Pecos, TX (Cottonwood) 300 MW expansion
Company: Core Scientific - Project: Cottonwood
The claim, verbatim
Core Scientific plans a 300 MW expansion at its Pecos, TX (Cottonwood) site, currently 50 MW, over 2025-2027.
Source (primary)
core-scientific 8-K exhibit (finalcorzfy2023earningsp.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-09)Live source ↗
Quote: “300 MW expansion planned for 2025-2027”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
The infrastructure slide lists Pecos, TX (Cottonwood) at 50 MW with a footnote marker pointing to "300 MW expansion planned for 2025-2027." Both the current capacity and the planned expansion are established.
Confirmed in the source:
- Core Scientific's Pecos, TX (Cottonwood) site is listed at 50 MW as of the March 12, 2024 presentation
- A 300 MW expansion at the Pecos, TX (Cottonwood) site is planned for 2025-2027, per the footnote attached to the Pecos entry
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1839341/000162828024010544/finalcorzfy2023earningsp.htm) in full (18,367 characters, retrieved November 9, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms core-scientific 8-K exhibit (finalcorzfy2023earningsp.htm)
Quote: “300 MW expansion planned for 2025-2027”