Hyperscaler lease at Delta Forge 2
Company: Applied Digital - Project: Delta Forge 2
The claim, verbatim
Signed one 15-year lease with a U.S.-based high investment-grade hyperscaler, with three 5-year options, for 1 building at Delta Forge 2 totaling 210 MW of IT load.
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-10-03)Live source ↗Archive.org ↗
Quote: “U.S. Based High Investment Grade Hyperscaler – Signed one 15-year lease with three 5-year options for 1 building at Delta Forge 2, utilizing 210 MW of IT load”
How we checked this
Checked on October 5, 2026. The cited source supports every part of this claim.
The timeline and Delta Forge 2 slides state every element of this claim.
Confirmed in the source:
- Applied Digital signed one 15-year lease with a U.S.-based high investment-grade hyperscaler for Delta Forge 2
- The Delta Forge 2 lease carries three 5-year options
- The lease covers 1 building at Delta Forge 2
- The Delta Forge 2 lease totals 210 MW of IT load
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/_assets/_dc3803b9c1b927b47c1b631f6696dc2c/appliedblockchaininc/db/2905/27269/pdf/APLD_INV_June2026_Updated-compressed.pdf) in full (47,679 characters, retrieved October 3, 2026) and checked each assertion in the claim against it.