Cerebras contract at MTL-3
Company: WhiteFiber - Project: MTL-3
The claim, verbatim
MTL-3's 6.6 gross MW capacity is 100% contracted to Cerebras Systems for 5 MW of IT load with a 5-year average term.
Source (primary)
whitefiber 8-K exhibit (ea025484401ex99-1_white.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-05)Live source ↗
Quote: “MTL-3 6.6 Gross MW Capacity: 100% contracted Customer: Cerebras Systems IT Load: 5 MW Average Term: 5 years”
How we checked this
Checked on October 7, 2026. The cited source supports every part of this claim.
The portfolio slide states all of these MTL-3 details.
Confirmed in the source:
- MTL-3 has 6.6 gross MW of capacity
- MTL-3 capacity is 100% contracted
- The MTL-3 customer is Cerebras Systems
- MTL-3 IT load is 5 MW
- The MTL-3 average term is 5 years
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/2042022/000121390025081421/ea025484401ex99-1_white.htm) in full (24,103 characters, retrieved October 5, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms whitefiber 8-K exhibit (ea025484401ex99-1_white.htm)
Quote: “MTL-3 6.6 Gross MW Capacity: 100% contracted Customer: Cerebras Systems IT Load: 5 MW Average Term: 5 years”