Hyperscaler leases at Delta Forge 1
Company: Applied Digital
The claim, verbatim
Signed two 15-year leases with a U.S.-based high investment-grade hyperscaler, with three 5-year options, for 2 buildings at Delta Forge 1 (Boyce, LA) totaling 300 MW of IT load.
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-10-03)Live source ↗Archive.org ↗
Quote: “U.S. Based High Investment Grade Hyperscaler - Signed two 15-year leases with three 5-year options for 2 buildings at Delta Forge 1, utilizing 300 MW of IT load”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Investor Presentation
Quote: “U.S. Based High Investment Grade Hyperscaler - Signed two 15-year leases with three 5-year options for 2 buildings at Delta Forge 1, utilizing 300 MW of IT load”