Two additional HPC buildings in design phase adding 300 MW at Ellendale
Company: Applied Digital - Project: Polaris Forge 1
The claim, verbatim
The company is in the design phase for two additional buildings at Ellendale that will provide 300 MW of additional capacity, increasing total Ellendale capacity to 400 MW.
Source (primary)
Earnings Release (IR page (ir.applieddigital.com), earnings_call)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “Furthermore, we are in the design phase for two additional buildings at this location, which will increase the total capacity to 400 MW. Beyond this, we plan to bring an additional 300 MW online through two additional buildings, which are in the design stage, ultimately increasing Ellendale's total HPC capacity to 400 MW.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Earnings Release
Quote: “Furthermore, we are in the design phase for two additional buildings at this location, which will increase the total capacity to 400 MW. Beyond this, we plan to bring an additional 300 MW online through two additional buildings, which are in the design stage, ultimately increasing Ellendale's total HPC capacity to 400 MW.”