Future colocation sites: Pecos, Calvert City, Grand Forks, Auburn
Company: Core Scientific - Project: Auburn
The claim, verbatim
Future colocation sites include Pecos, TX (~200 MW), Calvert City, KY (~100 MW), and Grand Forks, ND (~70 MW) billable power; Auburn, AL (~30 MW) is available for colocation.
Source (primary)
Investor Conference Call Presentation (IR page (investors.corescientific.com), ir_presentation)
View cached copy (2026-10-16)Live source ↗Archive.org ↗
Quote: “Grand Forks, North Dakota Total Billable Power ~70MW Calvert City, Kentucky Total Billable Power ~100MW Site Status Future Colocation Site ... Pecos, Texas Total Billable Power ~200MW Site Status Future Colocation Site ... Auburn, Alabama Total Billable Power Site Status ~30MW Available for Colocation”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The site map lists each of these sites with the stated billable power and status.
Confirmed in the source:
- Pecos, Texas is a future colocation site with ~200 MW of billable power
- Calvert City, Kentucky is a future colocation site with ~100 MW of billable power
- Grand Forks, North Dakota is a future colocation site with ~70 MW of billable power
- Auburn, Alabama has ~30 MW of billable power available for colocation
What we did: Read our cached copy of IR page (investors.corescientific.com) (https://d1io3yog0oux5.cloudfront.net/_b76ddaa46c59e7a64138659274ff5f32/corescientific/db/1066/11263/pdf/Core+Scientific+Investor+Update+Presentation+FINAL.pdf) in full (11,378 characters, retrieved October 16, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Conference Call Presentation
Quote: “Grand Forks, North Dakota Total Billable Power ~70MW Calvert City, Kentucky Total Billable Power ~100MW Site Status Future Colocation Site ... Pecos, Texas Total Billable Power ~200MW Site Status Future Colocation Site ... Auburn, Alabama Total Billable Power Site Status ~30MW Available for Colocation”
