Polaris Forge 1 is a 100 MW hyperscaler data center leased from Applied Digital's Ellendale, North Dakota datacenter campus
Source (primary)
Applied Digital 8-K filed 2025-10-09 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “the Subsidiary Issuer (or an Affiliate thereof) entering into the Company's previously disclosed lease with a hyperscaler for the first 100 MW data center located at the Company's 400 MW Ellendale, North Dakota datacenter campus ("Polaris Forge 1")”
How we checked this
Checked on September 16, 2026. The cited source supports part of this claim, but not all of it.
The document supports a 100 MW first data center leased to a hyperscaler at the 400 MW Ellendale campus, but it treats Polaris Forge 1 as a multi-phase project rather than a single 100 MW facility.
Confirmed in the source:
- A lease with a hyperscaler covers the first 100 MW data center at Applied Digital's Ellendale, North Dakota campus
- The Ellendale campus has 400 MW of capacity
- Entering into that hyperscaler lease was a condition to the Macquarie Initial Closing
We could not confirm this from the cited source:
- That Polaris Forge 1 as a whole is a 100 MW facility — the filing refers to 'additional phases of the Polaris Forge 1' and to 'the Polaris Forge 1 data centers' (plural), indicating it extends beyond the first 100 MW building
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000149315225017609/form8-k.htm) in full (22,804 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 8-K filed 2025-10-09
Quote: “the Subsidiary Issuer (or an Affiliate thereof) entering into the Company's previously disclosed lease with a hyperscaler for the first 100 MW data center located at the Company's 400 MW Ellendale, North Dakota datacenter campus ("Polaris Forge 1")”