jain.com

Delta Forge 1

Project of Applied Digital

Kind
datacenter
Location
Boyce, Louisiana
County
Rapides Parish
State/region
LA
Country
US
Status
under construction as of October 14, 2026

Where it stands

Applied Digital's Delta Forge 1 campus in Boyce, Louisiana comprises two buildings totaling 300 MW of critical IT load, leased to a high investment-grade hyperscaler under two 15-year leases, and is currently under construction. The company expects initial ready for service in the first half of calendar 2027 and full capacity in early calendar 2028; project financing for the campus is still pending. A separate 150 MW expansion across Delta Forge 1 and Delta Forge 2 remains under negotiation and is not counted here.

300 MW under construction

PhaseMWStatusDateSource
Delta Forge 1 (two buildings, aggregate)300under constructionOur two buildings at our Delta Forge 1 campus, with an aggregate 300MW capacity, are currently under construction.
2026-10-07 View cached copy (2026-10-08)Live source ↗

Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: October 14, 2026).

Capacity

What has actually been delivered, against what has been promised. Each figure links to the statement it came from.

StageCapacityAs ofSource
Energized power flowing today--
Contracted a customer is on the hook300 MW IT load2026-10-08Hyperscaler leases at Delta Forge 1
Under construction300 MW IT load2026-09-01Delta Forge 1 groundbreaking and expected delivery
Permitted--
Interconnect approved utility has agreed to deliver--
Interconnect requested in a queue, nothing approved--
Announced a press-release figure430 MW2026-09-21AI data center power capacity target

Who has claimed this site

Capacity commitments in the order they were announced. A commitment that ended shows why.

2026-04-22
Undisclosed counterparty (one or more) - tenant · 300 MW · 15-year term source

Claims about this project

2026-02-08 - stated
2026-04-07 - stated
Delta Forge 1 groundbreaking and startup timeline 300.0 MW. Promised by 2027-06-30.
2026-04-07 - stated
2026-04-08 - stated
2026-04-08 - stated
Delta Forge 1 initial operations 300.0 MW. Promised by 2027-07-15.
2026-04-08 - stated
Delta Forge 1 critical IT load 300.0 MW. Promised by 2027-06-30.
2026-04-08 - stated
2026-04-08 - stated
2026-04-08 - stated
Delta Forge 1 300 MW data center 300.0 MW. Promised by 2027-07-01.
2026-04-22 - stated
2026-04-22 - stated
2026-07-26 - stated
2026-07-27 - stated
Delta Forge 1 capacity 300.0 MW. Promised by 2027-12-31.
2026-07-27 - stated
Delta Forge 1 hyperscaler lease 7500000000.0 USD. Promised by 2027-12-31.
2026-07-27 - stated
Delta Forge 1 initial operations 300.0 MW. Promised by 2027-12-31.
2026-07-27 - stated
Delta Forge 1 Lease (300 MW) 7.5 billion USD. Promised by 2027-01-01.
2026-07-27 - stated
2026-07-28 - stated
2026-07-28 - stated
2026-07-28 - stated
Delta Forge 1 contracted revenue 7.5 billion USD. Promised by 2028-06-30.
2026-07-28 - stated
2026-07-28 - stated
2026-07-29 - stated
Delta Forge 1 groundbreaking and expected delivery 300.0 MW. Promised by 2028-06-30.
2026-07-29 - stated
2026-07-29 - stated
2026-08-23 - stated
2026-09-01 - stated
2026-09-07 - stated
Delta Forge 1 operations expected 2027 300.0 MW. Promised by 2027-12-31.
2026-09-07 - stated
2026-09-07 - stated
2026-09-07 - stated
2026-09-07 - stated
2026-09-21 - stated
430 MW capacity by 2028 430.0 MW. Promised by 2028-12-31.
2026-09-21 - stated
AI data center power capacity target 430.0 MW. Promised by 2028-12-31.
2026-09-21 - stated
2026-09-25 - stated
2026-09-25 - stated
High-grade hyperscaler Delta Forge 1 lease 300.0 MW. Promised by 2028-06-30.
2026-09-25 - stated
2026-09-29 - stated
Delta Forge 1 delivery dates 300.0 MW. Promised by 2028-06-30.
2026-09-29 - stated
2026-10-03 - stated
Delta Forge 1 delivery 300.0 MW. Promised by 2028-06-30.
2026-10-03 - stated
2026-10-06 - stated
2026-10-06 - stated
Delta Forge 1 delivery 300.0 MW. Promised by 2028-06-30.
2026-10-08 - stated
Hyperscaler leases at Delta Forge 1 300.0 MW. Promised by 2028-06-30.
2026-10-08 - stated
Delta Forge 1 150 MW expansion lease 150.0 MW. Promised by 2026-12-31.
2026-10-14 - stated
2026-10-14 - stated
2026-10-17 - stated

Site intelligence

Analytical estimate. Each site below is located from public records (filings, releases, news, OpenStreetMap) and checked against free satellite imagery; "How we located this site" lists every step and the score it earned. The conclusion is computed from night-time lights, surface heat and year-over-year change, with the dates it rests on. These are hypotheses under active tracking, not legal parcels or an official endorsement.
Applied Digital Data Center
Probable
Rapides Parish, LA
31.3826, -92.6862
Approximate address 98M7+2G Boyce, LA, USA Reverse-geocoded from the candidate centroid; not a permit-confirmed parcel address.
Conclusion so far Something is built and runs warm, but it is dark at night -- not called yet. · confidence 30%
Undetermined -- a built footprint runs warm, but it is not lit at night -- construction and a dark-running site look alike from orbit: night-time lights at the site ran 1.9x the surrounding area (0 of 2 clear nights, 2026-09-22 to 2026-09-29); surface temperature +6.0 K against its surroundings (2 pass(es), 2026-09-23 to 2026-10-09). Based on 16 clear observation(s) from 2026-06-21 to 2026-10-19.
What would change this: Night-time lights at the footprint (operating), or year-over-year change (construction).
Latest clear imagery: Google 2026-10-18 · Sentinel-2 2026-10-14 · radar 2026-10-14 · Landsat 2026-10-09 · night lights 2026-10-01 · ECOSTRESS thermal 2026-09-10 · NAIP 2023-06-01
Newest clear images158 clear image date(s)
Visual view of applied-digital-delta-forge-1, 2026-10-18 (Google Earth (wide view))
2026-10-18Google Earth (wide view) · 4.08 m/pixel
Visual view of applied-digital-delta-forge-1, 2026-10-18 (Google Earth (close view))
2026-10-18Google Earth (close view) · 0.51 m/pixel
Visual view of applied-digital-delta-forge-1, 2026-10-14 (Sentinel-2)
2026-10-14Sentinel-2 · 10 m/pixel
Radar view of applied-digital-delta-forge-1, 2026-10-14 (Sentinel-1 (radar))
2026-10-14Sentinel-1 (radar) · 10 m/pixel
How we located this site
50/100 (probable): footprint location 40 + OSM feature named for the project 10
  1. Starting point (the project's stated locality) 2026-10-19
    Boyce, Louisiana → 31.39046, -92.66931 (locality)
  2. Located from a published address 2026-10-19
    Applied Digital Data Center → 31.38257, -92.68621 (footprint), 1.8 km from seed
  3. Other possible locations 2026-10-19
    1 other location cluster(s) kept as non-public candidates
  4. OpenStreetMap features nearby 2026-10-19
    1 named match(es)
Recent changes
  • 2025-09-28 vs 2025-08-19: clearing or grading visible
  • 2025-06-24 vs 2025-05-31: vegetation recovery visible
  • 2026-04-08 vs 2026-02-27: clearing or grading visible
  • 2025-12-23 vs 2025-11-05: structural change (radar signal shift)
  • 2026-07-06 vs 2026-05-02: vegetation recovery visible

Satellite imagery on this page is drawn from the Google Earth satellite basemap, USDA NAIP aerial photography (~1 m/pixel), ESA Sentinel-2 multispectral (10 m, with per-date cloud masks), NASA / USGS Landsat 8/9 (30 m, plus surface temperature), ESA Sentinel-1 radar (all-weather, night), NASA ECOSTRESS thermal (~70 m), and NASA Black Marble night lights (500 m, daily). Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.