Minimum electrical power capacity at acquired properties
Company: WhiteFiber - Project: NC-2 and NC-3
The claim, verbatim
Each of the two properties is expected to be served with a minimum of 30 megawatts of gross electrical power, for a combined minimum of 60 megawatts
Source (primary)
WhiteFiber 8-K filed 2026-08-17 (SEC EDGAR, sec_filing)
View cached copy (2026-08-30)Live source ↗
Quote: “Each of the two properties covered in the Purchase Agreement is expected to be served with a minimum of 30 megawatts of gross electrical power supply, for a combined minimum of 60 megawatts across the properties”
How we checked this
Checked on September 2, 2026. The cited source supports every part of this claim.
The filing states the two-property structure and both the per-property and combined minimum power figures, noting these are subject to confirmation as a closing condition.
Confirmed in the source:
- The Purchase Agreement covers two properties
- Each property is expected to be served with a minimum of 30 megawatts of gross electrical power supply
- The combined expected minimum across the two properties is 60 megawatts
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/2042022/000121390026090492/ea0302334-8k_whitefiber.htm) in full (9,102 characters, retrieved August 30, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WhiteFiber 8-K filed 2026-08-17
Quote: “Each of the two properties covered in the Purchase Agreement is expected to be served with a minimum of 30 megawatts of gross electrical power supply, for a combined minimum of 60 megawatts across the properties”