Polaris Forge 3 critical IT load and utility power capacity
Company: Applied Digital - Project: Polaris Forge 3
The claim, verbatim
Polaris Forge 3 delivers 300 MW of critical IT load supported by approximately 430 MW of grid-connected utility power
Source (primary)
APLD Stock Rallies After Hours On Massive New $7.5 Billion Hyperscaler Lease: Retail Think Firm Should Be Worth More Than Rival IREN - Stocktwits (-, news_article)
View cached copy (2026-08-31)Live source ↗
Quote: “delivers 300 MW of critical IT load supported by approximately 430 MW of grid-connected utility power”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms APLD Stock Rallies After Hours On Massive New $7.5 Billion Hyperscaler Lease: Retail Think Firm Should Be Worth More Than Rival IREN - Stocktwits
Quote: “delivers 300 MW of critical IT load supported by approximately 430 MW of grid-connected utility power”