Riot to assume Rhodium's 125 MW at Rockdale
Company: Riot
The claim, verbatim
After Rhodium vacates within three business days of closing, Riot will immediately assume Rhodium's 125 MW of power capacity and the operating assets at Rockdale, which allocates the entire Rockdale power load to self-use.
Source (primary)
riot 8-K exhibit (riot-20250321xex99d1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-18)Live source ↗
Quote: “Riot will immediately assume Rhodium's 125 MW of power capacity and the existing operating assets at the Rockdale Facility, resulting in the entire Rockdale Facility power load being allocated to self-use”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms riot 8-K exhibit (riot-20250321xex99d1.htm)
Quote: “Riot will immediately assume Rhodium's 125 MW of power capacity and the existing operating assets at the Rockdale Facility, resulting in the entire Rockdale Facility power load being allocated to self-use”
