Minimum electrical power capacity at acquired properties
Company: WhiteFiber - Project: NC-2 and NC-3
The claim, verbatim
Each of the two properties is expected to be served with a minimum of 30 megawatts of gross electrical power, for a combined minimum of 60 megawatts
Source (primary)
WhiteFiber 8-K filed 2026-08-17 (SEC EDGAR, sec_filing)
View cached copy (2026-08-30)Live source ↗
Quote: “Each of the two properties covered in the Purchase Agreement is expected to be served with a minimum of 30 megawatts of gross electrical power supply, for a combined minimum of 60 megawatts across the properties”
How we checked this
Checked on September 13, 2026. The cited source supports every part of this claim.
WhiteFiber's August 16, 2026 8-K states that each of the two properties is expected to receive at least 30 megawatts of gross electrical power, for a combined minimum of 60 megawatts. The filing also says this must be confirmed as a condition to closing.
Confirmed in the source:
- The purchase agreement covers two properties
- Each of the two properties is expected to be served with a minimum of 30 megawatts of gross electrical power supply
- The combined expected minimum across the two properties is 60 megawatts
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/2042022/000121390026090492/ea0302334-8k_whitefiber.htm) in full (9,102 characters, retrieved August 30, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WhiteFiber 8-K filed 2026-08-17
Quote: “Each of the two properties covered in the Purchase Agreement is expected to be served with a minimum of 30 megawatts of gross electrical power supply, for a combined minimum of 60 megawatts across the properties”