High-grade hyperscaler Delta Forge 1 lease
Company: Applied Digital - Project: Delta Forge 1
The claim, verbatim
Signed two 15-year leases with three 5-year renewal options for 300 MW of critical IT load at Delta Forge 1 (delivery 1H 2027 to 1H 2028)
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-09-25)Live source ↗Archive.org ↗
Quote: “U.S. Based High Investment Grade Hyperscaler - Signed two 15-year leases with three 5-year options for 2 buildings at Delta Forge 1, utilizing 300 MW of IT load”
How we checked this
Checked on September 27, 2026. The cited source supports every part of this claim.
The timeline, lease table and Delta Forge 1 page establish the lease count, options, 300 MW critical IT capacity and delivery window.
Confirmed in the source:
- Two 15-year leases were signed at Delta Forge 1
- The leases carry three 5-year renewal options
- Delta Forge 1 covers 300 MW of critical IT load
- Delta Forge 1 delivery dates are 1H 2027 / 1H 2028
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/_assets/_c3b095776b399204354d8f26dbb2553c/appliedblockchaininc/db/2905/27269/pdf/APLD_INV_June2026_Updated-compressed.pdf) in full (47,679 characters, retrieved September 25, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Presentation
Quote: “U.S. Based High Investment Grade Hyperscaler - Signed two 15-year leases with three 5-year options for 2 buildings at Delta Forge 1, utilizing 300 MW of IT load”