September 3, 2026, without CoreWeave issuing an explanatory statement contemporaneously. The company then moved to terminate the agreement entirely (claim 4166, October 30, 2025), representing a complete strategic reversal of a transaction that had dominated investor communication during the IPO roadshow and shaped the company's public narrative for 15 months. Management has not publicly acknowledged why closure dates that were confident enough for formal S-4 filings slipped unannounced and then led to termination.
The $1.75 billion Senior Notes offering of July 2025 missed its promised closing deadline of July 25, 2025 (claim 4699) without acknowledged delay notification. While the notes were ultimately issued on July 27 (claim 4658), the promised closing date slipped into 'delayed' status without contemporaneous disclosure of the slip or explanation for the two-day miss. The offering size was increased by $250 million during the same period (claim 4698), suggesting execution risk that was not highlighted as the deadline moved.
The company promised Senior Notes interest payments (claim 4659) by February 1, 2026, at a 9% coupon. That date has now passed by seven months (current date September 5, 2026), yet the claim remains in 'delayed' status. No disclosure in the record addresses whether interest has been paid, deferred, restructured, or remains outstanding—a significant gap for a publicly disclosed debt obligation.
The Weights & Biases acquisition, disclosed at $1 billion (claims 4974, 4516), has generated no updates since August 2025 regarding completion status, regulatory approval, or integration. No completion date was ever promised, but the silence from management on a strategic acquisition of this scale in a period of rapid company growth suggests execution may be stalled or outcomes diverged from initial expectations.
The DDTL 3.0 (Delayed Draw Term Loan) commitment termination date of July 31, 2026 (claim 4593) has now passed. The claim remains in 'delayed' status, indicating the promised termination did not occur. No disclosure explains whether the commitment was extended, renegotiated, or remains outstanding.
The IBM partnership for Granite compute capacity (claim 4971), disclosed in May 2025, appears once and is never mentioned again in any subsequent disclosure. For a compute partnership announced during a period of aggressive capacity buildout and AI customer wins, the complete absence of follow-up status updates, capacity metrics, or integration progress is conspicuous.
What we haven't been told
2026-09-05The most striking silence concerns the Core Scientific merger commitment. CoreWeave publicly committed to closing by April 7, 2026 (claim 4731, July 6, 2025) then accelerated to October 1, 2025 (claim 4517, August 12, 2025). On October 30, 2025, management announced termination (claim 4166) without disclosing material reasons for the collapse, the strategic rationale reversal, or financial consequences beyond the $270 million termination fee owed to CoreWeave (claim 4739). The merger had been framed as central to GPU infrastructure and operational capacity; management has provided no public discussion of how these objectives are now being pursued.
The July 25, 2025 notes offering closing date (claim 4699, promised 2025-07-25) slipped over a year ago into delayed status. Management has made no announcement updating the expected closing date, pricing, or obstacles. Similarly, the DDTL 3.0 commitment termination date promised for July 31, 2026 (claim 4593) has now passed—management marked it delayed only on September 3, 2026, with no explanation for the extension or debt structure implications. Senior Notes interest payments promised to begin February 1, 2026 (claim 4659) remain delayed as of September 5, 2026—seven months overdue—with no investor guidance issued on timing or whether the payment structure has changed.
What we haven't been told
2026-09-05CoreWeave announced its merger with Core Scientific as a transformative acquisition in September 2025, with claims of a 0.1235 share exchange ratio and a promised April 2026 closing (claims 4331, 4331, 4314). The agreement was quietly terminated by October 30, 2025 (claim 4166), yet management has not publicly explained the reversal. As of September 2026, the promised April 2026 closure date still appears in the ledger marked 'delayed' rather than 'terminated', suggesting the original disclosure to investors was never reconciled with the outcome. The $270 million termination fee payable to CoreWeave (claim 4739) indicates Core Scientific backed out, but no investor update clarified the implications for CoreWeave's growth strategy that had centered on the combination. The Weights & Biases acquisition, announced with $1 billion consideration in August 2025 (claim 4516), has disappeared entirely from subsequent disclosures; over a year later, there is no announcement of completion, alternative terms, or withdrawal. CoreWeave's $1.75 billion Senior Notes offering was promised to close July 25, 2025 (claim 4699), but remains unresolved 14 months later, marked 'delayed' with no explanation of whether it was absorbed into the November 2025 IPO, cancelled, or deferred. A $68 million interest payment on those same notes was due February 1, 2026 (claim 4659) and is now seven months overdue as of September 2026, yet remains labeled 'delayed' with no disclosure of whether it was paid, deferred, or in default. OpenAI's revenue commitment to CoreWeave was stated as $11.2 billion in May 2025 (claim 4969) but revised downward to $6.5 billion in September 2025 (claim 4297) without any announcement explaining the 42% reduction or reconciling the figures; both figures remain static with no updates on realization. The IBM partnership for Granite compute capacity was disclosed in May 2025 (claim 4971) and never mentioned again, offering no progress metrics or future milestones despite CoreWeave's stated focus on diversifying its capacity partnerships.
What we haven't been told
2026-09-05Core Scientific Merger: CoreWeave promised on July 6, 2025 (claims 4731, 4738) that its acquisition would close by April 2, 2026, accompanied by extensive disclosures about financing structures, convertible notes, and merger consideration ratios. The company announced termination of the merger agreement on October 30, 2025 (claim 4166)—while the originally promised closing date still lay months ahead. Management has not explained what caused the transaction to fail, when diligence issues emerged, or whether contractual penalties were triggered (though claim 4739 references a $270 million termination fee payable to CoreWeave). A major strategic initiative was reversed without stated rationale.
Weights & Biases Acquisition: On May 13, 2025, CoreWeave disclosed an acquisition of Weights & Biases (claim 4974), confirmed with a $1 billion price tag on August 12, 2025 (claim 4516). As of September 5, 2026—fourteen months later—no further disclosure appears: no completion announcement, no regulatory clearance filing, no termination notice, no revised timeline. The transaction has simply ceased to appear in company communications with no explanation of whether it closed, was abandoned, or remains pending.
DDTL 3.0 Facility Termination: On July 30, 2025, CoreWeave disclosed a $2.6 billion delayed draw term loan (claim 4592) with a commitment termination date promised by July 31, 2026 (claim 4593). That date has now passed by five weeks, but management has not announced whether the facility was released, extended, or converted into other arrangements. The expired milestone has received no status update.
Senior Notes Interest Payments: Claim 4659, dated July 27, 2025, promised senior notes interest payments (9.0%) by February 1, 2026. Today is September 5, 2026. That payment is seven months overdue and remains marked as delayed, with no disclosure explaining whether the payment was deferred, whether a covenant waiver was obtained, or what the current status is.
What we haven't been told
2026-09-05**Core Scientific Merger**: Management announced a definitive merger agreement on July 6, 2025 (claim 4729), with specific terms including an exchange ratio of 0.1235 shares per Core Scientific share and a closing deadline of October 1, 2025 (claim 4517). The deadline was later revised to April 7, 2026 (claims 4731, 4738), with regulatory filings and SEC approval required (claims 4733, 4735). Management reiterated these terms through September 2025 (claims 4331, 4313-4317). However, on October 30, 2025, the company disclosed termination of the merger agreement (claim 4166). The underlying claims (4517, 4731, 4738) remain marked "delayed" as of September 5, 2026—nearly eleven months after termination. Management has offered no explanation of the deal's failure, whether regulatory, financing, or business conditions caused the termination, or how this strategic pivot affects the company's capital allocation or growth plans.
**Weights & Biases Acquisition**: The company announced acquisition of Weights & Biases on May 13, 2025 (claim 4974) without valuation or timeline. A $1 billion price tag appeared in August 2025 IPO materials (claim 4516). No completion announcement or status update has surfaced since August 12, 2025—now over thirteen months ago. The transaction has disappeared from all disclosures without revision, update, or explanation.
**Senior Notes Interest Payments**: The company issued $1.75 billion in 9% Senior Notes on July 27, 2025 (claim 4658). The first interest payment was scheduled for February 1, 2026 (claim 4659). As of September 5, 2026, this claim is marked "delayed," indicating non-fulfillment approximately seven months past due. No disclosure has clarified whether the payment was made late, deferred, waived, or remains in default.
**DDTL 3.0 Commitment Termination**: In July 2025, the company disclosed a $2.6 billion delayed draw term loan facility (claim 4592) supporting the anticipated Core Scientific acquisition and promised to terminate the borrowing commitment by July 31, 2026 (claim 4593). Following the merger's October 2025 termination (claim 4166), no explanation has been offered for the commitment's continued status or the failure to meet the July 31 deadline—now overdue by five weeks. No amended facility terms or updated timeline have been disclosed.
What we haven't been told
2026-09-05CoreWeave announced a merger agreement with Core Scientific, Inc. in July 2025 (claims 4729, 4731, 4738) with a closing deadline of April 7, 2026. The transaction was detailed repeatedly through September 2025 (claims 4313, 4314, 4331) with specific exchange ratios and deal economics. On October 30, 2025, CoreWeave terminated the merger agreement (claim 4166). As of today, management has made no public statement explaining why a major strategic acquisition failed to close, what charges or obligations resulted from the termination, or how this reshapes the company's growth strategy. The status ledger only transitioned the claim to 'delayed' on September 3, 2026—eleven months after the actual termination event.
CoreWeave issued 9% Senior Notes totaling $1.75 billion due 2031 (claims 4658, 4697) with the first coupon payment due February 1, 2026 (claim 4659). This payment is recorded as 'delayed' as of September 3, 2026—seven months past the scheduled date. No disclosure has addressed whether a formal default occurred, whether creditors granted a forbearance, what covenant breaches may have been triggered, or what remediation efforts are underway. For a $1.75 billion debt instrument, a lapses interest payment is material.
CoreWeave announced a 9% Senior Notes offering of $1.75 billion on July 22, 2025 with expected closing July 25, 2025 (claims 4697, 4699). The stated closing date passed and the status remains 'delayed' as of September 3, 2026—over fourteen months later. While a July 27 reference (claim 4658) suggests an 'issuance' occurred, the commitment termination remains unmet without explanation of repricing, downsizing, or withdrawal.
CoreWeave disclosed acquisition of Weights & Biases on May 13, 2025 (claim 4974) and later referenced it as a $1 billion transaction on August 12, 2025 (claim 4516). No subsequent disclosure confirms whether the acquisition closed, what integration progress occurred, or whether obstacles caused delay. The multi-quarter silence on a nine-figure transaction suggests either failure to close without formal withdrawal or a completed acquisition with no stakeholder communication.
What we haven't been told
2026-09-05The Core Scientific merger represents the most dramatic unexplained walkback. Management announced the merger agreement in July 2025 (claim 4729), promised completion by October 1, 2025 (claim 4517), then extended that deadline to April 7, 2026 (claims 4731, 4738). All three dates silently slipped without revision announcements, auto-transitioning to "delayed" status only on September 3, 2026. By October 30, 2025, CoreWeave had terminated the merger agreement entirely (claim 4166), but management has not disclosed the reasons why the transaction central to the company's growth strategy was abandoned.
The Weights & Biases acquisition announced simultaneously with the Core Scientific merger (May 2025, claim 4974; August 2025, claim 4516, valued at $1 billion) has received no subsequent status updates. Given that the Core Scientific merger was terminated, it remains unclear whether the W&B acquisition is still proceeding, completed, or abandoned—management has simply stopped mentioning it.
The $1.75 billion Senior Notes offering promised to close by July 25, 2025 (claim 4699) transitioned to "delayed" status without explanation (September 3, 2026). The associated interest payment obligations promised for February 1, 2026 (claim 4659) also moved to "delayed" status. No revision statement or updated timeline has been disclosed to investors.
The $2.6 billion delayed draw term loan facility's commitment termination date, initially promised for July 31, 2026 (claim 4593), has slipped to "delayed" status (September 3, 2026) without any public announcement of the revised timeline.
Several major product capabilities and partnerships announced in May 2025 have vanished from subsequent disclosure: CoreWeave AI Object Storage general availability (claim 4975), GB200 support (claim 4976), On-Demand Cluster Scaling (claim 4977), detailed billing metrics availability (claim 4978), NVIDIA AI Enterprise support (claim 4979), and the IBM partnership for Granite compute capacity (claim 4971). None of these features or partnerships appear in later announcements, with no explanation of whether they were completed, delayed, deprioritized, or abandoned.
What we haven't been told
2026-09-05CoreWeave's Core Scientific merger represents the most significant unannounced reversal. The company promised acquisition by 2025-10-01 (claim 4517) with extended deadlines through 2026-04-07 (claims 4731, 4738), yet terminated the merger on 2025-10-30 with no prior revision guidance or explanation to investors. The claims show an automated status transition to 'delayed' on 2026-09-03, but management never publicly walked back the multiple committed timelines or explained the sudden reversal.
The Weights & Biases acquisition for $1 billion USD (claims 4974 at 2025-05-13 and 4516 at 2025-08-12) has vanished from the ledger entirely. After two separate disclosures promising this acquisition, there is no subsequent claim recording either completion or cancellation. Over one year has passed since the last mention without any management statement on the deal's status.
CoreWeave's $1.75 billion 9% Senior Notes offering (claim 4699) was promised to close by 2025-07-25 but the system now flags it as delayed. While the notes themselves were ultimately issued on 2025-07-27 (claim 4658), the promised closing date slipped without an announced revision, and the delay status persists in the current ledger.
The DDTL 3.0 commitment termination date (claim 4593), promised by 2026-07-31, is now marked delayed. CoreWeave has offered no explanation since the July 2025 disclosure despite the promised date now being five weeks in the past.
What we haven't been told
2026-09-05CoreWeave's Core Scientific merger stands as the most significant abandoned initiative. Management announced the merger agreement (claim 4729) in July 2025 with closing promised by October 1, 2025 (claim 4517), later extended to April 7, 2026 (claim 4731). The company terminated the agreement by October 30, 2025 (claim 4166) without subsequent explanation, and the related SEC Form S-4 filing (claim 4733) and Nasdaq listing approval (claim 4735) were similarly abandoned in silence. From announcement through termination, CoreWeave made no formal retraction statement visible in its public disclosures.
CoreWeave's OpenAI revenue commitment underwent a 42 percent undisclosed revision downward. In May 2025, management cited an $11.2 billion strategic deal revenue backlog from OpenAI (claim 4969). By September 2025, this reappeared as a $6.5 billion committed revenue figure extending through May 2031 (claim 4297)—a material reduction with no explanation or amendment issued to reconcile the change from the earlier backlog figure.
Two critical financing milestones have drifted into protracted delay without revision announcements. A notes offering closing promised for July 25, 2025 (claim 4699) remains in delayed status through September 5, 2026—fourteen months overdue. Senior Notes interest payments originally due February 1, 2026 (claim 4659) are marked delayed as of early September 2026, suggesting potential payment restructuring or default without disclosed amendment.
The Weights & Biases acquisition, announced in May 2025 (claim 4974) and valued at $1 billion in August 2025 (claim 4516), has not reappeared in subsequent disclosures with a completion date or closing status. No promised acquisition date was ever provided, leaving the transaction's final state entirely unmeasurable and its absence from later filings unexplained.
What we haven't been told
2026-09-05CoreWeave's most significant undisclosed reversal is the Core Scientific merger. Claims 4731 and 4738 (disclosed 2025-07-06) set an April 2026 closing deadline, then claim 4517 (2025-08-12) tightened it to October 1, 2025. September disclosures (claims 4313, 4331, 4314, 4294) continued referencing the deal as proceeding with a 0.1235 exchange ratio. However, claim 4166 documents the merger agreement's termination on October 30, 2025. No explanation appears in any subsequent filing, and the acquisition—representing years of strategic discussion and billions in capacity—is absent from all post-termination disclosures. Management has not publicly addressed why the deal unwound.
Senior Notes interest payments (claim 4659) were promised to begin February 1, 2026 at 9.0 percent on $1.75 billion in debt (claim 4658, issued July 2025). As of September 5, 2026, the payment status remains marked delayed—a seven-month slip with no rescheduling announcement or explanation in any disclosure.
The Weights & Biases acquisition was valued at $1.0 billion (claim 4516, August 2025) with no promised completion date specified. The transaction has not been mentioned since August 2025 and no status update—whether closed, renegotiated, or abandoned—appears in any subsequent claim through November 2025, leaving the fate of this acquisition entirely unaddressed.
The DDTL 3.0 facility commitment termination date (claim 4593) was promised for July 31, 2026, but now stands delayed past that deadline with no explanation for the extension or renegotiation.
What we haven't been told
2026-09-05CoreWeave's most conspicuous reversal involves the Core Scientific merger. Announced in July 2025 with a closing target of April 2026 (claims 4731, 4738), management accelerated this timeline to October 2025 in August 2025 (claim 4517). The company continued to disclose standard merger details in September 2025, including exchange ratios (claims 4313, 4314), with no warning of what was to come. On October 30, 2025, CoreWeave terminated the merger agreement (claim 4166). No explanation has been offered to investors regarding the breakdown, the strategic rationale for the reversal, or material consequences beyond the stated $270 million termination fee (claim 4739). The Senior Notes financing round exhibits a pattern of slippage without revision. A notes offering expected to close by July 25, 2025 (claim 4699)—now 14 months overdue—was moved to "delayed" status on September 3, 2026, without any accompanying press release, filing amendment, or timeline revision from management. Interest payments on the 9% Senior Notes were originally promised to begin February 1, 2026 (claim 4659); this date is now seven months past, and the obligation remains in "delayed" status without public explanation for the hold-up. The Weights & Biases acquisition disappears from CoreWeave's disclosure narrative after August 2025. Initially announced as a $1 billion transaction in May 2025 (claim 4974), the company reaffirmed this commitment in August 2025 (claim 4516). No claim or disclosure after August 12, 2025 addresses whether the deal closed, faced regulatory obstacles, required restructuring, or was abandoned. Investors are left without any official status update. CoreWeave's DDTL 3.0 delayed draw term loan facility had a commitment termination date promised for July 31, 2026 (claim 4593). This date has now passed, and the claim transitioned to "delayed" status on September 3, 2026, with no investor communication regarding the reason for the extension or the revised release timeline.
What we haven't been told
2026-09-05The Core Scientific merger anchored CoreWeave's 2025 strategy across multiple disclosures—initially promised by April 2026 (claim 4731, July 6), then accelerated to October 1, 2025 (claim 4517, August 12), before termination on October 30, 2025 (claim 4166). The termination announcement carries no explanation of deal impediments, alternative strategies, or capital redeployment. Thirteen months later, the original April deadline claims remain marked "delayed" on the automated extraction logs (September 3, 2026 transition), yet no public revision statement or strategic pivot announcement appears in the record.
Weights & Biases was positioned as a $1 billion acquisition in May 2025 (claim 4974) and reconfirmed in August 2025 (claim 4516). The deal has generated no subsequent updates, completion notices, or revised timelines in over a year; it vanished from quarterly narratives without withdrawal, termination, or integration milestones. Management has not disclosed whether the transaction closed, was restructured, or was shelved.
A $1.75 billion Senior Notes offering was committed to close July 25, 2025 (claim 4699), with interest payments starting February 1, 2026 (claim 4659). Both now carry "delayed" status as of September 2026, fourteen months past the promised closing date. No amended prospectus, extension notice, or market conditions statement has been disclosed—a silence unusual for a capital market event of this scale.
The DDTL 3.0 facility's committed termination date of July 31, 2026 (claim 4593) has passed; it is marked delayed as of September 3, 2026, with no extension notice, renewal terms, or explanation disclosed to stakeholders.
What we haven't been told
2026-09-05CoreWeave's Core Scientific merger represents the most significant undisclosed reversal. The deal was announced as signed in July 2025 with a promised April 2026 closing (claims 4731, 4738), received ongoing coverage through September 2025 (claims 4331, 4313, 4314 all marked 'stated'), but was unilaterally terminated by CoreWeave on October 30, 2025 (claim 4166). The transition from 'stated' to 'delayed' occurred on September 3, 2026—eleven months after the actual termination—providing no contemporaneous explanation for the strategic reversal or indication that problems had surfaced between announcement and abandonment. The Notes Offering expected closing date of July 25, 2025 (claim 4699) also transitioned from 'stated' to 'delayed' on September 3, 2026, more than a year after the missed deadline, again with no disclosed revised timeline. Senior Notes interest payments promised to begin by February 1, 2026 (claim 4659) now show 'delayed' status as of September 2026, yet no earnings call or SEC filing appears to have disclosed a rescheduled payment start. The DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) similarly transitioned to 'delayed' status after that date had passed, with no disclosed extension notice. The Weights & Biases acquisition, prominently disclosed at $1 billion in August 2025 (claim 4516), has generated no subsequent status updates, contrasting sharply with the detailed commentary on customer commitments and facility expansion, suggesting either a stalled transaction or a deprioritized initiative that management has ceased discussing publicly.
What we haven't been told
2026-09-05The most significant unremarked shift involves the Core Scientific merger, originally promised to close by April 7, 2026 (claims 4731, 4738, dated 2025-07-06 and 2025-07-07), which transitioned to 'delayed' status on September 3, 2026—four months past the stated deadline—with no intermediate announcement explaining the slip. The deal then appears as 'terminated' by October 30, 2025 (claim 4166), yet management disclosed the termination only after the fact without commenting on why the initially confident 2026-04-07 closing date became unreachable or when they realized it. A related claim from August 12 (claim 4517) promising a Core Scientific acquisition agreement by October 1, 2025 similarly auto-transitioned to 'delayed' on September 3, 2026, overshooting its target by a year with no prior revision narrative. The Notes Offering Expected Closing (claim 4699) was promised for July 25, 2025, but only registered as 'delayed' on September 3, 2026—over a year slippage that appears nowhere in stated guidance changes. The DDTL 3.0 commitment termination date (claim 4593) promised July 31, 2026, was marked 'delayed' on September 3, 2026, after missing its deadline with no explanation of why or what triggered the extension. These slippages share a pattern: all transitioned from 'stated' to 'delayed' on the same automation date (September 3, 2026), suggesting a systemic drift in delivery against publicly communicated timelines that management has not separately disclosed or explained.
What we haven't been told
2026-09-05CoreWeave's most significant silent reversal concerns the Core Scientific merger. Announced and reiterated throughout July-September 2025 (claims 4729, 4731, 4738, 4517, 4313, 4331, 4294) with a promised closing date of October 1, 2025 or April 7, 2026, the deal was terminated on October 30, 2025 (claim 4166). Yet the status for claims 4731 and 4738 only auto-transitioned to 'delayed' on September 3, 2026—nearly a year after termination—rather than reflecting the actual outcome. No statement appears in the claims record explaining the termination or its reasons.
The Weights & Biases acquisition exhibits another pattern of silence. First announced May 13, 2025 (claim 4974) and updated August 12, 2025 with a $1 billion valuation (claim 4516), the transaction then disappears entirely from subsequent disclosures. As of today there is no claim reflecting whether the deal closed, stalled, or was abandoned, and management has not explained the gap.
Financing timelines have also slipped quietly. The Senior Notes offering expected to close July 25, 2025 (claim 4699) missed that deadline and now shows delayed status, yet no revision announcement appears in the claims record. Similarly, the DDTL 3.0 commitment termination date of July 31, 2026 (claim 4593) is now past due as of September 5, 2026 with delayed status, without public explanation.
Across all three narratives the pattern is identical: promised milestones or completed events are recorded in the data backend but management disclosures have not publicly accounted for the slippage or reversal.
What we haven't been told
2026-09-05CoreWeave's most conspicuous silent reversal involves the Core Scientific merger. In July 2025, management announced the deal with a promised closing by April 7, 2026 (claim 4731, 4738), detailed the 0.1235 share exchange ratio through September 2025 (claims 4314, 4331, 4294), yet by October 30, 2025 the merger was terminated without public explanation (claim 4166). The status transitions show both the merger promise and closing deadline auto-transitioned to 'delayed' before termination was stated—indicating management missed their April deadline without revision before abandoning the deal entirely. No statement has clarified what broke or what this means for CoreWeave's strategic direction or balance sheet.
The Weights & Biases acquisition, valued at $1 billion in August 2025 (claim 4516), has vanished from disclosures after that date. Originally mentioned in May 2025 (claim 4974), there is no closing announcement, no integration update, and no subsequent mention in later filings. Management has not stated whether the deal proceeded or was abandoned.
Two debt facility commitments have slipped past their promised dates without acknowledgment. The DDTL 3.0 commitment termination date was promised for July 31, 2026 (claim 4593) and is now marked 'delayed' as of early September 2026; management has not disclosed what caused the miss or when it actually occurred. Senior Notes interest payments were promised to commence by February 1, 2026 (claim 4659) and remain marked 'delayed' seven months past that date; no revised payment schedule or explanation has been provided.
The Senior Notes offering expected closing of July 25, 2025 (claim 4699) was marked 'delayed,' yet no public update repositioned the actual closing date, leaving a gap between the promised and actual timeline.
What we haven't been told
2026-09-05CoreWeave's Core Scientific merger represents the most significant walked-back commitment. Multiple promised closing dates—April 7, 2026 (claims 4731, 4738) and October 1, 2025 (claim 4517)—transitioned to 'delayed' status without announced revisions on 2026-09-03. The merger was eventually terminated by October 30, 2025 (claim 4166), but management never publicly disclosed why the intermediate dates slipped or explained the reversal until the termination itself appeared in disclosures. The senior notes offering expected to close July 25, 2025 (claim 4699) also shifted to delayed status without a public revision statement; while the $1.75 billion 9% notes issuance was ultimately completed (claims 4697, 4658), the specific closing date promise evaporated from communications. Senior notes interest payments promised for February 1, 2026 (claim 4659) have now passed their deadline and remain in delayed status as of September 3, 2026, with no explanatory update from management about the miss. The DDTL 3.0 commitment termination date promised by July 31, 2026 (claim 4593) is similarly overdue and delayed without disclosed revision, and the facility itself has gone quiet in recent disclosures despite being a major financing vehicle. The Weights & Biases acquisition, stated at $1 billion (claim 4516) in August 2025, appears in early claims (4974, 4975) with promises of integration milestones like 'AI Object Storage general availability,' but subsequent disclosures contain no updates on deal completion, integration progress, or product launches, leaving unclear whether the acquisition proceeded or slipped.
What we haven't been told
2026-09-02CoreWeave's $104 billion revenue backlog, prominently disclosed in August 2026 (claims 962, 1824), was withdrawn by the auditor on September 1–2, 2026, without a management statement explaining the revision. While similar backlog figures appear in other claims (1493: $104.0B), the dual withdrawal suggests either a definitional restatement or qualification that remains unannounced. Q2 2026 revenue also underwent auditor withdrawals on the same dates (claims 960, 1822: $2.58B), though claim 1492 ($2.6B) remains stated, creating ambiguity about which figure is operative and what triggered the audit actions. The company's stated 2025 IPO target (claim 1527) silently became a 2026 event, with the Nasdaq listing completed August 20, 2026 (claim 1240), representing a full-year slip that was never retrospectively revised in the claim record. CoreWeave's $35 billion 2026 capital expenditure guidance (claim 369, promised by December 31, 2026) was set in mid-August with Q2 capital spending already at $9.4 billion (claim 1524); no interim progress updates or revisions have been disclosed as of early September, leaving visibility into full-year execution unclear. The Indonesia Greater Jakarta deployment commitment of 360 MW (claim 155, promised by December 31, 2028) remains on record but is characteristic of long-dated infrastructure milestones that frequently experience silent pushes without formal revision announcements.
Projects
| Fleet capacity | Megawatts | Share of anticipated |
|---|---|---|
| Energized today | 0 MW | 0% |
| Contracted | 640 MW | |
| Anticipated at full build-out | 1,790 MW | 100% |
Summed across 9 tracked project(s), from the capacity figures on each. Anticipated takes the firmest stage on record per project, so a site that is announced at 2 GW and contracted at 400 MW counts once, at 2 GW.
Digital Drive
datacenter - near Richmond, Virginia
Status: announced
Indonesia Data Center (first Asia-Pacific facility)
datacenter - Greater Jakarta
Status: announced
Kenilworth Campus
datacenter - Kenilworth, New Jersey
Status: announced
Lancaster Data Center
datacenter - Lancaster, Pennsylvania
Status: announced
Niagara Falls AI Campus
datacenter - Niagara Falls, New York
Status: announced
Plano Data Center
datacenter - Plano, Texas
Status: announced
Polaris Forge 1
campus
Status: partially operational
Sweden Data Center
datacenter - Stockholm
Status: announced
Taloja Campus
datacenter - Taloja, Navi Mumbai, India
Status: announced
Claims tracker
| Subject | Statement date | Promised by | Amount | Status |
|---|---|---|---|---|
| Nvidia ownership stake ~10%financing | 2026-10-18 | - | 47200000.0 shares | stated |
| Meta as compute customercustomer | 2026-10-18 | - | - | stated |
| 2032 bond yields reach 15%financing | 2026-10-18 | - | 15.0 percent | stated |
| $10.6B debt due by end of 2027financing | 2026-10-18 | 2027-12-31 | 10600000000.0 USD | stated |
| Q2 interest expense $640Mfinancing | 2026-10-18 | - | 640000000.0 USD | stated |
| Cash $5.5B vs current liabilities $20.9Bfinancing | 2026-10-18 | - | 5500000000.0 USD | stated |
| Uses GPU-backed financingfinancing | 2026-10-18 | - | - | stated |
| Leases data centers rather than owning themfacility capacity | 2026-10-18 | - | - | stated |
| $104.2B revenue backlogcustomer | 2026-10-18 | - | 104200000000.0 USD | stated |
| 5+ GW of Nvidia-based AI factories by 2030facility capacity | 2026-10-18 | 2030-12-31 | 5000.0 MW | stated |
| Nvidia $2B equity investmentfinancing | 2026-10-18 | - | 2000000000.0 USD | stated |
| Debt maturities through 2027financing | 2026-10-18 | 2027-12-31 | 10600000000.0 USD | stated |
| Contracted revenue backlogcustomer | 2026-10-18 | - | 104200000000.0 USD | stated |
| CoreWeave 12-year $8.7B HPC hosting contract with Core Scientificpartnership | 2026-10-17 | - | 8700000000.0 USD | stated |
| CoreWeave total indebtedness at June 30 (Q2 10-Q)financing | 2026-10-17 | - | - | stated |
| CoreWeave cash balance at June 30 (Q2 10-Q)financing | 2026-10-17 | - | - | stated |
| Nvidia $2B equity investment in CoreWeavefinancing | 2026-10-16 | - | 2000000000.0 USD | stated |
| Expanded Nvidia-CoreWeave relationshippartnership | 2026-10-16 | - | - | stated |
| 5+ GW of AI factories by 2030facility capacity | 2026-10-16 | 2030-12-31 | 5000.0 MW | stated |
| Nvidia holds ~10% stake in CoreWeavefinancing | 2026-10-16 | - | 47200000.0 shares | stated |
| Meta rents compute from CoreWeavecustomer | 2026-10-16 | - | - | stated |
| Meta as compute customercustomer | 2026-10-16 | - | - | stated |
| CoreWeave HPC agreement with Core Scientificpartnership | 2026-10-16 | - | - | stated |
| Q3 2026 revenue guidanceguidance | 2026-10-16 | - | 3500000000.0 USD | stated |
| Revenue backlog over $100Bcustomer | 2026-10-16 | - | 100000000000.0 USD | stated |
| Nvidia holds ~10% stakefinancing | 2026-10-16 | - | 47200000.0 shares | stated |
| CoreWeave 2031 bond issuancefinancing | 2026-10-16 | - | 9.75 percent | stated |
| Nvidia shareholder and chip supplierpartnership | 2026-10-16 | - | - | stated |
| CEO says backlog covers debt obligationsfinancing | 2026-10-16 | - | - | stated |
| Five-year capacity contracts with hyperscalers and AI labscustomer | 2026-10-16 | - | 5.0 years | stated |
| Q2 operating lease liabilitiesfinancing | 2026-10-16 | - | 16300000000.0 USD | stated |
| Q2 total debtfinancing | 2026-10-16 | - | 35600000000.0 USD | stated |
| Remaining performance obligations backlogcustomer | 2026-10-16 | - | 103700000000.0 USD | stated |
| 41% of RPO scheduled through 2028customer | 2026-10-16 | 2028-12-31 | 41.0 percent | stated |
| Top three customers' share of Q2 revenuecustomer | 2026-10-16 | - | 72.0 percent | stated |
| Share of revenue from take-or-pay contractscustomer | 2026-10-16 | - | 98.0 percent | stated |
| Credit rating BB+financing | 2026-10-16 | - | - | stated |
| CoreWeave revenue backlog $104Bcustomer | 2026-10-16 | - | 104000000000.0 USD | stated |
| CoreWeave $25B+ new commitments early Q3customer | 2026-10-16 | - | 25000000000.0 USD | stated |
| CoreWeave Q3 2026 interest expense guidanceguidance | 2026-10-16 | - | 900000000.0 USD | stated |
| CoreWeave Q2 2026 interest expense $640Mfinancing | 2026-10-16 | - | 640000000.0 USD | stated |
| CoreWeave founders sold $3.3B of stockpersonnel | 2026-10-16 | - | 3300000000.0 USD | stated |
| Over $25B new commitments early in Q3 2026customer | 2026-10-16 | - | 25000000000.0 USD | stated |
| Q3 2026 interest expense guidance $860M-$940Mguidance | 2026-10-16 | - | 900000000.0 USD | stated |
| Q2 2026 quarterly interest expense $640Mfinancing | 2026-10-16 | - | 640000000.0 USD | stated |
| Q2 2026 debt-to-equity ratio 8.94financing | 2026-10-16 | - | 8.94 ratio | stated |
| Unsecured bonds reached 15% yieldfinancing | 2026-10-16 | - | 15.0 percent | stated |
| Founders sold $3.3B of stockpersonnel | 2026-10-16 | - | 3300000000.0 USD | stated |
| CoreWeave $25B+ net new customer commitments early Q3 2026customer | 2026-10-16 | - | 25000000000.0 USD | stated |
| CoreWeave Q2 2026 total liabilities $72.05Bfinancing | 2026-10-16 | - | 72050000000.0 USD | stated |
| CoreWeave Q2 2026 capex $6.42Bfinancing | 2026-10-16 | - | 6420000000.0 USD | stated |
| CoreWeave Q2 2026 operating cash flow $679Mfinancing | 2026-10-16 | - | 679000000.0 USD | stated |
| CoreWeave funding sourcesfinancing | 2026-10-16 | - | - | stated |
| Michael Intrator CEO during Q2 releasepersonnel | 2026-10-16 | - | - | stated |
| 2027 capacity nearly sold outcustomer | 2026-10-16 | - | - | stated |
| Nvidia backstop for unsold capacitypartnership | 2026-10-16 | - | - | stated |
| 2031 bond issued in April at 9.75% yieldfinancing | 2026-10-16 | - | 9.75 percent | stated |
| Plan to borrow from insurance companiesfinancing | 2026-10-16 | - | - | stated |
| Financing structured so customer cash flows repay debtfinancing | 2026-10-16 | - | - | stated |
| Microsoft contract exit limited to force majeurecustomer | 2026-10-16 | - | - | stated |
| CoreWeave total debt at Q2financing | 2026-10-16 | - | 35600000000.0 USD | stated |
| CoreWeave operating lease liabilities at Q2financing | 2026-10-16 | - | 16300000000.0 USD | stated |
| CoreWeave remaining performance obligationscustomer | 2026-10-16 | - | 103700000000.0 USD | stated |
| Share of CoreWeave RPO scheduled through 2028customer | 2026-10-16 | 2028-12-31 | 41.0 percent | stated |
| RPO backlog: 41% of $103.7B scheduled through 2028guidance | 2026-10-16 | 2028-12-31 | 41.0 percent | stated |
| CoreWeave debt and operating leases exceed $50Bfinancing | 2026-10-16 | - | - | stated |
| CoreWeave customers: Microsoft, OpenAI, Metacustomer | 2026-10-16 | - | - | stated |
| CoreWeave 2032 senior notes carry 9.625% couponfinancing | 2026-10-16 | - | - | stated |
| CoreWeave Q2 2026 cash about $6Bfinancing | 2026-10-16 | - | - | stated |
| AI factory build-outs for Microsoft, OpenAI and Metacustomer | 2026-10-16 | - | - | stated |
| Debt and lease obligations ~$52Bfinancing | 2026-10-15 | - | 52000000000.0 USD | stated |
| Q2 net interest expense $640Mfinancing | 2026-10-15 | - | 640000000.0 USD | stated |
| CEO Intrator sold 200,000 sharespersonnel | 2026-10-15 | - | 200000.0 shares | stated |
| Nvidia $2B equity investment in CoreWeavefinancing | 2026-10-15 | - | 2000000000.0 USD | stated |
| 5+ GW of AI factories by 2030 on Nvidia technologyfacility capacity | 2026-10-15 | 2030-12-31 | 5.0 GW | stated |
| Expanded Nvidia relationshippartnership | 2026-10-15 | - | - | stated |
| Nvidia stake of 47.2M shares (~10%)financing | 2026-10-15 | - | 47200000.0 shares | stated |
| Meta as compute customercustomer | 2026-10-15 | - | - | stated |
| 5+ GW of AI factories on Nvidia technology by 2030facility capacity | 2026-10-15 | 2030-12-31 | 5000.0 MW | stated |
| Debt and lease obligations at end of Junefinancing | 2026-10-15 | - | 52000000000.0 USD | stated |
| Total debt and obligations exceed $51Bfinancing | 2026-10-15 | - | 51000000000.0 USD | stated |
| 9.75% senior bond due 2031financing | 2026-10-15 | - | 9.75 percent | stated |
| Backlog over $100B, ~two-thirds investment-grade customerscustomer | 2026-10-15 | - | 100000000000.0 USD | stated |
| Active power added in 2Q26facility capacity | 2026-10-15 | - | 500.0 MW | stated |
| 8GW active power target by YE2030facility capacity | 2026-10-15 | 2030-12-31 | 8.0 GW | stated |
| Customer pre-payments and collateral structurefinancing | 2026-10-15 | - | 50.0 percent | stated |
| CEO says backlog covers all debt obligationsfinancing | 2026-10-15 | - | - | stated |
| Contracts with all major hyperscalerscustomer | 2026-10-15 | - | - | stated |
| Total debt load ~$50Bfinancing | 2026-10-15 | - | 50000000000.0 USD | stated |
| April-issued bonds due 2031financing | 2026-10-15 | - | - | stated |
| Nvidia backstop for unsold capacity through April 2032partnership | 2026-10-15 | - | - | stated |
| IPO in March 2025financing | 2026-10-15 | - | - | stated |
| Microsoft and OpenAI as major customerscustomer | 2026-10-15 | - | - | stated |
| Annual capex forecast raised to up to $39Bguidance | 2026-10-15 | 2026-12-31 | 39000000000.0 USD | stated |
| Seeking investment-grade credit ratingfinancing | 2026-10-15 | - | - | stated |
| Co-founders' total share sales since IPOpersonnel | 2026-10-15 | - | 3300000000.0 USD | stated |
| Co-founders' combined ownership stakepersonnel | 2026-10-15 | - | 20.0 percent | stated |
| Founder sales pre-scheduled and disclosedpersonnel | 2026-10-15 | - | - | stated |
| CEO Intrator 2026 share salespersonnel | 2026-10-15 | - | 907000000.0 USD | stated |
| McBee share sales since IPOpersonnel | 2026-10-15 | - | 1060000000.0 USD | stated |
| Venturo share sales since IPOpersonnel | 2026-10-15 | - | 1200000000.0 USD | stated |
| Pre-IPO founder tender offer salesfinancing | 2026-10-15 | - | 488000000.0 USD | stated |
| CEO Intrator remaining holdingspersonnel | 2026-10-15 | - | 21867489.0 shares | stated |
| Contract backlog ~$104Bcustomer | 2026-10-15 | - | 104000000000.0 USD | stated |
| Q2 revenue $2.58B, up 112.3%guidance | 2026-10-15 | - | 2580000000.0 USD | stated |
| Interest expense rose to $640Mfinancing | 2026-10-15 | - | 640000000.0 USD | stated |
| Capex $6.42B; free cash flow -$5.74Bfinancing | 2026-10-15 | - | 6420000000.0 USD | stated |
| Total liabilities $72.05Bfinancing | 2026-10-15 | - | 72050000000.0 USD | stated |
| NVIDIA is GPU supplierpartnership | 2026-10-15 | - | - | stated |
| Agent-built data center anomaly detection systemproduct | 2026-10-15 | - | - | stated |
| 8GW active power target by end of 2030facility capacity | 2026-10-15 | 2030-12-31 | 8000.0 MW | stated |
| CoreWeave debt and lease obligationsfinancing | 2026-10-15 | - | 52000000000.0 USD | stated |
| CoreWeave Q2 net interest expensefinancing | 2026-10-15 | - | 640000000.0 USD | stated |
| CoreWeave seeking cheaper funding from insurersfinancing | 2026-10-15 | - | - | stated |
| CEO Michael Intrator share salepersonnel | 2026-10-15 | - | 200000.0 shares | stated |
| Nvidia holds ~10% stake in CoreWeavefinancing | 2026-10-15 | - | 10.0 percent | stated |
| Nvidia supplies and helps finance CoreWeave expansionpartnership | 2026-10-15 | - | - | stated |
| CoreWeave revenue backlog at 2Q26customer | 2026-10-14 | - | 104000000000.0 USD | stated |
| $1.25B bonds due 2032financing | 2026-10-14 | - | 1250000000.0 USD | stated |
| Total debt ~$52B at end of Junefinancing | 2026-10-14 | - | 52000000000.0 USD | stated |
| Q2 interest expense $640Mfinancing | 2026-10-14 | - | 640000000.0 USD | stated |
| Pursuing insurer capital via investment-grade chip-backed debtfinancing | 2026-10-14 | - | - | stated |
| Will continue chip-backed loansfinancing | 2026-10-14 | - | - | stated |
| Brannin McBee leads financingpersonnel | 2026-10-14 | - | - | stated |
| CoreWeave 9.625% bonds due 2032financing | 2026-10-14 | - | - | stated |
| CoreWeave S&P credit rating B+financing | 2026-10-14 | - | - | stated |
| CoreWeave targeting insurers for debt financingfinancing | 2026-10-14 | - | - | stated |
| CoreWeave IPO at $40 per sharefinancing | 2026-10-14 | - | 40.0 USD | stated |
| CoreWeave total debt loadfinancing | 2026-10-14 | - | 35000000000.0 USD | stated |
| CoreWeave bond yield reaches 15%financing | 2026-10-14 | - | 15.0 percent | stated |
| Total debt ~$52Bfinancing | 2026-10-14 | - | 52000000000.0 USD | stated |
| 9.625% senior notes due 2032financing | 2026-10-14 | - | 9.625 percent | stated |
| Nvidia equity stakefinancing | 2026-10-14 | - | 47200000.0 shares | stated |
| Anthropic infrastructure partnercustomer | 2026-10-14 | - | - | stated |
| Customer relationships with Microsoft, OpenAI, Metacustomer | 2026-10-14 | - | - | stated |
| Q2 2026 revenue backlog of $104Bcustomer | 2026-10-14 | - | 104000000000.0 USD | stated |
| $1.25B bond tranche due 2032 issued at 9.6%financing | 2026-10-14 | - | 1250000000.0 USD | stated |
| Q2 2026 balance-sheet debt of ~$35.1Bfinancing | 2026-10-14 | - | 35100000000.0 USD | stated |
| Total debt obligations incl. leases ~$51.6Bfinancing | 2026-10-14 | - | 51600000000.0 USD | stated |
| H1 2026 operating cash flow of ~$3.7Bfinancing | 2026-10-14 | - | 3700000000.0 USD | stated |
| H1 2026 principal and interest payments of $6.2Bfinancing | 2026-10-14 | - | 6200000000.0 USD | stated |
| CoreWeave 240 MW India buildoutfacility capacity | 2026-10-14 | - | 240.0 MW | stated |
| $104B signed backlogcustomer | 2026-10-14 | - | 104000000000.0 USD | stated |
| Unsecured bond yield touched 15%financing | 2026-10-14 | - | 15.0 percent | stated |
| Chip- and contract-secured debt financingfinancing | 2026-10-14 | - | - | stated |
| Pursuing investment-grade ratings to borrow from insurersfinancing | 2026-10-14 | - | - | stated |
| At-the-market equity program for up to 35M sharesfinancing | 2026-10-14 | - | 35000000.0 shares | stated |
| $3.0B private offering of convertible senior notes due 2033financing | 2026-10-14 | - | 3000000000.0 USD | stated |
| CoreWeave 2026 capital raisedfinancing | 2026-10-14 | - | 35000000000.0 USD | stated |
| CoreWeave debt and lease obligations at end of Junefinancing | 2026-10-14 | - | 52000000000.0 USD | stated |
| CoreWeave $1.25B unsecured bonds due 2032financing | 2026-10-14 | - | 1250000000.0 USD | stated |
| CoreWeave total debt of $35 billionfinancing | 2026-10-14 | - | 35000000000.0 USD | stated |
| 2026 capital raisedfinancing | 2026-10-14 | - | 35000000000.0 USD | stated |
| Debt and lease obligations at end of June 2026financing | 2026-10-14 | - | 52000000000.0 USD | stated |
| Q2 2026 interest costsfinancing | 2026-10-14 | - | 640000000.0 USD | stated |
| Leverage ratio vs Q2 EBITDAfinancing | 2026-10-14 | - | 5.8 x EBITDA | stated |
| Q3 2026 earnings dateguidance | 2026-10-14 | 2026-11-11 | - | stated |
| Data center count growthfacility capacity | 2026-10-14 | - | 51.0 facilities | stated |
| Total outstanding debt obligationsfinancing | 2026-10-14 | - | 50000000000.0 USD | stated |
| $1.25B bond issuefinancing | 2026-10-14 | - | 1250000000.0 USD | stated |
| Revenue backlog as of Juneguidance | 2026-10-14 | - | 104000000000.0 USD | stated |
| Major backlog customers: Microsoft, Meta, OpenAIcustomer | 2026-10-14 | - | - | stated |
| CEO: backlog covers all debt obligationsfinancing | 2026-10-14 | - | - | verified |
| Backlog tied to Microsoft, Meta and OpenAI dealscustomer | 2026-10-14 | - | - | stated |
| 240 MW India data center buildoutfacility capacity | 2026-10-14 | - | 240.0 MW | stated |
| Seeking debt financing from insurance companiesfinancing | 2026-10-14 | - | - | stated |
| CEO says backlog exceeds debt obligationsfinancing | 2026-10-14 | - | - | stated |
| CoreWeave cash vs recourse debt at June 30, 2026financing | 2026-10-14 | - | 31410000000.0 USD | stated |
| CoreWeave $104B revenue backlogcustomer | 2026-10-14 | - | 104000000000.0 USD | stated |
| CoreWeave $4.2B convertible notes due 2033financing | 2026-10-14 | - | 4200000000.0 USD | stated |
| CoreWeave leases 590 MW at Core Scientific, 395 MW billingfacility capacity | 2026-10-14 | - | 590.0 MW | stated |
| CoreWeave is ~77% of Core Scientific revenuecustomer | 2026-10-14 | - | 77.0 percent | stated |
| CoreWeave ~$5.5B spend on Core Scientific sitesfacility capacity | 2026-10-14 | - | 5500000000.0 USD | stated |
| $1.25B bond tranche due 2032financing | 2026-10-14 | - | 1250000000.0 USD | stated |
| CoreWeave 9.625% senior notes due 2032financing | 2026-10-14 | - | 9.625 percent | stated |
| CoreWeave 9.75% senior notes due 2031financing | 2026-10-14 | - | 9.75 percent | stated |
| CoreWeave cash and debt positionfinancing | 2026-10-13 | - | - | stated |
| Q2 revenue and backlogfinancing | 2026-10-13 | - | 104000000000.0 USD | stated |
| Q2 capex and free cash flowfinancing | 2026-10-13 | - | 6420000000.0 USD | stated |
| Q2 interest expensefinancing | 2026-10-13 | - | 640000000.0 USD | stated |
| Q2 net lossfinancing | 2026-10-13 | - | 626000000.0 USD | stated |
| Q1 EPS missfinancing | 2026-10-13 | - | -1.4 USD/share | stated |
| Securities fraud class actionregulatory | 2026-10-13 | - | - | stated |
| New Q3 customer commitmentscustomer | 2026-10-13 | - | 25000000000.0 USD | stated |
| Hyperscaler commitmentcustomer | 2026-10-13 | - | 21000000000.0 USD | stated |
| OpenAI contractscustomer | 2026-10-13 | - | 22400000000.0 USD | stated |
| Anthropic agreementcustomer | 2026-10-13 | - | - | stated |
| Operating cash flowfinancing | 2026-10-13 | - | 679000000.0 USD | stated |
| Adjusted EBITDAfinancing | 2026-10-13 | - | 1510000000.0 USD | stated |
| Active vs contracted powerfacility capacity | 2026-10-13 | - | 3.7 GW | stated |
| NVIDIA $2B investmentfinancing | 2026-10-13 | - | 2000000000.0 USD | stated |
| 2026 revenue guidanceguidance | 2026-10-13 | 2026-12-31 | 13200000000.0 USD | stated |
| $104B revenue backlogcustomer | 2026-10-13 | - | 104000000000.0 USD | stated |
| Q2 revenue $2.575B, +112%guidance | 2026-10-13 | - | 2575000000.0 USD | stated |
| Q2 operating cash flow $679Mguidance | 2026-10-13 | - | 679000000.0 USD | stated |
| Q2 GAAP EPS -$1.14guidance | 2026-10-13 | - | -1.14 USD/share | stated |
| Q2 net loss $626Mguidance | 2026-10-13 | - | 626000000.0 USD | stated |
| OpenAI commitments ~$22.4Bcustomer | 2026-10-13 | - | 22400000000.0 USD | stated |
| >$25B new commitments in early Q3customer | 2026-10-13 | - | 25000000000.0 USD | stated |
| ~25% July price increaseproduct | 2026-10-13 | - | 25.0 percent | stated |
| Q4 low-teens adjusted operating margin targetguidance | 2026-10-13 | 2026-12-31 | - | stated |
| At least 8 GW by 2030facility capacity | 2026-10-13 | 2030-12-31 | 8.0 GW | stated |
| Q3 interest expense guidance $860-940Mguidance | 2026-10-13 | 2026-09-30 | 940000000.0 USD | outcome unconfirmed |
| 2026 capex $35-39Bguidance | 2026-10-13 | 2026-12-31 | 39000000000.0 USD | stated |
| Cost of debt cut ~300bpsfinancing | 2026-10-13 | - | 1100000000.0 USD | stated |
| Pending securities class actionregulatory | 2026-10-13 | - | - | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-13 | - | 940000000.0 USD | stated |
| 2026 capex outlookguidance | 2026-10-13 | 2026-12-31 | 39000000000.0 USD | stated |
| 8 GW capacity target by 2030facility capacity | 2026-10-13 | 2030-12-31 | 8000.0 MW | stated |
| Cost of debt reduced ~300 bpsfinancing | 2026-10-13 | - | 1100000000.0 USD | stated |
| Contracted backlog ~$104Bcustomer | 2026-10-13 | - | 104000000000.0 USD | stated |
| 3.7 GW power under contract vs 1.5 GW activefacility capacity | 2026-10-13 | - | 3700.0 MW | stated |
| Securities class action over construction delaysregulatory | 2026-10-13 | - | - | stated |
| 2026 capex guidance $35-39Bguidance | 2026-10-12 | 2026-12-31 | 35000000000.0 USD | stated |
| Planned $9B acquisition of Core Scientificacquisition | 2026-10-12 | - | 9000000000.0 USD | stated |
| IPO completed March 2025financing | 2026-10-12 | - | - | stated |
| Adjusted operating income guidance $960M-$1.15B (Q2 2026 report)guidance | 2026-10-12 | - | 960000000.0 USD | stated |
| Revenue backlog ~$104B at end of Q2 2026customer | 2026-10-12 | - | 104000000000.0 USD | stated |
| $25B+ net-new customer commitments early Q3 2026customer | 2026-10-12 | - | 25000000000.0 USD | stated |
| Nine of 10 leading foundation model providers are customerscustomer | 2026-10-12 | - | - | stated |
| ClusterMAX Platinum ranking three times in a rowproduct | 2026-10-12 | - | - | stated |
| New Q2 customers: Caterpillar, Bentley, Grammarly, Isomorphic Labscustomer | 2026-10-12 | - | - | stated |
| Databricks and Hudson River Trading expanded relationshipscustomer | 2026-10-12 | - | - | stated |
| Jane Street $1B strategic investmentfinancing | 2026-10-12 | - | 1000000000.0 USD | stated |
| Active power 1.5 GW after ~500 MW Q2 growthfacility capacity | 2026-10-12 | - | 1500.0 MW | stated |
| ~3.7 GW contracted powerfacility capacity | 2026-10-12 | - | 3700.0 MW | stated |
| India entry: 240 MW at AdaniConneX Navi Mumbai campusfacility capacity - Taloja Campus | 2026-10-12 | 2029-12-31 | 240.0 MW | stated |
| AdaniConneX partnership for Navi Mumbai campuspartnership - Taloja Campus | 2026-10-12 | - | - | stated |
| $10B+ unsecured debt and convertible bondsfinancing | 2026-10-12 | - | 10000000000.0 USD | stated |
| $3.1B term loanfinancing | 2026-10-12 | - | 3100000000.0 USD | stated |
| CoreWeave Q2 2026 capital expendituresfinancing | 2026-10-12 | - | 6420000000.0 USD | stated |
| CoreWeave Q2 2026 free cash flowfinancing | 2026-10-12 | - | -5740000000.0 USD | stated |
| CoreWeave revenue backlogcustomer | 2026-10-12 | - | 104000000000.0 USD | stated |
| CoreWeave Q2 2026 adjusted EBITDAguidance | 2026-10-12 | - | 1510000000.0 USD | stated |
| Q2 2026 free cash flowfinancing | 2026-10-12 | - | -5740000000.0 USD | stated |
| Revenue backlogcustomer | 2026-10-12 | - | 104000000000.0 USD | stated |
| Q2 2026 adjusted EBITDAfinancing | 2026-10-12 | - | 1510000000.0 USD | stated |
| India expansion: 240 MW at AdaniConneX Navi Mumbaifacility capacity - Taloja Campus | 2026-10-12 | - | 240.0 MW | stated |
| Active power reached 1.5 GW; ~3.7 GW under contractfacility capacity | 2026-10-12 | - | 1500.0 MW | stated |
| $10B+ unsecured debt/converts and $3.1B term loanfinancing | 2026-10-12 | - | 10000000000.0 USD | stated |
| Three consecutive SemiAnalysis ClusterMAX Platinum rankingsproduct | 2026-10-12 | - | - | stated |
| No dividend plans; retain earningsfinancing | 2026-10-12 | - | - | stated |
| $2.6B AI infrastructure loan tied to uptime performancefinancing | 2026-10-12 | - | 2600000000.0 USD | stated |
| CoreWeave Q2 revenue backlog ~$100Bcustomer | 2026-10-10 | - | 100000000000.0 USD | stated |
| AdaniConneX India data center collaborationpartnership | 2026-10-10 | - | - | stated |
| 240 MW India AI infrastructure commitmentfacility capacity | 2026-10-10 | - | 240.0 MW | stated |
| Financing secured for build-outfinancing | 2026-10-09 | - | 18000000000.0 USD | stated |
| $3.7B convertible senior notes pricedfinancing | 2026-10-09 | - | 3700000000.0 USD | stated |
| Contracted revenue backlog $104B in Q2 2026customer | 2026-10-09 | - | 104000000000.0 USD | stated |
| Customers include Meta, Microsoft, OpenAI, Anthropiccustomer | 2026-10-09 | - | - | stated |
| Operates 51 data centersfacility capacity | 2026-10-09 | - | 51.0 data centers | stated |
| Over 250,000 Nvidia GPUs deployedfacility capacity | 2026-10-09 | - | 250000.0 GPUs | stated |
| Nvidia is a top investorpartnership | 2026-10-09 | - | - | stated |
| AI processing 35x faster, 80% cheaper than large cloudsproduct | 2026-10-09 | - | 80.0 percent | stated |
| Q2 2026 liabilities $72B vs equity $5Bfinancing | 2026-10-09 | - | 72000000000.0 USD | stated |
| Share count up 19% since 2025 IPOfinancing | 2026-10-09 | - | 19.0 percent | stated |
| Planned ATM sale of 35M sharesfinancing | 2026-10-09 | - | 35000000.0 shares | stated |
| Upsized $4.2B convertible senior notes offeringfinancing | 2026-10-09 | - | 4200000000.0 USD | stated |
| Major AI customerscustomer | 2026-10-09 | - | - | stated |
| GPU cloud performance and cost advantageproduct | 2026-10-09 | - | - | stated |
| Data center count and GPU fleetfacility capacity | 2026-10-09 | - | 51.0 data centers | stated |
| Nvidia as top investor and GPU supplierpartnership | 2026-10-09 | - | - | stated |
| Balance sheet liabilities vs equity Q2 2026financing | 2026-10-09 | - | 72000000000.0 USD | stated |
| Share count dilution since IPOfinancing | 2026-10-09 | - | 19.0 percent | stated |
| CoreWeave US$2.6b AI infrastructure loanfinancing | 2026-10-09 | - | 2600000000.0 USD | stated |
| Ennoble Care as CoreWeave clientcustomer | 2026-10-09 | - | - | stated |
| OpenAI contracts up to ~$22.4Bcustomer | 2026-10-09 | - | 22400000000.0 USD | stated |
| $3.7B 2.875% convertible notes due 2033financing | 2026-10-09 | - | 3700000000.0 USD | stated |
| Existing senior notes and earlier convertible couponsfinancing | 2026-10-09 | - | - | stated |
| At-the-market program up to 35M sharesfinancing | 2026-10-09 | - | 35000000.0 shares | stated |
| ATM share sale of 35 million sharesfinancing | 2026-10-09 | - | 35000000.0 units | stated |
| Active power target end-2026facility capacity | 2026-10-09 | 2026-12-31 | 1850.0 MW | stated |
| 2026 capital expenditure guidanceguidance | 2026-10-09 | 2026-12-31 | 35000000000.0 USD | stated |
| Q3 2026 revenue guidanceguidance | 2026-10-09 | - | 3450000000.0 USD | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-09 | - | 860000000.0 USD | stated |
| Q3 2026 adjusted operating income guidanceguidance | 2026-10-09 | - | 200000000.0 USD | stated |
| At-the-market share sale of 35 million sharesfinancing | 2026-10-09 | - | 35000000.0 units | stated |
| SPV-level borrowing secured on customer offtake creditfinancing | 2026-10-09 | - | - | stated |
| Borrowing at A- credit via structured dealfinancing | 2026-10-09 | - | - | stated |
| Lenders took renewal risk in latest debt dealfinancing | 2026-10-09 | - | - | stated |
| Cash Trap Event clause in $2.6B loanfinancing | 2026-10-09 | - | 2600000000.0 USD | stated |
| More Omni software deals on partner infrastructurepartnership | 2026-10-09 | - | - | stated |
| 240 MW India campusfacility capacity - Taloja Campus | 2026-10-09 | - | 240.0 MW | stated |
| India campus capacity online from mid-2028facility timeline - Taloja Campus | 2026-10-09 | 2028-06-30 | 240.0 MW | stated |
| FY2026 revenue guidance raised to $12.4B-$13.2Bguidance | 2026-10-09 | 2026-12-31 | 12800000000.0 USD | stated |
| Q3 2026 revenue guidance $3.4B-$3.6Bguidance | 2026-10-09 | - | 3500000000.0 USD | stated |
| 2026 capex target raised to $35B-$39Bguidance | 2026-10-09 | 2026-12-31 | 37000000000.0 USD | stated |
| Active power capacity above 1.85 GW by end of 2026facility capacity | 2026-10-09 | 2026-12-31 | 1850.0 MW | stated |
| Additional $21B commitment from Metacustomer | 2026-10-09 | - | 21000000000.0 USD | stated |
| Multi-year agreement with Anthropiccustomer | 2026-10-09 | - | - | stated |
| $6B commitment from Jane Streetcustomer | 2026-10-09 | - | 6000000000.0 USD | stated |
| GPU price increase in Julyproduct | 2026-10-09 | - | 25.0 percent | stated |
| Higher margins on new contractscustomer | 2026-10-09 | - | - | stated |
| Revenue backlog $104Bcustomer | 2026-10-09 | - | 104000000000.0 USD | stated |
| Over $25B net new commitments early Q3customer | 2026-10-09 | - | 25000000000.0 USD | stated |
| Delivery started on over half of backlogcustomer | 2026-10-09 | - | 50.0 percent | stated |
| FY2026 revenue guidanceguidance | 2026-10-09 | 2026-12-31 | 12400000000.0 USD | stated |
| Year-end annualized revenue run rate guidanceguidance | 2026-10-09 | 2026-12-31 | 18500000000.0 USD | stated |
| Cost of debt reduced ~300 bpsfinancing | 2026-10-09 | - | 1100000000.0 USD | stated |
| Total debt $35.6Bfinancing | 2026-10-09 | - | 35600000000.0 USD | stated |
| Deployments structured to repay asset-level debtfinancing | 2026-10-09 | - | - | stated |
| NVIDIA $2B equity investmentfinancing | 2026-10-09 | - | 2000000000.0 USD | stated |
| Backlog concentrated in Meta and OpenAIcustomer | 2026-10-09 | - | - | stated |
| Pending securities fraud class actionregulatory | 2026-10-09 | - | - | stated |
| Sold out of prior-gen GPUs; A100 contract into 2029customer | 2026-10-09 | - | - | stated |
| Contracted power 4.2 GW, 1.5 GW activefacility capacity | 2026-10-09 | - | 4200.0 MW | stated |
| Target at least 8 GW by 2030facility capacity | 2026-10-09 | 2030-12-31 | 8000.0 MW | stated |
| At least 8 GW contracted power by 2030facility capacity | 2026-10-09 | 2030-12-31 | 8000.0 MW | stated |
| A100 contract running into 2029customer | 2026-10-09 | - | - | stated |
| $3B convertible senior notes due 2033financing | 2026-10-09 | - | 3000000000.0 USD | stated |
| Capped call transactions alongside convertible offeringfinancing | 2026-10-09 | - | - | stated |
| ATM program up to 35M Class A sharesfinancing | 2026-10-09 | - | 35000000.0 units | stated |
| Objective of investment-grade credit profilefinancing | 2026-10-09 | - | - | stated |
| Q3 short-term compute contracts at ~$40M per MWcustomer | 2026-10-09 | - | 40000000.0 USD | stated |
| Contracting new capacity at higher prices since June 30customer | 2026-10-09 | - | - | stated |
| >$25B net new customer commitments early Q3customer | 2026-10-09 | - | 25000000000.0 USD | stated |
| Total contracted power ~4.2 GWfacility capacity | 2026-10-09 | - | 4200.0 MW | stated |
| CoreWeave contract with Microsoftcustomer | 2026-10-08 | - | - | stated |
| CoreWeave contract with Meta Platformscustomer | 2026-10-08 | - | - | stated |
| CoreWeave backed by Nvidiafinancing | 2026-10-08 | - | - | stated |
| India Taloja campus 240 MW AI data centerfacility capacity - Taloja Campus | 2026-10-08 | - | 240.0 MW | stated |
| AdaniConneX collaboration for India data centerpartnership - Taloja Campus | 2026-10-08 | - | - | stated |
| Taloja initial deployment: three 80 MW buildingsfacility capacity - Taloja Campus | 2026-10-08 | - | 80.0 MW | stated |
| Taloja campus expansion potential to 480 MWfacility capacity - Taloja Campus | 2026-10-08 | - | 480.0 MW | stated |
| Taloja first phase operational mid-2028facility timeline - Taloja Campus | 2026-10-08 | 2028-06-30 | - | stated |
| NVIDIA Vera Rubin deployment in Indiaproduct | 2026-10-08 | - | - | stated |
| ~4.2 GW contracted powerfacility capacity | 2026-10-08 | - | 4.2 GW | stated |
| CoreWeave Forge development platform announcedproduct | 2026-10-08 | - | - | stated |
| First to bring up and validate Nvidia Vera Rubin platformproduct | 2026-10-08 | - | - | stated |
| SemiAnalysis Platinum ClusterMAX rating, third consecutive timeproduct | 2026-10-08 | - | 3.0 consecutive ratings | stated |
| Navi Mumbai AI data center 240 MWfacility capacity - Taloja Campus | 2026-10-08 | - | 240.0 MW | stated |
| AdaniConneX partnership for India expansionpartnership - Taloja Campus | 2026-10-08 | - | 240.0 MW | stated |
| India build capacity online 2028facility timeline - Taloja Campus | 2026-10-08 | 2028-01-01 | - | stated |
| Willow Care (Willow Voice) uses CoreWeave for AI model trainingcustomer | 2026-10-08 | - | - | stated |
| CoreWeave Forge platform launchproduct | 2026-10-08 | - | - | stated |
| CoreWeave RL Rollouts preview: 15x faster model reloadproduct | 2026-10-08 | - | 15.0 x | stated |
| RL Rollouts built on Nvidia Dynamopartnership | 2026-10-08 | - | - | stated |
| FY2026 revenue guidanceguidance | 2026-10-08 | 2026-12-31 | 12400000000.0 USD | stated |
| Backlog ~$104B as of June 30, 2026customer | 2026-10-08 | - | 104000000000.0 USD | stated |
| $25B+ net new commitments in early Q3customer | 2026-10-08 | - | 25000000000.0 USD | stated |
| $21B Meta commitmentcustomer | 2026-10-08 | - | 21000000000.0 USD | stated |
| Multi-year Anthropic agreementcustomer | 2026-10-08 | - | - | stated |
| Caterpillar and Databricks customerscustomer | 2026-10-08 | - | - | stated |
| ~25% price increase across SKUs in Julyproduct | 2026-10-08 | - | 25.0 percent | stated |
| NVIDIA $2B investment in Class A stockfinancing | 2026-10-08 | - | 2000000000.0 USD | stated |
| NVIDIA partnership: 5+ GW AI factories by 2030partnership | 2026-10-08 | 2030-12-31 | 5.0 GW | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-08 | 2026-09-30 | 860000000.0 USD | outcome unconfirmed |
| >50% of backlog in deliverycustomer | 2026-10-08 | - | 50.0 percent | stated |
| Cost of debt cut ~300 bpsfinancing | 2026-10-08 | - | 300.0 bps | stated |
| Active power 1.5 GWfacility capacity | 2026-10-08 | - | 1.5 GW | stated |
| YE2026 active power target >1.85 GWfacility capacity | 2026-10-08 | 2026-12-31 | 1.85 GW | stated |
| 8+ GW by 2030 goalfacility capacity | 2026-10-08 | 2030-12-31 | 8.0 GW | stated |
| Exit-2026 annualized run-rate revenueguidance | 2026-10-08 | 2026-12-31 | 18500000000.0 USD | stated |
| CoreWeave Forge launchproduct | 2026-10-08 | - | - | stated |
| Forge new capabilities: Agent Lens, Registry, RL Rollouts, distillationproduct | 2026-10-08 | - | - | stated |
| ARIA generally availableproduct | 2026-10-08 | - | - | stated |
| Cognition AI running production on first Vera Rubin NVL72 rackscustomer | 2026-10-08 | - | - | stated |
| CoreWeave partner network launchpartnership | 2026-10-08 | - | - | stated |
| Forge free tier with paid tiersproduct | 2026-10-08 | - | - | stated |
| AdaniConneX partnership for India data center buildpartnership - Taloja Campus | 2026-10-08 | - | - | stated |
| India capacity not online until 2028facility timeline - Taloja Campus | 2026-10-08 | - | - | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-08 | - | 860000000.0 USD | stated |
| Contribution margin uplift after price increaseguidance | 2026-10-08 | - | 5.0 percent | stated |
| Year-end 2026 active power targetfacility capacity | 2026-10-08 | 2026-12-31 | 1850.0 MW | stated |
| 8 GW capacity goal by 2030facility capacity | 2026-10-08 | 2030-12-31 | 8000.0 MW | stated |
| NVIDIA partnership to build 5+ GW of AI factoriespartnership | 2026-10-08 | 2030-12-31 | 5000.0 MW | stated |
| NVIDIA $2B equity investmentfinancing | 2026-10-08 | - | 2000000000.0 USD | stated |
| Taloja initial deployment: three 80 MW buildings, CoreWeave sole tenantfacility capacity - Taloja Campus | 2026-10-08 | - | 240.0 MW | stated |
| Proposed $3B convertible notes due 2033financing | 2026-10-08 | - | 3000000000.0 USD | stated |
| 35 million-share Class A ATM programfinancing | 2026-10-08 | - | 35000000.0 units | stated |
| Nvidia $2B equity investment at $87.20/sharefinancing | 2026-10-08 | - | 2000000000.0 USD | stated |
| More than 5 GW of AI factories by 2030 with Nvidiafacility capacity | 2026-10-08 | 2030-12-31 | 5000.0 MW | stated |
| 240 MW AI data center capacity at AdaniConneX Taloja campus, Navi Mumbaifacility capacity - Taloja Campus | 2026-10-08 | - | 240.0 MW | stated |
| AdaniConneX India data center agreementpartnership - Taloja Campus | 2026-10-08 | - | - | stated |
| Forge and Partner Network launchesproduct | 2026-10-08 | - | - | stated |
| CoreWeave planned 240 MW data center capacity in Indiafacility capacity | 2026-10-07 | - | 240.0 MW | stated |
| AdaniConneX partnership for first India data centerspartnership | 2026-10-07 | - | - | stated |
| Taloja campus, Navi Mumbai initial capacityfacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| Taloja campus expansion optionfacility capacity - Taloja Campus | 2026-10-07 | - | 480.0 MW | stated |
| India data centers operational mid-2028facility timeline | 2026-10-07 | 2028-06-30 | - | stated |
| India project total investmentfinancing | 2026-10-07 | - | - | stated |
| India officefacility timeline | 2026-10-07 | - | - | stated |
| Nvidia Vera Rubin chips in India facilitiesproduct | 2026-10-07 | - | - | stated |
| Indonesia projects (first Asia entry)facility timeline | 2026-10-07 | - | - | stated |
| CEO says capacity largely sold outguidance | 2026-10-07 | - | - | stated |
| Total contracted power ~4.2 GWfacility capacity | 2026-10-07 | - | 4.2 GW | stated |
| Navi Mumbai project: three 80MW buildingsfacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| Navi Mumbai to use Nvidia Vera Rubinproduct | 2026-10-07 | - | - | stated |
| Navi Mumbai first phase completion mid-2028facility timeline - Taloja Campus | 2026-10-07 | 2028-06-30 | - | stated |
| Option to double Navi Mumbai capacityfacility capacity - Taloja Campus | 2026-10-07 | - | 480.0 MW | stated |
| Regional office in Indiafacility timeline | 2026-10-07 | - | - | stated |
| ~4.2GW contracted power globallyfacility capacity | 2026-10-07 | - | 4.2 GW | stated |
| CEO Michael Intrator Q3 stock salespersonnel | 2026-10-07 | - | 347000000.0 USD | stated |
| AdaniConneX collaboration for India entrypartnership - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| Taloja campus: three 80MW buildingsfacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| Taloja first phase available mid-2028facility timeline - Taloja Campus | 2026-10-07 | 2028-06-30 | - | stated |
| Option to expand Taloja by up to 240MW morefacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| India office and local hiringpersonnel | 2026-10-07 | - | - | stated |
| 25% GPU price increase in July 2026product | 2026-10-07 | - | 25.0 percent | stated |
| Additional 10% GPU price increaseproduct | 2026-10-07 | - | 10.0 percent | stated |
| Total debt ~$35.1Bfinancing | 2026-10-07 | - | 35100000000.0 USD | stated |
| Operating lease liabilities ~$16.3Bfinancing | 2026-10-07 | - | 16300000000.0 USD | stated |
| Cash ~$5.5Bfinancing | 2026-10-07 | - | 5500000000.0 USD | stated |
| India 240 MW capacity (COO statement)facility capacity | 2026-10-07 | - | 240.0 MW | stated |
| Navi Mumbai: three 80 MW buildings at Taloja campusfacility capacity - Taloja Campus | 2026-10-07 | - | 80.0 MW | stated |
| Indonesia 360 MW contracted power online in 2028facility timeline | 2026-10-07 | 2028-12-31 | 360.0 MW | stated |
| ~4.2 GW contracted power globallyfacility capacity | 2026-10-07 | - | 4200.0 MW | stated |
| Sole tenant with option to add up to 240MW at Talojafacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| 240 MW at AdaniConneX Taloja campus, Navi Mumbaifacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| Option to expand Taloja capacity to 480 MWfacility capacity - Taloja Campus | 2026-10-07 | - | 480.0 MW | stated |
| Multi-billion-dollar India project investmentfinancing - Taloja Campus | 2026-10-07 | - | - | stated |
| Taloja campus, Navi Mumbai: 240 MWfacility capacity - Taloja Campus | 2026-10-07 | - | 240.0 MW | stated |
| India project investment of multiple billionsfinancing - Taloja Campus | 2026-10-07 | - | - | stated |
| Second GPU price increaseproduct | 2026-10-07 | - | 10.0 percent | stated |
| Total debtfinancing | 2026-10-07 | - | 35100000000.0 USD | stated |
| Cash positionfinancing | 2026-10-07 | - | 5500000000.0 USD | stated |
| AdaniConneX India data center agreementpartnership - Taloja Campus | 2026-10-07 | - | - | stated |
| Taloja (Navi Mumbai) expansion optionfacility capacity - Taloja Campus | 2026-10-07 | - | 480.0 MW | stated |
| India first data centers onlinefacility timeline - Taloja Campus | 2026-10-07 | 2028-06-30 | - | stated |
| India office establishmentfacility timeline | 2026-10-07 | - | - | stated |
| India project lifetime investmentfinancing - Taloja Campus | 2026-10-07 | - | - | stated |
| Several-billion-dollar India investmentfinancing - Taloja Campus | 2026-10-07 | - | - | stated |
| Three Indonesia facilities (360 MW) online in 2028facility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-10-07 | 2028-12-31 | 360.0 MW | stated |
| Neural AI subpoena action against non-party CoreWeave dismissedother | 2026-10-07 | - | - | stated |
| $2.6B loan with Cash Trap Event clausefinancing | 2026-10-07 | - | 2600000000.0 USD | stated |
| $2.6B AI infrastructure loanfinancing | 2026-10-07 | - | 2600000000.0 USD | stated |
| $3.1B facility completed in Mayfinancing | 2026-10-07 | - | 3100000000.0 USD | stated |
| Cash trap/sweep provisions in $2.6B loanfinancing | 2026-10-07 | - | - | stated |
| Customer contracts backing $2.6B loan average three yearscustomer | 2026-10-07 | - | - | stated |
| CoreWeave FY2026 revenue guidance raisedguidance | 2026-10-07 | 2026-12-31 | 12800000000.0 USD | stated |
| Renewal or re-lease of customer contracts backing $2.6B loancustomer | 2026-10-07 | - | - | stated |
| $2.6B GPU-backed loan termsfinancing | 2026-10-07 | - | 2600000000.0 USD | stated |
| FY2026 revenue outlook raised to $12.4B–$13.2Bguidance | 2026-10-07 | 2026-12-31 | 12800000000.0 USD | stated |
| Physical AI Field Engineering service launchproduct | 2026-10-06 | - | - | stated |
| Caterpillar named as enterprise customercustomer | 2026-10-06 | - | - | stated |
| Caterpillar began working with CoreWeave in 2026customer | 2026-10-06 | - | - | stated |
| Richard Ahlfeld, SVP of Physical AIpersonnel | 2026-10-06 | - | - | stated |
| Caterpillar/CoreWeave/Nvidia field-data annotationpartnership | 2026-10-06 | - | - | stated |
| Q2 2026 revenueguidance | 2026-10-06 | - | 2600000000.0 USD | stated |
| Revenue backlog at June 30, 2026customer | 2026-10-06 | - | 104000000000.0 USD | stated |
| Net new customer commitments early Q3 2026customer | 2026-10-06 | - | 25000000000.0 USD | stated |
| Total contracted power as of Aug 11, 2026facility capacity | 2026-10-06 | - | 4200.0 MW | stated |
| Forge platform launchproduct | 2026-10-06 | - | - | stated |
| NVIDIA Vera Rubin NVL72 production availabilityproduct | 2026-10-06 | - | - | stated |
| Short-dated contracts signed at higher pricingcustomer | 2026-10-06 | - | - | stated |
| Forge platform offering unveiledproduct | 2026-10-06 | - | - | stated |
| 240 MW India campusfacility capacity - Taloja Campus | 2026-10-06 | - | 240.0 MW | stated |
| India campus capacity online from mid-2028facility timeline - Taloja Campus | 2026-10-06 | 2028-06-30 | 240.0 MW | stated |
| Revenue backlog ~$104B at end of Junecustomer | 2026-10-05 | - | 104000000000.0 USD | stated |
| $25B+ net new customer commitments early Q3customer | 2026-10-05 | - | 25000000000.0 USD | stated |
| Total indebtedness $35.6B at June 30financing | 2026-10-05 | - | 35600000000.0 USD | stated |
| CEO Michael Intrator share salepersonnel | 2026-10-05 | - | 6888224.88 USD | stated |
| Insider Brannin McBee share salepersonnel | 2026-10-05 | - | 4957203.39 USD | stated |
| Insider Brian Venturo share salepersonnel | 2026-10-05 | - | 5753867.04 USD | stated |
| Dell–CoreWeave co-engineering partnership for rack-scale AI systemspartnership | 2026-10-05 | - | - | stated |
| CoreWeave Racky rack managerproduct | 2026-10-05 | - | - | stated |
| Dell integrates CoreWeave Racky in L11 factoriespartnership | 2026-10-05 | - | - | stated |
| Dell co-engineering and factory partnershippartnership | 2026-10-05 | - | - | stated |
| Standalone Vera CPU capacity offeringproduct | 2026-10-05 | - | - | stated |
| Nvidia Vera CPU deployment with CoreWeavepartnership | 2026-10-05 | - | - | stated |
| Sandboxes startup time improvement on Vera CPUsproduct | 2026-10-05 | - | 3.0 x | stated |
| Revenue backlog exceeds $104Bcustomer | 2026-10-04 | - | 104000000000.0 USD | stated |
| Additional $25B deal signed in early Q3 2026customer | 2026-10-04 | - | 25000000000.0 USD | stated |
| Total debt over $35Bfinancing | 2026-10-04 | - | 35000000000.0 USD | stated |
| Q2 2026 interest expense $640Mfinancing | 2026-10-04 | - | 640000000.0 USD | stated |
| H1 2026 capex over $14Bfinancing | 2026-10-04 | - | 14000000000.0 USD | stated |
| Nvidia stake in and partnership with CoreWeavepartnership | 2026-10-04 | - | - | stated |
| Total debt exceeds $35Bfinancing | 2026-10-04 | - | 35000000000.0 USD | stated |
| Nvidia stake and partnershippartnership | 2026-10-04 | - | - | stated |
| CoreWeave $104B revenue backlog (RPO)guidance | 2026-10-03 | - | 104000000000.0 USD | stated |
| CoreWeave signed additional $25B in commitmentscustomer | 2026-10-03 | - | 25000000000.0 USD | stated |
| CoreWeave quarterly revenue $2.58Bfinancing | 2026-10-03 | - | 2580000000.0 USD | stated |
| CoreWeave quarterly capex $6.4B, FCF -$5.7Bfinancing | 2026-10-03 | - | 6400000000.0 USD | stated |
| CoreWeave debt ~$35B at end of Junefinancing | 2026-10-03 | - | 35000000000.0 USD | stated |
| CoreWeave bonds above 9% interestfinancing | 2026-10-03 | - | 9.0 percent | stated |
| CoreWeave quarterly net interest expense $640Mfinancing | 2026-10-03 | - | 640000000.0 USD | stated |
| $25B additional customer commitments signed early in quartercustomer | 2026-10-03 | - | 25000000000.0 USD | stated |
| Revenue backlog (RPO) of $104Bcustomer | 2026-10-03 | - | 104000000000.0 USD | stated |
| Total debt ~$35B at end of Junefinancing | 2026-10-03 | - | 35000000000.0 USD | stated |
| Bonds issued at interest rates above 9%financing | 2026-10-03 | - | 9.0 percent | stated |
| CoreWeave long-term lease obligationsfinancing | 2026-10-02 | - | 15700000000.0 USD | stated |
| CoreWeave quarterly capexfinancing | 2026-10-02 | - | 6400000000.0 USD | stated |
| Contracted backlogcustomer | 2026-10-02 | - | 104000000000.0 USD | stated |
| Gross technology equipment basefacility capacity | 2026-10-02 | - | 33820000000.0 USD | stated |
| Q2 interest expensefinancing | 2026-10-02 | - | 640000000.0 USD | stated |
| Convertible notes and capped callsfinancing | 2026-10-02 | - | - | stated |
| CoreWeave Forge launchproduct | 2026-10-02 | - | - | stated |
| NVIDIA Vera Rubin NVL72 availabilityproduct | 2026-10-02 | - | - | stated |
| Cognition first Vera Rubin NVL72 production customercustomer | 2026-10-02 | - | - | stated |
| NVIDIA Vera CPU offeringproduct | 2026-10-02 | - | 11000.0 concurrent environments per rack | stated |
| Ennoble Care selects CoreWeavecustomer | 2026-10-02 | - | - | stated |
| CoreWeave Partner Network launchpartnership | 2026-10-02 | - | - | stated |
| Caterpillar, Capital One, Cognition as customerscustomer | 2026-10-02 | - | - | stated |
| Signed backlog $104Bguidance | 2026-10-02 | - | 104000000000.0 USD | stated |
| New commitments >$25B signed early Q3customer | 2026-10-02 | - | 25000000000.0 USD | stated |
| Q2 revenue $2.575Bguidance | 2026-10-02 | - | 2575000000.0 USD | stated |
| Full-year revenue guidance raised to $12.4-13.2Bguidance | 2026-10-02 | 2026-12-31 | 13200000000.0 USD | stated |
| ~25% price increase across SKUs in Julyproduct | 2026-10-02 | - | 25.0 percent | stated |
| Managed inference ARR >$100Mproduct | 2026-10-02 | - | 100000000.0 USD | stated |
| Q3 interest expense guidance $860-940Mguidance | 2026-10-02 | 2026-09-30 | 940000000.0 USD | outcome unconfirmed |
| Securities class action over data center delaysregulatory | 2026-10-02 | - | - | stated |
| Operating cash flow $679M; adj. EBITDA $1.51Bguidance | 2026-10-02 | - | 679000000.0 USD | stated |
| Borrowing costs cut ~300 bpsfinancing | 2026-10-02 | - | 300.0 bps | stated |
| Adjusted operating margin low teens in Q4guidance | 2026-10-02 | 2026-12-31 | - | stated |
| Selected for Nasdaq-100regulatory | 2026-10-02 | - | - | stated |
| IBM Research uses CoreWeave infrastructurecustomer | 2026-10-02 | - | - | stated |
| IBM–CoreWeave joint engineering on identity and workload controlspartnership | 2026-10-02 | - | - | stated |
| CoreWeave Sandboxes for isolated agent executionproduct | 2026-10-02 | - | - | stated |
| CoreWeave–CrowdStrike AI security partnershippartnership | 2026-10-02 | - | - | stated |
| CrowdStrike uses CoreWeave compute for SafeMindcustomer | 2026-10-02 | - | - | stated |
| Jim Higgins is CoreWeave CISOpersonnel | 2026-10-02 | - | - | stated |
| CrowdStrike partnership: SafeMind compute and Cyber Superintelligence Lab design partnerpartnership | 2026-10-02 | - | - | stated |
| IBM Research runs single-tenant cluster on CoreWeavecustomer | 2026-10-02 | - | - | stated |
| FY2026 revenue guidance raised to $12.4-13.2Bguidance | 2026-10-02 | 2026-12-31 | 12400000000.0 USD | stated |
| At least 8 GW of capacity by 2030facility capacity | 2026-10-02 | 2030-12-31 | 8000.0 MW | stated |
| NVIDIA Vera CPU offered on bare metalproduct | 2026-10-02 | - | - | stated |
| Vera rack: 128 CPUs, 11,264 coresproduct | 2026-10-02 | - | 11264.0 cores | stated |
| Vera 3x faster sandbox startup vs x86product | 2026-10-02 | - | 3.0 x | stated |
| CoreWeave Sandboxes productproduct | 2026-10-02 | - | - | stated |
| Vera Rubin NVL72 4.8x token throughput (Cognition test)product | 2026-10-02 | - | 4.8 x | stated |
| CoreWeave Sandboxes for agent environmentsproduct | 2026-10-02 | - | - | stated |
| Full-year 2026 revenue guidance raisedguidance | 2026-10-02 | 2026-12-31 | 13200000000.0 USD | stated |
| Q4 adjusted operating margin guidanceguidance | 2026-10-02 | 2026-12-31 | - | stated |
| Signed backlog of $104 billioncustomer | 2026-10-02 | - | 104000000000.0 USD | stated |
| CoreWeave contracted power 4.2 GWfacility capacity | 2026-10-02 | - | 4.2 GW | stated |
| CoreWeave remaining performance obligations ~$130Bcustomer | 2026-10-02 | - | 130000000000.0 USD | stated |
| CoreWeave short-term 3-6 month contract at ~$40M/MWcustomer | 2026-10-02 | - | 40000000.0 USD/MW | stated |
| CoreWeave Forge AI development environmentproduct | 2026-10-02 | - | - | stated |
| CRO: demand imbalance and platform expansion beginning to lift marginsguidance | 2026-10-02 | - | - | stated |
| 4.2 GW of contracted powerfacility capacity | 2026-10-02 | - | 4200.0 MW | stated |
| Short-term 3-6 month capacity agreement at ~$40M per MWcustomer | 2026-10-02 | - | 40000000.0 USD | stated |
| Q2 2026 revenueguidance | 2026-10-02 | - | 2580000000.0 USD | stated |
| Backlog at end of June 2026customer | 2026-10-02 | - | 104000000000.0 USD | stated |
| Net new customer commitments in early Q3 2026customer | 2026-10-02 | - | 25000000000.0 USD | stated |
| Total debt as of June 30, 2026financing | 2026-10-02 | - | 35100000000.0 USD | stated |
| Net debt as of June 30, 2026financing | 2026-10-02 | - | 29500000000.0 USD | stated |
| H1 2026 capexfinancing | 2026-10-02 | - | 14900000000.0 USD | stated |
| H1 2026 operating cash flowfinancing | 2026-10-02 | - | 3700000000.0 USD | stated |
| H1 2026 financing raisedfinancing | 2026-10-02 | - | 14000000000.0 USD | stated |
| A100 GPU contract running into 2029customer | 2026-10-02 | - | - | stated |
| NVIDIA Vera Rubin NVL72 available on CoreWeave Cloudproduct | 2026-10-02 | - | - | stated |
| Forge failure detection improvementproduct | 2026-10-02 | - | 20.0 percent | stated |
| CoreWeave Sandboxes generally availableproduct | 2026-10-02 | - | - | stated |
| Vera CPU 1.7x gain on Terminal-Benchproduct | 2026-10-02 | - | 1.7 x | stated |
| CoreWeave to offer NVIDIA Vera CPUproduct | 2026-10-02 | - | 3.0 x | stated |
| Canva, Capital One, MasterClass building on platformcustomer | 2026-10-02 | - | - | stated |
| NVIDIA–CoreWeave co-engineered platformpartnership | 2026-10-02 | - | - | stated |
| NVIDIA V100 GPUs still serving workloadsfacility capacity | 2026-10-02 | - | - | stated |
| Forge failure detection and resolution cost claimsproduct | 2026-10-02 | - | 20.0 percent | stated |
| CoreWeave Notebooks launched in CoreWeave Forge (public preview)product | 2026-10-01 | - | - | stated |
| Q2 2026 net lossguidance | 2026-10-01 | - | 626000000.0 USD | stated |
| Q2 2026 interest expensefinancing | 2026-10-01 | - | 640000000.0 USD | stated |
| Q2 2026 revenueguidance | 2026-10-01 | - | 2600000000.0 USD | stated |
| Revenue backlog $104Bcustomer | 2026-10-01 | - | 104000000000.0 USD | stated |
| $25B+ new customer commitments early Q3customer | 2026-10-01 | - | 25000000000.0 USD | stated |
| Q2 adjusted EBITDAguidance | 2026-10-01 | - | 1500000000.0 USD | stated |
| Q2 adjusted operating incomeguidance | 2026-10-01 | - | 128000000.0 USD | stated |
| Non-GPU services ARR over $400Mproduct | 2026-10-01 | - | 400000000.0 USD | stated |
| July 2026 pricing changesproduct | 2026-10-01 | - | - | stated |
| Near-term capacity sold outfacility capacity | 2026-10-01 | - | - | stated |
| Meta Platforms is a major customercustomer | 2026-10-01 | - | - | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-01 | 2026-09-30 | 900000000.0 USD | outcome unconfirmed |
| 2026 capex guidance raised to $35-39Bguidance | 2026-10-01 | 2026-12-31 | 37000000000.0 USD | stated |
| $2.75B 9.750% senior notes due 2031financing | 2026-10-01 | 2031-12-31 | 2750000000.0 USD | stated |
| $3.5B senior notes offering announced in Junefinancing | 2026-10-01 | - | 3500000000.0 USD | stated |
| $104.2B contracted backlogcustomer | 2026-10-01 | - | 104200000000.0 USD | stated |
| Q2 2026 interest expense $640M driven by increased debtfinancing | 2026-10-01 | - | 640000000.0 USD | stated |
| Nitin Agrawal is CFOpersonnel | 2026-10-01 | - | - | stated |
| CoreWeave Partner Network launchpartnership | 2026-10-01 | - | - | stated |
| Agent search partners join Partner Networkpartnership | 2026-10-01 | - | - | stated |
| Ennoble Care clinical AI inference deploymentcustomer | 2026-10-01 | - | - | stated |
| CKS container spin-up speed claimproduct | 2026-10-01 | - | 10.0 x | stated |
| Three consecutive SemiAnalysis ClusterMAX Platinum rankingsproduct | 2026-10-01 | - | 3.0 rankings | stated |
| CoreWeave revenue backlog over $104Bguidance | 2026-10-01 | - | 104000000000.0 USD | stated |
| Nvidia Vera Rubin NVL72 available on CoreWeave cloudproduct | 2026-10-01 | - | - | stated |
| Cognition is first Vera Rubin cluster customercustomer | 2026-10-01 | - | - | stated |
| Vera Rubin inference throughput gain vs GB200 (Cognition benchmark)product | 2026-10-01 | - | 4.8 x | stated |
| Vera Rubin RL output-token throughput gain (Cognition benchmark)product | 2026-10-01 | - | 3.8 x | stated |
| GB200 and GB300 NVL72 systems already deployed, incl. Dell PowerRackfacility capacity | 2026-10-01 | - | - | stated |
| Dell Technologies PowerRack collaborationpartnership | 2026-10-01 | - | - | stated |
| Nvidia Vera CPU rack: 128 CPUs / 11,264 coresproduct | 2026-10-01 | - | 11264.0 CPU cores | stated |
| Vera rack supports 11,000+ concurrent agent environmentsproduct | 2026-10-01 | - | 11000.0 concurrent agent environments | stated |
| Forge AI development platform launchedproduct | 2026-10-01 | - | 30.0 days | stated |
| Revenue backlog of over $104B and expected recognition scheduleguidance | 2026-10-01 | - | 104000000000.0 USD | stated |
| Revenue backlog over $104B with recognition scheduleguidance | 2026-10-01 | - | 104000000000.0 USD | stated |
| Meta Platforms is one of CoreWeave's largest clientscustomer | 2026-10-01 | - | - | stated |
| Notebooks: publish views to Workspace as persistent panelsproduct | 2026-10-01 | - | - | stated |
| Notebooks: host notebooks as data appsproduct | 2026-10-01 | - | - | stated |
| Notebooks: more compute in notebook sandboxproduct | 2026-10-01 | - | - | stated |
| ARIA to co-author notebooksproduct | 2026-10-01 | - | - | stated |
| New rack-scale systems into production within daysproduct | 2026-10-01 | - | - | stated |
| Vera Rubin operable with existing GB200/GB300 toolingproduct | 2026-10-01 | - | - | stated |
| Vera CPU rack deployment (128 CPUs/rack)product | 2026-10-01 | - | 128.0 units | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-01 | 2026-09-30 | 860000000.0 USD | outcome unconfirmed |
| 2026 capex guidance raised to $35-39Bguidance | 2026-10-01 | 2026-12-31 | 35000000000.0 USD | stated |
| $2.75B 9.750% senior notes due 2031financing | 2026-10-01 | - | 2750000000.0 USD | stated |
| Partner Network integrations tested under production loadspartnership | 2026-10-01 | - | - | stated |
| $25B+ new net customer commitments in Q3customer | 2026-10-01 | - | 25000000000.0 USD | stated |
| Newer short-term contracts at $40M/MW annualized revenuecustomer | 2026-10-01 | - | 40000000.0 USD/MW | stated |
| Nvidia $2B additional investmentfinancing | 2026-10-01 | - | 2000000000.0 USD | stated |
| Nvidia partnership to develop 5+ GW AI infrastructure by 2030partnership | 2026-10-01 | 2030-12-31 | 5000.0 MW | stated |
| Early access to Nvidia Vera Rubin architecturepartnership | 2026-10-01 | - | - | stated |
| 8+ GW active power target by 2030facility capacity | 2026-10-01 | 2030-12-31 | 8000.0 MW | stated |
| ~1.5 GW active power at end of Q2facility capacity | 2026-10-01 | - | 1500.0 MW | stated |
| Three Indonesia data centers online in 2028facility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-10-01 | 2028-12-31 | 3.0 data centers | stated |
| Indonesia data centers add 360 MWfacility capacity - Indonesia Data Center (first Asia-Pacific facility) | 2026-10-01 | 2028-12-31 | 360.0 MW | stated |
| $2.6B loan facilityfinancing | 2026-10-01 | - | 2600000000.0 USD | stated |
| Q3 2026 interest expense guidanceguidance | 2026-10-01 | 2026-09-30 | 940000000.0 USD | outcome unconfirmed |
| 2026 capex guidance raised to $35-39Bguidance | 2026-10-01 | 2026-12-31 | 39000000000.0 USD | stated |
| Three Indonesia data centers (360 MW) online in 2028facility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-10-01 | 2028-12-31 | 360.0 MW | stated |
| Debt raised to fund infrastructure and contracted customer commitmentsfinancing | 2026-10-01 | - | - | stated |
| CoreWeave Forge launchproduct | 2026-09-30 | - | - | stated |
| Forge editionsproduct | 2026-09-30 | - | - | stated |
| CoreWeave Notebooksproduct | 2026-09-30 | - | - | stated |
| CoreWeave Agent Lensproduct | 2026-09-30 | - | - | stated |
| RL Rolloutsproduct | 2026-09-30 | - | - | stated |
| CoreWeave Aria GAproduct | 2026-09-30 | - | - | stated |
| Partner network: VAST Data, CrowdStrike, ClickHousepartnership | 2026-09-30 | - | - | stated |
| Nvidia Vera CPU early accessproduct | 2026-09-30 | - | - | stated |
| Nvidia Vera Rubin NVL72 availableproduct | 2026-09-30 | - | - | stated |
| Cognition first Vera Rubin NVL72 customercustomer | 2026-09-30 | - | - | stated |
| Nvidia Vera CPU broader testing in coming weeksproduct | 2026-09-30 | - | - | stated |
| CoreWeave Aria AI research assistant general availabilityproduct | 2026-09-30 | - | - | stated |
| New Forge tools: Notebooks, Agent Lens, RL Rolloutsproduct | 2026-09-30 | - | - | stated |
| MasterClass and Canva building on Forgecustomer | 2026-09-30 | - | - | stated |
| Agent Lens detects 20% more critical failuresproduct | 2026-09-30 | - | 20.0 percent | stated |
| Serverless RL 40% lower costproduct | 2026-09-30 | - | 40.0 percent | stated |
| Dedicated Inference RL Rollouts previewproduct | 2026-09-30 | - | - | stated |
| Forge Free, Pro and Enterprise editionsproduct | 2026-09-30 | - | 30.0 days | stated |
| Third consecutive ClusterMAX Platinum ratingproduct | 2026-09-30 | - | 3.0 times | stated |
| NVIDIA Vera CPU coming to CoreWeaveproduct | 2026-09-30 | - | 11264.0 cores | stated |
| First Vera Rubin NVL72 production racks receivedfacility timeline | 2026-09-30 | - | - | stated |
| Cognition scaled to thousands of GPUscustomer | 2026-09-30 | - | - | stated |
| Vera Rubin 4.8x token throughput vs GB200 for Cognitionproduct | 2026-09-30 | - | 4.8 x | stated |
| Vera CPU 3x faster sandbox startupproduct | 2026-09-30 | - | 3.0 x | stated |
| CoreWeave Agent Lens new serviceproduct | 2026-09-30 | - | 20.0 percent | stated |
| RL Rollouts private previewproduct | 2026-09-30 | - | - | stated |
| Ennoble Care selects CoreWeavecustomer | 2026-09-30 | - | - | stated |
| Serves nine of 10 leading AI labscustomer | 2026-09-30 | - | 9.0 customers | stated |
| NVIDIA co-engineering partnershippartnership | 2026-09-30 | - | - | stated |
| CoreWeave to offer NVIDIA Vera CPUproduct | 2026-09-30 | - | - | stated |
| Rack-scale Vera: 128 CPUs per rackfacility capacity | 2026-09-30 | - | 128.0 CPUs per rack | stated |
| Rack-scale Vera: 11,264 cores per rackfacility capacity | 2026-09-30 | - | 11264.0 cores per rack | stated |
| Vera rack supports 11,000+ concurrent agent environmentsproduct | 2026-09-30 | - | 11000.0 concurrent environments per rack | stated |
| 3x faster sandbox startup on Vera vs x86product | 2026-09-30 | - | 3.0 x speedup | stated |
| CoreWeave Sandboxes natively support Veraproduct | 2026-09-30 | - | - | stated |
| Fully Connected conference attendancecustomer | 2026-09-30 | - | 4500.0 attendees | stated |
| Agent Lens failure detection improvementproduct | 2026-09-30 | - | 20.0 percent | stated |
| Model Distillation new serviceproduct | 2026-09-30 | - | - | stated |
| CoreWeave Notebooks new serviceproduct | 2026-09-30 | - | - | stated |
| Cline uses Serverless Inferencecustomer | 2026-09-30 | - | - | stated |
| Grammarly uses Dedicated Inferencecustomer | 2026-09-30 | - | - | stated |
| NVIDIA and you.com Nemotron post-trainingpartnership | 2026-09-30 | - | 15.0 x | stated |
| Exa, Parallel Web Systems, You.com join Partner Networkpartnership | 2026-09-30 | - | - | stated |
| Forge Pro 30-day free trialproduct | 2026-09-30 | - | 30.0 days | stated |
| Forge AI development environment launchproduct | 2026-09-30 | - | - | stated |
| CoreWeave Partner Network launchpartnership | 2026-09-30 | - | - | stated |
| NVIDIA Vera CPU added to compute lineupproduct | 2026-09-30 | - | - | stated |
| CoreWeave ARENA Pass launchproduct | 2026-09-30 | - | - | stated |
| You.com used CoreWeave ARENAcustomer | 2026-09-30 | - | - | stated |
| Periodic Labs storage stress testcustomer | 2026-09-30 | - | 300.0 GB/s | stated |
| Scripps Research moved to productioncustomer | 2026-09-30 | - | - | stated |
| Unnamed consumer AI team chose CoreWeavecustomer | 2026-09-30 | - | - | stated |
| Voice AI evaluation resultsproduct | 2026-09-30 | - | 1200.0 concurrent sessions | stated |
| Hundreds of Rubin GPUs deployed across multiple regionsfacility capacity | 2026-09-30 | - | - | stated |
| Vera Rubin NVL72 3.8x RL output throughput vs GB200 for Cognitionproduct | 2026-09-30 | - | 3.8 x | stated |
| CoreWeave partnered with Cognition on Vera Rubin benchmarkingpartnership | 2026-09-30 | - | - | stated |
| Weights & Biases acquisition completedacquisition | 2026-09-30 | - | - | stated |
| Weights & Biases acquisition agreement announcedacquisition | 2026-09-30 | - | - | stated |
| Other acquisitions: Monolith, Conductor Technologies, OpenPipe, Marimoacquisition | 2026-09-30 | - | - | stated |
| W&B SaaS accounts migrated to CoreWeave Forge sign-inproduct | 2026-09-30 | - | - | stated |
| wandb.ai pages moving to coreweave.com in phasesproduct | 2026-09-30 | - | - | stated |
| W&B user base: 1M+ practitionerscustomer | 2026-09-30 | - | 1000000.0 users | stated |
| W&B customer base: 1,400+ companies incl. OpenAI, Meta, NVIDIAcustomer | 2026-09-30 | - | 1400.0 companies | stated |
| W&B platform usage: 1B+ runs trackedproduct | 2026-09-30 | - | 1000000000.0 runs | stated |
| W&B contracts and pricing unchanged by Forge movecustomer | 2026-09-30 | - | - | stated |
| Lukas Biewald is SVP of AI at CoreWeavepersonnel | 2026-09-30 | - | - | stated |
| Acquired Weights & Biases, OpenPipe, and marimoacquisition | 2026-09-30 | - | - | stated |
| Five announcements at Fully Connectedproduct | 2026-09-30 | - | 5.0 announcements | stated |
| CoreWeave Serverless Inference (pay-per-token)product | 2026-09-30 | - | - | stated |
| CoreWeave Dedicated Inference (pay-per-GPU-hour)product | 2026-09-30 | - | - | stated |
| CoreWeave ARENA supports inference evaluationproduct | 2026-09-30 | - | - | stated |
| Partner Network founding partners: VAST Data, ClickHouse, CrowdStrike, Reflectionpartnership | 2026-09-30 | - | - | stated |
| IBM / Red Hat collaborationpartnership | 2026-09-30 | - | - | stated |
| Data services and model/inference partnerspartnership | 2026-09-30 | - | - | stated |
| Agent search partners Exa, Parallel Web Systems, You.compartnership | 2026-09-30 | - | - | stated |
| 9 of 10 leading foundation model providerscustomer | 2026-09-30 | - | 9.0 customers | stated |
| SemiAnalysis ClusterMAX Platinum three timesproduct | 2026-09-30 | - | 3.0 rankings | stated |
| CoreWeave enterprise clients: Microsoft, OpenAI, Meta, Anthropiccustomer | 2026-09-30 | - | - | stated |
| Non-tech enterprise cloud customerscustomer | 2026-09-30 | - | - | stated |
| Forge AI development tools launchproduct | 2026-09-30 | - | - | stated |
| Forge Pro tier pricingproduct | 2026-09-30 | - | 60.0 USD | stated |
| Customers using 3+ productscustomer | 2026-09-30 | - | 82.0 percent | stated |
| No reduction in customer orders despite data center backlashcustomer | 2026-09-30 | - | - | stated |
| Q2 10-Q adds New York data center moratorium as riskregulatory | 2026-09-30 | - | - | stated |
| CoreWeave customer countcustomer | 2026-09-30 | - | 4500.0 customers | stated |
| Dell Vera Rubin deploymentpartnership | 2026-09-30 | - | - | stated |
| Ennoble Care clinical AI workloadscustomer | 2026-09-30 | - | - | stated |
| AI Object Storage enhancementsproduct | 2026-09-30 | - | - | stated |
| Physical AI Field Engineering teampersonnel | 2026-09-30 | - | 100.0 projects | stated |
| ATM offering up to 35M sharesfinancing | 2026-09-30 | - | 35000000.0 shares | stated |
| $3B convertible notes due 2033financing | 2026-09-30 | 2033-12-31 | 3000000000.0 USD | stated |
| Short-term contracts at $40M/MWcustomer | 2026-09-30 | - | 40000000.0 USD/MW | stated |
| Partner Network consolidates CrowdStrike, VAST Data, ClickHouse, Reflection collaborationspartnership | 2026-09-30 | - | - | stated |
| Partner Network organized into four categoriespartnership | 2026-09-30 | - | 4.0 categories | stated |
| AI agent search layer with Exa, Parallel Web Systems, You.compartnership | 2026-09-30 | - | - | stated |
| VAST Data collaboration with VAST AI Operating Systempartnership | 2026-09-30 | - | - | stated |
| IBM and Red Hat technologies in Partner Networkpartnership | 2026-09-30 | - | - | stated |
| Jon Jones, chief revenue officerpersonnel | 2026-09-30 | - | - | stated |
| W&B to remain cloud-agnosticproduct | 2026-09-30 | - | - | stated |
| W&B account teams and support unchangedcustomer | 2026-09-30 | - | - | stated |
| Accelerated investment in W&B platformproduct | 2026-09-30 | - | - | stated |
| Other CoreWeave acquisitionsacquisition | 2026-09-30 | - | - | stated |
| Vera deployment model on CoreWeaveproduct | 2026-09-30 | - | - | stated |
| Rack-scale Vera configurationproduct | 2026-09-30 | - | 128.0 units | stated |
| CoreWeave Agent Lens launch and performance claimproduct | 2026-09-30 | - | 20.0 percent | stated |
| Serverless RL performance claimproduct | 2026-09-30 | - | 40.0 percent | stated |
| CoreWeave Inference folded into Forgeproduct | 2026-09-30 | - | - | stated |
| Priority access to Nvidia advanced chipspartnership | 2026-09-30 | - | - | stated |
| CoreWeave ARENA Pass opens to new enterprise teamsproduct | 2026-09-30 | - | - | stated |
| ARENA Pass prioritizes teams nearing productionproduct | 2026-09-30 | - | - | stated |
| You.com ran workloads through CoreWeave ARENAcustomer | 2026-09-30 | - | - | stated |
| Periodic Labs evaluated CoreWeave storagecustomer | 2026-09-30 | - | - | stated |
| Vera CPU rack densityfacility capacity | 2026-09-30 | - | 11264.0 units | stated |
| Ennoble Care selects CoreWeave for clinical AI inferencecustomer | 2026-09-30 | - | - | stated |
| Forge editions and component availabilityproduct | 2026-09-30 | - | - | stated |
| Cognition on Vera Rubin NVL72customer | 2026-09-30 | - | - | stated |
| Ennoble Care clinical AI inferencecustomer | 2026-09-30 | - | - | stated |
| ATM program up to 35M sharesfinancing | 2026-09-30 | - | 35000000.0 units | stated |
| $3B convertible notes due 2033financing | 2026-09-30 | - | 3000000000.0 USD | stated |
| Partner admission criteriapartnership | 2026-09-30 | - | - | stated |
| Continued partner additionspartnership | 2026-09-30 | - | - | stated |
| AI agent search layer partnerspartnership | 2026-09-30 | - | - | stated |
| VAST Data integrationpartnership | 2026-09-30 | - | - | stated |
| IBM and Red Hat integrationpartnership | 2026-09-30 | - | - | stated |
| Forge software platform launch at Fully Connected conferenceproduct | 2026-09-30 | 2026-09-30 | - | verified |
| Vera Rubin GPUs for Cognition AIcustomer | 2026-09-30 | - | - | stated |
| Founding Partner Network memberspartnership | 2026-09-30 | - | - | stated |
| Partner Network expansion to agent toolspartnership | 2026-09-30 | - | - | stated |
| Serverless Inference offeringproduct | 2026-09-30 | - | - | stated |
| Dedicated Inference offeringproduct | 2026-09-30 | - | - | stated |
| ARENA supports trying both inference pathsproduct | 2026-09-30 | - | - | stated |
| Data services partners ClickHouse and LanceDBpartnership | 2026-09-30 | - | - | stated |
| Models and inference partnerspartnership | 2026-09-30 | - | - | stated |
| Vera agent sandbox startup performanceproduct | 2026-09-30 | - | 3.0 x | stated |
| Vera rack density: 128 CPUs / 11,264 coresfacility capacity | 2026-09-30 | - | 11264.0 cores | stated |
| Vera rack concurrent environmentsfacility capacity | 2026-09-30 | - | 11000.0 environments | stated |
| Vera CPU node specificationproduct | 2026-09-30 | - | - | stated |
| Spot CPU capacity savingsproduct | 2026-09-30 | - | 60.0 percent | stated |
| Multi-vendor CPU portfolio adds NVIDIApartnership | 2026-09-30 | - | - | stated |
| NVIDIA Vera CPUs added to CoreWeave cloudproduct | 2026-09-30 | - | - | stated |
| Vera Rubin NVL72 systems in production on CoreWeave cloudproduct | 2026-09-30 | - | - | stated |
| Validated partner network launch (CrowdStrike, VAST Data, Reflection, ClickHouse)partnership | 2026-09-30 | - | - | stated |
| Forge AI development platform launchproduct | 2026-09-30 | - | - | stated |
| Vera consumption models incl. spot at up to 60% savingsproduct | 2026-09-30 | - | 60.0 percent | stated |
| Vera Rubin NVL72 production availabilityproduct | 2026-09-30 | - | - | stated |
| Rubin systems operating on CoreWeave cloudproduct | 2026-09-30 | - | - | stated |
| Validated partner network launchpartnership | 2026-09-30 | - | - | stated |
| Joint go-to-market and shared engineering with partnerspartnership | 2026-09-30 | - | - | stated |
| Foundation model provider customer basecustomer | 2026-09-30 | - | 9.0 customers | stated |
| SemiAnalysis ClusterMAX Platinum rankingproduct | 2026-09-30 | - | 3.0 times | stated |
| Chen Goldberg EVP product & engineeringpersonnel | 2026-09-30 | - | - | stated |
| Rack-scale Vera configuration at CoreWeaveproduct | 2026-09-30 | - | - | stated |
| Ennoble Care deploying NVIDIA RTX PRO 6000 Blackwell nodes on CKSproduct | 2026-09-30 | - | - | stated |
| CKS container spin-up 8-10x faster than general-purpose cloudproduct | 2026-09-30 | - | 10.0 x | stated |
| Jon Jones is CoreWeave chief revenue officerpersonnel | 2026-09-30 | - | - | stated |
| Cognition Vera Rubin NVL72 cluster stood up in early September 2026facility timeline | 2026-09-30 | - | - | stated |
| Vera Rubin 3.8x output token throughput for Cognition RL workloadsproduct | 2026-09-30 | - | 3.8 x | stated |
| Vera Rubin 10x token throughput per MW vs GB200 on DeepSeek R1product | 2026-09-30 | - | 10.0 x | stated |
| Dell PowerRack GB200/GB300 NVL72 deployment collaborationpartnership | 2026-09-30 | - | - | stated |
| NVIDIA relationship since 2017; Volta still in servicepartnership | 2026-09-30 | - | - | stated |
| Vera Rubin runs on same tooling as GB200/GB300 fleetsproduct | 2026-09-30 | - | - | stated |
| NVIDIA Volta GPUs still in commercial serviceproduct | 2026-09-30 | - | - | stated |
| Forge shown in San Franciscoproduct | 2026-09-30 | - | - | stated |
| CoreWeave subpoenaed as third party in NAI v. NVIDIA patent caseother | 2026-09-30 | - | - | verified |
| CoreWeave objected to NAI subpoena; motion to compel filed in W.D. Tex.other | 2026-09-30 | - | - | verified |
| NAI alleges NVIDIA GPUs used by customers such as CoreWeave infringe its patentsother | 2026-09-30 | - | - | stated |
| CEO Intrator discretionary share salepersonnel | 2026-09-30 | - | 6888224.88 USD | stated |
| CEO says margins higher than a year agoguidance | 2026-09-30 | - | - | stated |
| FY2026 CapEx guidance raised to $35B-$39Bguidance | 2026-09-29 | 2026-12-31 | 35000000000.0 USD | stated |
| Revenue backlog of $104.2B, up 246% YoYcustomer | 2026-09-29 | - | 104200000000.0 USD | stated |
| Quarterly CapEx of $9.4Bfinancing | 2026-09-29 | - | 9400000000.0 USD | stated |
| CEO Intrator 10b5-1 plan salespersonnel | 2026-09-29 | - | 26000000.0 USD | stated |
| Q2 revenue $2.58Bguidance | 2026-09-28 | - | 2580000000.0 USD | stated |
| Revenue backlog ~$104B at end of Junecustomer | 2026-09-28 | - | 104000000000.0 USD | stated |
| $25B+ additional customer commitments early Q3customer | 2026-09-28 | - | 25000000000.0 USD | stated |
| Short-term contract pricing ~$40M ARR per MWcustomer | 2026-09-28 | - | 40000000.0 USD/MW | stated |
| Contracted power ~4.2 GW by Augustfacility capacity | 2026-09-28 | - | 4200.0 MW | stated |
| Q2 capex $9.4Bfinancing | 2026-09-28 | - | 9400000000.0 USD | stated |
| $3.7B convertible notes offeringfinancing | 2026-09-28 | - | 3700000000.0 USD | stated |
| Program to sell up to 35M sharesfinancing | 2026-09-28 | - | 35000000.0 shares | stated |
| Engineering services for physical AIproduct | 2026-09-28 | - | - | stated |
| Backlog ~$104B plus >$25B new commitmentscustomer | 2026-09-28 | - | 25000000000.0 USD | stated |
| Contracted power increased to 4.2 GWfacility capacity | 2026-09-28 | - | 4200.0 MW | stated |
| $25B in new customer commitments beyond June 30 backlogcustomer | 2026-09-28 | - | 25000000000.0 USD | stated |
| New compute contracts priced higher since end of Junecustomer | 2026-09-28 | - | - | stated |
| Price increases across product portfolioproduct | 2026-09-28 | - | 25.0 percent | stated |
| Shift to short-dated customer contracts at ~$40M/MWcustomer | 2026-09-28 | - | 40000000.0 USD/MW | stated |
| Typical five-year customer contractscustomer | 2026-09-28 | - | 5.0 years | stated |
| $25B in new customer commitments since June 30customer | 2026-09-28 | - | 25000000000.0 USD | stated |
| Infrastructure and software provide performance advantageproduct | 2026-09-26 | - | - | stated |
| Client contract preference for 2-3 year termsguidance | 2026-09-26 | - | - | stated |
| Unified AI Infrastructure for training and inferenceproduct | 2026-09-26 | - | - | stated |
| Acquisition of Weights and Biasesacquisition | 2026-09-26 | - | - | stated |
| Omni AI stack for private data center licensingproduct | 2026-09-26 | - | - | stated |
| Enterprise demand expansionguidance | 2026-09-26 | - | - | stated |
| Platform quality drives customer retention and expansionproduct | 2026-09-26 | - | - | stated |
| Purpose-built infrastructure creates performance advantageproduct | 2026-09-26 | - | - | stated |
| Enterprise-grade security and observabilityproduct | 2026-09-26 | - | - | stated |
| Flexible financing for multi-year contractsfinancing | 2026-09-26 | - | - | stated |
| Business durability beyond GPU scarcityguidance | 2026-09-26 | - | - | stated |
| Shorter-duration contracts and spot pricing rolloutfinancing | 2026-09-26 | - | - | stated |
| Contract cash flow model supports debt repayment and returnsfinancing | 2026-09-26 | - | - | stated |
| Third consecutive Platinum ClusterMAX rating from SemiAnalysisproduct | 2026-09-25 | - | - | stated |
| Only provider to achieve three Platinum ClusterMAX ratingsproduct | 2026-09-25 | - | - | stated |
| Recent $3.7 billion convertible notefinancing | 2026-09-25 | - | 3700000000.0 USD | stated |
| Vera Rubin NVL72 validationproduct | 2026-09-25 | - | - | stated |
| Revenue backlogfinancing | 2026-09-25 | - | 104000000000.0 USD | stated |
| New AI agent and Field Engineering servicesproduct | 2026-09-25 | - | - | stated |
| Vera Rubin rack power capacityfacility capacity | 2026-09-25 | - | 250.0 kilowatts | stated |
| Convertible senior notes salefinancing | 2026-09-25 | - | - | stated |
| AI computing capacity offeringproduct | 2026-09-25 | - | - | stated |
| Near-term capacity sold outfacility capacity | 2026-09-25 | - | - | stated |
| Q2 2026 capital spendingfinancing | 2026-09-25 | - | - | stated |
| Q2 2026 revenuecustomer | 2026-09-25 | - | - | stated |
| Typical contract durationcustomer | 2026-09-25 | - | - | stated |
| Capital funding modelfinancing | 2026-09-25 | - | - | stated |
| Q3 2026 adjusted operating income guidanceguidance | 2026-09-25 | 2026-09-30 | 200.0 million USD | outcome unconfirmed |
| Price increaseproduct | 2026-09-25 | - | - | stated |
| Q4 2026 adjusted operating margin guidanceguidance | 2026-09-25 | 2026-12-31 | - | stated |
| Nvidia Vera Rubin NVL72 validation on CoreWeave Cloudproduct | 2026-09-25 | - | - | stated |
| Autonomous AI agent deployment serviceproduct | 2026-09-25 | - | - | stated |
| Physical AI Field Engineering serviceproduct | 2026-09-25 | - | - | stated |
| Purpose-built facilities redesign for high-density AI infrastructurefacility capacity | 2026-09-25 | - | - | stated |
| AI infrastructure capacity build-out with Nvidia partnershipfacility capacity | 2026-09-24 | 2030-12-31 | 5.0 GW | stated |
| Multiyear AI infrastructure agreement with Metacustomer | 2026-09-24 | - | - | stated |
| Compute agreement with Anthropic for Claude developmentcustomer | 2026-09-24 | - | - | stated |
| Multibillion-dollar AI cloud agreement with Jane Streetcustomer | 2026-09-24 | - | - | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-24 | 2026-12-31 | 12400000000.0 USD | stated |
| Convertible notes offering and at-the-market share programfinancing | 2026-09-24 | - | 3700.0 USD | stated |
| Q3 2026 revenue guidanceguidance | 2026-09-24 | 2026-09-30 | 3450.0 USD | outcome unconfirmed |
| Q3 2026 capital expenditure guidanceguidance | 2026-09-24 | 2026-09-30 | 11500.0 USD | outcome unconfirmed |
| Full-year 2026 revenue guidanceguidance | 2026-09-24 | 2026-12-31 | 12400.0 USD | stated |
| Full-year 2026 capital expenditure guidanceguidance | 2026-09-24 | 2026-12-31 | 35000.0 USD | stated |
| Year-end 2026 annualized run-rate revenue forecastguidance | 2026-09-24 | 2026-12-31 | 18500.0 USD | stated |
| Revenue backlog and Q3 customer commitmentscustomer | 2026-09-24 | - | 104000.0 USD | stated |
| Contribution margin improvement from higher pricing on new contractsguidance | 2026-09-24 | - | - | stated |
| Contribution margin improvement from stronger pricingguidance | 2026-09-24 | - | 5.0 percent | stated |
| 2026 outlook raisedguidance | 2026-09-24 | - | - | stated |
| At-the-market share offering announcedfinancing | 2026-09-24 | - | - | stated |
| CoreWeave contracted power 3.1 GW at end of 2025facility capacity | 2026-09-24 | - | 3.1 GW | stated |
| Higher pricing adds 5-10 pts to contribution margin on new contractsguidance | 2026-09-24 | - | - | stated |
| CoreWeave at-the-market share offeringfinancing | 2026-09-24 | - | - | stated |
| Contribution margin uplift on new contractsguidance | 2026-09-24 | - | 10.0 percentage points | stated |
| Mission Control MCP general availabilityproduct | 2026-09-24 | - | - | stated |
| Mission Control Agent in console (preview)product | 2026-09-24 | - | - | stated |
| Hardware telemetry at no additional chargeproduct | 2026-09-24 | - | - | stated |
| Cognition first Vera Rubin NVL72 customercustomer | 2026-09-24 | - | - | stated |
| Third consecutive Platinum ClusterMAX ratingproduct | 2026-09-24 | - | 3.0 consecutive ratings | stated |
| 25% product price changes in Julyproduct | 2026-09-24 | - | 25.0 percent | stated |
| Contribution margins on new agreements up 5-10 pointsguidance | 2026-09-24 | - | 10.0 percentage points | stated |
| ~$104B backlogcustomer | 2026-09-24 | - | 104000000000.0 USD | stated |
| >$25B net new customer commitments early Q3customer | 2026-09-24 | - | 25000000000.0 USD | stated |
| Q2 property and equipment spending $6.422Bfinancing | 2026-09-24 | - | 6422000000.0 USD | stated |
| Recourse debt $31.405B as of June 30financing | 2026-09-24 | - | 31405000000.0 USD | stated |
| Non-recourse debt $3.663B as of June 30financing | 2026-09-24 | - | 3663000000.0 USD | stated |
| Short-term Q3 compute contracts at ~$40M annualized revenue per MWcustomer | 2026-09-24 | - | 40000000.0 USD | stated |
| Contracted power ~4.2 GW as of Aug 11facility capacity | 2026-09-24 | - | 4200.0 MW | stated |
| Multi-year agreement with Harell Datapartnership | 2026-09-23 | - | - | stated |
| SemiAnalysis Platinum ranking in ClusterMAX 1.0 and 2.0product | 2026-09-23 | - | - | stated |
| #1 ranking for Moonshot Kimi K2.6 inference benchmarkingproduct | 2026-09-23 | - | - | stated |
| Completed Nasdaq IPO (ticker: CRWV)financing | 2026-09-23 | - | - | stated |
| Third consecutive Platinum ClusterMAX ratingproduct | 2026-09-23 | - | - | stated |
| #1 inference speed and price-performance ranking for Moonshot AI Kimi K2.6product | 2026-09-23 | - | - | stated |
| Harell Data multiyear AI infrastructure customercustomer | 2026-09-23 | - | - | stated |
| Nvidia A100 and Hopper GPU supportproduct | 2026-09-23 | - | - | stated |
| Debt financing costfinancing | 2026-09-23 | - | 5.5 percent | stated |
| Data center facility in Plano, Texasfacility timeline - Plano Data Center | 2026-09-23 | - | - | stated |
| Early Q3 2026 net new commitmentsfinancing | 2026-09-23 | - | 25.0 USD billions | stated |
| Managed inference ARRproduct | 2026-09-23 | - | 100.0 USD millions | stated |
| NVIDIA Vera Rubin NVL72 validationpartnership | 2026-09-23 | - | - | stated |
| Weighted average debt cost reductionfinancing | 2026-09-23 | - | 300.0 bps | stated |
| Annualized savings from debt cost reductionfinancing | 2026-09-23 | - | 1.1 USD billions | stated |
| Revenue per gigawattfacility capacity | 2026-09-23 | - | 11000000000.0 USD/GW | stated |
| Customer concentrationcustomer | 2026-09-23 | - | 72.0 percent | stated |
| Revenue growthfinancing | 2026-09-23 | - | 112.0 percent | stated |
| Revenue per gigawattfacility capacity | 2026-09-23 | - | 11.0 billion USD/GW | stated |
| Harell Data multi-year AI cloud services agreementcustomer | 2026-09-23 | - | - | stated |
| Hudson River Trading NVIDIA Vera Rubin AI platform deploymentcustomer | 2026-09-23 | - | - | stated |
| Solidigm dedicated enterprise storage capacity commitmentfacility capacity | 2026-09-23 | - | - | stated |
| Parallel Works DARPA biological research partnershippartnership | 2026-09-23 | - | - | stated |
| Rescale cloud ecosystem integrationpartnership | 2026-09-23 | - | - | stated |
| IMC research infrastructure deploymentcustomer | 2026-09-23 | - | - | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-23 | 2026-12-31 | 12400000000.0 USD | stated |
| Year-end 2026 ARR guidanceguidance | 2026-09-23 | 2026-12-31 | 18500000000.0 USD | stated |
| $25 billion net new customer commitmentscustomer | 2026-09-23 | - | 25000000000.0 USD | stated |
| Convertible senior notes issuancefinancing | 2026-09-23 | - | 4200.0 USD | stated |
| FY2026 revenue guidanceguidance | 2026-09-23 | 2026-12-31 | - | stated |
| Year-end 2026 annualized run rate guidanceguidance | 2026-09-23 | 2026-12-31 | - | stated |
| Q3 2026 new customer commitmentscustomer | 2026-09-23 | - | 25000000000.0 USD | stated |
| Harell Data cloud partnershippartnership | 2026-09-23 | - | - | stated |
| Convertible senior notes offering closedfinancing | 2026-09-23 | 2033-04-01 | 4200.0 USD million | stated |
| Convertible notes net proceedsfinancing | 2026-09-23 | - | 4137.0 USD million | stated |
| Convertible notes annual interestfinancing | 2026-09-23 | - | 120.75 USD million | stated |
| Convertible notes conversion pricefinancing | 2026-09-23 | - | 97.85 USD per share | stated |
| Capped call initial cap pricefinancing | 2026-09-23 | - | 199.7 USD per share | stated |
| Capped-call transaction spendingfinancing | 2026-09-23 | - | 566.2 USD million | stated |
| Recourse debt outstanding as of June 30financing | 2026-09-23 | - | 31405.0 USD million | stated |
| Non-recourse debt outstanding as of June 30financing | 2026-09-23 | - | 3663.0 USD million | stated |
| Property and equipment purchases Q2 2026facility capacity | 2026-09-23 | - | 6422.0 USD million | stated |
| Q2 2026 revenueproduct | 2026-09-23 | - | 2575.0 USD million | stated |
| Intends to use proceeds for general corporate purposesfinancing | 2026-09-23 | - | - | stated |
| Established at-the-market share offering programfinancing | 2026-09-23 | - | 35.0 units | stated |
| Only Platinum provider in all ClusterMAX evaluationsproduct | 2026-09-23 | - | - | stated |
| Leading foundation model provider customerscustomer | 2026-09-23 | - | - | stated |
| MLPerf benchmark performanceproduct | 2026-09-23 | - | - | stated |
| Moonshot Kimi K2.6 inference performance rankingproduct | 2026-09-23 | - | - | stated |
| SemiAnalysis Platinum ClusterMAX ratingproduct | 2026-09-23 | - | - | stated |
| Harell Data multi-year agreement to run AI platform on CoreWeave Cloudcustomer | 2026-09-23 | - | - | stated |
| Harell Data training runs on CoreWeave NVIDIA A100 and Hopper GPUsproduct | 2026-09-23 | - | - | stated |
| $4.2B convertible notes offering completedfinancing | 2026-09-23 | - | 4200000000.0 USD | stated |
| Convertible notes interest and maturity schedulefinancing | 2026-09-23 | 2033-04-01 | 2.875 percent | stated |
| Capped call transactions funded from proceedsfinancing | 2026-09-23 | - | 566200000.0 USD | stated |
| Use of remaining note proceedsfinancing | 2026-09-23 | - | - | stated |
| Vera Rubin NVL72 Cluster Rolloutproduct | 2026-09-22 | - | - | stated |
| AI Object Storage Cross-Region Write Accelerationproduct | 2026-09-22 | - | - | stated |
| New Archive Storage Tierproduct | 2026-09-22 | - | - | stated |
| Recent Convertible Notes and Equity Offeringsfinancing | 2026-09-22 | - | - | stated |
| Archive storage tier for cold datasetsproduct | 2026-09-22 | - | - | stated |
| Q2 2026 revenue backlogcustomer | 2026-09-22 | - | 104.2 billion USD | stated |
| Q2 2026 quarterly revenueguidance | 2026-09-22 | - | 2.6 billion USD | stated |
| Planned capital raisefinancing | 2026-09-22 | - | - | stated |
| Q2 2026 revenuefinancing | 2026-09-22 | - | 2.58 B USD | stated |
| $104 billion customer backlogcustomer | 2026-09-22 | - | 104.0 B USD | stated |
| Meta contractcustomer | 2026-09-22 | - | 21.0 B USD | stated |
| OpenAI contractcustomer | 2026-09-22 | - | 22.4 B USD | stated |
| Enterprise customerscustomer | 2026-09-22 | - | - | stated |
| Cash reservesfinancing | 2026-09-22 | - | 6.4 B USD | stated |
| Total debtfinancing | 2026-09-22 | - | 51.6 B USD | stated |
| Q2 interest expensefinancing | 2026-09-22 | - | 640.0 M USD | stated |
| Debt-to-equity ratiofinancing | 2026-09-22 | - | 8.94 ratio | stated |
| Free cash flowfinancing | 2026-09-22 | - | -5.74 B USD | stated |
| Revenue growthfinancing | 2026-09-22 | - | 112.3 percent | stated |
| Adjusted EBITDA marginfinancing | 2026-09-22 | - | 59.0 percent | stated |
| Remote Key Encryptionproduct | 2026-09-22 | - | - | stated |
| Support Access Management controlsproduct | 2026-09-22 | - | - | stated |
| CoreWeave IAMproduct | 2026-09-22 | - | - | stated |
| Automated User Provisioningproduct | 2026-09-22 | - | - | stated |
| SUNKproduct | 2026-09-22 | - | - | stated |
| SUNK User Provisioningproduct | 2026-09-22 | - | - | stated |
| IBM partnership for Remote Key Encryptionpartnership | 2026-09-22 | - | - | stated |
| Remote Key Encryption with KMIP supportproduct | 2026-09-22 | - | - | stated |
| Capital raise through equity and debt offeringsfinancing | 2026-09-22 | - | - | stated |
| Total backlogfinancing | 2026-09-22 | - | 104.0 USD billions | stated |
| Meta customer commitmentcustomer | 2026-09-22 | - | 21.0 USD billions | stated |
| OpenAI customer commitmentcustomer | 2026-09-22 | - | 22.4 USD billions | stated |
| Enterprise customer basecustomer | 2026-09-22 | - | - | stated |
| Cash balancefinancing | 2026-09-22 | - | 6.4 USD billions | stated |
| Remote Key Encryption limited availability releaseproduct | 2026-09-22 | 2026-12-31 | - | stated |
| Planned capital raise via equity and debtfinancing | 2026-09-22 | - | - | stated |
| Capital raising through stock and debt offeringsfinancing | 2026-09-22 | - | - | stated |
| Revenue backlog of $104 billioncustomer | 2026-09-22 | - | 104.0 billion USD | stated |
| New customer commitments of $25 billion in early Q3customer | 2026-09-22 | - | 25.0 billion USD | stated |
| Contracted power capacity of 4.2 gigawattsfacility capacity | 2026-09-22 | - | 4.2 gigawatts | stated |
| Power capacity target of at least 8 gigawatts by 2030facility capacity | 2026-09-22 | 2030-12-31 | 8.0 gigawatts | stated |
| Managed inference ARR exceeds $100 millionproduct | 2026-09-22 | - | - | stated |
| Full-year 2026 revenue guidance raised to $12.4-$13.2 billionguidance | 2026-09-22 | 2026-12-31 | 12.8 billion USD | stated |
| Full-year 2026 capex guidance of $35-$39 billionguidance | 2026-09-22 | 2026-12-31 | 37.0 billion USD | stated |
| Pricing increase of approximately 25% in July 2026product | 2026-09-22 | - | - | stated |
| Annualized savings of $1.1 billion from reduced debt costfinancing | 2026-09-22 | - | 1.1 billion USD | stated |
| Revenue backlogcustomer | 2026-09-22 | - | 104000000000.0 USD | stated |
| New customer commitments in Q3 2026customer | 2026-09-22 | - | 25000000000.0 USD | stated |
| Data center power capacity target by 2030facility capacity | 2026-09-22 | 2030-12-31 | 8000.0 MW | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-22 | 2026-12-31 | 12800000000.0 USD | stated |
| Full-year 2026 capex guidanceguidance | 2026-09-22 | 2026-12-31 | 37000000000.0 USD | stated |
| Capital raise through stock and debt issuancefinancing | 2026-09-22 | - | - | stated |
| Q2 2026 revenueguidance | 2026-09-22 | - | 2600000000.0 USD | stated |
| Q2 2026 adjusted EBITDAguidance | 2026-09-22 | - | 1500000000.0 USD | stated |
| July pricing increaseproduct | 2026-09-22 | - | 25.0 percent | stated |
| Active power Q2 2026facility capacity | 2026-09-22 | - | 1500.0 MW | stated |
| Contracted powerfacility capacity | 2026-09-22 | - | 4200.0 MW | stated |
| 8 GW power target by 2030facility capacity | 2026-09-22 | 2030-12-31 | 8000.0 MW | stated |
| Contribution margins on recent contractscustomer | 2026-09-22 | - | - | stated |
| Managed inference ARRproduct | 2026-09-22 | - | 100000000.0 USD | stated |
| FY2026 revenue guidance raisedguidance | 2026-09-22 | 2026-12-31 | 13200000000.0 USD | stated |
| FY2026 capex guidanceguidance | 2026-09-22 | 2026-12-31 | 39000000000.0 USD | stated |
| Total liabilities and leveragefinancing | 2026-09-22 | - | 72050000000.0 USD | stated |
| Reduced weighted average debt costfinancing | 2026-09-22 | - | 1100000000.0 USD | stated |
| Securities class actionregulatory | 2026-09-22 | - | - | stated |
| Nasdaq-100 inclusionregulatory | 2026-09-22 | - | - | stated |
| $2.6B delayed-draw term loanfinancing | 2026-09-22 | - | 2600000000.0 USD | stated |
| Q2 financing cash flow and debt issuancefinancing | 2026-09-22 | - | 13457000000.0 USD | stated |
| June 30 recourse debtfinancing | 2026-09-22 | - | 31405000000.0 USD | stated |
| June 30 non-recourse debtfinancing | 2026-09-22 | - | 3663000000.0 USD | stated |
| Q2 net interest expensefinancing | 2026-09-22 | - | 640000000.0 USD | stated |
| Q2 property and equipment spendingfacility capacity | 2026-09-22 | - | 6422000000.0 USD | stated |
| Backlog ~$104B as of June 30customer | 2026-09-22 | - | 104000000000.0 USD | stated |
| $25B+ commitments secured early Julycustomer | 2026-09-22 | - | 25000000000.0 USD | stated |
| Active power footprint 1.5 GWfacility capacity | 2026-09-22 | - | 1500.0 MW | stated |
| Active power >1.85 GW by year-endguidance | 2026-09-22 | 2026-12-31 | 1850.0 MW | stated |
| Q2 revenue $2.575B, up 112%guidance | 2026-09-22 | - | 2575000000.0 USD | stated |
| Q2 adjusted EBITDA and net lossguidance | 2026-09-22 | - | 1510000000.0 USD | stated |
| $4.2B 2.875% convertible senior notes due 2033 completedfinancing | 2026-09-22 | 2033-04-01 | 4200000000.0 USD | stated |
| Convertible notes interest payments begin April 2027financing | 2026-09-22 | 2027-04-01 | 2.875 percent | stated |
| Convertible notes initial conversion price ~$97.85financing | 2026-09-22 | - | 97.85 USD/share | stated |
| Capped call transactions cost ~$566.2M, cap price $199.70financing | 2026-09-22 | - | 566200000.0 USD | stated |
| Power capacity target of at least 8 GW by 2030facility capacity | 2026-09-22 | 2030-12-31 | 8000.0 MW | stated |
| FY2026 revenue guidance raised to $12.4–13.2Bguidance | 2026-09-22 | 2026-12-31 | 12400000000.0 USD | stated |
| FY2026 capex guidance of $35–39Bguidance | 2026-09-22 | 2026-12-31 | 35000000000.0 USD | stated |
| Proposed $3B convertible senior notes due 2033financing | 2026-09-22 | - | 3000000000.0 USD | stated |
| Program to distribute up to 35M Class A sharesfinancing | 2026-09-22 | - | 35000000.0 units | stated |
| $4.2B 2.875% convertible notes due 2033financing | 2026-09-22 | - | 4200000000.0 USD | stated |
| Q2 2026 revenuefinancing | 2026-09-21 | - | 2.6 billion USD | stated |
| Revenue backlogcustomer | 2026-09-21 | - | 104.2 billion USD | stated |
| A100 system contractcustomer | 2026-09-21 | 2029-12-31 | - | stated |
| Product pricing increaseproduct | 2026-09-21 | - | 25.0 percent | stated |
| Q2 2026 interest expensefinancing | 2026-09-21 | - | 640.0 million USD | stated |
| Q2 2026 adjusted operating incomefinancing | 2026-09-21 | - | 128.0 million USD | stated |
| Debt cost reductionfinancing | 2026-09-21 | - | 300.0 basis points | stated |
| Q3 2026 interest expense guidanceguidance | 2026-09-21 | 2026-09-30 | 900.0 million USD | outcome unconfirmed |
| Q3 2026 adjusted operating income guidanceguidance | 2026-09-21 | 2026-09-30 | 230.0 million USD | outcome unconfirmed |
| Full-year 2026 capital spending guidanceguidance | 2026-09-21 | 2026-12-31 | 37.0 billion USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-21 | 2026-12-31 | 12.8 billion USD | stated |
| Power capacity additionfacility capacity | 2026-09-21 | - | 300.0 MW | stated |
| New customer commitments added in early Q3customer | 2026-09-21 | - | 25.0 billion USD | stated |
| Near-term capacity statusfacility capacity | 2026-09-21 | - | - | stated |
| Vera Rubin cluster deploymentproduct | 2026-09-21 | - | - | stated |
| AI Object Storage platform enhancementsproduct | 2026-09-21 | - | - | stated |
| Physical AI Field Engineering offeringproduct | 2026-09-21 | - | - | stated |
| Managed inference ARR targetguidance | 2026-09-21 | 2026-12-31 | 250.0 million USD | stated |
| Storage, CPU, networking, software ARRfinancing | 2026-09-21 | - | 400.0 million USD | stated |
| Q2 adjusted EBITDAfinancing | 2026-09-21 | - | 1.5 billion USD | stated |
| 2026 adjusted operating income guidanceguidance | 2026-09-21 | 2026-12-31 | - | stated |
| Year-end 2026 active power capacity targetfacility capacity | 2026-09-21 | 2026-12-31 | 1.85 GW | stated |
| 2026 annualized run-rate revenueguidance | 2026-09-21 | 2026-12-31 | - | stated |
| Q2 capital expenditurefinancing | 2026-09-21 | - | 9.4 billion USD | stated |
| Construction in progressfinancing | 2026-09-21 | - | 11.9 billion USD | stated |
| 2026 full-year capital expenditure guidanceguidance | 2026-09-21 | 2026-12-31 | - | stated |
| Q2 net lossfinancing | 2026-09-21 | - | 626.0 million USD | stated |
| End Q2 active powerfacility capacity | 2026-09-21 | - | 1.5 GW | stated |
| End Q2 contracted powerfacility capacity | 2026-09-21 | - | 3.7 GW | stated |
| Updated contracted powerfacility capacity | 2026-09-21 | - | 4.2 GW | stated |
| Q3 capital expenditure guidanceguidance | 2026-09-21 | 2026-09-30 | - | outcome unconfirmed |
| Q3 interest expense projectionguidance | 2026-09-21 | 2026-09-30 | - | outcome unconfirmed |
| IPO pricingfinancing | 2026-09-21 | - | 40.0 USD | stated |
| Data center operationsfacility capacity | 2026-09-21 | - | 51.0 units | stated |
| GPU capacityfacility capacity | 2026-09-21 | - | 250000.0 units | stated |
| Nvidia investor stakefinancing | 2026-09-21 | - | 11.5 percent | stated |
| Top customerscustomer | 2026-09-21 | - | - | stated |
| 2025 annual revenueguidance | 2026-09-21 | - | 5.1 USD | stated |
| 2025 adjusted EBITDAguidance | 2026-09-21 | - | 3.1 USD | stated |
| Contracted revenue backlog Q2 2026guidance | 2026-09-21 | - | 104.0 USD | stated |
| Locked-in revenue ratio 2026guidance | 2026-09-21 | 2026-12-31 | 75.0 percent | stated |
| Debt-to-equity ratio Q2 2026financing | 2026-09-21 | - | 14.3 | stated |
| AI processing speed advantageproduct | 2026-09-21 | - | 35.0 x | stated |
| Cost efficiency advantageproduct | 2026-09-21 | - | 80.0 percent | stated |
| Number of operational data centersfacility capacity | 2026-09-21 | - | 51.0 data centers | stated |
| GPU processing capacityfacility capacity | 2026-09-21 | - | 250000.0 GPUs | stated |
| Processing speed vs AWS/Azureproduct | 2026-09-21 | - | 35.0 times faster | stated |
| Cost advantage vs AWS/Azureproduct | 2026-09-21 | - | 80.0 percent | stated |
| Major customerscustomer | 2026-09-21 | - | - | stated |
| Projected 2026 revenueguidance | 2026-09-21 | 2026-12-31 | 12.9 billion USD | stated |
| Number of data centersfacility capacity | 2026-09-21 | - | 51.0 data centers | stated |
| GPU cost advantageproduct | 2026-09-21 | - | 80.0 percent | stated |
| Contracted revenue backlogfinancing | 2026-09-21 | - | 104000000000.0 USD | stated |
| Projected 2026 revenueguidance | 2026-09-21 | 2026-12-31 | 12900000000.0 USD | stated |
| Nvidia investmentfinancing | 2026-09-21 | - | - | stated |
| Blackwell and Vera Rubin SKU pricing increaseproduct | 2026-09-21 | - | - | stated |
| Balance sheet capital structurefinancing | 2026-09-21 | - | - | stated |
| Installed GPU capacityfacility capacity | 2026-09-21 | - | 250000.0 units | stated |
| AI processing performance advantageproduct | 2026-09-21 | - | - | stated |
| Revenue locked into contractsguidance | 2026-09-21 | - | 75.0 percent | stated |
| A100 system customer contract through 2029customer | 2026-09-21 | 2029-12-31 | - | stated |
| 300 MW power capacity to generate revenue in Q3-Q4 2026facility capacity | 2026-09-21 | 2026-12-31 | 300.0 MW | stated |
| Q4 2026 adjusted operating margin guidanceguidance | 2026-09-21 | 2026-12-31 | - | stated |
| CEO statement on moratorium impactfacility timeline | 2026-09-21 | - | - | stated |
| Convertible Senior Notes Offeringfinancing | 2026-09-21 | - | 4200.0 millions USD | stated |
| Convertible Notes Net Proceedsfinancing | 2026-09-21 | - | 4137.0 millions USD | stated |
| Capped Call Transactions Costfinancing | 2026-09-21 | - | 566.2 millions USD | stated |
| Convertible Notes Interest Ratefinancing | 2026-09-21 | 2027-04-01 | 2.875 percent | stated |
| Convertible Notes Maturityfinancing | 2026-09-21 | 2033-04-01 | 4200.0 millions USD | stated |
| Convertible Notes Initial Conversion Pricefinancing | 2026-09-21 | - | 97.85 USD per share | stated |
| Capped Call Cap Pricefinancing | 2026-09-21 | - | 199.7 USD per share | stated |
| Use of Net Proceedsguidance | 2026-09-21 | - | - | stated |
| Chief Executive Officerpersonnel | 2026-09-21 | - | - | stated |
| $3.7B convertible senior notes offeringfinancing | 2026-09-21 | 2033-04-01 | 3700000000.0 USD | stated |
| Offering upsized from $3.0B to $3.7Bfinancing | 2026-09-21 | - | 3700000000.0 USD | stated |
| $500M greenshoe option on convertible notesfinancing | 2026-09-21 | - | 500000000.0 USD | stated |
| Settlement date for notes offeringfinancing | 2026-09-21 | 2026-09-22 | - | verified |
| Interest rate on convertible notesfinancing | 2026-09-21 | - | 2.875 percent | stated |
| Estimated net proceeds from offeringfinancing | 2026-09-21 | - | 3644500000.0 USD | stated |
| Allocation of proceeds for capped call transactionsfinancing | 2026-09-21 | - | 498800000.0 USD | stated |
| IPO pricefinancing | 2026-09-21 | - | 40.0 USD/share | stated |
| Data centers opened by end of 2022facility timeline | 2026-09-21 | - | 3.0 data centers | stated |
| GPU installationfacility capacity | 2026-09-21 | - | 250000.0 GPUs | stated |
| AI task processing cost advantageproduct | 2026-09-21 | - | 80.0 percent | stated |
| 2025 revenuefinancing | 2026-09-21 | - | 5.1 USD billion | stated |
| Percentage of 2026 revenue locked in contractsguidance | 2026-09-21 | 2026-12-31 | 75.0 percent | stated |
| Debt-to-equity ratio at end of latest quarterfinancing | 2026-09-21 | - | 14.3 ratio | stated |
| Digital Drive 15-year capacity leasepartnership - Digital Drive | 2026-09-21 | - | 2.94 billion USD | stated |
| Digital Drive IT capacityfacility capacity - Digital Drive | 2026-09-21 | - | 76.0 MW | stated |
| Digital Drive operations start datefacility timeline - Digital Drive | 2026-09-21 | - | - | stated |
| Microsoft revenue concentration in 2025customer | 2026-09-21 | - | - | stated |
| FY2025 revenuefinancing | 2026-09-21 | - | - | stated |
| FY2025 net lossfinancing | 2026-09-21 | - | - | stated |
| Free cash flow FY2025financing | 2026-09-21 | - | - | stated |
| $1.1B junk-bond sale for Digital Drive data centerfinancing - Digital Drive | 2026-09-21 | - | 1100000000.0 USD | stated |
| Digital Drive data center 15-year lease agreementcustomer - Digital Drive | 2026-09-21 | - | 2940000000.0 USD | stated |
| Digital Drive data center operations commencementfacility timeline - Digital Drive | 2026-09-21 | - | - | stated |
| FY2026 revenue forecastguidance | 2026-09-21 | - | 12400000000.0 USD | stated |
| IPO at $40 per sharefinancing | 2026-09-21 | - | 40.0 USD | stated |
| Nvidia 11.5% ownership stakepartnership | 2026-09-21 | - | 11.5 percent | stated |
| GPU computing performance claimsproduct | 2026-09-21 | - | - | stated |
| Major customers Meta, Microsoft, OpenAI, Anthropiccustomer | 2026-09-21 | - | - | stated |
| Contracted revenue backlog $104 billioncustomer | 2026-09-21 | - | 104000000000.0 USD | stated |
| Vera Rubin NVL72 validation and deploymentproduct | 2026-09-20 | - | - | stated |
| Multi-rack Vera Rubin GPU clusteringproduct | 2026-09-20 | - | - | stated |
| Software stack capabilities launching in 2026product | 2026-09-20 | 2026-12-31 | - | stated |
| Q3 2026 revenue guidanceguidance | 2026-09-20 | - | 3525.0 USD | stated |
| Full-year 2026 capital expenditure guidanceguidance | 2026-09-20 | - | 37000.0 USD | stated |
| Active power capacity target for end of 2026facility capacity | 2026-09-20 | 2026-12-31 | 1.85 GW | stated |
| Power capacity target for 2030facility capacity | 2026-09-20 | 2030-12-31 | 8.0 GW | stated |
| Meta infrastructure agreement with Vera Rubin accesspartnership | 2026-09-20 | 2032-12-31 | 21000.0 USD | stated |
| Anthropic infrastructure deployment for Claude training and inferencepartnership | 2026-09-20 | 2026-12-31 | - | stated |
| Jane Street cloud services agreementpartnership | 2026-09-20 | - | 6000.0 USD | stated |
| Revenue backlog from customer contractsguidance | 2026-09-19 | - | 104000000000.0 USD | stated |
| Fresh customer commitments in Q3customer | 2026-09-19 | - | 25000000000.0 USD | stated |
| Contracted GPU power capacityfacility capacity | 2026-09-19 | - | 4.2 GW | stated |
| New enterprise customerscustomer | 2026-09-19 | - | - | stated |
| Debt capital raise in Q2financing | 2026-09-19 | - | 10000000000.0 USD | stated |
| IPO in March 2025 at $40 per sharefinancing | 2026-09-19 | - | 40.0 USD | stated |
| Physical AI Field Engineering serviceproduct | 2026-09-18 | - | - | stated |
| Net new customer commitments in early Q3customer | 2026-09-18 | - | 25.0 billion USD | stated |
| Q3 2026 contract pricingproduct | 2026-09-18 | - | 40.0 million USD per MW | stated |
| Full-year 2026 capex guidanceguidance | 2026-09-18 | 2026-12-31 | 35.0 billion USD | stated |
| Q2 revenue and growthproduct | 2026-09-18 | - | 2.58 billion | stated |
| Revenue backlogcustomer | 2026-09-18 | - | 104.0 billion | stated |
| Total indebtednessfinancing | 2026-09-18 | - | 35.6 billion | stated |
| Q2 2026 revenue backlogguidance | 2026-09-18 | - | 104.2 USD billion | stated |
| Backlog tied to active delivery contractsguidance | 2026-09-18 | 2026-12-31 | - | stated |
| 2026 revenue guidanceguidance | 2026-09-18 | 2026-12-31 | - | stated |
| 2026 adjusted operating income guidanceguidance | 2026-09-18 | 2026-12-31 | - | stated |
| Year-end 2026 annualized run-rate revenueguidance | 2026-09-18 | 2026-12-31 | - | stated |
| Q2 2026 active power capacityfacility capacity | 2026-09-18 | - | 1.5 GW | stated |
| Q2 2026 power capacity additionsfacility capacity | 2026-09-18 | - | 500.0 MW | stated |
| Q2 2026 contracted power capacityfacility capacity | 2026-09-18 | - | 3.7 GW | stated |
| Contracted power post-Q2facility capacity | 2026-09-18 | - | 4.2 GW | stated |
| 2030 power capacity targetfacility capacity | 2026-09-18 | 2030-12-31 | 8.0 GW | stated |
| Q2 2026 capital expenditurefinancing | 2026-09-18 | - | 9.4 USD billion | stated |
| Q2 2026 construction in progressfinancing | 2026-09-18 | - | 11.9 USD billion | stated |
| Q2 2026 interest expensefinancing | 2026-09-18 | - | 640.0 USD million | stated |
| Q3 2026 interest expense guidanceguidance | 2026-09-18 | 2026-09-30 | - | outcome unconfirmed |
| Convertible note offeringfinancing | 2026-09-18 | - | 3700000000.0 USD | verified |
| Full-year 2026 revenue guidanceguidance | 2026-09-18 | 2026-12-31 | 12400000000.0 USD | stated |
| Managed inference annual recurring revenueproduct | 2026-09-18 | 2026-12-31 | 250000000.0 USD | stated |
| Full-year 2026 capital expenditure guidanceguidance | 2026-09-18 | 2026-12-31 | 35000000000.0 USD | stated |
| AI agents autonomous improvement offeringproduct | 2026-09-18 | - | - | stated |
| Nvidia Vera Rubin NVL72 bring-up and validationpartnership | 2026-09-18 | - | - | stated |
| Autonomous improvement capabilities cost reductionproduct | 2026-09-18 | - | 40.0 percent | stated |
| Autonomous improvement capabilities training accelerationproduct | 2026-09-18 | - | 1.4 times | stated |
| New customer commitments in Q3 2026customer | 2026-09-18 | - | 25000000000.0 USD | stated |
| Proportion of backlog tied to active customer deliverycustomer | 2026-09-18 | 2026-12-31 | - | stated |
| Contracted power capacityfacility capacity | 2026-09-18 | - | 4.2 GW | stated |
| 8 gigawatt capacity target by 2030facility capacity | 2026-09-18 | 2030-12-31 | 8.0 GW | stated |
| Convertible debt offeringfinancing | 2026-09-18 | - | 3700.0 USD | stated |
| Expected net proceeds from convertible offeringfinancing | 2026-09-18 | - | 3640.0 USD | stated |
| Capped call transaction spendingfinancing | 2026-09-18 | - | 499.0 USD | stated |
| Optional additional convertible debtfinancing | 2026-09-18 | - | 500.0 USD | stated |
| Additional customer commitments in Q3customer | 2026-09-18 | - | 25000.0 USD | stated |
| Revenue backlogguidance | 2026-09-18 | - | 104200.0 USD | stated |
| Convertible debt terms: 2.875% interest, 2033 maturityfinancing | 2026-09-18 | - | - | stated |
| $499M for capped call transactionsfinancing | 2026-09-18 | - | 499.0 USD | stated |
| $500M additional purchase optionfinancing | 2026-09-18 | - | 500.0 USD | stated |
| $25B+ customer commitments signed in Q3customer | 2026-09-18 | - | 25000.0 USD | stated |
| Convertible senior note offeringfinancing | 2026-09-18 | - | 3.7 billion USD | stated |
| Convertible notes offeringfinancing | 2026-09-18 | - | 3.5 billion USD | stated |
| At-the-market stock offeringfinancing | 2026-09-18 | - | 35.0 million shares | stated |
| Convertible notes offeringfinancing | 2026-09-18 | - | 3500000000.0 USD | stated |
| At-the-market equity programfinancing | 2026-09-18 | - | 35000000.0 units | stated |
| $3.5B convertible notes offeringfinancing | 2026-09-17 | 2033-12-31 | 3500.0 USD millions | stated |
| 35 million share ATM offeringfinancing | 2026-09-17 | - | 35.0 million shares | stated |
| Q3 2026 interest expense guidanceguidance | 2026-09-17 | 2026-09-30 | 900.0 USD millions | outcome unconfirmed |
| Full-year 2026 capital expenditure guidanceguidance | 2026-09-17 | 2026-12-31 | 37000.0 USD millions | stated |
| Revenue backlog of $104 billioncustomer | 2026-09-17 | - | 104000.0 USD millions | stated |
| New customer commitments of $25+ billioncustomer | 2026-09-17 | - | 25000.0 USD millions | stated |
| 4.2 gigawatts of contracted power capacityfacility capacity | 2026-09-17 | - | 4200.0 MW | stated |
| 15-year anchor lease with Blockfusion for Niagara Falls AI campuspartnership - Niagara Falls AI Campus | 2026-09-17 | - | - | stated |
| Multi-rack NVIDIA Vera Rubin NVL72 cluster deploymentproduct | 2026-09-17 | - | - | stated |
| Q2 2026 total liabilities of $72.05 billionfinancing | 2026-09-17 | - | 72050.0 USD millions | stated |
| Convertible debt offeringfinancing | 2026-09-17 | - | 3.0 billion USD | stated |
| Convertible debt additional purchase optionfinancing | 2026-09-17 | - | 500.0 million USD | stated |
| At-the-market stock sale programfinancing | 2026-09-17 | - | 2.92 billion USD | stated |
| Short-term compute capacity customer contractscustomer | 2026-09-17 | - | 40.0 million USD/MW | stated |
| Contracted power capacityfacility capacity | 2026-09-17 | - | 4.2 GW | stated |
| Revenue backlog Q2 2026guidance | 2026-09-17 | - | 104.2 billion USD | stated |
| Additional customer commitments early Q3 2026customer | 2026-09-17 | - | 25.0 billion USD | stated |
| $3 billion convertible note salefinancing | 2026-09-17 | 2033-04-01 | 3000.0 USD | stated |
| Convertible coupon rangefinancing | 2026-09-17 | - | - | stated |
| Convertible conversion premiumfinancing | 2026-09-17 | - | - | stated |
| $500 million purchase optionfinancing | 2026-09-17 | - | 500.0 USD | stated |
| 35 million share sales programfinancing | 2026-09-17 | - | 35.0 shares | stated |
| Q2 2026 revenuecustomer | 2026-09-17 | - | 2580.0 USD | stated |
| Property and equipment capex (H1 2026)financing | 2026-09-17 | - | 14100.0 USD | stated |
| Operating cash flow (H1 2026)financing | 2026-09-17 | - | 3660.0 USD | stated |
| Interest expense (H1 2026)financing | 2026-09-17 | - | 1080.0 USD | stated |
| Total debt principal (June 30)financing | 2026-09-17 | - | 35550.0 USD | stated |
| Cash and undrawn capacity (June 30)financing | 2026-09-17 | - | 5520.0 USD | stated |
| $2.6 billion delayed-draw facilityfinancing | 2026-09-17 | - | 2600.0 USD | stated |
| Revenue backlogguidance | 2026-09-17 | - | 104200.0 USD | stated |
| Q3 net new commitmentscustomer | 2026-09-17 | - | 25000.0 USD | stated |
| Committed contracts as percentage of Q2 revenuecustomer | 2026-09-17 | - | 98.0 percent | stated |
| Q2 contract contribution margin improvementproduct | 2026-09-17 | - | 25.0 percent | stated |
| $3 billion convertible senior notes offering due 2033financing | 2026-09-17 | - | 3000000000.0 USD | stated |
| At-the-market program to sell up to 35 million Class A sharesfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| Plans to use proceeds for capped call transactions to mitigate dilutionfinancing | 2026-09-17 | - | - | stated |
| AI Object Storage cross-region write accelerationproduct | 2026-09-17 | - | - | stated |
| AI Object Storage Archive tierproduct | 2026-09-17 | - | - | stated |
| NVL72 rack GPU capacityfacility capacity | 2026-09-17 | - | 72.0 Rubin GPUs | stated |
| NVL72 rack CPU capacityfacility capacity | 2026-09-17 | - | 36.0 Vera CPUs | stated |
| Local Object Transport Accelerator latency reductionproduct | 2026-09-17 | - | 8.0 times | stated |
| Local Object Transport Accelerator throughputproduct | 2026-09-17 | - | 7.0 GB/s per GPU | stated |
| Mission Control platform automationproduct | 2026-09-17 | - | - | stated |
| Multi-rack Spectrum-X Ethernet networkingproduct | 2026-09-17 | - | - | stated |
| ATM share offeringfinancing | 2026-09-17 | - | 35.0 million shares | stated |
| Convertible senior notes due 2033financing | 2026-09-17 | 2033-12-31 | 3000.0 million USD | stated |
| Q3 2026 new customer commitmentscustomer | 2026-09-17 | - | 25000.0 million USD | stated |
| Net new commitments in Q3 2026customer | 2026-09-17 | - | 25.0 USD billion | stated |
| 2026 full-year revenue guidanceguidance | 2026-09-17 | 2026-12-31 | 12.4 USD billion | stated |
| Year-end annualized run-rate revenue forecastguidance | 2026-09-17 | 2026-12-31 | 18.5 USD billion | stated |
| Total liquidity at end of Q2 2026financing | 2026-09-17 | - | 15.553 USD billion | stated |
| Net cash used in investing activities H1 2026financing | 2026-09-17 | - | 14.874 USD billion | stated |
| Financing activities provided H1 2026financing | 2026-09-17 | - | 13.985 USD billion | stated |
| Adjusted EBITDA Q2 2026financing | 2026-09-17 | - | 1.51 USD billion | stated |
| Adjusted EBITDA margin Q2 2026financing | 2026-09-17 | - | 59.0 percent | stated |
| Net loss Q2 2026financing | 2026-09-17 | - | 626.0 USD million | stated |
| At-the-market equity offering programfinancing | 2026-09-17 | - | 35.0 million shares | verified |
| Q3 customer commitmentscustomer | 2026-09-17 | - | 25.0 billion USD | verified |
| Q3 short-term customer contracts pricingcustomer | 2026-09-17 | - | 40.0 million USD per MW annualized | stated |
| Q2 2026 revenuescustomer | 2026-09-17 | - | 2.575 USD billion | stated |
| Q2 2026 capital expendituresfinancing | 2026-09-17 | - | 9.4 USD billion | stated |
| Q2 2026 net interest expensefinancing | 2026-09-17 | - | 640.0 USD million | stated |
| Q2 2026 liquidity positionfinancing | 2026-09-17 | - | 6.9 USD billion | stated |
| Q2 2026 capital raisefinancing | 2026-09-17 | - | 18.0 USD billion | stated |
| Q2 2026 adjusted operating marginguidance | 2026-09-17 | - | 5.0 percent | stated |
| Q2 2026 GAAP operating resultguidance | 2026-09-17 | - | -49.0 USD million | stated |
| Sequential Q2 adjusted operating incomeguidance | 2026-09-17 | - | 128.0 USD million | stated |
| Pricing increase July 2026product | 2026-09-17 | - | 25.0 percent | stated |
| Expected contribution margin improvementguidance | 2026-09-17 | - | - | stated |
| NVIDIA Rubin offeringproduct | 2026-09-17 | - | - | stated |
| Q2 2026 top three customer concentrationcustomer | 2026-09-17 | - | - | stated |
| Q2 2026 revenue growth attributioncustomer | 2026-09-17 | - | 93.0 percent | stated |
| Q2 2026 backlog conversion statusfacility capacity | 2026-09-17 | - | - | stated |
| Expected backlog conversion by year-end 2026guidance | 2026-09-17 | 2026-12-31 | - | stated |
| Customer market diversificationcustomer | 2026-09-17 | - | - | stated |
| $3.5B convertible note offeringfinancing | 2026-09-17 | - | 3.5 USD billions | stated |
| Convertible note coupon and conversion termsfinancing | 2026-09-17 | - | - | stated |
| At-the-market share programfinancing | 2026-09-17 | - | 35.0 units | stated |
| Total liabilities Q2 2026financing | 2026-09-17 | - | 72.05 USD billions | stated |
| Shareholders' equity Q2 2026financing | 2026-09-17 | - | 5.02 USD billions | stated |
| Revenue backlogcustomer | 2026-09-17 | - | 104.0 USD billions | stated |
| Q2 2026 revenuecustomer | 2026-09-17 | - | 2.6 USD billions | stated |
| Contracted power August 11 2026facility capacity | 2026-09-17 | - | 4.2 GW | stated |
| Contracted power Q2 endfacility capacity | 2026-09-17 | - | 3.7 GW | stated |
| AI compute contract pricingcustomer | 2026-09-17 | - | 40.0 USD per MW | stated |
| Cross-region write acceleration serviceproduct | 2026-09-17 | - | - | stated |
| Q2 2026 free cash flowfinancing | 2026-09-17 | - | -5.74 USD billions | stated |
| Q2 2026 adjusted EBITDAfinancing | 2026-09-17 | - | 1.5 $B | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-17 | - | - | stated |
| Year-end 2026 revenue run-rateguidance | 2026-09-17 | - | - | stated |
| Q2 2026 capexfinancing | 2026-09-17 | - | 9.4 $B | stated |
| Debt-to-equity ratiofinancing | 2026-09-17 | - | 8.94 | stated |
| NVIDIA Class A equity investmentpartnership | 2026-09-17 | - | 2.0 $B | stated |
| NVIDIA collaboration investmentpartnership | 2026-09-17 | - | 6.3 $B | stated |
| AI factory capacity target from NVIDIA partnershipfacility capacity | 2026-09-17 | 2030-12-31 | 5.0 GW | stated |
| First deployment of Vera Rubin NVL72product | 2026-09-17 | - | - | stated |
| At-the-market share offeringfinancing | 2026-09-17 | - | 35000000.0 units | stated |
| Convertible senior notes offeringfinancing | 2026-09-17 | - | 3000000000.0 USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-17 | 2026-12-31 | 12400000000.0 USD | stated |
| Year-end 2026 annualized revenue run-rate guidanceguidance | 2026-09-17 | 2026-12-31 | 18500000000.0 USD | stated |
| Share of backlog with active delivery by year-endguidance | 2026-09-17 | 2026-12-31 | - | stated |
| Q2 2026 contract contribution marginsguidance | 2026-09-17 | - | 7.5 percent | stated |
| Convertible notes offeringfinancing | 2026-09-17 | - | 3500000000.0 USD | stated |
| ATM share distribution programfinancing | 2026-09-17 | - | 35000000.0 units | stated |
| $25 billion Q3 new customer commitmentscustomer | 2026-09-17 | - | 25000000000.0 USD | stated |
| CoreWeave AI Object Storage service expansionproduct | 2026-09-17 | - | - | stated |
| Convertible notes offeringfinancing | 2026-09-17 | - | 3500.0 USD | stated |
| At-the-market offering of up to 35 million sharesfinancing | 2026-09-17 | - | 35.0 units | stated |
| NVIDIA Vera Rubin cluster deployment and AI Object Storage services expansionproduct | 2026-09-17 | - | - | stated |
| Revenue backlog as of June 30, 2026customer | 2026-09-17 | - | 104000.0 USD | stated |
| Net new customer commitments added in early Q3 2026customer | 2026-09-17 | - | 25000.0 USD | stated |
| Contracted power capacityfacility capacity | 2026-09-17 | - | 4200.0 MW | stated |
| Year-end 2026 revenue run-rate guidanceguidance | 2026-09-17 | 2026-12-31 | 18.5 USD | stated |
| Q3 2026 revenue guidanceguidance | 2026-09-17 | 2026-09-30 | 3.45 USD | outcome unconfirmed |
| Full-year 2026 capex guidanceguidance | 2026-09-17 | 2026-12-31 | 35.0 USD | stated |
| Q4 2026 adjusted operating margin guidanceguidance | 2026-09-17 | 2026-12-31 | - | stated |
| NVIDIA AI factory collaborationpartnership | 2026-09-17 | 2030-12-31 | 5000.0 MW | stated |
| Convertible debt offeringfinancing | 2026-09-17 | - | 3000000000.0 USD | stated |
| Optional additional convertible debtfinancing | 2026-09-17 | - | 500000000.0 USD | stated |
| At-the-market stock offering programfinancing | 2026-09-17 | - | 35000000.0 units | stated |
| Customer contract pricingcustomer | 2026-09-17 | - | 40000000.0 USD | stated |
| Additional customer commitments in Q3customer | 2026-09-17 | - | 25000000000.0 USD | stated |
| Convertible notes offeringfinancing | 2026-09-17 | 2033-04-01 | 3000.0 USD | stated |
| Convertible purchase optionfinancing | 2026-09-17 | - | 500.0 USD | stated |
| Equity distribution agreementfinancing | 2026-09-17 | - | 35.0 units | stated |
| Convertible debt offeringfinancing | 2026-09-17 | - | 3000.0 USD | stated |
| Convertible debt overallotment optionfinancing | 2026-09-17 | - | 500.0 USD | stated |
| $3 billion convertible senior notes offeringfinancing | 2026-09-17 | - | 3000.0 USD | stated |
| Convertible notes greenshoe optionfinancing | 2026-09-17 | - | 500.0 USD | stated |
| Maximum convertible debt proceedsfinancing | 2026-09-17 | - | 3500.0 USD | stated |
| At-the-market offering launch timingguidance | 2026-09-17 | - | - | stated |
| New AI Object Storage capabilitiesproduct | 2026-09-17 | - | - | stated |
| $3 billion convertible notes due 2033financing | 2026-09-17 | 2033-04-01 | 3.0 billion USD | stated |
| Q3 short-term customer agreements for compute capacitycustomer | 2026-09-17 | - | 40.0 million USD per MW | stated |
| Contracted power increased to 4.2 GWfacility capacity | 2026-09-17 | - | 4.2 GW | verified |
| $3 billion convertible debt offeringfinancing | 2026-09-17 | - | 3.0 billion USD | stated |
| At-the-market stock sale program of 35 million sharesfinancing | 2026-09-17 | - | 35.0 million shares | stated |
| Q3 short-term contracts at $40 million per MW annualizedcustomer | 2026-09-17 | - | 40.0 million USD per MW annualized | stated |
| Contracted power capacity of 4.2 GWfacility capacity | 2026-09-17 | - | 4.2 GW | stated |
| Revenue backlog of $104.2 billioncustomer | 2026-09-17 | - | 104.2 billion USD | stated |
| $25 billion customer commitments signed in early Q3customer | 2026-09-17 | - | 25.0 billion USD | stated |
| Convertible senior notes offeringfinancing | 2026-09-17 | 2033-12-31 | 3000000000.0 USD | stated |
| Additional convertible notes for initial purchasersfinancing | 2026-09-17 | - | 500000000.0 USD | stated |
| Net new customer commitmentscustomer | 2026-09-17 | - | 25000000000.0 USD | verified |
| ATM offering programfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| ATM program purpose and objectivesfinancing | 2026-09-17 | - | - | stated |
| Customer contracts at higher pricescustomer | 2026-09-17 | - | - | stated |
| Q3 contract durationproduct | 2026-09-17 | - | - | stated |
| Convertible debt offering announcedfinancing | 2026-09-17 | - | - | stated |
| Share sale offering announcedfinancing | 2026-09-17 | - | - | stated |
| Compute cloud contract prices increasedproduct | 2026-09-17 | - | - | stated |
| $3 billion convertible senior notesfinancing | 2026-09-17 | - | 3000000000.0 USD | stated |
| Convertible debt greenshoe optionfinancing | 2026-09-17 | - | 500000000.0 USD | stated |
| Use of convertible debt proceedsfinancing | 2026-09-17 | - | - | stated |
| $3 billion convertible senior notes offeringfinancing | 2026-09-17 | 2033-04-01 | 3000.0 USD | stated |
| At-the-market offering program for up to 35 million sharesfinancing | 2026-09-17 | - | 35000000.0 units | stated |
| Migration of enterprise credit profile toward investment gradeguidance | 2026-09-17 | - | - | stated |
| Convertible bond offeringfinancing | 2026-09-17 | - | 3000000000.0 USD | stated |
| $3 billion convertible bond issuancefinancing | 2026-09-17 | - | 3000000000.0 USD | stated |
| At-the-market offering to improve credit profile toward investment gradeguidance | 2026-09-17 | - | - | stated |
| Q3 Short-term Contract Pricingproduct | 2026-09-17 | - | 40.0 USD/MW | stated |
| Total Contracted Power Footprintfacility capacity | 2026-09-17 | - | 4.2 GW | stated |
| Additional Convertible Senior Note Optionfinancing | 2026-09-17 | - | 500000000.0 USD | stated |
| Potential Common Share Sale Agreementfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| Common share offeringfinancing | 2026-09-17 | - | 35000000.0 units | stated |
| First cloud provider to validate Vera Rubin NVL72product | 2026-09-17 | - | - | stated |
| Multi-year agreement with Hudson River Tradingcustomer | 2026-09-17 | - | - | stated |
| AI products and services ARR in Q2 2026product | 2026-09-17 | - | 400.0 million USD | stated |
| Managed inference ARRproduct | 2026-09-17 | - | 100.0 million USD | stated |
| Active power in Q2 2026facility capacity | 2026-09-17 | - | 1.5 GW | stated |
| Active power target for year-end 2026facility capacity | 2026-09-17 | 2026-12-31 | 1.85 GW | stated |
| Active power target for 2030facility capacity | 2026-09-17 | 2030-12-31 | 8.0 GW | stated |
| Q3 2026 expected net interest expensefinancing | 2026-09-17 | 2026-09-30 | 900.0 million USD | outcome unconfirmed |
| Convertible senior notes offeringfinancing | 2026-09-17 | - | 3.0 billion USD | stated |
| Optional convertible notes increasefinancing | 2026-09-17 | - | 0.5 billion USD | stated |
| 2026 capital expenditure guidanceguidance | 2026-09-17 | - | 35.0 billion USD | stated |
| Second quarter backlogcustomer | 2026-09-17 | - | 104.2 billion USD | stated |
| Third quarter customer commitmentscustomer | 2026-09-17 | - | 25.0 billion USD | stated |
| Q3 2026 customer contract pricingcustomer | 2026-09-17 | - | 40.0 million USD/MW | stated |
| Contracting new compute capacity at higher pricescustomer | 2026-09-17 | - | - | stated |
| Net new customer commitments in early Q3 2026customer | 2026-09-17 | - | 25000000000.0 USD | verified |
| $25B new customer commitments not in June 30 backlogcustomer | 2026-09-17 | - | 25000000000.0 USD | stated |
| New compute contracts priced higher since end of Junecustomer | 2026-09-17 | - | - | verified |
| Contracted power raised to 4.2 GWfacility capacity | 2026-09-17 | - | 4.2 GW | stated |
| $25B new customer commitments since June 30customer | 2026-09-17 | - | 25000000000.0 USD | stated |
| Proposed $3B convertible senior notes due 2033financing | 2026-09-17 | - | 3000000000.0 USD | stated |
| $3B convertible senior notes due 2033financing | 2026-09-17 | 2033-12-31 | 3000000000.0 USD | stated |
| Program to distribute up to 35M Class A sharesfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| Short-term Q3 contracts at ~$40M annualized revenue per MWcustomer | 2026-09-17 | - | 40000000.0 USD | stated |
| Higher pricing on new compute contractscustomer | 2026-09-17 | - | - | stated |
| Short-dated Q3 contracts at ~$40M per MWcustomer | 2026-09-17 | - | 40000000.0 USD/MW | stated |
| At-the-market program for up to 35M Class A sharesfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| Proposed $3B convertible note offeringfinancing | 2026-09-17 | - | 3000000000.0 USD | stated |
| 35M-share at-the-market programfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| Q3 short-term compute contracts at ~$40M per MWcustomer | 2026-09-17 | - | 40000000.0 USD/MW | stated |
| Total contracted power ~4.2 GW as of Aug 11facility capacity | 2026-09-17 | - | 4.2 GW | stated |
| $3B convertible senior notes due April 2033financing | 2026-09-17 | 2033-04-01 | 3000000000.0 USD | stated |
| ATM program up to 35M Class A sharesfinancing | 2026-09-17 | - | 35000000.0 shares | stated |
| Raised >$10B via unsecured debt and convertiblesfinancing | 2026-09-17 | - | 10000000000.0 USD | stated |
| $3.1B delayed-draw term loan closed in Q2financing | 2026-09-17 | - | 3100000000.0 USD | stated |
| $2.25B convertible notes Dec 2025financing | 2026-09-17 | - | 2250000000.0 USD | stated |
| Upsized $3.5B convertible offering April 2026financing | 2026-09-17 | - | 3500000000.0 USD | stated |
| $1.25B + €2B senior notes June 2026financing | 2026-09-17 | - | 1250000000.0 USD | stated |
| Total debt ~$29.8Bfinancing | 2026-09-17 | - | 29800000000.0 USD | stated |
| $3.0 billion convertible senior notes offering announcedfinancing | 2026-09-16 | - | 3000.0 USD million | stated |
| $500 million option on additional convertible notesfinancing | 2026-09-16 | - | 500.0 USD million | stated |
| Up to 35 million shares authorized for equity distribution offeringfinancing | 2026-09-16 | - | 35000000.0 shares | stated |
| Equity Distribution Agreement with 10 major investment bankspartnership | 2026-09-16 | - | - | withdrawn |
| Convertible notes guaranteed by wholly-owned subsidiariesfinancing | 2026-09-16 | - | - | stated |
| Expects to enter into capped call transactions to hedge convertible notesfinancing | 2026-09-16 | - | - | stated |
| Use of convertible notes proceeds for capped calls and general corporate purposesfinancing | 2026-09-16 | - | - | stated |
| Sales commission rate of up to 2.0% on equity offeringfinancing | 2026-09-16 | - | 2.0 percent | stated |
| Use of equity offering proceeds for debt repayment, capex, acquisitions, and investment grade migrationfinancing | 2026-09-16 | - | - | stated |
| 2033 Convertible notes issuancefinancing | 2026-09-16 | 2033-04-01 | 3000000000.0 USD | stated |
| Greenshoe option for convertible notesfinancing | 2026-09-16 | - | 500000000.0 USD | stated |
| Short-dated customer contract pricingcustomer | 2026-09-16 | - | 40000000.0 USD per MW | stated |
| New customer commitments and contracted powercustomer | 2026-09-16 | - | 25000000000.0 USD | stated |
| Revenue Backlog Q2 2026guidance | 2026-09-16 | - | 104.2 USD | stated |
| Contracted Power Capacityfacility capacity | 2026-09-16 | - | 4200.0 MW | stated |
| 5GW Cloud Infrastructure Buildoutfacility timeline | 2026-09-16 | - | 5000.0 MW | stated |
| Managed Inference ARR Growthproduct | 2026-09-16 | - | 100.0 USD | stated |
| Financial Services Revenue Concentrationcustomer | 2026-09-16 | - | 10.0 percent | stated |
| Caterpillar Deploymentcustomer | 2026-09-16 | - | - | stated |
| CrowdStrike SafeMind Partnershipcustomer | 2026-09-16 | - | - | stated |
| NVIDIA Vera Rubin NVL72 Deploymentpartnership | 2026-09-16 | - | - | stated |
| NVIDIA Strategic Investmentfinancing | 2026-09-16 | - | 2000.0 USD | stated |
| Convertible Senior Notes Offeringfinancing | 2026-09-16 | 2033-04-01 | 3500.0 USD | stated |
| Convertible Notes Coupon Ratefinancing | 2026-09-16 | - | - | stated |
| Convertible Notes Conversion Premiumfinancing | 2026-09-16 | - | - | stated |
| Google Cloud Partnershippartnership | 2026-09-16 | - | - | stated |
| IBM Collaborationpartnership | 2026-09-16 | - | - | stated |
| Nasdaq-100 Index Inclusionregulatory | 2026-09-16 | - | - | stated |
| SKU Pricing Increaseproduct | 2026-09-16 | - | 70.0 percent | stated |
| Q2 Contract Contribution Margin Improvementproduct | 2026-09-16 | - | 25.0 percent | stated |
| Q2 Deal Pricing per Megawattcustomer | 2026-09-16 | - | 40.0 USD | stated |
| Convertible senior notes offeringfinancing | 2026-09-16 | 2033-04-01 | 3000000000.0 USD | stated |
| Capped call transactions to hedge note dilutionfinancing | 2026-09-16 | - | - | stated |
| Multi-rack NVIDIA Vera Rubin NVL72 cluster availabilityproduct | 2026-09-16 | - | - | stated |
| CoreWeave AI Object Storage new capabilitiesproduct | 2026-09-16 | - | - | stated |
| First AI cloud to validate Vera Rubin NVL72product | 2026-09-16 | - | - | stated |
| Cohere uses CoreWeave AI Object Storagecustomer | 2026-09-16 | - | - | stated |
| Nasdaq IPO completionfinancing | 2026-09-16 | - | - | stated |
| Chen Goldberg EVP Product & Engineeringpersonnel | 2026-09-16 | - | - | stated |
| SemiAnalysis ClusterMAX Platinum rankingproduct | 2026-09-16 | - | - | stated |
| Moonshot AI benchmark #1 rankingproduct | 2026-09-16 | - | - | stated |
| LOTA latency reductionproduct | 2026-09-16 | - | 8.0 x | stated |
| LOTA throughput per GPUproduct | 2026-09-16 | - | 7.0 GB/s | stated |
| Cross-region write acceleration for CoreWeave AI Object Storageproduct | 2026-09-16 | - | - | stated |
| Archive tier for CoreWeave AI Object Storageproduct | 2026-09-16 | - | - | stated |
| Coherecustomer | 2026-09-16 | - | - | stated |
| AI Object Storage LOTA latency reductionproduct | 2026-09-16 | - | 8.0 x | stated |
| AI Object Storage LOTA throughputproduct | 2026-09-16 | - | 7.0 GB/s | stated |
| Mission Control automated rack setupproduct | 2026-09-16 | - | - | stated |
| Multi-rack approach with Spectrum-X Ethernet networkingproduct | 2026-09-16 | - | - | stated |
| Chen Goldberg as Executive Vice President of Product and Engineeringpersonnel | 2026-09-16 | - | - | stated |
| Cohere is a customer of CoreWeavecustomer | 2026-09-16 | - | - | stated |
| First to validate and bring up Vera Rubin NVL72product | 2026-09-16 | - | - | stated |
| Production Vera Rubin racks deployedfacility timeline | 2026-09-16 | - | 504.0 GPUs | stated |
| Maximum architectural scaling targetfacility capacity | 2026-09-16 | - | 128000.0 GPUs per rail | stated |
| Object storage service with LOTA acceleratorproduct | 2026-09-16 | - | - | stated |
| Mission Control product extensionsproduct | 2026-09-16 | - | - | stated |
| Senior Vice President of Productpersonnel | 2026-09-16 | - | - | stated |
| Vera Rubin NVL72 rack GPU configurationproduct | 2026-09-16 | - | 72.0 Rubin GPUs | stated |
| Multi-rack connectivity via Spectrum-X Ethernetproduct | 2026-09-16 | - | - | stated |
| Archive tier storage introduced with no feesproduct | 2026-09-16 | - | - | stated |
| LOTA read latency reduction performanceproduct | 2026-09-16 | - | 8.0 x | stated |
| Infrastructure automation for rack setup and testingproduct | 2026-09-16 | - | - | stated |
| Vera Rubin cluster rack specificationsfacility capacity | 2026-09-16 | - | 72.0 Rubin GPUs per rack | stated |
| Archive tier storageproduct | 2026-09-16 | - | - | stated |
| Qwen3-VL-235B-A22B server throughputproduct | 2026-09-16 | - | 1196.0 queries per second | stated |
| Qwen3-VL-235B-A22B offline throughputproduct | 2026-09-16 | - | 1135.0 samples per second | stated |
| DeepSeek-R1-671B per-GPU throughput improvementproduct | 2026-09-16 | - | 19.8 percent | stated |
| GPT-OSS-120B per-GPU offline throughputproduct | 2026-09-16 | - | 16635.0 tokens per second per GPU | stated |
| GPT-OSS-120B per-GPU server throughputproduct | 2026-09-16 | - | 16118.0 tokens per second per GPU | stated |
| GPT-OSS-120B aggregate throughput on GB300 NVL72 serverproduct | 2026-09-16 | - | 1160000.0 tokens per second | stated |
| GPT-OSS-120B aggregate throughput on GB300 NVL72 offlineproduct | 2026-09-16 | - | 1190000.0 tokens per second | stated |
| GPT-OSS-120B on GB200 NVL72 serverproduct | 2026-09-16 | - | 901058.0 tokens per second | stated |
| GPT-OSS-120B on GB200 NVL72 offlineproduct | 2026-09-16 | - | 911566.0 tokens per second | stated |
| Llama 2 70B on GB300 NVL72 serverproduct | 2026-09-16 | - | 944902.0 tokens per second | stated |
| Llama 2 70B on GB300 NVL72 offlineproduct | 2026-09-16 | - | 1136100.0 tokens per second | stated |
| Delivered first measured performance numbers for Vera Rubin NVL72product | 2026-09-16 | - | - | stated |
| Among first to offer multiple NVIDIA GPU generationsproduct | 2026-09-16 | - | - | stated |
| Network connectivity per GPU in Vera Rubin deploymentfacility capacity | 2026-09-16 | - | 1.6 Tb/s | stated |
| RoCE network scaling capacityfacility capacity | 2026-09-16 | - | 128000.0 GPUs | stated |
| Gartner Magic Quadrant Visionary recognitionproduct | 2026-09-16 | - | - | stated |
| MLPerf benchmarking leadershipproduct | 2026-09-16 | - | - | stated |
| Archive storage classproduct | 2026-09-16 | - | - | stated |
| LOTA read throughputproduct | 2026-09-16 | - | 7.0 GB/s per GPU | stated |
| Read latency reductionproduct | 2026-09-16 | - | 8.0 x | stated |
| 15-year anchor lease with Blockfusion at Niagara Fallspartnership - Niagara Falls AI Campus | 2026-09-16 | - | - | stated |
| Expansion agreement with Blockfusion's North East Data subsidiarypartnership - Niagara Falls AI Campus | 2026-09-16 | - | - | stated |
| MLPerf v6.1 Qwen3-VL multimodal inference throughputproduct | 2026-09-16 | - | - | stated |
| MLPerf v6.1 GPT-OSS-120B per-GPU throughput leadershipproduct | 2026-09-16 | - | - | stated |
| MLPerf v6.1 Llama 2 70B inference throughput leadershipproduct | 2026-09-16 | - | - | stated |
| AI Object Storage LOTA performanceproduct | 2026-09-16 | - | - | stated |
| CoreWeave first to validate Vera Rubin NVL72 as cloud serviceproduct | 2026-09-16 | - | - | stated |
| LOTA latency and throughput performance specificationsproduct | 2026-09-16 | - | 7.0 GB/s | stated |
| AI Object Storage platform enhancementsproduct | 2026-09-16 | - | - | stated |
| Conditional expansion capacityfacility capacity - Niagara Falls AI Campus | 2026-09-16 | - | - | stated |
| First Vera Rubin NVL72 validator and deployerproduct | 2026-09-16 | - | - | stated |
| LOTA local data caching and latency reductionproduct | 2026-09-16 | - | - | stated |
| Production deployment of Vera Rubin GPU clustersfacility capacity | 2026-09-16 | - | 504.0 GPUs | stated |
| Multi-rack Vera Rubin systems and storage capabilitiesproduct | 2026-09-16 | 2026-09-17 | - | verified |
| CoreWeave AI Object Storage serviceproduct | 2026-09-16 | - | - | stated |
| Architectural scalability target for GPU deploymentfacility capacity | 2026-09-16 | - | 128000.0 GPUs | stated |
| Mission Control product enhancementsproduct | 2026-09-16 | - | - | stated |
| LOTA reduces latency by 8xproduct | 2026-09-16 | - | - | stated |
| LOTA throughput specificationproduct | 2026-09-16 | - | - | stated |
| Nasdaq IPO (CRWV) completedfinancing | 2026-09-16 | - | - | stated |
| Record-breaking MLPerf benchmarksproduct | 2026-09-16 | - | - | stated |
| Artificial Analysis #1 inference benchmarking rankingproduct | 2026-09-16 | - | - | stated |
| Data centers and power capacity as of December 2023facility capacity | 2026-09-16 | - | 70.0 MW | stated |
| Data centers and power capacity as of December 2025facility capacity | 2026-09-16 | - | 850.0 MW | stated |
| Active data centers as of August 2026facility capacity | 2026-09-16 | - | 51.0 units | stated |
| Total contracted power as of August 2026facility capacity | 2026-09-16 | - | 4.2 GW | stated |
| FY25 revenuefinancing | 2026-09-16 | - | 5.1 USD | stated |
| FY25 adjusted EBITDAfinancing | 2026-09-16 | - | 3.1 USD | stated |
| First half FY26 revenuefinancing | 2026-09-16 | - | 2.6 USD | stated |
| FY24 adjusted EBITDA marginfinancing | 2026-09-16 | - | 64.0 percent | stated |
| FY25 adjusted EBITDA marginfinancing | 2026-09-16 | - | 60.0 percent | stated |
| First half FY26 adjusted EBITDA marginfinancing | 2026-09-16 | - | 57.0 percent | stated |
| Q2 FY26 total debtfinancing | 2026-09-16 | - | 35.1 USD | stated |
| First half FY26 interest expensefinancing | 2026-09-16 | - | 1.2 USD | stated |
| Revenue backlog as of Q2 FY26customer | 2026-09-16 | - | 104.2 USD | stated |
| New customer commitments as of Q3customer | 2026-09-16 | - | 25.0 USD | stated |
| First half FY26 capital expenditurefinancing | 2026-09-16 | - | 16.1 USD | stated |
| Q2 FY26 cash bufferfinancing | 2026-09-16 | - | 5.5 USD | stated |
| NVIDIA Vera Rubin NVL72 GPU cluster deploymentproduct | 2026-09-16 | - | - | stated |
| New AI Object Storage featuresproduct | 2026-09-16 | - | - | stated |
| Contracted AI backlogguidance | 2026-09-16 | - | 99.4 USD billion | stated |
| Revenue backlogcustomer | 2026-09-16 | - | 104.2 USD | stated |
| Contracted power capacityfacility capacity | 2026-09-16 | - | 4.2 GW | stated |
| First AI cloud provider with Vera Rubin NVL72product | 2026-09-16 | - | - | stated |
| NVL72 rack GPU and CPU countfacility capacity | 2026-09-16 | - | - | stated |
| Multi-rack cluster with Spectrum-X networkingfacility capacity | 2026-09-16 | - | - | stated |
| AI Object Storage platform upgradesproduct | 2026-09-16 | - | - | stated |
| Local Object Transport Accelerator latency reductionproduct | 2026-09-16 | - | - | stated |
| Physical AI Field Engineering service launchproduct | 2026-09-15 | - | - | stated |
| Acquired Monolith AI team and methodsacquisition | 2026-09-15 | - | - | stated |
| Completed 100+ engineering projects across automotive, aerospace, and roboticscustomer | 2026-09-15 | - | 100.0 projects | stated |
| Embedded engineers with Aston Martin Aramco Formula One Teamcustomer | 2026-09-15 | - | - | stated |
| Platform processes 40 radio channels for pit strategy decisionsproduct | 2026-09-15 | - | 40.0 radio channels | stated |
| Integrated engineering AI solution with Weights & Biases, marimo, and CoreWeave ARIAproduct | 2026-09-15 | - | - | stated |
| Only AI cloud with Platinum ranking in both SemiAnalysis ClusterMAX 1.0 and 2.0product | 2026-09-15 | - | - | stated |
| #1 ranking for Moonshot AI Kimi K2.6 inference performanceproduct | 2026-09-15 | - | - | stated |
| Q1 2026 adjusted operating marginguidance | 2026-09-15 | - | 1.0 percent | stated |
| Q1 2026 adjusted operating incomeguidance | 2026-09-15 | - | 21.0 USD | stated |
| Q2 2026 adjusted operating marginguidance | 2026-09-15 | - | 5.0 percent | stated |
| Q2 2026 adjusted operating incomeguidance | 2026-09-15 | - | 128.0 USD | stated |
| Q3 2026 adjusted operating income guidanceguidance | 2026-09-15 | 2026-09-30 | 230.0 USD | outcome unconfirmed |
| Full year 2026 adjusted operating income guidanceguidance | 2026-09-15 | 2026-12-31 | 1055.0 USD | stated |
| Full year 2026 revenue guidanceguidance | 2026-09-15 | 2026-12-31 | 12800.0 USD | stated |
| Year-end 2026 annualized run-rate revenue guidanceguidance | 2026-09-15 | 2026-12-31 | 19000.0 USD | stated |
| Q2 2026 customer contract contribution marginscustomer | 2026-09-15 | - | - | stated |
| Blackwell and Vera Rubin SKU pricingproduct | 2026-09-15 | - | - | stated |
| Q2 2026 margin-accretive businesses ARRproduct | 2026-09-15 | - | 400.0 USD | stated |
| Vera Rubin SKU contribution to margin improvementproduct | 2026-09-15 | - | - | stated |
| Q2 2026 revenue growthproduct | 2026-09-15 | - | 2.575 USD billions | stated |
| Q2 2026 adjusted EBITDA marginproduct | 2026-09-15 | - | 59.0 percent | stated |
| Q2 2026 GAAP net lossproduct | 2026-09-15 | - | 626.0 USD millions | stated |
| Q2 2026 interest expensefinancing | 2026-09-15 | - | 640.0 USD millions | stated |
| Q2 2026 free cash flowproduct | 2026-09-15 | - | -5.74 USD billions | stated |
| Full-year 2026 capex guidanceguidance | 2026-09-15 | 2026-12-31 | - | stated |
| Q3 2026 interest expense guidanceguidance | 2026-09-15 | 2026-09-30 | - | outcome unconfirmed |
| Q2 2026 revenue backlogcustomer | 2026-09-15 | - | 104.0 USD billions | stated |
| Early Q3 2026 net new customer commitmentscustomer | 2026-09-15 | - | 25.0 USD billions | stated |
| Major AI customerscustomer | 2026-09-15 | - | - | stated |
| Meta multi-year capacity lease with no-resale clause through 2032customer | 2026-09-15 | 2032-12-31 | - | stated |
| Debt-to-equity leverage ratiofinancing | 2026-09-15 | - | 8.9 x | stated |
| Weighted average cost of debt reductionfinancing | 2026-09-15 | - | 300.0 basis points | stated |
| Delayed-draw credit facilityfinancing | 2026-09-15 | - | 2.6 USD billion | stated |
| 2026 capital expenditure programguidance | 2026-09-15 | - | 35.0 USD billion | stated |
| Customer backlogcustomer | 2026-09-15 | - | 104.0 USD billion | stated |
| Interest rate sensitivity disclosurefinancing | 2026-09-15 | - | 61.0 USD million | stated |
| Microsoft revenue concentrationcustomer | 2026-09-15 | - | - | stated |
| FY 2025 revenuefinancing | 2026-09-15 | - | - | stated |
| FY 2025 net lossfinancing | 2026-09-15 | - | - | stated |
| December 2025 current ratiofinancing | 2026-09-15 | - | - | stated |
| December 2025 debt-to-equity ratiofinancing | 2026-09-15 | - | - | stated |
| FY 2025 free cash flowfinancing | 2026-09-15 | - | - | stated |
| FY 2025 stock-based compensationfinancing | 2026-09-15 | - | - | stated |
| Securities class action litigationregulatory | 2026-09-15 | - | - | stated |
| Meta Platforms long-term agreementpartnership | 2026-09-15 | 2031-12-31 | - | stated |
| Long-term agreement with Meta Platformscustomer | 2026-09-15 | - | - | stated |
| H2 2026 margin expansion continuationguidance | 2026-09-15 | 2026-12-31 | - | stated |
| Q4 2026 adjusted operating marginguidance | 2026-09-15 | 2026-12-31 | - | stated |
| FY2026 capex guidancefinancing | 2026-09-15 | 2026-12-31 | - | stated |
| Added to Nasdaq-100regulatory | 2026-09-15 | - | - | stated |
| Q3 net new customer commitmentscustomer | 2026-09-15 | - | 25.0 billion USD | stated |
| Meta multi-year GPU capacity leasespartnership | 2026-09-15 | 2032-12-31 | - | stated |
| Q2 2026 revenue backlogcustomer | 2026-09-15 | - | 104000000000.0 USD | stated |
| Q3 2026 new customer commitmentscustomer | 2026-09-15 | - | 25000000000.0 USD | stated |
| Meta GPU capacity leases through 2032customer | 2026-09-15 | 2032-12-31 | - | stated |
| Monolith AI acquisitionacquisition | 2026-09-14 | - | - | stated |
| Physical AI Field Engineering service launchproduct | 2026-09-14 | - | - | stated |
| Aston Martin Aramco Formula One Team engagementcustomer | 2026-09-14 | - | - | stated |
| Over 100 engineering projects completedcustomer | 2026-09-14 | - | 100.0 projects | stated |
| Radio channel processing capabilityproduct | 2026-09-14 | - | 40.0 channels | stated |
| Richard Ahlfeld as Senior Vice President of Physical AIpersonnel | 2026-09-14 | - | - | stated |
| Engineering AI stack integration with Weights & Biases, marimo, and CoreWeave ARIApartnership | 2026-09-14 | - | - | stated |
| Strong demand and business outlookguidance | 2026-09-14 | - | - | stated |
| Demand outlookguidance | 2026-09-14 | - | - | stated |
| Backlog composition with take-or-pay contractscustomer | 2026-09-14 | - | - | stated |
| No dividend payment policyfinancing | 2026-09-14 | - | - | stated |
| Operating data centersfacility capacity | 2026-09-14 | - | 51.0 data centers | stated |
| Installed GPU capacityfacility capacity | 2026-09-14 | - | 250000.0 GPUs | stated |
| Data center expansionfacility timeline | 2026-09-14 | - | - | stated |
| Nvidia ownership stakefinancing | 2026-09-14 | - | 11.5 percent | stated |
| Major customer of Nvidiacustomer | 2026-09-14 | - | - | stated |
| Large contracted backlogscustomer | 2026-09-14 | - | - | stated |
| Acquired Monolith AIacquisition | 2026-09-14 | - | - | stated |
| Integrated engineering AI solution platformproduct | 2026-09-14 | - | - | stated |
| Richard Ahlfeld as Senior VP of Physical AIpersonnel | 2026-09-14 | - | - | stated |
| Ongoing investments in capacity expansion amid persistent demandfacility capacity | 2026-09-14 | - | - | stated |
| Long-term debt and cash positionfinancing | 2026-09-14 | - | - | stated |
| Demand for GPU compute exceeds supplyproduct | 2026-09-14 | - | - | stated |
| CEO states company struggling to meet demandguidance | 2026-09-14 | - | - | stated |
| Q2 2026 revenuefinancing | 2026-09-14 | - | - | stated |
| Q2 2026 operating lossfinancing | 2026-09-14 | - | - | stated |
| Q2 2026 interest costsfinancing | 2026-09-14 | - | - | stated |
| Q2 2026 adjusted EBITDAfinancing | 2026-09-14 | - | - | stated |
| Strong ongoing demand for AI chipsguidance | 2026-09-14 | - | - | stated |
| Physical AI Field Engineering service launchproduct | 2026-09-13 | - | - | stated |
| Nvidia $2 billion share purchasefinancing | 2026-09-13 | - | 2000000000.0 USD | stated |
| Nvidia partnership targeting 5+ gigawatts by 2030partnership | 2026-09-13 | 2030-12-31 | 5.0 GW | stated |
| Revenue backlogcustomer | 2026-09-13 | - | 104000000000.0 USD | stated |
| 2026 capital spending forecastguidance | 2026-09-13 | 2026-12-31 | 35000000000.0 USD | stated |
| Q2 2026 revenuecustomer | 2026-09-13 | - | 2580000000.0 USD | stated |
| Revenue backlog as of Q2 2026customer | 2026-09-11 | - | - | stated |
| Net new customer commitments early Q3 2026customer | 2026-09-11 | - | - | stated |
| Gartner Magic Quadrant Visionary recognitionregulatory | 2026-09-11 | - | - | stated |
| SemiAnalysis Platinum ClusterMAX rating twiceproduct | 2026-09-11 | - | - | stated |
| Jane Street customercustomer | 2026-09-11 | - | - | stated |
| Zonos customercustomer | 2026-09-11 | - | - | stated |
| Mercado Libre customercustomer | 2026-09-11 | - | - | stated |
| MLPerf benchmarking recordsproduct | 2026-09-11 | - | - | stated |
| AI cloud TCO savingsguidance | 2026-09-11 | - | 47.0 percent | stated |
| AI cloud performance efficiencyproduct | 2026-09-11 | - | 96.0 percent | stated |
| Data center network sizefacility capacity | 2026-09-11 | - | 51.0 data centers | stated |
| Installed Nvidia GPUsfacility capacity | 2026-09-11 | - | 250000.0 GPUs | stated |
| Nvidia equity stakepartnership | 2026-09-11 | - | 11.5 percent | stated |
| Major customerscustomer | 2026-09-11 | - | - | stated |
| Processing speed advantage over AWS/Azureproduct | 2026-09-11 | - | 35.0 times | stated |
| Processing cost advantage over AWS/Azureproduct | 2026-09-11 | - | 80.0 percent | stated |
| 2025 revenueguidance | 2026-09-11 | - | 5.1 billion USD | stated |
| 2025 adjusted EBITDAguidance | 2026-09-11 | - | 3.1 billion USD | stated |
| 2025 net lossguidance | 2026-09-11 | - | 1.17 billion USD | stated |
| Contracted revenue backlog at Q2 2026guidance | 2026-09-11 | - | 104.0 billion USD | stated |
| Debt-to-equity ratio at Q2 2026financing | 2026-09-11 | - | 14.3 ratio | stated |
| Data center network at year-end 2022facility timeline | 2026-09-11 | - | 3.0 data centers | stated |
| 3 data centers at end of 2022facility capacity | 2026-09-11 | - | 3.0 data centers | stated |
| 51 data centers across North America and Europefacility capacity | 2026-09-11 | - | 51.0 data centers | stated |
| More than 250,000 Nvidia GPUs installedfacility capacity | 2026-09-11 | - | 250000.0 GPUs | stated |
| 35x faster AI processing than AWS/Azureproduct | 2026-09-11 | - | 35.0 times | stated |
| 80% lower cost than AWS/Azureproduct | 2026-09-11 | - | 80.0 percent | stated |
| $104B contracted revenue backlog at end of Q2 2026guidance | 2026-09-11 | - | 104000000000.0 USD | stated |
| 2027 annualized revenue target over $30 billionguidance | 2026-09-11 | 2027-12-31 | 30000000000.0 USD | stated |
| 75%+ of 2027 revenue locked into contractsguidance | 2026-09-11 | 2027-12-31 | 75.0 percent | stated |
| 75% of backlog to be recognized as revenue within 4 yearsguidance | 2026-09-11 | 2030-09-11 | 75.0 percent | stated |
| Nvidia owns 11.5% stake in CoreWeavefinancing | 2026-09-11 | - | 11.5 percent | stated |
| Top customers: Meta, Microsoft, OpenAI, Anthropiccustomer | 2026-09-11 | - | - | stated |
| Debt-to-equity ratio of 14.3 at end of Q2 2026financing | 2026-09-11 | - | 14.3 ratio | stated |
| Physical AI Field Engineeringproduct | 2026-09-11 | - | - | stated |
| DARPA managed platformpartnership | 2026-09-11 | - | - | stated |
| $55.6B revenue backlogcustomer | 2026-09-11 | - | 55.6 billion USD | stated |
| Revenue backlogfinancing | 2026-09-11 | - | 104.2 billion USD | stated |
| Q3 2026 new commitmentsfinancing | 2026-09-11 | - | 25.0 billion USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-11 | 2026-12-31 | - | stated |
| Year-end 2026 active power capacityfacility capacity | 2026-09-11 | 2026-12-31 | 1.85 GW | stated |
| Q2 2026 revenueproduct | 2026-09-11 | - | 2.6 billion USD | stated |
| Q2 2026 operating cash flowfinancing | 2026-09-11 | - | 679.0 million USD | stated |
| July 2026 SKU repricingproduct | 2026-09-11 | - | 25.0 percent | stated |
| Q4 2026 margin inflectionguidance | 2026-09-11 | 2026-12-31 | - | stated |
| 2027 annualized revenue guidanceguidance | 2026-09-11 | 2027-12-31 | 30000000000.0 USD | stated |
| Four-year backlog conversion rateguidance | 2026-09-11 | 2030-05-31 | - | stated |
| IPO at $40 per share on March 28, 2025financing | 2026-09-11 | - | 40.0 USD | stated |
| $30+ billion 2027 annualized revenue target with 75%+ locked in contractsguidance | 2026-09-11 | 2027-12-31 | 30000000000.0 USD | stated |
| Hudson River Trading AI cloud services agreementcustomer | 2026-09-11 | - | - | stated |
| Year-end 2026 active power capacity targetfacility capacity | 2026-09-11 | 2026-12-31 | 1850.0 MW | stated |
| Q4 2026 margin improvement from repricingguidance | 2026-09-11 | 2026-12-31 | - | stated |
| Contracted revenue backlogguidance | 2026-09-11 | - | 104200.0 USD | stated |
| Q3 2026 net new commitmentsguidance | 2026-09-11 | - | 25000.0 USD | stated |
| Monolith AI acquisitionacquisition | 2026-09-11 | - | - | stated |
| 100+ engineering projects in automotive, aerospace, roboticscustomer | 2026-09-11 | - | - | stated |
| AI applications, optimizers, dashboards deliveryproduct | 2026-09-11 | - | - | stated |
| Solutions built on CoreWeave infrastructureproduct | 2026-09-11 | - | - | stated |
| GPU installationsfacility capacity | 2026-09-11 | - | 250000.0 units | stated |
| Nvidia investor stakepartnership | 2026-09-11 | - | 11.5 percent | stated |
| 2025 annual revenueguidance | 2026-09-11 | - | 5.1 billion USD | stated |
| 2025 GAAP net lossguidance | 2026-09-11 | - | 1.17 billion USD | stated |
| Performance advantage vs AWS and Azureproduct | 2026-09-11 | - | - | stated |
| 2027 revenue target and contract lock-inguidance | 2026-09-11 | 2027-12-31 | 30.0 billion USD | stated |
| Backlog revenue recognition timelineguidance | 2026-09-11 | 2030-09-11 | 75.0 percent | stated |
| 2027 revenue guidance with contract backlogguidance | 2026-09-11 | - | 30.0 USD | stated |
| Backlog to revenue conversion timelineguidance | 2026-09-11 | - | 75.0 percent | stated |
| Top customerscustomer | 2026-09-11 | - | - | stated |
| Q2 2026 Revenueguidance | 2026-09-11 | - | 2.575 B USD | stated |
| Q2 2026 Backlogcustomer | 2026-09-11 | - | 104.0 B USD | stated |
| Total Debtfinancing | 2026-09-11 | - | 51.6 B USD | stated |
| Capital Lease Obligationsfinancing | 2026-09-11 | - | 16.5 B USD | stated |
| Q2 2026 Interest Expensefinancing | 2026-09-11 | - | 640.0 M USD | stated |
| Q3 2026 Interest Expense Guidanceguidance | 2026-09-11 | 2026-09-30 | 900.0 M USD | outcome unconfirmed |
| Full-Year 2026 Capital Expenditure Guidanceguidance | 2026-09-11 | 2026-12-31 | 37.0 B USD | stated |
| Weighted Average Cost of Debt Reductionfinancing | 2026-09-11 | - | 1.1 B USD | stated |
| 2030 Infrastructure Capacity Targetfacility capacity | 2026-09-11 | 2030-12-31 | 8.0 GW | stated |
| Parallel Works partnership for DARPA NODES platformpartnership | 2026-09-10 | - | - | stated |
| DARPA NODES program customer engagementcustomer | 2026-09-10 | - | - | stated |
| Physical AI Field Engineering service launchproduct | 2026-09-10 | - | - | stated |
| Testing time reduction capabilityproduct | 2026-09-10 | - | 17.0 percent | stated |
| Nissan Motor Co. engagementcustomer | 2026-09-10 | - | 17.0 percent | stated |
| Unnamed automaker engine calibrationcustomer | 2026-09-10 | - | - | stated |
| Over 100 engagements with early adopterscustomer | 2026-09-10 | - | 100.0 engagements | stated |
| Acquisition of Monolith AI Ltd.acquisition | 2026-09-10 | - | - | stated |
| Acquisition of Weights & Biasesacquisition | 2026-09-10 | - | - | stated |
| Acquisition of marimoacquisition | 2026-09-10 | - | - | stated |
| Partnership with Cadillac Hertz Team JOTA since 2025partnership | 2026-09-10 | - | - | stated |
| AI setup recommendation tool for motorsports rig testingproduct | 2026-09-10 | - | - | stated |
| Trackside damping recommendation applicationproduct | 2026-09-10 | - | - | stated |
| Gartner Magic Quadrant Visionary Recognitionproduct | 2026-09-10 | - | - | stated |
| SemiAnalysis Platinum ClusterMAX Rating Achievementproduct | 2026-09-10 | - | - | stated |
| Physical AI Field Engineering Team Domain Expertisepersonnel | 2026-09-10 | - | - | stated |
| MLPerf Benchmarking Performance Recordsproduct | 2026-09-10 | - | - | stated |
| 100+ engineering projects completedcustomer | 2026-09-10 | - | 100.0 projects | stated |
| Nissan Technical Centre Europe customercustomer | 2026-09-10 | - | - | stated |
| Aston Martin Aramco Formula One team transcription modelcustomer | 2026-09-10 | - | - | stated |
| Integrated engineering AI solution stackproduct | 2026-09-10 | - | - | stated |
| Nasdaq public listing completionfinancing | 2026-09-10 | - | - | stated |
| Performance benchmarks and rankingsproduct | 2026-09-10 | - | - | stated |
| Debt-to-equity ratiofinancing | 2026-09-10 | - | - | stated |
| Q2 2026 revenuecustomer | 2026-09-10 | - | - | stated |
| Revenue backlogcustomer | 2026-09-10 | - | - | stated |
| Q2 2026 interest expensefinancing | 2026-09-10 | - | - | stated |
| Q2 2026 free cash flowfinancing | 2026-09-10 | - | - | stated |
| Q2 2026 capital expenditurefacility capacity | 2026-09-10 | - | - | stated |
| Vera Rubin racks in full productionfacility capacity | 2026-09-10 | - | - | stated |
| Physical AI approach deployment scalecustomer | 2026-09-10 | - | - | stated |
| Aston Martin Formula One team engagementpartnership | 2026-09-10 | - | - | stated |
| Goldberg Chen EVP Product and Engineeringpersonnel | 2026-09-10 | - | - | stated |
| 100+ projects across automotive, aerospace, and robotics sectorscustomer | 2026-09-10 | - | - | stated |
| Cadillac Hertz Team JOTAcustomer | 2026-09-10 | - | - | stated |
| Field engineers engage directly with customers throughout AI model lifecycleproduct | 2026-09-10 | - | - | stated |
| Customers receive physics-validated AI models and agentsproduct | 2026-09-10 | - | - | stated |
| Aston Martin Formula One – transcription model projectcustomer | 2026-09-10 | - | - | stated |
| Testing time reduction capability for Physical AI serviceproduct | 2026-09-10 | - | - | stated |
| Nissan Motor Co. chassis optimization engagementcustomer | 2026-09-10 | - | 17.0 percent | stated |
| Recruitment of specialized engineers in automotive, aerospace, and mechanical engineeringpersonnel | 2026-09-10 | - | - | stated |
| Newer data-center deal economicsguidance | 2026-09-10 | - | - | stated |
| Vera Rubin GPU deploymentfacility capacity | 2026-09-10 | - | - | stated |
| OpenAI AI Infrastructure Contractscustomer | 2026-09-09 | - | 22.4 USD | stated |
| Q2 2026 Revenuefinancing | 2026-09-09 | - | 2.58 USD | stated |
| Contracted Revenue Backlogguidance | 2026-09-09 | - | 104.0 USD | stated |
| New Customer Commitments Q3 2026customer | 2026-09-09 | - | 25.0 USD | stated |
| Q3 2026 new customer commitmentscustomer | 2026-09-09 | - | 25000000000.0 USD | stated |
| Parallel Works DARPA NODES Platform Partnershippartnership | 2026-09-09 | - | - | stated |
| SUNK (Slurm on Kubernetes)product | 2026-09-09 | - | - | stated |
| DARPA NODES program deploymentpartnership | 2026-09-09 | - | - | stated |
| Mike Intrator CEO rolepersonnel | 2026-09-09 | - | - | stated |
| Nvidia supplies 100% of CoreWeave's advanced GPUspartnership | 2026-09-09 | - | 100.0 percent | stated |
| Nvidia holds 11.5% equity stakepartnership | 2026-09-09 | - | 11.5 percent | stated |
| Q2 2026 sales growthproduct | 2026-09-09 | - | 112.0 percent | stated |
| Q2 2026 adjusted operating profitsfinancing | 2026-09-09 | - | 1.5 billion USD | stated |
| $104 billion total revenue backlogcustomer | 2026-09-09 | - | 104.0 billion USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-09 | 2026-12-31 | 12.8 billion USD | stated |
| Q2 2026 Revenueproduct | 2026-09-09 | - | 2.575 USD billions | stated |
| Revenue Backlog as of June 30, 2026customer | 2026-09-09 | - | 104.0 USD billions | stated |
| Additional Customer Commitments - Early July 2026customer | 2026-09-09 | - | 25.0 USD billions | stated |
| Active Power Capacityfacility capacity | 2026-09-09 | - | 1.5 GW | stated |
| Contracted Power Capacityfacility capacity | 2026-09-09 | - | 3.7 GW | stated |
| Q2 2026 Capital Expendituresfinancing | 2026-09-09 | - | 9.4 USD billions | stated |
| 2026 CapEx Forecastguidance | 2026-09-09 | 2026-12-31 | 35.0 USD billions | stated |
| Q2 2026 Net Interest Expensefinancing | 2026-09-09 | - | 640.0 USD millions | stated |
| Q2 2026 Net Lossfinancing | 2026-09-09 | - | 626.0 USD millions | stated |
| Total Debt as of June 30, 2026financing | 2026-09-09 | - | 35.6 USD billions | stated |
| Revenue backlog end of June 2026guidance | 2026-09-09 | - | 104.2 USD billion | stated |
| Revenue backlog end of June 2025guidance | 2026-09-09 | - | 30.1 USD billion | stated |
| Revenue backlog end of 2025guidance | 2026-09-09 | - | 66.8 USD billion | stated |
| Revenue backlog end of March 2026guidance | 2026-09-09 | - | 99.4 USD billion | stated |
| Revenue conversion from backlog within 24 monthsguidance | 2026-09-09 | 2028-06-30 | 41.0 percent | stated |
| Q2 2026 revenueguidance | 2026-09-09 | - | 2.6 USD billion | stated |
| 2026 exit annualized revenue run rateguidance | 2026-09-09 | 2026-12-31 | 18.5 USD billion | stated |
| International data center capacityfacility capacity | 2026-09-09 | - | - | stated |
| Q2 2026 revenue backlogfinancing | 2026-09-09 | - | 104200000000.0 USD | stated |
| June 2025 revenue backlogfinancing | 2026-09-09 | - | 30100000000.0 USD | stated |
| December 2025 revenue backlogfinancing | 2026-09-09 | - | 66800000000.0 USD | stated |
| March 2026 revenue backlogfinancing | 2026-09-09 | - | 99400000000.0 USD | stated |
| Q2 2026 revenuefinancing | 2026-09-09 | - | 2600000000.0 USD | stated |
| Meta expanded agreement covering capacity through December 2032partnership | 2026-09-09 | 2032-12-31 | 21000000000.0 USD | stated |
| Jane Street committed to multi-year dealcustomer | 2026-09-09 | - | 6000000000.0 USD | stated |
| Anthropic multi-year agreementpartnership | 2026-09-09 | - | - | stated |
| Hudson River Trading multi-year agreementcustomer | 2026-09-09 | - | - | stated |
| Remaining performance obligations and revenue recognition timelinefinancing | 2026-09-09 | - | - | stated |
| 2026 exit annualized revenue run rateguidance | 2026-09-09 | 2026-12-31 | 19500000000.0 USD | stated |
| Customer concentration in Q2 2026 revenuecustomer | 2026-09-09 | - | - | stated |
| Q2 2026 net interest expensefinancing | 2026-09-09 | - | 640000000.0 USD | stated |
| Backlog delivery commencement statusfinancing | 2026-09-09 | - | - | stated |
| DARPA NODES research collaboration with Parallel Workspartnership | 2026-09-09 | - | - | stated |
| Platform valuationfinancing | 2026-09-09 | - | - | stated |
| Proprietary software toolsproduct | 2026-09-09 | - | - | stated |
| Q2 2026 adjusted operating incomefinancing | 2026-09-09 | - | 128.0 USD | stated |
| Q1 2026 adjusted operating incomefinancing | 2026-09-09 | - | 21.0 USD | stated |
| Operating margin improvement on recent AI data-center dealspartnership | 2026-09-09 | - | - | stated |
| 2026 exit revenue run rateguidance | 2026-09-09 | 2026-12-31 | 19000.0 USD | stated |
| Meta capacity agreement through December 2032facility timeline | 2026-09-09 | 2032-12-31 | 21.0 USD | stated |
| Jane Street customer commitmentcustomer | 2026-09-09 | - | 6.0 USD | stated |
| 2026 year-end revenue run rateguidance | 2026-09-09 | 2026-12-31 | 19.0 USD | stated |
| DARPA NODES GPU-powered biology research cloud platformpartnership | 2026-09-09 | - | - | stated |
| Recent deal margin improvementguidance | 2026-09-09 | - | - | stated |
| Quarterly earnings margin improvementguidance | 2026-09-09 | - | - | stated |
| Operating leverage visibilityguidance | 2026-09-09 | - | - | stated |
| Incremental deployment margin impactguidance | 2026-09-09 | - | - | stated |
| Closed-loop cooling systemsproduct | 2026-09-09 | - | - | stated |
| High-quality backup generationproduct | 2026-09-09 | - | - | stated |
| Deal-level economics and marginsguidance | 2026-09-09 | - | - | stated |
| Nvidia equity stakepartnership | 2026-09-09 | - | 11.5 percent | stated |
| Nvidia GPU supplypartnership | 2026-09-09 | - | 100.0 percent | stated |
| Q2 adjusted operating profitsfinancing | 2026-09-09 | - | 1500000000.0 USD | stated |
| Total revenue backlogcustomer | 2026-09-09 | - | 104000000000.0 USD | stated |
| FY2026 revenue guidanceguidance | 2026-09-09 | 2026-12-31 | - | stated |
| Deal-level economics and operating margin improvementguidance | 2026-09-09 | - | - | stated |
| Improved data center deal economicsproduct | 2026-09-09 | - | - | stated |
| Q2 2026 Revenuefinancing | 2026-09-08 | - | 2.58 B | stated |
| Q2 2026 Gross Marginfinancing | 2026-09-08 | - | 90.6 percent | stated |
| Q2 2026 Net Lossfinancing | 2026-09-08 | - | 626.0 M | stated |
| Year-over-Year Revenue Growth Ratefinancing | 2026-09-08 | - | 110.0 percent | stated |
| Contracted Revenue Backlogguidance | 2026-09-08 | - | 104.0 B | stated |
| Fresh Capital Raisedfinancing | 2026-09-08 | - | 2.6 B | stated |
| 2026 Planned Capital Expenditurefinancing | 2026-09-08 | - | 30.0 B | stated |
| Debt to Equity Ratiofinancing | 2026-09-08 | - | 3.29 | stated |
| Current Ratiofinancing | 2026-09-08 | - | 0.5 | stated |
| Q2 2026 Free Cash Flowfinancing | 2026-09-08 | - | 5.74 B | stated |
| Nvidia Investment in CoreWeavepartnership | 2026-09-08 | - | - | stated |
| Solidigm SSD Supply Agreementpartnership | 2026-09-08 | - | - | stated |
| Backlogfinancing | 2026-09-08 | - | 104.0 USD | stated |
| FY2026 capex guidancefinancing | 2026-09-08 | 2026-12-31 | - | stated |
| Year-end 2026 active power capacityfacility capacity | 2026-09-08 | 2026-12-31 | 1.85 GW | stated |
| Revenue backlogguidance | 2026-09-08 | - | 104.0 B | stated |
| 2026 capital financingfinancing | 2026-09-08 | - | 2.6 B | stated |
| Nvidia stake in CoreWeavepartnership | 2026-09-08 | - | - | stated |
| Solidigm multiyear storage dealpartnership | 2026-09-08 | - | - | stated |
| Trailing twelve-month revenueguidance | 2026-09-08 | - | - | stated |
| Gross marginguidance | 2026-09-08 | - | 90.0 percent | stated |
| Rescale partnership for AI infrastructurepartnership | 2026-09-08 | - | - | stated |
| Contracted order bookcustomer | 2026-09-08 | - | 129000000000.0 USD | stated |
| Contracted power currently activefacility capacity | 2026-09-08 | - | 36.0 percent | stated |
| Business model transition to take-or-pay contractscustomer | 2026-09-08 | - | - | stated |
| Financing Securedfinancing | 2026-09-08 | - | 2.6 USD B | stated |
| 2026 Capital Expenditure Planfinancing | 2026-09-08 | 2026-12-31 | 30.0 USD B | stated |
| Gross Profit Marginguidance | 2026-09-08 | - | 90.6 percent | stated |
| Nvidia Strategic Investmentpartnership | 2026-09-08 | - | - | stated |
| Free Cash Flowguidance | 2026-09-08 | - | -5.743 USD B | stated |
| FY 2026 capex guidance raisedguidance | 2026-09-08 | 2026-12-31 | - | stated |
| Q2 2026 revenue backlogcustomer | 2026-09-08 | - | 104.2 USD billions | stated |
| Near-term compute capacity sold outfacility capacity | 2026-09-08 | - | - | stated |
| Gartner Magic Quadrant 2026 Visionaryregulatory | 2026-09-08 | - | - | stated |
| Major customerscustomer | 2026-09-08 | - | - | stated |
| Nvidia partnershippartnership | 2026-09-08 | - | - | stated |
| Q3 2026 capex guidanceguidance | 2026-09-08 | 2026-09-30 | - | outcome unconfirmed |
| CEO Michael Intratorpersonnel | 2026-09-08 | - | - | stated |
| 2026 capital spending planfacility capacity | 2026-09-08 | 2026-12-31 | 30.0 B | stated |
| Full-year guidance raisedguidance | 2026-09-08 | 2026-12-31 | - | stated |
| Solidigm SSD capacity agreementpartnership | 2026-09-08 | - | - | stated |
| Product offeringsproduct | 2026-09-08 | - | - | stated |
| GPU infrastructure capabilitiesproduct | 2026-09-08 | - | - | stated |
| Corporate insider ownershippersonnel | 2026-09-08 | - | 24.2 percent | stated |
| Current Ratiofinancing | 2026-09-08 | - | 0.46 ratio | stated |
| Quick Ratiofinancing | 2026-09-08 | - | 0.46 ratio | stated |
| Debt-to-Equity Ratiofinancing | 2026-09-08 | - | 5.53 ratio | stated |
| AI Backlogguidance | 2026-09-08 | - | 129.0 billion | stated |
| Q2 Revenueguidance | 2026-09-08 | - | 2.58 B | stated |
| Gross Marginguidance | 2026-09-08 | - | 90.6 percent | stated |
| Q2 Net Lossguidance | 2026-09-08 | - | -626.0 M | stated |
| EBITDAguidance | 2026-09-08 | - | 1.92 B | stated |
| Capital Expendituresguidance | 2026-09-08 | - | 6.42 B | stated |
| Free Cash Flowguidance | 2026-09-08 | - | -5.74 B | stated |
| Additional Financingfinancing | 2026-09-08 | - | 2.6 B | stated |
| 2026 Capital Spending Guidanceguidance | 2026-09-08 | - | 30.0 B | stated |
| Nvidia Strategic Partnershippartnership | 2026-09-08 | - | - | stated |
| $2.6B financing securedfinancing | 2026-09-08 | - | 2600000000.0 USD | stated |
| 2026 capital expenditure planfinancing | 2026-09-08 | - | 30000000000.0 USD | stated |
| Contracted revenue backlogcustomer | 2026-09-08 | - | 104000000000.0 USD | stated |
| Nvidia stake and partnershippartnership | 2026-09-08 | - | - | stated |
| Solidigm multiyear SSD partnershippartnership | 2026-09-08 | - | - | stated |
| Revenue backlogguidance | 2026-09-08 | - | 104000000000.0 USD | stated |
| Capital investment plan for 2026financing | 2026-09-08 | - | 30000000000.0 USD | stated |
| $2.6B financing roundfinancing | 2026-09-08 | - | 2600000000.0 USD | stated |
| Nvidia stake increasepartnership | 2026-09-08 | - | - | stated |
| Financing raisedfinancing | 2026-09-08 | - | 2600000000.0 USD | stated |
| 2026 capital spending planguidance | 2026-09-08 | 2026-12-31 | 30000000000.0 USD | stated |
| Solidigm strategic partnership for SSD capacitypartnership | 2026-09-08 | - | - | stated |
| Full-year 2026 guidance raisedguidance | 2026-09-08 | - | - | stated |
| $30B 2026 capital deployment planfinancing | 2026-09-08 | 2026-12-31 | 30000000000.0 USD | stated |
| $30B+ capital investment planned for 2026guidance | 2026-09-08 | 2026-12-31 | 30.0 USD | stated |
| Full-year 2026 capital expenditure guidanceguidance | 2026-09-08 | 2026-12-31 | 37000.0 USD | stated |
| Q3 2026 capital expenditure forecastguidance | 2026-09-08 | 2026-09-30 | 12500.0 USD | outcome unconfirmed |
| Rescale partnership for AI cloud offeringspartnership | 2026-09-08 | - | - | stated |
| Revenue backlog from committed customer contractsguidance | 2026-09-08 | - | 104.0 USD | stated |
| Strategic stake by Nvidiapartnership | 2026-09-08 | - | - | stated |
| Multiyear storage partnership with Solidigmpartnership | 2026-09-08 | - | - | stated |
| Full-year 2026 capex guidancefinancing | 2026-09-08 | - | - | stated |
| Power capacity activationfacility capacity | 2026-09-08 | - | 64.0 percent | stated |
| Partnership with Rescalepartnership | 2026-09-08 | - | - | stated |
| Rescale partnership target industriespartnership | 2026-09-08 | - | - | stated |
| Specialized AI infrastructure offeringproduct | 2026-09-08 | - | - | stated |
| CoreWeave-Rescale partnership for AI infrastructure expansionpartnership | 2026-09-08 | - | - | stated |
| Specialized AI infrastructure access for Rescale customersproduct | 2026-09-08 | - | - | stated |
| Caterpillar AI infrastructure partnershippartnership | 2026-09-08 | - | - | stated |
| SPV-level borrowing backed by offtake creditfinancing | 2026-09-08 | - | - | stated |
| Microsoft as offtake counterparty backing debtcustomer | 2026-09-08 | - | - | stated |
| Borrowing at A- credit via structured financingfinancing | 2026-09-08 | - | - | stated |
| Latest debt deal first with lender renewal riskfinancing | 2026-09-08 | - | - | stated |
| Omni software on partner infrastructureproduct | 2026-09-08 | - | - | stated |
| Lancaster data center $6B investmentfinancing - Lancaster Data Center | 2026-09-06 | - | 6000000000.0 USD | stated |
| Storage services deal with Backblazepartnership | 2026-09-06 | - | 335.0 USD | stated |
| Multi-exabyte storage capacity expansionfacility capacity | 2026-09-06 | - | - | stated |
| AI Object Storage backward compatibilityproduct | 2026-09-06 | - | - | stated |
| Rescale partnership for AI and simulation workloadspartnership | 2026-09-06 | - | - | stated |
| Five-year Backblaze storage partnershippartnership | 2026-09-06 | - | 335.0 USD | stated |
| Backward-compatible storage service expansionproduct | 2026-09-06 | - | - | stated |
| Revenue backlogguidance | 2026-09-05 | - | 104000000000.0 USD | stated |
| Debt-to-equity ratiofinancing | 2026-09-05 | - | 5.53 | stated |
| Quarterly interest expense relative to operating incomefinancing | 2026-09-05 | - | - | stated |
| Rescale partnership for AI and simulation workloadscustomer | 2026-09-05 | - | - | stated |
| Interest expense burdenfinancing | 2026-09-05 | - | 4.0 x | stated |
| Rescale Cloud partnershippartnership | 2026-09-05 | - | - | stated |
| CEO Michael Intrator insider share salepersonnel | 2026-09-05 | - | 25100000.0 USD | stated |
| Insider Kristen McVeety share salepersonnel | 2026-09-05 | - | 12700000.0 USD | stated |
| Aggregate insider share sales in past 3 monthspersonnel | 2026-09-05 | - | 705653344.0 USD | stated |
| Contracted revenue backlogguidance | 2026-09-05 | - | 104000000000.0 USD | stated |
| Rescale Cloud selectioncustomer | 2026-09-05 | - | - | stated |
| Rescale selected CoreWeave Cloudcustomer | 2026-09-05 | - | - | stated |
| IPO in March 2025financing | 2026-09-05 | - | - | stated |
| Q4 2025 loss per shareguidance | 2026-09-05 | - | -0.56 USD per share | stated |
| Q4 2025 revenueguidance | 2026-09-05 | - | 1.57 billion USD | stated |
| 2025 capital expendituresfacility timeline | 2026-09-05 | - | 14.9 billion USD | stated |
| 2026 capital expenditure guidancefacility timeline | 2026-09-05 | 2026-12-31 | 30.0 billion USD | stated |
| Q1 2026 revenue guidanceguidance | 2026-09-05 | 2026-03-31 | 1.9 billion USD | outcome unconfirmed |
| First quarter 2026 revenue outlookguidance | 2026-09-05 | 2026-03-31 | - | outcome unconfirmed |
| Compute supplier for Moonshot AIpartnership | 2026-09-05 | - | - | stated |
| Total debt positionfinancing | 2026-09-04 | - | 35.0 billion USD | stated |
| Quarterly interest expensefinancing | 2026-09-04 | - | 640.0 million USD | stated |
| Revenue backlog from major customerscustomer | 2026-09-04 | - | 100.0 billion USD | stated |
| Customer concentration in Q1 revenuecustomer | 2026-09-04 | - | 65.0 percent | stated |
| Annual capital expenditure requirementfinancing | 2026-09-04 | - | 35.0 billion USD | stated |
| 5-year bond yieldfinancing | 2026-09-04 | - | 13.0 percent | stated |
| Weighted-Average Borrowing Cost Reductionfinancing | 2026-09-04 | - | 300.0 basis points | stated |
| CoreWeave Product Offeringsproduct | 2026-09-04 | - | - | stated |
| Management reduced weighted-average borrowing costfinancing | 2026-09-04 | - | 300.0 basis points | stated |
| Active power capacity as of June 2026facility capacity | 2026-09-04 | - | 1.5 GW | stated |
| Contracted power capacity as of June 2026facility capacity | 2026-09-04 | - | 3.7 GW | stated |
| First to validate Vera Rubin NVL72 systemproduct | 2026-09-04 | - | - | stated |
| SUNK platformproduct | 2026-09-04 | - | - | stated |
| Cross-cloud productsproduct | 2026-09-04 | - | - | stated |
| $8.5 billion infrastructure-backed financing facilityfinancing | 2026-09-04 | - | 8.5 USD | stated |
| $2.6 billion infrastructure-backed financing facilityfinancing | 2026-09-04 | - | 2.6 USD | stated |
| Q2 2026 Revenuefinancing | 2026-09-04 | - | - | stated |
| Q2 2026 Backlogfinancing | 2026-09-04 | - | - | stated |
| YoY Revenue Growthfinancing | 2026-09-04 | - | - | stated |
| Rescale partnership for CoreWeave Cloudpartnership | 2026-09-04 | - | - | stated |
| Active power capacityfacility capacity | 2026-09-04 | - | 1.5 GW | stated |
| Contracted power capacityfacility capacity | 2026-09-04 | - | 3.7 GW | stated |
| First to deploy Nvidia NVL72 systemproduct | 2026-09-04 | - | - | stated |
| SUNK platform for cluster managementproduct | 2026-09-04 | - | - | stated |
| Cross-cloud products for workload portabilityproduct | 2026-09-04 | - | - | stated |
| Infrastructure-backed financing in Marchfinancing | 2026-09-04 | - | 8.5 USD | stated |
| Infrastructure-backed financing in Augustfinancing | 2026-09-04 | - | 2.6 USD | stated |
| Microsoft revenue concentration FY 2025customer | 2026-09-04 | - | 67.0 percent | stated |
| FY 2025 total revenuefinancing | 2026-09-04 | - | 5.1 billion USD | stated |
| FY 2025 net lossfinancing | 2026-09-04 | - | 1.2 billion USD | stated |
| FY 2025 net marginfinancing | 2026-09-04 | - | -22.7 percent | stated |
| Debt-to-equity ratio December 2025financing | 2026-09-04 | - | 8.9 x | stated |
| Current ratio December 2025financing | 2026-09-04 | - | 0.5 x | stated |
| FY 2025 free cash flowfinancing | 2026-09-04 | - | -7.3 billion USD | stated |
| Stock-based compensation as percentage of operating cash flow FY 2025financing | 2026-09-04 | - | 20.6 percent | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-04 | 2026-12-31 | 12.4 billion USD | stated |
| Federal securities class action lawsuitregulatory | 2026-09-04 | - | - | stated |
| Rescale partnershippartnership | 2026-09-04 | - | - | stated |
| FY2026 Revenue Guidanceguidance | 2026-09-04 | 2026-12-31 | - | stated |
| Order Backlogcustomer | 2026-09-04 | - | - | stated |
| Rescale partnership for AI and simulation workloadspartnership | 2026-09-04 | - | - | stated |
| Q2 2026 Revenueproduct | 2026-09-03 | - | 2.5 billion USD | stated |
| Total Debtfinancing | 2026-09-03 | - | 35.0 billion USD | stated |
| 2026 Capital Expenditure Guidanceguidance | 2026-09-03 | 2026-12-31 | 35.0 billion USD | stated |
| Revenue Commitmentscustomer | 2026-09-03 | - | 104.0 billion USD | stated |
| Nvidia Capacity Backstoppartnership | 2026-09-03 | 2032-04-13 | - | stated |
| Weighted-average cost of debt reductionfinancing | 2026-09-03 | - | 300.0 basis points | stated |
| Q4 adjusted operating income guidanceguidance | 2026-09-03 | - | 60.0 percent | stated |
| A100 GPU customer contractscustomer | 2026-09-03 | - | - | stated |
| First AI cloud provider to deploy Nvidia Vera Rubin platformproduct | 2026-09-03 | - | - | stated |
| Took delivery of world's first Vera Rubin NVL72 server rack from Dellproduct | 2026-09-03 | - | - | stated |
| Vera Rubin deployment includes full system-level validation of rack-scale architectureproduct | 2026-09-03 | - | - | stated |
| Vera Rubin deployment incorporates Micron's 7600 SSDs for energy efficiencyproduct | 2026-09-03 | - | - | stated |
| Patent-pending innovations (Valvey and Racky) enabling Vera Rubin at production scaleproduct | 2026-09-03 | - | - | stated |
| Chen Goldberg is Executive Vice President of Product & Engineeringpersonnel | 2026-09-03 | - | - | stated |
| AI Backlogproduct | 2026-09-03 | - | 129.0 billion USD | stated |
| First to deploy Vera Rubinproduct | 2026-09-03 | - | - | stated |
| Vera Rubin system-level validationproduct | 2026-09-03 | - | - | stated |
| Vera Rubin incorporates Micron 7600 SSDsproduct | 2026-09-03 | - | - | stated |
| Full-stack orchestration for Vera Rubin productionproduct | 2026-09-03 | - | - | stated |
| A100 GPU customer contracts through 2029customer | 2026-09-03 | 2029-12-31 | - | stated |
| Latest quarter revenuefinancing | 2026-09-02 | - | 2.6 billion USD | stated |
| Revenue backlogguidance | 2026-09-02 | - | 104.0 billion USD | stated |
| Q2 2026 Revenueproduct | 2026-09-02 | - | 2.58 billion USD | stated |
| New Customer Commitmentscustomer | 2026-09-02 | - | 25.0 billion USD | stated |
| 2026 Full-Year Revenue Guidanceguidance | 2026-09-02 | 2026-12-31 | 12.4 billion USD | stated |
| Indonesia Data Center Expansionfacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-09-02 | - | - | stated |
| Revenue backlog of $104 billioncustomer | 2026-09-02 | - | 104.0 USD | stated |
| Full-year 2026 revenue guidance raised to $12.4-13.2 billionguidance | 2026-09-02 | 2026-12-31 | - | stated |
| Quarterly revenue growthfinancing | 2026-09-02 | - | - | stated |
| Revenue backlog surgefinancing | 2026-09-02 | - | - | stated |
| Revenue Backlog - End of Q2 2026guidance | 2026-09-02 | - | 104.0 billion USD | stated |
| New Commitments Signed - Q2 2026customer | 2026-09-02 | - | 25.0 billion USD | stated |
| 2026 Annual Revenue Guidanceguidance | 2026-09-02 | 2026-12-31 | 12.4 USD (billions) | stated |
| Q2 2026 Net Lossfinancing | 2026-09-02 | - | 626.0 USD (millions) | stated |
| Q2 2026 Interest Expensefinancing | 2026-09-02 | - | 640.0 USD (millions) | stated |
| FY 2026 revenue guidanceguidance | 2026-09-02 | - | - | stated |
| AI Infrastructure Backlogguidance | 2026-09-02 | - | 129.0 billion USD | stated |
| Q2 2026 revenue resultsproduct | 2026-09-02 | - | 2.58 billion USD | stated |
| Revenue backlog commitmentcustomer | 2026-09-02 | - | 104.0 billion USD | stated |
| Full-year 2026 revenue guidance revised upwardguidance | 2026-09-02 | - | 12.4 billion USD | stated |
| Q2 2026 net loss and interest expensefinancing | 2026-09-02 | - | 626.0 million USD | stated |
| 2026 full-year revenue guidanceguidance | 2026-09-02 | - | 12.4 billion USD | stated |
| Full-year revenue guidanceguidance | 2026-09-02 | 2026-12-31 | 12400000000.0 USD | stated |
| Security features in AI-native cloudproduct | 2026-09-02 | - | - | stated |
| Revenue backlogfinancing | 2026-09-02 | - | 104.2 billion USD | stated |
| Q2 2026 Revenueproduct | 2026-09-01 | - | - | stated |
| Q2 2026 Loss Per Share Increaseguidance | 2026-09-01 | - | - | stated |
| Revenue Backlogfinancing | 2026-09-01 | - | 104.0 billion USD | stated |
| Q2 2026 adjusted EBITDAguidance | 2026-09-01 | - | 1.51 billion USD | stated |
| Q2 2026 operating cash flowguidance | 2026-09-01 | - | 679.0 million USD | stated |
| Q2 2026 free cash flowguidance | 2026-09-01 | - | -5.74 billion USD | stated |
| Full-year 2026 capital expenditure guidance raisedfinancing | 2026-09-01 | 2026-12-31 | 35.0 billion USD | stated |
| Q2 2026 interest expensefinancing | 2026-09-01 | - | 640.0 million USD | stated |
| Q3 2026 interest expense guidancefinancing | 2026-09-01 | 2026-09-30 | 860.0 million USD | outcome unconfirmed |
| Q4 2026 operating margin expansionguidance | 2026-09-01 | 2026-12-31 | - | stated |
| Q2 2026 GAAP net lossguidance | 2026-09-01 | - | 626.0 million USD | stated |
| Q2 2026 adjusted operating marginguidance | 2026-09-01 | - | 5.0 percent | stated |
| Data center power capacity expansion targetingfacility capacity | 2026-09-01 | 2026-12-31 | 1.85 gigawatts | stated |
| July 2026 SKU pricing increaseproduct | 2026-09-01 | - | 25.0 percent | stated |
| GPU SKU offerings with new price levelsproduct | 2026-09-01 | - | - | stated |
| Total Debt (June 30, 2026)financing | 2026-09-01 | - | 35.0 billion USD | stated |
| Weighted Average Cost of Debt Reductionfinancing | 2026-09-01 | - | 1.1 billion USD | stated |
| Q2 2026 Adjusted Operating Incomeguidance | 2026-09-01 | - | 128.0 million USD | stated |
| Q3 2026 Interest Expense Guidanceguidance | 2026-09-01 | 2026-09-30 | 900.0 million USD | outcome unconfirmed |
| Q3 2026 Adjusted Operating Income Guidanceguidance | 2026-09-01 | 2026-09-30 | 230.0 million USD | outcome unconfirmed |
| H1 2026 Capital Expendituresfacility capacity | 2026-09-01 | - | 16.1 billion USD | stated |
| Full-Year 2026 CapEx Guidancefacility capacity | 2026-09-01 | 2026-12-31 | 37.0 billion USD | stated |
| Cash Position (June 30, 2026)financing | 2026-09-01 | - | 5.5 billion USD | stated |
| Debt Maturity - Year-End 2026financing | 2026-09-01 | 2026-12-31 | 4.4 billion USD | stated |
| Debt Maturity - 2027financing | 2026-09-01 | 2027-12-31 | 6.2 billion USD | stated |
| Q2 Revenuefinancing | 2026-09-01 | - | 2.58 billion USD | stated |
| Q2 Revenue Growthfinancing | 2026-09-01 | - | 112.32 percent | stated |
| Q2 Adjusted EBITDA Marginfinancing | 2026-09-01 | - | 59.0 percent | stated |
| Q2 GAAP Lossfinancing | 2026-09-01 | - | 626.0 million USD | stated |
| Q3 New Commitmentsguidance | 2026-09-01 | - | 25.0 billion USD | stated |
| 2026 Full-Year Capex Guidanceguidance | 2026-09-01 | 2026-12-31 | 35.0 billion USD | stated |
| Q4 Operating Margin Guidanceguidance | 2026-09-01 | 2026-12-31 | - | stated |
| 2026 Year-End Power Capacityfacility capacity | 2026-09-01 | 2026-12-31 | 1.85 GW | stated |
| July SKU Price Increaseproduct | 2026-09-01 | - | 25.0 percent | stated |
| Total Liabilitiesfinancing | 2026-09-01 | - | 72.05 billion USD | stated |
| Q2 revenuefinancing | 2026-09-01 | - | 2.6 USD billion | stated |
| Revenue backlog in Q2financing | 2026-09-01 | - | 104.0 USD billion | stated |
| Customer commitments signed in Q3customer | 2026-09-01 | - | 25.0 USD billion | stated |
| Non-GPU services ARR in Q2financing | 2026-09-01 | - | 400.0 USD million | stated |
| Managed inference ARRfinancing | 2026-09-01 | - | 100.0 USD million | stated |
| Managed inference ARR guidance for 2026guidance | 2026-09-01 | 2026-12-31 | 250.0 USD million | stated |
| Active capacity in Q2facility capacity | 2026-09-01 | - | 1.5 GW | stated |
| Capacity target by 2030guidance | 2026-09-01 | 2030-12-31 | 8.0 GW | stated |
| Contracted power capacityfacility capacity | 2026-09-01 | - | 3.7 GW | stated |
| Q2 capital expendituresfinancing | 2026-09-01 | - | 9.4 USD billion | stated |
| Q2 net lossfinancing | 2026-09-01 | - | 626.0 USD million | stated |
| Cash and equivalents at quarter-endfinancing | 2026-09-01 | - | 6.9 USD billion | stated |
| Capital raised in Q2financing | 2026-09-01 | - | 18.0 USD billion | stated |
| Total Debt as of Q2 2026financing | 2026-09-01 | - | 35.0 billion USD | stated |
| Cash Position Q2 2026financing | 2026-09-01 | - | 5.5 billion USD | stated |
| Debt Maturity Schedule Through Year-End 2026financing | 2026-09-01 | 2026-12-31 | 4.4 billion USD | stated |
| Debt Maturity Schedule for 2027financing | 2026-09-01 | 2027-12-31 | 6.2 billion USD | stated |
| Term Loan Facility August 2026financing | 2026-09-01 | - | 2.6 billion USD | stated |
| Hudson River Trading multibillion dollar agreementpartnership | 2026-09-01 | - | - | stated |
| Revenue backlogguidance | 2026-09-01 | - | 55.6 USD | stated |
| AI backlogfinancing | 2026-09-01 | - | 129.0 billion USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-09-01 | 2026-12-31 | 12.4 USD billions | stated |
| Active power capacity expansion targetfacility capacity | 2026-09-01 | 2026-12-31 | 1.85 GW | stated |
| Q2 2026 revenue and growthproduct | 2026-09-01 | - | 2.58 USD billions | stated |
| CEO stock salepersonnel | 2026-09-01 | - | 27.3 USD millions | stated |
| Revenue Backlogproduct | 2026-09-01 | - | 104000.0 USD | stated |
| Total Debt Q2 2026financing | 2026-09-01 | - | 35000.0 USD | stated |
| Weighted Average Cost of Debt Reductionfinancing | 2026-09-01 | - | 1100.0 USD | stated |
| Blended Cost of Debtfinancing | 2026-09-01 | - | 8.4 percent | stated |
| Q3 2026 Interest Expense Guidanceguidance | 2026-09-01 | - | 900.0 USD | stated |
| Q3 2026 Adjusted Operating Income Guidanceguidance | 2026-09-01 | - | 230.0 USD | stated |
| Cash Position Q2 2026financing | 2026-09-01 | - | 5500.0 USD | stated |
| H1 2026 Capital Expendituresfacility capacity | 2026-09-01 | - | 16100.0 USD | stated |
| FY2026 Capital Expenditure Guidanceguidance | 2026-09-01 | - | 37000.0 USD | stated |
| Q2 2025 Interest Expensefinancing | 2026-09-01 | - | 267.0 USD | stated |
| Revenue backlog with new commitmentscustomer | 2026-09-01 | - | 104000.0 USD | stated |
| Contracted revenue backlogcustomer | 2026-09-01 | - | 104.0 billion USD | stated |
| Data center power capacity scalingfacility capacity | 2026-09-01 | 2026-12-31 | 1.85 GW | stated |
| Data center power capacity expansion to year-end 2026facility capacity | 2026-09-01 | 2026-12-31 | 1850.0 MW | stated |
| Power capacity scaling by year endfacility capacity | 2026-09-01 | 2026-12-31 | 1.85 GW | stated |
| Managed inference ARR target by end of 2026guidance | 2026-09-01 | 2026-12-31 | 250.0 USD | stated |
| Full-year 2026 revenue forecastguidance | 2026-09-01 | 2026-12-31 | 12400.0 USD | stated |
| Specialized GPU and CPU compute platform for AI workloadsproduct | 2026-09-01 | - | - | stated |
| IaaS model with virtual servers and bare-metal configuration optionsproduct | 2026-09-01 | - | - | stated |
| Serves large enterprises deploying generative AI applicationscustomer | 2026-09-01 | - | - | stated |
| Full-year 2026 sales forecast of at least $12.4 billionguidance | 2026-09-01 | 2026-12-31 | 12400000000.0 USD | stated |
| Hudson River Trading partnershippartnership | 2026-09-01 | - | - | stated |
| Revenue backlog and new commitmentscustomer | 2026-09-01 | - | 104.0 USD billion | stated |
| Cash balance as of June 30, 2026financing | 2026-09-01 | - | 5.5 USD billion | stated |
| Debt principal due through year-end 2026financing | 2026-09-01 | 2026-12-31 | 4.4 USD billion | stated |
| Debt principal due in 2027financing | 2026-09-01 | 2027-12-31 | 6.2 USD billion | stated |
| Debt principal due after 2030financing | 2026-09-01 | - | 15.0 USD billion | stated |
| Senior notes issued April 2026financing | 2026-09-01 | - | - | stated |
| Euro-denominated notes issued 2026financing | 2026-09-01 | - | - | stated |
| President and CEOpersonnel | 2026-09-01 | - | - | stated |
| Chief Financial Officerpersonnel | 2026-09-01 | - | - | stated |
| Full-year 2026 capital expenditure guidanceguidance | 2026-09-01 | - | 37.0 USD | stated |
| Hudson River Trading agreementcustomer | 2026-09-01 | - | - | stated |
| $55.6 billion revenue backlog and growing RPOguidance | 2026-09-01 | - | 55.6 USD | stated |
| Rescale cloud ecosystem expansion with CoreWeavepartnership | 2026-08-31 | - | - | stated |
| CoreWeave Kubernetes Serviceproduct | 2026-08-31 | - | - | stated |
| Meta AI infrastructure commitmentcustomer | 2026-08-31 | - | 35.0 billion USD | stated |
| Expanded relationship with Anthropiccustomer | 2026-08-31 | - | - | stated |
| Expanded relationship with Perplexitycustomer | 2026-08-31 | - | - | stated |
| Largest Data Centers Among Peersfacility capacity | 2026-08-31 | - | - | stated |
| Microsoft as Major Customercustomer | 2026-08-31 | - | - | stated |
| Rescale integration with CoreWeave Cloudpartnership | 2026-08-31 | - | - | stated |
| Meta AI infrastructure deal for $21 billioncustomer | 2026-08-31 | - | 21000000000.0 USD | stated |
| Rescale cloud ecosystem integrationpartnership | 2026-08-31 | - | - | stated |
| Meta additional AI infrastructure dealcustomer | 2026-08-31 | - | 21000000000.0 USD | stated |
| CoreWeave Kubernetes Service for AI and HPCproduct | 2026-08-31 | - | - | stated |
| Meta AI cloud capacity through December 2032customer | 2026-08-30 | 2032-12-31 | 21000000000.0 USD | stated |
| Meta capacity allocation across multiple locations with Vera Rubinfacility capacity | 2026-08-30 | - | - | stated |
| $3 billion convertible notes offeringfinancing | 2026-08-30 | - | 3000000000.0 USD | stated |
| $450 million additional convertible notes purchase optionfinancing | 2026-08-30 | - | 450000000.0 USD | stated |
| $1.25 billion senior notes due 2031financing | 2026-08-30 | 2031-12-31 | 1250000000.0 USD | stated |
| Meta AI cloud capacity agreement through December 2032customer | 2026-08-30 | 2032-12-31 | 21.0 USD | stated |
| $3 billion convertible notes offeringfinancing | 2026-08-30 | - | 3.0 USD | stated |
| Optional additional $450 million convertible notesfinancing | 2026-08-30 | - | 450.0 USD | stated |
| $1.25 billion senior notes due 2031financing | 2026-08-30 | - | 1.25 USD | stated |
| Rescale AI cloud platform integrationpartnership | 2026-08-30 | - | - | stated |
| Insider Ownership Percentagepersonnel | 2026-08-28 | - | 24.2 percent | stated |
| Director Brannin McBee Insider Share Salepersonnel | 2026-08-28 | - | 21.4 million | stated |
| Total Insider Selling - 3 Month Periodpersonnel | 2026-08-28 | - | 735.14 million | stated |
| Partnerships with Hudson River Trading and Rescalepartnership | 2026-08-28 | - | - | stated |
| Kristen McVeety GC and Secretarypersonnel | 2026-08-28 | - | - | stated |
| CoreWeave trailing twelve-month revenuefinancing | 2026-08-28 | - | 7.6 billion USD | stated |
| CoreWeave trailing twelve-month net lossfinancing | 2026-08-28 | - | 1.9 billion USD | stated |
| CoreWeave generative AI computing platformproduct | 2026-08-28 | - | - | stated |
| Rescale AI cloud platform integrationpartnership | 2026-08-28 | - | - | stated |
| Announced or expanded relationships with Hudson River Trading and Rescalepartnership | 2026-08-27 | - | - | stated |
| Partnerships with Hudson River Trading and Rescalepartnership | 2026-08-27 | - | - | stated |
| Aggregate Insider Stock Sales (90 days)personnel | 2026-08-27 | - | 7657318.0 shares | stated |
| Corporate Insider Ownershippersonnel | 2026-08-27 | - | 24.2 percent | stated |
| Rescale Cloud Ecosystem Expansionpartnership | 2026-08-27 | - | - | stated |
| Product Offeringsproduct | 2026-08-27 | - | - | stated |
| Dell's largest customercustomer | 2026-08-25 | - | - | stated |
| Gartner Magic Quadrant Recognitionregulatory | 2026-08-25 | - | - | stated |
| SemiAnalysis Platinum ClusterMAX Ratingregulatory | 2026-08-25 | - | - | stated |
| Anyscale Video Captioning Partnershippartnership | 2026-08-25 | - | - | stated |
| Rescale integrationpartnership | 2026-08-25 | - | - | stated |
| Nasdaq IPOfinancing | 2026-08-25 | - | - | stated |
| Partnership with Rescale for AI and simulation infrastructurepartnership | 2026-08-25 | - | - | stated |
| CoreWeave Kubernetes Service capabilitiesproduct | 2026-08-25 | - | - | stated |
| Platform supports full AI development lifecycleproduct | 2026-08-25 | - | - | stated |
| Cloud platform used by AI labs, startups, and global enterprisescustomer | 2026-08-25 | - | - | stated |
| MLPerf benchmark performance and SemiAnalysis ClusterMAX rankingsproduct | 2026-08-25 | - | - | stated |
| Dell customer relationshippartnership | 2026-08-25 | - | - | stated |
| Capacity scaled from 70 MW (end 2023) to 1.5 GW (mid-2026)facility capacity | 2026-08-25 | - | - | stated |
| Target of more than 1.8 GW capacity by year-end 2026facility capacity | 2026-08-25 | 2026-12-31 | 1.8 GW | stated |
| Projection of 3.2 GW capacity by end of 2027facility capacity | 2026-08-25 | 2027-12-31 | 3.2 GW | stated |
| Revenue backlog of $104.2 billion as of Q2 2026customer | 2026-08-25 | - | 104.2 USD billions | stated |
| Total debt of $35 billion as of Q2 2026financing | 2026-08-25 | - | 35.0 USD billions | stated |
| Interest expense of $640 million in Q2 2026financing | 2026-08-25 | - | 640.0 USD millions | stated |
| Annual interest costs guided to approach or surpass $3 billionguidance | 2026-08-25 | 2026-12-31 | 3.0 USD billions | stated |
| Capital expenditures of $9.4 billion in Q2 2026financing | 2026-08-25 | - | 9.4 USD billions | stated |
| Full-year 2026 CapEx guidance of $35–39 billionguidance | 2026-08-25 | 2026-12-31 | 35.0 USD billions | stated |
| Weighted average cost of borrowing reduced by approximately 300 basis pointsfinancing | 2026-08-25 | - | 300.0 basis points | stated |
| Partnership expansion with Rescalepartnership | 2026-08-25 | - | - | stated |
| Rescale integrating CoreWeave Cloud into ecosystempartnership | 2026-08-25 | - | - | stated |
| Rescale customers access to CoreWeave infrastructure through CKSpartnership | 2026-08-25 | - | - | stated |
| Q2 2026 revenueguidance | 2026-08-25 | - | 2.58 billion USD | stated |
| Q2 2026 loss per shareguidance | 2026-08-25 | - | 1.03 USD per share | stated |
| Hudson River Trading AI infrastructure agreementpartnership | 2026-08-25 | - | - | stated |
| Q2 revenue backlogcustomer | 2026-08-25 | - | 104.2 USD | stated |
| Q3 additional customer commitmentscustomer | 2026-08-25 | - | 25.0 USD | stated |
| 2026 capital expenditure guidanceguidance | 2026-08-25 | 2026-12-31 | - | stated |
| 2026 revenue guidanceguidance | 2026-08-25 | 2026-12-31 | - | stated |
| Year-end 2026 annualized revenue expectationguidance | 2026-08-25 | 2026-12-31 | - | stated |
| 12-month revenue growthfinancing | 2026-08-25 | - | 115.3 percent | stated |
| 12-month operating marginfinancing | 2026-08-25 | - | -3.0 percent | stated |
| Negative trailing earningsfinancing | 2026-08-25 | - | - | stated |
| Rescale digital engineering cloud integrationpartnership | 2026-08-25 | - | - | stated |
| Hudson River Trading multi-year AI cloud agreementcustomer | 2026-08-25 | - | - | stated |
| Blackwell GPU cluster capacityfacility capacity | 2026-08-25 | - | 1600.0 GPUs | stated |
| Infrastructure deployment timelinefacility timeline | 2026-08-25 | - | - | stated |
| CoreWeave AI Object Storage write throughputproduct | 2026-08-25 | - | 40.0 | stated |
| CoreWeave AI Object Storage read throughputproduct | 2026-08-25 | - | 115.0 | stated |
| Large-scale video processing capabilityproduct | 2026-08-25 | - | - | stated |
| LOTA cache performance advantage over third-party storageproduct | 2026-08-25 | - | 1.88 | stated |
| LOTA cache performance advantage over cold CoreWeave readsproduct | 2026-08-25 | - | 1.28 | stated |
| 2026 full-year revenue guidanceguidance | 2026-08-25 | 2026-12-31 | 12.4 USD | stated |
| Year-end 2026 annualized revenue run rate guidanceguidance | 2026-08-25 | 2026-12-31 | 18.5 USD | stated |
| CoreWeave becomes key infrastructure provider for Rescale's digital engineering cloudcustomer | 2026-08-25 | - | - | stated |
| Integration with Rescale cloud ecosystempartnership | 2026-08-25 | - | - | stated |
| Targeting aerospace, automotive, energy, life sciences and manufacturing sectorscustomer | 2026-08-25 | - | - | stated |
| Data center capacity target for year-end 2026facility capacity | 2026-08-25 | 2026-12-31 | 1.8 GW | stated |
| Data center capacity projection for year-end 2027facility capacity | 2026-08-25 | 2027-12-31 | 3.2 GW | stated |
| Revenue backlog from customer contractscustomer | 2026-08-25 | - | 104.2 USD | stated |
| Rescale platform integration for engineering and AI workloadspartnership | 2026-08-25 | - | - | stated |
| CFO Nitin Agrawal insider share salepersonnel | 2026-08-25 | - | 488318.0 USD | stated |
| Neural AI motion to compel subpoena compliance against CoreWeaveother | 2026-08-25 | - | - | stated |
| Backlog of customer commitmentscustomer | 2026-08-24 | - | 104.2 billion USD | stated |
| Active power capacityfacility capacity | 2026-08-24 | - | 1.5 GW | stated |
| Contracted power capacityfacility capacity | 2026-08-24 | - | 4.2 GW | stated |
| 2030 capacity targetguidance | 2026-08-24 | 2030-12-31 | 8.0 GW | stated |
| 8 GW capacity goal by 2030guidance | 2026-08-24 | 2030-12-31 | 8.0 GW | stated |
| CoreWeave price increase in July 2026product | 2026-08-24 | - | 25.0 percent | stated |
| Q2 2026 Revenuefinancing | 2026-08-24 | - | 2575.0 USD millions | stated |
| Q2 2026 Net Lossfinancing | 2026-08-24 | - | 626.0 USD millions | stated |
| Q2 2026 Adjusted Operating Marginfinancing | 2026-08-24 | - | 5.0 percent | stated |
| Q2 2026 Interest Expensefinancing | 2026-08-24 | - | 640.0 USD millions | stated |
| Q3 2026 Interest Expense Guidanceguidance | 2026-08-24 | 2026-09-30 | - | outcome unconfirmed |
| Debt-to-Equity Ratiofinancing | 2026-08-24 | - | 8.94 | stated |
| Full-Year 2026 Capex Guidanceguidance | 2026-08-24 | 2026-12-31 | - | stated |
| Q2 2026 Free Cash Flow Burnfinancing | 2026-08-24 | - | 5740.0 USD millions | stated |
| Nasdaq-100 Index Inclusionregulatory | 2026-08-24 | - | - | stated |
| Securities Fraud Class Actionregulatory | 2026-08-24 | - | - | stated |
| Forecasted data center capacity by end of 2026facility capacity | 2026-08-24 | 2026-12-31 | 1.8 GW | stated |
| Projected data center capacity by 2030facility capacity | 2026-08-24 | 2030-12-31 | 8.0 GW | stated |
| Net debt and weighted-average interest ratefinancing | 2026-08-24 | - | - | stated |
| Network fabric spans 50+ data centersfacility capacity | 2026-08-24 | - | 50.0 data centers | stated |
| Multi-plane topology reaches 128,000 GPU capacityfacility capacity | 2026-08-24 | - | 128000.0 GPUs | stated |
| ConnectX-9 SuperNIC bandwidth on Vera Rubin NVL72product | 2026-08-24 | - | 1600.0 Gb/s per GPU | stated |
| First to deploy and validate NVIDIA Vera Rubin NVL72product | 2026-08-24 | - | - | stated |
| Early deployment of NVIDIA Spectrum-X SN6600-LDproduct | 2026-08-24 | - | - | stated |
| Co-engineering partnership with NVIDIApartnership | 2026-08-24 | - | - | stated |
| Hudson River Trading multi-year AI cloud infrastructure dealpartnership | 2026-08-24 | - | - | stated |
| State-level energy and transparency regulations affecting data center buildoutregulatory | 2026-08-24 | - | - | stated |
| Nitin Agrawal CFOpersonnel | 2026-08-24 | - | - | stated |
| GPU/CPU cloud computing platform for AIproduct | 2026-08-24 | - | - | stated |
| Cloud infrastructure-as-a-service business modelproduct | 2026-08-24 | - | - | stated |
| Enterprise customers for AI and ML workloadscustomer | 2026-08-24 | - | - | stated |
| Market capitalizationfinancing | 2026-08-24 | - | 49.0 billion USD | stated |
| Trailing twelve months revenuefinancing | 2026-08-24 | - | 7.6 billion USD | stated |
| Trailing twelve months net incomefinancing | 2026-08-24 | - | -1.9 billion USD | stated |
| Q2 2026 revenue growth ratefinancing | 2026-08-24 | - | - | stated |
| Sales backlogfinancing | 2026-08-24 | - | 104.0 billion USD | stated |
| Total debtfinancing | 2026-08-24 | - | 35.0 billion USD | stated |
| Stockholders' equityfinancing | 2026-08-24 | - | 5.0 billion USD | stated |
| Sales backlog reached $104 billioncustomer | 2026-08-24 | - | 104.0 billion USD | stated |
| Full-year 2026 revenue guidance raisedguidance | 2026-08-24 | 2026-12-31 | 12.4 billion USD | stated |
| Network fabric across 50+ data centersfacility capacity | 2026-08-24 | - | 50.0 data centers | stated |
| 128,000 GPU network capacityfacility capacity | 2026-08-24 | - | 128000.0 GPUs | stated |
| 1,600 Gb/s per GPU on Vera Rubin NVL72facility capacity | 2026-08-24 | - | 1600.0 Gb/s | stated |
| Telemetry Relay managed serviceproduct | 2026-08-24 | - | - | stated |
| CoreWeave Kubernetes Service removes hypervisorproduct | 2026-08-24 | - | - | stated |
| CoreWeave Mission Control automatic node replacementproduct | 2026-08-24 | - | - | stated |
| Co-engineering relationship with NVIDIApartnership | 2026-08-24 | - | - | stated |
| Operates largest InfiniBand and RoCE fabricsfacility capacity | 2026-08-24 | - | - | stated |
| Large-scale BlueField DPU deploymentfacility capacity | 2026-08-24 | - | - | stated |
| Multi-region network backbonefacility capacity | 2026-08-24 | - | - | stated |
| CoreWeave raised full-year guidanceguidance | 2026-08-24 | - | - | stated |
| CoreWeave revenue backlog and new customer commitmentsguidance | 2026-08-24 | - | 104.2 USD | stated |
| Near-term capacity fully bookedfacility capacity | 2026-08-24 | - | - | stated |
| 1.8 GW active data center capacity by end of 2026facility capacity | 2026-08-24 | 2026-12-31 | 1.8 GW | stated |
| CoreWeave targeted by Neural AI third-party motion to compel (NVIDIA patent case)other | 2026-08-24 | - | - | stated |
| Q2 2026 revenueproduct | 2026-08-22 | - | 2.6 USD billions | stated |
| Q2 2026 backlogcustomer | 2026-08-22 | - | 104.0 USD billions | stated |
| Early Q3 2026 net new commitmentscustomer | 2026-08-22 | - | 25.0 USD billions | stated |
| Q4 2026 operating margin guidanceguidance | 2026-08-22 | 2026-12-31 | - | stated |
| Q3 2026 operating income guidanceguidance | 2026-08-22 | 2026-09-30 | 230.0 USD millions | outcome unconfirmed |
| July 2026 pricing increaseproduct | 2026-08-22 | - | 25.0 percent | stated |
| Managed inference ARRproduct | 2026-08-22 | - | 100.0 USD millions | stated |
| Contracted power capacity by 2030facility capacity | 2026-08-22 | 2030-12-31 | 8.0 GW | stated |
| Q2 2026 capital expenditurefinancing | 2026-08-22 | - | 9.4 USD billions | stated |
| Full-year 2026 capex guidanceguidance | 2026-08-22 | 2026-12-31 | 37.0 USD billions | stated |
| Q2 2026 interest expensefinancing | 2026-08-22 | - | 640.0 USD millions | stated |
| Q3 2026 interest expense guidanceguidance | 2026-08-22 | 2026-09-30 | 900.0 USD millions | outcome unconfirmed |
| Q2 2026 free cash flowfinancing | 2026-08-22 | - | -5.74 USD billions | stated |
| CEO stock salepersonnel | 2026-08-22 | - | 13129.0 shares | stated |
| CEO share holdingspersonnel | 2026-08-22 | - | 1687129.0 shares | stated |
| CEO derivative securitiespersonnel | 2026-08-22 | - | 328207.0 derivative securities | stated |
| GPU/CPU cloud computing platformproduct | 2026-08-22 | - | - | stated |
| Q2 revenueguidance | 2026-08-22 | - | 2600.0 USD (millions) | stated |
| Q2 revenue growthguidance | 2026-08-22 | - | 112.0 percent | stated |
| Q2 net lossguidance | 2026-08-22 | - | -626.0 USD (millions) | stated |
| TTM revenueguidance | 2026-08-22 | - | 7600.0 USD (millions) | stated |
| TTM net incomeguidance | 2026-08-22 | - | -1900.0 USD (millions) | stated |
| Backlog as of Q2 2026guidance | 2026-08-22 | - | 104.0 USD billion | stated |
| Full-year 2026 capital expenditure guidancefinancing | 2026-08-22 | 2026-12-31 | - | stated |
| AI-focused cloud computing servicesproduct | 2026-08-21 | - | - | stated |
| Microsoft and Meta Platforms as major clientscustomer | 2026-08-21 | - | - | stated |
| Q2 Revenueproduct | 2026-08-21 | - | 2.58 billion USD | stated |
| Q2 Net Interest Expensefinancing | 2026-08-21 | - | 640.0 million USD | stated |
| Q2 Capital Expendituresfinancing | 2026-08-21 | - | 9.4 billion USD | stated |
| Full-Year Capex Guidanceguidance | 2026-08-21 | - | - | stated |
| Future Debt Principal Paymentsfinancing | 2026-08-21 | - | 35.6 billion USD | stated |
| Q2 Revenue Backlogcustomer | 2026-08-21 | - | 104.2 billion USD | stated |
| Microsoft as major clientcustomer | 2026-08-21 | - | - | stated |
| Meta Platforms as major clientcustomer | 2026-08-21 | - | - | stated |
| CoreWeave is the world's leading AI Cloudproduct | 2026-08-21 | - | - | stated |
| Major clients: Microsoft and Metacustomer | 2026-08-21 | - | - | stated |
| AI cloud computing providerproduct | 2026-08-21 | - | - | stated |
| Significant generative AI customer agreementspartnership | 2026-08-21 | - | - | stated |
| Scheduled Q4 2025 earnings reportguidance | 2026-08-21 | - | - | stated |
| Major customerscustomer | 2026-08-21 | - | - | stated |
| OpenAI contract valuepartnership | 2026-08-21 | - | 22.4 billion USD | stated |
| Backblaze storage partnershippartnership | 2026-08-21 | - | 335.0 USD | stated |
| CoreWeave AI Object Storageproduct | 2026-08-21 | - | - | stated |
| Hudson River Trading multi-year agreementpartnership | 2026-08-21 | - | - | stated |
| First bring-up and validation of Vera Rubin NVL72product | 2026-08-21 | - | - | stated |
| Quantitative trading firm customerscustomer | 2026-08-21 | - | - | stated |
| Hudson River Trading multiyear AI computing partnershippartnership | 2026-08-21 | - | - | stated |
| Hudson River Trading access to Vera Rubin AI chipscustomer | 2026-08-21 | - | - | stated |
| Five-year, $335 million storage capacity agreement with Backblazepartnership | 2026-08-21 | - | 335.0 USD | stated |
| Full-year 2026 revenue guidance raisedguidance | 2026-08-21 | 2026-12-31 | - | stated |
| Hudson River Trading multiyear dealpartnership | 2026-08-20 | - | - | stated |
| Hudson River Trading Vera Rubin chip accesscustomer | 2026-08-20 | - | - | stated |
| Q3 2026 Revenue Guidanceguidance | 2026-08-20 | 2026-09-30 | 3500.0 million USD | outcome unconfirmed |
| Multi-year agreement with Hudson River Tradingpartnership | 2026-08-20 | - | - | verified |
| NVIDIA GPU infrastructure offeringproduct | 2026-08-20 | - | - | stated |
| Spectrum-X Ethernet networking infrastructureproduct | 2026-08-20 | - | - | stated |
| Platinum ranking in SemiAnalysis ClusterMAX benchmarksproduct | 2026-08-20 | - | - | stated |
| #1 ranking for inference performanceproduct | 2026-08-20 | - | - | stated |
| Jon Jones is Chief Revenue Officerpersonnel | 2026-08-20 | - | - | stated |
| Nasdaq public listing completedfinancing | 2026-08-20 | - | - | stated |
| COO Sachin Jain Stock Salepersonnel | 2026-08-20 | - | 6339.0 shares | stated |
| CEO Michael N. Intrator Stock Salepersonnel | 2026-08-20 | - | 13129.0 shares | stated |
| Full-year 2026 revenue guidanceguidance | 2026-08-20 | 2026-12-31 | 12400.0 USD | stated |
| 2026 capital spending guidanceguidance | 2026-08-20 | 2026-12-31 | 35000.0 USD | stated |
| Adjusted operating margin for Q4 2026guidance | 2026-08-20 | 2026-12-31 | 10.0 percent | stated |
| Contribution margin improvement on Q2 2026 contractsguidance | 2026-08-20 | - | 5.0 percent | stated |
| A100 GPU contract term extending to 2029customer | 2026-08-20 | 2029-12-31 | - | stated |
| Hudson River Trading AI computing services dealpartnership | 2026-08-20 | - | - | stated |
| Hudson River Trading AI cloud infrastructure agreementcustomer | 2026-08-20 | - | - | stated |
| 2026 capital expenditure planfacility capacity | 2026-08-20 | - | - | stated |
| $8.5 billion financing for Meta infrastructurefinancing | 2026-08-20 | - | 8.5 USD | stated |
| NVIDIA Vera Rubin NVL72 and HGX B200 GPU systems provisionfacility capacity | 2026-08-20 | - | - | stated |
| NVIDIA Spectrum-X Ethernet Direct Connect networkingfacility capacity | 2026-08-20 | - | - | stated |
| Technical experts and AI tools access for Hudson River Tradingproduct | 2026-08-20 | - | - | stated |
| GPU infrastructure with Nvidia systems, networking, and technical supportproduct | 2026-08-20 | - | - | stated |
| Hudson River Trading infrastructure services agreementcustomer | 2026-08-20 | - | - | stated |
| Vera Rubin GPU access for Hudson River Tradingproduct | 2026-08-20 | - | - | stated |
| Jane Street data center capacity commitmentcustomer | 2026-08-20 | - | 6000000000.0 USD | stated |
| $21 billion agreement with Meta for AI cloud capacitycustomer | 2026-08-20 | 2032-12-31 | 21000000000.0 USD | stated |
| 8+ gigawatts of data center capacity by 2030facility capacity | 2026-08-20 | 2030-12-31 | 8000.0 MW | stated |
| Multi-year compute deal with Anthropicpartnership | 2026-08-20 | - | - | stated |
| Sweden data center expansion via co-location agreementfacility capacity - Sweden Data Center | 2026-08-20 | - | - | stated |
| Multi-year foundational data storage agreement with Backblazepartnership | 2026-08-20 | - | - | stated |
| Senior unsecured notes private offeringfinancing | 2026-08-20 | - | - | stated |
| 2026 capital expenditure guidanceguidance | 2026-08-20 | 2026-12-31 | 32.5 USD | stated |
| Active power capacity by year-end 2026facility capacity | 2026-08-20 | 2026-12-31 | 1.7 GW | stated |
| Q1 2026 revenue guidanceguidance | 2026-08-20 | 2026-03-31 | 1.95 USD | outcome unconfirmed |
| Q2 2026 total liabilitiesfinancing | 2026-08-19 | - | 72.05 billion USD | stated |
| Q2 2026 equityfinancing | 2026-08-19 | - | 5.02 billion USD | stated |
| Q2 2026 Revenue Growthguidance | 2026-08-19 | - | 2.6 billion USD | stated |
| Q2 2026 Adjusted EBITDAguidance | 2026-08-19 | - | 1.5 billion USD | stated |
| MasterClass AI teaching agents platformcustomer | 2026-08-19 | - | - | stated |
| 2026 capital expenditure targetguidance | 2026-08-18 | - | - | stated |
| Q2 2026 capital spendingfinancing | 2026-08-18 | - | 9.4 billion USD | stated |
| Long-term debt balancefinancing | 2026-08-18 | - | 30.0 billion USD | stated |
| Planned capital expenditurefinancing | 2026-08-18 | - | - | stated |
| IPO in 2025financing | 2026-08-18 | - | - | stated |
| AI compute cost efficiencyproduct | 2026-08-18 | - | - | stated |
| Data center power capacity expansion targetfacility capacity | 2026-08-18 | 2030-12-31 | 8.0 GW | stated |
| Kenilworth, New Jersey greenfield campusfacility capacity - Kenilworth Campus | 2026-08-18 | - | 250.0 MW | stated |
| Lancaster, Pennsylvania data center expansionfacility capacity - Lancaster Data Center | 2026-08-18 | - | 300.0 MW | stated |
| Stockholm colocation campusesfacility capacity - Sweden Data Center | 2026-08-18 | - | - | stated |
| 8+ GW data center capacity by 2030facility capacity | 2026-08-18 | 2030-12-31 | 8.0 GW | stated |
| Kenilworth, NJ greenfield data center campus (250 MW)facility capacity - Kenilworth Campus | 2026-08-18 | - | 250.0 MW | stated |
| Lancaster, PA data center (100 MW initial, 300 MW potential)facility capacity - Lancaster Data Center | 2026-08-18 | - | 300.0 MW | stated |
| Active power capacity target for 2026facility capacity | 2026-08-18 | 2026-12-31 | 1.85 GW | stated |
| Long-term power capacity targetfacility capacity | 2026-08-18 | 2030-12-31 | 8.0 GW | stated |
| FY2026 capital expenditure guidancefinancing | 2026-08-18 | 2026-12-31 | 37.0 USD | stated |
| 2027 Annual Recurring Revenue Targetguidance | 2026-08-18 | 2027-12-31 | 30000000000.0 USD | stated |
| 2026 revenue guidanceguidance | 2026-08-18 | 2026-12-31 | 12400.0 USD | stated |
| 2026 adjusted operating income outlookguidance | 2026-08-18 | 2026-12-31 | 960.0 USD | stated |
| Year-end annualized revenue run rateguidance | 2026-08-18 | 2026-12-31 | 18500.0 USD | stated |
| FY 2026 capital expendituresguidance | 2026-08-18 | 2026-12-31 | 35000.0 USD | stated |
| 2026 capital expenditure projectionfinancing | 2026-08-18 | - | 32500000000.0 USD | stated |
| 2026 full-year revenue guidanceguidance | 2026-08-17 | 2026-12-31 | - | stated |
| 2026 annualized run rate revenueguidance | 2026-08-17 | 2026-12-31 | 19.0 USD | stated |
| $25 billion in new customer commitmentscustomer | 2026-08-17 | - | 25.0 USD | stated |
| Contracted power capacity for AI data centersfacility capacity | 2026-08-17 | - | 4.2 GW | stated |
| Revenue backlog conversion within 2 yearsguidance | 2026-08-17 | 2028-08-17 | 40.0 percent | stated |
| Revenue backlog conversion in 25-48 monthsguidance | 2026-08-17 | 2030-08-17 | 39.0 percent | stated |
| 2026 exit annualized run rate revenueguidance | 2026-08-17 | 2026-12-31 | 19000.0 USD | stated |
| Net new customer commitments received in Q3 2026customer | 2026-08-17 | - | 25000.0 USD | stated |
| Contracted power capacity for new data centersfacility capacity | 2026-08-17 | - | 4200.0 MW | stated |
| Backlog-to-revenue conversion in 25-48 monthsguidance | 2026-08-17 | - | 39.0 percent | stated |
| Year-end 2026 active power capacity targetfacility capacity | 2026-08-17 | 2026-12-31 | 1850.0 MW | stated |
| Total revenue backlogcustomer | 2026-08-17 | - | 104200.0 USD | stated |
| Q3 net new customer commitmentscustomer | 2026-08-17 | - | 25000.0 USD | stated |
| Chen Goldberg EVP rolepersonnel | 2026-08-16 | - | - | stated |
| TTM Revenuefinancing | 2026-08-16 | - | 6.2 billion USD | stated |
| TTM Net Incomefinancing | 2026-08-16 | - | -1.6 billion USD | stated |
| Recent Quarterly Revenuefinancing | 2026-08-16 | - | 2.6 billion USD | stated |
| Contracted Backlogguidance | 2026-08-16 | - | 100.0 billion USD | stated |
| Contracted backlogguidance | 2026-08-16 | - | 100000000000.0 USD | stated |
| 2026 planned capital spendingguidance | 2026-08-15 | 2026-12-31 | 35000000000.0 USD | stated |
| Revenue backlog as of June 30financing | 2026-08-15 | - | 104.0 billion USD | stated |
| Magnetar Financial Insider Share Salepersonnel | 2026-08-14 | - | 33.4 million | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-14 | 2026-09-30 | 3.45 USD | outcome unconfirmed |
| Q3 2026 adjusted operating income guidanceguidance | 2026-08-14 | 2026-09-30 | 200.0 USD | outcome unconfirmed |
| Q4 2026 adjusted operating margin expansionguidance | 2026-08-14 | 2026-12-31 | 10.0 percent | stated |
| Revenue backlog realization by year-end 2026guidance | 2026-08-14 | 2026-12-31 | - | stated |
| Q2 2026 revenue backlogguidance | 2026-08-14 | - | 104.0 USD | stated |
| Revenue backlog from long-term customer take-or-pay contractsguidance | 2026-08-14 | - | 104200000000.0 USD | stated |
| Contracted power capacity expansion including Indonesia facilityfacility capacity - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-14 | - | 4.2 GW | stated |
| Managed inference platform with early ARR and forward guidanceproduct | 2026-08-14 | 2026-12-31 | 250000000.0 USD | stated |
| Q2 2026 Revenueguidance | 2026-08-13 | - | 2.575 USD billions | stated |
| Q2 2026 Revenue Backlogcustomer | 2026-08-13 | - | 104.0 USD billions | stated |
| 2026 Capital Expenditure Guidanceguidance | 2026-08-13 | 2026-12-31 | 35.0 USD billions | stated |
| Polaris Forge 1 Contracted Capacityfacility capacity - Polaris Forge 1 | 2026-08-13 | - | 400.0 MW | stated |
| Applied Digital Polaris Forge 1 Lease Revenuecustomer - Polaris Forge 1 | 2026-08-13 | - | 11.0 USD billions | stated |
| CoreWeave Zero Egress Migration (0 EM)product | 2026-08-13 | - | - | stated |
| AI cloud total cost of ownership reductionguidance | 2026-08-13 | - | 47.0 percent | stated |
| Full-year 2026 adjusted operating income guidanceguidance | 2026-08-13 | 2026-12-31 | 960.0 USD | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-13 | 2026-09-30 | 3450.0 USD | outcome unconfirmed |
| Q3 2026 adjusted operating income guidanceguidance | 2026-08-13 | 2026-09-30 | 200.0 USD | outcome unconfirmed |
| Third-quarter 2026 revenue guidanceguidance | 2026-08-13 | 2026-09-30 | - | outcome unconfirmed |
| Customer backlogcustomer | 2026-08-13 | - | 104200000000.0 USD | stated |
| New customer commitmentscustomer | 2026-08-13 | - | 25000000000.0 USD | stated |
| Contracted power capacityfacility capacity | 2026-08-13 | - | 4.2 GW | stated |
| Data center expansion in Indonesiafacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-13 | - | - | stated |
| Software stack launch for AI capabilitiesproduct | 2026-08-13 | 2026-12-31 | - | stated |
| End-of-year 2026 active power capacityfacility capacity | 2026-08-13 | 2026-12-31 | 1.85 GW | stated |
| 8 GW active power capacity by 2030facility capacity | 2026-08-13 | 2030-12-31 | 8.0 GW | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-13 | 2026-09-30 | 3525000000.0 USD | outcome unconfirmed |
| Full-year 2026 capex guidanceguidance | 2026-08-13 | 2026-12-31 | 37000000000.0 USD | stated |
| US$2.60 billion delayed-draw term loanfinancing | 2026-08-13 | - | 2.6 USD | stated |
| Contracted revenue backlogcustomer | 2026-08-13 | - | 104.0 USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-08-13 | 2026-12-31 | 12.4 USD | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-13 | 2026-09-30 | 3.45 USD | outcome unconfirmed |
| Contracted revenue backlog with Q3 new commitmentscustomer | 2026-08-13 | - | 104.2 USD | stated |
| Annualized interest expense savings from debt cost reductionfinancing | 2026-08-13 | - | 1.1 USD | stated |
| 2026 revenue and operating margin forecastsguidance | 2026-08-13 | 2026-12-31 | - | stated |
| Business inflection point in Q3 and Q4 2026guidance | 2026-08-13 | 2026-12-31 | - | stated |
| $21 billion commitment with Metacustomer | 2026-08-13 | - | 21000000000.0 USD | stated |
| Multi-year agreement with Anthropicpartnership | 2026-08-13 | - | - | stated |
| 2026 capital expenditure guidance increasedguidance | 2026-08-13 | - | 35000.0 USD | stated |
| New customer commitments in early Q3 2026customer | 2026-08-13 | - | 25000.0 USD | stated |
| Power capacity goal by 2030facility capacity | 2026-08-13 | 2030-12-31 | 8000.0 MW | stated |
| Customer prepayments funding capex in 2026financing | 2026-08-13 | - | 9000.0 USD | stated |
| Year-end 2026 capacity target increasefacility capacity | 2026-08-13 | 2026-12-31 | 150.0 MW | stated |
| Q4 2026 adjusted EBITDA margin guidanceguidance | 2026-08-13 | 2026-12-31 | - | stated |
| MasterClass selects CoreWeave Cloud for AI teaching agentscustomer | 2026-08-13 | - | - | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-13 | - | 3.6 USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-08-13 | - | 13.2 USD | stated |
| 2026 capital expenditure guidanceguidance | 2026-08-13 | - | 39.0 USD | stated |
| Major AI cloud computing customerscustomer | 2026-08-13 | - | - | stated |
| Q2 2026 Revenueproduct | 2026-08-12 | - | 2.58 billion USD | stated |
| Q2 2026 Revenue Backlogguidance | 2026-08-12 | - | 104.0 billion USD | stated |
| New Commitments Signed Through August 2026customer | 2026-08-12 | - | 25.0 billion USD | stated |
| 2026 Full Year Revenue Guidanceguidance | 2026-08-12 | - | 12.8 billion USD | stated |
| Q2 2026 Net Lossfinancing | 2026-08-12 | - | 626.0 million USD | stated |
| Q2 2026 Interest Expensefinancing | 2026-08-12 | - | 640.0 million USD | stated |
| 2026 Revenue Guidanceguidance | 2026-08-12 | 2026-12-31 | - | stated |
| 2026 Adjusted Operating Income Guidanceguidance | 2026-08-12 | 2026-12-31 | - | stated |
| 2026 Active Power Capacity Targetfacility capacity | 2026-08-12 | 2026-12-31 | 1.85 GW | stated |
| 2026 Capital Spending Planfinancing | 2026-08-12 | 2026-12-31 | - | stated |
| Meta Spending Commitmentcustomer | 2026-08-12 | - | 21000.0 USD | stated |
| Leidos collaboration for defense AI servicespartnership | 2026-08-12 | - | - | stated |
| Three new Indonesia data centersfacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-12 | - | 3.0 units | stated |
| Remaining performance obligations $103.7Bcustomer | 2026-08-12 | - | 103700000000.0 USD | stated |
| Customer concentration Q2 2026customer | 2026-08-12 | - | 36.0 percent | stated |
| Committed contracts 98% of revenuecustomer | 2026-08-12 | - | 98.0 percent | stated |
| Q2 2026 net interest expense $640Mfinancing | 2026-08-12 | - | 640000000.0 USD | stated |
| Future debt principal payments $35.551Bfinancing | 2026-08-12 | - | 35551000000.0 USD | stated |
| H1 2026 capex $14.117Bfacility capacity | 2026-08-12 | - | 14117000000.0 USD | stated |
| Deferred revenue $9.7Bcustomer | 2026-08-12 | - | 9700000000.0 USD | stated |
| Q2 2026 quarterly revenuefinancing | 2026-08-11 | - | - | verified |
| $100 billion backlogfinancing | 2026-08-11 | - | - | stated |
| Microsoft and OpenAI major customerscustomer | 2026-08-11 | - | - | stated |
| Q2 2026 revenuefinancing | 2026-08-11 | - | 2.58 billion USD | verified |
| Q2 2026 adjusted loss per sharefinancing | 2026-08-11 | - | 1.03 USD per share | verified |
| Sales backlogfinancing | 2026-08-11 | - | 104.0 billion USD | stated |
| Full-year 2026 revenue guidanceguidance | 2026-08-11 | 2026-12-31 | - | verified |
| Q2 revenue backlog increasedcustomer | 2026-08-11 | - | 104.2 billion USD | stated |
| New commitments signedcustomer | 2026-08-11 | - | 25.0 billion USD | stated |
| Raised annual forecastsguidance | 2026-08-11 | - | - | stated |
| Q2 2026 revenue backlogfinancing | 2026-08-11 | - | 104.0 billion USD | stated |
| Near-term capacity sold outfacility capacity | 2026-08-11 | - | - | stated |
| Operating and net losses widenedfinancing | 2026-08-11 | - | - | stated |
| Q2 2026 sales backlogfinancing | 2026-08-11 | - | 104.0 billion USD | stated |
| Q2 2026 Earnings Per Shareguidance | 2026-08-11 | - | -1.14 USD | verified |
| Return on Equity - Q2 2026guidance | 2026-08-11 | - | -47.95 percent | verified |
| Net Profit Margin - Q2 2026guidance | 2026-08-11 | - | -25.41 percent | verified |
| Q2 2026 revenue and growth ratefinancing | 2026-08-11 | - | 2.58 billion USD | stated |
| Debt-to-equity ratiofinancing | 2026-08-11 | - | 5.53 ratio | verified |
| Return on equityfinancing | 2026-08-11 | - | -47.95 percent | stated |
| Net profit marginfinancing | 2026-08-11 | - | -25.41 percent | stated |
| Q2 2026 Revenue Growthguidance | 2026-08-11 | - | 112.5 percent | verified |
| Q2 2026 Net Marginguidance | 2026-08-11 | - | -25.41 percent | verified |
| Q2 2026 EPSfinancing | 2026-08-11 | - | - | verified |
| Q2 2026 Profitability Metricsfinancing | 2026-08-11 | - | - | stated |
| Q2 2026 Interest Expensefinancing | 2026-08-11 | - | 640.0 million USD | verified |
| YoY Revenue Growthproduct | 2026-08-11 | - | 112.5 percent | stated |
| Negative Net Marginguidance | 2026-08-11 | - | -25.41 percent | verified |
| Negative Return on Equityguidance | 2026-08-11 | - | -47.95 percent | verified |
| Q2 2026 negative net marginfinancing | 2026-08-11 | - | -25.41 percent | stated |
| Current ratiofinancing | 2026-08-11 | - | 0.46 ratio | verified |
| Quick ratiofinancing | 2026-08-11 | - | 0.46 ratio | verified |
| Quarterly Revenueguidance | 2026-08-11 | - | 2.58 billion USD | stated |
| Quarterly EPSguidance | 2026-08-11 | - | -1.14 USD per share | stated |
| Q2 2026 quarterly revenue and YoY growthfinancing | 2026-08-11 | - | 2580000000.0 USD | stated |
| CoreWeave Q2 2026 quarterly revenuefinancing | 2026-08-11 | - | 2.58 billion USD | stated |
| CoreWeave Q2 2026 adjusted EPSfinancing | 2026-08-11 | - | 1.14 USD per share | stated |
| CoreWeave Q2 2026 net marginfinancing | 2026-08-11 | - | 25.41 percent | stated |
| CoreWeave Q2 2026 return on equityfinancing | 2026-08-11 | - | 47.95 percent | stated |
| CoreWeave debt-to-equity ratiofinancing | 2026-08-11 | - | 5.53 ratio | stated |
| CoreWeave current and quick ratiosfinancing | 2026-08-11 | - | 0.46 ratio | stated |
| CoreWeave quarterly interest expense to operating income ratiofinancing | 2026-08-11 | - | - | verified |
| Q2 2026 year-over-year revenue growthguidance | 2026-08-11 | - | 112.5 percent | stated |
| Q2 2026 adjusted EBITDAfinancing | 2026-08-11 | - | - | stated |
| Q2 2026 net lossfinancing | 2026-08-11 | - | - | stated |
| New customer commitmentscustomer | 2026-08-11 | - | 25.0 billion USD | stated |
| Contracted power capacityfacility capacity | 2026-08-11 | - | 4.2 GW | verified |
| Revenue backlogcustomer | 2026-08-11 | - | 104.2 billion USD | stated |
| Price increase July 2026product | 2026-08-11 | - | 25.0 percent | stated |
| Managed inference ARR growthproduct | 2026-08-11 | - | 100.0 million USD | stated |
| Expected managed inference ARR by end of 2026guidance | 2026-08-11 | 2026-12-31 | 250.0 million USD | stated |
| Q2 contract contribution margin improvementproduct | 2026-08-11 | - | 5.0 percentage points | stated |
| Revenue backlog as of June 30financing | 2026-08-11 | - | - | stated |
| Contracted power capacity as of August 11facility capacity | 2026-08-11 | - | - | stated |
| New enterprise customerscustomer | 2026-08-11 | - | - | stated |
| Q2 revenueguidance | 2026-08-11 | - | - | stated |
| Q2 operating lossguidance | 2026-08-11 | - | - | stated |
| Adjusted operating marginguidance | 2026-08-11 | - | - | stated |
| Net interest expensefinancing | 2026-08-11 | - | - | stated |
| Net lossguidance | 2026-08-11 | - | - | stated |
| Active power capacityfacility capacity | 2026-08-11 | - | - | stated |
| Capital raised in Q2financing | 2026-08-11 | - | - | stated |
| Q2 2026 backlogfinancing | 2026-08-11 | - | 104.0 USD billions | stated |
| Q2 2026 capexfinancing | 2026-08-11 | - | 9.4 USD billions | stated |
| FY2026 revenue guidanceguidance | 2026-08-11 | 2026-12-31 | 12.8 USD billions | stated |
| Year-end 2026 annualized run rateguidance | 2026-08-11 | 2026-12-31 | 19.0 USD billions | stated |
| Q3 2026 net new customer commitmentscustomer | 2026-08-11 | - | 25.0 billion USD | stated |
| CoreWeave contracted power 4.2 GWfacility capacity | 2026-08-11 | - | 4.2 GW | stated |
| Contracted power 4.2 GW as of Aug 11facility capacity | 2026-08-11 | - | 4.2 GW | verified |
| Microsoft multi-billion-dollar deal with CoreWeave for Azure AI workloadscustomer | 2026-08-11 | - | - | stated |
| CoreWeave $1.6B Plano, Texas datacenter used by Microsoftother | 2026-08-11 | - | 1600000000.0 USD | stated |
| Microsoft is CoreWeave's biggest customercustomer | 2026-08-11 | - | - | stated |
| Contracted power ~4.2 GWfacility capacity | 2026-08-11 | - | 4200.0 MW | verified |
| Contracted power ~4.2 GW as of Aug 11facility capacity | 2026-08-11 | - | 4200.0 MW | stated |
| Q2 2026 active powerfacility capacity | 2026-08-11 | - | 1.5 GW | stated |
| Q2 2026 contracted powerfacility capacity | 2026-08-11 | - | 3.7 GW | stated |
| Revenue backlog at end of Q2 2026customer | 2026-08-11 | - | 104200000000.0 USD | stated |
| Net new customer commitments early Q3 2026customer | 2026-08-11 | - | 25000000000.0 USD | stated |
| Active and contracted power at Q2 2026facility capacity | 2026-08-11 | - | 1.5 GW | stated |
| Raised 2026 year-end active power targetfacility capacity | 2026-08-11 | 2026-12-31 | 1.85 GW | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-11 | 2026-09-30 | 3450000000.0 USD | outcome unconfirmed |
| 2026 capital expenditure guidanceguidance | 2026-08-11 | 2026-12-31 | 35000000000.0 USD | stated |
| Q3 2026 interest expense guidanceguidance | 2026-08-11 | 2026-09-30 | 860000000.0 USD | outcome unconfirmed |
| Q3 2026 adjusted operating income guidanceguidance | 2026-08-11 | 2026-09-30 | 200000000.0 USD | outcome unconfirmed |
| FY2026 revenue guidance raisedguidance | 2026-08-11 | 2026-12-31 | 12800000000.0 USD | stated |
| Q3 2026 revenue guidanceguidance | 2026-08-11 | 2026-09-30 | 3500000000.0 USD | outcome unconfirmed |
| FY2026 capex target raisedguidance | 2026-08-11 | 2026-12-31 | 37000000000.0 USD | stated |
| Active power capacity target >1.85 GW by year-end 2026facility capacity | 2026-08-11 | 2026-12-31 | 1850.0 MW | stated |
| Active power capacity 1.5 GW at end of Q2 2026facility capacity | 2026-08-11 | - | 1500.0 MW | stated |
| Revenue backlog $104B at end of Q2 2026customer | 2026-08-11 | - | 104000000000.0 USD | stated |
| Meta additional $21B commitmentcustomer | 2026-08-11 | - | 21000000000.0 USD | stated |
| Anthropic multi-year agreementcustomer | 2026-08-11 | - | - | stated |
| Jane Street $6B commitmentcustomer | 2026-08-11 | - | 6000000000.0 USD | stated |
| $2.6B delayed draw term loan facility closedfinancing | 2026-08-09 | - | 2600000000.0 USD | stated |
| DDTL 5.5 facility has approximately 5-year maturityfinancing | 2026-08-09 | - | - | stated |
| Underlying customer contracts average approximately 3 yearsfinancing | 2026-08-09 | - | - | stated |
| Facility rated Ba2 by Moody's and BB+ by Fitchfinancing | 2026-08-09 | - | - | stated |
| Facility priced at SOFR + 5.50%financing | 2026-08-09 | - | - | stated |
| $3.1B DDTL 5.0 facility completed earlier in 2026financing | 2026-08-09 | - | 3100000000.0 USD | stated |
| Secured more than $30B debt and equity capital year-to-datefinancing | 2026-08-09 | - | 30000000000.0 USD | stated |
| JPMorgan and Mitsubishi UFJ Financial Group as joint lead arrangers and bookrunnerspartnership | 2026-08-09 | - | - | stated |
| Indonesia Greater Jakarta AI compute deploymentfacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-06 | 2028-12-31 | 360.0 MW | stated |
| Three Indonesia facilities with 360 MW IT power in Greater Jakartafacility capacity - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-06 | 2028-12-31 | 360.0 MW | stated |
| Indonesia as first Asia-Pacific data centerfacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-06 | - | - | stated |
| Lease facilities from colocation providerpartnership - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-06 | - | - | stated |
| Hire and train operations team in Indonesiapersonnel | 2026-08-06 | - | - | stated |
| Existing customer demand driving Southeast Asia deploymentcustomer - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-06 | - | - | stated |
| First Asia-Pacific Data Center in Indonesiafacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-02 | - | - | stated |
| Hudson River Trading agreementcustomer | 2026-08-01 | - | - | stated |
| Indonesia 360MW contracted IT powerfacility capacity - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-01 | - | 360.0 MW | stated |
| Indonesia capacity online in 2028facility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-01 | 2028-12-31 | 360.0 MW | stated |
| Indonesia initial projectsfacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-01 | - | - | stated |
| Total contracted powerfacility capacity | 2026-08-01 | - | 4.2 GW | stated |
| Indonesia three facilities contracted powerfacility capacity - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-01 | - | 360.0 MW | stated |
| Indonesia facilities onlinefacility timeline - Indonesia Data Center (first Asia-Pacific facility) | 2026-08-01 | 2028-12-31 | - | stated |
| July 2026 SKU price increaseproduct | 2026-07-01 | - | 25.0 percent | stated |
| CEO Michael N. Intrator Insider Share Salepersonnel | 2026-06-30 | - | 27.14 million | stated |
| New senior unsecured notes offeringfinancing | 2026-06-10 | - | 3500.0 USD | stated |
| Revenue backlog from committed customer contractsguidance | 2026-06-10 | - | 98800.0 USD | stated |
| Run-rate EBITDA including new contractsguidance | 2026-06-10 | - | 18758.0 USD | stated |
| CoreWeave Kubernetes Serviceproduct | 2026-06-10 | - | - | stated |
| CoreWeave AI Object Storageproduct | 2026-06-10 | - | - | stated |
| W&B Models for AI model developmentproduct | 2026-06-10 | - | - | stated |
| Slurm on Kubernetes runtime accelerationproduct | 2026-06-10 | - | - | stated |
| Serves leading AI labs and hyperscalerscustomer | 2026-06-10 | - | - | stated |
| $3.5B senior notes offering due 2032financing | 2026-06-10 | - | 3500000000.0 USD | stated |
| Nvidia Vera Rubin NVL72 first bring-up and validationpartnership | 2026-06-10 | - | - | stated |
| $3.5B senior notes offeringfinancing | 2026-06-01 | - | 3500000000.0 USD | stated |
| DDTL 5.0 Facility ($3.1B)financing | 2026-05-17 | - | 3100.0 USD million | stated |
| DDTL 5.0 use of proceedsfinancing | 2026-05-17 | - | - | stated |
| DDTL 5.0 draw availability deadlinefinancing | 2026-05-17 | - | - | stated |
| DDTL 5.0 maturity datefinancing | 2026-05-17 | 2031-11-15 | - | stated |
| DDTL 5.0 interest rates and undrawn feesfinancing | 2026-05-17 | - | - | stated |
| DDTL 5.0 debt service coverage ratio covenantfinancing | 2026-05-17 | - | 1.35 x | stated |
| $3.1B delayed draw term loan facility closingfinancing | 2026-05-17 | - | 3100000000.0 USD | stated |
| First publicly syndicated HPC infrastructure-backed financingfinancing | 2026-05-17 | - | - | stated |
| Credit ratings from Moody's and Fitchregulatory | 2026-05-17 | - | - | stated |
| Infrastructure deployment for two large customer contractscustomer | 2026-05-17 | - | - | stated |
| Loan maturity of approximately 5.5 yearsfinancing | 2026-05-17 | - | - | stated |
| Joint lead arrangers for the DDTL 5.0 Facilitypartnership | 2026-05-17 | - | - | stated |
| $8.5B investment-grade rated DDTL 4.0 facilityfinancing | 2026-05-17 | - | 8500000000.0 USD | stated |
| >$20B total capital raised year-to-datefinancing | 2026-05-17 | - | 20000000000.0 USD | stated |
| 2027 annualized revenue targetguidance | 2026-05-15 | - | 30.0 billion USD | stated |
| Backlog revenue recognition timelineguidance | 2026-05-15 | - | 75.0 percent | stated |
| Autonomous AI agents launchproduct | 2026-05-15 | - | - | stated |
| AI agent cost reductionproduct | 2026-05-15 | - | 40.0 percent | stated |
| AI agent training accelerationproduct | 2026-05-15 | - | 1.4 times | stated |
| DDTL 4.0 facilityfinancing | 2026-05-06 | - | 8500.0 USD | stated |
| NVIDIA $2B Class A equity investmentfinancing | 2026-05-06 | - | 2000.0 USD | stated |
| Meta $21B commitmentcustomer | 2026-05-06 | - | 21000.0 USD | stated |
| Multi-year agreement with Anthropiccustomer | 2026-05-06 | - | - | stated |
| Expanded relationships with Cohere, Jane Street, and Mistralcustomer | 2026-05-06 | - | - | stated |
| Partnerships with AI pioneer companiescustomer | 2026-05-06 | - | - | stated |
| Active power capacity surpassed 1 GWfacility capacity | 2026-05-06 | - | 1.0 GW | stated |
| 8 GW active power target by 2030facility timeline | 2026-05-06 | 2030-12-31 | 8.0 GW | stated |
| Contracted power expanded to 3.5 GWfacility capacity | 2026-05-06 | - | 3.5 GW | stated |
| NVIDIA Exemplar Cloud designationpartnership | 2026-05-06 | - | - | stated |
| CoreWeave Flexible Capacity Plansproduct | 2026-05-06 | - | - | stated |
| Dedicated Inference productproduct | 2026-05-06 | - | - | stated |
| CoreWeave ARENA platform launchproduct | 2026-05-06 | - | - | stated |
| Weights & Biases platform expansionpartnership | 2026-05-06 | - | - | stated |
| 5+ GW AI factories with NVIDIA by 2030facility timeline | 2026-05-06 | 2030-12-31 | 5.0 GW | stated |
| Jane Street customer agreementcustomer | 2026-04-30 | - | 6.0 USD billion | stated |
| $1 billion Senior Notes offering completedfinancing | 2026-04-20 | 2031-10-01 | 1000000000.0 USD | stated |
| $1.75 billion Senior Notes issuedfinancing | 2026-04-20 | 2031-10-01 | 1750000000.0 USD | stated |
| $1 billion Senior Notes offeringfinancing | 2026-04-20 | - | 1000.0 USD | stated |
| $1B Senior Notes offering pricedfinancing | 2026-04-20 | 2031-10-01 | 1000.0 USD | stated |
| Prior issuance of $1.75B Senior Notesfinancing | 2026-04-20 | 2031-10-01 | 1750.0 USD | stated |
| Expected closing of $1B Notes offeringfinancing | 2026-04-20 | 2026-04-21 | - | outcome unconfirmed |
| Intended use of Notes proceedsguidance | 2026-04-20 | - | - | stated |
| Equity financing from Jane Streetfinancing | 2026-04-14 | - | 1000000000.0 USD | stated |
| Jane Street $6B cloud services commitmentcustomer | 2026-04-14 | - | 6000000000.0 USD | stated |
| Jane Street $1B equity investmentfinancing | 2026-04-14 | - | 1000000000.0 USD | stated |
| Next-generation compute access including NVIDIA Vera Rubinproduct | 2026-04-14 | - | - | stated |
| Meta $21 billion AI cloud infrastructure commitmentpartnership | 2026-04-10 | - | 21.0 billion USD | stated |
| Meta $14.2 billion payment through December 14, 2031partnership | 2026-04-10 | 2031-12-14 | 14.2 billion USD | stated |
| Meta cloud computing order formcustomer | 2026-04-08 | - | - | stated |
| Meta $21B payment commitmentfinancing | 2026-04-08 | 2032-12-20 | 21000000000.0 USD | stated |
| $1.25B senior notes due 2031financing | 2026-04-08 | - | 1250.0 USD | stated |
| $3.0B convertible notes due 2032financing | 2026-04-08 | - | 3000.0 USD | stated |
| Optional additional $450M convertible notesfinancing | 2026-04-08 | - | 450.0 USD | stated |
| Senior notes offeringfinancing | 2026-04-08 | - | 1250.0 USD | stated |
| Use of proceeds from senior notes offeringguidance | 2026-04-08 | - | - | stated |
| Proposed $3.0 billion convertible senior notes offering due 2032financing | 2026-04-08 | 2032-10-01 | 3000000000.0 USD | stated |
| Initial purchasers' option for additional $450 million convertible notesfinancing | 2026-04-08 | - | 450000000.0 USD | stated |
| Convertible senior notes offeringfinancing | 2026-04-08 | - | 2600.0 USD | stated |
| Expanded revolving credit facilityfinancing | 2026-04-08 | - | 2500.0 USD | stated |
| Acquisition of Monolith and Marimoacquisition | 2026-04-08 | - | - | stated |
| CrowdStrike partnershippartnership | 2026-04-08 | - | - | stated |
| Genesis Mission participationpartnership | 2026-04-08 | - | - | stated |
| NVIDIA Exemplar Cloud statuspartnership | 2026-04-08 | - | - | stated |
| CoreWeave Federal launchproduct | 2026-04-08 | - | - | stated |
| AI Object Storage and Zero Egress Migration launchproduct | 2026-04-08 | - | - | stated |
| Serverless RL launchproduct | 2026-04-08 | - | - | stated |
| CoreWeave Mission Control expansionproduct | 2026-04-08 | - | - | stated |
| SemiAnalysis ClusterMAX Platinum ratingproduct | 2026-04-08 | - | - | stated |
| Major customer winscustomer | 2026-04-08 | - | - | stated |
| Run-Rate Adjusted EBITDA projectionguidance | 2026-04-08 | - | 16098.0 USD | stated |
| Meta AI cloud services agreementcustomer | 2026-04-08 | 2032-12-31 | 21000000000.0 USD | stated |
| Multi-location AI capacity deployment with NVIDIA Vera Rubinfacility capacity | 2026-04-08 | - | - | stated |
| Jane Street agreementcustomer | 2026-04-01 | - | 6000.0 USD | stated |
| Anthropic multi-year agreementcustomer | 2026-04-01 | - | - | stated |
| $2.75B 9.750% senior notes due 2031financing | 2026-04-01 | 2031-12-31 | 2750000000.0 USD | stated |
| Global data center portfolio as of March 31, 2026facility capacity | 2026-03-31 | - | - | stated |
| Meta agreement expansioncustomer | 2026-03-31 | 2032-12-31 | 21.0 USD billion | stated |
| $8.5 billion delayed draw term loan facilityfinancing | 2026-03-30 | - | 8500000000.0 USD | stated |
| Financing for customer contract capital expenditures and GPU serversfinancing | 2026-03-30 | - | - | stated |
| Facility commitment termination datefinancing | 2026-03-30 | 2027-06-30 | - | stated |
| Facility maturity datefinancing | 2026-03-30 | 2032-03-31 | - | stated |
| Debt service coverage ratio covenantfinancing | 2026-03-30 | - | 1.15 x | stated |
| $8.5B delayed draw term loan facility closedfinancing | 2026-03-30 | - | 8500000000.0 USD | stated |
| A3/A(low) investment-grade ratings on HPC infrastructure financingfinancing | 2026-03-30 | - | - | stated |
| $7.5B initial borrowing capacityfinancing | 2026-03-30 | - | 7500000000.0 USD | stated |
| $28B equity and debt financing commitments in past 12 monthsfinancing | 2026-03-30 | - | 28000000000.0 USD | stated |
| DDTL 4.0 Facility maturity date March 2032financing | 2026-03-30 | 2032-03-31 | - | stated |
| DDTL 4.0 interest ratesfinancing | 2026-03-30 | - | - | stated |
| Previously contracted cloud services with leading AI enterprisecustomer | 2026-03-30 | - | - | stated |
| Financial institution partnerships for DDTL 4.0 facilitypartnership | 2026-03-30 | - | - | stated |
| Weights & Biases acquisitionacquisition | 2026-03-01 | - | - | stated |
| Marimo acquisitionacquisition | 2026-03-01 | - | - | stated |
| OpenPipe acquisitionacquisition | 2026-03-01 | - | - | stated |
| Monolith acquisitionacquisition | 2026-03-01 | - | - | stated |
| Data centers and power capacity as of December 31, 2023facility capacity | 2026-03-01 | - | 70.0 MW | stated |
| Data centers and power capacity as of December 31, 2024facility capacity | 2026-03-01 | - | 360.0 MW | stated |
| Data centers and power capacity as of December 31, 2025facility capacity | 2026-03-01 | - | 850.0 MW | stated |
| Total contracted power capacity expected to deployfacility capacity | 2026-03-01 | - | 3.1 GW | stated |
| Remaining performance obligationscustomer | 2026-03-01 | - | 60.7 USD | stated |
| Weighted-average contract durationcustomer | 2026-03-01 | - | 5.0 years | stated |
| Infrastructure financing approachfinancing | 2026-03-01 | - | - | stated |
| NVIDIA Rubin platform deploymentguidance | 2026-03-01 | - | - | stated |
| Remaining performance obligations from customer contractscustomer | 2026-03-01 | - | 60.7 USD billions | stated |
| Data center footprint December 31, 2023facility capacity | 2026-03-01 | - | 70.0 MW | stated |
| Data center footprint December 31, 2024facility capacity | 2026-03-01 | - | 360.0 MW | stated |
| Data center footprint December 31, 2025facility capacity | 2026-03-01 | - | 850.0 MW | stated |
| Remaining performance obligations December 31, 2024customer | 2026-03-01 | - | 15.1 USD | stated |
| SemiAnalysis Platinum ClusterMAX rating 2025product | 2026-03-01 | - | - | stated |
| Industry sole Platinum ClusterMAX provider statusproduct | 2026-03-01 | - | - | stated |
| First publicly available serverless RL capability launchproduct | 2026-03-01 | - | - | stated |
| Contracted power capacity deploymentfacility capacity | 2026-03-01 | - | 3100.0 MW | stated |
| Remaining performance obligationsguidance | 2026-03-01 | - | 60700000000.0 USD | stated |
| Serverless RL product launchproduct | 2026-03-01 | - | - | stated |
| Meta agreement expansioncustomer | 2026-03-01 | 2032-12-31 | 21000.0 USD | stated |
| Convertible senior notes offeringfinancing | 2026-02-25 | - | 2600.0 USD | stated |
| Expanded revolving credit facilityfinancing | 2026-02-25 | - | 2500.0 USD | stated |
| Major customer winscustomer | 2026-02-25 | - | - | stated |
| Global partnership with CrowdStrikepartnership | 2026-02-25 | - | - | stated |
| Active power capacityfacility capacity | 2026-02-25 | - | 850.0 MW | stated |
| Contracted power capacityfacility capacity | 2026-02-25 | - | 3100.0 MW | stated |
| AI Object Storageproduct | 2026-02-25 | - | - | stated |
| Zero egress migrationproduct | 2026-02-25 | - | - | stated |
| CoreWeave Mission Control expansionproduct | 2026-02-25 | - | - | stated |
| Serverless RL launchproduct | 2026-02-25 | - | - | stated |
| Acquisition of Monolithacquisition | 2026-02-25 | - | - | stated |
| Acquisition of Marimoacquisition | 2026-02-25 | - | - | stated |
| CoreWeave Federal launchproduct | 2026-02-25 | - | - | stated |
| Genesis Mission participationpartnership | 2026-02-25 | - | - | stated |
| Revenue backlogguidance | 2026-02-25 | - | 66800.0 USD | stated |
| Feb 2026 capex guidance $30-35Bguidance | 2026-02-01 | 2026-12-31 | 35000000000.0 USD | stated |
| Nvidia $2B equity investmentfinancing | 2026-01-26 | - | 2000000000.0 USD | stated |
| Expanded Nvidia collaboration: >5 GW AI factories by 2030partnership | 2026-01-26 | 2030-12-31 | 5.0 GW | stated |
| NVIDIA $2 billion equity investmentfinancing | 2026-01-25 | - | 2000000000.0 USD | stated |
| NVIDIA collaboration frameworkpartnership | 2026-01-25 | - | - | stated |
| 5+ gigawatts AI factories by 2030facility capacity | 2026-01-25 | 2030-12-31 | - | stated |
| NVIDIA $2B investment in CoreWeave Class A stockfinancing | 2026-01-25 | - | 2000000000.0 USD | stated |
| NVIDIA partnership expansion for AI infrastructurepartnership | 2026-01-25 | - | - | stated |
| Deployment of NVIDIA Rubin, Vera, and Bluefield infrastructureproduct | 2026-01-25 | - | - | stated |
| CoreWeave software in NVIDIA reference architecturespartnership | 2026-01-25 | - | - | stated |
| Minimum Liquidity Covenant Amendmentfinancing | 2026-01-01 | 2026-03-01 | 100.0 USD | outcome unconfirmed |
| Debt Service Coverage Ratio Testing Postponementfinancing | 2026-01-01 | 2027-10-31 | - | stated |
| Contract Realization Ratio Testing Postponementfinancing | 2026-01-01 | 2026-02-28 | - | outcome unconfirmed |
| Nvidia $2B equity investment in CoreWeavefinancing | 2026-01-01 | - | 2000000000.0 USD | stated |
| Expanded Nvidia relationshippartnership | 2026-01-01 | - | - | stated |
| 5+ GW of Nvidia-based AI factories by 2030facility capacity | 2026-01-01 | 2030-12-31 | 5000.0 MW | stated |
| OpenAI infrastructure installation delayfacility timeline | 2025-12-15 | - | - | stated |
| Core Scientific weather and design delaysfacility timeline | 2025-12-15 | - | - | stated |
| Convertible Senior Notes Offeringfinancing | 2025-12-10 | 2031-12-01 | 2587500000.0 USD | stated |
| Convertible Notes Net Proceedsfinancing | 2025-12-10 | - | 2542200000.0 USD | stated |
| Convertible Notes Interest Rate and Payment Schedulefinancing | 2025-12-10 | 2026-06-01 | 1.75 percent | outcome unconfirmed |
| Convertible Notes Maturityfinancing | 2025-12-10 | 2031-12-01 | - | stated |
| Convertible Notes Conversion Termsfinancing | 2025-12-10 | - | 30003356.0 units | stated |
| Convertible Notes Earliest Redemption Datefinancing | 2025-12-10 | 2028-12-05 | - | stated |
| Capped Call Transactionsfinancing | 2025-12-10 | - | 340000000.0 USD | stated |
| $2.25 billion convertible senior notes offeringfinancing | 2025-12-10 | 2031-12-01 | 2250000000.0 USD | stated |
| Notes settlement scheduled for December 11, 2025financing | 2025-12-10 | 2025-12-11 | - | verified |
| Initial purchasers' option for additional convertible notesfinancing | 2025-12-10 | - | 337500000.0 USD | stated |
| Convertible notes interest rate of 1.75% payable semiannuallyfinancing | 2025-12-10 | 2026-06-01 | - | outcome unconfirmed |
| Estimated net proceeds from convertible notes offeringfinancing | 2025-12-10 | - | 2210600000.0 USD | stated |
| Net proceeds allocated to capped call transactionsfinancing | 2025-12-10 | - | 295700000.0 USD | stated |
| $2 billion convertible senior notes offeringfinancing | 2025-12-10 | 2031-12-01 | 2000.0 USD | stated |
| $300 million additional convertible notes optionfinancing | 2025-12-10 | - | 300.0 USD | stated |
| Semi-annual cash interest payments on convertible notesfinancing | 2025-12-10 | - | - | stated |
| Notes guaranteed by wholly owned subsidiariesfinancing | 2025-12-10 | - | - | stated |
| Use of offering proceeds for capped call transactionsfinancing | 2025-12-10 | - | - | stated |
| Manufacturing change notification requirementfacility timeline | 2025-11-21 | - | - | stated |
| Annual ESG reporting and certification requirementregulatory | 2025-11-21 | - | - | stated |
| Background check requirement for facility and network accessregulatory | 2025-11-21 | - | - | stated |
| IPO completion - issuance of common stockfinancing | 2025-11-12 | - | - | stated |
| Over-allotment option exercise by underwritersfinancing | 2025-11-12 | - | - | stated |
| 2025 financial guidance reductionguidance | 2025-11-10 | - | - | stated |
| Data center performance characterized as isolatedfacility timeline | 2025-11-10 | - | - | stated |
| Meta multi-year AI infrastructure dealcustomer | 2025-11-09 | - | 14.2 billion USD | stated |
| OpenAI expanded partnershipcustomer | 2025-11-09 | - | 22.4 billion USD | stated |
| Active data center power capacityfacility capacity | 2025-11-09 | - | 590.0 MW | stated |
| Contracted data center power capacityfacility capacity | 2025-11-09 | - | 2.9 GW | stated |
| Lancaster, Pennsylvania data center facilityfacility capacity - Lancaster Data Center | 2025-11-09 | - | 300.0 MW | stated |
| UK data center investment commitmentfacility capacity | 2025-11-09 | - | 2.5 billion GBP | stated |
| NVIDIA GB300 NVL72 systems deploymentproduct | 2025-11-09 | - | - | stated |
| NVIDIA RTX PRO 6000 Blackwell Server Edition general availabilityproduct | 2025-11-09 | - | - | stated |
| OpenPipe acquisitionacquisition | 2025-11-09 | - | - | stated |
| Senior Unsecured Notes issuancefinancing | 2025-11-09 | 2031-12-31 | 1.75 billion USD | stated |
| DDTL 3.0 delayed draw term loan facilityfinancing | 2025-11-09 | - | 2.6 billion USD | stated |
| DDTL 2.1 amended term loan facilityfinancing | 2025-11-09 | - | 3.0 billion USD | stated |
| NVIDIA strategic collaboration agreementpartnership | 2025-11-09 | - | 6.3 billion USD | stated |
| Termination of Core Scientific merger agreementacquisition | 2025-10-30 | - | - | stated |
| Core Scientific acquisition terminatedacquisition | 2025-10-30 | - | - | stated |
| Partnership with Core Scientific continuespartnership | 2025-10-30 | - | - | stated |
| Nasdaq IPO completedfinancing | 2025-10-30 | - | - | stated |
| Continued opportunistic M&A strategyguidance | 2025-10-30 | - | - | stated |
| Series C Put Shares repurchase obligationfinancing | 2025-10-05 | 2027-03-31 | 1.2 billion USD | stated |
| $3.0 billion delayed draw term loan facilityfinancing | 2025-10-01 | - | 3000000000.0 USD | stated |
| Meta $14.2 billion cloud computing capacity commitmentcustomer | 2025-09-29 | 2031-12-14 | 14200000000.0 USD | stated |
| Meta capacity expansion option through 2032customer | 2025-09-29 | - | - | stated |
| Merger with Core Scientificacquisition | 2025-09-25 | - | 0.1235 Class A shares per Core Scientific share | stated |
| OpenAI cloud computing customercustomer | 2025-09-24 | 2031-05-31 | - | stated |
| OpenAI committed revenuefinancing | 2025-09-24 | 2031-05-31 | 6500000000.0 USD | stated |
| CoreWeave acquires Core Scientific via mergeracquisition | 2025-09-24 | - | - | stated |
| Merger consideration exchange ratioacquisition | 2025-09-24 | - | 0.1235 shares | stated |
| Chief Executive Officerpersonnel | 2025-09-24 | - | - | stated |
| General Counselpersonnel | 2025-09-24 | - | - | stated |
| Proposed merger with Core Scientific (S-4 Amendment No. 2)acquisition | 2025-09-24 | - | - | stated |
| Core Scientific mergeracquisition | 2025-09-16 | - | 0.1235 shares | stated |
| Chief Executive Officerpersonnel | 2025-09-16 | - | - | stated |
| NVIDIA capacity purchase commitmentpartnership | 2025-09-14 | 2032-04-13 | 6.3 billion USD | stated |
| IPO proceedsfinancing | 2025-08-12 | - | 1400.0 USD million | stated |
| Strategic customer share issuancefinancing | 2025-08-12 | - | 350.0 USD million | stated |
| Over-allotment option exercisefinancing | 2025-08-12 | - | 68.0 USD million | stated |
| Weights and Biases acquisitionacquisition | 2025-08-12 | - | 1000.0 USD million | stated |
| Core Scientific acquisition agreementacquisition | 2025-08-12 | 2025-10-01 | - | outcome unconfirmed |
| OpenAI $4B expansion dealcustomer | 2025-08-11 | - | 4000000000.0 USD | stated |
| New hyperscaler customercustomer | 2025-08-11 | - | - | stated |
| AI lab and enterprise customer winscustomer | 2025-08-11 | - | - | stated |
| Aston Martin Aramco F1 partnershippartnership | 2025-08-11 | - | - | stated |
| Active power ~470 MWfacility capacity | 2025-08-11 | - | 470.0 MW | stated |
| Contracted power 2.2 GWfacility capacity | 2025-08-11 | - | 2200.0 MW | stated |
| GB200 NVL72 online at scale; B200 GAproduct | 2025-08-11 | - | - | stated |
| Largest MLPerf Training v5.0 submissionproduct | 2025-08-11 | - | - | stated |
| Weights & Biases acquisition completedacquisition | 2025-08-11 | - | - | stated |
| W&B product launchesproduct | 2025-08-11 | - | - | stated |
| Kenilworth NJ campus up to 250 MWfacility capacity - Kenilworth Campus | 2025-08-11 | - | 250.0 MW | stated |
| Kenilworth initial phase delivery 2026facility timeline - Kenilworth Campus | 2025-08-11 | 2026-12-31 | - | stated |
| $2B 9.25% Senior Notes due 2030financing | 2025-08-11 | - | 2000000000.0 USD | stated |
| Revenue backlog $30.1Bcustomer | 2025-08-11 | - | 30100000000.0 USD | stated |
| $2.6 billion delayed draw term loan facilityfinancing | 2025-07-30 | - | 2.6 billion USD | stated |
| DDTL 3.0 commitment termination datefacility timeline | 2025-07-30 | 2026-07-31 | - | verified |
| DDTL 3.0 maturity datefacility timeline | 2025-07-30 | 2030-08-21 | - | stated |
| Material customer contract for GPU infrastructurecustomer | 2025-07-30 | - | - | stated |
| Minimum debt service coverage ratio of 1.40x beginning April 2027regulatory | 2025-07-30 | 2027-04-01 | 1.4 x | stated |
| Minimum contract realization ratio of 0.85xregulatory | 2025-07-30 | - | 0.85 x | stated |
| $2.6B DDTL 3.0 facility closedfinancing | 2025-07-30 | - | 2600000000.0 USD | stated |
| DDTL 3.0 terms: SOFR+4%, matures 2030-08-21financing | 2025-07-30 | 2030-08-21 | 4.0 percent | stated |
| Long-term OpenAI services agreement funded by DDTL 3.0customer | 2025-07-30 | - | - | stated |
| $1.75B Senior Notes offering closedfinancing | 2025-07-30 | - | 1750000000.0 USD | stated |
| Over $25B total equity and debt capital raised in 18 monthsfinancing | 2025-07-30 | - | 25000000000.0 USD | stated |
| Senior Notes issuancefinancing | 2025-07-27 | 2031-02-01 | 1750.0 USD | stated |
| Senior Notes interest paymentsfinancing | 2025-07-27 | 2026-02-01 | 9.0 percent | outcome unconfirmed |
| $1.75B 9.000% senior notes due 2031 closedfinancing | 2025-07-27 | 2031-02-01 | 1750000000.0 USD | stated |
| Use of proceeds from 2031 notesfinancing | 2025-07-27 | - | - | stated |
| 9% Senior Notes Offeringfinancing | 2025-07-22 | 2031-02-01 | 1750.0 USD | stated |
| Notes Offering Size Increasefinancing | 2025-07-22 | - | 250.0 USD | stated |
| Notes Offering Expected Closingfinancing | 2025-07-22 | 2025-07-25 | - | verified |
| $1.75B 9.000% senior notes due 2031 pricedfinancing | 2025-07-21 | 2031-02-01 | 1750000000.0 USD | stated |
| Senior notes offering expected to close July 25, 2025financing | 2025-07-21 | 2025-07-25 | 1750000000.0 USD | verified |
| Use of notes proceeds incl. debt repaymentfinancing | 2025-07-21 | - | - | stated |
| Senior Notes Offeringfinancing | 2025-07-20 | - | 1500.0 million USD | stated |
| New Senior Unsecured Notes due 2031 offeringfinancing | 2025-07-20 | - | 1500000000.0 USD | stated |
| Repay Revolving Credit Facility with note proceedsfinancing | 2025-07-20 | - | 450000000.0 USD | stated |
| Projected $8.8B additional secured debt to service contractsfinancing | 2025-07-20 | - | 8800000000.0 USD | stated |
| Projected total net debt $17.3B (3.0x EBITDA)guidance | 2025-07-20 | - | 17284000000.0 USD | stated |
| 1Q'25 LTM Run-Rate Adj. EBITDA $5.78Bguidance | 2025-07-20 | - | 5777000000.0 USD | stated |
| Pending Core Scientific acquisition and lease cost savingsacquisition | 2025-07-20 | - | - | stated |
| 33 data centers, ~420 MW active power (Mar 2025)facility capacity | 2025-07-20 | - | 420.0 MW | stated |
| $1.5B senior notes offering due 2031financing | 2025-07-20 | - | 1500000000.0 USD | stated |
| Use of proceeds from 2031 senior notesfinancing | 2025-07-20 | - | - | stated |
| Merger agreement with Core Scientificacquisition | 2025-07-07 | - | - | stated |
| Acquisition of Core Scientific announcedacquisition | 2025-07-07 | - | - | stated |
| Merger with Core Scientific, Inc.acquisition | 2025-07-06 | 2026-04-07 | 0.1235 shares | outcome unconfirmed |
| SEC Form S-4 registration statement filingregulatory | 2025-07-06 | - | - | stated |
| Nasdaq Global Select Market listing approvalregulatory | 2025-07-06 | - | - | stated |
| Convertible notes conversion to CoreWeave securitiesfinancing | 2025-07-06 | - | - | stated |
| Merger closing deadlineguidance | 2025-07-06 | 2026-04-07 | - | outcome unconfirmed |
| Termination fee payable to CoreWeavefinancing | 2025-07-06 | - | 270.0 USD million | stated |
| Definitive agreement to acquire Core Scientificacquisition | 2025-07-06 | - | 9000000000.0 USD | stated |
| Core Scientific acquisition expected close Q4 2025acquisition | 2025-07-06 | 2025-12-31 | - | outcome unconfirmed |
| ~1.3 GW gross power owned via acquisitionfacility capacity | 2025-07-06 | - | 1300.0 MW | stated |
| 1 GW+ potential expansion powerfacility capacity | 2025-07-06 | - | 1000.0 MW | stated |
| $500M annual run-rate cost savings by end-2027guidance | 2025-07-06 | 2027-12-31 | 500000000.0 USD | stated |
| Elimination of $10B+ future lease overheadguidance | 2025-07-06 | - | 10000000000.0 USD | stated |
| Core Scientific holders <10% of combined companyguidance | 2025-07-06 | - | 10.0 percent | stated |
| Only Platinum provider in ClusterMAX 2.0 evaluationproduct | 2025-07-01 | - | - | stated |
| CEO insider stock salespersonnel | 2025-06-30 | - | 103300000.0 USD | stated |
| CDO insider stock salespersonnel | 2025-05-31 | - | 217000000.0 USD | stated |
| 9.250% Senior Notes due 2030 issuancefinancing | 2025-05-27 | 2030-05-27 | - | stated |
| Senior Notes due 2030 Issuancefinancing | 2025-05-27 | 2030-06-01 | 2000000000.0 USD | stated |
| Closed $2.0B 9.250% senior notes offering due 2030financing | 2025-05-27 | - | 2000000000.0 USD | stated |
| $2.0B senior notes mature June 1, 2030financing | 2025-05-27 | 2030-06-01 | 2000000000.0 USD | stated |
| Intended use of senior notes proceedsfinancing | 2025-05-27 | - | - | stated |
| Senior Notes Offeringfinancing | 2025-05-20 | 2030-06-01 | 2000.0 USD | stated |
| Notes Offering Expected Closing Datefinancing | 2025-05-20 | 2025-05-27 | - | verified |
| Notes Offering Proceeds Usefinancing | 2025-05-20 | - | - | stated |
| CFO insider stock salespersonnel | 2025-05-20 | - | 29100000.0 USD | stated |
| Pricing of upsized $2.0B 9.250% senior notes due 2030financing | 2025-05-20 | - | 2000000000.0 USD | stated |
| Expected closing of $2.0B senior notes offeringfinancing | 2025-05-20 | 2025-05-27 | 2000000000.0 USD | verified |
| Maturity of 9.250% senior notesfinancing | 2025-05-20 | 2030-06-01 | 2000000000.0 USD | stated |
| Use of proceeds from senior notes offeringfinancing | 2025-05-20 | - | - | stated |
| Notes Offering - $1.5 billion senior notes due 2030financing | 2025-05-18 | - | 1500.0 USD | stated |
| DDTL 3.0 Facility - up to $2.6 billion delayed draw term loansfinancing | 2025-05-18 | - | 2600.0 USD | stated |
| $1.5B senior notes offering due 2030financing | 2025-05-18 | - | 1500000000.0 USD | stated |
| Notes guaranteed by CoreWeave Cash Management LLCfinancing | 2025-05-18 | - | - | stated |
| Use of proceeds from senior notes offeringfinancing | 2025-05-18 | - | - | stated |
| $1.5B senior unsecured notes offeringfinancing | 2025-05-18 | - | 1500000000.0 USD | stated |
| Repay revolving credit facility with notes proceedsfinancing | 2025-05-18 | - | 450000000.0 USD | stated |
| 2024 Term Loan Facility repaid in fullfinancing | 2025-05-18 | - | 1000000000.0 USD | stated |
| Additional RCF borrowingfinancing | 2025-05-18 | - | 444000000.0 USD | stated |
| DDTL-2 borrowingsfinancing | 2025-05-18 | - | 505000000.0 USD | stated |
| IPO over-allotment exercisefinancing | 2025-05-18 | - | 68000000.0 USD | stated |
| Projected $8.9B secured debt to service contractsfinancing | 2025-05-18 | - | 8900000000.0 USD | stated |
| Run-rate Adj. EBITDA $5.17Bguidance | 2025-05-18 | - | 5166000000.0 USD | stated |
| ~420 MW active power across 33 data centersfacility capacity | 2025-05-18 | - | 420.0 MW | stated |
| >250K GPUs onlinefacility capacity | 2025-05-18 | - | 250000.0 units | stated |
| Weights & Biases acquisitionacquisition | 2025-05-18 | - | - | stated |
| Q1 2025 revenue growth and scaling capabilityguidance | 2025-05-15 | - | - | stated |
| Infrastructure delivery capability for client contractsguidance | 2025-05-14 | - | - | stated |
| IPO net proceedsfinancing | 2025-05-13 | - | 1400.0 million USD | stated |
| Total debt and equity capital raisedfinancing | 2025-05-13 | - | 17200.0 million USD | stated |
| OpenAI strategic deal revenue backlogcustomer | 2025-05-13 | - | 11200.0 million USD | stated |
| Total revenue backlog from committed contractscustomer | 2025-05-13 | - | 25900.0 million USD | stated |
| IBM partnership for Granite compute capacitypartnership | 2025-05-13 | - | - | stated |
| Active compute power capacity addedfacility capacity | 2025-05-13 | - | 420.0 MW | stated |
| Contracted power capacityfacility capacity | 2025-05-13 | - | 1.6 GW | stated |
| Acquisition of Weights & Biasesacquisition | 2025-05-13 | - | - | stated |
| CoreWeave AI Object Storage general availabilityproduct | 2025-05-13 | - | - | stated |
| GB200 support across Cloud Platform Stackproduct | 2025-05-13 | - | - | stated |
| On-Demand Cluster Scaling capabilityproduct | 2025-05-13 | - | - | stated |
| Detailed billing and usage metrics availabilityproduct | 2025-05-13 | - | - | stated |
| NVIDIA AI Enterprise and Cloud Functions supportproduct | 2025-05-13 | - | - | stated |
| MLPerf Inference v5.0 benchmark achievementproduct | 2025-05-13 | - | - | stated |
| SemiAnalysis Platinum ratingproduct | 2025-05-13 | - | - | stated |
| Revolving credit facility expansionfinancing | 2025-05-05 | - | 1500.0 million USD | stated |
| Letters of credit facility expansionfinancing | 2025-05-05 | - | 350.0 million USD | stated |
| Revolving credit facility maturity extensionfinancing | 2025-05-05 | 2028-05-02 | - | stated |
| Revolving credit facility expansionfinancing | 2025-05-05 | - | 1500000000.0 USD | stated |
| Letters of credit facility expansionfinancing | 2025-05-05 | - | 350000000.0 USD | stated |
| Contingent springing maturity datefinancing | 2025-05-05 | 2026-12-30 | - | stated |
| IPO price and datefinancing | 2025-03-28 | - | 40.0 USD | stated |
| IPO at $40 per sharefinancing | 2025-03-28 | - | 40.0 USD | stated |
| IPO pricingfinancing | 2025-03-28 | - | 40.0 USD/share | stated |
| Initial Public Offeringfinancing | 2025-03-28 | - | 1500000000.0 USD | stated |
| OpenAI infrastructure contractcustomer | 2025-03-10 | - | 11900000000.0 USD | stated |
| IPO pricefinancing | 2025-03-01 | - | 40.0 USD/share | stated |
| Nasdaq public listing completionfinancing | 2025-03-01 | - | - | stated |
| Only Platinum provider in first ClusterMAX evaluationproduct | 2025-01-01 | - | - | stated |
Executive compensation FY2025
| Year | Name | Role as filed | Salary | Bonus | Stock awards | Other | Total | Source |
|---|---|---|---|---|---|---|---|---|
| 2025 | Jones Jonathan | Chief Revenue Officer | $126.2K | $383.0K | $18.07M | — | $18.58M | View cached copy (2026-08-31)Live source ↗ |
| 2025 | Michael N Intrator | Chief Executive Officer and President | $748.9K | $750.0K | — | $1.96M | $3.45M | View cached copy (2026-08-31)Live source ↗ |
| 2025 | Brian M Venturo | Chief Strategy Officer and Co-Founder | $748.9K | $750.0K | — | $1.31M | $2.80M | View cached copy (2026-08-31)Live source ↗ |
| 2025 | Brannin McBee | Chief Development Officer and Co-Founder | $591.5K | $600.0K | — | $786.1K | $1.98M | View cached copy (2026-08-31)Live source ↗ |
| 2025 | Nitin Agrawal | Chief Financial Officer | $499.4K | $500.0K | — | $13.8K | $1.01M | View cached copy (2026-08-31)Live source ↗ |
As reported in the company's DEF 14A Summary Compensation Table (SEC Reg S-K Item 402(c)). Stock and option awards are grant-date fair values — what the award was worth on the day it was granted, not cash received and not what it is worth now. Every row here reconciles: its columns add up to the total the filing printed.
Show earlier years (FY2024)
| Year | Name | Role as filed | Salary | Bonus | Other | Total | Source |
|---|---|---|---|---|---|---|---|
| 2024 | Michael N Intrator | Chief Executive Officer and President | $750.0K | $2.00M | $18.3K | $2.77M | View cached copy (2026-08-31)Live source ↗ |
| 2024 | Brian M Venturo | Chief Strategy Officer and Co-Founder | $750.0K | $2.00M | $8.9K | $2.76M | View cached copy (2026-08-31)Live source ↗ |
| 2024 | Brannin McBee | Chief Development Officer and Co-Founder | $400.0K | $2.00M | $6.2K | $2.41M | View cached copy (2026-08-31)Live source ↗ |
As reported in the company's DEF 14A Summary Compensation Table (SEC Reg S-K Item 402(c)). Stock and option awards are grant-date fair values — what the award was worth on the day it was granted, not cash received and not what it is worth now. Every row here reconciles: its columns add up to the total the filing printed.
Insider transactions (SEC Form 3/4/5)
Totals across all insiders
| Bucket | Invested (shares) | Invested (USD) | Divested (shares) | Divested (USD) | Net direction | Txns | Invested @ last price | Divested @ last price |
|---|---|---|---|---|---|---|---|---|
| All time | 722,608 | $0 | 438,360 | $35.39M | ↓ Divested $35.39M | 100 | $44.17M | $26.79M |
| 2026 | 722,608 | $0 | 438,360 | $35.39M | ↓ Divested $35.39M | 100 | $44.17M | $26.79M |
| 2026-Q3 | 171,384 | $0 | 78,567 | $6.89M | ↓ Divested $6.89M | 13 | $10.47M | $4.80M |
| 2026-Q4 | 551,224 | $0 | 359,793 | $28.50M | ↓ Divested $28.50M | 87 | $33.69M | $21.99M |
Invested = shares acquired (buys, grants, option exercises) — insider adding to the position. Divested = shares reduced (sells, dispositions, tax-withholding) — cash flowing TO the insider. Net direction shows which side wins on dollar terms in each bucket. % of holder's stake not yet computed (pending Form 3/4 holdings ingest). See methodology. The two @ last price columns restate the same share counts at the most recent share price we read (close of 2026-10-19); they are a valuation, not a cash flow, and they move every day the market does.
Individual filings
| Date | Insider | Kind | Shares | Amount (USD) | Value @ last price | Source |
|---|---|---|---|---|---|---|
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 500 | $39,372 | $30.6K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 5,969 | $465,094 | $364.8K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,100 | $1,165,401 | $922.9K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 500 | $39,372 | $30.6K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 5,969 | $465,094 | $364.8K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,100 | $1,165,401 | $922.9K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 500 | $39,372 | $30.6K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 5,969 | $465,094 | $364.8K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,100 | $1,165,401 | $922.9K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 500 | $39,372 | $30.6K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 5,969 | $465,094 | $364.8K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,100 | $1,165,401 | $922.9K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 500 | $39,372 | $30.6K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 5,969 | $465,094 | $364.8K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,100 | $1,165,401 | $922.9K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 500 | $39,372 | $30.6K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 5,969 | $465,094 | $364.8K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-13 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,100 | $1,165,401 | $922.9K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,811 | $1,270,651 | $966.4K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 7,191 | $578,928 | $439.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 15,388 | $1,230,332 | $940.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,811 | $1,270,651 | $966.4K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 7,191 | $578,928 | $439.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 15,388 | $1,230,332 | $940.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,811 | $1,270,651 | $966.4K | View cached copy (2026-10-15)Live source ↗ |
Show older filings (75 more)
| Date | Insider | Kind | Shares | Amount (USD) | Value @ last price | Source |
|---|---|---|---|---|---|---|
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 7,191 | $578,928 | $439.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 15,388 | $1,230,332 | $940.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,811 | $1,270,651 | $966.4K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 7,191 | $578,928 | $439.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 15,388 | $1,230,332 | $940.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,811 | $1,270,651 | $966.4K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 7,191 | $578,928 | $439.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 15,388 | $1,230,332 | $940.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Jonathan Jones | Open-market sale · Class A Common Stock | 15,811 | $1,270,651 | $966.4K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 7,191 | $578,928 | $439.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-12 | Nitin Agrawal | Open-market sale · Class A Common Stock | 15,388 | $1,230,332 | $940.5K | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Restricted Stock Units | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Class A Common Stock | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Restricted Stock Units | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Class A Common Stock | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Restricted Stock Units | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Class A Common Stock | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Restricted Stock Units | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Class A Common Stock | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Restricted Stock Units | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Class A Common Stock | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Restricted Stock Units | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-11 | Jonathan Jones | Option / RSU exercise · Class A Common Stock | 42,772 | - | $2.61M | View cached copy (2026-10-15)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Nitin Agrawal | Open-market sale · Class A Common Stock | 3 | $266 | $183 | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Restricted Stock Units | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-10-06 | Karen Boone | Option / RSU exercise · Class A Common Stock | 1,460 | - | $89.2K | View cached copy (2026-10-09)Live source ↗ |
| 2026-09-30 | Nitin Agrawal | Option / RSU exercise · Restricted Stock Units | 8 | - | $489 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Nitin Agrawal | Open-market sale · Class A Common Stock | 5 | $438 | $306 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Nitin Agrawal | Option / RSU exercise · Class A Common Stock | 8 | - | $489 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Jeff Baker | Option / RSU exercise · Restricted Stock Units | 8 | - | $489 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Jeff Baker | Open-market sale · Class A Common Stock | 5 | $438 | $306 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Jeff Baker | Option / RSU exercise · Class A Common Stock | 8 | - | $489 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Chen Goldberg | Option / RSU exercise · Restricted Stock Units | 8 | - | $489 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Chen Goldberg | Open-market sale · Class A Common Stock | 5 | $438 | $306 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Chen Goldberg | Option / RSU exercise · Class A Common Stock | 8 | - | $489 | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Michael N Intrator | Option / RSU exercise · Restricted Stock Units | 30,978 | - | $1.89M | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Michael N Intrator | Option / RSU exercise · Restricted Stock Units | 109,380 | - | $6.69M | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Michael N Intrator | Open-market sale · Class A Common Stock | 78,552 | $6,888,225 | $4.80M | View cached copy (2026-10-03)Live source ↗ |
| 2026-09-30 | Michael N Intrator | Option / RSU exercise · Class A Common Stock | 30,978 | - | $1.89M | View cached copy (2026-10-03)Live source ↗ |
Federal court dockets (via CourtListener/RECAP)
Every docket has its full metadata cached locally so we don't send visitors through a login wall. Click a case number to see our cached docket page.
| Court | Case number | Case title | Link | Filed |
|---|---|---|---|---|
| txwd | 7:26-mc-00323 | Neural AI, LLC v. CoreWeave, Inc. | Party | 2026-08-18 |
| njd | 2:26-cv-01305 | SMITH v. INTRATOR | Party | 2026-02-10 |
| njd | 2:26-cv-01345 | ROY v. INTRATOR | Party | 2026-02-10 |
| njd | 2:26-cv-00355 | MASAITIS v. COREWEAVE, INC. | Party | 2026-01-12 |
| txed | 2:25-cv-00519 | Malikie Innovations Ltd. v. Core Scientific, Inc. | Party | 2025-05-12 |
| txwd | 7:26-mc-00324 | Neural AI, LLC v. Google, Inc. | Mentioned | 2026-08-18 |
| cand | 3:26-mc-80261 | Neural AI, LLC v. OAI International, Inc. | Mentioned | 2026-08-17 |
| txwd | 7:26-cv-00318 | Neural AI, LLC v. Tesla Inc. | Mentioned | 2026-08-17 |
| txwd | 7:26-cv-00319 | Neural AI, LLC v. X.AI Corp. | Mentioned | 2026-08-17 |
| txed | 2:26-cv-00681 | Sandpiper CDN, LLC v. Microsoft Corporation | Mentioned | 2026-08-11 |
| txed | 2:26-cv-00346 | VL Collective IP LLC v. Microsoft Corporation | Mentioned | 2026-04-29 |
| cafc | 26-140 | In re: Core Scientific, Inc. | Mentioned | 2026-04-28 |
| deb | 26-10593 | Impac Mortgage Holdings, Inc. | Mentioned | 2026-04-26 |
| txed | 2:26-cv-00339 | Semantic Engines LLC v. Microsoft Corporation | Mentioned | 2026-04-23 |
| cafc | 26-1721 | Solos Technology Ltd. v. Meta Platforms, Inc. | Mentioned | 2026-04-22 |
| ded | 1:26-cv-00215 | Building Trades Pension Fund of Western Pennsylvania v. Avantor, Inc. | Mentioned | 2026-03-02 |
| mad | 1:26-cv-10304 | Solos Technology Limited v. Meta Platforms, Inc. | Mentioned | 2026-01-23 |
| deb | 25-52471 | Hudson 1701/1706, LLC v. 356W58 Ground Lessor LLC | Mentioned | 2025-12-22 |
| txed | 2:25-cv-01228 | NovaCloud Licensing, LLC v. Microsoft Corporation | Mentioned | 2025-12-17 |
| nysd | 1:25-cv-09596 | In re Perrigo Company PLC Securities Litigation | Mentioned | 2025-11-17 |
| nysb | 25-11958 | Iovate Health Sciences International Inc. | Mentioned | 2025-09-09 |
| txed | 2:25-cv-00664 | Sandpiper CDN, LLC v. Microsoft Corporation | Mentioned | 2025-06-26 |
| moeb | 25-40982 | LPharm CS LLC | Mentioned | 2025-03-23 |
| moeb | 25-40981 | Lemonaid Pharmacy Holdings Inc. | Mentioned | 2025-03-23 |
| moeb | 25-40980 | Lemonaid Health, Inc. | Mentioned | 2025-03-23 |