Hyperscaler leases at Polaris Forge 2
Company: Applied Digital - Project: Polaris Forge 2
The claim, verbatim
Signed two 15-year leases with a U.S.-based investment-grade hyperscaler, with two 5-year options, for 2 buildings at Polaris Forge 2 (Harwood, ND) totaling 200 MW of critical IT load.
Source (primary)
Investor Presentation (IR page (ir.applieddigital.com), ir_presentation)
View cached copy (2026-10-03)Live source ↗Archive.org ↗
Quote: “U.S. Based Investment-Grade Hyperscaler - Signed two 15-year leases with two 5- year options for 2 buildings at Polaris Forge 2, utilizing 200 MW of Critical IT load”
How we checked this
Checked on October 5, 2026. The cited source supports every part of this claim.
The timeline and Polaris Forge 2 slides state every element, including the Harwood ND location and the two 5-year options.
Confirmed in the source:
- Applied Digital signed two 15-year leases with a U.S.-based investment-grade hyperscaler for Polaris Forge 2
- The Polaris Forge 2 leases carry two 5-year options
- The leases cover 2 buildings at Polaris Forge 2
- Polaris Forge 2 is in Harwood, ND
- The Polaris Forge 2 leases total 200 MW of critical IT load
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/_assets/_dc3803b9c1b927b47c1b631f6696dc2c/appliedblockchaininc/db/2905/27269/pdf/APLD_INV_June2026_Updated-compressed.pdf) in full (47,679 characters, retrieved October 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Presentation
Quote: “U.S. Based Investment-Grade Hyperscaler - Signed two 15-year leases with two 5- year options for 2 buildings at Polaris Forge 2, utilizing 200 MW of Critical IT load”