Blönduós Campus facility in Iceland has 6 MW (gross) total capacity and WhiteFiber has executed contracts for 5.5 MW IT load with 100% renewable energy primarily from Blanda Hydro PowerStation

Source (primary)

WhiteFiber 10-K filed 2026-03-26 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗

Quote: “The facility has a 45 kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center's energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation”

How we checked this

Checked on September 15, 2026. The cited source supports every part of this claim.

The filing gives the Blönduós facility's 6 MW gross capacity and 5.5 MW of contracted IT load, and says its power is 100% renewable, mainly from Blanda Hydro PowerStation.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm) in full (600,249 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms WhiteFiber 10-K filed 2026-03-26

Quote: “The facility has a 45 kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center's energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation”

View cached copy (2026-08-31)Live source ↗