Khan v. Lockheed Martin Corporation — Entry #57: MEMORANDUM OF LAW in Opposition re: 54 MOTION to Dismiss the Amended Class Action Complaint
Case: Khan v. Lockheed Martin Corporation nysd · 1:25-cv-06197
filed July 28, 2025
What this document is
Docket entry #57 · filed April 27, 2026
MEMORANDUM OF LAW in Opposition re: 54 MOTION to Dismiss the Amended Class Action Complaint. . Document filed by Local 705 International Brotherhood of Teamsters Pension Fund, New England Teamsters Pension Fund..(Canty, Michael) (Entered: 04/27/2026)
Who is involved
- Alejandro Vega
- Emmanuel Salmon
- Employer-Teamsters Local Nos. 175 & 505 Pension Trust Fund
- Evan T. Scott
- Ian Bennett
- James D. Taiclet
- Jesus Malave
- Local 705 International Brotherhood of Teamsters Pension Fund
- Lockheed Martin Corporation
- Muhammad Khan
- New England Teamsters Pension Fund
- Robert O. Catching-Potter
Why we have it
We follow this case because it names a company we track, although that company is not a party:
- Applied Digital: its former name “FLIGHT SAFETY TECHNOLOGIES INC” appears in a filing in this case.
…Co-Lead Counsel. $1.2 million. • Flight Safety Technologies, Inc., (D. Conn.). Rosen Lead Counsel. $1…
- Core Scientific: its name “Core Scientific, Inc.” appears in a filing in this case.
…Rosen Lead Counsel. Pang v. Levitt (Core Scientific, Inc.), No. 22-CV-1191-LY (W.D. Tex.). Rosen…
A free copy from the RECAP archive of federal court filings (mirrored at the Internet Archive), retrieved October 19, 2026. Federal court filings are public records.
Document text
37 page(s), 78,582 characters, converted from the PDF's text layer · plain text.
Full text
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 1 of 37
UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF NEW YORK
MUHAMMAD KHAN, Individually and on
Behalf of All Others Similarly Situated,
Plaintiff, No. 1:25-cv-06197-MMG
vs. Judge Margaret M. Garnett
LOCKHEED MARTIN CORPORATION, CLASS ACTION
JAMES D. TAICLET, and JESUS MALAVE,
Defendants.
LEAD PLAINTIFFS’ MEMORANDUM OF LAW IN OPPOSITION TO
DEFENDANTS’ MOTION TO DISMISS THE AMENDED COMPLAINT
i
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 2 of 37
TABLE OF CONTENTS
TABLE OF AUTHORITIES ......................................................................................................... iii
I. INTRODUCTION .............................................................................................................. 1
II. FACTUAL BACKGROUND ............................................................................................. 6
A. Company Background ............................................................................................ 6
B. Defendants Falsely Stated They Managed the Risk of Cost Overruns For Their
Fixed Cost Programs ............................................................................................... 7
C. Defendants Misled Investors About the MFC Program ......................................... 7
D. Defendants Misled Investors About the Aeronautics Program............................... 8
E. Defendants Misled Investors About the F-35 Program .......................................... 8
F. Lockheed Shocked Investors by Disclosing Losses in the MFC and
Aeronautics Programs ............................................................................................. 9
G. Lockheed Shocked Investors Again by Disclosing Another $1 Billion Loss......... 9
III. LEAD PLAINTIFFS HAVE ADEQUATELY STATED A SECTION 10(B) CLAIM .... 9
A. The Complaint Adequately Alleges Falsity .......................................................... 10
1. Defendants Misled Investors About Lockheed’s Cost Analysis and Risk
Management Procedures ........................................................................... 10
2. Defendants Misled Investors About Three of Lockheed’s Most
Important Programs .................................................................................. 13
a. Defendants Misled Investors About the MFC Program ............... 13
(1) Defendants’ False and Misleading Statements ................. 13
(2) Defendants’ Falsity Arguments Fail ................................. 16
b. Defendants Misled Investors About the Aeronautics Program..... 19
c. Defendants Misled Investors About the F-35 Program ................ 22
B. The Complaint Adequately Alleges Scienter ........................................................ 24
1. Former Employee (FE) Accounts Support an Inference of Scienter ........ 24
2. Defendants’ Admissions Support an Inference of Scienter ...................... 25
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 3 of 37
3. Defendants’ Own Statements Demonstrate Knowledge ........................... 25
4. Motive and Opportunity............................................................................ 27
5. Malave’s Departure................................................................................... 28
6. Core Operations Doctrine ......................................................................... 28
7. The More Compelling Inference is Fraudulent......................................... 29
C. The Complaint Adequately Alleges Control Person Claims ................................ 29
IV. CONCLUSION ................................................................................................................. 29
ii
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 4 of 37
TABLE OF AUTHORITIES
Page(s)
Cases
In re Alstom SA Sec. Litig.,
406 F. Supp. 2d 433 (S.D.N.Y. 2005)......................................................................................24
In re AppHarvest Sec. Litig.,
684 F. Supp. 3d 201 (S.D.N.Y. 2023)......................................................................................12
In re Avon Sec. Litig.,
2019 WL 6115349 (S.D.N.Y. 2019) ..................................................................................25, 28
In re Block, Inc. Sec. Litig.,
2025 WL 2607890 (S.D.N.Y. 2025) ........................................................................................27
In re Dentsply Sirona, Inc. Sec. Litig.,
665 F. Supp. 3d 255 (E.D.N.Y. 2023) .....................................................................................19
Diabat v. Credit Suisse Grp. AG,
2024 WL 4252502 (S.D.N.Y. 2024) ........................................................................................20
ECA & Loc. 134 IBEW Joint Pension Tr. of Chi. v. JP Morgan Chase Co.,
553 F.3d 187 (2d Cir. 2009).....................................................................................................22
Emps. Ret. Sys. of Gov’t of the V.I. v. Blanford,
794 F.3d 297 (2d Cir. 2015).................................................................................................9, 24
In re Estee Lauder Co., Inc. Sec. Litig.,
2025 WL 965686 (S.D.N.Y. 2025) ..........................................................................................26
Freedman v. Value Health, Inc.,
958 F. Supp. 745 (D. Conn. 1997) .....................................................................................12, 25
Freudenberg v. E*Trade Fin. Corp.,
712 F. Supp. 2d 171 (S.D.N.Y. 2010)......................................................................................12
Gimpel v. Hain Celestial Grp., Inc.,
156 F.4th 121 (2d Cir. 2025) .......................................................................................16, 18, 27
In re iDreamSky Tech. Ltd. Sec. Litig.,
236 F. Supp. 3d 824 (S.D.N.Y. 2017)......................................................................................23
Ind. Pub. Ret. Sys. v. SAIC, Inc.,
818 F.3d 85 (2d Cir. 2016).......................................................................................................12
iii
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 5 of 37
Lorely Fin. (Jersey) No. 3 Ltd. v. Wells Fargo Sec., LLC,
797 F.3d 160 (2d Cir. 2015).....................................................................................................10
Matrixx Initiatives, Inc. v. Siracusano,
563 U.S. 27 (2011) ...................................................................................................................10
Meyer v. Jinkosolar Holdings Co., Ltd.,
761 F.3d 241 (2d Cir. 2014)...............................................................................................16, 18
In re MF Glob. Holdings Ltd. Sec. Litig.,
982 F. Supp. 2d 277 (S.D.N.Y. 2013)................................................................................13, 19
In re Mindbody, Inc. Sec. Litig.,
489 F. Supp. 3d 188 (S.D.N.Y. 2020)................................................................................14, 15
Mulligan v. Impax Lab'ys, Inc.,
36 F. Supp. 3d 942 (N.D. Cal. 2014) .......................................................................................20
Novak v. Kasaks,
216 F.3d 300 (2d Cir. 2000).....................................................................................................24
Omnicare, Inc. v. Laborers Dist. Council Const. Indus. Pension Fund,
575 U.S. 175 (2015) .................................................................................................................18
In re Pareteum Sec. Litig.,
2021 WL 3540779 (S.D.N.Y. 2021) ........................................................................................28
In re Parmalat Sec. Litig.,
375 F. Supp. 2d 278 (S.D.N.Y. 2005)......................................................................................29
Rombach v. Chang,
355 F.3d 164 (2d Cir. 2004).....................................................................................................23
In re Salix Pharms., Ltd.,
2016 WL 1629341 (S.D.N.Y. 2016) ..................................................................................17, 23
San Antonio Fire & Police Pension Fund v. Dentsply Sirona Inc.,
732 F. Supp. 3d 300 (S.D.N.Y. 2024)......................................................................................27
Schnall v. Annuity & Life Re (Holdings), Ltd.,
2004 WL 367644 (D. Conn. 2004) ..........................................................................................14
SEC v. Medallion Fin. Corp.,
2024 WL 4227753 (S.D.N.Y. 2024) ........................................................................................18
In re Signet Jewelers Ltd. Sec. Litig.,
2018 WL 6167889 (S.D.N.Y. 2018) ........................................................................................12
iv
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 6 of 37
Stadium Cap. LLC v. Co-Diagnostics, Inc.,
2024 WL 456745 (S.D.N.Y. 2024) ..........................................................................................21
In re Synchrony Fin. Sec. Litig.,
988 F.3d 157 (2d Cir. 2021).......................................................................................................9
Tellabs, Inc. v. Makor Issues & Rts., Ltd.,
551 U.S. 308 (2007) .................................................................................................................24
In re Vale S.A. Sec. Litig.,
2020 WL 2610979 (E.D.N.Y. 2020)........................................................................................17
In re Virtu Fin., Inc. Sec. Litig.,
770 F. Supp. 3d 482 (E.D.N.Y. 2025) .....................................................................................27
In re Vivendi Universal, S.A.,
381 F. Supp. 2d 158 (S.D.N.Y. 2003)......................................................................................14
In re Vivendi, S.A. Sec. Litig.,
838 F.3d 223 (2d Cir. 2016)...............................................................................................10, 21
In re Weight Watchers Int'l Inc. Sec. Litig.,
504 F. Supp. 3d 224 (S.D.N.Y. 2020)......................................................................................21
Wilson v. LSB Indus. Inc.,
2017 WL 7052046 (S.D.N.Y. 2017) ............................................................................17, 18, 22
Statutes
PSLRA, § 78u-4 et seq........................................................................................................... passim
Rules and Regulations
Federal Rules of Civil Procedure
Rule 9(b) ..............................................................................................................................9, 10
Rule 15 .....................................................................................................................................29
v
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 7 of 37
Lead Plaintiffs Local 705 International Brotherhood of Teamsters Pension Fund and New
England Teamsters Pension Fund (“Lead Plaintiffs”) respectfully submit this memorandum of law
in opposition to Defendants’ 1 Motion to Dismiss 2 the Amended Complaint (the “Complaint,” ECF
No. 52).
I. INTRODUCTION
Despite Defendants’ attempts to recast what this case is about, it is fundamentally a
straightforward and clear case of securities fraud. Lockheed’s most senior executives assured
investors, quarter after quarter, that they actively monitored Lockheed’s important fixed-price
contracts and had the risk of losses “well-contained”—even though Defendants knew Lockheed
lacked adequate internal systems needed to determine whether that was true. Ultimately, investors
absorbed the losses when Lockheed was finally forced to disclose billions in losses from cost
overruns. This action seeks to recover those losses investors suffered due to Defendants’ fraud.
As alleged in the Complaint, Defendants actively concealed from investors that: (i)
Lockheed did not have adequate cost analysis and risk management procedures in place to manage
costs in critical programs; and (ii) as a result, three of Lockheed’s most important programs—the
MFC Program, the Aeronautics Program, and the F-35 Program—were over cost and would result
in losses that would materially harm Lockheed’s profitability. Investors knew none of this. Instead,
Defendants repeatedly made materially false statements touting Lockheed’s ability to manage
1
Defendants are Lockheed Martin Corporation, (“Lockheed” or the “Company”), James Taiclet
(“Taiclet”), and Jesus Malave (“Malave,” and collectively with Lockheed and Taiclet,
“Defendants”).
2
“Motion” refers to the Memorandum of Law in Support of Defendants’ Motion to Dismiss the
Amended Complaint (ECF No. 55). Citations to “Ex.” refer to the exhibits attached to the
Declaration of Kristina A. Bunting (ECF No. 56). Citations to “¶” or “¶¶” refer to paragraphs in
the Complaint. Unless otherwise noted, all emphasis has been added and internal quotation marks
omitted.
1
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 8 of 37
costs and downplaying the risks of cost overruns when, in reality, the three programs were all
suffering substantial undisclosed losses.
For example, on January 23, 2024, Defendant Malave downplayed cost overrun risks by
claiming “we’re [] keeping a tight lid on . . . costs” and that Lockheed was “not aware of any
other contracts that . . . would cause any material issues.” ¶¶156, 160. This was false.
Unbeknownst to investors, Lockheed lacked adequate cost analysis and risk management
processes—deficiencies that Defendants later conceded (only after billions in losses came to light).
¶¶153-55, 157-59, 161-62. But instead of revealing those known deficiencies and warning
investors that the MFC and Aeronautics Programs were already experiencing cost overruns that
made substantial losses inevitable, Defendants repeatedly touted their “pricing discipline” and
risk-adjusted bidding practices (¶¶150-51), thereby falsely reassuring investors about the
Company’s cost and risk management procedures while concealing the immediate threat of losses
from the MFC and Aeronautics Programs.
The MFC Program was of particular concern to investors at the start of the Class Period.
At that point, the program had just switched from a cost-reimbursable contract (meaning Lockheed
would get reimbursed for excess costs) to a fixed-price contract—meaning there was a greater risk
of cost overruns that Lockheed would be forced to absorb. Despite this new phase of the contract,
Defendants downplayed the cost risks to investors. During the Class Period, Defendants publicly
stated Lockheed would record a $325 million loss in 2024 and assured investors the remaining
losses from the contract, if any, would be spread out in 2025 and beyond under “a one-per-year
type of framework.” See, e.g., ¶¶167-68. Then, on December 3, 2024, Defendant Malave told
investors the MFC losses would actually be lower moving forward and described the MFC
Program as a “tailwind.” ¶172. However, Defendants had no reasonable basis to make those
2
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 9 of 37
statements, as they were fully aware they had inadequate control over costs and risks in that
program and that they were about to record a staggering $1.3 billion loss on the program. Just a
few weeks later, investors were shocked when Lockheed abruptly disclosed that it had to record a
$1.3 billion loss in 2024—nearly a billion dollars more than Defendants stated just weeks earlier.
See, e.g., ¶¶128, 199.
Similarly, Defendants misled investors about their ability to control costs and mitigate risks
in the Aeronautics Program. Specifically, after abruptly recording massive losses in October 2024
and January 2025, which took investors by surprise because Defendants knowingly concealed such
risks (see, e.g., ¶¶128, 200), Defendants tried to calm investor concern by falsely stating they had
“significantly reduced the risk of future charges” to the Aeronautics Program and falsely
reassuring investors they had the cost overrun issue “well-contained.” ¶¶179, 183. Those were
lies. Just a few months later on July 22, 2025, after the CFO abruptly resigned, Lockheed disclosed
another $1 billion loss in the Aeronautics Program and finally admitted that Lockheed needed to
implement sweeping remedial measures to its cost analysis and risk management procedures—
conceding that the supposed cost control measures that Defendants touted during the Class Period
were actually known to be inadequate. ¶¶138-42.
At the same time, Defendants misled investors about the F-35 Program. Defendants knew
that a mandatory software upgrade for the F-35, known as the TR-3 upgrade, was plagued by
implementation and cost failures that caused aircraft delivery delays of more than 200 days, drove
total F-35 Program costs up by nearly $43 billion in a single year, and strained the Company’s
relationship with the U.S. government to the point that negotiations over the next production
contract—valued at $24.3 billion—had stalled. ¶¶109-11, 235. Despite these known problems,
Defendant Malave falsely told investors on July 23, 2024 that Lockheed “expect[ed]” the new F-
3
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 10 of 37
35 contract “to be awarded this year, maintaining program funding, and continuity,” ¶163,
conveying a misleadingly positive picture of a program that was mired in excess costs and contract
uncertainty. Id. On October 22, 2024, Lockheed was forced to disclose that the next contract would
not be awarded in 2024—contrary to Defendants’ previous statements—and the Company could
not recognize revenue or profit on approximately $400 million in incurred costs—revelations that
contributed to a 6% single-day stock decline. ¶¶115-16.
Defendants’ Motion to Dismiss does not meaningfully address any of these allegations.
Instead, their Motion creates a counter-factual narrative to support their arguments. For example,
Defendants argue the alleged misstatements are not actionably false or misleading because
Lockheed generally warned investors of the risks of losses. See Motion at 1, 17. This misses the
point. Investors understood that Lockheed develops technologies on fixed-price contracts and
therefore might suffer losses when projected costs exceed the contract value. However, investors
did not know—because Defendants never warned them—that Lockheed did not have adequate
cost analysis and risk management procedures in place at all, which led to ballooning costs and a
failure to fulfill contractual obligations that caused higher than expected losses. Moreover,
although Defendants made generic statements that the MFC and Aeronautics Programs might
suffer losses, such generic warnings were not specific enough to counteract Defendants’ false
statements to the contrary which affirmatively dispelled the possibility of such risks in real time.
Indeed, central to Defendants’ entire argument is their contention that investors were aware
of the risks. But if Defendants had adequately disclosed the risks, as they now argue, why were
investors completely blindsided by the Company’s disclosures of losses? The answer is simple:
because Defendants’ repeated false statements reassured investors that Lockheed had costs under
control. For example, after disclosing the nearly $2 billion in losses on January 28, 2025—which
4
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 11 of 37
caused a 10% single-day stock price decline, see ¶126-29—Defendants falsely reassured investors
that they had the cost issues “well contained” and that they had “de-risked” the Aeronautics
Program. ¶¶177, 183. However, just a few weeks later, on July 22, 2025, Lockheed was forced to
take another $1 billion loss from the Aeronautics Program, forcing Defendants to finally admit
they needed new reforms to Lockheed’s deficient cost and risk procedures, and causing
Lockheed’s stock price to drop another 10% in a single day. ¶¶138, 148. In response, one analyst
from Wolfe Research asked, “why should investors feel at all comfortable that you’ve de-risked
the problem programs” now? ¶145. Another analyst from Bank of America asked, “why did it take
$1 billion charges to change the way you’re reviewing this thing?” Id. Such analyst reports plainly
belie Defendants’ argument that investors knew of the risks.
Defendants also present several other falsity arguments that fail. For example, Defendants
argue their false statements about the Aeronautics Program are forward-looking statements
protected by the PSLRA safe harbor. Motion at 15. However, the safe harbor does not apply to
Defendants’ statements—such as Malave’s false statement that Lockheed has already “de-risked”
the program and had cost risks already “well-contained,” ¶¶179, 183—because they omitted
material facts and discussed actions that had already ostensibly occurred. Defendants also argue
that some of their statements are inactionable puffery. For example, Defendants claim Malave’s
“de-risked” statement is puffery, essentially arguing investors did not care whether Lockheed had
reduced the risk of future charges in the program. This is absurd, given the importance of the
programs, and belied by both investors’ pointed questions about the risk of losses and the furious
reaction from analysts after the truth was revealed, who questioned why the market should trust
that Lockheed had “de-risked the problem programs.” ¶145. Defendants’ framing of Lockheed’s
5
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 12 of 37
statements as opinions similarly fails; their statements are largely factual, and even if opinions,
they remain actionable because they lacked a reasonable basis.
Defendants’ challenges to scienter also fail. For example, Defendants argue the Complaint
does not adequately allege scienter because the statements from former Lockheed employees
(identified as FEs) are “untethered to the alleged fraud.” Motion at 2-3. Not so. The FEs paint a
consistent picture of a company that lacked the controls necessary to price, monitor, and manage
its most important fixed-price contracts. For example, FE-1, a Senior Project Manager on the MFC
Program, stated that cost overruns were known for many months before Defendants disclosed any
losses. ¶106. Similarly, FE-1 said there were already discussions about lowering costs in the MFC
Program in 2019, and FE-3 explained there was uncertainty regarding the MFC Program’s
financial viability as early as 2020. ¶¶107-08. These FE allegations—paired with other allegations,
such as Defendant Malave’s statement that they “closely” monitored the programs (¶160)—
support a strong inference of scienter.
The Court should deny Defendants’ Motion in its entirety.
II. FACTUAL BACKGROUND
A. Company Background
Lockheed is a defense contractor that generates most of its revenue from long-term
contracts with the U.S. Department of Defense and allied governments. ¶¶72, 74. Many of these
contracts, including the MFC and Aeronautics Programs, are fixed-price arrangements under
which the contractor (Lockheed) bears the risk of cost overruns that directly reduce profitability.
¶76. As a result, investors closely scrutinized Lockheed’s ability to manage costs in the MFC and
Aeronautics Programs as a critical factor in assessing the Company’s profitability. ¶¶10, 78, 83.
6
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 13 of 37
B. Defendants Falsely Stated They Managed the Risk of Cost Overruns For
Their Fixed Cost Programs
Lockheed’s ability to manage costs and limit the risks of cost overruns is vital to Lockheed
and its investors. However, FEs recounted that Lockheed lacked sufficient procedures to assess,
manage, and mitigate cost issues. These issues were known as early as 2019, ¶¶101, 108, and it
became clear by the start of the Class Period that Lockheed was unable to track or mitigate losses
from these programs. ¶101.
Despite knowing that Lockheed’s inability to manage risks and costs was creating an
overhang on Lockheed’s profitability, Defendants repeatedly assured investors that risks were well
contained and that robust cost-management procedures were in place. ¶¶12, 94-96, 150. For
example, on January 23, 2024, Defendant Malave touted the Company’s “pricing discipline” and
claimed that Lockheed’s “pricing accounts for [] risk,” including cost risks associated with fixed-
price contracts. ¶150. When analysts specifically pressed Defendants about the MFC Program’s
impact on margins, Defendant Malave downplayed the risks, stating the Company was “keeping
a tight lid on overhead and indirect costs.” ¶156. These statements, however, were false: the
Company lacked the procedures necessary to manage rising costs, and FEs confirmed that the
deficiencies with Lockheed’s procedures had been known internally since well before the Class
Period. ¶¶99, 101, 106-07, 153, 157.
C. Defendants Misled Investors About the MFC Program
The MFC Program originally operated as a cost-reimbursement contract, but in or around
2024, it switched to a fixed-price contract. ¶87. On April 23, 2024, Defendants disclosed a $100
million reach-forward loss on the MFC Program—the first such disclosure—and guided investors
that total 2024 MFC losses would be approximately $325 million. ¶¶22, 105.
7
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 14 of 37
Starting in Fall 2024, Defendants repeatedly told investors that the losses on the MFC
Program would not exceed $325 million. On October 22, 2024, Defendant Malave falsely
reiterated that full-year MFC losses would be limited to approximately $325 million. ¶¶34, 120-
21, 167-68. On December 3, 2024—weeks before year-end—Malave described the MFC Program
as a “tailwind,” assuring investors that losses were diminishing and the program was transitioning
to profitability. ¶¶35, 122, 172.
D. Defendants Misled Investors About the Aeronautics Program
Another significant program was Lockheed’s Aeronautics Program, another fixed-price
contract. After Lockheed announced massive unexpected charges for the MFC and Aeronautics
Programs in January 2025, Defendant Taiclet doubled down, claiming these massive charges had
“derisk[ed]” Lockheed’s “financial profile[.]” ¶¶130, 177. Similarly, on February 13, 2025,
Defendant Malave stated that the remaining cost overrun problems were “well-contained.” ¶¶132,
183. These statements calmed investor concerns. But unfortunately for investors, they were false:
Lockheed did not have the cost overrun problems contained, and would soon declare an additional
$1 billion loss in the Aeronautics Program. ¶¶49, 134, 180-82.
E. Defendants Misled Investors About the F-35 Program
Lockheed develops and manufactures F-35 aircrafts for the U.S. military. ¶89. The F-35
Program, which accounts for roughly a quarter of Lockheed’s revenue, involves contracts with the
U.S. government. ¶¶89-90. Throughout the Class Period, the F-35 Program experienced significant
difficulties implementing a mandatory technology upgrade known as TR-3, resulting in material
cost pressures and delivery delays. ¶¶26, 110-11. These failures delayed the award of the next
production contract (Lots 18-19). ¶¶26, 111. Yet on July 23, 2024, Defendant Malave told
investors that Lockheed “expect[ed] F-35 Lot 18 and 19 to be awarded this year, maintaining
program funding, and continuity”—a statement that was false and misleading when made. ¶¶112,
8
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 15 of 37
163. On October 22, 2024, Lockheed disclosed that Lots 18-19 contract negotiations were
indefinitely stalled due to excess costs, preventing the Company from recognizing approximately
$400 million in revenue. ¶¶30, 32, 115-19, 191, 194.
F. Lockheed Shocked Investors by Disclosing Losses in the MFC and
Aeronautics Programs
Shortly after telling investors MFC Program losses would be $325 million, Defendants
disclosed on January 28, 2025, that actual yearly MFC Program losses were $1.3 billion, and that
the Aeronautics Program had also suffered an additional $410 million in losses. ¶¶39, 126, 197-
98. Analysts were completely blindsided by this disclosure. Morgan Stanley noted the losses “took
investors by surprise,” and Deutsche Bank reported that the Aeronautics charge had not been
“previewed.” ¶¶41-42, 128, 199-200. As a result, Lockheed’s stock price fell over 9% in a single
day. ¶¶43, 129, 201.
G. Lockheed Shocked Investors Again by Disclosing Another $1 Billion Loss
On July 22, 2025, Lockheed disclosed an additional $950 million loss on the Aeronautics
Program and admitted that a “comprehensive review” had revealed the need for “significant
updates to the program’s schedule and cost estimates,” as well as enhancements “across the
portfolio”—an acknowledgment that the Company’s cost controls had been inadequate. ¶¶51-52,
138-40, 204-05, 212. Lockheed’s stock plummeted more than 10% in one day. ¶¶148, 209.
III. LEAD PLAINTIFFS HAVE ADEQUATELY STATED A SECTION 10(B) CLAIM
On a motion to dismiss, a court must “accept all factual claims in the complaint as true and
draw all reasonable inferences in the plaintiff’s favor.” Emps.’ Ret. Sys. of Gov’t of the V.I. v.
Blanford, 794 F.3d 297, 307 (2d Cir. 2015). Securities fraud claims under §10(b) are subject to the
heightened pleading requirements of Rule 9(b) and the PSLRA, however, courts “must be careful
not to mistake heightened pleading standards for impossible ones.” In re Synchrony Fin. Sec. Litig.,
9
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 16 of 37
988 F.3d 157, 161 (2d Cir. 2021). An “alleged fraud need only be plausible based on the complaint;
it need not be more likely than other possibilities.” Lorely Fin. (Jersey) No. 3 Ltd. v. Wells Fargo
Sec., LLC, 797 F.3d 160, 174 (2d Cir. 2015) (emphasis in original).
To state a claim for securities fraud under §10(b) of the Exchange Act and SEC Rule 10b-
5(b), a plaintiff must allege: “(1) a material misrepresentation or omission by the defendant [i.e.,
falsity]; (2) scienter; (3) a connection between the misrepresentation or omission and the purchase
or sale of a security; (4) reliance upon the misrepresentation or omission; (5) economic loss; and
(6) loss causation.” Matrixx Initiatives, Inc. v. Siracusano, 563 U.S. 27, 37-38 (2011). Here, Lead
Plaintiffs have established both falsity and scienter—the only elements challenged by Defendants
in their Motion.
A. The Complaint Adequately Alleges Falsity
A complaint pleads falsity under Rule 9(b) and the PSLRA if the plaintiff “specif[ies] each
statement alleged to have been misleading” and “the reason or reasons why the statement is
misleading.” 15 U.S.C. § 78u-4(b)(1)(B). “The test for whether a statement is materially
misleading under Section 10(b) is not whether the statement is misleading in and of itself, but
whether the defendants’ representations, taken together and in context, would have misled a
reasonable investor.” In re Vivendi, S.A. Sec. Litig., 838 F.3d 223, 250 (2d Cir. 2016) (emphasis
in original).
1. Defendants Misled Investors About Lockheed’s Cost Analysis and
Risk Management Procedures
Lockheed’s value to investors is almost entirely dependent on its ability to generate a profit
on its contracts—and that ability is almost entirely dependent on Lockheed’s ability to manage
costs and risks from its contracts, especially fixed-price ones. Accordingly, investors repeatedly
asked Defendants about the risk of losses from fixed-price contracts in the MFC and Aeronautics
10
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 17 of 37
Programs. In responses to analyst questioning, Defendants repeatedly represented that Lockheed
was closely tracking, monitoring, and containing the cost risks in those programs (¶¶150, 156,
160). For example, during Lockheed’s Q4 2024 earnings call, Defendant Malave claimed, in
response to an analyst question about risks in the MFC Program, that Lockheed was “employing
a lot more pricing discipline” and was “keeping a tight lid on overhead and indirect costs.” Id.
Similarly, on February 14, 2024, when asked about the Aeronautics Program, Malave claimed that
Defendants “monitor that one pretty closely” and falsely assured investors that Lockheed was “not
aware of any other contracts that . . . would cause any material issues.” ¶160.
These statements were false. In truth, as multiple FEs (and Lockheed itself) confirmed,
Lockheed’s cost assessment and risk management procedures were inadequate throughout the
Class Period, and the programs were significantly over expected costs. For example, according to
FE-2, cost and performance issues were prevalent at Lockheed, explaining that contract proposals
were never accurate and many ended up being over cost and behind schedule. ¶81. Similarly, FE-
3 stated there were concerns about the MFC Program’s financial viability as early as 2020. ¶108.
FE-1 likewise explained there were already discussions as early as 2019 about trying to lower costs
in the MFC Program, and it was known that losses would occur in the MFC Program prior to the
April 2024 announcement. ¶¶101, 106.
Defendants argue their statements were not false because they never said “that
[Lockheed’s] controls were adequate” or that Lockheed was monitoring its programs successfully.
Motion at 10, 23. This argument defies logic. Defendants were responding to analysts’ questions
about cost risks specifically in the MFC and Aeronautics Programs. By touting Lockheed’s
purported “pricing discipline” in response to these specific questions, Defendants falsely assured
investors that Lockheed’s supposed cost and risk management procedures were working as
11
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 18 of 37
intended for these programs. But their processes were not able to control costs and risks, making
Lockheed’s statements to the contrary actionably false and misleading. See In re AppHarvest Sec.
Litig., 684 F. Supp. 3d 201, 264-65 (S.D.N.Y. 2023) (misleading to convey there were no problems
with operations when company’s operations were deficient).
Defendants also argue that Defendant Taiclet’s post-class period admission that
Lockheed’s cost processes needed improvement does not support an inference they were deficient
during the Class Period. Motion at 11, 23. But this ignores the context behind Taiclet’s
announcement. Specifically, Taiclet made that admission after more than two billion dollars in
cost overruns in the MFC and Aeronautics Programs, explaining those overruns led to a “review”
that resulted in “significant changes” to the Company’s processes. ¶212. Defendant Taiclet was
not just saying that Lockheed would improve in the future, he acknowledged that Lockheed failed
to monitor costs during the Class Period. Such admissions plainly support falsity. See, e.g.,
Freudenberg v. E*Trade Fin. Corp., 712 F. Supp. 2d 171, 183-84 (S.D.N.Y. 2010) (post-Class
Period admission used to establish falsity); Freedman v. Value Health, Inc., 958 F. Supp. 745, 748-
49 (D. Conn. 1997) (claiming a company conducted due diligence were false based on later
statement by CEO describing “shortcomings” in due diligence process).
Contrary to Defendants’ arguments (Motion at 23-24), these statements are not puffery
because they were made in response to specific analyst questions regarding a key point of investor
concern. See In re Signet Jewelers Ltd. Sec. Litig., 2018 WL 6167889, at *12 (S.D.N.Y. 2018) (not
puffery when statement made in response to questioning about area of investor concern); see also
Ind. Pub. Ret. Sys. v. SAIC, Inc., 818 F.3d 85, 98 (2d Cir. 2016) (puffery depends on context);
¶¶149, 156, 160. Similarly, Defendants claim that Malave’s statement that there was a “possibility
that a risk can surface” was forward looking and protected by the PSLRA safe harbor. Motion at
12
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 19 of 37
11-13. But the PSLRA safe harbor does not apply here: merely warning of “possible risks while
failing to disclose [the] critical facts” that Lockheed’s processes were inadequate takes these
statements outside the safe harbor. In re MF Glob. Holdings Ltd. Sec. Litig., 982 F. Supp. 2d 277,
318 (S.D.N.Y. 2013).
2. Defendants Misled Investors About Three of Lockheed’s Most
Important Programs
Throughout the Class Period, Defendants also misrepresented Lockheed’s ability to control
costs and the risk of losses from three important contracts: the MFC Program, the Aeronautics
Program, and the F-35 Program.
a. Defendants Misled Investors About the MFC Program
Throughout 2024, Defendants repeatedly represented to investors that Lockheed was
tracking the costs of the MFC Program (¶¶156, 160), and based on that review, the MFC Program
would lose only $325 million in 2024 (¶¶167-68) and the remaining potential losses would be
spread out in future years (¶172). In truth, however, Lockheed had no reasonable basis to make
these statements, as the Company could not manage Lockheed’s performance as the program
moved into its fixed-price portion.
(1) Defendants’ False and Misleading Statements
On October 22, 2024, Defendant Malave claimed that Lockheed would have to take a
charge of “about $225 million” in addition to the $100 million charge Lockheed took earlier in
2024—totaling a $325 million loss in 2024. ¶167. Malave further assured investors that any
remaining charges in the MFC Program would be recorded in future years, stating that “as far as
2025,” charges would be “between, say, $250 million to $300 million in losses” for that year under
a “one-per-year type of framework.” ¶168. Weeks later, on December 3, 2024—i.e., the end of
the fiscal year—Malave went a step further, telling investors they should expect Lockheed to “get
13
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 20 of 37
a benefit from lower losses from the MFC classified program,” which would give Lockheed “a
little bit [of a] tailwind” in 2025. ¶172.
Malave’s statements were misleading because they led investors to believe Lockheed had
reliably assessed the costs and potential risks of cost overruns from the MFC Program and
determined that: no additional charges would be taken in 2024; additional losses would be spread
out under a one-per-year framework; and investors should expect lower losses from the MFC
Program moving forward. However, due to Lockheed’s inadequate procedures, Defendants had no
basis to state additional costs would not be recognized in 2024 or claim the program would be a
tailwind. ¶¶101-03, 138-43. Thus, Defendants’ statements were actionably false and misleading.
See Schnall v. Annuity & Life Re (Holdings), Ltd., 2004 WL 367644, at *7 (D. Conn. 2004)
(statements about likelihood of write-offs false and misleading when defendant did not have
reasonable basis to make statement); see also In re Mindbody, Inc. Sec. Litig., 489 F. Supp. 3d
188, 208 (S.D.N.Y. 2020) (when discussing company’s value, “Defendants impliedly warranted
that” their statements were based on “an accurate reference point”).
As FEs explained, Lockheed lacked any basis to accurately measure the costs or the risks
embedded in its MFC Program, meaning Lockheed had no ability to accurately assess the
probability it would recognize cost overruns as the MFC Program shifted to a fixed-price contract.
See supra Section III(A)(1). Moreover, the sheer magnitude of the $1.3 billion charge Lockheed
announced mere weeks after the above statements further supports an inference of falsity. It defies
belief that a company as sophisticated as Lockheed suddenly discovered that it needed to take an
additional billion dollar charge mere weeks after reassuring investors that a charge would be
limited to $325 million and the program would present a “tailwind” for the Company. See In re
14
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 21 of 37
Vivendi Universal, S.A., 381 F. Supp. 2d 158, 177 (S.D.N.Y. 2003) (size of impairment supported
“reasonable inference” of falsity).
Particularly notable is Defendant Malave’s December 3, 2024 statement—made days
before the end of the year—claiming that the MFC Program would be a “tailwind” to Lockheed’s
profitability moving forward. In addition to the reasons discussed above, this statement was also
misleading because it conveyed to investors that the MFC Program would be accretive to
Lockheed’s profitability, although in reality, Lockheed was about to recognize the full losses.
Indeed, mere weeks later, the Company announced a $1.3 billion charge that Lockheed was forced
to take in 2024 alone. It was materially false and misleading for Malave to describe the MFC
Program as a “benefit” and “tailwind” to profitability, and fail to warn investors of the imminent
charge, when Lockheed was set to record the full $1.3 billion loss that same quarter.
Defendants argue that Malave’s statements that the MFC Program would be a tailwind
were not false or misleading because he was “referencing the context of 2025” and “[i]ncreased
losses in 2024 would indeed make ‘lower losses’ in future years more likely.” Motion at 20. This
argument—that Malave’s statement was literally true—misses the point. The securities laws are
measured not by “literal truth,” but whether statements would mislead an investor. Mindbody, 489
F. Supp. 3d at 208. Here, Malave’s statements did just that. Throughout the year, Defendants
conveyed to investors that losses in 2024 would be limited to $325 million and spread out under a
one-per-year framework. If it was literally true at the time of Malave’s statement that Lockheed’s
2025 losses would be lower because of “increased losses” in 2024, then Malave and Lockheed
should have told investors that and disclosed all those known increased losses in 2024 that would
lead to lower losses in 2025. But they did not, which misled investors and caused Lockheed’s stock
price to unexpectedly plummet when the truth was disclosed.
15
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 22 of 37
(2) Defendants’ Falsity Arguments Fail
Defendants argue their statements about the MFC Program were not false or misleading
because Lockheed disclosed that additional losses “could” be recognized in 2024. Motion at 18,
20. But this argument completely ignores why Lockheed’s statements misled investors: not
because Lockheed failed to disclose that a charge might occur, but because Lockheed’s cost and
risk management processes were deficient, causing a $1.3 billion loss in 2024. Because Defendants
had no reasonable basis to tell investors to expect only a $325 million loss or to express that the
MFC contract would be a tailwind, qualifying those statements with general warnings that
additional charges could be taken did nothing to warn investors of the actual risk they faced. As
the Second Circuit explained, a company cannot warn of “a business’s peculiar risk of fire,” while
omitting “the fact that the [sprinkler system] has been found to be inoperable, without misleading
investors.” Meyer v. Jinkosolar Holdings Co., Ltd., 761 F.3d 241, 251 (2d Cir. 2014). So too here.
Defendants cannot reasonably claim investors were warned by statements cautioning Lockheed
“could” recognize additional costs, while simultaneously omitting that Lockheed’s cost and risk
management processes were utterly deficient and led to the full $1.3 billion loss.
Moreover, Defendants’ generic warnings did not counteract their highly specific
statements that the $1.3 billion loss would be spread out over the entire lifespan of the contract
under a “one-per-year type of framework.” ¶168. Thus, Lockheed’s general warnings that it
“could” incur additional losses over the contract’s lifespan (see Motion at 18, Ex. 10 at 24-25) did
not sufficiently warn investors of the known risk of the $1.3 billion loss in 2024, which is exactly
why investors were blindsided by the $1.3 billion charge. See, e.g., ¶¶128-29. In any event,
Defendants’ argument—that their generic warnings counteracted their specific statements to the
contrary—is a factual dispute not appropriate for a motion to dismiss. See Gimpel v. Hain Celestial
16
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 23 of 37
Grp., Inc., 156 F.4th 121, 142 (2d Cir. 2025) (inappropriate at pleading stage to assess whether
generic warnings counterbalanced specific misrepresentations).
Defendants next turn to a blunderbuss of equally inapplicable falsity defenses in their
Motion. These too fail.
Not Protected by Safe Harbor: Defendants argue their statements in ¶¶167 and 172 are
forward-looking statements protected by the PSLRA safe harbor. Motion at 19, 20-21. Not so. The
safe harbor protects forward looking statements only if they are accompanied by meaningful
cautionary language or are made without actual knowledge of falsity, but the safe harbor does not
protect statements premised on present statements of fact or omissions. In re Salix Pharms., Ltd.,
2016 WL 1629341, at *9 (S.D.N.Y. 2016).
Fundamentally, the safe harbor does not apply to these statements because they involve
misstatements and omissions about Lockheed’s then-existing cost and risk management
processes. Defendants knew, and failed to disclose, that these systems were inadequate and could
not adequately measure the risk of cost overruns. These types of misstatements and omissions are
not covered by the safe harbor. See, e.g., Wilson v. LSB Indus. Inc., 2017 WL 7052046, at *3
(S.D.N.Y. 2017) (safe harbor inapplicable when defendants “fail[ed] to disclose that no detailed
engineering analysis had been performed to support their cost projections”).
Even if the statements were subject to the safe harbor—and they are not—the lack of
meaningful cautionary language dooms Defendants’ arguments. Cautionary language is not
“meaningful” if it is generic or warns of the wrong risk. See In re Vale S.A. Sec. Litig., 2020 WL
2610979, at *14 (E.D.N.Y. 2020) (warnings that dams could collapse did not warn investors of
relevant risks: potential risk management failures). For example, Defendants cite cautionary
language warning that Lockheed may recognize additional costs for the MFC Program. Motion at
17
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 24 of 37
18. But that language did not warn investors of the relevant risks, namely that Lockheed already
had deficient performance and cost procedures, and Lockheed’s cost and risk management
processes admittedly could not accurately measure losses. Jinkosolar, 761 F.3d at 251 (risk
disclosure that a fire may occur is not meaningful when the relevant risk is that the sprinkler system
may not work). Moreover, the statements Defendants argue are forward looking (including ¶¶177-
79, 183) were made with actual knowledge of their falsity, further foreclosing the safe harbor. See
infra Section III(B).
Not Inactionable Opinions: Despite Defendants’ arguments, the statements in ¶¶166-67
(concerning the MFC Program charges) are not inactionable opinions, as they contained embedded
statements of fact that were untrue—specifically, that Defendants had reasonably determined that
additional charges were not probable at the time. See SEC v. Medallion Fin. Corp., 2024 WL
4227753, at *7-8 (S.D.N.Y. 2024) (opinions actionable where embedded statements of fact
untrue). As was revealed, Defendants’ cost assessment processes were deficient at the time,
making their statements actionably false and misleading.
Similarly, opinions are actionably misleading if they “do not rest on the inquiry or
investigation that a reasonable investor would expect.” LSB, 2017 WL 7052046, at *1; see also
Hain, 156 F.4th at 140 n.13 (holding the same). In other words, opinions are actionable if they
omit that the speaker lacks a reasonable basis for the opinion. See Omnicare, Inc. v. Laborers Dist.
Council Const. Indus. Pension Fund, 575 U.S. 175, 188-89 (2015) (explaining that statement “we
believe our conduct is lawful” would be misleading if no “meaningful legal inquiry” into the
conduct). Like the example provided in Omnicare, Defendants lacked a reasonable basis for
statements concerning MFC Program losses given admitted failures of Lockheed’s risk and cost
management processes.
18
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 25 of 37
b. Defendants Misled Investors About the Aeronautics Program
Defendants further misled investors about the risk of losses from the Aeronautics Program.
After the Company announced a shocking $410 million charge on the Aeronautics Program on
January 28, 2025, Defendant Malave falsely reassured investors that the Aeronautics Program had
been “de-risked” and that Lockheed had “significantly reduced the risk of future charges,”
conveying to the market that Lockheed’s risk and cost management processes had effectively
mitigated the chances of future charges on the Aeronautics Program. ¶¶177-79. Similarly, two
weeks later, Malave claimed Lockheed had future losses in the Aeronautics Program “well
contained.” ¶183. Taken together, these statements conveyed to investors that Lockheed had
already taken steps to mitigate the risk of future charges.
But in reality, Lockheed was flying blind. As FEs recounted, Lockheed conducted “no due
diligence” on its contracts and regularly ran over cost and behind schedule. See supra at 12; MF,
982 F. Supp. 2d at 317 (statements that internal processes mitigated risk actionable when internal
weaknesses undermined statements). And notably, Defendants themselves admitted at the end of
the Class Period that the Company needed to “add[] rigor” to its controls and processes, including
increased oversight and more comprehensive review of actual program performance, directly
contradicting Malave’s statements that they had things under control. ¶¶139-41; see In re Dentsply
Sirona, Inc. Sec. Litig., 665 F. Supp. 3d 255, 283 (E.D.N.Y. 2023) (“[s]ubsequent events can lend
support to an inference that a statement was fraudulent when made”).
Defendants cry foul, claiming that Lead Plaintiffs are alleging “fraud by hindsight” without
alleging contemporaneous facts to show the charges should have been taken earlier. Motion at 10-
19
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 26 of 37
14. Again, this argument misses the mark. 3 Defendants’ statements were not misleading because
they should have taken a charge earlier. Instead, it was misleading for Defendants to tell investors
they had de-risked and contained cost overruns in the Aeronautics Program when they had not
done so (as they themselves admitted months later). Defendants cannot meaningfully argue they
did not mislead investors by claiming Lockheed had contained cost overruns when they later
admitted that Lockheed’s purported processes to do so were deficient and forced them to take
another $1 billion loss.
Moreover, the Complaint demonstrates through contemporaneous FE allegations that
Lockheed’s deficient processes were in place throughout the Class Period. See, e.g., ¶¶102, 106.
Further, like the MFC Program, the sheer magnitude of the later charges supports an inference of
falsity. Defendants took an additional billion-dollar charge on the Aeronautics Program at the
same time they admitted Lockheed’s risk and cost procedures were not up to par. The inevitable
conclusion is that contrary to Defendants’ statements, those same procedures had not actually “de-
risked” the Aeronautics Program at that time.
Defendants next pivot to an attack on both the FEs and Taiclet’s own admission at the end
of the Class Period, claiming neither evidence falsity. Motion at 11. These arguments fail. First,
Defendants claim that because the FEs worked in MFC, not Aeronautics, their statements are
irrelevant. Id. However, the FEs recounted problems that Defendants admitted were systemic. As
courts have explained, FE allegations of this type can “demonstrate the pervasive and systemic
nature of [Lockheed’s] problems . . . from which the falsity of Defendants’ statements . . . may be
inferred.” Mulligan v. Impax Lab'ys, Inc., 36 F. Supp. 3d 942, 963 (N.D. Cal. 2014). Second,
3
This case is unlike Diabat v. Credit Suisse Grp. AG, 2024 WL 4252502, at *12 (S.D.N.Y. 2024),
where plaintiffs alleged no particularized facts that the statements were false when made. Here,
both FEs’ statements and Defendants’ own admissions demonstrate contemporaneous falsity.
20
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 27 of 37
Defendants attack Taiclet’s admission that Lockheed’s risk and cost management processes
needed improvement, claiming it doesn’t support falsity. Motion at 11. Again, this ignores context.
See Vivendi, 838 F.3d at 250 (falsity is assessed in context). Taiclet’s admission was made in
connection with a massive cost overrun charge. The obvious inference is that when Taiclet
admitted “[c]hallenges and performance issues” led to requiring “significant changes to processes
and testing approach,” he was referencing Lockheed’s failure to control the costs and risks of the
Aeronautics Program. ¶212.
Not Protected by Safe Harbor: Defendants argue that the de-risking statements are also
protected by the PSLRA safe harbor. Motion at 15. They are wrong.
First, Defendants’ statements in ¶¶177 and 179, such as Malave’s statement claiming
Lockheed had “de-risked” the Aeronautics Program, are not forward looking. These statements
referred to actions that Lockheed had already ostensibly taken—so Lockheed could claim they
had already “significantly reduced the risk.” ¶179; In re Weight Watchers Int'l Inc. Sec. Litig.,
504 F. Supp. 3d 224, 254 (S.D.N.Y. 2020) (statements discussing past events not forward looking).
Second, even if forward looking, which they are not, these statements are not protected by the safe
harbor because they were made with contemporaneous knowledge of falsity and were not
accompanied by cautionary language of the relevant risk (that Lockheed’s cost and risk
management processes were deficient). See supra at 19-20.
Not Opinions: Defendants further claim that Defendants’ statements that they “de-risked”
the Aeronautics program (¶¶177-79) and were taking a more conservative approach on costs
(¶183) are opinion statements. These statements are not opinions: these are “determinate, verifiable
statements.” Stadium Cap. LLC v. Co-Diagnostics, Inc., 2024 WL 456745, at *3 (S.D.N.Y. 2024).
Moreover, like the MFC Program statements, Defendants’ claims that they had successfully “de-
21
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 28 of 37
risk[ed]” and “contain[ed]” losses in Lockheed’s Aeronautics Program did “not rest on the inquiry
or investigation that a reasonable investor would expect.” LSB, 2017 WL 7052046, at *1. So even
if an opinion, these statements are actionable. Id.
Not Puffery: Finally, Defendants argue that their statements that they had “de-risked”
(¶¶177-79) and “contained” costs (¶183) were puffery, essentially arguing investors did not care
whether Lockheed had mitigated the risk of future cost overruns. That argument is absurd and
belied by even a cursory exam of both the statements and the surrounding context. Statements
cannot be dismissed as puffery “unless they are so obviously unimportant to a reasonable investor
that reasonable minds could not differ on the question of their importance.” ECA & Loc. 134 IBEW
Joint Pension Tr. of Chi. v. JP Morgan Chase Co., 553 F.3d 187, 197 (2d Cir. 2009). These
statements concerned Lockheed’s ability to mitigate risk for its primary sources of revenue.
Obviously, this was important to investors, as demonstrated by analysts’ dismayed reaction when
they discovered Lockheed had not “de-risked the problem programs.” ¶145.
c. Defendants Misled Investors About the F-35 Program
Like the MFC and Aeronautics Programs, the F-35 Program was also over cost and caused
significant, undisclosed problems at the Company. Specifically, Lockheed had failed to
successfully manage ballooning costs, implement the TR-3 software upgrade, and deliver previous
lots on time. This stalled negotiations with the U.S. government, delaying Lockheed’s ability to
recognize revenue from its F-35 contracts.
Despite these challenges, Defendants touted the program and misled investors about its
status. For example, on July 23, 2024, Defendant Taiclet claimed that Lockheed “continue[s] to
produce at a rate of 156 aircraft per year, and expect[s] to deliver 75 to 100 aircraft in the second
half of 2024.” ¶163. Defendant Malave added that Lockheed “expect[s] F-35 Lot 18 and 19 to be
awarded this year, maintaining program funding, and continuity.” Id. These statements were
22
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 29 of 37
false because they omitted the material facts that Lockheed’s failure to implement TR-3, deliver
previous lots on time, and manage the ballooning costs of the program had stalled negotiations
with the government. 4 Without those facts, the market was forced to rely on Defendants’
misleading characterization of the F-35 Program. See In re iDreamSky Tech. Ltd. Sec. Litig., 236
F. Supp. 3d 824, 831-34 (S.D.N.Y. 2017) (omission of known delays made statements false and
misleading).
In response, Defendants again shoot at a target of their own making. They claim that
because Lockheed ultimately delivered aircraft at the promised rate and that Lockheed’s struggles
with TR-3 were publicly reported, the aforementioned statements cannot be false. Motion at 21-
22. But that is not what the Complaint alleges was misleading about the F-35 statements. These
statements were misleading because they communicated that there were no issues with the F-35
contracts, while omitting that operational and cost issues, as well as Lockheed’s inability to
integrate TR-3, delayed negotiations with the U.S. government. ¶116.
Defendants also claim these statements were protected by the PSLRA safe harbor. But that
argument ignores that these misstatements are premised on omissions, which the safe harbor does
not protect. Salix, 2016 WL 1629341, at *9. And even if these statements were subject to the safe
harbor, the cautionary language was not meaningful: the risk disclosures warned of events that
may transpire, without disclosing “the risk has [already] transpired.” Rombach v. Chang, 355 F.3d
164, 173 (2d Cir. 2004). By the time Defendants made the misstatements, their failure to develop
the TR-3 upgrade, manage costs, and successfully negotiate with the U.S. government had already
occurred. The safe harbor does not protect these misstatements.
4
Defendants claim that Lockheed’s failure to implement TR-3 was unrelated to the stalled
negotiations of Lots 18 and 19. Motion at 21-22. These attempts to dispute the factual allegations
of the Complaint are inappropriate at the motion to dismiss stage and should be disregarded.
23
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 30 of 37
B. The Complaint Adequately Alleges Scienter
A plaintiff may plead scienter either “(a) by alleging facts to show that defendants had both
motive and opportunity to commit fraud, or (b) by alleging facts that constitute strong
circumstantial evidence of conscious misbehavior or recklessness.” Novak v. Kasaks, 216 F.3d
300, 307 (2d Cir. 2000). Strong circumstantial evidence of scienter includes situations where
Defendants “had access to information suggesting that their public statements were not accurate;
or [] failed to check information they had a duty to monitor.” Blanford, 794 F.3d at 306. “The
inquiry is whether all of the facts alleged, taken collectively, give rise to a strong inference of
scienter[.]” Tellabs, Inc. v. Makor Issues & Rts., Ltd., 551 U.S. 308, 310 (2007). Here, a holistic
review of the allegations establishes scienter.
1. Former Employee (FE) Accounts Support an Inference of Scienter
The FE accounts, which demonstrate the issues with cost overruns and risk management
were systemic and pervasive, strongly support an inference of scienter. See In re Alstom SA Sec.
Litig., 406 F. Supp. 2d 433, 504 (S.D.N.Y. 2005) (finding scienter for non-disclosure of cost
overruns when multiple CWs testified about systemic cost overruns). For example, FE-1 stated
that the MFC Program was already over cost well before the Class Period, causing the Company
to have internal discussions as early as 2019 about redesigns to help lower costs. ¶¶101, 242.
However, those remediation efforts were not implemented in time, and as a result, it was known
internally many months before the Class Period that the MFC Program would suffer losses. ¶¶242-
43.
Defendants argue that the FE allegations should be ignored because all three FEs worked
in MFC and thus cannot speak to the Aeronautics division. This narrow view of the allegations
ignores that the FEs allege a systemic course of conduct throughout Lockheed. For example, FE-
2 explained that, in general, contracts were taken in order to boost bonuses but ended up being
24
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 31 of 37
over cost and behind schedule. ¶81. According to FE-2, certain contracts were negotiated
improperly and there was no due diligence done to ensure Lockheed could complete a contract.
¶102. Indeed, the FE allegations further establish Defendants knew of these losses and discussed
them internally. FE-2, for example, recalled that loss-making contracts were presented to
management, who would discuss how they wanted to “manipulate or massage the numbers” and
“sweep things under the rug.” ¶¶81-82. Similarly, FE-1 explained there were regular meetings
concerning the status of the MFC Program. ¶245.
Finally, Defendants try to dismiss the FEs because they did not directly recount interactions
with Taiclet or Malave. This is wrong, as “[t]he notion that the CWs cannot be believed because
none had direct contact with any individual Defendant is contrary to law.” In re Avon Sec. Litig.,
2019 WL 6115349, at *21 (S.D.N.Y. 2019).
2. Defendants’ Admissions Support an Inference of Scienter
Defendants’ admissions that Lockheed needed to “improve the performance and oversight
of th[e] program[s]” are also indicative of scienter. ¶¶212-13. These admissions—combined with
the magnitude of the charges over prior months and the FE accounts of cost oversight deficiencies
before the Class Period—strongly support an inference of scienter. See Value Health, Inc., 958 F.
Supp. at 757 (CEO’s admission of “shortcomings” in due diligence process created a “strong
inference” of scienter). Defendants argue that adding additional controls does not support an
inference of scienter. Motion at 26. However, the thrust of the disclosure was not just that
Defendants were adding additional controls to its processes, but that the processes themselves had
been deficient. See ¶¶211-13.
3. Defendants’ Own Statements Demonstrate Knowledge
Throughout the Class Period, Defendants repeatedly told investors they closely monitored
the MFC and Aeronautics Programs and discussed the risks that Lockheed faced from those fixed-
25
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 32 of 37
price contracts. See ¶¶221-24, 227-32. Defendants also repeatedly discussed the F-35 Program.
See ¶¶225-26. These statements support an inference of scienter, as courts routinely find scienter
when a defendant regularly discusses a topic in detail. In re Estee Lauder Co., Inc. Sec. Litig., 2025
WL 965686, at *9 (S.D.N.Y. 2025) (finding scienter for statements on areas Defendants discussed
in detail).
For the MFC and Aeronautics Programs, Defendants repeatedly stated that they were
closely monitoring the programs and were aware of the fixed-price risks from them. For example,
with regard to the MFC Program, Defendant Malave stated that Defendants were keeping a “tight
lid on . . . costs.” ¶156. Similarly, regarding the Aeronautics Program, Malave told investors that
he and other Lockheed executives “monitor that one pretty closely.” ¶160. And later when
discussing the $410 million loss in the Aeronautics Program taken in the fourth quarter 2024,
Malave told investors that “earlier in the year,” meaning early in 2024 (the start of the Class
Period), “we had realized th[e] risk . . . causing us to perform a more comprehensive review of
current performance versus our key assumptions included in the estimate[.]” ¶179. These
statements establish scienter.
Defendants argue that pointing to these statements, some of which are alleged as false, to
support scienter is a circular argument, as falsity and scienter are different elements. Motion at 27.
That is another red herring. From these statements, it is clear that if there were deficiencies with
Lockheed’s cost analysis and risk management processes (which there were), Defendants were
aware of those. Thus, their statements claiming they closely monitored the programs and fixed-
price cost risks support an inference of scienter.
Defendants next suggest that the Complaint fails to allege the “particularized facts” that
Defendants’ monitoring of the programs revealed. Id. But that is wrong; the Complaint plainly
26
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 33 of 37
alleges that the specificity of Defendants’ statements (as well as FE testimony and Taiclet’s
ultimate admission that Lockheed’s procedures needed improvement) supports an inference that
Defendants knew that Lockheed’s cost and risk management procedures were deficient. 5 San
Antonio Fire & Police Pension Fund v. Dentsply Sirona Inc., 732 F. Supp. 3d 300, 319 (S.D.N.Y.
2024) (Defendants’ statements they were monitoring supply chain supported inference of scienter
for supply-chain statements). 6
4. Motive and Opportunity
Defendants Taiclet and Malave’s incentive compensation packages provide further indicia
of scienter. Defendants argue that an incentive compensation package cannot support scienter, but
the Second Circuit has recently clarified that incentive-based compensation supports scienter if a
complaint alleges a “direct link between the compensation package and the fraudulent statements.”
Hain, 156 F.4th at 145. Here, Defendant Taiclet and Malave’s compensation were largely based
on equity compensation, which depended on Lockheed maintaining its stock price, cash flow, and
capital efficiency. ¶¶248-51. This was corroborated by FE-2, who explained that contracts were
thrown together quickly to “help the financial numbers” and were taken to inflate numbers and
boost bonuses. ¶252.
Defendants also suggest that Malave and Taiclet’s increased stock holdings and the
Company’s stock buybacks rebuts any inference of scienter. But Malave’s and Taiclet’s
compensation was stock-based; the increased holdings had nothing to do with their belief in the
5
Defendants also incorrectly claim that Lead Plaintiffs must identify specific reports that
contradict Defendants’ statements. See In re Virtu Fin., Inc. Sec. Litig., 770 F. Supp. 3d 482, 522
(E.D.N.Y. 2025) (collecting cases).
6
This case is unlike In re Block, Inc. Sec. Litig., 2025 WL 2607890, at *16 (S.D.N.Y. 2025), where
the plaintiffs simultaneously and contradictorily alleged a company had inadequate data breach
detection systems and that these systems should have detected a data breach sooner. Lead
Plaintiffs’ contention is different: because Defendants spoke about how closely they monitored
risks and costs processes, they must have been aware of the alleged deficiencies.
27
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 34 of 37
stock price. And the stock buybacks are irrelevant, considering Lockheed repurchased
substantially less stock in 2024 than in prior years—presumably knowing the stock price would
decline once the Company disclosed the losses. See Ex. 11 at 44 (Lockheed repurchased $6 billion
of stock in 2023 and $3.7 billion in 2024).
5. Malave’s Departure
Defendants argue that Malave’s suspiciously timed departure cuts against an inference of
scienter because Malave left to “pursu[e] other opportunities” at a different company. Motion at
26-27. Defendants’ self-serving explanation ignores the context of Malave’s departure and its
connection to the allegations. Malave resigned on April 17, 2025—nine weeks after assuring
investors losses were “well-contained” and that he had a “good beat and handle on that cost over
the next number of years.” ¶¶46, 135–36, 183. But he did not, and three months later, Lockheed
was forced to disclose another $950 million in losses and admitted its processes needed sweeping
overhauls—reforms the new CFO implemented. ¶¶137–41. The timing of the resignation,
combined with the charges taken in the surrounding time period, strongly supports an inference of
scienter. In re Pareteum Sec. Litig., 2021 WL 3540779, at *17 (S.D.N.Y. 2021) (executive
departure within weeks of restatement supported “strong inference of scienter.”)
6. Core Operations Doctrine
Finally, the core operations doctrine adds to a compelling inference of scienter. All three
programs were vital to Lockheed. The F-35 Program was Lockheed’s “largest program,”
accounting for more than a quarter of Lockheed’s revenue. ¶234; Avon, 2019 WL 6115349, at *20
(finding scienter for statements concerning company’s largest market, which was 21% of revenue).
And Malave described the MFC and Aeronautics Programs as “growth engine[s]” during the Class
Period. ¶237.
28
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 35 of 37
7. The More Compelling Inference is Fraudulent
Defendants argue they did their best to warn investors of the risks. Motion at 28-29.
However, this argument is not more compelling than the Complaint’s allegations of scienter.
Indeed, Defendants ignore the allegations establishing that the Company’s cost and risk
management procedures were deficient before the Class Period (which they later admitted), and
that despite this, Defendants made affirmative misrepresentations to investors that misled them
and directly caused their losses.
C. The Complaint Adequately Alleges Control Person Claims
The Complaint also states control-person claims under Section 20(a) against Defendants
Malave and Taiclet. While Defendants suggest that a complaint must allege “culpable
participation,” courts in this circuit have rejected that argument. In re Parmalat Sec. Litig., 375 F.
Supp. 2d 278, 310 (S.D.N.Y. 2005). Even if required, the strong inference of scienter here provides
that element.
IV. CONCLUSION
For the foregoing reasons, Defendants’ Motion should be denied in full. If the Court
dismisses any or all of the Complaint, Lead Plaintiffs respectfully request leave to amend pursuant
to Rule 15 of the Federal Rules of Civil Procedure as this is the first complaint considered.
DATED: April 27, 2026 Respectfully submitted,
/s/ Michael P. Canty
LABATON KELLER SUCHAROW LLP
Michael P. Canty
James T. Christie
Nicholas D. Manningham
140 Broadway
New York, New York 10005
Telephone: (212) 907-0700
Facsimile: (212) 818-0477
[email protected]
29
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 36 of 37
[email protected]
[email protected]
Counsel for Lead Plaintiffs
30
Case 1:25-cv-06197-MMG Document 57 Filed 04/27/26 Page 37 of 37
LOCAL RULE 7.1(C) CERTIFICATION
I, James T. Christie, hereby certify that this memorandum of law complies with the word-
count limitations set forth in Rule 7.1(c) of the Local Rules of the United States District Court for
the Southern District of New York and contains 8,747 words, exclusive of the caption, table of
contents, table of authorities, signature blocks, and this certificate.
DATED: April 27, 2026
New York, New York
/s/ James T. Christie