North Dakota ELN02 AI data center Building 1 design capacity

Company: Applied Digital - Project: Polaris Forge 1

Subject kind
facility capacity
Statement date
2024-04-07
Promised amount
100.0 MW
Current status
stated

The claim, verbatim

Building 1 of the North Dakota ELN02 AI data center is designed as a three-story 428,000 GSF building with two 50MW data halls, for 100MW of critical IT capacity, peak rack load of 120kW/rack, and peak PUE of 1.3 (annual average 1.2).

Source (primary)

applied-digital 8-K exhibit (apldraisesummit040324fin.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗

Quote: “2 Data Halls – 50MW IT Load Each • Peak rack load of 120kW/rack • Peak PUE of 1.3, annual average of 1.2 ... Critical IT Capacity - 100MW Applied Digital’s North Dakota ELN02 AI Data Center”

How we checked this

Checked on November 10, 2026. The cited source supports every part of this claim.

Applied Digital's April 2024 presentation slide on its North Dakota ELN02 AI data center rendering lists every figure in the claim for Building 1. It gives three stories, 428,000 GSF, two 50MW data halls, 100MW critical IT capacity, a 120kW/rack peak and a peak PUE of 1.3 with a 1.2 annual average.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1144879/000114487924000066/apldraisesummit040324fin.htm) in full (11,985 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms applied-digital 8-K exhibit (apldraisesummit040324fin.htm)

Quote: “2 Data Halls – 50MW IT Load Each • Peak rack load of 120kW/rack • Peak PUE of 1.3, annual average of 1.2 ... Critical IT Capacity - 100MW Applied Digital’s North Dakota ELN02 AI Data Center”

View cached copy (2026-11-08)Live source ↗