PF1 Building 3, PF2, PF3, DF1, DF2 under construction
Company: Applied Digital - Project: Delta Forge 2
The claim, verbatim
The third 150 MW HPC building at Polaris Forge 1, along with Polaris Forge 2, Polaris Forge 3, Delta Forge 1 and Delta Forge 2, are in various stages of construction.
Source (primary)
applied-digital 8-K exhibit (apldq127earningsrelease.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-08)Live source ↗
Quote: “The third HPC building at Polaris Forge 1 (150 MW), along with Polaris Forge 2, Polaris Forge 3, Delta Forge 1, and Delta Forge 2, are in various stages of construction”
How we checked this
Checked on October 13, 2026. The cited source supports every part of this claim.
The release states that these projects are in various stages of construction and gives the 150 MW size for the third building.
Confirmed in the source:
- The third HPC building at Polaris Forge 1 is 150 MW
- The third Polaris Forge 1 building is in some stage of construction
- Polaris Forge 2, Polaris Forge 3, Delta Forge 1 and Delta Forge 2 are in various stages of construction
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1144879/000114487926000057/apldq127earningsrelease.htm) in full (40,083 characters, retrieved October 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms applied-digital 8-K exhibit (apldq127earningsrelease.htm)
Quote: “The third HPC building at Polaris Forge 1 (150 MW), along with Polaris Forge 2, Polaris Forge 3, Delta Forge 1, and Delta Forge 2, are in various stages of construction”