Polaris Forge 1 ELN-02 Operations
Company: Applied Digital - Project: Polaris Forge 1
The claim, verbatim
Polaris Forge 1 first HPC data center (ELN-02) recently commenced operations with 100 MW capacity
Source (primary)
Applied Digital S-3 filed 2025-12-05 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “We recently commenced operations at our first HPC data center at our Polaris Forge 1 campus in Ellendale, ND ("Polaris Forge 1") with 100MW of capacity ("ELN-02").”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
Every element — the ELN-02 designation, the 100 MW figure, the Polaris Forge 1 location, and the recent start of operations — appears in the document.
Confirmed in the source:
- Applied Digital's first HPC data center, ELN-02, is at the Polaris Forge 1 campus in Ellendale, North Dakota
- ELN-02 has 100 MW of capacity
- Operations at ELN-02 recently commenced
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000149315225026369/forms-3.htm) in full (89,712 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital S-3 filed 2025-12-05
Quote: “We recently commenced operations at our first HPC data center at our Polaris Forge 1 campus in Ellendale, ND ("Polaris Forge 1") with 100MW of capacity ("ELN-02").”