Ellendale scalable to 1GW
Company: Applied Digital - Project: Polaris Forge 1
The claim, verbatim
The Ellendale campus is designed to scale up to 1 gigawatt over time.
Source (primary)
applied-digital 8-K exhibit (ex99-2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-13)Live source ↗
Quote: “designed to scale up to 1 gigawatt over time”
How we checked this
Checked on October 15, 2026. The cited source supports every part of this claim.
The release says the Ellendale campus was planned to be designed to scale up to 1 gigawatt over time.
Confirmed in the source:
- The Ellendale campus is designed to scale up to 1 gigawatt over time
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/ex99-2.htm) in full (7,957 characters, retrieved October 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms applied-digital 8-K exhibit (ex99-2.htm)
Quote: “designed to scale up to 1 gigawatt over time”