Iceland facility capacity and customer contracts
Company: WhiteFiber - Project: Blonduos Campus
The claim, verbatim
Blönduós Campus facility in Iceland has 6 MW (gross) total capacity and WhiteFiber has executed contracts for 5.5 MW IT load with 100% renewable energy primarily from Blanda Hydro PowerStation
Source (primary)
WhiteFiber 10-K filed 2026-03-26 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The facility has a 45 kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center's energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms WhiteFiber 10-K filed 2026-03-26
Quote: “The facility has a 45 kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center's energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation”
