Pecos site additional 300 MW studied load
Company: Core Scientific - Project: Cottonwood
The claim, verbatim
ERCOT classified another 300 MW at Pecos as studied load.
Source (primary)
KBW keeps Core Scientific at outperform, says AMD’s 1.9 GW reservation is overlooked - Yahoo Finance (-, news_article)
View cached copy (2026-10-16)Live source ↗
Quote: “with another 300 MW at Pecos as studied load”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms KBW keeps Core Scientific at outperform, says AMD’s 1.9 GW reservation is overlooked - Yahoo Finance
Quote: “with another 300 MW at Pecos as studied load”