Polaris Forge 3 critical IT load and utility power capacity
Company: Applied Digital - Project: Polaris Forge 3
The claim, verbatim
Polaris Forge 3 delivers 300 MW of critical IT load supported by approximately 430 MW of grid-connected utility power
Source (primary)
APLD Stock Rallies After Hours On Massive New $7.5 Billion Hyperscaler Lease: Retail Think Firm Should Be Worth More Than Rival IREN - Stocktwits (-, news_article)
View cached copy (2026-08-31)Live source ↗
Quote: “delivers 300 MW of critical IT load supported by approximately 430 MW of grid-connected utility power”
How we checked this
Additional evidence
confirms APLD Stock Rallies After Hours On Massive New $7.5 Billion Hyperscaler Lease: Retail Think Firm Should Be Worth More Than Rival IREN - Stocktwits
Quote: “delivers 300 MW of critical IT load supported by approximately 430 MW of grid-connected utility power”
Record of changes
August 31, 2026 — statedlater found incorrect
Automated extraction from the cited source. Recorded automatically from the cited source when it was published, then queued for evidence review.
September 1, 2026 — withdrawnlater found incorrect
Evidence review against the cited source. The source confirms Polaris Forge 3 exists but contains no mention of the specific power capacity specifications (300 MW critical IT load or 430 MW grid-connected utility power).
September 2, 2026 — stated
Correction after re-verification. Re-verification found the cited source does support this claim. The earlier withdrawal was made in error and has been reversed. The source states exactly these capacity figures for Polaris Forge 3, but the attributed quote alters "delivering" to "delivers," so it is a near-verbatim paraphrase rather than a strict match.